Uploaded by Shuang Zhang

AU-893987

22/09/2020
The Solar River Project
JOIN NOW
PRICING
WHY ICN?
SEARCH
LOGIN 
CONTACT



The Solar River Project
 Locations:
SA Australia
 Project Value:
$480 million
 Project Status:
Pre-Construction
 Project Owner
THE SOLAR RIVER PROJECT PTY LTD
Project Details
The project includes a 200MW PV array with an integration of 300MWh battery system. This project
brings the most advanced solar PV power generation and storage technology to South Australia. The
project will deliver energy security, carbon reduction and hundreds of local jobs. The 200 Mega Watt
Ground Mounted Array will be connected to Australian National Grid via a 275,000-volt
transmission line.
Contact Details
The project is expected to generate (150) jobs in the development phase, (400) regional jobs in the
18-month construction phase and (25) regional jobs for the 25 year plus 25-year life of the facility
supporting field operations and maintenance activities.
 Jeff Camburn, ICN SA
The development includes the establishment of two community funds with the traditional owners the
Ngadjuri people and the Regional Goyder Council for sports, education and the Arts. A conservation
park for endangered species research and protection is also planned. This is an opportunity for job
creation in regional communities whilst participating in the step change to a cleaner world
eliminating millions of tonnes of pollutants emitted through conventional coal and gas fired
electricity generation.
 CONTACT EMAIL
Project Location
 +61 8 8303 2054
 Merril Kirk
 +61 8 8303 2383
 CONTACT EMAIL
The location of the project is 110km north of Adelaide, South Australia near Robertstown, out of
hundreds in outback South Australia. The site is located in a high solar region on large allotments of
pastoral land well suited to board acre PV installation and operation.
Status and Schedule
The project has secured Section 49 crown development approval and has secured a 15 year PPA with
Alinta Energy. Construction of the Solar River Project is anticipated to take 18 months, with
construction starting in 2019. The project is finalising the construction (EPC) contractor. Once
assigned, supplier contracts will be with the EPC directly.
The Solar River project encourages local industry interested in supplying to the project to register an
expression of interest (EOI) through the ICN Gateway.
SHOW LESS
https://gateway.icn.org.au/project/4169/the-solar-river-project?st=projects&psid=1573518768
1/2
22/09/2020
The Solar River Project
Work Packages
To edit or submit an expression of interest, select the  icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.
OPEN LISTINGS
AWARDED
STANDARD LISTINGS
STATUS

CLOSED LISTINGS
OTHER
OPEN
INCOMPLETE COMPLETE
▲ CONTRACT
▲ CONTRACT
The Solar River Project - Any Opportunities
ICN
OPENS
FULL PARTIAL
FULL PARTIAL
SCOPE
SCOPE
SCOPE SCOPE
CLOSES CLOSES DOCS EOI
EOI
27 Jul 2018
30 Jun 2020
30 Jun 2020
HELP
icn.org.au
ICN Gateway Home
Regional Gateway
Premium Subscribers
Project links
Common searches
NICS
Covid-19
COMPANY
Login
Create profile
ICN Gateway packages
Equifax Score
Newsletter
User guide
Helpdesk
Info for suppliers
Info for buyers
Contact us
LEGAL
CONNECT
Privacy
Terms of use

Bush Fire Relief
© ICN Gateway. All Rights Reserved.
https://gateway.icn.org.au/project/4169/the-solar-river-project?st=projects&psid=1573518768
2/2