Development Code International City Phase 3 - Dubai, UAE October 2007, Revision 1 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, CONTENTS SECTION 1.0: OVERVIEW 3 1.1 Introduction 1.2 Design Principles 1.3 The Master Plan 1.4 The Development Code SECTION 2.0: LAND USE 8 2.1 Introduction 2.2 Definitions 2.3 Configuration & Setback- Low Rise 2.4 Configuration & Setback- Mid Rise 2.5 Configuration & Setback- High Rise SECTION 3.0: BUILDING FORM SECTION 9.0: REVIEW AUTHORITY 14 19 4.1 Introduction 4.2 Character of Place 4.3 Architectural Language 4.4 Architectural Treatments 4.5 Materials and Colour 4.6 Pedestrian Access SECTION 5.0: SIGNAGE 26 5.1 Introduction 5.2 Types and Purpose 5.3 Treatments SECTION 6.0: LANDSCAPE SECTION 10.0: ADMINISTRATION AND PROCEDURES 47 30 41 49 10.1 General 10.2 Common Review Requirement 10.3 Concept Design 10.4 Building Permit 10.5 Variance 10.6 Exception 10.7 Condition Use 10.8 Development Code Amendment 10.9 Zoning Map Amendment 10.10 Enforcement SECTION 11.0: APPLICATION CHECKLIST 56 11.1 List of Concept Design Submission Requirements 11.2 List of Building Permit Submission Requirement SECTION 12.0: UTILITIES 6.1 Introduction 6.2 Safety 6.3 Planting Design Regulation 6.4 Special Requirements by Zone 6.5 Property Setbacks 6.6 Artistic Liberty and Design Originality 6.7 Irrigation Design Guidelines 6.8 Hard Landscape 6.9 Lighting 6.10 Water Features 6.11 Furniture 6.12 Boundary Treatments SECTION 7.0: DEFINITIONS 45 8.1 Title 8.2 Authorities 8.3 Purpose and Intent 8.4 Applicability 8.5 Amendments 8.6 Measuring System 9.1 General Authority 9.2 Development Code Administrator 9.3 Development Review Board 3.1 Introduction 3.2 Massing and Height 3.3 Parking, Loading & Access 3.4 Roadway Concept SECTION 4.0: ARCHITECTURAL CHARACTER SECTION 8.0: GENERAL PROVISIONS 12.1 Electricity 12.2 District Cooling System 12.3 Communications 12.4 Gas 12.5 Potable Water 12.6 Irrigation Water Services 12.7 Sewerage 12.8 Storm Water 59 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 1.0: OVERVIEW SECTION 1.0: OVERVIEW 1.1 Introduction 1.2 Design Principles 1.3 The Master Plan 1.4 The Development Code Development Code October 2007- Rev.1 1.1: OVERVIEW - INTRODUCTION 1.1 Introduction International City Phase 3 International City Phase 3 (ICP3) is a Dubai-based community designed to address the needs of its residents by providing a desirable and sustainable place to live, learn, interact, socialize, work and recreate. The 731 hectare site (ref: DM B6300109 Nad Al Sheba) is a vacant parcel located just south of Nakheel’s International City Phase 1 in the Nad Al Sheba/Warsan 1 District 630, southwest of Dubai. The site incorporates International City Phase 3 which has been master planned as a previous exercise based on a concentric configuration of purchasable plots. The public environment includes the city’s streets, parks, community, facilities and infrastructure that should inspire plot purchasers to build developments within ICP3 which addresses ‘best practice’ and innovation in all areas of design. Plot developers will be directed and aided by this Development Code. The brief defined by Nakheel for the project embodies the principles of variety, quality, lifestyle and affordability with an added emphasis on public transport, walkable neighborhoods and the creation of focal places for social gatherings. 4 Development Code October 2007- Rev.1 1.2: OVERVIEW – DESIGN PRINCIPLES 1.2 Overview - Design Principles The six basic design principles, which have guided the structure of the Master Plan for International City Phase 3 and the Residential Code are as follows: 1.2.1 A Place for Living The application of ‘best practice’ and adherence to new urbanism planning principles has formed the basis of the Master Plan design of ICP3. It will assist in ensuring the creation of a city with a high standard of amenity and lifestyle within a sustainable framework. 1.2.2 Focal Hearts – Public Places Both the Commercial and Residential Districts of ICP3 have significant focal public spaces allowing for pedestrian interaction. They are places for gathering, relaxing, entertaining and shopping. Similarly the smaller Neighborhood Centers also have discernible centers created around landscaped squares with fringe retail facilities within close proximity (walking distance) from each home. open space system and parks of ICP3 to allow easy access for recreation, exercise and interactive learning opportunities. Water is not a naturally occurring component of the landscape of ICP3 and whilst there is undoubtedly a public preference for elements such as lakes and large water bodies, they are environmentally unsustainable and impose major ongoing maintenance costs. Therefore the use of water in the landscape is limited largely to small fountains in focal areas at entries, major urban spaces and vista terminals. 1.2.6 Public Transport In order to reverse the current high dependency on private vehicle use and reduce traffic congestion, ICP3 has incorporated an easement for a future people mover system with two major and many minor transit stops. The main stations form public transport hubs incorporating bus depots. Each hub is located close to the respective commercial and neighborhood centre districts of the City. 1.2.3 Pedestrian and Cycle Way Friendly Networks Residents and visitors to ICP3 can experience and access all areas of the City by foot or bicycle through a designated and dedicated path system. This network consists of several circuits of varying length for both transit/destination and recreational users. The principle of pedestrian/bicycle way accessibility throughout ICP3 on all streets and public spaces in combination with the provision of generous seating, lighting, landscaping, bicycle racks and shade shelters will provide a highly permeable pedestrian friendly environment. 1.2.4 Variety – Mixed Use The mix of different uses as defined by the code and zoning uses allows the creation of a more interesting dynamic community. Zoning allows for a variety of dwelling types from Studio to 2 Bedroom Apartments to attract both singles and families often mixed with commercial and retail development on the ground level. The centre of each neighborhood is zoned to allow shops and offices of sufficient variety to supply the daily needs of households whilst the larger Ramblas provides the concentration of larger retail stores, banks, restaurants, cafes and civic facilities such as public library, post office and police station. 1.2.5 Parks, Open Space and the Use of Water in the Landscape Parks provide relief to urban areas and are essential contrast elements. They allow nature to dominate and have qualified beneficial effects on human health. Linear park systems also provide sustainable corridors for birds and other fauna and this element forms a part of the open space principle of ICP3. Many educational facilities have been located adjacent to the 5 Development Code October 2007- Rev.1 1.3: OVERVIEW – THE MASTER PLAN 1.3 The Master Plan The purpose of the Master Plan is to set the foundation for the physical design of International City Phase 3. It sets out the location and layout of development plots, land uses, building heights and massing. It also identifies the location of community facilities, infrastructure, utility provisions and open spaces. The Master Plan illustrates the key features and characteristics that will make International City Phase 3 truly unique. It shows the relationship between buildings, open spaces, community centers and the streetscape. It also corresponds with the Development Code which provides a more detailed description related to the development of individual plots including architectural characteristics, building massing, floor area ratios, Building height and accessibility. International City Phase 3 Master Plan 6 Development Code October 2007- Rev.1 1.3: OVERVIEW – THE MASTER PLAN 1.4 Overview - The Development Code The Development Code provides the guide to the detailed layout of spaces, land uses, building heights and location of community and public facilities. The Development Code is a key tool in realizing the Master Plan. It provides the regulatory framework to ensure buildings are located according to the plan and are designed to complement one another and ultimately result in a high quality environment. The contents of the Development Code are described as follows: 1.0 Overview – to introduce the guidelines, its purpose, intent and applicability and to reaffirm Nakheel’s authority to administer the code 2.0 Land Use – a detailed section illustrating the permissible land use mix and floor plans for basement, ground and upper floors for low, medium or high rise developments and the land use associated requirements such as setbacks, parking, lot coverage, number of floors etc. 3.0 Building Form – building height, massing treatments and articulation, suitable corner and ground floor treatments and details about material palette, colour and building transparency for each development type. 4.0 Architectural Character - provides a set of guidelines to achieving an exciting but complementary mix of architectural features and scale. As an appendix to this section, it includes a summary of architectural features in successful international cities and an array of architectural features that will be encouraged in the development. 5.0 Signage – provides details of permitted types and purposes of signs for each location. 6.0 Landscape – Sets out the mix of hard and soft landscape elements for each type of open space within plots and the relationship of the landscape to the public realm 7.0 Definitions 8.0 General Provisions - The regulations established by this code shall be considered minimum requirements for development 9.0 Review Authority - explanation of the delegation of authority and enforcement of the code The Development Code will carry out several functions: • To provide set standards needed to ensure the Master Plan vision is realized • To create a procedure to allow Nakheel to evaluate development and ensure the code guidelines are met • To focus on good design but not to reign in creative freedom • To allow the community the flexibility to evolve over time whilst maintaining the original vision of the Master Plan • To ensure that the end development meets best practice design standards and is an attractive place to live, work and visit 1.5 Overriding Development Criteria Nakheel’s policy allows for changes to the criteria of its development from time to time, optimizing development potential. The developer is deemed to agree and abide by Nakheel policies on an ongoing basis and is required to conform to all Nakheel future submission requirements for all design and utility services. Note: This issue of the Development Code supersedes all previous versions / issues. Where words are shown in “Italic”, specific meaning assigned to the word shall apply as per the “DEFINITIONS” section of this code. 10.0 Administration and Procedures - summary of the relevant bodies and their responsibilities 11.0 Application Checklist 12.0 Utilities Supplement for Plots - details requirements for power, district cooling, communications, gas, potable water, irrigation, sewerage and storm water 7 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 2.0: LAND USE SECTION 2.0: LAND USE 2.1 Introduction 2.2 Definitions 2.3 Configuration & Setback- Low Rise 2.4 Configuration & Setback- Mid Rise 2.5 Configuration & Setback- High Rise Development Code October 2007- Rev.1 2.1: LAND USE - INTRODUCTION 2.1 Introduction For the purposes of the code areas with individual land use characteristics have been divided into 12 land uses: The remainder of this section provides details of plot sizes; floor plans for lower, ground and upper floors; building set back areas and building sections. It also provides a summary of plot coverage, density, commercial use and required parking for each land use. Code Land use High Rise HR2 High Rise G+9 min / FAR 5 HR3 High Rise G+7 min / FAR 4 HR4 High Rise G+20 min / FAR 8 HR5 High Rise G+14 min / FAR 6.3 HR6 High Rise G+7 min / FAR 4.25 HR7 High Rise G+8 min / FAR 4.75 Mid Rise MR3 Mid Rise G+5 min / FAR 3.3 MR5 Mid Rise G+4 min / FAR 2.5 Low Rise LR1 Low Rise G+2 min / FAR 1.75 LR2 Low Rise G+3 min / FAR 2.2 LR4 Low Rise G+3 min / FAR 2.2 LR5 Low Rise G+3 min / FAR 2.18 Amenity & Infrastructure Plots EDU Education / FAR 2 REL Religious / FAR 0.25 UTL Primary Substation UTL TSE Pump Station UTL Communication Center OPS Open Space Note: Only four floors are allowed in addition to the minimum required number of floors for each land use category. 9 Development Code October 2007- Rev.1 2.2: LAND USE - DEFINITIONS LEGEND: ICP3 PLOTS High Rise CODE HR7 HR6 HR5 HR4 HR3 HR2 Height / FAR High Rise G+8 min / FAR 4.75 High Rise G+7 min / FAR 4.25 High Rise G+14 min / FAR 6.3 High Rise G+20 min / FAR 8 High Rise G+7 min / FAR 4 High Rise G+9 min / FAR 5 Commercial above / with 17.65% as Retail type2 at ground floor and mezzanine Residential above / with Commercial at ground floor Residential above / with Commercial at ground floor USE Residential above / with 7.89% as Commercial, 3.95% as Retail type1 and 3.95% of FAR as Retail type2 at ground floor and mezzanine. 3.125% retail type1& 3.125% retail type2 at ground and mezzanine / with commercial above 5% retail type1& 5% retail type2 at ground and mezzanine / with commercial above KEY Mid Rise CODE Low Rise MR3 MR5 LR1 LR2 LR4 LR5 Mid Rise G+5 min / FAR 3.3 Mid Rise G+4 min / FAR 2.5 Low Rise G+2 min / FAR 1.75 Low Rise G+3 min / FAR 2.2 Low Rise G+3 min / FAR 2.2 Low Rise G+3 min / FAR 2.18 Residential above / with Retail at ground floor Commercial above / with 20% as Retail Type 2 at ground floor Commercial above / with 10.71% as Retail type1 at ground floor and mezzanine. 100% Residential KEY Height / FAR USE ICP 3: Matrix defining land use height, floor area ratios and distribution of uses Residential above / with 10% as Retail type1 at ground floor Commercial above / with 7.76% as Retail type2 at ground floor and mezzanine Note: Reference to percentage on this page means percentage of Total Floor Area (TFA) permissible on a plot 10 Development Code October 2007- Rev.1 the ground floor Setback from boundary of the building to building line is shall be minimum 3.5m on all Minimum 75% LOW RISE sides of the plot, except between 0.45m of building below and 1.2m where a setback is elevation must The maximum adjacent to a 19m road above the front the number of corridor (ICP2 only), average top of streets floors for each then the setback shall kerb on the Max. 55% landuse is, be 5m. primary street of plot buildings on the respective front area corner plots, landuse A balcony edge shall min. 75% of minimum not be within 2m from Ground storey each side number of max height 5.5m the boundary line. elevation must floors with four front the additional Upper storeys The top storey of a streets floors. building will be set back max height 4m except top a min of 2m from the storey height building face. PARKING ANCILLARY GRADE STRUCTURES ANCILLARY ROOF STRUCTURES SET BACK ALIGNMENT FOOTPRINT STOREYS LAND USE DIAGRAM 2.3: BUILDING CONFIGURATION & SETBACK – LOW RISE All basement floors can be across 100% of the plot. Grade and above grade parking structures must have a podium deck above which is usable by the tenants as a common open space, and may only extend to the building setback face. Exposed faces of parking structures will have fenestration compatible with occupied areas of buildings. Roof top plant & ancillary structures shall All ancillary be set back structures not min. 3.5m from sited on roofs the top storey (gate houses, Roof ancillary guard structures (non houses etc.) habitable) will form part such as plant, of the 55% stair & lift head allowable Access to parking shall be enclosures building foot from side streets or rear where and habitable print possible, within 10.5m from structures, shall plot boundary and 24m from be a max 4m road junctions. No parking in height. structure facade shall face onto public open space or primary or secondary roads. The following diagrams are not intended to be a 'pattern book' but seek to illustrate the building configuration & setbacks 11 Development Code October 2007- Rev.1 MID RISE the ground floor of the building shall be between 0.45m below and 1.2m above the average top of kerb on the primary street front The maximum number of floors for each landuse is, Ground storey the respective max height 5.5m landuse minimum number of floors with Other four additional floors. commercial storeys also 5.5m Upper storeys max height 4m except top storey height Setback from boundary to building line is minimum 3.5m on all Minimum 75% sides of the plot, except of building where a setback is elevation must adjacent to a 19m road front the corridor (ICP2 only), streets then the setback shall Max. 55% be 5m. of plot buildings on area corner plots, A balcony edge shall min. 75% of not be within 2m from each side the boundary line. elevation must front the The top storey of a streets building will be set back a min of 2m from the building face. PARKING ANCILLARY GRADE STRUCTURES ANCILLARY ROOF STRUCTURES SET BACK ALIGNMENT FOOTPRINT STOREYS LAND USE DIAGRAM 2.4: BUILDING CONFIGURATION & SETBACK – MID RISE All basement floors can be across 100% of the plot. Grade and above grade parking structures must have a podium deck above which is usable by the tenants as a common open space, and may only extend to the building setback face. Exposed faces of parking structures will have fenestration compatible with occupied areas of buildings. Roof top plant & ancillary structures shall All ancillary be set back structures not min. 3.5m from sited on roofs the top storey (gate houses, Roof ancillary guard structures (non houses etc.) habitable) will form part such as plant, of the 55% stair & lift head allowable Access to parking shall be enclosures building foot from side streets or rear where and habitable possible, within 10.5m from print structures, shall plot boundary and 24m from be a max 4m road junctions. No parking in height. structure facade shall face onto public open space or primary or secondary roads. The following diagrams are not intended to be a 'pattern book' but seek to illustrate the building configuration & setbacks 12 Development Code October 2007- Rev.1 HIGH RISE The maximum number of floors for each landuse is, the respective landuse minimum number of floors with four additional floors. the ground floor of the building shall be between 0.45m below and 1.2m above the average top of kerb on the primary street front HR4 & HR5: Max. 65% of plot area Minimum 75% of building elevation must front the streets Ground storey max Plots with height 6.5m HR2, HR3, HR6 multiple street & HR7: frontages, min. Other commercial Max. 50% of 75% of each storeys to be max plot area side elevation 5.5m must front 3 sides of streets Upper storeys max height 4m except top two storeys height Setback from boundary to building line is minimum 8m on sides of the plot facing the streets frontages, the remaining sides shall be setback minimum 3.5m. The tower shall be facing the main street and always be setback 8m from plot boundary with a further 2m on the top floor. Where streets surrounding the plot are of equal status, the tower shall be located on any corner of the building. A balcony edge shall not be within 2m from the boundary line. PARKING ANCILLARY GRADE STRUCTURES ANCILLARY ROOF STRUCTURES SET BACK ALIGNMENT FOOTPRINT STOREYS LAND USE DIAGRAM 2.5: BUILDING CONFIGURATION & SETBACK – HIGH RISE All basement floors can be across 100% of the plot. Grade and above grade parking structures must have a podium deck above which is usable by the tenants as a common open space, and may only extend to the building setback face. Exposed faces of parking structures will have fenestration compatible with occupied areas of buildings. Roof top plant & ancillary structures shall be