PLM315 Maintenance Processing: Operational Functions SAP ERP - Operations Support Date Training Center Instructors Education Website Participant Handbook Course Version: 92 Course Duration: 3 Day(s) Material Number: 50095527 An SAP course - use it to learn, reference it for work Copyright Copyright © 2009 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Trademarks • Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation. • IBM®, DB2®, OS/2®, DB2/6000®, Parallel Sysplex®, MVS/ESA®, RS/6000®, AIX®, S/390®, AS/400®, OS/390®, and OS/400® are registered trademarks of IBM Corporation. • ORACLE® is a registered trademark of ORACLE Corporation. • INFORMIX®-OnLine for SAP and INFORMIX® Dynamic ServerTM are registered trademarks of Informix Software Incorporated. • UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group. • Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® and other Citrix product names referenced herein are trademarks of Citrix Systems, Inc. • HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology. • JAVA® is a registered trademark of Sun Microsystems, Inc. • JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. • SAP, SAP Logo, R/2, RIVA, R/3, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAP EarlyWatch, BAPI, SAPPHIRE, Management Cockpit, mySAP.com Logo and mySAP.com are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other products mentioned are trademarks or registered trademarks of their respective companies. Disclaimer THESE MATERIALS ARE PROVIDED BY SAP ON AN "AS IS" BASIS, AND SAP EXPRESSLY DISCLAIMS ANY AND ALL WARRANTIES, EXPRESS OR APPLIED, INCLUDING WITHOUT LIMITATION WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THESE MATERIALS AND THE SERVICE, INFORMATION, TEXT, GRAPHICS, LINKS, OR ANY OTHER MATERIALS AND PRODUCTS CONTAINED HEREIN. IN NO EVENT SHALL SAP BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR PUNITIVE DAMAGES OF ANY KIND WHATSOEVER, INCLUDING WITHOUT LIMITATION LOST REVENUES OR LOST PROFITS, WHICH MAY RESULT FROM THE USE OF THESE MATERIALS OR INCLUDED SOFTWARE COMPONENTS. g20097301958 About This Handbook This handbook is intended to complement the instructor-led presentation of this course, and serve as a source of reference. It is not suitable for self-study. Typographic Conventions American English is the standard used in this handbook. The following typographic conventions are also used. Type Style Description Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths, and options. Also used for cross-references to other documentation both internal and external. 2009 Example text Emphasized words or phrases in body text, titles of graphics, and tables EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example SELECT and INCLUDE. Example text Screen output. This includes file and directory names and their paths, messages, names of variables and parameters, and passages of the source text of a program. Example text Exact user entry. These are words and characters that you enter in the system exactly as they appear in the documentation. <Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries. © 2009 SAP AG. All rights reserved. iii About This Handbook PLM315 Icons in Body Text The following icons are used in this handbook. Icon Meaning For more information, tips, or background Note or further explanation of previous point Exception or caution Procedures Indicates that the item is displayed in the instructor's presentation. iv © 2009 SAP AG. All rights reserved. 2009 Contents Course Overview ......................................................... vii Course Goals ...........................................................vii Course Objectives .....................................................vii Unit 1: Notification......................................................... 1 Setting Up a Notification Type ........................................2 Unit 2: Planning .......................................................... 37 Order Planning ........................................................ 38 Work Center ........................................................... 68 Controlling in the Planning Phase .................................. 77 Unit 3: Scheduling ...................................................... 103 Material Availability Check ..........................................104 Scheduling ............................................................ 114 Printing ................................................................132 Unit 4: Completion...................................................... 143 Completion Confirmation and Technical Completion ............144 Controlling in the Completion Phase ..............................162 Appendix 1: Customizing Paths 2009 .................................. 181 © 2009 SAP AG. All rights reserved. v Contents vi PLM315 © 2009 SAP AG. All rights reserved. 2009 Course Overview The intensive course PLM315 (Maintenance Processing: Operational Functions) consolidates the maintenance processing topics introduced in PLM300 (Maintenance). The objective is to set up maintenance processing in the system for the notification, planning, controlling, and completion phases according to the customer-specific requirements. The settings for controlling maintenance tasks during the planning and completion phases are also demonstrated. Target Audience This course is intended for the following audiences: • • Project leader Project team Course Prerequisites Required Knowledge • PLM300 Maintenance Recommended Knowledge • SAP01 (SAP Overview) Course Goals This course will prepare you to: • Make all the basic Customizing settings for maintenance processing. Course Objectives After completing this course, you will be able to: • • • • 2009 Set up and use notification (notification type, catalog, catalog profiles) Set up and use planning (order type, work center, capacity planning, controlling) Set up and use controlling (material availability check, scheduling, printing) Set up and use completion (completion confirmation, controlling, history) © 2009 SAP AG. All rights reserved. vii Course Overview viii PLM315 © 2009 SAP AG. All rights reserved. 2009 Unit 1 Notification Unit Overview This chapter refers to the chapters on Malfunction-Based Maintenance and Planning Maintenance in the course PLM300 and repeats the notification concept. The relevant Customizing settings, as well as a range of detailed functions in the application, are also demonstrated. Unit Objectives After completing this unit, you will be able to: • Define new notification types and assign basic parameters Unit Contents Lesson: Setting Up a Notification Type .........................................2 Exercise 1: Set Up a Notification Type ................................... 13 2009 © 2009 SAP AG. All rights reserved. 1 Unit 1: Notification PLM315 Lesson: Setting Up a Notification Type Lesson Overview This lesson shows you how to set up a new notification type. Lesson Objectives After completing this lesson, you will be able to: • Define new notification types and assign basic parameters Business Example In maintenance processing, you use a notification to collect maintenance requirements. A company should have its own notification type for requirements set up. Notification Category, Notification Type Figure 1: Notification Category, Notification Type You can use maintenance notifications (notification category 01, notification type M1 or M2) to enter and process requirements and malfunctions. Alternatively you can create a general notification (notification category 05, notification type G0, for example), which is initially created in central message creation. 2 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type General notification uses a simple entry screen for entering the requirement into the system - you do not have to define the type (for example, malfunction, request, complaint, internal problem notification). You can only decide the type in the second step by changing the notification type General Notification to the specific notification type (for example, Malfunction Report). In the subsequent notification, the maintenance planner adds all the missing details. The advantage of using general notifications is that you can make a central, coordinated entry for any kind of requirement. The person making the entry does not have to be a trained maintenance planner. In the R/3 System, you use the notification type to assign notifications to the individual applications. You can use the individual notification types to define different classes of maintenance notifications and then use these classes when making selections. You can use the notification type to define the use of the maintenance notification for particular business processes. In the standard system, notification types are structured according to functional criteria (malfunction notification, maintenance request, activity report). Figure 2: Settings for Notification Types 2009 © 2009 SAP AG. All rights reserved. 3 Unit 1: Notification PLM315 The following settings are available for notification types: • Long text control This allows you to lock a text and to add a line to the log (changed by, date of change, and so on). • Notification origin Defines the basic character of a notification (for example, requirement or malfunction report) • Reference time The time suggested when the notification is completed, which is then set for the notification in the notification history. • Order type Default order type specified when creating an order from a notification. • Number assignment The number range used. • Priority / priority type This allows you to prioritize notifications in connection with date proposals. • Partners Contact persons who should be available in notification and order processing (supplier, customer, and so on). • Object Information Information concerning the reference object of the notification or order and that can be displayed from the notification or the order. • Field selection Selection and controls for the fields used in the notification. • Catalog / catalog profile Any area of the findings (object parts, damage, cause of damage and so on) can be assigned to the the notification type catalog which can be selected from the findings code. The catalog profile limits the selection of available code groups referring to specific subject areas (car type, data processing, production machines, and so on). 4 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type General settings for maintenance notifications: The following settings can be used for all types of notification: • Field selection The field selection for notifications allows you to control certain fields together for all notification types (for example, light color for the notification from and notification date fields). • List editing You can set up list processing for notifications in Customizing so that it contains standard values for selection screens, field selection, and the display variant. • The system condition indicator The system condition indicator defines the conditions that a technical system can have (operational, out of order, and so on). These settings are defined at client level and are not dependent on the notification type. • Transaction start values The transaction start values for a notification transaction define whether an initial screen should be displayed and which default notification type should be used. Initial Screen must be selected if you want to access the initial screen with the field for the notification number and notification type. You can also define which screen should be the first detail screen. The notification header screen is the initial screen in the standard system, but this can be changed. Configuration of the Notification Interface Figure 3: Configuration of Tabs 2009 © 2009 SAP AG. All rights reserved. 5 Unit 1: Notification PLM315 You can configure tabs for each notification type. A total of 26 different tab pages are available (22 notification-based, 4 item-based). You can define a simple view or an enhanced view for each notification type. This means that a very simple screen appears for the person entering the notification, but that all details appear for the person processing it. Different transactions enable you to use the two notification type views: • • The plant maintenance transactions IW24 (Malfunction Report), IW25 (Activity Report), and IW26 (Request) access the enhanced view. Transaction IQS21 accesses the basic view. You can define screen areas (subscreens) for each tab. 21 different screen areas are available. You can assign the tabs their own internal heading and a graphical symbol, if required. You can easily activate or deactivate predefined tabs pages. Within a notification type, you can also specify different layouts for the notification screen, for example, to distinguish between display mode and change mode. For example, you might want only core data to be visible in display mode, whereas all data should be displayed in change mode. This is controlled using activity categories (create, change and display). Priorities Figure 4: Priorities A priority can be assigned to each maintenance notification and order. This priority defines the required start and end dates for the notification or order, relative to the creation date. 6 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type During maintenance processing, you can work with internal priority types for notifications and orders. Since you can define an unlimited number of priorities for each priority type, it is easier for you to use the same priority types for notifications and orders. The same priority keys have the same meaning. Object Information The object information provides summarized core data on a technical object, which can be used to support processing of a maintenance task (for example, last active notification, last active order, or next maintenance). The object information is available at the following locations: • • • In the master record for the technical object In the notification In the order Figure 5: Object Information Key The object information key controls: • • • • Automatic display of object information Reference to object information Number of days in past to search for PMIS info and notifications The display of characteristics for the reference object The object information key defines how the object information is displayed in notifications and orders. 2009 © 2009 SAP AG. All rights reserved. 7 Unit 1: Notification PLM315 If the Automatically indicator is set, the system automatically displays the object information in the notification as soon as the reference object is entered or changed. The reference specifies whether the object information should relate only to the reference object, to the reference object and all superior objects in the technical hierarchy, or to all objects in the reference object structure. You can specify the number of days in the past (from the time of the query) the system should search for the statistics from the information system (breakdowns reported, notifications created, and so on). You can also enter such a search period for finding notifications. You can also define whether the system should display completed or outstanding notifications, and not only notifications with the status In processing or Outstanding. If the indicator for characteristics is set, the characteristics of the reference object are displayed, provided it has been assigned to a class. Catalogs and Catalog Profile Figure 6: Catalogs A cross-application catalog system is used for reporting maintenance notifications. This catalog system has a hierarchical structure. The first level of the catalog system is the catalog type. Each catalog type represents a certain directory. Each catalog type can be further subdivided using code groups. You can define individual codes in each group. 8 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type The following catalog types are provided as standard for Plant Maintenance: • • • • • • Catalog 2 for tasks Catalog 5 for causes of damage Catalog A for activities Catalog B for object parts Catalog C for damage To define your own catalog type, use catalog types R to Z. You can define appropriate keywords for the standard catalogs of damage and problem codes. These words appear in the notification item as keywords for the respective catalog displayed. Figure 7: Assigning Catalogs to Notification Types In Customizing, catalogs are assigned to each notification type for the following predefined areas: problems, causes, tasks, activities and object parts. The corresponding fields for cause of damage, object part and so on, are only provided in the notification item after catalogs have been assigned to the notification type. 2009 © 2009 SAP AG. All rights reserved. 9 Unit 1: Notification PLM315 Figure 8: Catalogs and Catalog Profile The catalog profile combines a selection of code groups from different catalogs for a particular topic (for example, findings procedure for pumps). One or more code groups can be selected from each catalog. You can specify code groups by writing them out in full or you can use wildcards to select several code groups within an entry (for example, PUMP*). Figure 9: Assigning Catalog Profiles to Notification Types You can assign the catalog profile to the master record for the technical object and notification type. 10 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type If the technical object and notification type both have a catalog profile, the profile from the technical object is always read first when a notification is created, and copied if available. Customizing Checklists Figure 10: Notification Customizing 2009 © 2009 SAP AG. All rights reserved. 11 Unit 1: Notification 12 PLM315 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Exercise 1: Set Up a Notification Type Exercise Objectives After completing this exercise, you will be able to: • Create notification types • Define notification parameters Business Example In your company, a new notification type is to be created for entering requirements. The relevant notification parameters should be optimally configured for this purpose. Task 1: Display an existing notification type: 1. Display the existing notification type N1. Which Customizing function do you choose? 2. To which notification category is notification type N1 assigned, and which other notification categories exist? 3. What is defined by the origin indicator? 4. What is defined by the reference date/time? 5. What effect does the Early Number Allocation indicator have? Task 2: Creating a new notification type 1. Control parameters Create a new notification type ## as a copy of notification type N1. This notification type should have the following properties: – It should have the same character of a general maintenance notification. –The reference date/time should be the notification completion. – The catalog profile General Findings procedure should be assigned. – The update group is 26. – The number assignment should be made upon saving. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 13 Unit 1: Notification PLM315 Which control parameters do you set? Notification origin Reference time Catalog profile Update group Early number allocation 2. Screen area notification header The screen type for the notification header is Maintenance Notification. The screen type for the reference object is Equipment Only. In which Customizing option can you enter these settings? 3. Long text control It should be logged who entered the long text for all notifications that are created with your notification type ##. It should not be possible to change the long text at a later date. How do you do this? 4. Number range Assign your notification type ## to the number range of the group of maintenance notifications. How do you do this? Task 3: Configuration of the Notification Interface 1. For the notification type ##, create five tabs with the screen areas specified below. How do you do this? ______________________________________________________ ______________________________________________________ ______________________________________________________ Continued on next page 14 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Notification Item overview System availability Activities Maintenance plan • • • • • Screen RefObject Subject and long text (Windows 32bit) Basic dates Areas of responsibility Item + cause • Overview of all notification items with activities, causes, tasks • • System availability Effect on system • Activities for notification header • Use task list as the tab header Task 4: Define priorities 1. Define a new priority type ##. Which Customizing path do you choose? 2. Define three priorities A, B and C for your priority type. Set all the proposed start dates to today, and set the required end dates to today (A), a week today (B), and two weeks today (C). Which entries do you make? Priority Rel. Start Rel. End Unit Start Unit End A B C 3. Assign the priority type ## to your notification type ##. How do you do this? