AEC PQP

advertisement
Project Name
ARIES ENGINEERING CONSULTANT
Project Quality Management Plan
Version 1.0
VERSION HISTORY
Version
#
Implemented
By
Revision
Date
Approved
By
1.0
Chong Chee Yen
8th October
2018
Chong Chee Yen
Approval
Date
Reason
8th October
2018
Date: 8th October 2018
Project Name
TABLE OF CONTENTS
1 INTRODUCTION ........................................................................................................ 3
1.1
Purpose of The Project Quality Management Plan ...................................... 3
2 PROJECT QUALITY MANAGEMENT OVERVIEW ................................................... 3
2.1
Organization, Responsibilities, and Interfaces ............................................. 3
2.2
Tools, Environment, and Interfaces ............................................................. 3
3 PROJECT QUALITY MANAGEMENT ....................................................................... 3
3.1
Quality Planning ........................................................................................... 3
3.1.1 Define Project Quality ............................................................................. 3
3.1.2 Measure Project Quality .......................................................................... 3
3.2
Quality Assurance ........................................................................................ 3
3.2.1 Analyze Project Quality ........................................................................... 4
3.2.2 Improve Project Quality ........................................................................... 4
3.3
Quality Control ............................................................................................. 4
APPENDIX A: PROJECT QUALITY MANAGEMENT PLAN APPROVAL .................... 4
Project Name
1 INTRODUCTION
1.1
PURPOSE OF THE PROJECT QUALITY MANAGEMENT PLAN
The Project Quality Management Plan documents the necessary information
required to effectively manage project quality from project planning to completion.
It defines a project’s quality policies, procedures, roles and responsibilities.
The Project Quality Management Plan is created during the planning stage of the
project. Its intended audience is the project director, project manager, project team
and anyone whose support is needed to complete a quality project.
2 PROJECT QUALITY MANAGEMENT OVERVIEW
2.1
ORGANIZATION, RESPONSIBILITIES, AND INTERFACES
Name
Ir. CHONG CHEE YEN
CHONG CHEE FU
SITINURHAWA BINTI ABDUL HUSIN
WONG PEI FANG
2.2
Role
QM Director
QM Manager
QM Officer
QM Officer
Quality Responsibility
Quality mentoring and coaching
Quality audit and checking
Quality management on design
Quality management on drafting
TOOLS, ENVIRONMENT, AND INTERFACES
Tool
Microsoft Excel
Description
To monitor progress of works from planning to completion
3 PROJECT QUALITY MANAGEMENT
The highest of levels Quality Management involves planning, design, checking,
and acting to improve project quality standards. Aries Engineering Consultant
(AEC) divides the practice of Quality Management into three process groups:
Quality Planning (QP), Quality Assurance (QA) and Quality Control (QC). The
following sections define how this project will apply each of these process groups
to define, monitor and control quality standards.
3.1
QUALITY PLANNING
3.1.1 Define Project Quality
Project quality is defined as a design that meets client’s requirements, comply
with the relevant code of practice and requirements of local authorities.
3.1.2 Measure Project Quality
To measure project quality, AEC is committed to monitor the processes from
planning to completion to ensure project quality is within the reasonable standard
acceptable to our client.
3.2
QUALITY ASSURANCE
AEC is committed to assure our clients that our project team shall follow the
project quality management plan from project planning to completion.
Project Name
3.2.1 Analyze Project Quality
AEC will analyze quality data, documents for improvement and what was learned
from quality analysis to eliminate the gaps between the current and targeted level
of performance.
3.2.2 Improve Project Quality
AEC will identify ways of doing things better, cheaper and faster. For projects, we
identify way of eliminating unsatisfactory performance.
3.3
QUALITY CONTROL
AEC will continue to monitor and control actions that will be necessary to control
quality throughout the project’s life. On going project monitoring and improvement
will be implemented for quality control
.
Project Name
Appendix A: Project Quality Management Plan Approval
The undersigned acknowledge they have reviewed the Project Quality
Management Plan and agree with the approach it presents. Changes to this
Project Quality Management Plan will be coordinated with and approved by the
undersigned or their designated representatives.
Signature:
Date:
Print Name:
Ir. CHONG CHEE YEN
Title:
Principal
Role:
Quality Management Director
Signature:
Date:
Print Name:
CHONG CHEE FU
Title:
Project Executive
Role:
Quality Management Manager
Signature:
Date:
Print Name:
SITINURHAWA BINTI ABDUL HUSIN
Title:
Engineer
Role:
Quality Management Officer
Signature:
Date:
Print Name:
WONG PEI FANG
Title:
Draftsperson
Role:
Quality Management Officer