One United Nations Programme II Operational Plan (2013 - 2017) Islamic Republic of Pakistan Front Cover Pictures: copyright © UNOPS, FAO, UNIDO, UNICEF Back Cover Pictures: copyright © UNICEF, UNHABITAT, UNIDO One UN Programme II Contents Acronyms.................... ................................................................................................................Ii 1. Introduction ................................................................................................................01 1.1 1.2 2. One Programme II (2013-2017) ................................................................................01 The Operational Plan.................................................................................................02 Programme Implementation, Management and Responsibilities ....................................04 2.1 2.2 Management Arrangements One Programme II (2013 2017) ................................04 UN Coordination and Coherence ..............................................................................05 2.2.1 Strategic Level Coordination..........................................................................05 2.2.2 Technical Level Coordination .........................................................................06 3. Joint UN Initiatives in Support of One Programme II (2013 2017) Implementation .........09 3.1 3.2 3.3 4. Resources and Resource Mobilization.............................................................................11 4.1 4.2 5. Communications .......................................................................................................09 Operations.................................................................................................................09 Risk Management & Business Continuity..................................................................10 One Fund...................................................................................................................12 Summary of OP II Budget and Resource Requirements ...........................................13 Monitoring, Review, Reporting and Evaluation ...............................................................15 5.1 5.2 5.3 OPII, the Operational Plan and Agency Country Documents: Derivatives and Linkages ......................................................................................................................15 Annual Workplans .....................................................................................................16 Review, Reporting and Evaluation Framework ..........................................................16 5.3.1 Monitoring Responsibilities...........................................................................18 5.3.2 SPA Reports ...................................................................................................19 5.4 Annual Progress Reviews and Annual Results Reports..............................................19 (see fig.1 for details) 5.4.1 The Annual Progress Report ..........................................................................20 5.4.2 Mid-Term Progress Review ............................................................................23 One UN Programme II 5.5 5.6 5.7 Development of One Programme III (2018-2022) ....................................................23 Information Management .........................................................................................23 Review, Reporting and Evaluation Plan .....................................................................25 Annexes Annex 1: Summary of OP II Summary of One Programme II Results Framework .................27 Annex 2: OP II Management Structure..................................................................................32 Annex 3: TOR for the High Level Committee (HLC) ...............................................................34 Annex 4: TOR - OPII Oversight Committee for One Programme II........................................35 Annex 5: TORs - OPII Administrative Area Steering Committees (Scs) .................................36 Annex 6: TORs - SPA Conveners............................................................................................38 Annex 7 : TORs SPA Working Groups (SPA WG) ...................................................................40 Annex 8 : TORs - Programme Management Team (PMT) .....................................................42 Annex 9 : TORs SPA Monitoring, Reporting and Review Committees (MRRCs) ...................45 Annex 10 : TORs Planning, Monitoring and Evaluation Group (PME) ..................................47 Annex 11 : TORs - Operations Management Team (OMT) ....................................................49 Annex 12: TORs UN Communications Group (UNCG) ..........................................................52 Annex 13 : TORs Pakistan One Fund (2013-17) ...................................................................55 Annex 14 : Overview of the Membership of OPII Management Structures..........................62 Annex 15 : M&E Calendar...................................................................................................................63 List of Table Table-1: Table-2: Table-3: Table-4: Table-5: Administrative Area Steering Committee Co-chairs ......................................05 Summary of OP II Resource Requirements per SPA.......................................13 OP II Budget Requirements per SPA outcome ...............................................14 Planned Review and Reporting Activities ......................................................17 Monitoring Responsibilities...........................................................................18 List of Figure Figure - 1: Figure - 2: Indicative One Programme Budget to SPA.....................................................11 Reporting Workflow for OP II - Draft .............................................................22 One UN Programme II Acronyms i One UN Programme II ii One UN Programme II 1. Introduction 1.1 One Programme II (2013-2017) In 2008, Pakistan became one of eight countries for the Delivering as One UN pilot, with the launch of the first One UN Programme (OP I) 2009-2012. The second One Programme (OP II) 2013-2017 was signed by the Government and 18 participating UN agencies, funds and programmes. The OP II document provides a common strategy and overview of the development context, the UN's role and comparative advantage, as well as the priorities and guiding principles for the UN's work in Pakistan. The second One Programme (OP II) is aligned with national political processes and national and subnational develop priorities. National ownership was assured through the OP II being formulated in close collaboration with the federal, provincial and regional governments, key donors, and a wide spectrum of civil society actors. The OPII is a national programme framework of the UN system in Pakistan, with a strong focus on implementing at the sub-national level in accordance with the 18th Constitutional Amendment, leading to the devolution of power to the administrative areas and implemented by the Government of Pakistan in 2011. As a result, the implementation of OP II focuses on both the federal and the Administrative Area level1. Building upon lessons learnt from OP I (2009-2012) and the global UN Independent Evaluation of Lessons Learned from Delivering as One2, OP II is results-orientated, with an increased emphasis on results-based monitoring and reporting. There is greater focus on capacity development at all levels, and management structures have been rationalized with the move away from joint programmes to joint programming. On the basis of extensive consultations, the Government of Pakistan and the United Nations Country Team (UNCT) identified six key Strategic Priority Areas (SPAs), or goals, in which the UN has a comparative advantage and can significantly contribute to supporting progress towards over the five year implementation period. The SPAs reflect priorities identified through national and provincial consultations and a review of key national frameworks and strategies. These include: 1. 2. SPA 1: Vulnerable and marginalized populations have equitable access and use of quality services SPA 2: Inclusive economic growth through the development of sustainable livelihoods. SPA 3: Increased national resilience to disasters, crises and external shocks Pakistan's Federal system includes a Federal Government located in Islamabad, Islamabad Capital Territory, five provinces of Balochistan, Gilgit-Baltistan, Khyber Pakhtunkhwa, Punjab, Sindh and the Federally Administered Tribal Areas. For ease of reference, these will be referred to as Administrative Areas in this document. United Nations A/66/859, General Assembly 26 June 2012, 12-39094 (E) 230712, *1239094*, Sixty-sixth session, Agenda item 117, Follow-up to the outcome of the Millennium Summit: Independent Evaluation of Lessons Learned from Delivering as One. 01 One UN Programme II SPA 4: Strengthened governance and social cohesion SPA 5: Gender Equality and Social Justice SPA 6: Food and nutrition security for the most vulnerable groups OP II is fully consistent with the key normative programming principles of human rights-based approaches, gender equality, resilience and environmental sustainability, as well as the operational strategies of UN Reform - results-based management and capacity development. It also takes into account national and provincial priorities which were chalked out in close collaboration with key government counterparts and ministries, during national and provincial consultations. 1.2 The Operational Plan The Operational Plan for the One Programme II3 complements the common UN development strategy, by providing management guidance and a framework for coherent delivery. The Plan is the partner document to the One Programme II (2013-2017). This is a living and flexible plan, which ensures the compliance of OP II implementation with Delivering as One Standard Operation Procedures4. The Operational Plan comprises two parts: (1) a narrative outlining the, management and organisational arrangements for OP II implementation and (2) results matrices for each SPA disaggregated by administrative area. The plan was validated through consultations with government partners held both at the federal level and in all eight administrative area5. Part 1 includes a management structure outlining the joint UN Government Steering and Coordination mechanisms at the federal and administrative area, as well as the internal UN coordination architecture. Roles, responsibilities and partners are identified for each body. Furthermore this section includes the monitoring, review and evaluation plan, resource mobilisation and joint UN approaches to Communications, Operations and Risk Management. Part 2 provides detailed results matrices for each SPA in each administrative area, including outcomes, joint outputs, individual agency outputs, projection of financial resources required for the achievement of outputs. Full information on performance indicators, baselines and targets for each out is also provided. These will be flexible plans in order for the ensure that the UN response remains relevant. The results matrices for OP II allows federal and sub-national counterparts and partners to gain an overview of the complementary work and partnerships of all UN agencies both nationally and in specific administrative areas of Pakistan. This reduces transaction costs for Government and other external partners needing an effective overall picture of UN activities in each administrative area. In addition, it also provides a consolidated framework for all UN agencies to develop and implement their plans according to the national and provincial priorities. 3. 4. 5. 02 The One Programme II 2013-2017 common UN strategy for Pakistan was signed by teh Government of Pakistan and 19 UN agencies, funds and programmes in December 2012. The UN Development Group issues Standard Operating Procedures for Delivering as One countries in September 2013. Extensive nation-wide consultations took place during the development of the One Programme II. In addition, the Operational Plan (Part 1 and 2) was within consultations were held at the federal level in in all eight administrative area governments in July and August 2013. One UN Programme II 6 Furthermore, the Operational Plan is also a tool to facilitate and promote joint programming , and indicates potential areas for development of joint programmes. Programme planning; implementation and review in the administrative areas will be overseen by administrative area Steering Committees. The OP II supports joint resource mobilization, where agencies are able to develop more comprehensive, multi-sector programmes building on each other's contributions to joint results. The plan provides performance measures that are specific to the administrative areas, and outlines a clear Monitoring and Evaluation (M&E) Framework and Plan. This strengthens transparency and accountability for reviews and adjustments during the five-year time frame of 2013-2017. The M&E Framework is intended to ensure that progress is measured, reviewed and reported annually, resulting in discussions and key decisions that are required to address challenges and constraints. The Operational Plan is envisioned as a dynamic plan, subject to change as context, needs and opportunities emerge. Annual reviews, as well as a midterm review in 2015, will provide the platform for joint, evidence-based analysis and identification of any amendments which need to be made to the results matrices for each SPA. Similarly part of the annual review process is tracking the use of funds in order to assess delivery challenges and ensure that any funding gaps are identified in a timely manner. The financial review will feed into both the narrative and financial reporting on OPII. The Operational Plan's management structure supports effective results-based management at national and sub-national levels. Government ownership and oversight is ensured at all levels, from the National Level High Level Committee and Oversight Committee to the Administrative Area Steering Committees. At the national level, the UN Country Team Heads of Agencies, led by the UN Resident Coordinator, will have overall responsibility for the implementation of OP II. They will be supported by Deputy Heads of Agencies and Operations Managers convening in the Programme and Operations Management Teams, and by M&E and subject matter experts through six SPA Working Groups (one for each SPA). Planning and monitoring will be supported by a common UN information management strategy and tool, facilitating the progress towards UN goals be monitored, projected and visualized together with progress towards key national development indicators. The UN information system will complement the Development Assistance Database (DAD) maintained by the Economic Affairs Division and supported by the UN. The total financial resources required for the OP II are US$2.038 billion. At the time of launching OP II, there is a funding gap of US$ 1.384, thus 67.9% of the funds required for the UN to achieve the established OP II results and goals will need to be mobilised. Funding will be mobilised both from core and non-core sources, through collective UN efforts as well as through fundraising initiatives of individual agencies. Financial management and resource mobilization will be enhanced through the Pakistan One Fund, where donors will be encouraged to channel unearmarked financial resources. The UN and Government will jointly oversee the received contributions and their allocation to OP II strategic priority areas and outcomes. Financial contributions are reported through the national DAD. 6. Joint programming refers to agencies jointly planning results and multiple activities to achieve these, yet implementing activities individually. This is different from joint programmes, where activities are implemented jointly. 03 One UN Programme II 2. Programme Implementation, Management and Responsibilities The programme management structure is based on principles established by the UNCT in agreement with the Government of Pakistan7: Results and performance based management; Support for devolution and provincial or administrative area specificity; Flexibility, allowing for changes in outputs and activities based on evidence and analysis of evolving or emerging needs and opportunities; Use of existing Government structures at national and sub-national levels. The OP II management arrangements aim to achieve: Strong and focused strategic oversight by the Government of Pakistan at the federal, and administrative area levels, under the overall leadership of the Economic Affair Division and coordinated by Planning and Development Departments at Provincial and administrative area level; Coherent internal UN arrangement that facilitates coordinated programme planning, monitoring, review and reporting; Fewer, formal meetings between the Government and UN, thus allowing for a needs-based operational working and planning arrangement. Management Arrangements One Programme II (2013 2017) The OP II management and coordination architecture articulates the principles of partnership and government ownership, as well as UN coherence. Joint Government-UN oversight mechanisms are in place at the national, federal and administrative area level. Internal UN coordination is ensured under the guidance of the UN Resident Coordinator (RC) and UNCT. 1. Joint UN-Government Oversight and Coordination High Level Committee: The overall oversight role in the implementation of the One UN reform process is maintained with the High Level Committee. The High Level Committee 8 (HLC ) sits at the federal level and is co-chaired by the Secretary Economic Affairs Division (EAD) and the UN Resident Coordinator. Members include the UN Country Team, Secretaries of federal and administrative area governments, as well as representatives of donors and civil society. It oversees the joint work of the UN in Pakistan, promoting coherence and synergy within the UN and with its partners. Oversight Committee : lt provides strategic oversight for OPII implementation. Cochaired by the Secretary of EAD and the UN RC, with representation of Donor/member state, the Oversight Committee has both monitoring and review responsibilities as well 9 7. 