Business Plan for Bihar State Power Transmission Company for

advertisement
Revised
Bihar State Power (Holding)
Company Ltd.
Business Plan for Bihar State Power Transmission
Company for control period from FY 2013-14 to
FY 2015-16
Business Plan prepared as a part of regulatory filing under MYT framework of BERC.
November, 2012
Business Plan for Bihar State Power Transmission Company
THIS SPACE IS INTENTIONALLY LEFT BLANK
Business Plan for Bihar State Power Transmission Company
TABLE OF CONTENTS
1
INTRODUCTION ......................................................................................................... 5
Background ......................................................................................................................... 5
STU Scope/ Duties ............................................................................................................. 6
Unbundling of BSEB .......................................................................................................... 6
Approach to Development of Business Plan ................................................................... 6
PROFILE OF BIHAR STATE POWER TRANSMISSION COMPANY ......................... 8
TRANSMISSION BUSINESS – ISSUES AND CHALLENGES .................................. 11
Demand-Supply Projections ............................................................................................ 11
Transmission & Distribution (T&D) Losses .................................................................... 13
Financial health of Power Sector in Bihar ...................................................................... 13
Other Key Challenges ...................................................................................................... 14
BUSINESS PLAN FOR BIHAR STATE POWER TRANSMISSION COMPNAY ..... 16
Key Objectives .................................................................................................................. 16
Proposed Capital Expenditure ........................................................................................ 17
Capitalisation Schedule ................................................................................................... 23
Funding of Capex ............................................................................................................. 23
ANNEXURES ................................................................................................................... 25
Bihar State Power Holding Company
Page 3
Business Plan for Bihar State Power Transmission Company
List of Tables
TABLE 1: TRANSMISSION - EXISTING INFRASTRUCTURE ................................................................................. 8
TABLE 2: PROJECTED POWER AVAILABILITY (MW) ..................................................................................... 11
TABLE 3: 18TH ELECTRIC POWER SURVEY PROJECTIONS (MW) .................................................................. 12
TABLE 4: TRANSMISSION & DISTRIBUTION (T&D) LOSSES ........................................................................... 13
TABLE 5: CASE-2 IPP PROJECTS ................................................................................................................... 17
TABLE 6: YEAR WISE CAPITAL INVESTMENT PLANNED FOR TRANSMISSION FUNCTION ............................... 18
TABLE 7: BSEB TRANSMISSION - CAPITAL INVESTMENT PLAN..................................................................... 18
TABLE 8: REQUIREMENT RELATED TO TRANSMISSION SYSTEM DURING 12TH PLAN TO MEET LOAD DEMAND
PROJECTED IN 18TH EPS AND TO EVACUATE POWER FROM PROPOSED NEW TPS. (BRGF) .................. 19
TABLE 9: IMMEDIATE REMOVAL OF EXISTING TRANSMISSION CONSTRAINTS, TO BE IMPLEMENTED DURING
2012-13 AND 2013-14 (BRGF) .............................................................................................................. 21
TABLE 10: ON-GOING ADB FUNDED SCHEME TO BE IMPLEMENTED BY FY 2014-15 ..................................... 22
TABLE 11: CAPITALISATION SCHEDULE ........................................................................................................ 23
TABLE 12: SCHEME WISE C APITALISATION ................................................................................................... 23
TABLE 13: FUNDING OF CAPEX...................................................................................................................... 23
TABLE 14: LENGTH OF TRANSMISSION LINES (CKM) TO BE ADDED ............................................................. 24
TABLE 15: NO. OF SUBSTATION TO BE ADDED................................................................................................ 24
TABLE 16: 400 K V SUBSTATIONS ................................................................................................................... 25
TABLE 17: 220 K V SUBSTATIONS ................................................................................................................... 25
TABLE 18: 132 K V SUBSTATIONS ................................................................................................................... 25
TABLE 19: 400 K V LINES ............................................................................................................................... 26
TABLE 20: 220 K V LINES ............................................................................................................................... 26
TABLE 21: 132 K V LINES ............................................................................................................................... 26
TABLE 22: 33 KV LINES ................................................................................................................................. 27
TABLE 23: PLANNED AUGMENTATION/ REPLACEMENT/ R&M....................................................................... 28
Bihar State Power Holding Company
Page 4
Business Plan for Bihar State Power Transmission Company
1
Introduction
Background
1.1
Bihar State Electricity Board (“Board” or “BSEB”) originally constituted on 1st April 1958 under
Section 5 of the Electricity (Supply) Act, 1948 and was engaged in the management of
electricity generation, transmission, distribution and related activities in the State of Bihar.
1.2
Under the new 'Bihar State Electricity Reforms Transfer Scheme 2012', the BSEB has been
unbundled into five companies: Bihar State Power (Holding) Company Limited (Holding
company), Bihar State Power Transmission Company, Bihar State Power Generation
Company, South Bihar Power Distribution Company and North Bihar Power Distribution
Company with effect from 1st November’ 2012 vide notification no: iz0@cksM Z iqu0Z la0&31@2008
¼[kaM&1½ 17
a)
“Bihar State Power (Holding) Company Limited” means the Company that will own
shares of newly incorporated reorganized four companies i.e. Bihar State Power
Generation Company Limited, Bihar State Power Transmission Company Limited, South
Bihar Power Distribution Company Limited, and North Bihar Power Distribution Company
Limited
b) “Bihar State Power Generation Company Limited” means the Generating Company to
which the Generating Undertakings of the Board
c) “Bihar State Power Transmission Company Limited” means the Transmission
Company to which the Transmission Undertakings of the Board
d) “South Bihar Power Distribution Company Limited”, “North Bihar Power
Distribution Company Limited”, collectively mean the Distribution Companies, to which
the Distribution Undertakings of the Board.
1.3
The BERC in exercise of power vested in it section 62(1) (d) read with section 62(3) and
section 64(3) (a) of the Electricity Act 2003 and the BERC Terms and Conditions for
Determination of Tariff Regulations, 2007 and other enabling provision in this behalf, issued
Tariff order for FY 2012-13 for the supply of electricity by erstwhile BSEB in the state of Bihar.
In this Order, the BERC also issued directions to erstwhile BSEB to prepare separate
Business Plans for Generation, Transmission and Distribution functions and submit Multi Year
Tariff petition for Three years commencing from FY 2013-14.
1.4
Accordingly, the erstwhile BSEB, in compliance with the BERC Terms and Conditions of Tariff
Regulations, 2007 has prepared a separate Business Plan for Transmission function for the
three year control period beginning with FY 2013-14. With unbundling of erstwhile BSEB from
1st November, 2012 the Holding Company (on behalf of Bihar State Power Transmission
Company) has prepared Business plan for the three years control period (from FY 2013-14 to
FY 2015-16) for the Transmission Company (Transco).The objective of the Business Plan is
to project the Capital Investments, Financing costs, various expenses and performance of the
Transmission function of BSEB during the MYT control period.
Bihar State Power Holding Company
Page 5
Business Plan for Bihar State Power Transmission Company
STU Scope/ Duties
1.5
The Electricity Act, 2003 under Section 39 mandates following duties to be discharged by the
State Transmission Utility (STU).
•
•
•
•
1.6
Transmission of Electricity through intra-state transmission system
Planning and Co-ordination relating to intra-state transmission with CTU, State
Government, Generators, Regional Power Committees, Authority and Licensees.
Ensure development of an efficient, co-ordinated and economical system of intra-State
transmission lines for smooth flow of electricity from a generating station to the load
centres
Provide non-discriminatory Open Access to its transmission system for use by any
licensee, generating company or consumer at specified charges approved by the state
commission.
Considering the above stated duties of STU, business scope for Transmission Company
essentially covers the following:
•
•
•
•
Planning and development of a properly co-ordinated intra-state transmission system in
its Capital Investment Plan.
