TEDAŞ-MYD/99-031 TURKISH ELECTRICITY DISTRIBUTION CO. MATERIAL MANAGEMENT DEPARTMENT TECHNICAL SPECIFICATION FOR MV / LV DRY TYPE POWER TRANSFORMERS WITH EPOXY RESIN INSULATED WINDINGS APRIL, 1999 TEDAŞ-MYD/99-031 TECHNICAL SPECIFICATION FOR MV / LV DRY TYPE POWER TRANSFORMERS WITH EPOXY RESIN INSULATED WINDINGS CONSENTS 1. 2. GENERAL 1.1. Scope 1.2. Standards 1.3. Service Conditions CHARACTERISTICS 2.1. Type 2.2. Electrical Characteristics 2.2.1. Rated Frequency 2.2.2. Rated Power 2.2.3. Highest System Voltages 2.2.4. Rated Voltages 2.2.5. Off-load voltage regulation 2.2.6. Connection symbol 2.2.7. Impedance (short circuit) Voltage 2.2.8. Rated Insulation levels 2.2.9. Temperature Rise Limits 2.2.10. Reference Temperature (T ref) 2.2.11. Sound Power Level 2.2.12. Operation Regime 2.2.13. Operation Under Overvoltage 2.2.14. Losses 2.2.15. Tolerances 2.2.16. Temporary Overloading 2.3. Constructional Characteristics 2.3.1. Core 2.3.2. Windings 2.3.3. Tap Changing 2.3.4. Connections and Terminals 2.3.5. Overload Protection 2.3.6. Chassis and Auxiliary Equipment 2.3.7. Nameplate 2.3.8. Anticorrosion Precautions i TEDAŞ-MYD/99-031 3. TESTS 3.1. 4. Type Tests and Special Tests 3.1.1. Type Tests 3.1.2. Special Tests 3.2. Routine Tests 3.3. Acceptance Tests and Provisions 3.3.1. Acceptance Tests and Sampling 3.3.2. Acceptance Criteria 3.3.3. Provision for Acceptance Tests 3.3.4. Acceptance Procedure MISCELLANEOUS CONDITIONS 4.1. Packing 4.2. Special Tools 4.3. Documents to be Submitted With the Bid 4.4. Documents to be Submitted for Approval 4.5. Documents to be Submitted With the Transformer 4.6. Bid Prices 4.7. Warranty APPENDICES APP – I List Of Materials APP – II Schedule Of Guaranteed Characteristics ii TEDAŞ-MYD/99-031 TECHNICAL SPECIFICATION FOR MV / LV DRY TYPE POWER TRANSFORMERS WITH EPOXY RESIN INSULATED WINDINGS 1. GENERAL 1.1. Scope This specification covers the technical characteristics of dry type MV/LV Power transformers to be purchased for use in medium voltage distribution networks with rated voltage up to 36 kV and rated power up to 1600 kVA. Unless otherwise is specified in this specification and in its appendices, the power transformers in the scope of this specification shall be supplied as complete units with all auxiliary equipment. The types and the technical characteristics of the transformers to be purchased have been given in the Bill of Materials and/or Schedule of Guaranteed Characteristics. 1.2. Standards Unless otherwise is specified in this specification and in its appendices, the power transformer in the scope of this specification shall be manufactured and tested in accordance with the latest editions of the following Turkish Standards (TS), International Electrotechnical Commission (IEC) Standards and CENELEC Standards: TS 7451 / IEC 60726 : Dry Type Transformers TS IEC 60905 : Loading rules for dry type transformers TS 267 / IEC 76 : Power Transformers HD 464 S1/A2 : Dry type transformers HD 464 S1 : Dry type transformers 1.3. Service Conditions Unless otherwise is specified in the Bill of Materials, the transformers in the scope of order, shall be suitable for use under the following conditions: TEDAŞ-MYD/99-031 Service Conditions Indoor Altitude 1000 m 0 Ambient Temperature ( C) Minimum -25 0C, maximum 40 0C Average temperature over 24 hours 30 0C Air pollution of the environment Low Ice formation - Wind pressure - Exposure to earthquakes Horizontal acceleration = 0.5 g Vertical acceleration = 0.8 x Hor.accel. Environment class E2 Climate Class C1 Climate class F1 Fire class F1 2. CHARACTERISTICS The dry type LV/MV distribution transformers in the scope of this specification, shall be used in the distribution networks as step-down transformers and shall have the following characteristics, unless otherwise specified in the Bill of Materials. 