set back min. All ancillary 3.5m from the structures not top storey sited on roofs (gate houses, Roof ancillary guard houses structures (non etc.) will form habitable) such part of the as plant, stair & allowable lift head building foot Access to parking shall be enclosures and print from side streets or rear where habitable possible, within 10.5m from structures, shall plot boundary and 24m from be a max 4m in road junctions. No parking height. structure facade shall face onto public open space or primary or secondary roads. The following diagrams are not intended to be a 'pattern book' but seek to illustrate the building configuration & setbacks 13 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 3.0: BUILDING FORM SECTION 3.0: BUILDING FORM 3.1 Introduction 3.2 Massing and Height 3.3 Parking, Loading & Access 3.4 Roadway Concept Development Code October 2007- Rev.1 3.1: BUILDING FORM - INTRODUCTION 3.1 Introduction 3.1.4 Building Articulation • Frame open spaces When designing building structures there are a number of development code requirements to be considered. The aim of these is to create a structured frame work for massing, articulation, fenestration and material selection within which developers can create interesting functional and aesthetically well designed buildings. The incorporation of vertical and horizontal architectural detailing prevents blank dull facades and increases visual interest. • Emphasize gateways to public areas Design duplication for plots will not comply with the Architectural planning aspirations of the ICP3 development. The design should lend itself to interesting façade theme variations without compromising the planning. Distinction for each of the development will achieve uniqueness and negate repetitions. This will, therefore, assist in differentiating the offering and consequently improve its appeal to the community. • Articulating the facade – with the architectural elements described in Section 4.0 • Emphasizing corner treatments - projecting elements forward, adding bay windows, pulling back to create an open space • Architectural articulation will include stepping the building facade in or out, varying roof lines, changing the rhythm of windows and doors adding architectural details and varying materials. See Section 5.0. Increasing building height on part or all of the building - all tall buildings should be designed to include elements at a human scale from the ground to 5th storey • Varying roof heights and roof features to add visual interest and identify clusters of related uses for a diversified skyline • Increasing the size of windows or doorways for drama • Changing colours, materials and textures 3.1.5 Active Frontages & Facades A balcony projection shall be permitted along the whole or part of the building facade. Balcony projections shall be articulated. Balconies shall be on the first floor upwards with a minimum clear height of the balcony above the finished kerbstone level of not be less than 3.0m. Balconies overlooking a road, service road or neighboring property must be not less than 2m away from the plot boundary. No structural projections shall be allowed outside the plot boundary (including retaining walls, footings, or boundary walls). A balcony must not be enclosed. 20% of all apartments in low and mid rise development must have balconies. 3.1.1 Building Orientation The most fundamental requirement in structuring built form is to differentiate between public fronts of buildings and private backs of buildings. Buildings that front streets and frame open spaces encourage public activity create visual interest and ensure the space to the rear of the building remains private in character for access, gardens or parking. The ground floor level of the building or structure shall be between 0.45m below and 1.2m above the average top of kerb of the primary street front. 3.1.2 Building Height/ Floor Area Ratios The heights of the buildings have been set according to the land use and provide a range of height options within each category. This adds flexibility, enabling buildings within the same zone to be different heights and allowing individual plot owners to vary the roof line within individual plots. All tall buildings should be designed to include elements at a human scale from the ground to 5th storey. The building footprint will be 55% of the plot area see tables 2.3, 2.4 and 2.5 (Note: the footprint for high rise mixed use will be 65%, see page 13). 3.1.3 Plot Amalgamation The developer is required to submit a written application to Nakheel customer service for the amalgamation of plots and must include the following documents: • Cover letter stamped and signed by the owner. • Application fee, to be advised by sales on the basis of area. • Proof of ownership of plots (purchase receipt copy). • NOC from Sales. Once the above documents are received and approved, the amalgamation affection plan shall be issued. Existing zoning and land use requirement will still apply to all amalgamated plots. The FAR, footprint and setback requirements shall remain unchanged, subject to technical review and approval. A maximum of two plots can be amalgamated to form a single plot subject to application and approval. Note, amalgamation of more than two plots may be permitted to create suitable development parcels for civic uses, subject to application and approval See section 10.11 Amalgamation, for Terms & Conditions. Making the fronts of buildings active adds interest, vitality to the adjoining public realm. Views into buildings add interest for passers-by and views out add ‘eyes on the street’ and contribute to safety. Parking entrances or exits are not allowed via the building face fronting the street or streets. The areas of building on road fronts must be occupied by primary land use functions creating active frontage. All buildings must add visual interest and animation to facades by including the following features: • Including architectural elements that provide relief from the climate such as arcades, colonnades and awnings • Designing in frequent doors and windows with few blank walls • Using narrow frontages or stepping larger buildings in or out giving a vertical rhythm to the street scene • Enlivening the edges of buildings with articulation such as balconies, bays, porches, awnings and projections that overlap the building with the street This can be done by: Pergolas are permitted around the external areas of buildings in un-built areas of the plot and within the setback area. Pergola height shall not exceed 3.5m Pergolas are permitted for covering roof top swimming pools providing their setback is not less than 3.5m from the building boundary, their projection shall not exceed 1.5m from the swimming pool edge and their height shall not exceed 3.5m above the swimming pool edge level. • Using small level changes at building entrances to give a sense of privacy and surveillance but maintaining access Awnings are permitted along the whole or part of the building facade. Awnings shall be positioned at ground floor or first floor level with a maximum projection from the building face of 2m. They must not interfere with pedestrian or vehicular movement. • Where privacy is not an issue using non reflective glazed areas to allow lively internal uses to be viewed from the street The following section provides a matrix of mandatory building form elements for each development type. 3.1.6 Highlight Landmarks The design of the streets, landscaped areas and individual building forms will help residents and visitors to orientate themselves. It is therefore important to define building forms which create local landmarks for plots which: • Terminate views and vistas • Punctuate activity nodes • Provide focus where streets converge 15 Development Code October 2007- Rev.1 3.0: BUILDING FORM ON SITE PARKING SPACE REQUIREMENTS: RESIDENTIAL Studio / 1 bed 1 space per apartment 2 bed 1.5 space per apartment 3 bed 2 space per apartment Visitor Parking 1 space per 35 car parking spaces provided COMMERCIAL Staff Parking 1 space per 50m2 commercial space Visitor Parking 1 space per 100 car parking spaces provided RETAIL Parking 1 space per 25m2 Retail Space HOTEL General 1 space per 5 guest rooms Restaurant 1 space per 47m2 of restaurant space Ballroom/conference 1 space per 19m2 room/wedding hall Staff Parking 1 space per 100m2 THEATRES/CINEMAS General 1 space per 3 seats CYCLE PARKING 1 multiple bicycle rack per 30 car parking General spaces provided Figure 3.1 Note: figures are based on building’s total floor area. Where parking allocation results in 0.5 of a whole number, the figure should be rounded up to the nearest whole number. 3.3 Parking, Loading & Access Parking and loading requirements are established as part of this code to ensure that all activities in International City Phase 3 are provided with adequate and reasonable parking and loading facilities that meet the needs of anticipated demands. 3.3.1 Parking Basement parking G-1 is preferred in all low, mid and high rise developments. Basement parking G-1 and G-2 is preferred in all mid and high rise developments. Additional parking shall occur at Ground Level and above, however, all parking must be covered 100% with a podium deck and landscape in accordance with Section 6.0 of this report. For facade treatment of parking structures refer to parking columns in sections 2.3, 2.4 and 2.5 3.3.2 Location of Parking The location of parking in relationship to structures on a plot and the streetscape are regulated by sections 2.3, 2.4 and 2.5. Mid Rise - all parking shall be at G-1 and G-2 across 100% of the Bus and taxi drop off areas shall be permitted in areas viewed by plot. Additional parking shall be at grade and above if required. All the general public. parking levels must be covered by a podium deck. General loading spaces shall have a minimum width of 3m and a High Rise - all parking shall be at G-1 and G-2 across 100% of the length of 12m exclusive of aisle and maneuvering space, a plot. All additional parking levels must be covered by a podium minimum vertical clearance of 5.5m and an inside turning radius deck. shall be a minimum of 9m Parking areas will not be located along the front of the building nor within the setback area from all sides of the plot boundary. See sections 2.3, 2.4 and 2.5 for further details, set back and access requirements. Semi trailer space requirements shall have a minimum width of 3.5m and a length of 17m exclusive of aisle and maneuvering space, a minimum vertical clearance of 5.5m and an inside turning radius of 12.5m (sizes and location to be confirmed) All loading areas should be designed to be screened from the view of the general public and designed to fit appropriately into the Parking and loading layouts shall require approval by Nakheel prior design of the surrounding structure. to construction or use. No Concept Design or site plan approval shall be granted if Nakheel is unable to determine that parking and 3.3.8 Access & Egress loading areas meet the requirements shown in sections 2.3, 2.4 & Vehicular access and egress leading to car parking areas shall be 2.5. as per JAFZA minimum width requirement. Access and egress points will be positioned to minimize disruption to the tree spacing 3.3.4 Number of Spaces along roads. Figure 3.1 designates the minimum number of parking spaces, Access to parking shall be: visitor parking spaces and multiple bicycle racks required. • From side streets or to the rear of plots where possible, The parking requirements including a m2 measurement shall be • 24m from road junctions and within side setback. based on total floor area (in the event that the calculations results in a fraction greater than 0.5 the number shall be rounded up to • There will be a maximum of 2 vehicular access/egress points on any one side of a plot fronting a road (including provision for the next whole number, otherwise the number should be rounded service access). down) • Should be within 10.5m from the plot boundary, as this will be 3.3.5 Markings and Accessories the reference setback allocated for individual plot in the road design and infrastructure services Each required parking space will be individually identified by surface markings in accordance with JAFZA standards. Aisles and Substation shall be accommodated within the plot clear of the maneuvering areas shall also be clearly marked with directional setback area and avoiding direct access from street. Other service and traffic information as determined necessary. structures shall be accommodated away from the building frontage facing the street, unless otherwise, overruled by the Lighting shall be installed as needed for purposes of safety and relevant service provider. shall be installed in a manner to prevent light from reaching beyond the intended area. Certain plots are segregated from the road by public open space. The vehicular access and egress points to the plot will be designed 3.3.6 Landscaping, Screening and Drainage to transverse the open space and must be perpendicular (90 degrees) to the adjoining road. See Section 6.0 All vehicular circulation to and from the plot must not cross or Parking and loading areas shall be graded, paved with a material conflict. The entries to the car park shall precede exits on the approved by Nakheel, drained, and maintained to avoid dust, approaching side of the nearest road lane. Two way design should erosion or excessive water flow. include a curved “T” junction to prevent exiting cars crossing oncoming traffic flow. 3.3.7 Loading Areas Rear setback and rear half of Side setback must be a minimum Loading areas shall be located away from the view of the general 150mm higher than the parking aisle and landscaped with trees. public where possible, especially on the larger commercial plots. Pedestrian access to the side and back landscaped areas shall be Side streets & rear of plots are preferential loading access areas. provided directly from the building 3.3.3 Approval Process Low Rise - all parking shall be at G-1 across 100% of the plot. Additional parking shall be at grade and above if required. All Commercial activities requiring large volumes of loading, such as parking levels must be covered by a podium deck. supermarkets, will be subject to restricted loading hours. 17 October 2007- Rev.1 Development Code 3.0: BUILDING FORM 18 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 4.0: ARCHITECTURAL CHARACTER SECTION 4.0: ARCHITECTURAL CHARACTER 4.1 Introduction 4.2 Character of Place 4.3 Architectural Language 4.4 Architectural Treatments 4.5 Materials and Colour 4.6 Pedestrian Access Development Code October 2007- Rev.1 4.0: ARCHITECTURAL CHARACTER 4.1 Introduction This Development Code is not intended to be a prescriptive pattern book, rather a reference guide to the design of urban neighborhoods. The intent is to create a place rich in spatial experience punctuated by incidental monuments within a landscape and a variety of architectural scale and expression. Creative application of design principles and architectural language is encouraged for designers to develop distinctive yet varied neighborhoods whose stylistic expression is underpinned by a proportional elegance. 20 Development Code October 2007- Rev.1 4.0: ARCHITECTURAL CHARACTER 4.2 Character of Place 4.4 Architectural Treatments Our favourite cities all display a surprising consistency of scale and proportion. Observe the typical streetscape of London or New York, Paris or Rome, Stockholm or Barcelona and you will appreciate the similarities in scale and storey height, for example: a taller podium with proportionately diminishing upper storey’s, vertical fenestration emphasis and a detailed embellishment of entrances, balconies, dormer windows, roofs and chimneys. The architectural language for International City Phase 3 is built upon a syntax of key architectural elements which contribute to the definition of the architectural character of a neighborhood. They add personality and human scale detail. 4.4.1 Applicability – Low to Mid Rise It is important to recognize that the character of place is determined by a number of contributing influences: Buildings scale The following architectural components should be applied to all low and mid-rise buildings and podium sections (up to 5 storey’s) of high-rise buildings. Refer to Section 2.0 - Land Use for site plan parameters. • Massing • Arcades • Form • Rustication • Materials • Quoining, cornices and pilasters • Colour • Awnings These are the principal factors, which together with its history, collective memory to add spirit of its residents, help make a place distinctly different from another. • Verandahs • Balconies • Bay windows They are also qualities of a more timeless architectural design. • Corner expression • Loggia • Roof terraces • Generous overhangs 4.3 Architectural Language In the development of an architectural language for International City Phase 3 we aim to learn from the past and employ a timeless proportional elegance and elemental detail as the framework for all new development. We intend this framework to underpin the architectural language and syntax of International City Phase 3 in order to engender a rich variety of architectural expression and to discourage architectural pastiche. 4.4.2 Applicability – High Rise The following architectural treatments should be applied to G+6 to G+20 buildings above podium (G+5) level. (Elements described in the previous section (4.4.1) shall apply to all levels below the 6th storey.) Facade Tower treatment: Use of glass should be kept to a minimum (less than 50%) sufficient to provide natural day lighting requirements for either residential or commercial uses. This is intended to reduce glare and solar heat gain to a minimum. Balconies/ Solar Shading: balconies and other solar shading devices are strongly encouraged especially on south and west facing facades. It is intended that these elements alone will convey the articulation of the building structures Designers should seek to exploit these features to produce high quality, innovative designs. 21 October 2007- Rev.1 Development Code 4.0: ARCHITECTURAL CHARACTER The following diagrams are not intended as a ‘pattern book’ but seek to illustrate how different architectural treatments may be applied at the G + 3 to G + 4 storey scale. 24 Development Code October 2007- Rev.1 4.0: ARCHITECTURAL CHARACTER 4.5 Materials & Colour. 