Agile Methodology
Home / Agile / Agile Methodology
We are living in a fast-paced world where Maggi cooks in 2 minutes, and pizza delivery happens at

Agile
secret recipe on Agile Methodology, which will give you all the ingredients, you need to get started

What is Agile?

Agile Manifesto – 4 Values and 12
all on the platter!
Principles
Let’s get started.



SUBSCRIBE TO NEWSLETTER
your doorstep within 30 minutes. So, why not make our learning fast-paced! Here, I bring you my
Why Agile Methodology?
What is Scrum?
Scrum Values
Enter your email address:
on Agile. Additionally, we will trace it right from its origins to the most advanced topics. We got it
Subscribe
In this article, we are going to cover:-
What is Agile Methodology?
History of Agile
Agile Manifesto
Principles of Agile Methodology

Scrum Team
Agile Terminologies

Scrum Product Owner

Scrum Development Team
Advantages of Agile Methodology
Agile Frameworks
Scrum
Lean


Kanban Software Development
Scrum Master
Extreme Programming (XP)
Scrum Events

Dynamic Systems Development Method (DSDM)
Sprint Planning

Daily Scrum Meeting

Sprint Review
Sprint Retrospective

Scrum Artifacts

Artifact Transparency

Definition of Done
Selenium Certification | Selenium Course
Feature Driven Development (FDD)
What is Sprint?


ToolsQA Selenium Online Training |
Crystal
Comparative Analysis of Different Agile Methodologies
What is Agile Methodology?
According to the dictionary, it is an adjective that means to move quickly & easily. Its application
is no different from when organizations use it.
Agile methodology is a set of values and principles that ought to be followed to become Agile.
It is an approach to software development where team interaction, customer collaboration, and
responding to change are the key themes. In addition to that, Agile methodology provides us with

Agile Methodogies Guides


Scrum Guide
a framework where continuous improvements happen at different stages of the software
development life cycle.
Let’s trace back the roots from where it popped up.
Kanban Guide
RECENT POST

Extreme Programming

Lean Development
History of Agile Methodology
Write Effective XPaths

DSDM Guide
The legacy of Agile methodology sprung from the buzz word “continuous delivery,” which was
Handle Radio Button in Selenium
only a dream in traditional models of software development like Waterfall, V- shape model, etc.
WebDriver
In the early 1990s, as computers began to enter in the organizations, software development faced
XPath in Selenium
a crisis named – “the application development crisis,“ or “application delivery lag.“ Which, in
Keyboard Events in Selenium Actions
turn, meant that the time between a validated business need and an actual application in
Class

