NEYVELI LIGNITE CORPORATION LIMITED, NEYVELI-607 801
STATEMENT SHOWING THE QUARTERLY PROGRESS OF SUPPLY/PURCHASE CONTRACTS
FOR THE QUARTER ENDING SEPTEMBER - 2014 - CATEGORY -I 5 Crore and above
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
2
3
4
1
M/s. Indian Oil Corporation
Ltd
2
BEML Limited
3
LOA
Procurement of 12 Nos
M/s Tata Hitachi Construction .No.COCONTS/0017A/MI,IA&MII
Backhoes of bucket capacity not
Machinery Co.Ltd, Chennai
/Backhoes/cm/2013 dt.
less than 0.9 cum
01.01.2014
4
NSK Builders, Trichy
LOA
Alternate road form Neyveli
.No.COCONTS/0014A/TA/ROAD
Township to Mandarakuppam
S/CM/2013 dt. 20.01.2014
5
TELCO CONSTRUCTION
EQPT CO LTD
PO/11-12/003285/ENQ/1112/001143/MM03(01)
20.10.2011
6
BHARAT PETROLEUM
CORPORATION LTD
PO/11-12/005382/tc/ENQ/1112/003345/MM18(05)/10/11 PO
DATE 09.03.12
7
8
9
M/s. Hindustan Petroleum
Corporation Limited
M/s.Phoenix Conveyor Belt
India (P) Limited
M/s. Sri Krishna Explosives
and Accessories company,
Tirupati
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
5
6
Date of
completion
7
365 days.
Delivery
completion date
(09.03.13)
PRESENT STATUS
8
PO/11-12/005383/TC/ENQ/1112/003345/MM18(05)/10/11
PO Date :09/03/2012
High speed diesel oil
3691.34
LTE
PO/10-11/005313/ENQ/1011/002994/MM03(01)15.02.11
Price agreement for supply of
BEML spares
1221.6
STE
365 Days price
agreement valid
till 14.02.12
Part supply
616.28
GTE
31.03.14
Supply completed.
2628
PTE
12 Months from
Site handed over on 12.03.14. Work under progress.
handing over site
Spares for TATA HITACHI
hydraulic excavotors and
shovels as per company's price
list
529.03
LTE
365 days
High speed diesel oil
1429.89
LTE
365 days delivery
completion date Short closure under process.
(09.03.13)
LTE
365 days.
Delivery
completion date
(09.03.13)
PO/11-12/005384/TC/ENQ/1112/003345/MM18(05)/10/11
PO Date :09/03/2012
High speed diesel oil
PO/12-13/002209/TC/ENQ/1112/004203/MM02(04)/49/1
PO Date :04/08/2012
2400mm wide steel cord belt ST
4000 with top cover 14mm and
bottom cover 10mm
5334.25
GTE
PO/12-13/002603/TC/ENQ/1213/000528/MM18(03)/36/21
PO Date: 28/08/2012
High strength cartridge type
Explosive 125 MM dia. & 83 MM
dia
592.57
LTE
843.05
Short closure under process.
Part supply
Short closure under process.
365 days delivery
completion
Part Supply
(04.08.13)
365 days delivery
completion Date
Short closed.
(28.08.13)
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Cast Boster (100 gms), Cast
PO/12-13/005123/TC/ENQ/12M/s. Premier Explosives Ltd.,
Boster (250 gms) Site Mixed
10
13/001710/MM18(03)/36/21. PO
Secunderabad
Explosive High Strength. SME
date: 08.01.2013
Nominal Strength.
1416.33
Cast Boster (100 gms), Cast
PO/12-13/005124/TC/ENQ/12Boster (250 gms) Site Mixed
13/001710/MM18(03)/36/21. PO
Explosive High Strength. SME
date: 08.01.2013
Nominal Strength.
2133.63
M/s. Vetrivel Explosives Pvt
11 Ltd., Salem
Bharath Petroleum
12
Corporation Ltd Chennai
PO./12-13/006361/TC/ENQ/1213/003408/MM18(05)/10/11 PO
Date:15.03.2013
High speed diesel oil
1575.82
LTE
LTE
LTE
Date of
completion
PRESENT STATUS
1095 Days.
Delivery
Part supply
completion date:
08.01.2016
1095 Days.
Delivery
Part Supply
completion date:
08.01.2016
365 Days.
Delivery
Short closure under process.
Completion Date
(15.03.2014)
365 days.
Delivery
completion date
(15.03.14)
365 days.
Delivery
completion date
(15.03.14)
M/s. Hindustan Petroleum
13 Coporation Ltd.
PO/12-13/006362/TC/ENQ/1213/003408/MM18(05)/10/11. PO High speed diesel oil
date: 15.03.2013
929.09
LTE
M/s. Indian Oil Corporation
14 Ltd
PO/12-13/006363/TC/ENQ/1213/003408/MM18(05)/10/11. PO High speed diesel oil
date: 15.03.2013
3761.32 lakhs
LTE
supply spare parts for Russian
Pipelayes under price
agreement
3120.6
STE
365 Days
Supply completed.
596.8
LTE
365 Days
Part supply
PO/13-14/000691/TC/ENQ/1215 Industrial Spares Distributors 13/004967/mm03(01)/44/7
Dt.10.05.2013
Short closure under process.
Short closure under process.
16
BHARAT PETROLEUM
CORPORATION LTD
PO/13-14/002922/TC/ENQ/1314/000902/MM18(05)/10/11.