4.5.4 Roofs 4.5.1 General Facade The choice of roof material should be in keeping with the design of the building. External walls may comprise of the following materials: • Usage of glass with a low reflectance (max 30%) should not be more than 50% of the facade (including windows). • Render finish in various textures. This may have integral colour pigmentation or be finished with exterior quality paint systems. • Stone or cast stone cladding • Calcium silicate blocks • Brickwork • Tile finishes including rain screen terracotta systems. • Aluminum cladding systems can be considered on high rise commercial buildings only. Flat roofs will not be seen from street level but special attention should be paid to the buildings parapet as the visual termination of the building at high level. A variety of pitched roofs can be employed in a design. Traditional roofing materials such a tiles should only be employed on pitched or mansard roof structures. More modern shaped roofs such as ‘butterfly’, curved or mono-pitched roofs should employ other materials such as metal standings seam systems. Eaves/ roof soffits are highly visible elements at the top of buildings and should be given special attention by designers in terms of materials and colour as well as form. 4.5.2 Facade Base 4.6 Pedestrian Access Designs should seek to unify the non-glazed areas at the ground storey level of buildings with a consistent quality material. For example, use of a natural stone cladding as opposed to a render finish. Pedestrian access for the main users of the building must be located facing the street, or primary street on a corner plot, in a prominent position and without obstructions. Designers must give consideration to the choice of materials that have been used on an adjacent plot and seek to use a complimentary material (use of colour, texture and material type) at the ground floor level of their building design. The above requirements seek to create unification of materials and colours at street level without making them homogeneous. Structures exceeding 5 storeys in height are expected to provide discernable architectural treatment to delineate the podium, shaft and top using exterior materials, colour, architectural relief and detail, pedestrian scale treatments, and transparent windows. Entrances into residential buildings should have a hierarchy that relates width and design to their function and frequency of use. • Primary residential entries – should be a minimum of 4m wide paved pathway for entry into the building or private gardens/courtyard/parking • Secondary residential entries – should be a minimum 2m wide paved pathway for entry to the back of properties, bin areas, bicycle parking etc. • Mixed Use entries – dimensioned to meet the needs for the user, access to commercial, residential and office space 4.5.3 Facade Mid Level Materials, colours and textures utilized to cover the remaining facade areas should be selected to compliment the base material in colour and texture. Stark contrasts should be carefully considered and be only employed to highlight features such as corners, projections, window and door surrounds if required. 25 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 5.0: SIGNAGE SECTION 5.0: SIGNAGE 5.1 Introduction 5.2 Types and Purpose 5.3 Treatments Development Code October 2007- Rev.1 5.0: SIGNAGE – TYPES AND PURPOSE 5.1 Introduction All signs erected, altered, displayed or relocated in plots within International City Phase 3 shall be constructed and maintained according to the standards established by this Code. Section 5.2 identifies permitted signage by area and type and purpose. A “P” indicates that a classification of sign is permitted by right within a given area. All temporary or permanent signs erected, altered, displayed or relocated in International City Phase 3 require approval from Nakheel in accordance with the development review process described in Section 10, Administration and Procedures. A master sign plan shall be submitted for all signs; this shall show the location, detail dimensions, colour, materials, and method of illumination. Each applicant that obtains approval will be required to maintain the sign in a safe and secure condition. All signs will be in Arabic and/ or English. The following signs are exempt from the code and therefore do not require approval: • Signs within individual building enclosures and which can be viewed only by occupants and visitors • Statutory signs such as traffic, parking, warning, danger, street names, utility marker, official signs and legal notices issued by Nakheel. • Works of art that exclude commercial messages • Address plates less than 0.3 m2 in total area. The following signs will be prohibited: • Signs that form a traffic hazard • Signs affixed to utility poles, trees, stones, bushes, other natural features or other signs • Obstructs doors, windows, entries or openings • Signs in poor repair • Signs that obstructs neighboring signs or pedestrian traffic either physically or visually All abandoned signs shall be removed within 60 calendar days of the date that business, person or activity that the sign identifies or advertises ceases to operate on the site on which the sign is located. The applicant that receives approval for the sign will be responsible for maintaining such a sign in a secure and safe condition. If Nakheel deems that the sign is not secure, safe or in good condition it shall be considered as a violation of the code and enforcement proceedings shall be commenced. Temporary signs must conform with the general signage code standards, permitted temporary signs include: • Real estate • Special event or sale • Contractor advertisement • Future facility advertisement Sign lighting shall be arranged and maintained so that the source is not directly visible from a public right of way or adjacent property. 27 October 2007- Rev.1 Development Code 5.0: SIGNAGE – TYPES AND PURPOSE Plot Signage: Mandatory requirements for sign types and purposes. 28 October 2007- Rev.1 Development Code 5.0: SIGNAGE – TYPES AND PURPOSE Plot Signage: Mandatory requirements for sign size, number, type and lighting. 29 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 6.0: LANDSCAPE SECTION 6.0: LANDSCAPE 6.1 Introduction 6.2 Safety 6.3 Planting Design Regulation 6.4 Special Requirements by Zone 6.5 Property Setbacks 6.6 Artistic Liberty and Design Originality 6.7 Irrigation Design Guidelines 6.8 Hard Landscape 6.9 Lighting 6.10 Water Features 6.11 Furniture 6.12 Boundary Treatments Development Code October 2007- Rev.1 6.0: LANDSCAPE 6.0 Landscape 6.1 Introduction Landscape and irrigation regulations are established being part of the development code as means to: • Provide the developer with a set of landscape and irrigation guidelines which promote the establishment of the overall style and quality of the landscape for International City Phase 3 • Encourage the penetration of green spaces into the fabric of the city creating climatic and visual relief from urban hardscape • Aid in emphasizing the individual identity of key areas and streetscape planting hierarchy in association with the road corridor structure • Assist in providing a cohesive environment both visually and functionally, that maximizes the quality of life for residents It should be noted that all irrigation and landscaping shall conform to all relevant authority regulations in respect of safety. 6.2 Safety No landscaping shall be permitted whatsoever that endangers in any way the health or public safety by creating traffic hazard, or obstructing vision and sight lines. No plants which are toxic to human beings, by contact or ingestion shall be permitted. 6.3 Planting Design Regulations Planting layouts and plant selection shall be designed to achieve the following objectives: • Encourage the use of open and terraced spaces by providing visual interest and climatic amelioration • Direct pedestrian circulation • Accent entrances, intersections • Reinforce the individual identity of key areas and road hierarchy • Encourage short and long term water conservation • Maximize privacy around ground floor residential apartments • Reflect circulation patterns, visibility and safety of pedestrian and vehicular traffic • Plants shall be positioned to allow access for maintenance focal areas and road/footpath 6.3.1 Planting Specifications Planting specifications have been set as part of this code to unify the quality and standard of planting for the development, as well as to ensure that plot developer takes into consideration plant design parameters which may effect structural elements which need to be considered in the preliminary phases of development and planning. All plants shall be established in special beds (lawns, ground covers and seasonal) or pits (trees, palms and shrubs). The pit/bed shall be large enough to take the root ball and shall be thoroughly watered prior to planting. Planting soil depth shall comply with the following minimum requirements: Palm pits Tree pits Large shrub pits Shrub beds Ground cover bed Lawn areas 1500x1500x1500mm 1200x1200x1200mm 500mm deep 500mm deep 300mm deep 300mm deep The use of Soil Moisture Retention Additives is required as water conservation is a priority. In the Tender process, use of those additives shall be guaranteed by the tenderer in terms of a percentage irrigation water use reduction over a specified period of time. Approved amendments shall acquire the following: • Provide soil with high water holding/ retention/ absorbing capacity particularly in sandy and saline soils when incorporated them. • Have a quick soil wetting ability and a long lasting (at least 5 years) stability in the soil resisting fast natural degradation processes • Be environmentally friendly with no short or long term impacts on the environment, non toxic and non–hazardous to any ecosystem, soil organisms, humans, animals and underground water. • Shall not contain levels of any element above those specified in the rules and regulations of local authorities particularly heavy metals • Not hinder plant nutrient uptake or interfere with/ affected by application of fertilizers, pesticides or any treatment whether chemical or biological • Belong to one of the following categories: 1. Organic copolymers, 2. Acrylamides, 3. Acrylic polymers, 4. Volcanic ash/ Basaltic volcanic parent material, 5. Amorphous silica or 6. Coated silica • Have a minimum absorption capacity of 75-100ml water/gm of material with a minimum of 85-90% available as plant water • Reduce irrigation water consumption by a minimum of 45% The following products have been tested and approved by Nakheel Design Group (NDG). Any product suggested by contractors must obtain approval by NDG before application. Contact details of suppliers of those materials can be obtained from NDG: • Sanoplant and the associated electro-kinetic technology • Sanonet • Zeoplant • Stockosorb • Zeolux 31 Development Code October 2007- Rev.1 6.0: LANDSCAPE • All palms, and trees with the exception of small accent palms shall have a minimum distance of 2.5 metres from building • All palms, with the exception of small accent palms shall have a minimum spacing of 9.0 metres from other palms All Large trees shall have a minimum distance of 5.0 metres from other large trees • • All Tree and Palms shall be planted a minimum of 1.0 metre away from all footpaths • All Tree and Palm pits shall maintain minimum distances from underlying services as specified by the relevant authority regulations 6.4 Special Requirements by Zone 6.4.1 Concrete Podiums This section of the code has been established to ensure that the plot developer adheres to certain regulations and minimum requirements for the landscape use and development of open areas on concrete podiums. Concrete podiums are required above all parking structures at ground level and above. Landscape design objectives for concrete podiums are as follows: • Enhance the overall appearance of the development by providing visual relief and establishing additional green spaces throughout the International City development • Encourage the use of open and terraced spaces by providing visual interest and improvement of the microclimate • Ensure safety of residents • Maximizes the quality of life for residents 6.4.2 Integration of Services and Landscape Requirements All landscape plans submitted shall include landscape development of concrete podiums, including detailed irrigation that allows for the allocated amounts of water as defined in Section 6.7 and drainage plans that ensure that all palm, tree and planting beds drain freely. Landscape plans need to be prepared in consultation with structural engineers to ensure that the required modification to structural elements have been undertaken in order to incorporate adequate space for palm/tree pits. adequate structural loading, size, water supply and drainage requirements, and as defined in Section 6.3.1 of this report. 6.4.4 Emergency Access The location of planting shall ensure access for emergency evacuation whilst still meeting the minimum requirements for soft landscape percentages as defined in podium landscape matrix. Emergency access routes on the podium deck will be kept free from obstacles. Adequacy of emergency access and evacuation routes will need to be confirmed by the relevant authorities. 6.4.5 Maintenance The location of planting shall ensure access for maintenance whilst still meeting the minimum landscape requirements. All maintenance and plant machinery will be screened from view and properly stored in areas to which public access will be prohibited. All plant and maintenance buildings/units will be clearly signed by the service provider. 6.5 Property Setbacks This section of the code has been established to ensure that the plot developer adheres to certain requirements and regulations with regards to the visual appearance and functionality of plot setbacks. Setback treatment contributes an essential role in the overall appearance of the development. • The setback area is required to be landscape and free of any structure above grade except for awnings, balconies and other exposed projected structures extending to a maximum of 1.5 meter into setback corridor. • The only acceptable, subject to approval, use of the side / rear setback area is driveway or ramp going down to the basement, laid out adjacent to the boundary, with the condition that an equal landscaped area is provided bordering the driveway / ramp • Only in case of plot with narrow width, where it is not possible to provide for an equal and bordering area of landscape in lieu of use of driveway / ramp in the setback on the ground floor, there shall be a minimum landscape of 24% of plot area subject to approval. Considerations include the load generated from plants, irrigation/drainage systems and sufficient planting medium depth. 6.3.2 Restrictions on Planting Distances Sufficient space should be allowed at the time of planting to accommodate the spread of branches and roots likely to occur as a plant matures. This will safeguard the plant against felling or excessive cutting-back as well as preventing any overpowering or damaging effects on nearby buildings or other structures. The restrictions on spacing are as follows: 6.4.3 Podium Planting Concrete podium decks should be developed to include planting and recreational activities. Regulations for land use and design for these areas are defined in the Podium Landscape Matrix. All podiums at Ground Level shall incorporate a minimum 35% of Total Area for trees and palms (refer to Podium Landscape Matrix). Tree and Palm planting pits shall be designed for 32 Development Code October 2007- Rev.1 6.0: LANDSCAPE • While calculating landscape on the ground floor, any area covered by a supported structure, excluding area with awnings / balconies / other projected structures, will only be counted as half of the calculated area for adding and achieving either the required landscape all around the building in setback area or a minimum of 24% of plot area in case of narrow plot. • In order to maximize the landscape, common and single access or egress will be used for driveway and ramp placed side by side to be later bifurcated to achieve a minimum of 24% landscape of total plot area. • All setback planting levels shall be flush with the adjacent paving / hardscape material. • Careful consideration shall be given to the placement of plant material used on the setbacks so as not to create any visual barriers or obstruct pedestrian flow between adjacent plots. 6.5.1 Landscaping that Faces Street Fronts All planting facing street fronts, be it at front or at the side, must comply with the planting scheme summarised on the ‘Landscape Planting To Plots That Face Street Fronts’ Table in order to establish a strong framework which ties into the overall development, and by contributing to the individual identity of the street corridor type. Trees within setback areas should be evenly spaced and shall be aligned with the tree spacing on the adjoining public road corridor (tree spacing for all public roads is set out in the Masterplan) to minimise loss of trees through the positioning of access/egress points and to maintain constant tree spacing along roads. If basement parking extends to the boundary of the plot the developer must allow for ‘setdowns’ or ‘upstands’, adequate drainage and irrigation as defined in this section of the report to allow for adequate provision of trees/palms, shrubs and lawn. • Rear setbacks which are adjoining an educational facility, are to refer to the relevant authority regulations with regards to the specifications for separating structures. • Rear setbacks which are adjoining parks and open space shall be screened with planting to allow privacy for plot purchaser and park and green belt users 6.6 Artistic Liberty and Design Originality It is important to note that the design guidelines in this document are not established as a means to force developers into preconceived design solutions. Creative design solutions are encouraged. The guidelines key motivation is to ensure public safety, and encourage property developers to have a unified vision keeping in mind the larger picture and instilling harmony and continuity within ICP3. 6.7 Irrigation Design Guidelines General Issues • All landscape areas shall be provided with a fixed and permanent irrigation system (underground) • A fully automatic irrigation system shall be installed to irrigate soft landscape areas • Operation of the irrigation system shall be controlled from a fully computerized Central Control System and a number of field satellite controllers • The system design shall ensure that the peak water demand for the entire plantation is met on a daily basis • The system shall be capable of regulating the irrigation timings based upon the climatic conditions • The irrigation system shall be designed to ensure that the plants receive the following volumes of water daily at peak demand (see figure 6.1): Furthermore the plot developer shall match adjoining levels of existing and proposed finished landscape and paving areas in all common areas at street frontages and common side boundaries between the proposed building and street /plot line. 6.5.2 Building Setbacks that are Adjoining Other Plots and Public Areas The following regulations have been set in order to a guarantee privacy, safety and access: • Minimum of 0.6 metres planting space width shall be maintained between driveways and neighbouring buildings to allow for the planting of screening shrubs for buildings with ground floor residential units. • Minimum requirements for emergency vehicles need to be considered in the preliminary planning phase in adherence with relevant authority regulations Figure 6.1: Nakheel Irrigation Guidelines 34 Development Code October 2007- Rev.1 6.0: LANDSCAPE 6.8 Hard Landscape Where hard landscape adjoins any public area such as road verges the: • Hard landscape materials shall be either locally occurring (stone gravel etc.) or manufactured locally (concrete products etc.) wherever possible • Where this is not possible, imported materials shall be used. Preference shall be given to materials that are stocked by a local agent who will also offer technical support • Imported materials shall only be used where a property or character of material is required that is not otherwise available • All materials used maintenance • Colour and texture and use of materials shall complement the buildings and architectural style and reflect a modern urban environment shall be durable and require low • All concrete structures and sub base layers shall be designed to engineers approval • To minimise problems associated with blown dust and sand, all ground planes shall be treated so that there is no bare ground or exposed sand. Paving, pebbles, gravel or ground covers shall be used on all open areas 6.8.1 General The following list of materials illustrate a set of products and materials which will also be used in public open space areas and road corridor verges. The use of any of these materials will therefore provide continuity between these areas which is highly recommended. Locally occurring/manufactured materials include the following: 6.8.2 Concrete Products Concrete block: 60mm minimum thickness in pedestrian areas. Can be laid in a variety of patterns including basket weave, stretcher and herringbone or in accordance with manufacturers own pattern guidelines. Concrete blocks should be on 80mm minimum thickness in shared pedestrian/vehicular zones. To be laid on a 25mm mortar bed on concrete base to engineers specifications. In-situ concrete: Generally to be used in pedestrian areas only, 100mm minimum thickness. Finishes available include grit finish, exposed aggregate, smooth, patterned. 