1999 IEEE PES Summer Meeting Retuning Stabilizers for the North-South Brazilian Interconnection N.Martins, A.A.Barbosa, J.C.R.Ferraz M.G. dos Santos, A.L.B.Bergamo, C.S.Yung CEPEL, Rio de Janeiro, Brazil Eletrobrás, Rio de Janeiro, Brazil V.R. Oliveira, N.J.P. Macedo Furnas, Rio de Janeiro, Brazil Brazilian -South Interconnection Brazilian North North-South Interconnection Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 2 Brazilian -South Interconnection Brazilian North North-South Interconnection -- Detail Detail NORTH V. CO ND E U G N I X O I R I T N A C O T BELO MO N TE I R A LTAM IR A S N NORTHEAST O S . LU IS PER ISES S OBR A L M IRA N D A T UC U R U I PE NT E CO S T ES FO RTA LEZ A S E C.T/P RE P P IR IP IRI PE R ITO R O PR E S. DUT R A M AR A BA TA P /XIN 1 ESTR E ITO I A U G A R A A C R AT EUS AC U BO A ES PER A N C A C ORE M A S C . G RA N DE MIL/R E C S J P/M IL FR A G O S O S . J O AO D O P IAUI LAJ/SJP L AJE AD O M O X OTO PA U LO A FO N S O J UA ZEIRO S .3B LAJ/S OB S IP UE IR AS I R LAJ /IRE . F R I C N A S C O S E NH O R D O BO N FIM O SO B /S LV IR E CE C IC E RO DA NTAS BAR R EIRA S R P A M R A N .T O M IR A DO R C AN T I NZ C ORR E NT R IO FO RM O RI O ITA B AIA N A ITAB A IAN IN HA CA M A CA R I SA LVA DO R S . AN TO N IO D E J ES US B O M JE SUS D A LA PA SO MAC E IO PE N ED O C AT U GO V MU A NG ABEIRA A CU AG PAR E I NH FUN IL S AM /BJ L S B AR R O A LTO S A D O I R BJ L/G MB A SME /B JL R N IQU E LAN D IA L A A IO M ESS IAS XIN G O JARD IM IRE/SLV PE IX E IO R IB EIR AO J AG U A RI O LIN D IN A CENTRAL WEST R EC IF E AN G E LIM ITA PA R IC A SO B RA DIN HO O I R BEL EM P.B R MUS SU R E PA U F ER RO G O IAN IN HA BO M NOM E TA C AIM BO S N I T N A C O T S E RR A d a ME SA N ATA L II Q U I/R E C M ILA G RE S P ICO S E LISEU M ART IN S M .A.GR A ND E C AN A BRAVA NATAL IC O PA PA G AIO F.3 TU PIR AT INS R M O SS O R O D ER IVA CAO B. ES P/M IL O I R R U SS AS Q UIX A DA TE RE S IN A SE RR A Q UE B R ADA S. ISABEL IPI/MAR B AN A BU IU IMPE R AT R IZ M O C AMBIN H O B R ASIL IA G E RA L X AVA N T E S SA MAM B A IA SM E/TM A R A NH A NGUE R A FSA IO P RE BAN D EIR AN TE S T O M .C LA R OS IO R PIR A PO RA C OR U M BA C AP IM B RAN CO C AC H O EIR A D O U R AD A S .D IVIS A S. ROMAO T R ES MAR IA S J E Q U G A R A VARZE A D A PA LM A I R U I T I N H ON IR A PE A HA ITAPE BI A LM E N JEQ UITIN H O NH A EUN A PO LIS I O E MB O R CA C AO IT UM BIA RA S.S IMA O S .G O TAR D O 2 AGUA VE RM ELH A C . P E NA N E VES T.O ES TE V.G R AN D E PO RTO CO L O M B IA M E S Q UITA MA SC A R EN HA S S .L U ZIA J AG UA R A M AR IM B ON D O GO V VA LA D AR E S PO M PEU N OVA PO N TE S .G .PARA IPATING A TA QU ARIL SOUTHEAST LE G E N D H YDR OE LEC TR IC P LA NT SUB STATION LT 230 kV LT 3 45 kV LT 500 kV 500 kV AC TRANSMISSION REINFORCEMENT ALTERNATIVE NORTH-SOUTH INTERCONNECTION Retuning Stabilizers for the North-South Brazilian Interconnection Eletrobrás GRUPO COORDENADOR DE PLANEJAMENTO DOS SISTEMAS ELÉTRICOS - GCPS North-South Interconnection 1999 IEEE PES Summer Meeting 3 Retuning -South Retuning Stabilizers Stabilizers for for the the Brazilian Brazilian North North-South Interconnection Interconnection • Carried out by the Eletrobrás/GCOI task force NSPRE/R • TCSC damping controllers previously defined by Planning Division • Various base cases and (N-1) contingency scenarios have been considered • Integral of accelerating power PSSs Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 4 System System Data Data • North-South interconnection – 1000 km long, 1300 MW transfer, 500 kV compact line, series compensated – 2 TCSC’s (6% compensation each) – 2300 bus model, 120 generators, 4 SVC’s, 1 HVDC link – North-South mode (0.17 - 0.25 Hz) may become low damped Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 5 Retuning Retuning Procedure Procedure • The retuning procedure comprises eight steps: – Step 1 – Eigenvalue and Step Disturbance Studies on Individual Generator Units – Step 2 – Study of Three Base Cases – Step 3 – Coordinated Design of TCSCs and PSSs – Step 4 – Robustness Assessment of the PSS and TCSC Designs for Multiple Scenarios – Step 5 – Benchmarking Small Signal and Transient Stability Results – Step 6 – Transient Stability Simulations – Step 7 – Stabilizer Commissioning, Retuning and Power Plant Tests – Step 8 – Power System