DT.03.09.2013
Light diesel oil IS:1460/2000
17
Hindustan Petroleum
Corporation Limited
PO/13-14/002925/TC/ENQ/1314/000875/MM18(04)10/11
DT.03.09.2013
Furnace oil conforming to
IS:1593/1982
6650.68
LTE
365 Days
Part supply
18
BHARAT PETROLEUM
CORPORATION LTD
PO/13-14/002924/TC/ENQ/1314/000875/MM18(04)/10/11
DT.03.09.2013
Furnace oil conforming to
IS:1593/1982
4433.78
LTE
365 Days
Part supply
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
19 M/s.BHEL, New Delhi
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Rs.151255.00
TPS II Expn. (2 x 250 MW) Main
LOA No. 0006H/ A01/ CT/04, Dt:
+US$21,016,0
Plant Package (Boiler, Turbo
19.8.05
00
Euro
Generators & their auxiliaries)
40,000,000
Apar Industries Ltd., Unit
uniflex cables 12/13 Jyoti wire PO/13-14/004590/TC/ENQ/1220 house 23A Shah industrial
13/004323/MM12/(04)/40/11 Dt.
estate veera desai road
29.11.2013
andheri west city,Mumbai
PO/13-14/005167/TC/ENQ/13Regenesis Industries Private
21
14/002062/MM18(3)/36/21 PO
Limited
Dt. 06.01.14
11KV, 3x185 +95/3 sq.mm. ATC
conductor, EPR insulated land
line flexible cable (as per
detailed)
1040.81
Date of
completion
PRESENT STATUS
Global
36 months for
Unit-I, 40 months
for Unit-II Extn.
EOT granted with
right to levy LD
upto 30.09.13 for
Unit-I and upto
31.12.13 for UnitII
99.29% .Unit -I:Unit is re-lighted upt on 24.08.2014 and
synchronised with grid on 25.08.2014. due to failures in seal
pot puncture, NMFJ failure and Air& Gass duct leak, Unit
was shutdown from 25.09.2014 for rectification of above
works. COD is anticipated by October 2014. Unit-II: Boiler
was first lighted up on 22.05.2013 for " Ethylene Diamine
Tetra Acetic Acid" (EDTA) cje,coa; c;eamomg amd tje
c;eamomg was completed. Steam blow out operation was
completed in August 13. Boiler was again lighted up & TG
was rolled upto the rated speed of 3000 rpm and the
electrical tests were carried out & completed on 25.10.2013.
After that the modifications were carriedout as in Unit I and
completed on 04.06.2014. Now, Boiler light up is awaiting
for the proposed modification to tbe carried out in Unit I
which mayrequire to execute in Unit II also. COD is
anticipated by October 2014.
PTE
180 days
Part supply
High strength 125 mm
997.34
PTE
730 Days.
Delivery
Part Supply
Completion Date
( 18/09/2014)
2000mm ST3150 steel cord Belt
Vulcanising equipment set.
2400mm ST4000 Belt
Vulcanising Equipment set.
655.93
GTE
240 Days .
Delively
Part Supply
completion date
18.09.2014
LTE
365 Days.
Delivery
Part supply
completion date
24.03.2015
LTE
3656 Days.
Delivery
Part supply
Completion date
24.03.2015
22 Nilos India Pvt Ltd.,
PO/13-14/005384/TC/ENQ/1314/000515/MM22(1)/23/21 PO
Dt. 21.01.2014
Hindustan Petroleum
23
Corporation Limited
PO/13-14/006453/TC/ENQ/1314/003841/MM18(05)/10/11 PO High speed diesel oil
Dt. 24.03.2014
PO/13-14/006454/TC/ENQ/1324 Indian Oil Corporation Limited 14/003841/MM18(05)/10/11 PO High speed diesel oil
Dt. 24.03.2014
1340.97
5416.06
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Date of
completion
PRESENT STATUS
PO/13-14/006455/TC/ENQ/1314/003841/MM18(05)/10/11 PO High speed diesel oil
Dt. 24.03.2014
2274.41
LTE
365 Days.
Delivery
Part Supply
completion date
24.03.2015
Phoenix Conveyor Belt India
Ltd.,
PO/14-15/000579/TC/ENQ/1314/001754/MM02(04)/49/1 PO
Dt. 09.05.14
Steel Cord conveyor Belt
2000MM Wide ST 3150
7865.17
GTE
240 Days.
Delivery
Supply completed.
completion date
04.01.2015
Phoenix Conveyor Belt India
27
Ltd.,
PO/14-15/002206/TC/ENQ/1314/004889/MM02(04)/49/1 PO
Date: 14.08.2014
Steel Cord conveyor Belting
2400MM Wide
GTE
240 Days .
Delively
Part Supply
completion date
11/04/2015
M/s BHEL (Transmission
28
Business Group), New Delhi
LOA 0011H/TS II Ex./
A08/CT/2004, Dt.11.11.05
400 KV Switchyard & Power
transformer
29 M/s. Gammon (I) Ltd.
Bharath Petroleum
25
Corporation Ltd Chennai
26
9756.24
8411
PTE
LOA 0014H/TSII.Ex./A06/ CT/04
NDCTS & RCC chimney
dt.29.12.05
5530.79
PTE
30 M/s.Mecon, Ranchi
LOA 0016H/TS II Ex./ A 02
/CT/04, Dt: 28.10.2005
Lignite Handling System
24398.2
PTE
M/s Subash Projects and
31 Marketing Ltd, (SPML)
Kolkatta-16.
