Energy Strategy Victoria University of Wellington – Energy Strategy Contents 1. Introduction ....................................................................................................... 3 2. Targets ................................................................................................................ 4 2.1 Vision ............................................................................................................. 4 2.2 Benchmarks................................................................................................. 4 2.3 Ten year energy projections.................................................................... 5 3. Management.................................................................................................... 8 3.1 Administration ............................................................................................. 8 3.2 Tenancies..................................................................................................... 9 3.3 Measurement.............................................................................................. 9 3.4 Analysis ....................................................................................................... 10 3.5 Reporting ................................................................................................... 11 3.6 Energy Management Team .................................................................. 11 4. Energy Supply ................................................................................................. 12 4.1 Security of Supply..................................................................................... 12 4.2 Response to national shortages ........................................................... 13 4.3 On­site energy sources ........................................................................... 13 5. Energy Efficiency............................................................................................ 15 5.1 Investment Criteria................................................................................... 15 5.2 New design and re­fit.............................................................................. 15 5.3 New and replacement equipment ..................................................... 16 5.4 Mechanical plant .................................................................................... 16 5.5 Lighting ....................................................................................................... 17 5.6 User Participation ..................................................................................... 18 5.7 Audits .......................................................................................................... 18 6. Summary of Actions....................................................................................... 19 6.1 Management Actions............................................................................. 19 6.2 Energy Supply Actions............................................................................. 20 6.3 Energy Efficiency Actions ....................................................................... 20 May 2007 p. 2 Victoria University of Wellington – Energy Strategy 1. Introduction Since 2002, energy use at Victoria University of Wellington has steadily been increasing. The numbers of staff and students is increasing, the amount of occupied floor area is growing and new equipment is always being purchased. The combination of greater demand and higher prices has lead to significant increases in energy expenditure. In 2006 VUW spent $2.1 million on electricity and $900,000 on natural gas. If ‘business as usual’ continues energy expenditure will soon exceed $4 million/yr. Energy management has been handled by a number of staff on an ad­hoc basis over the past few years. Several beneficial energy projects have been completed, but a coherent direction for energy management has been lacking. This energy strategy provides a framework for the energy management programme over the next ten years. In August 2006, the University approved the environmental policy and the environmental committee has since been established, signalling the increased commitment by the university towards sustainability initiatives. One of the objectives listed in the policy states “the University will actively manage the use of energy and utilities in order to achieve a reduced level of user demand and more efficient use of available resources.” The basis for this energy strategy comes from both a financial and an environmental need to better manage energy use. The strategy provides objectives for each aspect of energy management and then details the actions required to meet each objective. May 2007 p. 3 Victoria University of Wellington – Energy Strategy 2. Targets 2.1 Vision Victoria University of Wellington will follow best practice energy management standards to maximise energy efficiency and minimise energy cost. 2.2 Benchmarks It is important to be realistic about what can be achieved through energy efficiency