8. Programme management structures are in compliance with the UNDG Delivering as One Standard Operational Procedures. See Annex 3 for complete TORs 9. See Annex 4 for complete TORs 04 One UN Programme II as responsibilities for the steering of the Pakistan One Fund. With regards to its monitoring and review responsibilities, the Oversight Committee will review Annual Progress Reports, and oversee the independent midterm review and final evaluation. With regards to the Pakistan One Fund, the Oversight Committee plays an oversight role, including reviewing and endorsing allocation decisions of unearmarked funds. 2.2 Administrative Area OP II Steering Committees - one at the federal level and one for each sub-national administrative area, including ICT. The nine Steering Committees10 will be co-chaired by the Secretary P&D and representative of the UN RC. The membership of SCs will include key Administrative Area line departments and ministries, UN Administrative Area Steering Committees agencies, key civil s o c i e t y Government Co-Chair organisations and Federal RC donors. Invitations UNESCO may be extended to Islamabad Capital Territory the private sector Sindh UNICEF and academia on a n e e d s b a s i s . Balochistan FAO S t e e r i n g UNDP Committees will Punjab provide strategic Pakistan Administered Kashmir UNHABITAT oversight and UNWOMEN guidance to the Gilgit- Baltistan devolved priorities Federally Administered Tribal Areas (FATA) WHO and targets of the UNHCR Operational Plan. Khyber Pakhtunkhwa They will also Table - 1: Administrative Area Steering Committee Co-chairs annually review progress against the joint outputs and therein feed into the annual reporting process. As permanent members of the HLC, the Steering Committee Chairs will represent sub-national strategic interests regarding UN programming at the HLC deliberations, one of which is the annual review at the national level. UN Coordination and Coherence The UN's coordination structures have been established at the strategic (Head of Agency), and technical (Deputy Head of Agency) levels. 2.2.1 Strategic Level Coordination The UN Resident Coordinator (UN RC) will provide strategic leadership to UN coordination and the implementation of OPII in Pakistan. The UN RC together with the UNCT will have joint overall 10. See Annex 5 for complete TORs 05 One UN Programme II responsibility for resource mobilization and the prioritization of the Pakistan One Fund. The Resident Coordinator as One Leader also ensures that the UN speaks with One Voice in its advocacy with government and development partners. The One Leader will be supported in the execution of the One UN reform process, the management of the One Fund, and the cohesive and effective planning, implementation and monitoring of the OP II by an RC Office. Support at the central level will be guided by the Head of the RC Office, providing additional support for administrative area coordination. The RC Office will also work jointly with the co-chairs of the UN Administrative Area Coordination Teams on the coordination, planning and implementation of OP II, information sharing, monitoring, and the management of the Steering Committee meetings at the administrative area level. United Nations Country Team (UNCT): The UNCT, composed of Resident Coordinator and the Heads of Agencies, has ultimate responsibility over the implementation of OP II and provides strategic oversight and guidance to this goal. The UNCT supports resource mobilization efforts and the management of the Pakistan One Fund. Heads of Agencies are also responsible for ensuring active participation of their agencies in OP II management structures at all levels, including the Programme Management Team, Operations Management Team, and SPA Working Groups at the national level, and the Steering Committees at the sub-national level. Strategic Priority Area Conveners (SPA Conveners11): Reflected throughout the OPII management structure is the function of SPA Conveners. The function is embedded in the Heads of Agencies, but also effective at the Programme Management Team and Monitoring and Review Committee levels. Heads of Agencies with assigned roles as SPA Conveners will facilitate and enable their respective SPA Working Groups to achieve intended results. SPA Convener Heads of Agencies are primarily responsible for keeping the RC and UNCT updated on progress, gaps and challenges in relation to the implementation of specific SPA results. SPA Conveners are accountable to the RC for following-up on SPA progress and consulting with the UNCT particularly with regards to any implementation challenges. 2.2.2 Technical Level Coordination To ensure that the UNCT is adequately supported and advised on both programme and operational issues so it can continue to provide strategic oversight and guidance, the OP II management arrangement provides for a dual institutional setup at the Deputy Heads of Agency and Head of Operations level: Programme Management Team (PMT) and Operations Management Team (OMT). For this arrangement to be effective UNCT members will ensure: 11.. 04 06 Consistent deputy level engagement at both OMT and PMT Delegation of specific decision making, advisory and accountability responsibilities to both PMT and OMT. Alignment between programmatic priorities and operational arrangements by establishing clear requirements for strong coordination between PMT and OMT. See Annex 6 for complete TORs One UN Programme II 12 Operations Management Team (OMT ): The OMT will advance common business practices, including aspects of finance and administration, procurement, ICT, human resources, ICSC, common services, common premises and protocol matters. The OMT will make assessments and recommendations to the UNCT on joint activities for their approval with the aim of improved effectiveness of common services and identification of new joint services/activities. Programme Management Team (PMT ): Reporting to the UNCT, the principle function i of the PMT is to manage the planning, implementation and monitoring of OPII and ensure One Programme coherence across the SPAs. This includes the development of the OP II annual workplan. Furthermore, the PMT manages and provides quality assurance to monitoring, reporting and evaluation processes. Supported by the Planning, Monitoring and Evaluation Group (see below), the PMT identifies and addresses gaps in implementation and funding, as well as an cross-SPA bottlenecks. The PMT will guide and manage the work of the Planning, Monitoring and Evaluation Group (PME). In addition, the PMT will support resource mobilization and the allocation of Pakistan One Fund unearmarked resources. Planning, Monitoring and Evaluation Group (PME)14: The PME Group reports to and supports the PMT through the provision of technical support and advice on planning, monitoring, reporting and review processes. The PME Group promotes the standardisation of reviews and reports, develops templates, etc. UN Administrative Area Coordination Teams: The teams coordinate and facilitate the implementation of UNCT decisions at the sub-national level. These Coordination Teams will be comprised of one representative of each resident agency. For those agencies not resident in an administrative area, a staff member will be nominated to be part of the emailing list for the purposes of information sharing, attending meetings when possible, and providing input whenever required. The Coordination Team will be chaired by the same agency that will serve as the Steering Committee Co-Chair. 13 The Chair of the Coordination Team will report to the UNCT on the monthly Coordination Team meetings as well as on information sharing, planning and monitoring activities. At the thematic level, SPA Working Groups organized around each SPA work at the central level, with active communication with UN Administrative Area Coordination Teams. SPA Working Groups15: There is a working group for each of the six SPAs of OP II. These groups are responsible for providing strategic guidance and coordination of activities being carried out in the achievement of the SPA's outcomes and outputs. The SPA Working Groups will also be supported by specialists in Monitoring and evaluation to support the overall OP II M&E process. This forum will promote coherent dialogue with Government and other partners. This will also be the platform to address any bottlenecks or challenges that arise collectively as well as to foster synergies and the leveraging of the opportunities for joint programmes. Thematic sub- 12. 13. 14. 15. See Annex 11 for complete TORs See Annex 8 for complete TORs See Annex 10 for complete TORs See Annex 7 for complete TORs 07 One UN Programme II working groups will be created as required to enhance coherent and coordinated delivery. Each SPA Working Group will be supported by a monitoring, reporting and review committee that supports for ensuring quality, regular monitoring, reporting & evaluation by each participating agency at the federal and administrative area level. 08 UN Communications Group (UNCG): The UN Communications Group will be the main implementer of the communications strategy and will rely on the continued support of the UNCT to ensure adequate funds and human resources. The Group will carry out joint events and communications initiatives in support of the various SPAs as well as the promotion of overarching common UN messages. Chaired by the UN Information Centre (UNIC), The UNCG comprises of the communications officers and focal points form the various UN agencies. One UN Programme II 3. Joint UN Initiatives in Support of One Programme II (2013 2017) Implementation 3.1 Communications A recently released research study on the global perception of the Unites Nations found that 61% of Pakistanis had no opinion about the UN. This data most likely translates into a lack of knowledge of the activities of the UN in the country. OP II offers an unprecedented opportunity for increasing the level of recognition of the United Nations in Pakistan and for determining a positive change in the above mentioned percentage. In order to achieve this objective, the UN Communications Group will work in close collaboration with the UN Information Centre (UNIC), the Resident Coordinator's Office and the other UN agencies, funds and programmes to develop a common communications strategy. SPAs SPA 1: Co-Convener UNESCO Co-Convener UNICEF SPA 2: UNIDO UNFPA SPA 3: UNHABITAT IOM SPA 4: UNODC UNDP SPA 5: ILO UN Women SPA 6: WFP Co-Convener WHO The strategy aims to raise awareness of the development priorities in the country, at engaging Pakistani counterparts in communicating those priorities, at keeping the donor community informed on the achievements of the One UN Programme. The plan will target the media, governmental institutions, the general public, the donor community and the civil society. It will focus on developing a set of corporate communications products, on enhancing digital communications by updating both content and visual identity of the UN in Pakistan website and by disseminating information through selected social media channels. Bilingual communications will be considerably strengthened by increasing the number of information available in Urdu. The celebration of UN observances will be a high-priority with a special focus on those themes falling within the strategic priorities of the One UN Programme. Relations with the media will be fostered at both national and provincial level and media workshops will be organized in the provinces. The plan will include also political advocacy events targeting both federal and provincial governmental institutions as well as the donor community. Support from national celebrities will be sought for delivering key information to the general public. 3.2 Operations The OMT works to achieve operational coherence among the agencies and to harmonize operational approaches where possible. The OMT is supported by technical working groups in Human Resources, Procurement, Administration, Finance, and Information Communications Technology. Notable 09 One UN Programme II achievements in harmonization include: a. b. c. One UN HR portal for common job advertisements; common contracts in security services, banking services and sharing of agency long-termagreements; shared information resources for vehicle management and a common staff directory. In support of OP II implementation, there will be a joint planning process between the OMT and the PMT to ensure that additional opportunities for harmonized efforts are leveraged and that efforts are targeted where they can most effectively support the Strategic Priority Areas in the OPII. 3.3 Risk Management & Business Continuity In line with the UN's approach of staying and delivering, joint approaches to risk management and business continuity are critical aspects of ensuring that development gains are not lost in case of a crisis. The development of annual workplans will further promote joint business continuity planning at the level of the One Programme. Considering the country context of Pakistan, where natural and manmade disasters are regular occurrences, annual workplans allow emergency response to be accommodated in a manner that supports the retention of development gains and the continuity of development programming which underpins the humanitarian response context. Common UN management approaches to all manner of risk, from programme implementation to security to enterprise risk, will be integrated into both programme planning and operations. The common UN Programme Criticality Assessment methodology is being applied in Pakistan to strengthen the response to security risk and support business continuity. Programme Criticality Reviews of the activities encompassed by OP II will be carried out at the national level on an annual basis in order to inform programming and operations throughout the country. To better address the enterprise risks posed to the effective delivery of programmes by implementing partners in a more coherent manner, the Harmonised Approach to Cash Transfers (HACT) initiative will be continued to be fostered. This initiative aims to share information on, and promote a common approach to, assessing and building the capacity of implementing partners. As part of this initiative, a common partnership information management system will be developed. Common capacity building tools are also being developed. Increased coordination in communication and the joint UN communications strategy will further support a common approach towards risk management. 10 One UN Programme II 4. Resources and Resource Mobilization The total indicative financial resources required for the five year OPII are $2.038 billion Total finances required per Strategic Priority Area Strategic Priority Areas Percent of total budget Resources to be mobilized in USD SPA 1 800,080,982.00 SPA 2 218,249,874.00 SPA 3 339,771,338.00 SPA 4 247,311,505.00 SPA 5 82,379,311.00 SPA 6 350,356,767.00 Total 2,038,149,777.00 SPA 6 17% SPA 5 4% SPA 1 39% SPA 4 12% SPA 3 17% SPA 2 11% Fig - 1: Indicative One Programme Budget to SPA The basic resource base of OPII is the core and non-core funds of agencies, which will be supported by the additional funds from the One Fund (in country and globally) or other joint mechanisms. Core funding comes from more predictable annual/biannual pledging or assessed contributions from member countries, especially in the case of UN Funds and Programmes, whose core budget envelopes are decided upon for the whole programming cycle by their governing bodies. Some UN agencies do not have any core resources due to the nature of their programmes and respective funding. These UN agencies in particular rely more on non-core funding. Overall for OP II, the UN system agencies envisage that they will mobilize non-core funding through their own fundraising initiatives either at the global or national level. These include all bilateral, private and multilateral sources for both development and humanitarian activities. The foreseen core and non-core resources fall well short of the planned OPII funding requirements. To effectively address the funding gap, the UN in Pakistan will develop a Resource Mobilisation Strategy. The aim of the Strategy will be to increase the likelihood of successful implementation of OPII with enhanced funding predictability achieved through the strategic raising of adequate resources. The Strategy will identify key potential partners of the UN at the global and country level based on an analysis of mutual priorities and interests. The UN RC, UNCT/SPA conveners will take the lead in the 03 11 One UN Programme II implementation of the Strategy, and the undertaking of advocacy and negotiations for the mobilization of funds. Where appropriate, the UN RC will oversee the development of common fundraising proposals by the UNCT members, in line with the requirements and guidelines of relevant funds and individual donors. The resource mobilization strategy will be supported by the UN communications strategy, plan and products. The UN will also undertake a thematic mapping exercise of the resident donors. The strategy will emphasise the need for very targeted resource mobilisation efforts built around the individual SPAs and flagship UN programmes in the various outcome areas.. Joint resource mobilization will be focused on joint initiatives. SPAs will also identify key areas which could be the basis of potential joint programmes-for which focussed resource mobilization efforts will be initiated. 4.1 One Fund As a key tool to support the resource mobilization, financial management and implementation of One UN, a Pakistan One Fund has been established. Donors will be encouraged to channel their funding to 16 OPII through the Pakistan One Fund . Contributions to the One Fund are expected to be either unearmarked funds, or funds earmarked at the outcome and/or joint output level. Funds earmarked for specific agencies are not to be channelled through the One Fund, but are expected to be managed directly as bilateral agency funding. Decisions on the allocation of unearmarked One Fund resources will be prepared by the RC and UNCT and endorsed by the Oversight Committee in line with the One Fund TOR. Guidelines for the distribution of unearmarked One Funds in Pakistan will be refined by the RC UNCT in line with the UNDG proposed criteria for Multi-Donor Trust Fund allocations17. Such criteria may include relevance, demonstrated value for money, realistic implementation prospects, and recognized agency specific comparative advantage, as well as considerations of disbursement and expenditure rates of previously approved allocations. The UNCT has appointed UNDP as the Administrative Agent (AA) of the Pakistan One Fund. UNDP's Multi-Partner Trust Fund Office (MPTF Office) will perform the function of the AA. The key roles of the AA will be to receive, administer and disburse financial contributions to the Pakistan One Fund; to consolidate narrative and financial statements and reports based on submissions provided to the AA by each participating UN Organization; and to provide consolidated annual substantive and financial reports to the UN Resident Coordinator. Participating UN Organizations will administer the funds in accordance with their own regulations, rules, directives and procedures, including taking measures to prevent corrupt, fraudulent, collusive or coercive practices. 