electrical contractor

advertisement
AURORA HALOGEN ACCENT HOUSING 2
ROUND AND SQUARE TRIMLESS
AH2-ARE3 & AH2-ASE3
INSTALLATION INSTRUCTIONS
Fixtures must be installed by a qualified electrician (check with local and national codes for proper installation).
To prevent electrical shock , disconnect electrical supply before installation or servicing.
Housing
Fig.1
Complete Fixture
Drywall
Anchor
Screens
6 1/16”
(154mm)
Plaster
Plate
5 7/8”
(149mm)
18 1/2”
(470mm)
8 7/8”
(225mm)
12 1/8”
8.9
8.9
(307mm)
WORKFLOW CHART
ELECTRICAL CONTRACTOR
1. Locate and mount housing
2. Screw and lock-in housing
3. Connect wires in housing
DRYWALL CONTRACTOR
Adjustable
gears hidden
behind the
lamp.
1. Install and cut drywall
around housing.
Back Light Shield
Tilt Gear
Pan Lock
Pan Rotation Ring
Fig.2
Pan Tilt Mechanism
attached to inside
of plaster plate.
ELECTRICAL CONTRACTOR
1. Adjust plaster flange frame
and tighten wing nuts.
2. Connect the MR16 wiring to
the plaster plate.
3. Screw plaster plate into
housing.
4. Test MR16.
Hot Aiming
with Phillips Screwdriver
DRYWALL CONTRACTOR
Light Spill Shield
5 Bullet Catches
Snoot Retaining Ring
Hot Aiming
Tilt Screw
Locking Ring (Included)
MR16 Lamp
Locking Ring (Included)
Soft Focus Lens (Included)
Lens (Optional)
Louver (Optional)
1. Plaster, sand & paint.
2. Clean aperture with
clean damp towel.
ELECTRICAL CONTRACTOR
1. Clean aperture with clean damp towel,
where the drywall contractor missed.
2. Adjust pan rotation ring and aim lamp.
You’re done! ☺
Snoot (Included)
Fig.3
Snoot Finger Grip
Snoot Assembly
1718 W. Fullerton Chicago , IL 60614 Ph: 773.770.1196
Fax: 773.883.6128
www.purelighting.com
1
ELECTRICAL CONTRACTOR
1
Use these dimensions when locating center point of aperture during
installation. Align fixture using laser or chalk line.
5 7/8"
14 3/4"
(149mm)
(375mm)
Alignment
Notch
8 7/8"
(226mm)
6 1/16"
(154mm)
6 1/16"
(154mm)
NOTE: APERTURE
IS CENTERED
WITH CURVES IN
HOUSING.
2
12 1/8"
(308mm)
Alignment
Notch
Hanger bars must align and remain flush with joist.
NOTE: APERTURE IS
CENTERED WITH CURVES
IN HOUSING.
(NOT CENTER IN FIXTURE)
MUST BE
FLUSH WITH
JOIST.
2
Drywall
anchor
screens may
be removed,
if the joists
are less
than 14 1/2”
apart.
ELECTRICAL CONTRACTOR
3
After fixture is positioned, tighten all (10) screws on hanger bars.
REMODEL NOTE: CUT
DRYWALL TO MIDDLE
OF JOIST.
4
After installation, pull on fixture to ensure there is no movement.
3
ELECTRICAL CONTRACTOR
5
LINE INPUT 120V - 240V
INSIDE AURORA JUNCTION BOX
(NOT TO SCALE)
- Neutral
TO NEXT FIXTURE
+ Dimmable Switchleg
*NOTE*
Leave 12” of wire in the
junction box for future
maintenance through
the fixture aperture.
MAGNETIC LOW
VOLTAGE DIMMER
Pull on wire nuts
to make sure the
connection is
tight.
INSIDE AURORA
FIXTURE
120V 75W MAGNETIC
TRANSFORMER
(240V ELECTRONIC
TRANSFORMER FOR
EUROPE)
MR16 LAMP
WIRING DIAGRAM
FOR USE WITH PURE LIGHTING AURORA NON-RGB FIXTURES
4
DRYWALL CONTRACTOR
6
Drywall contractor must install drywall and cut 14 3/4” (375mm) X
12 1/8” (308mm) hole with rotary cutting tool around fixture or
pre-cut hole in drywall prior to installation. Contratista hojas de pared tiene que
instalar la hoja de pared y corte un agujero 14 3/4” (375 mm) X 12 1/8” (308 mm) con une corto
rotatorio alrededor el enseres fijo o lo corte un agujero antes que instalar.
