Miami Shores Village Community Center January 2016 Purpose Provide an update on the following: 1. Review of Planning Efforts to this Point • • • 2. Evaluation of the Existing Facility • 3. Market analysis Survey results Building Program Existing conditions and site context Potential Site and Concept Plans 2 Planning Efforts 3 Demographics • Primary Service Area – Miami Shores Village • Secondary Service Area – Geographic area currently served by the existing Community Center 4 Demographics Summary • Miami Shores has a reasonably large household size but the median age is older than the national number but lower than the state. • Miami Shores has a very high median household income level and as a result has a very high Recreation Spending Potential Index. • Miami Shores has fewer children than the national numbers but there is expected to be significant growth in the 5-17 age group in the coming years. • There is a diverse population with significant African American and Hispanic segments. • The Secondary Service Area is much larger and would help support a community center of some magnitude. 5 Service Area Providers Public • Miami Shores – Community Center – Fieldhouse • • • Miami Beach North Miami Biscayne Park Non-Profit • Jewish Community Center – Miami Beach Private • MPower Project Fitness • Primal Fitness • Miami Theater Company • Further away – LA Fitness – US 1 Fitness 6 Market Conclusion Opportunities • The demographic characteristics of Miami Shores indicates households with high income levels and disposable income for recreation purposes. • The Secondary Service Area will provide a larger population base to enhance the operation of a new community center. • The population will continue to grow at a steady pace. • There are a limited number of other indoor recreation and fitness centers in the immediate Miami Shores area. • Miami Shores Village has a smaller, older, community center and fieldhouse to support its recreational needs. Both of these facilities need to be replaced by a comprehensive, family focused, public recreation center. 7 Market Conclusion Challenges • Miami Shores Village has a relatively small population base that will require a more comprehensive community center to continue to draw some users from the Secondary Service Area. • The demographics of both Miami Shores and the Secondary Service Area shows a population that is older with a significant number of seniors. The rate of participation in fitness and recreational activities is generally lower among this age group. • The Secondary Service Area has a significantly lower median household income level. • Funding not only the development but the operation of a new community center will have to be clearly defined. 8 Survey Results • Statistically valid random survey of Miami Shores residents. • Approximately 3,000 were mailed out. • 453 surveys were returned. • 95% level of confidence with a precision rate of +/- 4.5%. 9 Survey Results 10 Survey Results 11 Survey Results 12 Survey Results 13 Survey Results 14 Survey Results 15 Building Program • Based on conversations with staff and user groups. • Considers the survey results. • Planned to replace the existing Community Center and Fieldhouse. • A building of approximately 52,500 SF 16 Building Program • Key spaces – New amenities • • • • Gymnasium Weight/Cardio Area Group/Exercise Room Elevated Walk/Jog Track – Replaces existing spaces • • • • • • Gymnastics Area Community Rooms Kitchen –Catering Arts & Crafts Room Youth After-School/Summer Camp Rooms Concessions/Food Prep – Support areas • • • • Office Space Drop-in Child Watch Outdoor Restrooms Restrooms/Locker Rooms 17 Building Program Space Number of Spaces Square Footage Total SF Lobby 1 1,000 1,000 Office Space (Admin, conf. room, work space) Drop-in Child Watch (includes unisex restroom) 1 1 1,500 1,000 1,500 1,000 Outdoor Restrooms 2 200 400 Gymnastics 1 6,000 6,000 Gymnastics Storage 1 600 600 Gymnasium (1 H.S. ct. or two 50’ x 74’ cross ct.) 1 11,224 11,224 Gymnasium Storage 1 600 600 Weight/Cardio Area 1 2,500 2,500 Group Exercise/Dance Room 1 2,000 2,000 Group Exercise Storage 1 300 300 Elevated Walk/Jog Track (in gym, 1/10 mile) 1 3,696 3,696 Restroom/Locker Rooms 2 600 1,200 Community Room (divides into 3 rooms w/stage) 1 3,600 3,600 Community Room Storage 1 500 500 Kitchen- Catering 1 500 500 Arts & Crafts Room (useable for sewing) 1 1,200 1,200 Arts & Crafts Storage 1 200 200 Youth After-School/Summer Camp Rooms 3 800 2,400 Youth Area Storage 3 200 600 Youth Area Restrooms 2 300 600 Support Active Use Activity Rooms Concessions/Food Prep (serves outdoor fields) 1 400 400 Sub-Total 29 38,920 42,020 Net to Gross Final Total 25% 10,505 52,525 18 Evaluation of the Existing Facility 19 Existing Building History The existing building is approximately 46 years old… 20 Streetscape Context • Field House is separated from Community Center Building • Relationship to fields only, not to Community Center • Small structure adapted to present use. • Increased management issues • Distance from main office 21 Existing Building Program • Space Distribution Analysis • • See how the spaces are organized and how the progression through the spaces occurs. Understand the general sizes of spaces and how they function. 