Oscillation Monitoring Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 6 Exciting -South Mode Exciting the the North North-South Mode the the Most Most • Simultaneous disturbances of opposite polarities applied to North and South generators • Monitor the magnitude of power transients in the North-South tie B ode Dia gra m 40 λ = -0.034 ± j 1.079 30 20 ∆PN-S TIE(s)/Σ ∆P ∆PN-S TIE(s)/ ∆P i MEC(s) i MEC (s) Ma gnitude 10 0 -10 -20 -30 ∆ / ∆P P iT(s) i MEC (s) -40 -50 0 1 2 3 Retuning Stabilizers for the North-South Brazilian Interconnection 4 5 6 7 8 9 1999 IEEE PES Summer Meeting 10 7 Step Step Responses Responses • Step responses of major system generators for scenario R (1000MW N/NE -> S/SE) with existing PSSs and without TCSC stabilizer S te p Re s pons e s 0.2 Te rm ina l MW De via tion (pu) λ = -0.034 ± j 1.079 0.1 0 -0.1 0 5 10 15 20 25 Retuning Stabilizers for the North-South Brazilian Interconnection 30 1999 IEEE PES Summer Meeting 8 Mode -Shape for -South Inter -Area Mode Mode-Shape for North North-South Inter-Area Mode • Mode-Shape for North-South inter-area mode (λ = -0.034 ± j 1.079) South-Southeast Itaipu 50 Hz Retuning Stabilizers for the North-South Brazilian Interconnection North-Northeast 1999 IEEE PES Summer Meeting 9 Ranking Ranking the the Most Most Effective Effective PSS PSS Locations Locations Based Based on on Transfer Transfer Function Function Residues Residues • The residue ranking list of transfer functions ∆ωi(λ)/∆Vrefi (λ), i = 1, ..., Ng helps locating the most effective generators for installing or retuning existing PSS for damping the inter-area mode λ = -0.034 ± j 1.079 Xingó Itaparica Paulo Afonso IV Sobradinho Retuning Stabilizers for the North-South Brazilian Interconnection Itaipu 1999 IEEE PES Summer Meeting 1 0 PSS PSS Tuning Tuning and and Coordination Coordination for for Damping Damping Several Several Dominant Dominant Modes Modes • Dominant pole spectrum for ∆ω(s)/∆Vref(s) at Xingó power plant. The complex vectors are the transfer function residues associated with the various poles. The residue magnitudes were made larger than actual for readability Imag. (rad/s) 9.0 7.5 Local Northeastern Modes 6.0 4.5 3.0 North-Northeast Mode 1.5 North-South Mode 0.0 -1.25 -0.75 -0.25 Real Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 1 PSS PSS Tuning Tuning and and Coordination Coordination for for Damping Damping Several Several Dominant Dominant Modes Modes Bode Plot The PSS phase determined so that the residues associated with the Magnitude (dB) characteristics are 100 50 0 -50 150 about 8 rad/s are advanced 100 by about 70° while the residue associated with the North-South mode at 1 rad/s experiences no phase change. Phase (deg) multimachine modes at 50 0 -3 10 10 -2 10 -1 10 0 10 1 10 2 10 3 Frequency (rad/sec) 2 3s 1 + 0.12 s 1 + 0.25s PSS ( s ) = K pss 1 + 3s 1 + 0.012s 1 + 0.75s Three Lead-Lag Blocks Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 2 PSS PSS Tuning Tuning and and Coordination Coordination for for Damping Damping Several Several Dominant Dominant Modes Modes • This PSS tuning causes the original residues shown in to be rotated and amplified as indicated in the figure below • Dominant pole spectrum and residues for the open-loop transfer function PSS(s).∆ω(s)/∆Vref(s). These residues correspond to the firstorder estimate for the Root-Locus plot, as the PSS gain at Xingó power plant is raised from zero to 20 pu/pu. Imag. (rad/s) 9.0 7.5 Local Northeastern Modes 6.0 South-Southeast Mode 4.5 3.0 North-Northeast Mode North-South Mode 1.5 0.0 -1.25 -0.75 -0.25 Real Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 3 PSS PSS Tuning Tuning and and Coordination Coordination for for Damping Damping Several Several Dominant Dominant Modes Modes • First-Order estimate of the Root-Contour plot as the gains of stabilizers at Xingó, Paulo Afonso IV and Itaparica are raised from zero to 20 pu/pu Imag. (rad/s) Local Northeastern Modes 9.0 7.5 6.0 South-Southeast Mode 4.5 North-Northeast Mode 3.0 1.5 North-South Mode 0.0 -2.50 -2.00 -1.50 -1.00 -0.50 0.00 Real Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 4 Examples -Locus for Examples of of Root Root-Locus for Large Large System System Models Models • Root-Contour plot as the gains of the PSSs at Xingó, Paulo Afonso IV and Itaparica are raised