C. S. YAP METALPARTS INDUSTRIES SDN. BHD. WORK INSTRUCTIONS TITLE: TDK PACKING PROCESS (EXPORT) EFFECTIVE DATE: 12.01.2015 DOC NO: CSY MP-W049 REV. NO: 00 PAGE NO: 1 OF 4 Process Flow Instruction Picture/ Photo/ Diagram 1 Wrap the part with air bubble. Air bubble wrapping air bubble 2 Label the part name & Part name & Part number part number. Insert label (sticker type) 3 Choose box Choose the suitable box to fit in the part. 1 FOR REFERENCE ONLY C. S. YAP METALPARTS INDUSTRIES SDN. BHD. WORK INSTRUCTIONS TITLE: TDK PACKING PROCESS EFFECTIVE DATE: 12.01.2015 DOC NO: CSY MP-W049 REV. NO: 00 PAGE NO: 2 OF 4 Process Flow Instruction Picture/ Photo/ Diagram 1 Insert foam Fill in foam 4 Insert foam at the bottom & 4 edges around the part. 5 Fill in all the empty spaces in the box with foam, to prevent part from movement. Foam Foam Then place the foam above the part. 6 Seal the box. Seal the box 2 FOR REFERENCE ONLY C. S. YAP METALPARTS INDUSTRIES SDN. BHD. WORK INSTRUCTIONS TITLE: TDK PACKING PROCESS EFFECTIVE DATE: 12.01.2015 DOC NO: CSY MP-W049 REV. NO: 00 PAGE NO: 3 OF 4 Process Flow Instruction 2 Information 7 Label the related information on the box. a) receiver b) part number c) part name d) quantity Precaution sticker Box Wrapping 8 Label the precaution sticker at the side of the box 9 Wrapped the box with stretch film End FOR REFERENCE ONLY Picture/ Photo/ Diagram C. S. YAP METALPARTS INDUSTRIES SDN. BHD. WORK INSTRUCTIONS TITLE: TDK PACKING PROCESS DOC NO: CSY MP-W049 Process Flow EFFECTIVE DATE: 12.01.2015 REV. NO: 00 PAGE NO: 4 OF 4 Instruction Picture/ Photo/ Diagram Remarks: Before packing, perform preliminary inspection as per below: 1) The part to be delivered must tally (part name and part number) with a list / document provided. 2) The quantity to be delivered must be tally with a list / document provided. 3) No damaged part delivered. 4) Provide air bubble, foam and box that compatible with the part to be delivered. Caution: 1) Each part to be delivered must packed properly to prevent damage. 2) Insert all parts needed to be delivered into the box. 3) Make sure that the goods to be delivered will not crush or damage if overlapped or thrown. 4) Every part must have a part name and part number. 5) Label the precaution sticker at the side of the box. 6) If the parts to be delivered are heavy, get confirmation from TDK's PIC or QA in advance for quantity per box. Prepared By: Teh Chee Hua QA/QC Asst. Mgr/ DQMR Reviewed By: Arut QA/QC Mgr. Approved By: Yap Chee Yee QMR / Deputy GM Date: 12.01.2015 Date: 12.01.2015 Date: 12.01.2015 FOR REFERENCE ONLY