Rajasthan Electricity Regulatory Commission, Jaipur Notification

advertisement
Rajasthan Electricity Regulatory Commission, Jaipur
Notification
Jaipur, 19th Feb., 2010
No. RERC/Secy/Reg. 79 In exercise of the powers conferred by Sections 43 to
48, 50, 55 and 56 read with Section 181 of the Electricity Act 2003 (Act 36 of
2003), the Rajasthan Electricity Regulatory Commission, after previous
publication, makes the following Regulations :---These regulations shall be called The Rajasthan Electricity Regulatory
Commission (Electricity Supply Code and Connected Matters)(Ninth
Amendment) Regulations, 2009 and will come into force, from the date of its
publication in the official gazette.
The following amendments are made in the principal regulations i.e.
Rajasthan Electricity Regulatory Commission (Electricity Supply Code and
Connected Matters) Regulations, 2004as amended to date. The clause-wise
amended text will now read as follows :
1. Regulation 4: Category of consumers and character of service
Note :
(i) If any existing connection is at variance from table above it shall be
changed at consumer's request. However, if a consumer availing LT
supply but falling in the category of HT supply or an HT consumer but
falling in EHT category, does not tender request, the licensee may change
the character of service wherever feasible after serving a notice of not less
than 60 days to the consumer to provide transformer sub-station and
allied accessories for taking supply at prescribed voltage, at his cost,
failing which the Discom itself may install transformer at the premises of the
consumer and charge the transformer rent as per schedule.
(v) The consumer, under Large Industrial Service, having connected load
above 150 hp (112 kW), may keep his contract demand, even below 125
kVA. Similarly, other categories of consumers having HT supply, may keep
their contract demand even below 50 kVA.
2.
Regulation 6 : Application for supply
6(1) An owner or an occupier of any premises requiring supply of electricity
may apply for supplying electricity to such premises to such officer as the
licensee may designate for this purpose. The application shall be in a
form based on the model form as at Annex-IV. However, the form shall
also be applicable for other miscellaneous activities viz Load
extension/reduction, transfer/shifting of connections etc. The licensee
may also ask for other relevant information required by him for release of
1
connection and/or execution of related work by incorporating suitable
changes in the model form. The licensee may also develop suitable form
for accepting application through electronic media.”
6(8) The application form shall be supplied free of cost by the licensee or can
be downloaded from the website of the licensee. The licensee shall
make available with the form, a checklist of documents normally
required to be furnished and a gist of charges as per these regulations.
After sub regulation (10), the following new sub-regulations will be added(11) If on inspection of installation of applicant, any deficiency is found or the
fitting is found to be incomplete, a thirty days notice shall be given to the
applicant for removing the deficiency. Necessary fee for testing of
installation as per Schedule shall be payable for subsequent inspection.
Failure to comply with the above, the application may be treated as
withdrawn.
(12) More than one industrial/non-domestic connection in the same premises
and in the same name shall not be allowed. Two Connections in a
premise can only be allowed if these are
physically & electrically
separated.
(13) If a consumer, required to install a transformer, is unable to install the
same, the Licensee, on request of the consumer and on the merit of the
case, may provide the transformer and charge rent as per Schedule.
Necessary metering arrangements shall be as per applicable regulations
and tariff.
(14) All HT consumers shall be required to execute an agreement based on
the model agreement given at annexure-V with the Licensee on a non
judicial stamp paper, of value as prescribed by the Government of
Rajasthan. Other consumers shall not be required to execute such
agreement and the application form itself, shall form the agreement. The
date of commencement of agreement shall be the date of release of
connection, in both the cases. Minimum period for such agreement will
be one year.
(15) The supply shall be given to owner or occupier of a premises, on
production of necessary documentary evidence. In the event of no
formal agreement having been entered into between the Licensee and
the consumer, once the supply of electricity has commenced, the latter
shall be bound by the terms and conditions of the agreement required
to be executed as above. The consumer shall not refuse to tender an
agreement if so required by the Licensee at any time after the supply
has commenced, notwithstanding that the same was not entered into
before. In such an event, the date of agreement shall be the date of
commencement of supply to the consumer.
(16) Without previous consent of the Licensee, the consumer shall neither,
assign, transfer or part with the benefit of his agreement with the
Licensee nor shall the consumer in any manner part with or create any
2
partial or separate interest there under.
