Instrumentation Drawings

advertisement
ISO A1 594mm x 841mm
PROJECT
Approved: _____
VALVE & GATE SYMBOLS
PRIMARY ELEMENT SYMBOLS
Checked: _____
FLOW
MISCELLANEOUS SYMBOLS
ACTUATOR SYMBOLS
ELECTROMAGNETIC
DIAPHRAGM SEAL
BUBBLE TUBE
Designer: _____
PURGE SET
ANNULAR DIAPHRAGM
ULTRASONIC
ULTRASONIC CLAMP-ON
OR DOPPLER
CYLINDER
SELF CONTAINED
AIR SUPPLY
AS
ULTRASONIC IN-LINE
Project Management Initials:
VENTURI
XP
GLOBE VALVE
M
MOTOR
XX
RUPTURE DISK
(PRESSURE RELIEF)
CAPACITANCE
E
ELECTRODES
(WITH HOLDER)
PROPELLER OR TURBINE
VORTEX
RUPTURE DISK
(VACUUM RELIEF)
FLOAT
(REGULATED SIDE)
TARGET
T
TRAP
X
EQUIPMENT
CONNECTION WITH
ELECTRICAL
INTERLOCK
H
E
PRESSURE REGULATOR
H
M
PITOT TUBE
VENT TO
ATMOSPHERE
TEMPERATURE
SIGHT GLASS
NOTE X:
F=FLOW
L=LEVEL
XG
S
GATE, OR
(OTHER) IN-LINE VALVE
BALL CHECK VALVE
BALL VALVE
PLUG VALVE
THREE WAY VALVE
(ARROW IF SHOWN
INDICATES FAIL OPEN
PATH)
KNIFE GATE
HYDRAMOTOR
ELECTROHYDRAULIC
MANUAL (SHOWN ONLY FOR HAND OPERATED VALVES
EQUIPPED WITH POSITION MONITORING
INSTRUMENTS)
TELESCOPING VALVE
ELECTRIC
DAMPER OR LOUVER
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
PINCH VALVE
SLEEVE VALVE
XX
OPTICAL
FI
P
FLOW
STRAIGHTENER
ELECTROPNEUMATIC
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
PRESSURE OR VACUUM RELIEF
SPRING OR WEIGHT LOADED
NOTE X:
W=WATER
A=AIR
ORIFICE PLATE
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
SLUICE GATE
PREFABRICATED SLIDE GATE
SOLENOID
XX
COMBINDIATION
AIR/VACUUM VALVE
ROTAMETER
TE
XX
TEMPERATURE ELEMENT
WITH WELL
XX
TE
TEMPERATURE ELEMENT
SURFACE MOUNT
WEIR
AVERAGING
PITOT TUBE
FLOW NOZZLE
XX
DP
DEVICE INTERFACE
DRAIN POINT
RECIPROCATING
PUMP (PD)
CENTRIFUGAL COMPRESSOR
OR BLOWER
XX
FIELD MOUNTED
SAMPLE POINT
FC
FLUSHING CONNECTION
RECIPROCATING
COMPRESSOR (PD)
XX
ROTARY
PUMP (PD)
XX
I
XX
XX
INPUTS & OUTPUTS TO SHARED OR
PROGRAMMABLE LOGIC CONTROLLER
RESET
OR
OR LOGIC
YY
A CONTROL PANEL (CP) PACKAGED WITH MECHANICAL
EQUIPMENT OR A SYSTEM IS SHOWN WITH FACE OF PANEL
MOUNTED INSTRUMENTS & EXTERNAL INTERFACE SIGNALS
SIMILAR TO MC & VSD PANELS.
4.
CONTROL PANELS (CP) OTHER THAN THOSE PREVIOUSLY DESCRIBED ARE SHOWN WITH FACE & INTERIOR OF PANEL
MOUNTED INSTRUMENTS.
5.
SEE ELECTRICAL DRAWINGS FOR MC & VFD LOCATIONS WITHIN
THE MCC.
X
PULSE OUTPUT
X: BLANK = TIME DURATION
(PULSE WIDTH)
F = PULSE TRAIN
T = TRIAC
6.
PIPING, EQUIPMENT & INSTRUMENTS WHICH ARE EXISTING OR
FURNISHED BY OTHERS ARE SHOWN LIGHT-LINED (HALF-TONE)
XX
HS
YY
DIGITAL INPUT
PANEL MOUNTED SWITCH
STATIC MIXER
COMPRESSOR
3.
FIELD SWITCH
YY
EJECTOR
MOTOR CONTROL (MC) & VARIABLE SPEED DRIVE (VSD) PANELS
ARE SHOWN WITH FACE OF PANEL MOUNTED INSTRUMENTS &
EXTERNAL INTERFACE SIGNALS ONLY.
YY
XX
HS
MOTOR CONTROL CENTER
MOUNTED
2.
ANALOG OUTPUT
PULSE INPUT
MOTOR
THIS IS A GENERAL P & ID SYMBOL SHEET. SOME SYMBOLS OR
NOTATIONS MAY NOT BE USED ON THIS PROJECT.
YY
ANALOG INPUT
ROTARY
COMPRESSOR (PD)
XX
XX
HS
MCC MOUNTED SWITCH
INTERIOR OF MCC
MOUNTED
X
EXISTING OR FURNISHED BY OTHERS
DIGITAL OUTPUT
X: BLANK = MAINTAINED
(ELECTRICALLY
HELD)
M = MOMENTARY
L = LATCHED
(MAGNETICALLY
OR MECHANICALLY
HELD)
EXAMPLE OF
INSTRUMENTS SHARING
COMMON HOUSING
PIPE LINE DESCRIPTION KEY
250-CS-SS1
YY: MEASURED VARIABLE OR OUTPUT FUNCTION
FROM INSTRUMENT IDENTIFICATION TABLE
PIPE MATERIAL
YN ON DIGITAL INPUT INDICATES COMPUTER/HAND
SWITCH STATUS
XX
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
FLOW STREAM IDENTIFICATION
CONNECTION
TO/FROM RPU/PLC
SHARED DISPLAY/ CONTROL
ACCESSIBLE TO OPERATOR
ON MAIN CONTROL CONSOLE
PIPE MATERIAL IDENTIFICATION
NOTE:
ROTARY
LOBE PUMP
0
NOMINAL PIPE SIZE
HEAT
EXCHANGER
PROGRESSIVE
CAVITY PUMP
ISSUE/REVISION
NEW
NOTE:
MCC PILOT LIGHT
SUMP PUMP
MUD VALVE
1.
AND LOGIC
A
MIXER
TURBINE
BACKFLOW PREVENTOR
GENERAL NOTES
PANEL PILOT LIGHT
SCREW PUMP
AUTO AIR RELEASE
VALVE
FLAP GATE
XX: FO = FAIL OPEN
FC = FAIL CLOSED
FI = FAIL TO INTERMEDIATE POSITION
BLANK = FAIL TO LAST POSITION
INTERLOCK LOGIC
R
INTERIOR OF PANEL
MOUNTED
CENTRIFUGAL
PUMP
(WET PIT)
ON LOSS OF PRIMARY POWER (PNEUMATIC OR ELECTRICAL)
YY
FACE OF PANEL
MOUNTED
XX
SP
NOTE:
INSTRUMENT & FUNCTION SYMBOLS
PILOT LIGHT
XX
F=FLUSHING WATER
L=LUBE OIL
S=SEAL WATER
DIAPHRAGM (PRESSURE BALANCED)
PRESSURE RELIEF VALVE
REGISTRATION
EQUIPMENT SYMBOLS
CENTRIFUGAL
PUMP
(DRY PIT)
NOTE X:
DD
NNN
DIAPHRAGM (SPRING OPPOSED)
PRESSURE GAUGE
X
AIR GAP
FLUME
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
CHECK VALVE
XX
E
Printed on ___% Post-Consumer
Recycled Content Paper
PRESSURE REDUCING
LEVEL
M
XX
BUTTERFLY VALVE,
DAMPER OR LOUVER
RESIDUALS
MANAGEMENT
FACILITY
NOTE XX : CS = CONSTANT SPEED
2S = TWO SPEED
VS = VARIABLE SPEED
PD : POSITIVE DISPLACEMENT
XX: SEE PAGE 2 OF THE P&ID LEGEND
SS1
- 316L STAINLESS STEEL,
SCH 10s
SS2
- 316L STAINLESS STEEL,
SCH 40s
PVC
- SCH 40 PVC
PVC80
- SCH 80 PVC
CPVC
- SCH 80 CPVC
REFER TO SPECIFICATIONS FOR COMPLETE PIPE MATERIAL
DESIGNATION
PROJECT NUMBER
60246477
SHEET TITLE
P&ID
LEGEND AND
GENERAL NOTES 1
SHEET NUMBER
DI601
ISO A1 594mm x 841mm
Approved: _____
PROJECT
INSTRUMENT IDENTIFICATION TABLE
INSTRUMENT & FUNCTION TAGGING
EXPLANATORY NOTATIONS
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
Checked: _____
ISA-S5.1-1984
FIRST LETTER
LETTER
Project Management Initials:
Designer: _____
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
SUCCEEDING LETTERS
MEASURED OR
INITIATING VARIABLE
MODIFIER
ANALYSIS (2)
BURNER, COMBUSTION
DENSITY
VOLTAGE
FLOW RATE
READOUT OR
PASSIVE FUNCTION
OUTPUT FUNCTION
S-PPP
EEE ##
CLOSE, STOP, DECREASE (1)
CONTROL
OPEN, START, INCREASE (1)
III
FAIL (1)
PRESSURE, VACUUM
QUANTITY (2)
RADIATION
SPEED, FREQUENCY
TEMPERATURE
MULTIVARIABLE (2)
VIBRATION, MECHANICAL ANALYSIS
WEIGHT, FORCE
UNCLASSIFIED (2)
EVENT, STATE, PRESENCE
POSITION, DIMENSION
A
B
D
E
F
H
I
2/3:
FLOW STREAM & INSTRUMENT LINE SYMBOLS
INDICATE
LIGHT
MOTOR (1)
ORIFICE, RESTRICTION
POINT (TEST) CONNECTION
XX
LOW (CLOSED)
MIDDLE OR INTERMEDIATE
ON OR OPERATE (1)
OVERLOAD (1)
MAIN FLOW STREAM
XX
SECONDARY FLOW STREAM
XX
OTHER FLOW STREAM
PUMP (1)
INTEGRATE, TOTALIZE
CLOSED CONDUITS
(DASHED LINE
INDICATES
ALTERNATE
FLOW STREAM)
RECORD
SAFETY
MULTIFUNCTION (2)
WELL
UNCLASSIFIED (2)
SWITCH
TRANSMIT
MULTIFUNCTION (2)
VALVE, DAMPER, LOUVER
UNCLASSIFIED (2)
RELAY, COMPUTE, CONVERT
DRIVER, ACTUATOR,
UNCLASSIFIED FINAL
CONTROL ELEMENT
XX
OPEN CHANNEL OR TANK FLOW STREAM
MULTIFUNCTION (2)
UNCLASSIFIED (2)
NOTE XX:
AM
CM
CAM
CL
FR
FOR
FS
FOS
HO
HOA
LR
LOR
LOS
LP
MFS
MOC
OC
OO
OOC
OSC
SS
ST
SP
ES
SELECTOR
SWITCH
(MAINTAINED
CONTACTS)
NOTE XX: FLOW STREAM IDENTIFICATION
ELECTRIC SIGNAL
SOFTWARE LINE
(1) USER'S CHOICE
ELECTROMAGNETIC OR SONIC SIGNAL
(2) WHEN USED, SYMBOL OR SIGNAL LINE IS ANNOTATED.