Cont No.053306/0017H/ TSII
Expn./A04/ Conts. Thermal/04,
Dt:04.12.06
Circulating Water System and
Fire Protection System A04
3324.70
Lakhs
PTE
32 M/s Driplex Water Engg. Ltd.
LOA 0022H/TS II Ex./ WTP/
A05/CT/04, Dt: 29.12.2005
Supply, erection &
commissioning of Water
Treatment Plant & Effluent
treatment Plant
6272.00
Lakhs
PTE
99.25%. Trialoperation of Unit I power transformers
completed on 20.03.2012. Trial operation of Unit II power
10.07.07
transformers started on 28.08.2014 and completed on
26.09.2014
99.87%. CT-I: completed and was teken into service. Trial
operation of cooling tower 1 is completed . PG test is
25 months from
pending . CT-II: Taken in to service on 12.05.2012. Trial
the date of LOA
operation & PG tests are pending. Chimney taken into
service.
28.06.08
99.74%. Lignite Handling system was provisionally taken
over by NLC on 31.03.2013
32 Months from
the date date of 98.85%, EOT granted upto 30.06.2014.
LOA (14.11.08)
28-02-09
98.05%. Final take over of RO-DM plant by NLC was done
on 05.10.2012. Erection works completed in Effluent
Treatment Plant except some finishing works. The trial
operation of Circulating water chemical dozing system was
started on 14.11.12, but stopped on 25.11.12 since unit was
under shutdown. The trial operation of circulating water
chemical dozing system, Electro chlorination plant and
effluent treatment plant are to be carried out, while Unit is
put in to continous operation. Pre treatment plant was taken
oven by NLC on 14.06.13. Production of soft water as and
when required is taking place through pre treatment plant.
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
33 M/s BHEL, New Delhi
34
M/s Kirloskar Brothers Ltd.,
Pune.
35 M/s Thermax Ltd., Pune
36
M/s Gammon India Ltd.,
Mumbai
37 M/s BHEL, New Delhi
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Date of
completion
PRESENT STATUS
35&29 months
from LOA
(29.12.05) for PG
test of unit I & II
respectively
100% . Unit 1&2 PG test completed on 29.01.2014 and final
taken over on 07.08.2014 but issue of certificate is pending
due to completion of supply of mandatory spares, tools &
taclies, documentation and certain pending works.
053282 & 053283/ 0026H/BPP/
RA1/CONT.Thermal/04,
Dt: 10.08.06
Main Plant
(Supply Erection &
Commissioning of Steam
Generator Turbo Generator &
Auxiliaries RAI)
607,86,52,530
US$8727310
Euro
12995510
(Rs.911.44
Crores)
Global
Cont. No.53310/ 0029 H/
BPP/(2x 125 MW)/ RA4/CT/04,
Dt:20.12.06
Circulating Water System and
Fire Protection System
2506.35
Lakhs
PTE
30 months from 100%. BTPP requested to initiate action on closure of
LOA dt.17.06.06 contract.
2112.93
PTE
32 months from 100% . Note submitted to finalise the contract value to Rs.
LOA dt.12.11.08 20,68,66,149/- No claim certificate was obtained.
Induced draft cooling towers and
LOA No. 0031H/BPP/RA6/CT/04
RCC Bi-flue Chimney for
Dt. 31.05.2006
Barsingsar project, Rajasthan
3888
PTE
Cont No. 053284 & 053285/
0032 H/BPP/RA7/CT/04,
dt.18.08.06 for supply &
services respectively
7128
PTE
LOA No.
Water Pre-treatment Plant and
0030H/BPP/RA5/conts.Thermal/ D.M. Plant Package (RA5) for
04 Dt. 13.03.2006
Barsingsar Project, Rajasthan.
220 KV switch yard & Power
Transformers Package (RA7) for
BTPP (2 x 125 MW) Rajasthan
38 M/s BHEL, Bangalore
DCS (Distribution control system
CO/Conts/0010T/TS-II-ST) implementation in state II units
II/DCS/IMP/2012 Dt. 13.06.2013
(4x210 MW) of TS-II at Neyveli
39 M/s. Mecon Ltd, Ranchi
LOA.No.0033J/NTPL
(2X500MW)/CT/06 dt.31.03.07
40 M/s BHEL, New Delhi
M/s.Larsen & Toubro Ltd,
41
Chennai
30.11.2008
99.50%. PG test successfully completed and Final Take
over done on 24.12.2013 for IDCTs and 09.04.2013 for
CHIMNEY
20 months from
the date of LOA 99%. No demand certificate was issued on 19.08.2014 and
i.e., upto
No claim certificate was issued as Arbitration is in progress.
15.11.07.
Unit -I 12.06.15,
Unit II12.09.2015, Unit
III- 12.06.2015,
Unit IV12.10.2016
Posting of resident site manager and site engineers by
BHEL-EDN. Space for site office alloted by NLC. FAT
completed for EDN DCS phanels phase I 17.07.2014 to
02.08.14 and Phase II 17.09.14 to 23.09.14. LOI for civil sub
contractor was issued by BHEL on 23.08.14. Boomi Pooja
for construction of Boiler Remote I/O room performed on
28.08.14.
3990
...
Project Consultancy services
1049.24 (Euro
339000+
Taxes & duties
at actuals.