(17) Where the title of ownership of premises has changed, a new
connection shall be given in the premises only if all arrears and dues in
respect of old connection in the premises have been cleared and paid.
However, In case of auction of an existing industry by RIICO/ RFC or by
official liquidator appointed by Rajasthan High Court or Debt Recovery
Tribunal, new connection shall be released as per policy guidelines of
State Government & prevailing law provided that such policy guidelines
contains provisions /scheme for recovery of outstanding dues of
licensee.
(18) Shifting of existing connections shall be allowed to an owner from one
premises to another subject to technical feasibility and charges for
shifting of lines shall be recovered as per schedule. Credit of amount
already deposited towards security shall be given.
(19) Consumers other than agriculture consumers situated in Rural Area(s)
and requiring HT supply can be given supply through continuous supply
feeders from nearest technical feasible point , provided the full cost of
line to be drawn is borne by the consumer.
(20) The licensee may also provide temporary supply to a consumer on
receipt of an application in prescribed form at annexure-IV along with
application fee as per Schedule, However, temporary connection shall
not be released under Public Street Lighting, Agriculture and to the
places of permanent wedding houses. The licensee may frame
additional terms and conditions regarding safety and effective metering
of such installations.
(21) For construction of a building where the period of construction is more
than one year and the applicant desires to take permanent connection,
then permanent connection under respective category could be
released. However the existing consumers under LT domestic & nondomestic categories may use supply upto 25% of his sanctioned
connected load for further construction purposes, from its permanent
connection. This facility shall not be available for construction of Building
Complexes and to other categories of consumers.
3. Regulation 11 : Supply where electric line /plant is provided by applicant
The following New sub regulations shall be inserted after sub- regulation (3)
(4) Maintenance of service line
(a) Notwithstanding that the cost of the service line is paid for by the
consumer, all rights of the service line including the portion paid for by
the consumer shall vest in the Licensee and maintained by the Licensee
at its cost. The Licensee shall have a right to utilise optimally the aforesaid
service line, place apparatus other than those required to control the
supply to the consumer and to lay overhead and underground feeders
3
in the property of the consumer with a view to connect the same with
the apparatus installed in any other consumer's premises provided the
quality of supply to the consumer is not adversely affected. The
consumer shall provide all necessary facilities for such work.
Provided that a dedicated feeder which emanates from licensee’s
substation to the consumer’s premises and its full cost has been borne by
the consumer, shall not be tapped by the licensee for release of another
connection for first four years from the date of release of connection,
unless the consumer, who has borne the cost, gives his consent.
(5) In case of electrification of areas/colonies developed by Local Bodies,
Railways, Defense, Private Housing Societies/Developers etc after
obtaining technical sanction from the Licensee and handing over of
completed installation to the satisfaction of the Licensee and if service
line has been provided up to the consumers’ installation by the agency
which has electrified the area, only 15 %of the expenses for providing
electric line, plant, distribution mains and service line etc. as per
schedule shall be payable to the Licensee towards supervision charges.
In case service line is to be provided by the Licensee, only 25% of
expenses for providing electric line, plant, distribution mains and service
line etc as per Schedule shall be payable to the licensee.
(6) Building complex
(a) In case of Building Complex/Large Building, if the maximum demand
calculated on the basis of covered area as per calculation given below
is more than 50 kVA then the owner/builder/ developer/ group of
consumers is required to
install transformer and its associated
equipments within the Building Complex/Large Building of appropriate
capacity :S.
Type of Building Connected
load Designed
No Complex/Large
per 1000 sq ft of Maximum Demand
Building
covered area #
50% of total connected
1
Domestic
8 kW
Load
2
10 kW
50% of total connected
NonDomestic
Load
#Covered area on all floors of such Building Complex/Large Building as per
approved plan or actually constructed, whichever is more.
(b) The owner/builder/developer/group of consumers is required to carry
out the following works :(i) Laying of HT cable from terminating pole near the building
complex/Large Building to the transformer.
(ii) Installation of transformer sub-station within the premises.
(iii) Laying of LT cable upto the bus bar/metering cubical and all associated
works.
4
(iv)The licensee shall recover supervision charges as per applicable rate.
However, if owner/builder/developer/group of consumers is unable to
undertake the work at his own, he may request the licensee for getting
work execute on his behalf on payment basis.