16. 17. 12 See Annex X for complete TORs UNDG Guidance on MDTF One UN Programme II 4.2 Summary of OP II Budget and Resource Requirements Table-2: Summary of OPII Resource Requirements per SPA OP II - SPA wise Fund Gap Analysis Status as on 23-April-2013 Resources to be mobilized in USD 696,753,911 %age of the total Budget (2,038,149,777) 34% SPA 2 Inclusive economic growth through the development of sustainable livelihoods 26,869,380 1% SPA 3 Increased National Resilience to disasters, crises and external shocks 44,323,902 2% SPA 4 Strengthened Governance and Social Cohesion 231,279,856 11% SPA 5 Gender Equality and Social Justice 72,561,336 3% SPA 6 - Food and Nutrition security for the most vulnerable groups 312,703,206 15% Total 1,384,491,591 67% Strategic Priority Areas SPA 1 Vulnerable and Marginalized Populations haveequitable access and use of quality services 13 One UN Programme II Table-3: OP II Budget Requirements per SPA outcome OP II - SPA wise Fund Gap Analysis Status as on 23-April-2013 Outcome SPA 1 Vulnerable and Marginalized Populations have equitable access and use of quality services Resource requirements (USD) Available resources from the UN (USD) Resources to be mobilised 83,163,116 19,321,720 63,841,396 156,662,682 20,479,880 136,182,802 1.3: Capacity for equitable social service delivery improved at all levels, including using innovative technology 560,255,184 63,525,471 496,729,713 Total 800,080,982 103,327,071 696,753,911 1.1: Policy environment, legislation, budgetary allocation and accountability mechanisms strengthened in support of equitable access to social and basic services for human development 1.2: Increased public awareness / behaviours change to ensure vulnerable and excluded populations practice safe behaviours, as well as access and use quality services, including housing SPA 2 Inclusive economic growth through the development of sustainable livelihoods 2.1 Creation of employment opportunities and decent work through industry, construction, services, 132,976,341 118,680,961 vocational/skills training, agricultural and cultural development, as well as promoting youth employment and public-private partnerships (25/09) 2.2 Industrial development, both urban and rural, emphasizing SME/SMI development, women's 55,242,733 51528733 participation, clean development and sustainable energy supply and use at affordable cost (11/04) 20,106,800 2.3 Equitable and fair trade promotion enhanced 9,924,000 2.4 Key causes and consequences of population growth addressed (02/02) Total 218,249,874 16,246,800 4924000 3,714,000 3,860,000 5,000,000 26,869,380 88,791,335 15,830,060 61,352,250 50,202,250 11,150,000 145,875,193 134,470,308 11,404,885 27,922,500 21,983,543 5,938,957 339,771,338 295,447,436 44,323,902 SPA 4 Strengthened Governance and Social Cohesion 58,728,095 4.1 The capacity of institutions to be more democratic and accountable is strengthened, including, inter alia, the engagement of civil society organisations, media and academia 10,960,684 47,767,411 63,431,350 2,046,832 61,348,518 108,236,642 2,988,133 105,248,509 16,915,418 0 16,915,418 247,311,505 15,995,649 231,279,856 23,649,615 4,566,232 18,083,383 5.2 Political, Economic, Social and Legal Rights of all, and especially excluded groups, are respected, protected and fulfilled,including through Institutional strenthening and capacity development of dulty bearers 5.3 Human Right Instituitions specially positioned and advocaditing for integrating Human Rights at all levels 49,920,560 4,108,100 45,812,460 8,809,136 143,643 8,665,493 Total 3.2 Vulnerable populations benefit from improved sustainable environmental management practices, including climate change mitigation and adaptation 3.3 Vulnerable populations benefit from improved prevention, risk reduction and response (mitigation), and are assisted to reach development goals including MDG targets 3.4 Country policies, plans and institutions are enabled to prevent and manage narcotics traffickingrelated challenges Total 4.2 Rule of law and public security institutions strengthened to enhance public trust and social stability, and to provide improved safety and security, including measures to address transnational crime and trafficking 4.3 Improved accountability and access to quality social protection and other services for excluded and vulnerable groups 4.4 Strengthened Decentralized Governance Total 34.18% 14,295,380 191,380,494 SPA 3 Increased National Resilience to disasters, crises and external shocks 104,621,395 3.1 National, provincial and district capacities to prevent, assess, reduce and manage risks are developed Fund gap %age (total Bugdet) 2,038,149,777 1.31% 2.17% 11.34% SPA 5 Gender Equality and Social Justice 5.1 Government and Civil Society are active and accountable in eliminating discrimination against women and girls 82,379,311 8,817,975 72,561,336 SPA 6 Food and Nutrition security for the most vulnerable groups 115,771,726 29,581,726 86,190,000 234,585,041 8,071,835 226,513,206 350,356,767 2,038,149,777 37,653,561 652,622,186 312,703,206 1,384,491,591 3.56% 6.1: Household food security increased 6.2: Nutrition security increased, especially for vulnerable and excluded groups Total two billion thirty-eight million one hundred forty-nine thousand seven hundred seventy-seven Note: The data has been taken from the final Power Point presentations of Islamabad Consultations 9-10 April 2013 14 15.34% 67.92% One UN Programme II 5. Monitoring, Review, Reporting and Evaluation 5.1 OPII, the Operational Plan and Agency Country Documents: Derivatives and Linkages The OPII and its Operational Plan results matrices will provide basis to the monitoring, review, reporting and evaluation under the Review, Reporting and Evaluation Framework. The OPII provides the outcome level goals for the UN's five-year Programme, which will be evaluated at the end of five years. These will form the basis for the OP II Annual Workplans, which will be developed at the beginning of each year. However, annual reviews will take place through the provincial steering committees, supported by UN administrative area co-chairs, which will provide reports/outcomes of their review meetings in their respective provinces and feed into the national level PMT meetings for information sharing and key decision-making. In the Operational Plan Part 2, the targets of the UN system's work are outlined at the more detailed joint output and agency output levels. Most importantly, the Operational Plan, as a devolved programming framework, depicts UN agencies' specific targets at the federal and administrative areas levels; monitoring of which will be carried out by the individual agencies. Although, joint monitoring should be promoted wherever relevant. Each agency will drive the monitoring process as per their internal M&E framework, which is intentionally aligned with the OPII framework of outcomes and results. By way of this, each agency will report on their respective joint outcomes, outputs and targets based on their monitoring reports. Through these monitoring report, agencies level annual progress reports are developed which will feed into the overall annual review and reporting of the OPII. Monitoring of results at outcome level will be ensured through the annual review process whereby progress (based on agency level monitoring reports) will be shared, issues and challenges and corrective measures discussed. Within the OPII framework, the SPA Working Groups are responsible for compiling the information from the agency monitoring reports and annual monitoring reports as per the Monitoring, Review, Reporting and Evaluation framework of OPII (discussed later). All SPA reports will be consolidated in one Annual Report which will be spearheaded by the RC's Office with oversight by HLC. Each participating UN agency is expected to align their programmes and M&E systems with the OP II Operational Plan in order to harmonise the systems and process, and thus facilitate adherence to joint reporting, reviewing and monitoring of agreed deliverables. All UN activities in Pakistan are guided by the OPII Operational Plan results matrices at the joint output and agency output levels which are culmination of agency specific outcomes, outputs and results. The OPII and Operational Plan results matrices are expected to comprehensively link with agencies' respective country programmes which will facilitate the OPII reporting on monitoring of joint outcomes, outputs and results. During the planning process of OPII, agencies have identified their own agency specific outputs under the joint outputs, and will be responsible for contributing to the achievement of the joint outputs as per the agency specific implementation plan and strategies. Measuring progress against the combined and geographically specific targets of each joint output indicator will reflect how the UN system is progressing in achieving joint intended results, and therefore advancing the common development aims. In light of the emphasis on measuring progress against joint outputs and outcomes, wherever possible joint assessments and monitoring will be carried out. 03 15 One UN Programme II 5.2 Annual Workplans The Operational Plan Part 2 (SPA results matrices) illustrates what the UN system in Pakistan aims to achieve over the five year implementation period (2013-2017). In addition to these, annual OP II workplans will be developed based on the results of the annual reviews. The annual workplan will be compiled by each SPA working group at the SPA level, and will complement the individual agency workplans. Administrative area-specific workplans can be extrapolated from the SPA plans as required. The annual workplan will be informed by annual progress reviews and hence be coupled with this process (see Annual Progress Report section). Monitoring and Evaluation Bodies: The Planning, Monitoring and Evaluation Group (PME) and SPA Monitoring, Reporting, and Review Committees (MRRCs): The Planning, Monitoring and Evaluation Group (PME), which reports to the PMT, will lead and strengthen the process of Review, Reporting and Evaluation Framework under the OPII and provide coordination and quality assurance to ensure high-quality reporting on progress and identification of constraints on achieving joint outputs and outcomes as articulated in the Operational Plan. The PME will be supported by the SPA Working Groups. Each SPA Working Group will be supported by a group of M&E specialists in those areas of work, the MRRCs. The PME may call upon SPA MRRCs individually as required for the purposes of supporting the overall OP II planning, monitoring and evaluation framework. 5.3 Review, Reporting and Evaluation Framework A key lesson learned from OP I was the need to establish clear baselines and targets at the outset. Utmost effort has gone into achieving this objective in the planning and development of OPII. Nevertheless, due to the absence, in some instances, of appropriately disaggregated data, some of the outcome and joint output level indicators lack baseline values. Where baselines do not exist, agencies will establish these baselines during the first year of the OP II through surveys, studies or assessments. Cases where baselines are not established after this initial grace period will be reviewed by the PMT and recommended to UNCT for the removal of respective indicators and results from the operational plan results matrix. The OPII Results Framework has strenuously worked toward ensuring all baselines, targets, indicators and means of verifications are clearly defined in the Operations Plan Part 2. In addition, OPII Review, Reporting and Evaluation Framework is based on existing modalities and processes of M&E framework at agency level which are combined together to provide basis for reporting against joint outcomes, outputs and targets under the OPII framework. An additional lessons learned from OPI is that monitoring, evaluation and reporting activities need to be fully integrated into regular plans and 18 activities of the agencies. Hence, the OPII M & E Plan uses existing modalities and processes as far as possible, as well as establishing clear time frames and responsibilities for agency's engagement and contribution. 18. 16 UNDG Guidance on MDTF One UN Programme II The following table provides an overview of the planned review and reporting activities. Table - 4: Planned Review and Reporting Activities Type/Level of Report External Evaluations Frequency (a) Mid-Term Evaluation (mid2015) (b) Final Evaluation (end 2016 – early 2017) Modality Independent external evaluation led by federal and provincial governments and other partners. One Programme Annual Workplans Annual SPA Working Groups will develop SPA annual workplans which will be compiled with the guidance and support of the PMT, PME and RCO. One UN Programme II Reviews Annual (to be completed by January of the following year); narrative and financial UN systemwide, internally produced, but the reports will be circulated to partners especially the provincial/administrative area governments. One Programme II Results Reports by SPAs and Area Annual (to be completed by March of the following year) UN systemwide, internally produced, but will be circulated to partners including the government. Financial Reports: incl. Donor Assistance Database (DAD) Quarterly updating within 15 days of end of quarter. Internal, through agency data entry and quality assurance focal points. UNCT Task Force will oversee. Thematic Reviews (e.g. Gender, HRBA, etc.) TBD. Reviews will be commissioned by UN UNCT as required and appropriate. Conducted by independent external entities or individuals who are selected through transparent competitive bidding processes. DaO Results (to measure achievement in main DaO areas, such as the Five Ones, One Voice and aid effectiveness) TBD. TBD RC/UNCT Report Annual Compiled by RCO; information provided by agencies and SPA groups Other Reports: e.g. MDG progress TBD. OneView will contain disaggregated MDG data as well as analysis of other key indicators TBD 17 One UN Programme II In addition, a detailed annual monitoring and evaluation calendar will be developed by the PME and MRRCs. The M&E Calendar will be complimented by agencies' planned M&E activities, surveys, studies and evaluations together with OPII M&E activities. As such, the M&E calendar will reflect complementarities and opportunities for cooperation across agencies, in terms of joint research, 19 assessment and evaluations . 5.3.1 Monitoring Responsibilities Monitoring responsibilities will be established at three key levels: with the agencies, with the SPA Working Groups, with the support of the PME, and with the AA. With the support of the PME, the PMT will manage the formal processes and provide quality assurance, with the UNCT carrying overall responsibility for the results. These roles and responsibilities are summarized as follows: Table - 5: Monitoring Responsibilities 19. 18 See Annex 8 One UN Programme II 5.3.2 SPA Reports As a supporting step in the development of the Annual Progress Reports, the SPA Working Groups, with technical support by PME, will complete SPA Reports according to a template provided by the PME and approved by the PMT20 as per the prescribed timelines under the Reporting, Review and Evaluation Framework. Responsibility for this process will rest with the SPA conveners. The SPA Reports will be consolidation of agencies' information to depict progress towards joint outputs in each administrative area. Based on targets established in the annual work plans, an assessment will be made as to whether progress made towards results has been sufficient or not, and what if anything needs to be done to boost it. Any gaps, challenges and bottlenecks in the implementation of specific SPAs will be identified and raised with the PMT and UNCT. In addition, financial reporting will enable assessment on funding gaps which will help identify resource mobilization targets for following years, amongst addressing of other issues and challenges. 5.4 Annual Progress Reviews and Annual Results Reports (see fig.1 for details) Annual Progress Reviews: Annual Progress Reviews (APR) will take place at two levels; one at the national, and other at the provincial level, prior to the development of Annual Progress Reports. The APRs will take place at Provincial level by Provincial/Administrative Steering Committees, with support by SPA Working Groups. The reviews will provide opportunities of stocktaking of progress on results, lessons learnt and good practices and also to engage with the government, partners and other stakeholders at Provincial level. These reviews will focus on progress made against outcomes and outputs for each SPAs against their relevant indicators and targets as well as challenges requiring readjustments of the planned results and targets for the coming year. Responsibilities during APRs: Each agency responsible for reviewing progress around its area of intervention at joint output level according to agreed indicators and targets Each agency responsible for reviewing its contribution towards achievement if the outcomes and their respective indicators and targets Administrative Area Steering Committees responsible for convening APRs, selecting participants and developing reports on APRs as per SPAs. MRRCs will provide support to Provincial/Administrative Steering Committees in terms of developing formats and templates for APRs, providing guidance and also acting as interface between Provincial/Administrative Steering Committees and the PMT The outcome of all reviews will feed into commitments for the coming years through key decision making by the PMT and HLC. APRs are expected to be initiated at the beginning of each year starting from January 2014. In addition, Administrative Area Steering Committees will hold annual reviews, which should normally take place in 20. See draft example reporting format in Annex X 19 One UN Programme II February of each year. Reports on APRs will be developed and shared with Provincial/Administrative Steering Committees, PMT and HLC only. The APR at national level will provide an opportunity to culminate provincial level reviews and present is as an overall review of the OPII. The RC Office will lead the process for coordination of the national level APR, spearheaded by Economic Affairs Division. The APR at national level will be attended by key partners including national and provincial level government ministries and members from PMT, OMT, UNCT and HLC. The intent is to discuss the progress in light of the achievements, lessons learnt, issues and challenges from the provincial level, which will pave way for strategic decision making by the senior members at national level. APRs at all level to be completed before mid-February of each year so that the reports can be submitted to SPA Working Groups for consolidation for Annual Progress Reports (as detailed below). 