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 15 Unit 1: Notification PLM315 Task 5: Object Information 1. Defining Object Information Keys Define a new object information key ##; this key should be displayed automatically when you create a notification. The analysis data should only relate to the object entered. As soon as the threshold value of 500 completed orders is exceeded, the system should display this information. The evaluation should take the previous two years into consideration. All notifications should be considered, but no contracts. The characteristic information should be displayed. Which parameters do you set? Automatically Reference for notification and class selection Completed orders No. days Contract Classification 2. Assigning an Object Information Key Assign the object information key ## to the notification type ##. How do you do this? 3. The pump P-1000-N001 is to undergo a general overhaul. Create a maintenance notification with notification type ## for the equipment P-1000-N001. Establish the following general information about the pump: What information is contained in the object information? From which date is the selection made? _____________________________________ How many completed orders are there? _____________________________________ What is the diameter of the running wheel? _____________________________________ Which documents are assigned? Continued on next page 16 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type _____________________________________ _____________________________________ Save the maintenance request. Which number do you receive? Task 6: Catalogs and Catalog Profile 1. Which catalogs are normally used in plant maintenance? Assign these to your notification type ##. How do you do this? ______________________________________________ ______________________________________________ ______________________________________________ 2. Code groups and codes Create a new code group ## with 5 codes for the damage catalog. Which codes have you created? Code 3. Description Catalog profile Create catalog profile ## that accesses your code group ## for the damage catalog, but displays all entries for the other catalogs. What entries do you make in the catalog profile? 4. Catalog profile and notification type Continued on next page 2009 © 2009 SAP AG. All rights reserved. 17 Unit 1: Notification PLM315 Assign your catalog type ## to your catalog profile ##. Which entries do you make? 5. Create notification Create a notification with notification type LO## for your equipment TEQ-##. Check whether the required code groups and codes are proposed. Which notification number was assigned by the system? 18 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Solution 1: Set Up a Notification Type Task 1: Display an existing notification type: 1. Display the existing notification type N1. Which Customizing function do you choose? a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Notification Types 2. To which notification category is notification type N1 assigned, and which other notification categories exist? a) 3. What is defined by the origin indicator? a) 4. The origin indicator specifies the screen sequence on which the notification type is based. In other words, those which are under tabs assigned to the origin indicator or screen areas of a business process, for example a malfunction report, an activity report. What is defined by the reference date/time? a) 5. N1 is assigned to the notification category 01 (= Plant maintenance). Other notification categories are 02 (= Quality notification) and 03 (= Service notification). Date and time proposed when you complete the maintenance notification. What effect does the Early Number Allocation indicator have? a) The indicator causes the notification to be assigned a number when the Create function is called, and not just when it is saved. Task 2: Creating a new notification type 1. Control parameters Create a new notification type ## as a copy of notification type N1. This notification type should have the following properties: Continued on next page 2009 © 2009 SAP AG. All rights reserved. 19 Unit 1: Notification PLM315 – It should have the same character of a general maintenance notification. –The reference date/time should be the notification completion. – The catalog profile General Findings procedure should be assigned. – The update group is 26. – The number assignment should be made upon saving. Which control parameters do you set? Notification origin Reference time Catalog profile Update group Early number allocation a) 2. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Notification Types Field Name or Data Type Values Notification origin General notification Reference time D Catalog profile 1000 Update group 26 Early number allocation Deselected Screen area notification header The screen type for the notification header is Maintenance Notification. The screen type for the reference object is Equipment Only. Continued on next page 20 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type In which Customizing option can you enter these settings? a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Overview of Notification Type Select the line containing the notification type. In the dialog structure, double click the option Screen Areas in Notification Header. 3. Field Name or Data Type Values Screen type hdr H100 Screen category object O150 Long text control It should be logged who entered the long text for all notifications that are created with your notification type ##. It should not be possible to change the long text at a later date. How do you do this? a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Overview of Notification Type Select the notification type, and in the dialog structure double click the line Format Long Text. Select Log Line and activate No Text Change. 4. Number range Assign your notification type ## to the number range of the group of maintenance notifications. How do you do this? a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Number Ranges Set the indicator for the interval Maintenance Notification. Select Maintain Groups, double-click notification type ##, and then assign the notification type to the interval using Assign Element/Group. Task 3: Configuration of the Notification Interface 1. For the notification type ##, create five tabs with the screen areas specified below. How do you do this? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 21 Unit 1: Notification PLM315 ______________________________________________________ ______________________________________________________ ______________________________________________________ Notification Item overview System availability Activities Maintenance plan a) • • • • • Screen RefObject Subject and long text (Windows 32bit) Basic dates Areas of responsibility Item + cause • Overview of all notification items with activities, causes, tasks • • System availability Effect on system • Activities for notification header • Use task list as the tab header SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Overview of Notification Type Select the notification type and in the Dialog Structure, double-click the line Screen Structure for Extended View. Select New Entries and make the following entries: Notification tab Continued on next page 22 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Field Name or Data Type Values Tab 10\TAB01 Tab header Notification Tab ?; Data release Screen area 1 005 Screen area 2 032 Screen area 3 040 Screen area 4 010 Screen area 5 015 Select Next Entries. Task list tab Field Name or Data Type Values Tab 10\TAB08 Tab header Maintenance plan Tab ?; Data release Select Next Entries. Item overview tab Items main tab Field Name or Data Type Values Tab 10\TAB10 Tab header Items Tab ?; Data release Screen areas None Select Next Entries. Item overview lower-level tab Continued on next page 2009 © 2009 SAP AG. All rights reserved. 23 Unit 1: Notification PLM315 Field Name or Data Type Values Tab 20\TAB01 Tab header Item overview Tab ?; Release data Screen areas None Select Next Entries. Activities lower-level tab Field Name or Data Type Values Tab 20\TAB04 Tab header Activities Tab ?; Release data None Select Next Entries. Causes lower-level tab Field Name or Data Type Values Tab 20\TAB02 Tab header Causes Tab ?; Data release Screen areas None Select Next Entries. Tasks lower-level tab Field Name or Data Type Values Tab 20\TAB03 Tab header Tasks Tab ?; Data release Screen areas None Select Next Entries. System availability main tab Continued on next page 24 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Field Name or Data Type Values Tab 10\TAB04 Tab header System availability Tab ?; Data release None Select Next Entries. Activities main tab Field Name or Data Type Values Tab 10\TAB12 Tab header Activities Tab ?; Data release Screen areas None Save and select Back. Task 4: Define priorities 1. Define a new priority type ##. Which Customizing path do you choose? a) SAP standard menu → Tools → Customizing → IMG → Execute Project Select SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Response Time Monitoring → Define Priorities In the Choose Activity dialog box, place the cursor in the Define Priority Types line and select Choose. Select New Entries, and enter the priority type ##. Save and select Back. 2. Define three priorities A, B and C for your priority type. Set all the proposed start dates to today, and set the required end dates to today (A), a week today (B), and two weeks today (C). Which entries do you make? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 25 Unit 1: Notification PLM315 Priority Rel. Start Rel. End Unit Start Unit End A B C a) In the Choose Activity dialog box, place the cursor in the line Define Priorities for Each Priority Type, and select Choose. Select New Entries. Priority Rel. Start Rel. End A Unit Start Unit End DAY DAY B 7 DAY DAY C 14 DAY DAY Save and select Back 3. Assign the priority type ## to your notification type ##. How do you do this? a) In the Choose Activity dialog box, place the cursor in the line Assign Priority Types to Notification Types, and select Choose. Assign the priority type to the notification type. Task 5: Object Information 1. Defining Object Information Keys Define a new object information key ##; this key should be displayed automatically when you create a notification. The analysis data should only relate to the object entered. As soon as the threshold value of 500 completed orders is exceeded, the system should display this information. The evaluation should take the previous two years into consideration. All notifications should be considered, but no contracts. The characteristic information should be displayed. Which parameters do you set? Continued on next page 26 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Automatically Reference for notification and class selection Completed orders No. days Contract Classification a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Object Information → Define Object Information Keys Select New Entries Field Name or Data Type Value Automatically Yes Reference for notification and class Object selection 2. Completed orders 500 No. days 730 Outstdg notifications Select Contract None Classification Characteristics Assigning an Object Information Key Continued on next page 2009 © 2009 SAP AG. All rights reserved. 27 Unit 1: Notification PLM315 Assign the object information key ## to the notification type ##. How do you do this? a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Object Information → Object Information → Assign Object Information Keys to Notification Types 3. The pump P-1000-N001 is to undergo a general overhaul. Create a maintenance notification with notification type ## for the equipment P-1000-N001. Establish the following general information about the pump: What information is contained in the object information? From which date is the selection made? _____________________________________ How many completed orders are there? _____________________________________ What is the diameter of the running wheel? _____________________________________ Which documents are assigned? _____________________________________ _____________________________________ Continued on next page 28 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Save the maintenance request. Which number do you receive? a) SAP standard menu → Logistics → Plant Maintenance → Maintenance Processing → Notification → Create (General) Enter notification type ##; enter Equipment P-1000-N001 In the reference object screen area, choose the Object Information symbol (blue-white I-button). From which date is the selection made? Current date -2 years How many completed orders are there? see the Compl.Ord field What is the diameter of the running wheel? 130 mm Which documents are assigned? P-1000 Task 6: Catalogs and Catalog Profile 1. Which catalogs are normally used in plant maintenance? Assign these to your notification type ##. How do you do this? ______________________________________________ ______________________________________________ Continued on next page 2009 © 2009 SAP AG. All rights reserved. 29 Unit 1: Notification PLM315 ______________________________________________ a) Select catalogs: SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Overview of Notification Type Select the notification type, and in the Dialog Structure double-click the line Catalogs and Catalog Profiles. Assign the following catalogs: 2. Field Name or Data Type Values Problems C Causes 5 Tasks 2 Object parts B Activities A Code groups and codes Create a new code group ## with 5 codes for the damage catalog. Which codes have you created? Code Description Continued on next page 30 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type Code a) Description SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Content → Maintain Catalogs Choose Edit Catalog in the dialog box; enter and execute catalog type C code group ##. Select New Entries Enter a short text and set to Released status, release data, then select the line and double-click the Codes folder on the left in the Dialog Structure. 3. Code Description 1000 ...(any) 2000 ... 3000 ... 4000 ... 5000 ... Catalog profile Create catalog profile ## that accesses your code group ## for the damage catalog, but displays all entries for the other catalogs. What entries do you make in the catalog profile? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 31 Unit 1: Notification PLM315 a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Content → Define Catalog Profile Select New Entries, enter ## as the catalog profile number and assign some text to the catalog profile (for example Gr.##), Data release then double-click the Catalogs / code groups folder in the Dialog Structure. Select New Entries and make the following entries: 4. Catalog Code group 2 * 5 * A * B * C ## Catalog profile and notification type Assign your catalog type ## to your catalog profile ##. Which entries do you make? Continued on next page 32 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Setting Up a Notification Type a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Content → Change Catalogs and Catalog Profile for Notification Type or Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Overview of Notification Type Select the notification type, and in the Dialog Structure double-click the line Catalogs and Catalog Profiles. 5. Catalog Code group Catalog profile ## Problems C Causes 5 Tasks 2 Activities A Object parts B Create notification Create a notification with notification type LO## for your equipment TEQ-##. Check whether the required code groups and codes are proposed. Which notification number was assigned by the system? a) SAP standard menu → Plant Maintenance → Maintenance Processing → Notification → Create (General) Enter notification type ## and equipment TEQ-## and check the position of the corresponding catalog entries. 2009 © 2009 SAP AG. All rights reserved. 33 Unit 1: Notification PLM315 Lesson Summary You should now be able to: • Define new notification types and assign basic parameters 34 © 2009 SAP AG. All rights reserved. 2009 PLM315 Unit Summary Unit Summary You should now be able to: • Define new notification types and assign basic parameters 2009 © 2009 SAP AG. All rights reserved. 35 Unit Summary 36 PLM315 © 2009 SAP AG. All rights reserved. 2009 Unit 2 Planning Unit Overview This chapter refers to the chapters Organization of Plant Maintenance, Malfunction-Based Maintenance, and Planning Maintenance in the course PLM300, repeats the concept of planning maintenance orders, and consolidates the participants' knowledge of using maintenance orders during the planning phase by providing information on a whole range of detailed functions, as well as the corresponding Customizing settings. The course still provides information on costing in maintenance orders and the necessary Customizing settings. Unit Objectives After completing this unit, you will be able to: • • • • • • • • Define and configure order types in plant maintenance Define and configure maintenance activity types Define and assign external processing profiles Define and assign control keys Describe the structure of the work center and use the work center Use and set up costing in the order Calculate surcharges List commitments Unit Contents Lesson: Order Planning......................................................... 38 Exercise 2: Setting Up an Order Type: (I)................................ 51 Exercise 3: Setting Up an Order Type (2) ................................ 57 Lesson: Work Center ............................................................ 68 Exercise 4: Work Center ................................................... 73 Lesson: Controlling in the Planning Phase ................................... 77 Exercise 5: Controlling in the Planning Phase........................... 89 2009 © 2009 SAP AG. All rights reserved. 37 Unit 2: Planning PLM315 Lesson: Order Planning Lesson Overview This lesson provides an overview of key customizing settings for defining and configuring order types in the planning phase of plant maintenance. Lesson Objectives After completing this lesson, you will be able to: • • • • Define and configure order types in plant maintenance Define and configure maintenance activity types Define and assign external processing profiles Define and assign control keys Business Example The project team wants to define and configure its own order type. Maintenance activity types, external processing profiles and control keys should also be defined and assigned to the new order type. Order Types Figure 11: Order Category, Order Type Order category determines the application component to which an order belongs. It is usually used as a program-internal selection criterion and to all intents and purposes does not appear to users. The order categories for the respective applications are fixed in the system. 38 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning You can freely define the order types within an order category for each application. The order type represents business segments (repair, maintenance, refurbishment, investment) that differ in the way they are processed and therefore have different system settings. Figure 12: Setting Up an Order Type: (I) Different order types should be used for different business situations because many system control functions depend on the order type. A distinction is made here between parameters that depend directly on the order type and those that are assigned to a combination of order type and planning plant: 2009 © 2009 SAP AG. All rights reserved. 39 Unit 2: Planning PLM315 Parameters for order type: • Settlement profile Specifies possible settlement recipients, the default receiver as well as additional parameters (for example, allocation structure). • Budget profile The budget profile summarizes the budgeting control parameters (time frame, display, availability checks, currency conversion). • Residence time Residence time 1: specifies the period of time (in calendar months) that must elapse between when the deletion flag is set (step 1) and when the deletion indicator is set (step 2). Residence time 2: specifies the period of time (in calendar months) that must elapse between when the deletion indicator is set (step 2) and the reorganization (step 3). • Screen for reference object Specifies which input masks should be used for the reference object. • Number range Specifies which number range interval is used for each order type. • Planning plant Assigns order types to the maintenance planning plant. • Costing variants: actual + planned Contains control parameters for planned and actual calculations in the order. • Settlement rule Defines the start time for creating the settlement rule. • Maintenance activity type Subdivides tasks within an order type and serves evaluation purposes (inspection, routine maintenance, preventive maintenance, refurbishment, cleaning, and so on). Not to be confused with CO activities, which are assigned to the cost center and enable work valuation during operation. • Planning indicator The order planning indicator performs selection and statistical evaluation in the plant maintenance and customer service information systems (planned, unplanned, immediate orders). 40 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Figure 13: Maintenance Activity Types The maintenance activity type is the key for the type of maintenance activity executed (repair, shutdown, periodic tasks and so on). In cost evaluations (total costs, number of orders per technical object), you can classify the data using the maintenance activity type (distinction made between maintenance activities and costs). The permitted activity types are assigned to each order type. Setting Up an Order Type (II) Figure 14: Setting Up an Order Type (II) 2009 © 2009 SAP AG. All rights reserved. 41 Unit 2: Planning PLM315 Parameters for order type: • Default Value Profiles Contain default values for external procurement or for general settings. • Step-by-step operations / change documents / MRP relevance A customizing step that contains a series of settings, such as the increment for numbering operations, the creation of change documents, the MRP relevance of reservations (when creating or releasing the order), and so on. • Priority type with priorities (as with notifications) • Object information (as with notifications) • Default control key A control key can be proposed by the order type. • Partner determination procedure/Determination of address data The partner determination procedure makes contact persons available for order processing. This assignment also links to the central address management. Simple order view You can define a simple order view for certain user groups (such as maintenance technicians). You do this by assigning a view profile containing only the most important screen areas on the smallest possible number of tab pages. 