(c) The Laying of overhead HT line from the nearest existing mains to the
building complex/Large Building shall be under taken as a deposit work
by Licensee at consumer’s cost.
(d) The capacity of HT cable/overhead line, distribution transformer & the LT
cable connecting the transformer to the meter cubical etc. shall be
designed for 30% higher demand than the designed maximum demand.
NOTE:
(i) For the purpose of arriving at the voltage of supply to building
complex/Large Buildings, the designed maximum demand shall be
considered.
(ii) Above provisions are not applicable for electrification of colonies.
(e) If the designed maximum demand of the building complex/Large
Building as calculated above, is below 50 kVA, then the connections to
individual owner/occupant shall be released
through Licensee’
transformer as is released to other normal consumers. In that case the
owner/builder/developer/group of consumer shall provide at their own
cost cubical with panel for fixing meters on the ground floor of the
Building Complex/Large Building & shall pay supervision charges towards
this work.
(f) The maintenance of Infrastructure provided for electrification by the
owner/builder/developer/group of consumer shall be done by
themselves. However, maintenance of overhead and underground line
up to the terminating point shall be done by the licensee.
(g) In case more than one consumer in a building complex require HT
connections, instead of providing individual transformers, they may, in
their own interest, provide jointly, complete infrastructure for
electrification from HT supply point up to metering point of individual
consumers by installing only one transformer of appropriate capacity not
less than arithmetic sum of their contract demands. However, for billing
and other purposes, the consumers shall be treated individually.
(7) In case there is no space available in the old Building complex/Large
Building built prior to 31.12.1996, having at least one connection,
Licensee may allow to install the transformer outside or himself provide
and may charge estimated cost plus 50% of the estimated cost of
transformer sub-station & Double Pole Structure as onetime payment
towards maintenance of the transformer installation and and sub-station
by the Licensee. However, in cases where the space for installation of
transformer is neither available within the Building Complex/Large
Building nor outside the premises and augmentation of transformer is
required, then the licensee
5
may charge estimated cost plus 50% of cost of additional transformer
capacity required for catering the demand/load of the Building
Complex/Large Building, as onetime payment towards its installation and
maintenance.
4. Regulation 16: Security
(4)
Exemption from payment of Security
The licensee may exempt from payment of Security Deposit ,any State &
Central Govt. Department(s), including Railways and the employees/ex
employees of all the Vidyut Nigams who have completed 5 years of
service for their residential use, after obtaining suitable undertaking to
safeguard its interest. However, all public sector undertakings &local
bodies shall deposit the Security amount.
5.
Regulation 20: Security for electric meter
The Consumer has an option to provide his own meter as per RERC
(Metering) Regulations, 2007. The security amount in respect of a meter,
when provided by the licensee, shall be as mentioned in the Schedule.
6. Regulation 25 : Supply through meters
(2) Metering in each case shall be provided on ground floor only. Metering
equipment shall preferably be near the main gate of the premises and
easily accessessible.
7. Regulation 30 Defective meter
(1)
In case the consumer or the licensee suspect a meter not functioning
properly, a notice can be given to the other party. The accuracy of the
meter shall be tested by the licensee on site or in its testing laboratory. In
case the consumer so desires, he may get the testing done at
laboratories designated for the purpose by the Commission at his own
cost. A consumer desirous of getting his metering equipment etc. tested
may request for the same to the Licensee along with testing fee
prescribed in the Schedule.
8. Regulation 35: Payments to licensee
(2) Licensee shall endeavour that electricity bills are delivered to the
consumer within three days of its issue date and allow a minimum period
of at least fifteen days from the date of issue of electricity bills for
payment at the concerned office of the licensee or other collection
centers authorized by the licensee as notified through local newspapers/
printed on the bills. The licensee may accept payment either in cash or
by pay order/bank draft/banker’s cheque, a cheque drawn on a local
branch of a bank, credit card or Electronic Clearing System.
(7) A consumer, desirous of leaving the premises for a long time, should in his
own interest, intimate the Licensee about the same so as to avoid any
confusion of stopped meter. He may deposit an amount with the
Licensee for monthly adjustment of his bills. The minimum amount to be
6
deposited should not be less than minimum billing /Fixed charges
amount for a period of 12 months. The Licensee shall accept such
amount as a matter of affording convenience to the consumer to
prevent disconnection. No rebate shall be allowed to the consumer. The
consumer may or may not seek discontinuance of supply for this period.
