Name:_________________________________________________________ Roll Number:________________________ PROJECT PROPOSAL RUBRIC Level 7 Problem The problem is statement clearly defined the system i.e. under being study Project Context The information related to project data is defined accurately Conceptual model The conceptual model is properly aligned with the problem statement Project future benefits The future benefits can be achieved after implemented the solutions of problem i.e. being study Level 5 The problem is defined with minor shortcomings Level 3 The problem is defined with major shortcomings Level 1 The problem is not defined in an appropriate way The information related to project data is defined with minor missing elements The conceptual model is drawn with minor missing elements of the problem statement The future benefits can be achieved with minor missing scope of work areas The information related to project data is defined with major missing elements The conceptual model is drawn with major missing elements of the problem statement The future benefits can be achieved with major missing scope of work areas The information related to project data is not defined accurately The conceptual model is not properly aligned with the problem statement The future benefits cannot be achieved after implemented the solutions of problem i.e. being study