Project Name ARIES ENGINEERING CONSULTANT Project Quality Management Plan Version 1.0 VERSION HISTORY Version # Implemented By Revision Date Approved By 1.0 Chong Chee Yen 8th October 2018 Chong Chee Yen Approval Date Reason 8th October 2018 Date: 8th October 2018 Project Name TABLE OF CONTENTS 1 INTRODUCTION ........................................................................................................ 3 1.1 Purpose of The Project Quality Management Plan ...................................... 3 2 PROJECT QUALITY MANAGEMENT OVERVIEW ................................................... 3 2.1 Organization, Responsibilities, and Interfaces ............................................. 3 2.2 Tools, Environment, and Interfaces ............................................................. 3 3 PROJECT QUALITY MANAGEMENT ....................................................................... 3 3.1 Quality Planning ........................................................................................... 3 3.1.1 Define Project Quality ............................................................................. 3 3.1.2 Measure Project Quality .......................................................................... 3 3.2 Quality Assurance ........................................................................................ 3 3.2.1 Analyze Project Quality ........................................................................... 4 3.2.2 Improve Project Quality ........................................................................... 4 3.3 Quality Control ............................................................................................. 4 APPENDIX A: PROJECT QUALITY MANAGEMENT PLAN APPROVAL .................... 4 Project Name 1 INTRODUCTION 1.1 PURPOSE OF THE PROJECT QUALITY MANAGEMENT PLAN The Project Quality Management Plan documents the necessary information required to effectively manage project quality from project planning to completion. It defines a project’s quality policies, procedures, roles and responsibilities. The Project Quality Management Plan is created during the planning stage of the project. Its intended audience is the project director, project manager, project team and anyone whose support is needed to complete a quality project. 2 PROJECT QUALITY MANAGEMENT OVERVIEW 2.1 ORGANIZATION, RESPONSIBILITIES, AND INTERFACES Name Ir. CHONG CHEE YEN CHONG CHEE FU SITINURHAWA BINTI ABDUL HUSIN WONG PEI FANG 2.2 Role QM Director QM Manager QM Officer QM Officer Quality Responsibility Quality mentoring and coaching Quality audit and checking Quality management on design Quality management on drafting TOOLS, ENVIRONMENT, AND INTERFACES Tool Microsoft Excel Description To monitor progress of works from planning to completion 3 PROJECT QUALITY MANAGEMENT The highest of levels Quality Management involves planning, design, checking, and acting to improve project quality standards. Aries Engineering Consultant (AEC) divides the practice of Quality Management into three process groups: Quality Planning (QP), Quality Assurance (QA) and Quality Control (QC). The following sections define how this project will apply each of these process groups to define, monitor and control quality standards. 3.1 QUALITY PLANNING 3.1.1 Define Project Quality Project quality is defined as a design that meets client’s requirements, comply with the relevant code of practice and requirements of local authorities. 3.1.2 Measure Project Quality To measure project quality, AEC is committed to monitor the processes from planning to completion to ensure project quality is within the reasonable standard acceptable to our client. 3.2 QUALITY ASSURANCE AEC is committed to assure our clients that our project team shall follow the project quality management plan from project planning to completion. Project Name 3.2.1 Analyze Project Quality AEC will analyze quality data, documents for improvement and what was learned from quality analysis to eliminate the gaps between the current and targeted level of performance. 3.2.2 Improve Project Quality AEC will identify ways of doing things better, cheaper and faster. For projects, we identify way of eliminating unsatisfactory performance. 3.3 QUALITY CONTROL AEC will continue to monitor and control actions that will be necessary to control quality throughout the project’s life. On going project monitoring and improvement will be implemented for quality control . Project Name Appendix A: Project Quality Management Plan Approval The undersigned acknowledge they have reviewed the Project Quality Management Plan and agree with the approach it presents. Changes to this Project Quality Management Plan will be coordinated with and approved by the undersigned or their designated representatives. Signature: Date: Print Name: Ir. CHONG CHEE YEN Title: Principal Role: Quality Management Director Signature: Date: Print Name: CHONG CHEE FU Title: Project Executive Role: Quality Management Manager Signature: Date: Print Name: SITINURHAWA BINTI ABDUL HUSIN Title: Engineer Role: Quality Management Officer Signature: Date: Print Name: WONG PEI FANG Title: Draftsperson Role: Quality Management Officer