ISO A1 594mm x 841mm PROJECT Approved: _____ VALVE & GATE SYMBOLS PRIMARY ELEMENT SYMBOLS Checked: _____ FLOW MISCELLANEOUS SYMBOLS ACTUATOR SYMBOLS ELECTROMAGNETIC DIAPHRAGM SEAL BUBBLE TUBE Designer: _____ PURGE SET ANNULAR DIAPHRAGM ULTRASONIC ULTRASONIC CLAMP-ON OR DOPPLER CYLINDER SELF CONTAINED AIR SUPPLY AS ULTRASONIC IN-LINE Project Management Initials: VENTURI XP GLOBE VALVE M MOTOR XX RUPTURE DISK (PRESSURE RELIEF) CAPACITANCE E ELECTRODES (WITH HOLDER) PROPELLER OR TURBINE VORTEX RUPTURE DISK (VACUUM RELIEF) FLOAT (REGULATED SIDE) TARGET T TRAP X EQUIPMENT CONNECTION WITH ELECTRICAL INTERLOCK H E PRESSURE REGULATOR H M PITOT TUBE VENT TO ATMOSPHERE TEMPERATURE SIGHT GLASS NOTE X: F=FLOW L=LEVEL XG S GATE, OR (OTHER) IN-LINE VALVE BALL CHECK VALVE BALL VALVE PLUG VALVE THREE WAY VALVE (ARROW IF SHOWN INDICATES FAIL OPEN PATH) KNIFE GATE HYDRAMOTOR ELECTROHYDRAULIC MANUAL (SHOWN ONLY FOR HAND OPERATED VALVES EQUIPPED WITH POSITION MONITORING INSTRUMENTS) TELESCOPING VALVE ELECTRIC DAMPER OR LOUVER ELGIN AREA WATER SUPPLY SYSTEM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT PINCH VALVE SLEEVE VALVE XX OPTICAL FI P FLOW STRAIGHTENER ELECTROPNEUMATIC ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT PRESSURE OR VACUUM RELIEF SPRING OR WEIGHT LOADED NOTE X: W=WATER A=AIR ORIFICE PLATE AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com SLUICE GATE PREFABRICATED SLIDE GATE SOLENOID XX COMBINDIATION AIR/VACUUM VALVE ROTAMETER TE XX TEMPERATURE ELEMENT WITH WELL XX TE TEMPERATURE ELEMENT SURFACE MOUNT WEIR AVERAGING PITOT TUBE FLOW NOZZLE XX DP DEVICE INTERFACE DRAIN POINT RECIPROCATING PUMP (PD) CENTRIFUGAL COMPRESSOR OR BLOWER XX FIELD MOUNTED SAMPLE POINT FC FLUSHING CONNECTION RECIPROCATING COMPRESSOR (PD) XX ROTARY PUMP (PD) XX I XX XX INPUTS & OUTPUTS TO SHARED OR PROGRAMMABLE LOGIC CONTROLLER RESET OR OR LOGIC YY A CONTROL PANEL (CP) PACKAGED WITH MECHANICAL EQUIPMENT OR A SYSTEM IS SHOWN WITH FACE OF PANEL MOUNTED INSTRUMENTS & EXTERNAL INTERFACE SIGNALS SIMILAR TO MC & VSD PANELS. 4. CONTROL PANELS (CP) OTHER THAN THOSE PREVIOUSLY DESCRIBED ARE SHOWN WITH FACE & INTERIOR OF PANEL MOUNTED INSTRUMENTS. 5. SEE ELECTRICAL DRAWINGS FOR MC & VFD LOCATIONS WITHIN THE MCC. X PULSE OUTPUT X: BLANK = TIME DURATION (PULSE WIDTH) F = PULSE TRAIN T = TRIAC 6. PIPING, EQUIPMENT & INSTRUMENTS WHICH ARE EXISTING OR FURNISHED BY OTHERS ARE SHOWN LIGHT-LINED (HALF-TONE) XX HS YY DIGITAL INPUT PANEL MOUNTED SWITCH STATIC MIXER COMPRESSOR 3. FIELD SWITCH YY EJECTOR MOTOR CONTROL (MC) & VARIABLE SPEED DRIVE (VSD) PANELS ARE SHOWN WITH FACE OF PANEL MOUNTED INSTRUMENTS & EXTERNAL INTERFACE SIGNALS ONLY. YY XX HS MOTOR CONTROL CENTER MOUNTED 2. ANALOG OUTPUT PULSE INPUT MOTOR THIS IS A GENERAL P & ID SYMBOL SHEET. SOME SYMBOLS OR NOTATIONS MAY NOT BE USED ON THIS PROJECT. YY ANALOG INPUT ROTARY COMPRESSOR (PD) XX XX HS MCC MOUNTED SWITCH INTERIOR OF MCC MOUNTED X EXISTING OR FURNISHED BY OTHERS DIGITAL OUTPUT X: BLANK = MAINTAINED (ELECTRICALLY HELD) M = MOMENTARY L = LATCHED (MAGNETICALLY OR MECHANICALLY HELD) EXAMPLE OF INSTRUMENTS SHARING COMMON HOUSING PIPE LINE DESCRIPTION KEY 250-CS-SS1 YY: MEASURED VARIABLE OR OUTPUT FUNCTION FROM INSTRUMENT IDENTIFICATION TABLE PIPE MATERIAL YN ON DIGITAL INPUT INDICATES COMPUTER/HAND SWITCH STATUS XX 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN FLOW STREAM IDENTIFICATION CONNECTION TO/FROM RPU/PLC SHARED DISPLAY/ CONTROL ACCESSIBLE TO OPERATOR ON MAIN CONTROL CONSOLE PIPE MATERIAL IDENTIFICATION NOTE: ROTARY LOBE PUMP 0 NOMINAL PIPE SIZE HEAT EXCHANGER PROGRESSIVE CAVITY PUMP ISSUE/REVISION NEW NOTE: MCC PILOT LIGHT SUMP PUMP MUD VALVE 1. AND LOGIC A MIXER TURBINE BACKFLOW PREVENTOR GENERAL NOTES PANEL PILOT LIGHT SCREW PUMP AUTO AIR RELEASE VALVE FLAP GATE XX: FO = FAIL OPEN FC = FAIL CLOSED FI = FAIL TO INTERMEDIATE POSITION BLANK = FAIL TO LAST POSITION INTERLOCK LOGIC R INTERIOR OF PANEL MOUNTED CENTRIFUGAL PUMP (WET PIT) ON LOSS OF PRIMARY POWER (PNEUMATIC OR ELECTRICAL) YY FACE OF PANEL MOUNTED XX SP NOTE: INSTRUMENT & FUNCTION SYMBOLS PILOT LIGHT XX F=FLUSHING WATER L=LUBE OIL S=SEAL WATER DIAPHRAGM (PRESSURE BALANCED) PRESSURE RELIEF VALVE REGISTRATION EQUIPMENT SYMBOLS CENTRIFUGAL PUMP (DRY PIT) NOTE X: DD NNN DIAPHRAGM (SPRING OPPOSED) PRESSURE GAUGE X AIR GAP FLUME Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG CHECK VALVE XX E Printed on ___% Post-Consumer Recycled Content Paper PRESSURE REDUCING LEVEL M XX BUTTERFLY VALVE, DAMPER OR LOUVER RESIDUALS MANAGEMENT FACILITY NOTE XX : CS = CONSTANT SPEED 2S = TWO SPEED VS = VARIABLE SPEED PD : POSITIVE DISPLACEMENT XX: SEE PAGE 2 OF THE P&ID LEGEND SS1 - 316L STAINLESS STEEL, SCH 10s SS2 - 316L STAINLESS STEEL, SCH 40s PVC - SCH 40 PVC PVC80 - SCH 80 PVC CPVC - SCH 80 CPVC REFER TO SPECIFICATIONS FOR COMPLETE PIPE MATERIAL DESIGNATION PROJECT NUMBER 60246477 SHEET TITLE P&ID LEGEND AND GENERAL NOTES 1 SHEET NUMBER DI601 ISO A1 594mm x 841mm Approved: _____ PROJECT INSTRUMENT IDENTIFICATION TABLE INSTRUMENT & FUNCTION TAGGING EXPLANATORY NOTATIONS ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 Checked: _____ ISA-S5.1-1984 FIRST LETTER LETTER Project Management Initials: Designer: _____ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z SUCCEEDING LETTERS MEASURED OR INITIATING VARIABLE MODIFIER ANALYSIS (2) BURNER, COMBUSTION DENSITY VOLTAGE FLOW RATE READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION S-PPP EEE ## CLOSE, STOP, DECREASE (1) CONTROL OPEN, START, INCREASE (1) III FAIL (1) PRESSURE, VACUUM QUANTITY (2) RADIATION SPEED, FREQUENCY TEMPERATURE MULTIVARIABLE (2) VIBRATION, MECHANICAL ANALYSIS WEIGHT, FORCE UNCLASSIFIED (2) EVENT, STATE, PRESENCE POSITION, DIMENSION A B D E F H I 2/3: FLOW STREAM & INSTRUMENT LINE SYMBOLS INDICATE LIGHT MOTOR (1) ORIFICE, RESTRICTION POINT (TEST) CONNECTION XX LOW (CLOSED) MIDDLE OR INTERMEDIATE ON OR OPERATE (1) OVERLOAD (1) MAIN FLOW STREAM XX SECONDARY FLOW STREAM XX OTHER FLOW STREAM PUMP (1) INTEGRATE, TOTALIZE CLOSED CONDUITS (DASHED LINE INDICATES ALTERNATE FLOW STREAM) RECORD SAFETY MULTIFUNCTION (2) WELL UNCLASSIFIED (2) SWITCH TRANSMIT MULTIFUNCTION (2) VALVE, DAMPER, LOUVER UNCLASSIFIED (2) RELAY, COMPUTE, CONVERT DRIVER, ACTUATOR, UNCLASSIFIED FINAL CONTROL ELEMENT XX OPEN CHANNEL OR TANK FLOW STREAM MULTIFUNCTION (2) UNCLASSIFIED (2) NOTE XX: AM CM CAM CL FR FOR FS FOS HO HOA LR LOR LOS LP MFS MOC OC OO OOC OSC SS ST SP ES SELECTOR SWITCH (MAINTAINED CONTACTS) NOTE XX: FLOW STREAM IDENTIFICATION ELECTRIC SIGNAL SOFTWARE LINE (1) USER'S CHOICE ELECTROMAGNETIC OR SONIC SIGNAL (2) WHEN USED, SYMBOL OR SIGNAL LINE IS ANNOTATED. SPRING RETURN SWITCH OR PUSHBUTTONS (MOMENTARY CONTACTS) PNEUMATIC SIGNAL FLOW STREAM IDENTIFICATION * L L L L HYDRAULIC SIGNAL X X X X CAPILLARY TUBE Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG Printed on ___% Post-Consumer Recycled Content Paper BACKWASH WASTE THICKENED SLUDGE BTS BWW BACKWASH WASTE THICKENER SUPERNATANT BACKWASH WASTE CCS CLARIFIER THICKENED SLUDGE CEN CENTRATE CS CLARIFIED SLUDGE CTS DS CLARIFIER SLUDGE THICKENER SUPERNATANT DEWATERED SLUDGE POL POLYMER SOLUTION SLU BLENDED SLUDGE STS SODIUM THIOSULPHATE XX XX XX VT VENT * IDENTIFICATION MAY BE FOLLOWED BY A NUMBER TO DIFFERENTIATE AMONG SIMILAR FLOW STREAMS. FOR EXAMPLE, CH1 & CH2 WOULD REPRESENT TWO DIFFERENT CHEMICAL FLOW STREAMS. SIGNAL CONTINUATION ON SAME DRAWING. X = 1,2,3,ETC. X FLOW STREAM TO OR FROM EQUIPMENT NOT SHOWN ON OTHER DRAWINGS GENERAL NOTES 1. THIS IS A GENERAL P & ID LEGEND SHEET. SOME SYMBOLS OR NOTATIONS MAY NOT BE USED ON THIS PROJECT. ABBREVIATIONS AS INSTRUMENT AIR SUPPLY L/S ECV ELECTRIC CHECK VALVE NC NORMALLY