2.1. Type - Three phase, with two windings Dry type with epoxy resin insulated windings Without enclosure (Protection class IP00) Natural air cooling (AN) Off-load voltage regulation 2.2. Electrical Characteristics 2.2.1. Rated Frequency 2.2.2. Rated Power (Hz) : 50 (kVA) : 400-630-1000-1600 2.2.3. Highest System Voltages (Primary) (kV) : 7.2-12-17.5-36 (Secondary) (kV) : 1.1 HV windings (kV) : 6.3-10.5-15.8-33 LV windings (V) 2.2.4. Rated Voltages • • : 400/231 2 TEDAŞ-MYD/99-031 2.2.5. Off-load voltage regulation • • • Tap changer windings : On the HV side Regulation class : Constant flux (IS-SAA; IEC-CFVV) Number of taps and voltage regulation range : 6.3-10.5-15.8 33 Regulation range ± 2x2.5 % 28.5-30-31.5-33-34.5 Number of taps 5 5 Off-load voltage ratio YG ± 2x2,5 % / 0.4 28.5-30-31.5-33-34.5/0.4 Rated voltage (kV) • Tapping powers : Equal to the rated power for all taps 2.2.6. Connection symbol : Dyn 11 2.2.7. Impedance (short circuit) Voltage (Uk%) : 6 (at reference temperature) (at rated tap) 2.2.8. Rated Insulation levels i) HV windings Rated voltage kV 6.3 10.5 15.8 33 Impulse withstand voltage (1.2/50 µs) kV rms 60 75 95 170 One-minute power frequency withstand voltage ii) LV winding • One-minute power frequency withstand level (kV) : 3 2.2.9. Temperature Rise Limits i) Windings: Insulation material of (F) or (H) temperature class, shall be used in the insulation of windings. Insulation material temperature class Class (F) Class (H) Insulation system (hot spot) temperature ( C) 155 180 Winding highest temperature rise (Resistance measurement method) (0K) 100 125 0 ii) Core and Metallic Parts: Temperature rise in the core, shall never reach a level to harm metallic parts and material adjoining them. 3 TEDAŞ-MYD/99-031 2.2.10. Reference Temperature (T ref) i) Impedance (short circuit) voltage and load losses, according to temperature class of insulation material used, shall be given at the reference temperature specified below and warranted. ii) Insulation Material Class Reference Temperature Class (F) 120 Class (H) 145 For transformers with windings made of insulation material of different temperature class, reference temperature of the winding with highest insulation temperature class, shall be used. 2.2.11. Sound Power Level (LWA) (Highest values without tolerance) Transformer rated power Noisel Level (kVA) 400 630 1000 1250 1600 (dB) 68 70 73 74 76 2.2.12. Operation Regime Transformers shall be suitable for continuous operation under 100% of unbalance loading. 2.2.13. Operation Under Overvoltage Transformers shall be suitable for continuous operation under the following overvoltage conditions without exceeding temperature rise limits stipulated in the specification. • At 105% of rated voltage and at rated current, • At 110% of rated voltage and at no-load. 2.2.14. Losses (Highest values without tolerance) Rated Voltage (kV) Up to 15.8 kV 33 kV Rated Power (kVA) 400 Off-Load Losses Pb (W) 930 Load Losses Py (W) 4600 630 1300 6500 1000 1700 10500 1250 2100 13000 1600 2600 17000 400 1120 4900 630 1450 6650 1000 2000 10500 1250 2250 13000 1600 2800 17000 4 TEDAŞ-MYD/99-031 2.2.15. Tolerances Transformers shall be deemed to comply with this specification when their values obtained from tests are found to be same as those warranted by the Manufacturer, within the tolerances indicated below: - Off-load voltage ratio : ± 0.5 % (At the main tap) - Impedance voltage at rated current : ± 10% (At the main tap - Off-load current : + 30 % 2.2.16. Temporary Overloading Transformers shall comply with temporary overloading according to “Loading rules for dry type transformers, TS IEC 60905). Temporary overloading covers at ambient temperatures of 100C, 200C and 300C shall be given in the bid. 2.3. Constructional Characteristics All the material used in the construction of the transformers, shall be selected from the materials suitable for its place and purpose of use and also from the material of highest quality, long durability, with superior physical and electrical properties. Design and manufacturing of transformers, shall be made with the latest technical practices and best workmanship and related safety factors in the whole work shall be considered with their broadest margins. 2.3.1. Core In the construction of the core, all the measures shall be taken to minimize the no-load losses and the noise. 2.3.2. Windings i) Electrolytic copper or aluminum conductors shall be used in the windings and the conductors shall be insulated with high-grade insulation materials of (F) or (H) temperature class. ii) Windings shall be designed and manufactured in a way that they shall withstand thermal and dynamic stresses due to short circuits and insulation withstand tests specified in the specification, without any damage. 