Installation Instructions – Mounting IQ3.../.../XNC/... Controller/Interface Important: Retain these instructions Contents 1Installation......................................................................1 2Disposal..........................................................................2 1Installation 1 Install 2 Connect Serial Interface Install IQ3 according to IQ3xcite Installation Instructions - Mounting, section 3 steps 1 to 11 If /SER/.., serial interface auxiliary board, fitted Note that only one of the RS232 or RS485 connectors can have a cable connected at any one time in order to comply with Class B EMC emission standard (EN61000-6-3, residential, commercial, and light industrial environments). WARNING: Failure to comply with this requirement will reduce the unit to Class A (industrial environments); in a domestic environment the unit may cause radio interference, in which case the user may be required to take adequate measures. TX RX RTS/TXEN CTS/RXEN RS485 IQ3xcite Installation Instructions Mounting (TG200626) RS232 either RS485 2 wire, RS485 4 wire, or RS422 or RS232 2 part connector with 5 screw terminals fo 0.5 to 2.5 mm2 cross section area (14 to 20 AWG) cable either 9 way D type plug 6 RTS 7 CTS 8 9 1 2 3 4 5 RX Note TX (held high) GND pins 1,6,9 - no connection or RJ11 socket If RS485 2 wire 32 devices maximum 0V A B 0V A B 1 2 3 4 5 6 0V A B IQ3../.../SER/XNC/... RX CTS RTS GND TX Note pin 2 - no connection Note that only one of the two RS232 connectors can be used at a time RB RA T B A 0V 120 ohm terminator T If RS422 IQ3../.../SER/XNC/... Terminator switch ON external 100 ohm terminator If RS485 4 wire 32 devices maximum 0V TA TB RA RB TA RA TB RA T 0V TA TB RA RB 0V TA TB RA RB 0V RB B T A 0V RB 100 ohm terminator IQ3../.../SER/XNC/... Terminator switch OFF RB RA T B T A 0V 120 ohm terminators Terminator switch ON This diagram shows IQ3 wired as a master, it may also be wired as a slave. If the IQ3/XNC/SER controller and other units on the bus are in the same cabinet using the same power supply, each device should have a good physical earth (ground) connection. continued next page IQ3.../.../XNC/... Installation Instructions TG200911 Issue 4 , 09/10/20141 IQ3.../.../XNC/... 1 Installation Instructions – Mounting Installation (continued) Connect Serial Interface 2 (continued) RS485 2 wire, RS485 4 wire, or RS422 (continued) If the IQ3/XNC/SER controller and other units on the bus are in different cabinets or use different power supplies (e.g. different UPSs), the cabinets should be isolated from each other. If the bus is likely to suffer from surge and grounding problems, surge protection should be added. The isolator should be connected to the earth (ground) of the nearest device, the 0V of the isolator and the surge protector should be connected together, and earth (ground) of the surge protector’s exposed side (e.g. backbone bus) should be connected as directly as possible to the surge ground or earth bond. Multiple Cabinets 0V A B 0V A B terminate at far end A B 0V Isolating Repeater A B 0V Surge Protection A B 0V A B 0V Cabinet B Surge Ground or Earth Bond Cabinet A RB Isolating Repeater RA T A T B B A 0V 0V Surge Protection to more cabinets A B A B A B 0V 0V 0V Backbone Bus terminate at far end Surge Ground or Earth Bond 2 IQ3.../.../XNC/... Installation Instructions TG200911 Issue 4 , 09/10/2014 Installation Instructions – Mounting 1 Installation 3 IQ3.../.../XNC/... (continued) Connect Trend Current Loop Network If /LAN/.., IQ system current loop Lan auxiliary board, fitted Network Engineering Manual, (92-1735) Cable 9k6 baud 19k2 baud No. of Wires Belden 9182 1000 m (1090 yds) 700 m (765 yds) 2 Belden 9207 1000 m (1090 yds) 500 m (545 yds) 2 Trend TP/1/1/22/HF/200 (Belden 8761) 700 m (765 yds) 350 m (380 yds) 2 Trend TP/2/2/22/HF/200 (Belden 8723) 500 m (545 yds) 250 m (270 yds) 4 2 off 2 part connectors with 4 screw terminals for 0.5 to 2.5 mm2 cross section area (14 to 20 AWG) cable TX RX OK polarity independent Using 2 wire method Using 4 wire method IQ LAN IQ LAN T- T+ R- R+ T- T+ R- R+ T- T+ R- R+ T- T+ R- R+ 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 OUT IN earth (ground) screen to convenient input channel screen terminal 25 26 27 N + 0 OUT IN earth (ground) screen to convenient input channel screen terminal 25 26 27 N + 4 0 Continue Installation For IQ3xcite, continue installation according to IQ3xcite Installation Instructions - Mounting TG200626, section 3 step 12. IQ3xcite Installation Instructions - Mounting (TG200626) IQ3.../.../XNC/... Installation Instructions TG200911 Issue 4 , 09/10/20143 IQ3.../.../XNC/... Installation Instructions – Mounting 2Disposal WEEE Directive: At the end of their useful life the packaging and product should be disposed of by a suitable recycling centre. Do not dispose of with normal household waste. Do not burn. Please send any comments about this or any other Trend technical publication to techpubs@trendcontrols.com © 2014 Honeywell Technologies Sàrl, ECC Division. All rights reserved. Manufactured for and on behalf of the Environmental and Combustion Controls Division of Honeywell Technologies Sàrl, Z.A. La Pièce, 16, 1180 Rolle, Switzerland by its Authorized Representative, Trend Control Systems Limited. Trend Control Systems Limited reserves the right to revise this publication from time to time and make changes to the content hereof without obligation to notify any person of such revisions or changes. Trend Control Systems Limited Albery House, Springfield Road, Horsham, West Sussex, RH12 2PQ, UK. Tel:+44 (0)1403 211888 Fax:+44 (0)1403 241608 www.trendcontrols.com Trend Control Systems USA 6670 4 185th Avenue NE, Redmond, Washington 98052, USA. Tel:(425) 897-3900 Fax:(425) 869-8445 www.trendamericas.com IQ3.../.../XNC/... Installation Instructions TG200911 Issue 4 , 09/10/2014