initiatives with the available resources. Firstly, the current energy use of the University can be compared to other facilities. Benchmarking should only be used as a guide, rather than a target, as the data can vary in quality and often does not provide a fair comparison. A common benchmark used for commercial buildings in New Zealand is 200 kWh/yr.m2. In 2006, the University was at 194 kWh/yr.m2. TEFMA also collects energy expenditure data which compares VUW with other New Zealand Universities, as shown in Figure 1. $16 $/EFTSU $/sq.m $14 $12 $10 $8 $6 $4 $2 $0 2002 2003 VUW 2004 NZ Average 2005 $200 $180 $160 $140 $120 $100 $80 $60 $40 $20 $0 2002 2003 2004 VUW NZ Average 2005 Figure 1: TEFMA energy expenditure comparisons All of these ‘benchmarks’ suggest that VUW is currently about average in terms of it energy use and expenditure. This suggests that enormous energy savings are unlikely, but being ‘average’ for New Zealand still leaves plenty of scope for improvement. New buildings around Wellington, which have been built as a showpiece for energy efficiency, including the offices for the Ministry for the Environment, Meridian Energy and Department of Conservation have, or are expecting, energy use of around 100 kWh/yr.m2. It is unrealistic to expect VUW to reach that level with its existing building stock. However, case studies show that over a 10 year period it is reasonable to target 25% savings for electricity May 2007 p. 4 Victoria University of Wellington – Energy Strategy and 40% savings for gas.1 This would reduce the energy index to around 140 kWh/ yr.m2. 2.3 Ten year energy projections Tracking the energy use over recent history, it is evident that the electricity use has been increasing by about 6% each year, while the gas use has fluctuated depending on climatic conditions. The ‘business as usual’ case assumes that electricity use continues to grow at 6% per annum and gas use remains at a stable level. It is much more difficult to model energy pricing. For the purposes of this projection it is assumed that the university will be able to continue to get 3­year supply contracts for both electricity and gas and each new contract brings a 15% price increase for electricity and a 20% increase for gas (based on recently observed price increases). Any new construction projects will significantly influence energy construction. At this stage 3 new construction projects are planned. The expected energy use for these buildings is estimated based on their proposed floor area – standard energy intensity for ‘business as usual’ and nearly half that for the ‘energy efficiency’ scenario. Developing and implementing an energy management programme, as outlined in this strategy, will potentially generate energy savings of 25% for electricity and 40% for gas. Greater energy savings will be possible in the first few years of the programme, after which savings will become harder to achieve. The forecast energy usage and targets are summarised in table 1 and figure 2 and assume the energy savings described above. Other New Zealand organisations have achieved similar levels of savings such as Te Papa (30% reduction in electricity use) and AgResearch (25% reduction in energy cost). 1 May 2007 p. 5 Victoria University of Wellington – Energy Strategy Year Electricity GWh/yr BaU EE 19.2 18.6 20.3 18.4 21.3 18.1 23.3 18.2 25.4 18.9 26.5 19.4 27.6 20.1 28.6 20.9 29.7 21.6 30.7 22.4 252.6 196.8 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 TOTAL Gas $/yr BaU $2,369,709 $2,762,785 $3,028,035 $3,311,612 $3,979,440 $4,331,034 $4,503,103 $5,158,008 $5,574,328 $5,772,208 $40,790,262 GWh/yr BaU EE 15.3 14.8 15.4 13.4 15.4 12.1 15.9 11.3 16.9 11.1 17.0 10.6 17.0 10.4 17.0 10.2 17.0 10.1 17.0 10.0 163.9 114.0 EE $2,302,896 $2,514,327 $2,576,735 $2,588,259 $2,958,917 $3,175,043 $3,285,409 $3,759,057 $4,062,769 $4,210,187 $31,433,601 $/yr BaU EE $897,530 $867,466 $1,042,632 $908,714 $1,042,632 $821,622 $1,118,776 $791,594 $1,351,827 $881,416 $1,361,855 $850,930 $1,399,235 $851,728 $1,556,406 $932,467 $1,556,406 $923,151 $1,593,785 $939,350 $12,921,083 $8,768,438 Table 1: Forecast energy futures NB: Bau – ‘Business as Usual’; EE – ‘Energy Efficiency’ Average Monthly TOU Electricity Expenditure $700,000 $600,000 $/month $500,000 $400,000 $300,000 $200,000 Campus Accommodation $100,000 Laby Extension Cotton Extension Energy Efficiency May 2007 Jul­16 Jul­15 Jan­16 Jan­15 Jul­14 Jul­13 Jan­14 Jan­13 Jul­12 Jul­11 Jan­12 Jan­11 Jul­10 Jul­09 Jan­10 Jan­09 Jul­08 Jul­07 Jan­08 Jan­07 Jul­06 Jul­05 Jan­06 Jan­05 $0 Business as Usual p. 6 Victoria University of Wellington – Energy Strategy Average Monthly Gas Expenditure $300,000 $250,000 $/month $200,000 $150,000 $100,000 Laby Extension Jul­16 Jan­16 Jul­15 Jan­15 Jul­14 Jan­14 Jul­13 Jul­12 Jan­13 Jan­12 Jul­11 Jul­10 Jan­11 Jan­10 Jul­09 Jul­08 Jan­09 Jan­08 Jul­07 Jan­07 Jul­06 Jan­06 Jul­05 $0 Jan­05 $50,000 Campus Accommodation Cotton Extension Energy Efficiency Business as Usual Figure 2: Forecast energy futures May 2007 p. 7 Victoria University of Wellington – Energy Strategy 3. Management