5 TEDAŞ-MYD/99-031 iii) Transformers shall be safe against fires and for this purpose shall be manufactured of the materials which are unflammable, fire-resistant, self-extinguishing upon the cut-off of the arc and which shall not cause any poisonous and flammable gas emission to contaminate its surroundings during the burning process. 2.3.3. Tap Changing Terminals of high voltage windings’ voltage regulation taps shall be mounted on the windings and tap changing process shall be carried out through connection bridges during unenergized conditions. Tapping terminals shall be marked such that they shall indicate their own respective taps. 2.3.4. Connections and Terminals i) As specified in the Bill of Materials, LV and HV connection windings’ terminals shall be suitable for connections to be made from top, or for external connections from bottom. ii) LV and neutral terminals shall be of copper, rectangular flat conductors with suitable cross-sections and shall as necessary, be placed on core-compressing profiles at the top and bottom. Connection pads suitable for cable or flat bar connections for LV connections, shall be furnished together with the transformer. iii) For HV terminals, standard design of the manufacturer is accepted, provided that requirements specified in Clause 2.3.4.i are met. 2.3.5. Overload Protection Transformer shall be equipped with a “Temperature Protection System” against overheating and thermal stresses due to high ambient temperature and overloading. i) Temperature Protection System shall consist of temperature detectors, at least one per phase with temperature-variable resistance, plus a trip unit. Temperature detectors shall be placed to the hottest point of LV winding. Upon reaching the winding temperature alarm level, relay contacts in the trip unit shall change positions and a control signal (alarm) shall be received. When winding temperature goes down by 6K below the warning level, relay contacts of the trip unit shall return to their normal positions. ii) Temperature Protection System shall provide automatic protection against the faults arising from its own supply circuit such as voltage interruptions and open circuits. iii) Trip unit shall be supplied with a voltage of 220 V AC. Additional equipment necessary for alternative supply arrangements shall be indicated in the bid. 6 TEDAŞ-MYD/99-031 iv) Warning temperatures for alarm and trip operations of the Temperature Protection System, characteristics of the protection system and connection diagrams shall be furnished together with the bid. 2.3.6. Chassis and Auxiliary Equipment Transformer shall have a robust chassis which will carry the full weight of the transformer on four flat wheels movable in both axes. Wheels shall be lockable and suitable for removal when necessary. The chassis with its wheels off, shall be suitable for sliding on a flat surface. On the chassis, the following items shall be provided: - Lifting rings to lift the transformer safely - Hauling rings to haul the transformer in all directions - Earthing screw-type terminal made of stainless steel (marked with earthing symbol), at the base. 2.3.7. Nameplate Each transformer shall have an easily visible nameplate made of stainless steel or other noncorroding metal. The nameplate shall be fixed on the transformer with stainless steel screws or rivets and the lettering shall be legible and durable. In addition to the information given in TS 267/IEC 60076-1 following information shall be included on the nameplate; - Purchaser’s order number, - Year and month of manufacture, - No-load losses and load losses, - Numbers of tapping positions and corresponding voltages, (V and/or kV) - Purchaser’s material code number - Environmental class, climatic class and fire class 2.3.8. Anticorrosion Precautions 2.3.8.1 General Metal parts of the transformers shall be manufactured with corrosion resistant materials and be finished in such a way that corrosion is minimized. 7 TEDAŞ-MYD/99-031 The following precautions shall be taken against corrosion: - Current-carrying parts shall be made from non-ferrous metals - All surfaces shall be self-draining wherever practicable and all enclosures shall have an insectproof drain hole; - Materials and combination of materials used in the construction of the equipment shall be selected and arranged in a way to present galvanic corrosion; - Ferrous parts shall be either hot-dip galvanized or painted; - Surfaces to be galvanized or painted shall be sound, clean and free from any foreign materials which will in any way detract from the life and functioning of the coating. 