468 OCC Meeting - Western Regional Power Committee

advertisement
m-«f~
government of India
~~~
~l
~iC{g~ut~W&
~
~ 0iT g
9001-2008
ISO: 9001-2008
Western Regional Power Committee
~ -3, ~~
al;r, ~
(¥), ~ - 400 093
F-3, MIDC Area, Andheri (East), Mumbai - 400 093
~
Phone: 022- 28221681; 28200194; 28200195;28200196 ~
Fax: 022 - 28370193
Website: www.wrpc.nic.in
E-mail: opc-wrpc@gov.in.opnwrpc@gmail.com
~:-
qjtfcr.~,
~
ct?r
ct?r
9tll<1'1 ~
B~;:q£l~
ct?r
9tll<1'1 ~
468
eft ~
Cf)f
Cf)14CJ~ I
qft-:qq ~
~
~,
16.02.2015 c6r, MUMBAI
WHfci
r:iw"1' ~
~
if
\3"I1~lMd 468
eft ~
B~;:q£l~
ct?r
R'1iCf)
Cf)f Cf)14CJ~ ~
I
(Q;f Q;f~)
\3ftlT~ ~
(ytll<1'1)
MINUTES OF 468TH MEETING OF OPERATION & COORDINATION
SUB-COMMITTEE OF WRPC
HELD ON 16TH FEBRUARY 2015 IN MUMBAI
The 468THmeeting of Operation & Co-ordination Sub-Committee of WRPC was
held on 16th February, 2015 in Mumbai hosted by EPTCL. The list of participants is
enclosed at Annexure-I.
Shri S Bhujade CEO, EPTCL welcomed Sh. SD Taksande, Member Secretary, WRPC
& other delegates of 468th OCC meeting. He thanked WRPC Secretariat for giving
opportunity to EPTCL for organizing this meeting and expressed pride in organizing
the same.
He stated that Essar Power Transmission Company Ltd (EPCTL) is an Interstate
Transmission Licensee and operate Stage - I Element which consist of following
transmission elements:
1. 400KV D/C 22.5 KM Vindhyachal-Kroba LILO at Mahan with 400KV Bays,
2. 400KV D/C 104.8 KM Gandhar–Hazira with Bays at NTPC Gandhar,
3. 400KV/220KV Substation
Stage - II which is under construction and shall be completed shortly, consists of
1. 400KV Bays at Mahan and Bays at PGCIL Sipat for Mahan-Sipat Line
2. 400KV D/C Quad Moose 336 KM line
Essar Power has seven operational power plants in India and one operational power
plant in Algoma, Canada, with a total installed generation capacity of 3,910 MW.
Shri S D Taksande, Member Secretary, WRPC extended warm welcome to Shri S
Bhujade CEO, EPTCL & all the participants of the 468th OCCM. He expressed his
gratitude to CEO, EPTCL and his team of engineers for making excellent arrangement
for meeting. He appreciated the diversified business area & effort imparted in the
power sector for national growth by ESSAR Group. He informed that since last OCC
meeting following important events had taken place and
informed about current
important issues which need attention of OCC.
1. Declaration of COD : Intimation of CoD by CEA to Ministry of Coal/CIL shall be
conveyed based on the confirmation letter of COD by RPC & RLDC/SLDC.
2. Exploration of PSDF fund by Gujarat: Recommendations of Appraisal
Committee of PSDF for the ADMS application submitted by SLDC, GETCO,
2
Gujarat for funding from PSDF to the tune of 1.5 crore.
3. A meeting was conducted at NLDC regarding shifting of control area of APL-III.
No concrete decision was evolved & the control area is still with SLDC, Gujarat.
4. Methodology for reasonable scheduling of NTPC stations was decided in 467th
OCC meeting. NTPC intimated that still they were facing the problems of
unreasonable Scheduling. The matter will be further discussed in ensuing
WRPC meeting.
5. 28th WRPC meeting
is scheduled to be held on 3rd & 4th March 2015 at
Udaipur.
6. ATC/TTC calculation methodology at state boundaries: Maharashtra intimated
that they have been facing huge curtailment in ATC/TTC and imposing the
congestion charges.
7. Transmission line outage planning software being developed by Shri
Satyanarayan S, SE(C&P), WRPC is under full swing & expected to implement
in next month onwards. MS suggested to call a meeting among transmission
licensees/agencies for further feedback and hands on experiences.
8. Possibilities on exploration of pump storage facilities in WR.
9. Welcomed Rattan India(India bull) as a new OCC member.
10. WR unrestricted demand was 44553 MW as compared to 43092 MW during the
last year(3 % growth).
There after he requested SE(O), WRPC to take up regular agenda items in seriatim
for discussion.
ITEM No. 1:
CONFIRMATION OF THE MINUTES
Shri M M Dhakate, S.E(Opn), stated that Minutes of 467th meeting of Operation &
Coordination Sub-Committee of WRPC held on 16th January 2015 at Mumbai were
forwarded vide letter No. WRPC/OPN/OCC-Minutes/2014-15/944 dated 27.01.2015.
GM, WRLDC vide letter dated 9th February, 2015 requested for following amendment in
Sr no 3 of Member secretary’s address 467th OCC minutes:
Quote
“ WRLDC has been fully ring fenced wef 01.01.2015.”
Unquote:
468th OCC MINUTES
3
Shall be replaced by following:
“ WRLDC has been fully ring fenced wef 01.10.2010.”
The committee agreed to modification of date from 01.01.2015 to 01.10.2010.
No other comments have been received. The minutes were confirmed with above
modification.
ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
JANUARY 2015.
Member Secretary, WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during January 2015.
Chief Manager, WRLDC in the presentation (copy attached at Annexure – 2 in soft copy)
concentrated broadly on the performance of the grid for month of January 2015 as
below:
2.1
Frequency Particulars
The average frequency during the month of January, 2015 was 49.99Hz. The
maximum instantaneous frequency was 50.56 Hz at 3:03hrs on 1-January-15 while
minimum instantaneous frequency was 49.55 Hz at 7:36hrs on 15-January-15. The
frequency profile during January, 2015 was as under:
01-Jan-2015 to 31-Jan-2015
% time
IEGC band (49.9 < f < 50.05 Hz)
53.73
< 49.9 Hz
17.46
> 50.05 Hz
28.81
The detailed frequency particulars are enclosed at Annex- 2.1.
The Sub-Committee noted.
2.2
Operational Discipline
There was a net inter-regional export of 3501.00 MUs by WR against net export
schedule of 3180.00 MUs.
The Sub-Committee noted.
2.3
Voltage Profile
Voltage profile at some of 765/400 kV sub-stations during the month of January
2015 furnished by WRLDC is enclosed at Annex-2.3.
The Sub-Committee noted as above.
468th OCC MINUTES
4
2.4 U/F Relay Operations
As per WRLDC records during January 2015 the system frequency didn’t touch 49.2
Hz and no UFR operation has been reported by WRLDC.
The UFR operation status reported by constituents is enclosed at Annexure-2.4.
The Sub-Committee noted as above.
2.5
Power Cuts / Load Restrictions
Details of Power Cuts and Regulatory measures during January 2015 as furnished
by the state utilities are given in Annex. 2.5.
The Sub-Committee noted as above.
2.6
Details of Generating Units under Forced outages
Details of generating units under forced outages during January 2015 are given in
Annex-2.6.
The Sub-Committee noted as above.
2.7
Details of Generating Units under Planned outages
The details of generating units under Planned Outages during January 2015 are given in
Annex-2.7
The Sub-Committee noted as above.
ITEM NO.3: OPERATIONAL PLANNING
3.1
Proposed Planned maintenance programme of generating units.
The maintenance programme of generating units for February 2015 & March 2015
was discussed.
The finalized outage schedule of generating units for the above period and the
modified outages plan is placed at Annexure-3.1.
The Sub-Committee agreed as above.
3.2
A.
Outage Programme of Transmission Lines/elements
The committee had received 576 nos. of proposals for outage planning during February
2015 & March 2015. Further some proposals were received at the last moment of the
meeting.
The committee observed that :-
468th OCC MINUTES
5
1. There were repetitions in the proposals, wherein the same line had been
requested for outage a number of times.
2. The lines pertaining to STU were proposed for outage. As per 446th OCCM,
such lines should be first approached to concerned STU and only in case of
problems faced in outages concern utilities shall approach to OCC of WRPC.
3. Line details/reasons in many cases were not mentioned in proposal.
Committee requested that while submitting outage planning data, necessary
care may please be taken.
4. All utilities were requested to avail outages as planned.
5. Sub-Committee noted that the outages planning shall be period of 20th of the
OCC month to 19th of the following month.
6. In case of any contingencies in parallel rout, online OPGW work etc. A/R shall
be brought in service from non auto mode.
WRLDC suggested that the request for Emergency outage shall have following
information:
1. Name and Voltage level of the Element required to be taken under
emergency outage
2. Requesting Agency
3. Element owner
4. Date and duration of the outage
Reason of Emergency outage.
All approved outage are transparently displayed on the Google excel sheet having
URL:https://docs.google.com/spreadsheets/d/1M-JeQbm6Cer8dB0uHStyPcGIMs95U
s7TqqFrxq77mGY/edit#gid=863831921 and it is visible to all who have requested for
access. It is desired that official representing there organization further delegate these
access to all concern in their organization for smooth functioning 24X7. Separate mails
are also forwarded to all utilities on D-1 day.
The Sub-Committee agreed/noted for the same.
Shri Satyanarayan, S. SE(C&P), WRPC is developing a web-based transmission
elements outages planning. He updated the status of development. He assured that
project shall be implemented from next month onwards.
Member Secretary, WRPC suggested to call a meeting among the transmission
licensees/agencies, WRPC, WRLDC, SLDC’s to resolve the common issues may be
raised during the implementation of Web based planning.
The Sub-Committee noted the same.
468th OCC MINUTES
6
3.3
ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – FEBRUARY 2015
& MARCH 2015
Details of anticipated restricted & un-restricted demands for the months of February 2015
& March 2015 are given in Annex 3.3.
The Sub-Committee noted the same.
ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF JANUARY 2015
The details of actual generation, demand, drawl of power from grid; exchanges etc.
are given in the following Annexure:
Annex 4.1 - Actual Generation and Requirement for January 2015
Annex 4.2 - Peak Demand: Schedule Vs Actual for January 2015
Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines
for January 2015.
Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector
stations, Drawl Schedules and Entitlements of constituents during January 2015
Annex 4.6 - Inter System Exchanges for January 2015.
Annex 4.7 – Details of level of Major Reservoirs in Western Region for Month January
2015.
The Sub-Committee noted.
ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month. The
other minor tripping details during the month received from WRLDC is enclosed at
Annexure-5.
The Sub-Committee noted as above.
ITEM NO. 6:Healthiness status of SERs/DRs of equipment in the system.
Constituents have furnished the status of healthiness of SER/DRs in their systems on
the dates below :
Sl No. Name of
Date of Receipt
constituents
1
PGCIL,WRTS-I
06.02.2015
2
PGCIL,WRTS-II
06.02.2015
3
MPPTCL
09.02.2015
4
NTPC
07.02.2015
5
CSPTCL
06.02.2015
6
GETCO
09.02.2015
7
MSETCL
10.02.2015
468th OCC MINUTES
7
WRLDC informed that as per IEGC DR/EL data is to be forwarded within 24 hours of
an event. The DR/EL of the following events in ISTS in December, 2014 is yet to be
received at WRLDC.
Owner
/
Agenc
y
S.
N.
Name of Element
1
HVDC Badrawati Report on Pole
1 on 11.12.14 0805hrs
PGCIL
2
1. 765 KV Aurangabad-Wardha-1
2. 765 kV Aurangabad-Dhule
3. L/R of Aurangabad-Pahe -2
4. 765 kV Aurangabad Bus 1 on
18.12.14 at 1719hrs
PGCIL
,
BDTC
L
Event
HVDC Bhadrawati
Pole 1 Trip due to
Valve Based
Eletronic Gate fault
Multiple tripping due
to Tie CB Blast of
765 kV WardhaAurangabad 1 at 765
kV Aurangabad S/s
DR/EL
Status
Not
Received
Not
Received
MS stated that in time with discussion in earlier OCCs, DR/EL of events be submitted
to WRLDC and WRPC within a week time.
Constituents of WR were requested to ensure healthiness and sent information to this
office regularly as per the recommendation of enquiry committee of Grid disturbances on
25.02.2007 and 28.02.2007.
The Sub-Committee noted.
ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR
COMMISSIONING OF REACTORS, TRANSMISSION LINES AND
GENERATING UNITS IN WR.
7.1 Status of completion of ongoing Schemes for Commissioning of reactors.
The present status regarding schedule and commissioning of reactors is as below:
S.
No.
400
Sub/stn.
1
Jabalpur
125 MVAR
PGCIL
Commissioned
26.03.2014
on
2
Khandwa
125 MVAR
PGCIL
Commissioned
28.03.2014
on
3
India bulls
80 MVAR MSETCL
BR
Commissioned 26.11.2013
4
Nagda
50 MVAR
MPPTCL
Commissioned in Feb-2014
5
Sasan Line 240 MVAR
reactor-1
RELIANCE
Commissioned
16.02.2014
468th OCC MINUTES
kV Size
(MVAR)
Implementing Expected commissioning
agency
date
on
8
6
Shujalpur
125 MVAR
PGCIL
Commissioned
31.07.2014
on
7
Bhatapara
125 MVAR
PGCIL
Commissioned
24.07.2014
on
8
Raigarh
125 MVAR
PGCIL
Commissioned
30.07.2014
on
9
Aurangabad
125 MVAR
PGCIL
Commissioned
28.04.2014
on
10
Nanded
125 MVAR
MSETCL
June – 2015
11
Sholapur
125 MVAR
MSETCL
June – 2015
12
Kolhapur
125 MVAR
MSETCL
June – 2015
13
Akola
125 MVAR
MSETCL
June – 2015
*14
Nagda
125 MVAR
MPPTCL
March – 2015
15
Bhopal
80 MVAR
MPPTCL
March – 2015
16
Damoh
125 MVAR
PGCIL
Commissioned
30.09.2014
on
17
Bachau
125 MVAR
PGCIL
Commissioned
01.12.2014
on
18
Pirana
125 MVAR
PGCIL
Commissioned
02.10.2014
on
19
Itarsi
PGCIL
Commissioned
15.08.2014
Commissioned
13.10.2014
on
PGCIL
March – 2015
20
Seoni
1X125
MVAR(Ist)
1X125
MVAR(IInd
)
125 MVAR
21
Parli
125 MVAR
PGCIL
March – 2015
22
Raipur
125 MVAR
PGCIL
Commissioned
30.09.2014
on
23
Gwalior
125 MVAR
PGCIL
Commissioned
30.06.2014
on
24
ISP
125 MVAR
NHDC
December 2015
25
Line reactor 50MVAR
at Nagda-ISP
line at Nagda
MPPTCL
July 2015
468th OCC MINUTES
on
9
end
26
Satpura
27
50 MVAR
MPPGCL
March-2015
Sasan Line 240 MVAR
reactor-2
RELIANCE
Commissioned
21.01.2015
28
Sasan
reactor
RELIANCE
May-2015
29
Bus reactor 330 MVAr
at Wardha
PGCIL
Commissioned
01.11.2014
on
30
Bus reactor 330 MVAr
at Dhule
BDTCL
Commissioned
04.12.2014
on
Bus 240 MVAR
on
*50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor after
commissioning of 125 MVAr reactor at Nagda.
*50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor.
Sub-Committee noted as above.
7.2 Status of completion of 765/400 kV and above ongoing Transmission Schemes
being executed/implemented by Transmission Agencies.
The updated status on various ongoing transmission schemes for the current year as
per the current information available is as follows: S.
No.
Name of the Line
POWERGRID
1
400 kV Navsari – Kudus D/C Line
2
765kV S/C Satna-Gwalior line
(359Km + 60Km D/C Portion) Ckt.-II
3
765 kV Durg pooling station Champa
Pooling
station
Dharamjaygarh PS - 2nd ckt
4
765 kV Gwalior - Jaipur line (1st Ckt)
S/C
5
765 kV Dharamjaygarh - Jabalpur
Pooling Station D/C line
6
765 kV Wardha –NizamabadHyderabad D/C
7
765 kV Narendra-Kolhapur D/C
8
400 kV Aurangabad - Boisar line D/C
line
9
765 kV Aurangabad (PG) - Padghe
(PG) D/C
10
800kV DC Champa – Kurukshetra
468th OCC MINUTES
Target
Completion
Date
Remarks
March-15
ROW problem
Commissioned
06.08.2014
Commissioned
21.05.2014
March-15
March-15
March-15
March-15
July -2015
June-2015
March 2015
on
on
10
11
12
Bipole
765 kV D/C Jharsuguda – Korba
Ckt I Commissioned
28.07.14
Ckt II Commissioned
29.07.14
Ckt I Commissioned
01.07.14
Ckt II Commissioned
03.07.14
765 kV Wardha- Aurangabad D/C
Line.
13
765 kV Aurangabad- Solapur D/C
line
June 2015
14
15
765 kV Solapur-Pune line
765KV Durg-Wardha D/C
June 2015
16
765 kV Ranchi-DharamjaigarhBilaspur II & 765 kV RanchiDharamgaigad-I
17
LILO of both circuits of Aurangabad –
Pune 400 kV D/c line at Pune
765/400 kV GIS
LILO of both circuits of Parli– Pune
400 kV D/c line at Pune 765/400 kV
GIS
18
CHHATTISHGARH
1
LILO of 400 kV Korba westKhedamara at Marwa
2
400
kV
DCDS
Raipur(Raita)Jagdalpur(DCDS)
2.1 220 kV Korba-Bishrampur line
(DCSS)
2.2 220 kV DCDS lines Chhuri to Mopka
(Bilaspur), (DCDS)
2.3 LILO of 220 kV Raigarh-Budipadar at
400 kV PGCIL S/s Raigarh
2.4 LILO of 220 Korba (E)- Bishrampur
line at 220 kV Churri S/s
2.5 LILO of 220 kV Raigarh – Jindal
(Tamnar) at Girwani 220 kV S/s
GUJARAT
1
400 kV D/C Kosamba-Chorania line
(Package I
2
400 kV D/C Kosamba-Chorania line
(Package II)
3
400 kV D/C Mundra-Zerda line No. 1
4
400 kV D/C Mundra-Zerda line No. 2
5
400 kV D/C Vadinar-Amreli line
468th OCC MINUTES
on
on
on
on
Commissioned
on
15.11.14
Ckt I likely to be
commissioned in Jan2015
Ckt II Commissioned on
31.03.14
Feb-15
Feb-15
June- 2015
March 2015
Commissioned
14.08.14
on
April- 2015
May-2015
March-2015
Charged on 22.08.14
Commissioned
05.07.14
Commissioned
05.07.14
March-2015
March-2015
June -2015
on
on
11
6
400kV APL-Hadala LILO to Halvad
March -2015
7
400 kV D/C Amreli-Kasor line(Part-1) March -2015
8
400 kV Charanka- Veloda
March 2015
MADHYA PRADESH
1
Chhegaon-Julwania 400 KV DCDS
Line
2
on
Ckt I Commissioned on
04.09.14
Ckt II Commissioned on
07.08.14
Pithampur- Indore 400KV DCDS
Line
3
Commissioned
31.10.14
Satpura TPH-Ashta 400KV DCDS March – 2015
Line
MAHARASHTRA(STU)
1
2
400KV D/C line from Koradi-(II) to Mar- 2015
Wardha S/S(PG) D/C
400 kV Akola(II)- Taptitanda -I
Charged in Jan-14
765 kV Tiroda- Koradi-(III) ckt-II
Commissioned
20.01.15
765 kV Koradi-(III)- Akola(II) ckt-II
765 kV Akola(II)- Taptitanda ckt-II
400
kV
Akola(APML)
to
Akola(MSETCL)-II
Charged at 400 kV level
Commissioned
on
02.10.14
3
4
5
6
7
8
9
10
11
400 kV Taptitanda-Bableshwar-D/C
LILO of 400 kV Chandrapur-Parli at
Nanded
2x1500 MVA 765/400 kV, ICTs at
Ektuni
400 kV Bableshwar-Kudus D/C
(Quad)
765 kV Akola(II)-Ektuni -2 ( To be
charge at 400kV at Tapthithanda)
12
400kV IEPL-Warora
May 2015
Jun-15
Aug-15
Jun-15
May 2015
SLDC Maharashtra would give detail of
the revised arrangement for IEPL in
place of 400kV IEPL-Warora D/c
GUJARAT
(IPTC
route)
by
WR
Transmission (Guj) Pvt. Ltd
1 400
kV
Rajgarh(PG)-Karamsad
May 2015
(GETCO) D/C
STERLITE (JTCL)
1 765 kV Dhramjaygarh - Jabalpur (JTCL) May -2015
D/C line
2 765 kV Jabalpur - Bina (JTCL) S/c
May -2015
STERLITE (BDTCL)
1 765 kV Bhopal - Indore (BDTCL) S/C
468th OCC MINUTES
on
Severe ROW Problem
Severe ROW Problem
Commissioned
on
12
2
765 kV Bhopal-Bhopal (BDTCL)
3 765 kV Vadodara - Dhule (BDTCL) S/C March - 2015
4 765 kV Dhule - Aurangabad (BDTCL)
S/C
5 400 kV Dhule-Dhule(D/C) (up to dead
end tower)
RAICHUR SHOLAPUR TRANSMISSION
CO. LTD.(RSTCL)
1 765 kV Raichur - Sholapur line 2nd S/C
19.11.14
Commissioned
16.07.14
Commissioned
04.12.14
Commissioned
05.12.14
on
on
on
Commissioned
on
29.06.2014
It was suggested by WRLDC and constituents that important list of line will be sent by
each constituent to WRLDC and WRLDC will compile and furnish the list as per
priority of commissioning.
The Sub-Committee noted and agreed as above.
7.3
Commissioning of new Generating units in Western Region and the
capacity expected to be commissioned during the current year 2014-15.
A. INTIMATION OF COMMERCIAL DATE OF OPERATION OF THERMAL
PROJECTS TO MINISTRY OF COAL/CIL.
Secretary, CEA vide letter dated 30.01.2015 intimated that the Chairperson, CEA took
a meeting on 28.01.2015 with the Member (Hydro/ Thermal/ E & C), Member I/c (GO
& D) and other concerned Officers of CEA to discuss the issue regarding the
procedure to be followed for intimation of Commercial Date of Operation (CoD) to
Ministry of Coal/CIL for the purpose of supply of coal as per the FSA. The decision
taken in this regard is stated below:
Henceforth intimation of CoD by CEA to Ministry of Coal/CIL shall be conveyed based
on the following:
•
Confirmation letter by RPC for the Cod received in CEA; or
•
Confirmation letter from concerned RLDC/SLDC (as the case may be).
Since, CEA has to convey the declaration of CoD only for the purpose of supply of
coal by CIL as per the FSA, therefore, the matter would be dealt by OM Division. TPM
Division will intimate the commissioning date of the Unit to OM Division for this
purpose. Member (GO & D) will issue direction to all RPCs to furnish the commercial
date of operation (CoD) to CEA immediately after receipt of information.
468th OCC MINUTES
13
OCC DISCUSSION:
CM, WRLDC stated that as per the existing regulations, CoD of all the units in the
control area jurisdiction of RLDCs have to follow the order of Hon’ble CERC in para
35 of its order dated 8th Aug 2014 in Pet.No.85/MP/2014 in the matter of
Consideration of the declaration of COD and scheduling of Sasan UMPP in terms of
the judgment dated 12.8.2013 in Appeal No.149/2013 of Appellate Tribunal for
Electricity if has been directed that following provisions shall be adopted by RLDCs
for declaration of COD by generating stations which are not governed by TCT 2014-19
and adequate provisions are not made in the respective PPAs.
Quote
“Guidelines with regard to the commercial operation
35.WRLDC has prayed for "issue of specific guidelines with respect to declaration of
COD of the generators who are not governed by the Central Electricity Regulatory
Commission (Terms and Conditions of Tariff) Regulations , 2009 to be in line with
CERC regulations so that the same can be implemented in a dispute free manner and
eliminate any possibility of gaming by generator". The Commission has taken note of
the prayer of WRLDC and is of the view that in case of UMPP, the PPA contains the
necessary provisions with regard to the performance testing and commercial operation
of the unit of the generating stations and the same should be strictly complied with. In
other cases, if adequate provisions are not made in the PPA, the RLDC shall be
guided by the provisions in the Central Electricity Regulatory Commission (Terms and
conditions of Tariff) Regulations, 2014 in this regard. We direct the NLDC and RLDCs
to submit report in consultation with CEA which shall include specific difficulties
experienced by RLDCs in dealing with the performance testing and commercial
operation of the generating stations which are not governed by the Tariff Regulations
of the Commission. The report shall be submitted within two months. We direct the
staff of the Commission to study the report of the NLDC/RLDCs and place it before the
Commission along with its suggestions for consideration and necessary directions.”
468th OCC MINUTES
14
Unquote
Accordingly the following practices have been adopted by WRLDC w.r.t. declaration of
COD of any Unit (irrespective of the ownership) by a generating station (CGS/IPP
etc).
A. While declaration of COD of a unit by a UMPP station, necessary provisions of
PPA shall be strictly complied. This means, UMPPs have to submit all the
documents stipulated in PPA to RLDCs also before declaring COD for
necessary checking before staring the commercial scheduling by RLDCs.
B. In case of stations were adequate provisions are not made in PPA, then RLDCs
shall be guided by TCT 2014-19 clauses of COD mentioned in Chapter-2.
Which means, all the stations have to follow the following clauses of TCT 201419.
•
COD of a thermal station mean the date by generating company after
demonstrating MCR or IC through successful trial run after seven days
prior notice issued to its beneficiaries.
•
Trial run mean, successful running of the generating station or unit
thereof at MCR or IC for continuous period of 72hrs. for thermal and
12hrs for hydro stations.
•
Generating company shall certify to the effect that the generating station
meet the key provisions of technical standards of CEA.
•
Certificate shall be signed by CMD/CEO/MD of the company subsequent
to its approval by the Board of directors in the format enclosed at
Appendix-VI if TCT 2014-19 and shall be submitted to Member
Secretary & concerned RLDC.
Member Secretary WRPC stated that during the framing methodology all the
rules/regulations shall be maintained.
The Sub-committee discussed the matter in detail and decided that all the generators
shall be requested to send to SLDC/WRLDC as the case may be, a certificate
indicating completion of all the modalities such as continuous running for 72 hrs at
95% of rated capacity etc. and
supporting documents viz. SEM meter data etc.
SLDC/WRLDC would submit data log of corresponding period when 72 hours of
468th OCC MINUTES
15
continuous running at 95% of rated capacity was achieved. WRPC/WRLDC would
then verify the details and confirm the COD of their generating units to CEA for
onward communication to CIL for resuming coal supply.
Member Secretary, WRPC shall issue a confirmation letter to OM division of CEA with
a copy to GM Division of CEA for their further needful.
The sub-committee agreed/noted the above methodology of COD for coal
linkage purpose.
B. STATUS OF GENERATING UNITS COMMISSIONED /EXPECTED TO BE
COMMISSIONED DURING THE CURRENT YEAR 2014-15 IN WESTERN REGION
The status regarding Generating units, commissioned /expected to be
commissioned during the current year 2014-15 according the available information is as
below:
Name of the Power Projects
Unit No. Capacity Date of
Commissioning
(MW)
/Schedule Date
GUJARAT
NIL
CHHATTISGARH
Marwa
1
2
500
500
May 2015
May 2015
MAHARASHTRA
Dhariwal
2
300
Synd. On 23.04.2014
CHANDRAPUR
8
500
Synd. On 11.01.2015
CHANDRAPUR
9
500
September 2015
KORADI
8
660
April 2015
KORADI
9
660
August 2015
KORADI
10
660
March -2016
PARLI
8
250
December 2015
APML
MADHYA PRADESH
Singhaji TPS
5
660
COD on 11.10.2014
2
600
Commissioned on 15.10.14
M/s Jhabua Power, Seoni
1
600
Jaiprakash Power, Nigri
1
660
Jaiprakash Power, Nigri
Moser Bear (Hindustan power)
Moser Bear (Hindustan power)
EssarPower MP ltd (Mahan)
2
1
2
660
600
600
1
600
March – 2015
Synchronized on 3.09.14
COD on 17.9.14
March 2015
March – 2015
December 2015
Synchronized on 24.04.13
468th OCC MINUTES
16
EssarPower MP ltd(Mahan)
Jhabua Power
BLA
CENTRAL SECTOR/IPP
KSK
KSK
ACBIL
SASAN
SASAN
Sasan
Dgen
Dgen
Dgen
2
1
2
600
600
45
March 2015
March 2015
June 2015
2
5
600
600
1
5
6
4
51
52
53
300
660
660
660
400
400
400
March 2015
March 2015
March 2015
Synchronized in 22.08.2014
March 2014
Synchronized in May 2014
COD on 11.12.2014
COD on 11.12.2014
COD on 11.12.2014
Sub-committee noted as above.
ITEM NO. 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Third quarter
(October 2014 to December 2014) for the year 2014-15.
Healthiness of DG set at Black Start Capable Stations in Western Region
Western Region has 29 stations capable of black start. As per section 5.8(b) of IEGC,
“…the Diesel generator sets for black start would be tested on weekly basis& the test
report shall be sent to RLDC on quarterly basis.”
The list of stations in WR for black start with current status is enclosed at Annexure 8.1.
The Sub-Committee noted as above.
ITEM NO. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR
Status of physical & cyber security in Power Sector for the Third quarter (October
2014 to December 2014) have not been received from some of the constituents.
The Sub-Committee noted as above.
ITEM NO. 8.3 BUS VOLTAGE DIP IN 220 KV SWITCHYARD &
DISTURBANCE IN ELECTRICAL BUSES & GENERATOR :
OS, NPCIL Kakarapara intimated that on 19/01/15
voltage
dip occurred
twice at 08:40 hrs and 08:41 hrs respectively. As per Disturbance Recording
System (DRS) first time voltage dipped by 9kV, second time voltage dipped
468th OCC MINUTES
17
b 23 kV. SLDC wa
by
as contacted & as per them
m fault occcurred att Haldarw
wa
e
end
(Halda
arwa-
GE
EPCO line
e).As per DTR, fau
ult
persistted for 400msec
4
&
fo
ollowing are
a the ob
bservationss from DT
TR.
1) R ph
hase grid voltage diipped from
m 225 to 153 KV.
2) Hal 1 and 2 cu
urrent increased to 650A from
m -56A.
3)
nerator cu
urrent inccreased frrom 8500 amps to 13000 amps (Stattor
Gen
current limiter 92
240 A)
nerator terminal volttage dippe
ed to 13.8
8 KV from 15.8 KV.
4) Gen
5) SUT
T fed bus-B
B&C/G &H
H voltage dipped to 5.25 KV ffrom 6.6 KV.
K
6) UT fed
f
bus-A//F voltage dipped to
o 5.56 KV
V from 6.6 KV.
Sim
milar incide
ent also occurred
o
o 04/12/2
on
2014 whe
en bus vo
oltage dip
p from 220
0
KV to 188 KV
V occurred
d on 1616
6 hrs & on 28/12/201
14 at 105
54 hrs.
Thiss type off disturbances
in grid volta
age & ge
enerator p
parameters
exp
pected at KAPS be
ecause off transmission
are no
ot
line isolation during fault & in
thiss case fau
ult persistted for lo
ong time (400msec)
(
.
The
e Sub-Com
mmittee discussed
d
d the mattter & sug
ggested to
o refer it in a PCM
M for
furtther delibe
eration as
s more info
ormation is required to analy
yse the inc
cident.
ITE
EM NO. 9 : ITEMS
S FROM WRLDC:
W
:
1. OPERATIONAL DIS
SCIPLINE
• The sta
atus of com
mpliance to
o DSM reg
gulation by major Stattes of Wes
stern Regio
on
is as given below
w:
468thh OCC MINU
UTES
18
The
e sub-com
mmittee no
oted as ab
bove.
2. Schedulin
ng of NTPC Coal Firred Stations
In liine with the
e decision
n taken in the
t
467th OCC
O
meeting, WRLD
DC has cre
eated a
sep
parate web
bpage on its website to
t facilitate
e beneficiaries in sen
nding their requisition
ns
as per
p their de
ecision takken the OC
CC meeting
g. The web
bpage show
ws the follo
owing
figu
ures for eacch 15-minu
ute time blo
ock:
-
Declare
ed Capability of ISGS
S in MW
-
Entitlem
ment of the
e beneficia
ary computted from th
he DC in MW
-
Requissition receivved from the benefic
ciaries in MW
M
-
Requissition receivved from the benefic
ciary as % of its entitlement
-
Injectio
on Schedule (Summa
ation of the
e Requisitio
ons) in MW
W
-
Injectio
on Schedule as % of Declared Capability
The
e URL:
http://wrldc..in/WebPublish/ISGS
S_SurplusP
Perc.aspx
Alte
ernate URL
L:
http:///wrldc.com
m/WebPublish/ISGS_
_SurplusPe
erc.aspx
Hen
nce, the scheduling
s
g coordina
ators of Discoms / SLDCs ass well as Generatin
ng
Sta
ations can transpare
ently see the entittlement, re
equisition and sche
edule of all
a
Ben
neficiaries// ISGS in R0,
R R1 and
d other sub
bsequent re
evisions.
All cases, where Requissitions sen
nt by SLDC
Cs are in deviation
d
frrom the de
ecision take
en
in 4
467th OCC or cases where the
e ISGS exp
presses re
eservationss in their schedule
s
a
are
468thh OCC MINU
UTES
19
flagged by WRLDC to the concerned SLDCs with copy to the respective ISGS along
with an advice to SLDCs to review their requisitions.
The WRLDC & NTPC intimated that they were still facing the problem in
implementation of methodology /decision taken in 467th OCC meeting & getting
unreasonable schedule.
Member Secretary WRPC stated that the matter will be taken up in ensuing
WRPC meeting.
The sub-committee noted as above.
3. CERC order in petition No. RP/06/2014 in the matter of review petition filed by
Tripura State Electricity Corporation Ltd (later joined by M.P.) on Deviation
Settlement mechanism
Hon’ble CERC vide its order dated 20.01.2015 in petition No. RP/06/2014 has granted
relaxation in regulation 5 (1) (iii), 5 (1) (iv) and regulation 7 (3) of the DSM regulation in
respect of the utilities having schedule of 400 MW or below w.e.f. 2nd February 2015.
In compliance with the CERC directions the aforesaid CERC order has been
uploaded on the WRLDC website and is available at the following URL:
http://wrldc.in/docs/CERC%20Order%20on%20DSM_Tripura%20State%20Ele
ctricity%20Corporation%20Ltd.pdf
Alternate URL
http://wrldc.com/docs/CERC%20Order%20on%20DSM_Tripura%20State%20E
lectricity%20Corporation%20Ltd.pdf
a) The salient features of the above order are:
The relaxation of Regulations 5 (1) (iii), 5 (1) (iv) and Regulation 7 (3) of the
DSM Regulation in respect of utilities having schedule of 400 MW or below with
effect from 2nd February, 2015 as under:-
a.
In case of utilities having schedule of 400 MW or below, Deviation
Charges shall be receivable:
(i) for under-drawal upto 48 MW in relaxation of Regulation 5 (1) (iii) of the
DSM Regulations, and
(ii) for over-injection upto 48 MW in relaxation of Regulation 5 (1) (iv) of the
DSM Regulations.
The sub-committee noted as above.
468th OCC MINUTES
20
4. DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS (FIRST
AMENDMENT) REGULATIONS, 2014 DATED 18TH DECEMBER’ 2014
As per the amendment the over drawl / Under Injection at Frequency less than 49.7 Hz
is Not Permissible. Likewise Under drawl / Over Injection at Frequency more than
50.1Hz is Not permissible.
Summary of DSM regulation from the Grid operation prospective is tabulated below :
Frequency
Range
F < 49.7
Over Drawl
Under Drawl
Under Injection
Over Injection
X Not Allowed
✓
X Not Allowed
✓
49.7 ≤ F <49.9
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
49.9 ≤ F <50.05
50.05 ≤ F <
50.1
50.1 ≤ F
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
✓
X Not Allowed
✓
X Not Allowed
Deviation
Limit:
12% of Schedule or 150MW whichever is less. ( Relaxation upto 48MW for
Schedule ≤ 400MW)
The sub-committee noted as above.
5. FAILURE IN ULDC TELECOMMUNICATION SYSTEM RESULTING IN NONAVAILABILITY OF REAL-TIME DATA FOR PROLONGED PERIOD IN THE
MONTH OF JANUARY-2015
a) Due to failure of MUX cards at Bhatapara since 11:10 Hrs of 24-jan to 13:26 of
27-Jan, the entire data from Raipur (which is a major concentration point)
stopped coming. All RTU’s data from Bhadrawati, Raipur, Parli, GMR, Seoni,
Sipat, Bilaspur, Wardha was not available at WRLDC. Complete Chhattisgarh
area data was not available. The observability of nearly 10,000 MW was not
available at WRLDC control room.
b) Again, there was a MUX card failure at Indore POP at 1500 Hrs. of 27-Jan to
11:40 of 29-Jan. Madhya Pradesh and Chhattisgarh area data was not visible.
The Indore POP handling about 25,000 MW, causes complete darkness and we
are operating in a blind mode.
c) Generation of 300MW at Sipat in W3 area was not visible from 22:45hrs of 22Jan-15 to 11:40hrs of 29-Jan at WRLDC, which causing serious inconvenience
468th OCC MINUTES
21
to Grid operation and endanger the Grid security. It is requested to look in to the
issue and may kindly resolve the same at the earliest.
d) The nodal officer on behalf of POWERGRID may be identified for resolution
above such operational issues.
The issue of reliability and redundancy of communication channels used for telemetry
of data from stations to SLDC/RLDC/NLDC is being deliberated in the OCC forum.
There is a need for assigning higher priority by the concerned utilities in this regard.
In this matter a meeting was taken by Chairperson CEA on 28th January 2015 wherein
the need for ensuring reliable telecommunication up to 33 kV level was emphasized.
The constraints experienced during system restoration due to failure of communication
system during Cyclone storm Hudhud was discussed in detail. During the meeting it
was decided that optical fiber connectivity upto 33kV is desirable to enhance
redundancy in day to day operation, beside help in early restoration during natural
calamity. It was also decided that all new substation below 132kV should have optical
fiber connectivity.
Members deliberated on the following issues:
1. Monitoring ULDC telecommunication system by respective utilities
2. Nomination of nodal officers by POWERGRID for resolution of issues and
coordination in related with telecommunications
3. Providing redundant communication channel for speech and data transfer from
major stations to SLDCs and WRLDC.
4. Providing optical fibre connectivity at all new 132 kV substations.
DGM, WRLDC intimated that the following executives from WRLDC & PGCIL
would be coordinated for resolution of issues related with telecommunications
1. Smt Sachala Mishra / Smt Jyoti Sharma WRLDC
2. Sh RJ Dubey DGM WR-I Nagpur
3. Dr RK Dubey WR-II Asst GM Vadodara (unless any new name suggested by WR
II)
4. Sh RK Agrawal DGM - Powergrid Chhatishgarh System.
468th OCC MINUTES
22
He
further
informed
that
because
of
the
radial
nature
of
ULDC
communication, any single failure in the chain, data transmission to WRLDC
and reverse transmission to SLDCs gets interrupted. The same has been
discussed for the Maharastra data loss during 24-27 January due to ULDC
link failure at Bhatapara / Indore causing a major deviation on the DSM.
WRLDC has submitted a proposal for communication patch up between
ULDC and Powergrid Telecom and also has been appraised to POWERGRID
LD & C to implement. WRLDC requested WR I / II to implement the
communication patch up at all wide band location where both ULDC and
POWERGRID Telecom co-exist. State utilities may approach above coordinating officer in case of failure of data in real time for prolonged period.
The sub-Committee noted as above.
6. SECURE EVACUATION FROM SASAN-VINDHYACHAL COMPLEX
Sasan UMPP has an envisaged capacity of 3960 MW. Presently Five units of
Sasan are commercially in operation (3300 MW). The COD process of 6th Unit has
also started. The installed capacity at Vindhyachal-I, II, III and IV is 4260 MW. This
includes 2x500 MW units of Vindhyachal-IV. The total generation at Sasan and
Vindhyachal complex is around 8220 MW. The present position of the envisaged
transmission system for evacuation from Sasan-Vindhyachal complex is as under:
S No.
Element Name
Status
1
765 kV Sasan-Satna ckt-1
In operation
2
765 kV Sasan-Satna ckt-2
In operation
3
2x1000 MVA, 765/400 kV ICT at Sasan
In operation
4
765 kV Sasan-Vindhyachal
Expected in March’2015
5
765 kV Vindhyachal-Satna ckt-1
Expected in March’2015
6
765 kV Vindhyachal-Satna ckt-2
Expected in March’2015
7
2x1500
MVA,
400/765
kV
ICT
at Expected in March’2015
Vindhyachal PS
8
765 kV Gwalior-Jaipur
Representative
from
POWERGRID,
Expected in March’2015
WR-II
had
intimated
that
765kV/400kV
Vindhyachal pooling station is in advance stage of commissioning and expected by
468th OCC MINUTES
23
end of Feb 15.
The following are the sequence for charging of various elements
associated with Vchal pooling stations:
Existing contingency arrangement:
1. Circuit no. 1 of 400kV V’chal (NTPC) – V’chal (Pooling) is connected to Rihand
(NTPC) (interconnection between WR & NR)
2. Circuit no. 2 of 400kV V’chal (NTPC) – V’chal (pooling) is connected to Sasan
UMPP bypassing V’chal (Pooling) station
3.. Circuit no. 1 of 400kV Sasan UMPP – V’chal (Pooling) station is connected to
Rihand (NTPC) by passing V’chal (pooling) and presently line is kept open at both
ends.
Proposed arrangement
1.
Circuit no. 1 of 400kV V’chal (NTPC) – V’chal (Pooling) shall remains
connected to Rihand (NTPC) (interconnection between WR & NR)
2.
Circuit no. 2 of 400kV V’chal (NTPC) – V’chal (pooling) shall remains
connected to Sasan UMPP bypassing V’chal (Pooling) station. However,
shutdown is proposed on 24.02.15 & 25.02.15 for connecting 400kV Sasan –
V’chal (pooling) Ckt.1 from loc.no. 12/0.
3.
First time charging of 765/400kV V’chal (pooling) station through
charging of 400kV Sasan – V’chal (pooling) Ckt.1 from Sasan end (extending
from loc.no.12/0 to pooling station).
4.
First time charging of 765/400KV ICT # 2 at V’chal (pooling) station.
5.
First time charging of 765kV V’chal (pooling) – Satna Ckt. 1.
6.
First time charging of 765kV V’chal (pooling) – Satna Ckt. 2.
The line diagram for above arrangement is attached at Annexure 9.6.
The sub-Committee noted as above.
468th OCC MINUTES
24
7. Reliability of DG set at Blackstart stations
During the workshop on Western Region Recovery Procedure, the agreed on the
need for having reliable auxiliary supply for success of black start. Accordingly the
matter was discussed in 467th OCC meeting wherein it was decided that the station
having black start facility shall have at-least two DG sets for reliability and redundancy
of DG set.
The list of 23 stations having single DG set along with make and year of
Manufacturing are given below.
Stations with only one DG set
Year
S No
Station Name
Make
Madhya Pradesh
1999
1
Pench
CUMINS INDIA PVT. LTD.
