Marine Repair Technician Wisconsin Indianhead Technical College 31-461-4 Technical Diploma 2008-2009 Program Review Improvement Plan and 2009-2011 Progress Reports 1 WITC IMPROVEMENT PLAN for Implementation in 2009-2010 & 2010-2011 (Final January 2010) Program Name: MARINE REPAIR PROGRAM College Division: TRADE AND TECHNICAL List Divisional Dean: MIKE BOYLE Program Action Plan PROGRAM REVIEW DATA Action Plan: Create and implement a marketing plan Planned Outcome: Increase program awareness across the country. Update plan yearly. “This semester (spring 2010) we will be meeting with Shawnda Schelinder and Kathy Maas to set a marketing plan for 2011 spring enrollments. These way potential students will know we now offer the 3 semester Marine program with enrollments starting in the fall and spring semesters. Post 911 GI bill can also be implemented in this marketing plan” Key Staff Responsible Todd Larson Tim Edwards Garry Krause Randy Deli Kathy Maas Shawnda Schelinder Mary Ross Karen Hoglund Timeframe Timeframe: From: 1/2010 Resources Resources Needed: $ __20,000__ To: _5/2010__ Funding Source: ___External ___WTCS _X_Other Internal Timeframe: From: _9/2009_ Resources Needed: $ _____________ To: __5/2010__ Funding Source: ___External ___WTCS ___Other Internal Indicator: N200 CURRICULUM 1. Review and update Program Outcomes, as appropriate – advisory committee approval Is required Tim Edwards Advisory committee Trixie Melin Action Plan: Provide advisory committee with list of program outcomes Planned Outcome: Use advisory committee to create an accurate list of program outcomes. Indicator: S400 2 2. COSs updated to reflect current curriculum content. Action Plan: Current COS’s are up to date and reflect current program content. Timeframe: From: _None_ Resources Needed: $ _____________ To: ___ Funding Source: ___External ___WTCS ___Other Internal Timeframe: From: _9/2009_ Resources Needed: $ _____________ To: __5/2010__ Funding Source: ___External ___WTCS ___Other Internal Timeframe: From: _9/2009_ Resources Needed: $ _____________ To: __5/2010__ Funding Source: ___External ___WTCS ___Other Internal Planned Outcome: None Indicator: C200 3. Review/update online course curriculum to ensure compliance with college standards. “We currently do not offer any online course curriculum in the Marine Program”. Action Plan: N/A Planned Outcome: Indicator: _____ 4. Program Design document to be completed to incorporate Program Outcomes and Collegewide Outcomes/Indicators for use with WIDS Analyzer. Andrea Schullo Action Plan: Have advisory committee provide input on outcomes. Complete program design document. “This is scheduled for our January 27, 2010 advisory committee meeting. Planned Outcome: Will have updated program outcomes. Indicator: M150 3 ASSESSMENT Action Plan: Increase ability to complete hands on assessments of students in a timely fashion. Todd Larson Tim Edwards Garry Krause Randy Deli Mike Boyle Timeframe: From: _2009___ Resources Needed: $ _____________ To: _2012___ Funding Source: ___External ___WTCS ___Other Internal Tim Edwards Advisory Committee members Timeframe: From: _09-2010___ Resources Needed: $ _____________ To: 2011-2012____ Funding Source: ___External ___WTCS ___Other Internal Timeframe: From: _2009_____ Resources Needed: $ 100,000 To: __2012__ Funding Source: ___External ___WTCS ___Other Internal Planned Outcome: Create projects that assess in a minimal amount of time. Increase the amount of test cells available to students. Indicator: N200 Advisory Committees Action Plan: Committee members review curriculum. “Our plan is to review 2 courses per year; courses up for review have been sent to advisory committee members to be reviewed on January 27, 2010.” Planned Outcome: Curriculum will be accurate and up to date with industry needs. Indicator: C200 Equipment Facilities Action Plan: Construct additional engine test cells Planned Outcome: To accommodate students needs in troubleshooting running engines, and assessment of student learning. “This plan was submitted on the 2010-2011 Trade and Technical Planning documents for facility upgrades.” Todd Larson Tim Edwards Garry Krause Randy Deli Mike Boyle Indicator: S400 4 Timeframe: From: __Ongoing for both Fall and Spring semesters Learning and Innovation Action Plan: Because of the new restructured semester 1, 2, and 3; instructors must do more short “how to “demonstrations on using tools and completing mechanical procedures. To: ____________ Resources Needed: $ _____________ Funding Source: ___External ___WTCS ___Other Internal Planned Outcome: This will speed up the hands on projects that students are working on. Indicator: M150 Interface with General Education Action Plan: Team teach applied science. “Applied science is now team taught for the 2009-2010 school term.” Pat Kinney Arden Clapero Todd Larson Tim Edwards Timeframe: From: _2009________ Resources Needed: $ _____________ To: __2010_________ Funding Source: ___External ___WTCS ___Other Internal Student services staff Karen Hoglund Timeframe: From: _2009________ Resources Needed: $ _____________ To: __January 2011__ Funding Source: ___External ___WTCS ___Other Internal Planned Outcome: To better connect general education courses with core courses. Applied studies courses will have a positive effect on students, thus having a positive impact on program retention Indicator: M150 Interface with Student Services Staff Action Plan: Do not register students for spring semester 2010. “No new students were allowed to register this spring semester. New students will be allowed to register for Spring semester starting January 2011.” Planned Outcome: Because of the program implementation, it is essential that no new students be in-rolled for January 2010 until 4th semester students have graduated. Indicator: N200 5 INTERFACE WITH ACADEMIC DEANS Action Plan: Have annual plan updated in time to meet the needs of the new curriculum. Randy Deli Todd Larson Tim Edwards Garry Krause Mike Boyle Planned Outcome: Student needs will be met through the planning process. Timeframe: From: _2009_____ Resources Needed: $ _____________ To: __2010_______ Funding Source: ___External ___WTCS ___Other Internal Indicator: N200 Team Leader Signature __ Academic Dean Signature Date _________________________________________ Date 1/13/2010_and 12/1/10_and 6/22/11___________ ____________________________________________________________________________________________________________________________ Divisional Dean Signature Date Vice President of Academic Affairs Date 6 WITC Program Review Improvement Plan Progress Report – Spring 2010, November 2010 Date of Report: 6/29/2010; November 2010 Program: Marine Repair Technician Year Program Review Began: 2009 (List year the program completed its self-study, QRP analysis, and initial improvement plan) Person Completing Report: Todd Larson/Randy Deli YEAR-END ACTIVITY REPORT Outcome Action Item (If connected to QRP, list indicator) (as listed in improvement plan) N:200 Create and implement a marketing plan Progress to Date On Target? (Yes or No) We have met with the marketing department and set up a plan which has been working very well. Enrollments are doing great and enrollment services have been notified to start directing students to the Spring semester. Television commercials have been running in the Duluth/Superior area and program flyers are printed and will be dispersed to each of the campus recruiters to be used throughout the state. A marine E7 Yes If No, Why are you not on Target? newsletter will go out the live by the end of May. November 2010 update: Additional marketing which took place is we now have a WITC Marine Repair link to face book with is updated by the instructors. June 22, 2011 update: Instructors continue to use face book for marketing. Instructors post pictures, videos and they also receive postings for regional employment related to the Marine industry. This has been working great for the Marine program. Indicator: S400 Review, update and approve 2 program outcomes with the Marine advisory committee Program outcomes were handed to Yes our advisory committee at our January 27th committee meeting and the program outcomes were discussed and approved. November 2010 update: Program outcomes will be discussed and reviewed at our advisory committee which will take place in Ashland on December 13, 2010. An additional item which will be discussed is the course outcomes for the Applied Science which is one of the General Studies requirements for the Marine 8 Program. June 22, 2011 update: During January’s Advisory committee meeting program outcomes were once again reviewed and the committee also reviewed several course outcome summaries. Making some suggestions and having good discussion and then approving all which was discussed. Indicator: F200 and F600 COS’s updated to reflect current curriculum content. Course outcome summaries have been updated and revised to meet the new 3 semester format. Yes Have advisory committee provide input on course outcomes and complete program design document. The advisory committee met and reviewed and approved the course outcomes for 2 courses. The program design (WIDS analyzer) was completed in May 2010. Yes November 2010 update: Andrea Schullo and Instructor Todd Larson reviewed and updated the WIDS analyzer and the college wide outcome assessment on November 30th in Ashland. June 22, 2011 update: Yes the program advisory committee met in January, 2011 and discussed, 9 provided input, and reviewed program outcomes and course outcome summaries. Indicator: N200 Increase ability to complete hands on assessments of students in a timely fashion. This was somewhat of a challenge this past year. The reason is because we are currently finishing up the 2nd year program, combined with the implementing the new 3 semester curriculum. This will improve when each instructor is able to teach their special areas. No Currently finishing up with the 2 year program. No Available funding resources currently not November 2010 update: No change. However major equipment priority was put forth by the deans during planning and the Marine program will be getting all requests which will help this area after July 1, 2011. The end result will be more learning stations equipped