Victoria University of Wellington is a large organisation with nearly 100 separate energy accounts, several tenancies and numerous metering points. This section outlines the strategy to achieve effective management of the energy accounts (both paying suppliers and billing tenants) and how to best collect and process energy use data. 3.1 Administration · Strategy: Energy invoices will be generated, received and processed in a systematic and efficient manner, whereby all energy invoice data is checked for accuracy and recorded in an electronic database. · Background: Every month VUW receives nearly 100 invoices for electricity or gas. Most of these are for non Time­of­Use (non TOU) small sites which have their meter read once a month. It is important that an effective system is used to process the invoices received. They need to be checked to ensure there are no errors in the invoice (a small percentage of invoices generated by retailers contain errors). They need to be paid quickly to receive the prompt payment discount and need to be allocated to the correct VUW cost centre. · Actions: o Non TOU meters will be read at the end of each month and the readings will be given to energy suppliers­ this ensures all sites have the same billing period and there are no estimated invoices. o Hard copies of invoices to be sent to Accounts Payable; scanned and emailed to Facilities Management administrators to approve and action payment. o Copies of all invoices to be emailed to Energy and Technical Services, directly from the supplier where possible, to check for errors and follow up where necessary. The invoice data will then be uploaded into an accessible electronic database. May 2007 p. 8 Victoria University of Wellington – Energy Strategy 3.2 Tenancies · Strategy: The energy use of all tenants will be systematically metered and invoiced where cost­effective. · Background: The University has a number of tenants including cafes, bookshops etc. Most of the tenancy agreements state the tenant is responsible for paying for energy separately from rent. Some of the tenants have check meters to measure their energy use and are billed by VUW, others are billed directly by energy suppliers, others have meters but have never been read and some have no meters at all. The energy use and billing structure of the tenants should be reviewed to make sure the appropriate parties are paying for the energy. · Actions: o Review the tenancy agreement for each tenant to determine responsibility for energy use. o Determine the existing system of accounting for the energy use of tenants. o Develop cost­effective solutions to ensure that tenant energy use is being billed and paid fairly and correctly. § NB: Energy could be incorporated into the rental rate when the leases are renewed or sub­metering installed and read monthly. If the tenant is estimated to use less than $1,000/yr then metered energy billing is unlikely to be worthwhile. 3.3 Measurement · Strategy: Sufficient energy consumption and expenditure data will be collected to provide cost­effective analysis of energy performance and potential savings. · Background: To effectively manage energy use, it first needs to be measured. More detailed measurement of the energy use allows of more detailed analysis of energy performance. Detailed measurement is also a critical tool in identifying energy saving opportunities and assessing the impact of energy efficiency projects. Many resources could be used measuring the energy use in great detail, however before the investment of time and money is made, any proposed additional measurements need to show evidence of adding sufficient value to justify the investment. May 2007 p. 9 Victoria University of Wellington – Energy Strategy · Actions: o Utilise all energy measurement sources: Energy invoices, energy retailer web­based services, metering company data, energy purchase database software. o Trend plant performance using the Building Management System. o Ensure all buildings follow guidelines for energy metering: § Buildings with an annual electricity use of more than 300,000 kWh should have a Stream TOU electricity meter measuring the main supply to the building. § Sites (ie: one building or a group of buildings) with annual gas expenditure greater than $100,000 should have a TOU gas meter measuring the main supply to the site. § All new construction should optimise connections to the Building Management System. 