Crystal Methodology

Agile Methodology

Feature Driven Development (FDD)
Inspect Element In Chrome
production was on an average of about three years. And it was HUGE. By the time project coding
Capturing ScreenShot in Selenium
& implementation happened, following things surfaced:
Run Selenium tests on Edge
The requirements of the customer changed OR
Manual Testing
The value of the product diminished. Therefore, the entire process proved too costly.
First Selenium Test Case
The waterfall model could not cope up with the changing market needs and often led to costly
Configure Selenium WebDriver with
failures for big sized projects.
Eclipse
Hence, the frustration of thought leaders and the dire need for something that was timelier and
more responsive gave birth to a methodology based on Values & Principles – called – Agile
Run Selenium tests on Chrome
Methodology.
Top 10 API Testing Tools
Handle CheckBox in Selenium
WebDriver
iFrames in Selenium WebDriver
TestProject Agent in Docker Container
As depicted in the picture above, the Waterfall model gives a lack of confidence in the team
because it tends to pile. Which, in turn, leads to low morale among the team members. Therefore,
the entire project appears to fall apart due to constant changes in the intrinsic and extrinsic forces.
Whereas in Agile Methodology, the entire project is finished in mini-projects so the team has
better control over the deliverables and the team morale remains high. It, in turn, leads to high ROI.
Let’s look at the Agile Manifesto.
Agile Manifesto
In 2001, a small group of software gurus, tired of the traditional approach, got together and wrote
a manifesto which became a guiding principle for Agile Software development.
The Agile Manifesto’s core statement says: – “We are uncovering better ways of developing
software by doing it and helping others do it. Through this work, we have come to value:
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
In other words, it means that, while there is value in items on the right, we value the items
on the left more.”
Let’s translate the above core statement in a diagram that’s easier to relate to: –
Comparison between Agile methodology & the traditional way of doing a project shows us that
Agile methodology is an iterative method of doing a project which involves customer collaboration.
In addition to this, it is highly flexible to change.
Whereas, the traditional way of doing a project involved following a predefined plan that was not
adaptable to changes. Therefore, it leads to deteriorated business value to the client.
Principles of Agile Methodology
Following are the 12 main principles in Agile methodology: –
1. Customer satisfaction through early and continuous delivery of useful software – It
means letting the customer know the progress by the distribution of values to the customers.
Which, in turn, is achieved by fulfilling the highest priority requirements first.
2. Welcome changing requirements, even late in development – This implies flexible
adaptation to the changing needs of the customer. In addition to this, providing them a
competitive advantage to external changes.
3. Frequently Delivered Software (weeks rather than months) – This provides immediate
value to the customer by delivering working features timely.
4. Work together – i.e., Close and daily cooperation between Business people and Developers by
keeping documentation and requirements lightweight.
5. Trust and Support – Projects are successful around motivated individuals who should be
trusted.
6. Face to Face conversation – Oral communication is preferred to rule out any discrepancies and
be on the same page.
7. Working Software – It is the primary measure of progress and should be delivered timely.
8. Sustainable development – Agile methodology maintains the work-life balance among the
team members and promotes happiness by avoiding exhaustion.
9. Continuous Attention- Means consistent attention to technical excellence and good design
enhances the agility of any team.
10. Simplicity – It is the art of maximizing the amount of work not done—is essential. It uses the
Pareto principle or the 80/20 rule that says that typically 80% of your results may come from
only 20% of your efforts.
11. Self-organizing teams – The scrum team has autonomy and responsibility to meet the goals
of the sprint.
12. Reflect & Adjust – At regular intervals team reflects on how to become more productive and
then adjusts accordingly. The retrospective meetings ensure the implementation of the lessons
learned during the project into the next iteration.
Agile Terminologies
Unlike the waterfall model, in Agile methodology, both development & testing activities go hand
in hand.
Below are the Agile terminologies that are used to refer to the customer requirements, steps, and
solution offered to the client: –
The above picture depicts the Strategy & Execution Model in an Agile project. Here-
Each level represents a strategic goal that has to finish in different periods.
Story Level Items (part of Strategy) include Tasks & Stories;
In addition to the above, Portfolio Items (part of Execution) includes Features,
Initiative/Epic & Theme.
A task may take hours or days to finish;
Whereas a feature may require weeks to get completed.
Moreover, the upside-down triangle on the right depicts this timeframe.
The main characters in a general Agile methodology are as below. A thorough understanding of
these terminologies & definitions is necessary before proceeding further.
Product backlog: a list of requirements provided by the customer in the form of Epic,
Features, Stories, etc. generally captured in an excel sheet format.
Epic: Large level requirements/ needs of the business.
Features: Divisions of Epic, precisely defines the needs of the customer.
Stories: It refers to the detailed definition of each requirement/ Feature.
Tasks: Defines the solution of each Story. They are the actions taken on “Story.”
To explain Epic, Story & Tasks further, let’s exemplify them in the below way, whereby:-
Consider that a customer wants to build an online shopping platform where users can buy clothes
for all ages. The online shopping platform will develop in 2 Releases – The Core functionalities will
go in Release 1, and Release 2 will feature the rest of the backlog items.
Epic is a big story that will help the end-user to resolve a business problem. e.g., As a registered
user, I should be able to buy clothes using various payment options. If you carefully look, you will
see that this talks about “registration,” “payment options,” and “buying.” Epics can span across
Releases, so in current, e.g., we can have Credit Card payment in release 1, while PayPal or bank
transfer can be in release 2.
Features define the characteristics of the product. A Feature needs to fit in a single release,
though it can span across multiple Sprints. e.g., for the above Epic, the Features can be defined as
“User Registration,” “Payment Via Credit Cards.” “Payment Via PayPal,” etc.
Stories are smaller pieces of functionality, and they directly map to an epic. The story needs to fit
in a single sprint. e.g., for User registration Feature, we can have the following stories:
