RAIL BALTICA R A I LWAY T R A N S P O RTAT I O N T E R M P R OJ E C T 10/21/2019 2 ABSTRACT This paper discusses the new project of Rail Baltica. It will examine both the benefits and the problem solving that are TABLE OF CONTENTS 1-INTRODUCTION 2--RAIL BALTICA PROJECT STORY 3- RB RAIL AS 4- CONNECTIVITY 5-LOCAL IMPACT 5678910- INTRODUCTION Rail Baltica a rail transport infrastructure project with a goal to integrate the Baltic States in the European rail network. The project includes five European Union countries – Poland, Lithuania, Latvia, Estonia and indirectly also Finland. It connects Helsinki, Tallinn, Pärnu, Riga, Panevežys, Kaunas, Vilnius, Warsaw. The Baltic part of the Rail Baltica project is referred to as the Rail Baltica Global Project. -The largest Baltic region infrastructure project in the last 100 years -For both passenger and freight traffic -Environmentally friendly – powered by electricity, producing less noise and vibration -Part of the EU’s North Sea - Baltic TEN-T corridor -Enables intermodality & multimodality RB RAIL AS RB Rail AS is a joint venture between the three Baltic States established in October 2014. Holding equal shares in RB Rail AS are SIA Eiropas dzelzceļa līnijas in Latvia, UAB Rail Baltica statyba in Lithuania and OU Rail Baltic Estonia in Estonia. RB Rail AS is the central coordinator for the Rail Baltica project. The project involves the construction of a high speed rail line from Tallinn to the Lithuanian/Polish border. Rail Baltica will be an electrified public use rail line, an environmentally friendly and modern form of transportation. General center: Riga Foundation Year:2014 Company type: Partnership Size : 51-200 employees Areas of expertise: Railway Construction CONNECTIVITY Rail Baltica will link the capital cities of Estonia, Latvia, Lithuania and Poland to each other and is currently one of the biggest investments improving the mobility and travel opportunities as well as developing business, trade, and tourism in the region. It is the largest railway infrastructure project to be constructed in the Baltic countries in the last 100 years. By integrating the region’s key transport infrastructure elements ranging from sea ports and inland logistics facilities to airports and city terminals into the Rail Baltica ecosystem, the project will pave the way for the development of new intermodal and multimodal logistics and passenger solutions. TIME FRAME Planned start of railway operations Completion of main environmental, spatial and pre- design studies 2017 2018 Planned start of main construction phase 2026