Review and Comments by the Independent Engineer

advertisement
Review and Comments by the Independent Engineer
where the Concessionaire is required to send any drawings or
documents to the
Independent Engineer for review and comments, and in the event such
In cases
comments are
received by the Concessionaire, it shall duly consider such comments in
accordance with the
Concession Agreement and Good Industry Practice for taking appropriate
action thereon.
The correspondence between the Concessionaire and the Independent
Engineer shall be
deemed valid only
if
a copy thereof is endorsed to and received by the
Authority.
1.18 Definitions and Interpretation
1.18.1 Unless specified otherwise in this Manual, the definitions contained in
the
Concession Agreement shall apply.
1 .1 8.2 Grade separated structures
i) The structures through which the traffic flows at different levels are called
grade separated structures.
ii) A
grade separated structure which is provided for crossing of vehicles
under
the Project Expressway is called as Vehicular Underpass (VUP).
iii) A
grade separated structure which is provided for crossing of vehicles over
the Project Expressway is called as Vehicular Overpass (VOP).
iv) A structure provided below the Project Expressway for crossing of the
pedestrians is called Pedestrian Underpass (PUP).
v) A structure provided below the Project Expressway for crossing of the
cattle
is called
vi)
Cattle Underpass (CUP).
A pedestrian/cattle underpass through which light vehicles of height up to
3 m can also pass is called Light Vehicular Underpass (LVUP).
vii) Flyover is
synonymous to VUP/VOP