ELECTRICAL CONTRACTOR
7
Electrician must anchor drywall to drywall anchor screens. Insert
screws through drywall into anchor screens on fixture.
Drywall Anchor Screen
e
Inse
all
ryw
rt D
er
sH
ew
Scr
Drywall Anchor Screw
5
ELECTRICAL CONTRACTOR
Loosen (4) wing nuts and adjust plaster flange frame to be flush with drywall.
All 4 corners MUST be exactly even with drywall. Plaster flange frame adjusts to
accommodate 1/8” (13mm) to 1 1/4” (32mm) ceiling thickness.
s to
a djust p
las
t
fla n
Lo o s e n w i n
t
nu
er
g
8
g e fra m e
Plaster
Flange Frame
9
Use a straight edge or level and move plaster flange frame up
or down to be exactly even with drywall.
Ceiling
Tighten (4) wing nuts securely.
t
nu
s to
a dj u st p
las
t
er
fla n
g e fra m e
T i g h te n w i n g
10
PLASTER
FLANGE FRAME
MUST BE TIGHT OR
PLASTER SEAMS WILL CRACK !
6
ELECTRICAL CONTRACTOR
11 Secure MR16 into locking rings. Feed MR16 socket through slot in the
dome and plug MR16 into socket.
Slot in Dome
pe
ti g h te n l o c k i
n
rin
Snoot Lamp Holder
g s.
Use
to
Lamp Locking Ring
Louver and Lens Locking Ring
g
n
Plaster Plate
12 Loosely attach plaster plate using all (4) screws. After all (4) screws
are started, go back and tighten the screws securely.
7
ELECTRICAL CONTRACTOR
13 Check to ensure that the plaster plate is flush and even with the drywall.
14
*IMPORTANT*
Turn on and test MR16 to ensure they are properly installed.
MR16
HALOGEN
ACCENT LIGHT
8
ELECTRICAL CONTRACTOR
15 To aim lamp, loosen pan lock, rotate and position the pan rotation ring.
Pan Lock
HANDS MUST BE CLEAN WHEN ADJUSTING FIXTURE
16 Tilt and rotate MR16 as needed. When lamp is properly adjusted secure
pan lock.
HANDS MUST BE CLEAN WHEN ADJUSTING FIXTURE
9
DRYWALL CONTRACTOR
Make sure provided paint
shield is in place.
(Asegurase que el protector
de pintura estés puesto.)
17 Plaster (Yeso)
Apply a thin
layer of
Durabond 45
compound
around all four
Aplicar una capa delgada de Durabond 45
sides.
18
Sand (Lijar)
Lijar y yeso otra
ves hasta que
superficie estés
completamente
liso.
alrededor de los cuatro lados.
19
Paint (Pintar)
Pintar sobre
el protector
de pintura.
Remover el
protector de
pintura 2060 minutos
después de
pintar.
20
Sand and plaster again,
until smooth finish is
achieved.
Paint over paint shield.
Remove paint shield 20 to
60 minutes after painting.
Remove any excess paint that
is on the beveled edge. Any
excess paint will be noticeable
when light is powered on. Wipe
inside of aperture with clean
damp towel.
(Remover cualquier exceso de
pintura. Cualquier exceso de
pintura será notable cuando la luz
esta encendido. Limpie adentro de
la apertura con una toalla limpia y
húmeda.)
21
Clean inside of fixture with
compressed air to remove any
remaining construction debris.
(Limpia adentro de enseres fijo con aire
comprimido para remover cualquier
polvo que halla quedado adentro.)
10
ELECTRICAL CONTRACTOR
22
HANDS MUST BE CLEAN WHEN ADJUSTING FIXTURE.
Pan Lock
Wash hands and clean all drywall residue from inside aperture, with a
clean damp towel. Electrician or lighting designer - ensure pan rotation
ring is adjusted, locked in place, and the lamp is aimed properly.
11
INS-AH2-ARE3
1718 W. Fullerton Chicago , IL 60614 Ph: 773.770.1196
Fax: 773.883.6128
www.purelighting.com
Download