3.4 Analysis · Strategy: VUW will systematically gauge energy performance and identify and quantify potential energy savings or costs. · Background: Accurate assessment of the energy performance and energy saving strategies need to based on robust analysis of the collected data. The analysis should provide a useful gauge of energy performance; uncover anomalies in energy use patterns or building operations and it should highlight areas to target for energy savings. Individual energy efficiency projects will require more specific analysis to examine the extent of energy savings possible and how cost­effective they are. The analysis must provide sufficient detail to guide the energy management programme and make wise investment decisions. The level of detail of the analysis needs to be clearly defined and targeted to prevent excessive, unproductive analysis. · Actions: o Establish a system of comparing monthly energy use with expected use. o Check the energy use of each major building for anomalies on a monthly basis. o Analyse data as necessary on a case­by­case basis for individual energy efficiency projects. o Where ‘negative’ trends or anomalies are identified these will be investigated and appropriate action taken. May 2007 p. 10 Victoria University of Wellington – Energy Strategy 3.5 Reporting · Strategy: Relevant information regarding energy performance and projects will be reported through appropriate channels to key stakeholders. · Background: The energy management programme should not act in isolation of the rest of the University. The energy performance and the results of the energy efficiency projects need to be reported to the wider University. This includes facilities management, the senior management team, faculty representatives and all staff and students. The information reported needs to be relevant to each group. · Actions: o Include energy expenditure and consumption in the monthly facilities management report to the senior management team. o Distribute quarterly energy performance review and project updates. o Prepare energy management updates to be published on the VUW website and through staff and student communications. o Targeted consumption reports with action points will be provided to Heads of School. 3.6 Energy Management Team · Strategy: An energy management team will effectively progress energy management initiatives. · Background: The energy management programme will develop a number of energy efficiency projects, many of which will need input from relevant people within the University. The team should include a lead energy manager, the asset managers, the facilities manager, maintenance contractors and the building management system contractors. Holding regular meetings will provide a platform to discuss energy management initiatives and get input and resources from all parties. It will also provide additional impetus for the projects. · Actions: o Establish an energy management team with appropriate representation. o Hold monthly meetings with clear outcomes targeted and actions planned. May 2007 p. 11 Victoria University of Wellington – Energy Strategy 4. Energy Supply The following section details the best strategies for sourcing energy with respect to national energy supplies. The University needs to be confident of the long term security of its energy sources and where possible it should pursue renewable energy options. 4.1 Security of Supply · Strategy: The University will strategically select its energy sources considering national supply capacity. · Background: The demand for energy in New Zealand is steadily growing and placing greater pressure on our energy reserves. Electricity is a vital energy source for the University, which is a relatively reliable source (Wellington does not face the same network problems as Auckland). A large proportion of the electricity generation is from hydro­power so there is the risk of low rainfall reducing lake levels and restricting hydro­generation capacity. However, this is only likely to result in increased prices rather than losing all electricity supply (both now and in the future). The Electricity Commission was established in 2003 to ensure that the electricity system is able to cope with up to a 1­ in­60 dry year.2 The only other energy source currently used by the University is Natural Gas; primarily for water heating and some for cooking. “Gas has been a major energy source in New Zealand for 30 years. Proven reserves of gas declined sharply in 2001 when the Maui field was found to have considerably less economically recoverable gas left than previously thought. Renewed exploration efforts have found more gas and led to some increases in proven reserves”.3 In the short to medium term at least gas will be available and provides to most cost­effective method of water heating. If gas shortages continue to push prices higher, then alternative forms of heating should be investigated – including using boilers with other fuel sources such as coal or electricity and replacing hot water based heating with electric heating systems. Draft New Zealand Energy Strategy to 2050, Ministry of Economic Development, December 2006, pg 18 3 Ibid. 2 May 2007 p. 12 Victoria University of Wellington – Energy Strategy · Actions: o Continue to use electricity and natural gas as the sources of purchase energy for the University. o If shortages of natural gas make it a less economically viable energy source for the University, investigate alternative means of heating. 