5.4.1 The Annual Progress Report The Annual Progress Report on OP II implementation will be developed by March of each year as per the UNDG guidelines and the requirements of the One Fund. The Annual Progress Report will consist of progress on each SPAs in light of the workplan and agreed performance targets for each year. In addition to overall achievements under each SPA, the report will also include sections on progress within the various administrative areas within each SPA. as well as highlight key lessons learnt, issues and challenges from provincial review reports. The first year, the Annual Progress Report may focus more on the extent to which the OPII monitoring and review framework and mechanisms have been established, including geographical area specific baselines and targets, provincial launch of the programme, coordination meeting and setting up of committees and systems. The Annual Progress Report will be presented to the Oversight Committee, after clearance from HLC. The Report will be an opportunity for the UNCT to engage with the Government and other partners to review overall progress toward results and take stock of lessons and good practices that will feed into the annual planning processes and commitments for the coming year and also analyse and determine way forward with all key issues and challenges that may hamper progress towards achieving results. The UN will ensure that all data is broken down by sex as well as urban/rural status. Given the particular challenges facing women in Pakistan, it is also proposed that the UN collect additional data that speak to the specific condition of women in Pakistan as part of its commitment to gender equality and empowerment, and that this information will feed into the Annual Review process as well as Annual Progress Report. Responsibilities for Annual Progress Reports: 20 Each agency responsible for providing progress around its area of intervention at joint output level according to agreed indicators and targets Each agency responsible for providing its contribution towards achievement if the outcomes and their respective indicators and targets One UN Programme II SPAs responsible for collating information from all agencies on reporting by joint outputs for each SPAs, and financial utilization reports. The RC office responsible for collating all information from SPAs and development of final Annual Progress Report. The final annual report will be cleared by the HLC in consultation with EAD and will be disseminated widely. 21 One UN Programme II Fig - 2: Reporting Workflow for OP II - Draft respective MRRC lead. Participating agencies to align their review and reporting processes to OPII reporting and review processes as per the guidelines provided by the RCO 22 One UN Programme II 5.4.2 Mid-Term Progress Review An independent and external OP II Mid-Term Review will be completed in 2015. The Mid-Term Review will allow the UNCT to take stock of achievements at midpoint, and, in particular, to identify particular gaps and delays that requires key decision making by the HLC. This will allow for a revision of relevant risks and assumptions and the adoption of any necessary adjustments to the remaining years' targets, strategies, and focus in each geographical area. The Mid-term Progress Review will take place in collaboration with Economic Affairs Division and participation of key government departments, partners and other stakeholders. The overall process of the OP II Mid-Term Review will be facilitated by the RCO under the guidance of the HLC. Provincial/Regional consultations with Government stakeholders through the OPII Steering Committees will ensure their broad ownership and participation in this review process. 5.5 Development of One Programme III (2018-2022) The mid-term review will also inform the development of the One Programme III 2018-2022 (OPIII). The development of OP II will need to begin in 2015, as a two year planning period is required. Details of this planning process will be determined closer to the time. Final Evaluation An independent and external Final Evaluation will be conducted to assess the relevance, efficiency, effectiveness, and impact of the UN System's contribution, as described in the OP II. The evaluation will focus on progress towards OPII at the outcome level. The evaluation will be conducted in the second quarter of 2017 to allow incorporation of the results and lessons learned into the UNCT's analytical deliberations and the strategic planning of the subsequent One Programme. The evaluation will be preceded by necessary surveys or assessments comparable to the baseline, as outlined in the OP II Operational Plan Results Matrix and M&E Calendar. Any relevant national reports, and/or studies and evaluations conducted by UN Agencies and by their partners during the cycle, will also feed into the OP II Final Evaluation. The evaluation process will follow UNEG policy and guidelines. Formation of Evaluation Management Committee and Reference Group will take place to ensure independency and impartiality of the results. Members for both groups will be sought from all key stakeholders including the government, donors, UN agencies and key partners. The evaluation results will be validated with national partners and stakeholders primarily through the Oversight Committee and ultimately the HLC. 5.6 Information Management The overall responsibility for information management lies within the Resident Coordinator's Office, under the guidance of the UNCT and PMT, and in collaboration with the PME Working Group. An OP II Information Management Strategy will be developed. The focus of the strategy will be on developing a comprehensive online database of UN activities in Pakistan, an OP II monitoring and evaluation tool as 23 One UN Programme II well as an internal UN OPII web portal to facilitate and support the thematic working groups and committees both at the federal and provincial level. This strategy will build upon tools and systems, such as the One View, already developed within the context of OP I. 24 6 5 4 3 2. Overseen by the SPA (MRRC) 1. Prepared by each agency 1. MRRCs, with inputs from agencies 1. PME Working Group (PME WG) 2. Overseen by the MRRC CoConvenors Group, i.e. SPA CoConvenors reps on the SPA MRRCs 1. Executive summaries of strategic agency specifci and joint programme results achieved for the year for each of the 9 geographical areas) (Federal, ICT, Balochistan, KP, Punjab, Sindh, G-B, FATA, AJK) disaggregated by SPA 1. Outsourced 2. In coordination with EAD with oversight by PMT and RCO, supported by SPAs OP II MID-TERM PROGRESS REVIEW: 1. Progress on all SPAs by mid-point of implementation plan as per the Results Matrix (agreed outcomes and outputs) 3. Annexes - Operational Plan matrices (1 x consolidated and 9 by geographical area) 2. 6 sections, 1 for each SPA - showing results achieved for the year, disaggregated by each of the 9 geographical area 1. Outsourced Administrative Area Committees OP II ANNUAL RESULTS REPORT: Report on APRs to be produced and disseminated 3. APRs to be carried out in 9 Provincial/Administrative areas (Federal, ICT, Balochistan, KP, Punjab, Sindh, G-B, FATA, AJK) disaggregated by SPA 2. Each agency responsible for reviewing its contribution towards achievement of the outcomes and their respective indicators and targets Convened by Administrative Area Committees with 1. Each agency responsible for reviewing progress support from SPA (MRRCs) around its area of intervention at joint output level and PMT according to agreed indicators and targets 1. by SPA, disaggregated by geographical area (each agency to submit 6 reports by SPA) OP II ANNUAL PROGRESS REVIEWS: TEMPLATES development: Annual Progress Reports templates (Overall and Agency Specific) OPERATIONAL PLAN update: (include changes that have evolved at agency level) AGENCY SPECIFIC SPA ANNUAL PROGRESS REPORTS: 1 Prepared by: Feb Drafts Final Mar Apr May Jun X 2013 Jul Aug Sep Oct X Nov Dec 2015 2016 Jul 2017 2018 End Jan Q2 End Apr End Apr End Apr End Apr End Feb End Feb End Feb End Feb End Jan End Jan End Jan End Apr End Feb End Feb End Feb End Feb End Feb Jul&Dec Jul&Dec Jul&Dec 2014 5.7 2 Type of Report # One UN Programme II Review, Reporting and Evaluation Plan 25 26 6 5 4 3 2. Overseen by the SPA (MRRC) 1. Prepared by each agency 1. MRRCs, with inputs from agencies 1. PME Working Group (PME WG) Prepared by: 2. Overseen by the MRRC CoConvenors Group, i.e. SPA CoConvenors reps on the SPA MRRCs 1. Executive summaries of strategic agency specifci and joint programme results achieved for the year for each of the 9 geographical areas) (Federal, ICT, Balochistan, KP, Punjab, Sindh, G-B, FATA, AJK) disaggregated by SPA 1. Outsourced 2. In coordination with EAD with oversight by PMT and RCO, supported by SPAs (MRRCs). OP II MID-TERM PROGRESS REVIEW: 1. Progress on all SPAs by mid-point of implementation plan as per the Results Matrix (agreed outcomes and outputs) 3. Annexes - Operational Plan matrices (1 x consolidated and 9 by geographical area) 2. 6 sections, 1 for each SPA - showing results achieved for the year, disaggregated by each of the 9 geographical area 1. Outsourced Administrative Area Committees OP II ANNUAL RESULTS REPORT: Report on APRs to be produced and disseminated 3. APRs to be carried out in 9 Provincial/Administrative areas (Federal, ICT, Balochistan, KP, Punjab, Sindh, G-B, FATA, AJK) disaggregated by SPA 2. Each agency responsible for reviewing its contribution towards achievement of the outcomes and their respective indicators and targets Convened by Administrative Area Committees with 1. Each agency responsible for reviewing progress support from SPA (MRRCs) around its area of intervention at joint output level and PMT according to agreed indicators and targets 1. by SPA, disaggregated by geographical area (each agency to submit 6 reports by SPA) OP II ANNUAL PROGRESS REVIEWS: TEMPLATES development: Annual Progress Reports templates (Overall and Agency Specific) OPERATIONAL PLAN update: (include changes that have evolved at agency level) AGENCY SPECIFIC SPA ANNUAL PROGRESS REPORTS: 1 2 Type of Report # Feb Drafts Final Mar Apr May Jun X 2013 Jul Aug Sep Oct X Nov Dec 2015 2016 Jul 2017 2018 End Jan Q2 End Apr End Apr End Apr End Apr End Feb End Feb End Feb End Feb End Jan End Jan End Jan End Apr End Feb End Feb End Feb End Feb End Feb Jul&Dec Jul&Dec Jul&Dec 2014 One UN Programme II One UN Programme II Annex 1: Summary of OP II Summary of One Programme II Results Framework Strategic Priority Areas 1. Vulnerable and marginalized populations have equitable access and use of quality services Outcomes 1.1 Policy environment, legislation, budgetary allocation and accountability mechanisms strengthened in support of equitable access to social and basic services for human development Joint Outputs 1.1.1 1.1.2 1.1.3 1.2 Increased public awareness/behaviour change to ensure vulnerable and excluded populations practice safe behaviour, as well as access and use quality services, including housing 1.2.1 1.2.2 1.2.3 1.3 Capacity for equitable social service delivery improved at all levels, including using innovative technology 1.3.1 1.3.2 1.3.3 1.3.4 2 Inclusive economic growth through the development of sustainable livelihoods 2.1 Creation of employment opportunities & decent work through industry, construction, services, vocational/skill training, agricultural & cultural development, as well as promoting youth employment & 2.1.1 2.1.2 Key National and Provincial stakeholders develop and implement equity-focused, child and gender sensitive laws, policies, and strategies. Equity focused and gender sensitive research and evaluation used for improved policy planning, monitoring and budget allocations. Accountability systems and structures are functional, strengthened and accessed by rights holders Vulnerable people, in particular women and child, have access to information relating to safe practices and behaviours. Vulnerable groups participate more actively in the development, implementation and monitoring of programmes design to increase access and utilization of quality basic social services Increased availability of integrated sexual and reproductive health information and services for adolescents and youth, especially the most marginalized. Duty Bearers are empowered and able to deliver efficient, accountable and transparent services to the most vulnerable communities. Provincial departments Identify and channel resources to the most vulnerable communities. Provincial departments put in place long term human resource management strategies and plans. Models for mapping and reaching basic services to the chronically underserved groups are developed, implemented, evaluated and successful models scaled up. Policies and programmes to enable inclusive growth and improve livelihood and economic opportunities for the most vulnerable developed and implemented with a particular focus on agriculture, culture and post crisis recovery. Marginalized and excluded groups enjoy 27 One UN Programme II public-private partnerships 2.1.3 2.2 Industrial development, both urban & rural, emphasizing SME / SMI development, women’s participation, clean development & sustainable energy supply & use at affordable cost 2.2.1 2.2.2 2.2.3 2.3 Equitable & fair trade promotion enhanced 2.3.1 2.3.2 3 Increased national resilience to disasters, crises and external shocks 2.4 Key causes & consequences of population growth addressed 2.4.1 3.1 National, provincial & district capacities to prevent, assess, reduce & manage risks are developed 3.1.1 3.1.2 3.1.3 3.1.4 3.2 Vulnerable populations benefit from improved sustainable environmental management practices, including climate change mitigation & adaptation 28 3.2.1 equitable access to advanced vocational and entrepreneurship skills training under a revamped and responsive TVET System. Women and young people have increased access to skills, training and financial assets necessary to participate more fully in the formal economy. Policies and programmes to promote the growth of a sustainable and inclusive SME / SMI sector formulated and implemented. Clean production strategies—including waste management and climate change mitigation measures—promoted and adopted in priority industrial sectors. Targeted initiatives to enhance production and use of low-cost sustainable energy solutions, particularly among poor households, piloted at community and national levels. Policies and support mechanisms for inclusive trade and development in place. Women are better able to participate in and benefit from engagement with the global trade system. Key decision-makers are able to conduct demographic research and utilise data in the formulation of economic and labour policies. All key disaster management institutions establish effective risk assessment, hazard mapping, coordination and oversight mechanisms at federal, provincial and district levels addressing the concerns of vulnerable population. PDMAs, DDMAs and service providers develop contingency plans that respond to community and individual level vulnerabilities. DMAs and other institutions including line departments at national, provincial, and district levels are better prepared and able to respond to and reduce risk. Community-based mitigation and preparedness programmes established and function effectively. Policies and programmes for integrated natural resource management and climate change adaptation and mitigation developed and implemented at national, provincial and community levels. [08/07] One UN Programme II 3.2.2 3.2.3 3.3 Vulnerable populations benefit from improved prevention, risk reduction & response (mitigation), and are assisted to reach development goals including MDG targets 3.3.1 3.3.2 3.3.3 4 Strengthened governance and social cohesion 3.4 Country policies, plans & institutions are enabled to prevent & manage narcotics trafficking-related challenges 4.1 The capacity of institutions to be more democratic and accountable is strengthened, including, inter alia, the engagement of civil society organisations, media and academia. 3.4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.2 Rule of law and public security institutions strengthened to enhance public trust and social stability, and to provide improved safety and security, including measures to address transnational crime and trafficking 4.2.1 4.2.2 Key institutions at provincial and district level design and implement [communitybased] integrated natural resource management strategies in environmentally fragile eco-systems. Knowledge and advocacy platform on transboundary water issues and best practices for integrated water resource management established. Comprehensive plans are in place to provide the most vulnerable populations with reliable, comprehensive information and options to cope with the effects of climate change. Right holders including vulnerable children and women, are increasingly resilient with improved capacity to assess, mitigate and respond to disasters. Crisis affected communities have access to training, entrepreneurship, livelihood opportunities and community infrastructure during early recovery & rehabilitation. Relevant institutions establish and maintain central disaggregated data base for the exchange of information on cross-border issues National legislation reflects commitments to human rights and relevant UN Conventions and treaties. Federal and provincial committees and secretariats are better able to carry out effective oversight. Civil society and media are better able to promote participation of people in democratic processes and public dialogue and discourse. The electoral administration, systems and processes of the Election Commission and its field offices are reformed and aligned with international standards and best practices. Effective and efficient structures and mechanisms in place and operational to ensure that the poor and marginalized are better able to access justice. Communities, including rural poor and refugees benefit from grievance redress mechanisms. 