6.8.3 Natural Stone Natural stone includes boulders, cobbles, pebbles and hand dressed wall cladding/coping stones and paving. Where possible, the use of natural stone should be used in focal areas. If used its should be located in focal public areas such as central design in plazas, major water features and around sculptures Natural stone could include Rawda supplied locally by quarries in the Hatta region of UAE. All cobbles, pebbles and gravel should be water worn, locally sourced and be of various sizes from pea gravel (2-5mm diameter) to large cobbles (100-200mm diameter). Boulders will be selected for their natural appearance and will generally be between 400mm - 1200mm dia. Imported materials with local agents: Indian Sandstones: Dolphur, Modak and other Indian sandstones are stocked by several companies within the UAE. 25mm minimum thickness for cladding, 35mm minimum thickness for pedestrian paving, 50mm minimum thickness for vehicular paving/shared zones/copings and edgings. Available colours include browns, yellows, tans/beiges and pinks. Finishes include honed, riven, hewn, sawn and grit blasted. All sandstone should be double sealed on both faces prior to fixing with an approved sealant. Granites: A variety of different granites from Saudi Arabia, Oman, other Gulf Countries and India are stocked by several companies within the UAE. Granite should only be used in focal areas and for water features, 25mm minimum thickness for cladding, 35mm minimum thickness pedestrian paving, 50mm minimum thickness for copings and edgings. Granite setts should be either 50 x 50, 100 x 100 or 100 x 200mm. Available colours include greys, browns, pinks, yellows. Finishes available include polished, honed, flamed. All granite shall be sealed on both faces prior to fixing with an approved sealant. 38 Development Code October 2007- Rev.1 6.0: LANDSCAPE 6.8.4 Timber There are a number of timber merchants who stock both hard and soft woods within the UAE. Sizes of timber shall be in accordance with BS5450 (for Hardwood) and BS4471 (for Softwood). Timber will be used for pergolas, gazebos, mashrabiya and shade structures. Hard Woods: All hard woods must be sourced from certified managed renewable resources and shall not include declining species. Finishes available include debarked, sawn and planed. Timber may be varnished or treated with a clear or colour preservative. Soft Woods: Where soft wood is required New Zealand Pine (pinus sp) is a common option. Soft wood timber should be of good quality without dead knots and from a certified managed source. Treated with an approved water borne preservative applied by vacuum pressure impregnation. Finishes include debarked, sawn and planed. Timber may be varnished or treated with a clear or colour preservative to look like hard wood. Imported materials include: 6.8.5 Ceramic Tiles Mosaic ceramic pool tiles: Range of sizes, thicknesses and colors as required. Commonly used in association with pools. Tiles will be used in residential pools and can be used in water features. Terracotta ceramic tiles: To be used under as a pedestrian surface under building appliques. Tiles are available in various thicknesses and sizes. Usually laid on 25mm depth latex modified mortar, sealed with an impregnated sealant on both sides to engineers specifications. Finishes include pressed, matt, glazed. Colors should relate to the overall theme of the zone. 6.8.6 Metals Stainless steel: Stainless steel shall be 316L marine graded, thickness and size as detailed. Finishes include brushed or polished Finished include mirrored, etched, brushed, anodized, antique, hairline or coated in polyester powder or PVF2 Finishes may include anodized or powder coated. 6.8.7 Rubber Safety Flooring To be used under all children’s play equipment in public play areas. The flooring must be sufficiently thick to absorb shock and wide enough to provide the recommended minimum space zones around each piece of equipment. Rubber safety flooring to have a rubber base layer and an EPDM rubber wearing course. The surface can be brightly painted or laid using coloured rubber tiles. 6.9 Lighting The lighting of landscape areas within the plot should include landscape lighting, facade/ architectural lighting, signage lighting and water feature lighting as applicable. Lighting schemes will be developed to reflect the location of the development, the land use and the frequency of use. Light fittings can include under water lights, pool lights, pole lights, bollards, spike lights, up lights, wall lights and recessed lights. All lighting will be at an ambient level to prevent glare and create an atmospheric ambience. Lighting schemes shall be designed to ensure safety whilst minimizing nuisance and glare for residents and pedestrians and drivers in the adjacent public realm. Steps, ramps, and directional changes must be identified by lighting. Lighting fittings will be selected from reputable manufacturers with established local agencies. Light fittings will be selected for their functional and aesthetic value. Pole top luminaries for focal areas such as large plazas. Light sources shall be high pressure sodium (warm yellow). Bollards, wall lights, step lights and path lights shall be mounted below eye level to control glare. Light sources may be incandescent or mercury vapour (white). Underwater lights will be provided in swimming pools and water features underwater. The use of special lighting, such as up lighting, silhouetting, etc., should be used in focal landscape areas. The light source shall be concealed to control glare. Light sources for highlighting may be incandescent or mercury vapor. Aluminum: Uses include grills, gates, sculpture, flagpoles, lighting and railings. Aluminum is available in a range of sizes and thicknesses as required. It can be cast or produced in sheets 39 Development Code October 2007- Rev.1 6.0: LANDSCAPE 6.11 Furniture 6.12 Boundary Treatments The proposed furniture selected by plot purchasers should complement the furniture range selected for public open spaces and streetscapes. Walls shall be required as indicated in the adjacent table (Figure 6.2). • The types of street furniture used shall depend on the location and intended function of that space e.g. adjoining streetscape, entrance, inner courtyard, transitory space, private garden, etc. • All moveable furniture incorporated within the landscape shall be at the discretion of the plot owner and must conform to the guidelines for street furniture where applicable • All street furniture shall be a prefabricated design from a reputable company, delivered to the site, and must be of a durable and high standard of construction • The furniture will be chosen from an existing range to ensure the different elements complement one another and appear unified. The styles chosen may incorporate a motif • The types of furniture that could be included are listed below: Benches/Seats: Figure 6.2: Boundary Treatments • Backed or backless, no arm rests • Grade A softwood or hardwood timber seats and benches • Black or brushed silver metalwork • Ground fixed with stainless steel fittings • Located within hard landscape settings, such as courtyards, plazas, play areas and along entry routes 6.10 Water Features Where roads surrounding a plot are equal in size, the ‘front’ of the plot will be assigned to the longest boundary fronting a road. Where roads and plot boundaries are equal in respective size and boundary lengths, the ‘front’ of the plot will be assigned along the road with the closest connection to a major roadway. will be assigned to the longest boundary fronting a road. No wall shall be permitted within setbacks fronting streets. As an exception, fencing within setback area facing the street is permitted, only for private landscaped gardens and shall be a maximum of 1.8m high from the average arithmetic mean finished landscape level. Walls including foundations shall be placed entirely inside the plot to which they belong with the external face aligned on the plot boundary. Only one boundary wall will be permitted on each side of the plot boundary. There shall be no duplication of walls on any boundary. The developer shall comply with the Boundary Treatment Matrix opposite, unless a wall already exists. Walls shall be constructed of durable materials that are compatible with buildings on the same plot in terms of materials, finish, colour and appearance. No fences of wood, plastic or chain link will be allowed. Walls shall be a uniform height of 2 metres. Bins: A wall may be classified as one of the following: • Where proposed they should be located in visually and functionally important locations to maximize their impact. The Molok recessed disposal system or similar should be used as the primary form of rubbish collection • All pump rooms shall be provided in voids below the podium structure and should not be visible from ground level. Additional bins should chosen from an existing range that is complementary to the seating and benches • Grade A softwood or hardwood, Solid wall: A solid fence shall be constructed of concrete block and stucco, and have no openings larger than 1 metre in diameter or width. Solid fences may have a decorative cap of which no more than 50% of the top may be 1 metre or less above or below the required uniform height. All access covers shall be recessed and matched to adjoining hard landscape patterns and materials. • Black or brushed silver metalwork • Ground fixed with stainless steel fittings • Maximum diameter 600mm, maximum height Receptacle size to suit standard JAFZA waste bags • Located adjacent to access routes but not directly adjacent to seating areas All water features will be designed to reflect a contemporary urban theme. Materials used around the water features shall be durable, require little maintenance and will be non-slip. Key water features may include natural stone e.g. granites, sandstones etc. Where possible, water features shall include integrated seating walls. Standing water shall meet safety standards and be a maximum of 300mm deep. Water quality shall be of a standard to permit human interaction. 1.2m. Public Art: • • Public art is encouraged and should generally be used to highlight a key location such as an entrance or the termination of a vista or subtly integrated into the landscape to provide surprise or interest Public art is entirely at the discretion of the plot owner but must be of a safe and durable and high standard level of construction and of non reflective material Half wall: a semi solid wall shall have a solid lower half constructed in concrete block and stucco, and an upper half of an open design in which a physical separation shall be maintained between the two sides of the fence but a visual connection between the two remains. Open wall: an open designed fence shall be constructed of wrought iron, aluminium or other acceptable material and shall maintain a physical separation between the two sides of the wall, but shall maintain open visual contact between the two sides. Alternatively vertical uprights may be used in open wall design, as long as the open design areas constitute at least 1/3 of the total length of the wall and no solid section is greater than 3m long. 40 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 7.0: DEFINITIONS Development Code October 2007- Rev.1 7.0: DEFINITION Abutting: A common border with or being separated from such common border only by a roadway, easement or right-of-way. Access: The place or way by which pedestrians and vehicles have a safe and usable ingress and egress to a property or use. An unobstructed way or means of approach to private entry to or exit from a property. Access Driveway: The area between the travelled portion of a road and a parking lot used by motor vehicles for access to and from a car park, but does not include an isle. Building Height: The vertical distance from ground floor to height of the highest roof structure. Penthouse, mechanical equipment and architectural features that comprise the “top” of the structure shall not be considered in the overall structure height. Buildable Area: That portion of a plot upon which a building, structure, pavement, or other improvements may be placed after designation of areas such as front, rear and side yards. Accessory use: A use customarily incidental to and related to a principal use established on the same lot. Building Permit: An authorization granted by JAFZA certifying that the design of a proposed structure or development, to be erected on a designated plot, after complying with all relevant provision applicable to this Code. The permit allows the building construction to commence. Addition: An extension or increase in total floor area or height of a building or structure. Building Primary: A building within which is conducted the principal use permitted on the plot, as provided by this Code. Adjacent: Abutting, directly connected to, or bordering. Car Park, Parking: Land used to park motor vehicles. Applicant: The person, party or corporation applying for approval or permission; normally understood to be the owner, leaseholder or developer of the lot. Car Park Structure: a building or structure consisting of one or more levels and used to temporarily store motor vehicles. Ancillary use: Use or function in support of, or adjunct to, the primary use or function Articulation: The utilisation of a variety of architectural design elements, including expression of the building’s functional components or modules, glazing, canopy and shading systems, protrusions, indentations and architectural features to define, and add interest and variety to a buildings facade Awnings: Projected roof-like structure suspended from the vertical building face to provide shade and climatic relief over external doorways, windows, entrances, external sitting and eating areas. Awnings may be retractable. Balcony: An external platform that projects from the face of a building and is surrounded by a railing, balustrade, or parapet. It must not be enclosed. Basement: The level or levels of a building below ground floor. Building: A permanently located structure having a room supported by walls or columns but excluding any courtyard such structure may have provided, however, that no form of fabric, tent or vehicle shall be considered a building. Building, Accessory: A building devoted to an accessory use or structure that is complementary to the primary use or structure. Building Consent Authority: Jebel Ali Free Zone Authority Change of Use: Any use which differs from the previous use of building or land. Commercial: Commercial Development within this Code refers to, Management and Office Uses. Conditional Use: An allowance, with respect to variance or exception, granted explicitly for a unique case contingent upon certain conditions as determined by the DBR notwithstanding the prevailing criteria but granted after concluding that all possibilities are considered and mitigation measures adopted with conditions ranging from fee payment to other measures. Construction Plans: The maps, drawings and specifications indicating the proposed location and design of improvements to be installed. Courtyard: A landscape outdoor open space surrounded by walls or fences or other materials utilized to establish as sense of boundary. Covered: Enclosed or protected by a slab, roof, skylight, dome or similar permanent structure, excluding permeable structures such as louvers, grilles, pergolas etc. Density: The number of dwelling units per unit of land. Development: The construction, reconstruction, conversion, erection, alteration, relocation or enlargement of any building or structure; any mining excavation or land fill; and any land disturbance in preparation for any of the above. Development Plan: A combination of application and submissions to be submitted to Nakheel that are necessary to gain approval for project construction. Development Review Board: Entity selected by Nakheel to be responsible for approval or denial of items requiring possible variation or alternations of this Code. Driveway: An access to a required off-street parking facility of an off-street loading area. Dwelling: A building used as a self contained residence that must include a kitchen sink, food preparation facilities, a bath or shower, and a closet pan and wash basin. Dwelling Unit: One or more habitable rooms constituting a self contained unit with separate entrance and used or intended to be use for living and sleeping purposes. Dwelling, Multiple Unit: A building divided into two or more dwelling units, each of which is occupied or intended to be occupied as permanent home or residence. Also known as Apartment Structure. Easement: A grant of one or more of the property rights by the property owners to and/or for use by the public, a corporation, of another person or entity. Egress: An exit Enclosed: Area contained or enclosed by a building structure such as walls, glazing etc. Environment: The physical factors of the surroundings of human beings including the land, water, atmosphere, climate, sounds, odours, tastes, the biological factors of animals and plants and the social factor of aesthetics. Existing Use: The lawful use of a building, lots or structure at the time or the enactment of these regulations. Exception: Are approved minor deviations from development standards established in the Development Code based on valid justifiable reasons after exhausting all considerations for valid solutions and mitigation measures. Facade: The exterior walls of a building exposed to public view or that wall viewed by persons not within the building. 