9. Regulation 43 : Increase/Decrease in connected load/demand
(2) Consumer shall not be allowed decrease in load / demand until the
expiry of initial period of agreement i.e one year. However, the licensee
may allow for reduction in demand on receipt of minimum billing/fixed
charges of balance period.
(3)
Once the load/ demand is increased/ decreased, it shall not be allowed
to be reduced further within one year of increase/ decrease. The
consumer shall give one-month notice in writing where initial agreement
period has expired and the consumer wants permanent disconnection
or reduction in connected load/contract demand. The consumer may
also get his connection permanently disconnected on payment of
minimum billing/fixed charges, as the case may be for one month on a
notice of less than one month.
10. Regulation 44 : General:
The licensee shall issue detailed instructions regarding terms and
conditions of supply not inconsistent with the Act and the regulations
framed by the Commission for the benefit of consumers and persons
applying for supply of electricity, containing detailed information
regarding technical requirements of consumers’ and licensees’
installation and provisions relating to safety as contained in the Indian
Electricity Rules- 1956, or as specified by the Authority, procedure for
inspection by licensee, requirement of security, agreement that a
consumer may have to enter with the licensee regarding supply of
electricity, provisions relating to change in consumer category, increase/
decrease in connected load / contract demand, change in name of
consumer or transfer of connections, shifting of lines , grievance
redressal, metering ,charges for miscellaneous services provided by the
licensee and all connected matters, conforming to the provisions of the
regulations framed by the Commission, terms and conditions of his
license and terms and conditions of tariff determined by the Commission
from time to time.
11. Schedule:
6. Line and plant charges for temporary connection
(4) Adjustable part
(a) Advance consumption charges to be worked out on the basis of
probable period of use of connection with minimum use of electricity for
8 hours per day and at temporary supply tariff (both fixed and energy
charges) prescribed for respective category of consumer. The billing
shall be done on the basis of “Tariff for Temporary Supply” under “Tariff
for Supply of Electricity.”
7
12. Schedule : New Schedules
8.
Testing fee
a) LT Single-Phase meter (per meter)
Rs. 35/-
b) LT three Phase meter (per meter)
Rs. 70/-
c) Demand or Special Type meter: (per
meter)
(i) For LT supply
Rs. 150/(ii) For HT supply
Rs. 450/Rs.1200/(iii) For EHT supply
d) Transformer Oil (per sample)
Rs.1200/e) Instrument Transformers:
(i) LT current Transformer:
Rs. 40/- per transformer
(ii) HT CTPT Sets:
Rs.200/- per set
(iii)EHT current or potential Transformer: Rs.400/- per transformer
f) Capacitor Units: (Per unit)
(i) Upto 5 kVAR
Rs. 70/(ii) Above 5 kVAR but upto 10 kVAR
Rs. 90/Rs.105/(iii) Above 10 kVAR but upto 25
kVAR
Rs.170/(iv) Above 25 kVAR
9.
Testing of consumer's installation:
(a) The first inspection and
Test of a new Nil
installation or of an addition or
alteration
in the existing installation.
(b)
Subsequent
inspection
and
test Rs. 90/necessitated
by defects
noticed in the
installation or by absence of the supervisor of
wiring
contractor at the time of
first
inspection.
(Payable in advance for
each subsequent visit for purposes of test.)
10. Re-sealing charges:
(if found broken)
(a) Meter Box
(b) Terminal Cover of Meter
(Single Phase)
(c) Terminal Cover of Meter:
(Poly Phase)
(d) Meter Body (Single Phase)
(e) Meter Body (Poly Phase)
(f) HT/EHT Metering Panel
(g) Cubical at Building Complex
11. Replacement of broken glass:
(Per Glass)
(a) Meter
(i) Single Phase
(ii) Poly Phase
(b) Meter Box
Rs. 50/Rs. 100/Rs. 200/Rs. 200/Rs. 500/Rs.3000/Rs. 200/-
Rs. 70/Rs. 200/Rs. 25/-
8
12.
13.
14.
Attendance of fuse man
Charges for attendance of fuse man
at consumer's premises during any
function
(Maximum 6 Hours.)
Change of meter
For changing meter only at the Rs.35/instance of the consumer where it is (each)
necessitated by temporary increase
in consumption and demand.
