EMERGENCY BALLAST AND AC BALLAST MUST BE FED FROM THE SAME BRANCH CIRCUIT VEM700MV-SL TYPICAL SCHEMATICS ONLY MAY BE USED WITH OTHER BALLASTS. CONSULT THE FACTORY FOR OTHER WIRING DIAGRAMS. Fluorescent Emergency Ballast WIRING DIAGRAMS for 1-LAMP emergency operation Universal Voltage ( 100V ~ 277VAC ) JWEB-700T5-UN INSTALLATION INSTRUCTIONS GREEN (GROUND WIRE) GREEN (GROUND WIRE) 100~277V TO UNSWITCHED AC 100~277V VEM700MV-SL TO UNSWITCHED AC VEM700MV-SL IMPORTANT SAFEGUARDS 1. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. GREEN (GROUND WIRE) 100~277V 2. To prevent high voltage from being present on the output leads (red and yellow), do not join battery connector until installation is completed and AC power is supplied to the emergency ballast. GREEN (GROUND WIRE) 100~277V TO UNSWITCHED AC VEM700MV-SL TO UNSWITCHED AC 3. All electrical connections must be in accordance with local code and the National Electric Code. VEM700MV-SL 4. To reduce the risk of electric shock, disconnect both normal and emergency power supplies and battery connector of the emergency ballast before installation. 5. Do not use outdoors. This emergency ballast is for indoor fixtures except air outlets or hazardous location fixtures. 6. An un-switched AC power source is required (100 ~ 277 volts). GREEN (GROUND WIRE) 100~277V GREEN (GROUND WIRE) TO UNSWITCHED AC 100~277V VEM700MV-SL TO UNSWITCHED AC VEM700MV-SL 7. Do not mount near gas or electric heaters. 8. Do not attempt to service the battery. A sealed, no-maintenance battery is used that is not field replaceable. Replace the entire battery when necessary. 9. This emergency ballast is for one fluorescent lamp 14 W through 54 W (2'- 4') T5 bipin, except 35W, 22 W T5 circular, 36 W through 55 W (4-pin) long compact, 32 W (4-pin) compact, 32 W (4'), 40 W (5') and 44 W HO (4') T8 bipin for 90 minutes at reduced light output. FIG 8 TWO (2) LAMP RAPID START BALLAST W/2 LAMP EMERGENCY OPERATION GREEN (GROUND WIRE) 100~277V 10. This product should be mounted in location and at heights where it will not readily be subject to tampering by unauthorized personnel. GREEN (GROUND WIRE) TO UNSWITCHED AC 100~277V VEM700MV-SL TO UNSWITCHED AC 11. This emergency ballast is for factory or field installation. VEM700MV-SL 12. Do not use this emergency ballast other than intended use. LAMP1 13. All servicing should be performed by qualified personnel only. SAVE THESE INSTRUCTIONS FIG 9 TWO (2) LAMP INSTANT START BALLAST GREEN (GROUND WIRE) 100~277V VEM700MV-SL PAGE 4 TO UNSWITCHED AC Contains Nickel-Cadmium Rechargeable Battery. Must be recycled or disposed properly. PAGE 1 (3) Emergency ballast requires an un switched AC power source (100 ~ 277 VAC). INSTALLATION INSTRUCTIONS CAUTION: (4) When emergency ballast is used with switched fixture, an additional un switched hot (100 ~ 277 VAC) wire must be run to junction box and connected to the emergency ballast. (Refer to Fig.4) (5) After installation is completed, supply AC power to emergency ballast and join the battery connector. To prevent electrical shock, disconnect the AC power by turning off the circuit breaker and battery connector must be open. Join battery connector after installation and after AC power is turned on. 3. BALLAST WIRING BLOCK DIAGRAMS Fig.4 1. INSTALLING THE VEM700MV-SL Switched Fixture (1) Install the emergency ballast in the AC ballast channel or enclosed wireway so the wire leads are not exposed at least 1/2" away from the AC ballast(s). Refer to Fig.1 for typical mounting. HOT AC LINE (2) Make all electrical connections in accordance with local code and National Electrical Code. Fig.2 Inside Ballast Channel BLACK 100V ~277V Installing the Test Switch with LED charge indicator Lamp AC Ballast Channel WHITE AC Ballast WHT/BLK WHITE COMMON Emergency ballast VEM700MV-SL BLACK 100V ~277V GREEN (GROUND WIRE) Emergency ballast VEM700MV-SL WHT/RED WHT/RED TEST SWITCH & LED CHARGE INDICATOR Plastic Nut AC Ballast WHITE GREEN (GROUND WIRE) Emergency Ballast Test Button WHITE BLACK HOT AC LINE WHT/BLK COMMON Fig.1 Unswitch Fixture BLACK TEST SWITCH & LED CHARGE INDICATOR RED(+) RED(+) Leads Test switch with LED charge indicator 4. MOUNTING THE TEST SWITCH AND CHARGE INDICATOR LIGHT d Inside Strip Fixture Emergency Ballast Select appropriate location on the side of the fixture so that Test Switch can be seen after installation. Allow for proper clearance and drill or punch 5/8" hole. Remove the plastic nut and push the Test Switch into the 5/8" hole. Secure the Test Switch with plastic nut. (Refer to Fig.2) Connect the wires as indicated in wiring diagrams on Page 4. Push to Test Fixture 5. LABELS d Test switch with LED charge indicator Drill a 5/8" hole and install Test Switch on the appropriate location on the fixture Attach the appropriate label to the Test Switch Plate and attach Re-lamping Label for lamp type and wattage to fixture. The Caution and Re-lamping label must be on the fixture in a readily visible location to anyone attempting to service the fixture. 6. COMPLETE INSTALLATION When installation is complete, supply AC power to emergency ballast and join the battery connector. Do not push Test Switch button until join the battery connector. (3) Install the test switch and the light indicator in the strip fixture. Refer to Fig. 2 . OPERATION (4) Install the test switch and the light indicator in the recessed troffer fixture. Refer to Fig. 3 . When AC power is applied, the charging indicator light is illuminated, indicating battery is being charged. When power fails, the emergency ballast automatically switches to emergency power (internal battery), operating one lamps at reduced illumination for a minimum of 90 minutes. MAINTENANCE Test Switch This emergency ballast has test switch and charge indicator. Press test switch to test emergency operation. Allow minimum 24 hours battery charging before conducting one hour test. Recommended periodical test schedule is as follows: 2. WIRING THE VEM700MV-SL (1) Refer to the Wiring Diagram on the back page (Page 4) for the proper wiring (2) Emergency ballast and AC ballast must be on the same branch circuit. PAGE 2 1. For initial testing unit need to be charged about 1 hour, then press test switch to. Conduct a short discharge test. 2. Visually inspect the charging indicator light monthly. It should be illuminated. 3. Test the emergency operation of fixture for 30 seconds at 30 day intervals. One or two lamps should be operate at reduced illumination. 4. Conduct 90 min battery discharge test once a year. One or two lamps should be operate at reduced illumination. PAGE 3