CONTENT OF METHOD STATEMENT
AND CHECK LIST
Tillie of the Document
1) Electrical Safety for Temporary Electrical Distribution System
of Construction
2) Method statement of Bus Bar System
3) Method statement of Distribution Board
4) Method statement of Cable Tray, Truncking & Ladder
5) Method statement of Floor Truncking (Where ever applicable)
6) Method statement of LV Cable
7) Method statement of Under Ground Cable
8) Earthing & Lightning Arresters
9) Flow Chart – Electrical Installation
10) Check list for Material Receiving Inspection
11) Check list for Cable Tray
12) Check list for Feeder Cabling
13) Check list for Pre-Commissioning – Cable
14) Check list for Panel Installation
15) Check list for Cable Termination
16) Check list for Panel Power-Up (Pre-Commissioning)
Page No
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….
……….