29 One UN Programme II 4.2.3 4.3 Improved accountability and access to quality social protection and other services for excluded and vulnerable people 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.4 Strengthened decentralised governance 4.4.1 4.4.2 5 Gender Equality and Social Justice 5.1 Government and civil society are active and accountable in eliminating discrimination against women and girls 5.1.1 5.1.2 5.1.3 5.2 Political, economic, social & legal rights of all, & especially excluded groups, are respected, protected & fulfilled, including through institutional strengthening & capacity development of duty bearers 30 5.2.1 5.2.2 The criminal justice system is better able to identify and respond to national and transnational crime. Social protection policies and legal frameworks harmonized with relevant international treaties ratified by Pakistan, and reflect regional best practice. National and provincial institutions have enhanced capacity and robust systems to implement social protection and social insurance schemes for the most vulnerable. Duty bearers and right holders are aware, motivated and practice/promote peace building. Transparent and accountable registration services are available for children, refugees and other target groups. Policies and institutions for refugees management developed and strengthened. Relevant legislation and policies developed at the provincial/area and district levels to facilitate equity, sustainability and inclusiveness. Provincial institutions/departments undertake reform to carry out their functions in line with the 18th Amendment. National laws and legislation are revised to bring them into line with international frameworks on women’s rights [in particular CEDAW and CRC] National, provincial and area policy-makers and planners are able to collect, analyze and use high quality sex disaggregated data to address biases that prevent women and girls from fulfilling their rights. Civil society and women’s groups have enhanced lobbing capacity to demand accountability and advocate for the implementation of women friendly legislation. National and provincial/area policies, strategies, capacities and programmes targeting the most marginalized children and youth are coherent, complementary and promote collaboration. National and provincial/area policies, strategies and programmes that reduce exploitation and promote decent work, targeting the most excluded groups, are One UN Programme II 5.2.3 5.3 Human rights institutions strategically positioned, & advocating for integrating human rights at all levels 5.3.1 5.3.2 5.3.3 6 Food and nutrition security for the most vulnerable groups 6.1 Household food security increased 6.1.1 6.2 Nutrition security increased, especially for vulnerable and excluded groups 6.2.1 6.2.2 6.2.3 coherent and complementary, and promote collaboration. National & provincial polices, strategies and programmes protect the rights of excluded groups. Capacity of NHRIs to promote and protect human rights at national and provincial levels strengthened. Civil society and human rights bodies are able to act as independent monitoring and reporting mechanism on the status of human rights. Relevant government and civil society mechanisms to monitor and report on the implementation of the concluding observations and remarks of the committees of all relevant International Treaties and Conventions are functioning effectively Integrated responses to improve food security. Provincial /regional governments have developed and implemented nutrition policies, strategies, and plans to address malnutrition among the most disadvantaged /vulnerable population groups. Vulnerable population groups have improved their nutritional practices i.e. infants, young children, pregnant and lactating women, adolescent girls. Effective prevention and treatment of acute malnutrition in the targeted communities. 31 32 Steering Comm GB Steering Comm PAK Steering Comm KP Steering Comm Sindh Steering Comm FATA Steering Comm Punjab Steering Comm Federal Steering Comm ICT Steering Comm Balochistan Oversight Committee SPA3 SPA2 SPA1 SPA6 SPA5 SPA4 SPA WORKING GROUPS UN Resident Coordinator High Level Committee UN Communications Group Operations Management Team Programme Management Team UN Country Team One UN Programme II Annex 2: OP II Management Structure MRRC MRRC SubWorking Groups MRRC SPA 3 SubWorking Groups SPA 2 SubWorking Groups SPA 1 MRRC MRRC SubWorking Groups MRRC SPA 6 SubWorking Groups SPA 5 SubWorking Groups SPA 4 SPA WORKING GROUPS ICT Sub-Working Group Procurement Sub-Working Group UN Communications Group (UNDG) Budget & Finance Sub-Working Group Human Resources Sub-Working Group Operations Management Team (OMT) HACT Taskforce Planning, Monitoring & Evaluation Group Programme Management Team (PMT) One UN Programme II 33 One UN Programme II Annex 3: TOR for the High Level Committee (HLC) Mandate The High Level Committee (HLC) serves as the highest strategic decision-making body for issues concerning the UN Reform in Pakistan. The HLC has an oversight role in implementation of the One UN reform process and serves as forum to set up a strategic dialogue to help the UN system, Government and the development partners to oversee the overall progress of Delivering as One (DaO) for which Pakistan is one of the eight pilot countries. Responsibilities The HLC plays a key role to guide the overall design and endorsement of the One UN Porgramme through the following functions: 1. 2. 3. 4. 5. Provide strategic guidance to the UN Reform in Pakistan and the areas of engagement for the One UN Programme. Ensure alignment of the One UN programme with national, provincial and regional priorities as DaO pilot country. Based on findings of the Oversight Committee, review the One UN Programme implementation to ensure that it is closely aligned with the results framework. Serve as a forum for the consideration of strategic/policy issues that may impede the implementation of the One UN Programme and to suggest remedial actions. Decide on changes in current practices of UN assistance in line with the recommendations of the Paris Declaration on Aid Effectiveness and Busan Declaration. Composition Membership of the HLC will be based on representation from the following stakeholders groups to ensure timeliness of guidance and strategic decisions making: 1. 2. 3. 4. 5. 6. Secretary EAD UN Resident Coordinator SPA Conveners Representative of donors/ Member states Representatives of Federal Ministries/ bodies Representatives of provincial and regional governments Member Member Member Member Member Member Meeting Frequency The HLC will meet on annual basis though it can also meet more than once a year, if need be. 34 One UN Programme II Annex 4: TOR - OPII Oversight Committee for One Programme II Mandate The Oversight Committee is an overarching monitoring and review forum of the One Programme (OP 21 II) in Pakistan. Being a sub-committee of the High Level Committee (HLC) , the Oversight Committee will monitor and review progress on all Strategic Priority Areas (SPAs) of OP II at the broad policy level. Its mandate is to ensure periodic oversight of the overall implementation of OP II, the coherent allocation and use of the Pakistan One Fund. Responsibilities Exercise high level monitoring and overview of the overall implementation of OP II, and providing guidance and facilitation, as appropriate. Review agencies progress made at the joint output and outcome levels on the implementation of OP II and its components and report to the High Level Committee on related findings. Undertake joint reviews of the Operational Plan with Administrative Area Steering Committees (SCs) and take stock of any modifications made in the Operational Plan to keep it context and time-sensitive. Review and endorse UNCT recommendations on the allocation of unearmarked contributions in the One Fund in accordance with the agreed OPII documents and results framework. Provide strategic oversight to the allocation of the Pakistan One Fund and take stock of the earmarked contributions received in the One Fund. Manage the implementation of mid-term review and the final evaluation of OP II. Composition 22 The Oversight Committee has the following composition . 1. 2. Secretary EAD UN Resident Coordinator SPA Conveners invited as required. Co-Chair Co-Chair Meeting Frequency The Oversight Committee will meet biannually. With regard to the decisions and oversight of the One Fund Provisions, the Committee will meet as required. 21. 22. The Oversight Committee can also act on behalf of the HLC, if need be. EAD and RC may invite representative(s) of any other organization(s) for the meeting of Oversight Committee, as appropriate. 35 One UN Programme II Annex 5: TORs - OPII Administrative Area Steering Committees (SCs) Mandate Steering Committees will be formed in each of the eight geographic areas in Pakistan one federal, 1 ICT, 4 provinces and 3 regions. As a geographic representative body with senior government and UN representation, the SCs will provide strategic oversight and guidance to the One UN engagement in the respective provinces and regions. Responsibilities: Provide guidance to One UN output level strategic plans and projects/ activities reviews and progress reports; Ensure provincial/ area ownership of the One UN plans, reviews, reports and evaluations in line with national/ provincial/ area government's development priorities; As permanent members of the High Level Committee, the Steering Committee Chair is to represent provincial/area strategic interests and agreed UN programme at the High Level Committee (HLC) deliberations. Co-Chair arrangement: Senior provincial/area government representative to co-chair the SC together with the relevant UN agency officially assigned by the UN Resident Coordinator (RC)/UN Country Team (UNCT) as co-Chair23. Membership: EAD representative, key provincial/area line departments, UN agencies with activities in the region/province, key CSOs and donors. Private sector and academia is to be invited on a needs basis. Authority: As a representative body of a province/area, the Steering Committee will provide strategic oversight to One UN's One Programme implementation, reviews, and progress on the results achieved. Meeting Frequency: The SC will hold its meeting as required but not less than twice a year on predefined dates. Designated provincial/area government focal point will be responsible for convening the meetings. Approach to UN's engagement: Working closely with their provincial/area counterparts, the UN agencies will develop provincial/area activity plans, reviews, and progress reports ensuring government line departments' consensus. The 23. 36 List of UN Co-chair agencies appended at annex-A One UN Programme II resulting agreed activity plans, reviews and reports requiring strategic oversight and ownership will subsequently be consolidated into a One UN agenda and presented to the respective Steering Committees for consideration. Methodology: Steering Committees will have the flexibility to form and dissolve working groups on a needs basis for specific planning or related purposes. Responsibilities of the UN Co-Chair Agencies: Ensuring that all agencies (irrespective of presence in province/region) are systematically invited and informed of the SC meetings, proceedings, decisions and follow-up arrangements. 37 One UN Programme II Annex 6: TORs - SPA Conveners Mandate: Consistent with the results based management approach underpinning the One Programme II and teh Deliverying as One Standard Operating Procedures, the management arrangement is designed to ensure that the Resident Coordinator and UNCT maintain focus on the achievement of the results of the six strategic priority areas. It is with this principal objective that the role of SPA Convener is introduced in the management arrangement of OPII. Key roles and responsibilities: The SPA Convener role is reflected at all key levels of the OPII management arrangement. An agency that is an SPA Convener carries functional responsibilities through its programme staff in the deputy HoA in the Programme Management Team and through programmes staff in the SPA MRRCs. Following are the key elements of this in relation to the internal and external engagement of the SPA Conveners. A. Internal to UN system: At the UN Country Team The SPA Conveners at the Head of Agency level will have direct responsibility towards the RC and the UNCT for keeping them updated on the progress, shortcomings and issues related to specific SPA results in compliance with the M&E plan. PMT updates and reports, as envisaged in the M&E plan, together with regular bilateral meetings with these institutions will be the main sources of information updates for the SPA Convener Heads of Agencies. SPA Conveners are also responsible for spearheading resource mobilisation efforts within their SPA. At the Programme Management Team - the deputy HoAs (programme) making part of PMT will carry dual roles of: In collective capacity - ensure One Programme coherence, progress and consistency across all the SPAs In individual capacity - ensure that their respective HoAs, as SPA Conveners, are kept informed of progress and alerted to issues related to the SPA for which their agency is the convener. At the Monitoring and Reporting Committee the technical representatives of the SPA Conveners will act as chair/co-chair of the respective MRRC, with direct responsibility for coordinating effective progress monitoring and reporting on the results of that specific SPA. The individual agencies will act independently in carrying out their outputs, and are therefore not foreseen to be either coordinated or managed by the SPA Conveners, with the exception of when required by the RC/UNCT in specific cases. Individual agencies will primarily carry the responsibility for coordination with their respective counterparts internal and external, in relation to agency-specific outputs. 38 One UN Programme II In relation to joint outputs and outcome results, all agencies will ensure that the respective SPA conveners are provided the required information and updates. At the MRRC level, information will be compiled and analysed particularly in order to prepare progress reports. At the RC and UNCT levels, agencies are to provide SPA Conveners with information on particular bottlenecks, challenges and gaps in SPA implementation. As such, all agencies contributing to the SPA results will be responsible for providing timely information to the SPA Convener in the context of monitoring, review, analysis and reports associated with the SPA. The SPA Convener role towards UN agencies will primarily be that of facilitator and enabler in the broader context of SPA results. B. External to UN System: The Resident Coordinator is the leader and key interlocutor on behalf of the UN Pakistan with the external partners for all strategic programme, coordination and operational issues related to OPII. The SPA Convener's role is primarily to advise and assist the Resident Coordinator on issues related to Strategic Priority Areas. In addition, SPA Conveners: will act as the facilitator and point of reference in ensuring that external counterparts are directed to the relevant UN agencies when the issues involved relate to a specific agency's output or activity. This will not affect the direct interactions expected between agencies and their counterparts in relation to OPII outputs; will on all strategic issues requiring a UN position or point of view, ensure that the RC is briefed and consulted prior to taking any action. Where necessary, the RC will consult the UNCT for advice and decision-making first; will not carry a de facto coordination role with the external counterparts on SPA-related issues on behalf of the UN system unless this is agreed to and clearly delegated by the RC/UNCT in specific cases; will spearhead resource mobilisation efforts on behalf of the UN system in matters pertaining to the SPA; will assist the RC in the external engagements related to specific SPAs and ensure that he/she is provided with necessary updates, briefs and documentations. Principles for SPA Convener engagement: Conveners for each SPA will have to be agreed by RC and UNCT jointly. SPA Conveners will be assigned for a period of 18 months. The RC & UNCT will review the SPA Convener arrangement before the completion of the rotation period with the view to confirm, rotate or replace agencies as appropriate. One agency can be convener for only one SPA at any given time. More than one co-convener can be assigned for an SPA. However, one designated principal convener will, on a rotational basis, be responsible to the RC for updates on the SPA. 39 One UN Programme II Annex 7 : TORs SPA Working Groups (SPA WG) Mandate A SPA WG is the structure chosen by the UNCT to contribute to outputs as defined in the OP II (20132017) Operational Plan in a coordinated and effective manner. The overall objective of SPA WGs is therefore to enhance efficiencies, improve coherence and reduce transaction costs for the UN, implementing partners and other stakeholders. SPA WGs will operate as a joint working mechanism co-owned by the participating UN agencies and will be convened by the head of a UN Agency appointed by the RC in consultation with the UNCT. The UNRC will also appoint a UN head of agency as co-convener to serve during long absences of the convener. The SPA WG are diverse in size, structure, management and coordination modalities. Each SPA WG comprises staff from various UN Organizations who will work together on the issues assigned to that SPA WG to ensure the achievement of outputs, UN coordination, institutional learning (across UN organizations) and UN staff development. If a SPA WG so chooses, it may have different types of membership; e.g. a core group of full members and a broader group of associate members. SPA WG will recommend UN agencies best placed to lead specific areas of work. With the aim of achieving optimal use of human resources and to make concerted action on specific thematic issues easier, a SPA WG may chose to establish sub-working groups