Metering Equipment: Installation Requirements EXTERIOR METHOD ENCLOSED METHOD Meter Height Requirements 100-225 Amp – Std RPI-8 300-325 Amp – Std RPI-9 400 Amp – Std RPI-10 See Notes 3&4 CIC Conduit (CIC) to be trimmed to 2" above bushing after trenches are backfilled (typical of both methods) Conduit Note 2 SCH 80 PVC, RGS, or IMC Conduit PVC Coupling Minimum Riser Size Requirements 100-225 Amp, 2-1 /2" Min 300-350 Amp, 3" 400 Amp, 3" Note 5 Hold down straps (securely fastened to frame of building) Foundation PVC Coupling Fi nal Grade Final Grade Minimum 2-1/2” Schedule 40 PVC /////////// PVC bushing below foundation 12" /////////// 15-18" Typ PVC Bushing Vinyl Marking Tape (see RT-G) 36" Min Sand CIC 36" Min Sand For approved trench, see RT-8 Conduit (CIC) owned by NVE (typical of both methods) SUBDIVISIONS, CUSTOM HOMES, AND TOWN HOUSES NOTES: 1. All installations shall meet the City, County, or State building codes. 2. Incoming conduit can be of rigid galvanized steel (RGS), intermediate metal conduit (IMC), or SCH 80 PVC. If SCH 80 PVC is used contractor must make sure trade size is clearly labeled and visible, showing SCH 80. If this cannot be done it will be rejected. 3. A plastic bushing is required on the panel end of the incoming conduit. 4. For the RGS or IMC conduit, a hub or bonding jumper is required for proper grounding of the conduit. A hub is the preferred method. (Per local building code) 5. All metal conduit exposed to the earth must be covered with 10 mil pipe protection tape, ½ lapped or PVC coating. 6. Kicks or Offsets shall not be permitted in service risers. 7. If contractor elects to hard stick service then they shall follow all applicable NEC codes and County codes in effect. This is above and beyond NVE standard installation. Electric Service Requirements Drawn: Eng: Appr: Date: DC RD DA 9/13 Cable Risers, Residential Single Meter, CIC, Underground RPI-23 Revision: 4 Page 1 of 2 Metering Equipment: Installation Requirements For meter height plus equipment and installation requirements for multiple meters, see RPM-53 Conduit (CIC) to be trimmed 2" above bushing after trenches are backfilled Pull Section Bushing (Notes 3 & 4) 3" Min metal conduit or SCH 80 PVC (Note 2) Hold down strap (must be securely fastened to frame of building) Note 5 Final Grade 12" //////////////// Vinyl Marking Tape, per RT-G 15 - 18" 3" PVC bushing below foundation 36" Min Sand Conduit (CIC) owned by NV Energy (Note 6) For approved trench, see RT-8 APARTMENTS AND CONDOMINIUMS NOTES: 1. All installations shall meet the City, County, or State building codes. 2. The incoming conduit can be a rigid galvanized steel (RGS), intermediate metal conduit, or SCH 80 PVC. If SCH 80 PVC is used contractor must make sure trade size is clearly labeled and visible, showing SCH 80. If this cannot be done it will be rejected. 3. A plastic bushing is required on the panel end of the incoming conduit. 4. A hub or bonding jumper is required for proper grounding of the conduit. A hub is the preferred method (per local building code). 5. All metal conduit exposed to earth must be covered with 10 mil pipe protection tape, ½ lapped or PVC coating. 6. Kicks or Offsets shall not be permitted in service risers. 7. If contractor elects to hard stick service then they shall follow all applicable NEC codes and County codes in effect. This is above and beyond NVE standard installation. Electric Service Requirements Drawn: Eng: Appr: Date: DC RD DA 9/13 Cable Risers, Residential Single Meter, CIC, Underground RPI-23 Revision: 4 Page 2 of 2