4.2 Response to national shortages · Strategy: The University will responsibly respond to national shortages in electricity supply to ease demand for generation. · Background: The combination of increasing energy demand and climate change is placing a lot of pressure on our hydro­ electricity supply. Low­lake levels and the corresponding ‘electricity crises’ are likely to happen more often. In previous years all central and local government funded organisations have been asked to lead by example and save 10% during these times. Similar requested are likely to occur again. The University should strive to meet these savings targets and if possible exceed them. This should be done through a combination of an awareness campaign and technical changes to the operation of the buildings. · Actions: During times of national electricity shortages the following actions should be taken: o Publicity campaign to request staff and students save electricity. o Heating and cooling set­points adjusted to less comfortable but tolerable temperatures. o Time schedules adjusted so that plant and equipment shuts down for a longer period overnight. o Lights in entry foyers and other day lit or low use areas switched off, if safe illuminance levels can be maintained. 4.3 On­site energy sources · Strategy: All energy generation options will be investigated and implemented where cost­effective and consistent with environmental goals. · Background: Small scale renewable energy technologies are becoming more available, more efficient and more cost effective. It may be possible to both reduce energy purchases and use a more environmentally friendly fuel source at the same time. Two technologies which are more developed are solar hot May 2007 p. 13 Victoria University of Wellington – Energy Strategy water systems and small scale wind turbines; however there may be more technologies which are suitable for VUW. The renewable energy options discussed above have the ability to generate energy for the University, but this is more likely to be small scale. Cogeneration plants are being used in other facilities around New Zealand. For example a gas fired turbine could be used to generate electricity, and at the same time the waste heat is captured and used for hot water heating. It warrants further investigation to determine what systems are available and if they would be cost­effective at the University. · Actions: o Prepare a report investigating sustainable energy and cogeneration options for the University and their potential application, with recommendations for further action. o Conduct consultation prior to proceeding with any projects as necessary. o In all cases consider energy generation options appropriate to the need, consistent with environmental and financial goals. o Implement all suitable projects. May 2007 p. 14 Victoria University of Wellington – Energy Strategy 5. Energy Efficiency The following section details the strategies for ensuring that energy efficiency initiatives are successfully identified and implemented. The initiatives need to consider new projects and existing facilities, technical solutions and awareness campaigns. 5.1 Investment Criteria · Strategy: All energy efficiency and renewable energy initiatives shown to have a payback period of less than 10 years, without being detrimental to the level of service provided to users, will receive financial consideration. · Background: The University can afford to invest in energy efficiency initiatives with a longer payback period than most organisations, as the buildings will be used by VUW for considerable length of time into the future. Furthermore, energy efficiency projects also provide educational opportunities for students. However the investment in energy efficiency should be managed so that initiatives with the greatest savings and shortest payback are implemented first. · Actions: o Develop a standard template to present energy efficiency initiatives for funding consideration. 5.2 New design and re­fit · Strategy: Any renovations or new construction will be designed to cost­effectively optimise energy efficiency, without being detrimental to the level of service provided to users. · Background: The potential for energy efficiency is at its greatest during the design of a building – it is much easier and cheaper to incorporate energy efficient design strategies and operating systems into a building before anything has been built. Energy efficiency and the wider principles of ecologically sustainable design (ESD) should be considered at the earliest stages of design. · Actions: May 2007 p. 15 Victoria University of Wellington – Energy Strategy o Develop standard design guidelines for ESD to be used when approaching designers. For larger projects these may need to be specifically tailored to suit the project. o Review plans during design process to ensure ESD is being optimised. Where appropriate an external consultant may be needed. 