CLOSED ES (F) ELECTRICAL SUPPLY NFC NOT FULLY CLOSED FURNISHED NFO NOT FULLY OPEN FC FAIL CLOSE NO NORMALLY OPEN FI FAIL INDETERMINATE O/P OUTPUT FL FAIL LOCKED ORB ORBIT VALVE FO FAIL OPEN PV PROCESS VARIABLE FP FULL PORT REV REVERSE FWD FORWARD RV RECIRCULATION VALVE I/P INPUT SP SET POINT LITRES/SECOND ELGIN AREA WATER SUPPLY SYSTEM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com ANALYSIS INSTRUMENTS TAPPED OR SAMPLED SIGNAL NO. NN FROM SHEET NO. XX X CLIENT REGISTRATION NON-CONNECTING LINES FLOW STREAM NO. NN TO SHEET NO. XX AUTO/MANUAL COMPUTER/MANUAL COMPUTER/AUTO/MANUAL COMPUTER/LOCAL FORWARD/REVERSE FORWARD/OFF/REVERSE FAST/SLOW FAST/OFF/SLOW HAND/OFF HAND/OFF/AUTO LOCAL/REMOTE LOCAL/OFF/REMOTE LOCKOUT STOP LOCAL/PLC MODULATE FASTER/SLOWER MODULATE OPEN/CLOSE OPEN/CLOSE ON/OFF OPEN/OFF/CLOSE OPEN/STOP/CLOSE START/STOP START STOP EMERGENCY STOP "R", WHEN ADDED TO NOTATION, INDICATES REMOTE. EXAMPLE: HOR = HAND/OFF/REMOTE EXPOSED PROBE OR GAS DETECTOR NN/XX = = = = = = = = = = = = = = = = = = = = = = = = 2. NOTE XX: NN/XX UTILITY WATER MOTOR ELECTROMAGNETIC, SONIC PNEUMATIC PULSE FREQUENCY PULSE DURATION RESISTANCE "A", WHEN ADDED TO NOTATION, INDICATES AUTO. EXAMPLE: HOA = HAND/OFF/AUTO XX = ES-ELECTRICAL SUPPLY HS-HYDRAULIC SUPPLY GS-GAS SUPPLY NS-NITROGEN SUPPLY REFER TO FLOW STREAM IDENTIFICATION FOR OTHER TYPES OF SUPPLY CONNECTING LINES UW = = = = = = 1. INSTRUMENT SUPPLY OR CONNECTION TO PROCESS BCS M O P PF PD R ANALOG BINARY DIGITAL VOLTAGE FREQUENCY HYDRAULIC CURRENT HAND SWITCHES CONTROL STATION MOMENTARY = = = = = = = SMALL CIRCLE SIGNIFIES LOGICAL INVERSION OF SIGNAL HIGH (OPENED) SCAN TIME RATE OF CHANGE PROCESS OR INITIATING VARIABLE I I =I FUCTIONAL INSTRUMENT IDENTIFICATION LETTERS FROM INSTRUMENT IDENTIFICATION TABLE GLASS, VIEWING DEVICE HAND CURRENT (ELECTRICAL) POWER TIME, TIME SCHEDULE LEVEL MOTOR, MOTION (1) 1: EEE = LOOP NUMBER SENSOR (PRIMARY ELEMENT) RATIO (FRACTION) NOTE PPP = IF USED, ONE TO THREE ALPHANUMERIC CHARACTERS TO IDENTIFY BUILDING OR PROCESS MODIFIER ALARM DIFFERENTIAL SIGNAL CONVERTERS S = IF USED, ONE NUMERIC OR CHARACTER TO IDENTIFY A FACILITY SECTION RESIDUALS MANAGEMENT FACILITY IN-LINE COL CDG CG CH4 CLG CLR COG DO HC HUM H2S MHO NOG NH4 N2G OG ORP OUR OZG PH SD SO2 SS TOC TRB = = = = = = = = = = = = = = = = = = = = = = = = = COLOUR CARBON DIOXIDE GAS COMBUSTIBLE GAS METHANE CHLORINE GAS CHLORINE RESIDUAL CARBON MONOXIDE GAS DISSOLVED OXYGEN HYDROCARBONS HUMIDITY HYDROGEN SULFIDE CONDUCTIVITY NITRIC OXIDE GAS AMMONIA NITROGEN GAS OXYGEN GAS OXIDATION REDUCTION POT. OXYGEN UPTAKE RATE OZONE GAS pH SOLIDS DENSITY SULPHUR DIOXIDE GAS SUSPENDED SOLIDS TOTAL ORGANIC CARBON TURBIDITY ISSUE/REVISION EQUIPMENT DESCRIPTORS PMP SMP VLV FLM PRM TPM PRS LVS BCH BLD GEN ATS UPS PFR UPM ICP GCP = = = = = = = = = = = = = = = = = PUMP SUMP PUMP VALVE FLOW METER PRESSURE METER TEMPERATURE METER PRESSURE SWITCH LEVEL SWITCH BATTERY CHARGER BUILDING SERVICES GENERATOR AUTOMATIC TRANSFER SWITCH UNINTERRUPTIBLE POWER SUPPLY POWER FAIL RELAY UNIVERSAL POWER METER INSTRUMENT CONTROL PANEL GENERATOR CONTROL PANEL 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE P&ID LEGEND AND GENERAL NOTES 2 SHEET NUMBER DI602 ISO A1 594mm x 841mm PROJECT READY STATUS READY STATUS DEVICENET BWP03_VFD_START LOCAL/REMOTE STATUS BWP03_VFD_REMOT Designer: _____ ORP INDICATION LOCAL/REMOTE STATUS BWP02_VFD_REMOT BWP01_VFD_START CLIENT LOCAL/REMOTE STATUS BWP01_VFD_REMOT ELGIN AREA WATER SUPPLY SYSTEM RUNNING STATUS BWP01_VFD_RUNNG FAULT STATUS FAULT STATUS 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca BWP01_VFD_FAULT BWP02_VFD_FAULT BWT01_AT1_FAULT BWT01_LT1 10-STS-CPVC MOTOR CURRENT MOTOR CURRENT MOTOR CURRENT BWP01_VFD_STAAI BWP02_VFD_STAAI BWP03_VFD_STAAI HIGH PRESSURE HIGH PRESSURE HIGH PRESSURE CONSULTANT BWP01_PSH_ALMDI BWP02_PSH_ALMDI BWP03_PSH_ALMDI 80-PD-PVC START/STOP COMMAND BWP02_VFD_RUNNG BWP03_VFD_FAULT FROM SODIUM THIOSULPHATE DOSING PUMPS DI609 ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 BWT01_AT1_STAAI TRANSMITTER FAULT Project Management Initials: BWP02_VFD_START BWP03_VFD_RUNNG FAULT STATUS DI615 START/STOP COMMAND RUNNING STATUS RUNNING STATUS BWT01_V01_CLOSD BWP01_VFD_FEDBK DEVICENET Checked: _____ START/STOP COMMAND CLOSED STATUS SPEED FEEDBACK BWP02_VFD_FEDBK BWP03_VFD_FEDBK BWT02_LT1_FAULT BWT01_LT1_FAULT BWP01_VFD_SETPT SPEED FEEDBACK SPEED FEEDBACK TRANSMITTER FAULT TRANSMITTER FAULT SPEED SETPOINT BWP02_VFD_SETPT BWP03_VFD_SETPT BWT02_LT1_STAAI BWT01_LT1_STAAI RESIDUALS MANAGEMENT FACILITY BWP01_VFD_READY SPEED SETPOINT SPEED SETPOINT LEVEL INDICATION LEVEL INDICATION READY STATUS BWP02_VFD_READY DEVICENET Approved: _____ BWP03_VFD_READY AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com NOTE 2 FROM CONVEYORS / TRUCK LOADING STATIONS LCP20 BWP01_PSH BWT01_AT1 900-BWW-CPP FROM FILTERS DI608 CONNECTION TO FUTURE PUMP CONNECTION TO FUTURE PUMP M 250-CEN-SS1 100x200 400x200 200x150 400-BWW-SS1 200-BWW-SS1 300-CTS-SS1 BACKWASH WASTE CLARIFIER/THICKENER FEED PUMP BWP01 DP DI605 TO BACKWASH WASTE CLARIFIER CLF01 DP LCP21 BWP02_PSH BACKWASH WASTE ZSL EQUALIZATION BASIN BWT02 200-CS-SS1 FROM SEDIMENTATION SLUDGE EQ TANKS PI I PSH M DI607 REGISTRATION 100x200 150-SLU-SS1 400x200 200x150 200-BWW-SS1 FROM THICKENED SLUDGE HOLDING TANK VS NOTE 2 BACKWASH WASTE CLARIFIER/THICKENER FEED PUMP BWP02 DP DP LCP22 CLOSED STATUS DI615 10-STS-CPVC BWP03_PSH BWT02_V01_CLOSD FROM SODIUM THIOSULPHATE DOSING PUMPS PI I BWT02_AT1 ORP INDICATION PSH AIT BWT02_AT1_STAAI ORP TRANSMITTER FAULT 10-STS-CPVC BWT02_AT1_FAULT 100x200 200x150 200-BWW-SS1 300-BWW-SS2 400-BWW-SS1 100-PD-PVC FROM MAIN & 2nd FLOOR PROCESS DRAINS M 400x200 300-BWW-SS2 100-PD-PVC FROM SODIUM THIOSULPHATE DOSING PUMPS AE OVERFLOW DI615 200-BWW-SS1 BACKWASH WASTE CLARIFIER/THICKENER FEED PUMP BWP03 ISSUE/REVISION CONNECTION TO FUTURE PUMP 900-BWW LCP NOTE 3 DEVICENET LSL LSH1 LSH2 LSHH TEMPERATURE INDICATION BWT00_MX1_READY PI I PSH BWT00_TT1 TE 75-PD-PVC TIT 200-BWW-SS1 BWT00_PSH 40 200x350 M 400x200 400-BWW-SS1 PROCESS DRAINS SUMP PIT SMT01 SMP01 SMP02 SUBMERSIBLE SUMP PUMPS DESCRIPTION VS BACKWASH WASTE MIXING PUMP BWT00_MX1 KEY PLAN BWT00_MX1_FEDBK START/STOP COMMAND BWT00_MX1_START LOCAL/REMOTE STATUS DP RUNNING STATUS PROJECT NUMBER 60246477 BWT00_MX1_RUNNG SHEET TITLE FAULT STATUS 350x300 NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s. NOTE 3: FLAP GATE TO BE INSTALLED AT THE OVERFLOW PIPE ENTRANCE TO DISCHARGE MH. DATE SPEED FEEDBACK BWT00_MX1_REMOT DP I/R ISSUE FOR TENDER BWT00_MX1_SETPT 350x200 M 2013-10-09 SPEED SETPOINT M FROM LOWER FLOOR PROCESS DRAINS 0 READY STATUS LCP23 BWT00_TT1_STAAI Printed on ___% Post-Consumer Recycled Content Paper TO BACKWASH WASTE CLARIFIER CLF02 DP CONNECTION TO FUTURE PUMP SMT01_LCP_ALMDI 40 DI605 VS DP GENERAL ALARM 50-PD-PVC Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG 200-BWW-SS1 VS FROM SEDIMENTATION SLUDGE THICKENERS DI604 PSH ORP AE FROM CENTRIFUGES DI606 PI I AIT BACKWASH WASTE EQUALIZATION BASIN BWT01 ZSL BWT02_LT1 BWT00_MX1_FAULT 350x300 MOTOR CURRENT 350-BWW-SS2 BWT00_MX1_STAAI HIGH PRESSURE BWT00_PSH_ALMDI P&ID BACKWASH WASTE EQUALIZATION BASIN & TRANSFER PUMPS SHEET NUMBER DI603 ISO A1 594mm x 841mm SPEED SETPOINT SPEED SETPOINT RSP03_VFD_SETPT SPEED SETPOINT RSP02_VFD_SETPT SPEED FEEDBACK RSP01_VFD_SETPT SPEED FEEDBACK RSP03_VFD_FEDBK SPEED FEEDBACK RSP02_VFD_FEDBK RSP01_VFD_FEDBK PROJECT START/STOP COMMAND RSP03_VFD_REMOT RUNNING STATUS RSP03_VFD_RUNNG Checked: _____ FAULT STATUS Designer: _____ RUNNING STATUS RSP02_VFD_RUNNG RSP01_VFD_REMOT RUNNING STATUS RSP01_VFD_RUNNG RSP01_VFD_FAULT READY STATUS RSP03_VFD_READY READY STATUS RSP02_VFD_READY