Story 1: As a new customer, I should be able to Register on the website using my First Name,
Last Name, Email ID, and Password
2nd Story: As a new customer, I should be able to register to the site using my social
credentials (Facebook, Google, and Twitter)
Story 3: As a new customer, I should be aware of any errors that need to be corrected while
filling up the registration form
Tasks: Tasks define the actual work that needs to be done to complete a story. Usually, to
complete a story, we may need the help of multiple members of a Scrum Team. Therefore, a Story
is divided into tasks, and the assignment of each task to one member happens. Once all these
tasks finish, we can mark the story as “Done” or “Completed.”
Story: As a new customer, I should be able to Register on the website using my First Name, Last
Name, Email ID, and Password.
Development Tasks: – Some of the typical development tasks can be:
Task 1: Create a UI Form that can accept First Name, Last Name, Email Id and Password fields
Task 2: Create a Backend DB table, that can store customer information
3rd Task: Password Encryption
Task 4: User Registration API
QA Tasks: – Some of the typical QA tasks can be:
Task 6: Create test cases for the story
Task 7: Create Automation Scripts for the story
8th Task: Execute functional test cases
Task 9: Identify and Create test data required for the story
Advantages of Agile Methodology
There are several advantages of using Agile methodology. Let’s have a look at them below: –
1. Enhanced Quality – Firstly, since the integration of testing happens during the cycle, there are
regular checkups to see that the product is working during the development. Therefore, it
enables the Product Owner to make changes as and when needed.
2. Better Customer Experience – Secondly, there is continuous interaction between stakeholders
and the team during the entire Agile process. It enables the team to understand the client’s
vision and produce high-quality products. It, in turn, helps in gaining customer’s trust and
increased satisfaction.
3. Transparency – Thirdly, the entire project in Agile methodology involves regular client
meetings, and all the other details are transparently available to all the team members.
4. Early & Predictable Delivery – In addition to the above, since sprints occur on a fixed schedule
(1- 4 weeks), it’s easy to predict the timing of project completion and can save on costs too.
Therefore, the product owner can review the deliverable as early as within three weeks, and he
can provide feedback if something has not gone according to his expectations.
5. Ease of doing transactions – Moreover, Scrum methodologies allow for flexible adaptation to
the changing customer requirements. A continuous reprioritization happens by refining the
Product Backlog and adapting to the new customer needs.
6. Continuous Engagement – Finally, the Iterative nature of Agile methodology implies that the
features are delivered incrementally. It happens by continuously keeping the team and
resources engaged in what they are best.
Agile Frameworks
Since we have now fully equipped ourselves with the basics and principles on which Agile teams
work, let’s have a look at different frameworks that follow principles of Agile methodology.
All Agile methodologies work on the above model that mainly depicts how sprints run one after
another. They all follow a “plan-design-build-test-review” approach.
But from an implementation standpoint, every methodology has its own set of practices,
terminologies, etc.
Eg. Think of your product as chicken curry, which has all sorts of different flavors in it.
The way it’s prepared will be different for each chef – these different ways are like different Agile
methodologies. The result is the same, but the process and effectiveness will be different for each
one of them.
We have summarized some of the primary Agile methodologies and will try to explain the below
to you:1. Scrum
2. Lean
3. Kanban Software Development
4. Extreme Programming (XP)
5. Dynamic Systems Development Method (DSDM)
6. Feature Driven Development (FDD)
7. Crystal
Scrum:
What is Scrum?
Scrum is one of the most commonly used Agile methodologies. Scrums have gained popularity
within the Agile software development community because they are simple and have a proven
productivity rate.
Scrum focuses on Team. It is a method that concentrates specifically on how to manage tasks
within a team-based development environment. Scrum believes in enabling & empowering the
development team and suggests working in small teams (say- 7 to 9 members).
Principle of Scrum
The fundamental principle of Scrum is that by dividing time and projects, you can enhance an
organization’s effectiveness and productivity.
Scrum makes the process of development less complicated by making the information transparent.
Which, in turn, helps the team to overcome the disadvantages of waterfall model like
Under & overestimation of time
Lack of progress report
Inability to adapt to changes, etc.
Scrum Artifacts:
We will try to comprehend it with the help of an example. If you have to construct your house,
what would be your strategy? First, we will make the list of all requirements as belowBuy a piece of land/ empty plot
Hire an architect
Get the map of the house passed
Hire contractor
Buying construction material
Hire labor to construct
Suggest customizations
This list of requirements is known as “Product Backlog.”
Now, the architect confirmed that they would come over for the discussion on Week2, Day 1 from
today so you will start prioritizing your tasks from the above list and put some timeline around it.
e.g. –
Week 1 – Finish the purchase of the land, registry, considering legal formalities, etc.
Week 2, Day 1 – Meet architect, list your design requirements.
Day 3 – finalize the design, suggest modifications
Day 5 – pass the map
Week 3, Day 1 – hire contractor, share the house design
Day 3 – get estimated material needed from the contractor
Day 5– buy the material
Week 4 – Construction starts
You may like to capture these activities along with timelines in a separate document. Which, in
turn, will ensure the timely completion of all the activities. This document is known as “Sprint
Backlog.” Whereas, the process of defining objectives to achieve is known as “Sprint Goal” or
“Increment” in Scrum. For example – for Week 2, Day 1, you kept an objective to meet the
architect & finalize the design. It is Increment.
Roles and responsibilities in Scrum:
It consists of three positions, and their responsibilities are as follows:
Scrum Master:
The Scrum Master is responsible for making sure that the Scrum Team adheres to the values and
principles of Agile methodology. Additionally, the scrum master ensures the adherence to the
processes and practices that the team agreed they would use. The responsibilities of a Scrum
Master include:
Clearing obstacles
Establishing an environment where the team can be effective
Addressing team dynamics
Ensuring a good relationship between the team and the Product Owner as well as others
outside the team
Protecting the team from outside interruptions and distractions.
Product owner:
The Product Owner in a product development team is responsible for managing the product
backlog to achieve the desired result that a team seeks to accomplish. Key activities to accomplish
this include:
Clearly expressing Product Backlog items.
Ordering the items in the Product Backlog to best achieve goals and missions.
Optimizing the value of the work the Development Team performs.
Ensuring that the Product Backlog is visible, transparent, and clear to all, and shows what
the Scrum Team will work on next.
Ensuring the Development Team understands items in the Product Backlog to the level
needed.
The creation of the Product Owner role as part of the Scrum framework happened to address the
challenges that product development teams faced. For instance, multiple & conflicting directions or
no direction at all concerning what to build.
Scrum Team:
Scrum Team is also known as the “Development team.” It usually consists of Developers. Testers,
Designers, etc. They are the ones who work on Product Backlog items. According to the Scrum
Guide, the scrum team should be between three to nine people and should have all the skills
necessary to deliver the product. Below are some of the main characteristics of the Scrum Team:
Scrum Teams are self-organizing. They decide how to turn the backlog into a potentially
releasable functionality.
Development teams are cross-functional, with all the skills necessary to create the product
increment.
Scrum Team doesn’t give any titles to the development team, regardless of the work they
perform.
Scrum team doesn’t recognize any sub-teams, regardless of cross-domain folks that are
present (e.g., BA, tester, developer, etc.)
Process of Scrum:
By now have a fair bit of understanding about Artifacts of Agile methodology as well as various
roles in the Scrum process. Therefore, let’s try to familiarize ourselves with Scrum Process Flow.
1. Product Backlog- Here, the Product owner meets the client and takes down all the
requirements. A document referred to as Product Backlog captures these requirements.
2. Sprint Backlog – Now, the Product Owner shares this Product Backlog with the Sprint
team (consists of Scrum Master, Developers, and testers) in a meeting referred to as the
“Sprint Planning” meeting. In sprint planning, the entire team agrees to complete a sub-set of
product backlog items. This agreement is called the Sprint Backlog & its basis the team’s
velocity/ capacity & the length of the sprint. The vital point to note here is, once the team has
finalized the Sprint backlog, they cannot change it within the Sprint. If any change is required, it
either goes to the next sprint, or the cancellation of the current sprint happens.
For instance, the team may decide to release software in 3 iterations (each iteration is referred to
as “Sprint” in the world of Scrum)
First Iteration– Story 1 and 3 will be released (Sprint 1)
Second Iteration – Release of Story 2, 4 and 6 will happen(Sprint 2)
Third Iteration – Story 5 will be released (Sprint 3)
Daily Scrum– The Scrum Master conducts a daily meeting of the duration of 15 minutes with
the Sprint team to ensure progress is on track. This meeting is “Daily Scrum.” It broadly
discusses the below pointersWhat did you accomplish since the last meeting?
What are you working on until the next meeting?
What’s getting in your way?
Sprint Review– At the end of each phase or “Sprint” – Scrum Master organizes a meeting
referred to as the “Sprint Review” meeting. In this meeting, the Product owner reviews the
product and assess whether the product is as per client expectations or not. It is an informal
meeting & is kept to less than 4 hours a week for a 4-week sprint.
Sprint Retrospective meeting is conducted to discuss “What went well during the Sprint” and
“What needs improvement.” This meeting takes place after the sprint review but before the
next Sprint Planning Meeting. Its duration can be of a maximum of 3 hours for a 4-week sprint.
Applicability of Scrum:
In the complex situations where the outcome is unknown at the beginning, and the approach
should be to adapt & evolve in the process. Scrum works on a time-boxed iterative approach. The
main focus of this approach is working incrementally rather than all at once.
Lean Software Development –
What is Lean?
Lean is about developing a project smartly by focusing on what the customer wants and
eliminating the non-value adding activities in the process. In other words, the lean methodology
emphasizes on excluding the features that are not valuable to the customers and then prioritize &
deliver them in small batches.
The value can be added by:-
Eliminating waste
Increased learning
Delivering end product as soon as possible
History of Lean:
In the 20th century, a manufacturing giant called Toyota faced issues with its long production and
manufacturing chains. Hence, a solution called the Toyota Production System was devised,
which focused on eliminating waste activities from the manufacturing cycle. Later, it got renamed
to Lean manufacturing.
In 2003, its implementation happened in the Software industry. Its leading proponents were Mary
& Tom Poppendeick, who compiled the principles of Lean in a book called “Lean Software
Development.”
Principles of Lean:
The main principle of Lean is to deliver high-quality products in minimum time with the least
wastage of resources.
The division of Lean principles happens into two categories – Main Principles & Lean Software
Development Principles, which are a derivation from the core principles of Lean.
Let’s discuss Lean Software Development Principles below
Optimize the whole – To be effective, you have to look at the bigger picture and develop a
system that focuses on individual parts of a project along with the smooth functioning of the
entire system.
Eliminate waste – Waste (as discussed later) can be understood in “Lean terms” as the nonvalue adding. Hence, the focus should be on intentionally reducing the non-value adding &
unnecessary activities.
Build Quality In – This means developing an automated and standardized system that
foolproofs it from any human error.
Deliver Fast – The faster we deliver to our customers, the quicker we will get the feedback and
work upon it.
Create Knowledge – This means all the learnings and findings learned during a project should
be documented so that they can be shared with others as well.
Respect People – This boils down to understanding that each entity is equally essential in the
success of any project. One should treat customers, colleagues, employees with equal respect.
Defer Commitment – This is a basis just in time philosophy, i.e., teams should responsibly wait
and collect enough information before making any decision.
Lean ArtifactsValue-Add activities –are all the activities that physically improve a product or a service for
customers. Which, in turn, means they are those activities that add value!
Non-Value Add (NVA) activities – are activities that do not add value but undergo execution.
The Customer has to bear the cost of NVA, and since it is not a value add, a customer doesn’t
want to pay for it.
Waste: Anything that doesn’t bring value to the table is referred to as waste & eliminating it is