SPRING RETURN SWITCH
OR PUSHBUTTONS
(MOMENTARY
CONTACTS)
PNEUMATIC SIGNAL
FLOW STREAM IDENTIFICATION
*
L
L
L
L
HYDRAULIC SIGNAL
X
X
X
X
CAPILLARY TUBE
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
Printed on ___% Post-Consumer
Recycled Content Paper
BACKWASH WASTE THICKENED SLUDGE
BTS
BWW
BACKWASH WASTE THICKENER
SUPERNATANT
BACKWASH WASTE
CCS
CLARIFIER THICKENED SLUDGE
CEN
CENTRATE
CS
CLARIFIED SLUDGE
CTS
DS
CLARIFIER SLUDGE THICKENER
SUPERNATANT
DEWATERED SLUDGE
POL
POLYMER SOLUTION
SLU
BLENDED SLUDGE
STS
SODIUM THIOSULPHATE
XX
XX
XX
VT
VENT
* IDENTIFICATION MAY BE FOLLOWED BY A NUMBER
TO DIFFERENTIATE AMONG SIMILAR FLOW STREAMS.
FOR EXAMPLE, CH1 & CH2 WOULD REPRESENT
TWO DIFFERENT CHEMICAL FLOW STREAMS.
SIGNAL CONTINUATION
ON SAME DRAWING. X = 1,2,3,ETC.
X
FLOW STREAM TO OR FROM EQUIPMENT
NOT SHOWN ON OTHER DRAWINGS
GENERAL NOTES
1. THIS IS A GENERAL P & ID LEGEND SHEET. SOME SYMBOLS OR
NOTATIONS MAY NOT BE USED ON THIS PROJECT.
ABBREVIATIONS
AS
INSTRUMENT AIR SUPPLY
L/S
ECV
ELECTRIC CHECK VALVE
NC
NORMALLY CLOSED
ES
(F)
ELECTRICAL SUPPLY
NFC
NOT FULLY CLOSED
FURNISHED
NFO
NOT FULLY OPEN
FC
FAIL CLOSE
NO
NORMALLY OPEN
FI
FAIL INDETERMINATE
O/P
OUTPUT
FL
FAIL LOCKED
ORB
ORBIT VALVE
FO
FAIL OPEN
PV
PROCESS VARIABLE
FP
FULL PORT
REV
REVERSE
FWD
FORWARD
RV
RECIRCULATION VALVE
I/P
INPUT
SP
SET POINT
LITRES/SECOND
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
ANALYSIS INSTRUMENTS
TAPPED OR SAMPLED
SIGNAL NO. NN
FROM SHEET NO. XX
X
CLIENT
REGISTRATION
NON-CONNECTING LINES
FLOW STREAM NO. NN
TO SHEET NO. XX
AUTO/MANUAL
COMPUTER/MANUAL
COMPUTER/AUTO/MANUAL
COMPUTER/LOCAL
FORWARD/REVERSE
FORWARD/OFF/REVERSE
FAST/SLOW
FAST/OFF/SLOW
HAND/OFF
HAND/OFF/AUTO
LOCAL/REMOTE
LOCAL/OFF/REMOTE
LOCKOUT STOP
LOCAL/PLC
MODULATE FASTER/SLOWER
MODULATE OPEN/CLOSE
OPEN/CLOSE
ON/OFF
OPEN/OFF/CLOSE
OPEN/STOP/CLOSE
START/STOP
START
STOP
EMERGENCY STOP
"R", WHEN ADDED TO NOTATION, INDICATES REMOTE.
EXAMPLE: HOR = HAND/OFF/REMOTE
EXPOSED PROBE
OR GAS DETECTOR
NN/XX
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
2.
NOTE XX:
NN/XX
UTILITY WATER
MOTOR
ELECTROMAGNETIC, SONIC
PNEUMATIC
PULSE FREQUENCY
PULSE DURATION
RESISTANCE
"A", WHEN ADDED TO NOTATION, INDICATES AUTO.
EXAMPLE: HOA = HAND/OFF/AUTO
XX = ES-ELECTRICAL SUPPLY HS-HYDRAULIC SUPPLY
GS-GAS SUPPLY
NS-NITROGEN SUPPLY
REFER TO FLOW STREAM IDENTIFICATION FOR OTHER TYPES
OF SUPPLY
CONNECTING LINES
UW
=
=
=
=
=
=
1.
INSTRUMENT SUPPLY OR CONNECTION TO PROCESS
BCS
M
O
P
PF
PD
R
ANALOG
BINARY
DIGITAL
VOLTAGE
FREQUENCY
HYDRAULIC
CURRENT
HAND SWITCHES
CONTROL STATION
MOMENTARY
=
=
=
=
=
=
=
SMALL CIRCLE SIGNIFIES
LOGICAL INVERSION OF SIGNAL
HIGH (OPENED)
SCAN
TIME RATE OF CHANGE
PROCESS OR INITIATING VARIABLE
I I =I FUCTIONAL INSTRUMENT IDENTIFICATION
LETTERS FROM INSTRUMENT IDENTIFICATION
TABLE
GLASS, VIEWING DEVICE
HAND
CURRENT (ELECTRICAL)
POWER
TIME, TIME SCHEDULE
LEVEL
MOTOR, MOTION (1)
1:
EEE = LOOP NUMBER
SENSOR (PRIMARY ELEMENT)
RATIO (FRACTION)
NOTE
PPP = IF USED, ONE TO THREE ALPHANUMERIC
CHARACTERS TO IDENTIFY BUILDING OR
PROCESS
MODIFIER
ALARM
DIFFERENTIAL
SIGNAL CONVERTERS
S = IF USED, ONE NUMERIC OR CHARACTER TO
IDENTIFY A FACILITY SECTION
RESIDUALS
MANAGEMENT
FACILITY
IN-LINE
COL
CDG
CG
CH4
CLG
CLR
COG
DO
HC
HUM
H2S
MHO
NOG
NH4
N2G
OG
ORP
OUR
OZG
PH
SD
SO2
SS
TOC
TRB
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
COLOUR
CARBON DIOXIDE GAS
COMBUSTIBLE GAS
METHANE
CHLORINE GAS
CHLORINE RESIDUAL
CARBON MONOXIDE GAS
DISSOLVED OXYGEN
HYDROCARBONS
HUMIDITY
HYDROGEN SULFIDE
CONDUCTIVITY
NITRIC OXIDE GAS
AMMONIA
NITROGEN GAS
OXYGEN GAS
OXIDATION REDUCTION POT.
OXYGEN UPTAKE RATE
OZONE GAS
pH
SOLIDS DENSITY
SULPHUR DIOXIDE GAS
SUSPENDED SOLIDS
TOTAL ORGANIC CARBON
TURBIDITY
ISSUE/REVISION
EQUIPMENT DESCRIPTORS
PMP
SMP
VLV
FLM
PRM
TPM
PRS
LVS
BCH
BLD
GEN
ATS
UPS
PFR
UPM
ICP
GCP
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
PUMP
SUMP PUMP
VALVE
FLOW METER
PRESSURE METER
TEMPERATURE METER
PRESSURE SWITCH
LEVEL SWITCH
BATTERY CHARGER
BUILDING SERVICES
GENERATOR
AUTOMATIC TRANSFER SWITCH
UNINTERRUPTIBLE POWER SUPPLY
POWER FAIL RELAY
UNIVERSAL POWER METER
INSTRUMENT CONTROL PANEL
GENERATOR CONTROL PANEL
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
P&ID
LEGEND AND
GENERAL NOTES 2
SHEET NUMBER
DI602
ISO A1 594mm x 841mm
PROJECT
READY STATUS
READY STATUS
DEVICENET
BWP03_VFD_START
LOCAL/REMOTE STATUS
BWP03_VFD_REMOT
Designer: _____
ORP INDICATION
LOCAL/REMOTE STATUS
BWP02_VFD_REMOT
BWP01_VFD_START
CLIENT
LOCAL/REMOTE STATUS
BWP01_VFD_REMOT
ELGIN AREA WATER
SUPPLY SYSTEM
RUNNING STATUS
BWP01_VFD_RUNNG
FAULT STATUS
FAULT STATUS
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
BWP01_VFD_FAULT
BWP02_VFD_FAULT
BWT01_AT1_FAULT
BWT01_LT1
10-STS-CPVC
MOTOR CURRENT
MOTOR CURRENT
MOTOR CURRENT
BWP01_VFD_STAAI
BWP02_VFD_STAAI
BWP03_VFD_STAAI
HIGH PRESSURE
HIGH PRESSURE
HIGH PRESSURE
CONSULTANT
BWP01_PSH_ALMDI
BWP02_PSH_ALMDI
BWP03_PSH_ALMDI
80-PD-PVC
START/STOP COMMAND
BWP02_VFD_RUNNG
BWP03_VFD_FAULT
FROM SODIUM THIOSULPHATE
DOSING PUMPS
DI609
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
BWT01_AT1_STAAI
TRANSMITTER FAULT
Project Management Initials:
BWP02_VFD_START
BWP03_VFD_RUNNG
FAULT STATUS
DI615
START/STOP COMMAND
RUNNING STATUS
RUNNING STATUS
BWT01_V01_CLOSD
BWP01_VFD_FEDBK
DEVICENET
Checked: _____
START/STOP COMMAND
CLOSED STATUS
SPEED FEEDBACK
BWP02_VFD_FEDBK
BWP03_VFD_FEDBK
BWT02_LT1_FAULT
BWT01_LT1_FAULT
BWP01_VFD_SETPT
SPEED FEEDBACK
SPEED FEEDBACK
TRANSMITTER FAULT
TRANSMITTER FAULT
SPEED SETPOINT
BWP02_VFD_SETPT
BWP03_VFD_SETPT
BWT02_LT1_STAAI
BWT01_LT1_STAAI
RESIDUALS
MANAGEMENT
FACILITY
BWP01_VFD_READY
SPEED SETPOINT
SPEED SETPOINT
LEVEL INDICATION
LEVEL INDICATION
READY STATUS
BWP02_VFD_READY
DEVICENET
Approved: _____
BWP03_VFD_READY
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
NOTE 2
FROM CONVEYORS / TRUCK
LOADING STATIONS
LCP20
BWP01_PSH
BWT01_AT1
900-BWW-CPP
FROM FILTERS
DI608
CONNECTION TO
FUTURE PUMP
CONNECTION TO
FUTURE PUMP
M
250-CEN-SS1
100x200
400x200
200x150
400-BWW-SS1
200-BWW-SS1
300-CTS-SS1
BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP01
DP
DI605
TO BACKWASH
WASTE
CLARIFIER
CLF01
DP
LCP21
BWP02_PSH
BACKWASH WASTE
ZSL
EQUALIZATION
BASIN
BWT02
200-CS-SS1
FROM SEDIMENTATION
SLUDGE EQ TANKS
PI
I
PSH
M
DI607
REGISTRATION
100x200
150-SLU-SS1
400x200
200x150
200-BWW-SS1
FROM THICKENED
SLUDGE HOLDING TANK
VS
NOTE 2
BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP02
DP
DP
LCP22
CLOSED STATUS
DI615
10-STS-CPVC
BWP03_PSH
BWT02_V01_CLOSD
FROM SODIUM THIOSULPHATE
DOSING PUMPS
PI
I
BWT02_AT1
ORP INDICATION
PSH
AIT
BWT02_AT1_STAAI
ORP
TRANSMITTER FAULT
10-STS-CPVC
BWT02_AT1_FAULT
100x200
200x150
200-BWW-SS1
300-BWW-SS2
400-BWW-SS1
100-PD-PVC
FROM MAIN & 2nd FLOOR
PROCESS DRAINS
M
400x200
300-BWW-SS2
100-PD-PVC
FROM SODIUM THIOSULPHATE
DOSING PUMPS
AE
OVERFLOW
DI615
200-BWW-SS1
BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP03
ISSUE/REVISION
CONNECTION TO
FUTURE PUMP
900-BWW
LCP
NOTE 3
DEVICENET
LSL LSH1 LSH2 LSHH
TEMPERATURE INDICATION
BWT00_MX1_READY
PI
I
PSH
BWT00_TT1
TE
75-PD-PVC
TIT
200-BWW-SS1
BWT00_PSH
40
200x350
M
400x200
400-BWW-SS1
PROCESS DRAINS
SUMP PIT
SMT01
SMP01
SMP02
SUBMERSIBLE SUMP
PUMPS
DESCRIPTION
VS
BACKWASH WASTE
MIXING PUMP
BWT00_MX1
KEY PLAN
BWT00_MX1_FEDBK
START/STOP COMMAND
BWT00_MX1_START
LOCAL/REMOTE STATUS
DP
RUNNING STATUS
PROJECT NUMBER
60246477
BWT00_MX1_RUNNG
SHEET TITLE
FAULT STATUS
350x300
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s.