2.3.8.2 Painting For painting, following procedure shall be adopted: a) Prior to painting, all surfaces shall be subjected to complete cleaning process according to methods given in painting standards (such as sandblasting+chemical cleaning, etc.) b) Catalyzed epoxy paints with anti-corrosion pigments shall be used for primary-coating. c) Any paint, for intermediate coats, may be selected by the Manufacturer. d) One of the following types of paints shall be used as finishing coat: . polyurethane paints; . alkyd and silicone-based paints; . modified vinly paints; e) The minimum thickness of each coat shall be 35 microns (total 105 microns). f) Painting of the transformers shall be completed before the routine tests. The total thickness of the film at five points, chosen at random on the painted surface, shall be measured by employing a paint inspection gauge. The mean value of the measurements shall not be less than 105 microns. The film adhesion shall be verified by the adhesive tape test according to TS 4313/ASTM D 3359. The degree of adhesion shall not be worse than Class-4 mentioned in these standards. 8 TEDAŞ-MYD/99-031 2.3.8.3 Galvanizing Galvanizing and tests on galvanized surfaces shall be in accordance with ISO 1459, 1460, 1461 and TS 914 (Zinc coating with the method of hot dip galvanizing). Hot dip galvanizing of all metal parts including the threads of bolts and screwed rods shall be carried out after all machining, bending, cutting, drilling, punching, marking and welding operations have been carried out. Galvanized nuts shall be lubricated by a water-resistant, rust-inhibiting oil after tapping and cleaning of threads. Small parts which could not be painted or galvanized, shall be made from stainless steel. 3. TESTS Unless otherwise specified, the tests shall be carried out according to TS and IEC standards, on completely assembled transformers. 3.1. Type Tests and Special Tests 3.1.1. Type Tests - Temperature rise (heating) test: (The test shall be performed at 30 kV tapping of 33/0.4 kV transformers, at the lowest tapping of 6.3-15/0.4 kV transformers, with the corresponding respective load losses thereof. - Full-wave impulse test, - Measurement of sound power level test (According to TS 8711 / IEC 60551), - Mechanical withstand test against short circuits, 3.1.2. Special Tests Related Standards: HD 464 S1/A2 Classes (Humidity Pollution) (Climatic) (Fire Behaviour) Tests (Clauses) E0 E1 E2 C1 C2 F0 F1 1) Low ambient temperature ZB.2 - - - Yes Yes(* ) - - - 2) Thermal shock at -50C ZB3.1. - - - Yes No - - - 3) Thermal shock at -25 C ZB.3.2a/b - - - No Yes - - - 4) Condensation test ZA.2.1 No Yes No - - - - - 5) Condansation and humidity penetration test ZA.2.2.a/b No No Yes - - - - - 6) Fire behaviour test ZC.2;ZC.3 - - - - - No Yes Yes 7) Operation under external Fire-to be defined) - - - - - - No No Yes 0 (*) Not necessary if Test ZB.3.2a is undertaken) 9 TEDAŞ-MYD/99-031 3.2. Routine Tests Following routine tests shall be carried out by the Manufacturer on all manufactured transformers in the scope of this specification: - Measurement of winding resistance - Measurement of the voltage ratio and check of voltage vector relationship - Measurement of impedance voltage and load loss - Measurement of no-load loss and current - Applied voltage test - Induced overvoltage test - Measurement of partial discharge (DIN/VDE 0532, Teil 6) - Measurement of loss angle tangent (the measurement shall be carried out between windings and between each winding and the chassis. The measurement results shall be corrected to 200C). 