42 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Figure 15: External Processing Profiles During external processing, a distinction is made between the external procurement of material and the assignment of complete operations to external companies. Since both of the procurement processes generally require different data for purchasing (different purchasing groups or different cost elements), you should define different profiles. The profiles can be defined centrally for each order type in Customizing. Alternatively, these settings can be set as user-specific with the user default values. The user values override the Customizing settings. Control Keys for Operations The control key in an operation controls the following parameters: • • • • • • • • • • Capacity planning Scheduling operations Capacity requirement Costing Service Printing time tickets Printing confirmation slips Printing operations Completion confirmations External processing The system controls the processing of individual operations using the operation control key. 2009 © 2009 SAP AG. All rights reserved. 43 Unit 2: Planning PLM315 You use the capacity planning indicator to ensure that the operation is scheduled and capacity load records are created for it. By setting the costing indicator, you ensure that the operation is taken into account during costing. You use the external processing key to define that the operation is executed by an external company. You use the completion confirmation indicator to specify whether the operation can be confirmed and what type of completion confirmation applies. The print parameters specify whether time tickets, confirmation slips, and so on should be printed for this operation. Figure 16: Special Order Types In addition to the standard order types, such as repair or maintenance plan orders, plant maintenance also includes more specialized order types: • • Refurbishment Investment These special order types have the same basic Customizing settings as the standard order types. In addition to the basic Customizing settings, you also need to make special settings for these order types. 44 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning For example, the following settings might be included for refurbishment order types: • • • Refurbishment indicator Separate number range Separate settlement profile Hint: If you want to refurbish materials externally you can use the subcontracting process. This is explained in the course PLM300. The following settings might be included for investment order types: • • • Investment indicator Separate number range Investment profile Integration Notification/Order Figure 17: Integration Notification/Order Assigning notifications to an order Notifications can be assigned to an existing order or one that is newly created. If the notification is assigned to a task list, then the operations of the task list can be transferred to the order object list. A prerequisite for doing this is to have a Customizing setting (notification and order integration). Four new fields are 2009 © 2009 SAP AG. All rights reserved. 45 Unit 2: Planning PLM315 available in the order object list: functional location, equipment, notification and plan date. The notifications assigned to an order are then placed in the order's object list. Object list entries In the order type settings, you can specify how entries in the order object list affect the order operation list if, for example, several notifications that have a task list are grouped into one order. You have the following options: • • • • Assignment of operations to object list entries inactive (default) Assignment of operations only for notifications with task lists called from maintenance plans Assignment of operations to all notifications Assignment of operations to all object list entries (for example, also equipments, functional locations) Delete notifications or operations If a notification is deleted from the order's object list, then all operations transferred by the notification's task list will also be deleted. Likewise, if all a notification's operations are deleted from an order's task list, the notification will also be removed from the object list. Header notification If an order is created from a single notification, it then becomes the header notification for the order (notification is attached to object list). The relationship between order and object list can be deleted. If several notifications are assigned in one existing order, then this can become the header notification (only if the contract does not have one). The subsequent assignment of a header notification can also be reversed again. Notification long text If an order is created from a notification, then the long text of the notification can be transferred as the order's long text (only when the order is first created). This must be activated in Customizing for all types of notification. 46 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Inspection Rounds Figure 18: Inspection Rounds If you want to structure work as an inspection round, you can assign technical objects to the respective operations directly (one functional location or piece of equipment for each operation) instead of using the object list. Hint: You can only use this function, however, if you have deactivated the assignment of operations to object list entries for the order type. You can adjust the sequence of operations by numbering the operations in line with the actual sequence of the technical objects. You can also define the recording of a counter reading or reading of a measurement point for each technical object. In this process, any available measurement point/counter available at the technical object can be added to the operation as a production resource/tool 2009 © 2009 SAP AG. All rights reserved. 47 Unit 2: Planning PLM315 Contract and Internet Catalog Figure 19: Direct catalog access (OCI) To access an external spare-parts catalog based on the Internet, a direct link can be established between the order's component list and the catalog. The link is found at OCI interface (Open Catalog Interface). To do this, however, the catalog and its call structure must first be defined in Customizing. Once a spare-part has been chosen from the supplier catalog, an item type N (non-stock) is created in the component list of the order. Once a spare-part has been chosen from the supplier catalog, an item type N (non-stock) is created in the component list of the order. 48 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Customizing Checklists Figure 20: Order Customizing (1) Order type • • • • • • • • • • • • • • • • • • 2009 Settlement profile Budget profile Residence time Screen for reference object Number range Maintenance planning plant Costing Variants Settlement rule Maintenance activity type Planning indicator Default Value Profiles Step-by-step operations, change documents, MRP relevance Priorities Object info keys Default control key Partners, Addresses Integration of Notification and Order OCI interface (internet catalog) © 2009 SAP AG. All rights reserved. 49 Unit 2: Planning PLM315 Special Order Types • • 50 Order combined with notification Refurbishment order © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Exercise 2: Setting Up an Order Type: (I) Exercise Objectives After completing this exercise, you will be able to: • Create a new order type • Assign the required parameters to the order type Business Example A new order type is to be created for processing routine maintenance tasks in your company. All the parameters for the order type should be configured optimally for this purpose. Task 1: 1. Create a new order type LO##. Assign the settlement profile for maintenance orders, general budget profile, and the entry mask for functional location, equipment and assembly for the reference object. How do you do this? Settlement profile: Budget profile: Screen RefObject: 2. Number Range Assign this order type to the number range group for maintenance orders. How do you do this? 3. Order Type and Planning Plant Assign this order type to the maintenance planning plant 1000. Which Customizing function do you choose for this? 4. Settlement rule: For your order type, the settlement rule should be mandatory at the time of order completion. How do you do this? 5. Costing Variants Continued on next page 2009 © 2009 SAP AG. All rights reserved. 51 Unit 2: Planning PLM315 Assign the costing variant for maintenance orders (for planned and actual costs) to your order type in plant 1000. Which Customizing function do you use? Which costing variant have you selected? 6. Maintenance Activity Types Assign permitted maintenance activity types to your order type and define a maintenance activity type as the default activity type. Which maintenance activity types are permitted? Which is the default maintenance activity type? Task 2: Create an Order 52 1. Create an order with the order type LO## for your equipment TEQ-##. 2. What reference objects are proposed? 3. Which maintenance activity type is proposed and which could you assign to the order otherwise? 4. Save the order. Which number is assigned to it? © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Solution 2: Setting Up an Order Type: (I) Task 1: 1. Create a new order type LO##. Assign the settlement profile for maintenance orders, general budget profile, and the entry mask for functional location, equipment and assembly for the reference object. How do you do this? Settlement profile: Budget profile: Screen RefObject: a) SAP Menu → Tools → Customizing → IMG → Execute Project Select SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Order Types Click New Entries, enter order type LO## and an appropriate short text. 2. Field Name or Data Type Values Settlement profile 40 Budget profile 000001 Screen RefObject O100 Number Range Assign this order type to the number range group for maintenance orders. How do you do this? a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Number Ranges Choose Maintain Groups, select Repair and Maintenance Orders, double-click the order type LO## to select it, and choose Assign element/group to assign the order type to the group. 3. Order Type and Planning Plant Continued on next page 2009 © 2009 SAP AG. All rights reserved. 53 Unit 2: Planning PLM315 Assign this order type to the maintenance planning plant 1000. Which Customizing function do you choose for this? a) Order Type and Planning Plant In Customizing, select: Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Assign Order Types to Maintenance Plants 4. Settlement rule: For your order type, the settlement rule should be mandatory at the time of order completion. How do you do this? a) Settlement rule: Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Settlement Rule: Define Time and Creation of Distribution Rule Select the Mandatory for completion option for your order LO##. 5. Costing Variants Assign the costing variant for maintenance orders (for planned and actual costs) to your order type in plant 1000. Which Customizing function do you use? Which costing variant have you selected? a) Costing Variants Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Costing Data for Maintenance and Service Orders → Assign Costing Parameters and Results Analysis Keys Enter the costing variant PM01 as the planned and actual values. 6. Maintenance Activity Types Assign permitted maintenance activity types to your order type and define a maintenance activity type as the default activity type. Which maintenance activity types are permitted? Continued on next page 54 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Which is the default maintenance activity type? a) Maintenance Activity Types Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Maintenance Activity Type → Assign Valid Maintenance Activity Types to Maintenance Order Types Select New Entries, enter order type LO## and assign the maintenance activity types already in the system, for example, 001, 002 and 003 or → Default Values for Maintenance Activity Type for Each Order Type Enter default value, for example, 001 Task 2: Create an Order 1. Create an order with the order type LO## for your equipment TEQ-##. a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create General Order type LO## 2. What reference objects are proposed? a) Reference objects: Equipment, functional location and assembly 3. Which maintenance activity type is proposed and which could you assign to the order otherwise? a) 4. Save the order. Which number is assigned to it? a) 2009 Default depending on the key maintained in the previous exercise, for example 001; 002 and 003 can be assigned. Order number: 800xxx © 2009 SAP AG. All rights reserved. 55 Unit 2: Planning 56 PLM315 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Exercise 3: Setting Up an Order Type (2) Exercise Objectives After completing this exercise, you will be able to: • Assign the required parameters to the order type Business Example A new order type is to be created for processing routine maintenance tasks in your company. The parameters for the order type should be configured optimally for this purpose. Task 1: Default value profiles 1. Define the default value profile EXS## for external processing data and EXM## for external materials with the following parameters: EXS## EXM## Cost Element 417000 415000 Purchasing Org. 1000 1000 Purch. Group 0## 0## Material Group 007 010 2. Assign the profile EXS## for external processing and the profile EXM## for an external material for your order type LO## and for the maintenance planning plant 1000. Which Customizing function do you choose? 3. It should also be possible to select operations and replace the work center when incorporating a task list. Which checkboxes do you activate? Task 2: 1. Supplement one of your orders as follows: Assign an internal operation and then an external operation using the control key PM02. The internal operation should also contain a non-stock material. Save the order. 2. Call the order again and determine the following data: Continued on next page 2009 © 2009 SAP AG. All rights reserved. 57 Unit 2: Planning PLM315 PurchReq. no. External operation PurchReq. no. Non-stock material Cost element for non-stock material Material group for external operation Task 3: Additional settings The following settings should also be made for your order type LO##. (Which Customizing function must you choose to make each setting?): 1. Priority type ## and the object information key ## should apply. 2. Group all external services and materials under one purchase requisition number. 3. Assign the partner determination procedure PM to your order type. The person responsible role is the partner function for the order header. 4. Determine the address data in the following sequence: Order → Equipment → Functional location. 5. The default value for the control key for your order type is to be PM01. 6. Ensure that change documents are generated. 7. Create an order with the order type LO## (any priority) for the equipment TEQ-##. 8. Change the responsible work center to MECHANIK. Save the order. 9. Call the order again. Determine the following data and indicate in particular whether the data complies with the settings you have made in Customizing. Order number Start/end date Control key, internal operation Address data Action log Task 4: Optional:Inspection rounds 1. Identifying objects Continued on next page 58 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Create an order for functional location ##-B with order type PM03 and three operations. Assign an operation to each piece of equipment. Operation Short text Equipment 0010 Visual control and read counter P1 TEY-## 0020 Visual control and read counter P2 TEQ-## 0030 Visual control and read counter P3 TEW-## Set up a display variant for the operations control table is such as way that the Functional Location, Equipment, and Production Resources/Tools columns appear immediately to the right of the operations short text. 2. Assigning measuring points as production resources/tools Assign the measuring point that belongs to the piece of equipment to each of the respective operations as a production resource/tool. How do you proceed? Then set the order to in process. 3. Entering a completion confirmation Use the overall completion confirmation to enter both the actual times and the counter readings. Use the profile PM0002 (plant maintenance - general) to do this. How do you proceed? 2009 © 2009 SAP AG. All rights reserved. 59 Unit 2: Planning PLM315 Solution 3: Setting Up an Order Type (2) Task 1: Default value profiles 1. Define the default value profile EXS## for external processing data and EXM## for external materials with the following parameters: EXS## EXM## Cost Element 417000 415000 Purchasing Org. 1000 1000 Purch. Group 0## 0## Material Group 007 010 a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Create Default Value Profiles for External Procurement 2. EXM## Cost Element 417000 415000 Purchasing Org. 1000 1000 Purch. Group 0## 0## Material Group 007 010 Assign the profile EXS## for external processing and the profile EXM## for an external material for your order type LO## and for the maintenance planning plant 1000. Which Customizing function do you choose? a) 3. EXS## Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Default Values for Task List Data and Profile Assignments It should also be possible to select operations and replace the work center when incorporating a task list. Which checkboxes do you activate? a) The same Customizing option as in the previous step. Activate the Operation selection and Work center selection checkboxes. Continued on next page 60 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Task 2: 1. Supplement one of your orders as follows: Assign an internal operation and then an external operation using the control key PM02. The internal operation should also contain a non-stock material. Save the order. a) 2. SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Call the order again and determine the following data: PurchReq. no. External operation PurchReq. no. Non-stock material Cost element for non-stock material Material group for external operation a) Call the order again and determine the following data: PurchReq. no. External operation 100xxxxx PurchReq. no. Non-stock material 100xxxxx Cost element for non-stock material 415000 Material group for external operation 007 Continued on next page 2009 © 2009 SAP AG. All rights reserved. 61 Unit 2: Planning PLM315 Task 3: Additional settings The following settings should also be made for your order type LO##. (Which Customizing function must you choose to make each setting?): 1. Priority type ## and the object information key ## should apply. a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Priority Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → General Data → Define Priorities In the dialog box, choose Define Priority Type for Orders and assign the priority type ##. Object information Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Object Information → Assign Object Information Keys to Order Types 2. Group all external services and materials under one purchase requisition number. a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval Set the indicator for the collective purchase requisition. 3. Assign the partner determination procedure PM to your order type. The person responsible role is the partner function for the order header. a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Partner → Define Partner Determination Procedure and Partner Function In the dialog box, choose Assign Partner Determination Procedure to Order. Assign the partner determination procedure PM to your order type and the Person Responsible (VW) entry to the function of order. Continued on next page 62 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning 4. Determine the address data in the following sequence: Order → Equipment → Functional location. a) 5. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Access Sequence for Determining Address Data Planning Plant 1000 Order Type LO## Category OKP A1 1 A2 3 A3 2 The default value for the control key for your order type is to be PM01. a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Control Key → Maintain Default Values for Control Keys for Order Types Click New Entries and make the following settings: Review planning plant 1000, order type LO##. 6. Ensure that change documents are generated. a) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval Set the indicator for the creation of change documents. 7. Create an order with the order type LO## (any priority) for the equipment TEQ-##. a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create (General) Order Type LO## Equipment TEQ-## Continued on next page 2009 © 2009 SAP AG. All rights reserved. 63 Unit 2: Planning PLM315 8. Change the responsible work center to MECHANIK. Save the order. a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Change the work center responsible in the order's header data. 9. Call the order again. Determine the following data and indicate in particular whether the data complies with the settings you have made in Customizing. Order number Start/end date Control key, internal operation Address data Action log a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Correct? Order number 8xxxxx Yes Basic start Current date Yes Basic fin. Depends on priority Yes Control key, internal operation PM01 Yes Address data From equipment Yes Action log Change of responsible work center Yes Task 4: Optional:Inspection rounds 1. Identifying objects Create an order for functional location ##-B with order type PM03 and three operations. Assign an operation to each piece of equipment. Continued on next page 64 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Operation Short text Equipment 0010 Visual control and read counter P1 TEY-## 0020 Visual control and read counter P2 TEQ-## 0030 Visual control and read counter P3 TEW-## Set up a display variant for the operations control table is such as way that the Functional Location, Equipment, and Production Resources/Tools columns appear immediately to the right of the operations short text. a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create In the operations list, first drag the Functional Location, Equipment and Production Resources/Tools columns and drop them next to the (at the top right of the operations list) to save short text; then choose this setting as a variant with a name of your choice. 