Provide access to Transmission facilities to the State distribution utilities and any other
user of the Transmission system, on payment of transmission charges.
Provide long-term and short-term open access to consumers on payment of requisite
transmission and other charges approved by the State commission.
Explore and develop the new dimensions of business from growth perspective and
enhance value.
Unbundling of BSEB
1.7
As a result of the adoption of Electricity Act 2003, the Board has been unbundled into one
holding company, one Generation Company, one Transmission Company and two
Distribution Companies. These companies will maintain separate books of accounts and will
be exclusively responsible for their own revenue generation/ financial viability.
Unbundling of BSEB
Approach to Development of Business Plan
1.8
The Business Plan for the Transmission Company is prepared based on the review of
Bihar State Power Holding Company
Page 6
Business Plan for Bihar State Power Transmission Company
erstwhile BSEB’s Transmission profile, challenges faced in intra-state transmission and
operational performance. While preparing the Business Plan, past trends of various
parameters has been considered so as to project the same appropriately for the years
covered under the control period.
1.9
Broadly, the capital investment is determined based on the analysis of projected demand
growth in electricity distribution sector commensurate with the economic growth in the state,
and generation capacity additions/ increased evacuation requirement vis-à-vis the available
transmission capacity. Further, based on these growth projections, requirement of additional
transmission lines and substations or augmentation of existing transmission capacity and
replacement of transmission lines are planned.
1.10
Accordingly, the Transmission Business Plan for the control period would include following:
1.11
•
Capital Investment Plan: Capital investments in the transmission function are required
for both, addition of new lines and substations necessary for allowing flow of increased
power onwards to the distribution utilities as well as system strengthening and
improvement schemes for increased reliability and grid stability. The planning of Capital
Investment is essentially commensurate with the anticipated load growth and quality
improvement measures. The Capital Investment Plan broadly includes the proposed year
wise Capital Investment towards new assets to be added and R&M at different
transmission voltages.
•
Capitalisation schedule and Funding of Capex: The Business Plan also includes the
schedule of capitalisation for the proposed investments, separately for the new schemes
and for R&M works. Considering the year wise amount envisaged under BRGF, the
funding of Capital Investment has been proposed.
•
Major Transmission Assets: The major Transmission Lines and Substations proposed
to be added, R&M and augmentation works along with capacity additions have also been
summarised in this Business Plan.
Each of the above mentioned components of the Business Plan has been detailed out in
subsequent chapters. The Business Plan has been prepared according to the BERC Terms
and Conditions of Tariff Regulations, 2007, the Electricity Act, 2003 and applicable rules/
regulations/ provision of the law, Standard Accounting Practices and generally accepted O&M
norms etc.
Bihar State Power Holding Company
Page 7
Business Plan for Bihar State Power Transmission Company
Profile of Bihar State Power Transmission Company
2.1
BSEB was originally operating as an integrated utility and a deemed State Transmission
Utility (STU) taking care of intra-state transmission of power in the State of Bihar. After
unbundling, the entire transmission assets of the erstwhile BSEB were transferred to the new
Transmission Company
Main functions and duties of Bihar State Power Transmission Company Limited:
a) The Company shall be primarily in the business of transmission of electricity and it shall
be vested with the transmission assets, interest in property, rights and liabilities of the
Bihar State Electricity Board (The “Board”) necessary for the business of transmission, as
per decision of the Government of Bihar to reorganize the Board under the provisions of
Part-XIII (Reorganization of Board) of the Electricity Act, 2003 (and the transfer schemes
notified thereunder) and the resolutions, circulars, ordinances and notifications issued in
this regard. The company shall act as Transmission License under the Provisions of
Section 14 of the Electricity Act, 2003 and the company shall also act as State
Transmission Utility if notified by the State Government under the provisions of Section 39
of Electricity Act, 2003.
b) To undertake planning and coordination activities in regard to intra-State Transmission,
works connected with the intra-State Transmission in the State of Bihar, to introduce open
access in transmission on payment of transmission charges and such other functions as
may be assigned to the company by law or otherwise by Government or Government
Authority concerning the operation of the Power System and to ensure development of an
efficient, coordinated and economical system of intra-State Transmission lines for smooth
flow of electricity from a generating station to load centers and to provide nondiscriminatory open access to its transmission system as per the provisions of the
Electricity Act, 2003.
c) To plan, acquire, develop, establish, construct, take over, erect, lay, operate, run,
manage, hire, lease, buy, lease, buy, sell, maintain, enlarge, alter, work and use,
renovate, modernize, electrical transmission lines and / or net works through various
voltage lines and associated sub-stations, including cables, wires, accumulators plants,
motors, meters, apparatus, computers and materials connected with transmission,
ancillary services, telecommunication and tele-metering equipment.
d) Load dispatch function.
e) CRITL function.
f)
2.2
Any other function as assigned by the holding company
Primarily, the transmission of power in Bihar takes place at 400 kV, 220 kV and 132 kV
voltage levels. The transmission network of Transco consists of 85 substations and
approximately 6,400 Circuit Kilometres (CKM) long transmission lines. The transmission
system is capable of transmitting 5418.5 MVA of power. The details of existing transmission
st
infrastructures on 31 March, 2012 are tabulated below for reference:
Table 1: Transmission - Existing Infrastructure
Voltage
400 kV
No. of
Substations
-
Line Length
(CKM)
75
Transformer Capacity
(MVA)
-
220 kV
9
1,147
2450
132 kV
76
5,178
4588
Total
85
6,400
Bihar State Power Holding Company
Page 8
Business Plan for Bihar State Power Transmission Company
Energy Scenario
2.3
The power supply position in the State of Bihar remained very poor and consequently the
peak demand deficit in the State has comparatively remained worse than the national
average for the country. The deficits in terms of energy availability and peak demand for Bihar
in FY 2010-11 were 13% and 22.5%; whereas the same at national level were 8.5% and 9.8%
respectively. As per CEA’s report, the peak deficit was around 14.4% and energy requirement
deficit was 21.3% for FY 2011-12. The details are represented in the charts below:
15000
21.3%
14000
20%
16.4%
13000
12000
24%
14.4%
13.3%
16%
13.0%
11000
12%
10000
8%
9000
4%
8000
7000
0%
2007-08
2008-09
Requirement (MU)
2009-10
2010-11
Availability (MU)
2011-12
Deficit
Source:- CEA
40%
2500
34.0%
2000
32.9%
27.6%
30%
22.5%
1500
14.4%
1000
10%
500
0
0%
2007-08
2008-09
Peak Demand (MW)
2.4
20%
2009-10
2010-11
Peak Met (MW)
2011-12
Peak Deficit
Bihar has witnessed sharp increase in the economic growth during 11th plan period mainly on
account of the developments in the secondary sector which has led to a sharp rise in the percapita income. However, the same is yet to reflect in the energy/ power sector growth, as
evident from the per capita energy consumption of state, which is very low at 122 kWh in
comparison to the national average of 780 units. The centrally sponsored schemes like
Restructured-Accelerated Power Development and Reforms Programme (R-APDRP) and
Rajiv Gandhi Grameen Vidyutikaran Yojna (RGGVY) are being implemented in the state with
specific focus on distribution sector improvement.
Bihar State Power Holding Company
Page 9
Business Plan for Bihar State Power Transmission Company
2.5
South and North Discoms mainly relies for its energy requirement on Central Sector
Generating Stations viz. NTPC, NHPC, PTC and others as the State generating capacity is
not adequate to meet the supply needs. Presently, the overall Transmission & Distribution
losses being incurred by two Discoms are around 41%. The transmission system needs to be
strengthened suitably for smooth interface with the inter-state network in the country and for
meeting requirement of wheeling the power.