the core of Lean thinking.
Toyota Production System’s forefather Shigeo Shingo identified seven major wastes in the
manufacturing process. Which, in turn, were later translated into 7 Wastes of Software
Development, by Mary & Tom Poppendick.
They are:1. Partially Done Work
2. Extra Features
3. Relearning
4. Handoffs
5. Delays
6. Task Switching
7. Defects
Difference between Lean and Scrum:
Lean is not a time-bound approach, unlike Scrum, where you have to finish an iteration in 2-4
weeks.
Lean is a philosophy or a mindset, whereas Scrum is a framework.
In Lean, you can select, plan & implement only one feature before you repeat this process for
another feature, unlike scrum.
Scrum uses a visual workflow called Scrum Board, unlike Lean.
Kanban
What is Kanban?
A Toyota engineer Taiichi Ohno invented the Kanban framework. The Japanese word “Kan” means
“Visual” & “Ban” means “Cards.” Hence, Kanban focuses on a visualized workflow where work is
broken down into smaller tasks and displayed on the Kanban board. It helps in maintaining
transparency in the team.
Principle of Kanban:
There are three main principles on which Kanban works:1. Visualizing what you do
2. Cap the Work-In-Progress activities
3. Enhance the flow by pulling the next most prior thing from the backlog
4. Continuous Improvement by inspecting blockers and adapting to the ever-changing conditions,
resources & customer demands.
Process of Kanban:
Before we discuss the basic Kanban process, let’s first understand what a basic Kanban Board
consists of:-
Columns – Each column represents the progress status, e.g., “To-Do,” “Doing,” “Done.”
Visual Cards – the Main feature of any Kanban board is Stickies, cards, etc.
WIP limit – Maximum number of cards that are workable at any point in time.
Commitment Point – The step where tasks are picked up from Stories/ backlog.
Delivery Point – It is the point where the end customer gets the final product.
A Kanban board can be more detailed in terms of the information provided through columns. e.g.,
In the image below, “Assignee” & “Archive” columns are also added to further detail the process.
It implies that depending upon the need, the enhancement of the complexity of any Kanban Board
takes place by adding more columns into it.
Let’s now try to understand the Kanban workflow with the help of an example from our testing
world:-
First, the user requirements are collated & collected in the form of a Product Backlog. After that,
the curation of a Kanban Board happens, which has stickies on it – a visual representation of
tasks.
After that, say our story is to “test a product” then various tasks under it can be Design,
Development, and Test case creation, Test Execution, etc.
Finally, these tasks are pulled from the backlog/stories & moved to the “To-Do” column; it is the
Commitment Point.
As soon as, the team starts working on a particular task, it moves to “In-Progress.“
During the process, capping of the maximum number of tasks that can be carried out at any
given time happens. It is known as the WIP limit.
As soon as the tasks finish, they move to the next column, “Done.” It is a Delivery Point.
Advantages of Kanban:
Following are the main advantages of Kanban:1. Flexibility – Firstly, this means there are no prescribed phase durations, and priorities are
reassessed continuously based on the most recent information.
2. Continuous Delivery – The Second advantage is delivering small portions of a project
continuously to the customer. Which, in turn, helps in synchronizing the future iterations with
the updated business requirements.
3. Reduction of Waste – Thirdly, the Kanban system focuses on the reduction of waste in all its
forms: over-production, unnecessary motion, defects, over-processing, and waiting. In terms of
software development – Work that is not needed, incorrect work, etc.
Difference between Kanban & Scrum:
Even though Kanban and Scrum work on Agile methodology, there are places where they differ.
The time-boxed sprints are optional in Kanban, unlike scrum where iterations are time-bound to
2-4 weeks.
Work is pulled from the backlog, as a single unit, as and when needed, unlike Scrum where we
pick up batches of work from the product.
In addition to the above, the client can add new features during an ongoing iteration, unlike
Scrum, where no addition of new features can happen once an iteration starts.
Multiple teams share the Kanban board.
Moreover, there are no defined roles in Kanban like Product Owner (PO), Scrum Master (SM) or
Scrum team, etc.
Extreme Programming (XP)
What is XP?
Kent Beck developed this, and it has evolved as a highly disciplined method of continuously
delivering high-quality software. XP methodology works on five core values as discussed below:-
Simplicity – First is Simplicity. Which in simple words means avoiding the waste and only doing
what’s needed & asked.
Communication – Second is Communication, which means having face-to-face communication
to clear any doubts. In other words, it means to be on the same page.
Feedback – Third is Feedback, which means providing constructive feedback, which is
workable for future improvements. One can achieve this by focusing on the changes needed &
implementing them.
Courage – Fourth is Courage, which means adapting to the changes & not making excuses for
the failure. In addition to this, being truthful about the estimates & progress of the project.
Respect– Fifth is Respect. This means everyone deserves respect as an individual team
member.
Practices of XP:
The below image depicts the 12 practices on which XP works. These are mutually inclusive of each
other meaning all these practices work in conjunction to deliver effective & efficient products.
Let’s discuss these practices further:1. Pair Programming – It implies two team members sit on the same computer & work together.
The driver writes the code & the observer reviews each line of code when it’s written. This, in
turn, helps in quick identification of areas of improvisation.
2. On-Site Customer – The XP customer is highly engaged with the team & is available on-site to
provide regular feedback.
3. Test-First – Implies testing the code first & then running it later after fixing the bugs. It helps in
reduced effort & less number of errors during the production.
4. Iterative Development – It is also known as incremental design which means doing work in
small increments & building it up further.
5. Refactoring – Its primary focus is to remove the duplication of various processes.
6. Simple Design – Keeping the system design as simple as possible will ensure the smooth
running of the process.
7. Planning Game – The stories are used to describe end-user requirements & the planning
process.
8. Coding Standards – Establishing standardized rules of code for all of the team members.
9. Continuous Integration – This means testing of small codes happens immediately before
adding them to a more significant project. It ensures that error detection happens early on.
10. 40- Hour week – As the name suggests, every team member is required to work for 40 hours
a week. Therefore, maintaining a work-life balance.