22 Recreation and Building Context • Existing site is approximately 96,310 square feet (+/- 2.65 acres) • Centrally located on NE 96th Street and NE 7th Avenue • Railroad tracks along the western boundary • Mostly surrounded by single-family residential neighborhood NE 96th Street 23 Present Site Area Distribution Site areas distributed as follows: Existing Building 26,950 sq.ft. Basketball Courts 21,190 sq.ft. Tennis Facility 48,170 sq.ft. Field House 19,500 sq.ft. Total = 115,810 sq.ft. (2.65 Acres) NE 96th Street 24 Streetscape Context • Approximately ¼ mile walk • 5 minutes from front door of existing building to furthest playing field • Narrow sidewalk abutting vehicular ROW • Minimal landscaping • Lack of weather protection • Alternative route to the fields would be to walk through existing courts/tennis center • disruption to those using the facilities NE 96th Street 25 Site and Concept Plans 26 Parking Demand for a New Facility • Proposed Community Center Program: 52,500 sq. ft. (approx.) • Parking ratio required: • • 1 space / 300 sq. ft. of gross building area Required parking = 177 spaces Options to meet future parking demand: • Existing parking scenario • Shared parking use agreement (Churches) • Parking ½ level below new building • New building elevated above surface parking • Surface parking lot • Additional parking may be accommodated by reconfigured onstreet parking 27 Parking Demand Options • Parking located ½ level below ground with new building above NE 96th Street • New building construction elevated to accommodate surface parking 28 Parking Demand Options • New building construction elevated to accommodate surface parking ½ level below. 29 Parking Demand Options • New building construction elevated to accommodate surface parking 30 Potential Site Development Options 31 Summary of New Facility Development Requirements • Existing facility must remain operational during construction of new facility. • Operations must be phased, during construction, so that services continue uninterrupted as transition occurs into new building. • New development options must address current parking shortfalls • Preference being that the parking solution should occur within the program of any new facility. • New facility should provide attractive and safe bus and vehicle drop-off • New facility has multiple, direct and convenient access points to the playfields 32 Panoramic View Overlooking the Fields • Community Center would be more centrally located • Building in this location provides easier access in moving guests back and forth between amenities • Increased security due to “more eyes on the park” 33 Preferred Option Site Plan: Option 3 Community Center: 52,500 sq.ft. • • New facility located overlooking the baseball fields More centrally located to provide convenient access/views to fields Drop-off Area • Increased visibility and imagery Parking: • • Surface parking lot located on the site of existing community center with some below the new facility (XXX spaces) Remainder of parking demand met by reconfigured on-street parking Tennis Center: • Relocated to a remote site or removed NE 96th Street 34 Concept Plan Design Refinement 35 What We Want to Accomplish Explore: • Creative ways to organize program and respond to site attributes • Preliminary conceptual building layout – With program established uses and areas – Internal activities proximity and organization • Building site relationship concept – Access demands – Parking – Drop-Off – Relationship to fields • Views • Walkability – Infrastructure • Septic Tank /Drainfield 36 Architectural Design Objectives • Design a building that is: – Functional • Community needs • Uses – Aesthetically pleasing – Economically viable – Sustainable • Design a building that creates : – Community identity – Sense of place – Meeting point – Responds to site context 37 Concept Plan • Not an architectural schematic • Establishes basic ideas – Spatial organization – Begins the process of defining at planning level building costs • Evaluates organizational relationships • Architectural Schematic Design – Requires much more detailed programming, design options and architectural work – Results in a more finalized building design – Should be part of a future phase of project development • Architectural design • Construction documents 38 Concept Plan 39 Lower Level Parking • +/- 180 parking spaces – Under building – Consumes totality of site • Two Options – Half level underground • 4 to 5 feet – Street level • Community Center on 2nd floor • Vertical