3.3. Acceptance Tests and Provisions 3.3.1. Acceptance Tests and Sampling - Type test specified in Clause 3.1.1.: Application shall be made according to Clause 3.3.3.i. Application of the dynamic ability to withstand short-circuit test (hereinafter referred to as DAWSCT) shall be as follows. In regard to DAWSCT, distribution transformers are classified as follows, as far as no design difference exists. Rated Voltage 6.3 – 15.8 kV Rated Power of Transformer 33 kV 50 – 2000 kVA 50 – 200 kVA 250 – 630 kVA 250 – 630 kVA 800 – 2500 kVA 800 – 2500 kVA 10 TEDAŞ-MYD/99-031 Should the Bidder submit a valid test report of DAWSCT for a transformer within any group, this test report shall be considered also valid for the other transformers of the same group. If the Purchaser decides to repeat the test, the results shall be binding as well as for all the transformers in the relevant group. In case the Bidders fail to submit a valid DAWSCT report for an item of which the bid quantity is 50 (fifty) or more, such tests shall be performed, at full expense of the Supplier, after the placement of the order. In case the bid quantity of transformers in an item is 50 (fifty) or more, even though the Bidders quote less than 50 (fifty) transformers, the total number of transformers in that item shall be taken as the basis for performing DAWSCT. Thus; partial bid shall not relieve the Supplier of the above-mentioned obligation of carrying out DAWSCT. Should any of Bidders submit a valid test report of DAWSCT for an item, regardless of the bid quantity of transformers within this item, the other Suppliers shall be required, if they are awarded, to carry out the DAWSCT at full expense of their own. - Routine Tests Specified in Clause 3.2. All the routine tests shall be repeated on the samples to be taken from each party of supply. At each delivery of the transformers submitted for inspection and test, those which are of the same class and type, are considered to make up a party. Samples shall be chosen by the Purchaser’s representatives at random, and unless otherwise specified, number of samples shall be determined from the following Table: Number of Transformers in the Party Number of Samples to be Taken 1 – 10 2 11 – 30 3 31 – 50 4 51 – 100 6 101 – 200 8 3.3.2. Acceptance Criteria i) All type test shall have positive results. The negative result of a type test, may involve rejection of all units of the same type and characteristics in the supply, if the Purchaser concludes that transformer’s service reliability will be lost. The Purchaser, at its unobjectionable judgement, may accept the repetition of the test, if the Supplier proposes to modify, within a reasonable period of time, the design of the transformers and to repeat, at its own expense, all the type tests specified in the Specification. 11 TEDAŞ-MYD/99-031 ii) All routine tests shall have a positive result. Should the result of any routine test on any sample becomes negative these tests shall be repeated on all the transformers in the party. Accordingly the defective units shall be replaced or repaired at full expense of the Supplier. Losses obtained as a result of the tests, shall not exceed the values given in Clause “2.2.1.4. Losses.” 3.3.3. Provisions for Acceptance Tests i) In case the Bidder fails to submit the test reports together with the bid or the test reports submitted are considered inadequate, as Specified in the Contract, all the type tests in Clause 3.1. or a part thereof shall be carried out at the Manufacturer’s premises or in an independent laboratory located in Turkey or abroad, at full expense of the Manufacturer. If it is stipulated in the Contract that some of the acceptance tests shall be conducted abroad, the other acceptance tests shall not be started before the positive test reports related with the transformer are submitted to the Purchaser. The Supplier can not claim any extention of time for possible delays in the delivery program due to carrying out the acceptance tests. No payment shall be made to the Supplier until the conclusion of acceptance tests. ii) Not withstanding the submission of adequate type test reports with the bid, or positive results of the type tests conducted during acceptance tests of first party of supply, the Purchaser, at its unobjectionable judgement, may request total or partial repetition of the tests at the Manufacturer’s premises or at an independent laboratory located in Turkey or abroad. For the tests to be carried out in Turkey or abroad, samples will be selected by the Purchaser’s representatives in numbers stipulated by the tests/standards. For the tests to be performed abroad, sample(s) shall be sealed and then shipped by the Manufacturer to the laboratory where the test will be performed. In case that positive results are obtained from these tests, the cost thereof shall be incurred by the Purchaser in TL, on the basis of the test prices quoted in the Bid. If the test prices are quoted in foreign currency, the costs shall be converted into TL at the selling exchange rates established by the Central Bank of Turkey on the date of performance of the tests. In case of negative results of the tests, the Supplier shall incur the cost thereof and the remaining part of the order shall be cancelled. 