PTE
LOA No. Co/Conts./ 0014K &
0015K/NTPL/ TTPP/07,
Dt.28.01.09 (Both tenders
combined in to single order)
Steam Generator unit ESP
package (TA1-SG) & Steam
Turbine Generator Package
(TA1-TG)
319600
ICB
28.12.2012
Work in progress. EOT given up to 15.02.2014 &
30.04.2014 for completion of trial operation. firm requested
EOT upto Oct.14 and Dec 14 for Unit I and II trial operation
respectively.
LOA NoCo Conts/0026K/NTPL/
TTPP/TA8/2007, Dt:29.01.10
400 KV SWGR SwitchYard &
220 KV SWGR Switchyard
2117.40
Lakhs
(USD
8677224)
(Euro 70348)
….
24 months
from LOA
Note requesting EOT upto 31.12.2014 with levy of LD is
putup to SD.
66 months from Contracts extended upto 31.12.2014 with escalation and
LOA
without levy of LD put up to Board.
SL.
No.
42
NAME OF THE
ORGANISATION WITH
LOCATION
M/s Gammon India Ltd.,
Mumbai
43 M/s ABB Ltd., Chennai
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
PRESENT STATUS
10252
GTE
EOT upto 31.05.14 for Unit I and 28.02.14 for completion of
24 months from
whole work including successful commissioning of elevator
the date of LOA
with right to levy LD was granted.
Contract No.
Power Transformer package
053398/Coconts/0028K/NTPL/T (TA9) for TTPP (2x500MW)
TPP/TA 9/07/DT. 23.02.2010
Project at Tuticorin.
10252
PTE
34 months from Work is in progress. EOT granted upto 25.08.2014 with levy
LOA ( LOA DT. of LD for mech.completion and testing and upto 25.12.14 for
23.07.2010)
completion of PG test.
12705
PTE
33 months
from LOA
Work is in progress. EOT given upto 31.08.2014 with right
to levy LD . Note for further EOT is under circulation.
8456.67
PTE
34 months
from LOA
85% work completed as on 30.04.2014. TOT with a right to
levy LD granted upto for PG test. Unit I 30.09.2014 Unit II
30.10.2014.
PTE
7 years from
7 years (LOA date 13.01.2009) Lignite excavator under
the date of LOA
progress.
(13.01.09)
GTE
Work is under progress. EOT given upto 15.08.14 with right
19 months from to levy LD for completion of Trial operation and upto
LOA 22.02.2012 15.11.14 for completion of PG test. Nopte for further
extension is under circulation.
1770
STE
Performance test
to be completed
for BWE -I by
end of 24th
months & BWE II by the end of
39the month (
rekoned from
date of LOA)
22 & 27 months
from date of LOA Work in progress. EOT upto 31.07.2014 for Unit I & upt to
for unit-I & II
15.08.2014 for Unit II with right to elvy LD.
Resply.
CONTS/0027K/NTPL/
TTPP/TA6/2007, Dt:29.01.10
Power Transformer Package for
TTPP
44
M/s.Gammon India Ltd.,
Mumbai
LOA
2 Nos Draft Cooling Tower for
No.CoConts/0029K/NTPL/TTPP
NTPL Project
TA6/2007,
Dt: 12.03.10
45
M/s.Kirloskar Brothers Ltd
Pune
LOA Co CONTS/0038
K/NTPL/TYTPP/TA4/08,
Dt: 31.10.09
Circulating Water systems
M/s BCL FGM Consortium,
46
New Delhi
Contract No. 053367
CoConts/007M/BLMP/
Lig./OS/2008, Dt.11.06.09
Lignite Excavation. Hiring of
Crawler Mounted Shovels / Hyd
Exe Backhoes, Dumpers at
Barsingsar Lignite Mines
9086
M/s. Tecton Engineering &
47 Construction LLC Agman,
UAE
Co. Conts/
0014M/NTPL/TTPP/TA5/
2008, Dt:23-7-10
Desalination Plant and Water
Treatment Plant Package (TA 5)
for Tuticorin Thermal Power
Project.
Rs.16551.18
USD
2011718
48 M/s Seimens Mumbai
Date of
completion
LOA.No. Coconts/0034P/MRejuvenation BWEs 146 & 147
II/BWEs/146&147/Rejuv/Elec201
electrical Portion.
0. dt. 08.06.11
49
M/s.Energo Engg.Projects
Ltd.,New Delhi
LOA No.Co.Cons/0023
M/NTPL/TTPP/TA-3/2008,
Dt:08.4.10
Ash Handling Plant & Auxillaries
Package (TA3)
5994.1
GTE
50
M/s.Energo Engg.Projects
Ltd.,New Delhi
LOA No.0031M/HTSII
Expn./A03/Ph-II/CT/08,
Dt: 12.02.2010
Ash Handling System (A03)
Phase-II, TPS-II Expn
1609.5
PTE
15 months
from LOA
BWE I performance test conducted on 15.11.2013.
supplies to BWE II has been completed dismantling
completed Re- erection including strengthening under
progress.
75% Work is in progress. EOT upto 30.10.14 with right to
levy LD to complete initial operation of AHS was granted.