1999
2
Bargi
Cumins India Ltd. Pune
2005
3
Medikheda
Cromption Greaves
2005
4
Tons(Bansagar)
Cromption Greaves
1995
5
Rajghat
KIRLOSKER ELECTRICAL ltd
1958
6
GandhiSagar
KATO ENGINEERS
2014
7
Birsinghpur
HBL
Gujarat
1990
8
GPEC(CLPIPL)
Caterpiller Model No. 3608
1991
9
GIPCL-I
KIRLOSKAR CUMINS LTD
1987
10
Ukai (H)
Kirlosker Electric Co.Ltd
1983
11
Mini Hydro
Jyoti Ltd.,Baroda
1990
12
Kadana
KIRLOSKAR CUMINS LTD
1991
13
KAWAS
Ceglec Ltd.
1994
14
GANDHAR
Niigata Engg,Japan
Maharashtra
1992
15
Khopoli
CUMINS INDIA PVT. LTD.
1997
16
Bhivpuri
Catter Pillar
2002
17
Bhira
Catter Pillar
1994
18
Bhira PSS
CUMINS INDIA PVT. LTD.
1993
19
Trombay
Kirloskar
1958
20
KOYNA I & II
AEG (Made in Germany)
2006
21
URAN
Kirloskar
1991
22
Paithan
Kirloskar
Chhattisgarh
1996
23
Hasdeo Bango
CUMINS INDIA PVT. LTD.
The sub-committee noted as above.
8. TESTING AND COMMISSIONING OF NEW GENERATING UNITS IN WESTERN
REGION
468th OCC MINUTES
25
As per the available information at WRLDC following units are expected to inject
infirm power as part of Testing and commissioning activity for Capacity addition in
FY 2014-15..
1. SASAN UMPP Unit-6 ( 660MW already synchronized)
2. Maruti Clean Coal ltd unit-1 ( 300MW expected on 11/02/2015)
3. Jaypee Nigrie
Unit-2 ( 660MW expected on 11/02/2015 )
4. RKM Power Unit-1 ( 600MW expected on 14/02/2015)
Many more units which are planned for commissioning as indicated in Item 7.3-B
may add to above list. Other entities may also furnish the details of generating
units expected to be under performance test in Feb’15 and March’15 alongwith
plan for injecting infirm power into the grid for testing etc so that the infirm power
from these units be staggered to avoid any high frequency operation.
9. Extension of start-up supply to large Power station during system
restoration
A) CGPL UMPP
The issue of extending startup supply to CGPL UMPP was discussed in 465th 466th
and 467th OCC meeting. It was decided that GETCO, WRTS-II and CGPL officials
would visit the site and assess the feasibility of connectivity between CGPL Mundra
and 220kV Nanikhakar line for drawing start-up supply under contingency situation. It
was also suggested by members and agreed by CGPL Mundra that they would submit
a detailed plan to avail start-up power by following alternative methods (used under
contingency condition only)
a) Interconnection of APL and CGPL
b) From 220kV Nanikhakar of GETCO
CGPL has confirmed vide its letter dated 29th Jan 2015 that a meeting was held
between SLDC Gujarat and CGPL on 10th Jan 2015. The CGPL proposal is as under:
1. GETCO may install 220/400kV ICT of appropriate rating at CGPL Mundra for
getting power from 220kV Nani-Khakhar CGPL line. CGPL start-up power
requirement would be app. 60MW at 400kV level.
2. Power at 400kV level can be extended to CGPL from Bhachau-CGPL Mundra
line which is shortest line to CGPL(approx 110km). Bhachau(PGCIL) 400kV S/s
may be charged from 220/400kV ICT at Bhachau or from 400kV VadaviBhachau line or 400 kV Varsana-Bhachau line.
468th OCC MINUTES
26
CE SLDC Gujarat suggested following two alternatives for black-start facilities
at CGPL UMPP:
1. Installed the diesel power captive plant of capacity of 60 MW.
2. Be a HT consumer of PGVCL having contract demand of 60 MW for which CGPL
has to pay PGVCL. After agreement GETCO shall be provided the necessary
transformer etc.
Member Secretary, WRPC stated that purchasing of 60 MW rating diesel plant
may be too costly, therefore second alternative would be better for CGPL.
The sub-committee noted as above.
10.Utilization of available capacity in Pump Storage Hydro Plants in Western Region Western Regional Grid has seen a dramatic increase in the installed capacity of
thermal stations, large-scale integration of renewable energy sources and large
variation in peak and off-peak demand. The emerging challenges in grid operation call
for enhancing the flexibility of generation and explore possibility of energy storage.
Operation of available capacity of Pumped Storage hydro plants in pumping mode
would provide the following advantages:
a) Would enable storage of electrical energy into potential energy during off-peak
hours for utilization during peak hours
b) Provides a dynamic load during off-peak hours and thus helps in reducing
difference between Maximum and Minimum Load in the system
c) Limits the quantum of variation in despatch schedule of thermal stations, thus
would help in enhancing efficiency of thermal stations
d) Would provide spinning reserve in the grid due to its flexibility to quickly change
over from motoring mode to generation mode
e) Would help in voltage and power factor correction
f) Improved System Reliability
The above benefits are elaborated in detail in the CBIP Publication No. 265 titled
“Pumped Storage in India” published in Nov 1997.
There was a discussion on the above issues during the 467th OCC meeting and there
was a consensus on the need for full utilization of available capacity of pumped
468th OCC MINUTES
27
storage hydro plants in Western Region. The status of pumped storage hydro capacity
in Western Region is as under:
Capability
of working
Station
Capacity
State
Year
in
pumping
mode
1
Paithon
Whether
being
operated
in
pumping
Availability
of
Telemetry
mode
Yes
SLDC
No
1x12
Maharashtra 1984
2 Ujjaini
1x12
Maharashtra 1990
Yes
3 Bhivpuri
1x90
Maharashtra
No
4 Bhira
1x150
Maharashtra
Yes
No
No
5 Ghatghar
2x125
Maharashtra
Yes
Yes
No
(Jayakwadi)
Kalwa to
Tail
6
Sardar
Sarovar
6x200
confirm
No
No
race
Yes
reservoir
Gujarat
to
be
completed
7 Kadana-I
2x60
Gujarat
8 Kadana-II
2x60
Gujarat
1990
Yes
No
No
1995-
Yes
No
No
96
The CEA report on “Large Scale Grid Integration of Renewable Energy Sources- Way
Forward” issued in November 2013 also emphasizes the need for exploitation of
pumped storage hydro stations. The report lists various existing and envisaged PSP
schemes in all the States.
SLDC-Kalwa to update the following
-
Status of operating Paithan and Ujjaini hydro plants in pumping mode
-
Status of operating hydro stations of Bhira and Bhivpuri in pumped storage
mode. Constraints if any may be elaborated
-
Status of completion of PSP scheme in 2x40 MW Koyna left bank, 700 MW
Malsej Ghat, 400 MW Humbarli
NCA may update the progress of construction of tail race reservoir in SSP
468th OCC MINUTES
28
SLDC Gotri may update the status of healthiness of Kadana PSP (4x60 MW).
Constraints if any may be elaborated.
SLDC MP representative informed that there is no hydro project like Mara (1100
MW) and Binauda (2250 MW) as mentioned in agenda in Madhya Pradesh.
Member(Power), NCA informed that the construction of tail race reservoir in
SSP would take around 18 months from now and will be discussed in next
power sub-committee of NCA & commercial modalities would be also
discussed.
Member Secretary, WRPC stated that in order to ensure balance between load
and generation, the generation is required to be backed down during off-peak
hours and picked up during peaking hours. The difference of demand at Peak &
off-peak hours is around 12000 MW. These emerging challenges in grid
operation call for enhancing the flexibility of existing fleet of conventional
generation and also exploit the available facilities for energy storage and
spinning reserve in the form of Pumped Storage hydro stations.
The uses of PSP will definitely help in load flattering and smooth operation of
grid. He further informed that the matter will be discussed in the 28th WRPC
meeting to be held on 3rd & 4th March, 2015 at Udaipur.
The sub-committee noted as above.
11. Review of ATC/TTC for each state control area in Western Region.
As per the CERC regulations on congestion alleviation in real-time TTC/ATC is to be
computed by SLDCs for their States. The need for assessment of import/export ATC
for each state was emphasized CERC order on Grid Disturbance of July 2012. The
assessment of TTC/ATC for in a meeting taken by Member (GO&D), CEA on 29th Oct
2014. There was a consensus on the issue in the 13th FOLD meeting held on 11-Dec14.
468th OCC MINUTES
29
The matter was further discussed in the 464th, 465th, 466th and 467th OCC meeting. It
was decided to have joint study with SLDCs to identifying measures to enhance
import/export limits from the grid. One day workshop on TTC/ATC was conducted with
nominated representatives from SLDCs and WRPC on 17-Dec-14 at WRLDC, where
methodology of TTC/ATC computation was explained and the need for computing
TTC for each state control area was emphasized. A hand on training was given to all
participants and study cases were shared.
SLDC, MSETCL vide letter dated 12.02.2015(Copy enclosed at Annexure – 9.11)
intimated that they have not accepted reduced ATC of 6300 MW calculated by
WRLDC inspite of commissioning of many new lines and ICTs Maharashtra system.
Due to reduced ATC they are facing problem to procuring the power and also during
ensuring high demand power the reduced ATC will be a matter of serious concern.
Member Secretary stated that the assumptions of WRLDC for arriving at 6300 MW
ATC can be verified/re-checked by MSETCL and if any suggestions are there WRLDC
should accommodate the same . In this regard it is requested that MSETCL and
WRLDC would jointly look into calculation and sort all the matter and revert to OCC.
The sub-committee noted as above.
12. Testing of SPS envisaged for SR-NEW grid operation
The matter has been deliberated in different OCC’s as well as PCM. In 27th
TCC/WRPC, POWERGRID stated that signal was extended to all envisaged
generator, accordingly mock trial of SPS was conducted on 1st December-14 and
result was shared with the members in 466th OCC.
The following is present status of the progress of the activities.
Responsible Agency
KWPCL/DB Power
468th OCC MINUTES
Progress stated in 468
meeting of OCC
POWERGRID has
extended SPS signal upto
KWPCL and DB Power.
Wiring for generation
reduction within the Station
to be completed by
respective Stations
Pending Action
KWPCL and DB Power to
complete the wiring for
generation reduction within
their station.
30
POWERGRID
BALCO wiring is completed POWEGRID to complete
and LANCO wiring will be the wiring for extending the
completed by 28-Feb-15. SPS signal to LANCO
Extension of signal from
JPL to JPL Extn. has been
completed by Jindal.
JPL
MSETCL and
POWERGRID
MSETCL and
POWERGRID
NIL
-
MSETCL to coordinate with
POWERGRID for
extending SPS signal for
250 MW Load Shedding
OR 250 MW generation
increase at Koyna Hydro
-
MSETCL to coordinate with
POWERGRID for
extending SPS Signal at
IEPL, Koradi ,
Khaparkheda, Chandrapur
The sub-committee noted as above.
13. Implementation of the revised AUFLS in DD and DNH
MSETCL have revised its quantum of load relief in all stages of AUFLS scheme
and submitted the updated revised quantum of load relief with feeder details. The
updated AUFLS scheme of Western Region is as follows.
Western Region
Stage - I 49.2 Hz
States
Stage - II 49.0 Hz
Stage - III 48.8 Hz
Stage - IV 48.6 Hz
Implement Required Implement Required Implemen
Required Implemented Required
ed Load
Load
ed Load Load
ted Load
Load relief Load relief Load relief
relief
relief
relief
relief
relief
GUJARAT
580
773
580
726
580
1117
590
1025
MADHYA PRADESH
460
468
460
450
460
460
465
490
CHATTISGARH
150
110
150
114
155
117
155
91
MAHARASHTRA
805
1122
810
1215
815
1044
820
1071
25
10
25
*
25
15
25
*
25
15
25
*
25
15
25
*
GOA
UT: DD
UT: DNH
Total load relief
30
*
30
*
35
*
35
*
2060
2497
2070
2530
2085
2763
2105
2702
* UFRs under procurement
DNH has informed in 465th OCC that work order has been placed and the agency
has been deployed for implementation. It was informed by DD that re-tendering for
the relays started on 7th November, 2014
468th OCC MINUTES
31
GOA, DD and DNH representative were not present in the meeting.
14. Status of telemetry in Western Region
Detail Summary of Telemetry Status.
S
No
1
2
3
4
5
6
7
Telemetry not
available
400kV Warora
400kV
Lonikhand(New)
400kV
ChandrapurStgII
400kV Taptithanda
400kV Khaparkheda
400kV Deepnagar
Further, 17more
stations where
220kV station data is
not available
Telemetry
Updated in 467th
Intermittent
OCC
Maharashtra
Total 48 Stations
220kV data is
intermittent
Updated in
468th OCC
Mar-15
Mar-15
Work is under
progress.
SCADA based
System
Station not
Commission
Gujarat
1
220kV Bhatiya
2
220kV Mokha.
220kV
Navsari(Getco)
Madhya Pradesh
468th OCC MINUTES
32
S
No
1
2
Telemetry not
available
220kV Dhar
220kV Panagar
36 Station of 132kV
where Telemetry is
not available
1
1
2
220kV Amona
220kV Cuncolim
1
2
3
Telemetry
Updated in 467th
Intermittent
OCC
220kV Anuppur
Work is under
132kVWaidhan
progress.
132kVMorwa
Chhattisgarh
19 Station of
132kV where
Telemetry is
intermittent
GOA
220kV Tivim,
220kV Ponda,
Not Updated
220kV Xeldam
110 kV Kadamba
110kV Verna
DD and DNH
220kV Magarwada.
220kV Kharadpara
220kV Khadoli
Updated in
468th OCC
March-15
March-15
Check and
update the
status
Not Updated
Not Updated
Not Updated
Updated
Completion date
in 467th OCC
Updated
Completion date
in 468th OCC
31-Jan-15
31-Jan-15
28-Feb-15
28-Feb-15
-
Completed
Completed
28-Feb-15
28-April-15
-
28-Feb-15
28-Feb-15
31-Mar-15
31-Mar-15
POWERGRID
S Nos
1
2
3
4
5
Station Intermittent Telemetry
Telemetry Status
765kV Kotra
765kV Tamnar
400kV Navsari
765kV Dharamjaygarh
400kV Magarwara
PMU Data
1 Satna PMU data at WRLDC
Alternate 2nd Channel
1 Aurangabad alternate 2nd channel
IPP
S Nos
Station Intermittent Telemetry
1 JPL
468th OCC MINUTES
Updated Completion
date in 467th OCC
Updated Completion
date in 468th OCC
Not Updated
Work is in Progress
33
2 ESSAR Mahan
Not Updated
Within Week
Alternate 2nd channel--
Redundant Comm. Channel
S No
Redundant Comm. Channel
Completion date in
467th OCC update
Completion date in
468th OCC update
1
2
3
APL Tiroda
CGPL
SASAN UMPP
28-Feb-15
31-Jan-15
31-Jan-15
28-Feb-15
Software Modification
Not informed
15. ADMS(Automatic Demand Management Scheme) Implementation as per
Sec. 5.4.2 of IEGC:
Gujarat have submitted the updated status of ADMS implementation as on
31.01.2015. Progress Report as on 31.01.15:
• The hardware for control centre and field have been received.
•
Survey work of all selected sites completed.
•
•
Communication has been established between SLDC and Load Management
Units of Discoms.
Field device installation work is under progress at different sites.
•
Project completion date is by 31st March,2015
SLDC GETCO have intimated the progress of ADMS in WR as on 31.01.2015 is
attached at annexure 15.
Member Secretary WRPC requested to expedite the project & submit the present
status to WRPC/WRLDC in prescribed format.
The sub-Committee noted as above.
16. Non availability of Bus bar Protection at 400 KV Korba (West)
CSPGCL representative was not present during the meeting.
17. Lack of Bus bar protection for 220 kV Bus of Birsinghpur Thermal power
station causing complete Blackout of 400 kV Birsinghpur Thermal station
MPPGCL has informed in 466th and 467th OCC that equipment order has been placed
on 27th November to GE and expected date of commissioning is by June’15.
No representative were present during the meeting.
18. Failed Mock testing of SPS for 765 AGRA- GWALIOR on 24th December-14
468th OCC MINUTES
34
MS WRPC has taken up matter regarding non receipt of signals to Vindhyachal, Korba
and CGPL with Powergrid and requested for early rectification. On confirmation,
matter will be taken up with NRPC for further mock testing.
Member Secretary, WRPC requested NTPC Vindhyachal, Korba, CGPL and
Powergrid sit together & resolve the issue & suggested for again mock-test at the
earliest.
The Sub-Committee noted as above.
ITEM NO.9A : Additional agenda items.
1. Replacement of porcelain disc insulators with composite polymer insulators in
all polluted sections of lines in Gujarat
POWERGRID, WRTS-II had informed that frequent tripping of various critical lines due
to flashover of porcelain disc insulator strings were observed in various lines passing
through highly chemical/industrial polluted areas in Central / South Gujarat, which affects
the stability of integrity of system and may leads partial system disturbance.
In view of above, it has been decided to upgrade the system by replacing all porcelain
disc insulator strings with composite longrod (polymer) insulator strings in following lines,
during March ‘15 to May ’15, to avoid such undesirable line trippings, on account of
insulator failure.
•
400kV Gandhar – Navsari Ckt. 1&2
•
400kV Navsari – Magarwada – Kala – Vapi Ckt. 1&2
•
400kV Pirana – Vadodara Ckt. 1&2
•
400kV Dehgam – Pirana Ckt. 1&2
•
220kV Kawas associated tr.lines (Balance portion)
•
220kV Kakrapar associated tr.lines.
•
220kV Vapi-Magarwada, Vapi- Karadpada & Vapi-Sayali- Khaodli Ckt. 1&2.
468th OCC MINUTES
35
All the constituents, WRPC and WRLDC were agreed for availing shutdown
required for replacement of porcelain disc insulator strings with polymer
composite insulators, in aforesaid lines.
Sub-committee noted as above.
2. Delay in receipt of WRLDC code for online OPGW stringing works:
POWERGRID, WR-II informed that the codes for online OPGW stringing works on
various lines of WR-II is obtained in OCC meeting (from 07:00 hrs to 18:00 hrs).
However, in recent past, it has been observed that in some of lines, the code issued by
WRLDC for OPGW stringing works is too late which results poor progress and project
getting delayed for completion. It is pertinent to mention that massive gangs have been
mobilized on various lines to complete entire master communication project, by end of
May 2015.
OCC suggested WRLDC to ensure timely issuance of codes for facilitating early
completion of project.
ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING
468th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure10. Accordingly it was proposed to host 469th OCC by BDTCL/JTCL 10th & 11th March,
2015 at Nagpur. BDTCL/JTCL agreed for the same. The 470th OCC meeting would be
hosted by NTPC HQ at Raipur/Mumbai on behalf of NTPC Vindhyachal.
******************************
468th OCC MINUTES
ANNEXURE-I
LIST OF PARTICIPANTS OF 468th OCC MEETING OF WRPC HELD ON 16.02.2015 AT WRPC,
MUMBAI
Sl.No. Organisation, Name & Designation
E-mail
Mobile
I
1
2
3
4
5
6
WRPC
Shri S.D. Taksande, M.S.
Shri M.M. Dhakate, S.E.(O)
Shri Satyanarayan S., S.E. (Comml.)
Shri L.K.S. Rathore, D.D.
Shri A.C. Suresh, D.D.
Shri Ratnesh Yadav, A.D.
ms-wrpc@nic.in
opc-wrpc@nic.in
satyaguru@yahoo.com
lksr_2000@yahoo.com
acsuresh@yahoo.com
9820878384
9004087224
9223399938
9833371844
9969941273
8903929150
II
7
8
9
10
MSETCL / MSEDCL/MahaGenco
Shri Jayant Weekey, C.E.
Shri D.K. Rokade, S.E.
Shri D.J. Kolhe, E.E.
Shri Ajit Pachori, E.E.
jayantweekey@gmail.com
dkrokade@gmail.com
deepakkolhe@yahoo.com
9819962321
9167831551
9820981115
9619461420
III
11
MPPTCL / MPPGCL
Shri Sanjay Mehta, E.E.
mehtasanjay67@yahoo.co.in
9425805017
IV
12
CSPTCL / CSPGCL
Shri V.N. Singh, E.E.
cseb.vnsingh@gmail.com
9425561160
V
13
GETCO / GSLDC/ GSECL
Shri B.B. Mehta, C.E.
bbm@gebmail.com
9879200736
VI
14
15
16
17
WRLDC / POWERGRID
Shri J. James, G.M.
Shri Kuleshwar Sahu, A.G.M.
Shri P.R. Wankhede, D.G.M.
Shri Abhimanyu Gartia, D.G.M.
jebakerjames@gmail.com
9422808863
kuleshwars@gmail.com
9425294214
wankhede@powergridindia.com
agartia@gmail.com
18
19
20
21
22
23
24
25
26
27
Smt. Pushpa S., C.M.
Smt. S. Usha, C.M.
Shri Vivek Pandey, C.M.
Shri D. Bruhananda, Mgr.
Shri Chandan Kumar, Eng.
Shri Srinivas Chittari, Eng.
Miss. Jyoti Shukla, Eng.
Shri Mahendra Nath, Eng.
Ms. Chitrankshi, Eng.
Shri Abhishek Kr. Gupta, Dy. Mgr.
pushpa_seshadri@hotmail.com 9869404482
usha_s_gopi@rediffmail.com
vpandey76@gmail.com
9869404673
bruhananded@yahoo.com
9428504279
protectionwrldc@gmail.com
srinivas.chittari@hotmail.com
jyotisharma.22@rediffmail.com 9869082852
mahendranath.malla@gmail.com
chitra_20j@yahoo.com
abhishek_all@yahoo.com
9869404650
VII
28
29
30
31
NTPC
Shri P.B. Behere, G.M.
Shri E.P. Rao, A.G.M.
Shri S.K. Shrivastava, A.G.M
Shri A.K. Chandeliya, D.G.M.
pbbehere@ntpc.co.in
eprao@ntpc.co.in
sksrivastava07@ntpc.co.in
akchandeliya@ntpc.co.in
9004497088
9004497144
9425178069
9004497151
VIII
32
33
TATA POWER
Shri R.M. Sankhe, Head Opn.
Shri P.R. Gadave, A.G.M.
rmsankhe@tatapower.com
prgadave@tatapower.com
9099006541
9223553341
IX
APL
34
35
Shri C.S. Bobade, G.M.
Shri Akkshay Mathur, G.M.
chandrashekhar.bobade@adani.com
8980802255
akshayv.mathur@adani.com
9870663062
X
36
37
38
39
RINFRA
Shri Sachin Zirpe, G.M.
Shri R.P. Singh, D.G.M.
Shri Deepak Sankhe, D.G.M.
Shri Vijay Chavan, Mgr.
sachin.zirpe@relianceada.com 9322607630
rajendra.pr.singh@relianceada.com
9770010025
deepak.sankhe@relianceada.com
vijay.chavan@relianceada.com 9320167746
XI
40
KSK Mahanadi
Shri Manish Upadhyay, A.G.M.
manishupadhyay.g@ksk.co.in
9630080704
XII
41
42
NPCIL
Shri S.K. Maiti, SCE
Shri A.A. Ansari, SCE
skmaiti@npcil.co.in
aaansari@npcil.co.in
9428821925
9423982716
XIII
43
44
45
46
47
48
ESSAR
Shri Arvind Kumar, V.P.
Shri Sachidanand Bhujale, CEO
Shri Ashim Ganguly, Sr. Mgr.
Shri D.J. Saxena, Sr. Mgr.
Shri Kamlesh Garg
Ashish Kakroo
XIV
49
50
TORRENT POWER
Shri M.H. Kshatriya, G.M.
Ms. Snehal Shah, A.G.M.
mhkshatriya@torrentpower.com 9227410148
snehalshah@torrentpower.com 9227250816
XV
51
JPL
Shri Ashish Gera, A.G.M.
ashishgera@jindalpower.com
7898905117
XVI
52
NHDC
Shri Vinod K. Singh, Mgr.
vinodnhdc@rediffmail.com
9425952513
XVII
53
RKM PPL
Shri N. Krishna Kumar, D.G.M.
krishnakumar.n@rkmpowergen.in
8435000264
XVIII
54
GMR GROUP
Shri Pramod Khandelwal, G.M.
pramod.khandelwa@gmrgroup.in8390903524
XIX
55
NCA
Shri M.A.K.P. Singh, Member(P)
makpsingh @yahoo.com
XX
56
STERLITE
Shri Sachin Deshpande, G.M.
sachin.deshpande@sterlite.com 8966903047
XXI
57
RATTAN INDIA POWER LTD.
Ms. Reena Kori, D.G.M.
reena.kori@rattanindia.com
arvind.kumar@essar.com
sbhujale@essar.com
aganguly@essar.com
dsaxena@essar.com
9425066437
Anaulagnak 2.1
maah janavarI 2015 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa
piScama
xao
~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )
(
FREQUENCY PARTICULARS DURING JANUARY 2015
(AS PER FREQUENCY REPORT OF WRLDC)
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY
AaOsat AavaRi%t
2. INSTANTANEOUS
50.38
Hz. BETWEEN 0200 Hrs & 0300 Hrs Hrs. ON 02.01.2015
49.69
Hz. BETWEEN 0800 Hrs & 0900 Hrs Hrs. ON 25.01.2015
49.99 Hz.
ta%kailak
2.1 MAXIMUM FREQUENCY
AiQaktma AavaRi%t
2.2 MINIMUM FREQUENCY
nyaUnatma AavaRi%t
3. %AGE OF TIME WHEN FREQUENCY WAS
50.56
Hz. AT 03:03:00 Hrs. ON 01.01.2015
49.55
Hz. AT 07:36:00 hrs Hrs. ON 15.01.2015
JANUARY 2015
DECEMBER 2014
NOVEMBER 2014
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.61
1.00
0.41
16.85
22.85
16.08
53.73
48.29
53.60
28.81
27.86
29.90
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz.
48.5
hT\ja ko naIcao
3.2 BETWEEN 48.5 Hz. AND 48.8 Hz.
48.5
hT\ja AaOr 48.8 hT\ja ko baIca
3.3 BETWEEN 48.8 Hz. AND 49.2 Hz.
48.8
hT\ja AaOr 49.2 hT\ja ko baIca
3.4 BETWEEN 49.2 Hz. AND 49.5 Hz.
49.2
hT\ja AaOr
49.5
hT\ja ko baIca
3.5 BETWEEN 49.5 Hz. AND 49.7 Hz.
49.5
hT\ja AaOr 49.7 hT\ja ko baIca
3.6 BETWEEN 49.7 Hz. AND 49.9 Hz.
49.7
hT\ja AaOr 50.2 hT\ja ko baIca
3.7 BETWEEN 49.9 Hz. AND 50.05 Hz.
49.9
hT\ja AaOr
50.05
hT\ja ko baIca
3.8 BETWEEN 50.05 Hz. AND 51.5 Hz.
50.05
hT\ja AaOr
51.5
hT\ja ko baIca
3.9 ABOVE 51.5 Hz.
51.5
hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY
TOUCHED 48.80 Hz.
AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY
TOUCHED 48.60 Hz.
AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY
TOUCHED 51.00 Hz.
AavaRi%t 51.00 hT\ja kao CUhI
Power System Operation Corporation Ltd.
(A wholly owned subsidiary company of POWERGRID)
Western Regional Load Despatch Centre,Mumbai
2015
Voltage Profile during the month of January 2015
Annex-I
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Annex-2.3
इंदौर
इटारसी
कराड
धुले
असोज
कासोर
Indore
Itarsi
Karad
Dhule
Asoj
Kasor
जेतपुर
Bhilai
Jetpur
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
424
423
420
421
422
420
422
417
419
419
421
419
422
422
421
421
420
419
420
423
421
422
422
424
420
419
419
417
423
422
420
424
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
398
399
402
402
403
404
402
399
407
398
400
398
419
419
416
416
416
417
416
415
415
416
417
417
416
416
417
417
415
414
416
417
416
416
416
415
416
414
413
416
416
416
414
419
400
400
398
399
394
396
397
410
410
397
395
397
396
396
394
394
392
392
394
390
390
391
397
390
396
398
395
397
394
391
393
390
440
438
438
439
440
439
435
422
439
440
440
439
440
440
438
438
439
437
437
436
440
438
439
439
439
440
436
437
438
436
437
440
415
412
408
413
417
409
417
422
422
413
412
415
413
413
414
414
407
406
412
410
409
413
410
408
411
419
411
410
412
407
408
406
435
435
432
434
434
430
431
426
430
431
432
428
432
432
433
433
434
432
433
432
430
433
432
433
434
432
425
433
429
430
429
435
403
397
398
399
401
394
391
412
414
401
399
398
396
396
395
395
396
388
395
393
394
394
393
391
392
399
398
399
396
394
394
388
424
424
421
423
423
419
418
419
420
420
421
421
420
420
426
426
422
420
421
419
420
420
421
422
423
423
423
421
421
420
420
426
406
403
403
407
403
402
399
414
415
404
405
403
406
406
407
407
403
401
400
402
401
401
401
406
403
409
405
398
404
402
403
398
421
421
418
420
420
419
420
415
417
419
420
420
420
420
420
420
418
419
419
420
420
420
420
420
421
421
420
421
420
420
418
421
409
405
406
406
406
405
403
412
413
406
408
406
404
404
406
406
405
406
402
406
406
405
406
406
409
408
407
404
406
406
406
402
426
408
407
408
411
408
407
405
416
419
407
408
410
409
409
407
407
404
405
404
404
405
407
409
405
406
411
407
406
405
405
405
404
414
419
412
418
416
413
414
412
415
415
414
415
413
415
418
417
415
417
414
414
414
407
416
417
418
420
418
417
415
414
414
420
403
400
395
402
401
395
401
400
402
402
404
402
401
398
406
403
402
399
400
402
401
403
404
406
403
405
404
406
405
403
403
395
भार
सूचना
,
WRLDC, Mumbai
MIS
423
421
423
423
422
420
420
422
421
422
419
422
422
423
423
421
420
423
420
422
422
421
421
424
424
423
419
419
419
419
426
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Bina
Gwalior
नागदा
खंडवा
Nagda
Khandwa
Sipat
seoni
Bina
Gwalior
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
424
424
421
419
419
418
417
417
418
423
420
419
420
421
423
419
418
418
419
418
420
427
421
424
420
421
419
424
420
415
414
427
404
407
404
405
402
401
402
402
402
406
400
404
404
406
404
402
399
399
400
398
398
409
405
403
407
405
406
403
402
396
398
396
412
413
411
408
409
408
407
406
409
410
411
412
416
418
411
410
409
411
412
410
414
414
410
411
411
413
408
410
409
406
404
418
385
394
392
391
389
389
390
387
390
394
390
394
394
400
392
395
390
393
394
392
397
394
398
390
399
398
396
396
390
384
385
384
425
423
420
421
422
421
421
417
419
421
421
420
423
423
422
422
423
421
423
424
423
426
424
424
424
424
422
421
426
424
421
426
406
402
400
403
400
397
397
411
414
399
398
399
401
401
399
399
397
397
399
396
395
400
403
401
405
406
405
416
408
399
400
395
428
427
424
426
427
426
425
423
423
426
429
426
426
426
426
426
427
424
427
428
427
426
427
423
425
425
423
427
426
427
426
429
407
403
403
404
403
400
400
417
417
404
402
404
406
406
402
402
399
396
403
399
399
399
402
396
399
406
405
411
401
402
402
396
789
789
762
761
789
789
789
789
789
789
767
761
789
789
789
789
789
789
766
765
777
778
773
773
773
773
772
773
755
755
766
789
752
752
743
740
752
752
752
752
752
752
747
747
752
752
752
752
752
752
741
744
744
755
755
755
755
773
753
755
755
755
752
740
793
783
776
784
786
784
780
789
788
784
792
783
782
788
789
783
781
788
784
783
791
790
787
785
796
790
790
784
781
785
786
796
751
749
753
757
757
752
751
753
757
757
752
753
752
757
756
744
748
751
747
749
745
757
759
748
758
759
757
755
755
751
753
744
795
793
788
788
786
783
783
783
789
789
789
792
798
800
792
791
789
792
793
791
791
799
791
793
795
795
788
791
789
780
786
800
762
759
757
754
752
749
755
750
754
759
759
758
760
766
759
762
753
761
749
756
751
760
770
754
767
771
754
750
751
742
777
742
799
797
791
788
788
788
791
789
791
793
795
795
795
797
798
791
791
793
794
795
799
804
798
794
794
794
792
793
789
782
784
804
757
768
764
765
758
759
762
762
762
763
757
768
764
765
765
763
759
765
761
756
759
772
772
759
768
769
768
754
758
747
751
747
भार
सूचना
,
WRLDC, Mumbai
MIS
ANNEX -2.4
Sl. No
Under Frequency Operation in various Constituent System of Western Region during the month JANUARY 15
( Compiled from the data received from the constituents)
Date
Gujarat
Chhattisgarh
Madhya Pradesh
No. of
Max Load Relief No. of
Max Load Relief No. of
Occasions
at 49.2 Hz
Occasions
at 49.2 Hz
Occasions
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
01-Jan-15
02-Jan-15
03-Jan-15
04-Jan-15
05-Jan-15
06-Jan-15
07-Jan-15
08-Jan-15
09-Jan-15
10-Jan-15
11-Jan-15
12-Jan-15
13-Jan-15
14-Jan-15
15-Jan-15
16-Jan-15
17-Jan-15
18-Jan-15
19-Jan-15
20-Jan-15
21-Jan-15
22-Jan-15
23-Jan-15
24-Jan-15
25-Jan-15
26-Jan-15
27-Jan-15
28-Jan-15
29-Jan-15
30-Jan-15
31-Jan-15
Recommonded Load relief at
49.2 Hz / 49.0/48.8/48.6 Hz
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
211.2
0
0
0
0
0
0
0
0
0
0
0
0
1025
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NIL
Max Load Relief No. of
Max Load Relief
at 49.2 Hz
Occasions
at 49.2 Hz
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NIL
91
Maharashtra
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NIL
490
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
851
Annexure -2.5
POWER CUT/RESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JANUARY-2015
k : gaujarat
Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM
Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.
1
2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit2. Power supply to Agricultural & Rural Sectors
a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase
supply during rest of 16 Hrs by providing LSTC.
b) Jyotigram Yojana 24 hrs.
3 Anya jaanakarI
3. Any other information: NIL.
K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivaVut kTaOtI kI maa~a
pabandI ka samaya
ivavarNa Details
Quantum of
Restriction Timing
power cut (MW)
sao From
tk To
(a) Power Restrictions(Evening
SaUnya Nil
SaUnya Nil
SaUnya Nil
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar
inayamana Load Shedding
(c) Anya jaanakarI Other information
1.Weekly Off
2.Staggering of power supply
p`it idna kula }jaa- kTaOtI
Total Energy Cut
(MUs /day
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector: ivavarNa Details
sao From
idnaaMk Date
2.1 Three-Phase
01.01.2015
Supply(DLF)
2.1 Three-Phase
Supply(Irrigation)
2.1 Three-Phase
Supply(Mixed)
tk To
p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
31.01.2015
23:38
21:52
23:22
01.01.2015
31.01.2015
10:13
09:10
09:49
01.01.2015
31.01.2015
23:29
21:34
23:13
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM
ivavarNa Details
Scheduled Power cuts in Urban Areas
sao From
tk To idnaaMk Aaosat p`itidna
Date
idnaaMk Date
AapUit- GaMTo
Max.
(Hrs)
3.1 Commissionary H. Qtrs.
3.2 District Head Qtrs.
3.3 Tehsil Head Qtrs.
01.01.2015
01.01.2015
01.01.2015
31.01.2015
31.01.2015
31.01.2015
23:50
23:53
23:51
Average Supply
Hours per day
Min. (Hrs)
Average (Hrs)
23:20
23:28
23:09
23:42
23:47
23:41
ga : maharaYT/ Maharashtra
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivaVut kTaOtI kI maa~a
pabandI ka samaya
ivavarNa Details
Quantum of
Restriction Timing
power cut (MW)
From
To
(a) Power Cuts/Restriction on HT/
SaUnya Nil
SaUnya Nil
SaUnya Nil
LT Industries
(b) Load Shedding
From 01.01.15 to 31.01.15
@ 0-837 MW
(c) Any other information
1.Weekly Off
2. Staggering of power supply
Industrial Staggering LS
withdrawn from 03/02/2012
p`it idna kula }jaa- kTaOtI
Total Energy Cut
(MUs /day
SaUnya Nil
@ 3.1 MUs/day
00.00
24.00
SaUnya Nil
SaUnya Nil
SaUnya Nil
tk To
idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector
ivavarNa Details
sao From
idnaaMk Date
Max. (Hrs)
2.1 Three-Phase Supply
Average (Hrs)
10:00
08:00
09:00
01.01.2015 31.01.2015
18:00
3 Anya jaanakarI Any other information:
There is no load shedding on industrial feeders in Maharashtra
18:00
18:00
2.2 Single-Phase Supply
01.01.2015 31.01.2015
Min. (Hrs)
Ga : C%tIsagaZ, Chhattisgarh:
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivaVut kTaOtI kI maa~a
Quantum of power cut (MW)
ivavarNa Details
pabandI ka samaya
Restriction Time
tk
sao From
To
p`it idna kula
}jaa- kTaOtI
Total
Energy Cut
(MUs /day)
(A) Scheduled
(a) (i) Power Cuts/
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries
(iii) Power Cuts/Restriction
on Rural
(iv) Agriculture pump*
(v)Urban/ Sub-Urban
(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled
(a) Load Shedding
00.00(Av)
-
-
-
00.00(Av)
-
-
-
00.00 (Av)
113.51 (Av) of 31days
00.00(Av)
00.00 (Av)
17.00
-
23.00
-
0.681
-
1.Rural 80.06(Av) For 124.75 Hrs.
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
-
-
0.327
-
0.156
3. HT Industries 76.74 (Av) For 75.03 Hrs.
Total Energy Cut/day
( b) Any other information
1.Weekly Off/staggering of
power supply
1.146
1day (In a week as per
consumer’s option) 50MW(Av.)
-
-
0.039
2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector
ivavarNa Details
2.1 Three-Phase Supply
2.2 Single-Phase Supply
2.3 Remarks/Note/
sao From
idnaaMk Date
tk To
idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max. (Hrs)
01.01.2015 to 31.01.2015, 6.00
Hrs (Power cut)
-
3 Anya jaanakarI / Any other information: SaUnya Nil
-
Min. (Hrs)
Average (Hrs)
18.00
-
-
-
संल नक Annex-2.6
अिनवाय यिु नट आऊटे ज का जनवर 2015 का व ता रत यौरा
Details of forced unit outages during the month of Jan.2015
अनु
क्रमांक
युिनट
Unit
संघटक
मता
सo
Constituent/IPP मेगावॉट
Cap.MW समय
Sl.No
Time
From
िदनांक
समय
Date
Date
सo
कारण
From
Reason
िदनांक
1.
Essar-2
GSECL
172
12:12
22-Feb-13
Still out
Still out
Shortage of gas
2.
GTPS-2
GSECL
120
20:20
10-Oct-14
Still out
Still out
RSD
3.
GTPS-1
GSECL
120
5:36
22-Oct-14
Still out
Still out
Flame failure
4.
UTPS-1
GSECL
120
5:36
22-Oct-14
Still out
Still out
Flame failure
5.
UTRAN STG-II -1
GSECL
375
8:43
22-Oct-14
Still out
Still out
RSD
6.
SUGEN-2
GSECL
382
14:45
8-Nov-14
11:16
31-Jan-15
7.
UTPS-2
GSECL
120
15:04
10-Nov-14
Still out
Still out
RSD
8.
SLPP-1
GSECL
125
21:50
29-Nov-14
Still out
Still out
Gt-3 tripped on
differential protection
9.
GPEC-2
GSECL
218
12:15
22-Dec-14
6:58
16-Jan-15
RSD
10.
DGBP-2
GSECL
107
19:02
22-Dec-14
9:12
19-Jan-15
RSD
11.
STPS-2
GSECL
120
19:00
1-Jan-15
11:05
3-Feb-15
RSD
12.
WTPS-6
GSECL
210
0:41
4-Jan-15
4:12
22-Jan-15
RSD
13.
GTPS-3
GSECL
210
20:55
4-Jan-15
4:30
22-Jan-15
RSD
14.
WTPS-5
GSECL
210
19:40
4-Jan-15
10:22
8-Jan-15
RSD
15.
GPEC-3
GSECL
218
19:39
9-Jan-15
7:56
19-Jan-15
RSD
16.
DGBP-1
GSECL
107
21:08
12-Jan-15
11:46
16-Jan-15
RSD
17.
WTPS-2
GSECL
210
23:35
13-Jan-15
10:33
16-Jan-15
RSD
18.
WTPS-5
GSECL
210
21:53
13-Jan-15
Still out
Still out
RSD
19.
AECO-E
GSECL
110
7:33
14-Jan-15
13:09
27-Jan-15
Turbine temperature
High
20.
SLPP-2
GSECL
125
07:25
17-Jan-15
16:58
20-Jan-15
BTL
21.
DGBP-1
GSECL
107
19:43
17-Jan-15
Still out
Still out
RSD
22.
GPEC-2
GSECL
219
11:46
20-Jan-15
10:33
2-Feb-15
RSD
Electrical fault
23.
SLPP-3
GSECL
125
1:15
21-Jan-15
1:21
24-Jan-15
BTL
24.
UTPS-5
GSECL
210
0:11
22-Jan-15
Still out
Still out
AOH
25.
GPEC-3
GSECL
219
19:31
22-Jan-15
8:50
2-Feb-15
RSD
26.
SLPP-3
GEB
125
0:00
27-Jan-15
02:30
30-Jan-15
BTL
27.
SUGEN-2
GEB
382
11:46
31-Jan-15
Still out
Still out
RSD
28.
SLPP-2
GEB
125
21:00
31-Jan-15
4-Feb-15
BTL
29.
TORRENT
POWER -E
TORRENT
POWER
110
7:33
14-Jan-15
13:09
27-Jan-15
30.
APL-1
APL
330
19:00
29-Dec-14
Still out
Still out
Coal shortage
31.
APML-4
ADANI POWER
660
3:26
4-Jan-15
09:38
6-Feb-15
Valve leakages
32.
Koradi-5
MAHAGENCO
200
10:30
17-Jun-14
Still out
Still out
ID fan problem
33.
चंद्रपुर
C'PUR-1
MAHAGENCO
210
7:15
28-Aug-14
Still out
Still out
Economy shutdown
34.
BHUSAWAL-2
210
12:43
13-Sep-14
Still out
Still out
Economy shutdown
35.
WPCL-1
135
0:43
30-Oct-14
Still out
Still out
ESP belt damage
36.
INDIABULLS(A)-2
INDIABULLS
270
16:16
30-Oct-14
1:07
25-Jan-15
37.
INDIABULLS(A)-1 INDIABULLS
270
21:55
27-Jan-15
Still out
Still out
MAHAGENCO
MAHAGENCO
12:30
Turbine temperature
High
Electrical protection
Coal shortage
38.
URAN-7
MAHAGENCO
108
4:49
28-Dec-14
21:06
27-Jan-15
Boiler validity expire
39.
JAIGAD - 2
MAHAGENCO
300
20:57
2-Jan-15
18:50
14-Jan-15
Less schedule
40.