3.3.4. Acceptance Procedure i) The Purchaser shall have the right to inspect and/or to test the Goods at the premises of the Supplier or its subcontractor(s), at point of delivery and/or at the Good’s final destination. The Supplier shall furnish to the Purchaser’s representatives all facilities and assistance for inspections and tests. 12 TEDAŞ-MYD/99-031 ii) The Supplier shall submit to the Purchaser the test program after signing the Contract. The Supplier shall notify the Purchaser at least 20 (twenty) days in advance of the active date of the beginning of the tests to be performed abroad, and 7 (seven) days in advance for the tests to be performed in Turkey. iii) All routine tests shall be performed at the Manufacturer’s premises. During the acceptance tests, if the Manufacturer fails to perform any test which was stated in the Contract to be conducted at the Manufacturer’s premises, he will make all provisions to perform such tests within 15 (fifteen) days of the date of commencement of the acceptance tests. Otherwise it shall be concluded that the goods are not ready for acceptance. The date of the delayed tests shall be accepted as the delivery date, provided that the test results are submitted to the Purchaser within 7 (seven) days. However, the Purchaser reserves the right to implement the relevant terms of the Contract, concerning the delay. iv) The tests shall be carried out with the attendance of the Purchaser’s representatives. The test reports shall include the serial number(s) of the sample(s) and the information necessary for identification of all main parts of the samples. The test reports shall be so arranged that the compliance of the goods to this specification and its attachments shall be clearly stated, and then countersigned. In case of positive results of tests, a Release Note for the shipment of relevant party of goods shall be given by the Purchaser’s representatives. The Purchaser’s representatives may leave the decision to the General Management, if a clear decision concerning the test results cannot be reached by them. The Purchaser may not wish to be represented at the tests by notifying the Supplier in due time. In this case, the Supplier shall proceed with the tests and submit the test results to the Purchaser. The test reports thus prepared and signed by the Supplier shall be sent to the Purchaser in 8 copies for check and approval. If the test reports are approved, the Purchaser shall issue a Release Note for shipment and return 2 approved copies of the Test Report to the Supplier. If the test carried out abroad are not witnessed by the Purchaser’s representatives, the sample shall be resealed by the laboratory after he completion of the tests and shipped back to the Manufacturer. The sample shall be examined by the Purchaser’s representatives, at the Manufacturer’s premises. v) The Purchaser’s right to inspect, test, and where necessary, reject the Goods after the Goods’ arrival in the final destination shall in no way be limited or waived by reason of the Goods’ having previously been inspected, tested and passed by the Purchaser or its representative prior to the Good’s shipment. vi) Nothing in this clause shall in any way release the Supplier from any warranty or other obligations under this Contract. 4. MISCELLANEOUS CONDITIONS 13 TEDAŞ-MYD/99-031 4.1. Packing Wheels, special tools of the transformer and equipment which require shipment as unmounted to the transformer, shall be placed into separate packing crates and delivered together therewith. Brand name of the transformer, its characteristics and order number shall be written on the packing crate. Transformer shall be packed properly in order not to get damaged during transportation and/or storage. 