11. Collective code ownership – This means everyone owns the code in the team & that everyone
is allowed to exert a “positive” duty to make the changes to the code as necessary. Hence, it
reduces the dependency on any one developer.
12. Metaphor – This means a simple layman explanation of how the code works, i.e., the ability to
explain the system to the new people without flooding them with technical terms.
Process of XP:
The process of XP is as below in the form a diagram:-
Planning – The first stage of the process is to start collecting the requirements from the
customers in the form of user stories. The value of each user story is then estimated, which
should roughly help the team to understand how long it will take to implement a story. XP
practices used here are:Planning Game
On-Site Customer
Design – Second is Design. Having a simple design of a system ensures fewer dependencies &
early deliveries. The addition of any extra functionalities can happen later as well. Additionally,
if some stories need more research in terms of technicality, a short time-boxed period is
assigned called Spike. XP practices used here are:Refactoring
Simple Design
Coding – Third is coding. This is the core of any process. The actual coding of software starts
here. In other words, the team sits together & starts working incrementally to deliver the end
product. XP practices used here are:Pair programming
Collective code ownership
Coding Standards
Testing – Towards the end, the code is tested first & run later, after fixing the bugs. Following
practice supports it
Continuous integration
Test first
Iterative development
Release – Finally, the customer valued product is released & project velocity is computed to
keep a tab on the progress. Measurement of Project velocity happens, which is a quantifying
criterion of the amount of work accomplished in a project.
Advantages of XP:
Following are the main advantages of XP:1. Time-saving – Firstly, it allows the organizations to save time required for project execution
because XP focuses on the timely delivery of final products.
2. Cost-Effective – Secondly, XP saves a lot of money because they don’t use too much
documentation. They usually solve problems through discussions inside of the team.
3. Simplicity– Thirdly, the developers create a straightforward code that they can improve at any
moment.
4. High Visibility – Finally, the whole process in XP is visible and accountable. Developers commit
what they will accomplish and show progress.
Difference between XP & Scrum:
Following are the main differences between XP & Scrum:1. Scrum works on iterations which are 2-4 weeks long whereas XP iterations are 1-2 weeks long.
2. Scrum doesn’t allow changes in the sprint once started. Unlike XP, which enables the
introduction of new features. These features can replace a feature on which the work is yet to
begin.
3. XP works on strictly high priority, unlike Scrum.
4. XP prescribes engineering practices like refactoring, simple designs, pair programming, etc.,
unlike Scrum.
5. Roles in XP are the customer, the developer, the tracker & the coach, unlike Scrum, where the
primary roles are of SM, PO & Scrum team.
Dynamic Systems Development Method (DSDM)
What is DSDM?
The Dynamic Systems Development Method (DSDM) is a simple and straight-forward Agile
framework that works best in case of fixed time and resources and varying functionalities. DSDM
uses the 80-20 rule i.e., 80% of system deployment in 20% of the time.
Principle of DSDM:
There are nine principles in DSDM which are more like a way of working to deliver efficient endproducts.
The eight Principles of DSDM are as follows:
1. Focus on the business need – Maintaining the focus on the business requirement is vital. It
means ensuring the alignment of the projects with the business objective.
2. Deliver on time – Frequent and timely releases help in the early detection of errors.
3. Collaborate – Teamwork basis trust and honesty lead to effective production, which also helps
in quicker resolution of various issues.
4. Never compromise quality – Delivering a quality product is the main focus.
5. Build incrementally from firm foundations – One can achieve this by breaking a more
significant task into smaller tasks. The development of the most critical tasks happens first.
6. Develop iteratively – Acclimatization of the changes becomes easy using the Iterative model
of development. It helps in reversing / updating already built products.
7. Communicate continuously and clearly – Empowered teams that work co-operatively are
more efficient, productive & communicate better with each other.
8. Demonstrate control – DSDM aims at having small-sized teams with a high degree of
communication between them and in turn, an efficiently integrated & controlled structure.
Process of DSDM:
As we already got a fair amount of understanding on various phases of DSDM process so let’s
deep dive into it and understand it in more detail as well as diagrammatically-
1. Pre-Project – This phase occurs before the actual project starts. Here, the conceptualization of
the project happens, and the decision making happens whether to start up the project or not.
Following are its main objectives:Identify the problem
Check the scope of the project
Chalk out a plan
2. Feasibility Study –This means whether the project is workable & how is it possible. Following
are its main objectives:To analyze various estimates like costs involved, timelines, resources available, etc.
Deciding whether the project is workable or not.
To determine the approach of working
Intentionally keeping it short helps because DSDM works best in short time frames.
3. Foundation/Business Study – Here, the team researches the business aspect of the project
like which technology to use, what should be the workflow, etc. Following are its main
objectives:First, define a high-level requirement on a macro level
Second, define the working solution of the project
Third, considering the customer, management & solution perspective to deliver a robust endproduct
4. Evolutionary Development Phase – Also known as Functional Model Iteration, here the
construction of Functional Prototypes (FP) of the system happens. FP means a prototype of the
different functions that the system will perform. Following are its main objectives:First, to create a functional prototype of the actual product.
Second, to provide a detailed requirement for the final product.
5. Deployment Phase – Also, known as implementation & incremental delivery stage. Here, the
designing & development of the product happens incrementally and delivered after
documenting whether the project has all the requirements as desired. Additionally, the training
of end-users happens on how to use the system & after that, it gets approval. Following are its
main objectives:Provide required documentation
Act as the primary review point
Provide training to the users
Assess whether the current product meets the project requirements or not.
Expand the scope of the design prototype to suit the final requirement.
There are three sub-phases or sections within the Deployment, namely Assemble, Review, and
Deploy.
Assemble – Here, you would perform those activities required to put all the pieces together.