42 Development Code October 2007- Rev.1 7.0: DEFINITION Feature: Fixtures, components or appurtenances attached to, contiguous to or otherwise related to a building structure or property including, without limitation, materials, overlays, mouldings, sculptures, fountains, light fixtures, windows, and monuments. Fence: A construction not considered a structure, which is designed for screening or enclosing. Landscaping screens of a height or over 1 meter shall be considered a fence whereas random plantings of any height shall not be considered a fence. Finding of Fact: Statement of facts upon which a decision by the Development Review Board has been reached. Floor Area: sum area of a single floor of a building or structure. This includes associated cupboards, service shafts, fire stairs, corridors, lift shafts, garbage, store and service and utility rooms and the like but excludes light wells, balconies, terraces, articulations (<450mm), non habitable projections, parking, access driveways, loading docks, uncovered external areas, uncovered non habitable roof terraces, podium decks, uncovered amenities such as swimming pools, spas, uncovered roof top plant, uncovered plant equipment, lift motor rooms, water tanks, pergolas, awnings, un-enclosed atrium and the like. Floor Area Ratio (FAR): A number that dictates the maximum permissible Total Floor Area for a plot. Floor Use: Use permitted for primary activity or use within each storey or part of a storey. Completed buildings and all areas within it, must conform to the permissible land use for each storey that main contain ancillary functions in support of primary use. Footprint: the outer boundary of a building storey in plan, measured from the external faces of the building, viewed from 1m above finished floor level Frontages: Configuration of the front facade or a structure along at minimum, the first two floors including the ground floor. Grade: The elevation of the surface of the ground at any point on a site. Grade, Existing: The elevation of the surface of the existing undisturbed ground at any point on a site. Grade, Finished Floor: The final elevation of the ground surface after a man-made alterations, such as grading, grubbing, filling or excavating, have been made on the ground surface. Ground Floor: the level of the building at natural ground level which is between 0.45m below and 1.2m above the average top of kerb on the primary street front. Home Office: A conditional, accessory use permitted in specific Zones that allow operation of small business in a home providing that impacts are mitigated and a conditional use permit issued. Hospitality: Refers to the relationship process between a guest and a host, and it also refers to the act or practice of being hospitable, that is, the reception and entertainment of guests, visitors, or strangers, with liberality and goodwill. Hospitality frequently refers to the hospitality industry including but not limited to hotels, restaurants, catering, resorts, clubs and any other service position that deals with tourists. Hotel: Is an establishment that provides paid lodging, usually on a short-term basis. Hotels often provide a number of additional guest services such as a restaurant, a swimming pool or childcare. Some hotels have conference services and meeting rooms and encourage groups to hold conventions and meetings at their location. Illuminated: A sign utilising an artificial or a reflective light source. Impervious Cover: Any hard surfaced, man-made area that does not readily absorb or retain water, including but not limited to building roofs, parking and driveway areas, graveled areas, sidewalks and pave recreation areas. Master Plan: The ICP3 Master Plan. Masterplan Consent Authority: Design Approval Department for ICP3 NOC: No Objection Certificate issued by the relevant authority Occupied: Arrange, designed, build, altered, converted, rented, lease, occupied or intended to be occupied. Open Plot: An area of open land other than a road, used or intended to be used to provide space for the parking or storage of motor vehicles, including parking space, loading space, maneuvering aisles, and other areas providing access to parking or loading spaces. Parking, Off-Street: An off-street parking space consist of a space adequate for parking an automobile with room for opening doors on both sides together with property related access to a public street including maneuvering room. Paseo: A public walk or boulevard designed exclusively for use of pedestrians and including limited amenities or urban open spaces. Improvement: Any building structure, place, fence, gate, landscaping tree, wall, car park, or other object constituting a physical feature which is not a natural feature. Pergola: External arbour or passageway with columns supporting a roof or trellis (openings to be not less than 50% of the total pergola area) used to provide shade and climatic relief over pedestrian areas. Ingress: An entry Permitted Uses: Any use allowed in a Zone by right. Intersection: The crossing of two (2) or more roads of grade. Plant Materials, Plants: Living street, shrubs, vines, ground covers, sod, and flowering annuals; biennials and perennials adapted to the environment of Dubai. Plaza: An urban open space that is surrounded by streets and structures, largely paved and possibly including landscaping, public art, seating or other features. Landscaping: The treatment and maintenance of a property, podium or area with a combination of planting (ground cover, shrubs, trees and palms), hardscape elements (paving, walls, lighting and furniture) which form features (walkways, fences, pools, fountains, or benches). Landscape Plan: A plan submitted as part of a package for Development Plan approval indicating the proposed landscape development, irrigation system and fences. Land Use: Permitted use for the primary activity or activities for buildings on the plot. The land uses are identified in the Land Use plan. Loading Space: Off-street: Space logically and conveniently located for bulk pick-ups and deliveries, scaled to delivery vehicles expected to be used, and accessible to such vehicles when required off-street parking spaces are filled. Plot: A piece, parcel, or plot of land occupied by or to be occupied by one principal buildings, its accessory buildings and frontage on a street. Plot Area: The total extent of surface, measure in horizontal plane within the lot lines of a lot. As noted on the Plot Location Certificate issued by Nakheel. Plot Boundary: demarcated line marking the outer edge of a Plot Area as shown on the Plot Location Certificate issued by Nakheel Plot Coverage: The percentage of the area of a lot or parcel of land which is occupied by buildings or structures. Plot Frontage: The portion of a lot which abuts a road. 43 Development Code October 2007- Rev.1 7.0: DEFINITION Plot Line: Any line bounding a lot as herein defined. Plot Line, Front: plot boundary line separating an interior plot from the street. In the case of a corner plot, the orientation of existing or proposed development shall be used to determine which plot line shall consider the front. Plot Line, Rear: A plot line which is opposite and most distant from the front plot line. In the case of an irregular plot, the rear plot line shall be an assumed line parallel to and at the maximum distance from the front plot line. Plot Line, Side: Any plot boundary line that is not a front plot line or a rear plot line. Plot Width: The width of a plot at the minimum building setback line. Primary use: main land use or function Public Facilities: Services or facilities provided by government or government agencies for the benefits of the general public and to which the public will have access. Remodelling: The refashioning or alteration (weather structural or not) of a building or structure without its established use being change Retail Type 1: Green grocer, grocery shop, Laundromat, food & beverage dispensing including outside sitting. Super and Hyper markets are not permitted. Retail Type 2: Excluding permissible use in Retail Type 1, showrooms, wholesale trading, banking, specialty shops, pharmacies, real estate, food & beverage without outside sitting. Super and Hyper markets are not permitted. Right-of-Way: A strip of land by reservation, dedication or condemnation and intended to be occupied by a road, oil or gas pipeline, water line, sanitary or storm sewer, and other uses. Screening: A method of visually obscuring nearby structures or land use (car park, outdoor storage) from another with the use of one or a combination of fencing, walls, dense, vegetarian, or berms. Setback: A prescribed zone around the edge of a plot where certain buildings, structures and uses are prohibited and where access and landscape treatment is strictly controlled by the Development Code. Setback, Rear: A setback extending the full width of the lot in the area between the rear lot line and the rear building line Setback, Side: A setback extending the full width of the lot in the area between the side lot line and a side building line. Total Plot Area: Area of a plot within its defined boundary lines, as noted in the Plot Location Certificate issued by Nakheel. Sign: Any devised designed to inform or attract the attention of a person not on the premises on which the sign is located. It means any structure, wall, natural object, or other device used for visual communication which is visible from any street or means of access and is used to advertise or direct attention to an activity, product, place, person or business. Utility Authorities: Authorities, public or private utility service providers and the like, whose NOC must be acquired prior to assessment of the submission by the Building Consent Authority and/or Masterplan Consent Authority. Sign, Awning: A sign that is mounted painted or attached to an awning, canopy or marquee. Sign, Illuminated: Any sign designed to emit or brightly reflect artificial light. Sign, Ground: A sign which is less than 1.6 meters from the ground or is supported by a sign structure that is placed on or is anchored in the ground and is independent of any building or other structure. Sign, Pedestal: A sign that is mounted on one or more freestanding poles or other support so that the bottom edge of the sign face is more than 0.5 meters from contact with the solid base or the ground. Also sometimes known as a “pole sign”. Variation: A request to Nakheel for permission to vary or depart from a requirement located within this Code due to special conditions that result in an unnecessary hardship Variance: It is an adjustment which permits minor changes of the Development Code requirements where individual properties are uniquely affected by the strict application of the regulations. The extent to vary is restricted and the degree of the variance is limited to the minimum change necessary to overcome the unique requirements of a property. Zone: A geographic area within which specific development regulations assigned by this Code shall apply. Zoning Map: An official map that identifies Zones that are subject to the specific use and development regulations of this Code. Sign, Projecting: A sign that is partially or wholly dependent upon a building for support and that projects more than 30 centimetres from such building. Sign, Temporary: A sign or advertising display constructed of cloth, canvas, fabric, wood or other light material intended to be displayed for a short period of time. Sign, Tower: A large scale sign that is mounted near the top of a tower that is generally used as a means of identifying an important tenant or the name of the facility. Sign, Wall: Any sign posted or painted in suspended form or otherwise affixed to the wall of any building or structure in an essentially flat position or with the exposed face of the sign in a plane approximately parallel to the plane of such a wall. Storey: A complete horizontal level within a building between two immediate floors or the roof in the case of the topmost storey. References to a building floor or storey are often expressed as a number such as ‘G+3’ or ground floor plus 3 storeys. Total Floor Area: Sum of Floor Area of all storeys including mezzanine within building or buildings within a plot or amalgamated plots. 44 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 8.0: GENERAL PROVISIONS Development Code October 2007- Rev.1 8.0: GENERAL PROVISIONS 8.1 Title This development Code is hereby officially known as the “International City – Phase 3 Development Code”. References to the ‘this Code’ shall be interpreted as references to the International City Phases 3 Development Code. 8.2 Authorities F. Facilitate adequate provision of transportation, water, waste water, parks and open spaces and other public facilities. G. Maintain property values by stabilizing expectations and ensuring predictability in development. H. Establish a process that effectively and fairly applies the regulation and standards of this Code. 8.2.1 Authority of Nakheel Nakheel is responsible for promoting and controlling the development of ICP3. As a result, Nakheel is granted the authority to establish regulations and guidelines to manage the use and development of all land, water and structures within the boundaries of ICP3. Nakheel shall have the right to approve or deny all applications for development within ICP3. In accordance with the declaration on the property title, Nakheel has the authority to: A. Implement and ensure compliance with this Code B. Appoint an authority or individual to review and approve or deny a Concept Design or Building Permit design application for compliance to this code. C. Amend and interpret this code, as needed. D. Establish and enforce additional rules, guides requirements, as determined to be appropriate. E. Prevent or minimize conflicts or negative impact among adjacent land uses. 8.4 Applicability The regulations established by this Code shall be considered minimum requirements for development as follows: A. No building, structure or lands shall be used or reused and no building or structure shall be constructed, reconstructed, occupied, moved, or structurally altered unless in conformity with the appropriate regulations established within this Code. C. All landscaping, parking, and signs shall be expected to meet the requirements of this Code. Approval shall be granted by Nakheel before a sign may be constructed, altered or otherwise displayed within ICP3. Compliance to this Code, does not relieves the developer or landowner from the responsibility to acquire all additional permits or approval as needed for site development or construction in ICP3 including but not limited to approval from JAFZA, Dubai Electricity and Water Authority (DEWA) in addition to other service providers. D. Yards and lots shall not be reduced below dimensions and area requirements established in this Code. Likewise, no structure or building shall be permitted to exceed requirements regarding bulk standards. 8.3 Purpose & Intent This Code is established for the purpose of promoting the public health, safety and general welfare of the present and future residents, employees and guests of ICP3 and promoting safe, orderly and structure development. The Master Plan for ICP3 is the fundamental guide to all decisions made under this Code. This Code regulates development in order to achieve objectives of the plan that includes, but is not limited to, the following: A. Implement the Block Guidelines established in the plan and defined in this Code that dictate the character and pattern of development of the area. B. Enhance safety from fire, panic, and other dangers. C. Promote health and generic welfare. D. Provide adequate light and air. Existing development, including development that is under construction or has received approval by Nakheel, shall be exempt from meeting requirements established by code amendments adopted following application approval. Improvement to existing development shall meet requirements as amended at the time of application for approval of said improvements. 8.6 Measuring System The Standard International (SI) system of measurements shall be considered the accepted and official measuring system for this Code. All applications, figures and other materials submitted for approval shall utilize the Standard International system. B. No part of a yard, open space, off-street parking or loading space necessary for compliance by a building or structure for purposes of meeting the regulations of this Code shall be by another building or structure for compliance unless such shared use of resources is permitted by this Code and approved by Nakheel. and 8.2.2 Authority to Other Entities 8.5.2 Existing Development E. In the event that requirements of this Code conflict or compete with requirements of other lawfully adopted rules, regulations, ordinances or resolutions, the most restrictive shall apply. 8.5 Amendments Nakheel shall have the authority to amend this Code, as and when needed. Amendments shall be completed in accordance with Section 10.0, Administration & Procedures of this Code. 8.5.1 New Development New development taking place after amendment to the Development Code shall be expected to meet requirements of the Code as amended. Development shall be required to meet an amended Code if an application for approval has not been submitted or a submitted application has not received approval prior to adoption of the new code amendment. 46 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 9.0: REVIEW AUTHORITY October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code SECTION 10.0: ADMINISTRATION AND PROCEDURES Development Code October 2007- Rev.1 10.0: ADMINISTRATION & PROCEDURES 10.1 General 10.1.1 Applications Nakheel utilizes a series of applications and processes to ensure that development activity or other actions meet the overall goals of the ICP3 Master Plan and the specific requirements of the Development Code. Nakheel offers, as a service oriented approach, numerous pre-Concept Design meetings, email queries and design reviews in order to ensure that the appointed consultants fully understand the requirements of the Development Code,. The first concept Design / Building Permit submission is complementary and charges only apply when there is resubmission or subsequent submissions to offset time and cost implications incurred due to additional review process. The application process further serves as a tool for communication between the potential developer or applicant and Nakheel. As an exception, an applicant may submit a request for a Variance, Exception or Conditional use simultaneously with a Building Permit application in the need for such application is already known to the potential applicant and the Development Code Administrator. 10.1.4 Pre-Qualification of Consultants All engineering, architectural and allied professionals utilized in development of plans and implementation of the project must be licensed and registered with prevailing authority, having jurisdiction over ICP 3, for the type and size of project undertaken in the Development. Appointment of consultant, engaged for a project, must occur prior to submission of a Concept Design or Building Permit application. 10.1.5 Additional Information A single development planning process, as shown in Figure 10.1, Development Plan Process shall be utilized by Nakheel for all development related activities in ICP3 including new construction or modification of existing structures, signs, parking or other amenities. The Development Code Administrator has the authority to seek additional information or waive information requirement as deemed necessary throughout the process to ensure adherence to the Development Code in a timely fashion. Reasonable time required to obtain and provide additional information shall not be accounted in meeting time requirements established by this Code. 10.1.3 Simultaneous Submission of Applications 10.2 Common Review Requirement 10.1.2 General Development Plan Process A single development may require several applications prior to approval leading to a building permit. To increase efficiency, the Development Code Administrator may permit an applicant to submit applications for approval to the same development simultaneously, assuming that submissions continue to follow the sequence described in Figure 10.1. Pre-Concept Design Meeting Concept Design Stage Building Permit General discussion of the project with the applicant prior to a significant expenditure of resources. Administrator to brief the applicant about the general requirements of Concept Design submission. Full documentation of project and review by Administrator. Necessity of Variances or Exceptions is determined and addressed at this stage (if necessary). To be granted upon review of all final construction documents and determination that all additional approvals (from all relevant service providers) have been met. Fig. 10.1 Development Plan Process 10.2.1 Pre-Concept Design Meeting Prior to submitting a Concept Design submission for consideration, a potential applicant could request and attend a Pre-Concept Design Meeting with the Development Code Administrator. The purpose of the Meeting shall be to: Development Code or Zoning Map, approval shall be necessary prior to submitting a Concept Design or Site Plan. 10.2.2 Development Intent Questionnaires To request a Pre-Concept Design Meeting, a potential applicant must complete and submit a Development Intent Questionnaire. The Questionnaire shall be based on the checklist included in Application Checklist design to provide the general information needed to fulfill the purpose of the Meeting. 