2.6
In order to strengthen the transmission network, the erstwhile BSEB has undertaken various
transmission network capacity addition, augmentation and improvement projects for achieving
its objective of making available reliable power across the State. The Central Government
promoted initiative – Rastriya Sam Vikas Yojana (RSVY) is one such scheme focussed on
strengthening the Transmission and Distribution network and reduction of T&D losses.
2.7
The Transco is also implementing various capacity addition schemes funded by the Asian
Development Bank (ADB) proposed under Central Government sponsored Backward Region
Grant Fund (BRGF) programme. Further, the Company had been taking assistance from
Bihar Government out of the allocated Five Year Plan fund for energy sector.
Economic Growth in Bihar
2.8
The State of Bihar has experienced tremendous economic growth since the last few years.
The developmental activities in the various sectors in the state have resulted in impressive
th
growth rate of the state. During the 11 plan period against the all India growth rate of 7.94%,
Bihar achieved a growth rate of 12.08% at constant prices. The per capita income of Bihar
grew at 10.47% during the 11th plan, which is 4% higher than the same for the country. The
primary sector of the state is experiencing a decline in the share of state’s domestic product –
from 37.49% in 2000-01 to 18.12% in 2011-12 (Adv.). This is due to the increased pace of
developments in the secondary sector.
Twelfth plan objectives for growth trends
2.9
The State Government of Bihar has set following objectives to meet 12-13% growth rate
during the twelfth plan period:
•
•
•
•
•
•
•
2.10
To attempt for a high growth rate (7%) in Agriculture and allied sectors by adopting the
strategy of the Rainbow Revolution;
To develop infrastructure at a much higher pace;
To focus on industrialization;
To emphasize the development of the social sector further, particularly education and
health;
To make a sustained effort for reduction in poverty;
To make a substantial increase in the income level of the lowest strata of society; and
To make an attempt at equitable regional development.
Due to rapid growth in Bihar, the current level of demand is anticipated to increase drastically
from current level of 2000 MW to 6000 MW in near future. To facilitate the growth of the State
and in order to meet the increasing demand for power, the state Government of Bihar has
planned various power generation capacity addition programmes and allocation of fresh/
increased power from upcoming Central and Private sector projects. With the materialisation
of these capacities, the Transmission system needs to be adequately enhanced and
strengthened so as the power from various new/ additional generating sources is evacuated
efficiently for further transmission and supply to the consumers at distribution end in the State.
Bihar State Power Holding Company
Page 10
Business Plan for Bihar State Power Transmission Company
Transmission Business – Issues and challenges
3.1
Transmission network serves as an important link between the Generation and Distribution
segments of electricity supply business. The issues and challenges pertaining to the
Transmission business are mostly in terms of keeping up with the growth needs of the other
two segments. While the growth in the demand along with increasing electrification end drive
the need to meet the peak demand and energy requirement by arranging supply from internal
and external generation sources, the transmission system has to be strengthened adequately
and timely for maintaining grid stability and supply quality.
Demand-Supply Projections
3.2
Post separation from Jharkhand, Bihar is left with only BTPS, MTPS and Koshi Hydro Power
Stations which is very limited power generating capacity in view of the requirements of the
State. The State Government has taken several initiatives in order to fulfil the supply needs of
the State in terms of setting up Independent Private Projects (IPPs) and State Sector projects
and arranging share from central sector projects. The total power available including the
private and central allocations to the state of Bihar is going to touch around 5300 MW in FY
2015-16 from current level of around 2300 MW.
Table 2: Projected Power Availability (MW)
2012-13 (RE)
NTPC
MW
MU
MW
2014-15 (P)
MYT Control Period
MU
MW
MU
NTPC
a) Farakka 1, 2
and 3
b) Talchar
c) Kahalgaon 1
and 2
Barh -Stg 2 #1
Barh -Stg 2 #2
Barh Stg 1 Unit 1
Barh Stg 1 Unit 2
Barh Stg 1 Unit 3
NTPC Total
MW
MU
MW
MU
MW
MU
MW
MU
528
2,834
528
2,889
528
2,889
528
2,889
528
2,585
398
2,449
398
2,449
398
2,449
528
2,662
438
2,670
438
2,670
438
2,670
330
1,638
330
330
175
2,457
2,048
977
1,694
9,646
2,199
13,490
330
330
175
175
175
2,549
2,457
2,457
1,303
1,194
109
15,528
25
25
186
186
50
372
21
108
129
78
404
482
1,694
8,081
2013-14 (P)
Railway & BSEB
Nabinagar -I
Nabinagar -II
Nabinagar - III
Nabinagar - IV
Total Nabinagar
NHPC
a) Rangit
b) Teesta
Total NHPC
21
108
129
136.88
726.20
863.08
Bihar State Power Holding Company
21
108
129
78
404
482
21
108
129
78
404
482
2015-16 (P)
MW
MU
Page 11
Business Plan for Bihar State Power Transmission Company
PTC
Chukka
Tala
Total PTC
80
260
340
580.03
1,122
1,702
80
260
340
298
968
1,266
80
260
340
298
968
1,266
80
260
340
298
968
1,266
100
100
745
745
100
100
745
745
100
100
745
745
1,254
1,518
200
1,752
50
2,772
200
1,802
200
450
650
1,752
50
2,957
4,759
200
450
300
260
1,283
1,314
50
3,942
1,314
949
7,569
(1.2)
110
110
136
461
110
110
594
594
56.75
53.66
53
45
80
53
45
80
110
110
250
53
594
594
673
45
80
110
573
110
607
110
607
110
477
110
607
110
607
132
363
5,243
93
29,617
DVC
DVC
Total DVC
Others
Adani
NEA+Short Term
Essar
Essar 2
GMR
Total Others
State
BTPS
BTPS
BTPS Stg 2
BSHPC
Sugar Mills
KBUNL #1 (MTPS
Stg 1)
KBUNL # 2 (MTPS
Stg 1)
KBUNL # 3 (MTPS
Stg 2)
UI Sales
Solar RPO
Total Availability
3.3
200
105
105
0
2,573
(1069)
0
12,459
2,916
19
15,732
3,921
49
23,317
th
On the demand side, the peak demand is going to rise as also projected by CEA in its 18
Electric Power Survey (EPS). According to the survey, following are projected to be achieved
by Bihar.
•
•
•
A per-capita electricity consumption of level 770 kWh;
Electrification of additional 17,000 villages; and
Capacity addition programme of 6600 MW up to FY 2015-16 and 14000 MW by FY
2016-17.
Table 3: 18th Electric Power Survey Projections (MW)
18th EPS Projections
3.4
2012-13
2013-14
2014-15
2015-16
2017-18
Peak Demand (MW)
2642
3194
3873
4472
5108
Energy requirement (MU)
16389
19478
23214
26330
29539
The retail sales for Bihar is projected to grow from 6694 MU in FY 2011-12 to 9298 MU in FY
2015-16 at a CAGR of 8.96%. Based on the projections of Peak demand, Energy
Bihar State Power Holding Company
Page 12
Business Plan for Bihar State Power Transmission Company
Requirement and the Availability of power, the demand-supply gap is envisaged to be
reduced and the state would be able to meet its peak demand by FY 2015-16.
3.5
Therefore, the Transmission network requirements for the period FY 2013-14 to FY 2015-16
have to be strategically planned so as to meet the demand growth envisaged. The challenge
for BSEB is be able to put up adequate evacuation facilities for upcoming generation capacity
and augmentation/ replacement of transmission elements to accommodate the bulk power
from internal and external sources without congestion.