2. Assigning measuring points as production resources/tools Assign the measuring point that belongs to the piece of equipment to each of the respective operations as a production resource/tool. How do you proceed? Then set the order to in process. a) 3. Select all the operations in the operations list and choose the Production Resources/Tools button to assign the counters as production resources/tools. In the dialog box that appears, choose the Measuring Point button and select the measuring point using the F4 help. Entering a completion confirmation Use the overall completion confirmation to enter both the actual times and the counter readings. Use the profile PM0002 (plant maintenance - general) to do this. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 65 Unit 2: Planning PLM315 How do you proceed? a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Completion Confirmation → Entry → Overall Completion Confirmation From the menu bar, choose Extras → Settings Enter the profile PM0002, then choose Measurement Readings/Counter Readings In the dialog box that appears, choose Measuring Points for the inspection rounds. 66 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Order Planning Lesson Summary You should now be able to: • Define and configure order types in plant maintenance • Define and configure maintenance activity types • Define and assign external processing profiles • Define and assign control keys 2009 © 2009 SAP AG. All rights reserved. 67 Unit 2: Planning PLM315 Lesson: Work Center Lesson Overview This lesson shows the structure and use of the work center for plant maintenance. Lesson Objectives After completing this lesson, you will be able to: • Describe the structure of the work center and use the work center Business Example The project team would like to present its company's own maintenance group as the plant maintenance work centers in the system. Work center Definition • • The work center is an organizational unit that can carry out work. It specifies where operations can be carried out and who do so. Machines, people, and groups of people, as well as others, can be defined as work centers. Function • Work center data forms the basis for: cost, capacity, and target date calculation You use work centers to execute operations for routings and orders. You can use work center data to help: • • 68 Define which machines or personnel should be used for the operations Calculate costs, capacities and target dates for the operations © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Work Center Figure 21: Work Center Data Work center data is used for the following business functions: • • • • • • Basic data - contains the description, work center category (for example, Plant Maintenance), and task list usage (which routings the work center may be used for). Default values - contain, for example, a default control key. Capacity - available capacity is usually entered as the standard available capacity with the specifications - factory calendar, work start and end, level of individual capacity (= number of people) and operating time per capita. The available capacity can be restricted according to time, or can be organized in shifts differing from the standard available capacity. Scheduling - the operation dates are calculated on the basis of lead times (duration of operation), starting from the basic start or end dates. Costing - internal personnel costs are assigned on the basis of the activity types defined in Controlling. The activity types contain the assignment to an hourly rate. Activity types are assigned indirectly using a cost center, not directly to the work center. Personnel data - in addition to defining available capacity, people (= personnel numbers from Human Resources) or positions can be assigned in the work center. Hint: The integration of Human Resources to work centers and order planning is explained in the course PLM322. Available capacity 2009 © 2009 SAP AG. All rights reserved. 69 Unit 2: Planning PLM315 Definition • • Available capacity is the work that can be provided by a unit of capacity at one work center for each working day. Available capacity is defined using work start and finish, duration of breaks, capacity utilization, and number of individual capacity units. Function • Available capacity forms the basis for: Available capacity refers to the capacity available within a specific period. Available capacity is determined by: • • • • Work starting and finishing times Length of breaks Capacity utilization level of the capacity units The number of individual capacity units that make up total capacity In Capacity, the system saves the time worked and the daily available capacity for each work center. Figure 22: Available Capacity in the Work Center The standard available capacity is valid if no interval of available capacity has been defined. The standard available capacity is defined using the shift starting and finishing times, break lengths, and number of individual capacity. The system uses the above data to calculate capacity unit working time. The period for which the standard available capacity is valid has no limit. 70 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Work Center If you have specified validity periods for available capacity, these are referred to as intervals of available capacity. This is the capacity available within a specific period of validity. To define an interval of available capacity, you can determine shift programs that will also be valid for all work centers for a fixed time period. Start, finish, and break times are specified for work centers in a shift. Hint: The topic of capacity planning, both at work center and employee level, is explained in the course PLM322. Figure 23: PM-PP Integration Work centers are not just used in maintenance but in other areas too, for example, production work centers. If a maintenance order has been written for a machine being used as a production work center, production planners should be able to see all pending maintenance orders and the production orders for this work center on their planning boards. To display maintenance orders for a production work center, the number of the PP work center must first be entered in the technical object's location data. The maintenance order must also have a system condition at the header level. 2009 © 2009 SAP AG. All rights reserved. 71 Unit 2: Planning PLM315 Customizing Checklists Figure 24: Work Center Customizing 72 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Work Center Exercise 4: Work Center Exercise Objectives After completing this exercise, you will be able to: • Create a maintenance work center Business Example The company would like to map its own maintenance groups as the plant maintenance work centers in the system. Task: 1. Creating a work center Create a new work center T-EW## (= electrical workshop, group ##) in plant 1000 with the work center category plant maintenance. The person responsible for the work center is 0##. The work center should only be used in Plant Maintenance - maintenance task lists have been planned as the task list usage - and has no standard values. Use the control key for internal processing. Define the following available capacity for the Person capacity category in work center T-EW##: Employees work one shift from 7:00 a.m. to 5:00 p.m. with a one-hour break. The number of days worked is based on the factory calendar valid for plant 1000. 4 technicians who are available for processing planned orders 60% of the time work in the workshop. The work center is in cost center 4300 and is cleared there using activity type 1410. Which values do you enter? 2009 © 2009 SAP AG. All rights reserved. 73 Unit 2: Planning PLM315 Solution 4: Work Center Task: 1. Creating a work center Create a new work center T-EW## (= electrical workshop, group ##) in plant 1000 with the work center category plant maintenance. The person responsible for the work center is 0##. The work center should only be used in Plant Maintenance - maintenance task lists have been planned as the task list usage - and has no standard values. Use the control key for internal processing. Define the following available capacity for the Person capacity category in work center T-EW##: Employees work one shift from 7:00 a.m. to 5:00 p.m. with a one-hour break. The number of days worked is based on the factory calendar valid for plant 1000. 4 technicians who are available for processing planned orders 60% of the time work in the workshop. The work center is in cost center 4300 and is cleared there using activity type 1410. Which values do you enter? a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Environment → Work Centers → Work Center → Create Hint: Maintain data on the work center tab pages in sequence from left to right. The Technology tab page is not required. If you do access this tab page, however, you can terminate maintenance of the mandatory fields by choosing Cancel (F12). Call the transaction and enter the following data: Plant 1000 Work center T-EW## Work center cat. 0005 Release your data Basic Data tab page Continued on next page 74 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Work Center Object description Electrical workshop, group ## Person responsible 0## Task list usage 004 Standard value key SAP0 Default Values tab page Control key PM01 Capacities tab page Capacity category 002 Other formula SAP008 Choose the Capacity header data button Start 07:00 End 17:00 Capacity utilization 60 Length of breaks 01:00 No. of indiv. cap. 4 Scheduling tab page Capacity category 002 Other formula SAP004 Costing tab page 2009 Cost Center 4300 ActType Int. Proc. 1410 Formula key SAP008 © 2009 SAP AG. All rights reserved. 75 Unit 2: Planning PLM315 Lesson Summary You should now be able to: • Describe the structure of the work center and use the work center 76 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Lesson: Controlling in the Planning Phase Lesson Overview This lesson describes controlling for maintenance orders in the planning phase. Lesson Objectives After completing this lesson, you will be able to: • • • Use and set up costing in the order Calculate surcharges List commitments Business Example Controlling of maintenance orders is to take place as part of the company's overhead cost controlling. You need to set up costing for order resources for this purpose. Overhead rates are also to be calculated for certain resources. Externally procured services and materials are to be listed in the orders as commitments. Prerequisites As part of Logistics, Plant Maintenance is integrated with various areas in Accounting. To ensure effective controlling of plant maintenance orders you need to set up the organizational units in Financial Accounting and Controlling correctly, and create cost centers specific to plant maintenance with the relevant annual plan. 2009 © 2009 SAP AG. All rights reserved. 77 Unit 2: Planning PLM315 Figure 25: Organizational Levels Accounting and Controlling Client: The client represents the company or group and forms the data basis for the entire company. Chart of accounts: Every company code in the SAP system uses G/L accounts from one particular chart of accounts. The general ledger accounts are unique within a chart of accounts. Any form of identification can be used to define the chart of accounts. Controlling area A controlling area is an organizational unit used to represent a closed system for cost accounting purposes. Several company codes can be assigned to one controlling area for cross-company code cost accounting. Company code: In Accounting, business transactions are entered, saved, processed further, and the accounts managed at company code level. You can set up several company codes for each client, so that you can manage the accounts of several independent companies/subsidiaries at the same time. However, you must set up at least one company code. Business area: The business area represents an organizational unit for which internal reporting can be set up. There can be several business areas for a company code, but these also apply to all other company codes. For this reason, the business areas must have the same meaning in all company codes. Use of this organizational level is optional. You use the business areas if you want to create a balance sheet and a profit and loss statement for additional internal areas as well as for company codes. 78 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Within the defined controlling area, 2 cost centers are relevant for plant maintenance in the course of internal activity allocation: • • The cost center that provides a service (cost center for the work center) The cost center that requests a service (cost center for the technical object) Figure 26: Cost Centers in Plant Maintenance Order values can be classified according to costs, services, and settlements depending on the type of maintenance task (order type) and the processing phase of the maintenance order. 2009 © 2009 SAP AG. All rights reserved. 79 Unit 2: Planning PLM315 Figure 27: Terms in Maintenance • • • • 80 Costs: Costs are generally the value-based consumption of production factors for activity output and input, and for securing the necessary capacity within the company. Activities: Activities are the result of the combination of factors in the company; that is, the goods and services created during business. Settlements: Settlements are complete or partial allocations of the costs determined for an object to another object. When resources are consumed, the maintenance order is debited with the cost of the resource consumption. The settlements credit the order by passing the costs on to another object. Expenses / revenues: Costs for an order usually also represent expenses, while activities are not usually regarded as revenues, since they are not sold. © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Costing in the Order Figure 28: Value Flow in Maintenance Orders In the case of repair, inspection, or maintenance orders, the order is debited with planned costs when the required resources are dispatched. Each time resources are subsequently consumed, the order is debited with actual costs for the resource values. In the completion phase, the orders are credited by settlement with the resource consumption costs (see unit Controlling in the Completion Phase). The following applies to refurbishment orders: When the required resources are dispatched, the order is debited with planned costs representing the value of these resources. Subsequently, each time the resource is consumed, the order is debited with the actual costs that correspond to the value of the resource. Following delivery of the refurbished material, the order is credited with the value of the material. During settlement, the balance of actual costs and services is allocated to the material. 2009 © 2009 SAP AG. All rights reserved. 81 Unit 2: Planning PLM315 Figure 29: Costs in Maintenance Processes A distinction can be made between the following costs, depending on the processing phase of the order: • • • Estimated costs: Used in resource-neutral order planning to specify the anticipated cost volume for an order. The estimated costs are entered manually in the order. You can enter estimated costs as a manual reference value before releasing the order. The cost estimate can take place as an overall estimate for the order or based on value categories (own staff, external staff, own material, and so on). Estimated costs are updated to the information system (PMIS) for use in later evaluations. Planned costs: Planned costs are determined automatically for the order based on the cost estimate when dispatching order-specific resources (operations with internal activities, materials, and so on). Planned costs cannot be maintained manually. Actual costs: The order is automatically debited with actual costs during costing as a result of resource consumption (internal activities, materials, and so on). You cannot enter actual costs manually. Overhead Rates Besides the valuation of dispatched and consumed resources for an order, which displays planned and actual costs and takes the prices of these resources into account, you can also determine overhead rates. An overhead rate is a flat-rate percentage or amount-based markup on direct costs that enables you to allocate overhead costs to cost accounting objects according to cause. An example of the use of overhead rates is to allocate overhead from material cost centers to orders by debiting the orders in proportion to the material withdrawals and crediting the material cost centers with the same amounts. 82 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Overhead rates are also used to allocate sales and administration overhead. These overheads can also be used to monetize resources consumed in the order that are not listed separately, such as administration, transportation, and the like. Such overheads generate additional planned costs if they refer to planned resources. If they affect consumed resources, they represent additional actual costs and are listed as such in the order. Figure 30: Overheads on Planned Costs Overheads on planned costs are determined as part of the standard cost estimate; that is, they are calculated automatically when you save the order or, if requested, during order processing when a specific cost determination function is executed. It is only possible to determine planned overheads if a costing sheet is entered in the planned costing variant that applies to the order type in question. 2009 © 2009 SAP AG. All rights reserved. 83 Unit 2: Planning PLM315 Figure 31: Overheads on Actual Costs Actual overheads are also determined if a costing sheet is entered in the (actual) costing variant. However, overheads for consumed resources are not determined automatically for each consumption posting (confirmation, material withdrawal, and so on). You have to initiate this separately. Only then is the order debited with overheads on actual costs. Commitments Management Commitments are contractual or MRP-relevant obligations that are not entered in accounting but that lead to actual costs as a result of various business transactions. Commitments management is used to enter these obligations at an early stage and to analyze their effects on costing and finance, for example for purchase orders. Order commitments are used to separately update and monitor certain resources, in particular resources that are required for external procurement. Commitment values are updated in parallel with order planning and execution; that is to say, both the standard cost estimate and actual costing influence the commitment data. You must activate open items management in Customizing for the order type in question. 84 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Figure 32: Building Up Commitments The commitment data is built up when the scheduled order resources are valuated. Since the commitment value is not built up for internal activities, for example, it can be smaller than the planned costs of the order. Figure 33: Updating Commitments An increase in the order commitment can occur through certain actions performed after the order has been planned, such as the conversion of purchase requisitions into purchase orders, including a price increase, or the manual creation of purchase orders assigned to the order. As a result of these planning steps, the commitment values can exceed the planned costs. 2009 © 2009 SAP AG. All rights reserved. 85 Unit 2: Planning PLM315 Figure 34: Reducing Commitments Subsequent steps that are executed with reference to planning, such as entry of a goods receipt for the purchase order, lead to a reduction in the order commitment. The commitment values to be reduced are thereby determined as a result of the actual costing. Ideally, once all the obligations entered during planning have been redeemed, the commitment for the order should be zero. Controlling for Refurbishment Figure 35: Costs and Activities in Refurbishment 86 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase In the case of refurbishment, an order not only lists planned and actual costs, but also activities. These refer to the material to be delivered as a result of refurbishment. The cost report (CO report) lists these activities as negative values under Delivery. Customizing Checklists Figure 36: Customizing Settings for Controlling 2009 © 2009 SAP AG. All rights reserved. 87 Unit 2: Planning 88 PLM315 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Exercise 5: Controlling in the Planning Phase Exercise Objectives After completing this exercise, you will be able to: • Set up and perform costing in a maintenance order • Set up and use cost views in a maintenance order Business Example To make life easier for decision makers, standard orders are to be assigned manually planned estimated costs, wherever possible. During the planning phase for a maintenance order, you want to display its cost situation using planned costs calculated based on the scheduled resources. You want to be able to display the cost situation at any time during planning and processing of the maintenance order. Task 1: Costing in the maintenance order 1. Performing costing with a standard order type Create a new maintenance order with the standard order type PM01 for your equipment TEQ-## and note the order number. First, carry out a cost estimation based on the value categories in the cost profile. Then schedule your workshop T-ME## for 5 hours. The rubber seal DG-1000 is to be replaced. Then execute the task. How do you do this? 2. Checking the costs Now check the estimated, planned, and actual costs of your order. Display the cost structure of the order, both according to value categories and according to cost elements. How do you do this? 3. Checking the cost profile and the cost estimation version Display the cost profile in Customizing. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 89 Unit 2: Planning PLM315 Which path do you choose? Which value categories does the cost profile contain? Which is the valid cost estimate version? 4. Checking the value categories and cost elements Check the assignment of cost elements to value categories. How and where do you make this assignment? 5. Checking the costing variant Check the rules for determining planned costs in the order according to the Customizing settings and the relevant order data and other data. Which Customizing settings or other settings are relevant for standard cost estimates? Task 2: Determine surcharge 1. Determine the actual surcharges for your order. Which path do you choose? Task 3: Open item management 1. Checking open item management Which settings do you need to activate for the order type in order to use open item management? 2. Plan an operation for external services with the control key PM02 and the operation quantity 2 AU (activity units) in the order you created previously and enter a valuation price. Which path do you choose? 3. Check whether a commitment value is displayed for your order. Which path do you choose? What is the commitment displayed? 4. Enter a purchase order for 1 AU (one activity unit) for your order and then check the commitment value. Which path do you choose? Which purchase order number is assigned? What is the commitment displayed? Continued on next page 90 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase 5. Enter a goods receipt for 1 AU goods receipt for your order. How do you do this? Which document number does the system assign? 2009 © 2009 SAP AG. All rights reserved. 91 Unit 2: Planning PLM315 Solution 5: Controlling in the Planning Phase Task 1: Costing in the maintenance order 1. Performing costing with a standard order type Create a new maintenance order with the standard order type PM01 for your equipment TEQ-## and note the order number. First, carry out a cost estimation based on the value categories in the cost profile. Then schedule your workshop T-ME## for 5 hours. The rubber seal DG-1000 is to be replaced. Then execute the task. Continued on next page 92 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase How do you do this? a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create (General) Order type PM01, equipment TEQ-##. Estimate costs Costs tab, Costs subtab You can enter the estimated costs directly in the lines for the corresponding value categories in the Estimated costs column. The total estimated costs is displayed in the Costs field in the order header. Plan order Enter a workload of 5 hours in operation 0010. Choose List on the detailed screen for operation 0010 on the Components tab to access the bill of material for the equipment and select material DG-1000. Then release the order for processing - release and save it. Execute order Perform time confirmation and goods movement SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Completion Confirmation → Entry → Overall Completion Confirmation Enter order number. Choose Operation Data (magnifying glass) in the Time confirmation screen area. The system loads the material scheduled for the operation. Enter storage location 0001 and save the data. 2. Checking the costs Now check the estimated, planned, and actual costs of your order. Display the cost structure of the order, both according to value categories and according to cost elements. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 93 Unit 2: Planning PLM315 How do you do this? a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Display Display according to value categories Costs tab, Overview subtab Estimated costs: as entered manually Planned costs: calculated automatically based on the resources planned. Overhead rates are also calculated automatically. Actual costs: if the number of hours and material withdrawal do not deviate from planning, the actual costs are the same as the planned costs in the categories Internal Labor and Internal Materials. However, the system does not automatically calculate overhead costs for actual costs. This is a separate step (see Determine surcharge). Display according to cost elements Costs tab, Rep. Plan/Act. button 3. Checking the cost profile and the cost estimation version Display the cost profile in Customizing. Which path do you choose? Which value categories does the cost profile contain? Continued on next page 94 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Which is the valid cost estimate version? a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → Settings for Display of Costs → Define Default Values for Value Categories Value category Description 400 Internal materials / spares 415 Material - direct reference 417 External services 615 Internal labor 800 Revenues 890 Spares (own production) 999 Miscellaneous Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → Settings for Display of Costs → Define Version for Cost Estimates for Orders Cost estimate version 6 (determined by Controlling). 4. Checking the value categories and cost elements Check the assignment of cost elements to value categories. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 95 Unit 2: Planning PLM315 How and where do you make this assignment? a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → Settings for Display of Costs → Assign Cost Elements to Value Categories Value category Cost elements 400 400000 - 410300 415 415000 417 417000; 700000 615 615000 - 626300 800 800000 - 809999 890 890000 - 899999 999 1 - 9999999999 This means that all costs that debit the order using the cost elements listed above are displayed using the corresponding value categories. 5. Checking the costing variant Check the rules for determining planned costs in the order according to the Customizing settings and the relevant order data and other data. Continued on next page 96 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Which Customizing settings or other settings are relevant for standard cost estimates? a) Costing Variants SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Costing Data for Maintenance and Service Orders → Maintain Costing Variants Variant PM01 >Costing type 05 - Maintenance order >Valuation variant PM0 - Maintenance order The valuation variant contains pricing strategies for all resource types (material, internal, external processing, and so on). The costing variant must be assigned to the order type: Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Costing Data for Maintenance and Service Orders → Assign Costing Parameters and Results Analysis Keys Additional important settings: Stock material: 1. Subcontracting component item in order must be costing-relevant 2. For planning using a BOM: BOM item must be costing-relevant 3. Accounting screen (1) in material master must be maintained and contain a price Internal service: 1. The work in the operation must be specified in the Work field 2. The activity type in the operation must have a price for the current fiscal year 3. The Cost indicator must be selected in the control key of the operation. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 97 Unit 2: Planning PLM315 Task 2: Determine surcharge 1. Determine the actual surcharges for your order. Which path do you choose? a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Completion → Individual Processing → Determine Actual Cost Surcharges (KGI2) Enter the current period and order number; delete the Test Run indicator. SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Display Costs tab, Actual costs column, Overhead rates line Task 3: Open item management 1. Checking open item management Which settings do you need to activate for the order type in order to use open item management? a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Order Types Call the details for the order type and set the Open item management indicator. 2. Plan an operation for external services with the control key PM02 and the operation quantity 2 AU (activity units) in the order you created previously and enter a valuation price. Which path do you choose? a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Your order number 3. Check whether a commitment value is displayed for your order. Which path do you choose? Continued on next page 98 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase What is the commitment displayed? a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Extras → Cost reports → Budget/commitments List: Budget/Actual/Commitments Commitment: The system displays the purchase requisition commitment. 4. Enter a purchase order for 1 AU (one activity unit) for your order and then check the commitment value. Which path do you choose? Which purchase order number is assigned? What is the commitment displayed? a) SAP menu → Logistics → Materials Management → Purchasing → Purchase Order → Create → Vendor/Supplying Plant Known Document Overview On Choose My Purchase Requisitions Drag the purchase requisition into the shopping cart and enter the vendor 1000. Save your entries. SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Extras → Cost reports → Budget/commitments List: Budget/Actual/Commitments Commitment: The system displays the purchase requisition commitment. Hint: You can display a view of the commitment line items by double clicking on the amount in the Commitment column - this view displays both the purchase requisition and the purchase order with the corresponding value. 5. Enter a goods receipt for 1 AU goods receipt for your order. How do you do this? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 99 Unit 2: Planning PLM315 Which document number does the system assign? a) SAP menu → Logistics → Materials Management → Inventory Management → Goods Movement → Goods Movement (MIGO) Choose Goods Receipt Purchase Order and enter your purchase order number. Select the indicator Item OK at the bottom of the screen and save your entries. SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Extras → Cost reports → Budget/commitments List: Budget/Actual/Commitments >> If the goods receipt value is the same as the purchase order value, the commitment is cancelled out completely. 100 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Planning Phase Lesson Summary You should now be able to: • Use and set up costing in the order • Calculate surcharges • List commitments 2009 © 2009 SAP AG. All rights reserved. 101 Unit Summary PLM315 Unit Summary You should now be able to: • Define and configure order types in plant maintenance • Define and configure maintenance activity types • Define and assign external processing profiles • Define and assign control keys • Describe the structure of the work center and use the work center • Use and set up costing in the order • Calculate surcharges • List commitments 102 © 2009 SAP AG. All rights reserved. 2009 Unit 3 Scheduling Unit Overview This chapter is based on the chapter Planning Maintenance in the course PLM300 and repeats the concept of controlling maintenance orders. The course also provides more detailed information on using maintenance orders during the controlling phase, together with a wealth of detailed functions and the corresponding Customizing settings. Unit Objectives After completing this unit, you will be able to: • • • • • • Run a material availability check Set the parameters necessary for a material availability check Schedule maintenance orders Set the relevant scheduling parameters Carry out and print the print control settings Carry out necessary Customizing settings for printing notifications or orders. Unit Contents Lesson: Material Availability Check ..........................................104 Exercise 6: Material Availability Check ..................................109 Lesson: Scheduling............................................................. 114 Exercise 7: Scheduling ....................................................121 Lesson: Printing .................................................................132 Exercise 8: Printing ........................................................135 2009 © 2009 SAP AG. All rights reserved. 103 Unit 3: Scheduling PLM315 Lesson: Material Availability Check Lesson Overview This lesson shows how the material availability check is run for plant maintenance orders, and which Customizing settings are required. Lesson Objectives After completing this lesson, you will be able to: • • Run a material availability check Set the parameters necessary for a material availability check Business Example The goal of the controlling phase is to place an order in process. To do this, the material situation for the order must be checked. The project team checks which Customizing settings for checking material availability for the order type should be used. Material availability check You must set up the following parameters before you can execute the controlling phase for maintenance orders: 104 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Material Availability Check Figure 37: Setting Up an Order Type: (III) • Material Availability Check Settings for order type and material master determine whether a material availability check is possible, how it should be run, and how shortfalls should be dealt with. • Scheduling parameters Determine how order operation start and finish dates should be calculated. • Printer management The available shop papers, printing programs, and formulas per order type are determined here. User settings and print diversion can also be activated. Figure 38: Material Availability Check 2009 © 2009 SAP AG. All rights reserved. 105 Unit 3: Scheduling PLM315 Availability checks are controlled by checking instructions consisting of checking rules and checking groups. A check can be made in an open order or in an order release. The availability check leads to a shortfall (FMAT) status being generated when there is a deficit in the warehouse. You can determine whether or not an order is allowed to be released despite shortfalls. Availability checks can be set to generate a dynamic check of all goods received/goods issued (order requirements, orders, stock in transfer, safety stock, etc.). These settings are determined for the combination of checking group and checking rule. The checking rules are then assigned to the order type. The checking group is recorded in the material master. Figure 39: Component List: Removed from Storage The component list of an IH order can be changed using its own transaction (IW3K). Supplements and changes can thus also be made by employees who have no change authorization for the order. 106 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Material Availability Check Customizing Checklists Figure 40: Customizing Settings for Material Availability Check 2009 © 2009 SAP AG. All rights reserved. 107 Unit 3: Scheduling 108 PLM315 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Material Availability Check Exercise 6: Material Availability Check Exercise Objectives After completing this exercise, you will be able to: • Set the parameters necessary for a material availability check Business Example Company order controlling should run material availability checks. Task: 1. Define availability check Assign rule PM to your order type in Plant 1000 for availability operations 1 and 2 to check material availability. When parts are missing, the user should decide whether or not to release the order in operation 2. PRT and capacity availability should not be checked. What do the following mean Availability function 1:_______________________________________ Availability function 2:_______________________________________ What do you enter here? ____________________________________________________________ ____________________________________________________________ 2. Run availability check Assign 1 piece each of warehouse materials 100-100 and 401-400 to one of your orders for reference object TEQ## and display the scope of the check. Material open quantity Quantity units confirmed quantity 100-100 401-400 2009 © 2009 SAP AG. All rights reserved. 109 Unit 3: Scheduling PLM315 Solution 6: Material Availability Check Task: 1. Define availability check Assign rule PM to your order type in Plant 1000 for availability operations 1 and 2 to check material availability. When parts are missing, the user should decide whether or not to release the order in operation 2. PRT and capacity availability should not be checked. What do the following mean Availability function 1:_______________________________________ Availability function 2:_______________________________________ What do you enter here? ____________________________________________________________ Continued on next page 110 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Material Availability Check ____________________________________________________________ a) SAP Menu → Tools → Customizing → IMG → Execute Project Select SAP Reference IMG Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Availability Check for Materials, PRTs and Capacities → Define Inspection Control Select New Entries. Plant 1000, order type LO##, availability function 1 (= check for open order) Material availability area Activate Check material availability when saving order PMChecking rule PRT availability area Set No check Select New Entries Plant 1000, order type LO##, Availability function 2 (= check availability of released order) Material availability area Check material availability when saving order: activate Checking rule: PM Release material: 1 PRT availability area Set No check 2. Run availability check Assign 1 piece each of warehouse materials 100-100 and 401-400 to one of your orders for reference object TEQ## and display the scope of the check. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 111 Unit 3: Scheduling PLM315 Material open quantity Quantity units confirmed quantity 100-100 401-400 a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Select Components tab page, and enter materials. Material open quantity Quantity units confirmed quantity 100-100 1 Pc 1 401-400 1 Pc 1 Select items and click Check material availability Select Continue. Select Continue. Hint: Click Inspection Scope to display the scope of the check. 112 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Material Availability Check Lesson Summary You should now be able to: • Run a material availability check • Set the parameters necessary for a material availability check 2009 © 2009 SAP AG. All rights reserved. 113 Unit 3: Scheduling PLM315 Lesson: Scheduling Lesson Overview This lesson demonstrates the scheduling of maintenance orders and the relevant Customizing settings. Lesson Objectives After completing this lesson, you will be able to: • • Schedule maintenance orders Set the relevant scheduling parameters Business Example The goal of the controlling phase is to place an order in process. The dates must be checked. Using the Customizing settings the project team is able to check how the scheduling of the maintenance order can be fixed and optimized. Scheduling Figure 41: Scheduling During scheduling, the lead times for the operations (Duration field) are totaled and then either added to the basic start date (forwards scheduling) or subtracted from the basic end date (backwards scheduling). The start or end dates calculated in this way can deviate from the basic dates. 114 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling For each order type, you can define the standard scheduling type. However, this can be changed on the header data screen for the service order. Each scheduling type refers to a scheduling method, for example, forward scheduling, backward scheduling, current date scheduling, no scheduling. Adjust basic dates means that the date entries scheduled always have priority over the basic dates. Automatic scheduling means that the system always schedules the order when you save it. Scheduling including breaks means that the break times from the work center masters are taken into consideration. If the indicator is not set, the total break time is distributed proportionally. The scheduling including breaks can only be used in connection with a shift sequence with scheduled breaks (in maintenance this is not usual). Order shift means that if you change the basic dates when an order is being executed, the system always uses the new basic dates for scheduling purposes, rather than the actual dates entered so far. Figure 42: Scheduling Types This diagram shows how the system determines the dates for the three operations in an order (Op1 to Op3) dependent on the scheduling type. For the scheduling type Only capacity requirements, the capacity requirements are distributed equally across the period between basic start and basic end date. The basic dates are adjusted if necessary, depending on the setting for the order type. This means that the start date for the first operation is copied as the basic start date of the order and the end date for the last operation copied as the basic end date of the order. 2009 © 2009 SAP AG. All rights reserved. 115 Unit 3: Scheduling PLM315 For each scheduling type, you can set whether the time can also be entered for the basic dates, in addition to the date. The capacity loads already available are considered during capacity scheduling. Only those work centers that have the indicator Relevant for Capacity Scheduling are involved in capacity scheduling. For each operation to be scheduled, the system checks whether sufficient free capacity is available for it on the date calculated. If sufficient capacity is available, the operation is scheduled. If sufficient capacity is not available, the operation is shifted to a date when capacity problems do not arise. Figure 43: Relationships - Overview A relationship describes time-based dependencies between two operations in a maintenance order. For example, a particular operation can only start once another operation has been completed, or an operation cannot be completed before another operation has been completed. Relationships are determined by two factors: • • 116 Type Time period © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling There are four types of relationship: • • • • Finish -> Start - The end of one operation is linked to the start of the next operation. Start - Start - The start of one operation is linked to the start of the next operation. Finish - Finish - The end of one operation is linked to the end of the next operation. Start -> Finish - The start of one operation is linked to the end of the next operation. The time period is the time between two operations that are linked by a relationship. For example, the waiting times between two working stages can be represented. If only some operations in an order are fully linked by relationships, the missing relationships can be regenerated using the Generate relationships function for an order. FS relationships are automatically generated here. Time Zone Support Figure 44: Time Zone Support - Overview If you plan an execute a maintenance task with several employees in different time zones, you can switch the time zone in notifications, orders, confirmations, measuring points, and measurement documents. 