MOTOR CURRENT RSP01_VFD_STAAI HIGH PRESSURE RSP03_PSH_ALMDI ELGIN AREA WATER SUPPLY SYSTEM MOTOR CURRENT RSP02_VFD_STAAI HIGH PRESSURE CLIENT RSP01_VFD_READY MOTOR CURRENT RSP03_VFD_STAAI ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 FAULT STATUS RSP02_VFD_FAULT READY STATUS SED01_LT1_FAULT RSP02_VFD_REMOT RESIDUALS MANAGEMENT FACILITY LOCAL/REMOTE STATUS FAULT STATUS RSP03_VFD_FAULT TRANSMITTER FAULT LOCAL/REMOTE STATUS DEVICENET DEVICENET LOCAL/REMOTE STATUS SED01_LT1_STAAI RSP01_VFD_START RSP02_VFD_START DEVICENET Approved: _____ RSP03_VFD_START LEVEL INDICATION START/STOP COMMAND START/STOP COMMAND HIGH PRESSURE RSP02_PSH_ALMDI RSP01_PSH_ALMDI LEVEL INDICATION 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca SED02_LT1_STAAI TRANSMITTER FAULT LCP24 Project Management Initials: SED02_LT1_FAULT RSP01_PSH CLOSED STATUS SED01_V01_CLOSD PI I CONSULTANT PSH AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com SED01_LT1 CLOSED STATUS SED02_V01_CLOSD M FLOOD ALARM SED00_LSH_ALMDI 100x200 300x200 TO SEDIMENTATION SLUDGE THICKENER CLF03 NOTE 2 SEDIMENTATION SLUDGE FROM SEDIMENTATION BASINS 300-CS-SS2 SED02_LT1 ZSL LCP25 RSP02_PSH 250-CS-SS PI I 300-CS-SS2 ZSL PSH M 100x200 300x200 SEDIMENTATION SLUDGE EQUALIZATION TANK SED02 LSH 200x150 VS 200-CS-SS2 300-CS-SS2 SEDIMENTATION SLUDGE REGISTRATION DP DP VALVE CHAMBER LCP26 NOTE 2 RSP03_PSH PI 300-CS-SS2 I PSH M 100x200 300x200 250-CS-SS2 250-CS-SS2 200-CS-SS1 80 DRAIN 200-CS-SS2 200x150 DP SEDIMENTATION SLUDGE THICKENER FEED PUMP RSP03 TO SEDIMENTATION SLUDGE THICKENER CLF04 DP DEVICENET CONNECTION TO FUTURE PUMP SPEED SETPOINT SPEED FEEDBACK SED00_PSH CONNECTION TO FUTURE PUMP TIT PI I SED00_TT1 ISSUE/REVISION SED00_MX1_SETPT LCP27 TE DI606 VS 200-CS-SS2 250-CS Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG DP DP SEDIMENTATION SLUDGE EQUALIZATION TANK SED01 DI606 VS 200-CS-SS2 250-CS DI618 200-CS-SS2 200x150 SED00_MX1_FEDBK PSH START/STOP COMMAND SED00_MX1_START TEMPERATURE INDICATION SED00_TT1_STAAI LOCAL/REMOTE STATUS M SED00_MX1_REMOT 100x250 300x250 250x200 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION RUNNING STATUS 200x150 SED00_MX1_RUNNG VS 250-CS-SS2 0 KEY PLAN FAULT STATUS DP 250x200 SEDIMENTATION SLUDGE MIXING PUMP SED00_MX1 DP SED00_MX1_FAULT READY STATUS SED00_MX1_READY 250x200 MOTOR CURRENT 250-CS-SS2 SED00_MX1_STAAI HIGH PRESSURE SED00_PSH_ALMDI 200-CS-SS1 PROJECT NUMBER DI603 TO BACKWASH WASTE EQUALIZATION BASIN TO PLANT DRAIN NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s Printed on ___% Post-Consumer Recycled Content Paper TO PLANT DRAIN 60246477 SHEET TITLE P&ID SEDIMENTATION SLUDGE EQ BASIN & TRANSFER PUMPS SHEET NUMBER DI604 ISO A1 594mm x 841mm OPEN COMMAND CLF01_IC1_OPENN PROJECT CLOSE COMMAND RESIDUALS MANAGEMENT FACILITY Approved: _____ CLF01_IC1_CLOSE LOCAL/REMOTE STATUS CLF01_IC1_REMOT OPENED STATUS CLF01_IC1_OPEND Checked: _____ FLOW INDICATION CLF01_FT1_STAAI CLF01_IC1_CLOSD TRANSMITTER FAULT FAULT STATUS CLF01_FT1_FAULT CLF01_IC1_FAULT CLIENT VENDOR CONTROL PANEL SCP23 20-POL-PVC80 DI612 Designer: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 THICKENER VENDOR PACKAGE CLOSED STATUS ELGIN AREA WATER SUPPLY SYSTEM FROM POLYMER SYSTEM CLF01_AT2 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca TSS INDICATION CLF01_AT1_STAAI CLF01_MX1 Project Management Initials: TRANSMITTER FAULT M CLF01_AT1_FAULT CS CLF01_MX2 CLF01_SLC M M CS CS SS CONSULTANT CLF01_FT1 400x300 AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com CLF01_IC1 M CLF01_AT1 200x250 M 200-BWW-SS1 SS BACKWASH WASTE THICKENER/CLARIFIER CLF01 FROM BACKWASH WASTE TRANSFER PUMP BWP01 OPEN COMMAND CLF02_IC1_OPENN CLF01_AT3 CLOSE COMMAND CLF01_FT2 CLF02_IC1_CLOSE SS LOCAL/REMOTE STATUS CLF01_0C1 300-BTS-SS1 DI603 M CLF02_IC1_REMOT 200x100 OPENED STATUS 100-BCS-SS2 CLF02_IC1_OPEND Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG CLOSED STATUS M THICKENER VENDOR PACKAGE CLF02_IC1_CLOSD REGISTRATION FAULT STATUS CLF02_IC1_FAULT FLOW INDICATION CLF02_FT1_STAAI TRANSMITTER FAULT VENDOR CONTROL PANEL SCP24 CLF02_FT1_FAULT NOTE 2 CLF02_AT2 N/C TO BWW EQUALIZATION BASIN 20-POL-PVC80 DI612 CLF02_MX1 FROM POLYMER SYSTEM M TSS INDICATION CS CLF02_AT1_STAAI TRANSMITTER FAULT SS CLF02_MX2 CLF02_SLC M M CS CS CLF02_FT1 CLF02_AT1_FAULT 400x300 350-BTS-SS1 300-BTS-SS1 300x350 M CLF02_AT1 M CLF02_IC1 TO RMF DISCHARGE 200x250 200-BWW-SS1 SS ISSUE/REVISION BACKWASH WASTE THICKENER/CLARIFIER CLF02 DI603 FROM BACKWASH WASTE TRANSFER PUMP BWP03 NOTE 2 TO BWW EQUALIZATION BASIN CLF02_AT3 CLF02_FT2 SS 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN CLF02_0C1 M 200x100 100-BCS-SS2 M DI607 TO THICKENED SLUDGE HOLDING TANKS PROJECT NUMBER DI606 FROM SEDIMENTATION SLUDGE THICKENERS DISCHARGE NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: PIPE FOR TESTING/COMMISSIONING NOTE 3: DENOTES DEVICE PROVIDED BY CONTRACTOR, CONNECTED AND CONTROLLED BY VENDOR'S PANEL Printed on ___% Post-Consumer Recycled Content Paper 300-CTS-SS1 60246477 SHEET TITLE P&ID BACKWASH WASTE THICKENING SHEET NUMBER DI605 ISO A1 594mm x 841mm OPEN COMMAND CLF03_IC1_OPENN CLOSE COMMAND CLF03_IC1_CLOSE PROJECT LOCAL/REMOTE STATUS RESIDUALS MANAGEMENT FACILITY Approved: _____ CLF03_IC1_REMOT OPENED STATUS CLF03_IC1_OPEND FLOW INDICATION CLOSED STATUS CLF03_FT1_STAAI CLF03_IC1_CLOSD TRANSMITTER FAULT Checked: _____ THICKENER VENDOR PACKAGE CLF03_FT1_FAULT ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 VENDOR CONTROL PANEL SCP25 FAULT STATUS CLF03_IC1_FAULT CLIENT Designer: _____ CLF03_MX1 FROM POLYMER SYSTEM M CS TSS INDICATION CLF03_AT1_STAAI CLF03_AT2 CLF03_MX2 CLF03_SLC M M CS CS 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca SS CLF03_AT1 CLF03_FT1 TRANSMITTER FAULT Project Management Initials: ELGIN AREA WATER SUPPLY SYSTEM 20-POL-PVC80 DI613 SS CLF03_AT1_FAULT 250x200 CLF03_IC1 CONSULTANT M AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com 200x250 M DI604 200-CS-SS2 FROM SEDIMENTATION SLUDGE PUMP RSP01 SEDIMENTATION SLUDGE THICKENER CLF03 OPEN COMMAND CLF04_IC1_OPENN CLOSE COMMAND CLF04_IC1_CLOSE CLF03_AT3 LOCAL/REMOTE STATUS SS CLF03_OC1 M OPENED STATUS CLF04_IC1_OPEND 200-CCS-SS2 CLOSED STATUS M CLF04_IC1_CLOSD 200-CTS-SS1 CLF03_FT2 CLF04_IC1_REMOT FAULT STATUS Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG CLF04_IC1_FAULT THICKENER VENDOR PACKAGE REGISTRATION VENDOR CONTROL PANEL SCP26 FLOW INDICATION CLF04_FT1_STAAI TRANSMITTER FAULT CLF04_FT1_FAULT CLF04_AT2 20-POL-PVC80 DI613 CLF04_MX1 FROM POLYMER SYSTEM M CS TSS INDICATION CLF04_AT1_STAAI SS CLF04_MX2 CLF04_SLC M M CS CS 200x300 CLF04_AT1 CLF04_FT1 TRANSMITTER FAULT CLF04_AT1_FAULT 250x200 CL04_IC1 SS 200x300 200-CTS-SS1 300-CTS-SS1 TO BACKWASH WASTE EQUALIZATION BASINS 200x250 DI604 200-CS-SS2 DI603 M M FROM SEDIMENTATION SLUDGE PUMP RSP03 ISSUE/REVISION NOTE 2 300-CTS-SS1 SEDIMENTATION SLUDGE THICKENER CLF04 DI605 N/C TO SEDIMENTATION SLUDGE TANKS CLF04_AT3 CLF04_FT2 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN SS CLF04_OC1 M 200-CCS-SS2 M 200-CCS-SS2 DI607 TO THICKENED SLUDGE HOLDING TANKS PROJECT NUMBER NOTE 2 60246477 200-CCS-SS2 TO SEDIMENTATION SLUDGE TANKS NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: PIPE FOR TESTING/COMMISSIONING NOTE 3: DENOTES DEVICE PROVIDED BY CONTRACTOR, CONNECTED AND CONTROLLED BY VENDOR'S PANEL Printed on ___% Post-Consumer Recycled Content Paper SHEET TITLE P&ID SEDIMENTATION SLUDGE THICKENING SHEET NUMBER DI606 LOCAL/REMOTE STATUS SFP03_VFD_REMOT SLT00_MX1_REMOT Approved: _____ SPEED SETPOINT Checked: _____ SLT00_MX1_SETPT SPEED FEEDBACK LEVEL INDICATION SFP03_VFD_SETPT SPEED FEEDBACK SPEED SETPOINT SFP02_VFD_SETPT SPEED FEEDBACK MOTOR CURRENT