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
51
M/s. Sical Logistics Ltd,
Chennai
LOA No.CoConts/0017P/NTPL/
CWALCont. Thermal/10
dt.21.09.12
Transportation of Coal from MCL
to Tuticorin Port via Port
Praradip
90674.67
Lakhs
PTE
52
M/s. Lahmeyer International
India, Gurgaon
LOA No.Coconts/0020P/
NTPL/2010, dt.09.02.11
Consultancy Services for New
Thermal Power Project
1298.00
Lakhs
PTE
53 M/s. MBE, Kolkatta
54
55
56
LOA (1) Coconts/0022P/ MI/BWE/2010
dt.28.03.11
1 No. 700 L BWE
LOA (2) Coconts/0022P/MI/BWE/2010 dt.28.03.11
M/s. NICCO Power Project
Pvt., Ltd., New Delhi
Relocation of 4 X 20 MVA
LOA No.Coconts./
33KV/11.55KV/Sub-station at
0024P/MIA/SS/2009, dt:08.10.10
Mine-IA
M/s Mather & Platt Pumps
Ltd, Mumbai
LOA No.Coconts/
0026P/NTPL/TTPP/TD1/2010,
DT 19.03.12
M/s. TKF, Germany & M/s.
TKIIL, Pune
LOA No.CoConts/0033P/M-II/
BWEs/146 & 147/Rejuv./2010
dt.08.06.11
LOA
No.CoConts/0037P/NTPL/TC2B/
2010 Dt..17.03.12
LOA
58 M/s. Jyothi Limited, Vadodara No.CoConts/0041P/NTPL/TC2A/
2010 Dt..17.03.12
57
M/s Ramsky Infrastructures
Limited, Hyderabad
Fire protection system package
(TD1) for NTPL Power Project
Supply 10957
Mtce - 600
Lakhs
GTE
711.14
PTE
6039.48
Date of
completion
PRESENT STATUS
54 months from
LOA or 36
months from
supply of Coal by Supply of Coal by NTPL is likely to be in October 2014.
M/s.NTPL,
whichever is
earlier
08.08.2016
Work In progress.
30 months from
LOA Mtce upto
TOT (2 months)
The equipment commissioned on 15.09.2014.
during warranty &
3 years after
warranty.
7.10.2011
No extension of time was considered after 31.03.2014.
PTE
20 & 25 months
for completion of Work in progress. EOT given upto 31.08.14 with right to
PG test of Unit I levy LD. Firm requested for EOT upto 28.02.2015. Note for
& II respectively EOT upto 31.12.14 is under approval.
from date of LOA
Performance test
to be completed
for BWE-I by end
of 24th month &
BWE-II by the
end of 39th
month (reckoned
from date of
LOA)
BWE I performance test conducted on 15.11.13. supplies to
BWE II has been effected on 24.10.13. Dismantling
completed, re-erection including strengthening under
progress.
Rejuvenation BWEs 146 & 147
Mechanical Portion.
992.00
Euro 5055.32
STE
See water RCC intake channel
and outfall pipe lines
6689
PTE
12 months from Work in progress. EOT given upto 30.03.14 with right to
the date of LOA levy LD for completion of whole works.
Circulating water System and
outfall system
3855
PTE
12 months from 50% Mehcanical supply, 55% Electrical supply , 47% Civil
the date of LOA works. EOT upto 31.05.14 with a right to levy LD.
SL.
No.
59
NAME OF THE
ORGANISATION WITH
LOCATION
M/s. DEE Tech Projects Pvt.
Ltd
60 M/s. TRF Limited
CONTRACT NO.
LOA.No. CoConts/042P/ NTPL/
TTPP/GWC/ SWP/TC/3B
dt.07.12.11
LOA.No. CoConts/0004R/ NTPL/
TTPP/Sh Unloader/2011
dt.19.05.12
LOA NoCo
Conts/0010RNTPL/NRB/2011
DT.06.02.2012
BRIEF DETAILS OF THE
MATERIALS PROCURED
PTE
12 months from Work in progress EOT given upto 30.06.14 with right to levy
the date of LOA LD.
Shore Unloader 2 Nos. 2000
TPH
8622
PTE
18 months from Note requesting EOT upto 30.09.2014 with levy of LD putup
LOA
to SD.
672.14
PTE
18 months from
The work front is handed over to the firm on 07.03.2012.
the date of
work in progress. EOT given upto 31.07.2014 with right to
handing over of
levy LD. Note for EOT upto 31.10.2014 is under circulation.
site
7287.5
PTE
30 months from
Work in progress. Approval has been given for
date of LOA (i.e
enhancement of quantity by 20%.
02.02.2012)
Procurement of 2 Nos. 1400 Lit.
Bucket Wheel Excavators
20614.51
Euro
13,944,460
GTE
36 moths from
Supplies completed. Erection 1st machine - 80.4% , 2nd
date of LOA (i.e
Machine 66.37%.
05.07.12)
Establishing Data Centre & Data
recovery centre along with SAPERP
1599.99
PTE
12 months from Work under progress. EOT given upto 26.08.14 with right to
the date of LOA levy of LD.
Construction of non- residential
buildings for NTPL township at
Tuticorin
62
M/s.Mahalakshmi Infra
Cont.No.53454/Coconts/0018R/ Outsourcing of Overburden
contract Pvt.Ltd., Ahmedabad Mine1A/2011 dt.17.03.12
Removel of Mine-1A
63
M/s. Takraf India Pvt.Ltd,
Chennai
65 M/s L&T Chennai
66
M/s Leitwind shriram Mfn.
Chennai
PRESENT STATUS
1192
M/s Abiram Infra projects,
Hydrabad
64 M/s.Wipro Limited
Date of
completion
Storm water pumping
Arrangements for NTPL
61
LOA No. CO
CONTS/0022R/BWE/M-II/2011
dt.05.07.12
LOA
No.CoConts/0007T/CO/DC&DR/
2012, dt.29.10.12
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
LOA NO. CO
CONTS/0001A/MIA&MI
IBWE/2013 Dt. 31.10.13
Procurement of 2 nos 700 Lit
BWEs for Mine I & Mien-II and
maintenance.