10.3 Concept Design 10.3.1 Submission of Materials Generally, the Concept Design shall accurately show to scale property boundaries, location and dimensions of all structures, all building wall elevations and setbacks, parking areas, entry ways, topography, north orientation, a decision of bulk details, floor plans, a master sign plan and a master landscape and open space plan including irrigation. Specific requirements are provided in Section 11: Application Checklists. Two sets of collated and bounded hard copies must be accompanied by: A. CAD file / files of the Concept Design. The CAD files should be in a format that is acceptable to Nakheel including file format, separation of design elements into layers, and clean line work. B. A spread-sheet with summary of all development data, in compliance with the requirements of this Code (such as lot area, build up area and parking provision). A. Familiarize the applicant with Nakheel, ICP3, Master Plan, Development Code and any other requirements. The Development Code Administrator shall ensure that the potential applicant is aware of the application process and the requirements that must be met to receive project approval. B. Allow the Development Code Administrator and potential applicants to discuss the proposed project. Discussion is intended to ensure that applications for development are submitted in an efficient manner and that the final product best meets the vision of the Master Plan and the requirements of this Code. C. Evaluate the need for additional approvals. If the Development Code Administrator determines that a proposed project will not meet the requirements of this Code, the applicants may prepare to request a Variance or Exception. As an alternative, the applicant may request an amendment to the Development Code or Zoning Map. Should the applicant opt to apply for an amendment to the 50 Development Code October 2007- Rev.1 10.0: ADMINISTRATION & PROCEDURES of compliance or resubmission shall be made within 5 working days if final action, for a total of 15 working days. to the applicant while the second set shall be similarly marked and retained by Nakheel. B. Upon approval, the applicant shall have no more than 6 months to submit a Building Permit Compliance application. D. Upon receipt of an approved Building Permit Compliance, the applicant may approach JAFZA for the final building permit application. C. Following 6 months, a Concept Design shall be considered expired. An extension of time shall be granted by Nakheel upon request. 10.4 Building Permit 10.4.1 Submission of Materials A. Generally, the Building Permit shall include final drawings and construction documents as needed to commence construction. B. The Building Permit application and all drawing will be accompanied by approval of all additional applications and studies, including requirements of Variance, Exception or Conditional Use by the DRB. 10.4.4 Time A. The Development Code Administrator shall approve or resubmit a Building Permit within 15 working days of receipt of the application and determination of completeness. Notification of approval or resubmission shall be made within 5 working days of final action, for a total of 20 working days. B. Upon approval, the applicant shall have no more than 6 months to utilize an approved Building Permit Compliance. Following 6 months, if the applicant has not initiated construction or is otherwise unable to prove progress, the Building Permit shall be deemed as expired. An extension of time maybe granted by Nakheel upon request. C. A CAD file of the Site Plan must be submitted as part of required materials. The CAD file should be in a format that is acceptable to Nakheel, including file format separation of design elements into layers and clean line work. 10.4.2 Minor Modifications to Approved Concept Design Fig. 10.2 Concept Design Review Process 10.3.2 Review Process A. The approval process shall follow the steps highlighted in Figure 10.2, Concept Design Review Process and discussed throughout Section 10, Administration and Procedures. B. The Development Code Administration shall review the application in its ability to meet the vision of the ICP3 Master Plan and the requirements of the Code are met, the Development Code Administrator shall approve the application. If additional information is needed, the Administrator shall request additional information. The applicant may be permitted to make minor modifications to the approved Concept Design prior to Building Permit application. All said modifications should be noted for review by revision cloud with annotated revision triangles represented in revision table on each drawing modified or changed from approved Concept design, by the Development Code Administrator. The Development Code Administrator reserves the right to determine that proposed changes are beyond ‘minor modifications’ and reject such changes. 10.4.3 Review Process A. The approval process shall follow the steps highlighted in Figure 10.3, Building Permit Review Process and discussed throughout Section 10, Administration and Procedures. C. The Development Code Administrator shall notify the applicant of final action including approval or resubmission of the application. One set of the plans marked as Compliance Certificate shall be accompanied by a Compliance Certificate letter and returned to the applicant while the second set shall be retained by Nakheel. B. The Development Code Administrator shall conduct final review the application in its ability to meet the vision of the ICP3 Master Plan and the requirements of this Code. If all requirements are met, the Development Code Administrator shall approve the application. If additional information is needed, the Administrator shall request additional information. 10.3.3 Time C. The Development Code Administrator shall notify the applicant of final action, including approval or resubmission of the application. One set of the plan marked as approved or resubmission shall be accompanied by a letter and returned A. The Development Code Administrator shall approve or deny a Concept Design within 10 working days upon receipt of application and determination of completeness. Notification Fig. 10.3 Building Permit Review Process 51 Development Code October 2007- Rev.1 10.0: ADMINISTRATION & PROCEDURES 10.6 Exception 10.5.1 Submission of Materials D. The Development Code Administrator shall notify the applicant in writing of final action, including approval or resubmission of the application. Generally, the application shall include all materials required to indicate the requested variance. If submitted as part of the Development Plan process, materials submitted for Concept Design review will largely be sufficient. E. The Development Review Board reserves the right to approve a Variance with conditions, safeguard or restrictions are needed to address any adverse impacts resulting from the Variance. Generally, the application shall include all materials required to indicate the requested exception. If submitted as part of the Development Plan process, materials submitted for Concept Design review will largely be sufficient. 10.5.2 General Criteria 10.5.4 Time 10.6.2 General Criteria The Development Review Board may issue a variance from the requirements of the Development Code if such action is not contrary to the interest of the residents, investors, employees, stakeholders, and visitors of ICP3. The Development Review Board must also find that, due to special conditions, literal enforcement of the Development Code would result in undue and unnecessary hardship based upon the following criteria: A. The Development Code Administrator shall submit a report to the Development Review Board within 15 working days of receipt of the application and determination of completeness. The Development Review Board may issue an exception from the requirements of the Development Code if such action is not contrary to the interest of residents, investors, employees, and visitors of International City Phases 3, Development Review Board must also find that special conditions proposed by the applicant while not in compliance with all requirement of the Development Code, are more or equally appropriate toward meeting the spirit of Master Plan and this Code. Approval of the exception shall be based upon the following criteria: 10.5 Variance A. Extraordinary conditions regarding the specific land involved are such that strict enforcement of this Code would deprive the applicant of reasonable use of the land. B. The Variance would not be detrimental to the health welfare, safety, morals, order, privacy, convenience, or prosperity of surrounding residents, investors, employees, and visitors of ICP3. C. The conditions are unique to this site and do not apply to other locations found in the same Zone. B. The Development Review Board shall take final action on the application for Variance within 15 working days of receiving the report from the Development Code Administrator. Notification of approval or resubmission shall be made within 5 working days of final action, for a total of 20 workings day. C. Upon approval of a building permit, the applicant shall have no more than 6 months to utilize an approved Variance. Following 6 months, if the applicant has not initiated construction or is otherwise unable to prove progress, the Variance shall be considered expired. An extension of time maybe granted by Nakheel upon request. D. The extraordinary conditions have not been created as a result of actions by the applicant. B. The proposed exception will provide an equal or greater means of meeting the purposes of this Code than literal enforcement of existing requirements. D. The exception would be consistent with the spirit and intent of ICP3 Master Plan and this Code. Conditions of the site and enforcement of this Code would prohibit or unreasonably restrict use of the land. 10.6.3 Exception Process A. The approval process shall follow the steps highlighted in Figure 10.4 Development Review Board Process and discussed throughout Section 10, Administration and Procedures. 10.5.3 Variance Process A. The approval process shall follow the steps highlighted in Figure 10.4 Development Review Board Process and discussed throughout Section 10, Administration and Procedures. B. The Development Code Administrator shall complete a report to the Development Review Board including an overview of request for Exception, a recommendation of approval or resubmission, and proposed findings of fact to support the recommendation. The Applicant shall furnish a list of justifiable and rational reasons to support its proposal. B. The Development Code Administrator shall complete a report to the Development Review Board including an overview of the request for Variance, a recommendation of approval or resubmission, and proposed findings of fact to support the recommendation. C. The Development Review Board shall consider the recommendation of the Development Code Administrator and determine final action including approval or resubmission of the application and specific finding of fact. A. The proposed project remains compatible with surroundings land used and is not detrimental to the health, welfare, safety, morals, order, privacy convenience or prosperity of surroundings residents, investors, employees, and visitors of ICP3 C. The extraordinary conditions proposed by the applicant are unique to the project or the site. E. The Variance would be consistent with the spirit and intent of the ICP3 Master Plan and this Code. F. 10.6.1 Submission of Materials C. The Development Review Board shall consider the commendation of the Development Code Administrator and determine final action, including approval or resubmission of the application and specific findings of fact. D. The Development Code Administrator shall notify the applicant in writing of final action, including approval or resubmission of the application. Fig. 10.4 Development Review Board Process 52 Development Code October 2007- Rev.1 10.0: ADMINISTRATION & PROCEDURES E. The Development Review Board reserves the right to approve an exception with conditions, safeguard or restrictions as needed to address any adverse impact resulting from the Variance. 10.6.4 Time A. The Development Code Administrator shall submit a report to the Development Review Board within 15 working days or receipt of the application and determination of completeness. B. The Development Review Board shall take final action on the application for Exception within 15 working days of receiving the report from the Development Code Administrator. Notification of approval or resubmission shall be made within 5 working days of final action, for a total of 20 working days. C. Upon approval of building permit, the applicant shall have not more than 6 months to utilize an approve Exception. Following 6 months if the applicant has not initiated construction or is otherwise unable to prove progress, the Exception shall be considered expired. An extension of time maybe granted by Nakheel upon request. 10.6.5 Runs with the Use Unless otherwise specified in the approval by the DRB, an exception applies only to the specific use or project for which it is granted. No new use or project shall be permitted to utilize the exception without prior approval by the DRB. 10.7 Conditional Use 10.7.1 Submission of Materials Generally, the application shall include all materials required to indicate the requested conditional use. If submitted as part of the Development Plan process, material submitted for Building Permit Compliance review will largely be sufficient. 10.7.2 General Criteria: The Development Review Board may issue approval of a Conditional Use if the proposed project meets the criteria established. 10.7.3 Conditional Use Process A. The approval process shall follow the steps highlighted in Figure 10.4 Development Review Board Process and discussed throughout Section 10, Administration and Procedures. B. The Development Code Administrator shall complete a report to the Development Review Board including an overview of the request for Conditional Use, a recommendation of approval or resubmission, and proposed findings of fact to support the recommendation. C. The Development Review Board shall consider the recommendation of the Development Code Administrator and determine final action including approval or resubmission of the application and specific findings of fact. A. The proposed amendment is not detrimental to the health, welfare, safety, morals, order, privacy, convenience, or prosperity of surrounding resident, investors, employees, and visitors of ICP3. D. The Development Code Administrator shall notify the applicant in writing of final action including approval or resubmission of the application B. The proposed exception will provide an equal or greater means of meeting the purposes of this Code than current requirements. E. The Development Review Board reserves the right to approve a Conditional Use with added conditions, safeguard or restrictions as needed to address any adverse impact resulting from the Variance. C. The proposed amendment is consistent with the Master Plan and will not adversely impact the mobility and infrastructure systems of ICP3. 10.7.4 Time A. The Development Code Administrator shall submit a report to the Development Review Board within 15 working days of receipt of the application and determination of completeness. B. The Development Review Board shall take final action on the application for Conditional Use within 15 working days of receiving the report from the Development Code Administrator. Notification of approval or resubmission shall be made within 5 working days of final action, for a total of 20 working days. C. Upon approval of building permit compliance, the applicant shall have no more than 6 months to utilize and approved Conditional use. Following 6 months, if the applicant has not initiated construction or is otherwise unable to prove progress, the Conditional use shall be considered expired. An extension of time may be granted by Nakheel upon request. 10.7.5 Runs with the Use Unless otherwise specified in the approval by the DRB, a Conditional Use applies only to the specific use or project for which it is granted. No new use or project shall be permitted to utilize the exception without prior approval by the DRB. 10.8 Development Code Amendment 10.8.1 Request for Amendment A Development Code Amendment maybe requested by an applicant seeking Development Plan approval. The authority to approve or amend this Code is granted to the DRB; however, Nakheel maintains the final authority and may choose to amend the Code without DRB approval. 10.8.2 General Criteria The Development Review Board may amend the Development Code if the following criteria are met. 10.8.3 Amendment Process A. The Development Code Administrator shall complete a report to the Development Review Board including an overview of the request for amendment including a recommendation regarding the proposed amendment and potential impacts. B. The Development Review Board shall consider the recommendation of the Development Code Administrator and determine to approve, reject or modify the proposed amendment. C. If the request to amend the Development Code was submitted by an applicant for Development Plan approval, the Development Code Administrator shall notify the applicant in writing of final action, including approval or denial of the amendment. 10.8.4 Time Upon approval, an amendment to the development shall take place immediately upon final action including by the Development Review Board. 10.9 Zoning Map Amendment 10.9.1 Request for Amendment A Zoning Map Amendment may be requested by an applicant seeking Development Plan approval, the Development Code Administrator, the Development Review Board, or Nakheel. The authority to approve an amendment to Zoning Map related to this Code is granted to the DRB, however, Nakheel remains the final authority and may choose to amend the Zoning Map without DRB approval. 10.9.2 General Criteria The Development Review Board may amend the Zoning Map if the following criteria are met: A. The proposed amendment is beneficial to the orderly efficient and economic development of ICP3 and will enhance or protect the health, welfare, safety, morals, order, privacy, 53 Development Code October 2007- Rev.1 10.0: ADMINISTRATION & PROCEDURES convenience, or prosperity of surrounding residents, investors, employees, and visitors of the community. B. The site or sites involved in the proposed amendment are more suitable for use and standard permitted in the proposed Zone than in the current Zone. C. The proposed amendment is consistent with the Master Plan and will not adversely impact the mobility and infrastructure systems of ICP3. D. The proposed change in the Zoning Map will remain compatible with the character of the surrounding area. 10.9.3 Amendment Process A. The Development Code Administrator shall complete a report to the Development Review Board including an overview of the request for amendment, including a recommendation regarding the proposed amendment and potential impact. B. The Development Review Board shall consider the recommendation of the Development Code Administrator and determine to approved, reject or modify the proposed amendment. C. If the request to amend the Zoning Map was submitted by an applicant for Development Plan approval, the Development Code Administrator shall notify the applicant in writing of final action including approval or denial of the amendment. 10.9.4 Time Upon approval, an amendment to the Development shall take place immediately upon final action by the Development Review Board. 10.10 Enforcement 10.10.1 Compliance Required A. No person may use, occupy, or develop land, buildings or other structures, or authorize or permit the use, occupancy, or development of land, building or other structure except in accordance with all applicable provisions of this Code. B. The developer of any building or land in violation of this Code as well as any architect, builder, contractor or other professional consultant who may have assisted or contributed to such violation shall be considered guilty of a violation of this Code. C. Any use, arrangement or construction differing from officially approved plans shall be deemed in violation of this Code. 10.10.2 Responsibility for Enforcement F. A. The Development Code Administrator is given authority on behalf of Nakheel to enforce the requirements of this Code, including the ability to monitor all development and operation of activities with ICP3. Nakheel shall have ultimate authority for enforcement and shall impose penalties for violation of this Code as appropriate. 