responsible for specific technical areas. Membership of these sub-working groups will be determined by the SPA WG Conveners based on the specific mandate of each SPA WG. Members of SPA WGs Each SPA WG Group consists of nominated staff from participating UN Agencies working together in a to achieve specific thematic area. In addition to the technical staff the groups will include professionals in the areas of Gender, Culture and Human Rights, HIV/AIDs, communication and monitoring and evaluation. Each SPA WG will be supported by a dedicated Monitoring, Review and Reporting Committee (MRRC) and will form sub-working groups as necessary. Key Functions: SPA WGs will serve the following functions: 40 Ensure coordination to contribute effectively to specific outputs, including joint planning / programming, with particular emphasis on maximizing synergies, and where possible jointly undertaking implementation, monitoring and evaluation activities. SPA WG will advise concerned management bodies. However they will not have a management function and will not form a new management layer; Conduct a planning meeting to agree on the overall priorities and main strategies to be implemented the following year; Develop common annual work plans (AWP) and the Conveners will be responsible for the overall planning, implementation, monitoring and ensuring follow up; One UN Programme II Conduct an Annual Review to assess progress and achievements in the previous year and agree on recommendations for the following year; With support of MRRCs, SPA WG prepare an annual report using a standard format with an analysis of implementation, level of progress and recommendations for following year. This will feed into the annual report; Maintaining a dialogue and coordinating with the UN co-chairs of the administrative area steering committees to ensure coherent programme implementation; Support joint resource mobilization efforts at the SPA level as well as foster, promote and strengthen donors' relations at the thematic level. Monitor, review and report against the progress made in achieving the outputs and contributing to the outcomes of the OP II. Prepare Annual SPA WG Reports providing detailed information on programmatic results and use of funds. Information from all the SPA WG Reports will be compiled in the OP II Annual Report prepared and distributed by the RCO to all relevant stakeholders; Establish an internal communication system for sharing information between SPA WG and UNCT suitable for the respective SPA. The Conveners are responsible for the communication to other SPA WGs, as well as for maintaining records with all relevant information about the work of the SPAs. The Conveners are responsible for the communication to other SPA WGs, as well as for maintaining records with all relevant information about the work of the SPAs. Accountability Participating UN Agencies are accountable to the SPA conveners for their contribution to the annual work plan. The SPA conveners are accountable to UNCT and RC. While the management and financial accountability remains with individual UN Agencies and their National Implementing Partners, accountability for the results and OP II reporting of the results as identified in the OP II M&E plan lies with the SPA WG for those areas which fall under its responsibility. So the Conveners are accountable to the UNCT and the UNRC for the coordination, planning and monitoring of the results that the SPA WG covers, as well as the actual implementation of the key functions of the SPA WG. While the Conveners will strive for consensus, they are entrusted with the necessary level of authority to make decisions on SPA WG programmatic priorities, joint interventions and measures that may be required to ensure the successful implementation of the OP II in line with UN and Government regulations. The SPA Conveners will decide with relevant partners on the appropriate modality and format for a coordinated dialogue and ensure the effective involvement of all stakeholders (GOP, UN, Donors, Academia, NGO, civil society, and Private Sector) in the SPA WG. The Conveners will also identify ways to use the DRG structure as a platform for policy dialogue between all development partners. 41 One UN Programme II Annex 8 : TORs - Programme Management Team (PMT) Mandate The Programnme Management Team comprises deputy heads of agencies or head or programme, or their equivalents, and acts as a technical advisory body to the RC/UNCT. Specifically, the PMT will: advise and assist RC/UNCT with the planning, monitoring, reviewing and reporting of One Programme II results and resource mobilization both along and across the SPAs, ensuring alignment with normative programming principles. advise and regularly update the RC/UNCT on OP II progress and areas requiring attention both collectively and individually where relevant as per the demands of the SPA Convener role. Guide, provide quality assurance to, and manage the work of the Planning, Monitoring and Evaluation Working Group ensuring that focus is maintained on monitoring the achievement of results. Responsibilities: Planning Identify, prioritize and recommend programmatic measures aimed at ensuring coherence and consistency in the delivery of One Programme to RC/UNCT for decision making. This will include review of the agreed results framework - at both Outcome and Joint Output levels, to ensure that the performance measures are updated, consistent, measurable and realistic. Ensure that programme approaches and strategies adopted across Administrative Area areas by the UN agencies are aligned and shared uniformly to maximize programmatic synergies and capitalize on the emerging best practices across the regions and provinces. Ensure that an OP II Annual Workplan is developed and approved by the UNCT. Develop Annual PMT Management Plan identifying key achievement targets and schedules, for the review and approval of RC/UNCT. Advise RC/UNCT on the approaches necessary for ensuring that humanitarian and recovery planning maintain focus and build towards the development objectives of the One Programme. Monitoring and Reporting Guide and manage the work of the PME in the development and implementation of monitoring, review and reporting plans and formats for the OP II. Manage and guide MRRC work in the design, implementation and updating of M&E Plan for OPII. Provide quality assurance to the Annual Progress Reports, Mid-term Review and Final Evaluation, and related processes. 42 One UN Programme II Ensure SPAs define the missing baselines and MOVs for the outcome and output indicators within the first year of OPII. Ensure RC/UNCT are regularly updated on overall One Programme progress, and suggest measures necessary for efficient (timely) and effective (results-based) contribution towards achievement of outcome results both across and within SPAs. Provide relevant information on individual SPAs through SPA Convener function, where relevant, to the SPA Convener HoA. Manage the use and updating of One UN information systems, especially One View, ensuring data and information are consistent with the programming requirement of the UN agencies, and remain relevant to the information interest of government, donors and civil society. Regularly update the RC/UNCT on the progress and difficulties of implementing Annual PMT Management Plan. Resource mobilization & donor relations: Advise and support RC/UNCT on approaches aimed at improving awareness among donors and counterparts concerning OPII progress and achievements. Advise and assist the RC/UNCT with the design and implementation of a One UN resource mobilization strategy. Support the implementation of the UN Communications Strategy. Design and recommend to RC/UNCT the principles and criteria for the allocation of unearmarked resources from One Fund. Review and recommend to RC/UNCT the projects and activities for resource allocation from One Fund. Meeting Frequency: PMT will meet regularly to implement its management plan, follow the work of the SPA WGs, and to meet the advisory requirements of RC/UNCT. The PMT should meet on a fortnightly basis in preparation for the UNCT meeting. Chair: The RC/UNCT will appoint two co-chairs from two agencies for a minimum period of 18 months to ensure that at least one “reporting period” is covered by the co-chairs. The appointments will be reviewed by the RC/UNCT and rotated among other agencies as needed. PMT Co-chairs will attend UNCT meetings on regular basis and will ensure that information flow between the two institutions is both regular and timely. 43 One UN Programme II PMT co-chairs will liaise with OMT co-chairs on a regular basis to ensure programme and operations plans and requirements are adequately aligned. Reporting: PMT collectively will report directly to the RC/UNCT through regular progress reports. In addition, PMT co-chair will regularly report at the UNCT meetings on achievements and constraints, with dual objective of keeping UNCT informed and also to ensure timely decision making on critical OP II aspects. Where relevant, this will be done in consultation with responsible SPA Conveners. Membership: Restricted to the UN agency Deputy Heads of Agency / Programme or equivalent only. HoAs to nominate both permanent member and alternate to PMT. Permanent alternates to attend only when PMT member is travelling or cannot exceptionally attend. RC/UNCT to review and approve PMT membership list proposed by the HoAs, ensuring required seniority and experience requirements are met. PMT to monitor and review the attendance of its members, and accordingly update RC/UNCT on members failing to attend three consecutive meetings. The UNRCO will be represented on the PMT by the Head of the Office or an alternate appointed by the RC. Working arrangement: PMT will be responsible for organizing its meetings, all preparatory work, taking minutes and ensuring follow-up on its decisions. These responsibilities will be decided and the necessary resources assigned by the Co-Chairs in consultation with PMT members. Costs for holding meetings will be shared among the PMT members on a rotational basis. Costs related to major meetings and workshops will be shared by the agencies. Costs related to travel of members to the provinces and regions for PMT work will be borne by the respective agencies. 44 One UN Programme II Annex 9 : TORs SPA Monitoring, Reporting and Review Committees (MRRCs): Mandate The SPA Monitoring, Reporting and Review Committees (MRRCs) are sub-groups of the SPA Working Groups and are responsible for monitoring the SPA level M & E and Results Frameworks, as contained in the Operational Plan, and ensuring that the baselines, targets and indicators are established 25 appropriately, and for verifying the reported figures and data . Purpose The SPA MRRCs will provide coordination and quality assurance to ensure high-quality reporting on progress and identification of constraints on achieving joint outputs and outcomes as articulated in the Operational Plan. Authority Under the overall guidance of the SPA and in collaboration with the Planning, Monitoring and Evaluation Group (PME), the MRRCs will have both the responsibility and authority to receive updates/reports on the progress, both programmatic and financial, against joint output level targets and indicators directly from the focal person assigned by each agency for each of the OPII outputs in their portfolio. The focal persons assigned by the agencies will be accountable to MRRCs for ensuring that required programmatic and financial information duly approved - is provided in a timely and consistent manner, as per agreed templates. The MRRC Co-Conveners have the responsibility to ensure results-based reporting compliance in line with the requirements of the reporting templates and requisite guidance. Responsibilities of the MRRCs 25. Ensure that baselines have been identified and established for each of the targets in the Operational Plan Collecting inputs from all participating agencies for the respective MRRCs and ensuring adherence to quality results based results reporting standards for annual reporting as per SPAs. Assess the quality of the results in the operational plan to ensure that all joint outputs and performance measures are results based and are compliant with operational plan development guidelines Ensure there is clear and timely flow of information to and from Administrative Area Steering Committees and that appropriate support is provided in relation to implementation of the Review, Reporting and Evaluation Plan. One UN Programme II (2013 2017) 45 One UN Programme II Ensure all deadlines are met as per the agreed Review, Reporting and Evaluation Plan; provide timely feedback to the SPA WG in case of issues especially in relation to reporting and reviews. Prepare an annual SPA M&E calendar that is to include: Reporting and coordination meetings. Coordination of the preparation and finalization of agency inputs for each respective SPA to the OPII Annual Report Uploading requisite information to the UN One View system as required Timelines for preparation for Annual Progress Reviews and Reports. Reporting: MRRCs will work closely with and report to the SPA Working Group, whilst maintaining close links with the PME. Meeting Frequency: MRRCs will meet regularly to ensure SPA-related monitoring and reporting targets and requirements are achieved. Frequency of these meetings will be decided by the MRRCs in consultation with the SPA Working Group. Chair: The Chair and co-chair for each MRRC will be determined by the SPA conveners and revised based on changes in the SPA convener agencies assigned by RC/UNCT as required. MRRC Chairs will attend PME or PMT meetings as required to ensure timely and regular information flows between the different fora and invited by the SPA convenors and PMT/PME chairs.. Membership: 1) Each of the UN agencies that are participating in a given SPA will place one technical staff and one alternate on the relevant MRRC. The MRRC members must meet following requirements: 2) 3) 4) 46 Well experienced in programme monitoring, evaluation, review and reporting Strong background and understanding of Results Based Management Strong commitment to UN interagency partnerships and coordination Head of Agencies to nominate both permanent member and alternate to MRRC. Alternates to attend only when permanent member is travelling or could not exceptionally attend. RC/UNCT to review and approve MRRC membership list in consultation with PMT/PME, ensuring required experience requirements are met. SPA conveners to monitor and review the attendance of MRRC members, and accordingly update RC/UNCT on members failing to attend three consecutive meetings. One UN Programme II Annex 10 : TORs Planning, Monitoring and Evaluation Group (PME): The Planning, Monitoring and Evaluation Group is a sub-group of the PMT mandated to ensure uniformity and standardization of reporting and to ensure overall compliance with operational guidelines. Responsibilities: The PME will provide technical advice and support to the PMT regarding its OP II monitoring, reporting, reviewing and planning functions. The PME will be responsible for: Preparing standardized reporting templates and associated guidance notes for monitoring of progress against the operational plan, as well as for annual results reporting; Prepare an M&E calendar and support the PMT to ensure that the SPA WGs comply to the Review, Reporting and Evaluation Plan; Prepare an annual M&E calendar that is to include: - Reporting and coordination meetings. Timelines for collection of necessary reporting inputs from SPA WGs. Coordination of compilation of OPII Annual Report Timelines for preparation for Annual Progress Reviews and Reports. Ensuring that the respective MRRCs adhere to the appropriate guidelines and provide substantive feedback and/or inputs to the MRRCs to ensure quality results based reporting; Collecting inputs from all participating agencies for the SPA WGs and ensuring adherence to quality results based reporting standards for annual reporting and ad hoc reports; Design a template for the Annual Workplans and an accompanying guidance note; Review of Annual Workplans for quality assurance and standardisation; Support Annual Progress Reviews conducted at Provincial/Administrative level and ensure that guidance, formats and templates for the reviews are provided in timely fashion and that all stakeholders are aware of the process which facilitates optimum participation for useful results; Act as an advisory body to the PMT and RCO on OP II information management and the development of an OP II Information Management Strategy. Regularly communicating and updating the PMT. Reporting: The PME will report to the PMT and collaborate closely with SPA Working Groups, in particular SPA MRRCs. 47 One UN Programme II Meeting Frequency: The PME will meet at a minimum on a monthly basis to ensure the above stated requirements are achieved. Frequency of meetings will also be determined by the reporting cycle and PMT/UNCT requirements.. Chair: The PME chair and co-chair will be determined by the PMT and reviewed as required. PME chairs will attend PMT meetings as required to ensure timely and regular information flows between the different fora and invited by the PMT chairs. Membership: The PMT will determine the membership of the PME. Members will be identified according to their technical expertise and seniority, not their agency. A senior level representative of the RCO will also be part of the group. The specific requirements of membership include: Well experienced in programme monitoring, evaluation, review and reporting Strong background and understanding of Results Based Management Strong commitment to UN interagency partnerships and coordination Alternates will not be officially appointed as membership is restricted. A alternates will be allowed to attend only when a permanent member is not able to attend for a longer period of time and it is agreed upon by the rest of the PME membership. Working Arrangements: Each PME will be responsible for organizing its own secretariat and meeting arrangements, all preparatory work, documenting minutes and ensuring follow-up on its decisions. The chairing/convening agency will need to bear the cost of such arrangements, including travel. Costs for holding meetings will be shared among the PME member agencies on a revolving basis. Costs related to travel of members to the provinces and regions for PME work will be borne by the respective agencies. Cost and arrangement for holding PME meetings/consultations in the provinces/regions will be managed and borne by the relevant Administrative Area Steering Committee co-chairing agency. 