NOTE 3: FLAP GATE TO BE INSTALLED AT THE OVERFLOW PIPE
ENTRANCE TO DISCHARGE MH.
DATE
SPEED FEEDBACK
BWT00_MX1_REMOT
DP
I/R
ISSUE FOR TENDER
BWT00_MX1_SETPT
350x200
M
2013-10-09
SPEED SETPOINT
M
FROM LOWER FLOOR
PROCESS DRAINS
0
READY STATUS
LCP23
BWT00_TT1_STAAI
Printed on ___% Post-Consumer
Recycled Content Paper
TO BACKWASH
WASTE
CLARIFIER
CLF02
DP
CONNECTION TO
FUTURE PUMP
SMT01_LCP_ALMDI
40
DI605
VS
DP
GENERAL ALARM
50-PD-PVC
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
200-BWW-SS1
VS
FROM SEDIMENTATION
SLUDGE THICKENERS
DI604
PSH
ORP
AE
FROM
CENTRIFUGES
DI606
PI
I
AIT
BACKWASH WASTE
EQUALIZATION
BASIN
BWT01
ZSL
BWT02_LT1
BWT00_MX1_FAULT
350x300
MOTOR CURRENT
350-BWW-SS2
BWT00_MX1_STAAI
HIGH PRESSURE
BWT00_PSH_ALMDI
P&ID
BACKWASH WASTE EQUALIZATION
BASIN & TRANSFER PUMPS
SHEET NUMBER
DI603
ISO A1 594mm x 841mm
SPEED SETPOINT
SPEED SETPOINT
RSP03_VFD_SETPT
SPEED SETPOINT
RSP02_VFD_SETPT
SPEED FEEDBACK
RSP01_VFD_SETPT
SPEED FEEDBACK
RSP03_VFD_FEDBK
SPEED FEEDBACK
RSP02_VFD_FEDBK
RSP01_VFD_FEDBK
PROJECT
START/STOP COMMAND
RSP03_VFD_REMOT
RUNNING STATUS
RSP03_VFD_RUNNG
Checked: _____
FAULT STATUS
Designer: _____
RUNNING STATUS
RSP02_VFD_RUNNG
RSP01_VFD_REMOT
RUNNING STATUS
RSP01_VFD_RUNNG
RSP01_VFD_FAULT
READY STATUS
RSP03_VFD_READY
READY STATUS
RSP02_VFD_READY
MOTOR CURRENT
RSP01_VFD_STAAI
HIGH PRESSURE
RSP03_PSH_ALMDI
ELGIN AREA WATER
SUPPLY SYSTEM
MOTOR CURRENT
RSP02_VFD_STAAI
HIGH PRESSURE
CLIENT
RSP01_VFD_READY
MOTOR CURRENT
RSP03_VFD_STAAI
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
FAULT STATUS
RSP02_VFD_FAULT
READY STATUS
SED01_LT1_FAULT
RSP02_VFD_REMOT
RESIDUALS
MANAGEMENT
FACILITY
LOCAL/REMOTE STATUS
FAULT STATUS
RSP03_VFD_FAULT
TRANSMITTER FAULT
LOCAL/REMOTE STATUS
DEVICENET
DEVICENET
LOCAL/REMOTE STATUS
SED01_LT1_STAAI
RSP01_VFD_START
RSP02_VFD_START
DEVICENET
Approved: _____
RSP03_VFD_START
LEVEL INDICATION
START/STOP COMMAND
START/STOP COMMAND
HIGH PRESSURE
RSP02_PSH_ALMDI
RSP01_PSH_ALMDI
LEVEL INDICATION
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
SED02_LT1_STAAI
TRANSMITTER FAULT
LCP24
Project Management Initials:
SED02_LT1_FAULT
RSP01_PSH
CLOSED STATUS
SED01_V01_CLOSD
PI
I
CONSULTANT
PSH
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
SED01_LT1
CLOSED STATUS
SED02_V01_CLOSD
M
FLOOD ALARM
SED00_LSH_ALMDI
100x200
300x200
TO
SEDIMENTATION
SLUDGE
THICKENER
CLF03
NOTE 2
SEDIMENTATION SLUDGE
FROM
SEDIMENTATION
BASINS
300-CS-SS2
SED02_LT1
ZSL
LCP25
RSP02_PSH
250-CS-SS
PI
I
300-CS-SS2
ZSL
PSH
M
100x200
300x200
SEDIMENTATION SLUDGE
EQUALIZATION TANK
SED02
LSH
200x150
VS
200-CS-SS2
300-CS-SS2
SEDIMENTATION SLUDGE
REGISTRATION
DP
DP
VALVE CHAMBER
LCP26
NOTE 2
RSP03_PSH
PI
300-CS-SS2
I
PSH
M
100x200
300x200
250-CS-SS2
250-CS-SS2
200-CS-SS1
80 DRAIN
200-CS-SS2
200x150
DP
SEDIMENTATION SLUDGE
THICKENER FEED PUMP
RSP03
TO
SEDIMENTATION
SLUDGE
THICKENER
CLF04
DP
DEVICENET
CONNECTION TO
FUTURE PUMP
SPEED SETPOINT
SPEED FEEDBACK
SED00_PSH
CONNECTION TO
FUTURE PUMP
TIT
PI
I
SED00_TT1
ISSUE/REVISION
SED00_MX1_SETPT
LCP27
TE
DI606
VS
200-CS-SS2
250-CS
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
DP
DP
SEDIMENTATION SLUDGE
EQUALIZATION TANK
SED01
DI606
VS
200-CS-SS2
250-CS
DI618
200-CS-SS2
200x150
SED00_MX1_FEDBK
PSH
START/STOP COMMAND
SED00_MX1_START
TEMPERATURE INDICATION
SED00_TT1_STAAI
LOCAL/REMOTE STATUS
M
SED00_MX1_REMOT
100x250
300x250
250x200
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
RUNNING STATUS
200x150
SED00_MX1_RUNNG
VS
250-CS-SS2
0
KEY PLAN
FAULT STATUS
DP
250x200
SEDIMENTATION SLUDGE
MIXING PUMP
SED00_MX1
DP
SED00_MX1_FAULT
READY STATUS
SED00_MX1_READY
250x200
MOTOR CURRENT
250-CS-SS2
SED00_MX1_STAAI
HIGH PRESSURE
SED00_PSH_ALMDI
200-CS-SS1
PROJECT NUMBER
DI603
TO BACKWASH WASTE
EQUALIZATION BASIN
TO PLANT DRAIN
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s
Printed on ___% Post-Consumer
Recycled Content Paper
TO PLANT DRAIN
60246477
SHEET TITLE
P&ID
SEDIMENTATION SLUDGE EQ
BASIN & TRANSFER PUMPS
SHEET NUMBER
DI604
ISO A1 594mm x 841mm
OPEN COMMAND
CLF01_IC1_OPENN
PROJECT
CLOSE COMMAND
RESIDUALS
MANAGEMENT
FACILITY
Approved: _____
CLF01_IC1_CLOSE
LOCAL/REMOTE STATUS
CLF01_IC1_REMOT
OPENED STATUS
CLF01_IC1_OPEND
Checked: _____
FLOW INDICATION
CLF01_FT1_STAAI
CLF01_IC1_CLOSD
TRANSMITTER FAULT
FAULT STATUS
CLF01_FT1_FAULT
CLF01_IC1_FAULT
CLIENT
VENDOR
CONTROL PANEL
SCP23
20-POL-PVC80
DI612
Designer: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
THICKENER
VENDOR PACKAGE
CLOSED STATUS
ELGIN AREA WATER
SUPPLY SYSTEM
FROM POLYMER
SYSTEM
CLF01_AT2
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
TSS INDICATION
CLF01_AT1_STAAI
CLF01_MX1
Project Management Initials:
TRANSMITTER FAULT
M
CLF01_AT1_FAULT
CS
CLF01_MX2
CLF01_SLC
M
M
CS
CS
SS
CONSULTANT
CLF01_FT1
400x300
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
CLF01_IC1
M
CLF01_AT1
200x250
M
200-BWW-SS1
SS
BACKWASH WASTE
THICKENER/CLARIFIER
CLF01
FROM BACKWASH
WASTE TRANSFER
PUMP BWP01
OPEN COMMAND
CLF02_IC1_OPENN
CLF01_AT3
CLOSE COMMAND
CLF01_FT2
CLF02_IC1_CLOSE
SS
LOCAL/REMOTE STATUS
CLF01_0C1
300-BTS-SS1
DI603
M
CLF02_IC1_REMOT
200x100
OPENED STATUS
100-BCS-SS2
CLF02_IC1_OPEND
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
CLOSED STATUS
M
THICKENER
VENDOR PACKAGE
CLF02_IC1_CLOSD
REGISTRATION
FAULT STATUS
CLF02_IC1_FAULT
FLOW INDICATION
CLF02_FT1_STAAI
TRANSMITTER FAULT
VENDOR
CONTROL PANEL
SCP24
CLF02_FT1_FAULT
NOTE 2
CLF02_AT2
N/C
TO BWW
EQUALIZATION
BASIN
20-POL-PVC80
DI612
CLF02_MX1
FROM POLYMER
SYSTEM
M
TSS INDICATION
CS
CLF02_AT1_STAAI
TRANSMITTER FAULT
SS
CLF02_MX2
CLF02_SLC
M
M
CS
CS
CLF02_FT1
CLF02_AT1_FAULT
400x300
350-BTS-SS1
300-BTS-SS1
300x350
M
CLF02_AT1
M
CLF02_IC1
TO RMF
DISCHARGE
200x250
200-BWW-SS1
SS
ISSUE/REVISION
BACKWASH WASTE
THICKENER/CLARIFIER
CLF02
DI603
FROM BACKWASH
WASTE TRANSFER
PUMP BWP03
NOTE 2
TO BWW
EQUALIZATION
BASIN
CLF02_AT3
CLF02_FT2
SS
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
CLF02_0C1
M
200x100
100-BCS-SS2
M
DI607
TO THICKENED
SLUDGE HOLDING
TANKS
PROJECT NUMBER
DI606
FROM SEDIMENTATION
SLUDGE THICKENERS
DISCHARGE
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPE FOR TESTING/COMMISSIONING
NOTE 3:
DENOTES DEVICE PROVIDED BY CONTRACTOR,
CONNECTED AND CONTROLLED BY VENDOR'S PANEL
Printed on ___% Post-Consumer
Recycled Content Paper
300-CTS-SS1
60246477
SHEET TITLE
P&ID
BACKWASH WASTE
THICKENING
SHEET NUMBER
DI605
ISO A1 594mm x 841mm
OPEN COMMAND
CLF03_IC1_OPENN
CLOSE COMMAND
CLF03_IC1_CLOSE
PROJECT
LOCAL/REMOTE STATUS
RESIDUALS
MANAGEMENT
FACILITY
Approved: _____
CLF03_IC1_REMOT
OPENED STATUS
CLF03_IC1_OPEND
FLOW INDICATION
CLOSED STATUS
CLF03_FT1_STAAI
CLF03_IC1_CLOSD
TRANSMITTER FAULT
Checked: _____
THICKENER
VENDOR PACKAGE
CLF03_FT1_FAULT
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
VENDOR
CONTROL PANEL
SCP25
FAULT STATUS
CLF03_IC1_FAULT
CLIENT
Designer: _____
CLF03_MX1
FROM POLYMER
SYSTEM
M
CS
TSS INDICATION
CLF03_AT1_STAAI
CLF03_AT2
CLF03_MX2
CLF03_SLC
M
M
CS
CS
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