SFP02_OC1_CLOSE SPEED FEEDBACK SFP02_OC1_REMOT READY STATUS OPENED STATUS SFP01_VFD_READY SFP02_OC1_OPEND MOTOR CURRENT CLOSED STATUS SFP01_VFD_STAAI SFP02_VFD_STAAI SFP02_OC1_CLOSD LEVEL INDICATION HIGH PRESSURE ALARM SLT02_LT1_STAAI HIGH PRESSURE ALARM SLT01_PSH_ALMDI HIGH PRESSURE ALARM HIGH PRESSURE ALARM SFP03_PSH_ALMDI FAULT STATUS SFP01_PSH_ALMDI SFP02_PSH_ALMDI SFP02_OC1_FAULT TRANSMITTER FAULT Project Management Initials: SLT02_LT1_FAULT LCP28 SLT01_LT1 ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT ELGIN AREA WATER SUPPLY SYSTEM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com I SFP01_PSH CLOSED STATUS PI M SLT01_V02_CLSD RESIDUALS MANAGEMENT FACILITY LOCAL/REMOTE STATUS SFP01_VFD_FEDBK MOTOR CURRENT SFP03_VFD_STAAI CLOSE COMMAND SFP01_VFD_SETPT SFP02_VFD_READY MOTOR CURRENT SLT00_MX1_STAAI SFP02_OC1_OPENN SPEED SETPOINT READY STATUS SFP03_VFD_READY OPEN COMMAND SFP01_VFD_FAULT SFP02_VFD_FEDBK READY STATUS SLT00_MX1_READY SLT01_LT1_FAULT Designer: _____ SPEED SETPOINT SFP02_VFD_FAULT SFP03_VFD_FEDBK READY STATUS TRANSMITTER FAULT FAULT STATUS FAULT STATUS SFP03_VFD_FAULT SLT00_MX1_FEDBK SLT01_LT1_STAAI SFP01_VFD_RUNNG SFP02_VFD_RUNNG FAULT STATUS SLT00_MX1_FAULT DEVICENET FAULT STATUS RUNNING STATUS RUNNING STATUS SFP03_VFD_RUNNG SLT00_MX1_RUNNG SFP01_VFD_REMOT SFP02_VFD_REMOT RUNNING STATUS RUNNING STATUS PROJECT LOCAL/REMOTE STATUS LOCAL/REMOTE STATUS DEVICENET LOCAL/REMOTE STATUS SFP01_VFD_START SFP02_VFD_START DEVICENET SLT00_MX1_START START/STOP COMMAND START/STOP COMMAND SFP03_VFD_START DEVICENET ISO A1 594mm x 841mm START/STOP COMMAND START/STOP COMMAND PSH VS CLOSED STATUS SLT01_V01_CLSD 250x150 NOTE 2 150-SLU-SS2 DI608 ZSL CENTRIFUGE FEED PUMP SFP01 LCP29 SLT02_LT1 ZSL SFP02_OC1 300-SLU-SS2 SFP02_PSH PI M 100-BCS-SS2 PSH VS THICKENED SLUDGE HOLDING TANK SLT02 FROM BACKWASH WASTE CLARIFIERS 250x150 150-SLU-SS2 150-SLU-SS2 ZSL 300-SLU-SS2 DI606 200-CCS-SS2 LCP30 SFP02_OC2 I CLOSED STATUS NOTE 2 SLT02_V01_CLSD 250-SLU-SS2 FROM SEDIMENTATION SLUDGE THICKENERS REGISTRATION 80-SLU-SS2 CENTRIFUGE FEED PUMP SFP02 ZSL CLOSED STATUS SLT02_V02_CLSD M SFP03_PSH PI M PSH VS 250x150 200-SLU-SS2 200-SLU-SS2 150-SLU-SS2 150-SLU-SS1 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG M I THICKENED SLUDGE HOLDING TANK SLT01 DI605 TO CENTRIFUGE CEN01 CONNECTION TO FUTURE PUMP 80-SLU-SS2 CENTRIFUGE FEED PUMP SFP03 LCP31 CONNECTION TO FUTURE PUMP DI608 TO CENTRIFUGE CEN02 TEMPERATURE INDICATION SLT00_TT1_STAAI I ISSUE/REVISION SLT00_TT1 TE SLT00_PSH TIT PI M PSH VS 250x150 OPEN COMMAND SFP02_OC2_OPENN 250-SLU-SS2 CLOSE COMMAND SFP02_OC2_CLOSE 250x200 250x200 THICKENED SLUDGE HOLDING TANK MIXING PUMP SLT00_MX1 100-SLU-SS2 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION LOCAL/REMOTE STATUS SFP02_OC2_REMOT KEY PLAN OPENED STATUS SFP02_OC2_OPEND 250-SLU-SS2 CLOSED STATUS SFP02_OC2_CLOSD FAULT STATUS SFP02_OC2_FAULT PROJECT NUMBER TO PLANT DRAIN 100-SLU-SS2 80-SLU-SS2 DI616 SHEET TITLE 80-UW-PVC80 DI603 UTILITY WATER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s Printed on ___% Post-Consumer Recycled Content Paper 60246477 TO BWW EQ BASIN P&ID THICKENED SLUDGE HOLDING TANK & CENTRIFUGE FEED PUMPS SHEET NUMBER DI607 ISO A1 594mm x 841mm PROJECT TSS INDICATION CEN01_AT1_STAAI Approved: _____ FEED PUMP START PERMISSIVE FLOW INDICATION CEN01_FT1_STAAI TRANSMITTER FAULT SLUDGE CONVEYANCE PATH READY TRANSMITTER FAULT CEN01_AT1_FAULT RESIDUALS MANAGEMENT FACILITY CEN01_LCP_LKOUT CEN01_FT1_FAULT CEN01_LCP_DISBL Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CEN01 VENDOR CONTROL PANEL SCP21 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com 100x65 65-UW-PVC80 65x50 65x50 65x25 65x25 100x65 FLUSHING CEN01_CO3 CIP M M CEN01_CO1 M UTILITY WATER FC CEN01_CO2 65-POL-PVC80 DI614 CEN01_BDV NOTE 2 FI CEN01_AT1 FROM POLYMER FEED SYSTEM SE TE VT 150-SLU-SS2 DI607 CEN01_VT1 CEN01_MDV SE VE TE M VS 65x50 SS PI M VS CEN01_FT1 FI M FROM CENTRIFUGE FEED PUMP SFP01 REGISTRATION CENTRIFUGE CEN01 65-UW-PVC80 65x50 65x50 65x25 65x25 TSS INDICATION CEN02_AT1_STAAI FLUSHING DI614 CEN02_CO3 CEN02_AT1_FAULT M FC CIP 65-POL-PVC80 NOTE 2 65-POL-PVC FI CEN02_AT1 FROM POLYMER FEED SYSTEM SE TE M CEN02_VT1 VS VT CEN02_FT1 SS PI GATE FLUSH CEN02_MDV SE VE 150-SLU-SS2 TE M VS 250-CEN-SS1 FI DI607 200-DS-SS CEN02_BDN M M CEN01_OC1 TRANSMITTER FAULT CEN02_CO2 CEN02_CO1 65x50 M FROM CENTRIFUGE FEED PUMP SFP03 ISSUE/REVISION CENTRIFUGE CEN02 CHUTE CONNECTION 200-DS-SS FLOW INDICATION CEN02_FT1_STAAI TRANSMITTER FAULT CEN02_FT1_FAULT DI609 TO SLUDGE CAKE CONVEYOR SCC01 CEN02_OC1 250-CEN-SS1 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG GATE FLUSH 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN 250-CEN-SS1 FEED PUMP START PERMISSIVE CEN02_LCP_LKOUT SLUDGE CONVEYANCE PATH READY CEN02_LCP_DISBL NOTES: 1. ALL TAGS TO BE PREFIXED BY "EAW_". 2. THREE (3) POLYMER INJECTION LOCATIONS TO BE POSITIONED: - AT CENTRIFUGE INLET - 2m UPSTREAM OF INLET - 10m UPSTREAM OF INLET DENOTES DEVICE SUPPLIED BY CENTRIFUGE VENDOR. OTHER DEVICES SUPPLIED BY CONTRACTOR 3. Printed on ___% Post-Consumer Recycled Content Paper CEN02 VENDOR CONTROL PANEL SCP22 DI603 TO BACKWASH WASTE EQUALIZATION BASINS PROJECT NUMBER CHUTE CONNECTION DI609 TO SLUDGE CAKE CONVEYOR SCC02 60246477 SHEET TITLE P&ID CENTRIFUGES SHEET NUMBER DI608 ISO A1 594mm x 841mm MOTION STATUS SCC03_MSI_STADI MOTION STATUS SCC01_MS1_STADI FORWARD COMMAND SCC03_000_STARF START / STOP COMMAND SCC01_000_START START / STOP COMMAND SCC03_000_START PROJECT LOCAL / REMOTE STATUS LOCAL / REMOTE STATUS DEVICENET RUNNING STATUS DEVICENET SCC01_000_RUNNG OPENED STATUS FAULT STATUS SCC01_000_FAULT Checked: _____ SCC03_000_RUNNG SCC02_000_START FAULT STATUS SCC01_000_STAAI SCC02_000_REMOT SCC02_SV1_OPEND RUNNING STATUS CLOSED STATUS SCC02_SV1_CLOSD SCC03_000_STAAI EMERGENCY STOP SCC01_000_ESTOP ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 LOCAL / REMOTE STATUS OPENED STATUS MOTOR CURRENT EMERGENCY STOP Designer: _____ START / STOP COMMAND SCC03_000_READY MOTOR CURRENT SCC01_SV1_CLOSD SCC02_MS1_STADI RUNNING STATUS READY STATUS SCC01_000_READY CLOSED STATUS RESIDUALS MANAGEMENT FACILITY MOTION STATUS SCC03_000_FAULT READY STATUS SCC01_SV1_OPEND SCC03_000_REMOT SCC02_000_RUNNG DEVICENET Approved: _____ SCC01_000_REMOT SCC03_000_ESTOP CLIENT FAULT STATUS ELGIN AREA WATER SUPPLY SYSTEM SCC02_000_FAULT READY STATUS DI608 SCC02_000_READY FROM CENTRIFUGE CEN02 SCC01 LOCAL CONTROL PANEL LCP35 DI608 SCC02_000_STAAI EMERGENCY STOP SCC02_000_ESTOP SCC02_SV1 50-UW-PVC80 DI616 S OPEN COMMAND SCC02 LOCAL CONTROL PANEL LCP36 SCC01_SV1 UTLITY WATER OPEN COMMAND SCC03_OC1_OPENN SCC03_OC2_OPENN CLOSE COMMAND SCC03_OC2_CLOSE CLOSE COMMAND SCC03_OC2_REMOT LOCAL / REMOTE STATUS OPENED STATUS SCC03_OC1_REMOT START / STOP COMMAND SCC04_000_START MS CLOSED STATUS CONVEYOR EXTENSION FOR FUTURE CENTRIFUGE SCC03_OC1_OPEND SCC01_MS1 LOCAL / REMOTE STATUS MS SCC03_OC2_CLOSD SCC02_MS1 CLOSED STATUS SCC04_000_REMOT FAULT STATUS SCC03_OC1_CLOSD M RUNNING STATUS SCC04_000_RUNNG DEVICENET SCC03_OC2_OPEND OPENED STATUS CONVEYOR EXTENSION FOR FUTURE CENTRIFUGE SCC03_OC2_FAULT M FAULT STATUS CS SCREW CONVEYOR SCC01 AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com LOCAL / REMOTE STATUS SCC03_OC1_CLOSE CS SCC03_OC1_FAULT SCREW CONVEYOR SCC02 FAULT STATUS SCC04_000_FAULT READY STATUS SCC04_000_READY MOTOR CURRENT UP SLOW UP SLOW UP FAST UP FAST SCC03 LOCAL CONTROL PANEL LCP37 SCC04_000_STAAI Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG CONSULTANT S DOWN SLOW EMERGENCY STOP SCC04_000_ESTOP DOWN FAST MOTION STATUS SCC04_MSI_STADI SCC03 LOCAL CONTROL PANEL LCP37 MS SCC03_MS1 M NOTE 2 NOTE 2 CS CRN01 LOCAL CONTROL