A B C D E F G 1 2:03 System Action a.m. Rev. 2013-04-15 2019-03-15; Version 13.0 4 Appendix C3.08 electrics 5 6 7 Deliveries of the General Annex applies to this topic 8 9 System Action For railway projects: Outline of devices for electricity supply to installations 10 For railway projects: Main Cable Plan should demonstrate a working farm with its power supply and transmission and the associated main ducts for all electrical, signaling and 11 telecommunications installations. Cabling related public electrical installations in technical buildings, cure For railway projects: For railway projects a general reovisning of impact on existing technical 12 buildings and the possible expansion needs For railway projects: System Action railway will be developed in accordance with Section 4 of TDOK 2018: 0491 "Development of system specification and system documentation in investment Rail" and under section 14 of Annex E3.01. 13 Infra System path: Recognition of existing systems and facilities as E3.08 Section 2.1, 9, 9.1, 14 9.2, 9.3 ( "situation analysis") E3.01 Infra System path: Reporting of overall needs assessment for lighting according E3.08 section 15 10.2 Page 1 C3.08-ub-Electric Power System Action v13.0 A B C D E F G Infra System path: Accounting for any expansion needs of the traffic control system and road signs. according E3.08 section 9, 9.1, 9.2, 9.3 16 Infra System path: Basis for decision on the selection of measures and 17 principutformimgsstandard according E3.08 section 10.3 Infra System path: Basis for decision on the selection of measures and 18 detaljutformimgsstandard according E3.08 section 10.4 For railway projects: Additional Tmall 0978 section 4.11. Electric power plant: the following type of plant to be included as subtitle and reported. • Distribution network <1000V 16.7 - 50Hz 19 For railway projects: New electrical installation must be labeled according to the on-site existing nomenclature and secondly by SEK Manual 419 20:21 Page 2 C3.08-ub-Electric Power System Action v13.0