NASIK - 5
MAHAGENCO
210
19:55
2-Jan-15
7:10
5-Jan-15
ID fan problem
41.
BHUSAWAL-3
MAHAGENCO
210
0:36
20:15
10-Jan-15
BTL
42.
C'PUR - 3
MAHAGENCO
210
23:38
9-Jan-15
14:48
14-Jan-15
BTL
KHAPERKHEDA-4 MAHAGENCO
210
22:03
9-Jan-15
7:30
12-Jan-15
Turbine maintenance
210
8:23
11-Jan-15
7:41
18-Jan-15
BTL
MAHAGENCO
108
6:40
12-Jan-15
8:43
26-Jan-15
Gas shortage
CHANDRAPUR-4 MAHAGENCO
210
23:03
18-Jan-15
8:07
21-Jan-15
BTL
20.02.15
BTL
43.
44.
BHUSAWAL-3
45.
URAN-8
46.
MAHAGENCO
4-Jan-15
47.
B'WAL-3
MAHAGENCO
210
8:01
20-Jan-15
48.
PARAS-4
MAHAGENCO
250
15:45
20-Jan-15
11:27
25-Jan-15
GT LV side testing
49.
K'KHEDA-5
MAHAGENCO
500
19:22
22-Jan-15
21:29
27-Jan-15
BTL
50.
B'WAL-5
MAHAGENCO
500
13:50
25-Jan-15
18:03
3-Feb-15
BTL
51.
URAN-8
MAHAGENCO
108
15:08
26-Jan-15
19:48
2-Feb-15
Tripped due to jerk of
tripping of 220kv lines
52.
URAN-5
MAHAGENCO
108
23:57
27-Jan-15
18:45
31-Jan-15
Generator trip
53.
WPCL-3
IPP
135
14:02
25-Dec-14
0:55
26-Jan-15
ID fan problem
54.
WPCL-4
IPP
135
22:27
25-Jan-15
Still out
Still out
ID fan problem
55.
DAHANU-2
Reliance
Energy
250
1:55
4-Jan-15
Still out
Still out
Stator earth fault
56.
SASAN - 1
REL
660
11:23
13-Jan-15
19:52
31-Jan-15
Ash evacuation
problem
57.
SASAN - 4
RELIANCE
ENERGY
660
12:51
13-Jan-15
11:17
26-Jan-15
Ash evacuation
problem
58.
RGPPL-1B
RGPPL
320
23:00
31-Mar-14
Still out
Still out
Dry preservation
59.
RGPPL-3A
RGPPL
320
18:57
17-Apr-14
Ready
Ready
Less requisition
60.
RGPPL-1A
RGPPL
320
13:30
8-Jul-14
Ready
Ready
Less requisition
61.
RGPPL-2A
RGPPL
332
12:00
21-Jul-14
Still out
Still out
CW pump problem
62.
RGPPL-2B
RGPPL
332
13:30
1-Sep-14
Still out
Still out
Less requisition
63.
Amarkantak-4
120
11:13
30-Apr-14
30.04.15
Electrical fault
64.
SATPURA-7
210
22:00
6-Dec-14
21.02.15
Critical coal shortage
65.
SGTPS-1
MPGCL
210
22:55
31-Dec-15
16:49
12-Jan-15
Less requisition
66.
SGTPS-2
MPGCL
210
10:20
1-Jan-15
16:22
12-Jan-15
Less requisition
67.
SGTPS-4
MPGCL
210
20:22
1-Jan-15
7:34
12-Jan-15
Less requisition
68.
SSTPS-1
MPGCL
600
11:30
1-Jan-15
28.02.15
Less requisition
69.
SSTPS-2
MPGCL
600
20:00
1-Jan-15
23:10
12-Jan-15
Less requisition
70.
JP BINA - 2
MPGCL
250
20:38
1-Jan-15
5:17
11-Jan-15
Less requisition
71.
SATPURA-8
MPGCL
210
6:32
7-Jan-15
11:43
10-Jan-15
72.
AMARKANTAK
-3
MPGC
120
0:25
12-Jan-15
Still out
Still out
73.
SSTPS-2
600
13:44
21-Jan-15
Still out
Still out
74.
KORBA(W)-5
500
12:30
18-Jan-15
9:05
23-Jan-15
Flame failure
75.
KORBA(W )-4
210
16:30
6-Jan-15
20:06
10-Jan-15
Gen transformer oil
leakage
76.
KORBA (E)
EXTN-2
CSEB
250
21:15
28-Jan-15
31-Jan-15
Bottom ash problem
77.
DGEN - 52
DGEN
400
0:00
11-Dec-14
11:00
15-Jan-15
No schedule
78.
DGEN - 53
DGEN
400
0:00
11-Dec-14
11:00
23-Jan-15
No schedule
79.
DGEN - 51
DGEN
400
12:05
Still out
Still out
No schedule
MPGCL
MPGCL
MPGC
CSPGCL
CSPGCL
13-Jan-15
23:55
Suspected tube
leakage
Fire caught in turbine
floor
Arcing in GT Y-ph
bushing
80.
DGEN -52
DGEN
400
12:05
15-Jan-15
Still out
Still out
No schedule
81.
DGEN -53
DGEN
400
11:59
23-Jan-15
Still out
Still out
No schedule
82.
JPL STAGE II-1
600
0:04
14-Nov-14
19:06
18-Jan-15
83.
JPL STAGE I-4
250
21:07
9-Jan-15
3:06
12-Jan-15
84.
JPL STAGE II-2
JPL
600
5:52
9-Nov-14
85.
ACBIL-1
ACBIL
135
22:48
8-Jan-15
4:51
11-Jan-15
Fire in turbine insulation
86.
ACBIL II
ACBIL
135
20:38
25-Jan-15
0:06
29-Jan-15
BTL
87.
VANDANA -1
VANDANA
135
15:00
9-Jan-15
Still out
Still out
BTL
88.
DHARIWAL-2
DHARIWAL
300
0:00
22-Dec-14
Still out
Still out
No schedule
89.
Lanco-2
LANCO
AMARKANTAK
300
12:20
21-Aug-13
Still out
Still out
Coal shortage
90.
EMCO-2
EMCO
300
0:47
6-Jan-15
12:18
19-Jan-15
Low coal stock
91.
EMCO-I
EMCO
300
2:46
23-Jan-15
Still out
Still out
Over hauling
92.
DBPOWER-1
DBPOWER
600
9:53
24-Aug-14
Still out
Still out
BTL
93.
KSK Mahanadi-4
KSK
MAHANADI
600
16:50
26-Aug-14
Still out
Still out
Testing and
maintenance
94.
KWPCL I
KWPCL
600
9:04
31-Jan-15
1:01
9-Feb-15
No schedule
95.
TAPS - 4
NPC
540
19:04
19-Dec-14
23:13
31-Jan-15
Biennial shutdown
96.
TAPS - 2
NPC
160
20:06
13-Jan-15
0:23
22-Jan-15
Reactor recycling &
pump maintenance
97.
GANDHAR-3
NTPC
219
20:07
7-Nov-14
13:57
21-Jan-15
Less requisition
98.
KAWAS-1A
NTPC
164
22:10
15-Nov-14
7:07
16-Jan-15
Less requisition
99.
KAWAS-1B
NTPC
164
19:12
16-Nov-14
8:31
20-Jan-15
Less requisition
100.
MOUDA - II
NTPC
500
0:00
24-Nov-14
Still out
Still out
101.
GANDHAR-1
NTPC
219
20:45
3-Dec-14
8:00
16-Jan-15
Less requisition
102.
GANDHAR-2
NTPC
219
18:00
30-Dec-14
NA
15-Jan-15
Less requisition
103.
VSTPS-4
NTPC
210
21:36
31-Dec-14
22:45
9-Jan-15
Less requisition
104.
MOUDA-1
NTPC
500
0:25
1-Jan-15
17:02
19-Jan-15
Less requisition
105.
KAWAS-2B
NTPC
164
11:09
1-Jan-15
Still out
Still out
Less requisition
106.
VSTPS-3
NTPC
210
7:11
4-Jan-15
6:55
8-Jan-15
107.
VSTPS-4
NTPC
210
22:45
9-Jan-15
5:54
16-Jan-15
108.
VSTPS-2
NTPC
210
15:00
10-Jan-15
18:13
17-Jan-15
109.
KAWAS-2A
NTPC
164
21:07
13-Jan-15
Still out
Still out
Less requisition
110.
GANDHAR-2
NTPC
219
18:01
15-Jan-15
7:59
23-Jan-15
Less requisition
111.
KAWAS-1B
NTPC
164
20:26
20-Jan-15
6:52
29-Jan-15
Less requisition
112.
GANDHAR-3
NTPC
219
19:05
21-Jan-15
Still out
Still out
Less requisition
113.
GANDHAR-1
NTPC
219
18:00
24-Jan-15
Still out
Still out
Less requisition
114.
MOUDA-1
NTPC
500
21:37
24-Jan-15
Still out
Still out
Less requisition
JINDAL
POWER
JINDAL
POWER
21:56
1-Feb-15
Ash evacuation problem/
CHP problem
Leakage in vacuum
pump
Ash evacuation
problem
Low schedule
Drum level low/less
requisition
RSD for better System
Operation
RSD for better System
Operation
115.
GANDHAR-2
NTPC
219
17:59
25-Jan-15
Still out
Still out
Less requisition
116.
KAWAS-1A
NTPC
164
0:14
26-Jan-15
Still out
Still out
Less requisition
Note: Units out for more than 72 hrs are only included.
संल नक
Annex-2.7
िनयोिजत युिनट आऊटे ज का जनवर 2015 का व ता रत यौरा
Details of planned unit outages during the month of Jan. 2015
अनु
क्रमांक
यिु नट
संघटक
Unit
Constituent/IPP
Sl.No
मता
मेगावॉट
Cap.MW
समय
Time
सo
सo
कारण
From
From
Reason
िदनांक
समय
Date
Time
िदनांक
Date
1.
Torrent Power-F
Torrent Power
121
0:07
31-Dec-14
4:55
14-Jan-15
AOH
2.
APL-3
APL
330
3:01
31-Dec-14
21:57
6-Feb-15
COH
3.
PARLI-3
MAHAGENCO
210
23:51
13-Feb-13
Still out
Still out
Water supply
problem
4.
TATA-5
TATA
500
20:30
3-Jan-15
Still out
Still out
COH
5.
KORBA(W) - 3
CSPGCL
210
23:50
10-Jan-15
Still out
Still out
AOH
6.
SASAN-3
RELIANCE
ENERGY
660
0:10
9-Dec-14
6:27
21-Jan-15
AOH
7.
APL-3
APL
330
3:01
31-Dec-14
21:57
6-Feb-15
AOH
8.
NSPCL-1
NTPC-SAIL
250
0:00
22-Nov-14
15:26
26-Jan-15
COH
9.
TAPS - 1
NPC
160
22:39
12-Oct-14
Still out
Still out
Refueling works
Annex- 3.1
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING JANUARY 2015 AND FEBRUARY
2015
S. No. Unit
No.
Capacity
(MW)
1
Reason
GUVNL
1.1
UTPS
1.2
SUGEN UNIT 30
5
210
30
9:00
20-Jan-15
17-Feb-15
6-Mar-15 COH
20-Feb-15
Preventive Maintenance and Boiler
Annual Inspection
MPPGCL
2
2.1
Outage as per Annual
Maintenance Plan
sao From
tk To
AMARKANTAK
3
120
12.01.15
10.04.15
R&M WORK
3
CSPGCL
3.1
Korba (W)-III
3
210
10-Jan-15
07-Feb-15
AOH
3.2
Korba (W)-I
1
210
14-Mar-15
29-Mar-15
AOH
3.3
Korba (W)-IV
4
210
05-Feb-15
28-Feb-15
AOH
3.4
JPL
2
250
25-Feb-15
26-Mar-15
AOH
25.02.15
10.04.15
15.03.15
15.05.15
C-Inspection and R&M
Boiler,HPT module Replacement, R &
M of ESP
MSPGCL
4
4.1
4.2
5
Central Sector
5.1
5.2
GANDHAR
KORBA
GT-2
6
500
5.3
SIPAT
1
600
20.03.15
15.05.15
Turbine,Boiler & Generator Overhauling
5.4
SASAN
4
660
07.03.15
21.03.15
CONDENSER CLEANING
5.5
SASAN
5
660
23.02.15
05.03.15
BEARING HIGH VIBRATION
5.6
SASAN
2
660
22.03.15
31.03.15
BEARING HIGH VIBRATION
5.7
CGPL
30
800
15.03.15
31.03.15
AOH
ANNEXURE 3.2
Line
Outage Planning of Transmission elements during the Duration 20.02.2015 to 19.03.2015
From
To
Basis Reason
Date
Time Date
Time
SN
KV
1
400kv MAIN BUS-1 AT
400 BANSIA(RAIGARH)S/S
19-Feb-15
7:00
2
400 Korba Tie transformer # 3
19-Feb-15
07:30 h21-Feb-15
3
400kv TIE BUS AT
400 BANSIA(RAIGARH)S/S
20-Feb-15
7:00
24-Feb-15
4
Tie Bay of Akola(II)-Amravati at
400 Akola-II
20-Feb-15
7:00
20-Feb-15
5
765 Sipat- Bilaspur CKT- I
20/Feb/15
08:00 19-Mar-15
6
400 Korba-Bhilai-1
20-Feb-15
9:00
05-Mar-15
7
400 Korba-Bhilai-2
20-Feb-15
9:00
05-Mar-15
8
400 Jabalpur-Jabalpur (pool)# 2
20-Feb-15
10:00 20-Feb-15
20-Feb-15
9:00
20-Feb-15 18:00
Daily
20-Feb-15
9:00
20-Feb-15 18:00
Daily
9
10
AURANGABAD(PG) I (716) Bay at
WARDHA
Seoni- Bilaspur-I Main bay (710) at
765
SEONI
765
11
20-Feb-15
9.00
400
400 KV D/C Jabalpur-Itrasi Ckt-1 &
2.
20-Feb-15
8:00
Agency
RKMPL
RKMPL
NTPC
NTPC
RKMPL
RKMPL
APTCL
MEGPTCL
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
PGCIL
WR-II
R
AMP work and CT Oil sampling
WRTS-I
WRTS-I
R
AMP works
WRTS-I
WRTS-I
R
1 NO CB ERECTION &
CONT. NECESSARY IPS TUBE &
JUMPERING JOB
400KV CTS replacement and
19:00 Hrs Continu normalization and testing of
breaker.
1 NO CB ERECTION &
18:00
CONT. NECESSARY IPS TUBE &
JUMPERING JOB
1 NO CB ERECTION &
18:00
DAILY NECESSARY IPS TUBE &
JUMPERING JOB
A/R kept in Non Auto Mode for
18:00
Daily
OPGW stringing work on ckt I
A/R non auto mode for Additional
18:00
Daily Earthing work on lines by Raipur
TLM
A/R non auto mode for Additional
18:00
Daily Earthing work on lines by Raipur
TLM
AMP of terminal equipment &
17:00
Daily
associated bay equipment,
22-Feb-15 18:00
22-Feb-15 17.00
400 Parli- Chandrapur ll Ckt-2
12
System
21-Feb-15 18:00
Bay Maint. Work & dignostic
Testing of reactor, CB, CT & relay,
Replacement of broken spacer
Daily cum vibration damper
MSETCL
Contin Crossing of 765 KV S/C JabalpurPGCIL
uous Bina Line(AP10-AP10/1)
13
400 Vindhyachal (NTPC) - Sasan Ckt.2
20-Feb-15
08:00 21-Feb-15 18:00
Dismantling of existing connection
and connecting both Vchal (pool) Contin
Sasan Ckt.1 &2 at V'chal (pooling) PGCIL
ous
SS as per the original scheme, for
charging Vchal (Pooling) SS.
14
765 Bus # 2 at Jabalpur Pooling Station
20-Feb-15
09:00 20-Feb-15 18:00
Daily
15
220 Bus #II at Pirana sub-station
20-Feb-15
8:00
Daily
21-Feb-15 18:00
Erection of Isolators for
Commissioning of 765KV
Dharmjaygarh # 3 Bays
For aluminium tube connection
under Bus #II FOR NEW 220kv
BAY
type
MSETCL
JTCL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
R
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
WR-II
C
PGCIL
C
Time
For commissioning of CSD relay in
Tie Bay with the permission to
Daily switch On- Off 3 to 4 times, for
PGCIL
checking current wave form in
CSD relay
For construction of 765KV D/C
Contin
Dharamjaygarh (Korba)-Jabalpur CSPTCL
uous
Transmission Line (Part-I)
16
765 1500 MVA ICT -I at Indore (PG)
20-Feb-15
9:00
20-Feb-15 18:00
17
400 Korba- Khedamara D/C
20-Feb-15
8:00
21-Feb-15 18:00
18
765kV S/C
765 Dharamjaygarh_champa(Durg) main 20-Feb-15
and Tie bay along with Line
9:00
21-Feb-15 18:00
Continu
For erection of auxiliary bus of
spare reactor
WRTS-I
PGCIL
C
19
220 BUS I at Boisar
20-Feb-15
8:00
20-Feb-15 18:00
Daily
For jumpering of existing 220 kV
BUS I to Bay Extension area .
PGCIL
WR-II
C
20
220
Boisar ( PGCIL ) - Boisar ( MSETCL
20-Feb-15
) Line 2
8:00
20-Feb-15 18:00
Daily
For jumpering of existing TBC Bay
MSETCL
to Bay Extension area .
WR-II
C
21
400 Raigarh 1 tie Bay (06) at Raipur S/S
20-Feb-15
9:00
22-Feb-15 17:00
Daily
For NTAMC Work
WRTS-I
PGCIL
C
22
400
20-Feb-15
8:00
20-Feb-15 18:00
Daily
For NTAMC work
PGCIL
WR-II
C
23
400 400KV Pirana (TPL) – Sugen Line 2
20-Feb-15
8:00
20-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
24
400 400KV Bus 2 at Pirana (TPL)
20-Feb-15
8:00
20-Feb-15 18:00
TPL
TPL
R
25
400 Bus # 2 at Jabalpur
20-Feb-15
08:00 21-Feb-15 18:00
PGCIL
WR-II
C
26
400 KOLHAPUR-MAPUSA I
20-Feb-15
9:00
24-Feb-15 18:00
WRTS-I
WRTS-I
R
27
400 Tarapur-Padghe # II
20-Feb-15
8:00
20-Feb-15 18:00
PGCIL
WR-II
R
28
400 Shujalpur - Nagda # 2
20-Feb-15
07:00 19-Mar-15
18:00
PGCIL
WR-II
C
29
400 Bhachau - Mundra # 1
20-Feb-15
07:00 19-Mar-15
18:00
PGCIL
WR-II
C
30
400 Khandwa - Rajgarh # 1
20-Feb-15
07:00 19-Mar-15
18:00
PGCIL
WR-II
C
31
400 Khandwa - Dhule # 1
20-Feb-15
07:00 19-Mar-15
18:00
PGCIL
WR-II
C
32
400 Itarsi - Khandwa # 1
20-Feb-15
07:00 19-Mar-15
18:00
For Silicon Coating Work
for upgradation of Itarsi # 4 Main
Contin Bay equipment from 2000Amp to
ous
3150Amp rating at 400kV
Substation, Jabalpur.
Insulator replacement & AMP of
Daily
Kolhapur end bays
Insulator Replacement works by
Daily
Polymer
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
PGCIL
WR-II
C
Pirana-Dehgam line #I
Daily
SN
KV
Line
From
Date
Time
To
Date
Basis
33
220 Satna (PG) - Satna (MP)# 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
34
400 Dehgam - Ranchhodpura # 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
35
400 Bhachau - Ranchodpura # 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
36
400 Asoj - SSP # 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
37
220 Navasari - Vav # 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
38
765 Bina - Gwalior # 2
20-Feb-15
07:00 19-Mar-15
18:00
Daily
39
220 Gandhar - Haldarwa # 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
40
220 Kawas - Dastan
20-Feb-15
07:00 19-Mar-15
18:00
Daily
41
220 Dastan - Navsari
20-Feb-15
07:00 19-Mar-15
18:00
Daily
42
220 Kawas - Haldarwa
20-Feb-15
07:00 19-Mar-15
18:00
Daily
43
220 Damoh - Damoh
20-Feb-15
07:00 19-Mar-15
18:00
Daily
44
400 SSP - Rajgarh # 1
20-Feb-15
07:00 19-Mar-15
18:00
Daily
45
400
20-Feb-15
07:00 19-Mar-15
18:00
Daily
46
765 Satna - Gwalior Ckt-I
20-Feb-15
07:00 19-Mar-15
18:00
Daily
47
400 Gwalior - Agra Ckt-I
20-Feb-15
07:00 19-Mar-15
18:00
Daily
Vindhyachal (NTPC) - Sasan
(Reliance)
Reason
System
Agency
type
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
Time
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
SN
KV
Line
From
Date
Time
To
Date
Basis
48
400
Vapi - Kala
20-Feb-15
07:00 19-Mar-15
18:00
49
220
Khandwa - Chhegaon
20-Feb-15
07:00 19-Mar-15
18:00
50
220
Indore - Pithampur
20-Feb-15
07:00 19-Mar-15
18:00
51
220 Indore - Barwatha
20-Feb-15
07:00 19-Mar-15
18:00
52
220 Barwatha - Chhegaon
20-Feb-15
07:00 19-Mar-15
18:00
53
400 KOLHAPUR-MAPUSA I & II
20-Feb-15
8:00
19-Mar-15
18:00
54
400 BHADRAVATI-PARLI I & II
20-Feb-15
9:00
19-Mar-15
18:00
55
400 BHADRAVATI-CHANDRAPUR I & II 20-Feb-15
9:00
19-Mar-15
18:00
56
400
20-Feb-15
9:00
19-Mar-15
18:00
57
400 RAIPUR-BHADRAVATI II & III
20-Feb-15
9:00
19-Mar-15
18:00
58
400 KOLHAPUR-MAPUSA I & II
20-Feb-15
9:00
19-Mar-15
18:00
59
400 Satna - Bina Ckt. 1&2
20-Feb-15
08:00 19-Mar-15
18:00
60
400 Nagda - Dehgam Ckt. 1&2
20-Feb-15
08:00 19-Mar-15
18:00
61
400 Indore - Asoj Ckt 2
20-Feb-15
08:00 19-Mar-15
18:00
62
400 Dehgam - Pirana Ckt. 1&2
20-Feb-15
08:00 19-Mar-15
18:00
63
400 Kansari-Vadavi-1
20-Feb-15
8:00
20-Feb-15 18:00
64
765
AURANGABAD(PG)# 2 Line Reactor
20-Feb-15
Switchable at WARDHA
9:00
28-Feb-15 18:00
65
765 1500MVA ICT-2 at Solapur
9:00
21-Feb-15 18:00
BHADRAVATI-CHANDRAPUR III &
IV
20-Feb-15
Reason
System
Agency
type
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
PGCIL
WR-II
R
PGCIL
WR-II
R
PGCIL
WR-II
R
PGCIL
WR-II
R
WRTGPL
GETCO
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
c
Time
Online replacement of E/W with
OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Online replacement of E/W with
Daily OPGW. A/R shall be kept in non
auto mode
Daily OPGW Work, A/R OFF
OPGW/additional eathing work.
Daily
A/R OFF
OPGW/additional eathing work.
Daily
A/R OFF
OPGW/additional eathing work.
Daily
A/R OFF
OPGW/additional eathing work.
Daily
A/R OFF
OPGW/additional eathing work.
Daily
A/R OFF
PID testing of insulator strings.
Daily A/R shall be kept In non auto
mode for both circuits.
PID testing of insulator strings.
Daily A/R shall be kept In non auto
mode for both circuits.
PID testing of insulator strings.
A/R shall be kept In non auto
Daily mode for both circuits. And
Replacement of defective insulator
strings thorugh Hot Line
Maintenance
PID testing of insulator strings.
Daily A/R shall be kept In non auto
mode for both circuits.
Daily PMM work
Reactor Dismantling and Erection
Conti. of New Reactor, line remain in
service.
Daily Repalcement of Bph Bushing.
Daily
SN
KV
Line
Date
From
Time
To
Date
Basis
Reason
System
Agency
type
WRTS-I
PGCIL
R
JPL
JPL
WRTS-I
WRTS-I
C
DB Power
PGCIL
C
WRTS-I
M/s TRN
C
PGCIL
WR-II
R
WRTS-I
DHARIWAL R
Time
8:00
20-Feb-15 15:00
8:00
20-Feb-15 18:00
8:00
21-Feb-15 18:00
Replacement of WTI and AMP of
718R CB.
Sequential outage, one breaker at
Daily a time for replacement of 400kV
Defective CB interrupter [ Power
Flow will not be affected ]
Shutdown required on both the
lines for erection of spare reactor
Daily LA BPI and IPS tube at SEONI.
And Shutdown required on both
the lines for stringing aux bus at
SEONI
Stringing of 765kV, S/C RaigarhContin
Champa TL between AP 9/2
uous
(E+18) - AP 10/0 (E+9)
Contin Stringing of Main Bus-II of M/s
uous TRN Bays
Daily Testing of Remote Operation
To attened/ fixing of line spacers
Daily
by M/s Dhariwal in lilo portion.
Contin Tremination of conductor at gantry
uous
9:00
21-Feb-15 17:00
Daily
AMP OF BAY Equipment
10:00 21-Feb-15 14:00
Daily
R
21-Feb-15
9:00
21-Feb-15 18:00
Daily
AMP of ICT and associated bay equPGCIL
WR-II
Attending problem of TBC isolator WRTMPL /
WRTS-I
MSETCL
at MSETCL Waluj S/S.
765 765 KV Bus # 1 at WARDHA
21-Feb-15
9:00
21-Feb-15 18:00
Daily
Bus extention for Abad # 3 & 4 ckt WRTS-I
WRTS-I
C
78
400k 400 KV Bus 1 at Akola II substation
21-Feb-15
7:00
20-Feb-15 18:00
Daily
checking Primary stability of
busbar protection with existing bay MEGPTCL
& new bay
MEGPTCL
C
79
765
21-Feb-15
9:00
23-Feb-15 18:00
Commossioning of RTCC, Spare
WRTS-I
ICT unit & DGA of bushing oil.
WRTS-I
C
66
765
Line Reactor of 765 kV Kotra - Durg
Ckt # 1 at Kotra P/S
20-Feb-15
8:00
21-Feb-15 18:00
67
400
Sequential outage of Switchyard
Breakers at JPL - stage - II
20-Feb-15
8:00
19-Mar-15
68
765 Seoni - Bina & Seoni-Wardha II
20-Feb-15
9:00
21-Feb-15 18:00
69
400kV D/C DB POWER - Kotra PS
400 (765) Ckt-I & Ckt-II
20-Feb-15
8:00
21-Feb-15 18:00
70
400 400 KV Main Bus-II at Tamnar PS
20-Feb-15
10:00 25-Feb-15 18:00
71
75
400 500 MVA ICT 3 at Boisar
20-Feb-15
BHADRAVATI-DHARIWAL &
400
20-Feb-15
DHARIWAL -PARLI
765 Jabalpur PS -Bhopal & Jbalpur PSBina line bays with reactor(at Hirapur - 20-Feb-15
Bandha pooling station
765 kV Dharamjaygarh # 1 Tie Bay
21-Feb-15
765
(808) at PS/Jabapur
400 315 MVA ICT 1 at Bhachau
21-Feb-15
76
400 Aurangabad-Pune # 1
77
72
73
74
1500MVA ICT-2 at
AURANGABAD(PG)
Conti.
80
400 Bus # 2 at Jabalpur Pooling Station
81
82
400 AT#1 Tie Bay(402) at Bilaspur S/S
21-Feb-15
400 ICT-I Main Bay at Bhatapara ss
21-Feb-15
Jabalpur-II/Gwalior-III Tie Bay at Bina
765
21-Feb-15
SS
83
84
765 1500 MVA ICT -II at Indore (PG)
18:00
Daily
21-Feb-15
21-Feb-15
WR-II
R
R
PGCIL
WR-II
C
Daily
Daily
WRTS-I
WRTS-I
PGCIL
PGCIL
R
R
Daily
For Bay Maintenance work
PGCIL
WR-II
R
Daily
For commissioning of CSD relay in
Tie Bay (switch On- Off 3 to 4
PGCIL
times ) for chacking current wave
form in CSD relay
WR-II
C
Daily
9:00
9:00
21-Feb-15 18:00
21-Feb-15 17:00
09:00 21-Feb-15 18:00
21-Feb-15 18:00
PGCIL
Erection/Jumper with Isolators for
400KV Bay No.: 413 of Jhabua
Power Bays
For AMP work
For AMP works
09:00 21-Feb-15 18:00
9:00
BDTCL/JTCL
PGCIL
SN
KV
Line
Date
From
Time
To
Date
Basis
Reason
System
For commissioning of Tie Bay 402 PGCIL
Agency
type
WR-II
C
Time
85
400 BUS 2 at Boisar
21-Feb-15
8:00
21-Feb-15 18:00
Daily
86
765 Champa-I Bus Reactor at Durg PS
21-Feb-15
9:00
24-Feb-15 18:00
Continu
87
400 Pirana-Dehgam line -II
21-Feb-15
8:00
21-Feb-15 18:00
88
400 400KV Pirana (TPL) – Sugen Line 2
21-Feb-15
8:00
89
400 400KV Bus 1 at Pirana (TPL)
21-Feb-15
90
765 1000 MVA ICT#1 at Satna
91
765
92
WRTS-I
PGCIL
C
Daily
For erection of auxiliary bus of
spare reactor
For NTAMC work
PGCIL
WR-II
C
21-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
8:00
21-Feb-15 18:00
Daily
TPL
TPL
R
21-Feb-15
9:00
21-Feb-15 18:00
Daily
PGCIL
WR-II
R
21-Feb-15
09:00 21-Feb-15 18:00
Daily
For Silicon Coating Work
FOR WINDING TAN DELTA,
RELAY FIRMWARE
UPGRADATION &
RECTIFICATION OF PLAIN OIL
GAUGE
ICT Spare Phase Commissioning
in place of ICT # 1 R Phase
PGCIL
WR-II
C
400 Tarapur-Padghe # I
21-Feb-15
8:00
21-Feb-15 18:00
Daily
PGCIL
WR-II
R
93
400 400 KV Bus # 2 at WARDHA
21-Feb-15
9:00
21-Feb-15 18:00
WRTS-I
WRTS-I
R
94
400 PARLI-PUNE D/C line
21-Feb-15
9:00
25-Feb-15 18:00
WRTMPL
WRTS-I
C
95
220
KV Kawas-Ichhapore 1
21-Feb-15
08:30 h21-Feb-15 18:00 Hrs Continu
NTPC
NTPC
96
400 kAkola-Aurangabad D/C
22-Feb-15
8:00
22-Feb-15 18:00
Daily
PGCIL
MEGPTCL / MC
9:00
23-Feb-15 18:00
Daily
Yearly AMP work
WRTS-I
WRTS-I
R
9:00
22-Feb-15 18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
WR-II
C
WR-II
R
97
98
1500 MVA ICT # 1 at Jabalpur
Pooling Station
HVDC Pole-1 & 400kV Ramagundam22-Feb-15
HVDC
1 at Bhadrawati
Seoni- Bilaspur-II Main bay (716) at
765
22-Feb-15
SEONI
Insulator Replacement works by
Polymer
Daily Isolator dismantling work
Lilo of line at PGCIL PUNE(GIS)
Conti.
S/S
PM of bay equipment.
765 kV S/C Akola-II-Aurangabad
Ckt-II crossing work
for upgradation of Itarsi # 4 Main
Bay equipment from 2000Amp to PGCIL
3150Amp rating at 400kV
Substation, Jabalpur.
For aluminium tube connection
PGCIL
under Bus #I for new 220KV bay
99
400 Jabalpur - Itarsi # 4
22-Feb-15
08:00 23-Feb-15 18:00
Daily
100
220 Bus #I at Pirana sub-station
22-Feb-15
8:00
22-Feb-15 18:00
Daily
101
400 Pirana-Asoj line #I
22-Feb-15
8:00
22-Feb-15 18:00
Daily
For NTAMC work
PGCIL
WR-II
C
102
400 400KV Pirana (TPL) –Pirana(PG)- 2
22-Feb-15
8:00
22-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
103
400 400KV Bus 1 at Pirana
22-Feb-15
8:00
22-Feb-15 18:00
Daily
TPL
TPL
R
104
400 Tarapur-Padghe # II
22-Feb-15
8:00
22-Feb-15 18:00
Daily
PGCIL
WR-II
R
105
400 Navsari- Magarwada
22-Feb-15
7:00
22-Feb-15 20:00
Daily
For Silicon Coating Work
Insulator Replacement works by
Polymer
Jumpering of line in Multicircuit
towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2.
PGCIL
WR-II
C
SN
KV
Line
Date
From
Time
To
Date
Basis
Reason
System
Agency
type
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
WRTS-I
WRTS-I
R
PGCIL
WRPC
ERPC
PGCIL
WR-II
R
WRTS-I
WRTS-I
R
RKMPL
RKMPL
Time
106
400 Navsari- Vapi
22-Feb-15
7:00
22-Feb-15 20:00
107
400 Magarwada- Kala
22-Feb-15
7:00
22-Feb-15 20:00
108
400 Vapi- Kala
22-Feb-15
7:00
22-Feb-15 20:00
109
400 RAIPUR-WARDHA- I
22-Feb-15
9:00
23-Feb-15 18:00
110
400
22-Feb-15
8:00
22-Feb-15 17:00
SEL - Raigarh - 2
111
400 Line reactor of Itarsi-Indore-1
22-Feb-15
9:00
19-Mar-15
112
765 765 KV ICT # 2 at WARDHA
23-Feb-15
9:00
24-Feb-15 18:00
113
400kv MAIN BUS-2 AT
400 BANSIA(RAIGARH)S/S
23-Feb-15
7:00
26-Feb-15 18:00
114
765 Bus # 1 at Jabalpur Pooling Station
23-Feb-15
09:00 23-Feb-15 18:00
Daily
PGCIL
WR-II
115
765/
Sipat 400KV ICT-1 MAIN BAY-15
400
23-Feb-15
07:30
19:00
28-Feb-15
hrs
hrs
All burnt control cable replacement
Contin
(ICT-1 TRANSFORMER S/D NOT NTPC
ous
REQUIRED)
NTPC
116
765
23-Feb-15
8:00
23-Feb-15 16:00
Daily
WRTS-I
PGCIL
R
117
765
23-Feb-15
7:00
23-Feb-15 18:00
Daily
118
220
23-Feb-15
10:00 23-Feb-15 17:00
119
765
23-Feb-15
10:00 24-Feb-15
120
121
765
400
23-Feb-15
23-Feb-15
122
400 Aurangabad-Pune # 2
23-Feb-15
Bay No 721 (Main Bay of 765 kV Bus
Reactor) at Kotra P/S
240 MVAR Bus Reactor at PS /
Jabalpur
BUS -I at Khandwa s/s
707 Bay (AGRA -1 MAIN) AT
GWALIOR
765KV BUS-2 at Solapur
315MVA ICT-3 at PUNE
18:00
Jumpering of line in Multicircuit
towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2.
Jumpering of line in Multicircuit
Daily towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2.
Jumpering of line in Multicircuit
Daily towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2.
Stringing work of broken earth wire
Daily at location 549, 550. & to attend
clearance between earth wire &
conductor.
Stringing works of 765KV S/C
Contin
Angul-Jharsuguda Transmission
uous
line, Line-I, Part-II
To Take Line Reacter Out for
attending oil leakage &
Cont. replacement of gaskat, also oil
filteration/refilling should be done.
Line will be taken into service
without line reactor
Bushing replacement and LA
Conti.
replacement work
1 NO CB ERECTION &
CONT. NECESSARY IPS TUBE &
JUMPERING JOB
Daily
765kV Bus Isolators Earth Switch
Erection / Alignment problem
AMP
C
PGCIL
WR-II
R
Daily
AMP of Bus reactor &
associated bay equipment,
AMP work
PGCIL
WR-II
R
18:00
Daily
AMP WORKS
PGCIL
WR-II
R
9:00
9:00
24-Feb-15 18:00
23-Feb-15 18:00
Daily
Daily
9:00
23-Feb-15 18:00
Daily
AMP works.
AMP works.
Attending problem of TBC isolator
at MSETCL Waluj S/S.
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTMPL /
WRTS-I
MSETCL
R
R
R
SN
KV
Line
Date
From
Time
To
Date
Basis
Reason
System
checking Primary stability of
busbar protection with existing bay MEGPTCL
& new bay
Agency
type
MEGPTCL
C
Time
123
400k 400 KV Bus 2 at Akola II substation
23-Feb-15
7:00
22-Feb-15 18:00
Daily
124
765 765 kV Bus Reactor at Kotra P/S
23-Feb-15
8:00
24-Feb-15 22:00
Contin
Commissioing of CSD
uous
WRTS-I
PGCIL
C
125
400 AT#2 Main Bay(404) at Bilaspur S/S 23-Feb-15
9:00
23-Feb-15 18:00
Daily
For AMP work
WRTS-I
PGCIL
R
126
127
400 ICT-I Tie Bay at Bhatapara ss
765 Bus- 1 at Bina
23-Feb-15
23-Feb-15
9:00 23-Feb-15 17:00
09:00 23-Feb-15 18:00
Daily
Daily
For AMP works
For Bus AMP
WRTS-I
PGCIL
PGCIL
WR-II
R
R
128
765kV Dharmjaygarh_bilaspur Main
765 bay along with Line shutdown also
required during testing of SAS.
23-Feb-15
9:00
25-Feb-15 18:00
Continu
For erection of auxiliary bus of
spare reactor
WRTS-I
PGCIL
C
129
400
23-Feb-15
9:00
23-Feb-15 17:00
Daily
For NTAMC Work
WRTS-I
PGCIL
C
130
Raigarh 2 Main Bay (04) at Raipur
S/S
400 315MVA ICT # I at Shujalpur
23-Feb-15
10:00 23-Feb-15 14:00
Daily
For NTAMC Works
PGCIL
WR-II
C
131
400 400KV Pirana (TPL) –Pirana(PG)- 2
23-Feb-15
8:00
23-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
132
400 400KV Bus 2 at Pirana (TPL)
400KV Transfer Bus Coupler at
400
Pirana
23-Feb-15
8:00
23-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
23-Feb-15
8:00
23-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
WR-II
R
WR-II
R
133
134
765 1000 MVA ICT# 2 at Satna
23-Feb-15
9:00
23-Feb-15 18:00
Daily
135
400 Tarapur-Padghe # I
23-Feb-15
8:00
23-Feb-15 18:00
Daily
23-Feb-15
9.00
23-Feb-15 17.00
Daily
23-Feb-15
9:00
24-Feb-15 18:00
Daily
23-Feb-15
9:00
23-Feb-15 13:00
Daily
23-Feb-15
14:00 23-Feb-15 18:00
Daily
136
FOR WINDING TAN DELTA,
RELAY FIRMWARE
PGCIL
UPGRADATION &
RECTIFICATION OF PLAIN OIL
GAUGE
Insulator Replacement works by
PGCIL
Polymer
Q.M.work., C & tan Delta testing of
CT
MSETCL
MSETCL
220 Talandge- Chikodi line.
137
765 1500MVA-ICT I at SEONI
138
765
139
Kotra # 2 (701) Main Bay at Tamnar
PS
Kotra # 2 & AT#1 (702) Tie Bay at
765
Tamnar PS
140
400 Vapi - Kala
23-Feb-15
08:00 23-Feb-15 18:00
Daily
141
400 400kV Bus#1 at Dehgam
23-Feb-15
10:00 23-Feb-15 18:00
Daily
Replacement of 390 KV LA with
336 KV LA.
Replacement of support latch
assembly of 70152 CB
Replacement of support latch
assembly of 70252 CB
TESTING OF REMOTE
OPERATION
To attend Hot-Spot in Bus#1
Isolator of Bay No. 424
WRTS-I
WRTS-I
R
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
PGCIL
WR-II
C
PGCIL
WR-II
R
SN
KV
Line
From
Date
Time
To
Date
Basis
142
220 Kakrapar - Haldarwa ckt 1&2
23-Feb-15
8:00
25-Feb-15 18:00
143
400 Bus-1 (at MPPTCL End) at Indore
23-Feb-15
9:00
23-Feb-15 18:00
144
400
145
23-Feb-15
9:00
400 Jabalpur-Sasan
23-Feb-15
10:00 23-Feb-15 14:00
146
400 BHADRAVATI-PARLI I
23-Feb-15
9:00
23-Feb-15
147
765 Seoni - Wardha I & II Line
24-Feb-15
9:00
01-Mar-15
148
400 Vindhyachal Bus-Section-2
24-Feb-15
07:30 h26-Feb-15
149
765 1500MVA ICT # 2 at PS / Jabalpur 24-Feb-15
9:00
150
151
152
400 BUS -I at Khandwa s/s
220 Amona Bay (203) at MAPUSA
400 Parli-2 Main Bay (407) at PUNE
10:00 24-Feb-15
9:00 24-Feb-15
9:00 24-Feb-15
153
400KV Bus -1 at Waluj S/S with
400 Aurangabad-Pune # 1 on TBC & then 24-Feb-15
Aurangabad-Pune # 2 on TBC
154
765
155
156
157
158
Indore (PG) Indore (MP) -2
1500MVA ICT-1 at
AURANGABAD(PG)
24-Feb-15
24-Feb-15
24-Feb-15
24-Feb-15
23-Feb-15 18:00
24-Feb-15
9:00
25-Feb-15 18:00
9:00
26-Feb-15 18:00
25-Feb-15 18:00
24-Feb-15
9:00
26-Feb-15 18:00
24-Feb-15
9:00
26-Feb-15 18:00
24-Feb-15
09:00 24-Feb-15 18:00
765 Bus # 2 at Jabalpur Pooling Station
Daily
With Asoj-2 to be put on TBC bay
of MPPTCL and line out . For
busbar integration & replacement
of damaged Isolater Parts
Daily
Attending problem of Pune -1&2
Conti. Bus -1 Isolator at MSETCL Waluj
S/S.
Conti.
8:00
220 Korba-Suhela- Banari
System
Agency
type
WR-II
C
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
R
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
C
NTPC
NTPC
PGCIL
WR-II
R
PGCIL
WRTS-I
WRTS-I
WR-II
WRTS-I
WRTS-I
R
R
R
WRTMPL /
WRTS-I
MSETCL
R
Tower erection at loc.no. 119 &
124 and stringing between span
Contin 118-119 & 124-125 for diversion
of line due to GIPCL lignite mines. PGCIL
ous
Also replacement of existing CTs
with higher rating CTs at Haldarwa
SS
With Asoj-2 to be put on TBC bay
of MPPTCL and line out . For
Daily
PGCIL
busbar integration & replacement
of damaged Isolater Parts
Y ph Line CVT replacement at
Jabalpur
18:00
Daily Yearly AMP work
Shutdown required on both the
18:00
Conti. lines for erection of aux bus tower
at SEONI.
19:00 hrs ContinuAMP
AMP of ICT #2 & associated bay
18:00
Daily
equipment,
17:00
Daily AMP work
18:00
Daily AMP Works
18:00
Daily AMP works.
400 400 KV D/C Jabalpur-Itrasi Ckt-3 & 4 24-Feb-15
765 Seoni- Bina
Reason
Time
Commossioning of RTCC, Spare
WRTS-I
ICT unit & DGA of bushing oil.