10.11 Amalgamation B. Any individual may make the Development Code Administrator aware of potential violations. To investigate a complaint, the Development Code Administrator must be provided a detail account of the violation, the period of occurrence and, if possible the alleged responsible parties. All complaints shall be maintained on record by the Development Code Administrator. 10.10.3 Notice of Intent A. Upon determination of a violation, the Development Code Administrator shall give notice to the individual or individuals responsible for said violation with instructions for discontinuance and compliance. The Administrator shall provide a reasonable time for compliance. B. The Development Code Administrator is hereby authorized to immediately suspend activities without notice that cause imminent damage to property or injury to persons. 10.10.4 Penalties Nakheel reserves the right to take all appropriate actions and initiate proceeding to prevent unlawful construction, to recover damages, or to restrain, correct or abate any violation of this Code. One or more of the following penalties may be assessed against any person involved with violations of this Code. A. Removal or correction of the Violation at the owner’s expense. B. A fine of up to Dhs. 1,000 for each day that a violation exists after specified reasonable time provided by the Notice of Intent has expired, as calculated from the date of issuance. C. A onetime fine for each occurrence of a violation including: - 1,000 Dhs – upon the initial occurrence - 2,000 Dhs – upon the second occurrence - 3,000 Dhs – upon the third occurrence - 10,000 Dhs –upon any subsequent occurrences All fees are through cheque in favour of Nakheel LLC, and submitted to Nakheel Sales Office. D. Discontinuance of utility services until the violation has been addressed to the satisfaction of Nakheel. E. Removal of consultants from the register of consultants registered to perform work in ICP3. In the case of a violation which endangers public health or safety, arrest and detention for a period of time established by a court of jurisdiction. Should the Applicant be able to purchase adjacent plots, it is the discretion of the Applicant to propose amalgamation of its plots subject to DRB approval and compliance to specific terms and conditions 10.11.1 Terms & Conditions Administration and Assessment Cost: A charge of AED 5000 (please note a maximum of only two plots can be amalgamated) payable to Nakheel LLC to cover the administration & assessment cost. Demarcation Certificate and Reservation Contract: Provide all previous original NOC’s, affection plans and Amalgamation Certificate to Nakheel Sales and pay charges as advised by them to finalise the title amendments. The Plot Demarcation Certificate and Reservation Contract for the amalgamated plot will be reissued to the purchaser by Nakheel sales upon receipt of the original Affection Plans and Reservation Contracts of the individual plots and payment of their prescribed charges. Design Submissions: There will no submission costs for the first design submission of each stage provided both of the plots have not been assessed prior to application of amalgamation of plots. The process of pre Concept Design meeting and all subsequent submissions, excluding any re-submission charges, will be treated as new design assessment submissions without any charge to the owner. Re-submissions: All past applications and Compliance Certificates will be rendered void, requiring re-submission from the Concept stage onwards. An additional fee of AED 5000 for each submission stage shall be payable to Nakheel LLC, for reassessment of submissions of each of the stages that have been previously assessed for either of the individual plots. 10.11.2 Qualifications and Clarifications The legal requirements of the individual plots will be transferred jointly to the amalgamated plot and acceptance of the amalgamated plot title will render all claims on behalf of individual plots void Amalgamated plots shall have their driveway within 10M from the adjacent neighbours’ boundaries (per the new plot demarcation certificate) and not from any other part of the plot. Required setbacks for landscape as per the Development Code. Plots are required to maintain “Active Frontage” per the Development Code to the majority of the façade facing the roads. 54 Development Code October 2007- Rev.1 10.0: ADMINISTRATION & PROCEDURES The amalgamated plots with higher than G + 5 permissible storeys are required to distinctly separate the superstructure above the 5th storey. The requirements of development code as amended will be applicable to the amalgamated plot with special conditions, based on the purchaser’s development design proposal. It is strongly recommended that the ICP 3 Master Planning consent division should be consulted for pre-concept stage submission to confirm special conditions. 10.11.4 Contact Details In case a TPD needs to obtain information, technical queries, pre concept design meetings, Concept Design and Building Permit submissions and any other technical details, the contact details are as follows: 10.11.3 Particular Notes Where amalgamation results in merging of plots with two different land uses, the individual land use and corresponding TFA shall be adhered to within the confines of a unified building. Where the amalgamation of two separate land uses results in increase of TFA of individual land use or increase in aggregate total from the maximum allowable TFA, the amalgamated plot will be re valued and shall be subject to an additional upfront payment to Nakheel by the owner prior to the issuance of an NOC. The payment for such will be assessed and advised by Nakheel, based on the proposal by the owner. 55 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 11.0: APPLICATIONS CHECKLIST Development Code October 2007- Rev.1 11.0: APPLICATION CHECKLIST 11.1 List of Concept Design Submission Requirements: 11.1.1. Two (2) hard copy sets of Architectural Drawings, which includes the following: A. Cover sheet with the following information: • D. Coloured Perspective with view from major vantage point E. Drawings should show grid lines, levels, room names, critical dimensions, plot limits and building setbacks Setting-out plan G. All floor Plans H. All building elevations (in case of circular building, front, rear and side) I. Sections (minimum 2- showing all the built levels incl. basements, plant and roof) J. Conceptual fenestrations. Details – specifically K. Conceptual Parking and Loading Plan L. Concept Landscape Plan Schedule of architects, engineers, contractors and other allied professionals working on the project with details of their license and appointment by the owner of the plot as per the affection plan issued by Nakheel. the gardens other required spaces. The plans should also include the following: • Clear grid lines on all plans / sections / elevations. • Clearly marked section lines through critical areas. • Car parking layouts with circulation directions. • Schedule of improvements / amendments from the approved Concept Designs due to compliance to other authority requirements (if any) on the revision box within the title block as well as markup on the drawings. • Detailed elevations (scale 1:100) of all building faces for each structure including delineation of podiums, shafts (lower, middle and upper sections) and top. • Two or more sections (scale of 1:100) drawn at right angles through each structure and indicating internal and external floor levels, window sill heights, parapet heights, penthouses, roof gardens, mechanical equipment, vertical movement areas, open to sky shafts / riser structures and the relationship to surrounding structures. • Detailed drawings shall include location of fences, walls, parking areas, signs, landscaping and lighting for purposes of context and review • Site plan and elevations as needed to indicate detailed design of parking area including number of floors (if needed) below and above ground, parking and lane dimensions, location of access, screening techniques employed and details to ensure compatibility with the structure and site design. Grading Plan (scale 1:200). A site plan and two cross sections through the site in each main direction indicating existing and finished levels with areas of cut and fill emphasized in shading. A soft copy of the approved plans/documents from JAFZA granted Concept Design NOC. 11.2.2. Detailed Architectural Design C. First sheet with the following information: • Plot’s TFA, land use and permissible building footprint • Building foot print and TFA calculations with corresponding drawings highlighting the excluded area for each of the calculations (Schedule and graphic) • Car parking calculations (Schedule) Architectural 11.2.1. Documentation • B. Name of project • Copy of affection plan • Letter of Appointment by plot owner • Plot no. • Date & issue of submission • Client name • Consultant’s name, Logo, Signature and Address F. 11.2 List of Building Permit Compliance Certificate Submission Requirements: All drawings to have title block indicating scale, orientation, key plan, project name, project address, owner information and date. 11.2.3. Site Plan & Calculation sheet showing: • Affection plan • Plot entry and exit in relation to street layout. • Built-to line and setbacks. • Setting out plan. Location of proposed primary and accessory buildings. • Location of services connection as per the ICP3 Combined Services Drawing. • Existing and proposed site contours. • Area calculation sheet showing: • Plot FAR, land use, permissible building footprint and TFA. • Building foot print and TFA calculations with corresponding drawings highlighting the excluded area for each of the calculations (Schedule and graphic) • • Car parking calculations (schedule) indicating the total number of parking spaces required for the project compared with the designed spaces with a breakdown of visitor parking (with unsecured outside access) and handicap parking. Also include the number of on-street spaces adjacent to the project, and number of bicycle units supported. 11.2.5. Signage 11.1.2. One (1) soft copy of computer aided design (CAD) drawings in DWG. File format. 11.2.4. Architectural Drawings: • • Perspective or elevation renderings clearly showing the proposed style, appearance and form of all buildings and improvements. Detailed plans of each floor of primary and accessory structures including all development, improvements or alterations. Roof plans shall be included and accessory structures and service facilities such as refuse areas. All indoor and outdoor spaces shall be clearly delineated, including roof • Calculations indicating the amount of sign space and type of permitted signs available to the project • Precise location, dimensions, design, and type of signs to be utilized throughout the site in relationship to plot lines, setbacks, structures, amenities, and the streetscape • A single elevation depicting each permanent sign 11.2.6. Landscape Design • Schedule of plants with specie details and materials specification for the hard landscape based on the palette of plants and materials recommended by Nakheel for the Development. • Site plan and section detail of location of landscape treatments, including trees, shrubs, ground cover and lawns. 57 Development Code October 2007- Rev.1 11.0: APPLICATION CHECKLIST • Provide area schedule with percentage of the open spaces that are hard and soft scape with breakdown of types of soft scape i.e. lawns, shrubs and trees in numbers. Location and section detail of hard surface materials, water features and fencing to be located on the project site 11.5. Sustainability We encourage consideration of elements of sustainability in design. Few of the examples are placed below: • Green tank: A separate water tank to capture and deliver storm water and water condensate for irrigation and harvesting, dual flush, car washing, building cleaning etc. • Water and energy efficient appliances / fixtures like compact florescent bulbs, dish washers, washing machines and split units. 11.2.7. Irrigation • Irrigation site plan (scale 1:200) indicating the location and capacity of the irrigation water storage tanks (if considered), tank connections, and details of the distribution system 11.3. Utility Plan & Self Certification tables 11.6. Construction Schedule Provide services connection drawings i.e., • Electrical • Potable Water • Sewer • Treated Sewage Effluent Telecommunications • Centralized Gas (TSE) services for • Proposed time schedule for completion of the project as initiated upon receiving an approved Building Permit. • Management plan describing the organization of work to be completed on the project coordination with the provided time schedule, including plans for onsite supervisory personnel. Irrigation Confirming co-ordination with the utility connections indicating depths, levels, and sizes of all pipes / conduits designed for each plot as shown in the combined services drawing. • Provide drawings incorporating mandatory services. • Storm water drainage design drawings that reflect retention of storm water within the plot and do not run-off grade level. • Copy of Self Certification Tables filled-in as per the required format. • Final load calculations for the development confirming the numbers stated on the self certification tables for each service 11.4. NOC’s from Service Providers. As JAFZA Building Permit application covers all other service NOC’s, the following are required by Nakheel on Nakheel Building Permit Submission: • Gas from Lootah BC Gas • TSE from Palm Water • Sewer from Palm Water 58 October 2007, Revision 1 International City Phase 3 - Dubai, UAE Development Code, SECTION 12.0: UTILITIES SUPPLEMENT FOR PLOTS SECTION 12.0: UTILITIES SUPPLEMENT FOR PLOTS 12.1 Electricity 12.2 District Cooling System 12.3 Communications 12.4 Gas 12.5 Potable Water 12.6 Irrigation Water Services 12.7 Sewerage 12.8 Storm Water Development Code October 2007- Rev.1 12.0: UTILITIES SUPPLEMENT FOR PLOTS Scope & Limitation: This section shall apply to the development officially known as the International City Phase 3 and should be read in conjunction with the Master Plan for the Development and The Development Code, ADMINISTRATION & PROCEDURES for Master Planning related Approvals for International City Phase 3 plots and other supplements and directives issued by NAKHEEL. This document should be read in conjunction with the Master Plan, The Development Code, Construction Administration and Procedures supplement and other supplements and directives issued and as amended by NAKHEEL for International City Phase 3. The application of this document is limited to the specific requirements for compliance, submissions and related approvals from NAKHEEL International City Phase 3, Master Planning matters only. We have endeavoured to inform the stakeholders on matters related to the overall development process by co-ordinating with relevant parties to assist the stakeholders in understanding the overall process, however, we do not warrant the accuracy of the information contained herein. The stakeholders are required to make their own enquiries with the relevant Authorities, Utility providers and Departments within NAKHEEL to ascertain their obligations and comply with the same, without explicit reliance on information provided herein. SERVICES: 12.1. ELECTRICITY DEWA street cables and the lot developer’s ducting will be as shown on the infrastructure design drawings. The indoor transformer substation will be constructed by the lot developer to meet all the relevant local building regulations and DEWA standard requirements. Medium Voltage (MV) fit out of the substation will be completed by DEWA, with the lot developer taking all responsibility for electrical services downstream of the LV (Low Voltage) terminals of the transformer that supply their property. Termination of the LV cables within the substation will be undertaken by DEWA. All downstream electrical work is to be in accordance with the local wiring rules and distribution standards. Space provided for the substation as well as sizing of the substations will be subject to DEWA prior approval. In order to comply with the intent for efficient use of resources and utility connection, each lot shall submit, for approval, a schedule of all anticipated electrical loads for the building. As a guide, the Master Plan is based upon a connected load density and these energy levels should be taken as the maximum permitted. Please refer to Self Certification Tables. Design Responsibility List Nakheel shall: 1. Provide the following information accessible through the BIW website: • Overview: Dubai Electricity and Water Authority (DEWA) is the power authority providing the local electricity network service. In order to access the electricity network, each lot developer is required to provide a substation in compliance to DEWA requirements, on the lot as agreed with DEWA and NAKHEEL Master Planning Dept., allowing installation and replacement of the building’s transformer. The requirements and provisions noted in this section relating to DEWA are for information only and should be verified by the owner with the service provider. Accessibility and layout of the substation is to be in accordance with DEWA standard drawing for an 11/0.38kV indoor substation sized for a minimum capacity transformer of 1500 KVA. Each building shall provide underground cable ducts including two spare ducts for future upgrades and management of the MV network. The ducts shall extend from the property boundary to the substation, to DEWA standard specification, which will allow DEWA to install the 11kV consumer’s mains to the substation, as well as communication and other cables necessary for the control and monitoring of the substation. The position of the interface point between • The position of the interface point between DEWA street cables and the lot developer’s ducting as shown on the Combined Services drawings. This plot infrastructure data is issued solely as provisional and preliminary information. Criteria for third party developers to indicate all anticipated electrical loads based on facilities, general services, air conditioning, fire fighting, lifts / escalators and hydraulics equipment and general design calculations for the building in the form of proformas for the electrical services design and installation referred to as Self Certification Table. The plot owner shall: • Be responsible for the application, coordination and verification to DEWA of provisions and requirements for electrical connection. • Provide substation with location conforming to both ICP 3 Development Code and DEWA requirements following whichever is more stringent. • Provide the underground cable ducts with two spare ducts from internal substation to the interface point of DEWA. • Provide conduits (per DEWA standards) to extend the connection from DEWA interface point connection to the building substation. • Be responsible for rectifying the kerbs, footpaths, roads in public property, affected by third party developer’s work during connection of services. • Submit for approval to DEWA, a schedule of all anticipated electrical loads based on facilities, general service, air conditioning, fire fighting, lifts / escalators and hydraulics equipment and general design calculations for the building in compliance with the Self Certification Table provided by Nakheel, with proposed mitigation measures in design to prevent exceeding the maximum permissible loads. Provide a copy of approval from DEWA to Nakheel. • Provide completed Self Certification Table compliant to the criteria reflected on Self Certification tables for Electrical services design and installation to Nakheel; 12.2. DISTRICT COOLING SYSTEM Overview: District Cooling is not available for ICP 3 development. 