4.2. Special Tools If special tools are required for mounting and dismantling of transformers, these special tools shall be delivered with transformers and list of tools shall be specified in the Bid. 4.3. Documents to be Submitted With the Bid - Schedule of Guaranteed Characteristics Bidders are required to fill-in and sign the Schedule of Guaranteed Characteristics in the appendix of the specification for transformers in each item they proposed, and enclose one copy of each with their bids. Information given in these schedules will be binding. - Type test and Special test reports or certificates Bidders are required to submit with their bids, reports or certificates of type and special tests carried out in an independent laboratory. Reports of tests which were carried out with the presence of Purchaser’s representatives during the previous orders, may be acceptable. The tests must belong to the type of equipment offered. The Purchaser, if he deems necessary, may ask the Supplier the proof that the test reports belong to the type of equipment offered. If the equipment offered are manufactured under a license, type test reports representing the production in Turkey shall also be required. The test reports shall contain the name of the laboratory, names, titles, and signatures of observers and persons performing the tests, and the date of tests. The Purchaser reserves the right to determine to its satisfaction to evaluate the bids of the Bidders who bid not submit appropriate or any type test reports, provided that the type tests to be carried out in Turkey shall be carried out on a sample unit to be selected out of the first delivery lot, and the type tests to be carried out abroad shall be carried out before the first lot is delivered, at the Supplier’s cost. - Following documents and drawings In addition to the Schedule of Guaranteed Characteristics, the Bidders shall submit with 14 TEDAŞ-MYD/99-031 their bids following documents for each type of equipment offered. a) TSE certificates, ISO 9001 or 9002 Quality System Certificates b) Detailed catalogues, manuals for mounting, operation and maintenance instructions c) Descriptive information and drawings with type of core and windings, insulation, tapchanger and auxiliary equipment. d) Drawings with overall dimensions and location of auxiliary equipment e) Drawings with transport dimensions and transport weights f) List of special tools (if any) g) Information concerning overload protection h) Overloading curves i) Information concerning cast resin insulation material - Calculations for demonstration of thermal ability to withstand short circuit. The Bidder’s failure to submit any of the documents required here above or any missing date may entitle the Purchaser to reject the bid. 4.4. Documents to be Submitted for Approval After the signing of the Contract, the Supplier shall submit the following drawings in 3 (three) copies (one of them shall be transparent) for approval within a due time, taking into account the delivery program. a) Drawings indicating the overall dimensions of transformers complete with all auxiliary equipment. b) Drawings with transport dimensions and transformer weights c) Nameplate drawings The approval of drawings and documents shall not relieve the Supplier of this obligation for carrying out the terms of the Contract, and of his responsibility for correctness of drawings and manufacturing to technical aspects. The drawings submitted for approval shall be approved and send back to the Supplier not later than 15 (fifteen) days, however any delay due to late submission of drawings shall not entitle the Supplier to claim for a time extension. 