10417.6 +
O&M 1276.1
Euro
99,65,642.00
GTE
within 36 months 95% drawings approved. M/c 1 supplies (Indi) 24.56% M/c 2
(i.e. 31.07.16) supplies (Indi) 14.09% completed.
LOA CO CONTS/0006T/Wind
Farm/2012 Dt. 26.08.2013
Procurement of Land Design,
Manufacture, supply, erection,
testing commissioning,
synchronization with grid,
Handing over, Guaranteeing, of
51Mw wind farm complete at
Kaluneerkulam Tamil Nadu and
O&M
33252+O&M
1462
PTE
10 Months from
26 lands registered in favor of NLC. Two wind Mill
LOA and 5 years
commissioned on 29.08.2014 & 01.09.2014. Time
from
extension given upto 31.10.2014 with right to levy LD.
commissioning.
48 months for
unit I and 54
Steam Generator & auxiliaries
208908 Euro
months for unit II
67 M/s BHEL
package TA1 for NNTPP (2x500
PTE (ICB)
Contract signed on 02.04.2014 . Work under progress.
56.350 Million
from the date of
MW)
LOA for trial
operation.
LOA No.
Project Consultancy services
M/s Desien Private Ltd., New
1091.07 USD
68
CoConts/0010A/NUPPL/Proj.con NUPPL for New Thermal Power
PTE (ICB)
30.01.2020
Work In Progress.
Delhi
222976
sy/2013 dt. 31.12.2013
Project.
LOA No.
CoConts/0014T/NNTPP/NTA1SG/2012 Dt. 31.10.2013
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
69 M/s BHEL
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
LOA No.
CoConts/0015R/NNTPS/MTA2T Turbo Genrator (NTA2)NNTPS
G Dt. 23.12.2013
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
102268
Date of
completion
PRESENT STATUS
42 months for
Unit I and 48
PTE (ICB)
Work commenced.
months for Unit II
from LOA date.
ST-33/A-79
Maintenance of 3 Nos. of
1400LTr BWE (L&T-1,2,3), 1 no
of 700 Ltr BWE (L&T) and 3
Nos. of MTC's (7,8,9) in MII for
three years.
11400
....
Three years
(06.09.15)
66.66%
71 M/s TAKRAF
EST-88/A-45
Maintenance of one no,of 4420
Cu M/hr MTC-10 and on no of
20000 TPH SPR(SPR -IV) in
Mine II for three years
1526
...
29.02.2016
50.00%
72 M/s Thyssenkrupp
LOI (121)/EST-90/A-14
Maintenance of two now of
700ltr BWE 1649 & 1650 for
three years
4050
…
31.012.16
25.00% This agreement value included both BWE 1649 of
MI and BWE 1650 of MII.
7997
PTE
29.06.2007
100% Completed. Final reconciliation is in progress and
conditional No claim certificate was issued as arbitration is
in progress.
70 M/s. L&T
73
M/S IVRCL, I&P LTD
Hydrabad
053273/0033H/BPP/RA8/cont/th
Water Carrier system
ermal/04 dt. 22.05.2006
74 M/s. Telcon. Co., Chennai
053364/0017/M/M-I,M-II&M-II
Expn/Backhoe/2008 dt.
06.04.2009.
MII Expansion - Full
maintenance contract for 7 years
for 7 Nos. of Backhoes.
692.05
PTE
22.06.16
71.86%
75 M/s. Telcon. Co., Chennai
MII Expansion - Full
053364/0017M/M-I,M-II & M-II
maintenance contract for 7 years
Expn./Backhoe/2008 dt.06.04.09
for 9 Nos. of Backhoes.
889.78
PTE
22.06.16
73.26%
Agt.No.GM/MI-A/
NA/SMD/A03/90600320/14/1213 Dt.22.06.12
Transportation of Lignite from
Mine-IA Bunker to Mine-I Bunker
(9.0 lakh T)
676.06
PTE
30.08.2014
77 M/s.Sushee Infra Pvt. Ltd.
GM/C/37/11-12
lakhs)
Site grading, deepening of lake,
diversion of drain, construction
of bridges, surplus weir, check
dams etc. for 2x500 MW NNTPS
at Neyveli.
827.28
(updated)
.....
6 months
66.66 %. EOT upto 30.09.2014 receiving right to levy LD.
Grading work at all levels completed and civil workwill be
completed shortly. About 5% of the work is pending.
78 M/s.NSK Builders Pvt. Ltd.
GM/C/04/12-13
(Rs.663.76
lakhs) I Suppl GM/C/42/12-13
Formation of internal roads Rs.2.97 lakhs , 2nd Suppl.
Phase-I for 2x500 MW NNTPS
Proposal for a value of Rs. 47.10 at Neyveli.
lakhs approved.
6 months
63.00 %. The contractor has completed their scope of work
at 71m and 69M levels. The contractor has stopped the
work at 67M level and requested short closure of the
agreement as a portion of site was not handed over in time.
the request is being examinend by NLC. Legal opinion from
senior lawyer has been sought.
76
M/s. Chettinad Logistics (P)
Ltd
(Rs.751.38
(Original) 620
(Up dated)
687.58
......
97.35%. Work under progress.