SS
CLF03_AT1
CLF03_FT1
TRANSMITTER FAULT
Project Management Initials:
ELGIN AREA WATER
SUPPLY SYSTEM
20-POL-PVC80
DI613
SS
CLF03_AT1_FAULT
250x200
CLF03_IC1
CONSULTANT
M
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
200x250
M
DI604
200-CS-SS2
FROM SEDIMENTATION
SLUDGE PUMP RSP01
SEDIMENTATION
SLUDGE THICKENER
CLF03
OPEN COMMAND
CLF04_IC1_OPENN
CLOSE COMMAND
CLF04_IC1_CLOSE
CLF03_AT3
LOCAL/REMOTE STATUS
SS
CLF03_OC1
M
OPENED STATUS
CLF04_IC1_OPEND
200-CCS-SS2
CLOSED STATUS
M
CLF04_IC1_CLOSD
200-CTS-SS1
CLF03_FT2
CLF04_IC1_REMOT
FAULT STATUS
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
CLF04_IC1_FAULT
THICKENER
VENDOR PACKAGE
REGISTRATION
VENDOR
CONTROL PANEL
SCP26
FLOW INDICATION
CLF04_FT1_STAAI
TRANSMITTER FAULT
CLF04_FT1_FAULT
CLF04_AT2
20-POL-PVC80
DI613
CLF04_MX1
FROM POLYMER
SYSTEM
M
CS
TSS INDICATION
CLF04_AT1_STAAI
SS
CLF04_MX2
CLF04_SLC
M
M
CS
CS
200x300
CLF04_AT1
CLF04_FT1
TRANSMITTER FAULT
CLF04_AT1_FAULT
250x200
CL04_IC1
SS
200x300
200-CTS-SS1
300-CTS-SS1
TO BACKWASH
WASTE EQUALIZATION
BASINS
200x250
DI604
200-CS-SS2
DI603
M
M
FROM SEDIMENTATION
SLUDGE PUMP RSP03
ISSUE/REVISION
NOTE 2
300-CTS-SS1
SEDIMENTATION
SLUDGE THICKENER
CLF04
DI605
N/C
TO
SEDIMENTATION
SLUDGE TANKS
CLF04_AT3
CLF04_FT2
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
SS
CLF04_OC1
M
200-CCS-SS2
M
200-CCS-SS2
DI607
TO THICKENED
SLUDGE HOLDING
TANKS
PROJECT NUMBER
NOTE 2
60246477
200-CCS-SS2
TO
SEDIMENTATION
SLUDGE TANKS
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPE FOR TESTING/COMMISSIONING
NOTE 3:
DENOTES DEVICE PROVIDED BY CONTRACTOR,
CONNECTED AND CONTROLLED BY VENDOR'S PANEL
Printed on ___% Post-Consumer
Recycled Content Paper
SHEET TITLE
P&ID
SEDIMENTATION SLUDGE
THICKENING
SHEET NUMBER
DI606
LOCAL/REMOTE STATUS
SFP03_VFD_REMOT
SLT00_MX1_REMOT
Approved: _____
SPEED SETPOINT
Checked: _____
SLT00_MX1_SETPT
SPEED FEEDBACK
LEVEL INDICATION
SFP03_VFD_SETPT
SPEED FEEDBACK
SPEED SETPOINT
SFP02_VFD_SETPT
SPEED FEEDBACK
MOTOR CURRENT
SFP02_OC1_CLOSE
SPEED FEEDBACK
SFP02_OC1_REMOT
READY STATUS
OPENED STATUS
SFP01_VFD_READY
SFP02_OC1_OPEND
MOTOR CURRENT
CLOSED STATUS
SFP01_VFD_STAAI
SFP02_VFD_STAAI
SFP02_OC1_CLOSD
LEVEL INDICATION
HIGH PRESSURE ALARM
SLT02_LT1_STAAI
HIGH PRESSURE ALARM
SLT01_PSH_ALMDI
HIGH PRESSURE ALARM
HIGH PRESSURE ALARM
SFP03_PSH_ALMDI
FAULT STATUS
SFP01_PSH_ALMDI
SFP02_PSH_ALMDI
SFP02_OC1_FAULT
TRANSMITTER FAULT
Project Management Initials:
SLT02_LT1_FAULT
LCP28
SLT01_LT1
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
I
SFP01_PSH
CLOSED STATUS
PI
M
SLT01_V02_CLSD
RESIDUALS
MANAGEMENT
FACILITY
LOCAL/REMOTE STATUS
SFP01_VFD_FEDBK
MOTOR CURRENT
SFP03_VFD_STAAI
CLOSE COMMAND
SFP01_VFD_SETPT
SFP02_VFD_READY
MOTOR CURRENT
SLT00_MX1_STAAI
SFP02_OC1_OPENN
SPEED SETPOINT
READY STATUS
SFP03_VFD_READY
OPEN COMMAND
SFP01_VFD_FAULT
SFP02_VFD_FEDBK
READY STATUS
SLT00_MX1_READY
SLT01_LT1_FAULT
Designer: _____
SPEED SETPOINT
SFP02_VFD_FAULT
SFP03_VFD_FEDBK
READY STATUS
TRANSMITTER FAULT
FAULT STATUS
FAULT STATUS
SFP03_VFD_FAULT
SLT00_MX1_FEDBK
SLT01_LT1_STAAI
SFP01_VFD_RUNNG
SFP02_VFD_RUNNG
FAULT STATUS
SLT00_MX1_FAULT
DEVICENET
FAULT STATUS
RUNNING STATUS
RUNNING STATUS
SFP03_VFD_RUNNG
SLT00_MX1_RUNNG
SFP01_VFD_REMOT
SFP02_VFD_REMOT
RUNNING STATUS
RUNNING STATUS
PROJECT
LOCAL/REMOTE STATUS
LOCAL/REMOTE STATUS
DEVICENET
LOCAL/REMOTE STATUS
SFP01_VFD_START
SFP02_VFD_START
DEVICENET
SLT00_MX1_START
START/STOP COMMAND
START/STOP COMMAND
SFP03_VFD_START
DEVICENET
ISO A1 594mm x 841mm
START/STOP COMMAND
START/STOP COMMAND
PSH
VS
CLOSED STATUS
SLT01_V01_CLSD
250x150
NOTE 2
150-SLU-SS2
DI608
ZSL
CENTRIFUGE
FEED PUMP
SFP01
LCP29
SLT02_LT1
ZSL
SFP02_OC1
300-SLU-SS2
SFP02_PSH
PI
M
100-BCS-SS2
PSH
VS
THICKENED SLUDGE
HOLDING TANK
SLT02
FROM BACKWASH
WASTE CLARIFIERS
250x150
150-SLU-SS2
150-SLU-SS2
ZSL
300-SLU-SS2
DI606
200-CCS-SS2
LCP30
SFP02_OC2
I
CLOSED STATUS
NOTE 2
SLT02_V01_CLSD
250-SLU-SS2
FROM
SEDIMENTATION
SLUDGE
THICKENERS
REGISTRATION
80-SLU-SS2
CENTRIFUGE
FEED PUMP
SFP02
ZSL
CLOSED STATUS
SLT02_V02_CLSD
M
SFP03_PSH
PI
M
PSH
VS
250x150
200-SLU-SS2
200-SLU-SS2
150-SLU-SS2
150-SLU-SS1
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
M
I
THICKENED SLUDGE
HOLDING TANK
SLT01
DI605
TO CENTRIFUGE
CEN01
CONNECTION TO
FUTURE PUMP
80-SLU-SS2
CENTRIFUGE
FEED PUMP
SFP03
LCP31
CONNECTION TO
FUTURE PUMP
DI608
TO CENTRIFUGE
CEN02
TEMPERATURE INDICATION
SLT00_TT1_STAAI
I
ISSUE/REVISION
SLT00_TT1
TE
SLT00_PSH
TIT
PI
M
PSH
VS
250x150
OPEN COMMAND
SFP02_OC2_OPENN
250-SLU-SS2
CLOSE COMMAND
SFP02_OC2_CLOSE
250x200
250x200
THICKENED SLUDGE
HOLDING TANK
MIXING PUMP
SLT00_MX1
100-SLU-SS2
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
LOCAL/REMOTE STATUS
SFP02_OC2_REMOT
KEY PLAN
OPENED STATUS
SFP02_OC2_OPEND
250-SLU-SS2
CLOSED STATUS
SFP02_OC2_CLOSD
FAULT STATUS
SFP02_OC2_FAULT
PROJECT NUMBER
TO PLANT DRAIN
100-SLU-SS2
80-SLU-SS2
DI616
SHEET TITLE
80-UW-PVC80
DI603
UTILITY WATER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s
Printed on ___% Post-Consumer
Recycled Content Paper
60246477
TO BWW EQ BASIN
P&ID
THICKENED SLUDGE HOLDING
TANK & CENTRIFUGE FEED PUMPS
SHEET NUMBER
DI607
ISO A1 594mm x 841mm
PROJECT
TSS INDICATION
CEN01_AT1_STAAI
Approved: _____
FEED PUMP START
PERMISSIVE
FLOW INDICATION
CEN01_FT1_STAAI
TRANSMITTER FAULT
SLUDGE CONVEYANCE PATH
READY
TRANSMITTER FAULT
CEN01_AT1_FAULT
RESIDUALS
MANAGEMENT
FACILITY
CEN01_LCP_LKOUT
CEN01_FT1_FAULT
CEN01_LCP_DISBL
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CEN01
VENDOR
CONTROL PANEL
SCP21
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
100x65
65-UW-PVC80
65x50
65x50
65x25
65x25
100x65
FLUSHING
CEN01_CO3
CIP
M
M
CEN01_CO1
M
UTILITY WATER
FC
CEN01_CO2
65-POL-PVC80
DI614
CEN01_BDV
NOTE 2
FI
CEN01_AT1
FROM POLYMER
FEED SYSTEM
SE
TE
VT
150-SLU-SS2
DI607
CEN01_VT1
CEN01_MDV
SE
VE
TE
M
VS
65x50
SS
PI
M
VS
CEN01_FT1
FI
M
FROM CENTRIFUGE
FEED PUMP SFP01
REGISTRATION
CENTRIFUGE
CEN01
65-UW-PVC80
65x50
65x50
65x25
65x25
TSS INDICATION
CEN02_AT1_STAAI
FLUSHING
DI614
CEN02_CO3
CEN02_AT1_FAULT
M
FC
CIP
65-POL-PVC80
NOTE 2
65-POL-PVC
FI
CEN02_AT1
FROM POLYMER
FEED SYSTEM
SE
TE
M
CEN02_VT1
VS
VT
CEN02_FT1
SS
PI
GATE
FLUSH
CEN02_MDV
SE
VE
150-SLU-SS2
TE
M
VS
250-CEN-SS1
FI
DI607
200-DS-SS
CEN02_BDN
M
M
CEN01_OC1
TRANSMITTER FAULT
CEN02_CO2
CEN02_CO1
65x50
M
FROM CENTRIFUGE
FEED PUMP SFP03
ISSUE/REVISION
CENTRIFUGE
CEN02
CHUTE
CONNECTION
200-DS-SS
FLOW INDICATION
CEN02_FT1_STAAI
TRANSMITTER FAULT
CEN02_FT1_FAULT
DI609
TO SLUDGE
CAKE
CONVEYOR
SCC01
CEN02_OC1
250-CEN-SS1
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
GATE
FLUSH
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
250-CEN-SS1
FEED PUMP START
PERMISSIVE
CEN02_LCP_LKOUT
SLUDGE CONVEYANCE PATH
READY
CEN02_LCP_DISBL
NOTES:
1.
ALL TAGS TO BE PREFIXED BY "EAW_".
2.
THREE (3) POLYMER INJECTION LOCATIONS TO BE POSITIONED:
- AT CENTRIFUGE INLET
- 2m UPSTREAM OF INLET
- 10m UPSTREAM OF INLET
DENOTES DEVICE SUPPLIED BY CENTRIFUGE VENDOR. OTHER
DEVICES SUPPLIED BY CONTRACTOR
3.