Labour charges for shifting of meter in the same premises:
L.T.-Single Phase
Rs. 100/Three Phase
Rs. 200/H.T.- 11 kV
33 kV
132 or 220 kV
15.
Rs. 250/-
Rs. 2000/Rs.2000/Rs.2000/-
Charges for alteration/shifting of service line
a) Single Phase LT line
Rs. 100/m of line to be shifted
b) Three Phase LT line
Rs. 150/ m of line to be shifted
c) 11 kV line charges
d)Conversion of LT 1phase to LT
3phase line
e)Conversion of LT 3phase to 11 kV
line
f) 33 kV & above line
Note:
Rs.150/ m of line to be shifted
Rs.75/m
Rs.55/m
Actual cost plus 50% overhead
i. Line charges indicated at (a), (b) & (c) above are inclusive cost of line
materials and overheads.
ii. For retrieved material of line (which may or may not be removed) a credit @
25%of estimated amount shall be allowed.
16.
Charges for duplicate bill.
Category of Consumers
(a) Duplicate copy of bill for LT supply
consumers.
(b) Duplicate copy of bill for HT/EHT
supply consumers & consumers whose
system of supply is HT/EHT.
Charges*
Free for domestic consumers
having LT single phase supply.
Others:Rs. 5/- per copy
Rs.20/- per copy
*The licensee shall provide the facility of free download of copy of bills from its
website which shall be considered valid for payment.
(Ashwini Bhagat)
Secretary
9
Annex - IV
fo|qr forj.k fuxe fyfeVsM
ekWMy QkeZ
u;s fo|qr lEcU/k ¼LFkk;h@vLFkk;h½ ds fy,@Lohd`r Hkkj c<kus vFkok?kVkus@uke ifjorZu¼Lokeh
ogh½@dusD’ku VªkalQj ¼LokfeRo dk ifjorZu½@orZeku dusD’ku f’k¶V djus@orZeku dusD’ku dh Js.kh esa
ifjoruZ bR;kfn ds fy, vkosnu ,oa vuqcU/k izi=
¼10 : ds ukWu T;wfM’k;y LVkWEi isij ij ½
lgk;d vfHk;Urk ¼
½
fo|qr forj.k fuxe fyfeVsM]
---------------------------------A
1- vkosnd dk uke ---------------------------------------------------------------firk@ifr dk uke--------------------------------------]
2- iwjk irk
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
3- VsyhQksu u -
--------------------------------------------eksckbZy u- ---------------------------------------------------------------------
4- dusD’ku dh Js.kh 1- ?kjsyw
3- d`f"k
2- v?kjsyw
¼nqdku]dk;kZy;]gksVy]efUnj]vLirky]Ldwy] /keZ’kkyk gsrq½
4 y/kq m|ksx
5- e/;e m|ksx
6-fefJr Hkkj
7- lkoZtfud jks’kuh 8- 8- o`gr~ m|ksx
5- vkons d dh fLFkfr 1- edku ekfyd
2- fdjk;snkj
3 dCtsnkj
6- vkosnd dk izdkj
(i) u;k fo|qr laca/k &&&&&&&
------------------fdyksokV@gk-ik@dsoh, LFkkbZ
vLFkkbZ
(ii) Hkkj o`f)@?kVkuk &&&&&& [kkrkla- -------------- fdyksokV@gk-ik-ls ---------------fdyksokV@gk-ik-@lafonk
ekax
--------------dsoh, ls ----------------dsoh,
(iii)orZeku dusD’ku &&&&[kkrk l- -----------------f’kf¶Vax gr
s q------------------------------ ls-----------------------dks
(iv)orZeku dusD’ku &&&&[kkrk la--------------------dk uke ifjorZu ------------------------ls ----------------------------- dks
(v)Js.kh ifjoruZ
&&&&[kkrk la- ----------------ds Js.kh esa ifjorZu gsrq ------------Js.kh ls ----------------------Js.kh
esa A
(vi)orZeku dusD’ku &&&&[kkrk la- -------------- tks fd Jh ----------------------------------ds uke ls gS mls---------------------------dk VªkalQj
VªkalQj djus gsrqA
10
7- cSad [kkrs dk fooj.k&&&&&[kkrk-l- ---------------------------------------cSad dk uke-,oa ’kk[kk----------------------------¼,¢fPNd½
¼ iklcqd ds izFke o vfUre ysu&nsu ds i`"B dh izekf.kr QksVks izfr layXu djsAa ½
8- layXu nLrkost &&&&&,y QkeZ@’kiFk i=
fdjk;snkj@dCtsnkj gksus ij vuqcU/k i= vFkok