Crossing of 765 KV S/C JabalpurContin
PGCIL
Bina Line(AP 10/1-AP 11)
uous
contin
Crossing of Bhopal - Jabalpur line BDTCL
uous
contin Crossing Of JabalpurJTCL
uous Dharamjaygarh line
Erection of Isolators for
Daily Commissioning of 765KV
PGCIL
Dharmjaygarh # 4 Bays
WRTS-I
C
JTCL
PGCIL
CSPTCL
WR-II
C
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
WRTS-I
PGCIL
R
WR-II
R
PGCIL
C
PGCIL
WR-II
C
C
Time
For AMP works
159
400 Korba Line Main Bay at Bhatapara ss 24-Feb-15
9:00
24-Feb-15 17:00
Daily
160
400
Bus- 1 at Bina
24-Feb-15
09:00 24-Feb-15 18:00
Daily
161
220 Korba(W)- Banari D/C
24-Feb-15
8:00
162
163
400 Raigarh 2 Tie Bay at Raipur S/S
400 315MVA ICT # II at Shujalpur
24-Feb-15
24-Feb-15
9:00 24-Feb-15 17:00
10:00 24-Feb-15 14:00
PGCIL
For Bus AMP
For construction of 765KV D/C
Contin Dharamjaygarh (Korba)-Jabalpur
CSPTCL
uous Transmission Line (Part-I) AP 4A/04A/1
Daily For NTAMC Work
WRTS-I
Daily For NTAMC Works
PGCIL
164
400 400KV Pirana (TPL) –Pirana(PG)- 1
24-Feb-15
8:00
24-Feb-15 18:00
Daily
For Silicon Coating Work
TPL
TPL
R
165
400 400KV Bus 1 at Pirana
24-Feb-15
8:00
24-Feb-15 18:00
Daily
TPL
TPL
R
166
400 Bus # 1 at Jabalpur 400kV S/S
24-Feb-15
10:00 25-Feb-15 18:00
Daily
PGCIL
WR-II
R
167
400 Boisar-Padghe
24-Feb-15
8:00
24-Feb-15 18:00
Daily
For Silicon Coating Work
Hyvelm make Isolator ARM
replacement work at 400Kv
Jabalpue SS
Insulator Replacement works by
Polymer
PGCIL
WR-II
R
168
400 400 kv Rajgarh (Pgcil )- Ssp CKT I
24-Feb-15
6.00
24-Feb-15 18.00
daily
Maintenance Work
PGCIL/MPP
WR - II
TCL
R
169
220
10.00 24-Feb-15 17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
170
220
9.00
24-Feb-15 18.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
171
220
9.00
24-Feb-15 17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
172
173
400
400
8:00
8:00
24-Feb-15 18:00
24-Feb-15 18:00
Daily
Daily
WRTGPL
GETCO
GETCO
GETCO
24-Feb-15
9.00
24-Feb-15 17.00
MSETCL
MSETCL
24-Feb-15 13:00
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
PGCIL
WR-II
C
WRTS-I
PGCIL
C
PGCIL
WR-II
C
PGCIL
WR-II
C
174
220 KV ANOOPUR - KOTMIKALA
24-Feb-15
CKT - I
220 KV SEONI ( PGCIL) -SEONI I/C 24-Feb-15
I
220 KV MALANPUR - GWL( PG)
24-Feb-15
CKT - I
Kansari-Vadavi-2
24-Feb-15
Kasor- Chorania Line
24-Feb-15
Bhusawal-Koradi
25-Feb-15 18:00
400
175
765 AT#1 (703) Main Bay at Tamnar PS
24-Feb-15
9:00
176
765
Kotra # 1 (704) Main Bay at Tamnar
PS
24-Feb-15
14:00 24-Feb-15 18:00
177
220 220kV Dehgam-Ranasan#1
24-Feb-15
10:00 24-Feb-15 17:00
178
400
24-Feb-15
8:00
179
400 BUS REACTOR at Kala
24-Feb-15
08:00 24-Feb-15 18:00
180
400 KALA - MAGARWADA
24-Feb-15
7:00
i) 400kV RKM Power - KSK Ckt-III
ii) 400kV RKM Power - Kotra P/S
25-Feb-15 18:00
24-Feb-15 18:00
PMM work
PMM work
Q.M. and Disc string
Daily replacement,fixing of
spacers,dampers,earthbond
Contin Replacement of support latch
uous assembly of 70352 CB
Contin Replacement of support latch
uous assembly of 70452 CB
Site Acceptance Test (SAT) work
Daily
of NTAMC
Stringing of 765kV, S/C RaigarhContin
Champa TL between Loc 14/6
uous
(A+3) - Loc 14/7 (A+3)
TESTING OF REMOTE
Daily
OPERATION
TESTING OF REMOTE
Daily
OPERATION
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
WR-II
C
WRTS-I
R
Time
181
400 Bus-2 (at MPPTCL End) at indore
24-Feb-15
9:00
24-Feb-15 18:00
Daily
182
HVDCDIA 10 Q50 Bay at BHADRAWATI
Main Bay of Kotra - Durg Ckt # 1 at
765
Kotra P/S
400 BUS -II at Khandwa s/s
705 Bay (TIE BAY JAIP-1 & ICT-1)
765
AT GWALIOR
Seoni- Bilaspur-II Tie bay (717) at
765
SEONI
400 Parli-2 Tie Bay (408) at PUNE
24-Feb-15
9:00
24-Feb-15 18:00
Daily
With Asoj-2 to be put on TBC bay
of MPPTCL and 400KV IndoreIndore-2 TBC Bay of PGCIL . For PGCIL
busbar intrigation & replacement
of Isolater Parts
WRTS-I
Yealy AMP
25-Feb-15
8:00
26-Feb-15 18:00
Daily
AMP
WRTS-I
PGCIL
R
25-Feb-15
10:00 25-Feb-15 17:00
Daily
AMP work
PGCIL
WR-II
R
25-Feb-15
10:00 26-Feb-15
18:00
Daily
AMP WORKS
PGCIL
WR-II
R
25-Feb-15
9:00
27-Feb-15 18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
25-Feb-15
9:00
25-Feb-15 18:00
WRTS-I
WRTS-I
R
09-Mar-15
9:00
10-Mar-15
JTCL
PGCIL
25-Feb-15
9.00
25-Feb-15 17.00
MSETCL
MSETCL
25-Feb-15
9:00
26-Feb-15 18:00
Daily AMP works.
contin Crossing Of Jabalpuruous Dharamjaygarh line
Dignostic Testing of reactor, CB,
Daily
CT & relay
Erecetion of Isolator & BPI for
Daily
NTPC bay
WRTS-I
WRTS-I
c
25-Feb-15
09:00 25-Feb-15 18:00
Daily
WR-II
C
WRTS-I
WRTS-I
PGCIL
PGCIL
R
WRTS-I
PGCIL
R
PGCIL
WR-II
R
NTPC
NTPC
PGCIL
WR-II
R
WRTS-I
PGCIL
C
183
184
185
186
187
188
189
400 Korba - Bhilai ckt 2
400
Karad-Jaigad I
18:00
190
400 400KV BUS-2 at Solapur
191
765
192
193
765 ICT-2 Main Bay ( 720) at Kotra PS
400 AT#2 Tie Bay(405) at Bilaspur S/S
25-Feb-15
25-Feb-15
9:00
9:00
26-Feb-15 18:00
25-Feb-15 18:00
Daily
Daily
194
400 Bhilai Line Main Bay at Bhatapara ss 25-Feb-15
9:00
25-Feb-15 17:00
Daily
195
220 Kawas - Navsari 1
25-Feb-15
09:00 25-Feb-15 18:00
Daily
196
400 Korba Bus coupler #2
25-Feb-15
07:30 h14-Mar-15
197
400
25-Feb-15
09:00 25-Feb-15 18:00
198
765 Bus Reactor at Durg PS
25-Feb-15
9:00
28-Feb-15 18:00
For Bus AMP
For erection of auxiliary bus of
Continu
spare reactor
199
400 Sipat #1 Main Bay (13) at Raipur S/S 25-Feb-15
9:00
26-Feb-15 17:00
Daily
For NTAMC Work
WRTS-I
PGCIL
C
200
201
220 Shujalpur - Rajgarh Ckt.2
400 Bachau - Ranchodpura Ckt.1
25-Feb-15
25-Feb-15
10:00 25-Feb-15 18:00
9:00 25-Feb-15 18:00
Daily
Daily
MPPTCL
PGCIL
WR-II
WR-II
C
R
202
400 KOLHAPUR-MAPUSA II
25-Feb-15
9:00
01-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
203
400 Vapi-Boisar
25-Feb-15
8:00
25-Feb-15 18:00
Daily
For NTAMC Works
For rectification of hot spots
Insulator replacement & AMP of
Kolhapur end bays
Insulator Replacement works by
Polymer
PGCIL
WR-II
R
204
400 400 kv Rajgarh (Pgcil )- Ssp CKT II
25-Feb-15
6.00
25-Feb-15 18.00
daily
Maintenance Work
PGCIL/MPP
WR - II
TCL
R
205
220
25-Feb-15
9.00
25-Feb-15 17.00
daily
Maintenance Work
MPPTCL
R
Bay No.: 814 Tie Bay of Bina # 1 at
Jabalpur Pooling Station
Bus- 2 at Bina
220 KV MALANPUR - (GWL) PG
CKT - II
Erection/Testing of Current
Transformer for Commissioning of PGCIL
765KV Dharmjaygarh # 3 Bays
For AMP
For AMP work
For AMP works
For attending line defects
19:00 Hrs Continufor Breaker and CT replacement.
Daily
MPPTCL
R
SN
206
KV
220
Line
220 KV DAMOH PG - TIKAMGARH
CKT
400 KV Vandana-Birsinghpur line
and 400 KV Balco-Birsinghpur line
207
400
208
765 Satna - Gwalior Ckt.1
209
765
210
240 MVAr BUS REACTOR at
Jabalpur pooling SS
Kotra # 1 & AT#2 (705) Tie Bay at
765
Tamnar PS
Date
From
Time
To
Date
25-Feb-15
9.00
25-Feb-15 18.00
Basis
Reason
System
Agency
type
daily
Maintenance Work
MPPTCL
MPPTCL
R
EPTCL
C
WR-II
R
PGCIL
WR-II
C
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
PGCIL
WR-II
C
Time
25-Feb-15
6:00
26-Feb-15 19:00
Daily
25-Feb-15
8:00
28-Feb-15 18:00
Daily
25-Feb-15
9:00
25-Feb-15 18:00
25-Feb-15
9:00
25-Feb-15 13:00
Overhead crossing of 400KV D/c
(Quad) Mahan-Sipat line of M/s
Essar Power Transmission
PGCIL
company Limited( shutdown
required of 400 kv VandanaBirsinghpur & Balco-Birsinghpur
line)
Rectifiction of various line defects PGCIL
RELAY FIRMWARE
UPGRADATION
Contin Replacement of support latch
uous assembly of 70552 CB
Contin Replacement of support latch
uous assembly of 70652 CB
Site Acceptance Test (SAT) work
Daily
of NTAMC
Daily
211
765 AT#2 (706) Main Bay at Tamnar PS
25-Feb-15
14:00 25-Feb-15 18:00
212
220 220kV Dehgam-Ranasan#2
25-Feb-15
10:00 25-Feb-15 17:00
213
400/
315 MVA ICT - I at KALA
220
25-Feb-15
7:00
25-Feb-15 18:00
Daily
TESTING OF REMOTE
OPERATION
PGCIL
WR-II
C
214
400 SOLAPUR-PARLI # 2
25-Feb-15
9:00
26-Feb-15 18:00
Daily
To replace conductor connecting
HV bushing & Isolator with IPS
tube of 765/400kv ICT spare unit.
WRTMPL
WRTS-I
C
215
216
HVDCDIA 10 Q51 Bay at BHADRAWATI
220 Jhanor Haldarwa 1
AURANGABAD I Main Bay (409) at
400
PUNE
25-Feb-15
26-Feb-15
9:00
9:00
25-Feb-15 18:00
26-Feb-15 17:00
Daily
Daily
Yealy AMP
AMP of bays
WRTS-I
PGCIL
WRTS-I
WR-II
R
R
26-Feb-15
9:00
26-Feb-15 18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
218
400KV Bus -2 at Waluj S/S with
400 Aurangabad-Pune # 1 on TBC & then 26-Feb-15
Aurangabad-Pune # 2 on TBC
9:00
27-Feb-15 18:00
Attending problem of Pune -1&2
Conti. Bus -1 Isolator at MSETCL Waluj
S/S.
WRTMPL /
WRTS-I
MSETCL
R
219
765 765/400KV ICT -2 at Aurangabad
26-Feb-15
9:00
01-Mar-15
Conti. Commossioning of RTCC.
WRTS-I
WRTS-I
C
220
765
Bay No.: 817 Tie Bay of Bina # 2 at
Jabalpur Pooling Station
26-Feb-15
09:00 26-Feb-15 18:00
Daily
WR-II
C
Parali-Lonikand II ckt 1
26-Feb-15
9.00
26-Feb-15 17.00
Daily
Lonikand-Lonikand II ckt 1
400
400 Raipur-KSK-3
400 ICT-II Tie Bay at Bhatapara ss
220 Kawas -Navsari 2
26-Feb-15
9.00
26-Feb-15 17.00
Daily
26-Feb-15
26-Feb-15
26-Feb-15
9:00 26-Feb-15 18:00
9:00 26-Feb-15 17:00
09:00 26-Feb-15 18:00
Daily
Daily
Daily
217
221
222
223
224
225
400
18:00
Erection/Testing of Current
Transformer for Commissioning of PGCIL
765KV Dharmjaygarh # 4 Bays
Faulty insulator string
replacement.
Faulty insulator string
replacement.
For AMP work
For AMP works
For attending line defects
MSETCL
MSETCL
MSETCL
MSETCL
WRTS-I
WRTS-I
PGCIL
PGCIL
PGCIL
WR-II
R
R
R
SN
KV
Line
From
Date
765kV S/C Korba_jharsuguda-1 Line
26-Feb-15
shutdown
Time
To
Date
Basis
Reason
System
Agency
type
9:00
28-Feb-15 18:00
Continu
For erection of auxiliary bus of
spare reactor
WRTS-I
PGCIL
C
9:00
27-Feb-15 17:00
Daily
For NTAMC Work
WRTS-I
PGCIL
C
For NTAMC Works
PGCIL
WR-II
C
PGCIL
WR-II
R
PGCIL
WR-II
C
PGCIL
WR-II
R
Time
226
765
227
400 Sipat # 3 Tie Bay (14) at Raipur S/S
228
400 63 MVAR Bus Reactor-I at Shujalpur 26-Feb-15
10:00 26-Feb-15 14:00
Daily
229
400 Bus # 2 at Jabalpur 400kV S/S
26-Feb-15
10:00 27-Feb-15 18:00
Daily
230
765
26-Feb-15
09:00 26-Feb-15 18:00
Daily
231
400 Boisar-Padghe
26-Feb-15
8:00
26-Feb-15 18:00
Daily
232
220 220 KV DAMOH PG - SAGAR CKT
26-Feb-15
9.00
26-Feb-15 18.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
233
26-Feb-15
9.00
26-Feb-15 18.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
234
220 220 KV DAMOH PGCIL I/C - II
220 KV BINA(PGCIL) -SHIVPURI
220
CKT
26-Feb-15
9.00
27-Feb-15 17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
235
765 SASAN-SATNA#1 Line
26-Feb-15
9:00
26-Feb-15 18:00
Daily
RELAY FIRMWARE
UPGRADATION
PGCIL
WR-II
C
236
400
9:00
01-Mar-15
Conti. Replacement of CTs and jumpers WRTS-I
WRTS-I
C
9:00
26-Feb-15 13:00
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
PGCIL
WR-II
C
WRTS-I
PGCIL
C
PGCIL
WR-II
C
MSETCL
MSETCL
WRTS-I
EPTCL
WRTS-I
EPTCL
PGCIL
WRPC
ERPC
WRTS-I
PGCIL
R
PGCIL
WR-II
R
237
238
1500 MVA ICT # 1 at Jabalpur
Pooling Station
26-Feb-15
Aurangabad(PG)26-Feb-15
Aurangabad(MSETCL) # I
Bus Reactor (707) Main Bay at
765
26-Feb-15
Tamnar PS
Bus Reactor & AT#3 (708) Tie Bay at
765
26-Feb-15
Tamnar PS
18:00
14:00 26-Feb-15 18:00
239
220 220kV Dehgam-Dehgam#1
26-Feb-15
10:00 26-Feb-15 17:00
240
400 400kV D/C Sipat-Ranchi TL
26-Feb-15
8:00
27-Feb-15 18:00
241
220 KALA - KHADOLI - I
26-Feb-15
7:00
26-Feb-15 18:00
242
26-Feb-15
9.00
26-Feb-15 17.00
243
244
Khadka-Babhleswar
400
HVDCDIA 10 Q52 Bay at BHADRAWATI
400/2500MVA ICT-2 at EPTCL(Hazira)
26-Feb-15
26-Feb-15
9:00
6:00
26-Feb-15 18:00
3/42015
19:00
245
765
26-Feb-15
8:00
02-Mar-15
246
Ranchi - Dharamjaygarh - 1
400 Main Bay of AT # 4 at Kotra P/S
27-Feb-15
8:00
27-Feb-15 18:00
247
400 315 MVA ICT 1 at Boisar
27-Feb-15
8:00
27-Feb-15 18:00
18:00
Contin
uous
Contin
uous
Hyvelm make Isolator ARM
replacement work at 400Kv
Jabalpue SS
ICT Spare Phase Swapping in
place of ICT # 1 Y Phase
Insulator Replacement works by
Polymer
Replacement of support latch
assembly of 70752 CB
Replacement of support latch
assembly of 70852 CB
Site Acceptance Test (SAT) work
Daily
of NTAMC
Stringing of 765kV, S/C RachiContin
Korba TL between AP 42C/0
uous
(D+25) - 42D/0 (D+25)
TESTING OF REMOTE
Daily
OPERATION
To attend the Aux. Bus PG
Daily isolator problem ,CT tan delta,
CVT TAN DELTA Measurement
Daily Yealy AMP
Conti Internal Inspection of ICTs
FR RECTIFICATION OF
Contin LOCATION NO 50/0 WHICH
uous MEMBER HAS BEEN CUT AND
IS IN BEND CONDITION DUE TO
NAXALITE EFFECT
Daily AMP
AMP , Attending Leakages &
Daily
Painting
R
SN
248
249
250
251
252
KV
Line
400 315 MVA ICT 2 at Bhachau
220 BUS -II at Khandwa s/s
AURANGABAD II Main Bay (410) at
400
PUNE
400 Padgha-Kharghar
407 Main Bay of 765 KV ICT # 2 at
400
WARDHA
253
Khadka-Akola
From
Basis
Reason
Agency
type
10:00 27-Feb-15 14:00
10:00 27-Feb-15 17:00
Daily
Daily
AMP of ICT and associated bay equPGCIL
PGCIL
AMP work
WR-II
WR-II
R
R
27-Feb-15
9:00
27-Feb-15 18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
27-Feb-15
8.00
27-Feb-15 18.00
Daily
Cross arm Painting work
MSETCL
MSETCL
27-Feb-15
9:00
27-Feb-15 18:00
Conti. CT N2 valve Replacement work
WRTS-I
WRTS-I
27-Feb-15
8.00
27-Feb-15 18.00
Daily
MSETCL
MSETCL
WRTS-I
WRTS-I
R
PGCIL
WR-II
R
Date
Time
27-Feb-15
27-Feb-15
To
Date
System
Time
400
CT tan delta,Relay testing, CB
DCRM Measurement & Routine
Line maint.
Erecetion of Isolator & BPI for
NTPC bay
Fixing of dislocated spacers,hot
spot
R
254
400 400KV BUS-1 at Solapur
27-Feb-15
9:00
28-Feb-15 18:00
Daily
255
400 Mundra-Jetpur Circuit#1
27-Feb-15
08:00 27-Feb-15 18:00
Daily
256
765
27-Feb-15
9:00
28-Feb-15 18:00
Daily
For AMP
WRTS-I
PGCIL
R
257
400 ACBIL Main Bay(414) at Bilaspur S/S 27-Feb-15
9:00
27-Feb-15 18:00
Daily
For AMP work
WRTS-I
PGCIL
R
258
400 KSK Main Bay (40) at Raipur S/S
27-Feb-15
9:00
28-Feb-15 17:00
Daily
WRTS-I
259
400 ICT-II Main Bay at Bhatapara ss
27-Feb-15
9:00
27-Feb-15 17:00
Daily
For AMP Work
For AMP works
R
PGCIL
POWERGRI
R
D
260
220 Navsari (PG) - Navsari (GETCO) # 1 27-Feb-15
09:00 27-Feb-15 18:00
Daily
For attending line defects
POWERGRI WR-II
R
261
400
27-Feb-15
10:00 28-Feb-15 18:00
Daily
For NTAMC Works
POWERGRI WR-II
C
262
400 Vapi-Boisar
27-Feb-15
8:00
27-Feb-15 18:00
POWERGRI WR-II
R
263
400 400 KV Isp- Nagda Ckt
27-Feb-15
9.00
27-Feb-15 16.00
MPPTCL
MPPTCL
R
264
220
220 KV D/C Korba-Kotmikala-1 and 2
27-Feb-15
of CSPTCL
6:00
28-Feb-15 19:00
CSPTCL
EPTCL
265
765 AT#2 (709) Main Bay at Tamnar PS
27-Feb-15
9:00
27-Feb-15 13:00
WRTS-I
POWERGRI
C
D
266
220 220kV Dehgam-Dehgam#2
27-Feb-15
10:00 27-Feb-15 17:00
267
400/
315MVA ICT - II at KALA
220
27-Feb-15
7:00
27-Feb-15 18:00
Daily
268
765 Bus # 2 at Jabalpur Pooling Station
27-Feb-15
09:00 27-Feb-15 18:00
269
HVDCDIA 20 Q 50 Bay at BHADRAWATI
27-Feb-15
9:00
270
220 Jhanor Haldarwa 2
28-Feb-15
271
765 Bus reactor Main bay (713) at SEONI 28-Feb-15
Tie Bay of 400kV ICT-2 & Bus
Reactor at Kotra PS
125 MVAR Bus Reactor-II at
Shujalpur
Insulator Replacement works by
Polymer
daily Maintenance Work
Overhead crossing of 400KV D/c
Daily (Quad) Mahan-Sipat line of M/s
Essar Power Transmission
company Limited
Contin Replacement of support latch
uous assembly of 70952 CB
Site Acceptance Test (SAT) work
Daily
of NTAMC
Daily
WRTS-I
POWERGR
WR-II
ID
C
TESTING OF REMOTE
OPERATION
POWERGR
WR-II
ID
C
Daily
To carry out Bus Stability Test for
Commissioning of 765kV Bus
Reactor # 1
POWERGRI WR-II
C
27-Feb-15 18:00
Daily
Yealy AMP
WRTS-I
R
9:00
28-Feb-15 17:00
Daily
AMP of bays
POWERGRI WR-II
R
9:00
28-Feb-15 18:00
Daily
AMP works.
WRTS-I
R
WRTS-I
WRTS-I
SN
272
KV
Line
AURANGABAD II Tie Bay (411) at
PUNE
Bus Reactor # 2 (330MVAR) at
765
WARDHA
400
Date
From
Time
To
Date
28-Feb-15
9:00
28-Feb-15 18:00
28-Feb-15
9:00
01-Mar-15
Basis
Reason
System
Agency
type
Daily
AMP works.
WRTS-I
WRTS-I
R
WRTS-I
C
WRTS-I
C
WRTS-I
R
Time
274
765 WARDHA - AURANGABAD(PG) I
28-Feb-15
9:00
28-Feb-15 18:00
275
400 Parli # 2 (408) Tie Bay at WARDHA 28-Feb-15
9:00
28-Feb-15 18:00
Auxiliary Bus connection work at
WRTS-I
WARDHA
Commissioning of Spare Reactor
unit & DGA of bushing oil at
Daily Aurangabad and NGR
WRTS-I
Replacement& DGA of bushing oil
at WARDHA
Conti. CT N2 valve Replacement work
WRTS-I
28-Feb-15
9.00
28-Feb-15 17.00
Daily
273
276
Khadka-Koradi
18:00
Conti.
400
CT tan delta,Relay testing, CB
DCRM Measurement & Routine
Line maint.
Fixing of dislocated spacers,hot
spot
For AMP works
277
400 Mundra-Jetpur Circuit#2
28-Feb-15
08:00 28-Feb-15 18:00
Daily
278
220 ICT-I Bay at Bhatapara ss
28-Feb-15
9:00
28-Feb-15 17:00
Daily
279
220 Navsari (PG) - Navsari (GETCO) -2
28-Feb-15
09:00 28-Feb-15 18:00
Daily
280
400 Main Bus-1 at Kalwa
28-Feb-15
09:00 01-Mar-15
18:00
281
765 SASAN-SATNA-2 Line REACTOR
28-Feb-15
9:00
02-Mar-15
18:00
282
765
Bay No.: 803 (Main Bay) of ICT # 1 at
28-Feb-15
Jabalpur Pooling Station
10:00 28-Feb-15
11:30
283
765
Bay No.: 806 (Main Bay) of ICT # 2 at
28-Feb-15
Jabalpur Pooling Station
11:45 28-Feb-15
02:30
284
400 Boisar-Padghe
28-Feb-15
8:00
28-Feb-15 18:00
285
400 Kasor- CPEC Line
28-Feb-15
8:00
28-Feb-15 18:00
Conti. Isolator Maintenance
For attending of Fire Fighting. Line
Cont. will be taken into service without
line reactor at Satna
For Collection of Current
Daily Transformer Oil Samples of ICT #
1 Main Bay
For Collection of Current
Daily Transformer Oil Samples of ICT #
2 Main Bay
Insulator Replacement works by
Daily
Polymer
Daily PMM work
286
765 SASAN-SATNA#2 Line
28-Feb-15
9:00
28-Feb-15 18:00
Daily
287
220 220kV Bus Coupler at Dehgam
28-Feb-15
10:00 28-Feb-15 16:00
288
400
28-Feb-15
10:00 04-Mar-15
289
220 KALA - KHADOLI - II
28-Feb-15
7:00
28-Feb-15 18:00
290
HVDCDIA 20 Q 52 Bay at BHADRAWATI
28-Feb-15
9:00
28-Feb-15 18:00
291
400 Kalwa-Padgha
01-Mar-15
09:00 01-Mar-15
AT#01 and 400 KV Main Bus-I of
Tamnar PS at Tamnar PS
18:00
18:00
For attending line defects
RELAY FIRMWARE
UPGRADATION
MSETCL
MSETCL
POWERGRI WR-II
WRTS-I
POWERGRI
R
D
POWERGRI WR-II
MSETCl
R
R
MSETCl
POWERGRI WR-II
R
POWERGRI WR-II
C
POWERGRI WR-II
C
POWERGRI WR-II
R
GETCO
GETCO
POWERGRI WR-II
C
Site Acceptance Test (SAT) work
of NTAMC
Contin Stringing of Main Bus-I of M/s TRN
uous Bays
TESTING OF REMOTE
Daily
OPERATION
POWERGR
WR-II
ID
C
WRTS-I
C
POWERGR
WR-II
ID
C
Daily
Yealy AMP
WRTS-I
WRTS-I
R
Daily
maintenance work
MSETCL
MSETCL
R
Daily
M/s TRN
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
For collection of oil sample from
ABB make 765 kV Bushings to
carry out the DGA analysis. Line
will be charged within 15 minutes
POWERGRI WR-II
R
POWERGRI WR-II
POWERGRI WR-II
C
C
POWERGRI WR-II
R
WRTS-II
WRTS-I
C
MEGPTCL
MEGPTCL
R
Time
292
765 Satna - Bina # 2 line reactor at Bina
01-Mar-15
09:00 01-Mar-15
18:00
Daily
293
294
400 ICT # 1 at Damoh
400 ICT # 2 at Damoh
01-Mar-15
01-Mar-15
10:00 01-Mar-15
15:00 01-Mar-15
14:00
19:00
Daily
Daily
295
400 Mundra-Limbdi Circuit #1
01-Mar-15
08:00 01-Mar-15
18:00
Daily
296
400 Seoni-Khandwa-I
02-Mar-15
9:00
02-Mar-15
18:00
Daily
297
409 Main Bay of Akola-1 Line-1 at
400 K
Akola II substation
02-Mar-15
7:00
28-Feb-15 18:00
Daily
298
765 Bina-Jabalpur (Pool )# 1
02-Mar-15
8:00
02-Mar-15
19:00
Daily
299
220 KAPP- Haldarwa 1
706 BAY ICT-1 MAIN BAY AT
765
GWALIOR
02-Mar-15
9:00
02-Mar-15
17:00
Daily
AMP of terminal equipment &
associated bay equipment and
rectification of line defects
AMP of bays
02-Mar-15
10:00 03-Mar-15
18:00
Daily
301
765 Bus reactor-Tie bay (714) at SEONI
02-Mar-15
9:00
03-Mar-15
18:00
302
765 Raichur-2 Tie Bay (714) at Solapur
02-Mar-15
9:00
02-Mar-15
303
400 Karad (80MVAr) Reactor at Solapur
02-Mar-15
9:00
304
765
765KV BUS-1 at
AURANGABAD(PG)
02-Mar-15
305
400
400 KV S/C Bina Thermal Power
Station-MPPTCL 400kV S/S Bina
For NTAMC work
For NTAMC work
Rectification of Jumper
mismatching
Replacement of Distance Relay
and CSD commissioining at
SEONI
409 CT Testing
POWERGRI WR-II
R
POWERGRI WR-II
R
AMP WORKS
POWERGRI WR-II
R
Daily
AMP works.
WRTS-I
WRTS-I
R
18:00
Daily
WRTS-I
WRTS-I
R
05-Mar-15
18:00
Daily
AMP works.
AMP, DGA of bushing oil & Fire
Fighting works.
WRTS-I
WRTS-I
R
9:00
02-Mar-15
18:00
Daily
Bus Extension at Aurangabad
WRTS-I
WRTS-I
C
02-Mar-15
8:00
03-Mar-15
18:00
Crossing of 765 KV S/C JabalpurJAYPEE/M
Contin
JTCL
Bina Line-Pkg-B(AP111/2PPTCL
uous
AP111/3)
02-Mar-15
9:00
02-Mar-15
18:00
Conti. CT N2 valve Replacement work
WRTS-I
WRTS-I
R
02-Mar-15
9:00
02-Mar-15
16:00
Daily
DGA of Bushing oil.
WRTS-I
WRTS-I
R
02-Mar-15
9:00
02-Mar-15
16:00
Daily
DGA of Bushing oil.
WRTS-I
WRTS-I
R
02-Mar-15
9:00
03-Mar-15
18:00
Daily
For AMP
WRTS-I
310
765 ICT#2 Main Bay(721) at Bilaspur S/S 02-Mar-15
9:00
03-Mar-15
18:00
Daily
For AMP work
WRTS-I
311
400
02-Mar-15
9:00
02-Mar-15
17:00
Daily
For AMP Work
WRTS-I
312
220 ICT-II Bay at Bhatapara ss
02-Mar-15
9:00
02-Mar-15
17:00
Daily
313
400k
02-Mar-15
9:00
02-Mar-15
18:00
Daily
300
306
307
308
309
424 Main Bay of 400 KV ICT # 2 at
WARDHA
400 125MVAR Bus Reactor at PARLI
125MVAR Bus Reactor at
400
AURANGABAD(PG)
Main Bay of 765kV Wardha-I at Durg
765
PS
400
Raigarh 4 Main Bay (39) at Raipur
S/S
400KV BUS-2 of Ph-3 APL
generation plant switchyard.
For AMP works
For Bus jumper Disconnection to
isolate the jack bus for CB
retrofitting.
WRTS-I
APL
POWERGRI
D
POWERGRI
D
POWERGRI
D
POWERGRI
D
APL
R
R
R
R
C
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
POWERGRI WR-II
R
Time
314
Gwalior - Bina # 1 line reactor at
765 Bina (along with line outage for 30
minutes)
02-Mar-15
09:00 02-Mar-15
18:00
Daily
For collection of oil sample from
ABB make 765 kV Bushings to
carry out the DGA analysis. Line
will be charged within 30 minutes
315
316
400 Damoh - Bhopal # 1 TL
400 Damoh - Bhopal # 2 TL
02-Mar-15
02-Mar-15
10:00 02-Mar-15
15:00 02-Mar-15
14:00
19:00
Daily
Daily
For NTAMC work
For NTAMC work
POWERGRI WR-II
POWERGRI WR-II
C
C
317
400
02-Mar-15
10:00 02-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
318
400 Bachau - Varsana Ckt.2
Bus Reactor # 1 (Main & Tie Bay) at
400
Jabalpur Pooling Station
02-Mar-15
10:00 02-Mar-15
14:00
Daily
C
02-Mar-15
09:00 03-Mar-15
18:00
Cont.
320
400 Vapi-Boisar
02-Mar-15
8:00
02-Mar-15
18:00
Daily
For replacement of pentrograph iso POWERGRI WR-II
Installation & Commissioning of
POWERGRI WR-II
CSD Relay
Insulator Replacement works by
POWERGRI WR-II
Polymer
321
400
400 KV BUS REACTOR AT 400 KV
S/S BINA
02-Mar-15
9.00
02-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
322
400k
Sectionalizer 442 Betweem Ph-3 & 4
02-Mar-15
of APL generation plant Switchyard.
9:00
07-Mar-15
18:00
Continu
Retrofitting of SIEMENS 400KV
CB in place of chinese CB.
APL
APL
C
323
765
1500MVA-ICT-3 & Seoni-Wardha I
line
02-Mar-15
9:00
07-Mar-15
18:00
Shutdown required on both the line
Conti. & transformer for erection of aux
WRTS-I
bus tower at SEONI.
WRTS-I
C
324
HVDCDIA 30 Q 50 Bay at BHADRAWATI
02-Mar-15
9:00
02-Mar-15
18:00
Daily
WRTS-I
R
325
400 Seoni-Khandwa-II
03-Mar-15
9:00
03-Mar-15
18:00
Daily
326
765
03-Mar-15
8:00
05-Mar-15
17:00
327
Sundargarh - Dharamjaygarh 1&2
400 Vindhyachal Bus- Coupler-3
03-Mar-15
07:30 h03-Mar-15
19:00 hrs Daily
328
765
Dharamjaygarh # 1 Line/Bus reactor
03-Mar-15
at PS / Jabapur
09:00 03-Mar-15
17:00
Daily
329
765 Bina-Jabalpur (Pool )# 2
03-Mar-15
8:00
03-Mar-15
19:00
Daily
330
400
03-Mar-15
9:00
03-Mar-15
18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
03-Mar-15
03-Mar-15
9:00
9:00
03-Mar-15
03-Mar-15
18:00
18:00
Daily
Daily
AMP works.
AMP works.
WRTS-I
WRTS-I
WRTS-I
WRTS-I
R
R
03-Mar-15
9:00
03-Mar-15
18:00
Daily
Bus Extension at Aurangabad
WRTS-I
WRTS-I
C
319
331
332
333
Khandwa-Dhule-2
Main Bay of 400kv ICT-2 (407) at
Solapur
400 Parli # 1 Main Bay (415) at PARLI
400 ICT-2 Main Bay (412) at PUNE
765KV BUS-2 at
765
AURANGABAD(PG)
Yealy AMP
WRTS-I
Replacement of Distance Relay
WRTS-II
WRTS-I
and CSD commissioining at
SEONI
To attened punch point of
Trnsmission Line. And Erection of
Contin Beam near Dharmjaygarh line-2
POWERGR WRPC
uous for Dharamjaygarh Line-3&4 Bay ID
ERPC
extension work. And For erection
of auxiliary bus of spare reactor
NTPC
NTPC
AMP
AMP of Line reactor charged as a
POWERGRI WR-II
Bus Reactor & associated bay
equipment,
AMP of terminal equipment &
POWERGRI WR-II
associated bay equipment and
rectification of line defects
C
R
C
R
R
SN
KV
Line
Date
From
Time
To
Date
Time
Basis
Reason
System
334
400 Akola-Aurangabad # 1
03-Mar-15
9:00
03-Mar-15
13:00
Daily
Bushing oil DGA of Reactor at
Akola (MSETCL), line charged w/o WRTS-I
reactor.
335
400 Sipat # 2 Main Bay (09) at Raipur S/S 03-Mar-15
8:00
04-Mar-15
18:00
Daily
For AMP Work
336
220 Transfer Bus at Bhatapara
9:00
3-Mar-15
17:00
Daily
337
Gwalior - Bina # 2 line reactor at
765 Bina (along with line outage for 30
minutes)
V,chal -SATNA#2 Line REACTOR
(charged as bus reactor)
338
765
339
400 Korba(W)- Khedamara S/C
3/Mar/15
03-Mar-15
09:00 03-Mar-15
18:00
Daily
For AMP works
For collection of oil sample from
ABB make 765 kV Bushings to
carry out the DGA analysis. Line
will be charged within 30 minutes
WRTS-I
WRTS-I
Agency
type
WRTS-I
R
POWERGRI
R
D
POWERGRI R
D
POWERGRI WR-II
R
For Commissioning of Auto
Reclosing Scheme of the line,
C
Cont. outage of line reactor (presently
POWERGRI WR-II
charged as bus reactor) is required
at Satna
For construction of 765KV D/C
Contin
POWERGRI
C
Dharamjaygarh (Korba)-Jabalpur CSPTCL
uous
D
Transmission Line (Part-I)
03-Mar-15
9:00
04-Mar-15
18:00
03-Mar-15
8:00
04-Mar-15
18:00
340
400 315MVA ICT#II at Pirana Sub-Station 03-Mar-15
8:00
03-Mar-15
18:00
Daily
For NTAMC work
POWERGRI WR-II
C
341
400 Damoh - Birshingpur # 1 TL
03-Mar-15
10:00 03-Mar-15
14:00
Daily
For NTAMC work at Damoh S/S.
POWERGRI WR-II
C
342
400 Damoh - Birshingpur # 2 TL
03-Mar-15
15:00 03-Mar-15
19:00
Daily
For NTAMC work at Damoh S/S.
POWERGRI WR-II
C
343
400 Khandwa-Itarsi-1
03-Mar-15
10:00 03-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
344
400
03-Mar-15
8:00
03-Mar-15
17:00
Daily
03-Mar-15
8:00
03-Mar-15
18:00
Daily
03-Mar-15
9.00
03-Mar-15
17.00
daily
03-Mar-15
9.00
03-Mar-15
17.00
03-Mar-15
03-Mar-15
03-Mar-15
10:00 03-Mar-15
8:00 03-Mar-15
8:00 03-Mar-15
03-Mar-15
9:00
03-Mar-15
03-Mar-15
SEL - Raigarh - 2
345
400 Boisar-Padghe
346
400
347
348
349
350
351
352
353
400 KV LINE REACTOR- I AT 400
KV S/S BINA
315MVA XMER - I AT400 KV S/S
400
BHOPAL
400 400kV Dehgam-Sami#2
400 Kansari Kankaroli
400 Asoj-indore line-1
Station Transformer - II, 400 /11.5
400
KV, 90 MVA at JPL
AURANGABAD(PG)400
AURANGABAD(MSETCL)- II
412 Main Bay of Akola-1 Line-2 at
400 K
Akola II substation
For tightening of Jumpers,
Adjustment of VD, Corona Ring
and spacer at various locations
Insulator Replacement works by
Polymer
POWERGR WRPC
ID
ERPC
POWERGRI WR-II
R
Maintenance Work
MPPTCL
MPPTCL
R
daily
Maintenance Work
MPPTCL
MPPTCL
R
17:00
18:00
18.00
Daily
Daily
Daily
APL
PGCIL
PGCIL
WR-II
GETCO
GETCO
C
18-Mar-15
17:00
Daily
NTAMC Adaptation Work
PMM work
PMM work
Preventive maintenence /AOH
(JPL Unit - II under shutdown)
JPL
JPL
9:00
04-Mar-15
18:00
Replacement of HCB Isolator
WRTS-I
WRTS-I
C
7:00
03-Mar-15
18:00
SF6 Filteration of 412 CB
MEGPTCL
MEGPTCL
R
Conti.
Daily
SN
KV
Line
Date
From
Time
To
Date
Time
Basis
Reason
354
400 400kV Athena (ACPL) - Kotra PS
03-Mar-15
8:00
04-Apr-15
18:00
355
765 765 KV ICT # 3 at WARDHA
04-Mar-15
9:00
06-Mar-15
18:00
356
400 RAIPUR-WARDHA II
04-Mar-15
9:00
05-Mar-15
18:00
357
220 KAPP- Haldarwa 2
04-Mar-15
9:00
04-Mar-15
17:00
Stringing of 765kV, S/C RaigarhContin
Champa TL between Loc 13/5
uous
(A+3) - Loc 13/6 (A+3)
Daily
LA replacement work
To attend clearance between earth
Daily
wire & conductor.
Daily AMP of bays
358
400
04-Mar-15
8:00
04-Mar-15
18:00
Daily
AMP Work
359
400 315MVA ICT-2 at Solapur
04-Mar-15
9:00
04-Mar-15
18:00
Daily
360
765 Seoni- Bina Tie bay (726) at SEONI 04-Mar-15
9:00
06-Mar-15
18:00
Rourkela - Raigarh - 2
361
362
363
04-Mar-15
400 Parli- Chandrapur ll Ckt-1
Tie Bay of 765kV Wardha-I at Durg
765
PS
Bus Reactor Main Bay(706) at
765
Bilaspur S/S
9.00
06-Mar-15
System
Agency
WRTS-I
POWERGRI
C
D
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
R
POWERGRI WR-II
POWERGR WRPC
ID
ERPC
R
AMP works & DGA of bushing oil.
WRTS-I
WRTS-I
R
Daily
AMP works.
WRTS-I
WRTS-I
R
Daily
Bay Maint. Work & dignostic
Testing of reactor, CB, CT & relay,
Replacement of broken spacer
cum vibration damper
MSETCL
17.00
04-Mar-15
9:00
05-Mar-15
18:00
Daily
For AMP
WRTS-I
04-Mar-15
9:00
05-Mar-15
18:00
Daily
For AMP work
WRTS-I
05-Mar-15
17:00
Daily
For AMP Work
WRTS-I
18:00
Daily
364
400 Sipat # 2 Tie Bay (08) at Raipur S/S
04-Mar-15
9:00
365
220 Bus-I at Bhatapara
4/Mar/15
10:00 4-Mar-15
type
For AMP works
For collection of oil sample from
Daily ABB make 765 kV & 400 kV
Bushings to carry out the DGA
analysis.
For commissioning of 765kV side
Daily
CSD of ICT-1 at Gwalior
For erection of auxiliary bus of
Continu
spare reactor
WRTS-I
MSETCL
POWERGRI
D
POWERGRI
D
POWERGRI
D
POWERGRI
D
R
R
R
R
366
765 1000 MVA ICT 1 at Bina
04-Mar-15
09:00 04-Mar-15
18:00
367
765 1500 MVA ICT-1 AT GWALIOR
04-Mar-15
10:00 04-Mar-15
18:00
368
765 765kV Korba-Ranchi-2 Ckt 02
04-Mar-15
9:00
05-Mar-15
18:00
369
400 Bus Reactor # 1 at Damoh
04-Mar-15
10:00 04-Mar-15
14:00
Daily
For NTAMC work at Damoh S/S.
POWERGRI WR-II
C
370
400 Bus Reactor # 2 at Damoh
04-Mar-15
15:00 04-Mar-15
19:00
Daily
For NTAMC work at Damoh S/S.
