22/09/2020 The Solar River Project JOIN NOW PRICING WHY ICN? SEARCH LOGIN CONTACT The Solar River Project Locations: SA Australia Project Value: $480 million Project Status: Pre-Construction Project Owner THE SOLAR RIVER PROJECT PTY LTD Project Details The project includes a 200MW PV array with an integration of 300MWh battery system. This project brings the most advanced solar PV power generation and storage technology to South Australia. The project will deliver energy security, carbon reduction and hundreds of local jobs. The 200 Mega Watt Ground Mounted Array will be connected to Australian National Grid via a 275,000-volt transmission line. Contact Details The project is expected to generate (150) jobs in the development phase, (400) regional jobs in the 18-month construction phase and (25) regional jobs for the 25 year plus 25-year life of the facility supporting field operations and maintenance activities. Jeff Camburn, ICN SA The development includes the establishment of two community funds with the traditional owners the Ngadjuri people and the Regional Goyder Council for sports, education and the Arts. A conservation park for endangered species research and protection is also planned. This is an opportunity for job creation in regional communities whilst participating in the step change to a cleaner world eliminating millions of tonnes of pollutants emitted through conventional coal and gas fired electricity generation. CONTACT EMAIL Project Location +61 8 8303 2054 Merril Kirk +61 8 8303 2383 CONTACT EMAIL The location of the project is 110km north of Adelaide, South Australia near Robertstown, out of hundreds in outback South Australia. The site is located in a high solar region on large allotments of pastoral land well suited to board acre PV installation and operation. Status and Schedule The project has secured Section 49 crown development approval and has secured a 15 year PPA with Alinta Energy. Construction of the Solar River Project is anticipated to take 18 months, with construction starting in 2019. The project is finalising the construction (EPC) contractor. Once assigned, supplier contracts will be with the EPC directly. The Solar River project encourages local industry interested in supplying to the project to register an expression of interest (EOI) through the ICN Gateway. SHOW LESS https://gateway.icn.org.au/project/4169/the-solar-river-project?st=projects&psid=1573518768 1/2 22/09/2020 The Solar River Project Work Packages To edit or submit an expression of interest, select the icon next to the package you are interested in. Note: The closing date/s for expressions of interest shown below are subject to change. OPEN LISTINGS AWARDED STANDARD LISTINGS STATUS CLOSED LISTINGS OTHER OPEN INCOMPLETE COMPLETE ▲ CONTRACT ▲ CONTRACT The Solar River Project - Any Opportunities ICN OPENS FULL PARTIAL FULL PARTIAL SCOPE SCOPE SCOPE SCOPE CLOSES CLOSES DOCS EOI EOI 27 Jul 2018 30 Jun 2020 30 Jun 2020 HELP icn.org.au ICN Gateway Home Regional Gateway Premium Subscribers Project links Common searches NICS Covid-19 COMPANY Login Create profile ICN Gateway packages Equifax Score Newsletter User guide Helpdesk Info for suppliers Info for buyers Contact us LEGAL CONNECT Privacy Terms of use Bush Fire Relief © ICN Gateway. All Rights Reserved. https://gateway.icn.org.au/project/4169/the-solar-river-project?st=projects&psid=1573518768 2/2