Transmission & Distribution (T&D) Losses
3.6
The transmission losses in the system is projected as in the following table
Table 4: Transmission Loss Projections
FY 2009-10
Fy 2010-11
FY2011-12
FY 2012-13
FY 2013-14
6.52%
4.33%
*4.07%
4.02%
5.7%
FY 2014-15
FY 2015-16
3.97%
3.92%
*6 months data
3.7
The T&D losses in the state of Bihar have remained on the higher side mainly on account of
lack of resources and the old and ageing infrastructure. The T&D loss level trend for BSEB is
tabulated below for reference:
Table 5: Transmission & Distribution (T&D) Losses
3.8
FY 2006-07
FY 2007-08
FY 2008-09
FY 2009-10
FY 2010-11
42.61%
39.06%
37.98%
38.32%
43.59%
FY 2011-12
44.05%
The Commercial losses on account of theft and pilferage are major components of the losses.
With the increasing electrification initiatives at distribution end, certain portion of energy is
pilfered through unauthorised means. Though, it’s a challenge for Distribution Function to
reduce the losses, the Transmission system has to accommodate the loss component as well
along with legitimate retail sales so far as the transmission infrastructure requirement is
concerned.
Financial health of Power Sector in Bihar
3.9
The erstwhile BSEB has not added much generation capacity since 2002-03. Major portion of
bulk power purchased by two Discoms is from Central Sector Generating Stations and other
sources. Further, T&D loss component is in the range of 40%. Erstwhile BSEB on one hand
buys costly power from spot market in order to try and bridge the demand supply gap, the
higher T&D losses on the other hand lead to insufficient recovery. This restricts erstwhile
BSEBs ability to meet its payment obligations including power purchase bills.
3.10
It has become a challenge to balance the increasing tariff in consumer interest against the
revenue requirement essential for sustainability of the business, which has been bridged
through government support to a certain extent in the past. The approved tariff increase
during past have however remained insufficient to cover the cost that erstwhile BSEB has
incurred and has thus rendered it financially strained.
3.11
From the trend of power purchase costs, it is observed that the costs have risen by almost
double in FY 2011-12 from the FY 2005-06 levels. During the same period, the Average
Billing Rate for the retail categories of consumers has increased only by 87%.
Bihar State Power Holding Company
Page 13
Business Plan for Bihar State Power Transmission Company
Financial Loss
2006-07
2007-08
(856)
(851)
2008-09
2009-10
2010-11
2011-12
(1,623)
(1,618)
(300)
(600)
(900)
(1,200)
(1,102)
(1,500)
(1,496)
(1,800)
3.12
The increasing loss levels are a major cause of concern as the losses further raise the debt
burden on erstwhile BSEB for meeting its working capital requirements which in turn
increases the interest and finance costs. The recovery of the high losses is not practically
feasible as it will result in huge tariff shock for consumers. Overall the financial health of
BSEB is poor which is a big challenge for all the functions including Transmission.
3.13
With the increasing quantum of power to be transmitted through its existing network, available
margins/ space in the receiving substations and capacity for augmentation are constraints for
further expansion.
Other Key Challenges
3.14
The growth of Transmission Lines and Substations additions over the past few years is
represented in following chart.
Line Length (CKM)
Transformer Capacity (MVA)
5000
5000
4000
4000
3000
3000
2000
2000
1000
1000
0
2007-08 2008-09 2009-10 2010-11 2011-12
400 kV
3.15
220 kV
132 kV
0
2007-08 2008-09 2009-10 2010-11 2011-12
220 kV
132 kV
Observing the past trend shows that the length of 400 kV Transmission line remained at 75
CKM level, whereas it has grown at minimal 0.4% CAGR for 220 kV and 4.4% CAGR for 132
kV level during five years.
Bihar State Power Holding Company
Page 14
Business Plan for Bihar State Power Transmission Company
3.16
Similarly, the number of 220 kV substations grew at 3% and 132 kV substations increased at
5.65% CAGR during this period. The 220 kV Transformer capacity increased at 8.8% CAGR
and that for 132 kV increased at 13% CAGR.
3.17
Taking into account the tremendous growth that is expected to take place during the ensuing
MYT control period in terms of power availability and retail sales, the Transmission segment
has to cope up by suitably enhancing the growth rate of infrastructure additions and
undertaking appropriate R&M schemes. Thus, keeping pace with the ever increasing power
requirements would be a major business challenge for the Transmission Company during the
ensuing MYT control period.
3.18
The Open Access regulations were issued by BERC in 2006 according to which the eligible
person (Licensee, Generating Company, Consumer etc.) is allowed for non-discriminatory
open access to the intra-state transmission system subject to availability of adequate
transmission capacity. With the growth of the power market, the open access consumers may
put a challenge before the Transco in terms of providing access to transmission facilities.
Transmission Company has to take care of additional capacity that might be required to
accommodate such needs as such open access consumers may not necessarily be existing
customers.
3.19
At execution level, the key challenge for Transmission Company shall be to manage the
multiple clearances related to projects and land – right of way issues efficiently to ensure that
all the schemes are approved and implemented without any time and cost overrun.
3.20
Replacement of ageing assets is necessary to maintain reliability of supply. Further, to
maintain safety and reliability in operation of transmission system, it’s important to improve
the condition monitoring and augment or refurbish the network and control/ switchgear
equipment.
Bihar State Power Holding Company
Page 15
Business Plan for Bihar State Power Transmission Company
Business Plan for Bihar State Power Transmission Compnay
4.1
The Business Plan for the Transmission Company has been prepared according to the
direction given by the Hon`ble Commission (BERC) in the latest Tariff order for FY 2012-13.
The relevant Para containing the direction is reproduced below for reference:
“The Commission directs the Board or its successor restructured companies to submit the
business plan for generation, transmission and distribution functions separately for a period of
three years, i.e. FY 2013-14 to FY 2015-16 by September, 2012.”
Key Objectives
4.2
Broadly, the following key objectives were kept in mind while preparing the Business Plan.
•
Strategic Planning: The primary objective of the Business Plan is to analyse and
anticipate the future requirements in advance and strategically plan for the capital
investments, related means of financing and various associated costs and document
them which would serve as an effective tool for monitoring and execution of future works.
With the level of economic growth the state of Bihar is experiencing, it becomes utmost
important to project the growth in transmission network infrastructure commensurate with
the energy demand required for fuelling the economic growth targets of the State.
•
Regulatory Compliance: As highlighted in aforesaid Para 4.1, the direction issued by the
Hon`ble commission entails submission of function wise separate Business Plan. Thus it
is an essential part of the regulatory compliance for the Company.
•
Better Operational Efficiency: The Business Plan is prepared so as to be useful for the
Managing Board, associated stakeholders, the Hon’ble Commission and various
government bodies. The future projections in the Plan would help the Transco in decision
making and taking proactive actions, and thus improving the overall operational efficiency
of the transmission network infrastructure.
4.3
In order to meet the growing demand for power by the two distribution companies, its diversity
in terms of geography and evacuating the power expected to be available from upcoming
intra/ inter-state generating stations, Bihar State Power Holding Company (BSPHC) has
prepared a comprehensive business plan to expand the transmission network in the State of
Bihar through various network/ system improvement measures, capacity augmentation and
adding new substations and transmission lines.
4.4
The erstwhile BSEB had signed MoU with some of the upcoming Independent Power Projects
(IPP). Out of these projects, 2x660 MW generation project of Jas infrastructure Capital Pvt.
Limited at Banka is progressing towards commissioning. The necessary evacuation of power
at Banka has been planned in FY 2012-13.
4.5
The Government of Bihar has set up a Special Purpose Vehicle (SPV) to establish three IPPs
under tariff based competitive bidding (Case-2) route, which are also expected to be
th
commissioned is during the 12 plan period.
Bihar State Power Holding Company
Page 16
Business Plan for Bihar State Power Transmission Company
Table 6: Case-2 IPP Projects
S.
No.
1.
Project
Capacity (MW)
Buxar Thermal Power Station at Chausa, Buxar
2x660 = 1200
2.
Lakhisarai Thermal Power Station at Kajara, Lakhisarai.
2x660 = 1200
3.