5.3 New and replacement equipment · Strategy: Energy efficiency will form part of the selection criteria prior to purchasing any new piece of energy using equipment. · Background: As the University develops new equipment is constantly being purchased or old equipment replaced. This includes items such as computers, light fittings, chillers etc. When selecting a new piece of equipment there are several factors which effect the decision of which one to purchase. Items which use a significant amount of energy and have a long useful life, such as boilers and chillers, should be selected with significant emphasis given to energy efficiency in the decision making process. · Actions: o Incorporate selection criteria for new and replacement equipment into the ESD guidelines described above. o Ensure procurement policy and practice at all levels considers energy efficiency and broader environmental issues. 5.4 Mechanical plant · Strategy: All mechanical plant (including lifts, heating, ventilating and air­conditioning systems) will be operated to maximise energy efficiency without decreasing the service provided. · Background: HVAC systems account for about 70% of the energy used on site and about 50% of the energy cost. A lot of the plant is controlled by the Building Management System (BMS), which means adjusting the system is relatively simple. It is common to find that HVAC systems are not operating at their maximum efficiency and with some changes to the controls and / or some additional equipment significant improvements can be made to the system. To identify these opportunities requires careful analysis of the performance of the HVAC system at the moment. May 2007 p. 16 Victoria University of Wellington – Energy Strategy · Actions: o Establish monitoring of the HVAC system performance through the BMS. o Assess the energy performance during winter and summer and identify areas for improvements. § Focus particularly on reducing excess ventilation rates. o Develop strategies to improve performance. o Ensure power factor for all buildings charged for peak demand has a power factor of 0.95 or above. 5.5 Lighting · Strategy: The University will not waste energy by providing more artificial light than is necessary or by leaving lights on when they are not needed. · Background: Lighting accounts for 25% of the energy cost. The majority of lighting fixtures throughout the University are controlled by the users with a simple on/off switch. A more sophisticated method of control should be investigated and trialled to determine if the controls are cost effective and practical – particularly in open plan areas. Secondly the University can ensure that it does not ‘over­light’ areas, by ensuring that lighting fit­outs are installed which do not greatly exceed standard illuminance requirements. · Actions: o Investigate options for lighting controls and trial them to determine the level of savings possible and the practicalities of using them. o Systematically check illuminance levels to ensure the standard requirements are not being greatly exceeded, and delamp or redesign where necessary. o Incorporate lighting design recommendations in ESD guidelines. May 2007 p. 17 Victoria University of Wellington – Energy Strategy 5.6 User Participation · Strategy: Energy management initiatives will gain support from staff and students and the wider community through an effective communication plan. · Background: The University will have a much more effective energy management programme if energy efficiency gains enthusiasm from staff and students and ultimately becomes habitual. Social marketing techniques will be needed to encourage staff and students to make a commitment to energy efficiency. The University also needs to take a leadership role in the community and be seen to be actively pursuing energy efficiency. · Actions: o Develop a communication plan which will engage staff and students. § Increase awareness of energy use § Generate commitment to energy efficiency 5.7 Audits · Strategy: All buildings will be regularly audited with more detailed investigations carried out in as needed in energy intensive buildings. · Background: Energy Audits have already been completed for all of the large buildings, excluding the Rec Centre, the Railway Station, Student Union Building and the Karori Campus. The numerous University houses are also yet to be audited. An energy audit has 2 primary functions – it assesses the current performance of the building, describing its operation and it also identifies potential energy savings. Many of the energy saving opportunities from the audits completed previously have already been implemented. The previous audits also suggested areas which could provide significant energy savings following further investigation. · Actions: o Conduct energy audits of Rec Centre, Railway Station, Student Union and Karori Campus. o Conduct basic energy audits of houses. o Conduct a more detailed investigation of areas suggested in completed audits. o Systematically repeat audits of buildings every 6 years. May 2007 p. 18 Victoria University of Wellington – Energy Strategy 6. Summary of Actions 6.1 Management Actions Category Administration Tenancies Measurement Actions Non TOU meters will be read at the end of each month and the readings will be given to energy suppliers Hard copies of invoices to be sent to Accounts Payable; scanned and emailed to Facilities Management administrators to approve and action payment. Copies