Review – Here, you will make sure the things work and are approved to deploy the product.
During this time you would also carry out a retrospective for the increment.
Deploy – Here, you release the product or solution. It is when the work carried out in the
iteration is made available for everyone to use.
6. Post-Project – This is the maintenance phase where regular checkups take place for the
smooth running of software. Following are its main objectives:Assess the deployed solution
Provide feedback if there are any performance gaps.
I want to share an interesting fact – the approach which I took to set up my website is pretty close
to the DSDM process. Let me take you back in flashback days of mine –
1. Pre-Project Phase – During my initial days of career when I was doing a well-paid job as a
software tester. There is always this heated discussion in our QA forums that most of the
websites related to software testing don’t provide in-depth and an easy to understand content.
It was a light-bulb moment for me. I realized, there is a problem which is strongly felt by
colleagues, so why not make an attempt to solve it? This problem statement leads to the idea
generation of our website. In DSDM terminology, it is the “Pre-Project” phase.
2. Feasibility Study – I made a rough estimate of time, cost, etc. which is required to set up this
website. With the job, it was quite a daunting task to take out time. However, I liked this idea.
Therefore, these things didn’t act as a roadblock for me, and I moved ahead with the next step.
3. Foundation / Business Study – Next, I created a high-level plan, in terms of what all are the
required skillsets for developing this website (Designer, Developer, Content Writer, etc.). I also
explored various plugins, hosting service providers which I may like to use for developing my
website.
4. Evolutionary Development Stage – After I gathered all the required information which is
required to set up my website, I created a more detailed plan (LLP). I listed all action items in a
time-bound / phase-wise approach
Phase 1 (Jan to March) –
Jan 1-10 – Purchase domain from leading domain name provider, take hosting service
provider
January 11-25 – Hire freelancer for content writing
Jan 26-31 – Install free plugins for my website
Feb 1-28 – Develop the first version of the site which has blogs related to Software Testing
March 1 – Launch first iteration of my website
Phase 2 (April to June) –
April 1-10 – Purchase paid plugins
April 11-30 – Hire full-time content writer, hire a freelancer for designing, etc.
May 1-30 – Incorporate functionality to deliver online training, write more blogs
June 1 – Launch the second iteration of my website
Phase 3.
Phase 4.
5. Deployment Phase – Now, I have a complete list of what needs to accomplish, when & how.
Next, an action-packed stage, I started building the first version of my website. After one
month, when I was pretty satisfied that the website has shaped up as per my expectations
from phase 1, I published it for public viewing.
6. Post-Project phase – I kept a check on the analytics of my website regularly. Additionally, I
ensured all plugins work properly, and there are no compatibility issues. I took regular
feedbacks from my colleagues – if there were any issues, I made a note of it so that I can take it
up in my next iteration.
Difference between DSDM & Scrum:
1. DSDM works on fixed time & variable functionality unlike traditional methods of software
development which worked on varying time & resources with the expectation to deliver fixed
functionalities.
2. In addition to the above, the end-user actively participates with the team in DSDM, unlike
Scrum where end-users interact only with the Product Owner.
3. Moreover, DSDM involves diligent documentation, unlike Scrum.
4. Daily Stand up meetings happen in Scrum, unlike DSDM, where information sharing happens
through documents.
5. Additionally, DSDM advocates producing 80% of the solution in 20% of the time, unlike Scrum,
where each iteration gets 2-4 weeks.
Feature Driven Development
What is FDD?
FDD is a design-oriented Agile process developed by Jeff De Luca & Peter Coad.
As the name “Feature Driven Development” suggests, it is the features that are nothing but smallsized projects which are in a complete state. Features in FDD are just like User stories in Agile
methodology.
Principle of FDD:
FDD also works on the principles of the Agile Manifesto. It focuses on delivering client-valued
features in the <action><result><object> format. e.g., register (action) the account (result) of a user
(object) is a form of a feature that the FDD method uses.
Roles in FDD:
Following are the leading roles in the FDD process – Project Manager, Chief Architect,
Development Manager, Chief Programmer, Class Owner, and Domain Expert.
Process of FDD:
There are mainly five steps that this process uses. The below diagram depicts the procedure
followed in the FDD methodology.
1. Develop an Overall Model -The client team and development team develop an overall model.
Chief Architect guides this.
2. Build a Feature List – Shortlist the features for the implementation, from the client
requirements given in the first step. Each feature should complete within two weeks.
3. Plan By Feature – This means planning the features which require implementation and
deciding which team will be responsible for doing it. Teams are selected & given different
feature sets.
4. Design By Feature – The chief programmer designs the feature by drawing sequence
diagrams. Sequence Diagram is the vertical diagrammatic representation of the sequence of
different activities carried out at different times. Its objective is to track the progress.
5. Build By Feature – The Chief programmer writes the code, tests it, and checks. After that, if it’s
ok, it gets the approval.
Advantages of FDD:
Following are the main advantages of using FDD:1. Risk Reduction – FDD helps in reducing risks using shorter iterations of designing,
understanding of the requirements, and the system without any ambiguity.
2. Regular Builds– Regular builds ensure there is always an up to date system. Which, in turn, the
client can see.
3. Visibility of progress and results– By frequent, appropriate, and accurate progress reporting
at all levels of the project, visibility is high, which in turn leads to better project control.
4. Costing the project by feature leads to greater accuracy.
Difference between FDD & Scrum:
Unlike Scrum, each iteration has to complete within two weeks. If it is not possible, then it
further breaks into smaller pieces until it meets the limit of two weeks.
FDD chooses the best of the different methodologies in the Agile Scrum, XP, etc. & applies
them.
A feature team consists of a project manager, chief architect, development manager, domain
expert, class owner, and chief programmer, unlike Scrum, which has only three roles. Namely,
Product Owner, Scrum Master & Scrum Team.
Crystal
What is Crystal?
Alistair Cockburn defined Crystal as, “Crystal is a family of human-powered, adaptive, ultra-light,
‘stretch-to-fit’ software development methodologies.”