Printed on ___% Post-Consumer
Recycled Content Paper
CEN02
VENDOR
CONTROL PANEL
SCP22
DI603
TO BACKWASH
WASTE
EQUALIZATION
BASINS
PROJECT NUMBER
CHUTE
CONNECTION
DI609
TO SLUDGE
CAKE
CONVEYOR
SCC02
60246477
SHEET TITLE
P&ID
CENTRIFUGES
SHEET NUMBER
DI608
ISO A1 594mm x 841mm
MOTION STATUS
SCC03_MSI_STADI
MOTION STATUS
SCC01_MS1_STADI
FORWARD COMMAND
SCC03_000_STARF
START / STOP COMMAND
SCC01_000_START
START / STOP COMMAND
SCC03_000_START
PROJECT
LOCAL / REMOTE STATUS
LOCAL / REMOTE STATUS
DEVICENET
RUNNING STATUS
DEVICENET
SCC01_000_RUNNG
OPENED STATUS
FAULT STATUS
SCC01_000_FAULT
Checked: _____
SCC03_000_RUNNG
SCC02_000_START
FAULT STATUS
SCC01_000_STAAI
SCC02_000_REMOT
SCC02_SV1_OPEND
RUNNING STATUS
CLOSED STATUS
SCC02_SV1_CLOSD
SCC03_000_STAAI
EMERGENCY STOP
SCC01_000_ESTOP
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
LOCAL / REMOTE STATUS
OPENED STATUS
MOTOR CURRENT
EMERGENCY STOP
Designer: _____
START / STOP COMMAND
SCC03_000_READY
MOTOR CURRENT
SCC01_SV1_CLOSD
SCC02_MS1_STADI
RUNNING STATUS
READY STATUS
SCC01_000_READY
CLOSED STATUS
RESIDUALS
MANAGEMENT
FACILITY
MOTION STATUS
SCC03_000_FAULT
READY STATUS
SCC01_SV1_OPEND
SCC03_000_REMOT
SCC02_000_RUNNG
DEVICENET
Approved: _____
SCC01_000_REMOT
SCC03_000_ESTOP
CLIENT
FAULT STATUS
ELGIN AREA WATER
SUPPLY SYSTEM
SCC02_000_FAULT
READY STATUS
DI608
SCC02_000_READY
FROM CENTRIFUGE
CEN02
SCC01
LOCAL CONTROL
PANEL
LCP35
DI608
SCC02_000_STAAI
EMERGENCY STOP
SCC02_000_ESTOP
SCC02_SV1
50-UW-PVC80
DI616
S
OPEN COMMAND
SCC02
LOCAL CONTROL
PANEL
LCP36
SCC01_SV1
UTLITY WATER
OPEN COMMAND
SCC03_OC1_OPENN
SCC03_OC2_OPENN
CLOSE COMMAND
SCC03_OC2_CLOSE
CLOSE COMMAND
SCC03_OC2_REMOT
LOCAL / REMOTE STATUS
OPENED STATUS
SCC03_OC1_REMOT
START / STOP COMMAND
SCC04_000_START
MS
CLOSED STATUS
CONVEYOR EXTENSION
FOR FUTURE CENTRIFUGE
SCC03_OC1_OPEND
SCC01_MS1
LOCAL / REMOTE STATUS
MS
SCC03_OC2_CLOSD
SCC02_MS1
CLOSED STATUS
SCC04_000_REMOT
FAULT STATUS
SCC03_OC1_CLOSD
M
RUNNING STATUS
SCC04_000_RUNNG
DEVICENET
SCC03_OC2_OPEND
OPENED STATUS
CONVEYOR EXTENSION
FOR FUTURE CENTRIFUGE
SCC03_OC2_FAULT
M
FAULT STATUS
CS
SCREW CONVEYOR
SCC01
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
LOCAL / REMOTE STATUS
SCC03_OC1_CLOSE
CS
SCC03_OC1_FAULT
SCREW CONVEYOR
SCC02
FAULT STATUS
SCC04_000_FAULT
READY STATUS
SCC04_000_READY
MOTOR CURRENT
UP
SLOW
UP
SLOW
UP
FAST
UP
FAST
SCC03
LOCAL CONTROL
PANEL
LCP37
SCC04_000_STAAI
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
CONSULTANT
S
DOWN
SLOW
EMERGENCY STOP
SCC04_000_ESTOP
DOWN
FAST
MOTION STATUS
SCC04_MSI_STADI
SCC03
LOCAL CONTROL
PANEL
LCP37
MS
SCC03_MS1
M
NOTE 2
NOTE 2
CS
CRN01
LOCAL CONTROL
PENDANT
SCREW CONVEYOR
SCC03
M
DOWN
SLOW
CRN02
LOCAL CONTROL
PENDANT
M
SCC03_OC1
SCC03_OC2
DOWN
FAST
80-PD-PVC
FLOOR
FLOOR
SCC04
LOCAL CONTROL
PANEL
LCP38
M
FLOOR
DI603
FLOOR
HOIST WINCH
CRN01
HOIST WINCH
CRN02
TELESCOPIC CHUTE
REGISTRATION
DRAIN TO BW
EQ BASIN
M
TELESCOPIC CHUTE
SCC05_MS1
MS
SCC04_MS1
R
MS
R
R
R
R
R
R
R
OPEN BOTTOM
SCREW CONVEYOR
SCC04
R
R
R
R
R
R
R
R
OPEN BOTTOM
SCREW CONVEYOR
SCC05
ISSUE/REVISION
M
M
CS
E
E
E
E
E
E
E
E
E
SLUDGE TRAILER #1
R
SCC05
LOCAL CONTROL
PANEL
LCP39
CS
E
E
E
E
E
SLUDGE TRAILER #2
R
E
E
R
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
R
MOTION STATUS
SCC05_MS1_STADI
START / STOP COMMAND
E
E
E
E
SCC05_000_START
LOCAL / REMOTE STATUS
SCC05_000_REMOT
RUNNING STATUS
PHOTOELECTRIC SENSOR LEGEND
R RECEIVER
E
EMITTER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: GATES SCC03_OC1 & SCC03_OC2 RELAY
TO SCC03 LCP
Printed on ___% Post-Consumer
Recycled Content Paper
FORWARD
FORWARD
G
G
VENDOR
CONTROL PANEL
SCP29
BACKWARD
BACKWARD
Y
STOP
STOP
R
TRAFFIC
LIGHT
R
PROJECT NUMBER
60246477
FAULT STATUS
SCC05_000_FAULT
Y
TRAFFIC
LIGHT
SCC05_000_RUNNG
DEVICENET
Project Management Initials:
FROM CENTRIFUGE
CEN01
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
MOTOR CURRENT
SCC03
LOCAL CONTROL
PANEL
LCP37
READY STATUS
SCC05_000_READY
MOTOR CURRENT
SCC05_000_STAAI
EMERGENCY STOP
SCC05_000_ESTOP
SHEET TITLE
P&ID
DEWATERED SLUDGE
CONVEYOR SYSTEM
SHEET NUMBER
DI609
ISO A1 594mm x 841mm
Approved: _____
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
HIGH LEVEL ALARM
PDT11_LSH_ALMDI
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
Designer: _____
VENDOR
CONTROL PANEL
SCP27
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
RECIRCULATION
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
PDT11_WT1
PDT11_LSH
PPP11_SV1
Project Management Initials:
LSH
LIQUID POLYMER
TOTE
FC
CONSULTANT
PPP11_PI1
PDT11
PI
RUN
ASL DRY
TOTE SCALE
PPP11_PSH
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
PSH
PPP11_SV2
S
NOTE 2
PDT12_LT1
VS
PDT12_MX1
M
PPP11
PDT12_LSH
PDT12_LSL
M
CS
VAP11
M
VACUUM
LOADER
S
PDT13_LSH
PDT12_SV1
PDT13_LT1
PDT13_LSL
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
POLYMER FEEDER
DI613
PFR11_LSL
LSL
FROM FEED PUMP
PRESSURE RELIEF
AGING TANK
PDT12
PFR11
REGISTRATION
M
PPP12
VS
25-POL-PVC
PPS10_SV1
WETTING
CHAMBER
S
FEED TANK
PDT13
DI612
TO THICKENER
POLYMER
FEED SYSTEM
PPS10_SV2
25-POL-PVC
S
PPS10_SV3
S
ISSUE/REVISION
POLYMER PREPARATION
SYSTEM VENDOR
PACKAGE
DI616
40-UW-SS
HIGH LEVEL ALARM
POP10_LSH_ALMDI
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
TEMPERED WATER
KEY PLAN
POP10_LSH
LSH
PROJECT NUMBER
TO BWW EQ
BASIN
60246477
SHEET TITLE
TO BWW EQ
BASIN
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: POLYMER ACTIVATION MONITOR
Printed on ___% Post-Consumer
Recycled Content Paper
P&ID
THICKENER POLYMER
PREPARATION SYSTEM
SHEET NUMBER
DI610
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
Designer: _____
VENDOR
CONTROL PANEL
SCP28
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
RECIRCULATION
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
PDT21_WT1
PPP21_SV1
FC
CONSULTANT
PPP21_PI1
PDT21
PI
25-POL-PVC
RUN
ASL DRY
TOTE SCALE
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
PSH
PPP21_SV2
S
15-POL-PVC
M
PDT22_LSL
LSL
S
M
PDT23_LT1
PDT23_SV1
PDT22_SV2
S
PDT23_SV2
PDT23_MX1
PDT22_LSH
LSH
NOTE 2
PDT22_SV1
PDT22_LT1
VS
PDT22_MX1
PPP21
PPP21_PSH
NOTE 2
Project Management Initials:
LIQUID POLYMER
TOTE
PDT23_LSH
PDT23_LSL
M
CS
CS
DI614
FROM FEED PUMP
PRESSURE RELIEF
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
POLYMER FEEDER
PFR21_LSL
LSL
PFR21
REGISTRATION
PDT22_SV3
M
PPP22
S
VS
PPS20_SV1
S
S
PDT23_SV3
WETTING
CHAMBER
BATCH TANK #2
PDT23
BATCH TANK #1
PDT22
65-POL-PVC
DI614
TO CENTRIFUGES
POLYMER FEED
SYSTEM
PPS20_SV2
S
50-POL-PVC
ISSUE/REVISION
POLYMER PREPARATION
SYSTEM VENDOR
PACKAGE
TEMPERED WATER
DI616
HIGH LEVEL ALARM
50-UW-SS
FROM UTILITY WATER
BOOSTER PUMP /
HEATERS
POP20_LSH_ALMDI
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
POP20_LSH
LSH
PROJECT NUMBER
TO BWW EQ
BASIN
60246477
SHEET TITLE
P&ID
DEWATERING POLYMER
PREPARATION SYSTEM
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: POLYMER ACTIVATION MONITOR
Printed on ___% Post-Consumer
Recycled Content Paper
SHEET NUMBER
DI611
ISO A1 594mm x 841mm
DI610
TO STORAGE TANK
OPEN COMMAND
PROJECT
POP11_SV1_OPENN
Approved: _____
OPEN COMMAND
FLOW INDICATION
POP10_SV1_OPENN
POP10_FT1_STAAI
HIGH PRESSURE ALARM
Checked: _____
TRANSMITTER FAULT
POP10_FT1_FAULT
POP10_FT2_FAULT
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
LOCAL
CONTROL
PANEL
LCP32
START/STOP COMMAND
POP11_000_START
LOCAL/REMOTE STATUS
POP11_000_REMOT
FIT
NOTE 2
PI
POP11_000_RUNNG
POP10_IC1_SETPT
POSITION FEEDBACK
LOCAL/REMOTE STATUS
FAULT STATUS
POP10_IC1_REMOT
M
RUN
ASL DRY
SPEED SETPOINT
POP10_IC1
FE
POP11_SV1
M
POP10_IC1_FAULT
NOTE 3
15-POL-PVC
15-POL-PVC
M
VS
POP11_000_FEDBK
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
FAULT STATUS
M
S
POP11_000_SETPT
SPEED FEEDBACK
ELGIN AREA WATER
SUPPLY SYSTEM
POP10_IC1_FEDBK
FIT
POP11_000_FAULT
CLIENT
POP10_FT1
PSH
25-POL-PVC
Project Management Initials:
POSITION SETPOINT
POP10_FT2
FE
POP11_PSH
POP11_PI1
RUNNING STATUS
Designer: _____
POP10_FT2_STAAI
TRANSMITTER FAULT
POP11_PSH_ALMDI
RESIDUALS
MANAGEMENT
FACILITY
FLOW INDICATION
DI605
CONSULTANT
POP10_SV1
POLYMER DOSING
PUMP POP11
TO BACKWASH
WASTE THICKENER
CLF01
S
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
HIGH PRESSURE ALARM
POP12_PSH_ALMDI
LOCAL
CONTROL
PANEL
LCP32
START/STOP COMMAND
POP12_000_START
LOCAL/REMOTE STATUS
POP12_000_REMOT
POP12_PSH
POP12_PI1
NOTE 2
PI
RUNNING STATUS
PSH
25-POL-PVC
POP12_000_RUNNG
FAULT STATUS
15-UW-PVC
RUN
ASL DRY
POP12_000_FAULT
SPEED SETPOINT
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
POP12_000_SETPT
M
15-POL-PVC
VS
SPEED FEEDBACK
POP12_000_FEDBK
POLYMER DOSING
PUMP POP12
REGISTRATION
OPEN COMMAND
POP10_SV2_OPENN
OPEN COMMAND
FLOW INDICATION
POP13_SV1_OPENN
POP10_FT3_STAAI
HIGH PRESSURE ALARM
FLOW INDICATION
POP10_FT4_STAAI
TRANSMITTER FAULT
POP13_PSH_ALMDI
POP10_FT3_FAULT
TRANSMITTER FAULT
POP10_FT4_FAULT
