Installation Instructions

advertisement
POD 4.4, 4.2, 4.1 (recess mount) - INSTALLATION AND OPERATION INSTRUCTIONS
CAUTION: BEFORE CONNECTING THE FIXTURE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF.
corporate
t (877) SSL-GREEN
f (630) 889-8106
3609 Swenson Ave.
St. Charles, IL 60174
DETAILED ILLUSTRATION
GENERAL:
1. Before starting the installation, make sure all electricity has been
turned off and electrical breaker has been locked out and tagged out.
Fig 1A
2. To ensure the success of the installation, be sure to read these
instructions and review the diagrams thoroughly before beginning.
POD 4.4 - Cut opening Minimum 12-5/8” x 12-5/8” ( No more than 13-1/2” x 13-1/2” )
POD 4.2 - Cut opening Minimum 12-5/8” x 5- 3/4” ( No more than 13-1/2” x 6- 5/8” )
3. All electrical connections must be in accordance with local codes,
ordinances, or the National Electrical Code.
NOTE: The important safeguards and instructions appearing in this
manual are not meant to cover all possible conditions and situations
that may occur.
POD 4.1 - Cut opening Minimum 5-3/4” x 5- 3/4” ( No more than 6- 5/8” x 6- 5/8” )
Fig 1
Refer to chart size
above for cutting
opening in ceiling,
see figure Fig 1A.
Drywall Wings
Light Engine
INSTALLATION:
1. Cut opening in ceiling if needed. Fig 1
NOTE: Refer to chart Fig 1A for cutting correct sized opening.
Fig 2
2. Remove Light Engine from Plaster Frame, by removing (4) security
screws and loosening (4) convenience screws. Then slide Engine out.
Space
above ceiling
is needed
to position
fixture into
place.
320.7 mm (Ø12.625) in)
48.2 mm (1.9 in)
355.6 mm (14 in)
17.8 mm (0.7 in)
Fig 3
320.7 mm (Ø12.625)
5. Plug cord from Light Engine into Power Supply.
355.6 mm (14 in)
431.8 mm (17 in)
4. Run approved conduit and AC wires to J-Box and connect AC wires
to supply with wire nuts. Then snap Power Supply onto J-Box. Fig 3
6. Push Light Engine up through opening in secured Plaster Frame and
adjust the front edge of Light Engine flush to ceiling, tighten the (4)
convenience screws. Once position is set, use (4) security screws to
anchor Light Engine to Plaster Frame.
Face Trim
406.4 mm (16 in)
NOTE: Remove Drywall Wings for step (3) by taking off wing nut & screw.
3. Angle and fit Plaster Frame up through opening. Reapply Drywall
Wings and Secure Plaster Frame to structure above ceiling using
Drywall Wings or other standard industry approved method. Fig 2
Plaster Frame
15 mm (0.6 in)
Fig 4
112 mm (4.4 in)
7. Attach Face Trim by inserting spring-loaded capture arms into holes at
edge of Light Engine, then raising trim up flush to ceiling surface. Fig 4
Drywall Wings
Rev 1013
CONFIDENTIAL THIS DOCUMENT IS THE PROPRIETARY PROPERTY OF SOLID STATE LUMINAIRES. ANY UNAUTHORIZED TRANSFER, USE OR REPRODUCTION IS STRICLY PROHIBITED. ©2013 SOLID STATE LUMINAIRES.
Download