Damjan Mulej Eltec Petrol d.o.o. Eltec Petrol`s experience – EPC projects Energy Efficiency in Slovenia: The Way Forward Ljubljana, 26. 09. 2013 2 Mission and slogan Energy Of the Green Future We contribute to lowering energy and water consumption and help to preserve the environment. Energy and Environmental Solutions 3 Vision and strategy To become the leading provider of integrated solutions in the South-East Europe in the fields of: • district energy systems, • water supply systems, • efficient lighting, • energy management. We perform our services to lower the operating and maintenance costs in public, sports, business and industrial buildings, residential buildings and on district heating, water supply and public lighting systems. Energy and Environmental Solutions 4 Area of activity Region: Our partners: Austria, Croatia, BiH, Italy, Kosovo, Macedonia, Montenegro, Serbia, Slovenia Ljubljana, Belgrade, Zagreb, Maribor, Novi Sad, Niš, Jesenice, Velenje, Tuzla, Koper, Kranj, Celje, Železniki, Preddvor, Murska Sobota, Trbovlje, Piran, Nazarje, Postojna, Luče, Mozirje, Sombor, Zrenjanin, Kraljevo, Kragujevac, Pirot, Sisak, Varaždin, ... Energy and Environmental Solutions 5 Energy management Comprehensive solutions of energy efficiency in building design, renovation and facilities management with the objectives of sustainable living. Energy and Environmental Solutions 6 Water supply systems Comprehensive solutions in the field of economic construction design, the renewal and management of drinking water systems. Energy and Environmental Solutions 7 District energy systems Comprehensive solutions in the field of economic construction design, the renewal and management of production sources and the distribution and utilization of gas, heating and cooling. Energy and Environmental Solutions 8 Efficient lighting Comprehensive solutions in the field of economic construction design, the renewal and management of lighting in production and sports facilities and street lighting systems. Energy and Environmental Solutions 9 Energy Contracting • Energy Performance Contracting (EPC) • Energy Supply Contracting (ESC) • Public-Private Partnership (PPP) • Guaranteed effects, payment is subject to achieved savings. • We take the technical and financial risk. • We provide financing. • We take control of your facilities. Energy and Environmental Solutions 10 Energy performance contracting • The contractor is bound by the contract to perform the measurements that bring a certain reduction in energy costs (energy and maintenance) and water • The savings are guaranteed by contractor • Guarantees may vary - depends on the contract: • Payments from savings - directly dependence • Other instruments: • Financial instruments (bank guarantee, …) • Subsequent payment Energy and Environmental Solutions 11 EPC – characteristics: • The contractor takes risk - technical • • • • • Baseline analysis Providing savings Optimal equipment – contract period – life period Investment costs Maintenance and operational costs. • The contractor takes risk – financial • IRR (money value) • Customer´s “fate”. Energy and Environmental Solutions Eltec Petrol d.o.o. References 13 Municipality Kranj – EPC, EDC • Begin in 2001, Contract in 2002 – 15 years • Upgrade in 2007, 2011, 2012 • Measurements are implemented on: • • • • Office building Elementary schools Sport halls Sport complex with Olympic pool • Contracts: • • • • Energy performance contracting Energy delivery contracting Concession for heating and cooling Energy management for buildings and pool Energy and Environmental Solutions 14 Municipalty Kranj – EPC, EDC • Phase I: • Reconstruction of boiler equipment • Heat substations and regulation • Lightning reconstruction in sport hall • Phase II: • Heat delivery for two elementary schools • Construction of two boiler houses • Phase III: Olympic pool • • • • Ventilation with heat recovery Water treatment: use of micro filtration Change of energy source (natural gas) Temperature regulation Energy and Environmental Solutions 15 Municipality Kranj – EPC, EDC • Financing: • • Phase I-III: contractor only Phase IV-: customer’s participation and grants • Baseline: • Heat consumption: 9.800.000 kWh • Guaranteed savings: • Heat: 3.200.000 kWh Energy and Environmental Solutions 16 ZPO – EPC • Begin: 2010, contract: 15 years • Upgrade in 2011 • Measurements implemented on: • Hall B (indoor swimming pool, sauna center, bowling,) • Hall A – indoor sport hall Golovec, offices • Contracts: • Energy performance contracting, • Energy management • Phase I – Hall B: • • • Renovation of building envelope (glass wall facade) Lightning renovation in indoor swimming pool Ventilation with heat recovery Energy and Environmental Solutions 17 ZPO – EPC • Phase II.: Hall A • Financing: • • • Contractor Customer´s participation Grants from different sources • Baseline: • • Electricity consumption: 1.252.000 kWh Heat consumption: 442.000 kWh • Guaranteed savings : • electricity: 626.000 kWh, heat: 44.200 kWh Energy and Environmental Solutions 18 UNIVERSITY OF MARIBOR – EPC, EDC • Begin in 2009, Contract 15 years • Upgrade 2010 - 2013 • Measurement, implemented on: • • • • • • Office building 17 faculties, 2 public institutions Indoor sport hall University library Together 28 objects, 137.900 m2 of heated square Indirectly also heat delivery to residential buildings Energy and Environmental Solutions 19 UNIVERSITY OF MARIBOR – EPC, EDC • Contracts: • • • • Project company Energy performance contracting for certain buildings Energy delivery for all objects Energy management for all objects • Phase I: • Measurement of energy consumption, temperature and illumination in all objects • • • Construction of district heating system for Campus, renovation of heat stations, modification of hot water preparation Lightning renovation in 5 objects Renovation of boiler houses Energy and Environmental Solutions 20 UNIVERSITY OF MARIBOR – EPC, EDC • Phase II: Photovoltaic power plants • Phase III: Boiler houses reconstruction and cogeneration • Phase IV: Recontruction of building envelopes Energy and Environmental Solutions 21 UNIVERSITY OF MARIBOR – EPC, EDC • Contractor´s financing, grants from different sources, • Baseline: • • Electricity consumption: 4.765.000 kWh Heat consumption: 6.923.000 kWh • Guaranteed savings : • • Electricity: 680.000 kWh Heat: 260.000 kWh Energy and Environmental Solutions 22 Experiences Preparatory phase (customer): • Baseline analysis – definition of customer´s goals • The availability of financial resources: • • • • Own resources, grants Loans EPC project – possibilities? Combination • Business model: • Tender preparations • Human resources Energy and Environmental Solutions 23 Experiences Project success conditions (contractor): • Baseline analysis – (not energy consumption only!) • Human resources Energy management: • Technical (including sofware) equipment that enables easy control, monitoring the operation and energy consumption in a number of facilities Energy and Environmental Solutions 24 Experience • Cooperation with clients at all levels: management, maintenance and users • In the mentioned projects, additional savings has been achieved by the effective energy management (in one year period) 470 MWh heat (11,8 %) and 132 MWh electricity (17,8 %) Energy and Environmental Solutions 25 Experience Project success conditions (contractor): • Project financing • Financial resources • Guarantees • Company balance sheet – project balance sheet Energy and Environmental Solutions Eltec Petrol d.o.o. www.eltec-petrol.com Ljubljana, 25. 09. 2013