POWERGRI WR-II
C
371
400
Khandwa-Itarsi-2
04-Mar-15
10:00 04-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
372
765
1500MVA ICT # 1 (Main & Tie Bay)
at Jabalpur Pooling Station
04-Mar-15
09:00 05-Mar-15
18:00
Cont.
373
400 Boisar-Padghe
04-Mar-15
8:00
04-Mar-15
18:00
Daily
374
400
04-Mar-15
9.00
04-Mar-15
17.00
daily
Maintenance Work
375
400 400kV Dehgam-Gandhar#2
04-Mar-15
10:00 04-Mar-15
17:00
Daily
NTAMC Adaptation Work & SAT of POWERGR
WR-II
NTAMC
ID
400 KV LINE REACTOR- II AT 400
KV S/S BINA
Installation & Commissioning of
CSD Relay
Insulator Replacement works by
Polymer
POWERGRI WR-II
R
POWERGRI WR-II
C
WRTS-I
POWERGRI
C
D
POWERGRI WR-II
C
POWERGRI WR-II
R
MPPTCL
R
MPPTCL
C
SN
KV
Line
Date
From
Time
To
Date
Basis
Reason
System
Agency
type
PMM work
PMM work
PMM work
Rectification of line construction
defects
PGCIL
PGCIL
PGCIL
GETCO
GETCO
GETCO
WRTS-I
WRTS-I
C
WRTS-I
R
Time
376
377
378
400 Asoj-indore line-2
220 ichapur-Kawas-1
400 Kansari Bhinmal
04-Mar-15
04-Mar-15
04-Mar-15
8:00
8:00
8:00
04-Mar-15 18.00
04-Mar-15 18:00
04-Mar-15 18:00
Daily
Daily
Daily
379
765 DURG PS - WARDHA_1 & 2_D/C
04-Mar-15
9:00
04-Mar-15
18:00
Daily
380
400
04-Mar-15
9:00
04-Mar-15
18:00
Daily
Yealy AMP
WRTS-I
381
765 Bina - Gwalior # 3
05-Mar-15
8:00
05-Mar-15
19:00
Daily
AMP of terminal equipment &
associated bay equipment and
rectification of line defects
POWERGRI WR-II
R
382
765
9:00
05-Mar-15
18:00
Daily
AMP work
WRTS-I
WRTS-I
R
8:00
05-Mar-15
20:00
WRTS-I
POWERGRI
R
D
383
50MVAR Bus reactor at
BHADRAWATI
Bus Reactor-2 (709) Main bay at
05-Mar-15
WARDHA
Jindal # 2 (413) Main Bay at Tamnar
400
05-Mar-15
PS
Contin
AMP WORKS
uous
AMP works ( TL and Substation
Daily
Line Equipment )
Daily AMP works.
Daily AMP works.
Dignostic Testing of reactor, CB,
Daily CT & relay
WRTS-I
384
220 Tarapur-Boisar
05-Mar-15
8:00
05-Mar-15
18:00
385
386
765 ICT-2 Tie Bay (705) at Solapur
400 Parli # 2 Main Bay (418) at PARLI
05-Mar-15
05-Mar-15
9:00
9:00
05-Mar-15
05-Mar-15
18:00
18:00
05-Mar-15
9.00
05-Mar-15
17.00
05-Mar-15
9:00
06-Mar-15
17:00
Daily
5/Mar/15
11:00 5-Mar-15
19:00
Daily
387
388
389
400 Lonikand-koyna Stage IV
Wardha1 Main Bay (34) at Raipur
400
S/S
220 Bus-II at Bhatapara
For AMP Work
For AMP works
POWERGRI WR-II
R
WRTS-I
WRTS-I
WRTS-I
WRTS-I
R
R
MSETCL
MSETCL
POWERGRI
R
D
POWERGRI R
D
WRTS-I
390
765 1000 MVA ICT 2 at Bina
05-Mar-15
09:00 05-Mar-15
18:00
Daily
391
220 Damoh - Damoh MPPTCL # 1 TL
05-Mar-15
10:00 05-Mar-15
14:00
Daily
For collection of oil sample from
ABB make 765 kV & 400 kV
Bushings to carry out the DGA
analysis.
For NTAMC work at Damoh S/S.
392
220 Damoh - Damoh MPPTCL # 2 TL
05-Mar-15
15:00 05-Mar-15
19:00
Daily
For NTAMC work at Damoh S/S.
WR-II
C
393
400
05-Mar-15
10:00 05-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
394
400
05-Mar-15
9.00
05-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
05-Mar-15
8:00
05-Mar-15
18:00
Daily
PMM work
PGCIL
GETCO
05-Mar-15
9:00
06-Mar-15
18:00
05-Mar-15
9:00
05-Mar-15
18:00
Daily
395
396
397
Khandwa-Seoni-1
315MVA XMER - I & BDTCL - I Tie
AT400 KV S/S BOPAL
220 I'pore-Kawas-2
AURANGABAD(PG)400
AURANGABAD(MSETCL)-I
HVDC-2 & Chandrapur -1Tie bay
400
(405) at BHADRAWATI
Conti.
398
400 Korba-Raipur-3&4
06-Mar-15
9:00
20-Mar-15
18:00
Daily
399
400 Bhatapra-Bhilai
06-Mar-15
9:00
20-Mar-15
18:00
Daily
POWERGRI WR-II
R
MPPTCL
WR-II
C
MPPTCL
Replacement of CTs and jumpers WRTS-I
WRTS-I
C
Yealy AMP
WRTS-I
WRTS-I
R
WRTS-I
PGCIL
C
WRTS-I
PGCIL
C
A/R non auto mode for Additional
Earthing work on lines by Raipur
TLM
A/R non auto mode for Additional
Earthing work on lines by Raipur
TLM
SN
400
401
402
403
404
405
KV
Line
Basis
Reason
System
Agency
type
18:00
Daily
AMP work
WRTS-I
WRTS-I
R
06-Mar-15
18:00
8:00
06-Mar-15
20:00
06-Mar-15
8:00
06-Mar-15
18:00
06-Mar-15
400 Bhusawal-Akola
Main Bay of 765kV Wardha-II at Durg
765
06-Mar-15
PS
9.00
06-Mar-15
17.00
Daily AMP works
Contin
AMP WORKS
uous
Daily Attending Leakages & Painting
Disc string replacement,fixing of
Daily spacers,dampers,earthbond
MSETCL
9:00
07-Mar-15
18:00
Daily
For AMP
WRTS-I
Bus Reactor-2 (708) Tie bay at
WARDHA
400 Tarapur-Boisar # I
Jindal # 2 & AT#3 (414) Tie Bay at
400
Tamnar PS
400 315 MVA ICT 2 at Boisar
765
Date
From
Time
To
Date
Time
06-Mar-15
9:00
06-Mar-15
06-Mar-15
8:00
06-Mar-15
R
POWERGRI WR-II
POWERGRI
R
WRTS-I
D
R
POWERGRI WR-II
MSETCL
POWERGRI
R
D
POWERGRI
R
D
406
400 Bus Coupler # 1 at Raipur S/S
06-Mar-15
9:00
07-Mar-15
17:00
Daily
For AMP Work
WRTS-I
407
220 Damoh - Sagar MPPTCL
06-Mar-15
10:00 06-Mar-15
14:00
Daily
For NTAMC work at Damoh S/S.
MPPTCL
WR-II
C
408
220 Damoh - Tikamgarh MPPTCL
06-Mar-15
15:00 06-Mar-15
19:00
Daily
For NTAMC work at Damoh S/S.
MPPTCL
WR-II
C
409
765
06-Mar-15
09:00 07-Mar-15
18:00
POWERGRI WR-II
C
410
765 DURG PS - WARDHA_1 & 2_D/C
07-Mar-15
9:00
07-Mar-15
18:00
WRTS-I
WRTS-I
C
411
765
07-Mar-15
9:00
11-Mar-15
18:00
WRTS-I
WRTS-I
C
412
413
220 Kawas Haldarwa 1
400 Tarapur-Boisar # II
07-Mar-15
07-Mar-15
09:00 07-Mar-15 17:00
8:00 07-Mar-15 18:00
414
400 AT#3 (415) Main Bay at Tamnar PS
07-Mar-15
8:00
07-Mar-15
20:00
415
765 Seoni- Bina Main bay (727) at SEONI 07-Mar-15
9:00
07-Mar-15
416
765 ICT-1 Main Bay (703) at Solapur
07-Mar-15
9:00
07-Mar-15
9.00
1500MVA ICT # 2 (Main & Tie Bay)
at Jabalpur Pooling Station
WARDHA - AURANGABAD(PG) I &
II _D/C
417
Daily AMP of bays
Daily AMP works
Contin
AMP WORKS
uous
R
POWERGRI WR-II
R
POWERGRI WR-II
POWERGRI
R
WRTS-I
D
18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
07-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
08-Mar-15
17.00
AMP works.
Bay Maint. Work & dignostic
Testing of reactor, CB, CT & relay,
Replacement of broken spacer
cum vibration damper
Bus extention for Raipur # 3 & 4
ckt
Commissioning of Line Reactor at
AURANGABAD(PG) & Bushing oil
DGA of Reactor at Akola
(MSETCL)
For AMP works
MSETCL
MSETCL
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTS-I
POWERGRI R
D
400 Parli- Chandrapur-lll
418
765 765 KV Bus # 2 at WARDHA
419
400
420
400 Bus-I at Bhatapara
AURANGABAD(PG)AKOLA(MSETCL)-II
Installation & Commissioning of
CSD Relay
Rectification of LA terminal pad
Daily replacement work of Ckt-1 at
WARDHA
For construction ,crossing &
swapping work of up-coming new
765kV WARDHA Conti.
AURANGABAD(PG) 3 & 4 _D/C
line. AND NGR Replacement at
Wardha-Aurangabad-1
Cont.
Daily
07-Mar-15
9:00
07-Mar-15
18:00
Daily
07-Mar-15
9:00
07-Mar-15
18:00
Daily
7/Mar/15
9:00
7-Mar-15
17:00
Daily
SN
KV
Line
400KV BUS-2 of Ph-3 APL
generation plant switchyard.
Date
From
Time
To
Date
Time
Basis
Reason
System
Agency
type
07-Mar-15
9:00
07-Mar-15
18:00
Daily
For Bus jumper Reconnection to
normalize the jack bus after CB
retrofitting.
APL
APL
C
421
400k
422
220 Damoh - Katni MPPTCL # 1 TL
07-Mar-15
10:00 07-Mar-15
14:00
Daily
For NTAMC work at Damoh S/S.
MPPTCL
WR-II
C
423
220 Damoh - Katni MPPTCL # 2 TL
07-Mar-15
15:00 07-Mar-15
19:00
Daily
For NTAMC work at Damoh S/S.
MPPTCL
WR-II
C
424
400
07-Mar-15
10:00 07-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
07-Mar-15
9.00
07-Mar-15
17.00
07-Mar-15
09:00 07-Mar-15
18:00
08-Mar-15
9:00
08-Mar-15
18:00
08-Mar-15
9.00
08-Mar-15
17.00
Khandwa-Seoni-2
429
765/ Sipat 400KV ICT-1 TO IBT-1 TIE
400 BAY-14
09-Mar-15
07:30
14-Mar-15
hrs
19:00
hrs
430
220 Kawas Haldarwa 2
09-Mar-15
09:00 09-Mar-15
17:00
Replacement of faulty insulator
string
Swiitcheable Line Reactor to be
taken out of service for carrying
Daily out the AMP work of switcheable
CB. Line shall be remain in
service
Stringing work of broken earth wire
Daily
between span 387 to 390
Dignostic Testing of reactor, CB,
Daily CT & relay
All burnt control cable replacement
Contin (ICT-1 AND IBT-1
ous
TRANSFORMERS S/D NOT
REQUIRED)
Daily AMP of bays
431
400
09-Mar-15
9:00
09-Mar-15
17:00
Daily
AMP Work
432
400
09-Mar-15
9:00
09-Mar-15
18:00
Daily
433
765
09-Mar-15
10:00 10-Mar-15
18:00
Daily
434
400
09-Mar-15
8:00
09-Mar-15
20:00
Contin
AMP WORKS
uous
WRTS-I
POWERGRI
R
D
435
765
09-Mar-15
9:00
11-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
436
765 Pune Line Reacator at Solapur
09-Mar-15
9:00
09-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
437
765 WARDHA - AURANGABAD(PG) II
09-Mar-15
9:00
09-Mar-15
18:00
Daily
WRTS-I
WRTS-I
C
438
765
09-Mar-15
9:00
10-Mar-15
18:00
439
765 ICT#1 at Bilaspur S/S
09-Mar-15
8:00
10-Mar-15
440
400 Bus Coupler # 2 at Raipur S/S
09-Mar-15
8:00
08-Mar-15
425
400 Dhule-Babhleswar ckt 2
426
765
427
400 WARDHA-PARLI II
428
Gwalior-III lIne Reactor at Bina SS
400 Akola-Wardha-ll
Rourkela - Raigarh - 2
BUS REACTOR (80MVAR) AT
KOLHAPUR
712 L/R BAY OF BINA -1 AT
GWALIOR
Jindal # 1 (416) Main Bay at Tamnar
PS
1500MVA-ICT I Main bay (712) at
SEONI
Tie Bay of 765kV Wardha-II at Durg
PS
Daily
MSETCL
MSETCL
POWERGRI WR-II
R
WRTS-I
WRTS-I
R
MSETCL
MSETCL
NTPC
NTPC
POWERGRI WR-II
POWERGR WRPC
ID
ERPC
R
AMP WORKS
WRTS-I
R
AMP works
POWERGRI WR-II
AMP works.
Daily
AMP, DGA of bushing oil & Fire
Fighting works.
Commissioning of Spare Reactor
unit at Aurangabad &
Commissioning of Illumination
system at WARDHA
For AMP
WRTS-I
18:00
Daily
For AMP work
WRTS-I
18:00
Daily
For AMP Work
WRTS-I
WRTS-I
C
POWERGRI
R
D
POWERGRI
R
D
POWERGRI
R
D
SN
KV
Line
Date
From
Time
To
Date
Time
Basis
Reason
System
Agency
type
441
765 Bus-2 at Satna
09-Mar-15
9:00
10-Mar-15
18:00
Daily
For extension of Bus-2 & Bus Bar
POWERGRI WR-II
testing for Bus Reactor-2
C
442
400
09-Mar-15
10:00 09-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
443
765 Raipur PS -Dharamjaygarh PS S/C
09-Mar-15
8:00
09-Mar-15
18:00
Daily
For overhead crossing of 800 kV
HVDC Champa-Kurukshetra TL
444
400 Itarsi-Indore-2
09-Mar-15
9:00
10-Mar-15
18:00
Cont.
445
765
09-Mar-15
09:00 10-Mar-15
18:00
Cont.
Khandwa-Rajgarh -2
WRTS-I
POWERGRI
C
D
For Retrofitting of Main-I Distance
POWERGRI WR-II
Relay
Installation & Commissioning of
POWERGRI WR-II
CSD Relay
C
09-Mar-15
9.00
09-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
447
448
Bus Reactor # 2 (Main & Tie Bay) at
Jabalpur Pooling Station
315MVA XMER - I I AT400 KV S/S
400
BHOPAL
400 400 kv Indore - Nagda Ckt
220 Sartanpar-Bhimasr Line No. 1
09-Mar-15
09-Mar-15
9.00
8:00
09-Mar-15 16.00
09-Mar-15 18:00
daily
Daily
400 400kV Dehgam-Nagda#1
09-Mar-15
10:00 09-Mar-15
17:00
Daily
MPPTCL
MPPTCL
GETCO
GETCO
POWERGR
WR-II
ID
R
449
Maintenance Work
PMM work
Site Acceptance Test (SAT) work
of NTAMC
450
400
9:00
09-Mar-15
18:00
Daily
Yealy AMP
WRTS-I
451
220 Transfer Bus at Damoh
10-Mar-15
10:00 10-Mar-15
17:00
Daily
AMP of Bus & associated BAY
Equipment
POWERGRI WR-II
452
400
10-Mar-15
8:00
10-Mar-15
20:00
Contin
AMP WORKS
uous
453
765 Raichur-2 Line Recator at Solapur
10-Mar-15
9:00
10-Mar-15
18:00
Daily
AMP works & DGA of bushing oil . WRTS-I
WRTS-I
R
454
400 400KV BUS-2 at PARLI
10-Mar-15
9:00
10-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
455
220 TAPS-Bhilad
10-Mar-15
8:00
11-Mar-15
19:00
Daily
AMP works.
Annual maintenance of
equipments & painting
GETCO
NPCIL
456
400 Bhadrawati # 2 LR Bay at Raipur S/S 10-Mar-15
8:00
09-Mar-15
18:00
Daily
For AMP Work
WRTS-I
POWERGRI
R
D
457
Mundra - Jetpur # 2 line reactor at
400
Jetpur
14:00
Daily
For bushing tan delta
measurement. Line charged within POWERGRI WR-II
15 min. wihtout LR at Jetpur end.
458
Chakabura- Bharari (Bilaspur) D/C
400
Line
10-Mar-15
8:00
11-Mar-15
18:00
For construction of 765KV D/C
Contin
Dharamjaygarh (Korba)-Jabalpur
uous
Transmission Line (Part-I)
459
400
10-Mar-15
10:00 10-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
460
400 Bina-Shujalpur Ckt-I
220 KV PITHAMPUR - RAJGARH
220
PG CKT - I
10-Mar-15
10:00 10-Mar-15
18:00
Daily
For NTAMC Works
POWERGRI WR-II
C
10-Mar-15
9.00
10-Mar-15
16.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
462
220 220 KV MALANPUR - AURAIYA CKT 10-Mar-15
9.00
11-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
463
464
220 Haldarva-Jhanor-1(NTPC)
400 Vadavi - Dehgam (PG) - 2
8:00
8:00
10-Mar-15
10-Mar-15
18:00
18:00
Daily
Daily
PMM work
PMM work
PGCIL
GETCO
GETCO
GETCO
446
461
HVDC -2 interconnector (404) Bay at
09-Mar-15
BHADRAWATI
Jindal # 1 & Future (417) Tie Bay at
Tamnar PS
Khandwa-Rajgarh-1
10-Mar-15
10-Mar-15
10-Mar-15
10:00 10-Mar-15
WRTS-I
ACB
WRTS-I
C
C
R
R
POWERGRI
R
D
R
POWERGRI
C
D
SN
KV
Line
From
Time
To
Date
Time
8:00
10-Mar-15
9:00
10-Mar-15
467
10-Mar-15
220 Sartanpar-Bhimasr Line No. 2
400KV JPL - JPL Extn Interconnector
400
10-Mar-15
Line
10-Mar-15
132 Vindhyachal-Wadhan-1
07:30 h10-Mar-15
19:00 hrs Daily
468
400 400kV Dehgam-Pirana#1
10-Mar-15
10:00 10-Mar-15
17:00
Daily
469
220
11-Mar-15
9:00
11-Mar-15
18:00
Daily
470
765 AT#3 (709) Main Bay at Tamnar PS
11-Mar-15
6:00
11-Mar-15
22:00
Contin
AMP WORKS
uous
471
400 Raichur-1 Line Reactor at Solapur
11-Mar-15
9:00
11-Mar-15
18:00
Daily
AMP works & DGA of bushing oil . WRTS-I
11-Mar-15
9.00
11-Mar-15
17.00
Daily
Bay Maint. Work & dignostic
Testing of reactor, CB, CT & relay MSETCL
Date
465
466
GED Line-5 (Future) Bay (210) at
Mapusa
472
473
474
475
400 Parli- Solapur
Main Bay of 765kV Kotra-I at Durg
765
PS
Jindal #1 Main Bay (33) at Raipur
400
S/S
Satna-GWALIOR#1 Reactor Bay
765
(712R) at Satna
Basis
Reason
System
Agency
18:00
Daily
GETCO
GETCO
17:00
Daily
PMM work
Relay/Protection Testing/Line
maintenence.
Replacement of R,Y and B Ph PT
Site Acceptance Test (SAT) work
of NTAMC
JPL
JPL
NTPC
NTPC
POWERGR
WR-II
ID
AMP Works
WRTMPL
WRTS-I
WRTS-I
POWERGRI
R
D
WRTS-I
type
C
R
R
MSETCL
POWERGRI
R
D
POWERGRI
R
D
11-Mar-15
9:00
12-Mar-15
18:00
Daily
For AMP
WRTS-I
11-Mar-15
8:00
10-Mar-15
18:00
Daily
For AMP Work
WRTS-I
11-Mar-15
9:00
11-Mar-15
18:00
Daily
For Annual maintenance work
POWERGRI WR-II
R
476
400 315 MVA ICT-1 at Khandwa
11-Mar-15
10:00 11-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
477
400 Bina-Shujalpur Ckt-II
11-Mar-15
10:00 11-Mar-15
18:00
Daily
For NTAMC Works
POWERGRI WR-II
C
478
765
JBP - Dharmjaygarh Reactor Line # 1
11-Mar-15
Reactor at Jabalpur Pooling Station
09:00 12-Mar-15
18:00
Cont.
Installation & Commissioning of
CSD Relay
POWERGRI WR-II
C
479
400
11-Mar-15
9.00
11-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
480
400
11-Mar-15
9.00
11-Mar-15
18.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
481
220
11-Mar-15
9.00
11-Mar-15
18.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
482
400
11-Mar-15
8:00
11-Mar-15
18:00
Daily
GETCO
GETCO
483
400
11-Mar-15
9:00
12-Mar-15
18:00
PMM work
Replacement of CT'S at
Conti.
Bhadrawati
WRTS-I
WRTS-I
R
484
220
12-Mar-15
9:00
12-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
485
765 AT#3 of Tamnar PS
12-Mar-15
8:00
12-Mar-15
18:00
Contin
AMP WORKS
uous
WRTS-I
POWERGRI
R
D
486
765 1500MVA ICT-1 at Solapur
12-Mar-15
9:00
12-Mar-15
18:00
Daily
AMP works & DGA of bushing oil.
WRTS-I
WRTS-I
R
487
765
12-Mar-15
9:00
14-Mar-15
18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
488
220 TAPS-Borivali
12-Mar-15
8:00
14-Mar-15
19:00
Daily
Annual maintenance of
equipments & painting
MSETCL
NPCIL
315MVA XMER - I I & BDTCL - II Tie
AT400 KV S/S BHOPAL
400 kv Birsinghpur - Katni Ckt - I
220 KV SEONI PG - CHHINDWARA
CKT- II
Vadavi - Dehgam (PG) - 2
Bhilai-1 & Raipur-1 Tie bay (414 )
Bay at BHADRAWATI
GED Line-6 (Future) Bay (211) at
Mapusa
1500MVA-ICT-2 Main bay (715) at
SEONI
AMP Works
SN
KV
Line
489
Date
From
Time
To
Date
Time
Basis
12-Mar-15
9.00
12-Mar-15
17.00
400 Parli- Parli PG-1
490
9.00
14-Mar-15
Daily
17.00
400 Parli- Chandrapur ll Ckt-2
System
Bay Maint. Work & dignostic
Testing of reactor, CB, CT & relay MSETCL
Bay Maint. Work & dignostic
Testing of reactor, CB, CT & relay,
Replacement of broken spacer
cum vibration damper
MSETCL
Daily
12-Mar-15
Reason
Agency
type
MSETCL
MSETCL
POWERGRI
R
D
POWERGRI
R
D
491
765 BUS#1 at Bilaspur S/S
12-Mar-15
8:00
13-Mar-15
18:00
Daily
For AMP work
WRTS-I
492
400 Jindal #1 Tie Bay (32) at Raipur S/S
12-Mar-15
8:00
11-Mar-15
18:00
Daily
For AMP Work
WRTS-I
493
400 63MVAR BUS REACTOR at Satna
12-Mar-15
9:00
12-Mar-15
18:00
Daily
For Annual maintenance work
POWERGRI WR-II
R
494
400 315 MVA ICT-2 at Khandwa
12-Mar-15
10:00 12-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
495
496
400 Nagda-Shujalpur Ckt-I
400 Nagda-Shujalpur Ckt-II
12-Mar-15
12-Mar-15
10:00 12-Mar-15
14:00 12-Mar-15
14:00
18:00
Daily
Daily
POWERGRI WR-II
POWERGRI WR-II
C
C
497
220
12-Mar-15
8:00
14-Mar-15
18:00
Daily
498
220 220 KV MEHGAON - AURAIYA CKT 12-Mar-15
9.00
13-Mar-15
17.00
daily
For NTAMC Works
For NTAMC Works
For Replacment of damage
Twin -Zebra Bus- Section
above Kota-RAPP -A Ckt
No.01 and Kota -Barod Bay
Maintenance Work
499
500
220 Haldarva-Jhanor-2(NTPC)
400 Indore-Pithampur-1
12-Mar-15
12-Mar-15
8:00
9:00
12-Mar-15
12-Mar-15
18:00
18:00
Daily
Daily
12-Mar-15
9.00
12-Mar-15
17.00
12-Mar-15
9.00
12-Mar-15
17.00
12-Mar-15
8:00
14-Mar-15
18:00
Daily
504
400 Bus Reactor Tie Bay (402) at Solapur 13-Mar-15
9:00
13-Mar-15
18:00
Daily
505
506
400 Aurangabad-Akola II
400 125MVAR Bus Reactor at SEONI
13-Mar-15
13-Mar-15
9.00
9:00
13-Mar-15
13-Mar-15
17.00
16:00
Daily
Daily
13-Mar-15
9.00
13-Mar-15
17.00
508
765 Tie Bay of 765kV Kotra-II at Durg PS 13-Mar-15
9:00
14-Mar-15
509
400 Bhilai # 1 Main Bay at Raipur S/S
13-Mar-15
8:00
510
400 V'chal-Satna#3
13-Mar-15
9:00
Badod - Kota
501
502
503
400 Parali-Lonikand II ckt 2
400 Lonikand-Lonikand II ckt 2
220
Daily
Daily
Badod - Modak
507
400 Akola-Nandgaonpeth
PMM work
Reamote HMI Testing
Replacement of faulty insulator
string
Replacement of faulty insulator
string
Restringing work between Location
No. 159 to 185.
Concern Officer Sh. B R S
Gautam.
Schedule Maintenance, Concern
Officer Sh. Raghuvir
Singh AEN(M)
AMP works.
Daily
Bay Maintenance work
DGA of Bushing oil.
Disc string replacement,fixing of
spacers,dampers,earthbond
18:00
Daily
For AMP
12-Mar-15
18:00
Daily
For AMP Work
13-Mar-15
18:00
Daily
For Annual maintenance work
MPPTCL
NRPC
WRPC
MPPTCL
MPPTCL
R
GETCO
MPPTCL
GETCO
WR-II
C
MSETCL
MSETCL
MSETCL
MSETCL
MPPTCL
NRPC
WRPC
WRTS-I
WRTS-I
R
MSETCL
WRTS-I
MSETCL
WRTS-I
R
MSETCL
MSETCL
POWERGRI
R
WRTS-I
D
POWERGRI
R
WRTS-I
D
R
POWERGRI WR-II
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
Time
511
400 125 MVAr Bus Reactor-1 at Khandwa 13-Mar-15
10:00 13-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
512
513
13-Mar-15
13-Mar-15
10:00 13-Mar-15
14:00 13-Mar-15
14:00
18:00
Daily
Daily
For NTAMC Works
For NTAMC Works
POWERGRI WR-II
POWERGRI WR-II
C
C
13-Mar-15
09:00 14-Mar-15
18:00
Cont.
Installation & Commissioning of
CSD Relay
POWERGRI WR-II
C
13-Mar-15
9.00
13-Mar-15
18.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
516
220 Shujalpur-Shujalpur Ckt-II
220 Shujalpur-Shujalpur Ckt-I
JBP - BINA # 3 Line Reactors (Main
765 & Tie Bay) at Jabalpur Pooling
Station
220 KV SEONI PG - CHHINDWARA
220
CKT- I
400 Indore-Pithampur-2
13-Mar-15
9:00
13-Mar-15
18:00
Daily
MPPTCL
WR-II
C
517
400 Bhachau-Ranchodpura-1&2
13-Mar-15
08:00 19-Mar-15
18:00
Cont.
POWERGRI WR-II
C
518
400 400kV Dehgam-Pirana#2
13-Mar-15
10:00 13-Mar-15
17:00
Daily
POWERGR
WR-II
ID
C
14-Mar-15
9.00
14-Mar-15
17.00
Daily
Reamote HMI Testing
Shiifting of Towers for SSNL Canal
crossing to maintain electrical
clearance
Site Acceptance Test (SAT) work
of NTAMC
C & tan Delta testing of CT Bay
maint. Work
MSETCL
MSETCL
520
765 Raichur-1 Main Bay (716) at Solapur 14-Mar-15
9:00
14-Mar-15
18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
521
522
765 765 KV Bus # 2 at WARDHA
400 Satna-Bina#4
9:00
9:00
14-Mar-15 18:00
14-Mar-15 18:00
Daily
Daily
Extended Bus Jumpering work
For Annual maintenance work
WRTS-I
WRTS-I
POWERGRI WR-II
C
R
523
400 125 MVAr Bus Reactor-2 at Khandwa 14-Mar-15
10:00 14-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. POWERGRI WR-II
C
524
220 Shujalpur-Rajgarh Ckt-I
14-Mar-15
10:00 13-Mar-15
14:00
Daily
For NTAMC Works
POWERGRI WR-II
C
525
400
14-Mar-15
8:00
14-Mar-15
18:00
Daily
For overhead crossing of 800 kV
HVDC Champa-Kurukshetra TL
CSPTCL
POWERGRI
C
D
526
765 Indore-Bhopal line
14-Mar-15
9:00
15-Mar-15
18:00
STERLITE
WR-II
C
527
400 400kV Dehgam-Gandhar#1
14-Mar-15
10:00 14-Mar-15
POWERGR
WR-II
ID
C
528
765
15-Mar-15
9:00
POWERGRI WR-II
C
529
530
400 Bina -Shujalpur LR-I
400 Bina -Shujalpur LR-II
15-Mar-15
15-Mar-15
10:00 15-Mar-15
14:00 15-Mar-15
POWERGRI WR-II
POWERGRI WR-II
C
C
531
400 AURANGABAD-PUNE D/C line
15-Mar-15
9:00
WRTMPL
WRTS-I
C
532
533
400 Vindhyachal Tie-Line-1
400 Vindhyachal Tie-Line-2
15-Mar-15
15-Mar-15
07:30 h20-Mar-15
07:30 h20-Mar-15
NTPC
NTPC
NTPC
NTPC
534
400/
Sipat 400KV IBT-1 MAIN BAY-13
132
16-Mar-15
07:30
21-Mar-15
hrs
NTPC
NTPC
514
515
519
400 Dhule-Khandwa Ckt.I
DCDS (Quad) Marwa TPP - Raipur
(Raita) TL
V,chal -SATNA#1 Line
REACTOR(charged as bus reactor)
14-Mar-15
14-Mar-15
16-Mar-15
19-Mar-15
Reamote HMI Testing & Testing of
CT selection scheme for spare
reactor
Site Acceptance Test (SAT) work
17:00
Daily
of NTAMC
For Commissioning of Auto
Reclosing Scheme of the line,
18:00
Cont. outage of line reactor (presently
charged as bus reactor) is required
at Satna
14:00
Daily For NTAMC Works
18:00
Daily For NTAMC Works
Lilo of line at PGCIL PUNE(GIS)
18:00
Conti.
S/S
19:00 hrs ContinuLILO work (StageV)
19:00 hrs ContinuLILO work (StageV)
All burnt control cable
19:00
Contin replacement(IBT-1
hrs
ous
TRANSFORMER S/D NOT
REQUIRED)
Cont.
SN
KV
Line
Seoni # 2 (701) Main bay at
WARDHA
SOLAPUR-KOLHAPUR I
Bay 704 (Indore - Bina, Main Bay )
1500MVA-ICT-3 Main bay (718) at
SEONI
Raichur-1 Tie Bay (717) at Solapur
535
765
536
537
400
765
538
765
539
765
540
220 TAPS-Vapi
541
542
543
544
Pole 2 Main bay (10C03c)at HVDC
400 APL
400 New Koyna-Dabhol ckt 1
400 KV D/C KORBA WEST
400 KHEDAMERA LILO FOR MODWA
PPP
Main Bay of 400kV GMR-I at Durg
400
PS
545
400 ICT # 1 Bay (01) at Raipur S/S
546
765
547
Bay No 709 (Main Bay of
Autotransformer # 3) at Kotra P/S
Ranchi Line Reactor (716LR) at
765
Bilaspur S/S
548
220 Khandwa-Nepanagar
549
400
550
400
551
220
552
220
553
400
554
400 Navasari - Vapi (Magarwada Ckt.2)
Date
From
Time
To
Date
Time
Basis
Reason
System
Agency
type
16-Mar-15
9:00
16-Mar-15
18:00
Daily
AMP work
WRTS-I
WRTS-I
R
16-Mar-15
16-Mar-15
9:00
9:00
16-Mar-15
16-Mar-15
18:00
18:00
Daily
Daily
AMP Works
AMP WORKS
WRTMPL WRTS-I
POWERGRI WR-II
R
R
16-Mar-15
9:00
18-Mar-15
18:00
Daily
AMP works.
WRTS-I
WRTS-I
R
16-Mar-15
9:00
16-Mar-15
18:00
Daily
WRTS-I
WRTS-I
R
16-Mar-15
8:00
18-Mar-15
19:00
Daily
AMP works.
Annual maintenance of
equipments & painting
GETCO
NPCIL
16-Mar-15
9:00
16-Mar-15
18:00
Daily
CB time testing in 400kV side
APL
WR-II
16-Mar-15
8.30
25-Mar-15
17.30
Daily
MSETCL
MSETCL
16-Mar-15
8:00
17-Mar-15
18:00
Cold line insulator cleaning
Crossing of 765 KV D/C
Contin
Dharamjaygarh-Jabalpur
uous
Line(AP54B-AP55)
CSPDCL
JTCL
16-Mar-15
9:00
16-Mar-15
18:00
Daily
For AMP
WRTS-I
16-Mar-15
9:00
13-Mar-15
18:00
Daily
For AMP Work
WRTS-I
16-Mar-15
8:00
17-Mar-15
18:00
Daily
For AMP Work
WRTS-I
16-Mar-15
9:00
17-Feb-15 18:00
Daily
For attending leakages
WRTS-I
16-Mar-15
10:00 16-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. MPPTCL
16-Mar-15
09:00 17-Mar-15
18:00
Cont.
16-Mar-15
9.00
17-Mar-15
17.00
16-Mar-15
10.00 16-Mar-15
16-Mar-15
9.00
16-Mar-15
POWERGRI
D
POWERGRI
D
POWERGRI
D
POWERGRI
D
R
R
R
R
R
WR-II
C
Installation & Commissioning of
CSD Relay
POWERGRI WR-II
C
daily
Maintenance Work
MPPTCL
MPPTCL
R
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
16-Mar-15
16.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
9:00
17-Mar-15
18:00
Conti.
WRTS-I
WRTS-I
R
16-Mar-15
8:00
17-Mar-15
18:00
Daily
555
765 Seoni # 2 (702) Tie bay at WARDHA 17-Mar-15
9:00
17-Mar-15
18:00
Daily
556
557
400 SOLAPUR-KOLHAPUR II
765 ICT-2 Main Bay (706) at Solapur
Pole 2 tie bay (10C03A)at HVDC
400 APL
17-Mar-15
17-Mar-15
9:00
9:00
17-Mar-15
17-Mar-15
18:00
18:00
17-Mar-15
9:00
17-Mar-15
18:00
558
Bus Reactor # 2 (Main & Tie Bay) at
Jabalpur Pooling Station
315MVA XMER - I AT400 KV S/S
BINA
220 KV ANOOPUR - KOTMIKALA
CKT - Il
220 KV PITHAMPUR - RAJGARH
PG CKT - II
Bhilai-1 Main bay (415) at
BHADRAWATI
Replacement of CT'S at
Bhadrawati
Replacement of porcelain disc
insulator strings with polymer
insulator strings in complete line
POWERGRI WR-II
C
AMP work
WRTS-I
WRTS-I
R
Daily
Daily
AMP Works
AMP works.
WRTMPL
WRTS-I
WRTS-I
WRTS-I
R
R
Daily
CB time testing in 400kV side
APL
WR-II
R
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
Time
Construction of 400KV RaitaDaily Jagdalpur Line. Location : AP
10/0 (FD-60+30) & AP 11/0 (FDCSPTCL
60+30)
Crossing of 765 KV S/C JabalpurContin
PGCIL
Bina Line(AP54-AP55)
uous
400KV DCDS Raipur-Raigarh CKT
1&2 , Location : 112(DA+3) &
400 113(DA+0)
17-Mar-15
560
400 400 KV D/C Damoh - Bhopal.
17-Mar-15
8:00
18-Mar-15
18:00
561
400 Tie Bay of 400kV GMR-I at Durg PS
17-Mar-15
9:00
17-Mar-15
18:00
Daily
For AMP
WRTS-I
562
400 Bus Coupler (06) at Raipur S/S
17-Mar-15
8:00
14-Mar-15
18:00
Daily
For AMP Work
WRTS-I
563
765 SATNA - GWL#1 Line
17-Mar-15
9:00
18-Mar-15
18:00
Cont.
For CSD commissining for Line
Reactor at Gwalior
POWERGRI WR-II
564
220 Khandwa-Omkareshwer
17-Mar-15
10:00 17-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. MPPTCL
WR-II
C
565
566
567
568
220
220
220
220
17-Mar-15
17-Mar-15
17-Mar-15
17-Mar-15
8:00
9.00
6.00
8:00
18-Mar-15 17:00
17-Mar-15 18.00
17-Mar-15 18.00
17-Mar-15 18:00
Daily
daily
daily
Daily
R
R
R
400 400kV Dehgam-Nagda#2
17-Mar-15
10:00 17-Mar-15
17:00
Daily
PGCIL
MPPTCL
MPPTCL
GETCO
POWERGR
ID
NPCIL
MPPTCL
MPPTCL
GETCO
569
WR-II
C
570
400 Gandhar - Navsari Ckt.1
17-Mar-15
8:00
17-Mar-15
18:00
Daily
MAINTENANCE WORK
Maintenance Work
Maintenance Work
PMM work
Site Acceptance Test (SAT) work
of NTAMC
To facilitate insulator repalcement
in 400kV Navsari - Vapi
(Magarwada Ckt.2) in multi circuit
towers due to low electrical
clearance
POWERGRI WR-II
C
571
765
Bay No 707 (Main Bay of 765 kV
Kotra - Tamnar Ckt# 1) at Kotra P/S
18-Mar-15
8:00
19-Mar-15
18:00
Daily
AMP
WRTS-I
572
765
Bay 706 ( 765/400 KV ICT#2, Main
Bay ) AT INDORE
18-Mar-15
9:00
18-Mar-15
18:00
Daily
AMP WORKS
POWERGRI WR-II
R
573
400 Bhachau-Ranchodpura-1&2
18-Mar-15
08:00 18-Mar-15
18:00
Daily
Crossing of 400 KV D/C Essar Bhachau Line
POWERGRI WR-II
C
574
765 Raichur-2 Main Bay (713) at Solapur 18-Mar-15
9:00
18-Mar-15
18:00
Daily
CT oil Sampling.
WRTS-I
R
575
400
18-Mar-15
9:00
18-Mar-15
18:00
Daily
For AMP
WRTS-I
576
765 ICT#3 at Bilaspur S/S
18-Mar-15
8:00
19-Mar-15
18:00
Daily
For AMP work
WRTS-I
577
400 Doma # 1 Bay (11) at Raipur S/S
18-Mar-15
8:00
15-Mar-15
18:00
Daily
For AMP Work
WRTS-I
578
220 Khandwa-Chhegaon-2
18-Mar-15
10:00 18-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. MPPTCL
579
765
18-Mar-15
09:00 19-Mar-15
18:00
Cont.
18-Mar-15
9.00
17.00
daily
559
580
TARAPUR - BOISAR
220 KV DAMOH PGCIL I/C - I
220 KV BADOD - KOTA CKT
Khanpur- Dehgam (PG)-1
Main Bay of 400kV GMR-II at Durg
PS
Bus Reactor # 1 (Main & Tie Bay) at
Jabalpur Pooling Station
315MVA XMER - I I AT400 KV S/S
400
BINA
8:00
17-Mar-15
19-Mar-15
17:00
R
CSPTCL
JTCL
POWERGRI
R
D
POWERGRI
R
D
C
POWERGRI
R
D
WRTS-I
POWERGRI
R
D
POWERGRI
R
D
POWERGRI
R
D
WR-II
C
Installation & Commissioning of
CSD Relay
POWERGRI WR-II
C
Maintenance Work
MPPTCL
R
MPPTCL
SN
581
582
583
KV
Line
400 KV S/S BHOPL - 400 KV
ITARSI - I
400 400 kv Birsinghpur - Katni Ckt - II
220 220 KV BADOD - MODAK CKT
Raipur-1 Main bay (410) at
400
BHADRAWATI
400
Date
From
Time
To
Date
Time
Basis
Reason
System
Agency
type
18-Mar-15
9.00
18-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
18-Mar-15
18-Mar-15
9.00
6.00
18-Mar-15
18-Mar-15
18.00
18.00
daily
daily
MPPTCL
MPPTCL
MPPTCL
MPPTCL
R
R
18-Mar-15
9:00
19-Mar-15
18:00
WRTS-I
WRTS-I
R
585
400 Navasari - Magarwada Ckt.1
19-Mar-15
8:00
20-Mar-15
18:00
586
587
400 Padgha-Talegaon
765 ICT#1, Main Bay at indore
Seoni-Wardha-I Main bay (721) at
765
SEONI
19-Mar-15
19-Mar-15
9.00
9:00
19-Mar-15
19-Mar-15
17.00
18:00
Maintenance Work
Maintenance Work
Replacement of CT'S at
Conti.
Bhadrawati
Replacement of porcelain disc
Daily insulator strings with polymer
insulator strings in complete line
Daily
C & tan Delta testing of CT
Daily AMP WORKS
19-Mar-15
9:00
20-Mar-15
18:00
Daily
589
220 TAPS-Boisar
19-Mar-15
8:00
20-Mar-15
19:00
Daily
590
400 Karad-Lonikand
19-Mar-15
9.00
19-Mar-15
17.00
Daily
19-Mar-15
9.00
19-Mar-15
17.00
Bay Maint. Work & dignostic
Daily Testing of reactor, CB, CT & relay MSETCL
Contin Crossing of 765 KV D/C
uous Dharamjaygarh-Jabalpur Line(AP3- PGCIL
AP4)
584
588
591
400 Parli(MS)- Parli PG-2
AMP works.
Annual maintenance of
equipments & painting
Annual Maintenance work.