{kfriwfrZ dk i= edku ekfyd gksusij izek.k gsrq
nLrkost
¼uke@Js.kh ifjorZu esa vko’;drk ugha ½
igpku izek.k i=-----------------------------------------------rglhynkj }kjk tkjh izek.k i= ¼—f"k dusD’ku ds fy,½
¼eqf[k;k dk jk’ku dkMZ@MªkbZfoax ykblsal@ ernkrk dk igpku i=@vk;dj isu dkMZ½
9-
ehVj LokfeRo
vkosnd dk
forj.k fuxe dk
10- eSaus bl vkosnu@ vuqcU/k izi= ds ihNs lHkh 'krsZ i<+ ,oa le> yh gSA bu lHkh 'krksZ esa rFkk ** fo|qr
vkiwfrZ gsrq 'krZs ,oa fucU/ku “(TCS) dh vU; 'krksZ ls eSa lger g¡waA bl izkFkZuk i= esa dksbZ Hkh xyr
lwpuk nsus ij vuqcU/k gV ldrk gS] ;fn fo|qr lEcU/k ns fn;k x;k gS rks bl vk/kkj ij fo|qr
lEcU/k dkVk tk ldrk gSA eSa vius fo|qr fQfVax dh Loa; lqj{kk ,oa ns[k js[k d:axk vkSj lqj{kk
fu;eksa dk ikyu d:axkA
lk{kh ds gLrk{kj
vkosnd ds gLrk{kj
uke ------------------------------------------------
uke --------------------------------------------
irk --------------------------------------------------------------
irk ------------------------------
----------------------------------------------------------------
------------------------------
fnukad
fnukad
dk;kZy; mi;ksx gsrq %& vkosnd }kjk tek djkbZ xbZ jkf’k ¼lgk;rk gsrq ihNs Øe la[;k 1 o 2 ns[ksa½
1234567-
izkFkZuk i= 'kqYd
-----------------------------------------------------------------------------------------------------------------LVkEi M`;wVh 'kqYd
-------------------------------------------------------------------------------------------------------------------ehVj ckDl dher
---------------------------------------------------------------------------------------------------------------------ehVj lqj{kk jkf’k
---------------------------------------------------------------------------------------------------------------------fo|qr miHkksx lqj{kk jkf’k --------------------------------------------------------------------------------------------------------------------vfxze jkf’k
--------------------------------------------------------------------------------------------------------------------vU;
;ksx-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------11
vkosnu Hkjus gsrq lgk;d tkudkjh
vkosnu@vuqcU/k ds Øe la[;k 6 ¼i½ esa ¼vkosfnr lEc) Hkkj dh x.kuk fuEukuqlkj djsa½
Ø-l1
1
2
3
4
5
6
7
Hkkj dk o.kZu
la[k;k
2
3
cYo@Qsu@ykbZV Iyx
¼5 ,Eih;j½
V~;wc ykbZV
Vsyhfotu dyj @’;ke 'osr
ikoj Iyx ¼15 ,Eih;j½
fÝt@dwyj
xhtj
,;j daMh’kuj 1 Vu @1-5
Vu
okVst
4
60 okWV
dqy okWVst
5 = (3x4)
40 okWV
100 okWV@60
okWV
500 okWV
250 okWV
1500 okWV
1500@2200
okWV
2- 'kqYd &
jktLFkku fo|qr fofu;ked vk;ksx ¼fo|qr iznk; dksM ,oa lEcfU/kr ekeysa½ fofu;e] 2009 dh vuqlwph ds vuqlkj
uksV %&
1- u;s dusD’kuksa ds vfrfjDr vU; vkosnuksa ij izkFkZuk i= ’kqYd ns; ugha gSA
2- Hkkj ?kVkus ]orZeku dusD’ku f’kf¶Vax ]dusD’ku ifjorZu¼ VªkalQj ½ gsrq ¼iwoZ dusD’ku drkZ }kjk lgefr
gksus ij ½
lqj{kk
jkf’k ns; ugh gSA
nLrkost layXu djsa&
layXu fd;s tkus okys nLrkost¨ dh lwph
12
vuqcU/k& i=
¼10 : ds ukWu T;wfM’k;y LVkWEi isij ij ½
;g izekf.kr fd;k tkrk gS fd esuas ;g --------------------------------------------------------------------------------¼LFkku dk iw.kZ fooj.k½
tks fd uxj ifj"kn @vU; LFkkuh; fudk; ------------------------------------esa fLFkr gS eSllZ@--------------------------------------------Jh ------------------------- fuoklh-------------------------------------------------
dks fdjk;s ij ns fn;k gS rFkk mDr Hkou esa fo|qr