48 One UN Programme II Annex 11 : TORs - Operations Management Team (OMT) Mandate The purpose of the Operations Management Team (OMT) is to provide support and advice to the UNCT in all identified areas of inter-agency operations activity for their effective implementation and coordination, including in all aspects of finance and administration, procurement, ICT, human resources, and other areas such as ICSC, common services, premises and protocol matters. Objective of the Group Under the guidance of the UN Country Team (UNCT), make assessments and recommendations to the UNCT on any activities requiring their approval including joint initiatives on the effectiveness of existing common services, identifying new services/activities for efficient and effective implementation, and planning and managing the services/activities as per the governance framework depicted under this Terms of Reference. Under UN reform, the OMT will assume a much larger role. The ultimate goal is to aim for a common platform for all UN agencies where the common services and operational needs of all can be met. Responsibilities and Tasks Identifying, assessing, prioritizing and planning activities to be included in the common services work plan. Seeking approval from the UNCT to proceed with activities identified in the form of a work plan. Implementing the activities of the approved work plan. These activities will be undertaken in an open and transparent manner, with as much participation amongst interested agencies as possible. Ensuring that large contracts negotiated by the OMT are covered by a 'Memorandum of Understanding' (MOU) between participating agencies Carrying out, either directly or through working groups, all approved activities in the work plan within the agreed-upon timeframes and budget resources, while ensuring: - that the agreed-upon rules and regulations of the UN lead agency are adhered to for all contracting, procurement, etc. openness and transparency in processes and decision-making Establish task forces/subcommittees, where necessary, to carry out detailed studies on how to implement specific common services. For each task force: - Develop Terms of Reference. - Appoint a leader who is an appropriate member of the OMT. - Report as a group to the OMT on a regular basis or as otherwise agreed upon. - Decide on a UN Agency best suited to manage the particular common service to designate as a Common Services Manager. 49 One UN Programme II - Analyze bids, shortlists and interviews and select service providers to be submitted to the OMT for review and approval. Determine appropriate performance measurements including performance indicators and benchmarks for each common service. Submit proposals and budgets to the OMT for final review and submission to UNCT for decision-making and approvals. Draw up schedule of payments by UN Agencies for services rendered. Ensure implementation is transparent, internal control measures are in place and activities are undertaken with as much participation amongst relevant interested agencies as possible. Ensure that the Common Services Account is managed as per existing/new MOU's governing cost-sharing arrangements. Membership The most senior Operations/ Administrative Managers of all agencies or their designated alternates. Other staff from participating agencies/entities based on their area of expertise and membership of assigned Task Forces. Members are required to attend OMT meetings regularly. Attendance sheet will be presented to the UNCT on a monthly basis. Chair The OMT co-chairs will hold the positions for one calendar year. The OMT co-chairs will also attend monthly UNCT meetings to update them about progress of operational matters. Minutes Due to the importance of minutes and their accurate reflection of the meeting, they will be circulated in draft form to OMT members and their alternates for comments and corrections before they are finalised and sent to the UNCT. The preparation of the minutes will be the responsibility of the Resident Coordinator's Office and be prepared as quickly as possible and circulated by e-mail to OMT members. This should be done within 1 week of the meeting to allow time for feedback and finalisation before the UNCT meeting. The format of the minutes should follow the template developed for this purpose. Methodology 50 Consensus - OMT is an advisory body and should make recommendations to the UNCT based on consensus. In case no consensus can be reached by OMT members the UNCT should be presented with the different views. Voting - on actions requiring a vote, each agency will be entitled to one vote, regardless of the number of representatives present. Confidentiality - most discussions and reports are in the public domain and therefore can be shared openly. However, members are required to uphold the confidentiality of sensitive information when it is explicitly classified as such. One UN Programme II Working Groups - the OMT has the authority to set up Working Groups to accomplish activities/tasks relating to the work plan or assignments delegated by the UNCT. The membership will be decided by the OMT and should be identified based on competency and value added. The co-ordinating agency/Chairperson should be selected for their knowledge of the activity and/or agency strength in that particular field. Reporting The OMT will report monthly to the UNCT on the CS Work Plan and other relevant matters by ensuring: a briefing from the co-chairs at the monthly UNCT meeting distribution of the approved minutes of the monthly OMT meeting The OMT Working Groups will report back to the OMT on a monthly basis on progress made. The Chairpersons of the Working Groups are also encouraged to keep OMT members up-to-date on progress or seek assistance/clarification via e-mail rather than wait for the next OMT meeting. Meeting Frequency The OMT will generally meet on a monthly basis unless requested by the UNCT to meet on a more frequent basis due to urgent matters. 51 One UN Programme II Annex 12: TORs UN Communications Group (UNCG) 1. 2. Introduction i. Set up in 1998 at the initiative of the United Nations Secretary-General, the United Nations Communications Group (UNCG) has emerged as a strong unifying platform for dealing with common communications challenges facing the United Nations. ii. The Group, which includes communications offices of all United Nations system organizations, as well as the Department of Public Information and the Executive Office of the Secretary-General, holds regular meetings at UN Headquarters, where current communications issues are discussed. Since 2002, it also meets once a year, at rotating locations and at the principals level, to discuss policy issues and agree on common responses and programmes of activity. In addition, several issue-based task forces work round the year to develop and carry out agreed communications strategies. Thus, by integrating communications resources of the UN system and devising practical measures to share their expertise, the United Nations Communications Group creates a close-knit information network, giving the UN communicators a practical tool to think and act together. Ii. The success of the UN Communications Group is largely determined by its ability to coordinate activities at the country level. While policies are made at global headquarters of UN organizations, usually at the principals level, the implementation of those policies depends on the ability of the country teams to cooperate and coordinate locally and/or regionally. It was agreed at the Fourth Annual Meeting of the UN Communications Group (23 24 May 2005, Geneva) that a paper outlining principles guiding such cooperation would be developed. This paper, prepared in response to the above decision, presents some ideas that could serve as a basis for a comprehensive policy on strategic communications for UN field offices. Proposal i. 3. As part of UN reform and harmonization of activities at the country level, United Nations organizations will create a UN Communications Group as part of each country team. Terms of Reference i. The UN Communications Group (UNCG) at the country level to be known as UNCGname of the country (e.g. UNCG-Pakistan) will seek to strengthen inter-Agency cooperation in the field of communications and to increase the media profile of United Nations activities at the national and/or regional level by: 52 providing leadership in communications for the UN Country Team; identifying new and creative ways to show how UN programmes are delivering results (emphasizing inter-agency collaboration); promoting a coherent image of the United Nations; One UN Programme II ii. 4. UNCG-Country will include communications focal points of all United Nations entities operating in the country and will be chaired by the Director/Officer-in-Charge of the UN Information Centre (UNIC) or the senior most Information Officer of any UN agency represented in that country. Recognizing that communications specialists are present in only a few UN agencies, communications focal points will be appointed by UN agencies as they may find appropriate. An alternate will also be appointed whenever possible. Activities i. Regular meetings: The Communications Group will meet at least regularly to discuss common communications issues and challenges, devise common responses and undertake collective action. Brief summaries or action points agreed will be prepared and circulated among all communications staff stationed in the country. ii. Communications strategies: UNCG-Country will develop communications strategies based on guidance prepared at the headquarters-level and distributed through the UNCG Secretariat in New York to undertake national public information campaigns on UN priority issues. Using the guidelines provided by the UNCG Secretariat, it will adapt and localize public information mandates, taking into account the national media environment and local needs. iii. Press releases: While each member of UNCG-Country will continue to issue individual press releases pertaining to individual organization's activities, joint press releases will be produced on key UN priority issues and activities, such as the Millennium Development Goals and UN Reform. These press releases issued through/by UNIC will help the public better understand the integrated nature of the work carried out by the UN organizations at the country level. iv. Calendar of media and public events: To avoid scheduling conflicts and with a view to better planning of Country Team events, the Communications Group will prepare and circulate every month a calendar of activities. This will include public events, such as seminars and other public gatherings and, to the extent possible, media-related activities, such as press conferences, visits by senior UN officials and launch of reports. The UNIC will be responsible for producing the calendar, with inputs from all UNCG members. v. Field Missions for Media: The UNCG-Country will periodically organize joint field missions for members of the local media to showcase coordinated UN system activities in specific areas (e.g. visit to a refugee camp to underline the work of several agencies). vi. Radio and TV Programmes: In countries where local UNICs are able to produce and air radio programmes through arrangements with national broadcasting authorities and/or private partners, UNCG-Country members will be invited to contribute stories and news items to such radio programmes. The UNIC will retain editorial control, but programme contents will be discussed in advance with UNCG-Country and its guidance 53 One UN Programme II will be sought on future programming. A similar approach will be taken with regard to producing TV programmes where such possibilities exist. 5. Vii. Electronic newsletter: In order to highlight the inter-related nature of UN work and the extent of its involvement at the national level, UNCG-Country will circulate a newsletter every month/fortnight/week (whichever is feasible), aimed at opinion leaders (Government officials, journalists, academics, NGO representatives etc). By providing highlights of current activities and informing readers about upcoming activities/events, the newsletter will serve as a clearing house of information and ideas. The UN Communications Group will coordinate regular submissions to the UN Information Centre, which will centralize contributions, package them and disseminate the final product electronically. viii. UN System Information kit: The Communications Group will create a common press kit, which will include fact sheets dedicated to the work of each UNCT covering the most important elements related to their activities. It will also include contact details of all communications focal points and will be offered to all visitors and media representatives. ix. Website: The Information Centre, in close collaboration with the Office of the Resident Coordinator, will maintain wherever possible - a UNCT website, providing access to the sites of individual agencies and highlighting collaborative activities of the UN System in that country. The website will offer a gateway to UN activities in the country and provide a platform for interaction with partners. x. Common observances of important dates and special occasions: Observance of UN Day and other special occasions provide excellent opportunities to showcase the work of the United Nations and rally greater support for the Organization at the national level. Some of the most successful UN days are those led by the Government and to which one or more UN agency lends support. The Communications Group will encourage relevant Government bodies to take leadership in recognizing key additional days, e.g. Human Rights Day, AIDS Day, World Health Day, etc. A working group created by UNCG-Country will work directly with the concerned governmental agencies and ensure the involvement of as many local UN agencies as possible. In order to better coordinate inter-agency cooperation, an annual calendar of special days/events will be prepared and posted on UNCT website in consultation with all Agencies. Reporting i. 54 UNCG-Country will report to the Resident Coordinators as well as to Heads of Agencies at the country level through the UNIC, which will also serve as the national secretariat for the Group. An annual review and evaluation of the Group's activities will be conducted, which will form the basis of an annual progress report. This report will be forwarded to the UNCG secretariat at UN Headquarters for sharing with all UNCG members and for posting on the UNCG website. One UN Programme II Annex 13 : TORs Pakistan One Fund (2013-17) I. II. Introduction 1. In 2008, Pakistan became one of eight pilot countries for One UN. The first One Programme (2008 2012) was signed in 2009. 2. A second generation One Programme II (2013 2017) continues the One UN reform process. The One Programme encompasses the developments strategies of all the UN agencies operating in Pakistan. Through an extensive prioritization and consultation process coupled with an analysis of the UN's comparative advantage, six priority areas have been selected for the One Programme II. Through their implementation, the UN will contribute to the implementation of national development priorities and the Millennium Development Goals. 3. A key component required in support of the One UN and the implementation of the One Programme and its components is the One Fund. With leadership of the UN Resident Coordinator in consultation with the UN Country Team (UNCT), the Pakistan One Fund aims to provide a coherent and streamlined platform for resource mobilization, fund allocation and reporting on the One Programme and its components. 4. These Terms of Reference (TOR) are in line with the management structures of the One Programme II and its components, and are subject to periodic review in line with the dynamic nature of the One UN reform process in Pakistan. Purpose of the Pakistan One Fund 5. III. The Pakistan One Fund will support resource mobilization and the allocation of resources to the One Programme and its components. It will also support the streamlining of substantive and financial monitoring. Description of the Pakistan One Fund A) Administration 6. The UNCT has appointed UNDP as the Administrative Agent of the Pakistan One Fund for the period of 2013 2017. UNDP will perform its functions of Administrative Agent (AA) in line with these TORs and in accordance with the UNDG-approved “Protocol on the Administrative Agent for Multi Donor Trust Funds and Joint Programmes, and One UN Funds”. UNDP's Multi-Partner Trust Fund Office (MPTF Office), will perform the function of the AA. B) Contributions to the Pakistan One Fund 7. Contributions to the One Fund may be accepted, among others, from governments of member states of the UN, intergovernmental and non-governmental organizations, 55 One UN Programme II international financial institutions, foundations or private sources. Acceptance of funds from the private sector will be guided by criteria stipulated by the UNCT, agency specific guidelines, and in the UN system-wide guidelines on cooperation between the UN and Business Community (the UN Secretary General's guidelines http://www.un.org/partners/business/otherpages/guide.htm). 56 8. In line with the objectives of the Pakistan One Fund, and to ensure maximum programming efficiency, donors are strongly encouraged to contribute multi-year unearmarked resources to the One Fund. Hence, in line with UNDG guidance, resources channeled through One Fund should be un-earmarked or softly earmarked, with earmarking allowed at the sector/thematic level. Earmarking to a specific agency output is not permitted. 9. Contributions to the Pakistan One Fund will be accepted in fully convertible currencies. Such contributions shall be deposited in the bank accounts designated by the Administrative Agent. The value of the contribution, if made in any other currency except for the United States dollar, shall be determined by applying the United Nations operational rate of exchange in effect on the date of payment. C) Eligibility for Funding from the Pakistan One Fund 10. Current Participating UN Organizations in the One Fund for the One Programme I may continue participation in the Pakistan One Fund for the OP II by concluding an Addendum to the Memorandum of Understanding (MOU) which has already been signed with the Administrative Agent. New UN Organisations, wishing to participate, may do so by concluding the standard MOU with the AA. D) Utilisation of the Pakistan One Fund 11. The Pakistan One Fund will be utilized to meet the unfunded priority results of the One Programme and its components, including any new initiatives required to respond to emerging needs. Details are presented in the One Programme document and the Operational Plan for the One Programme II. 12. Indirect costs of the Participating UN Organizations recovered through programme support costs will be 7%. All other costs incurred by each Participating UN Organization in carrying out the activities for which it is responsible under the Pakistan One Fund will be recovered as direct costs. 