PENDANT SCREW CONVEYOR SCC03 M DOWN SLOW CRN02 LOCAL CONTROL PENDANT M SCC03_OC1 SCC03_OC2 DOWN FAST 80-PD-PVC FLOOR FLOOR SCC04 LOCAL CONTROL PANEL LCP38 M FLOOR DI603 FLOOR HOIST WINCH CRN01 HOIST WINCH CRN02 TELESCOPIC CHUTE REGISTRATION DRAIN TO BW EQ BASIN M TELESCOPIC CHUTE SCC05_MS1 MS SCC04_MS1 R MS R R R R R R R OPEN BOTTOM SCREW CONVEYOR SCC04 R R R R R R R R OPEN BOTTOM SCREW CONVEYOR SCC05 ISSUE/REVISION M M CS E E E E E E E E E SLUDGE TRAILER #1 R SCC05 LOCAL CONTROL PANEL LCP39 CS E E E E E SLUDGE TRAILER #2 R E E R 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN R MOTION STATUS SCC05_MS1_STADI START / STOP COMMAND E E E E SCC05_000_START LOCAL / REMOTE STATUS SCC05_000_REMOT RUNNING STATUS PHOTOELECTRIC SENSOR LEGEND R RECEIVER E EMITTER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: GATES SCC03_OC1 & SCC03_OC2 RELAY TO SCC03 LCP Printed on ___% Post-Consumer Recycled Content Paper FORWARD FORWARD G G VENDOR CONTROL PANEL SCP29 BACKWARD BACKWARD Y STOP STOP R TRAFFIC LIGHT R PROJECT NUMBER 60246477 FAULT STATUS SCC05_000_FAULT Y TRAFFIC LIGHT SCC05_000_RUNNG DEVICENET Project Management Initials: FROM CENTRIFUGE CEN01 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca MOTOR CURRENT SCC03 LOCAL CONTROL PANEL LCP37 READY STATUS SCC05_000_READY MOTOR CURRENT SCC05_000_STAAI EMERGENCY STOP SCC05_000_ESTOP SHEET TITLE P&ID DEWATERED SLUDGE CONVEYOR SYSTEM SHEET NUMBER DI609 ISO A1 594mm x 841mm Approved: _____ PROJECT RESIDUALS MANAGEMENT FACILITY HIGH LEVEL ALARM PDT11_LSH_ALMDI Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 Designer: _____ VENDOR CONTROL PANEL SCP27 CLIENT ELGIN AREA WATER SUPPLY SYSTEM RECIRCULATION 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca PDT11_WT1 PDT11_LSH PPP11_SV1 Project Management Initials: LSH LIQUID POLYMER TOTE FC CONSULTANT PPP11_PI1 PDT11 PI RUN ASL DRY TOTE SCALE PPP11_PSH AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com PSH PPP11_SV2 S NOTE 2 PDT12_LT1 VS PDT12_MX1 M PPP11 PDT12_LSH PDT12_LSL M CS VAP11 M VACUUM LOADER S PDT13_LSH PDT12_SV1 PDT13_LT1 PDT13_LSL Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG POLYMER FEEDER DI613 PFR11_LSL LSL FROM FEED PUMP PRESSURE RELIEF AGING TANK PDT12 PFR11 REGISTRATION M PPP12 VS 25-POL-PVC PPS10_SV1 WETTING CHAMBER S FEED TANK PDT13 DI612 TO THICKENER POLYMER FEED SYSTEM PPS10_SV2 25-POL-PVC S PPS10_SV3 S ISSUE/REVISION POLYMER PREPARATION SYSTEM VENDOR PACKAGE DI616 40-UW-SS HIGH LEVEL ALARM POP10_LSH_ALMDI 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION TEMPERED WATER KEY PLAN POP10_LSH LSH PROJECT NUMBER TO BWW EQ BASIN 60246477 SHEET TITLE TO BWW EQ BASIN NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: POLYMER ACTIVATION MONITOR Printed on ___% Post-Consumer Recycled Content Paper P&ID THICKENER POLYMER PREPARATION SYSTEM SHEET NUMBER DI610 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 Designer: _____ VENDOR CONTROL PANEL SCP28 CLIENT ELGIN AREA WATER SUPPLY SYSTEM RECIRCULATION 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca PDT21_WT1 PPP21_SV1 FC CONSULTANT PPP21_PI1 PDT21 PI 25-POL-PVC RUN ASL DRY TOTE SCALE AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com PSH PPP21_SV2 S 15-POL-PVC M PDT22_LSL LSL S M PDT23_LT1 PDT23_SV1 PDT22_SV2 S PDT23_SV2 PDT23_MX1 PDT22_LSH LSH NOTE 2 PDT22_SV1 PDT22_LT1 VS PDT22_MX1 PPP21 PPP21_PSH NOTE 2 Project Management Initials: LIQUID POLYMER TOTE PDT23_LSH PDT23_LSL M CS CS DI614 FROM FEED PUMP PRESSURE RELIEF Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG POLYMER FEEDER PFR21_LSL LSL PFR21 REGISTRATION PDT22_SV3 M PPP22 S VS PPS20_SV1 S S PDT23_SV3 WETTING CHAMBER BATCH TANK #2 PDT23 BATCH TANK #1 PDT22 65-POL-PVC DI614 TO CENTRIFUGES POLYMER FEED SYSTEM PPS20_SV2 S 50-POL-PVC ISSUE/REVISION POLYMER PREPARATION SYSTEM VENDOR PACKAGE TEMPERED WATER DI616 HIGH LEVEL ALARM 50-UW-SS FROM UTILITY WATER BOOSTER PUMP / HEATERS POP20_LSH_ALMDI 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN POP20_LSH LSH PROJECT NUMBER TO BWW EQ BASIN 60246477 SHEET TITLE P&ID DEWATERING POLYMER PREPARATION SYSTEM NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: POLYMER ACTIVATION MONITOR Printed on ___% Post-Consumer Recycled Content Paper SHEET NUMBER DI611 ISO A1 594mm x 841mm DI610 TO STORAGE TANK OPEN COMMAND PROJECT POP11_SV1_OPENN Approved: _____ OPEN COMMAND FLOW INDICATION POP10_SV1_OPENN POP10_FT1_STAAI HIGH PRESSURE ALARM Checked: _____ TRANSMITTER FAULT POP10_FT1_FAULT POP10_FT2_FAULT ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 LOCAL CONTROL PANEL LCP32 START/STOP COMMAND POP11_000_START LOCAL/REMOTE STATUS POP11_000_REMOT FIT NOTE 2 PI POP11_000_RUNNG POP10_IC1_SETPT POSITION FEEDBACK LOCAL/REMOTE STATUS FAULT STATUS POP10_IC1_REMOT M RUN ASL DRY SPEED SETPOINT POP10_IC1 FE POP11_SV1 M POP10_IC1_FAULT NOTE 3 15-POL-PVC 15-POL-PVC M VS POP11_000_FEDBK 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca FAULT STATUS M S POP11_000_SETPT SPEED FEEDBACK ELGIN AREA WATER SUPPLY SYSTEM POP10_IC1_FEDBK FIT POP11_000_FAULT CLIENT POP10_FT1 PSH 25-POL-PVC Project Management Initials: POSITION SETPOINT POP10_FT2 FE POP11_PSH POP11_PI1 RUNNING STATUS Designer: _____ POP10_FT2_STAAI TRANSMITTER FAULT POP11_PSH_ALMDI RESIDUALS MANAGEMENT FACILITY FLOW INDICATION DI605 CONSULTANT POP10_SV1 POLYMER DOSING PUMP POP11 TO BACKWASH WASTE THICKENER CLF01 S AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com HIGH PRESSURE ALARM POP12_PSH_ALMDI LOCAL CONTROL PANEL LCP32 START/STOP COMMAND POP12_000_START LOCAL/REMOTE STATUS POP12_000_REMOT POP12_PSH POP12_PI1 NOTE 2 PI RUNNING STATUS PSH 25-POL-PVC POP12_000_RUNNG FAULT STATUS 15-UW-PVC RUN ASL DRY POP12_000_FAULT SPEED SETPOINT Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG POP12_000_SETPT M 15-POL-PVC VS SPEED FEEDBACK POP12_000_FEDBK POLYMER DOSING PUMP POP12 REGISTRATION OPEN COMMAND POP10_SV2_OPENN OPEN COMMAND FLOW INDICATION POP13_SV1_OPENN POP10_FT3_STAAI HIGH PRESSURE ALARM FLOW INDICATION POP10_FT4_STAAI TRANSMITTER FAULT POP13_PSH_ALMDI POP10_FT3_FAULT TRANSMITTER FAULT POP10_FT4_FAULT LOCAL CONTROL PANEL LCP32 START/STOP COMMAND POP13_000_START LOCAL/REMOTE STATUS POP13_000_REMOT POP10_FT4 POP10_IC2_SETPT PI RUNNING STATUS POSITION FEEDBACK FE POP13_PSH POP13_PI1 NOTE 2 POP13_000_RUNNG POSITION SETPOINT FIT POP10_IC2_FEDBK POP10_FT3 PSH LOCAL/REMOTE STATUS FIT 25-POL-PVC POP10_IC2_REMOT M FAULT STATUS RUN ASL DRY POP13_000_FAULT POP10_IC2 FE POP13_SV1 FAULT STATUS POP10_IC2_FAULT M S ISSUE/REVISION NOTE 3 SPEED SETPOINT M POP13_000_SETPT VS SPEED FEEDBACK POP13_000_FEDBK 15-POL-PVC M 15-POL-PVC POLYMER DOSING PUMP POP13 POP10_SV2 DI605 TO BACKWASH WASTE THICKENER CLF02 S CONNECTION FOR FUTURE PUMPS POLYMER FEED SYSTEM VENDOR PACKAGE DI610 I/R DATE ISSUE FOR TENDER DESCRIPTION DI613 HIGH LEVEL ALARM CONNECTION TO FUTURE POLYMER DOSING PUMPS POP11_LSH_ALMDI TO SLUDGE THICKENERS POLYMER FEED PUMPS POP11_LSH 50x15 LSH DI616 UTILITY WATER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP NOTE 3: V-NOTCH BALL VALVES Printed on ___% Post-Consumer Recycled Content Paper 2013-10-09 KEY PLAN 25-POL-PVC FROM POLYMER PREPARATION SYSTEM FEED TANK 0 50-UW-PVC PROJECT NUMBER DI613 UTILITY WATER 60246477 SHEET TITLE P&ID BACKWASH WASTE THICKENING POLYMER FEED SYSTEM TO BWW EQ BASIN SHEET NUMBER DI612 ISO A1 594mm x 841mm 15-POL-PVC DI610 TO FEED TANK OPEN COMMAND POP10_SV3_OPENN OPEN COMMAND FLOW INDICATION Approved: _____ POP14_SV1_OPENN HIGH PRESSURE ALARM Checked: _____ TRANSMITTER FAULT POP10_FT5_FAULT POP10_FT6_FAULT LOCAL CONTROL PANEL LCP33 START/STOP COMMAND POP14_000_START LOCAL/REMOTE STATUS POP14_000_REMOT POP10_FT6 PI POSITION FEEDBACK FE