circulation elements – Stairs – Elevators • Dedicated bus/vehicle dropoff 40 Lower Level Parking Entry Plaza Bus/Vehicle Drop-Off 41 First Recreation Level 42 First Recreation Level • Elevated over parking area • Lobby area and public space opens to field views – Concession as an activity generator • Central circulation spine – Enclosed Climate Controlled Area • Allows specific areas of building to work independently during evening /as needed • Open Lobby Galleria • Gymnasium 43 First Recreation Level • Community Space – Lobby Area – Meeting place, activities, relaxation – Linkage of building and open field • Concession as an activity generator • Gymnasium on south side – Large “blind” function – Large volume – Separate lobby entrance night activities 44 View of Community Space/Open Lobby Concept 45 Main Lobby Area 46 Gymnasium/Active Recreation Area 47 South End – Development Options • Option 1 Provide Parking – Needed to reach 170-180 spaces – Could be covered with deck and outdoor basketball court(s) • Increased cost • Option 2- Basketball Court/ Open Space – Most economical – Loss of parking spaces – Parking count reduced to 135140 spaces 48 Infrastructure – Septic Tank/Drainfield Location Option 1 - North End/Field • End of baseball field • Simplest location • Need to review issues with environmental regulations and FIRM elevation requirements Option 2- South End • Eliminates other uses • Parking count reduced to 135 to 140 spaces • Basketball court (s) 49 Second Recreation Level 50 Second Recreation Level Field View Area/Open Lobby 51 Second Recreation Level – Gymnasium Area 52 Preliminary Order-of-Magnitude Cost Opinion 53 Order-of-Magnitude Cost Opinion Clarifications • Provided for initial planning purposes only – There could be substantial deviations as project progresses • Carried out from preliminary concept plans – Totally based on building areas – No sufficient definition of plans for detailed cost opinion analysis • Costs derived from similar building types examples – There could be substantial variations with finishes, etc. • Does not include Furniture, Fixtures and Equipment (FF&E) • As project proceeds in Schematic Design: Need to contract specialized construction estimation consultant – More detailed design and clearer cost determination – Needed to help guide design and Village cost objectives 54 Derived Building Order-of-Magnitude Cost Opinion • Review of B&A recent order-of-magnitude cost determination for projects of similar complexity – Other Community Center – University building in process of design – Evaluation of Sweets Architect Square Foot 2015, DCR Square Foot Costbook 2016, for similar constructed buildings costs • Preliminary Projection of Per Square Foot Summary – – – – – Building cost Overhead and Profit 8% Bond 1.3% Contingencies 20% Total $243.00/SF $ 19.60/SF $ 3.20/SF $ 49.00/SF $314.80/SF 55 Building Program Proposed Vs. Actual PROGRAM OPEN LOBBY CONCEPT MAIN BUILDING NUMBER OF SPACES SQUARE FOOTAGE TOTAL SF BUILDING LAYOUT PROVIDED DELTA Support Lobby* Office Space (Admin, conf. room, work space) Drop-in Child Watch (includes unisex restroom) Outdoor Restrooms Circulation 1 1 1 2 1,500 1,500 1,000 200 1,500 1,500 1,000 400 2,400 2,000 1,000 684 9,800 900 500 0 284 9,800 1 1 1 1 1 1 1 1 2,000 6,000 600 13,000 600 2,500 2,000 300 2 600 2,000 6,000 600 13,000 600 2,500 2,000 300 1,200 1,500 600 453 13,000 500 2,500 2,000 360 1,500 (500) (5,400) (147) 0 (100) 0 0 60 0 300 1 3,600 500 500 1,200 200 800 800 200 300 400 3,600 500 500 1,200 200 3,200 2,400 600 600 400 3,500 500 700 1,500 194 3,200 2,400 850 1,120 400 (100) 0 200 300 (6) 0 0 250 520 0 40,300 45,800 52,661 6,861 - 52,661 6,861 Active Use Indoor Playground Gymnastics Gymnastics Storage Gymnasium Gymnasium Storage Weight/Cardio Area Group Exercise/Dance Room Group Exercise Storage jogging Rooftop Track Restroom/Locker Rooms Activity Rooms Community Room (divisible with stage) Community Room Storage Kitchen- Catering Arts & Crafts Room (useable for sewing) Arts & Crafts Storage Classrooms Youth After-School/Summer Camp Rooms Youth Area Storage Youth Area Restrooms Concessions/food prep SUB TOTAL FINAL TOTAL * 50% area counted open lobby 1 1 1 1 4 3 3 2 1 33 45,800 56 Order-of-Magnitude Project Development Costs * • Underbuilding Parking Area – 180 spaces@ $8,000/space $ 1,400,000 • Building Program** – 52,661 SF @ $315/SF Sub-Total • Architecture & Engineering – 10% Total $16,600,000 $18,000,000 $ 1,800,000 $19,800,00 * Does not include FF&E ** Allocation needed for street improvements 57 Next Steps in Project Development 58 Next Steps • Develop – Operations Analysis • Fee structure • Operational expenditures • Operational revenues • Future Contract – Schematic Design • Detailed program development for architectural design • Define a more clear budget based on a more detailed design 59 Miami Shores Village Community Center January 2016