Pirpainti Thermal Power Station at Pirpainti, Bhagalpur
2x660 = 1200
4.6
Although the implementation of transmission system for evacuation of power from Lakhisarai,
Pirpainti & Buxar generation projects is planned from FY 2016-17, there are associated
schemes for system strengthening at 220 kV and 132 kV voltage levels proposed during the
MYT control period so as to accommodate the projected peak demand on commissioning of
the projects
4.7
In order to draw additional power from the northern part of the Bihar, Transmission system for
evacuation of power from Darbhanga & Motihari 400 kV sub-stations is proposed to be
implemented from FY 2014-15 onwards.
4.8
At number of places of 132/33 kV substations, transformer capacity augmentation is proposed
including Karmanasa, Sonenagar, Pandaul, Chandauti, Hathidah, Lakhisarai, Muzaffarpur,
Ara, Kataiya and Sabour.
4.9
The Transmission lines at Lakhisarai, Jamui, Purnea, Dehri, Sonenagar, and Gaya are either
heavily loaded or old and dilapidated and therefore are required to be strengthened.
Accordingly, planning has been done to re-conductor these lines.
4.10
The Transmission network in the Capital of Bihar is adequate to take care of present level of
demand. However, the future growth in demand necessitates strengthening of transmission
system at 220 kV and 132 kV voltage levels for supplying power to Bihar and surrounding
load centres.
4.11
The proposed Transmission system for Patna city includes 400 kV substations at Bihta,
Gaighat and Fatuha and 220 kV substations Jakkanpur, Mithapur, and Gaighat along with
associated 400-220 kV interconnecting lines.
4.12
Apart from the future planning of the transmission works mentioned above, BSEB has also
planned for immediate removal of existing transmission constraints, to be implemented during
2012-13 at Fatuah, Begusarai, Bodh Gaya, Darbhanga, Gopalganj, Khagaul, Bihta, Sitamarhi,
Ara, Nawadah, Sabour, Naugachia etc.
4.13
The Transco has further provisioned for procurement of critical network equipment viz. Circuit
Breakers, Current Transformers etc. for meeting the medium term needs and procurement of
Emergency Restoration System.
4.14
From the Central Government’s BRGF programme funded by ADB, the BSEB would be
implementing 132/33 kV Grid Substations at Dhanha, Gangwara, and a 220/132 kV Grid
Substation at Pusauli. Under this programme, new 132 kV transmission lines are also
planned.
Proposed Capital Expenditure
4.15
For improvement in the transmission network availability and to strengthen the transmission
network, Transco has planned Capital Expenditure for installation of new transmission lines
Bihar State Power Holding Company
Page 17
Business Plan for Bihar State Power Transmission Company
and substations as well as augmentation and R&M works. The Transco has planned for
Capital Investment of Rs. 6845 Cr. by FY 2016-17, out of which Rs. 3957 Crore is to be
invested during FY 2012-13 up to FY 2015-16. This includes ADB funded new project
schemes worth Rs. 197 Crore and immediate removal of existing Transmission constraints
during FY 2012-13 and FY 2013-14 worth Rs. 310 Crore.
Table 7: Year Wise Capital Investment Planned for Transmission Function
(Rs. Crore)
S.
No.
1.
2.
3.
4.16
Planned Scheme
Total
Cost
2012-13
2013-14
2014-15
2015-16
TOTAL
MYT
Remaining
(2016-17)
12th Plan_18th EPS
(BRGF)
Immediate removal of
transmission constraints
ADB Funded Scheme
6338
437
210
844
1960
3450
2888
310
201
109
-
-
310
-
197
197
-
-
-
197
-
Grand Total
6845
835
319
844
1960
3957
2888
The detailed voltage wise break up of proposed capital expenditure during the next MYT
control period is tabulated below.
Table 8: BSEB Transmission - Capital Investment Plan
(Rs. Crore)
Particulars
FY 2012-13
FY 2013-14
FY 2014-15
FY 2015-16
Total
400 kV Substations
-
-
-
540
540
400 kV Lines
-
-
-
281
281
220 kV Substation
48
-
384
401
833
220 kV Line
42
-
243
571
856
132 kV Substation
49
-
-
-
49
132 kV Line
49
161
217
166
593
33 kV Line
10
-
-
-
10
Total
197
161
844
1,960
3,162
400 kV Substations
-
-
-
-
-
400 kV Lines
-
-
-
-
-
220 kV Substation
45
45
-
-
91
220 kV Line
11
11
-
-
22
132 kV Substation
25
74
-
-
99
132 kV Line
27
28
-
-
55
33 kV Line
-
-
-
-
-
Total
109
158
-
-
267
Grand Total
306
319
844
1960
3428
New Projects
R&M
Bihar State Power Holding Company
Page 18
Business Plan for Bihar State Power Transmission Company
4.17
Following table contains the detailed scheme wise Capital Investment Plan proposed by
BSPHC for Transmission Company
Table 9: Requirement related to transmission system during 12th plan to meet load demand
projected in 18th EPS and to evacuate power from proposed new TPS. (BRGF)
(Rs. Crore)
S.
No.
Year
Work
Total
Cost
Transmission system for evacuation of power from Banka 400/132 KV Sub-Station.
1
2013-14
Banka (PG) – Sultanganj 132 kV D/c
2
2013-14
Stringing of 2nd circuit of Banka – Sabour 132 kV D/c line
3
2013-14
49
6
LILO of both circuits of Banka – Sabour 132 kV D/c line at Banka substation of POWERGRID
Additional strengthening in Intra-State Transmission System
4
Re-conductoring of Purnea (PG) - Purnea (BSEB) 132 kV line (3 ckts.) by
high capacity conductor
5 2013-14 R&M of Grid Sub-Station, Karmanasa, Sonenagar, Pandaul, Chandauti,
Hathidah, Lakhisarai, Muzaffarpur, Ara, Kataiya and Sabour.
Transmission system for evacuation of power from Lakhisarai 400/132 KV Sub-Station.
21
2013-14
0.27
48
6
2013-14
Lakhisarai (PG) – Lakhisarai 132 kV D/c
21
7
2013-14
Lakhisarai (PG) – Jamui 132 kV D/c
28
Additional Strengthening in Intra-State Transmission System
8
2013-14
2nd circuit stringing of Kishanganj – Forbesganj 132 kV D/c line
9
2013-14
2nd circuit stringing of Forbesganj - Kataiya132 kV D/c line
10
2013-14
11
2013-14
LILO of Saharsa(New) – Sonbarsha 132 kV S/c (on D/c Tower) at Saharsa
(existing)
2nd circuit stringing of Muzaffarpur (Bhikhanpura) - Vaishali 132 kV D/c
line
Sub-total
2013-14
15
17
5
210
Transmission system for evacuation of power from Darbhanga & Motihari 400 kV sub-stations
12
2014-15
Darbhanga 400/220 kV - Darbhanga (BSEB) 220kV D/c line
35
13
2014-15
Darbhanga 400/220 kV - Bhikhanpura 220kV D/c line
80
14
2014-15
120
15
2014-15
2x160 MVA, 220/132kV sub-station at Samastipur by LILO of 220kV
Begusarai(BSEB) - KTPS D/c line
Darbhanga – Samastipur 220kV D/c line (S/c strung)
16
2014-15
2x160 MVA, 220/132kV sub-station at Supaul
60
17
2014-15
Darbhanga – Supaul 220kV D/c line
70
18
2014-15
Motihari 400/132 kV - Motihari (BSEB) 132 kV D/C line
14
19
2014-15
Motihari 400/132 kV - Betiah 132kV D/C line
38
20
2014-15
Motihari 400/132 kV – Raxaul 132kV D/C line
59
30
Additional Strengthening in Intra-State Transmission System
21
2014-15
Stringing 2nd circuit of Darbhanga-Phulparas 132 kV
Bihar State Power Holding Company
8
Page 19
Business Plan for Bihar State Power Transmission Company
Year
Work
22
2014-15
LILO of Darbhanga-Phulparas 132 kV D/c line at Pandaul
21
23
2014-15
110
24
2014-15
25
2014-15
2X160MVA 220/132 kV sub-station at SKMCH , with LILO of Darbhanga Kanti 220 kV D/c line
2X160MVA 220/132 kV sub-station at Bhikhanpura, with LILO of
Darbhanga - Kanti 220 kV D/c line
SKMCH – Bhikhanpura 220 kV D/c
26
2014-15
SKMCH-Sitamarhi 132 kV D/c line
42
27
2014-15
2nd circuit stringing of Motihari - Daka - Sitamarhi 132 kV D/c line
30
28
2014-15
2nd circuit stringing of Betiah - Raxaul 132 kV D/c line
6
2014-15
Sub-total
S.