POWERGRI WR-II
C
MSETCL
MSETCL
POWERGRI WR-II
R
WRTS-I
WRTS-I
R
MSETCL
NPCIL
MSETCL
MSETCL
MSETCL
592
765 765 kv line Champa-Dharamjaygarh 19-Mar-15
8:00
20-Mar-15
18:00
593
400 Tie Bay of 400kV GMR-I at Durg PS
19-Mar-15
9:00
19-Mar-15
18:00
Daily
For AMP
WRTS-I
594
220 Doma # 2 Bay (12) at Raipur S/S
19-Mar-15
8:00
16-Mar-15
18:00
Daily
For AMP Work
WRTS-I
595
400 (i) Korba(NTPC)-Bhilai -1 &2
19-Mar-15
8:00
20-Mar-15
18:00
For construction of 765KV D/C
Contin
Dharamjaygarh (Korba)-Jabalpur
uous
Transmission Line (Part-I)
596
220 Khandwa-Chhegaon-1
19-Mar-15
10:00 19-Mar-15
18:00
Daily
For NTAMC work at Khandwa S/S. MPPTCL
WR-II
597
220 DCDS Korba - Suhela TL
19-Mar-15
8:00
19-Mar-15
18:00
Daily
For overhead crossing of 800 kV
HVDC Champa-Kurukshetra TL
CSPTCL
POWERGRI
C
D
598
400
19-Mar-15
9.00
19-Mar-15
17.00
daily
Maintenance Work
MPPTCL
MPPTCL
R
19-Mar-15
9.00
19-Mar-15
18.00
daily
MPPTCL
MPPTCL
R
19-Mar-15
10:00 19-Mar-15
17:00
Daily
Maintenance Work
Site Acceptance Test (SAT) work
of NTAMC
APL
WR-II
C
Daily
To facilitate insulator repalcement
in 400kV - Navsari - Magarwada
POWERGRI WR-II
Ckt.1 in multi circuit towers due to
low electrical clearance
C
599
400 KV S/S BHOPL - 400 KV
ITARSI - I I
400 400 kv Damoh - Katni - Ckt
600
400 400kV Dehgam-Sami#1
601
400 Gandhar - Navsari Ckt.2
19-Mar-15
8:00
19-Mar-15
18:00
WRTS-I
JTCL
POWERGRI
R
D
POWERGRI
R
D
POWERGRI
C
D
C
Anaulagnak
frvarI 2015
AaOr
maaca- 2015
maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR
FEBRUARY 2015
maaMga
rajya
State
AND
MARCH 2015
}jaa- kI AavaSyakta
DEMAND
ENERGY REQUIREMENT
maogaavaaT (MW)
frvarI 2015
maaca- 2015
imailayana yauinaTsa (MUs)
frvarI 2015
maaca- 2015
FEBRUARY 2015
MARCH 2015
FEBRUARY 2015
MARCH 2015
1 gaujarat
GUJARAT
saIimat
AsaIimat
RESTRICTED
12500
13500
7290
8390
UNRESTRICTED
12540
13540
7300
8400
RESTRICTED
9130
8260
5025
5330
UNRESTRICTED
9130
8260
5025
533o
RESTRICTED
3000
3100
1675
1922
UNRESTRICTED
3000
3100
1693
1928
2 maQya p`doSa
saIimat
AsaIimat
3 C<aIsagaZ,
saIimat
AsaIimat
4 maharaYT/
MADHYA PRADESH
CHHATISGARH
MAHARASHTRA
saIimat
AsaIimat
RESTRICTED
19500
19800
10700
11800
UNRESTRICTED
19550
19850
10750
11850
5 gaaovaa
GOA
saIimat
AsaIimat
RESTRICTED
400
405
285
290
UNRESTRICTED
410
410
290
295
RESTRICTED
300
315
205
190
UNRESTRICTED
305
320
210
195
RESTRICTED
635
615
450
455
UNRESTRICTED
640
620
460
460
RESTRICTED
44099
44613
27000
28000
UNRESTRICTED
43822
44327
27150
28500
6 dmana dIva
saIimat
AsaIimat
7 DI ena eca
saIimat
AsaIimat
8 piScama xao~
saIimat
AsaIimat
3.3
DD
DNH
WESTERN REGION
Anaulagnak
4.1
maah janavarI 2015 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata
ACTUAL GENERATION & AVALABILITY FOR JANUARY 2015
Schedule yaaojanaa
k`maaMk
Sr.
No.
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
Actual vaastivak
carma
}jaa-
Peak
(Mw)
carma
Energy
(Gwh)
Auxillary
Consumption
Peak
(Mw)
(Gwh)
k (A) gaujarat GUJARAT
jalaIya
1.
2.
3.
4.
6.
tapIya
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
HYDRO
]k[- Ukai - 1
]k[- Ukai - 2
]k[- Ukai - 3
]k[- Ukai - 4
]k[- Ukai (Total)
]k[- ela baI saI eca Ukai LBCH - 1
]k[- ela baI saI eca Ukai LBCH - 2
]k[- ela baI saI eca Ukai LBCH (Total)
kDanaa Kadana - 1
kDanaa Kadana - 2
kDanaa Kadana - 3
kDanaa Kadana - 4
kDanaa Kadana (Total)
pnama PANAM & Madhuban Dam 1 & 2
kula jalaIya TOTAL(H)
Sr.
No.
37
38
39
40
41
42
43
44
75
75
75
0
152
3
0
3
60
60
0
60
60
10
225
61
123
123
124
0
0
0
0
0
0
0
98
0
0
202
203
211
506
0
0
212
214
212
0
210
210
213
210
210
211
0
0
42
150
2
3
16
0
60
120
0
273
0.000
42
85
0
74
60
120
0
121
0
0
0
0
0
0
0
0
70
70
36
140
19
100
100
200
200
50
70
70
136
145
37
0
145
145
89
145
145
145
0
0
100
100
210
210
210
0
210
210
150
210
210
210
0
0
37.91
80.64
40.70
46.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.13
0.00
0.00
120.56
115.67
87.36
277.63
0.00
0.00
51.00
113.78
132.42
0.00
112.39
118.13
48.67
36.44
35.54
120.07
0.00
0.00
0
0
0.00
0
0.000
0
0
0.00
0
0.503
0
0
0.00
0
0.000
0
0
0.00
0
0.000
0.024
0.005
0.000
0.000
0.005
0.025
0.343
THERMAL
TaoronT pavar ilaimaToD yauinaT saI
TaoronT pavar ilaimaToD yauinaT DI
TaoronT pavar ilaimaToD yauinaT [TaoronT pavar ilaimaToD yauinaT ef
TaoronT pavar ilaimaToD yauinaT jaI TI 1
TaoronT pavar ilaimaToD yauinaT jaI TI 2
TaoronT pavar ilaimaToD yauinaT esa TI jaI
Qauvarna tapIya Dhuvaran - 5
Qauvarna tapIya Dhuvaran - 6
Qauvarna tapIya Dhuvaran - GT 1
Qauvarna tapIya Dhuvaran - GT 2
Qauvarna tapIya Dhuvaran - STG
]ka[- yauinaT 1 Ukai -1
]ka[- yauinaT 2 Ukai -2
]ka[- yauinaT 3 Ukai -3
]ka[- yauinaT 4 Ukai -4
]ka[- yauinaT 5 Ukai -5
]ka[- yauinaT 6 Ukai -6
gaaMQaInagar 1 Gandhinagar - 1
gaaMQaInagar 2 Gandhinagar - 2
gaaMQaInagar 3 Gandhinagar - 3
gaaMQaInagar 4 Gandhinagar - 4
gaaMQaInagar 5 Gandhinagar - 5
vaNakbaaorI 1 Wanakbori - 1
vaaNakbaaOrI 2 Wanakbori - 2
vaaNakbaaOrI 3 Wanakbori - 3
vaaNakbaaOrI 4 Wanakbori - 4
vaaNakbaaOrI 5 Wanakbori - 5
vaaNakbaaOrI 6 Wanakbori - 6
vaaNakbaaOrI 7 Wanakbori - 7
]%trna Utran GT 1
]%trna Utran GT 2
]%trna UTRAN - GT- 3
]%trna UTRAN - GT-4
]%trna UTRAN - STG-I
]%trna UTRAN - STG-II
Schedule yaaojanaa
k`maaMk
4.03
8.54
10.59
0.00
23.16
1.85
0.00
1.85
6.43
3.64
0.00
5.44
15.51
3.83
44.35
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
isa@ka Sikka - 1
isa@ka Sikka - 2
kcC ilagnaa[-T Kutch Lignite - 1
kcC ilagnaa[-T Kutch Lignite - 2
kcC ilagnaa[-T Kutch Lignite - 3
kcC ilagnaa[-T Kutch Lignite - 4
saUrt ilagnaa[-T Surat Lignite - 1
saUrt ilagnaa[-T Surat Lignite - 2
3.481
1.115
6.545
6.963
0.000
0.000
1.134
0.918
0.146
0.146
11.030
9.753
10.939
19.817
0.093
0.072
5.884
10.490
13.629
0.000
0.204
0.000
Actual vaastivak
carma
}jaa-
Peak
(Mw)
70
70
45
45
47
0
110
110
70
70
75
0
173
240
carma
Energy
(Gwh)
63.83
1.66
41.52
49.07
33.74
29.22
0.00
80.90
Auxillary
Consumption
(Gwh)
Peak
(Mw)
112
92
72
71
62
54
0
130
3.405
1.613
8.766
6.118
0.325
8.759
saUrt ilagnaa[-T Surat Lignite - 3
saUrt ilagnaa[-T Surat Lignite - 4
e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1
e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2
jaI Aa[- pI saI ela GIPCL GT - 1
jaI Aa[- pI saI ela GIPCL GT - 2
jaI Aa[- pI saI ela GIPCL GT - 3
jaI Aa[- pI saI ela GIPCL ST - 1
jaI Aa[- pI saI ela GIPCL GT - 4
jaI Aa[- pI saI ela GIPCL ST - 2
[- esa esa e Aar ESSAR GT - 1
[- esa esa e Aar ESSAR GT - 2
[- esa esa e Aar ESSAR GT - 3
[- esa esa e Aar ESSAR STG
jaI pI [- saI GPEC GT - 1
jaI pI [- saI GPEC GT - 2
jaI pI [- saI GPEC GT - 3
jaI pI [- saI GPEC STG
jaI esa [- jaI GSEG GT - 1
jaI esa [- jaI GSEG GT - 2
jaI esa [- jaI GSEG STG
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
60
kula tapIya Total (T)
kula jalaIya+tapIya Total (H+T)
ivaMD [najaI- Wind Energy
kula jalaIya+tapIya+hvaa Total (H+T+Wind)
ivainamaya Exchanges
saIimat }jaa- maaMga Restricted Energy Req.
jalaIya
1.1
1.2
1.3
2
3
4
5
6
7
8
9
10
11
12
13
14
140
95
140
480
430
600
90
150
0
50
0
100
5277
6130
7992
9359
(+)
7290
MADHYA PRADESH
1
95
350
Sugen (GT 1 + GT 2)
saIpIpI sao Aayaat Imp from CPP+MUNDRA
K (B)
100
71.54
90.85
61.73
71.81
16.87
17.63
1.03
20.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.29
5.68
2.76
4.02
5.61
4.90
195.91
1669.09
129
129
103
105
34
34
29
46
0
0
0
0
0
0
0
218
161
27
52
51
23
292
2318
8.179
8.637
8.766
4132.23
4176.58
561.18
4737.76
3215.35
7953.11
11337
11555
358.705
359.049
80.65
62.05
58.00
41.25
47.35
38.44
2.18
79.46
0.00
8.65
8.72
6.27
1.00
0.00
0.00
128.15
292.65
646.17
194
117
172
99
163
91
5
310
0
30
22
60
20
0
0
387
1014
2378
Sr.
No.
2
3
4
5
6
7
8
9
10
11
12
13
14
0.191
0.040
0.097
0.040
0.835
7.213
12418
maQya p`doSa
50
114
40
50
75
90
130
0
30
0
30
15
0
20
210
610
1185
315
0
60
0
60
20
0
30
360
990
2114
Schedule yaaojanaa
k`maaMk
1
0.000
HYDRO
cambala pir Chambal Pr.(50%share)
gaaMQaI saagar Gandhi Sagar
raNaa p`tap sagar R.P.Sagar
javaahr sagar Jawahar Sagar
ponca Pench
baargaI Bargi
baargaI Bargi (LBCH)
banasaagar Toansa Bansagar-1 (Tons)
banasaagar Bansagar-2 (Deolondh)
banasaagar Bansagar-3 (Silpara)
banasaagar Bansagar-4 (Zinaha)
maoDIKoDa Medikheda
ibarisaMGapur Birsingpur
Tavaa Tawa
rajaGaaT Rajghat
Omkareshwar
[Midra saagar Indira Sagar
kula jalaIya TOTAL(H) MPPGCL
tapIya
0.000
sToSna ka naama
}jaa-
Station Name
Energy
(Gwh)
0.080
0.045
0.020
0.100
0.070
0.220
0.080
0.030
0.020
0.080
.
1.002
1.261
Actual vaastivak
carma
}jaa-
Peak
(Mw)
Energy
(Gwh)
carma
Peak
(Mw)
Auxillary
Consumption
(Gwh)
THERMAL
AmarkMTk II AMK II Unit -1
AmarkMTk II AMK II Unit -2
AmarkMTk III AMK III Unit -5
satpura I Satpura-I(60%Share)
satpura II Satpura-II Unit 6
satpura II Satpura-II Unit 7
satpura II Satpura-II Unit 8
satpura II Satpura-II Unit 9
satpura III Satpura-III Unit 10
satpura III Satpura-III Unit 11
esajaITIpIesa 1 SGTPS Unit - 1
esajaITIpIesa 2 SGTPS Unit - 2
esajaITIpIesa 3 SGTPS Unit - 3
esajaITIpIesa 4 SGTPS Unit - 4
esajaITIpIesa 5 SGTPS Unit - 5
15
16 SSTPS
kula tapIya Total (T)
kula jalaIya+tapIya Total (H+T)
Injection from WIND
61
82
0
50
0
67
128
163
122
163
142
191
144
194
291
390
1057
2572
1409
4036
18.47
0.00
155.73
0.00
103.41
0.00
108.23
118.51
111.79
62.29
62.29
69.51
107.09
79.64
312.72
78.45
1318.65
1964.82
100.63
74
0
217
0
180
0
187
190
182
184
184
176
180
183
507
627
2985
5675
0
16.560
0
0.000
9.950
21.250
22.210
16.400
16.400
16.570
9.580
132.520
133.781
kula jalaIya+tapIya + ivaMD Total (H+T+WIND)
ivainamaya Exchanges
saIimat }jaa- maaMga Rest. En. Req.
(+)
5800
2065.45
3298.51
5363.96
5675
1.75
5.39
0.69
7.83
120
10
7
137
0.050
0.050
27.64
27.64
27.64
27.84
36.85
66.82
116.93
116.93
116.93
116.93
181.69
145.00
1271.98
0.00
0.00
1271.98
1279.81
474.76
1754.57
44
40
46
48
120
120
210
210
210
210
255
255
1917
0
0
1917
2054
0
2054
12.890
81.42
22.38
17.20
8.86
142.58
0.00
2.97
5.92
2.05
7.11
8.01
23.25
25.75
373.50
560
240
711
38
471
0
19
6
67
65
80
126
0
1795
CHHATTISGARH C<aIsagaZ,
ga (C)
jalaIya
HYDRO
1 hsadova baaMgaao Hasdeo Bango
2 Gangrel
3 Mini Micro KWB
kula jalaIya TOTAL(H) CSEB
tapIya
1
2
3
4
5
6
7
8
9
14
kaorbaa (pU) Korba (E) Unit-1
kaorbaa (pU) Korba (E) Unit-2
kaorbaa (pU) Korba (E) Unit-3
kaorbaa (pU) Korba (E) Unit-4
kaorbaa (pU) Korba (E) Unit -5
kaorbaa (pU) Korba (E) Unit -6
kaorbaa (p) Korba (W) Unit -1
kaorbaa (p) Korba (W) Unit -2
kaorbaa (p) Korba (W) Unit -3
kaorbaa (p) Korba (W) Unit -4
baalakao sao Aayaat BALCO Import
ijandla sao Aayaat JINDAL Import
kula tapIya Total (T+IPP)
kula jalaIya+tapIya Total (H+T)
ivainamaya Exchanges
saIimat }jaa- maaMga Rest. En. Req.
Ga (D)
jalaIya
2
3
4
5
6
7
8
9
10
11
12
13
61
139
30
30
30
30
71
71
125
125
125
125
0
149
50
50
50
50
120
120
210
210
210
210
250
250
911
966
1780
1900
(+)
1675
MAHARASHTRA
1
120
19
tapIya
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27.660
15.620
13.610
11.230
171.020
171.130
HYDRO
74
49
165
10
120
3
5
3
0
0
9
37
32
506
300
150
600
20
444
60
10
5
0
0
80
250
47
1966
Schedule yaaojanaa
Sr.
No.
26.570
maharaYT/
kaoyanaa 1AaOr 2 Koyna 1 & 2
kaoyanaa III Koyna III
kaoyanaa IV Koyna IV
kaoyanaa DIpIeca Koyna DPH
TaTa jalaIya TATA Hydro
vaOtrNaa Vaitarna
eladarI Eldari
BaTgar AaOr vaIr Bhatgar & Vir
pOzana Paithan
itlaarI Tillari
BaIra Tola rosa Bhira Tail Race
GaTGar Ghatghar
Anya CaoTo jalaIya Small Hydro (others)
kula jalaIya TOTAL(H)
k`maaMk
3
0.110
THERMAL
10
11 KORBA(EB) Extn - 1
12 KORBA(EB) Extn - 2
kula tapIya Total (T)
13
55
6
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
0.908
2.995
3.903
Actual vaastivak
carma
}jaa-
Peak
(Mw)
Energy
(Gwh)
carma
Auxillary
Consumption
(Gwh)
Peak
(Mw)
THERMAL
naaisak 3 Nasik Unit -3
naaisak 4 Nasik Unit -4
naaisak 5 Nasik Unit -5
T/ambao 4 Trombay Unit -4
T/ambao 5 Trombay Unit -5
T/ambao 6 Trombay Unit -6
T/ambao 8 Trombay Unit -8
T/ambao 7A gaOsa Trombay -7A (Gas)
T/ambao 7ba Trombay -7B (WHR)
kaoraD,I 5 Koradi Unit -5
kaoraD,I 6 Koradi Unit -6
kaoraD,I 7 Koradi Unit -7
Bausaavala 2 Bhusawal Unit -2
Bausaavala 3 Bhusawal Unit -3
Bausaavala 4 Bhusawal Unit -4
Bausaavala 4 Bhusawal Unit -5
parlaI 3 Parli Unit -3
parlaI 4 Parli Unit -4
parlaI 5 Parli Unit -5
parlaI 6 Parli Unit -6
parlaI 7 Parli Unit -7
KaprKoD,a 1 Khaperkheda Unit -1
KaprKoD,a 2 Khaperkheda Unit -2
KaprKoD,a 3 Khaperkheda Unit -3
105
85
133
0
250
130
0
140
115
180
0
500
500
0
0
0
65
75
75
110
100
250
0
0
0
0
155
40
80
100
350
85
100
100
150
135
335
0
0
0
0
210
55
110
135
470
132.60
131.19
122.12
0.00
21.75
102.67
170.35
0.00
0.00
0.00
94.55
104.85
0.00
27.63
297.02
227.05
0.00
82.21
110.98
150.09
134.95
129.89
107.89
139.47
205
198
204
0
459
235
254
0
0
0
180
184
0
170
515
515
0
169
163
250
250
210
185
217
0.920
27
28
30
31
32
33
34
35
36
37
38
39
40
41
42
KaprKoD,a 4 Khaperkheda Unit -4
KaprKoD,a 5 Khaperkheda Unit -5
parsa Paras-3
parsa Paras-4
]rna Uran (Gas)
]rna Uran (WHR)
caMd`pur 1 Chandrapur Unit -1
caMd`pur 2 Chandrapur Unit -2
caMd`pur 3 Chandrapur Unit -3
caMd`pur 4 Chandrapur Unit - 4
caMd`pur 5 Chandrapur Unit -5
caMd`pur 6 Chandrapur Unit -6
caMd`pur 7 Chandrapur Unit -7
DhaNaU 1 Dahanu Unit-1
DhaNaU 2 Dahanu Unit-2
CPP
43
44 RGPPL Share
kula tapIya Total (T)
135
135
200
200
100
100
100
90
70
80
190
150
180
180
430
430
220
135
135
120
95
110
255
200
372
500
0.00
200
6290
0.00
300
9090
6966
9960
(+)
MAH. Wind + Solar Generation
kula jalaIya +tapIya Total (H+T+Wind)
Exchanges
TOTAL
(H+T)
ivainamaya
saIimat }jaa- maaMga Rest. En. Req.
gaaovaa GOA
Aa[- pI pI irlaayaMsa IPP Reliance
ivainamaya Exchanges
saIimat }jaa- maaMga Rest. En. Req.
dmana AaOr dIva DAMAN & DIU
dadra nagar hvaolaI DNH
kula DD &DNH (T)
ca (E)
C (F)
ja (G)
11200
115.85
263.52
144.15
111.60
165.99
89.95
0.00
95.37
104.16
117.04
290.80
249.77
255.19
161.79
12.36
2876.83
0.00
7341.63
172.27
7887.40
3123.12
11010.51
211
500
253
253
554
0
144
213
200
470
440
492
0
250
250
3931.00
0
10664
0
12746
19.21
16
Sr.
No.
(H)
1.
285
400
132
1.1
1.2
1.3
1.4
1.5
1.6
2.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
3.1
3.2
3.3
3.4
3.5
4.1
4.2
4.3
4.4
4.5
4.6
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
koMd`Iya xao~ Central Sector
ena pI saI N.P.C.
tara`pur 1 TAPS Unit -1
tara`pur 2 TAPS Unit -2
tara`pur 3 TAPS Unit -3
tara`pur 4 TAPS Unit -4
kakrapr 1 KAPS Unit -1
kakrapr 2 KAPS Unit -2
kula ena pI saI NPC Total
ena TI pI saI N.T.P.C.
kaorbaa esaTIpIesa 1 KSTPS Unit-1
kaorbaa esaTIpIesa 2 KSTPS Unit-2
kaorbaa esaTIpIesa 3 KSTPS Unit-3
kaorbaa esaTIpIesa 4 KSTPS Unit-4
kaorbaa esaTIpIesa 5 KSTPS Unit-5
kaorbaa esaTIpIesa 6 KSTPS Unit-6
kaorbaa esaTIpIesa 7 KSTPS Unit-7
kula kaorbaa KSTPS Total
ivanQa esaTIpIesa 1 VSTPS Unit-1
ivanQa esaTIpIesa 2 VSTPS Unit-2
ivanQa esaTIpIesa 3 VSTPS Unit-3
ivanQa esaTIpIesa 4 VSTPS Unit-4
ivanQa esaTIpIesa 5 VSTPS Unit-5
ivanQa esaTIpIesa 6 VSTPS Unit-6
ivanQa esaTIpIesa 7 VSTPS Unit-7
ivanQa esaTIpIesa 8 VSTPS Unit-8
ivanQa esaTIpIesa 9 VSTPS Unit-9
ivanQa esaTIpIesa 10 VSTPS Unit-10
ivanQa esaTIpIesa 11 VSTPS Unit-11
kula ivanQayaacala VSTPS Total
saIpt -1 -SIPAT-1
saIpt -2 -SIPAT-2
saIpt -3 -SIPAT-3
saIpt -4 -SIPAT-4
saIpt -5 SIPAT-5
kula saIpt -SIPAT TOTAL
kvaasa gaOsa 1e Kawas GT-1A
kvaasa gaOsa 1baI Kawas GT-1B
kvaasa esaTI 1saI Kawas ST-1C
kvaasa gaOsa 2e Kawas GT-2A
kvaasa gaOsa 2baI Kawas GT-2B
kvaasa esaTI 2saI Kawas ST-2C
14.263
3.150
348.627
376.725
272.00
241
291.21
393
167.56
298
463.62
680
631.18
977
Schedule yaaojanaa
k`maaMk
5.862
80
80
300
300
125
125
1010
1510
2294
Actual vaastivak
carma
Peak
(Mw)
160
160
480
480
200
200
1680
2600
4260
}jaaEnergy
(Gwh)
carma
Peak
(Mw)
0.00
64.06
404.22
0.04
171.24
157.16
796.72
0
160
546
151
546
151
1554
141.36
148.27
141.74
357.31
363.03
348.80
369.05
1869.57
123.83
88.20
108.05
63.31
113.80
123.68
314.35
300.12
215
213
216
513
518
514
517
2439
219
212
215
211
214
215
513
514
298.58
309.20
298.82
2459.71
416.31
384.66
408.82
320.24
324.51
1854.54
20.71
6.92
13.13
26.55
0.72
14.17
513
512
514
#REF!
664.00
663.00
667.00
514.00
512.00
2589.00
114
112
135
113
114
136
Auxillary
Consumption
(Gwh)
5.479
42.400
31.966
117.325
164.28
99.04
kula kvaasa KGPS Total
gaMQaar gaOsa 1 Gandhar GT-1
gaMQaar gaOsa 2 Gandhar GT-2
gaMQaar gaOsa 3 Gandhar GT-3
gaMQaar esaTI 4 Gandhar ST-4
kula gaMQaar GGPS Total
maaOda 1 Mauda -1
maaOda 2 Mauda -2
kula maaOda MAUDA Total
5.1
5.2
5.3
5.4
6.1
6.2
6.1
6.2
6.3
RGPPL Block I
RGPPL Block II
RGPPL Block III
RGPPL TOTAL
esa esa pI SSP RBPH - 1
7.1
esa esa pI SSP RBPH - 2
esa esa pI SSP RBPH - 3
esa esa pI SSP RBPH - 4
esa esa pI SSP RBPH - 5
esa esa pI SSP RBPH - 6
esa esa pI SSP CHPH - 1
esa esa pI SSP CHPH - 2
esa esa pI SSP CHPH - 3
esa esa pI SSP CHPH - 4
esa esa pI SSP CHPH - 5
kula esa esa pI SSP Total
kula poMca Pench Total
Jindal Injection
Amarkantak Lanco
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
8.1
8.2
8.3
(I)
piScamaI xao~
193
630
80
630
186
500
540
750
82.18
2.49
1.59
0.49
0.00
4.57
24.74
0.00
24.74
0.00
0.00
0.00
0.00
42.25
189
30.95
187
1.75
187
43.24
188
51.70
187
42.62
187
13.46
36
20.82
36
11.95
37
13.14
36
10.25
580
40
900
75
282.11
47.35
573.87
148.67
WESTERN REGION
ga`aosa ]%padna Gross generation
(J) ]plabQata Availability
naoT ivainamaya Net Exchanges
]plabQa }jaa- Energy Availability
(+)
27000
194
119
117
84
0
119
507
0
507
0
0
0
31
24133.65
23946.32
-3563.33
20383.00
2.841
1.098
0.000
0.000
5.836
0.000
36
1305
163
0
0
2.821
0.100
maah janavarI 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak
PEAK DEMAND - SCHEDULE VS ACTUAL FOR
rajya
gaujarat
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
maQya p`doSa
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
C<aIsagaZ,
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
maharaYT/
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
gaaovaa
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
essaar
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
dmana evaM dIva
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
dadra va na hvoalaI
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
piScama xao~
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
State
JANUARY
Anaulagnak 4.2
ANNEX-4.2
2015
idnaaMk
samaya
AavaRi<a
Date
Time
Frequency
12418
10.01.15
1100
49.91
12457
10.01.15
1100
49.91
7434
15.01.15
0300
50.00
1000
49.84
49.84
vaastivak Actual (MW)
Anticipated
Apoixat
AapUit-
(MW)
Catered
UNSCH LS
FC
SCH LS
kula Total
12418
-
-
-
12418
0
39
0
GUJARAT
Registered
Restricted
12500
Unrestricted
12540
7434
Min. Registered Demand
MADHYA PRADESH
Registered
Restricted
9180
Unrestricted
9180
Min. Registered Demand
9766
-
-
-
9766
21.01.15
9766
0
45
0
9811
21.01.15
1000
4421
4421
13.01.15
04:00
3269
3269
30.01.15
1900
49.94
3372
30.01.15
1900
49.94
1959
03.01.15
1300
49.76
1000
49.94
CHHATTISGARH
Registered
Restricted
3000
Unrestricted
3000
3269
96
7
0
1959
Min. Registered Demand
MAHARASHTRA
Registered
Restricted
19600
Unrestricted
19650
18408
-
-
-
18408
15.01.15
18408
559
39
0
19006
15.01.15
1000
49.94
10572
05.01.15
04:00
50.15
10572
Min. Registered Demand
*GOA
Registered
400
393
Unrestricted
400
393
1
-
-
393
09.01.15
1900
49.96
0.55
-
395
09.01.15
1900
49.96
185
13.01.15
09:00
49.90
185
Min. Registered Demand
ESSAR(ESIL)
Registered
440
Unrestricted
440
-
-
440
30.01.15
0200
50.03
0
0
-
440
30.01.15
0200
50.03
-
-
271
30.01.15
1100
50.01
0
0
-
271
30.01.15
1100
50.01
-
-
672
24.01.15
2000
49.95
0
1
-
673
24.01.15
2000
49.95
463
26.01.15
Min. Registered Demand
DD
Registered
271
Unrestricted
271
Min. Registered Demand
DNH
Registered
672
Unrestricted
672
Min. Registered Demand
463
WESTERN REGION
Registered
Restricted
44438
Unrestricted
44159
Min. Registered Demand
NOTE: LS
PC/RM
FC
Registered
Restricted
Unrestricted
=
=
=
=
=
=
43839
-
-
-
43839
20.01.15
1000
49.83
43839
433
261
0
44533
20.01.15
1000
49.83
26214
26214
02.01.15
Load Shedding
Power Cuts/Regulatory Measures
Frequency Correction
Actual Demand Met
Registered + LS + FC
Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.
0400
50.33
ANNEXURE 4.3
2015
Jan-15
समांतर/
अनु. .
PARALLEL / RADIAL OPERATION
TOTAL OPERATING HOURS
1
HVDC back-to back link(WR-NR)
729:43:00
2
HVDC back-to back link(WR-SR)
743:03:00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
टाई लाईन
765
-I
765
-II
TIE LINE
765
-I
765
-II
765
-I
400
400
400
-I
400
–II
400
–III
400 केवी सातपुरा से कोराडी
400 केवी खंडवा से धुले-I
400 केवी खंडवा से धुले-II
400 केवी इंदौर से असोज-I
400 केवी इंदौर से असोज-II
400 केवी इंदौर से असोज-III
400
-I
400
-II
400 केवी वापी से बोईसर
400
-I
400
-II
400 केवी रायगढ़ से झरसुगुड़ा-I
400 केवी रायगढ़ से झरसुगुड़ा-II
400 केवी नागदा से दे हगाम-I
400 केवी नागदा से दे हगाम-II
400
–I
400
–II
400
220
–II
-III
765kV Soni to Wardha
678:03:00
765kV Seoni to Wardha
475:27:00
765kV Seoni to Bilaspur-I
744:00:00
765kV Seoni to Bilaspur-II
744:00:00
765kV Durg to Wardha
636:41:00
400kV Bhilai to Koradi
572:35:00
400kV Bhilai to Bhadravati
744:00:00
400kV Raipur to Bhadravati-I
744:00:00
400kV Raipur to Bhadravati-II
744:00:00
400kV Raipur to Bhadravati-III
744:00:00
400kV Satpura to Koradi
744:00:00
400kV Khandwa-Dhule-I
736:51:00
400kV Khandwa-Dhule-II
737:12:00
400kV Indore to Asoj-I
744:00:00
400kV Indore to Asoj-II
742:52:00
400kV Indore to Asoj-III
701:10:00
400kV Kolhapur-Mapusa-I
552:51:00
400kV Kolhapur-Mapusa-II
478:38:00
400kV Vapi-Boisar
744:00:00
400kV Raigarh to Sterlight-I
744:00:00
400kV Raigarh to Sterlight -II
744:00:00
400kV Raigarh to Jharsuguda-I
744:00:00
400kV Raigarh to Jharsuguda-II
744:00:00
400kV Nagda to Dehgam
744:00:00
400kV Nagda to Dehgam
743:13:00
400kV Raipur to Wardha-I
736:39:00
400kV Raipur to Wardha-II
728:52:00
400kV Wardha to Mouda-II
734:11:00
220kV K(E) to Budhipadar-III
744:00:00
भार
,
WRLDC, Mumbai
Anaulagnak 4.5
maah janavarI 2015 ko daOrana pa~ta , iSaD\yaUla, GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoM sao D`avala AaOr ivainamayaaoM ka ivavarNa
DETAILS OF ENTITLEMENT/SCHEDULE/DRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS
JANUARY 2015
1
1
(pxaoivasa` Wara jaarI xao~Iya }jaa- laoKa ko AaQaar pr)
koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta
Declared Capcity (ex-bus) of Central Gen. Stns/Dedicated CG Stns/Jointly owned Stns & entitlement of beneficieries (MUs)
GaaoiYat xamata
(A)
AND EXCHANGES FOR THE MONTH OF
koMd`Iya ibajalaIGar
A. Central Gen. Stns.
kaorbaa esaTIpIesa
kaorbaa esaTIpIesa -III
ivanQa esaTIpIesa I
ivanQa esaTIpIesa II
ivanQa esaTIpIesa III
ivanQa esaTIpIesa IV
kvaasa gaOsa
gaMQaar gaOsa
saIpt
kakrapar
tara`pur 3 AaOr 4
(ba) samaip-t koMd`Iya ibajalaIGar
[Midra saagar
Korba STPS
(sa)
saMyau@t inajaI sToSana
tara`pur 1 AaOr 2
esaesapI
ponca
C. Jointly owned Stations
kula ([M saagar kao CaoD, kr)
Total (excl. Indira Sagar)
Korba STPS-III
Vindhyachal STPS-I
Vindhyachal STPS-II
Vindhyachal STPS-III
Vindhyachal STPS-IV
Kawas GPP
Gandhar GPP
Sipat
Kakrapar APS*
Tarapur APS 3&4*
gau}ivainaila
map`iva]kM
Dec. Cap.
GUVNL MPPGCL
1428.813
350.403
846.345
692.577
708.696
686.114
486.351
492.784
2081.445
294.857
361.711
244.940
67.277
154.516
165.527
188.513
164.613
138.597
177.657
567.860
83.766
91.767
Craivabaao
333.589
54.749
301.048
223.065
176.521
197.368
103.882
87.844
374.592
74.483
77.362
B. Dedicated CG Stations
maraiva]kM
57.606
275.525
46.699
Tarapur APS 1&2*
SSP*
Pench*
13536.437
dmana dIva
da na h
MSPGCL
GOA
DD
DNH
146.132
105.931
1.920
1.599
76.052
44.502
0.000
0.000
333.791
0.000
16.076
454.547
94.446
309.558
247.567
210.096
222.037
151.425
150.191
635.293
100.752
146.748
145.661
4.510
25.967
10.224
9.043
10.342
9.186
9.488
28.118
10.728
4.827
33.539
4.210
8.946
6.435
7.997
8.722
23.008
23.517
24.684
5.560
4.277
35.812
15.682
28.956
22.699
24.655
31.487
60.207
44.034
83.861
8.392
14.271
ecavaIDIsaI + ecaDblyaubaI
HVDC+HWB
15.433
11.176
245.570
28.803
44.084
kula
TOTAL
1428.813
350.403
846.345
692.577
708.696
686.114
486.351
492.784
2081.445
294.857
361.711
* vaas%aivak [njao@Sana
* Actual injection
245.570
Indira Sagar*
gaaovaa
CSEB
245.570
0.000
157.050
31.133
0.000
0.000
0.000
28.803
74.392
15.566
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
57.606
275.525
46.699
3624.540 2706.052
808.876
3712.437
279.148
209.614
474.326
1721.445 13536.437
gaaovaa
dmana dIva
da na h
* Actual injection
2
koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI ]%padna SaoD\yaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoD\yaUla
2
Generation Schedule (ex-bus) of Central Gen. Stations/Dedicated CG Stations/Jointly owned Stations & schedule of benificieries (MUs)
SaoD\yaUla
(A)
koMd`Iya ibajalaIGar
kaorbaa esaTIpIesa
kaorbaa esaTIpIesa -III $
ivanQa esaTIpIesa I
ivanQa esaTIpIesa II
ivanQa esaTIpIesa III
ivanQa esaTIpIesa IV
kvaasa gaOsa
gaMQaar gaOsa
saIpt
kakrapar
tara`pur 3 AaOr 4
(ba) samaip-t koMd`Iya ibajalaIGar
[Midra saagar
A. Central Gen. Stns.
Schedule
1406.427
348.576
545.992
560.125
569.602
575.518
80.508
5.694
1744.912
294.857
361.711
Korba STPS
Korba STPS-III $
Vindhyachal STPS-I
Vindhyachal STPS-II
Vindhyachal STPS- III
Vindhyachal STPS- IV
Kawas GPP**
Gandhar GPP**
Sipat
Kakrapar APS*
Tarapur APS 3&4*
gau}ivainaila
map`iva]kM
Craivabaao
GUVNL MPPGCL
243.856
66.979
74.596
130.756
150.267
133.106
42.121
1.004
425.844
83.766
91.767
326.160
55.208
178.882
154.126
115.948
151.422
13.776
0.757
347.532
74.483
77.362
CSEB
MSPGCL
GOA
DD
DNH
144.754
105.194
1.920
1.599
58.557
35.159
0.000
0.000
283.561
0.000
16.076
443.999
93.196
219.906
218.993
187.852
199.772
6.871
0.000
521.411
100.752
146.748
145.661
4.510
15.146
10.211
9.043
10.335
0.187
0.059
28.118
10.728
4.827
33.539
4.210
8.473
6.240
7.784
8.544
2.063
0.000
24.684
5.560
4.277
35.546
15.682
32.321
23.481
25.110
30.176
15.471
3.864
81.747
8.392
14.271
245.570
245.570
15.041
14.747
0.000
0.000
11.176
kula
TOTAL
1406.427
348.576
545.992
560.125
569.602
575.518
80.508
5.694
1744.912
294.857
361.711
245.570
RPPC(NVVNL)
KAWAS(RLNG)
saMyau@t inajaI sToSana
tara`pur 1 AaOr 2
esaesapI
ponca
kula [M saagar kao CaoD, kr
ecavaIDIsaI+ ecaDblyaubaI
HVDC+HWB /
Outside region(NR &
SR)
B. Dedicated CG Stations
Indira Sagar*
C. Jointly owned Stations
0.000
* vaas%aivak [njao@Sana
* Actual injection
57.606
275.525
46.699
10486.650
Tarapur APS 1&2*
SSP*
Pench*
Total (excl. Ind. Sagar)
28.803
0.000
44.084 157.050
0.000
31.133
2625.445 2077.574
0.000
0.000
GANDHAR(RLNG)
(sa)
maraiva]kM
0.000
0.000
0.000
699.408
28.803
74.392
15.566
2694.455
0.000
0.000
0.000
238.984
0.000
0.000
0.000
151.293
0.000
0.000
0.000
357.894
maraiva]kM
gaaovaa
dmana dIva
da na h
57.606
275.525
46.699
1641.597 10486.650
* Actual injection
Note:- $
These Scheduled Transactions are done by WRLDC under STOA.