12.3. COMMUNICATIONS Overview: Du is the telecommunications authority providing the local voice (landline telephones) and data services (television, cables, and internet). Etisalat is the telecommunications authority providing mobile communications services. For residential buildings G+7 or higher, a NOC for GSM installation from both Etisalat and Du are required. For a mixed-use building with commercial land use component, a NOC for GSM installation from both Etisalat and Du are required. The requirements and provisions noted in this section relating to Du are for information only and should be verified by the owner with the service provider. The service provider will extend and terminate communication ducts 1m within the third party developers plot. In order to access the telecommunications network, each building shall have a communications room (MDF room) located on the ground floor of the building or other location on the lot as agreed with Du. 60 Development Code October 2007- Rev.1 12.0: UTILITIES SUPPLEMENT FOR PLOTS The lot developer shall provide a communications cable joint pit at the property boundary as shown on the infrastructure design drawings, and conduits (minimum diameter of 80mm) from this pit to the MDF room. The communications pit, conduit and communications room layout shall be in accordance with the local telecommunications authority’s standard design and requirements. To consider the overall amenity being provided by the individual building, for each plot, submit as a minimum for approval, a statement summarising the preferred and installed communication network configuration. Please refer to Self Certification Tables. Design Responsibility List Nakheel shall: 1. Provide the following information accessible through the BIW website : • • The location of the interface point between Du’s communication ducts and the lot developer’s ducting as shown on the Combined Services drawings. This plot infrastructure data will be issued solely as provisional and preliminary information. Criteria for third party developers to indicate the floor voice outlet density, floor data outlet density, band width requirements for the building in the form of proforma for the communication services design and installation referred to as Self Certification Table. The plot owner shall: • Be responsible for the application, coordination and verification with Du for provisions, specifications and requirements for communications connection. • Provide MDF room and space for cable risers. • Provide the underground cable ducts to the interface point provided by Nakheel Infrastructure contractor. • • Submit for approval to Du, a schedule of all anticipated floor voice outlet density, floor data outlet density, band width requirements and general design calculations for the building, with proposed mitigation measures in design for prevention from exceeding maximum permissible loads based on the load criteria reflected on the Self Certification table and provide a copy of the approval, from Du, along with all submitted material to Nakheel. Provide completed Self Certification compliant to the criteria reflected therein for Communication services design and installation to Nakheel. • Cooperate with Du / Etisalat should the third party plot be assigned by the Authority to be feasible and best suited for installation of mobile communications tower. Also, accommodate an additional area for its base station that maybe required being located at the rooftop or within the building. • The location of the interface point of Lootah BC Gas capped stub-out to the developer’s lot as shown on the Combined Services drawings. This plot infrastructure information will be issued as provisional and preliminary information only. • A criteria for third party developers to indicate gas loads, anticipated gas consumptions and general design calculations for the building in the form of proforma for the communication services design and installation, referred to as Self Certification Table. 12.4. GAS Overview: Lootah BC Gas (LBCG) is the local network service provider for the centralised gas system. This centralised gas system will be made available to each lot development. The plot owner shall: Liquefied Petroleum Gas (LPG) will be available through a centralised system. It is anticipated that CNG (Compressed Natural Gas) will be available to the Development in future which will significantly reduce the cost of gas for TPD. The benefit of CNG over LPG is lower emission and pollution in addition to substantially lower cost. • Be responsible for the application, coordination and verification to Lootah BC Gas provisions, specifications and requirements for central gas connection. • Provide the design and installation of gas line inside the developer’s plot in accordance to Lootah BC Gas installation standards. • Be responsible for rectifying the kerbs, footpaths, roads in public property, affected by third party developer’s work during connection of services. • Submit for approval to Lootah BC Gas, a schedule of all anticipated gas loads and anticipated daily and annual consumptions and general design calculations for the building, with proposed mitigation measures in design for prevention from exceeding maximum permissible loads based on the load criteria reflected on the Self Certification Table and provide a copy of the approval, from Lootah BC Gas, along with all submitted material to Nakheel. Reticulated Gas Network will be provided as mandatory utility for ICP 3 developments. The requirements and provisions noted in this section relating to Lootah BC Gas are for information only and should be verified by the owner with the service provider. The service provider, Lootah BC Gas shall provide the gas line 1m within the Third Party Developer’s plot. Provision is to be made for ground floor gas meter room or other location on the lot as agreed with the gas distribution network provider. The meter room shall have unobstructed street access, allowing for the installation and replacement of the building’s gas stores and / or for the reading of the energy meter. Plot developers should make due allowance for a gas pipeline connection from the street boundary to the meter room. The gas piping will be located as shown on the infrastructure design drawing. In order to consider the overall application of natural resources, each plot owner shall submit for approval a schedule of the allowance being provided for the use / connection to the gas distribution network. Provide as a minimum, the following information. Please refer to Self Certification Table. Design Responsibility List Nakheel shall: 1. Provide the following information accessible through the BIW website: 12.5. POTABLE WATER Overview: Dubai Electricity and Water Authority (DEWA) is the water authority providing the local potable water service. The requirements and provisions noted in this section relating to DEWA are for information only and should be verified by the owner with the service provider. Upon approval of application, a single metered potable water line connection will be capped off within the lot boundary allowing connection by the lot developer. Connections to the potable water system by the lot developer shall be to DEWA requirements. The minimum residual pressure within the system main will be 10m. The lot developer must allow for the installation of storage tank/s onsite (to store one day’s equivalent water use). The lot developer shall also allow for the installation of pump/s onsite delivering water to the required pressure, to all levels within each building. 61 Development Code October 2007- Rev.1 12.0: UTILITIES SUPPLEMENT FOR PLOTS Jebel Ali Free Zone Authority (JAFZA) is the authority responsible for approvals for Fire services within each lot. For fire fighting purposes, the developer must also allow for the installation of storage tanks and pumps to deliver water to the required pressure to all levels within each building. The lot developer shall submit to JAFZA, for approval, details of their calculated storage requirement, pump selection and proposed pipe sizes. It is the responsibility of the lot developer to make an application to JAFZA / EHS for a NOC. The lot developer shall submit to DEWA, for approval, details of their calculated demand and storage requirements, pump selection and proposed pipe sizes. Work shall not commence on the connection unless approval is received from DEWA. Final opening of the lot isolation valve for provision of potable water from the potable water system shall be by DEWA. The lot developer shall endeavour to minimise the demand on the potable water supply system through the installation of AAA rated flow restriction devices. The developer shall be restricted from using potable water for lot irrigation (an irrigation supply will be made to each lot via the Treated Sewerage Effluent system). The development is cognisant for the efficient use of water. In order to monitor the demand on the development-wide infrastructure and ensure efficient use of the potable water, each Lot owner/vendor shall submit for approval a schedule of water consumption outlets proposed for the building. Please refer to Self Certification tables. Design Responsibility List Nakheel shall: 1. Provide the following information accessible through the BIW website: • • • The position of the interface point of DEWA’s capped potable water line to the developer’s lot as shown on the Combined Services drawings. This plot infrastructure data will be issued solely as provisional and preliminary information. Criteria for third party developers to indicate the storage capacity at site, anticipated daily, peak water consumptions and general design calculations for the building in the form of proforma for the communication services design and installation, referred to as Self Certification Table. Be responsible for rectifying the kerbs, footpaths, roads in public property, affected by third party developer’s work during connection of services. The plot owner shall: • Be responsible for the application, coordination and verification with DEWA for provisions and requirements of potable water connection. • Provide storage tank equivalent to one (1) day water consumption and a pump facility to deliver the water to the required pressure to all levels within the building. • Be responsible for rectifying the kerbs, footpaths, roads in public property, affected by third party developer’s work during connection of services. • Submit for approval to DEWA, anticipated daily and peak water consumptions, details for the calculated water demand and storage requirements, and general design calculations including pump selection and proposed pipe sizes for the building with proposed mitigation measures in design for prevention from exceeding maximum permissible loads based on the load criteria reflected on the Self Certification table and provide a copy of the approval, from DEWA, along with all submitted material to Nakheel. 12.6. IRRIGATION WATER SERVICES: Nakheel further encourageous the consideration of the TSE storage tank (also referred to as the “Green Tank”) to exercise water conservation efforts by incorporating additional capacity from catchment from condensate water (from mechanical plantrooms and air handling units) and storm water. The design should allow required filtering prior to re-use of recycled water. The minimum residual pressure within the main will be 140 kPa. The developer must allow for the installation of storage tanks and pumps to deliver TSE water to the required pressure to all levels within each building. The plot developer shall submit to JAFZA for approval, details of their calculated storage requirement, pump selection and proposed pipe sizes. It is the responsibility of the lot developer to make an application to Palm Water for a NOC. Design Responsibility List Nakheel shall: 1. Nakheel shall provide the following information accessible through the BIW website: • The position of the interface point of Palm Water’s capped TSE line to the developer’s lot as shown on the Combined Services drawing. This plot infrastructure data is issued solely as provisional and preliminary information. • Criteria for third party developers to indicate the landscaped area, anticipated daily and peak water consumption and general design calculations including pump selection and pipe sizes for the building in the form of proforma for the communication services design and installation, referred to as Self Certification Table. Overview: Palm Water are the authority responsible for providing services for irrigation water within each lot. TSE (Treated Sewage Effluent) will be provided for ICP 3 development for irrigation and is mandatory for third party developers. The requirements and provisions noted in this section relating to Palm Water are for information only and should be verified by the owner with the service provider. The provision of recycled water for both the fire (public fire hydrants only) and irrigation systems will be via a combined TSE system. TSE will be provided to a single point at each developable lot. The approval of application results in a single metered connection which is then capped off within the lot boundary allowing provision of connection by the lot developer. The connectin to the service is subject to approval from Palm Water. Nakheel encourages the consideration of other uses of the TSE. For example it can be used for toilet flushing (dual flush), car washing, building cleaning and private domain softscape irrigation. However, the developer needs to ensure and exercise extreme caution for TSE not to be used for servicing the showers, lavatories, service sinks and kitchen. Likewise, avoid any cross contamination between potable water and TSE water. The plot owner shall: • Be responsible for the application, coordination and verification to Palm Water for provisions and requirements for TSE connection. • Submit for approval to Palm Water details of landscaped area, anticipated daily and peak water consumption and general design calculations including pump selection and pipe sizes for the building with proposed mitigation measures in design for prevention from exceeding maximum permissible loads based on the load criteria reflected on the Self Certification Table and provide a copy of the approval, from Palm Water, along with all submitted material to Nakheel. • Be responsible for rectifying the kerbs, footpaths, roads in public property, affected by third party developer’s work during connection of services. 62 Development Code October 2007- Rev.1 12.0: UTILITIES SUPPLEMENT FOR PLOTS 12.7. SEWERAGE 12.8. STORM WATER Design Responsibility List Overview: Overview: Nakheel shall: Palm Water is the authority responsible for provision of sewer services within each lot. Onsite retention is mandatory for all Third Party Developers with a design storm of Average Recurrence Interval (ARI) of 10 years. 1. Not provide third party developers plots connection to the external underground storm water system connection. The requirements and provisions noted in this section relating to Palm Water are for information only and should be verified by the owner with the service provider. A sewer connection will be provided for each developable lot, as shown on the Combined Services Drawing. A single point of outfall will be allocated at the low point of each lot allowing building development anywhere within the lot envelope. The point of connection to the sewerage trunk main will be via a junction installed and capped within the lot boundary. The plot owner will be responsible for providing, connecting and maintaining an inspection opening and sanitary drain internal to the lot, subject to Palm Water approval. Design Responsibility List Nakheel shall: 1. Nakheel shall provide the following information accessible through the BIW website: • The position of the interface point of Palm Water’s capped sewer line to the developer’s lot as shown on the Combined Services Drawing. This plot infrastructure data is issued solely as provisional and preliminary information. • Criteria for third party developers to indicate the daily demand assumptions, anticipated daily and peak volume and general design calculations for the building in the form of proforma for the communication services design and installation, referred to as Self Certification Table. The plot owner shall: • Be responsible for the application, coordination and verification to Palm Water for provisions and requirements for sewer connection. • Submit for approval to Palm Water, the anticipated daily demand assumptions, anticipated daily and peak volume and general design calculations for the building with proposed mitigation measures in design for prevention from exceeding maximum permissible loads based on the load criteria reflected on the Self Certification Table and provide a copy of the approval, from Palm Water, along with all submitted material to Nakheel. The discharge of storm water is not permitted either to the sewer system or to the roads in the Development. Stormwater from the building built area footprint must be retained for the 10 year average reccurence interval storm event and used for landscape irrigation, toilet flushing, building maintenance and the like, and / or discharged to an onsite retention system. The stormwater from open areas at grade shall be similarly retained and must not discharge to public area. Where unavoidable to contain 100% of the stormwater on to the site, stormwater runoff from a maximum of 6.75% of the plot area (i.e., 15% of the balance footprint of the open spaces at grade, after allowing for 55% of the permissible building footprint) may be discharged directly only to the roads. The plot owner shall: 1. Retain the storm water run-off within the Owner’s plot and may re-use the storm water for irrigation purposes, toilet flushing and car cleaning/washing. 2. Submit for approval to Nakheel, anticipated retention system type, method and materials, the catchments area assumed within the lot and general design calculations for the building with proposed mitigation measures in design for prevention from exceeding maximum permissible loads based on the load criteria reflected on the Self Certification table. Where the design is based on discharge of unavoidable amount of stormwater directly only to the roads, the design must demonstrate compliance with appropriate design documentation including but not limited to pump provisions, pipe work, overflow diagrams with gradients and areas, enabling confirmation that no more than the maximum permissible stormwater is being discharged directly to the road. Any pipework/culverts for discharge to roadside shall demonstrate no interference with any external services and shall be installed at kerb level to the road. Calculations of building area stormwater retentions and tanks shall be provided along with drawings of tanks, soak ways etc. confirming compliance with these conditions. Storm water tanks are exempt from the TFA. The hydraulic engineer is required to submit Nakheel provided standard certification at the time of Building Permit submission specifically compliance with these criteria. (Please note that the certificate will have two specific clauses 1st confirming inability to contain and 2nd re the design in addition to the general confirmation of compliance with the Dev. Code – which will include the Utility section) All internal areas of the buildings shall be designed to a Freeboard of minimum 300mm. Ramps, stair cases, shafts and any area enabling stormwater access to the basements, shall be designed to this minimum freeboard requirement. Provide drawings confirming compliance with this condition including sections with RLs of kerb, road, foyer, stair landing, ramps and the like. 63