13. The Administrative Agent will be entitled to allocate an administrative fee of one percent (1%) of the amount contributed by each donor signing an Administrative Arrangement, to meet the Administrative Agent's costs of performing the Administrative Agent's functions. One UN Programme II IV. Governance Arrangements A) High Level Committee and the Oversight Committee 14. The High Level Committee (HLC) is responsible for the oversight of the One UN reform process in Pakistan. 15. The HLC has as its subsidiary body the Oversight Committee composed of the Secretary of the Economic Affairs Division (Co-Chair); the UN Resident Coordinator (Co-Chair); and a donor reprehensive. The Oversight Committee is responsible for the monitoring and review of OPII and will also be responsible for steering the Pakistan One Fund. In this respect, the Oversight Committee has the following responsibilities: Provide oversight to the management of the Pakistan One Fund Take stock of earmarked contributions received Review and endorse UNCT recommendations on the allocation of unearmarked contributions to the One Programme and its components B) UN Resident Coordinator and the UNCT 16. Chaired by the UN Resident Coordinator, the UNCT is the primary UN forum for strategic programmatic guidance in relation to priority gaps, windows of opportunity to achieve programme results and mobilizing resources for the Pakistan One Fund. 17. After soliciting priority proposals from each SPA and based on the subsequent analysis provided by the Programme Management Team (PMT), the UNCT will make recommendations to the Oversight Committee on the allocation of unearmarked contributions from the Pakistan One Fund. 18. The overall management of the Pakistan One Fund will be led and coordinated by the UN Resident Coordinator, who, in consultation with the UNCT, will be responsible for: Co-chairing the HLC and the Oversight Committee for the allocation of funds for the One Programme and its components in line with the proposals of the UNCT Communicating with Participating UN Organisations on decisions of the HLC and the Oversight Committee, including approved resource allocations Subject to fund availability, instructing the Administrative Agent to transfer the approved fund allocations to Participating UN Organisations Sharing Annual Progress Reports prepared by the Administrative Agent and other relevant communications with the HLC, the Oversight Committee, donors and other partners C) Support Structures 19. The PMT will support the identification of funding gaps within the One Programme II and its components by presenting the UNCT with an updated analysis of the priority 57 One UN Programme II outputs facing acute funding shortages. This will inform UNCT decision making when allocating unearmarked funding. 20. The Resident Coordinator's Office will provide secretariat and other relevant support services to the management and coordination of the Pakistan One Fund, and as per the Pakistan One Fund MOU/SAA, with the approval of the UNCT, the costs of such support may be charged as direct costs to the Pakistan One Fund. D) Administrative Agent 21. The responsibilities of the Administrative Agent will include the following: V. 58 Receive financial contributions to the Pakistan One Fund; Administer such funds received, in accordance with the relevant MOU including the provisions relating to winding up the Pakistan One Fund and related matters; Subject to availability of funds, disburse such funds received to each of the Participating UN Organizations in accordance with instructions from the UN Resident Coordinator, on behalf of the Oversight Committee; Consolidate narrative reports and financial statements based on submissions provided to the AA by Participating UN Organization through the established One Programme monitoring and reporting arrangements under the overall guidance of the UN Resident Coordinator and the Country Team; Provide final reporting, including notification that the Fund has been operationally disbursed and utilized. Monitoring and Evaluation 22. Monitoring and Evaluation (M & E) of the overall One Programme and its components shall be undertaken in accordance with the monitoring and evaluation framework detailed in the One Programme Operational Plan. Based on the submissions made through the established monitoring and reports arrangements of One Programme, Annual Progress Reports will be consolidated by the Administrative Agent in line with the agreed upon fund structure. In addition, the Oversight Committee will oversee an independent mid-term review and final evaluation. 23. The donor(s), the Resident Coordinator, the Administrative Agent and the Participating UN Organizations will hold annual consultations, as appropriate, to review the status of the Pakistan One Fund. 24. In addition, the Resident Coordinator and the UNCT may commission a regular, independent lessons-learned and review exercise relating to the operations and management of the Pakistan One Fund. One UN Programme II VI. Audit 25. VII. The Administrative Agent and Participating UN Organisations will by audited in accordance with their own financial rules and regulations. The 'Framework for auditing Delivering as One Programmes', provides the basis for a unified internal audit approach for auditing Delivering as One programmes at the country level jointly by the Internal Audit Services (IAS) of the Participating UN Organisations, in order to achieve more coherent governance, enhanced management and increased effectiveness of auditing Delivering as One Programmes. Where possible, auditing of the Pakistan One Fund will be conducted in line with this framework. Reporting 26. Each Participating UN Organization will provide the Administrative Agent with the following financial statements and reports: a) b) 27. Each Participating UN Organisation will provide narrative reports through established OP II operational arrangements, addressing progress made towards joint outputs. Under the oversight and guidance of the Programme Management Team (PMT) facilitated by the SPA Convener Agency, the Monitoring & Reporting Committees (MRRCs) will compile and submit to the AA: a) b) 28. Annual financial statements and reports for the period up to 31 December with respect to the funds disbursed to the Participating UN Organization from the Pakistan One Fund Account. These reports are to be provided no later than four months (30 April) after the end of the calendar year. Certified final financial statements and final financial reports from the Participating UN Organizations after the completion of the Programme and including the final year of the Programme, to be provided no later than six months (30 June) of the year following the financial closing of the Programme. Annual reports of the progress achieved towards joint outputs. These reports are to be provided no later than three months (31 March) after the end of the calendar year. Final narrative reports at the joint output level, after the completion of the activities in the One Programme documents and the Operational Plan, to be provided no later than four months (30 April) of the year following the financial closing of the Programme. The final reports will include a summary of results and achievements against the outcomes of the One Programme and its components. The Administrative Agent will prepare consolidated narrative and financial reports, based on the submissions referred to above. Annual financial and narrative progress reports will be finalized by 31 May and final financial and narrative reports will be finalized by 31 July. Consolidated reports will be sent to the UN Resident Coordinator for onward submission to the UNCT, High Level Committee, Oversight Committee and to each donor that has contributed to the Pakistan One Fund Account, in accordance with the timetable established in the Administrative Arrangement. 59 One UN Programme II 29. The Administrative Agent will also provide the Resident Coordinator for onwards submission to the UNCT, High Level Committee, Oversight Committee, donors and Participating UN Organizations with the following statements on its activities as Administrative Agent: a) b) 30. VIII. 60 Consolidated reports and related documents will be posted on the websites of the UNC T in Pakistan (w w w.un.org.pk) and the Administrative Agent (http://mptf.undp.org). Public Disclosure 31. IX. Certified annual financial statement (“Source and Use of Funds”) to be provided no later than five months (31 May) after the end of the calendar year; and Certified final financial statement (“Source and Use of Funds”) to be provided no later than seven months (31 July) of the year following the financial closing of the Pakistan One Fund. The Resident Coordinator, the UNCT and Administrative Agent will ensure that decisions regarding the review and approval of One Programme II and its components funded under the Pakistan One Fund as well as periodic reports on the progress of implementation of the One Programme and associated external evaluation reports are posted for public information on the website of the UNCT in Pakistan (www.un.org.pk), as well as on the Administrative Agent's website (http://mptf.undp.org). Website postings may also include a record of decisions of the Oversight Committee and UNCT, summary sheets of approved OPII components, fund level financial and progress reports, and external Pakistan One Fund evaluation reports, as appropriate. Termination of the Pakistan One Fund 32. Utilization of One Fund allocations for OPII to agencies will be time bound and limited to the utilization period specified in the project document and approved by the Oversight Committee. Any unutilized amount exceeding this period will have to be returned to Pakistan One Fund unless time extension is requested by the agency and approved by the Resident Coordinator & UN Country Team. 33. The Pakistan One Fund will terminate upon completion of the One Programme II and its components and after satisfaction of all commitments and liabilities. 34. Notwithstanding the completion of the initiatives financed from the Pakistan One Fund, any unutilized balances will continue to be held in the Pakistan One Fund Account until all commitments and liabilities incurred in implementation of the One Programme and its components have been satisfied and programme activities have been brought to an orderly conclusion. 35. Any balance remaining in the Pakistan One Fund Account or in the individual Participating UN Organizations' separate ledger accounts will be used for a purpose One UN Programme II mutually agreed upon by the donors, the UNCT and the Steering Committee, or returned to the donor(s) in proportion to their contribution to the Pakistan One Fund. UNCT Pakistan approval: 06 December 2012 61 62 UN Administrative Area Coordination Team members (reps of UN agencies with activities in the region/province) Provincial / Regional government line departments and ministries Key donors Key CSOs UNRC UNCT Minister of State EAD Secretary EAD UNRC Donor representative CSO Representative Deputy-Chairman ERRA Chairman NDMA Private sector and academia to be invited on a needs basis Additional Secretary P&D & UN co-chair EAD representative Secretary EAD & UNRC Secretary EAD UNCT Administrative Area Steering Committee Chairs Secretaries of line Ministries (12) Administrative Area Steering Committees Oversight Committee High-Level Committee OMT chair UNRCO PMT chair Heads of Agencies UNRC UNRC UN Country Team UNRCO Deputy Heads of Agencies PME chairs Programme Management Team UNICEF & UNWomen Operations Managers UNRCO UNICEF & UNDP UNRCO Communications Officers Communications focal points UNIC Operations UN Communications Management Team Group One UN Programme II Annex 14 : Overview of the Membership of OPII Management Structures Partner Activities Use of Information M & E Capacity Development OP II Evaluation Milestones Evaluations Reviews Monitoring Systems Surveys / Studies ACTIVITY Development of common reporting tools Surveys to gather joint output level baselines (see details below) Survey(s)/ studies to gather information on OPII outcome level indicators (see details below) Q1 2013 Q2 Q3 Administrati ve Area Steering Committee Meetings Agencies' annual reviews; Update on performance measures in the SPA results matrixes Q4 Oversight Committee Meeting Annual Progress Report Q1 Q3 2014 Q2 Administrati ve Area Steering Committee Meetings Agencies' annual reviews; Update on performance measures in the SPA results matrixes Q4 Oversight Committee Meeting Annual Progress Report Q1 Q2 Q3 Midterm review 2015 Administra tive Area Steering Committee Meetings Agencies' annual reviews; Update on performan ce measures in the SPA results matrixes Q4 One UN Programme II (to be updates as required) Annex 15 : M&E Calendar 63 64 Partner Activities Use of Information M & E Capacity Development OP II Evaluation Milestones Evaluations Reviews Monitoring Systems Surveys / Studies ACTIVITY Oversight Committee Meeting Annual Progress Report Q1 Q2 Q3 2016 Oversight Committee Meeting; Administrative Area Steering Committee Meetings TOR for final evaluation developed and consultant for final evaluation identified Agencies' annual reviews; Update on performance measures in the SPA results matrixes Q4 Q1 Oversight Committee Meeting Final evaluation initiated Annual Progress Report Update on performance measures in the OPII Survey(s)/ studies to gather information on OPII outcome level indicators (see details below) Final evaluation completed Q2 2017 Administrative Area Steering Committee Meetings Q3 Oversight Committee Meeting Final updating of OPII indicators Q4 One UN Programme II Rights holders' satisfaction with basic social services Firms that meet international standards of equitable and fair trade Firms that are able to enter the export market Vulnerable persons including refugees provided with sustainable solutions (in target areas) Federal and provincial institutions utilizing public consultations and information-sharing mechanisms Religious minority and indigenous community members at decision-making levels in government institutions Participating households with dietary energy consumption of more than 2100 calories per day for vulnerable persons, including Afghan refugees Provincial policies and programmes formulated and implemented to address key causes and consequences of population growth Population involved in Climate Change initiatives Community-based Climate Change adaptation and mitigation plans developed and funded Survey Survey Survey Survey Survey Survey OP II annual review/ special policy review Study Systematic vulnerability mapping Survey Vulnerable and excluded population participating in decision-making processes of social service providing institutions Survey Information Needed for OPII (Outcome Level Indicators) Based on the given Means of Verification in the OPII and draft SPA results matrix documents, an indicative list of monitoring activities and information that needs to be collected List of Surveys, Studies or Similar Monitoring Exercised to be Completed for the Development of Baselines and Targets for Given Performance Measures, as Reflected to be Pending in OPII at the Outcome level and the SPA Results Matrixes at the Joint Output Level One UN Programme II 65 66 Institutions strengthened to offer fair trade opportunities to women Survey of women managed fair trade businesses and survey of institutions supporting such businesses Community surveys No. of households practicing sustained use of recommended household water treatment technologies Number of communities (men and women) trained Policies which are gender responsive Baseline and endline surveys SPA 3 Household survey Related Government departments that comply with international standards of equitable/fair trade and focus on overall trade development ? Vulnerable population having accessed social services, information and products Public sector institutions adopting improved procedures and tools for planning, management and monitoring for the delivery of basic social services Sector budget earmarked for initiatives targeting the most vulnerable Survey SPA 2 SPA 1 Population based survey Baseline study / institutions survey Sector baseline analysis Baseline and endline surveys PATS surveys Development programmes focus on land and property rights of excluded groups, especially women Survey reports Information Needed for SPA results matrixes (Joint Output Level Indicators) Civilian law enforcement personnel, prosecutors and prison staff receiving training and equipment following international standards Case studies on key stakeholders' perceptions on effects of interventions Information Needed for OPII (Outcome Level Indicators) One UN Programme II i Survey to establish number of people trained in improved nutrition relevant curriculum/guidelines/manuals Survey of policy documents to analyse reflection of food and nutrition issues ? Unsure which indicator the surveys will provide information for – Maybe # of policy briefs based on disaggregated data publically available Degree of awareness among the general public and marginalized groups on voter rights ? Unsure which indicator the surveys will provide information for – either International standards for mutual legal assistance adopted, including availability of a Central Authority OR # of provinces following international standard prison management rules ? Unsure which indicator the assessment will provide information for Pew Research Center United Nations Retain Strong Global Image, September 2013 Survey SPA 6 Survey SPA 5 Impact Assessment Studies Stock-taking surveys Case studies on experts' opinions on effects of assistance activities SPA 4 Vulnerability assessment of areas affected by Glacial Lakes outburst Floods (GLOFs) Information Needed for OPII (Outcome Level Indicators) One UN Programme II 67