The Crystal agile framework focuses on individuals & their interactions within a system over
process & tools; which is also one of the agile manifesto statements.
Crystal works on two core assumptions:-
The team should undergo self-organization.
Every project is unique & has its own set of conditions under which it works. Hence, only its
team should decide the course/flow of the project.
History of Crystal:
Alistair Cockburn developed the “light-weight” methodology called Crystal for IBM in 1991.
Cockburn interviewed & researched numerous people who did not follow the traditional/ formal
approach but still delivered practical, successful projects. Therefore, he realized that different team
size & dynamics lead to varying procedures to carry on the projects.
Characteristics of Crystal:
As stated earlier, Cockburn defined Crystal as a family of human-powered, adaptive, ultra-light,
‘stretch-to-fit’ software development methodologies
Human Powered – Means the people involved in the project are the most crucial entity & that
the entire project process flow should adapt around them.
Adaptive / Stretch-to-fit – This means crystal has no fixed process or tools. Instead, they are
stretched to fit the ever-changing needs of a project & adapt to different business
requirements.
Ultra-light – It is a lightweight methodology that focuses on transparency & open
communication. It does not go heavy on documentation.
Crystal Method Family Members
Cockburn discovered that the properties of a project depend on the number of people involved in
the project.
The way smaller teams work inside a project can be different than the way bigger teams work on
a large-scale project. In other words, the criticality & the complexity of the procedure to carry on
the project is directly proportional to the size of the team.
Therefore, there is no one single Crystal method. In other words, there are different Crystal
methodologies for different types of projects which depends upon the following factors:-
Team Size ( Crystal Family as discussed below)
Criticality ( four levels of criticality as discussed below)
The priority of the project
Generally, different colors represent different team sizes. Which, collectively, in turn, is the Crystal
Family. They are:-
First is Crystal Clear – up to 6 people
Second is Crystal Yellow – up to 20 people
Then, Crystal Orange – up to 40 people
Crystal Red – up to 80 people
Crystal Maroon – up to 200 people
Apart from these, Crystal Diamond & Crystal Sapphire apply when there is a large amount of
risk posed to human life.
Four Levels of Criticality refers to the possible amount of risk posed by a system if it does not
perform as expected. They are –
Comfort
Discretionary Money
Essential Money
Life
The above diagram depicts that the larger the project gets ( in ascending order of complexity) the
darker the color becomes. In other words, it is illustrating the criticality of the project. For example,
the L40 project refers to a project having 40 team members developing a Life-Critical project.
The Crystal methodology can be related to the different facets of a gemstone crystal. Which, in
turn, means different faces of a crystal refer to the different underlying core principles & values in
a crystal methodology. These facets are a representation of techniques, tools, policies & roles;
which differ in different project conditions.
Cockburn differentiated the techniques, tools, etc. as below-
Methodology – refers to the set of practices, tools, etc.
Techniques – Refers to the skill areas, e.g., developing test cases
Policies – Refers to the standards which any organization must-have.
Applicability of Crystal:
To conclude, Crystal methodology applies to various project/team sizes. For instance, if there is a
team of six developers, then Crystal Clear is more appropriate. On the other hand, if there is a
bigger team of say more than 20 people, then Crystal Orange is suitable. Similarly, Crystal Sapphire
or Crystal Diamond methods apply in large projects that involve potential risk to human life. To
sum up, the determination of the magnitude of the Crystal methodology happens by the project
environment and the team size.
Difference between Crystal and Scrum:
Following are the main differences between Crystal & Scrum methodology:-
Firstly, face-to-face personalized meetings happen in Crystal. Whereas in Scrum, informal daily
standup meetings take place.
Secondly, the crystal process can be altered to accommodate any team size & criticality. On the
other hand, Scrum works on a set of pre-defined processes & tools.
Finally, there are numerous roles in Crystal-like Project Sponsor, Senior Designer/Programmer,
Software Documenters and Unit Testers, etc. Unlike Scrum, where there are three leading roles,
namely Scrum Master, Product Owner & Scrum Team.
Comparative Analysis of Different Agile Methodologies :
Practices Scrum
Approach
Time
Iterative
Kanban
XP
Short
Increments
Increments Iterations
Continuous
2-4 weeks
Delivery
Team Size 5-9
All types
1-6 weeks
Small to
Small team,
medium
2-10
Suitable
Project
are Iterative
All types
size
DSDM
FDD
Crystal
Iterative
Iterative
Incremental/Iterative
80%
Two
solution in
days to 2
20% time
weeks
2-10,
independent
teams
Smaller
All types
projects
Frequent Delivery
4-20,
more
Starts from as low
than one
as 6 to larger teams
team
Large
Small and medium
scale project
Sprint,
Product
Major
Practices
Backlog,
Kanban
Sprint
board,
Backlog,
stickies
Scrum
User stories,
refactoring,
pair
programming
Prototyping,
Feasibility
and
business
UML
Crystal Family,
diagrams Criticality
study
meetings
To conclude, I hope that, by now, you have a good understanding of Agile methodology along with
its different frameworks. In addition to this, you can clearly articulate which Agile methodology
should fit a particular development environment. The purpose of this article was to give you all the
information in one place. However, we will be creating detailed articles on each of the Agile
methodology. So if you need deep-dive into any one of them, feel free to do so.
Category: Agile
By Virender Singh
Tags:
October 1, 2019
Agile
Share this post





Author: Virender Singh
I am Virender Singh and I am a software Engineer. I have been in the Software profession for more than 12 years now. I worked on large
spectrum of projects, from being a QA engineer to being a Development Engineer. At present I work as a Software Engineer for Microsoft India
Development centre. I love to learn new technologies, specially in the field of Image Processing and Digital Signal processing. You can find me at
following locations @LinkedIn @FaceBook @ToolsQA @Github
Related posts
Site Links
Definition of Done
Scrum Values
September 9, 2020
September 1, 2020
Scrum Product Owner
Sprint Review
August 12, 2020
June 22, 2020
Sprint Retrospective
Daily Scrum Meeting
June 22, 2020
June 13, 2020
Recent Tutorials
Top Tutorials
Other Tutorials
Selenium Training
Cypress
Selenium - Java
Software Testing
Corporate Training
Protractor
Cucumber
Appium
Python
TestNg
JUnit
JavaScript
Rest Assured
Maven
Git
Postman
Java
Scrum
Selenium - C#
Katalon
Video Tutorials
About Us
Testimonials
Contact Us
SITEMAP
SpecFlow
© 2013-2020 TOOLSQA.COM | ALL RIGHTS RESERVED