dusD’ku nsus ij eq>s dksbZ vkifŸk ugha gSA eSa bl ckr dh xkjUVh nsrk gwW fd tc Hkh fdjk;snkj
]edku@nqdku @ ----------------------------------------[kkyh djsxk rks bl ckr dk iwjk &iwjk /;ku j[kwWxk fd fuxe dh
jkf’k cdk;k u jgsaA ,slk u gksus dh fLFkfr esa eSa Lo;a fuxe dh cdk;k jde dk nsunkj jgwWxkA
gLrk{kj fdjk,nkj
lk{kh ¼1½
gLrk{kj edku ekfyd
{kfriwfrZ ca/k i=
¼100 : ds ukWu T;wfM’k;y LVkWEi isij ij ½
tSlk fd eS----------------------------------------------iq=@ifRu Jh -----------------------------------------‘mez ------------------o"kZ fuoklh------------------------us lgk;d vfHk;Urk --------------------------------fo-fo-fu-------------------------ds dk;kZy; esa fo|qr dusD’ku gsrq vkosnu
fd;k gSA tSlk fd -----------------------fo-fo-fu- us mDr -----------------------fLFkr edku@nqdku----------------------dks esjs }kjk
visf{kr fo|qr dusD’ku ds fy, edku @nqdku dh lgefr eakxh gSA
tcfd eSa edku@nqdku ekfyd lgefr i= izLrqr djus esa vleFkZ gwW pwWfd -fo-fo-fu]us bl lEcU/k esa eq>
ls fyf[kr opu pkgk gS vxj eSa vkSj edku@nqdku efkyd ds e/; bl fo|qr dusD’ku ls lEcU/k esa vxj
fdlh U;k;ky; ds le{k fookn mRiUu gksrk gS rks fuxe bl ekeys esa ’kkfey ugha gksxk fQj Hkh fuxe
dks bl dkj.k gqbZ fdlh Hkh izdkj dh {kfr@[kpksZ dh {kfrifwrZ djus dk eSa opu nr
s k gwWA vr% ;g vuqcU/k
edku @nqdku ekfyd dh fcuk lgefr ds fuxe }kjk eq>s mDr ifjlj esa dusD’ku fn;s tkus gsrq lk{;
fd;k tkdj eSa opu nsrk gWw fd fuxe dks bl lEcU/k esa gq, okndj.k ds dkj.k gqbZ lHkh izdkj dh gkfu;ksa
@ {kfr;ksa ,oa [kpsZ dh {kfriwfrZ dk opu nsrk gwWA
LFkku
fnukad
lk{kh dk uke
irk
¼ fu"iknd ds gLrk{kj ½
’krsZ & dUM~;wV ikbZi ,oa fQfaVax gsrq vko’;d uV ckYsV bR;kfn ]vkosnd }kjk miyC/k djk;k tk;sxk A
izek.k i= rglhynkj ¼d`f"k dusD’ku ½
;g izekf.kr fd;k tkrk gS fd Jh @lqJh@Jhefr------------------------------------------------lqiq=@lqiq=h@iRuh Jh -------------------------------------------------------------tkfr ---------------------------------xzke @’kgj----------------------------------------ds fuoklh gS rFkk dqvk blds --------------------------------------------------------------xzke ds Hkw jktLo {ks= esa fLFkr gS
mlds dq,s dk jktLo vfHkys[k ds vuqlkj [k-u------------------------------------------------------gS vkSj [ksrh ds dk;Z mi;ksx esa
fy;k tkrk gS A bl dq, [ksr ds ekfyd Lo; gh gSa
g- iVokjh
gYQk u-
g- rglhynkj
13
bl vuqcU/k dks ^^fo|qr vkiwfrZ gsrq ’krsZa ,oa fucU/ku ,oa VSfjQ QkWj lIykbZ vkWQ bysDVªhsflvh dslHkh
izko/kkuksa tks fd le;≤ ij ykxw gks dh fo"k; oLrq esa i<k ,oa le>k tkos tks fd bl vuqcU/k dk gh
,d Hkkx ekuk tkosxkA fo|qr vf/kfu;e &2003 ds lqlaxr izko/kku ,oa blds v/khu cuk;s x;s fu;e
,oa fofu;e dk blds dksbZ i’pkrorhZ la’kks/ku ds izko/kkuA
****
14
Annexure-5
Model Agreement for HT consumer
(HT form of agreement is to be executed where the metering is at
consumer's premises and EHT Form of agreement is to be executed where
the metering is at RVPN/Licensee's sub-station)
Preamble
This Agreement made this------------- day of----------, 20----- between the --------Vidyut Vitran Licensee Limited, (hereinafter called the ‘Licensee’ which
expression shall where the context so admit include its successors in office
and assigns) of the one part and ------------------ (hereinafter called the
‘Consumer’ which expression where the context so admits shall include his
heirs, executors, administrators, legal representatives, successors in business
and assigns, of the other part.