LOCAL
CONTROL
PANEL
LCP32
START/STOP COMMAND
POP13_000_START
LOCAL/REMOTE STATUS
POP13_000_REMOT
POP10_FT4
POP10_IC2_SETPT
PI
RUNNING STATUS
POSITION FEEDBACK
FE
POP13_PSH
POP13_PI1
NOTE 2
POP13_000_RUNNG
POSITION SETPOINT
FIT
POP10_IC2_FEDBK
POP10_FT3
PSH
LOCAL/REMOTE STATUS
FIT
25-POL-PVC
POP10_IC2_REMOT
M
FAULT STATUS
RUN
ASL DRY
POP13_000_FAULT
POP10_IC2
FE
POP13_SV1
FAULT STATUS
POP10_IC2_FAULT
M
S
ISSUE/REVISION
NOTE 3
SPEED SETPOINT
M
POP13_000_SETPT
VS
SPEED FEEDBACK
POP13_000_FEDBK
15-POL-PVC
M
15-POL-PVC
POLYMER DOSING
PUMP POP13
POP10_SV2
DI605
TO BACKWASH
WASTE THICKENER
CLF02
S
CONNECTION FOR
FUTURE PUMPS
POLYMER FEED SYSTEM
VENDOR PACKAGE
DI610
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
DI613
HIGH LEVEL ALARM
CONNECTION TO
FUTURE POLYMER
DOSING PUMPS
POP11_LSH_ALMDI
TO SLUDGE
THICKENERS
POLYMER FEED
PUMPS
POP11_LSH
50x15
LSH
DI616
UTILITY WATER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES
Printed on ___% Post-Consumer
Recycled Content Paper
2013-10-09
KEY PLAN
25-POL-PVC
FROM POLYMER
PREPARATION SYSTEM
FEED TANK
0
50-UW-PVC
PROJECT NUMBER
DI613
UTILITY WATER
60246477
SHEET TITLE
P&ID
BACKWASH WASTE THICKENING
POLYMER FEED SYSTEM
TO BWW EQ
BASIN
SHEET NUMBER
DI612
ISO A1 594mm x 841mm
15-POL-PVC
DI610
TO FEED TANK
OPEN COMMAND
POP10_SV3_OPENN
OPEN COMMAND
FLOW INDICATION
Approved: _____
POP14_SV1_OPENN
HIGH PRESSURE ALARM
Checked: _____
TRANSMITTER FAULT
POP10_FT5_FAULT
POP10_FT6_FAULT
LOCAL
CONTROL
PANEL
LCP33
START/STOP COMMAND
POP14_000_START
LOCAL/REMOTE STATUS
POP14_000_REMOT
POP10_FT6
PI
POSITION FEEDBACK
FE
POP14_PSH
POP14_PI1
POP14_000_RUNNG
PSH
FIT
25-POL-PVC
POP10_IC3_FEDBK
POP10_FT5
POP10_IC3_REMOT
M
RUN
ASL DRY
SPEED SETPOINT
POP10_IC3
FE
POP14_SV1
M
POP10_IC3_FAULT
NOTE 3
15-POL-PVC
20-POL-PVC
M
VS POLYMER DOSING
PUMP POP14
POP14_000_FEDBK
FAULT STATUS
M
S
POP14_000_SETPT
SPEED FEEDBACK
ELGIN AREA WATER
SUPPLY SYSTEM
LOCAL/REMOTE STATUS
FAULT STATUS
Project Management Initials:
POP10_IC3_SETPT
CLIENT
NOTE 2
POP14_000_FAULT
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
POSITION SETPOINT
FIT
RUNNING STATUS
Designer: _____
POP10_FT6_STAAI
TRANSMITTER FAULT
POP14_PSH_ALMDI
RESIDUALS
MANAGEMENT
FACILITY
FLOW INDICATION
POP10_FT5_STAAI
PROJECT
DI606
15x20
POP10_SV3
TO SEDIMENTATION
SLUDGE THICKENER
CLF03
S
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
HIGH PRESSURE ALARM
POP15_PSH_ALMDI
LOCAL
CONTROL
PANEL
LCP33
START/STOP COMMAND
POP15_000_START
LOCAL/REMOTE STATUS
POP15_000_REMOT
POP15_PSH
POP15_PI1
NOTE 2
PI
RUNNING STATUS
PSH
25-POL-PVC
POP15_000_RUNNG
FAULT STATUS
15-UW-PVC
RUN
ASL DRY
POP15_000_FAULT
SPEED SETPOINT
M
POP15_000_SETPT
15-POL-PVC
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
VS
SPEED FEEDBACK
POP15_000_FEDBK
POLYMER DOSING
PUMP POP15
REGISTRATION
OPEN COMMAND
POP10_SV4_OPENN
OPEN COMMAND
FLOW INDICATION
POP16_SV1_OPENN
HIGH PRESSURE ALARM
POP10_FT8_STAAI
TRANSMITTER FAULT
POP16_PSH_ALMDI
TRANSMITTER FAULT
POP10_FT7_FAULT
POP10_FT8_FAULT
LOCAL
CONTROL
PANEL
LCP33
START/STOP COMMAND
POP16_000_START
LOCAL/REMOTE STATUS
POP16_000_REMOT
POP10_FT8
POSITION SETPOINT
FIT
PI
POP10_IC4_SETPT
POSITION FEEDBACK
FE
POP16_PSH
POP16_PI1
NOTE 2
RUNNING STATUS
POP16_000_RUNNG
FLOW INDICATION
POP10_FT7_STAAI
POP10_IC4_FEDBK
POP10_FT7
PSH
LOCAL/REMOTE STATUS
FIT
25-POL-PVC
POP10_IC4_REMOT
M
FAULT STATUS
RUN
ASL DRY
POP16_000_FAULT
POP10_IC4
FE
POP16_SV1
FAULT STATUS
POP10_IC4_FAULT
M
S
ISSUE/REVISION
NOTE 3
SPEED SETPOINT
M
POP16_000_SETPT
VS
SPEED FEEDBACK
POP16_000_FEDBK
20-POL-PVC
M
15-POL-PVC
POLYMER DOSING
PUMP POP16
POP10_SV4
15x20
DI606
TO SEDIMENTATION
SLUDGE THICKENER
CLF04
S
POLYMER FEED SYSTEM
VENDOR PACKAGE
DI612
FROM POLYMER
PREPARATION SYSTEM
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
25-POL-PVC
CONNECTION TO
FUTURE POLYMER
DOSING PUMPS
PROJECT NUMBER
DI616
UTILITY WATER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES
Printed on ___% Post-Consumer
Recycled Content Paper
50-UW-PVC
DI614
UTILITY WATER
60246477
SHEET TITLE
P&ID
SED. SLUDGE THICKENING
POLYMER FEED SYSTEM
SHEET NUMBER
DI613
ISO A1 594mm x 841mm
32-POL-PVC
DI611
TO BATCH TANK
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
START/STOP COMMAND
Checked: _____
POP21_000_START
LOCAL/REMOTE STATUS
OPEN COMMAND
POP21_000_REMOT
RUNNING STATUS
OPEN COMMAND
POP21_000_RUNNG
Designer: _____
CLIENT
POP21_SV1_OPENN
FLOW INDICATION
POP20_SV1_OPENN
FAULT STATUS
HIGH PRESSURE ALARM
POP21_000_FAULT
POP20_FT2_STAAI
TRANSMITTER FAULT
POP21_PSH_ALMDI
ELGIN AREA WATER
SUPPLY SYSTEM
FLOW INDICATION
POP20_FT1_STAAI
TRANSMITTER FAULT
POP20_FT1_FAULT
POP20_FT2_FAULT
POSITION SETPOINT
POP20_IC1_SETPT
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
SPEED SETPOINT
POSITION FEEDBACK
POP21_000_SETPT
POP20_IC1_FEDBK
LOCAL
CONTROL
PANEL
LCP34
Project Management Initials:
SPEED FEEDBACK
POP21_000_FEDBK
POP20_FT2
NOTE 2
CLOSED STATUS
65x40
FE
POP21_SV1
POP20_IC1
S
M
RUNNING STATUS
NOTE 3
65-UW-PVC
SPEED SETPOINT
POP22_000_SETPT
65-POL-PVC
M
VS POLYMER DOSING
PUMP POP21
POP22_000_RUNNG
FAULT STATUS
POP20_IC1_FAULT
M
POP22_000_REMOT
POP22_000_FAULT
POP20_IC1_CLOSD
M
LOCAL/REMOTE STATUS
FAULT STATUS
POP20_IC1_OPEND
FIT
RUN
ASL DRY
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
OPENED STATUS
POP20_FT1
PSH
40-POL-PVC
POP22_000_START
CONSULTANT
POP20_IC1_REMOT
FE
POP21_PSH
POP21_PI1
PI
START/STOP COMMAND
LOCAL/REMOTE STATUS
FIT
32-POL-PVC
32x65
POP20_SV1
DI608
TO CENTRIFUGE CEN01
S
HIGH PRESSURE ALARM
POP22_PSH_ALMDI
LOCAL
CONTROL
PANEL
LCP34
SPEED FEEDBACK
POP22_000_FEDBK
NOTE 2
POP22_PSH
POP22_PI1
PI
PSH
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
40-POL-PVC
65x40
RUN
ASL DRY
START/STOP COMMAND
REGISTRATION
POP23_000_START
FLOW INDICATION
M
LOCAL/REMOTE STATUS
POP23_000_REMOT
POP20_FT3_STAAI
VS POLYMER DOSING
PUMP POP22
OPEN COMMAND
TRANSMITTER FAULT
POP20_SV2_OPENN
RUNNING STATUS
POP23_000_RUNNG
POP20_FT3_FAULT
OPEN COMMAND
FLOW INDICATION
POP23_SV1_OPENN
FAULT STATUS
POP20_FT4_STAAI
POSITION SETPOINT
POP23_000_FAULT
HIGH PRESSURE ALARM
TRANSMITTER FAULT
POP23_PSH_ALMDI
SPEED SETPOINT
POSITION FEEDBACK
POP23_000_SETPT
POP20_IC2_FEDBK
LOCAL
CONTROL
PANEL
LCP34
SPEED FEEDBACK
POP23_000_FEDBK
POP20_FT4
LOCAL/REMOTE STATUS
FIT
NOTE 2
POP23_PI1
POP20_IC2_REMOT
OPENED STATUS
FE
POP23_PSH
PI
POP20_IC2_OPEND
POP20_FT3
PSH
FIT
40-POL-PVC
65x40
CLOSED STATUS
POP20_IC2_CLOSD
M
M
ISSUE/REVISION
FE
RUN
ASL DRY
POP20_IC2
POP23_SV1
M
S
FAULT STATUS
POP20_IC2_FAULT
NOTE 3
65-POL-PVC
M
VS POLYMER DOSING
PUMP POP23
32-POL-PVC
POP20_SV2
32x65
DI608
TO CENTRIFUGE CEN02
S
POLYMER FEED SYSTEM
VENDOR PACKAGE
DI611
POP20_IC2_SETPT
POP20_FT4_FAULT
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
65-POL-PVC
PREPARATION SYSTEM
CONNECTION TO
FUTURE POLYMER
DOSING PUMPS
PROJECT NUMBER
DI616
UTILITY WATER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES
Printed on ___% Post-Consumer
Recycled Content Paper
50-UW-PVC
60246477
SHEET TITLE
P&ID
DEWATERING
POLYMER FEED SYSTEM
SHEET NUMBER
DI614
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
Checked: _____
START/STOP COMMAND
TSP01_000_START
LOCAL/REMOVE STATUS
CLIENT
TSP01_000_REMOT
ELGIN AREA WATER
SUPPLY SYSTEM
RUNNING STATUS
HIGH PRESSURE ALARM
Designer: _____
TSP01_000_RUNNG
TSP01_PSH_ALMDI
FAULT STATUS
TSP01_000_FAULT
LOCAL
CONTROL
PANEL
LCP40
SPEED SETPOINT
TSP01_000_SETPT
Project Management Initials:
SPEED FEEDBACK
TSP01_000_FEDBK
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
DECHLORINATION
SYSTEM VENDOR
PACKAGE
NOTE 2
TSP01_PSH
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
PSH
PI
TSP01_PI1
M
VS
15x10
START/STOP COMMAND
TSP02_000_START
10-STS-CPVC
DOSING PUMP
TSP01
LOCAL/REMOVE STATUS
DI603
TO BACKWASH
WASTE EQ BASIN
BWT01
HIGH PRESSURE ALARM
TSP02_000_REMOT
TSP02_PSH_ALMDI
WEIGHT INDICATION
RUNNING STATUS
TST01_WT1_STAAI
TSP02_000_RUNNG
TRANSMITTER FAULT
LOCAL
CONTROL
PANEL
LCP40
FAULT STATUS
TST01_WT1_FAULT
TSP02_000_FAULT
SPEED SETPOINT
TSP02_000_SETPT
NOTE 2
TSP02_PSH
PSH
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
SPEED FEEDBACK
PI
TSP02_000_FEDBK
TSP02_PI1
REGISTRATION
TST01_WT1
M
VS
15-STS-CPVC
15x10
DI603
DOSING PUMP
TSP02
SODIUM
THIOSULPHATE
SOLUTION
TST01
TO BACKWASH
WASTE EQ BASIN
OVERFLOW
HIGH PRESSURE ALARM
TSP03_PSH_ALMDI
START/STOP COMMAND
LOCAL
CONTROL
PANEL
LCP40
TSP03_000_START
LOCAL/REMOVE STATUS
TSP03_000_REMOT
NOTE 2
RUNNING STATUS
TSP03_000_RUNNG
TSP03_PSH
PSH
PI
TSP03_PI1
FAULT STATUS
ISSUE/REVISION
TSP03_000_FAULT
M
SPEED SETPOINT
TSP03_000_SETPT
VS
SPEED FEEDBACK
TSP03_000_FEDBK
15x10
DOSING PUMP
TSP03
10-STS-CPVC
DI603
TO BACKWASH
WASTE EQ BASIN
BWT02
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
CONTAINMENT
TO
SEDIMENTATION
SLUDGE TANK
PROJECT NUMBER
60246477
SHEET TITLE
P&ID
RMF DISCHARGE
DECHLORINIZATION SYSTEM.