POP14_PSH POP14_PI1 POP14_000_RUNNG PSH FIT 25-POL-PVC POP10_IC3_FEDBK POP10_FT5 POP10_IC3_REMOT M RUN ASL DRY SPEED SETPOINT POP10_IC3 FE POP14_SV1 M POP10_IC3_FAULT NOTE 3 15-POL-PVC 20-POL-PVC M VS POLYMER DOSING PUMP POP14 POP14_000_FEDBK FAULT STATUS M S POP14_000_SETPT SPEED FEEDBACK ELGIN AREA WATER SUPPLY SYSTEM LOCAL/REMOTE STATUS FAULT STATUS Project Management Initials: POP10_IC3_SETPT CLIENT NOTE 2 POP14_000_FAULT ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 POSITION SETPOINT FIT RUNNING STATUS Designer: _____ POP10_FT6_STAAI TRANSMITTER FAULT POP14_PSH_ALMDI RESIDUALS MANAGEMENT FACILITY FLOW INDICATION POP10_FT5_STAAI PROJECT DI606 15x20 POP10_SV3 TO SEDIMENTATION SLUDGE THICKENER CLF03 S 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com HIGH PRESSURE ALARM POP15_PSH_ALMDI LOCAL CONTROL PANEL LCP33 START/STOP COMMAND POP15_000_START LOCAL/REMOTE STATUS POP15_000_REMOT POP15_PSH POP15_PI1 NOTE 2 PI RUNNING STATUS PSH 25-POL-PVC POP15_000_RUNNG FAULT STATUS 15-UW-PVC RUN ASL DRY POP15_000_FAULT SPEED SETPOINT M POP15_000_SETPT 15-POL-PVC Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG VS SPEED FEEDBACK POP15_000_FEDBK POLYMER DOSING PUMP POP15 REGISTRATION OPEN COMMAND POP10_SV4_OPENN OPEN COMMAND FLOW INDICATION POP16_SV1_OPENN HIGH PRESSURE ALARM POP10_FT8_STAAI TRANSMITTER FAULT POP16_PSH_ALMDI TRANSMITTER FAULT POP10_FT7_FAULT POP10_FT8_FAULT LOCAL CONTROL PANEL LCP33 START/STOP COMMAND POP16_000_START LOCAL/REMOTE STATUS POP16_000_REMOT POP10_FT8 POSITION SETPOINT FIT PI POP10_IC4_SETPT POSITION FEEDBACK FE POP16_PSH POP16_PI1 NOTE 2 RUNNING STATUS POP16_000_RUNNG FLOW INDICATION POP10_FT7_STAAI POP10_IC4_FEDBK POP10_FT7 PSH LOCAL/REMOTE STATUS FIT 25-POL-PVC POP10_IC4_REMOT M FAULT STATUS RUN ASL DRY POP16_000_FAULT POP10_IC4 FE POP16_SV1 FAULT STATUS POP10_IC4_FAULT M S ISSUE/REVISION NOTE 3 SPEED SETPOINT M POP16_000_SETPT VS SPEED FEEDBACK POP16_000_FEDBK 20-POL-PVC M 15-POL-PVC POLYMER DOSING PUMP POP16 POP10_SV4 15x20 DI606 TO SEDIMENTATION SLUDGE THICKENER CLF04 S POLYMER FEED SYSTEM VENDOR PACKAGE DI612 FROM POLYMER PREPARATION SYSTEM 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN 25-POL-PVC CONNECTION TO FUTURE POLYMER DOSING PUMPS PROJECT NUMBER DI616 UTILITY WATER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP NOTE 3: V-NOTCH BALL VALVES Printed on ___% Post-Consumer Recycled Content Paper 50-UW-PVC DI614 UTILITY WATER 60246477 SHEET TITLE P&ID SED. SLUDGE THICKENING POLYMER FEED SYSTEM SHEET NUMBER DI613 ISO A1 594mm x 841mm 32-POL-PVC DI611 TO BATCH TANK PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 START/STOP COMMAND Checked: _____ POP21_000_START LOCAL/REMOTE STATUS OPEN COMMAND POP21_000_REMOT RUNNING STATUS OPEN COMMAND POP21_000_RUNNG Designer: _____ CLIENT POP21_SV1_OPENN FLOW INDICATION POP20_SV1_OPENN FAULT STATUS HIGH PRESSURE ALARM POP21_000_FAULT POP20_FT2_STAAI TRANSMITTER FAULT POP21_PSH_ALMDI ELGIN AREA WATER SUPPLY SYSTEM FLOW INDICATION POP20_FT1_STAAI TRANSMITTER FAULT POP20_FT1_FAULT POP20_FT2_FAULT POSITION SETPOINT POP20_IC1_SETPT 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca SPEED SETPOINT POSITION FEEDBACK POP21_000_SETPT POP20_IC1_FEDBK LOCAL CONTROL PANEL LCP34 Project Management Initials: SPEED FEEDBACK POP21_000_FEDBK POP20_FT2 NOTE 2 CLOSED STATUS 65x40 FE POP21_SV1 POP20_IC1 S M RUNNING STATUS NOTE 3 65-UW-PVC SPEED SETPOINT POP22_000_SETPT 65-POL-PVC M VS POLYMER DOSING PUMP POP21 POP22_000_RUNNG FAULT STATUS POP20_IC1_FAULT M POP22_000_REMOT POP22_000_FAULT POP20_IC1_CLOSD M LOCAL/REMOTE STATUS FAULT STATUS POP20_IC1_OPEND FIT RUN ASL DRY AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com OPENED STATUS POP20_FT1 PSH 40-POL-PVC POP22_000_START CONSULTANT POP20_IC1_REMOT FE POP21_PSH POP21_PI1 PI START/STOP COMMAND LOCAL/REMOTE STATUS FIT 32-POL-PVC 32x65 POP20_SV1 DI608 TO CENTRIFUGE CEN01 S HIGH PRESSURE ALARM POP22_PSH_ALMDI LOCAL CONTROL PANEL LCP34 SPEED FEEDBACK POP22_000_FEDBK NOTE 2 POP22_PSH POP22_PI1 PI PSH Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG 40-POL-PVC 65x40 RUN ASL DRY START/STOP COMMAND REGISTRATION POP23_000_START FLOW INDICATION M LOCAL/REMOTE STATUS POP23_000_REMOT POP20_FT3_STAAI VS POLYMER DOSING PUMP POP22 OPEN COMMAND TRANSMITTER FAULT POP20_SV2_OPENN RUNNING STATUS POP23_000_RUNNG POP20_FT3_FAULT OPEN COMMAND FLOW INDICATION POP23_SV1_OPENN FAULT STATUS POP20_FT4_STAAI POSITION SETPOINT POP23_000_FAULT HIGH PRESSURE ALARM TRANSMITTER FAULT POP23_PSH_ALMDI SPEED SETPOINT POSITION FEEDBACK POP23_000_SETPT POP20_IC2_FEDBK LOCAL CONTROL PANEL LCP34 SPEED FEEDBACK POP23_000_FEDBK POP20_FT4 LOCAL/REMOTE STATUS FIT NOTE 2 POP23_PI1 POP20_IC2_REMOT OPENED STATUS FE POP23_PSH PI POP20_IC2_OPEND POP20_FT3 PSH FIT 40-POL-PVC 65x40 CLOSED STATUS POP20_IC2_CLOSD M M ISSUE/REVISION FE RUN ASL DRY POP20_IC2 POP23_SV1 M S FAULT STATUS POP20_IC2_FAULT NOTE 3 65-POL-PVC M VS POLYMER DOSING PUMP POP23 32-POL-PVC POP20_SV2 32x65 DI608 TO CENTRIFUGE CEN02 S POLYMER FEED SYSTEM VENDOR PACKAGE DI611 POP20_IC2_SETPT POP20_FT4_FAULT 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN 65-POL-PVC PREPARATION SYSTEM CONNECTION TO FUTURE POLYMER DOSING PUMPS PROJECT NUMBER DI616 UTILITY WATER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP NOTE 3: V-NOTCH BALL VALVES Printed on ___% Post-Consumer Recycled Content Paper 50-UW-PVC 60246477 SHEET TITLE P&ID DEWATERING POLYMER FEED SYSTEM SHEET NUMBER DI614 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 Checked: _____ START/STOP COMMAND TSP01_000_START LOCAL/REMOVE STATUS CLIENT TSP01_000_REMOT ELGIN AREA WATER SUPPLY SYSTEM RUNNING STATUS HIGH PRESSURE ALARM Designer: _____ TSP01_000_RUNNG TSP01_PSH_ALMDI FAULT STATUS TSP01_000_FAULT LOCAL CONTROL PANEL LCP40 SPEED SETPOINT TSP01_000_SETPT Project Management Initials: SPEED FEEDBACK TSP01_000_FEDBK 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca DECHLORINATION SYSTEM VENDOR PACKAGE NOTE 2 TSP01_PSH CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com PSH PI TSP01_PI1 M VS 15x10 START/STOP COMMAND TSP02_000_START 10-STS-CPVC DOSING PUMP TSP01 LOCAL/REMOVE STATUS DI603 TO BACKWASH WASTE EQ BASIN BWT01 HIGH PRESSURE ALARM TSP02_000_REMOT TSP02_PSH_ALMDI WEIGHT INDICATION RUNNING STATUS TST01_WT1_STAAI TSP02_000_RUNNG TRANSMITTER FAULT LOCAL CONTROL PANEL LCP40 FAULT STATUS TST01_WT1_FAULT TSP02_000_FAULT SPEED SETPOINT TSP02_000_SETPT NOTE 2 TSP02_PSH PSH Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG SPEED FEEDBACK PI TSP02_000_FEDBK TSP02_PI1 REGISTRATION TST01_WT1 M VS 15-STS-CPVC 15x10 DI603 DOSING PUMP TSP02 SODIUM THIOSULPHATE SOLUTION TST01 TO BACKWASH WASTE EQ BASIN OVERFLOW HIGH PRESSURE ALARM TSP03_PSH_ALMDI START/STOP COMMAND LOCAL CONTROL PANEL LCP40 TSP03_000_START LOCAL/REMOVE STATUS TSP03_000_REMOT NOTE 2 RUNNING STATUS TSP03_000_RUNNG TSP03_PSH PSH PI TSP03_PI1 FAULT STATUS ISSUE/REVISION TSP03_000_FAULT M SPEED SETPOINT TSP03_000_SETPT VS SPEED FEEDBACK TSP03_000_FEDBK 15x10 DOSING PUMP TSP03 10-STS-CPVC DI603 TO BACKWASH WASTE EQ BASIN BWT02 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN CONTAINMENT TO SEDIMENTATION SLUDGE TANK PROJECT NUMBER 60246477 SHEET TITLE P&ID RMF DISCHARGE DECHLORINIZATION SYSTEM. NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP Printed on ___% Post-Consumer Recycled Content Paper SHEET NUMBER DI615 ISO A1 594mm x 841mm RTU1 SAC GENERAL ALARM BLD06_CP1_ALMDI LOCAL/REMOTE STATUS PROJECT BSP01_VFD_REMOT RTU2 SAC GENERAL ALARM BLD06_CP2_ALMDI RESIDUALS MANAGEMENT FACILITY Approved: _____ RUNNING STATUS BSP01_VFD_RUNNG RTU3 SAC GENERAL ALARM BLD06_CP3_ALMDI GENERAL ALARM BSP01_VFD_ALMDI PUMP GALLERY SAC GENERAL ALARM