Where as the consumer has requested the Licensee to supply him with
electrical energy at the consumer's premises situated at-------------and
indicated in red in the map attached hereto for purpose of----------------------------- and the Licensee has agreed to supply to the consumer such energy
upon the terms and conditions hereinafter contained.
NOW IT IS HEREBY DECLARED AND AGREED AS FOLLOWS
(1)
The Licensee shall give supply to the consumer for -------------- purpose,
at the premises referred to above up to maximum demand of........KVA
(hereinafter called contract demand).
(2)
The electrical energy so supplied shall be of three phase, alternating
between phases and at
current, at a declared voltage of
a frequency of 50 (fifty) complete cycles per second at the terminals.
(3)
The point of supply as well as the metering point shall be at the
Prasaran Licensee’s / Licensee 's substation at
.
(FOR EHT ONLY)
This agreement shall subject as hereinafter provided, remain in force for
a period of one year in the first instance commencing from the date of
supply and shall remain in force till its termination.
(4)
Provided that either party shall be at liberty to terminate this
agreement or get his contract demand reduced by giving one
15
Deleted: ¶
month’s notice in writing in that behalf subject to completion of initial
period of one year including notice period. The consumer can also get
his connection permanently disconnected or get his contract demand
reduced on the same day of notice if he is ready to pay the minimum
billing/fixed charges amount equivalent to one month in lieu of one
month’s notice.
(5)
If the consumer opts for open access then the contract for open
access shall be governed by relevant regulations.
(6)
The consumer has agreed to bear stamp duty on this agreement.
In witness whereof I,
(Name
& designation)
on behalf of the
Vidyut Vitran Licensee Ltd., and
(Name & designation) on behalf of consumer, namely---------------------- have
hereunto set their signatures and the common seal the day, month & year
first written above.
Signed by the above named
in the presence of
Signature & Rubber Stamp
of the authorized representative of the Licensee
For & on behalf of-_
Vidyut Vitran Licensee Ltd.
1) (Name and Address).
2) (Name and Address).
Signed by the above named
in the presence of
Signature & Rubber Stamp on
behalf of consumer
1) (Name and Address).
2) (Name and Address).
The common seal is hereunto
affixed in the presence of
1) (Name and Address).
(Common seal of
the consumer)
a) (Name and Address).
16
Checklist for HT/EHT agreement to be executed by large industrial consumers
Activity
Yes/NO
(1) Agreement on Non-judicial stamp paper worth Rs. 10/- only
(2) Name, designation, consumer name have been filled up
(3) Consumer’s signatures and two witnesses thereof
(4) Consumer’s Common seal in case of companies registered
under companies act, otherwise rubber seal affixed and
witness thereof.
(5) Details of connected load duly verified by concerned subdivisional officer
(6) Site map indicating location of the premises duly marked with
red ink the area of supply, duly verified by concerned subdivisional officer.
(7) Power of attorney (in case of partnership firms)
(8) Resolution of Board of Directors & power of attorney (in case
of companies)
(9) Copies of this agreement- Complete sets (one original plus
five copies)
17
1
Download