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
79 M/s IVRCL Ltd, Hydrabad
80 M/s MBECL Kolkatta
CONTRACT NO.
LOA NO.
45/NLc/BP/CM/C&P/T039/S3/1112 Dt. 28.12.2011
A-92/147/NLC/BP/T040/S4/O&M/Lignite &Lime
handling /STE/11-12 Dt.
31.01.2012
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Date of
completion
PRESENT STATUS
O&M Contract for Water carrier
system (for 3 Year)
546
.......
3 years
88%. Work is in progress.
O&M Contract for Lime and
Lignite handling system
1404
......
3 years
91.60. work is in progress.
81
M/S. TCE Consulting Engg.,
Bangalore
Con.No.069/10E/HTS II
Expn./Cons/2002, dt: 01.09.04
Consultancy services for TPS- II
846.8
Euro135436
PTE
18.05.2009
Contract extended upto 30.03.2015 for a value of Rs.849.16
L & Euro 135436 from Rs.840.60 L & Euro 135436.
82
M/S. TCE Consulting Engg.,
Bangalore
076/001G/HTS®/PRCONS/2013
Consultancy services for BTPP
2x 125 MW), Rajasthan
695
PTE
30.09.2014
96%. TCE Contract extension till 30.09.2014. Further no
extension is required.
83
M/S. TCE Consulting Engg.,
Bangalore
LOA 001G/HTS(R)/PRCONS./2003,Dt: 23.06.2005
Project consultancy services for
Barsingsar Thermal Power
Project Rajasthan
519
..
84
M/s Mc Nally Bharat Engg.
Co.
LOA 0024H/HTSII
Expn./A03/CT/2004, Dt:31.5.06
TPS-II Expn. (2 x 250 MW) Ash
Handling system (A03) Package 3830.33 Lakhs
–
Phase-I
PTE
24 months from 75% . System was put in to trial operation as and when the
the date of LOA unit was in service since 13.11.2013 and the 30 days
operation has completed in 05.09.2014 for Unit I
(31.05.08).
85
M/s Mc Nally Bharat Engg.
Co.
LOA 0027H/BPP/RA2/CT/04,
Dt:17.06.06
Lignite and lime stote handling
ysytem oackage (RA2) for
Barsingsar Power project
17689
PTE
31 months from 99%. Guarantee period is completed on 03.04.2014 and No
the date of LOA demand certificate from NLC side was issued for providing
(16.1.09)
No claim certificate by the contractor.
86
M/s. Tecpro Ashtech Ltd.,
Pune.
LOA 0028H/BPP/RA2/CT/04,
Dt:02.08.2006
BPP at Rajasthan (2 x 125 MW)
– Ash Handling System (RA3
package)
2447
PTE
26 months from 94%. EOT without levy of LD granted upto 31.10.2014 to
the date of LOA complete works related to PG test activities and conduct PG
(01.10.08)
test of both units I & II
M/S ANSALDO
87 THOMASSEN B.V.,
NETHERLANDS
Lr. No. 283/GM/TPS-I
Expn./cont./2500/T.No.012(1314/TM/W.O/2013 DT.
30.09.2013
Euro 1161000/Repairing of IP-LP Turbine rotor
(INR) 951.67
removed from Unit -I of TPS - I
( Un Revealed
Expansion.
basis)
88 M/s. ECCI , Chennai
GM/MI/NAMC/MSU/7000315/
15/10-11
Construction of CERS including
internal Electrification in B&C
Area
699.98
PTE
GM/MI/NAMC/MSU/7000373/
17/10-11
Improvement works to AO
Building, canteen, sub station
stores, water supply sanitary
arrangements, roads culverts etc
including electrification work in
B&C area
692.41
PTE
89
M/s. Senthil Construction,
Chennai
..
15.04.2010 ( 66
months from
LOA)
Work in progressEOT granted upto 30.09.2014 without levy
of LD. Contrator has been intimated that the contract will
come to a close on 30.09.2014 as the works are completed.
7 months from
the date receipt
100% Status as on 30.09.14
of the Rotor at
firm,s workshop
27.09.2014
work completed.
EOT sought upto
93% of work completed. Balance work in progress.
31.01.2015
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
CONTRACT NO.
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Date of
completion
PRESENT STATUS
90
M/s. Renaatus Projects
Private Limited, Erode
Construction of Central
GM/MI/NAMC/MSU/70000407/2
workshop and allied works in
1/10-11 dt:28.12.10
B&C area
1557.94
PTE
91
M/s Energo engineering
projejcts Ltd
53341/cont.II/co/conts.0007K/RP Maintenance of LHP(up to TOT
/mines/lhp/07/ Dt. 28.02.2008
& during warranty period)
2199.6
PTE
3 years
92
M/s N.S.K Builders (P)
Limited, Trichy.
LOA.No. COCONTS/0019A/TSII General Civil works Phase II,
EXPN/C02 Gr.II/2013 Dt.
Group II roads & Drains in TPS
20.02.14
II Expn.
893.38
PTE
19.06.2015
93
M/s Durga Construction Co.