No.
Total
Cost
95
30
844
Additional Strengthening in Intra-State Transmission System
29
2015-16
LILO of Purnea-Naugachia/Khagaria 132 kV D/c at Katihar
35
30
2015-16
LILO of Purnea-Khagaria 132 kV circuit at Naugachia
17
31
2015-16
LILO of Barauni-Naugachia 132 kV circuit at Khagaria
10
32
2015-16
2X160MVA 220/132 kV sub-station at Chhapra
60
33
2015-16
192
34
2015-16
Creation of 2X500MVA, 400/220 kV New Sub-station at Hazipur with LILO
of Biharshariff - Muzffarpur 400 kV D/c
Hazipur 400/220 kV - Chhapra 220 kV D/c
35
2015-16
Chhapra-Siwan 132 kV D/c line
56
36
2015-16
Creation of 2X160MVA 220/132 kV sub-station at Sonenagar
60
37
2015-16
Gaya(POWERGRID) - Sonenagar220 kV D/c line
90
38
2015-16
Charging of Dehri - Sonenagar 220 kV D/c at rated voltage (220 kV)
39
2015-16
100
40
2015-16
Creation of 2X160MVA, 220/132 kV Substation at Gaya , with LILO of both
Ckt. of Biharsharif-Bodhgaya220 kV D/c line
Gaya 220 KV-Hulaganj 132 kV S/c on D/c tower
41
2015-16
2X500MVA, 400/220 kV New Sub-station near Gaighat
116
42
2015-16
2X500MVA, 400/220 kV New Sub-station at Fatuha
116
43
2015-16
Bihta - Patna (PG) - Fatuha - Gaighat 400 kV D/c line
281
44
2015-16
Bihta-Digha 132 kV D/c line
28
45
2015-16
Bihta-Khagaul 220 kV D/c line
30
46
2015-16
2x500 MVA, 400/220 KV Sub-Station at Bihta
116
47
2015-16
Bihta-Sipara 220 kV D/c line
65
48
2015-16
Patna(PG) - Khagaul 220 kV D/c line
40
49
2015-16
Creation of 3X160MVA, 220/132 kV Substation at Jakkanpur
61
50
2015-16
Creation of 3X160MVA, 220/132 kV Substation at Mithapur
61
51
2015-16
Creation of 2X160MVA, 220/132 kV Substation at Gaighat
60
52
2015-16
Jakkanpur -Khagaul 220 kV D/c line
30
53
2015-16
Gaighat(New 400/220 kV sub-station) – Gaighat 220 kV D/c line
25
54
2015-16
Gaighat(New 400/220 kV sub-station) – Mithapur 220 kV D/c line
25
55
2015-16
Gaighat(New 400/220 kV sub-station) – Jakkanpur 220 kV D/c line
35
56
2015-16
Patna (PG) – Mithapur 220 kV line
40
57
2015-16
Fatuha - Gaighat 220 kV D/c line
35
Bihar State Power Holding Company
80
-
21
Page 20
Business Plan for Bihar State Power Transmission Company
S.
No.
58
Year
Work
2015-16
Gaighat(New 400/220 kV sub-station) – Hazipur 400 kV line
2015-16
Sub-total
Total
Cost
80
1,960
Grand Total
3,013.45
Table 10: Immediate removal of existing transmission constraints, to be implemented during
2012-13 and 2013-14
(Rs. Crore)
S.
No.
1
Planning for removal of the constraint
Augmentation of 220/132 KV G.S.S., Fatuha by additional 150 MVA 220/132 KV
transformer.
Cost
12
2
220 KV BSF-Fatuha transmission line reconductoring.
3
(a) The transformer is under repair at Marson's works at Kolkata.
4
(b) One stand by 150 MVA 220/132 KV transformer has also been proposed to
procure for immediate replacement of any of the transformers (i.e. transformer 1 &
2) fails.
5
One additional 150 MVA 220/132 KV transformer has been proposed to be
procured for G.S.S., Begusarai.
7
6
One additional 150 MVA 220/132 KV transformer has been proposed to be
procured at G.S.S., Bodh Gaya for breakdown maintenance.
12
7
After completion of LILO work of 220 KV Dehri-Bodh Gaya transmission line with
765 / 400 / 220 KV G.S.S., Bodh Gaya, reconductoring of 220 KV Bodh Gaya-BSF
line is easily possible as there will be no problem in allowing shutdown.
14
8
Two additional 220/132 KV 150 MVA transformer will be required for G.S.S.,
Darbhanga and Gopalganj.
25
9
Fourth 50 MVA 132/33 KV will be required at G.S.S., Khagaul
5
10
One 50 MVA 132/33 KV transformer is required at G.S.S., Bihta.
5
11
4 Nos. 50 MVA 132/33 KV transformers will be required at G.S.S., Sitamarhi, Ara,
Nawadah, and Sabour.
12
One 20 MVA 132/33 KV transformer is required at Naugachia.
13
5 Nos. 20 MVA 132/33 KV transformers will be required Jainagar, Phulparas,
Supaul, Dhaka and Belaganj. And also construction of 132 KV and 33 KV bay is
needed for installing additional 20 MVA transformer.
20
14
1x150 MVA transformer at Sipara (BSEB) and 01 No. 220 KV Bay, each at Sipara
(BSEB) and Sampatchak (PG).
14
15
After commissioning of G.S.S., Sipara this line will off loaded and reconductoring
between Fatuha-Harnaut & Harnaut-Bari Pahari may be taken in phased manner.
5
16
As the reconductoring of 132 KV Purnea-Naugachia section of L/16 (Ckt.-I) and
BTPS-Khagaria of L/23 (Ckt.-II) has been completed therefore the reconductoring
of remaining section i.e. 132 KV BTPS-Naugachia (Ckt.-I L/16) and 132 KV PurneaKhagaria (Ckt.-II L/23) is to be completed.
Bihar State Power Holding Company
7
10
14
2
19
Page 21
Business Plan for Bihar State Power Transmission Company
S.
No.
17
Planning for removal of the constraint
Cost
Completion of 132 KV Darbhanga-Phulparas line covered under RSVY Phase-2
Part-II will offload this line but reconductoring will be still required.
1
18
Reconductoring of 132 KV S/C Chapra-Siwan transmission line.
5
19
After construction of 132 KV Biharsharif-Sheikhpura, 132KV Sheikhpura-Jamui and
132KV Sheikhpura-Lakhisarai these lines will be offloaded but its reconductoring
will still be required.
4
20
Reconductoring of these lines are required immediately as these lines are not being
loaded to its full capacity.
21
21
Provision of procurement of critical equipment viz the breaker, CT’s and other
critical items etc. is to be made for meeting the requirement on medium term basis.
5
22
Procurement of one set of emergency restoration system.
10
218
The amount of Rs. 218 Crore is proposed to be spent equally during FY 2012-13 and FY 2013-14.
Table 11: On-going ADB funded Scheme to be implemented by FY 2014-15
(Rs. Crore)
Package
G
H
I
S.