BLD06_CP4_ALMDI PRESSURE SETPOINT Checked: _____ ON DEMAND WATER HEATERS BSP01_VFD_SETPT SLUDGE THICKENER SAC GENERAL ALARM PRESSURE INDICATION BLD06_CP5_ALMDI BSP01_VFD_STAAI PWH01 TRUCK BAY SAC GENERAL ALARM PWH02 ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 NOTE: FOR ON DEMAND TANKLESS WATER HEATERS REFER TO DRAWING M610 FOR GAS AND CONNECTION DETAILS PWH03 CLIENT PUMP ENABLE/DISABLE BLD06_CP6_ALMDI BSP01_VFD_DISBL ELGIN AREA WATER SUPPLY SYSTEM Designer: _____ DECHLORINATION ROOM SAC GENERAL ALARM BLD06_CP7_ALMDI CENTRIFUGE ROOM SAC GENERAL ALARM PIT BLD06_CP8_ALMDI PE Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca BSP01_PT1 PI CONSULTANT LCP41 BUILDING HVAC ALARMS 80x32 TI TI M 80x32 80-UW-SS 40-UW-SS VS 150x80 SECURITY SYSTEM ARMED ALP06_000_STADI ALP06_604_ALMDI NC NC SECURITY SYSTEM ELECTRICAL ROOM ALARM TEMPERATURE CONTROLLER 150-UW-SS ALP06_607_ALMDI SECURITY SYSTEM CHEMICAL ROOM ALARM ALP06_605_ALMDI SECURITY SYSTEM CENTRIFUGE ROOM ALARM TO THICKENING POLYMER PREPARATION TE BOOSTER PUMP BSP01 150x80 SECURITY SYSTEM PROCESS ROOM ALARM BSP01_TE1 BSP01_CNV DI610 80x40 AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com 50-UW-SS DI611 80x50 TO DEWATERING POLYMER PREPARATION BOOSTER PUMP VENDOR PACKAGE ALP06_617_ALMDI SECURITY SYSTEM CONTROL ROOM ALARM 50-UW-SS1 ALP06_608_ALMDI DI612 80x50 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG TO POLYMER FEED SECURITY SYSTEM REGISTRATION 32-UW-PVC80 80x32 TO MAIN FLOOR HOSE STATIONS AND SAMPLE SINKS 100-UW-SS1 100-UW-SS1 DI608 150x100 100x32 100x80 TO CENTRIFUGES 100x50 FLOW INDICATION UWH01_FT1_STAAI 50-UW-SS1 TRANSMITTER FAULT UWH01_FT1_FAULT DI609 TO CONVEYORS ISSUE/REVISION 80-UW-SS1 YARD PIPE 150-WP-PVC 150-WP-SS TO CENTRIFUGE FEED PUMPS UWH01_FT1 IN-PLANT PIPE M 150-WP-SS 32-UW-PCV80 TO HOSE STATIONS (LOWER LEVEL) FROM POTABLE WATER SERVICE Printed on ___% Post-Consumer Recycled Content Paper DI607 150x32 SEE MECHANICAL DRAWINGS FOR CONTINUATION 0 2013-10-09 I/R DATE ISSUE FOR TENDER DESCRIPTION KEY PLAN 32-WP-CU TO BUILDING SERVICES SEE MECH DRAWINGS PROJECT NUMBER 60246477 SHEET TITLE P&ID RMF PLANT UTILITY WATER AND MISCELLANEOUS SHEET NUMBER DI616 ISO A1 594mm x 841mm DI618 DI618 HYDRAULIC POWER UNIT No 4 HPU40 Approved: _____ RSP11_SV1 M RSP11_PSH RSP11_IC1 Checked: _____ 200-CS-SS2 50-CS-SS2 Designer: _____ PSH VS 250x150 HYDRAULIC POWER UNIT No. 3 HPU30 PI M M ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 250x50 RSP10_AT1 150x250 CLIENT RSP10_FT1 SEDIMENTATION SLUDGE TRANSFER PUMP RSP11 RSP10_IC1 CONTAINMENT M M DI618 RSP12_PSH RSP12_IC1 ELGIN AREA WATER SUPPLY SYSTEM RSP10_OC1 SS I M RSP12_SV1 Project Management Initials: M I HPU30_LSL SS LOR HS HS RESIDUALS MANAGEMENT FACILITY RSP10_OC2 HPU30_TSH PI M TO SEDIMENTATION SLUDGE TANKS PSH VS M 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com UTILITY WATER 250x150 PROJECT 150x250 SEDIMENTATION SLUDGE TRANSFER PUMP RSP12 SLC11_SV1 (NOTE 2) 200-CS-SS S SED11_LT1 NOTE: DENOTES DEVICES TO BE SUPPLIED BY GENERAL CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED BY THE VENDOR PLC SCP30 SED11_SV1 CROSS COLLECTOR #1 MAIN COLLECTOR No 1 (NOTE 2) REGISTRATION SED12_SV1 S EX SEDIMENTATION BASIN No 1 SECTION 2 SED12 MAIN COLLECTOR No 2 (NOTE 2) HPU10_TSH HPU10_LSL SS LOR HS HS FROM EX FLOCCULATION TANK No 1 M ISSUE/REVISION SED13_SV1 HYDRAULIC POWER UNIT No. 1 HPU10 S CROSS COLLECTOR #2 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG S EX SEDIMENTATION BASIN No 1 SECTION 1 SED11 CONTAINMENT EX SEDIMENTATION BASIN No 1 SECTION 3 SED13 MAIN COLLECTOR No 3 (NOTE 2) 0 2013-10-09 DI618 I/R DATE DI618 KEY PLAN ISSUE FOR TENDER DESCRIPTION HYDRAULIC POWER UNIT No 2 HPU20 PROJECT NUMBER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO TANKS/SCRAPERS. NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE SUPPLED BY CONTRACTOR AND WILL BE MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE SCRAPER PLC #1. Printed on ___% Post-Consumer Recycled Content Paper 60246477 (NOTE 2) S SHEET TITLE SLC13_SV1 TO EX FILTERS 300-SD-DI TO PLANT DRAIN P&ID SEDIMENTATION BASIN No1 SLUDGE SCRAPER SYSTEM SHEET NUMBER DI617 ISO A1 594mm x 841mm DI617 DI617 HYDRAULIC POWER UNIT No 3 HPU30 Approved: _____ RSP21_SV1 M RSP21_PSH RSP21_IC1 Checked: _____ 200-CS-SS2 50-CS-SS2 Designer: _____ PSH VS 250x150 HYDRAULIC POWER UNIT No. 4 HPU40 PI M M ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 250x50 RSP20_AT1 150x250 CLIENT RSP20_FT1 SEDIMENTATION SLUDGE TRANSFER PUMP RSP21 RSP20_IC1 CONTAINMENT ELGIN AREA WATER SUPPLY SYSTEM RSP20_OC1 SS M I M M RSP22_SV1 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca 250-CS-SS2 RSP22_PSH RSP22_IC1 Project Management Initials: M I HPU40_LSL SS LOR HS HS RESIDUALS MANAGEMENT FACILITY RSP20_OC2 HPU40_TSH PI M PSH VS M CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com UTILITY WATER 250x150 150x250 SEDIMENTATION SLUDGE TRANSFER PUMP RSP22 DI617 SLUDGE TRANSFER LINE PROJECT 250-CS-SS2 DI604 SLC21_SV1 TO SEDIMENTATION SLUDGE TANKS (NOTE 2) 200-CS-SS S SED21_SV1 SED21_LT1 NOTE: DENOTES DEVICES TO BE SUPPLIED BY GENERAL CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED BY THE VENDOR PLC SCP31 SED21_SV1 CROSS COLLECTOR #3 MAIN COLLECTOR No 4 (NOTE 2) REGISTRATION SED22_SV1 S EX SEDIMENTATION BASIN No 2 SECTION 2 SED22 MAIN COLLECTOR No 5 HPU20_TSH (NOTE 2) HPU20_LSL SS LOR HS HS FROM EX FLOCCULATION TANK No 1 M ISSUE/REVISION SED23_SV1 HYDRAULIC POWER UNIT No. 2 HPU20 S CROSS COLLECTOR #4 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG S EX SEDIMENTATION BASIN No 2 SECTION 1 SED21 CONTAINMENT EX SEDIMENTATION BASIN No 2 SECTION 3 SED23 MAIN COLLECTOR No 6 (NOTE 2) 0 2013-10-09 DI617 I/R DATE DI617 KEY PLAN ISSUE FOR TENDER DESCRIPTION HYDRAULIC POWER UNIT No 1 HPU10 PROJECT NUMBER NOTES: NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_". NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO TANKS/SCRAPERS. NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE SUPPLED BY CONTRACTOR AND WILL BE MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE SCRAPER PLC #1. Printed on ___% Post-Consumer Recycled Content Paper 60246477 (NOTE 2) S SHEET TITLE SLC23_SV1 TO EX FILTERS 300-SD-DI TO PLANT DRAIN P&ID SEDIMENTATION BASIN No2 SLUDGE SCRAPER SYSTEM SHEET NUMBER DI618 ISO A1 594mm x 841mm ELGIN AREA WATER TREATMENT PLANT PROJECT CNET CNET CNET RPFM CNET CNET RPFM CNET CNET CNET CNET RPFM CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 F F CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CLIENT Existing Cisco Catalyst 2960 Ethernet Switch F Designer: _____ RESIDUALS MANAGEMENT FACILITY RPU01 CNET CNET CNET CNET RPA CNET CNET CNET CNET CNET Checked: _____ CNET CNET CNET CNET Approved: _____ RPU02 CNET CNET CNET ELGIN AREA WATER SUPPLY SYSTEM F RPFM RPFM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F Existing Cisco Catalyst 2960 Ethernet Switch F F F CONSULTANT F F F F F F F F F F F F F F F F F F F F F F F To Existing Wireless Switches F F F F F F F F F F F F AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com F F F F F F F F F F Project Management Initials: F F CNET RPA F CNET F F F F F F F F F F F CHEMICAL AREA Existing Media Converters F Existing Fibre Optic Patch Panel EAW-FPP-01 F F F F EAW_NCP30 EAW_UPS30 F C/F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F EXISTING PLC NETWORK COMMUNICATION PANEL No. 2 F F F F F F F F F F F F F F F EAW_SWI30 F F IP: XXX.XXX.XXX.XX F F F F F F F EAW_SCP31 EAW_SWI31 F F F F F F F F F F F F F F F EAW_SWI32 EAW-FPP-20 C/F DNET CNET EAW_OIT31 IP: XXX.XXX.XXX.XX Control Room Workstation REGISTRATION TO STANDALONE CONTROLLERS RACK1 EAW_SWI20 CNET RMF Comms Panel CNET