of all invoices to be emailed to Energy and Technical Services, directly from the supplier where possible, to check for errors and follow up where necessary. The invoice data will then be uploaded into an accessible electronic database. Review the tenancy agreement for each tenant to determine responsibility for energy use. Determine the existing system of accounting for the energy use of tenants. Develop cost­effective solutions to ensure that tenant energy use is being billed and paid fairly and correctly. Utilise all energy measurement sources: Energy invoices, energy retailer web­based services, metering company data, energy purchase database software. Trend plant performance Management System. Analysis Reporting May 2007 using the Completion Date immediate immediate immediate immediate immediate Jul­07 immediate Building Jul­07 Ensure all buildings follow guidelines for energy metering Establish a system of comparing monthly energy use with expected use. Oct­07 Check the energy use of each major building for anomalies on a monthly basis. Analyse data as necessary on a case­by­case basis for individual energy efficiency projects. ongoing Where ‘negative’ trends or anomalies are identified there will be integrated and appropriate action taken. ongoing Include energy expenditure and consumption in the monthly facilities management report to the senior management team. ongoing Distribute quarterly energy performance review and project updates. Jul­07 Prepare energy management updates to be published on the VUW website and through staff and student communications. Jul­07 Targeted consumption reports with action points will be provided to Heads of School. Jul­07 Jul­07 ongoing p. 19 Victoria University of Wellington – Energy Strategy Energy management team Establish an energy management appropriate representation. team with Hold monthly meetings with clear outcomes targeted and actions planned. Jul­07 ongoing 6.2 Energy Supply Actions Category Security of Supply Response to national shortages On­site energy sources Actions Continue to use electricity and natural gas as the sources of purchase energy for the University. Completion Date ongoing If shortages of natural gas make it a less economically viable energy source for the University, investigate alternative means of heating. Publicity campaign to request staff and students save electricity. Heating and cooling set­points adjusted to less comfortable but tolerable temperatures. as necessary as necessary as necessary Time schedules adjusted so that plant and equipment shuts down for a longer period overnight. as necessary Lights in entry foyers and other day lit or low use areas switched off, if safe illuminance levels can be maintained. as necessary Prepare a report investigating sustainable energy and cogeneration options for the University and their potential application, with recommendations for further action. Conduct consultation prior to proceeding with any projects as necessary. Implement all suitable projects. Oct­07 Jan­08 ongoing 6.3 Energy Efficiency Actions Category Investment criteria New design and re­ fit New and replacement equipment Actions Develop a standard template to present energy efficiency initiatives for funding consideration. Develop standard design guidelines for ESD to be used when approaching designers. For larger projects these may need to be specifically tailored to suit the project. Review plans during design process to ensure ESD is being optimised. Where appropriate an external consultant may be needed. Incorporate selection criteria for new and replacement equipment into the ESD guidelines described above. Ensure procurement policy and practice at all levels considers energy efficiency and broader environmental issues. May 2007 Completion Date Jul­07 Oct­07 as necessary Oct­07 Jul­07 p. 20 Victoria University of Wellington – Energy Strategy Mechanical plant Lighting Establish monitoring of the HVAC system performance through the BMS. Assess the energy performance during winter and summer and identify areas for improvements. Develop strategies to improve performance. Apr­08 ongoing Ensure power factor for all buildings charged for peak demand has a power factor of 0.95 or above. Oct­07 Investigate options for lighting controls and trial them to determine the level of savings possible and the practicalities of using them. Oct­07 Systematically check illuminance levels to ensure the standard requirements are not being greatly exceeded, and delamp or redesign where necessary. Incorporate lighting design recommendations in ESD guidelines. User participation Audits May 2007 Jul­07 Oct­07 Oct­07 Develop a communication plan which will engage staff and students to increase awareness of energy use and generate commitment to energy efficiency Conduct energy audits of Rec Centre, Railway Station, Student Union and Karori Campus. Conduct basic energy audits of houses. Jan­08 Apr­08 Conduct a more detailed investigation of areas suggested in completed audits. Systematically repeat audits of buildings every 6 years. Jan­08 ongoing Jul­07 p. 21