with more hands applications. June 22, 2011 update: Major equipment was approved for the Marine program and this will greatly improve additional work stations for 2nd and 3rd semester students. Instructors will begin ordering equipment after July 1, 2011. Indicator: F600 Work towards AMTECH AMTECH certification is used as a benchmark and guidelines to 10 certification achieve within the Marine Repair Technician program. We will continue to work towards this AMTECH certification if available funding resources exist within our department. available. November 2010 update: No change in the status, instructor Todd Larson has put forth his request to attend the AMTECH conference where he will be teaching some professional development seminars. June 22, 2011 update: AMTECH and ABYC MAY join forces to be one entity. If this merge takes place, curriculum with unified standards will take place at a much faster pace. Indicator: C200 Committee members review curriculum. “Our plan is to review 2 courses per year; courses up for review have been sent to advisory committee members to be reviewed on January 27, 2010.” The advisory committee will also update and validate the program outcomes The MRT advisory committee reviewed and approved the 3 semester programming and course sequence as proposed. In addition to the overall course sequence, 2 of the courses were updated and the program outcomes were validated. 11 Yes for 2 specific courses per year. Indicator: S400 Construct additional engine test cells. Additional test cells were constructed; however additional test cells along with adequate exhaust systems will need to be implemented. This was submitted for an improvement plan on our 2010-2011 facility improvement plan. No Additional items will be needed to have adequate engine testing procedures. November 2010 Update: Two more test cells were added to the marine lab, and a new ventilation system is currently being installed this week. June 22, 2011 update: We currently have 3 test cells with full capabilities. Much time and effort was put forth to make this happen so all 3 test cells can be used at once in a safe enclosed environment with new ventilation. Indicator: M150 With the new restructured semester 1, 2, and 3; Instructors must do more short “how To” demonstrations on using tools and completing mechanical procedures. Instructors are doing more demonstrations. Yes . Indicator: M150 Team teach applied Science Applied science is now team taught, however additional work needs to be completed on the level No The action item was completed, however either the level of applied science 12 at which applied science is currently being taught to technical level marine students. November 2010 update: A meeting took place on November 30th in Ashland. The Dean and the instructor of the applied science course, met with the Trade Dean and the instructor of the MRT program to outline course outcomes and learning objectives agreed upon by both parties. The advisory committee will meet on December 13 to approve of these changes or make additional recommendations. June 22, 2011 update: We continue to meet with the dean of general studies and the instructional staff of the applied science course. We all agree that more hands on projects and demonstrations need to be implemented within the applied science course. Digital volt/ohm meters have been ordered for the electronic portion and further equipment will be ordered for mechanical demonstrations. The applied science is currently lacking a science lab, which would be a nice place to do demonstrations. 13 needs to be taught as a technical diploma course or a program modification needs to be incorporated to drop applied science and add applied physical science. We will continue to work on this area for improvement. Indicator: N200 Do not enroll new students during the spring semester 2010 No new students were enrolled from enrollment services during this period. Yes November 2010 update: We will be enrolling 4 new students in January 2011. We have a waiting list beyond this however we cannot enroll any additional students because this group will merge with our current section of 14 to from a section of 18 students. Student attrition rate has been very low with the new 3 semester programming. June 22, 2011 update: Enrollment has been very stable in the program with January enrollments only allowing 4 students. By doing this it keeps the overall program full and keeps the combined section less than 17 students in Todd’s section. Indicator: N200 Have the annual plan updated to reflect the needs of the new 3 semester curriculum. The annual plan was submitted through our annual planning process for the 2010-2011 fiscal year. November 2010 update: The 2011-2012 plan has been 14 Yes submitted. Additional major equipment needs will be met to handle the increase in enrollment for this program. June 22, 2011 update: Additional major equipment was approved and will be ordered starting after July 1, 2011. This will provide additional work areas for 2nd and 3rd semester students in sections which are combined and maintain higher numbers. Choose an item. 15