from zero to 25 pu/pu imag 15% 10% 5% Local Northeastern Modes South-Southeast Mode North-Northeast Mode North-South Mode real Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 5 Examples -Locus for Examples of of Root Root-Locus for Large Large System System Models Models • Locus of North-South mode following changes in the PSS gains at Xingó, Paulo Afonso IV and Itaparica power plants imag 15% 10% 5% KPSS = 0 Proposed PSSs Existing PSSs KPSS = 25 Existing PSS Gains real Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 6 Examples Examples of of Full Full Eigensolution Eigensolution for for Large Large Systems Systems • Eigenvalue spectrum of the North-South Brazilian interconnection with existing PSSs and without TCSCs (1,700 state variables). The chosen scenario is not critical Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 7 Examples Examples of of Full Full Eigensolution Eigensolution for for Large Large Systems Systems • Eigenvalue spectrum for the North-South Brazilian interconnection in the absence of Power System Stabilizers and TCSC damping controllers (1,300 State Variables) Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 8 Example Example of of Macro Macro Functions Functions Results Results for for Various Various System System Scenarios Scenarios • Location of North-South Mode, considering 19 scenarios, with and without stabilizers at Xingó, Paulo Afonso IV and Itaparica power plants 15% 10% 5% Without Stabilizers With Existing Stabilizers Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 1 9 Example Example of of Macro Macro Functions Functions Results Results for for Various Various System System Scenarios Scenarios • Location of North-South Mode, considering 19 scenarios, with existing and proposed stabilizers at Xingó, Paulo Afonso IV and Itaparica power plants 15% 10% 5% Existing Stabilizers Proposed Stabilizers Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 2 0 Benchmarking -Signal and Benchmarking Small Small-Signal and Transient Transient Stability Stability Results Results • Comparison of small signal and transient stability program responses for a small disturbance. System model with proposed PSSs in Paulo Afonso IV and Xingó power plants (100 MVA base) Active Power Flow Deviation - pu North-South Tie-Line Power 0.1 Time (s) 0 -0.1 0 2 4 6 8 10 12 14 16 18 20 -0.2 -0.3 -0.4 -0.5 -0.6 -0.7 -0.8 -0.9 Transient Stability Software Small Signal Stability Software Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 2 1 Example Example of of Transient Transient Stability Stability Simulation Simulation • Active power flow transients in the North-South intertie, after a fault with subsequent line reclosure 1300 Power Flow (MW) 1200 1100 1000 900 800 Existing PSS's 700 Proposed PSS's in Xingó, Paulo Afonso IV & Itaparica 600 0 5 10 Time (s) 15 Retuning Stabilizers for the North-South Brazilian Interconnection 20 25 1999 IEEE PES Summer Meeting 2 2 Conclusions Conclusions • Modified PSSs at 3 power plants plus the TCSCs provide an adequate level of redundancy in the damping sources to the critical North-South mode • Advanced linear analysis software was instrumental to the success of the damping analysis and control study • Very low-frequency inter-area modes call for a tighter damping criteria (ξ = 15%) • GEP-based PSS tuning can be difficult sometimes Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 2 3 Example Example of of Macro Macro Functions Functions Results Results for for Various Various System System Scenarios Scenarios • Location of three major inter-area modes for 64 N-1 contingencies in the Argentinean interconnected system Imag 15% 10% 5% Real Retuning Stabilizers for the North-South Brazilian Interconnection 1999 IEEE PES Summer Meeting 2 4 GEP(s) GEP(s) Phase Phase Diagrams Diagrams 140 Phase (degrees) 120 100 PVr 80 GEP(X’) 60 GEP(2X’) 40 GEP(no load) GEP(R high,X high) 20 0 0 2 4 6 8 10 12 Retuning Stabilizers for the North-South Brazilian Interconnection 14 16 18 20 1999 IEEE PES Summer Meeting 2 5 Phase Phase Diagrams Diagrams for for GEP(s) GEP(s) and and PSS(s) PSS(s) 140 Phase (degrees) 120 100 80 60 PVr 40 PSS(ω max low) PSS(ω max high) 20 0 GEP(R high,X high) 0 2 4 6 8 10 12 Retuning Stabilizers for the North-South Brazilian Interconnection 14 16 18 20 1999 IEEE PES Summer Meeting 2 6