No.
Work
i.
Construction of 2x50 MVA, 132/33 KV Grid Subs-station at
Dhanha (West Champaran) on turnkey basis
ii.
Construction of 2x50 MVA, 132/33 KV Grid Sub-Station at
Gangwara (Darbhanga) on turnkey basis
iii.
Construction of 132 KV bay one each at Bettiah, Sasaram,
Mohnia, Dinara, Lakhisarai and Seikhpura G.S.S.
iv.
Construction of 4 no. 33 KV bay at remote end 33/11 KV Power
substations for down linking
i.
Construction of 2x150 MVA 220/132 KV Grid Sub-Station at
Pusauli (Kaimur)
ii.
2 nos. 220 KV bay extensions at 220/132 KV Dehri Grid sub
station
132 KV line (202 KM)
Total Cost
49.15
47.98
i.
LILO of 132 kV Pandaul Line at Gangwara - 10 KMs (approx.)
2.41
ii.
Pusauli (New) - Sasaram DCCS line -50 KMs (approx.)
12.03
iii.
Pusauli (New) - Bhabhua DCCS line -15 KMs (approx.)
3.61
iv.
Pusauli (New) - Dinara DCCS line -45 KMs (approx.)
10.83
v.
Lakhisarai - Shekhpura DCCS line-32 KMs (approx.)
7.70
vi.
Bettiah - Dhanha DCCS line-50 KMs (approx.)
12.03
48.61
33 KV line (40 KM)
vii
viii
New Line from132 kV Sub Station Dhanha (New) - 20 KMs
(approx.)
New Line from132 kV Sub Station Gangwara (New) - 20 KMs
(approx.)
Bihar State Power Holding Company
4.81
4.81
Page 22
Business Plan for Bihar State Power Transmission Company
Package
S.
No.
Work
Total Cost
9.63
J
i.
i. LILO of both ckts of Sasaram (PGCIL)- Ara (PGCIL) 220 KV
D/C line at New Sub Station at Pusauli (New)- 6 KM
ii.
Pusauli (New)-Dehri (BSEB) 220 KV D/C line - 8 KM
Grand Total
41.53
196.89
Capitalisation Schedule
4.18
While preparing the Business Plan, BSPHC has considered Capitalisation Schedule in
following manner for new schemes and for R&M works.
Table 12: Capitalisation Schedule
Capitalisation Schedule
4.19
Year 1
Year 2
For New Schemes
40%
40%
For R&M
60%
40%
Year 3
20%
Based on the above capitalisation schedule, following would be the scheme wise
Capitalisation. Out of total Capital expenditure of Rs. 3957 Crore planned, the capitalised
assets would be Rs. 2732 Crore during MYT period
.
Table 13: Scheme wise Capitalisation
(Rs. Crore)
S.
No.
1.
2.
3.
4.
Planned Scheme
2012-13
2013-14
2014-15
2015-16
TOTAL
MYT
Remaining
12th Plan_18th EPS
(BRGF)
Immediate removal of
transmission constraints
ADB Funded Scheme
175
269
490
1154
2087
1364
121
146
44
-
310
-
79
79
39
-
197
-
Opening
Capitalised
Grand Total
41
41
55
-
138
-
416
535
628
1154
2732
1364
CWIP
Funding of Capex
4.20
Funding of Capital Expenditure: Based on the Capital Investment Plan, BSPHC has projected
to fund the same with Grant and Loan in following manner.
Table 14: Funding of Capex
Opening Balance
Add: new Investment
Total
Bihar State Power Holding Company
FY 2012-13
FY 2013-14
FY 2014-15
FY 2015-16
138
557
342
558
835
319
844
1960
973
876
1186
2518
Page 23
Business Plan for Bihar State Power Transmission Company
FY 2012-13
FY 2013-14
FY 2014-15
FY 2015-16
Less: Investment Capitalised
374
493
572
1154
Less: Opening CWIP Capitalised
41
41
55
-
557
342
558
1364
Closing Balance
Funding of Capex
Capitalisation
416
535
628
1154
Add: IDC
15
16
8
-
Less: Grants
192
285
512
1154
239
265
123
-
Balance Capitalisation
4.21
The following table summarises the Transmission Lines and Substations proposed to be
added based on the Capitalisation schedule.
Table 15: Length of Transmission Lines (CKM) to be added
Voltage Level
FY 2012-13
FY 2013-14
FY 2014-15
FY 2015-16
Total
Remaining
-
104
104
156
239
608
858
676
506
1,296
390
400kV
-
-
220kV
6
6
132kV
81
257
453
33kV
16
16
8
-
40
-
Total
102
278
700
1,218
2,298
1,222
Table 16: No. of Substation to be added
Voltage Level
FY 2012-13
FY 2013-14
FY 2014-15
FY 2015-16
Total
Remaining
400 kV
-
-
-
1
1
3
220 kV
-
-
2
4
6
5
132 kV
-
1
1
-
2
0
Total
-
1
3
5
9
8
Bihar State Power Holding Company
Page 24
Business Plan for Bihar State Power Transmission Company
Annexures
Annexure 1: Major Substations proposed to be constructed
Table 17: 400 kV Substations
S. No.
Details of 400 kV Substation
1.
2X500MVA, 400/220 kV New Sub-station at Hazipur
2.
3.
2X500MVA, 400/220 kV New Sub-station near Gaighat
2X500MVA, 400/220 kV New Sub-station at Fatuha
4.
2x500 MVA, 400/220 KV Sub-Station at Bihta
Table 18: 220 kV Substations
S. No.
Details of 220 kV Substation
1.
2x160 MVA, 220/132kV sub-station at Samastipur
2.
2x160 MVA, 220/132kV sub-station at Supaul
3.
2X160MVA 220/132 kV sub-station at SKMCH
4.
2X160MVA 220/132 kV sub-station at Bhikhanpura
5.
2X160MVA 220/132 kV sub-station at Chhapra
6.
2X160MVA 220/132 kV sub-station at Sonenagar
7.
2X160MVA, 220/132 kV Substation at Gaya
8.
3X160MVA, 220/132 kV Substation at Jakkanpur
9.
3X160MVA, 220/132 kV Substation at Mithapur
10.
2X160MVA, 220/132 kV Substation at Gaighat
11.
2x150 MVA 220/132 KV Grid Sub-Station at Pusauli (Kaimur)
Table 19: 132 kV Substations
S. No.
Details of 132 kV Substation
1.
2x50 MVA, 132/33 KV Grid Subs-station at Dhanha (West Champaran) on turnkey basis
2.
2x50 MVA, 132/33 KV Grid Sub-Station at Gangwara (Darbhanga) on turnkey basis
Bihar State Power Holding Company
Page 25
Business Plan for Bihar State Power Transmission Company
Annexure 2: Major Transmission Lines proposed to be constructed
Table 20: 400 kV Lines
S. No.
Details of 400 kV Lines
1.
LILO of Biharshariff - Muzffarpur 400 kV D/c at 400 kV Hazipur Substation
2.
Bihta - Patna (PG) - Fatuha - Gaighat 400 kV D/c line
Table 21: 220 kV Lines
S. No.
Details of 220 kV Lines
1.
Darbhanga 400/220 kV - Darbhanga (BSEB) 220kV D/c line
2.
Darbhanga 400/220 kV - Bhikhanpura 220kV D/c line
3.
LILO of 220kV Begusarai(BSEB) - KTPS D/c line at Samastipur sub-station
4.
Darbhanga – Samastipur 220kV D/c line (S/c strung)
5.
Darbhanga – Supaul 220kV D/c line
6.
LILO of Darbhanga - Kanti 220 kV D/c line at 220/132 kV SKMCH sub-station
7.
LILO of Darbhanga - Kanti 220 kV D/c line at 220/132 kV Bhikhanpura sub-station
8.