Vadodara
LOA.No.Coconts/0020A/BP/C/M/
OB removal work at Barsingsar
OBR/2013 DT. 11.02.14
31595.28
PTE
7 Years from
11.02.14
94
M/s Essar Projects India Ltd, Co Conts/0031P/NNTPP/NTA3- Balance of Plant Package (nta3)
Mumbai
BOP/2010 Dt. 30.04.14
for NNTPP (2x500MW)
115907
GTE
45 months from
Kick off meeting held on 26.05.14. work under progress.
the date of LOA
7460
PTE
9 months from
Contract signed on 25.09.2014.
the date of LOA
9629
PTE
24 months from
the date of LOA Contract singed on 14.07.2014
i.e. 09.05.2014
555.68
PTE
18 months from
the date of LOA (
Drilling works are under progress.
i.e. from
11.04.14)
Supply of 0.864 MMT of
Cont.No.
Imported Coal Non- Cooking
053499/COConts/0004B/LTE/NT
(Steaming ) coal of TWO
PL-Coal/2014 Dt. 12.09.2014
quantities ( Indegenous origin)
41859.71
LTE
95 M/s BHEL, Chennai
LOA No. Coconts/0025A/PV
10MW (AC) Solar Power Plant
solar Power/CM/13, Dt. 03.04.14
96
M/s Mahalixmi Infra Contract LOA No. CoConts/0021A/ Mine
Pvt Ltd., Ahmedabad
I/OBR/2013 Dt. 09.05.14
97
M/s Mining Associates
Pvt.Ltd., West Bengal
98 M/s MSTC Ltd.
OverBurden Augmentation &
debris removal Mine I
Contract No.
Detailed exploration of 16000
053492/Coconts/0023A/Geology
mts. At 400 mts. Grid interval in.
0Drilling /CM/13, Dt. 12.06.14
EOT approved
91% of work completed. Balance work in progress.
upto 31.10.2014
120 Days from
LOA
CI=100%, CII=100%, CIII=100%
There is no significant progress. The firm is mobilising the
resources, but it is very slow.
Work under progress.
Contract Signed on 12.09.2014 CPG furnished by the firm.
99
M/s Thyssen Krupp Idustries
India Ltd., Pune
LOA No. Co Conts.0027A/MII
BWEs/1571/&1572/
Mech/Rejuvn/13 Dt. 01.09.2014
Rejuvn of BWEs 1571 & 1572 (
for indign Mech Portion)
1090.06
STE
Upto end of 29th
month from the LOA acceptance received CPG & APG furnished.
date of LOA
100
M/s Thyssen Krupp Idustries
India Ltd., Pune
LOA No. Co Conts.0027A/MII
BWEs/1571/&1572/
Mech/Rejuvn/13 Dt. 01.09.2014
Rejuvn of BWEs 1571 & 1572 (
for imp. Mechl. Portion)
Euro
5,219,964
STE
Upto end of 29th
month from the LOA acceptance received.
date of LOA
SL.
No.
NAME OF THE
ORGANISATION WITH
LOCATION
101 M/s Siemens Mumbai
CONTRACT NO.
LOA No. Co Conts.0028A/MII
BWEs/1571/&1572/
Elecl/Rejuvn/13 Dt. 01.09.2014
Contract No.
M/s Takraf GMBH Germany & 053485/Coconts/0024A/Man
Takraf India, Chennai
spr.I&II/Modification /2013 dt.
11.02.14
LOA.No. Coconts
M/s National Insurance Co.
103
/001B/Ins/Contract/14/oroder
Neyveli
placement / dt 24.03.14
M/s Diamond Infra
GM/MI/NA/MSU/70001066/Agt.N
104 Construction (P) Ltd.,
o. 52/13-14 Dt. 28.12.11
Chennai.
102
BRIEF DETAILS OF THE
MATERIALS PROCURED
VALUE OF
THE
MODE OF
CONTRACT
TENDER
(Rs. in Lakhs)
Date of
completion
PRESENT STATUS
1335.91
LTE
Upto end of 29th
month from the LOA acceptance received. CPG furnished.
date of LOA
3656.57
STE
Within 12 months
from LOA (i.e. Engineering completed supplies yet to be commenced.
06.01.15)
525.43
PTE
One year from
01.04.14 to
31.03.15
Construction of New GVTC in
Block - 20 of Neyveli Township
687.16
PTE
31.05.15
Rejuvn of BWEs 1571 & 1572 (
for Elecl. Portion)
Modification supply and
supervision of replacement of
components for Mine II man spr.
I & II
Insurance policies of assets and
stocks of products & services
unit of NLC
….
38.4% work completed. Balance work in progress.
105 M/s Rason Earth Movers
Agt.No. CGM/M-II/SMD/PT24/2012-13/A-161/2013-14
Desilting of Walaja Tank,
Strengthening the Tank Bund
and other allied civil works.
1371.71
…
02.09.2015
67.57%
106 Shri. C. Vadivelu Contractor
Permanent diversion of
Agt.No. CGM/M-II/SMD/PT-58/AParavanar along LA boundary
153/2013-14
including formation of bund.
762.83
…
11.06.15
20.97%
PTE
730 days from
the date of
commencement
of work
44.5% of work carried out upto 30.09.2014.
Transportation of ash slag
clinkers from Boiler areas of
Units 1 to 7 in TPS II
M/s Ayyakkannu & Co
107
Neyveli
Agt No.10241
108 M/s.Mecon, Ranchi
Project Consultancy services for
LOA No.CoConts/0008N/Bithnok
Bitnok Power project (1 x 250
PP/Proj. Cons./09, dt.17.03.10
MW)
529.88
756
Euros1480+
1171000
…
Environment clearance for Bithnok Mines is yet to received
58 months from .M/s Mecon has been requested to come for a meeting to
LOA
discuss and finalize various details fro combining project
services of both Barsingsar & Bithnok.