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
Printed on ___% Post-Consumer
Recycled Content Paper
SHEET NUMBER
DI615
ISO A1 594mm x 841mm
RTU1 SAC GENERAL ALARM
BLD06_CP1_ALMDI
LOCAL/REMOTE STATUS
PROJECT
BSP01_VFD_REMOT
RTU2 SAC GENERAL ALARM
BLD06_CP2_ALMDI
RESIDUALS
MANAGEMENT
FACILITY
Approved: _____
RUNNING STATUS
BSP01_VFD_RUNNG
RTU3 SAC GENERAL ALARM
BLD06_CP3_ALMDI
GENERAL ALARM
BSP01_VFD_ALMDI
PUMP GALLERY SAC
GENERAL ALARM
BLD06_CP4_ALMDI
PRESSURE SETPOINT
Checked: _____
ON DEMAND WATER
HEATERS
BSP01_VFD_SETPT
SLUDGE THICKENER SAC
GENERAL ALARM
PRESSURE INDICATION
BLD06_CP5_ALMDI
BSP01_VFD_STAAI
PWH01
TRUCK BAY SAC GENERAL
ALARM
PWH02
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
NOTE:
FOR ON DEMAND TANKLESS
WATER HEATERS REFER TO
DRAWING M610 FOR GAS AND
CONNECTION DETAILS
PWH03
CLIENT
PUMP ENABLE/DISABLE
BLD06_CP6_ALMDI
BSP01_VFD_DISBL
ELGIN AREA WATER
SUPPLY SYSTEM
Designer: _____
DECHLORINATION ROOM
SAC GENERAL ALARM
BLD06_CP7_ALMDI
CENTRIFUGE ROOM SAC
GENERAL ALARM
PIT
BLD06_CP8_ALMDI
PE
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
BSP01_PT1
PI
CONSULTANT
LCP41
BUILDING HVAC ALARMS
80x32
TI
TI
M
80x32
80-UW-SS
40-UW-SS
VS
150x80
SECURITY SYSTEM ARMED
ALP06_000_STADI
ALP06_604_ALMDI
NC
NC
SECURITY SYSTEM
ELECTRICAL ROOM ALARM
TEMPERATURE
CONTROLLER
150-UW-SS
ALP06_607_ALMDI
SECURITY SYSTEM
CHEMICAL ROOM ALARM
ALP06_605_ALMDI
SECURITY SYSTEM
CENTRIFUGE ROOM ALARM
TO THICKENING
POLYMER
PREPARATION
TE
BOOSTER PUMP
BSP01
150x80
SECURITY SYSTEM
PROCESS ROOM ALARM
BSP01_TE1
BSP01_CNV
DI610
80x40
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
50-UW-SS
DI611
80x50
TO DEWATERING
POLYMER
PREPARATION
BOOSTER PUMP
VENDOR PACKAGE
ALP06_617_ALMDI
SECURITY SYSTEM
CONTROL ROOM ALARM
50-UW-SS1
ALP06_608_ALMDI
DI612
80x50
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
TO POLYMER
FEED
SECURITY SYSTEM
REGISTRATION
32-UW-PVC80
80x32
TO MAIN FLOOR
HOSE STATIONS
AND SAMPLE SINKS
100-UW-SS1
100-UW-SS1
DI608
150x100
100x32
100x80
TO
CENTRIFUGES
100x50
FLOW INDICATION
UWH01_FT1_STAAI
50-UW-SS1
TRANSMITTER FAULT
UWH01_FT1_FAULT
DI609
TO CONVEYORS
ISSUE/REVISION
80-UW-SS1
YARD PIPE
150-WP-PVC
150-WP-SS
TO CENTRIFUGE
FEED PUMPS
UWH01_FT1
IN-PLANT PIPE
M
150-WP-SS
32-UW-PCV80
TO HOSE STATIONS
(LOWER LEVEL)
FROM POTABLE
WATER SERVICE
Printed on ___% Post-Consumer
Recycled Content Paper
DI607
150x32
SEE MECHANICAL DRAWINGS
FOR CONTINUATION
0
2013-10-09
I/R
DATE
ISSUE FOR TENDER
DESCRIPTION
KEY PLAN
32-WP-CU
TO BUILDING
SERVICES
SEE MECH
DRAWINGS
PROJECT NUMBER
60246477
SHEET TITLE
P&ID
RMF PLANT UTILITY WATER
AND MISCELLANEOUS
SHEET NUMBER
DI616
ISO A1 594mm x 841mm
DI618
DI618
HYDRAULIC POWER
UNIT No 4 HPU40
Approved: _____
RSP11_SV1
M
RSP11_PSH
RSP11_IC1
Checked: _____
200-CS-SS2
50-CS-SS2
Designer: _____
PSH
VS
250x150
HYDRAULIC POWER
UNIT No. 3
HPU30
PI
M
M
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
250x50
RSP10_AT1
150x250
CLIENT
RSP10_FT1
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP11
RSP10_IC1
CONTAINMENT
M
M
DI618
RSP12_PSH
RSP12_IC1
ELGIN AREA WATER
SUPPLY SYSTEM
RSP10_OC1
SS
I
M
RSP12_SV1
Project Management Initials:
M
I
HPU30_LSL
SS
LOR
HS
HS
RESIDUALS
MANAGEMENT
FACILITY
RSP10_OC2
HPU30_TSH
PI
M
TO SEDIMENTATION
SLUDGE TANKS
PSH
VS
M
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
UTILITY WATER
250x150
PROJECT
150x250
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP12
SLC11_SV1
(NOTE 2)
200-CS-SS
S
SED11_LT1
NOTE:
DENOTES DEVICES TO BE SUPPLIED BY GENERAL
CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED
BY THE VENDOR PLC SCP30
SED11_SV1
CROSS COLLECTOR #1
MAIN COLLECTOR No 1
(NOTE 2)
REGISTRATION
SED12_SV1
S
EX SEDIMENTATION BASIN No 1
SECTION 2
SED12
MAIN COLLECTOR No 2
(NOTE 2)
HPU10_TSH
HPU10_LSL
SS
LOR
HS
HS
FROM EX
FLOCCULATION
TANK No 1
M
ISSUE/REVISION
SED13_SV1
HYDRAULIC POWER
UNIT No. 1
HPU10
S
CROSS COLLECTOR #2
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
S
EX SEDIMENTATION BASIN No 1
SECTION 1
SED11
CONTAINMENT
EX SEDIMENTATION BASIN No 1
SECTION 3
SED13
MAIN COLLECTOR No 3
(NOTE 2)
0
2013-10-09
DI618
I/R
DATE
DI618
KEY PLAN
ISSUE FOR TENDER
DESCRIPTION
HYDRAULIC POWER
UNIT No 2 HPU20
PROJECT NUMBER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN
FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT
REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO
TANKS/SCRAPERS.
NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE
SUPPLED BY CONTRACTOR AND WILL BE
MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE
SCRAPER PLC #1.
Printed on ___% Post-Consumer
Recycled Content Paper
60246477
(NOTE 2)
S
SHEET TITLE
SLC13_SV1
TO EX FILTERS
300-SD-DI
TO PLANT DRAIN
P&ID
SEDIMENTATION BASIN No1
SLUDGE SCRAPER SYSTEM
SHEET NUMBER
DI617
ISO A1 594mm x 841mm
DI617
DI617
HYDRAULIC POWER
UNIT No 3 HPU30
Approved: _____
RSP21_SV1
M
RSP21_PSH
RSP21_IC1
Checked: _____
200-CS-SS2
50-CS-SS2
Designer: _____
PSH
VS
250x150
HYDRAULIC POWER
UNIT No. 4
HPU40
PI
M
M
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
250x50
RSP20_AT1
150x250
CLIENT
RSP20_FT1
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP21
RSP20_IC1
CONTAINMENT
ELGIN AREA WATER
SUPPLY SYSTEM
RSP20_OC1
SS
M
I
M
M
RSP22_SV1
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
250-CS-SS2
RSP22_PSH
RSP22_IC1
Project Management Initials:
M
I
HPU40_LSL
SS
LOR
HS
HS
RESIDUALS
MANAGEMENT
FACILITY
RSP20_OC2
HPU40_TSH
PI
M
PSH
VS
M
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
UTILITY WATER
250x150
150x250
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP22
DI617
SLUDGE TRANSFER
LINE
PROJECT
250-CS-SS2
DI604
SLC21_SV1
TO SEDIMENTATION
SLUDGE TANKS
(NOTE 2)
200-CS-SS
S
SED21_SV1
SED21_LT1
NOTE:
DENOTES DEVICES TO BE SUPPLIED BY GENERAL
CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED
BY THE VENDOR PLC SCP31
SED21_SV1
CROSS COLLECTOR #3
MAIN COLLECTOR No 4
(NOTE 2)
REGISTRATION
SED22_SV1
S
EX SEDIMENTATION BASIN
No 2 SECTION 2
SED22
MAIN COLLECTOR No 5
HPU20_TSH
(NOTE 2)
HPU20_LSL
SS
LOR
HS
HS
FROM EX
FLOCCULATION
TANK No 1
M
ISSUE/REVISION
SED23_SV1
HYDRAULIC POWER
UNIT No. 2
HPU20
S
CROSS COLLECTOR #4
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
S
EX SEDIMENTATION BASIN No 2
SECTION 1
SED21
CONTAINMENT
EX SEDIMENTATION BASIN No 2
SECTION 3
SED23
MAIN COLLECTOR No 6
(NOTE 2)
0
2013-10-09
DI617
I/R
DATE
DI617
KEY PLAN
ISSUE FOR TENDER
DESCRIPTION
HYDRAULIC POWER
UNIT No 1 HPU10
PROJECT NUMBER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN
FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT
REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO
TANKS/SCRAPERS.
NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE
SUPPLED BY CONTRACTOR AND WILL BE
MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE
SCRAPER PLC #1.
Printed on ___% Post-Consumer
Recycled Content Paper
60246477
(NOTE 2)
S
SHEET TITLE
SLC23_SV1
TO EX FILTERS
300-SD-DI
TO PLANT DRAIN
P&ID
SEDIMENTATION BASIN No2
SLUDGE SCRAPER SYSTEM
SHEET NUMBER
DI618
ISO A1 594mm x 841mm
ELGIN AREA WATER TREATMENT PLANT
PROJECT
CNET
CNET
CNET
RPFM
CNET
CNET
RPFM
CNET
CNET
CNET
CNET
RPFM
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
F
F
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CNET
CLIENT
Existing Cisco
Catalyst 2960
Ethernet Switch
F
Designer: _____
RESIDUALS
MANAGEMENT
FACILITY
RPU01
CNET
CNET
CNET
CNET
RPA
CNET
CNET
CNET
CNET
CNET
Checked: _____
CNET
CNET
CNET
CNET
Approved: _____
RPU02
CNET
CNET
CNET
ELGIN AREA WATER
SUPPLY SYSTEM
F
RPFM
RPFM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
Existing Cisco
Catalyst 2960
Ethernet Switch
F
F
F
CONSULTANT
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
To Existing Wireless
Switches
F
F
F
F
F
F
F
F
F
F
F
F
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
F
F
F
F
F
F
F
F
F
F
Project Management Initials:
F
F
CNET
RPA
F
CNET
F
F
F
F
F
F
F
F
F
F
F
CHEMICAL AREA
Existing Media
Converters
F
Existing Fibre Optic
Patch Panel
EAW-FPP-01
F
F
F
F
EAW_NCP30
EAW_UPS30
F
C/F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
EXISTING PLC NETWORK
COMMUNICATION PANEL No. 2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
EAW_SWI30
F
F
IP: XXX.XXX.XXX.XX
F
F
F
F
F
F
F
EAW_SCP31
EAW_SWI31
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
EAW_SWI32
EAW-FPP-20
C/F
DNET
CNET
EAW_OIT31
IP: XXX.XXX.XXX.XX
Control Room
Workstation
REGISTRATION
TO STANDALONE
CONTROLLERS
RACK1
EAW_SWI20
CNET
RMF
Comms
Panel
CNET
Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX
IP: XXX.XXX.XXX.XX
Control Room
Workstation
DeviceNet
To New MCC
Wireless AP
(Floor 1)
EAW_WAP20
CNET
Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX
CNET
Main UPS
IP: XXX.XXX.XXX.XX
BACNET
Sedimentation Basin No. 1
Sludge Scraper System
Vendor PLC
IP: XXX.XXX.XXX.XX
CNET
CNET
CNET
Wireless AP
(Floor 2)
EAW_WAP21
Wireless AP
(Floor 3)
EAW_WAP22
RACK2
CNET
CNET
CNET
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
EAW_PLC20
RMF Plant PLC
IP: XXX.XXX.XXX.XX
CNET
EAW_OIT30
Existing Fibre Optic
Patch Panel
EAW-FPP-02
EAW_CPU_21
EAW_UPS20
F
F
Sedimentation Basin No. 1
Sludge Scraper System
Vendor PLC
IP: XXX.XXX.XXX.XX
Printed on ___% Post-Consumer
Recycled Content Paper
F
EAW_PLC31
EAW_CPU20
EAW_NCP20
EAW_SCP20
RACK0
EAW_PLC30
RESIDUALS MANAGEMENT AREA
F
F
EAW_SCP30
ISSUE/REVISION
CNET
CNET
EAW_SCP21
EAW_SWI21
EAW_PLC21
C/F
BACNET
EAW_SCP22
EAW_SWI22
EAW_SCP23
EAW_SCP25
EAW_SCP27
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
EAW_SCP29
EAW_PLC23
EAW_PLC25
EAW_PLC27
EAW_PLC29
Backwash Waste
Thickener No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX
Sedimentation Thickener No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX
Polymer (Thickener)
Vendor PLC
IP: XXX.XXX.XXX.XX
Truck Unloading System
Vendor PLC
IP: XXX.XXX.XXX.XX
EAW_SCP24
EAW_PLC24
EAW_SCP26
EAW_PLC26
EAW_SCP28
EAW_PLC28
KEY PLAN
EAW_PLC22
Centrifuge No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX
Centrifuge No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX
EAW_OIT21
EAW_OIT22
PROJECT NUMBER
CNET
RPA
RPFM
ACN15
CNET
60246477
F
SHEET TITLE
F
DNET
DNET
Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX
Centrifuge No. 2
Vendor OIT
IP: XXX.XXX.XXX.XX
Backwash Waste
Thickener No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX
Sedimentation Thickener No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX
Polymer (Dewatering)
Vendor PLC
IP: XXX.XXX.XXX.XX
GENERAL SCADA
Network Architecture
SHEET NUMBER
DI620
ISO A1 594mm x 841mm
Approved: _____
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
2997 mm
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
2286 mm
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
150 mm
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
REGISTRATION
Printed on ___% Post-Consumer
Recycled Content Paper
ISSUE/REVISION
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
RMF
CONTROL PANEL
SHEET NUMBER
DI621
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
+
REGISTRATION
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
+
Printed on ___% Post-Consumer
Recycled Content Paper
ISSUE/REVISION
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
CONTROL PANEL SCP-20
POWER DISTRIBUTION
SHEET NUMBER
DI622
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
REGISTRATION
Printed on ___% Post-Consumer
Recycled Content Paper
ISSUE/REVISION
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
CONTROL PANEL SCP-20
POWER DISTRIBUTION
(CONTINUED)
SHEET NUMBER
DI623
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
REGISTRATION
Printed on ___% Post-Consumer
Recycled Content Paper
ISSUE/REVISION
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
NOTES:
CONTROL PANEL
SCP-20
RACK LAYOUT
SHEET NUMBER
DI624
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
REGISTRATION
Printed on ___% Post-Consumer
Recycled Content Paper
ISSUE/REVISION
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
NOTES:
CONTROL PANEL
SCP-20
RACK LAYOUT (CONTINUED)
SHEET NUMBER
DI625
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
Designer: _____
ELGIN AREA WATER
SUPPLY SYSTEM
Project Management Initials:
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
REGISTRATION
Printed on ___% Post-Consumer
Recycled Content Paper
ISSUE/REVISION
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
PROJECT NUMBER
60246477
SHEET TITLE
TYPICAL LOOP
DRAWING EXAMPLES
SHEET NUMBER
DI626
ISO A1 594mm x 841mm
PROJECT
Checked: _____
Approved: _____
ITEM #
WALL-MOUNT SWING OUT RACK
2
LOCKABLE FRONT TINTED WINDOW DOOR
3
24 PORT MANAGED SWITCH
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
4
RACK SHELF
Designer: _____
1
RESIDUALS
MANAGEMENT
FACILITY
5
MEDIA CONVERTER
6
FIBER HOUSING PANEL
Project Management Initials:
627
DESCRIPTION
7
FIBER ADAPTER PLATES
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
653
CONSULTANT
8
CABLE MANAGEMENT RACK
9
POWER DISTRIBUTION UNIT/BAR
10
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
PUNCHDOWN COPPER PATCH PANEL
610
TOP VIEW
REGISTRATION
1
653
Printed on ___% Post-Consumer
Recycled Content Paper
508
3
5
Cisco Systems
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
36
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
4
BLACK BOX
XMT
RCV
100 Mbps
10
6
7
ISSUE/REVISION
705
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
2
8
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
9
KEY PLAN
NOTES:
FRONT VIEW (DOOR REMOVED)
SIDE VIEW
PROJECT NUMBER
60246477
SHEET TITLE
GENERAL SCADA
Residual Management Area
Network Panel Layout (EAW_NCP20)
SHEET NUMBER
DI627
ISO A1 594mm x 841mm
PROJECT
ITEM #
DESCRIPTION
Approved: _____
Checked: _____
MEDIA CONVERTER
3
Designer: _____
2
1
5
24VDC POWER SUPPY
6
MAIN CIRCUIT BREAKER
Project Management Initials:
NEMA 4X FIBERGLASS REINFORCED PLASTIC (FRP)
WALL-MOUNT HINGED DOOR
7
120 VAC CIRCUIT BREAKERS
6 PORT MANAGED SWITCH
4
24VDC REDUNDANCY MODULE
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
TOP VIEW
8
24VDC CIRCUIT BREAKERS
9
SURGE PROTECTOR
10
UTILITY DUPLEX RECEPTACLE
11
UPS SIMPLEX RECEPTACLE
12
GROUNDING BAR
13
2" x 3" DEEP PANDUIT
14
PANEL LIGHT
15
TOWER UPS
16
STANDARD TERMINALS
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
825
2
4
3
1
5
345
329
275
Allen-Bradley
BLACK BOX
100 Mbps
17
Stratix 5700
1
2
Express
Setup
1
14
REGISTRATION
DC2
Pwr A
DC+
3
XMT
DC-
17
Pwr B
4
RCV
DC+
DIN RAIL
5
Com
IN2
1
Ref
13
IN1
Printed on ___% Post-Consumer
Recycled Content Paper
16
11
10
1084
9
939
7
1025
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
6
8
ISSUE/REVISION
15
12
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
NOTES:
740
FRONT VIEW (DOOR REMOVED)
PROJECT NUMBER
SIDE VIEW
60246477
SHEET TITLE
GENERAL SCADA
Settling / Sedimentation (Chemical Area)
Network Panel Layout (EAW_NCP30)
SHEET NUMBER
DI628
ISO A1 594mm x 841mm
PROJECT
Approved: _____
RESIDUALS
MANAGEMENT
FACILITY
Checked: _____
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
120 VAC FROM EXISTING LP
CLIENT
TO GND BUS
Designer: _____
BRK01 (15A)
DOOR
SWITCH
Project Management Initials:
BKR02 (5A)
FLUORESCENT
LIGHT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
BKR03 (5A)
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
UTILITY
#12 AWG WHITE
#12 AWG RED
BKR04 (15A)
UPS
#12 AWG WHITE
#12 AWG RED
BKR05 (5A)
SPARE
UPS
UNIT
#12 AWG GREEN
REGISTRATION
#12 AWG BLUE
#12 AWG WHITE
BKR06 (5A)
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG
MEDIA CONVERTER
Printed on ___% Post-Consumer
Recycled Content Paper
24VDCPS1
BKR07 (5A)
24 VDC
POWER
SUPPLY
+
24VDCPS2
BKR08 (5A)
ISSUE/REVISION
24 VDC
POWER
SUPPLY
#14 AWG BLACK
+
+V IN 1
+V IN 2
+V OUT
#14 AWG WHITE
REDUNDANCY
MODULE
#14 AWG BLACK
0
2013-10-09
I/R
DATE
ISSUED FOR TENDER
DESCRIPTION
KEY PLAN
5A
CB01
NETWORK SWITCH
5A
CB02
SPARE
PROJECT NUMBER
60246477
SHEET TITLE
GENERAL SCADA
Settling/Sedimentation (Chemical Area)
NP Power Schematic (EAW_NCP30)
SHEET NUMBER
DI629
Download