(ima yauinaT\sa)
3
AMtrxao~Iya ivainamayaaoM / iWpxaIya ivanamayaaoM kI SaoD\yaUla
3
Schedule for interregional exchanges/bilateral exchanges (MUs)
k
xao~ / rajya
pUvaI- xao~ ko rasto
Aayaat SaoD\yaUla
SaoD\yaUla
Region/State
Import SDLs through ER
Schedule
gau}ivainaila
map`iva]kM
GUVNL MPPGCL
Craivabaao
CSEB
MSPGCL
GOA
DD
DNH
0.000
0.000
13.117
0.000
1.354
0.000
-1.749
-0.025
0.000
0.000
0.000
24.000
0.000
0.000
0.000
0.248
-2.100
0.000
0.000
-14.213
0.000
0.000
43.368
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.480
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.322
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.034
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
ecavaIDIsaI
HVDC
kula
TOTAL
307.224
Indian Energy Exchange (WR to ER)
Power Exchange of India (ER to WR)
ER (NTPC)
DVC to MPPTCL (Long Term Open Access)
Hirakud to CSEB
APL1 GUVNL to APPCC ( AEL)
CSEB to APPCC ( NVVNL)
JPL-II to APPCC ( NVVNL)
JNSTPP to APPCC ( NVVNL)
APL2 GUVNL to BIHAR ( AEL)
APL3 GUVNL to BIHAR ( AEL)
STERLITE to CSEB ( NVVNL)
STERLITE to ESIL_WR ( PTC LTD)
STERLITE to ESIL_WR ( PXIL)
STERLITE to ESIL MSEB ( PTC LTD)
STERLITE to GCEL ( GMRETL)
CSEB to KSEB ( NVVNL)
WBSEB to MPPMCL MPSEB ( IEXL)
WBSEB to MPPMCL MPSEB ( PTC LTD)
JPL to MANIPUR ( PTC LTD)
0.000
0.000
24.672
0.000
0.000
-0.025
0.000
0.000
0.000
-81.758
-0.108
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
27.322
206.694
0.000
0.000
0.000
0.000
-0.660
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.400
0.450
0.000
-5.918
0.273
111.835
206.694
1.354
-0.025
-1.749
-0.025
-0.660
-81.758
-0.108
24.000
6.480
39.720
0.480
0.248
-2.100
0.400
0.450
-14.213
-9.113
0.000
0.000
-0.029
0.000
0.000
0.000
0.000
0.000
0.000
APL1 GUVNL to MAL MEGHALAYA ( PTC LTD)
JNSTPP to NGLD ( PTC LTD)
STERLITE to TPC MSEB ( STERLITE)
APL3 GUVNL to TGPCC ( AEL)
CSEB to TGPCC ( NVVNL)
JPL-II to TGPCC ( NVVNL)
JNSTPP to TGPCC ( NVVNL)
WBSEB to VYL MPSEB ( TPTCL)
MPPMCL MPSEB to WBSEB ( IEXL)
MPPMCL MPSEB to WBSEB ( PTC LTD)
SaoD\yaUla
K
xao~ / rajya
dixaNa xao~ ko rasto
Aayaat SaoD\yaUla
Region/State
Import SDLs through SR
Schedule
-219.829
Indian Energy Exchange (SR to NR)
Power Exchange of India (SR to WR)
CSEB to APPCC ( NVVNL)
JNSTPP to APPCC ( NVVNL)
CSEB to KSEB ( NVVNL)
JPL to TNEB ( JPL)
JPL-II to TNEB ( JPL)
JPL-II to TGPCC ( KISPL)
JPL-II to TGPCC ( PTC LTD)
JNSTPP to TGPCC ( NVVNL)
KSK TO TGPCC
LANCO TO TNEB
JPL II TO TNEB
ga
]%trI xao~ ko rasto
Aayaat SaoD\yaUla
Import SDLs through NR
Indian Energy Exchange (WR to NR)
Power Exchange of India (NR to WR)
Rihand (Hydro) to MPPTCL (Long Term Open Access)
Matathilla (Hydro) to MPPTCL (Long Term Open Access)
BSES_RAJ to MPPMCL MPSEB ( MPPL)
BSES YM (DTL)-NR to MPPMCL MPSEB ( MPPL)
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB)
TPDL_DTL to MPPMCL MPSEB ( MPPL)
WBSEB to MPPMCL MPSEB ( PTC LTD)
JPL to NPCL ( KISPL)
JPL to NPCL ( NPCL)
JSPL_DCPP to NPCL ( KISPL)
JNSTPP to NPCL ( NPCL)
JNSTPP to NPCL ( SCL)
TISCO to TSLB MSEB ( TSLB MSEB)
Ga
iWpxaIya SaoD\yaUlsa
gau}ivainaila
0.000
-10.571
0.000
0.000
0.000
0.000
-0.774
0.248
-1.300
-0.600
map`iva]kM
GUVNL MPPGCL
0.000
0.000
0.000
0.000
-2.043
-0.029
0.000
0.000
0.000
0.000
Craivabaao
0.000
0.000
46.056
0.000
0.000
0.000
0.000
0.000
0.000
0.000
maraiva]kM
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
gaaovaa
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
dmana dIva
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
da na h
CSEB
MSPGCL
GOA
DD
DNH
-9.113
-10.571
46.056
-0.029
-2.043
-0.029
-0.774
0.248
-1.300
-0.600
ecavaIDIsaI
HVDC
kula
TOTAL
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-1.189
0.000
0.000
0.000
0.000
0.000
-1.116
0.000
0.000
0.000
0.000
0.000
-3.366
0.000
-4.406
-12.192
-4.406
-1.283
-0.235
0.000
-82.851
-10.310
-98.480
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.003
0.003
-3.366
-1.189
-4.406
-12.192
-4.406
-1.283
-0.235
-1.116
-82.851
-10.310
-98.480
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
6.466
1.853
21.700
24.800
75.700
52.080
18.729
0.000
0.000
0.000
-0.300
-0.102
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-3.178
-0.114
-0.060
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
6.696
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-547.519
15.629
6.466
1.853
21.700
24.800
75.700
52.080
18.729
-3.178
-0.114
-0.060
-0.300
-0.102
6.696
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.124
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.150
-1.320
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
6.096
1.637
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.183
0.084
2.373
2.946
9.394
9.394
3.652
0.073
0.818
0.000
0.000
1.098
0.776
3.228
0.000
1.015
0.730
0.722
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.450
0.000
0.000
0.000
0.024
4.674
0.967
0.845
1.481
0.939
1.282
1.037
1.098
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.183
0.084
2.373
2.946
9.394
9.394
3.652
0.073
0.818
6.096
1.637
1.098
0.776
3.228
2.124
1.015
0.730
0.722
0.276
0.350
0.050
9.360
1.560
22.920
49.953
0.000
0.000
0.000
2.365
0.024
4.674
0.967
0.845
1.481
0.939
1.282
1.037
1.098
-327.619
Exchanges within WR
Mundra APL to Gujarat (LTOA)
JPL to AIGL MSEB ( AIGL MSEB)
JPL to ARPIPL MSEB ( ARPIPL MSEB)
JPL to ACCIL MSEB ( ACCIL MSEB)
JPL to ARVIND MSEB ( ARVIND MSEB)
JNSTPP to BEST MSEB ( PTC LTD)
JNSTPP to BEST MSEB ( SCL)
JPL to BOSCH MSEB ( BOSCH MSEB)
JPL to BCSIL MSEB ( BCSIL MSEB)
JPL to BHL MSEB ( BHL MSEB)
ACBIL to CSEB ( CSPTRDCL CSEB)
SPECT ACBIL to CSEB ( CSPTRDCL CSEB)
JPL to CLASSIC MSEB ( CLASSIC MSEB)
JPL to CIPLA MSEB ( CIPLA MSEB)
JPL to CEAT MSEB ( MPPL)
APL1 GUVNL to CHLM GUVNL ( AEL)
JPL to DNL MSEB ( DNL MSEB)
JPL to ETLC MSEB ( ETLC MSEB)
JPL to ETLT MSEB ( ETLT MSEB)
APL3 GUVNL to ESIL_WR ( PTC LTD)
EMCO to ESIL_WR ( IEXL)
EMCO to ESIL_WR ( PXIL)
JPL to ESIL_WR ( PXIL)
JSPL_DCPP to ESIL_WR ( PXIL)
JPL-II to ESIL_WR ( PXIL)
JNSTPP to ESIL_WR ( PTC LTD)
MSEB to ESIL_WR ( PXIL)
MPPMCL MPSEB to ESIL_WR ( IEXL)
MPPMCL MPSEB to ESIL_WR ( PXIL)
VANDANA to ESIL_WR ( PXIL)
APL3 GUVNL to ESIL MSEB ( PTC LTD)
JNSTPP to ESIL MSEB ( PTC LTD)
JPL to ETLW MSEB ( ETLW MSEB)
JPL to ETLB MSEB ( ETLB MSEB)
JPL to EILR MSEB ( MPPL)
JPL to ETLK MSEB ( ETLK MSEB)
JPL to EXIDE MSEB ( EXIDE MSEB)
JPL to EIPL MSEB ( EIPL MSEB)
JPL to EXIDE2 MSEB ( EXIDE2 MSEB)
JPL to FBML MSEB ( FBML MSEB)
APL3 GUVNL to GOA ( AEL)
JPL to GSL MSEB ( GSL MSEB)
EMCO to GCEL ( EMCO)
JPL to GODREJ MSEB ( GODREJ MSEB)
JCFPL GUVNL to SOLAR GOA ( NVVNL)
JPL to GIPL MSEB ( MPPL)
JPL to GPIL MSEB ( MPPL)
JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB)
EMCO TO MSEB
JNSTPP TO MP
EMCO TO DNH
TORRENT TO MP
LANCO TO MP
MP TO TORRENT
NSPCL to DD ( DD)
MSEB SOLAR TO CSEB SOLAR
RAJ MP SOLAR TO CSEB SOLAR
IEE
PEI
ca
4
5
6
7
8
9
10
11
kula Aayaat
Total Import
kula inayaa-t
Total Export
naoT Aayaat / inayaa-t
Net Imp. (+)/Exp. (-)
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM Total Entitlement incl. IR and bi-lateral exchange
kI iSaD\yaUla imalaakr kula pa~ta schedule
kI kula iSaDUyala
ibanaa xait ko kula D`avala
xait imalaakr kula D`avala
p p`NaalaI maoM kula pUla xait
p xao`~ sToSanaaoM sao
vaastivak [njao@Sana
(ima yauinaT\sa)
vaas%aivak AMtrxao~Iya
ivainamaya (ima yauinaT\sa)
AMtrxao~Iya ivainamaya
iSaD\yaUla (ima yauinaT\sa)
Total Sdl. incl. IR/ bi-lateral exch. Sdl.
Total Drl excl. Tr. Loss
Total Drl incl. Tr. Loss
-1319.569
-1079.345
-240.224
kula
Total
13296.213
10246.426
10828.586
9786.643
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-48.817
0.000
0.000
0.000
0.000
0.000
158.099
7.848
-86.955
-139.849
52.894
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
127.918
0.000
48.817
162.437
0.000
0.000
-0.605
-2.504
-134.736
-0.407
462.946
-156.333
619.280
0.000
0.000
0.000
3.810
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.605
2.504
-489.180
-18.379
-1443.826
-748.598
-695.228
gau}ivainaila
map`iva]kM
Craivabaao
GUVNL MPPGCL
3677.434
2678.339
3215.350
3215.350
3325.332
2696.854
3225.600
2633.924
0.705
0.000
0.830
0.000
0.870
0.000
4.082
0.538
1.789
107.150
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-1.576
-5.089
248.169
-7.114
255.283
0.000
21.150
0.000
0.000
0.000
0.948
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-27.450
0.000
-32.802
-27.450
-5.352
maraiva]kM
gaaovaa
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
4.811
0.000
0.000
27.400
0.000
33.533
0.000
33.533
dmana dIva
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
108.370
0.000
0.000
0.000
0.000
0.000
0.000
11.856
0.000
122.260
0.000
122.260
da na h
0.705
21.150
0.830
3.810
0.870
0.948
4.082
0.538
1.789
107.150
127.918
108.370
0.000
162.437
0.000
4.811
0.000
0.000
-373.852
-16.026
-1319.569
-1079.345
-240.224
ecavaIDIsaI
MSPGCL
GOA
DD
DNH
HVDC
TOTAL
113.648
4.180
416.718
637.104
3967.720
2949.738
3123.117
3123.117
273.796
233.632
214.721
214.721
243.147
184.826
168.520
177.000
596.586
480.154
463.616
463.616
15.433
14.747
0.944
0.853
13296.213
10246.426
10828.586
10465.685
-1041.943
Pooled loss in WR System
kaorbaa
Actual Inj. - WR Stns.
KSTPS
(MUs)
Actual IR Exchanges
(MUs)
IR Exchange Schedule
(MUs)
ivanQa 1 AaOr 2
ivanQa 3
VSTPS-1& 2 VSTPS-3
kula
CSEB
kvaasa
gaMQaar
kakrapar
tara`pur
esaesapI
ponca
kula
KGPS
GGPS
KAPS
TAPS
SSP
PENCH
TOTAL
46.699
13209.169
1752.240
1127.016 1168.414
294.857
419.317
] xao~ Aa
]xao kao ina
] xao naoT
d xao Aa
d xao inayaa-t
d xao naoT
pU xao Aa
pU xao inayaa-t
pU xao naoT
kula naoT
NR Imp
NR Exp
NR Net
SR Imp
SR Exp
SR Net
ER Imp
ER Exp
ER Net
Total Net
0.000
2825.000 -2825.000
79.340
3.470
0.000 960.836
-960.836
275.525
402.003
38.693
363.310
-3422.526
NRI sdl
NRE sdl
Net NR sdl
SRI sdl
SREsdl
Net SR sdl
ERI sdl
ERE sdl
Net ER sdl
Net WR sdl
0.326
1300.925
-1300.599
0.000
1578.177
-1578.177
307.224
239.417
67.807
-2810.969
maah janavarI 2015 ko AMtr-ajyaIya / AMtrxao~Iya ivainamayaaoM ka ivavarNa
DETAILS OF INTERSTATE/INTER-REGIONAL EXCHANGES FOR THE MONTH OF JANUARY 2015
From/ To
k`maaMk
A
1
Interstate/Inter-regional Schedules
included in ISGS
gau}ivainaila GUVNL
2
map`iva]kMila MPPGCL
3
Craivabaao CSEB
4
maraiva]kM ila MSPGCL
5
gau}ivainaila map`iva]kMila Craivabaao
maraiva]kMila
GUVNL MPPGCL CSEB
MSPGCL
48.817
0.000
gaaovaa
GOA
dmana dIva
DD
da na h
DNH
[ssaar
ESIL
] xao~
NR
Anaulagnak 4.6
Annex-4.6
d xao~
SR
pU xao~
ER
piScama xao~
kula
WR TOTAL
0.948
49.765
3.109
3.109
0.000
1.920
1.920
gaaovaa GOA
0.000
6
da na h DNH
0.000
7
kaorbaa KORBA-III
iMjadla pavar JPL
0.000
8
9
ADanaI pavar APL
10
ESSAR MAHAN
11
JAYPEE
12
laonakao Lanco -Pathadi
13
esaIbaIAa[-ela -ACBIL
14
KSK MAHANADI
15
JNSTPP(NIGRIE)
16
DB POWER
17
VANDANA
18
0.000
2.124
0.024
ESIL
20
ena esa pI saI ela NSPCL
21
]<arI xao~ N.Region (WR end)
0.276
23.574
0.000
35.161
33.840
162.437
162.437
7.733
127.918
7.733
23.462
49.953
2.365
3.810
EMCO
19
21.150
107.150
108.370
0.400
4.811
4.811
0.000
0.000
22
dixaNaI xao~ S. Region (S. Bus)
0.000
0.000
23
pUvaI- xao~ E. Region (WR end)
402.003
402.003
24
p xao~ W.Region (WR end)
25
enaTIpIsaI NTPC Injection
26
enapIsaI NPC Injection
27
Total ISGS drawal from the Grid
incl. interregional/ bi-lateral
B
Interstate/IR Exchanges not
included in ISGS
20
knaa-Tk Karnataka
21
yaUpIpIsaIela UPPCL
22
AarvaIpIenaela RVPNL
####### 960.836
38.693
3824.529
5885.980
714.174
3215.350 2633.924 637.104
3123.117 214.721 177.000
463.616
57.28
57.280
0.000
0.000
-19.97
-19.970
23 UPPCL ( Excess Drawn From Rajghat
-0.060
-0.060
24
kaoTa ]jjaOna Kota - Ujjain
0.000
25
kula ba Total B (13 to 17)
0.000
C
inavala ivainamaya Net Exchange (12+18)
D
kula Aayaat Total Imp. by WR
E
kula inayaa-t Total Export by WR
F
inavala ivainamaya Net Exchange (D-E)
G
p xao~ Wara vaIlD }jaa- Energy wheeled by WR
26
pU xao~ sao d xao~ kao inayaa-t ER export to SR
-20.030
0.000
0.000
3215.350 2613.894 637.104
0.000
57.280
0.000
0.000
37.250
3123.117 272.001 177.000
463.616
10502.082
439.253
3824.529
-3385.276
0.000
27
d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ER/WR
0.000
28
d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR
0.000
29
pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR
0.000
30
] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR
31
pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR
32
33
0.000
0.000
0.000
438.637
59.026
pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NR/WR
0.000
]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR
0.000
0.000
0.000
438.637
59.026
0.000
0.000
Anaulagnak 4.7
Annex-4.7
maah janavarI 2015 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JANUARY 2015
ivavarNa Particulars
kmaaMk
gau ] iva ina ila GUVNL
]ka[-
Sl. No.
Ukai
map`iva]kM ila
gaaMQaIsaagar
MPPGCL
Gandhisagar
ena eca DI saI
NHDC
[Midra saagar
Indira Sagar
maraiva]kM ila
MSEGCL
kaoyanaa
1 Levels in Mtrs. str maITr maoM
1.1
maah ko AMt maoM
99.35
394.23
255.91
652.79
102.90
397.66
255.99
648.10
At the end of the month
1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM
Corresponding Figure of the
month Last Year
Koyna
ANNEXURE 5
List of Grid Disturbances and Grid incidents (GD/GI) in Jan-2015: Western Region
Sr.
No.
Details of incident (Elements / Generation Tripped)
1
Bus Fault at 400 kV JPL Stage 2 S/s
2
3
4
5
Multiple element tripping at 220 kV Bus of 400/220 kV Nagda S/s
Multiple tripping from 220 kV Sagar S/s
Blackout at 220 /132 kV Ponda S/s
Tripping of HVDC Vindhyachal both poles
6
7
Multiple Tripping at Shingaji S/s
220 kV Bus Fault at 400/220 kV Wanakbori S/s
8
Blackout of 220/66 kv Sartanpur S/s
9
10
Bus Fault at 220/132 kV Damoh(MP) S/s
Multiple 400 kV lInes tripping from Karad on Over Voltage
Owner
Utility
Date
Time
JPL
06/01/2015
13:16
MPPTCL
MPPTCL
Goa
PGCIL
MPPGCL
GSECL
GETCO
MPPTCL
MSETCL
12/01/2015
13/01/2015
13/01/2015
19/01/2015
21/01/2015
21/01/2015
22/01/2015
23/01/2015
26/01/2015
20:42
16:49
16:30
22:39
13:44
12:53
17:25
11:28
16:37
Effect (Loss of generation/ Load), if Category as per CEA
any
Grid Standards
Nil
load Loss : Not Known To be
submitted by Gujarat SLDC
Nil
Load Loss : 140 MW
Nil
Gen loss : Not Known To be
submitted by MP SLDC
Gen loss : 600 MW
load Loss : Not Known To be
submitted by Gujarat SLDC
Load Loss : Not Known To be
submitted by MP SLDC
Nil
GI-2
GI-1
GI-1
GD-1
GI-2
GI-2
GI-2
GD-1
GD-1
GI-2
Annexure-6
LINES
DHARIWAL-BHADRAVATI - S/C
DHARIWAL-PARLI - S/C
ASOJ-CHORONIA - II
KASOR-CHORANIA - S/C
END S/S
OWNER
DHARIWAL
DHARIWAL
GETCO
GETCO
KV
OUT
TIME
OUT DATE
400
18:23
01-Jan-15
400
18:23
01-Jan-15
400
04:00
02-Jan-15
400
07:29
14-Jan-15
ASOJ - CHORANIA - I
GETCO
400
12:55
14-Jan-15
SSP -KASOR - S/C
GETCO
400
12:59
14-Jan-15
220
12:54
21-Jan-15
220
12:54
21-Jan-15
220
12:54
21-Jan-15
220
12:54
21-Jan-15
220
12:54
21-Jan-15
220
12:54
21-Jan-15
220
12:54
21-Jan-15
REMARKS
FLASHOVER AT
DHARIWAL
FLASHOVER AT
DHARIWAL
TREIPPED ON O/V
R PHASE TO EARTH
FAULT
R-B FAULT
ASOJ-PIRANA - S/C
GETCO
400
17:46
15-Jan-15
R-Y FAULT
200KV BUS - I FAULT AT
WANAKBARI
200KV BUS - I FAULT AT
WANAKBARI
200KV BUS - I FAULT AT
WANAKBARI
200KV BUS - I FAULT AT
WANAKBARI
200KV BUS - I FAULT AT
WANAKBARI
200KV BUS - I FAULT AT
WANAKBARI
200KV BUS - I FAULT AT
WANAKBARI
R-B PHASE
NASIK-NAVSARI - I
GETCO
220
09:11
08-Jan-15
POLE DISCREPENCY
DEHGAAM-RANCHORPURA - I
GETCO
400
08:19
01-Jan-15
400
19:55
21-Jan-15
GETCO
GOA
400
220
15:06
16:30
07-Jan-15
13-Jan-15
B-Y FAULT
B PHASE TO EARTH
FAULT
TRIPPED ON O/V
DIRECTIONAL E/F RELAY
AMONA-PONDA - S/C
GOA
220
16:30
13-Jan-15
DIRECTIONAL E/F RELAY
TILLARI-PONDA - S/C
GOA
220
16:30
13-Jan-15
DIRECTIONAL E/F RELAY
MAPUSA-PONDA - S/C
GOA
220
16:30
13-Jan-15
Y PHASE TO EARTH FAULT
JINDAL-JINDAL STAGE 2 - S/C
JPL
400
13:31
06-Jan-15
R- B BUS FAULT AT JPL
JINDAL - TAMNAR - II
JPL
400
13:31
06-Jan-15
R- B BUS FAULT AT JPL
JINDAL - TAMNAR - I
JPL
400
13:31
06-Jan-15
R- B BUS FAULT AT JPL
RAIPUR - KSK - I
KSK
400
13:12
29-Jan-15
400
15:24
02-Jan-15
R-B FUALT
DT RECEIVED FROM
ANUPUR
TRIPPED ON O/V
WANAKBARI - KAPADWAJ - I
WANAKBARI - KAPADWAJ - II
WANAKBARI-ASOJ - I
WANAKBARI-ASOJ - II
WANAKBARI - DHANSURA - I
WANAKBARI - DHANSURA - II
WANAKBARI - GODHARA - S/C
BHACHAU-RANCHORPURA - II
INDORE-ASOJ - II
KOLHAPUR-PONDA - S/C
JABALPUR-ANUPUR - II
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
MOSERBEAR
BINA-BHOPAL - II
MPPTCL
400
03:02
01-Jan-15
KATNI - B'PUR - II
MPPTCL
400
01:28
01-Jan-15
400
01:48
11-Jan-15
ISP-INDORE - II
SINGHAJI - CHEAGAON - S/C
SINGHAJI -PITAMPUR - I
SINGHAJI -PITAMPUR - II
MPPTCL
MPPTCL
MPPTCL
MPPTCL
400
400
400
13:44
13:44
13:44
21-Jan-15
21-Jan-15
21-Jan-15
TRIPPED ON O/V
R PHASE TO EARTH
FAULT
ARCING IN GT-2 Y-PH
BUSHING
ARCING IN GT-2 Y-PH
BUSHING
ARCING IN GT-2 Y-PH
LINES
END S/S
OWNER
KV
OUT
TIME
OUT DATE
REMARKS
BUSHING
DAMOH(MP)-SAGAR - S/C
220/132KV DAMOH(MP) ICT I
220/132KV DAMOH(MP) ICT II
DAMOH(MP)-KATNI S/C - S/C
MPPTCL
220
11:28
23-Jan-15
BUS FAULT AT DAMOH
220/132
11:28
23-Jan-15
BUS FAULT AT DAMOH
220/132
11:28
23-Jan-15
BUS FAULT AT DAMOH
MPPTCL
220
11:28
23-Jan-15
BUS FAULT AT DAMOH
INDORE-ASOJ - II
MPPTCL
400
15:06
07-Jan-15
TRIPPED ON O/V
DAMOH(MP)-DAMOH(PG) - I
MPPTCL
220
11:28
23-Jan-15
BUS FAULT AT DAMOH
MPPTCL
220
11:28
23-Jan-15
400
04:43
25-Jan-15
220
00:57
08-Jan-15
220
06:11
18-Jan-15
220
23:32
19-Jan-15
220
01:12
19-Jan-15
220
01:19
24-Jan-15
220
08:17
25-Jan-15
DAMOH(MP)-DAMOH(PG) - II
MPPTCL
MPPTCL
KARAD - KOLHPAUR - II
MSETCL
400
17:05
01-Jan-15
BUS FAULT AT DAMOH
R PHASE TO EARTH
FAULT
R PHASE TO EARTH
FAULT
R-E FAULT
R PHASE TO EARTH
FAULT
R-N FAULT
B PHASE TO EARTH
FAULT
R PHASE TO EARTH
FAULT
TRIPPED ON O/V
KARAD-KOLHAPUR - I
MSETCL
400
02:02
01-Jan-15
TRIPPED ON O/V
BABLESHWAR-PADGHE - I
MSETCL
400
23:48
07-Jan-15
DPR OPTD
KARAD-KOLHAPUR - II
MSETCL
400
04:01
09-Jan-15
TRIPPED ON O/V
KARAD-KOLHAPUR - II
MSETCL
400
02:58
11-Jan-15
TRIPPED ON O/V
KARAD-KOLHAPUR - I
CHANDRAPUR-PADGHE POLE II
JAIGARH-KARAD - II
MSETCL
400
03:02
13-Jan-15
500
00:50
23-Jan-15
MSETCL
400
16:37
26-Jan-15
TRIPPED ON O/V
PROBLEM IN CONTROL
PANAL
TRIPPED ON O/V
KARAD-L'KHAND - S/C
TAPTITANDA-BABLESHWAR II
NASIK-NAVSARI - I
MSETCL
400
16:37
26-Jan-15
TRIPPED ON O/V
400
19:19
01-Feb-15
TRIPPED ON O/V
MSETCL
220
09:11
08-Jan-15
POLE DISCREPENCY
KOLHAPUR-SOLAPUR - II
MSETCL
400
02:02
01-Jan-15
400
19:47
09-Jan-15
MSETCL
400
16:33
26-Jan-15
TRIPPED ON O/V
R PHASE TO EARTH
FAULT
TRIPPED ON O/V
MSETCL
400
07:02
18-Jan-15
400
06:40
03-Jan-15
NAGADA-RAJGARH - I
BADOD-KOTA - S/C
BADOD-KOTA - S/C
BADOD-KOTA - S/C
BADOD - KOTA - S/C
BADOD - KOTA - S/C
BADOD-KOTA - S/C
KARAD - SHOLAPUR - S/C
KARAD-SOLAPUR - S/C
SSP -DHULE - II
SOLAPUR - SOLAPUR
(MSETCL) - S/C
SOLAPUR -KOLHAPUR - II
MPPTCL
MPPTCL
MPPTCL
MPPTCL
MPPTCL
MPPTCL
MPPTCL
MSETCL
MSETCL
MSETCL
MSETCL
400
03:02
13-Jan-15
TRIPPED ON SOTF
B PHASE TO EARTH
FAULT
TRIPPED ON O/V
SHOLAPUR - KOLHAPUR - I
MSETCL
400
16:37
26-Jan-15
TRIPPED ON O/V
DHABOL-NAGOTHANE - I
MSETCL
400
01:58
01-Jan-15
TRIPPED ON O/V
DHABOL-NAGOTHANE - I
MSETCL
400
03:01
02-Jan-15
TREIPPED ON O/V
DHABOL-NAGOTHANE - II
MSETCL
400
21:30
21-Jan-15
TRIPPED ON O/V
MSETCL
MSETCL
400
OUT
TIME
18:00
22-Jan-15
TRIPPED ON O/V
DHABOL- NAGOTHANE - II
MSETCL
400
01:47
23-Jan-15
TRIPPED ON O/V
DABHOL-N'KOYNA-I - I
MSETCL
400
18:00
25-Jan-15
TRIPPED ON O/V
DABHOL-NAGOTHANE - II
MSETCL
400
03:57
28-Jan-15
400
06:48
28-Jan-15
TRIPPED ON O/V
TRIPPED ON DISTANCE
PROTECTION
Y-B FAULT
LINES
DHABOL-NAGOTHANE - II
DABHOL -NAGOTHANE - II
END S/S
OWNER
KV
MSETCL
OUT DATE
SSP-RAJGARH - II
NCA
400
11:22
14-Jan-15
SASAN - V'CHAL - II
NTPC
400
09:15
29-Jan-15
400
06:53
14-Jan-15
REMARKS
KORBA -MAHAN - S/C
NTPC
400
16:28
16-Jan-15
Y-B FAULT
B PHASE TO EARTH
FAULT
TRIPPED AT KORBA END
GANDHAR - SUJEN - S/C
NTPC
400
10:37
30-Jan-15
R-N FAULT
KOLHAPUR-SOLAPUR - II
PCGIL
400
02:02
01-Jan-15
400
19:47
09-Jan-15
TRIPPED ON O/V
R PHASE TO EARTH
FAULT
TRIPPED ON O/V
GANDHAR-HAZIRA - II
KARAD - SHOLAPUR - S/C
NTPC
PCGIL
KARAD-SOLAPUR - S/C
PCGIL
400
16:33
26-Jan-15
WARDHA-DURG - I
PCGIL
765
03:02
01-Jan-15
400
17:05
21-Jan-15
INDORE-INDORE(PG) - S/C
PGCIL
DAMOH(MP)-DAMOH(PG) - I
PGCIL
220
11:28
23-Jan-15
DAMOH(MP)-DAMOH(PG) - II
PGCIL
220
11:28
23-Jan-15
400
04:43
25-Jan-15
400
18:23
01-Jan-15
400
18:23
01-Jan-15
TREIPPED ON O/V
TRIPPED AT INDORE(PG)
END
BUS FAULT AT DAMOH
JINDAL - TAMNAR - II
PGCIL
400
13:31
06-Jan-15
BUS FAULT AT DAMOH
R PHASE TO EARTH
FAULT
FLASHOVER AT
DHARIWAL
FLASHOVER AT
DHARIWAL
R- B BUS FAULT AT JPL
JINDAL - TAMNAR - I
PGCIL
400
13:31
06-Jan-15
R- B BUS FAULT AT JPL
VINDHYACHAL - SATNA - II
PGCIL
400
17:03
16-Jan-15
TRIPPED AT SATNA END
DURG-WARDHA - I
PGCIL
765
17:28
03-Jan-15
TREIPPED ON O/V
DURG-WARDHA - II
PGCIL
765
03:42
04-Jan-15
TREIPPED ON O/V
WARDHA-A'BAD(PG) - I
PGCIL
765
17:08
08-Jan-15
TREIPPED ON O/V
SEONI - WARDHA - II
PGCIL
765
21:40
09-Jan-15
TRIPPED ON O/V
SEONI- WARDHA - II
PGCIL
765
21:55
14-Jan-15
400
07:27
14-Jan-15
NAGADA-RAJGARH - I
DHARIWAL-BHADRAVATI - S/C
DHARIWAL-PARLI - S/C
PGCIL
PGCIL
PGCIL
SEONI- WARDHA - I
PGCIL
765
19:50
15-Jan-15
TRIPPED ON O/V
B PHASE TO EARTH
FAULT
TRIPPED ON O/V
SEONI-WARDHA - II
PGCIL
765
20:55
15-Jan-15
TRIPPED ON O/V
SEONI- WARDHA - I
PGCIL
765
09:53
15-Jan-15
765
10:59
16-Jan-15
400
19:05
18-Jan-15
400
16:16
19-Jan-15
400
22:39
19-Jan-15
TRIPPED ON O/V
B PHASE TO EARTH
FAULT
Y-B FAULT
R PHASE TO EARTH
FAULT
SHORT CIRCUIT ALARM
IN BLOCK 2
DEHGAM-PIRANA - II
SEONI- WARDHA - I
NAVSARI-MAGARWADA - S/C
KHANDWA-RAJGARH - I
VINDHYACHAL HVDC POLE - I
PGCIL
PGCIL
PGCIL
PGCIL
PGCIL
LINES
END S/S
OWNER
KV
OUT
TIME
OUT DATE
400
22:39
19-Jan-15
REMARKS
SEONI-WARDHA - II
PGCIL
765
18:02
20-Jan-15
SHORT CIRCUIT ALARM
IN BLOCK 2
TRIPPED ON O/V
SEONI-WARDHA - II
PGCIL
765
18:03
21-Jan-15
TRIPPED ON O/V
SEONI-WARDHA - II
PGCIL
765
18:01
28-Jan-15
TRIPPED ON O/V
PGCIL
765
18:01
28-Jan-15
400
08:19
01-Jan-15
400
08:19
01-Jan-15
400
19:55
21-Jan-15
TRIPPED ON O/V
TRIPPED AT DEHGAUM
END
B-Y FAULT
B PHASE TO EARTH
FAULT
Y PHASE TO EARTH FAULT
VINDHYACHAL HVDC POLE - II
DURG -WARDHA - I
DEHGAM-W'BORI - S/C
DEHGAAM-RANCHORPURA - I
BHACHAU-RANCHORPURA - II
PGCIL
PGCIL
PGCIL
PGCIL
MAPUSA-PONDA - S/C
PGCIL
220
16:30
13-Jan-15
RAIPUR - KSK - I
PGCIL
400
13:12
29-Jan-15
400
15:24
02-Jan-15
400
06:40
03-Jan-15
PGCIL
400
03:02
13-Jan-15
R-B FUALT
DT RECEIVED FROM
ANUPUR
B PHASE TO EARTH
FAULT
TRIPPED ON O/V
SHOLAPUR - KOLHAPUR - I
PGCIL
400
16:37
26-Jan-15
TRIPPED ON O/V
DHABOL-NAGOTHANE - I
JABALPUR-ANUPUR - II
SOLAPUR - SOLAPUR
(MSETCL) - S/C
SOLAPUR -KOLHAPUR - II
PGCIL
PGCIL
RGPPL
400
01:58
01-Jan-15
TRIPPED ON O/V
DHABOL-NAGOTHANE - I
RGPPL
400
03:01
02-Jan-15
TREIPPED ON O/V
DHABOL-NAGOTHANE - II
RGPPL
400
21:30
21-Jan-15
TRIPPED ON O/V
DHABOL-NAGOTHANE - II
RGPPL
400
18:00
22-Jan-15
TRIPPED ON O/V
DHABOL- NAGOTHANE - II
RGPPL
400
01:47
23-Jan-15
TRIPPED ON O/V
DABHOL-N'KOYNA-I - I
RGPPL
400
18:00
25-Jan-15
TRIPPED ON O/V
DABHOL-NAGOTHANE - II
RGPPL
400
03:57
28-Jan-15
400
06:48
28-Jan-15
SASAN - V'CHAL - II
SASAN
400
09:15
29-Jan-15
TRIPPED ON O/V
TRIPPED ON DISTANCE
PROTECTION
Y-B FAULT
GANDHAR - SUJEN - S/C
SUGEN
400
10:37
30-Jan-15
R-N FAULT
TORRENT
400
17:46
15-Jan-15
R-B PHASE
DABHOL -NAGOTHANE - II
ASOJ-PIRANA - S/C
RGPPL
SUGEN-PIRANA - S/C
400
12:13
15-Jan-15
R-Y FAULT
TORRENT
Note : 1. DR is either to be submitted by Line owner or the sub-station owner to Following Mail id :
protectionwrldc@gmail.com, protectionwrpc@gmail.com
2. Non Receipt of DR/EL from Sub-Station will be taken as Non-Compliance of IEGC 5.2 (r) and CEA grid
Standard 15.3
3. Further In case of GD/GI If Details are not received following additional non-compliance is noted :5.9.6.c (VI)
and In case of lines under conenctivity CEA (Technical standards for connectivity to the Grid) Regulation, 2007-6.
4.d
ANNEXURE 8.1
Tentative Schedule for Mock- Drill of Units with Black Start Facility in Western Region
Power Station
Ukai (H)
Gandhisagar
Koyna I & II
Kadana
State
Gujarat
Tentative dates (Jan’15Jun’15)
Feb’15
Madhya Pradesh
Feb’15
Maharashtra
Feb’15
Gujarat
4th wk. of Feb’15
Birsinghpur
Madhya Pradesh
4th wk. of Feb’15
Pench
Madhya Pradesh
1st wk. of Mar’15
Maharashtra
2nd wk of Mar'15
Uran (Gas)
Dhuvaran
Ghatghar
GIPCL-I
Gujarat
Maharashtra
Gujarat
3rd wk of Mar’15
4th wk of Mar’15
1st wk of April’15
Khopoli
Maharashtra
2nd wk of April’15
Hasdeo Bango
Chattisgarh
2nd wk.of April’15
Bargi
Madhya Pradesh
2st wk of April’15
CLPIPL
Gujarat
3rd wk of April’15
Bansagar Stage-I
Madhya Pradesh
4th wk.of April’15
Bhivpuri
Maharashtra
4th wk of April’15
Sugen
SSP
Indira Sagar
Bhira
Omkareshwar
Bhira PSS
Kawas
Gandhar
Medikheda
Rajghat
Paithan
Trombay
Mini Hydro
Gujarat
Gujarat
Madhya Pradesh
Maharashtra
Madhya Pradesh
Maharashtra
Gujarat
Gujarat
Madhya Pradesh
Madhya Pradesh
Maharashtra
Maharashtra
Gujarat
4th wk.of April’15
1st wk of May’15
1st wk of May’15
1st wk of May’15
4th wk of May’15
4th wk of May’15
4th wk of May’15
1st wk.of june’15
1st wk. of june’15
4th wk of June’15
2nd wk. of june’15
4th wk of June’15
~
12,702
_
7C)1"_
1 1.27
--~---~-
MS L 0 C KAL ',II ,u,
02227601768
..--.
-
1:1622
P.001/002
.~
;.;..;....; •.•..A,I
.•. '~RA'
.~~oit!-~-:!.».
MAllARASHTRA
.'N'..sea·
STATE ELECTRICITY
TRANSMISSION CO.LTD.
I Office of The Chief Engineer
0 A' li
Maharashtra Stllte Load Dispatch Center, Thane-Belapur Road. P. . iro t,
Navi Mumbai Pin - 400 708.
Te\e :91_22-27601765 11766
Fax:91-22-27601769
Email: cesldc@mahasldc.in
website; htt ;/lwww.mahasldc.in
Ref: CELDKlSOrrECHI
002 68
1 2 FE B 20i5
Date: ~
To,
The General Manager
WRLOC, Mumbai
Sub;-Oepletion of Import TTC/ATC of Maharashtra
Ret-1) WRLDC/MO-1/1683/141815
2) WRLDC/MO-1/1683/14/15
&ystem
dated 24/0912014
dated 03/02/2015
Dear Sir,
It has been pointed out vide ref. (1) that Import TIC and ATC of Maharashtra system 7300
WWVand 7000 WV respectively. Later reduced to 6600 MW and 6300 Mt/V for system
security reasons and due to the addition of following elements,
.
1.765 kV Raipur-Wardha DIC
2.400 kV Bableshwar-Taptitanda ole
3. Addittion of 400/220 kV 500 MVA Bolser (PG)-ICT
And Generation at APML., Tiroda, 2700 MW (ex-bus) from all units of (5"'560 MW) units.
It is bring to your kind notice that Maharashtra system has fun LT AlMTOA share of 6300 MW
from Central sector, UMPP and private owned units. Reduced ATC means that Maharasntra
system is not entitled, to draw additional MW of power due to security reasons as per ref.(2)
and permitted to draw only scheduled l TAiMTOA share.
This means that. State has to maintain intra-state generation of 15000 MW to meet the
demand of21300 MW, if demands picks in summer, conSidering ATC of 6300 MW.
This will cause,
1. As Mumbai system has Operational capacity of 1877 MW, to deliver load of 3500 MW in
summer ,Mumbai discerns are unable to purchase power through ATe will be resorted to
load shedding.
'
2. In the case of tripping of unit, there is no option to carry the load shedding till the
restoration of units in MSEDCL and Mumbai system
'
The foU~wing is major bottleneck created in Maharashtra system due CTU-STU interconnection, at Auranqabad, endangering the security of the system.
Following are the observation at 765 kV and 400 kV Autangabad (PG) bus,
lZfOZ
ZOl~
11.Zl
.,16ZZ P.OOZ/OOZ
OZZZ160116~
1. 765 kV Wardha-Aurangabad DIC is loaded to 190()"2000 MW and on 400 KV Akola-(M}Aurangabad·(PG) DIC is loaded to 400-500 MW.
2. Henoe, Net l..oading on 400 kV Aurangabad (PG)-Aurangabad (M) D/C lines is around
2500 MW and on 7651400 kV icrs Aurangabad (PG)-is around "tPOO MW.
3. Out of 2500 MW Power 400 kV Aurangabad (PG)-Aurangabad
MW is on Aurangabad (M)-Pune (PG) Die lines.
(M) D/C lines, 1000-1200
4. This pattern of loading continues, without abnormal change, even if Maharashtra schedule
changes from 5200 MW and above.
In the recent study forwarded by RLDC, in event of outage on one 765/400 kV 1500 MVA
ICT Aurangabad (PG) along with 400 kV Aurangabad (M)-Aurangabc!d (PG) SIC, ATC
needs to be restricted to 5300 MW only. The outage is proposed for RTCC wor1< at leT and
changing CTs of lines.
This means that,
State has to maintain generation of 14000 MW to meet the demand of 19300 MW,
considering the ATC of 5300 MW, Otherwise, if intra-state generation is not adequate, the
load shedding in Mumbai and MSEDCL is inevitable in current scenario.
The copy of SCADA prints (Demand/400 kV line flows )dated 13/1012014 having,
Maharashtra schedule of 7726 MW,MSEDCL demand of 15698 MW,Mumbai demand 3267
MW with state demand 18965 MW is enclosed herewith, which itself shows that we have
managed the grid in secure manner at above ATe.
It seems that massive expansion plan of CTU is at 765 kV and 400 kV voltage level
connecting to STU network is not proving boon for enhancing. Import nC/ATC of
Maharashtra system and plus and it is against the commercial ethics.
It light of abol/e, It is suggested to study. the results of re-orientation. by forming, 400 kV
Aurangabad (PG)-Pune -(PG) lines by disoonnecting Aurangabad (PG)- Aurangabad(M)
lines from Aurangabad(M) sub-station for enhancing ATC and secure operation.
Due to Reduced ATC vide ref. (2), Load shedding in Mumbai and MSEDCL is inevitable in
summer season and balance Koyna water will be utilized before completion of Water year
ending on 31/05/2015.
The group having one of the member from STU is under process for finalizing
Maharashtra system, hence reduced ATC of 6300 MW is not acceptable.
TIC/ATC for
Thanking you,
Yours faithfully,
~
Chief Engineer
MSLDC~~.
Copy s.w.r to:
1) The Director (Operation) MSETCL Mumbai
2) The Member Secretary, WRPC, Mumbai
ANNEXURE 10
SR NO
UTILITIES
OCC NO. MONTH
1
2
CHHATTISHGARH
DD
454
455
Dec-14
Jan-14
3
GUJARAT
456
Feb-14
STATUS
-
4
RGPPL*
457
Mar-14
5
MAHARASHTRA
458
Apr-14
NTPC, HQ-II Raipur*
WRTS-I
459
460
May-14
Jun-14
KWPCL
TAPS-1&2
NTPC Gandhar/Kawas
RELIANCE SASAN
461
462
463
464
Jul-14
Aug-14
Sep-14
Oct-14
12
WRPC
465
Nov-14
13
MADHYA PRADESH
466
Dec-14
14
WRPC
467
Jan-15
15
ESSAR TRANSMISSION
468
Feb-15
16
BDTCL/JBTCL
469
Mar-15
17
NTPC VINDHYACHAL
470
Apr-15
18
TATA POWER
471
May-15
19
TORRENT POWER
472
Jun-15
20
CGPL
473
Jul-15
21
JPL
474
Aug-15
22
TAPS-3&4
475
Sep-15
23
ESSAR ESIL
476
Oct-15
24
APL
477
Nov-15
25
DNH
478
Dec-15
26
NTPC Mouda
479
Jan-16
27
KSK
480
Feb-16
28
RELIANCE TRANSMISSION
481
Mar-16
29
NTPC SIPAT, CG
482
Apr-16
30
NTPC KORBA
483
May-16
31
NCA
484
Jun-16
32
GOA
485
Jul-16
33
KAPS
486
Aug-16
34
RKM POWER GEN
487
Sep-16
35
NHDC
488
Oct-16
36
NTPC, Mumbai
489
Nov-16
37
38
39
ADANI TRANSMISSION
WRTS-II
SUGEN (TPL)
490
491
492
Dec-16
Jan-17
Feb-17
HOSTED ON 12.05.14 AT
MUMBAI BY WRPC AT
RELIANCE
HOSTED ON 13.06.14 AT NAGPUR
-
8
9
10
11
HOSTED ON 11.03.14 AT
MUMBAI BY NTPC
MUMBAI HQ-I
HOSTED ON 16.04.14 BY MSETCL AT
MUMBAI
-
6
7
REMARK
HOSTED ON 10.12.13 AT RAIPUR
HOSTED ON 16.01.14 AT DIU
HOSTED ON 13.02.14 AT VADODARA
HOSTING ON 10.07.14
AT RAIPUR BY
KWPCL(IPP)
hosted on 11.08.2014 at TARAPUR
hosted on 12.09.2014 at Bharuch
Hosted on 13.10.2014 at Varanasi
11.11.2014 at WRPC
Mumbai
Hosted on 09.12.2014 at Jabalpur
held on 16.01.2015 at WRPC
Mumbai
held on 16.02.2015 at Mumbai
to be held on 10 & 11 March
2015
ANNEXURE-15
PROGRESS OF AUTOMATIC DEMAND MANAGEMENT SCHEME (ADMS) IN GUJARAT
Sr.
No
ACTIVITY
DESCRIPTION
1
Identification of feeders for
ADMS (Y/N)
The details of substations / feeders identified for ADMS are as under:
Total No. of 132 / 66 KV S/S. - 100 Nos. Total No. of 11 KV feeders - 730 Nos.
Total load in MW - 650 MW.
2
Preparation of action plan /
detailed project report (Y/N)
3
Details of action plan
(Description)
4
Management / Administrative
funding approval
Road map of project:
Identification of technology, Prototype demonstration by the developers, Budgetary offer collections from
developers:
(Two developers has shown interest for providing solutions, they also given DEMO of the product. Budgetary
offer is given by one developer)
By 15th March 2014. (completed)
Detail project report submission to Competent authority and getting administrative approval of budgetary
provision etc:
By 15th April 2014. (Project report submitted to the Competent authority in June-14)
Preparation & Publication of tender:
By 15th May 2014. (Tender was published on August' 14)
Finalization of vender:
Executing agency has been finalized.
Time limit to vender for completion of job :
By 31st March 2015.
Management approval has been received in July-14.
5
Status of submission to CERC
(Y/N)
6
Target date of project completion By the end of March - 15.
7
Pilot project / demonstration If
any (Y/S)
Yes
8
Remarks
Progress Report as on 31.01.15:
Recently, the hardwares for control centre and field have been received.
Survey work of all selected sites have been completed.
Communication has been establshed between SLDC and Load Management Unit of Discoms.
Field device installation work is under progress at different sites.
The progress report had been submitted on 20.05.14 to Hon'ble CERC.
