Engineering for Refineries & PMC Services
January 2019
Contents
◼ Capabilities in refining units
◼ Refining projects
◼ PMC
◼ Contacts
Capabilities / Services Provided
▪ Front End Engineering, Budgeting, Estimating
Completed project: Uzbekneftegaz at Shurtan field
▪ Detail Design, Specifications & Drawings
▪ Project Management Consulting Services
▪ Site Support, Procurement, Tendering
▪ Design & Build, Construction Management
▪ Design & Construction Safety Management
▪ Project Technical and Commercial Completion
▪ All Engineering Disciplines covered
Capabilities / Services Provided
Our team has designed refining units throughout the world,
amongst them:
✓
Crude Oil & Vacuum Distillation Units
✓
Alkylation Units
✓
Fluid Bed Catalytic Crackers
✓
Isomerization Units
✓
Hydrotreating Units
✓
Lube Oil Plants
✓
Catalytic Reformers
✓
Sulphur Recovery Plants
✓
Hydrocrackers, Mild Hydrocrackers
✓
Asphalt Units
✓
LPG recovery units
✓
Visbreaking
✓
MTBE
✓ “Prime G” Units
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction
ARPECHIM REFINERY (ROMANIA)
▪
MTBE Plant
▪
C4 Selective Hydrogenation (diene hydrofination)
▪
Revamp of Visbreaking into SOAKER Visbreaking Unit
▪
FCC Naphtha Metoxilation Unit (TAME production)
▪
FCC Heavy Naphtha Hydrodesulphurization, ISAL UOP Process
▪
Hydrogen Plant
▪
Retrofitting of an existing Hydrotreating Unit to ultra low Sulphur- Diesel Production ( 10 ppm)
▪
Offsite Facilities for Hydrogen Plant and VGO Hydrotreating Unit
▪
DCS Implementation for All Process and Offsite Units.
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction(continuation)
PETROBRAZI REFINERY (ROMANIA)
▪ Revamp of Atmospheric and Vacuum Distillation Unit
▪ Revamp of Fluid Catalytic Cracking Unit
▪ DCS and ESD Implementation for All Process and Offsite Plants
▪ Implementation of Continuous Catalyst Regeneration for Catalytic Reforming Unit
▪ Revamp of Petroleum Product Rail Tanker Rack
▪ Revamp of Coke Cutting System
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction(continuation)
PETROTEL LUKOIL REFINERY (ROMANIA)
▪ Revamp of Atmospheric and Vacuum Distillation Unit 3
▪ Revamp of Kerosene and Diesel Hydrotreating Unit
▪ Revamp of Amine Treating and Sulphur Recovery Unit
▪ Revamp of Flare Gas Recovery Unit
▪ DCS and ESD Implementation for All Process and Offsite Plants
▪ FCC Naphtha Hydrodesulphurization Unit
▪ Revamp of Naphtha Hydrotrating Unit
▪ Revamp of Fluid Catalytic Cracking Unit
▪ Revamp of Delayed Coking Unit
▪ Hydrogen Plant (SAT LINDE Licence)
▪ Revamp of C5-C6 Isomerization Unit and Gas Fractionation (Parlsom Technology for Isomerization Unit)
▪ Revamp of Catalytic Reforming Unit( Packinox effluen-combined feed implementation)
▪ DCS Implementation for Nitrogen Plant
▪ MTBE and TAME Unit
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction(continuation)
PETROMIDIA REFINERY (ROMANIA)
▪
Automatic In-line Blending Gas Oil Unit
▪
Gas Oil Vacuum Drying Unit
▪
Road Bitumen Plant
▪
Vapor Recovery Unit on Truck and Rail Rack
▪
Mild Hydrocracking Plant
▪
FCC Unit revamp
STEAUA ROMANA-CAMPINA REFINERY (ROMANIA)
▪
Basic Design for Diesel Hydrodesulphurization Unit
▪
Revamp of Waste Water Treatment Unit
RAFO ONESTI REFINERY (ROMANIA)
▪
Gas Oil Hydrodewaxing Unit
▪
New MTBE/TAME Unit
▪
New Loading/Unloading Facilities
▪
Increase of Catalyst Volume for Diesel, Kerosene, Gas Oil Hydrotreating Units
▪
DCS Implementation for Ethers Unit
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction(continuation)
SYRIA
Banias Refinery, 6 milions t/y (all units)
Banias Refinery Expansion:
▪ Light Naphta Izomerization
▪ Kero Hydrotreating Revamping
▪ Mild Hydrocracking
▪ LPG Recovery Unit
▪ LPG Merox
▪ Kero Merox
▪ New LPG filling station
▪ New Cooling Tower
▪ Storage Tanks
▪ Basic Design for Revamping the Existing Crude Distillation Unit, Amine Treating Unit
▪ New MTBE Storage, New Filling Station
JORDAN
Aqaba South Petroleum Installation Project
Zarqa Refinery Extension to 2.5 milions t/y
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction(continuation)
PAKISTAN
Karachi Refinery, 1.5 millions t/y (all units)
Karachi Lube Oil Complex, 0.1milions t/y
TURKEY
Central Anatolia Refinery, Kirikkale, 5 millions t/y (all units)
Izmir refinery, Gasoline Sweetening and MTBE storage
Izmir refinery, Gasoline Specification Improvement Project GSIP
Izmir refinery, Oxygenate Tanks, Loading and Transfer System
ALBANIA
Ballsh Lube Oil Complex, 30000 t/y
USA
Coffeyville Refinery, Hydrotreater Unit
Placid Refinery, FCC Gasoline and Hydrotreater Unit
Sinclair Refinery, Vacuum Crude unit
Tesoro Refinery, Benzene Reduction Unit
Refining projects
BASIC DESIGN / FEED / DDE engineering activities / site assistance during construction(continuation)
VENEZUELA
Naphtha Stripper Extra Heavy Crude
The new PDVSA Project: "Despojador de Nafta de 270 MBD (200 MBD Crudo Extrapesado) para la Producción
Temprana de Crudos de la Faja Petrolífera del Orinoco" in short “Despojador de Nafta” located at Jose will process
270,000 barrels per day of Dry Diluted Extra Heavy Oil "(DCO)" and generate approximately 200,000 barrels per
day of Extra-Heavy Crude Oil (EHCO) and 70,000 barrels per day of Naphtha. (Approximately 25% naphtha and
75% extra-heavy crude oil).
