Project concept note on

OVERVOLTAGE AND UNDERVOLTAGE PROTECTION OF

DOMESTIC LOADS

STUDENT NAME:YOHANA PASTORY

Reg.No.BSCEE 44831

Contact.0752481860

Academic year.2018/2019

Date.11/01/2019

PRESENTATION OUTLINE

1. Problem and its context

2.Intended action [solution proposition and its specification]

3.Project objectives

4.Scope and limitations

1.0. PROBLEM AND ITS

CONTEXT

1.1.contextual Background

Power supply fluctuation in Tanzania causes domestic loads like Radios, Television and Fridges to be subjected to Over voltage and Under voltage, which may damage the equipments.

The protective device to be designed must be able to detect the unusual voltage and stop the supply to the domestic loads

1.2.issue [problem]statement.

The main problem is the power fluctuation in which the supply voltage rises above or falls below the acceptable limits of the nominal value (In Tanzania it is 230 + 6%

).

The voltage protective device to be designed will solve this problem by detecting the abnormal voltage and stops it from reaching the domestic loads.

2.0. INTENDED ACTION AND ITS

SPECFICATION

2.1. Intended action & its specification

The designed will solve this problem by detecting the abnormal voltage and stops it from reaching the domestic loads.

2.2. System requirement and constraints

The system should have ability to detect voltage level

The system should operate automatically

System should have very sensitive sensor to detect voltage level

2.3. system block diagram(conceptual model)

Step down

Transformer

RECTIFIER FILTER

CIRCUIT

Visual indication relay control circuit comparator comparator

AC POWER

12V +Ve voltage

Regulator

3.0. Project objectives

3.1. Main objectives

To design of an electronic circuit for detecting abnormal supply voltage under/over the nominal voltage.

3.2. Specific objective

Design of a rechargeable DC power supply with battery overcharging and undercharging protection to power the electronic control circuit.

To provide a means of protecting the device from surges

Upon detecting the abnormal supply, the supply should be switched off to the load after the delay time of 40ms.

When the normal supply(194V-243.8V) is detected from off position, the power should be switched on to the load automatically after a delay time of 40ms.

4.0. Scope 0f Work/Coverage

4.1.Depth &breadth of treatment.

This will focus on the specific objectives.

4.2. Study context or operational environment.

Design of this system will be implemented in residential houses industrial and oficces.

4.3. Key deliverables/outcomes expected.

The outcomes of this project is to solve the problem of lost electrical equipment due to fluctuation of voltage level.