15 TEDAŞ-MYD/99-031 4.5. Documents to be Submitted With the Transformer One copy of each of the following documents shall be submitted, enclosed in a protective plastic envelope: - Operation and maintenance instructions Approved drawings Approved test report 4.6. Bid Prices The bid prices shall be given in accordance with the relevant terms of the bidding documents. The bid unit prices shall include the prices of: - The complete transformer with all the equipment required in the specification, Acceptance tests, Special Tools, Packing The Bidders shall quote the prices of each of the type tests included in the specification separately (including the total expenses, such as transport, insurance etc.) 4.7. Warranty The Supplier shall warrant that each transformer of the supply shall have no defects arising from design, materials or workmanship, for a period of (twentyfour) months after the date of delivery. Should the transformers have defects or become defective due to design, materials and workmanship within the warranty period, and such defects may not be locally remedied, the Supplier shall act, at his own expenses, for dismantling, transportation to the Manufacturer’s premises; repair, transportation to the destination to be indicated by the Purchaser after repair and mounting as necessary, of the goods. The Supplier shall deliver the defective goods to the Manufacturer’s premises within 15 days of the date of the written notice, and shall deliver the repaired goods to the destination to be indicated by the Purchaser within 15 days of the date of the completion of the test. If the Supplier fails to comply with such delivery terms, or, if the Supplier, having been notified, fails to remedy to defects, the Purchaser shall proceed to take such remedial action as may be necessary, at the Supplier’s expense. In this case the Purchaser shall collect the costs and expenses from the earnings or performance security of the Supplier. The repaired or replaced equipment shall be covered by the same warranty stipulations. 16 TEDAŞ-MYD/99-031 APP. – I BILL OF MATERIALS FOR MV/LV DRY TYPE POWER TRANSFORMERS WITH EPOXY RESIN INSULATED WINDINGS File No : ………………………… Item No : ………………………… 1 1. Rated power (kVA) : 2. Rated voltage - HV winding (kV) : - LV winding (kV) : 3. Off-load-voltage regulation - Voltage regulation range : - Number of tap positions : 4. HV Connection type : 5. Connection terminals - HV Side : - LV Side : 6. Altitude (m) : 7. - Environmental class : - Climatic class : - Fire protection : 8. Purchaser’s code number : 9. Quantity : 17 2 3 4 TEDAŞ-MYD/99-031 APP. – II SCHEDULE OF GUARANTEED CHARACTERISTICS FOR MV/LV DRY TYPE POWER TRANSFORMERS WITH EPOXY RESIN INSULATED WINDINGS Order No : ……………… Item No : ……………… REQUIRED 1. Manufacturer : 2. Manufacturer’s type designation : 3. Standards in force : 4. Type : Indoor 5. Number of phases :3 6. Connection symbol : Dyn 11 7. Rated frequency 8. Rated power : 9. Type of cooling : (AN) (Hz) : 50 10. Insulation material temperature class . LV Winding : . HV winding : 11. Temperature rise limits . Highest temperature rise of winding (0K) : . Insulation system (hot spot) temperature (0C) : 12. Overload protection temperature . Alarm (0C) : . Trip (0C) : 13. Reference temperature (Tref) (Clause 2.2.2.10) (0C) : 14. Rated voltages . LV Winding (kV) : 0.4 . HV winding (kV) : 18 GUARANTEED TEDAŞ-MYD/99-031 Order No : ……………… Item No : ……………… REQUIRED 15. Tap winding (voltage regulation) : HV, Off-Load 16. Voltage regulation range : 17. Number of tap positions : 18. Off-load voltage ratio : GUARANTEED 19. Insulation levels . Short-time power frequency withstand voltage . Lightning impulse withstand voltage : (kV rms) : 20. Partial discharge level (maximum) (pC) : 20 21. Impedance voltage (at reference temperature)(UK%) : 6 22. Off-load current (%) : 23. Off-load losses (kW) : 24. On-load losses (at reference temperature) 25. Sound power level : (LWA) : 26. Short-circuit withstand time : 3 seconds 27. Winding characteristics HV . Conductor material : . Conductor dimensions (mm x mm) : . Total conductor weight (kg) : . Winding insulation : . Maximum variation in short circuit reactance after DAWSCT : 28. Characteristics of core . Material : . Magnetic flux density : - At rated voltage (T) : - At 110 % of rated voltage (T) : . Weight of core (kg) : 19 LV TEDAŞ-MYD/99-031 Order No : ……………… Item No : ……………… REQUIRED GUARANTEED 29. Environmental, Climatic and Fire Behavior Classes . Environmental class : . Climatic class : . Fire class : 30. External connection arrangements . LV terminals . HV terminals 31. Terminals . Material . Dimensions (mm) : . Connection details : Drawings shall be submitted 32. Weights . Total weight of transformer (kg) : . Transportation weight (kg) : 33. External dimensions . Width (mm) : . Length (mm) : . Height (mm) : . Distance between wheels (mm) : DATE SIGNATURE / STAMP 20