Refining projects
BASIC engineering activities (support to licensors)
▪
Hydrocracker Unit, Kherson, Ukraine
▪
LC Finner Unit, Caltex, Korea
▪
Hydrotreater Unit, Gdansk, Poland
▪
Hydrocracker Unit, MOL, Hungary
▪
Hydrotreater Unit, Fort Hills Oil Sands,
▪
Hydrocracker Unit and Hydrogen Plant,
Canada
Komsomolsk, Russia
▪
Hydrotreater Unit, CPC RDS, Taiwan
▪
Isodewaxing Unit, Taneko, Russia
▪
LC Finner Unit, North West, Canada
▪
Hydrocracker Unit, Mazeikin, Lithuania
▪
Hydrocracker Unit, Nizhnekamsk, Tatarstan
▪
Ethylene Plant, Tianjin, China
▪
Hydrocracker Unit, Engen, South Africa
▪
Ethylene Plant, Zhenhai, China
▪
DHC & MHC Hydrocracker Unit, Jubail,
▪
FCC Unit, Paradip, INDMAX, India
Saudi Arabia
▪
FCC Unit, BRPL, INDMAX, India
▪
Hydrocracker and Hydrotreater Unit,
Tuape, Rosneft, Russia
Project Management Consulting Services
ICARE can provide full service management capabilities including:
Completed project: Uzbekneftegaz at Shurtan field
PLANNING
MANAGEMENT
COORDINATION
▪ Project Scope Definition
• Construction/Program
• Estimating
▪ Conceptual Planning
Management
• Quality Planning
▪ Bid Package Development
• Engineering Management
• HSE Planning
▪ Contractor Screening & Pre-
• International Staffing
• Import/Export Coordination
• Interface Management
• Government/Authorities
Qualification
▪ Request for Proposal
• Change Control & Management
▪ Contractor Selection
• Contract Administration
▪ Project Execution Planning
• Licensor Management
▪ Budget Development
• Global Procurement/Sourcing
▪ Schedule Development
• Project Finance
• Equipment Expediting
• Project Schedule & Cost Controls
Interface Coordination
Project Management Consulting Services
Downstream & Upstream projects - selection
Client
CIMV, France
Title / Scope of Services
Technical Assistance for CIMV Prototype
Pilot Plant for biorefining
PDVSA / Venezuela
Consultancy services for developing indices
and cost structures for Oil and Gas EPC
projects
PDVSA / Venezuela
Critical Long Lead Items Supply Management
PDVSA / Venezuela
PDVSA / Venezuela
PDVSA / Venezuela
PDVSA / Venezuela
TOR / Ghana
Support and Supervision for the development
of the class II cost estimates for the Junin
Surface Management Project.
Support and Tracing of Procurement for Long
Lead Items of The Junin Surface Management
Project.
Support and project management for the EPC
of crude production increase from 105’000 to
165’000 BPD in Sinovensa’s facilities at Jose,
Morichal and MPE-3
Strategic Project Prioritization
TOR PMC for Expansion of CDU
Contract Price
(US$)
Commencement
and Completion
Dates
1,000,000.00
2015 – 2016
7,915,000
2013 – 2015
158,000,000
2013 – 2015
375,000
2014 – 2016
2,610,000
2014 – 2015
4,010,000
2014 – 2015
6,940,000
2017 -
3,300,000
2017 -
Contact
For further contact and information:
www.icare-group.com
Headquarter Office
Rue Faucigny 5
CH-1700 Fribourg
Switzerland
Commercial Office
Route Suisse 5
FIBA Building
CH-1295 Mies
Switzerland