2009 © 2009 SAP AG. All rights reserved. 117 Unit 3: Scheduling PLM315 The data is nevertheless stored with the time in the time zone in which the system is working (system time zone). This remains the same. The time conversion to another time zone appears only on the interface. When you deactivate time zone support, the system automatically reverts back to system time. If you have activated time zone support in Customizing, the following options are available: • • • Reference time zone: Time zone for the current transaction (only brief switch intended). Session time zone: This time zone applies for the session (between logging on and logging off). It is set when you have to deal with a particular region for a longer period of time. Personal time zone: The personal time zone in which the employee normally works. This is set in Customizing or in the user data (SU3). The personal time zone is the default value for the reference time zone if you have not set a session time zone. Figure 45: Time Zone Support - Procedure The central call center in England receives a phone call at 08:00 hrs local time informing them that the Japanese branch has a problem with a system. The time at which the system started to malfunction is indicated as 16.30 hrs local time in Japan. 118 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling The employee enters a malfunction report in the system. The employee's personal time zone is WET (Western European Time). To create the report, the employee switches the reference time zone briefly to JAPAN. The start of the malfunction can now be entered as 16.30 hrs. The time of entry is 17.00 hrs local time in Japan (= 08:00 hrs WET). Since the system is located in Germany, the report is created with the system time 09.00 hrs and posted to the database. For the call center employee, however, the personal time zone determines that the report appears with an entry time of 08.00 hrs and a malfunction start time of 07.30 hrs. Central maintenance planning is located in Germany. When the malfunction report was entered, the local time in Germany was 09.00 hrs. The work scheduler's personal time zone is CET (Central European Time). Since the scheduler is responsible for all notifications from Japan, he has set his session time zone to JAPAN. The reference time zone adapts itself to the session time zone and is likewise set to JAPAN. The scheduler creates an order and can see all the times displayed as local time in Japan. The technician's personal time zone is JAPAN. He opens the order that was created in Germany and sees a plan that is tailored to his working time. Customizing Checklists Figure 46: Customizing Settings for Scheduling 2009 © 2009 SAP AG. All rights reserved. 119 Unit 3: Scheduling 120 PLM315 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling Exercise 7: Scheduling Exercise Objectives After completing this exercise, you will be able to: • Schedule maintenance orders • Set the relevant scheduling parameters • Use and schedule relationships in maintenance orders Business Example The aim of the controlling phase is to place an order in process. The dates must be checked. Using the Customizing settings the project team is able to check how the the maintenance order can be scheduled and optimized. Task 1: Defining scheduling 1. Set up scheduling for the order type LO## in plant 1000 so that forward scheduling is performed, the dates are calculated automatically, and the basic dates are not adjusted. Which Customizing function do you use? ____________________________________________________ Which entries do you make? Plant Order type Production scheduler Adjust dates Production scheduler Scheduling type Automatic scheduling Continued on next page 2009 © 2009 SAP AG. All rights reserved. 121 Unit 3: Scheduling PLM315 Task 2: Performing scheduling 1. Create a new order with order type LO## for your equipment TEQ-##. Create four operations with your work center T-ME## with standard times (12-8-10-2 H). Perform scheduling and check the following data: Header Start: Basic/Scheduled End: Basic/Scheduled Operations Start End 0010 0020 0030 0040 Task 3: 1. Relationships: Entering a profile Add the general PM standard profile PM NETWORK for graphical display to your assigned profiles. Which Customizing function do you choose? 2. Creating maintenance orders A system has to be moved. Your work center T-ME## has been given the task of setting up scaffolding and connecting your pump TEQ-##. Create a maintenance order for this with the order type PM01. Plan 6 operations (0010 - 0060) with standard times (work) and materials. 3. Scheduling dependencies What options do you have for defining scheduling dependencies? 4. Relationships and operation network Maintain the following relationships for your operations: 0020 and 0030 follow 0010 0040 follows 0020 0050 follows 0030 0060 follows 0040 and 0050 Continued on next page 122 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling How do you proceed? ____________________________________________________ ____________________________________________________ ____________________________________________________ You want your operation 0010 to be performed after the operation 0010 of an order that you created earlier. How do you proceed? ____________________________________________________ ____________________________________________________ ____________________________________________________ 5. Network structure and Gantt chart Display your scheduling dependencies as a network structure and a Gantt chart. How do you proceed? Task 4: Optional: Time zones 1. Support employee in the UK You are an employee in the XYZ PLC central support center and are responsible for systems in Japan. First check the personal time zone for your user and set this to WET. 2. Maintenance request You receive a call from a colleague in Tokyo reporting malfunction noises from a system. The problem was discovered at 16.30 hrs local time in Tokyo. Create a maintenance request (M1) for the functional location ##-KGV with high priority. Choose JAPAN as the reference time zone. Enter 16.30 hrs local time in Tokyo as the malfunction start time. 3. Planner in Germany The planner in Germany is now responsible for the further processing of the notifications. Set the personal time zone for your user to CET. Check the schedule situation for the report on the basis of your personal time zone settings. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 123 Unit 3: Scheduling PLM315 4. Check the schedule situation for the report on the basis of local time in Japan. As the responsible planner, create a maintenance order for the malfunction report. Which time zone and what time is displayed in the order? With which date/time is the order saved to the database? 124 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling Solution 7: Scheduling Task 1: Defining scheduling 1. Set up scheduling for the order type LO## in plant 1000 so that forward scheduling is performed, the dates are calculated automatically, and the basic dates are not adjusted. Which Customizing function do you use? ____________________________________________________ Which entries do you make? Plant Order type Production scheduler Adjust dates Production scheduler Scheduling type Automatic scheduling a) SAP Menu→ Tools → Customizing → IMG → Execute Project Select SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Scheduling → Set Scheduling Parameters Plant 1000 Order type LO## Production scheduler * Adjust dates Do not adjust basic dates, dep. requirements to operation dates Scheduling type Forwards Automatic scheduling Yes Continued on next page 2009 © 2009 SAP AG. All rights reserved. 125 Unit 3: Scheduling PLM315 Task 2: Performing scheduling 1. Create a new order with order type LO## for your equipment TEQ-##. Create four operations with your work center T-ME## with standard times (12-8-10-2 H). Perform scheduling and check the following data: Header Start: Basic/Scheduled End: Basic/Scheduled Operations Start End 0010 0020 0030 0040 a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create (General) Order type LO## Schedule operations and select Schedule. Hint: You can see the scheduling data for the order type in the order header by choosing Display Other Scheduling Data. Task 3: 1. Relationships: Entering a profile Continued on next page 126 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling Add the general PM standard profile PM NETWORK for graphical display to your assigned profiles. Which Customizing function do you choose? a) SAP Menu → Tools → Customizing → IMG → Execute Project. Select Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Default Values for Task List Data and Profile Assignment Select your order type and assign the following profile: 2. Field Name or Data Type Values Profile - Plant Maintenance 0000001 Creating maintenance orders A system has to be moved. Your work center T-ME## has been given the task of setting up scaffolding and connecting your pump TEQ-##. Create a maintenance order for this with the order type PM01. Plan 6 operations (0010 - 0060) with standard times (work) and materials. a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create (General) Order type LO## 3. Scheduling dependencies What options do you have for defining scheduling dependencies? a) Finish-start relationship Start-start relationship Finish-finish relationship Start-finish relationship 4. Relationships and operation network Maintain the following relationships for your operations: 0020 and 0030 follow 0010 0040 follows 0020 0050 follows 0030 Continued on next page 2009 © 2009 SAP AG. All rights reserved. 127 Unit 3: Scheduling PLM315 0060 follows 0040 and 0050 How do you proceed? ____________________________________________________ ____________________________________________________ ____________________________________________________ You want your operation 0010 to be performed after the operation 0010 of an order that you created earlier. How do you proceed? ____________________________________________________ ____________________________________________________ ____________________________________________________ a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Go to → Graphic → Network Structure The operations can be linked to one another by using Connect: Place the cursor on the right half of operation 0010 and lead to the left half of operation 0020 (the end of operation 0010 is linked to the beginning of operation 0020) and so on. Linking to an external order: Go to the operations list and select operation 0010. Press Schedule. Go to the Relationships tab page. Enter the order number, operation number 0010, and FS (= finish-start relationship). 5. Network structure and Gantt chart Display your scheduling dependencies as a network structure and a Gantt chart. How do you proceed? a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Go to → Graphic → Network Structure or Go to → Graphic → Gantt Chart Continued on next page 128 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling Task 4: Optional: Time zones 1. Support employee in the UK You are an employee in the XYZ PLC central support center and are responsible for systems in Japan. First check the personal time zone for your user and set this to WET. a) 2. Transaction SU3; Default Values tab page Maintenance request You receive a call from a colleague in Tokyo reporting malfunction noises from a system. The problem was discovered at 16.30 hrs local time in Tokyo. Create a maintenance request (M1) for the functional location ##-KGV with high priority. Choose JAPAN as the reference time zone. Enter 16.30 hrs local time in Tokyo as the malfunction start time. a) SAP menu → Logistic→ Plant Maintenance → Maintenance Processing → Notification → Create (Special) → Maintenance Request Enter the functional location and the priority (notification header) Choose the Time zone: Central Europe pushbutton and set both the session and the reference time zone to JAPAN. Then enter the malfunction start time (Scheduling overview tab page) in local time for Japan. 3. Planner in Germany The planner in Germany is now responsible for the further processing of the notifications. Set the personal time zone for your user to CET. Check the schedule situation for the report on the basis of your personal time zone settings. a) Transaction SU3, Defaults tab page - Enter the time zone CET. SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Notification → Change The malfunction report was received by the planner at 09.30 hrs (Scheduling overview tab page). 4. Check the schedule situation for the report on the basis of local time in Japan. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 129 Unit 3: Scheduling PLM315 As the responsible planner, create a maintenance order for the malfunction report. Which time zone and what time is displayed in the order? With which date/time is the order saved to the database? a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Notification → Change Choose the Time zone: Central Europe pushbutton and set the reference time zone to JAPAN. (If the planner is responsible for Japan over a longer period of time and not just for the duration of the transaction, set the session time zone to JAPAN too.) b) In the report, choose and create the order with the order type PM01. In the order, the time zone is also set to JAPAN with the corresponding date/time display. The basic dates show the desired start/end of the order with the corresponding time (local time in Japan). The order is saved to the database with the date/time of the system time zone (in this case: CET). This can be checked in the Action Log. 130 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Scheduling Lesson Summary You should now be able to: • Schedule maintenance orders • Set the relevant scheduling parameters 2009 © 2009 SAP AG. All rights reserved. 131 Unit 3: Scheduling PLM315 Lesson: Printing Lesson Overview This lesson demonstrates printing notification and shop papers. It also covers key print Customizing settings in the field of plant maintenance. Lesson Objectives After completing this lesson, you will be able to: • • Carry out and print the print control settings Carry out necessary Customizing settings for printing notifications or orders. Business Example The project team defines the print parameters for printing orders and notifications. Printing Figure 47: Print Control The shop papers used are defined. For each shop paper, you can define additional control indicators, such as delta printing, updating the print status for each operation or component. You can also mark the shop paper as a time ticket or confirmation slip. 132 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Printing For each notification and order type, you define which shop papers can be printed, and which are printed as a system default setting. Shop papers must be specified for an order, otherwise printing is not possible. The selection field informs the system that a shop paper for an order type is proposed for printing. If the field is not selected, the user must enter manually which paper should be printed. The print diversion enables you to define that the print attributes of a particular shop paper are dependent on certain field contents in the order. As soon as you have printed shop papers for a maintenance order, the system sets the appropriate status automatically and creates a log. You can use the log to determine which papers have already been printed, who initiated the print job, and when they were printed. Figure 48: Printing Notifications and Orders If an order and notification are assigned to one another, you can print all data and shop papers for both of them together, irrespective of whether you trigger printing from order or notification processing. The system displays all the order and notification papers for selection in the dialog box. You can also call up the standard print routines from all the print programs. All the data from all of the order and notification papers is available. This makes it possible to print out all order and notification data on one shop paper (for example, long text for the notification in the order paper). The issue of data is controlled by the output program (print output program). All print programs can be used both in the order and notification printout. 2009 © 2009 SAP AG. All rights reserved. 133 Unit 3: Scheduling PLM315 The layout of the paper is defined by forms (there is a standard form available for all papers that can be modified as required). With the status control for shop papers you can trace the relevance of the printed shop papers. If a maintenance order or an operation has been changed after the shop papers were printed, the system displays the corresponding status in the order. Figure 49: Dedicated Printing Transactions Orders can be printed using a separate transaction (IW3D). This means that employees, who otherwise do not have any authorization to change the order, can also print the order. Customizing Checklists Figure 50: Customizing Settings for Printing 134 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Printing Exercise 8: Printing Exercise Objectives After completing this exercise, you will be able to: • Carry out and print the print control settings • Carry out necessary Customizing settings for printing notifications or orders Business Example The project team defines the print parameters for printing orders and notifications. Task 1: 1. Define the order papers to be printed for your order type LO##. Which Customizing function do you choose? ___________________________________________________ ___________________________________________________ ___________________________________________________ One paper should serve as instructions for the technician, another should notify warehouse management employees of the materials to be picked, and a third paper should remain with the maintenance supervisor in the workshop. Which papers have you selected? Paper Description Paper 1: Paper 2: Paper 3: 2. User-specific print defaults Set up user-specific print defaults based on the following specifications: – In planning plant 1000, for your planner group I##: – Print one copy of all papers on printer A000. – Print two copies of the paper for warehouse management (material staging) only on the printer in the warehouse. – Do not print the papers immediately, but place them in a spool file first. – No cover sheets should be printed. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 135 Unit 3: Scheduling PLM315 Which Customizing function do you choose? 3. What settings do you make? User Maintenance planning plant Maintenance planner group Paper Output device Number of copies New spool request Print immediately SAP cover page 4. What does the Print diversion function mean? Task 2: Printing the order Either set up a new order for order type LO##, or use an existing order for this order type. 1. How do you start printing the papers? 2. Which shop papers are proposed and which default values do you enter? Paper 3. 136 Output device Copy Delta Immediately Delete New Print the shop papers and then display the print log. © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Printing Solution 8: Printing Task 1: 1. Define the order papers to be printed for your order type LO##. Which Customizing function do you choose? ___________________________________________________ ___________________________________________________ ___________________________________________________ One paper should serve as instructions for the technician, another should notify warehouse management employees of the materials to be picked, and a third paper should remain with the maintenance supervisor in the workshop. Which papers have you selected? Paper Description Paper 1: Paper 2: Paper 3: a) SAP Menu→ Tools → Customizing → IMG → Execute Project Select SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Print Control → Define Shop Papers, Forms and Output Programs In the dialog box, choose Define Shop Papers for Order Type. Select the following shop papers, click Copy as ... and assign your own order type as document type in the screen that appears. 2. Paper Description Paper 1:2010 Operation control ticket Paper 2:2030 Job ticket Paper 3:2040 Pick list User-specific print defaults Set up user-specific print defaults based on the following specifications: Continued on next page 2009 © 2009 SAP AG. All rights reserved. 137 Unit 3: Scheduling PLM315 – In planning plant 1000, for your planner group I##: – Print one copy of all papers on printer A000. – Print two copies of the paper for warehouse management (material staging) only on the printer in the warehouse. – Do not print the papers immediately, but place them in a spool file first. – No cover sheets should be printed. Which Customizing function do you choose? a) SAP Menu→ Tools → Customizing → IMG → Execute Project Select SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Print Control → Define Printer In the dialog box, choose User Specific Print Control. 