SKMCH – Bhikhanpura 220 kV D/c
9.
Hazipur 400/220 kV - Chhapra 220 kV D/c
10.
Gaya(POWERGRID) - Sonenagar220 kV D/c line
11.
Charging of Dehri - Sonenagar 220 kV D/c at rated voltage (220 kV)
12.
LILO of both Ckt. of Biharsharif-Bodhgaya220 kV D/c line at 220/132 kV Gaya Substation
13.
Bihta-Khagaul 220 kV D/c line
14.
Bihta-Sipara 220 kV D/c line
15.
Patna(PG) - Khagaul 220 kV D/c line
16.
Jakkanpur -Khagaul 220 kV D/c line
17.
Gaighat(New 400/220 kV sub-station) – Gaighat 220 kV D/c line
18.
Gaighat(New 400/220 kV sub-station) – Mithapur 220 kV D/c line
19.
Gaighat(New 400/220 kV sub-station) – Jakkanpur 220 kV D/c line
20.
Patna (PG) – Mithapur 220 kV line
21.
Fatuha - Gaighat 220 kV D/c line
22.
23.
Gaighat(New 400/220 kV sub-station) – Hazipur 400 kV line
LILO of both ckts of Sasaram (PGCIL)- Ara (PGCIL) 220 KV
D/C line at New Sub Station at Pusauli (New)- 6 KM
24.
Pusauli (New)-Dehri (BSEB) 220 KV D/C line - 8 KM
Table 22: 132 kV Lines
S. No.
Details of 132 kV Lines
1.
Banka (PG) – Sultanganj 132 kV D/c
2.
3.
2 circuit of Banka – Sabour 132 kV D/c line
LILO of both circuits of Banka – Sabour 132 kV D/c line at Banka substation of
POWERGRID
4.
Lakhisarai (PG) – Lakhisarai 132 kV D/c
5.
Lakhisarai (PG) – Jamui 132 kV D/c
6.
2nd circuit stringing of Kishanganj – Forbesganj 132 kV D/c line
nd
Bihar State Power Holding Company
Page 26
Business Plan for Bihar State Power Transmission Company
S. No.
Details of 132 kV Lines
7.
2nd circuit stringing of Forbesganj - Kataiya132 kV D/c line
8.
LILO of Saharsa(New) – Sonbarsha 132 kV S/c (on D/c Tower) at Saharsa (existing)
9.
2nd circuit stringing of Muzaffarpur (Bhikhanpura) - Vaishali 132 kV D/c line
10.
Motihari 400/132 kV - Motihari (BSEB) 132 kV D/C line
11.
Motihari 400/132 kV - Betiah 132kV D/C line
12.
Motihari 400/132 kV – Raxaul 132kV D/C line
13.
Stringing 2nd circuit of Darbhanga-Phulparas 132 kV
14.
LILO of Darbhanga-Phulparas 132 kV D/c line at Pandaul
15.
SKMCH-Sitamarhi 132 kV D/c line
16.
2nd circuit stringing of Motihari - Daka - Sitamarhi 132 kV D/c line
17.
2nd circuit stringing of Betiah - Raxaul 132 kV D/c line
18.
LILO of Purnea-Naugachia/Khagaria 132 kV D/c at Katihar
19.
LILO of Purnea-Khagaria 132 kV circuit at Naugachia
20.
LILO of Barauni-Naugachia 132 kV circuit at Khagaria
21.
Chhapra-Siwan 132 kV D/c line
22.
Gaya 220 KV-Hulaganj 132 kV S/c on D/c tower
23.
Bihta-Digha 132 kV D/c line
24.
LILO of 132 kV Pandaul Line at Gangwara - 10 KMs
25.
Pusauli (New) - Sasaram DCCS line -50 KMs
26.
Pusauli (New) - Bhabhua DCCS line -15 KMs
27.
Pusauli (New) - Dinara DCCS line -45 KMs
28.
Lakhisarai - Shekhpura DCCS line-32 KMs
29.
Bettiah - Dhanha DCCS line-50 KMs
Table 23: 33 kV Lines
S. No.
Details of 33 kV Lines
1.
New Line from132 kV Sub Station Dhanha (New) - 20 KMs
2.
New Line from132 kV Sub Station Gangwara (New) - 20 KMs
Bihar State Power Holding Company
Page 27
Business Plan for Bihar State Power Transmission Company
Annexure 2: Planned augmentation/ replacement/ R&M of substations and
transmission lines
Table 24: Planned augmentation/ replacement/ R&M
S. No.
1.
2.
3.
4.
5.
6.
7.
8.
Particulars
Re-conductoring of Purnea (PG) - Purnea (BSEB) 132 kV line (3 ckts.) by high capacity
conductor
R&M of Grid Sub-Station, Karmanasa, Sonenagar, Pandaul, Chandauti, Hathidah,
Lakhisarai, Muzaffarpur, Ara, Kataiya and Sabour.
Augmentation of 220/132 KV G.S.S., Fatuha by additional 150 MVA 220/132 KV
transformer.
220 KV BSF-Fatuha transmission line reconductoring.
One stand by 150 MVA 220/132 KV transformer for immediate replacement, if any of the
transformers (i.e. transformer 1 & 2) fails.
One additional 150 MVA 220/132 KV transformer for G.S.S., Begusarai.
One additional 150 MVA 220/132 KV transformer at G.S.S., Bodh Gaya for breakdown
maintenance.
Reconductoring of 220 KV Bodh Gaya-BSF line as it is unable to bear maximum load due to
its longevity and wears & tear.
9.
Two additional 220/132 KV 150 MVA transformer for G.S.S., Darbhanga and Gopalganj.
10.
Fourth 50 MVA 132/33 KV transformer at G.S.S., Khagaul
11.
One 50 MVA 132/33 KV transformer at G.S.S., Bihta.
12.
4 Nos. 50 MVA 132/33 KV transformers at G.S.S., Sitamarhi, Ara, Nawadah, Sabour.
13.
One 20 MVA 132/33 KV transformer at Naugachia.
5 Nos. 20 MVA 132/33 KV transformers at Jainagar, Phulparas, Supaul, Dhaka and
Belaganj and construction of 132 KV and 33 KV bays for installing additional 20 MVA
transformer.
1x150 MVA transformer at Sipara (BSEB) and 01 No. 220 KV Bay, each at Sipara (BSEB)
and Sampatchak (PG).
After commissioning of G.S.S., Sipara this line will off loaded and reconductoring between
Fatuha-Harnaut & Harnaut-Bari Pahari may be taken in phased manner.
As completion of reconductoring of 132 KV Purnea-Naugachia section of L/16 (Ckt.-I) and
BTPS-Khagaria of L/23 (Ckt.-II), reconductoring of remaining section i.e. 132 KV BTPSNaugachia (Ckt.-I L/16) and 132 KV Purnea-Khagaria (Ckt.-II L/23) is to be completed.
Completion of 132 KV Darbhanga-Phulparas line covered under RSVY Phase-2 Part-II will
offload this line but reconductoring will be still required.
14.
15.
16.
17.
18.
19.
20.
21.
Reconductoring of 132 KV S/C Chapra-Siwan transmission line.
After construction of 132 KV Biharsharif-Sheikhpura, 132KV Sheikhpura-Jamui and 132KV
Sheikhpura-Lakhisarai these lines will be offloaded but its reconductoring will still be
required.
Reconductoring of
(a) 132 KV S/C Samastipur-Darbhanga.
(b) 132 KV D/C MTPS-Muzaffarpur.
(c) 132 KV Lalmatia-Sabour.
(d) 132 KV S/C MTPS-Motihari.
(e) 132 KV S/C Purnea-Dalkola.
(f) 132 KV Bettiah-Ramnagar.
Bihar State Power Holding Company
Page 28