C. S. YAP METALPARTS INDUSTRIES SDN. BHD.
WORK INSTRUCTIONS
TITLE: TDK PACKING PROCESS (EXPORT)
EFFECTIVE DATE: 12.01.2015
DOC NO: CSY MP-W049
REV. NO: 00
PAGE NO: 1 OF 4
Process Flow
Instruction
Picture/ Photo/ Diagram
1 Wrap the part with
air bubble.
Air bubble
wrapping
air bubble
2 Label the part name &
Part name & Part number
part number.
Insert label
(sticker type)
3
Choose box
Choose the suitable box
to fit in the part.
1
FOR REFERENCE ONLY
C. S. YAP METALPARTS INDUSTRIES SDN. BHD.
WORK INSTRUCTIONS
TITLE: TDK PACKING PROCESS
EFFECTIVE DATE: 12.01.2015
DOC NO: CSY MP-W049
REV. NO: 00
PAGE NO: 2 OF 4
Process Flow
Instruction
Picture/ Photo/ Diagram
1
Insert foam
Fill in foam
4 Insert foam at the bottom
& 4 edges around the
part.
5
Fill in all the empty
spaces in the box with
foam, to prevent part
from movement.
Foam
Foam
Then place the foam
above the part.
6 Seal the box.
Seal the box
2
FOR REFERENCE ONLY
C. S. YAP METALPARTS INDUSTRIES SDN. BHD.
WORK INSTRUCTIONS
TITLE: TDK PACKING PROCESS
EFFECTIVE DATE: 12.01.2015
DOC NO: CSY MP-W049
REV. NO: 00
PAGE NO: 3 OF 4
Process Flow
Instruction
2
Information
7 Label the related
information on the box.
a) receiver
b) part number
c) part name
d) quantity
Precaution sticker
Box Wrapping
8 Label the precaution
sticker at the side of the
box
9 Wrapped the box
with stretch film
End
FOR REFERENCE ONLY
Picture/ Photo/ Diagram
C. S. YAP METALPARTS INDUSTRIES SDN. BHD.
WORK INSTRUCTIONS
TITLE: TDK PACKING PROCESS
DOC NO: CSY MP-W049
Process Flow
EFFECTIVE DATE: 12.01.2015
REV. NO: 00
PAGE NO: 4 OF 4
Instruction
Picture/ Photo/ Diagram
Remarks:
Before packing, perform preliminary inspection as per below:
1) The part to be delivered must tally (part name and
part number) with a list / document provided.
2) The quantity to be delivered must be tally with a list /
document provided.
3) No damaged part delivered.
4) Provide air bubble, foam and box that compatible with
the part to be delivered.
Caution:
1) Each part to be delivered must packed properly to prevent
damage.
2) Insert all parts needed to be delivered into the box.
3) Make sure that the goods to be delivered will not crush or
damage if overlapped or thrown.
4) Every part must have a part name and part number.
5) Label the precaution sticker at the side of the box.
6) If the parts to be delivered are heavy, get confirmation
from TDK's PIC or QA in advance for quantity per box.
Prepared By:
Teh Chee Hua
QA/QC Asst. Mgr/ DQMR
Reviewed By:
Arut
QA/QC Mgr.
Approved By:
Yap Chee Yee
QMR / Deputy GM
Date: 12.01.2015
Date: 12.01.2015
Date: 12.01.2015
FOR REFERENCE ONLY