3. What settings do you make? User Maintenance planning plant Maintenance planner group Paper Output device Number of copies Continued on next page 138 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Printing New spool request Print immediately SAP cover page a) Settings: Hint: Click New Entries and then PM-specific Fields On/Off on the next screen. 4. User * * Maintenance planning plant 1000 1000 Maintenance planner group I## I## Paper * 2040 Output device A000 P083 Number of copies 1 2 New spool request Select Select Print immediately Deselect Deselect SAP cover page Deselect Deselect What does the Print diversion function mean? a) If you select settings in particular fields (for example, planner group) and field contents (for example, I##), documents are not sent to the standard printer, but diverted to another printer (for example, the printer specified for the order type and planner group). Continued on next page 2009 © 2009 SAP AG. All rights reserved. 139 Unit 3: Scheduling PLM315 Task 2: Printing the order Either set up a new order for order type LO##, or use an existing order for this order type. 1. How do you start printing the papers? a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Order → Print → Order Hint: The order must have the system status FREE. 2. Which shop papers are proposed and which default values do you enter? Paper Output device Copy Delta Immediately Delete New a) 3. Paper Output device Copy Delta Immediately Delete New 2010 A000 1 Deselect Dese- Dese- Yes lect lect 2030 A000 1 Deselect Dese- Dese- Select lect lect 2040 P083 2 Deselect Dese- Dese- Select lect lect Print the shop papers and then display the print log. a) From the order header: Goto → Logs → Print 140 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Printing Lesson Summary You should now be able to: • Carry out and print the print control settings • Carry out necessary Customizing settings for printing notifications or orders. 2009 © 2009 SAP AG. All rights reserved. 141 Unit Summary PLM315 Unit Summary You should now be able to: • Run a material availability check • Set the parameters necessary for a material availability check • Schedule maintenance orders • Set the relevant scheduling parameters • Carry out and print the print control settings • Carry out necessary Customizing settings for printing notifications or orders. 142 © 2009 SAP AG. All rights reserved. 2009 Unit 4 Completion Unit Overview This chapter is based on the chapters on Malfunction-Based Maintenance and Planning Maintenance in the course PLM300 and repeats the concept of completion confirmations and the completion of maintenance orders. The relevant Customizing settings, as well as a range of detailed functions in the application, are also demonstrated. The course still provides information on settling maintenance orders and the necessary Customizing settings. Unit Objectives After completing this unit, you will be able to: • • • • • • • Carry out necessary Customizing settings for completion confirmation Adjust whole completion confirmation screen Create completion confirmations Perform technical completion Set the parameters for order settlement Perform settlement Perform business completion Unit Contents Lesson: Completion Confirmation and Technical Completion ............144 Exercise 9: Completion Confirmation ....................................151 Lesson: Controlling in the Completion Phase...............................162 Exercise 10: Controlling in the Completion Phase .....................171 2009 © 2009 SAP AG. All rights reserved. 143 Unit 4: Completion PLM315 Lesson: Completion Confirmation and Technical Completion Lesson Overview This lesson demonstrates the use of completion confirmation and technical completion of maintenance orders and the relevant Customizing settings. Lesson Objectives After completing this lesson, you will be able to: • • • • Carry out necessary Customizing settings for completion confirmation Adjust whole completion confirmation screen Create completion confirmations Perform technical completion Business Example During completion, times and technical findings are confirmed for the task performed. The order is then technically completed and settled for the maintenance order. Completion Confirmation Figure 51: Setting Up an Order Type: (IV) 144 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Settings for completion confirmation • Control parameters Logs Partial/final confirmation? Write off reservations? Type of date check Default date and activities? • • • • Goods movements: Only backflushing? Causes of variance Screen templates (profile) for overall completion confirmation List editing Field selection A flexible screen layout is available for the overall completion confirmation. Profiles are defined that contain the active screen areas and available pushbuttons. The profile for the screen templates for the overall completion confirmation is created in Customizing. The assignment is made to the user, not the order type. Each user can configure the required profile when executing the completion confirmation. Figure 52: Settings for Overall Completion Confirmation 2009 © 2009 SAP AG. All rights reserved. 145 Unit 4: Completion PLM315 CATS Figure 53: CATS - Cross-Application Time Sheet CATS is a cross-application tool for individual users to confirm their work times and activities. It allows employees to enter data independently. This enables you to credit your department clearly with the work you have performed. CATS presents several advantages: • • • • • • Standard cross-application screens for entering the actual times Simple operation for all users Default field values and data entry templates (profiles) Integrated approval procedures Support of corrections User exits for more flexibility regarding authorization checks, validations, and default values With the Cross-Application Time Sheet (CATS) you can enter time data for different applications, including: • • • • Controlling: Internal activity allocation Personnel administration: Attendances, absences Service processing: Service entries Maintenance, customer service, project system: Completion confirmations Prerequisites for running CATS are an HR mini-master, a data entry profile and the appropriate authorizations to work with the time entry sheet. 146 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion The CATS process comprises the following steps: • • • • Entry of time data in the time sheet Release of time data (optional, depending on the process) Approval of time data (optional, depending on the process) Transfer of CATS data to the target applications Shift Note and Shift Report Figure 54: Shift Note Shift notes enable you to enter brief comments for events or special occurrences that you cannot enter otherwise, for example, in a completion confirmation or a maintenance notification. Shift notes can be output individually (as PDF files, for example) or sent by e-mail. Alternatively, shift notes can also be incorporated into shift reports. Shift notes can be configured in the SAP system either as a separate notification type or as part (tab) of another notification type. You can perform a full-text search for shift notes using the TREX search engine service. 2009 © 2009 SAP AG. All rights reserved. 147 Unit 4: Completion PLM315 Figure 55: Shift Report Shift reports allow you to collect all the important information for a work center or a technical object during a shift. The shift report simplifies the shift handover. It is output as a PDF document and can contain a number of different sections (that can be activated in Customizing): • • • • • • • Cover sheet Shift notes Completion confirmations Goods movements Maintenance notifications Maintenance orders WCM documents Shift reports are stored in the Knowledge Provider. A full-text search (TREX) can be used here. The shift note and shift report originate from the production area, where events were entered that related to a particular shift. Its use has now been expanded to plant maintenance. 148 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Digital Signature for Order Operations Figure 56: Digital Signature of Order Operations The digital signature performs the same function when processing digital data as the written signature does for printed documents. You can use the digital signature to "sign" digital documents. Digital signatures uniquely identify the signer of a digital document and also protect the integrity of the document. Changes are revealed in signed documents when the digital signature is checked. You can use digital signatures in SAP systems together with an external security product (user signature) or without such a product (system signature). The use of digital signatures and the connection to external security products are enabled in the SAP system by the Secure Store and Forward (SSF) component in SAP NetWeaver. You can find more information about SSF under http://help.sap.com in the SAP NetWeaver area (Key Areas > Security). In plant maintenance, the operations for an order can be digitally signed. Through the process of signing, an authorized and authenticated user approves the operation. The operation is then saved as a result. You can define whether digital signatures are optional, mandatory, or not required for certain combinations of order type and plant. If digital signatures are mandatory, the order cannot be completed technically until all the operations for the order have been digitally signed. 2009 © 2009 SAP AG. All rights reserved. 149 Unit 4: Completion PLM315 Technical Completion Customizing Checklists Figure 57: Customizing Settings for Completion Confirmations 150 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Exercise 9: Completion Confirmation Exercise Objectives After completing this exercise, you will be able to: • Make the necessary Customizing settings for completion confirmation • Adjust the overall completion confirmation screen • Create completion confirmations Business Example During completion, times and technical findings are confirmed for the task performed. The maintenance order is then technically completed and settled. Task 1: Confirmation parameters The following defaults apply for your order type LO##: The system proposes final confirmation, including the posting of outstanding reservations. It also proposes dates and activities. Actual work may only exceed planned work by a maximum of 50%. 1. Which parameters do you set? Final confirmation Post open reservations Propose dates Propose activities Work deviation active Work deviation Duration deviation active Duration deviation Date in future Task 2: Performing a completion confirmation 1. Confirm operations for the last order you created. Access the operations from collective time confirmation with selection. How do you delimit the selection criteria? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 151 Unit 4: Completion PLM315 __________________________________________________________ __________________________________________________________ __________________________________________________________ 2. Which orders/operations are proposed by the system? Which confirmation number is assigned to them? Enter the actual work time and set the final completion confirmation indicator for each operation. Confirmation number Order Operation Actual work Unit Check whether the data has been proposed correctly based on your confirmation parameters. Task 3: Adjusting the overall completion confirmation screen 1. Show the settings for profile PM01 of the overall completion confirmation. Which Customizing path do you choose? 2. Which settings have been made? Header data Screen area 1 Screen area 1 Task 4: Optional:Shift reports and shift notes 1. Different tasks Continued on next page 152 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Different tasks need to be performed on your electric pump TEQ-## during the course of a day: First, create a malfunction report documenting that unusual noises are coming from the pump gears. Note the number of the malfunction report: __________________________________________________________ Then convert the malfunction report into a maintenance order. Use the order type PM01 to do this. Make a note of the order number: __________________________________________________________ You also have to create a measurement document for the operating hours counter. Enter a counter reading of 20 hours. Make a note of the measurement document number: __________________________________________________________ 2. Shift note You also need to document a special occurrence in the shift note: A power failure meant that the pump could not be put into operation for 2 hours. Consequently, you need to check whether the replacement pumps could keep operation going with emergency power generators. Note the number of the shift note: __________________________________________________________ 3. Shift report Finally, all tasks and occurrences need to be incorporated into a shift report and stored. Create a shift report for your pump TEQ-##. Check whether all tasks and occurrences are included in the report. Note the number of the shift report: __________________________________________________________ Task 5: Optional:Digital signatures 1. Creating an order Create an order with order type PM01 for your piece of equipment TEQ-##. Link the task list with task list group PUMP_WTG and group counter 1. Then set the order to in process. Make a note of the order number: Continued on next page 2009 © 2009 SAP AG. All rights reserved. 153 Unit 4: Completion PLM315 __________________________________________________________ 2. Entering a completion confirmation Call the order and operation list and create a collective confirmation for your order. 3. Creating a digital signature Sign the individual operations. How do you proceed? What status does the operation have after it has been signed and in what state is it? 4. Checking the signature log Check the signature using the signature log. How do you proceed? 154 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Solution 9: Completion Confirmation Task 1: Confirmation parameters The following defaults apply for your order type LO##: The system proposes final confirmation, including the posting of outstanding reservations. It also proposes dates and activities. Actual work may only exceed planned work by a maximum of 50%. 1. Which parameters do you set? Final confirmation Post open reservations Propose dates Propose activities Work deviation active Work deviation Duration deviation active Duration deviation Date in future a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG Plant Maintenance and Customer Service → Maintenance and Service Processing → Completion Confirmations → Define Control Parameters for Completion Confirmations Final confirmation Yes Post open reservations Yes Propose dates Yes Propose activities Yes Work deviation active Yes Work deviation 50 Duration deviation active No Duration deviation Date in future No Continued on next page 2009 © 2009 SAP AG. All rights reserved. 155 Unit 4: Completion PLM315 Task 2: Performing a completion confirmation 1. Confirm operations for the last order you created. Access the operations from collective time confirmation with selection. How do you delimit the selection criteria? __________________________________________________________ __________________________________________________________ __________________________________________________________ a) SAP menu → Logistics → Maintenance → Maintenance Processing → Completion Confirmation → Entry → Time Sheet → CATS Classic → Record Working Times Delimit the selection using the order number or work center T-EW##, for example. 2. Which orders/operations are proposed by the system? Which confirmation number is assigned to them? Enter the actual work time and set the final completion confirmation indicator for each operation. Confirmation number Order Operation Actual work Unit Continued on next page 156 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Check whether the data has been proposed correctly based on your confirmation parameters. a) Confirmation number Order Operation Actual work Unit 38062 800228 0010 3 H 38062 800228 0020 5 H 38062 800228 0030 2 H 38062 800228 0040 1 H Task 3: Adjusting the overall completion confirmation screen 1. Show the settings for profile PM01 of the overall completion confirmation. Which Customizing path do you choose? a) SAP Menu→ Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG Plant Maintenance and Customer Service → Maintenance and Service Processing → Completion Confirmations → Set Screen Templates for Completion Confirmation Double click on the profile PM01 2. Which settings have been made? Header data Screen area 1 Screen area 1 a) Profile changeable, with totals line, release in future and release upon saving, (approval required is not set) Header data Plant maintenance with order number Screen area 1 Times for order operation Screen area 1 Goods movements Continued on next page 2009 © 2009 SAP AG. All rights reserved. 157 Unit 4: Completion PLM315 Task 4: Optional:Shift reports and shift notes 1. Different tasks Different tasks need to be performed on your electric pump TEQ-## during the course of a day: First, create a malfunction report documenting that unusual noises are coming from the pump gears. Note the number of the malfunction report: __________________________________________________________ Then convert the malfunction report into a maintenance order. Use the order type PM01 to do this. Make a note of the order number: __________________________________________________________ You also have to create a measurement document for the operating hours counter. Enter a counter reading of 20 hours. Make a note of the measurement document number: __________________________________________________________ a) Creating a notification or order SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Order / Notification Field Field value Order type PM01 Creating a measurement document SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Completion Confirmation → Measurement Documents → Create 2. Shift note You also need to document a special occurrence in the shift note: A power failure meant that the pump could not be put into operation for 2 hours. Consequently, you need to check whether the replacement pumps could keep operation going with emergency power generators. Note the number of the shift note: Continued on next page 158 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion __________________________________________________________ a) 3. SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Environment → Shift Report and Note for Technical Objects → Shift Note → Create Field Field value Functional location: ## Equipment (reference object) TEQ-## Shift report Finally, all tasks and occurrences need to be incorporated into a shift report and stored. Create a shift report for your pump TEQ-##. Check whether all tasks and occurrences are included in the report. Note the number of the shift report: __________________________________________________________ a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Environment → Shift Report and Note for Technical Objects → Shift Report → Create Task 5: Optional:Digital signatures 1. Creating an order Create an order with order type PM01 for your piece of equipment TEQ-##. Link the task list with task list group PUMP_WTG and group counter 1. Then set the order to in process. Make a note of the order number: __________________________________________________________ a) SAP menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Create Menu Extras → Task list selection → Direct entry 2. Entering a completion confirmation Continued on next page 2009 © 2009 SAP AG. All rights reserved. 159 Unit 4: Completion PLM315 Call the order and operation list and create a collective confirmation for your order. a) SAP Menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Order and Operation List → Change Menu Order → Confirmation → Collective Confirmation 3. Creating a digital signature Sign the individual operations. How do you proceed? What status does the operation have after it has been signed and in what state is it? a) Call the order from the order and operation list and then branch to the operation list Go to the details screen for the respective operation Menu Edit → Digital Signature → Set DSIG - the operation is completely locked. 4. Checking the signature log Check the signature using the signature log. How do you proceed? a) From the menu bar in the order, choose Goto → Logs → Digital Signature Log 160 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Completion Confirmation and Technical Completion Lesson Summary You should now be able to: • Carry out necessary Customizing settings for completion confirmation • Adjust whole completion confirmation screen • Create completion confirmations • Perform technical completion 2009 © 2009 SAP AG. All rights reserved. 161 Unit 4: Completion PLM315 Lesson: Controlling in the Completion Phase Lesson Overview This lesson demonstrates settlement of maintenance orders and the necessary Customizing settings. It also demonstrates technical and business completion. Lesson Objectives After completing this lesson, you will be able to: • • • Set the parameters for order settlement Perform settlement Perform business completion Business Example The maintenance tasks performed are to be settled on their requesters according to the causality principle. The cost center of the technical object is to be used in most cases as the account assignment object. Once all the orders have been settled, business completion is to be performed in Controlling. Order Settlement and Business Completion The maintenance order serves as an instrument for planning and executing maintenance tasks. This means the order is the cost object for all costs resulting from resource planning and consumption. The costs of the resources required when performing tasks generate debits for the order in the form of actual costs. To clear and monitor the costs according to the causality principle, the following questions must be answered: • • Is the order really the cost factor? What is the role of the requester or the object of the task? This is the basis for order settlement. 