Centrifuge No. 1 Vendor OIT IP: XXX.XXX.XXX.XX IP: XXX.XXX.XXX.XX Control Room Workstation DeviceNet To New MCC Wireless AP (Floor 1) EAW_WAP20 CNET Centrifuge No. 1 Vendor OIT IP: XXX.XXX.XXX.XX CNET Main UPS IP: XXX.XXX.XXX.XX BACNET Sedimentation Basin No. 1 Sludge Scraper System Vendor PLC IP: XXX.XXX.XXX.XX CNET CNET CNET Wireless AP (Floor 2) EAW_WAP21 Wireless AP (Floor 3) EAW_WAP22 RACK2 CNET CNET CNET Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG EAW_PLC20 RMF Plant PLC IP: XXX.XXX.XXX.XX CNET EAW_OIT30 Existing Fibre Optic Patch Panel EAW-FPP-02 EAW_CPU_21 EAW_UPS20 F F Sedimentation Basin No. 1 Sludge Scraper System Vendor PLC IP: XXX.XXX.XXX.XX Printed on ___% Post-Consumer Recycled Content Paper F EAW_PLC31 EAW_CPU20 EAW_NCP20 EAW_SCP20 RACK0 EAW_PLC30 RESIDUALS MANAGEMENT AREA F F EAW_SCP30 ISSUE/REVISION CNET CNET EAW_SCP21 EAW_SWI21 EAW_PLC21 C/F BACNET EAW_SCP22 EAW_SWI22 EAW_SCP23 EAW_SCP25 EAW_SCP27 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION EAW_SCP29 EAW_PLC23 EAW_PLC25 EAW_PLC27 EAW_PLC29 Backwash Waste Thickener No. 1 Vendor PLC IP: XXX.XXX.XXX.XX Sedimentation Thickener No. 1 Vendor PLC IP: XXX.XXX.XXX.XX Polymer (Thickener) Vendor PLC IP: XXX.XXX.XXX.XX Truck Unloading System Vendor PLC IP: XXX.XXX.XXX.XX EAW_SCP24 EAW_PLC24 EAW_SCP26 EAW_PLC26 EAW_SCP28 EAW_PLC28 KEY PLAN EAW_PLC22 Centrifuge No. 1 Vendor PLC IP: XXX.XXX.XXX.XX Centrifuge No. 2 Vendor PLC IP: XXX.XXX.XXX.XX EAW_OIT21 EAW_OIT22 PROJECT NUMBER CNET RPA RPFM ACN15 CNET 60246477 F SHEET TITLE F DNET DNET Centrifuge No. 1 Vendor OIT IP: XXX.XXX.XXX.XX Centrifuge No. 2 Vendor OIT IP: XXX.XXX.XXX.XX Backwash Waste Thickener No. 2 Vendor PLC IP: XXX.XXX.XXX.XX Sedimentation Thickener No. 2 Vendor PLC IP: XXX.XXX.XXX.XX Polymer (Dewatering) Vendor PLC IP: XXX.XXX.XXX.XX GENERAL SCADA Network Architecture SHEET NUMBER DI620 ISO A1 594mm x 841mm Approved: _____ PROJECT RESIDUALS MANAGEMENT FACILITY 2997 mm Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT 2286 mm AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com 150 mm Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG REGISTRATION Printed on ___% Post-Consumer Recycled Content Paper ISSUE/REVISION 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE RMF CONTROL PANEL SHEET NUMBER DI621 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com + REGISTRATION Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG + Printed on ___% Post-Consumer Recycled Content Paper ISSUE/REVISION 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE CONTROL PANEL SCP-20 POWER DISTRIBUTION SHEET NUMBER DI622 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG REGISTRATION Printed on ___% Post-Consumer Recycled Content Paper ISSUE/REVISION 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE CONTROL PANEL SCP-20 POWER DISTRIBUTION (CONTINUED) SHEET NUMBER DI623 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG REGISTRATION Printed on ___% Post-Consumer Recycled Content Paper ISSUE/REVISION 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE NOTES: CONTROL PANEL SCP-20 RACK LAYOUT SHEET NUMBER DI624 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG REGISTRATION Printed on ___% Post-Consumer Recycled Content Paper ISSUE/REVISION 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE NOTES: CONTROL PANEL SCP-20 RACK LAYOUT (CONTINUED) SHEET NUMBER DI625 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT Designer: _____ ELGIN AREA WATER SUPPLY SYSTEM Project Management Initials: 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG REGISTRATION Printed on ___% Post-Consumer Recycled Content Paper ISSUE/REVISION 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN PROJECT NUMBER 60246477 SHEET TITLE TYPICAL LOOP DRAWING EXAMPLES SHEET NUMBER DI626 ISO A1 594mm x 841mm PROJECT Checked: _____ Approved: _____ ITEM # WALL-MOUNT SWING OUT RACK 2 LOCKABLE FRONT TINTED WINDOW DOOR 3 24 PORT MANAGED SWITCH ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 4 RACK SHELF Designer: _____ 1 RESIDUALS MANAGEMENT FACILITY 5 MEDIA CONVERTER 6 FIBER HOUSING PANEL Project Management Initials: 627 DESCRIPTION 7 FIBER ADAPTER PLATES CLIENT ELGIN AREA WATER SUPPLY SYSTEM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca 653 CONSULTANT 8 CABLE MANAGEMENT RACK 9 POWER DISTRIBUTION UNIT/BAR 10 AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com PUNCHDOWN COPPER PATCH PANEL 610 TOP VIEW REGISTRATION 1 653 Printed on ___% Post-Consumer Recycled Content Paper 508 3 5 Cisco Systems 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 36 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 4 BLACK BOX XMT RCV 100 Mbps 10 6 7 ISSUE/REVISION 705 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG 2 8 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION 9 KEY PLAN NOTES: FRONT VIEW (DOOR REMOVED) SIDE VIEW PROJECT NUMBER 60246477 SHEET TITLE GENERAL SCADA Residual Management Area Network Panel Layout (EAW_NCP20) SHEET NUMBER DI627 ISO A1 594mm x 841mm PROJECT ITEM # DESCRIPTION Approved: _____ Checked: _____ MEDIA CONVERTER 3 Designer: _____ 2 1 5 24VDC POWER SUPPY 6 MAIN CIRCUIT BREAKER Project Management Initials: NEMA 4X FIBERGLASS REINFORCED PLASTIC (FRP) WALL-MOUNT HINGED DOOR 7 120 VAC CIRCUIT BREAKERS 6 PORT MANAGED SWITCH 4 24VDC REDUNDANCY MODULE RESIDUALS MANAGEMENT FACILITY ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 CLIENT ELGIN AREA WATER SUPPLY SYSTEM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT TOP VIEW 8 24VDC CIRCUIT BREAKERS 9 SURGE PROTECTOR 10 UTILITY DUPLEX RECEPTACLE 11 UPS SIMPLEX RECEPTACLE 12 GROUNDING BAR 13 2" x 3" DEEP PANDUIT 14 PANEL LIGHT 15 TOWER UPS 16 STANDARD TERMINALS AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com 825 2 4 3 1 5 345 329 275 Allen-Bradley BLACK BOX 100 Mbps 17 Stratix 5700 1 2 Express Setup 1 14 REGISTRATION DC2 Pwr A DC+ 3 XMT DC- 17 Pwr B 4 RCV DC+ DIN RAIL 5 Com IN2 1 Ref 13 IN1 Printed on ___% Post-Consumer Recycled Content Paper 16 11 10 1084 9 939 7 1025 Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG 6 8 ISSUE/REVISION 15 12 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN NOTES: 740 FRONT VIEW (DOOR REMOVED) PROJECT NUMBER SIDE VIEW 60246477 SHEET TITLE GENERAL SCADA Settling / Sedimentation (Chemical Area) Network Panel Layout (EAW_NCP30) SHEET NUMBER DI628 ISO A1 594mm x 841mm PROJECT Approved: _____ RESIDUALS MANAGEMENT FACILITY Checked: _____ ELGIN AREA WATER TREATMENT PLANT 43665 Dexter Line Central Elgin, Ontario N0L 2L0 120 VAC FROM EXISTING LP CLIENT TO GND BUS Designer: _____ BRK01 (15A) DOOR SWITCH Project Management Initials: BKR02 (5A) FLUORESCENT LIGHT ELGIN AREA WATER SUPPLY SYSTEM 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519.930.3505 tel 519.474.00451 fax www.watersupply.london.ca CONSULTANT BKR03 (5A) AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519.673.0510 tel 519.673.5975 fax www.aecom.com UTILITY #12 AWG WHITE #12 AWG RED BKR04 (15A) UPS #12 AWG WHITE #12 AWG RED BKR05 (5A) SPARE UPS UNIT #12 AWG GREEN REGISTRATION #12 AWG BLUE #12 AWG WHITE BKR06 (5A) Last saved: (2013-10-04) Last Plotted: 2013-10-04 Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG MEDIA CONVERTER Printed on ___% Post-Consumer Recycled Content Paper 24VDCPS1 BKR07 (5A) 24 VDC POWER SUPPLY + 24VDCPS2 BKR08 (5A) ISSUE/REVISION 24 VDC POWER SUPPLY #14 AWG BLACK + +V IN 1 +V IN 2 +V OUT #14 AWG WHITE REDUNDANCY MODULE #14 AWG BLACK 0 2013-10-09 I/R DATE ISSUED FOR TENDER DESCRIPTION KEY PLAN 5A CB01 NETWORK SWITCH 5A CB02 SPARE PROJECT NUMBER 60246477 SHEET TITLE GENERAL SCADA Settling/Sedimentation (Chemical Area) NP Power Schematic (EAW_NCP30) SHEET NUMBER DI629