162 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Figure 58: Motivation of Settlement Depending on the type of task, the order is settled on the actual cost factor, which means it is credited with the costs of resource consumption. The costs of the order are borne by a different receiver, who is simultaneously an object in cost accounting. This may be the cost center for the maintenance object or the organizational unit that requested the task. This means the order is used to collect all the costs incurred during planning and execution for task-related analysis. Figure 59: Settlement Process Continuous maintenance tasks, which are performed in the course of technical support for a specific maintenance object, are usually settled to the cost center of the object in question. This is only possible if the corresponding cost center 2009 © 2009 SAP AG. All rights reserved. 163 Unit 4: Completion PLM315 is entered as the receiver in the settlement rule for the order. When this is done, the actual costs for the order are passed on to the cost center, which debits this cost center and credits the order. The actual cost balance for the order is zero once settlement is complete, while the cost center has actual costs greater than zero. Figure 60: Settlement for Continuous Tasks Besides the cost center, other settlement receivers are possible. This usually depends on the type of task performed. Tasks of an investment nature that lead to an increase in the asset value can be settled on an asset as would be done in Asset Accounting, and larger tasks, such as shutdown projects, can be settled on the corresponding WBS element for the project. This is controlled by an order-specific settlement rule. 164 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Figure 61: Account Assignment Objects in Order Settlement The settlement rule can be set up automatically and manually, and with or without system defaults. It is set up for technical completion of an order, at the latest. While the settlement rule is defined during order processing and usually once only, settlement is a separate operation and can be repeated. Figure 62: Setting Up the Settlement Rule 2009 © 2009 SAP AG. All rights reserved. 165 Unit 4: Completion PLM315 An order for which settlement is complete can still be debited with actual costs. This is particularly likely in the case of orders that extend across several posting periods (which may mean months). As a result of these debits, the actual cost balance for the order is again greater than zero, and can be reduced to zero again by means of a further settlement. Settlement is technically possible provided business completion has not been performed for the order. Figure 63: Debiting the Order After Settlement Order completion involves several steps: First, the order is technically completed in Plant Maintenance once all the required tasks have been performed. This does not involve a cost flow. Only the settlement rule is defined, if this has not already taken place. No further changes can be made to the order. You can wait as long as you wish between the technical completion of an order and its settlement. Settlement credits the order with the actual costs. You can debit the order with further actual costs and repeat settlement again afterwards. Business completion is finally performed for an order that has been fully settled - with an actual cost balance of zero. After this point, the order can no longer be debited with actual costs. 166 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Figure 64: Options for Order Completion Technical completion of an order is only possible if a settlement rule is defined. Before settlement can take place, the order must contain a settlement rule and its actual cost balance must not be zero. As a result of complete settlement, the order has an actual cost balance of zero. Business completion can take place for an order if it has been settled completely or does not have any actual costs. An order for which business completion has taken place is marked as Completed (status ABGS) and can no longer be debited with actual costs. However, you can cancel this status. 2009 © 2009 SAP AG. All rights reserved. 167 Unit 4: Completion PLM315 Customizing Checklists Figure 65: Customizing Settings for Settlement Settlement for a Refurbishment Order Refurbishment orders are settled directly to the material stock. The order is debited by the value of the corresponding batch on removal of the defective part (in this case, C3). The order is similarly debited when working time is confirmed. In the case of goods receipt after refurbishment, the order is credited with the value of the batch refurbished (in this case, C2). This credit is shown as a negative debit. In order settlement, the receipt posting for the batch for the refurbished material can take place in two ways: • • In price control: standard price, the receipt for the batch refurbished is posted with the value of the standard price. The difference between refurbishment costs and the valuation of the batch refurbished is posted as a credit memo to a price difference account (FI). In price control: moving average price, the receipt for the batch refurbished is posted with the value of the actual increase in value; that is to say, the value of the costs in work and material. This leads to an increase in the moving average price on the material level. A prerequisite for settling to the material stock is that you define a settlement profile in Customizing where the material is set as a default account assignment. This settlement profile is assigned to the order type for refurbishment. The settlement rule "Material" is determined automatically during refurbishment. 168 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Figure 66: Refurbishment Order Settlement History Figure 67: Historical Maintenance Orders The objective of archiving orders is to remove order data collected over a long period of time from the database and store it in compressed form in a special database area (order history) for evaluation purposes. 2009 © 2009 SAP AG. All rights reserved. 169 Unit 4: Completion PLM315 There are two options available for archiving orders: • • Manually enter historical orders Reorganize orders (=archive and delete - SARA transaction) During reorganization, orders are transferred to the order history in compressed form. The following data is stored: • • • • • • Order header data Object list Determining Location and Account Assignment Data Operations and sub-operations Planned and unplanned material components, summarized by material numbers Costs, summarized by value categories Figure 68: Material Where-Used List The material where-used list compares the planned and actual consumption for each material and order. The system derives the planning data from the material components in the order, and calculates the actual data from the actual reservation quantities or goods movements for the order. Hint: To display material withdrawals, you must have activated the goods movements function for the order in Customizing. 170 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Exercise 10: Controlling in the Completion Phase Exercise Objectives After completing this exercise, you will be able to: • Set up settlement parameters • Perform settlement • Perform business completion Business Example The maintenance tasks performed are to be settled on their requesters according to the causality principle. The cost center of the technical object is to be used in most cases as the account assignment object. Once all the orders have been settled, business completion is to be performed in Controlling. Task: Order settlement 1. Check settlement rule Display the settlement rule for your order. Which path do you choose? Which settlement rule is displayed? 2. Check settlement profile Determine the settlement profile for your order from the Customizing settings. Which path do you choose? The settlement profile for your order is: 3. Determine the allocation structure assigned to the settlement profile. Now determine which credit cost element is determined from which debit cost element for your order. Which path do you choose? The allocation structure is: Which credit cost element is valid for which debit cost element for your order? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 171 Unit 4: Completion 4. PLM315 Settle order: Settle your order. Which path do you choose? 5. Analyze order costs after settlement Display the actual costs by cost type for your order. Which path do you choose? 6. Perform business completion for your order after settlement. How do you do this? 172 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Solution 10: Controlling in the Completion Phase Task: Order settlement 1. Check settlement rule Display the settlement rule for your order. Which path do you choose? Which settlement rule is displayed? a) SAP standard menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Symbol for Settlement Rule or Goto → Settlement Rule Settlement rules: 2. Category Receiver Percentage Settlement type No. CTR 4110 100 FUL 1 CTR 4110 100 PER 2 Check settlement profile Determine the settlement profile for your order from the Customizing settings. Which path do you choose? Continued on next page 2009 © 2009 SAP AG. All rights reserved. 173 Unit 4: Completion PLM315 The settlement profile for your order is: a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Order Types Select the line containing order type PM01. Access details. Settlement profile: 40 3. Determine the allocation structure assigned to the settlement profile. Now determine which credit cost element is determined from which debit cost element for your order. Which path do you choose? The allocation structure is: Which credit cost element is valid for which debit cost element for your order? a) SAP standard menu → Tools → Customizing → IMG → Execute Project Choose Display SAP Reference IMG. Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → General Order Settlement → Maintain Settlement Profiles Select the line containing settlement profile 40. Access details. Allocation structure: PM Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → General Order Settlement → Maintain Allocation Structures Select the line containing allocation structure PM. Double click on Assignments in the dialog structure (column on the left) Check where the debit cost element is listed in the assignments: Select assignment line -> Double click on Source in the dialog structure (column on the left) Continued on next page 174 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Double click on the cost element group. The 400xxx cost elements are contained in the assignment 001 Raw material costs. The cost element 890000 is in the assignment 030 Consumption semifinished products. The cost element 615000 is in the assignment 020 Activity allocation. Determine the settlement cost element for each source. Select assignment line -> Double click on Settlement cost elements in the dialog structure (column on the left) 400xxx cost elements are settled under cost element 651000 for the receiver category cost center. The cost element 890000 is settled under cost element 651000 for the receiver category cost center. The cost element 615000 is settled under cost element 652000 for the receiver category cost center. 4. Settle order: Settle your order. Which path do you choose? a) SAP standard menu → Logistics → Plant Maintenance → Maintenance Processing → Completion → Individual Processing → Settle Controlling area: 1000 (enter in the Controlling Area popup or choose Extras → Set Controlling Area) Order: Enter order number Settlement period: Enter current month (for example, 04 for April) Posting period: (Blank - in this case, the posting period is the same as the settlement period.) Fiscal year: Enter current fiscal year Processing type: Automatic Test run: (Deselected) 5. Analyze order costs after settlement Display the actual costs by cost type for your order. Continued on next page 2009 © 2009 SAP AG. All rights reserved. 175 Unit 4: Completion PLM315 Which path do you choose? a) SAP standard menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Costs tab, Rep. Plan/Act. button Credits Cost element 651000 Material order settlement Cost element 652000 Internal activity order settlement 6. Perform business completion for your order after settlement. How do you do this? a) SAP standard menu → Logistics → Plant Maintenance → Maintenance Processing → Order → Change Black and white flag or Order → Functions → Complete → Complete (Business) 176 © 2009 SAP AG. All rights reserved. 2009 PLM315 Lesson: Controlling in the Completion Phase Lesson Summary You should now be able to: • Set the parameters for order settlement • Perform settlement • Perform business completion 2009 © 2009 SAP AG. All rights reserved. 177 Unit Summary PLM315 Unit Summary You should now be able to: • Carry out necessary Customizing settings for completion confirmation • Adjust whole completion confirmation screen • Create completion confirmations • Perform technical completion • Set the parameters for order settlement • Perform settlement • Perform business completion 178 © 2009 SAP AG. All rights reserved. 2009 PLM315 Course Summary Course Summary You should now be able to: • • • • 2009 Set up and use notification (notification type, catalog, catalog profiles) Set up and use planning (order type, work center, capacity planning, controlling) Set up and use controlling (material availability check, scheduling, printing) Set up and use completion (completion confirmation, controlling, history) © 2009 SAP AG. All rights reserved. 179 Course Summary 180 PLM315 © 2009 SAP AG. All rights reserved. 2009 Appendix 1 Customizing Paths To access Customizing go to: SAP Menu→ Tools → Customizing → IMG → Execute Project (or use the transaction SPRO) Select SAP Reference IMG. Notification 2009 Field Name or Data Type Path Overview of notification type Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Overview of Notification Type Action box Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Additional Functions → Define Action Box General notification Cross-Application Components → Notification System condition Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Condition Indicator → Define System Conditions Catalog profile Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Content → Define Catalog Profile © 2009 SAP AG. All rights reserved. 181 Appendix 1: Customizing Paths PLM315 Field Name or Data Type Path Screen templates Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Set Screen Templates for the Notification Type Print notifications Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Notification Print Control Allowed change of notification Plant Maintenance and Customer Service type → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Allowed Change of Notification Type 182 Field selection Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Set Field Selection for Notifications Integration notification/order (long text transfer, object list control) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Notification and Order Integration Catalogs Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Content → Maintain Catalogs etc. Long text control Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Long Text Control for Notification Types List editing Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → List Editing © 2009 SAP AG. All rights reserved. 2009 PLM315 Appendix 1: Customizing Paths Field Name or Data Type Path Notification type Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Notification Types Assign notification types to order types Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Assign Notification Types to Order Types Number ranges Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Number Ranges Object information Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Object Information Partner determination procedure Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Partners Priorities Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Response Time Monitoring → Define Priorities Response profile Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Processing → Response Time Monitoring → Define Response Monitoring Transaction start values Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Notifications → Notification Creation → Notification Types → Define Transaction Start Values Planning 2009 © 2009 SAP AG. All rights reserved. 183 Appendix 1: Customizing Paths 184 PLM315 Field Name or Data Type Path Refurbishment order Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Indicate Order Types for Refurbishment Processing Order combined with notification Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Notification and Order Integration Order type Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Order Types Business Add-Ins Plant Maintenance and Customer Service → System Enhancements and Data Transfer → Business Add-Ins Customer exits Plant Maintenance and Customer Service → System Enhancements and Data Transfer → Develop Enhancements Simple order view Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Basic Order View → Define View Profiles / Assign View Profiles to Order Types External profiles Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Create Default Value Profiles for External Procurement Maintenance activity type Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Maintenance Activity Type → Define Maintenance Activity Types ...etc. © 2009 SAP AG. All rights reserved. 2009 PLM315 Appendix 1: Customizing Paths Field Name or Data Type Path Maintenance planning plant Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Assign Order Types to Maintenance Plants Integration notification/order (long text transfer, object list control) Plant Maintenance and Customer Service → Maintenance and Service Processing → Subcontracting for MRO Processes Costing data (costing variant, costing sheet) Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Costing Data for Maintenance and Service Orders Subcontracting for MRO processes Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Costing Data for Maintenance and Service Orders Number range Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Number Ranges Object information Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Object Information >> Open Item Management indicator on the detail screen for the order type 2009 Commitments Management Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Configure Order Types OCI interface Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Interface for Procurement Using Catalogs (OCI) © 2009 SAP AG. All rights reserved. 185 Appendix 1: Customizing Paths PLM315 Field Name or Data Type Path Partner determination procedure Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Partner → Define Partner Determination Procedure and Partner Function Planning indicator Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Default Value for Planning Indicator for Each Order Type Priorities Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → General Data → Define Priorities Control key Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Control Key → Maintain Control Keys ...etc. Overhead calculation Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Costing Data for Maintenance and Service Orders → Maintain Costing Sheet Control 186 © 2009 SAP AG. All rights reserved. 2009 PLM315 Appendix 1: Customizing Paths Field Name or Data Type Path Printing orders Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Print Control Material availability check Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Availability Check for Material, PRTs and Capacities Scheduling Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Scheduling Time zone support Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → Activate Time Zone Support for Application Areas Completion 2009 Field Name or Data Type Path Settlement profile Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → General Order Settlement → Maintain Settlement Profiles Settlement rule, creation time Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Settlement Rule: Define Time and Creation of Distribution Rule Screen templates for overall completion confirmation Plant Maintenance and Customer Service → Maintenance and Service Processing → Completion Confirmations → Set Screen Templates for Completion Confirmation Digital signature Cross-Application Components → General Application Functions → Digital Signature © 2009 SAP AG. All rights reserved. 187 Appendix 1: Customizing Paths 188 PLM315 Field Name or Data Type Path Digital signature for order types Plant Maintenance and Customer Service → Maintenance and Service Processing → Maintenance and Service Orders → Functions and Settings for Order Types → Define Digital Signature for Order Types Shift reports Plant Maintenance and Customer Service → Maintenance and Service Processing → Shift Reports/Notes → Settings for Shift Reports Shift notes Plant Maintenance and Customer Service → Maintenance and Service Processing → Shift Reports/Notes → Settings for Shift Notes Control parameters for completion confirmation Plant Maintenance and Customer Service → Maintenance and Service Processing → Completion Confirmations → Define Control Parameters for Completion Confirmations Allocation structure Plant Maintenance and Customer Service → Maintenance and Service Processing → Basic Settings → General Order Settlement → Maintain Allocation Structures © 2009 SAP AG. All rights reserved. 2009 Feedback SAP AG has made every effort in the preparation of this course to ensure the accuracy and completeness of the materials. If you have any corrections or suggestions for improvement, please record them in the appropriate place in the course evaluation. 2009 © 2009 SAP AG. All rights reserved. 189