The progress report was also submitted to WRPC on 27.08.14.
23/02/2015
DAILY CONSUMPTION OF WESTERN REGION
(2010-11 TO 2014-15)
1100
468th OCC Meeting
Maximum Energy
Consumption : 916MUs on
20th Jan’15 (2.8% higher
than last year)
CONSUMPTION IN MUs ---->
1000
900
Minimum Energy
Consumption : 767 MUs
on 1st Jan’15 (WR Demand
dropped by 3000MW/
approx 100 Mus).
800
Republic day
Effect
700
600
44 Mus drop in Energy
Consumption on 26th Jan
2015 (Republic day).
2012-13
Mar
Jan
Feb
Dec
Oct
Nov
Sep
Jul
Jan-15
Dec-14
Jan-14
% Change w.r.t last
month
% Change w.r.t
last Year
Average
Max
Date
861
916
20-Jan-15
919
982
11-Dec-14
851
891
9-Jan-14
-6.30
-6.71
~
1.20
2.81
~
LOAD DURATION CURVE (Jan-2015)
Demand met - Jan'15, Dec'14 & Jan'14
Max. 43839 MW on dt. 20.01.14 at 10:00 hrs
Load growth- 13.82 % against last year
Festival/Holiday effect on Demand
46000
• Max Demand
Met
increased by
13.82% in
Jan’15
compared to
last year.
MONTHS ---->
2014-15
Energy Consumption
MU/Day
Grid Operation Highlights
Dec-14
44000
45000
50 % of time load above
35500 MW
42000
Jan-15
MW
• Average
demand met
(hourly)in
Jan’15
increased by
9.85%
compared to
last year.
2013-14
40000
40000
Peak Demand met (MW)
Mumbai
16th February, 2015
Aug
Jun
May
Apr
500
38000
35000
Jan-14
36000
34000
30000
Kite Festival
32000
Republic Day
30000
1
3
Demand Met
Average
Max
Date when
Max.
5
7
9
Demand met
11
13
15 17 19
Date
Demand met
21
23
25 27 29
Demand met
31
25000
0%
40855
43839
42796
44946
36856
38515
-4.53
-2.46
% Change
w.r.t last
Year
10.85
13.82
20-Jan-15
9-Dec-14
6-Jan-14
~
~
Jan-15
Dec-14
Jan-14
% Change w.r.t
last month
20%
40%
60%
% of Time
80%
100%
Regional Demand met
Max: 43839 MW on 20th Jan’15 at
10:00 hrs
Min: 26214 MW
(2nd Jan, 04:00 hrs)
1
23/02/2015
Maharashtra Demand Met 2012-13 to 2014-15
21000
12000
8000
MW
17000
16000
7000
15000
11000
6000
2014-15
Jan
Feb
Mar
Dec
Oct
Jul
Sep
2014-15
MONTH
6000
3100
5000
11000
0:00
0:52
1:44
2:36
3:28
4:20
5:12
6:04
6:56
7:48
8:40
9:32
10:24
11:16
12:08
13:00
13:52
14:44
15:36
16:28
17:20
18:12
19:04
19:56
20:48
21:40
22:32
23:24
MW
12000
2600
10000
GEB Dmd 130115
2100
9000
≈1500 MW drop
7000
3472
3600
13000
≈3300 MW drop
9000
8000
Chhattisgarh Demand Met 2012-13 to 2014-15
14005
14000
Jun
2013-14
Gujarat Demand Met 2012-13 to 2014-15
15000
Aug
MONTH
May
Jan
Feb
2012-13
Mar
Dec
Oct
Nov
Sep
Jul
Aug
Jun
May
Apr
2013-14
Apr
4000
12000
10000
Demand dropped by
3000 MW due to rain
5000
13000
Nov
14000
Gujarat Demand
dropped in the range of
1000 to 3300 MW after
morning 7 o’clock
13000
9000
18000
GEB Dmd 140115
GEB Dmd 150115
8000
2014-15
2013-14
2012-13 MONTH
2014-15
MONTH
10000
One day before
9000
Mar
Feb
Jan
2 units of Vindhyachal were taken out for better system operation.
50 MUs
reduced in
Gujarat(46
MUs reduced
last year)
WR Demand on 25th, 26th and 27th Jan 2015
42000
40000
34000
Festival day
Reduction of ~ 1500 MW
generation within Gujarat
during morning peak hours
6000
Reduction of ~ 1000 MW
generation within Gujarat
during evening peak hours
0:00
0:44
1:28
2:12
2:56
3:40
4:24
5:08
5:52
6:36
7:20
8:04
8:48
9:32
10:16
11:00
11:44
12:28
13:12
13:56
14:40
15:24
16:08
16:52
17:36
18:20
19:04
19:48
20:32
21:16
22:00
22:44
23:28
5000
GUJGEN 13.01.15
GUJGEN 14.01.15
56 MU reduction in
Western Region’s
Daily Energy
consumption(41 MUs
reduced last year)
GUJGEN15.01.15
44 MU
Reduction in WR
Energy consumption (42
MU reduced in last year)
2500-3500MW reduction
in demand
During evening peak hours
36000
One day after
7000
Approx 1500 MW
drop in Demand
compare to
15th Jan 2015 during
Peak hours.
38000
32000
1500-2000MW
Reduction in demand
During night off peak
hours
30000
28000
26000
0:00
0:48
1:36
2:24
3:12
4:00
4:48
5:36
6:24
7:12
8:00
8:48
9:36
10:24
11:12
12:00
12:48
13:36
14:24
15:12
16:00
16:48
17:36
18:24
19:12
20:00
20:48
21:36
22:24
23:12
8000
2012-13
Approx 3300 MW
drop in Demand
Compare to 13th Jan
during Peak hours.(3500
MW reduced last year)
WR Demand met : Republic Day- 26th Jan 2015
GEB State Generation
11000
Dec
Nov
Oct
Sep
Aug
Jul
Jun
Mar
Jan
Feb
Dec
Oct
Nov
Sep
Aug
Jul
Jun
May
Apr
2013-14
Apr
1600
7000
May
MW
10050
10000
19000
MW
Exceptional day: 14th Jan-2015 (Kite festival in Gujarat, Makar Sankranti)
Madhyapradesh Demand Met 2012-13 to 2014-15
11000
20399
20000
WRDMD 250115
WRDMD 260115
WRDMD 270115
units ware taken out
for better system
operation.
2
23/02/2015
Max
Average
37.21
17.46
>50.05
51.01
42.15
27.28
46.89
34.71
20.59
21.91
16.08
22.99
26.52
38.56
30.22
26.26
45.12
16.22
12.11
16.98
21.59
22.58
18.34
23.85
35.86
17.95
25.27
36.03
47.51
27.57
21.16
35.19
31.22
33.29
64.83
53.73
Frequency Profile
Frequency Profile for JANUARY 2015
120.00
52.33
100.00
50
55.7
53.19
47.83
50.16
49.5
52.94
53.73
53.60
48.29
45.36
IEGC Band
40
80.00
60.00
30
20
10
40.00
0
20.00
Month
51.01
28.81
49.9-50.05
>50.05
31-Jan
29-Jan
27-Jan
25-Jan
23-Jan
21-Jan
19-Jan
17-Jan
15-Jan
9-Jan
13-Jan
7-Jan
<49.9
11-Jan
0.00
High Frequency Day : On 1st Jan, due to drop in all India demand by
6000 MW and Under drawal by MP, Maharashtra and Chhatisgarh.
Low Frequency Day : On
and Maharashtra.
15th
Jan, falling freq trend due to O/D by MP
49.9-50.05
Months
<49.9
>50.05
FVI
March'14
12.91
47.83
39.27
0.12
April'14
30.64
52.33
17.03
0.16
May'14
22.48
53.19
24.33
0.13
June’14
37.15
45.36
17.49
0.24
July’14
34.51
50.16
15.33
0.2
Aug’14
37.87
49.5
12.63
0.19
Sept’14
IEGC Band 49.9-50.05
60
5-Jan
49.9-50.05
41.92
43.14
53.51
48.48
51.47
53.75
50.52
54.78
56.82
55.60
55.79
55.89
57.02
49.02
64.83
50.68
61.26
58.95
51.90
53.60
43.22
53.64
58.57
61.05
47.35
48.33
47.96
64.14
53.10
59.28
60.03
3-Jan
<49.9
7.07
14.71
19.21
4.63
13.82
25.66
27.57
29.14
20.19
17.88
5.65
13.89
16.72
5.86
18.95
37.21
21.76
19.46
25.52
28.06
32.93
10.50
23.48
13.68
16.62
4.16
24.47
14.70
11.71
9.50
6.68
1-Jan
Date
1-Jan
2-Jan
3-Jan
4-Jan
5-Jan
6-Jan
7-Jan
8-Jan
9-Jan
10-Jan
11-Jan
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
26-Jan
27-Jan
28-Jan
29-Jan
30-Jan
31-Jan
IEGC Band
28.13
55.7
16.16
0.43
Oct’14
25.55
52.94
21.52
0.13
Nov'14
16.49
53.60
29.90
0.10
Dec'14
23.85
48.29
27.86
0.14
Jan'15
17.46
53.73
28.81
0.12
Maximum instantaneous
50.56 Hz
frq
on 1st January at 03:03 hrs
Minimum instantaneous
49.55 Hz
frq
on 15th January at 7:36 hrs
Avg Freq of the month
49.99 Hz
Compliance to DSM : JAN-2015
Frequency Jan-15
1-Jan-15
1-Jan-15
1-Jan-15
2-Jan-15
2-Jan-15
3-Jan-15
3-Jan-15
4-Jan-15
4-Jan-15
4-Jan-15
5-Jan-15
5-Jan-15
6-Jan-15
6-Jan-15
7-Jan-15
7-Jan-15
7-Jan-15
8-Jan-15
8-Jan-15
9-Jan-15
9-Jan-15
10-Jan-15
10-Jan-15
1-Jan-15
1-Jan-15
1-Jan-15
1-Jan-15
1-Jan-15
13-Jan-15
13-Jan-15
14-Jan-15
14-Jan-15
14-Jan-15
15-Jan-15
15-Jan-15
16-Jan-15
16-Jan-15
17-Jan-15
17-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
19-Jan-15
19-Jan-15
20-Jan-15
20-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
22-Jan-15
22-Jan-15
50.8
50.6
50.4
50.2
50
49.8
49.6
49.4
49.2
49
FRQ
Lower 49.9
Low Freq Day 15.01.2015 at 07:36 hrs
50.4
50.3
50.2
50.1
50
49.9
49.8
49.7
49.6
49.5
49.4
Time
0:00
0:56
1:52
2:48
3:44
4:40
5:36
6:32
7:28
8:24
9:20
10:16
11:12
12:08
13:04
14:00
14:56
15:52
16:48
17:44
18:40
19:36
20:32
21:28
22:24
23:20
in Hz
0:00
0:58
1:56
2:54
3:52
4:50
5:48
6:46
7:44
8:42
9:40
10:38
11:36
12:34
13:32
14:31
15:29
16:27
17:25
18:23
19:21
20:19
21:17
22:15
23:13
in Hz
High Frequency Dat 01.01.2015 at 03:03 hrs
50.8
50.6
50.4
50.2
50
49.8
49.6
49.4
49.2
Upper 50.05
Time
Deviation of MP remained within 12% of schedule for 70 % of time blocks
Gujarat was able to reverse polarity of its deviation for 94 % of time
3
23/02/2015
Gujarat Wind Generation 2013-14 Vs 2014-15
60.00
60.00
55.70
Max Wind gen: 55.70 Mus on 23rd
June 2014
50.00
Wind Generation(in Mus)
1200
Max. Wind Gen. 49.19 Mus on 19th July 2014
49.19
50.00
1000
 Wind Generation in Jan-15
40.00
30.00
Generation(in Mus)
40.00
in Mus
in Mus
Maharashtra Wind Generation 2013-14 Vs
2014-15
30.00
20.00
20.00
800
 Total Wind Generation of
WR – 569 Mus
600
 Gujarat- 428 Mus
400
 Maharashtra- 141 Mus
10.00
10.00
200
0.00
0
 Max – 35.57 Mus on 1st Jan
0.00
Month
2013-14
2014-15
2013-14
Month
2014-15
Months
Gujarat
Addition of New Elements - Jan 2015
ICTS
SL.NO.
SL.NO.
1
GENERATING UNITS
STATION NAME
CAPACITY (MW)
UNIT
DATE
Maharashtra
Chandrapur
500
8
11/01/2015*
*Written communication/information to control room yet to be received from Maharashtra.
Total Capacity added from Apr’14 to Jan’15 – 7071 MW
1
2
3
Bahachau (PG) & Varsana
(GETCO)
Bahachau (PG) & Varsana
(GETCO)
GETCO
SL.NO.
CONSTITUENT
STATION NAME
1
POWERGRID
Boisar*
Boisar*
2
POWERGRID
KV
DATE
CKT.KM.
3
POWERGRID
Bachau-Varsana
I
400
6/1/2015
10
4
IPP(Reliance
Power)
Bachau-Varsana
II
400
6/1/2015
10
Chornia-Mundra
II (LILO at
Mansar)
400
23/01/2015
0.5
Total
20.5
LINE NAME
Total Ckt.Km added in Jan’15 is 20.5 ckt Km. and
from Apr’14 to Jan’15 - 7028.5 ckt.km
KV RATIO
CAPACITY(MVA)
LINE REACTORS
CKT NO
TRANSMISSION LINES
CONSTITUENT
STATION NAME
DATE
NIL
STATE/ISGS/IPP
SL.NO.
CONSTITUENT
Maharashtra
Line Name
Satna*
Boisar-Aurangabad ckt
I
Boisar-Aurangabad ckt
II
Vindhyachal-Satna ckt
II
Sasan
SASAN-Satna Ckt-II
* Line Reactor charged as Bus Reactor
CONSTITUENT
1
POWERGRID
2
POWERGRID
CAPACITY
(MVAR)
DATE
80
9/1/2015
400
765
765
Total
BUS REACTORS
SL.NO.
KV
400
80
9/1/2015
240
12/1/2015
240
21/01/2015
640
CAPACITY
(MVAR)
DATE
80
9/1/2015
125
8/1/2015
STATION NAME
KV
Magarwada GIS (DAMAN)
Parli
400
400
Total
205
4
23/02/2015
3.2 Outage Coordination
• A web based Google sheet transparently shared with all.
Agenda Items
• Case-1: ELEMENT NAMES HAS TO BE CLEARLY RECORDED in OCC
– OCC SI.No 317, Utility has requested for outage of “ICT 2 & Boisar-2 L/R”.
– It is not clear whether it’s a bay shutdown, LR shutdown or ICT shutdown.
• Case-2: Utilities insisting for major changes in outages at last moment
– 467th OCC SI.NO.194: Hotline maintenance of 400kV EMCO-Bhadrawati 1 & 2 from 25-Jan to 15Feb-15.
– WRLDC reliability approved for hotline maintenance with caution “Ok, Work should be performed
carefully”.
– However, the agency was pressuring WRLDC control room for line outage stating there is no
generation at EMCO (SCADA data shows generation at EMCO).
• Case-3: Insisting for Multiple outages at nearby nodes at the same time
– Reliability has given consent for carrying OPGW work on 765kV Sipat-Bilaspur-1 from 20-Jan to
19-Feb-15.
– 467th OCC also approved the Seoni Bus-1 outage for 4th and 5th Feb.
– WRLDC had concurred the Seoni Bus-1 outage with condition that “all Auto Re-closer to be in
service at Seoni, Bilaspur and Sipat”.
– This issue for not facilitating the OPGW outage was referred to WRLDC seniors.
ISSUES
• Many time the elements proposed for shutdown are not clear
• Major changes proposed at the last moment
• Too much pressure in Real Time to control room even when
reliability advise to reschedule the outage is uploaded in real-time
6: Non Receipt of DR/EL detail for Jan-15
• Non Receipt of DR/EL from Sub-Station within 24hrs is taken as NonCompliance of IEGC 5.2 (r) and CEA grid Standard 15.3
Following number of tripping, Utilities have not send the DR/EL to
analyse at WRLDC for the month of Jan-15
Utility
PCGIL
MSETCL
MPPTCL
GETCO
GOA
NTPC
JPL
No. of Tripping DR/EL
not Received
40
26
20
16
4
4
3
Utility
DHARIWAL
TORRENT
KSK
MOSERBEAR
NCA
SASAN
SUGEN
No. of Tripping DR/EL not
Received
2
2
1
1
1
1
1
5
23/02/2015
7.2 Transmission Constraints in Maharashtra….Conti
7.2 Transmission Constraints in Maharashtra
In OCC -466
Target Completion Date
In OCC -467
Target Completion Date
Date will be updated
Date will be updated
Aug-15
Jun-15
SLDC Maharashtra would give
detail of the revised arrangement
for IEPL in place of 400kV IEPLWarora D/c
LILO of 400 kV Chandrapur-Parli at Nanded
Mar-15
Jun-15
Additional 220 kV outlets from Pune(PG)
MEGPTL
765 kV Akola(II)-Ektuni -2 (To be charge at
400kV at Tapthithanda)
765 kV Koradi-III- Akola(II)-2
BDTCL
400 kV Dhule_MH-Dhule_BDTCL ( Line idle
charged)
Date will be updated
Sep-15
Name of the line
Maharashtra
2x1500 MVA 765/400 kV, ICTs at Ektuni
400 kV Bableshwar-Kudus D/C (Quad)
400kV IEPL-Warora
Feb’15
Feb’15
Jan-15
Charged on Ist week of Feb’15
Non-readiness of Bays at MSETCL
end
Non-readiness of Bays at
MSETCL end
Name of the line
POWERGRID
765kV Pune(GIS)-Sholapur(PG)
400kV Aurangabad-Boisar-D/c
765 kV Aurangabad-Sholapur -1
765 kV Aurangabad-Sholapur -2
LILO of both circuits of Aurangabad – Pune 400
kV D/c line at Pune 765/400 kV GIS
LILO of both circuits of Parli– Pune 400 kV D/c
line at Pune 765/400 kV GIS
2. Healthiness status of DG set in SLDCs received from Gujarat,
Madhya Pradesh and Chhattisgarh.
3. Maharashtra SLDC – In 465th , 466th and 467th OCC informed that an
order has been placed for procuring DG set at SLDC Kalwa and would
be available by March-15.
In OCC -467
Target Completion Date
Dec-14
Dec-14
Nov-15
Nov-15
Feb-15 /June-15
Jul-15
Jun-15
Jun-15
Date will be updated
Feb-15
Date will be updated
400 kV DGEN-Vadodara D/C
Date will be updated
765kV Aurangabad(PG)-Padghe(PG)-D/c
Date will be updated
8.1: Healthiness status of DG set at Black Start stations
1. WRLDC has received the healthiness status of DG set in Black Start
Generating Stations for 3rd Quarter (Oct’14-Dec’14).
In OCC -466
Target Completion Date
Feb-15
Contingency arrangement to be
discussed in CEA Standing
committee
Jun-15
8.1 Mock Black Start Exercise in Western Region
• Tentative Schedule for Mock-Dill of Black start Station was approved in last
OCC-467th. Accordingly, concern representative may update the status and
plan for pending Mock-dill exercise
1
2
3
4
5
6
7
8
9
10
Power Station
State
Ukai (H)
Gandhisagar
Kadana
Birsinghpur
Pench
Uran (Gas)
Dhuvaran
Ghatghar
GIPCL-I
Khopoli
Gujarat
Madhya Pradesh
Gujarat
Madhya Pradesh
Madhya Pradesh
Maharashtra
Gujarat
Maharashtra
Gujarat
Maharashtra
Tentative dates (Jan’15Jun’15)
1st wk. of Feb’15
st
1 wk. of Feb’15
4th wk. of Feb’15
4th wk. of Feb’15
1st wk. of Mar’15
2nd wk of Mar'15
3rd wk of Mar’15
4th wk of Mar’15
1st wk of April’15
2nd wk of April’15
6
23/02/2015
8.1 Mock Black Start Exercise in Western Region…. Conti
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Power Station
State
Tentative dates (Jan’15- Jun’15)
Hasdeo Bango
Bargi
CLPIPL
Bansagar Stage-I
Bhivpuri
Sugen
SSP
Indira Sagar
Bhira
Chattisgarh
Madhya Pradesh
Gujarat
Madhya Pradesh
Maharashtra
Gujarat
Gujarat
Madhya Pradesh
Maharashtra
2nd wk.of April’15
2st wk of April’15
3rd wk of April’15
4th wk.of April’15
4th wk of April’15
4th wk.of April’15
1st wk of May’15
1st wk of May’15
1st wk of May’15
Koyna I & II
Maharashtra
2nd wk of May’15
Omkareshwar
Bhira PSS
Kawas
Gandhar
Medikheda
Rajghat
Paithan
Trombay
Mini Hydro
Madhya Pradesh
Maharashtra
Gujarat
Gujarat
Madhya Pradesh
Madhya Pradesh
Maharashtra
Maharashtra
Gujarat
4th wk of May’15
4th wk of May’15
4th wk of May’15
1st wk.of june’15
1st wk. of june’15
4th wk of June’15
2nd wk. of june’15
4th wk of June’15
Sl No Power Station
State/ Owner
Installed Cap. (MW)
Black Start Source Capacity
15
Rajghat,Hydro
Madhya Prapradesh
3x15
DG set
250KVA
16
17
18
19
20
GandhiSagar,Hydro
GPEC(CLPIPL)
GIPCL-I
Sugen
KAWAS
Madhya Prapradesh
Gujarat
Gujarat
Gujarat
NTPC
5x23
3x138+1x241
3x32+1x49
3x382.5 MW
DG set
DG set
DG set
DG set
DG set
125 KVA
3000 kVA
500 kVA
2x6MVA
21
GANDHAR
NTPC
657.39 MW
(3*144.3+224.49)
DG set
22
Dhuvaran
Gujarat
1x107+1x112
DG set
4250 kVA
2x1600 KVA+
1x700 KVA
Total=3900 KVA
4 MW
PH1: 412KVA
PH2:450KVA
WH:520KVA
200 KVA
23
URAN
Maharashtra
4*60(GT)+4*108(GT)+2
*120WHR
DG Set
24
Paithan,Hydro
Maharashtra
1*12
DG set
1*20
220V BATTERY
AND HOUSE
GENERATOR
MADHYAPRADESH
Is the DG set Healthy & Ready
for black start ? (Yes /No)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
25
BIRSINGHPUR,Hydro
26
SSP(RBPH & CHPH),Hydro NCA
27
Ukai (H),Hydro
Gujarat
4 x 75
DG set
500 kVA
Yes
Yes
28
Mini Hydro,Hydro
Gujarat
2 x 2.5
DG set
50 KW
Yes
29
Kadana,Hydro
Gujarat
4 x 60
DG set
DG set
Yes
500 KVA
Black Start Diesel Generator (DG) Set Test Report for the Quarter (Oct-Dec-14) - In compliance to Sec 5.8(b) of IEGC
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Power Station
State/ Owner
Tata Power /
Maharashtra
Khopoli,Hydro
Tata Power /
Maharashtra
Bhivpuri,Hydro
Tata Power /
Maharashtra
Bhira,Hydro
Tata Power /
Maharashtra
Bhira PSS,Hydro
Tata Power /
Maharashtra
Trombay
Ghatghar,Hydro
Maharashtra
KOYNA I & II,Hydro Maharashtra
Hasdeo
Bango,Hydro
Chhattisgarh
Indira Sagar,Hydro Madhya Prapradesh
Omkareswar,Hydro Madhya Prapradesh
Pench,Hydro
Madhya Pradesh
Bargi,Hydro
Madhya Prapradesh
Medikheda,Hydro Madhya Prapradesh
Tons(Bansagar),Hydr
o
Madhya Prapradesh
Rajghat,Hydro
Madhya Prapradesh
Installed Cap.
(MW)
Black Start
Source
Capacity
3 x 24
3 x 24
2 x 1.5
DG set
250 kVA
DG set
250 KW
6 x 25
DG set
250 KVA
1 x 150
DG set
500 KVA
1 x 20 + 1 x 60
2*125
4*65+4*75
DG set
DG Set
HG Set
2.5 MW
2*1250 KVA
2 MVA
3*40
8x125
8x65
2x80
2x45
3x20
DG set
DG set
DG set
DG set
DG set
DG set
250KVA
2X1000KVA
2X1010KVA
250KVA
250KVA
275KVA
3x105
3x15
DG set
DG set
250KVA
250KVA
Is the DG set Healthy &
Ready for black start ?
(Yes /No)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
9.2 Scheduling of NTPC Coal Fired Stations
• WRLDC has created a separate webpage showing the following figures for each 15minute time block
• Declared Capability of ISGS in MW
• Entitlement of the beneficiary computed from the DC in MW
• Requisition received from the beneficiaries in MW
• Requisition received from the beneficiary as % of its entitlement
• Injection Schedule (Summation of the Requisitions) in MW
• Injection Schedule as % of Declared Capability
• The scheduling coordinators of Discoms / SLDCs as well as Generating Stations can
transparently see the entitlement, requisition and schedule of all Beneficiaries/ ISGS
in R0, R1 and other subsequent revisions
• Beneficiaries and NTPC may confirm the methodology and share their experience regarding
implementation of the decisions taken in 467th OCC meeting
Yes
7
23/02/2015
9.3 CERC order on petition by Tripura and M.P. on DSM
• CERC has granted relaxation in regulation 5 (1) (iii), 5 (1) (iv)
and regulation 7 (3) of the DSM regulation in respect of the
utilities having schedule of 400 MW or below w.e.f. 2nd
February 2015
Deviation Charges shall be receivable:
• For under-drawal upto 48 MW in relaxation of Regulation 5 (1) (iii) of the DSM
Regulations, and
• For over-injection upto 48 MW in relaxation of Regulation 5 (1) (iv) of the DSM
Regulations.
9.4 Deviation Settlement Mechanism (First Amendment)
As per the Amendment the over drawl / Under Injection at Frequency less than 49.7 Hz is Not Permissible.
Likewise Under drawl / Over Injection at Frequency more than 50.1Hz is Not permissible.
Summary of DSM regulation from the Grid operation prospective is tabulated below
Frequency Range
Over Drawl
Under Drawl
Under Injection
X Not Allowed
✓
X Not Allowed
✓
49.7 ≤ F <49.9
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
F < 49.7
49.9 ≤ F <50.05
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
50.05 ≤ F < 50.1
✓Within Limit
✓Within Limit
✓Within Limit
✓Within Limit
50.1 ≤ F
✓
X Not Allowed
✓
X Not Allowed
Deviation Limit :
9.5 Multiple Failure in ULDC Telecommunication System in Jan-15
• Continuous 74hrs, 10000 MW of SCADA data was not available due
to MUX failure at Bhatapara (11:10 of 24-jan to 13:26 of 27-Jan)
• Continuous 46hrs, blackout of nearly 25000MW of SCADA data due
to MUX Failure at Indore (15:00 of 27-Jan to 11:40 of 29-Jan)
• Continuous 158 hrs Sipat Generation in W3 Area of 3000MW not
visible (22:45 of 22-Jan to 11:40 of 29-Jan)
Over Injection
12% of Schedule or 150MW whichever is less. ( Relaxation upto 48MW for Schedule ≤ 400MW)
9.5 Multiple Failure in ULDC Telecommunication…Conti
Members may like to deliberate on the following issues:
i. Monitoring ULDC telecommunication system by respective
utilities
ii. Nomination of nodal officers by POWERGRID for resolution of
issues
iii. Providing redundant communication channel for speech and data
transfer from major stations to SLDCs and WRLDC.
iv. Providing optical fiber connectivity at all substation upto 132 kV.
8
23/02/2015
9.6 Secure evacuation from Sasan-Vindhyachal complex
9.7 Reliability of DG set at Blackstart stations
Action Plan for Two DG sets at Blackstart stations ?
Total generation at Sasan and Vindhyachal complex is around 8220 MW. Envisaged
transmission system for evacuation from Sasan-Vindhyachal complex is as under
Stations with only one DG set
Station Name
Status
765 kV Sasan-Satna ckt-1
765 kV Sasan-Satna ckt-2
2x1000 MVA, 765/400 kV ICT at Sasan
765 kV Sasan-Vindhyachal
765 kV Vindhyachal-Satna ckt-1
765 kV Vindhyachal-Satna ckt-2
2x1500 MVA, 400/765 kV ICT at Vindhyachal
PS
In operation
In operation
In operation
Expected in March’2015
Expected in March’2015
Expected in March’2015
Expected in March’2015
765 kV Gwalior-Jaipur
Expected in March’2015
Pench
Bargi
Medikheda
Tons(Bansagar)
1
Khopoli
CUMINS INDIA PVT. LTD.
1992
2
Bhivpuri
Catter Pillar
1997
3
Bhira
Catter Pillar
2002
4
Bhira PSS
CUMINS INDIA PVT. LTD.
1994
Kirloskar
1993
5
Trombay
6
KOYNA I & II
7
8
9
Stations with only one DG set
10
11
12
13
Year
AEG (Made in Germany)
1958
URAN
Kirloskar
2006
Paithan
Kirloskar
1991
Chhattisgarh
9.7 Reliability of DG set at Blackstart stations …Conti
Station Name
Make
Maharashtra
Element Name
Make
Madhya Pradesh
CUMINS INDIA PVT. LTD.
Cumins India Ltd. Pune
Cromption Greaves
Cromption Greaves
Year
1999
1999
2005
2005
KIRLOSKER ELECTRICAL ltd
1995
KATO ENGINEERS
HBL
Gujarat
1958
2014
14
Rajghat
15
16
GandhiSagar
Birsinghpur
17
GPEC(CLPIPL)
Caterpiller Model No. 3608
1990
18
GIPCL-I
KIRLOSKAR CUMINS LTD
1991
19
Ukai (H)
Kirlosker Electric Co.Ltd
1987
20
21
22
23
Mini Hydro
Kadana
KAWAS
GANDHAR
Jyoti Ltd.,Baroda
KIRLOSKAR CUMINS LTD
Ceglec Ltd.
Niigata Engg,Japan
1983
1990
1991
1994
•
a)
b)
c)
d)
e)
f)
g)
h)
i)
Hasdeo Bango
CUMINS INDIA PVT. LTD.
1996
9.8 Testing and commissioning of New Generating
units
Following are expected to inject infirm power as part of Testing and commissioning activity
for Capacity addition in FY 2014-15
SASAN UMPP Unit-6 – 660 MW
Maruti Clean Coal ltd unit-1 - 300 MW
Jaypee Nigrie Unit-2 – 660 MW
RKM Power Unit-1 - 360 MW
GMR, Chhatisgarh – 685 MW
SKS Power Ltd, Chhatisgarh- 300 MW
Chandrapur-8 – 500 MW ?
Koradi stage 2- 500 MW ?
D B power –Unit 2 – 600 MW ?
• Other entities may also furnish the details of Generating units expected to be under
performance test in Feb’15 and March’15.
9
23/02/2015
9.9 Extension of start-up supply to large Power station during system
restoration
A. CGPL UMPP proposal is as under:
i. GETCO may install 220/400kV ICT of appropriate rating at
CGPL Mundra for getting power from 220kV NaniKhakhar CGPL line. CGPL start-up power requirement would be app.
60MW at 400kV level.
ii. Power at 400kV level can be extended to CGPL from BhachauCGPL Mundra line which is shortest line to CGPL(approx
110km). Bhachau(PGCIL) 400kV S/s may be charged from
220/400kV ICT at Bhachau or from 400kV Vadavi-Bhachau
line or Varsana-Bhachau 400kV line.
Extension of start up supply to Sipat
• Unit size: 500 MW / 660 MW
• Start up power requirement: 100 MW
• Alternate-1: Extension of supply from ER
– 220 kV Budhipadar- Korba (E)- Korba (W) – 220/400 kV ICT Korba (W) –
KSTPS – Sipat (after start up of KSTPS units)
– 400 kV Ranchi-Sipat
• Alternate-2: Extension of supply from NR
– 400 kV Vindhyachal – Korba- Sipat (after starting of unit at Korba)
• Alternate-3: Extension of supply from SR
– HVDC AC bypass at Bhadravati- 400 kV Raipur-Sipat
• Alternate-4: from Chattisgarh
– Chattisgarh subsystem built with black start of Bango hydro
Extension of Start up supply to Sasan_UMPP
• Unit size: 660 MW
• Requirement of start power : 76 MW
• Extension of Start-up supply : Alternate-1
– from NR via AC bypass of HVDC Vindhyachal BTB station
– NR grid –> 400 kV Vindhyachal -> 400 kV Sasan
• Extension of Start-up supply : Alternate-2
– M.P. subsystem build up from nearby black start sources
– Bansagar Tons Hydro : 3x105
– Birsinghpur Hydro : 20 MW
9.10 Utilization of available Pump Storage Hydro Plants
• SLDC-Kalwa to update pumping
mode of operation at
i.
Paithan, Ujjaini
ii. Bhira, Bhivpuri
iii. Status of completion of
PSP scheme in 2x40 MW
Koyna left bank, 700 MW
Malsej Ghat, 400 MW
Humbarli
• NCA: Construction of tail race
reservoir in SSP
• SLDC Gotri: Healthiness status
of Kadana PSP (4x60 MW).
• SLDC Jabalpur: Status of Mara
(1100 MW) and Binauda (2250
MW)
10
23/02/2015
9.11: TTC/ATC computation for each STATE control area
•
•
•
•
•
•
Mandated by CERC regulation on Real Time Congestion alleviation
Several workshop on TTC/ATC already conducted in the past
Advised as per Minutes of meeting by Member (GO&D), CEA on 29th Oct 2014.
Agreed in 13th FOLD meeting held on 11-Dec-14.
Revival of WR study group agreed in 465, 466, 467 OCC
Workshop conducted on TTC/ATC computation on 17-Dec-14 by WRLDC.
a)
b)
c)
d)
Participated by Maharashtra, Madhya Pradesh , Gujarat and WRPC.
Base case was given to all
Methodology of TTC/ATC computation was explained
Hands on training was given on the study cases.
• SLDCs may appraise the progress status.
11
23/02/2015
9.12: SPS envisaged for SR-NEW Grid Operation
•
Inadequate participation of generators envisaged for SPS related with SR-NEW grid synchronization was
discussed in 464th, 465th, 466 and 467th OCC as well as in PCM. Concern representative may update the progress.
Responsible Agency
KWPCL/DB Power
Progress Stated in 466 OCC
Pending Action
-
Wiring for Generation Reduction
within the Station
-
POWERGRID
LANCO and BALCO Communication
Channel to be Checked
Balco wiring will be
completed in 7 day and Lanco Balco wiring is completed and
wiring will be completed by Lanco wiring will be completed
by 28-Feb-15.
Jan 15.
JPL
Signal to be extended from JPL Stg-1
to JPL Stg-2
Signal extention work will be
completed by end of Dec'14
Work is completed ready for
testing.
-
-
-
-
MSETCL (250 MW Load
Shedding or Generator Pickup SPS Signal to be Extended
at Koyna) and POWERGRID
MSETCL and POWERGRID
SPS Signal to be Extended at IEPL,
Koradi , Khaparkheda, Chandrapur in
cordination with MSETCL
SPS Operation for Sholapur-Parli > 800MW (February-2015)
Date
Time
JPL+JPL
DB
NSPCL Lanco
KWPCL Balco
Total
(Extn)
KSK
Power
(Desired (Desired
(Desired (Desired (Desired
(Desired (Desired
(Desired
50MW) 100MW)
100MW) 50MW) 800MW)
300MW) 100MW)
100MW)
%
10/2/2015
7:55
203
40
48
0
0
0
0
291
36.4
10/2/2015
16:24
262
47
40
0
0
0
0
349
43.6
10/2/2015
22:52
212
40
0
0
0
0
0
252
31.5
11/2/2015
9:46
265
50
47
0
0
0
0
362
45.3
11/2/2015
14:16
235
40
41
0
0
0
0
316
39.5
155
40
166.5 32.125
50
28.25
0
0
0
0
0
0
0
245
0 226.875
30.6
28.4
11/2/2015 15:03
Average Response
SPS Operation for Sholapur-Parli > 800MW (January 2015)
Progress Stated in 467 OCC
Date
Time
02/01/2015
06:36
07/01/2015
06:44
11/01/2015
10:40
11/01/2015
11:13
11/01/2015
11:29
17/01/2015
13:22
18/01/2015
07:03
19/01/2015
07:02
24/01/2015
07:01
29/01/2015
07:02
Average Response
DB
NSPCL
KSK
JPL+JPL (Extn)
Total
(Desired Lanco Power KWPCL Balco
(Desired
(Desired
50MW) (Desired (Desired (Desired (Desired (Desired
100MW)
300MW)
100MW) 100MW) 100MW) 50MW) 800MW)
0
121
137
60
0
105
191
252
254
271
173.875
0
30
40
54
35
0
0
20
45
40
33
0
25
25
25
25
25
25
25
25
25
28.125
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
176
202
139
60
130
216
297
324
336
235
%
0
22
25.2
17.3
7.5
16.2
27
37.1
40.5
42
29.3
9.18: Mock testing of SPS for 765 AGRA- GWALIOR on 24th December-14
• POWERGRID has requested to again Mock test of SPS for 765kV
Agra-Gwalior. MS WRPC stated that Mock test may be
conducted after talk with NRPC
• Member may deliberate
12
23/02/2015
9.14: Status of telemetry in Western Region
9.13 Implementation of the revised AUFLS
• MSETCL have revised its quantum of load relief in all stages of AUFLS scheme.
The updated AUFLS scheme of Western Region is as follows.
Western Region
Stage - I 49.2 Hz
Stage - II 49.0 Hz
Stage - III 48.8 Hz
Stage - IV 48.6 Hz
Implement Required Implement Required Implemen
Required Implemented Required
ed Load
Load
ed Load
Load
ted Load
Load relief Load relief Load relief
relief
relief
relief
relief
relief
States
GUJARAT
580
773
580
726
580
1117
590
MADHYA PRADESH
460
468
460
450
460
460
465
CHATTISGARH
150
110
150
114
155
117
155
91
MAHARASHTRA
805
1122
810
1215
815
1044
820
1071
UT: DD
25
10
25
*
25
15
25
*
25
15
25
*
25
15
25
*
UT: DNH
30
*
30
*
35
*
35
*
2060
2497
2070
2530
2085
2763
2105
2702
GOA
Total load relief
1025
490
* UFRs under procurement
• DD and DNH may appraise the member about the status of revised AUFLS
9.14 Status of telemetry in Western Region
S
Telemetry not available
Telemetry Intermittent
Updated in 466th OCC
Nos
Maharashtra
1 400kV Warora
2 400kV Lonikhand(New)
3 400kV Chandrapur StgII
4 400kV Taptithanda
Total 48 Stations 220kV
Mar-15
5 400kV Khaparkheda
data is intermittent
6 400kV Deepnagar
Further, 17 more stations where
7 220kV station data is not
available
Gujarat
1 220kV Bhatiya
220kV Navsari (Getco)
Work is under progress.
2 220kV Mokha.
Madhya Pradesh
1 220kV Dhar
220kV ANUPPUR
2 220kV Panagar
132kvVWAIDHAN
132kVMORWA
9.14 Status of telemetry in Western Region … Conti
Updated in 467th
OCC
S
Telemetry not available
No
Chhattisgarh
1
Mar-15
Work is under
progress.
Work is under
progress.
36 Station of 132kV where
Telemetry is not available
GOA
1 220kV Amona
2 220kV Cuncolim
DD and DNH
1 220kV Magarwada.
2 220kV Kharadpara
3 220kV Khadoli
Telemetry Intermittent
19 Station of 132kV
where Telemetry is
intermittent
220kV Tivim,
220kV Ponda,
220kV Xeldam
110 kV Kadamba
110kV Verna
Updated in 466th OCC
Updated in 467th
OCC
-
-
Not Updated
Not Updated
Not Updated
Not Updated
13
23/02/2015
9.14 Status of telemetry in Western Region … Conti
9.14 Status of telemetry in Western Region … Conti
POWERGRID
S Nos
Station Intermittent Telemetry
1
Telemetry Status
765kV Kotra
765kV Tamnar
400kV Navsari
765kV Dharamjaygarh
400kV Magarwara
PMU Data
Satna PMU data at WRLDC
1
Alternate 2nd Channel
Aurangabad alternate 2nd channel
1
2
3
4
5
Updated Completion
date in 466th OCC
Updated Completion
date in 467th OCC
31-Dec-15
31-Dec-15
31-Jan-15
31-Jan-15
-
31-Jan-15
31-Jan-15
28-Feb-15
28-Feb-15
-
31-Jan-15
28-Feb-15
31-Mar-15
31-Mar-15
9.15 ADMS(Automatic Demand Management Scheme)
Implementation as per Sec. 5.4.2 of IEGC:
• Gujarat have submitted the updated status of ADMS
implementation as on 31.01.2015. Progress Report as on
31.01.15:
•
•
•
•
•
The hardware for control centre and field have been received.
Survey work of all selected sites completed.
Communication has been established between SLDC and Load Management
Units of Discoms.
Field device installation work is under progress at different sites.
Project completion date is by 31st March,2015
S Nos
Station Intermittent Telemetry
1 JPL *
2 ESSAR Mahan
IPP
Updated Completion date Updated Completion date
in 466th OCC
in 467th OCC
Issue is not Resolved
Not Updated*
Not Updated
Not Updated
* Data not coming from 5th Feb 2015
S No
1
2
3
Redundant Comm. Channel
Completion date in 466th Completion date in 467th
OCC update
OCC update
APL Tiroda
31-Jan-15
28-Feb-15
CGPL
31-Jan-15
31-Jan-15
SASAN UMPP
31-Jan-15
31-Jan-15
Redundant Comm. Channel
9. 16: Non availability of Bus bar Protection at 400 kV Korba (West)
• As per the Last two OCC expected commissioning date of Korba(West ) bus bar
protection is March’15. The present status may be updated.
9.17: Lack of Bus bar protection at 220 kV Bus cause complete Blackout of 400
kV Birsinghpur Thermal station
• MPPGCL may update the present status.
• Other utilities Chhattisgarh, Madhya Pradesh, Maharashtra, Goa
, DD and DNH may furnish the updated status to WRPC/WRLDC
14
23/02/2015
Maharashtra Demand on 25th, 26th and 27th
Jan 2015
18000
Gujarat Demand on 25th, 26th and 27th Jan
2015
13000
11000
16000
9000
Approx 1500 MW
dropped compare to
previous day (Sunday)
12000
MAHADmd 250115
5000
MAHADmd 270115
GEB Dmd 250115
3400
3200
3000
2800
2600
2400
2200
2000
7000
6000
Marginal Drop
5000
4000
0:00
1:09
2:18
3:27
4:36
5:45
6:54
8:03
9:12
10:21
11:30
12:39
13:48
14:57
16:06
17:15
18:24
19:33
20:42
21:51
23:00
3000
MPSEB Dmd 250115
MPSEB Dmd 260115
GEB Dmd 260115
GEB Dmd 270115
Chhatisgarh Demand on 25th, 26th and 27th
Jan 2015
MP Demand on 25th, 26th and 27th Jan 2015
MPSEB Dmd 270115
Marginal Drop
0:00
1:12
2:24
3:36
4:48
6:00
7:12
8:24
9:36
10:48
12:00
13:12
14:24
15:36
16:48
18:00
19:12
20:24
21:36
22:48
8000
MAHADmd 260115
Approx 1000 MW
dropped compare to
previous day (Sunday)
7000
0:00
1:16
2:32
3:48
5:04
6:20
7:36
8:52
10:08
11:24
12:40
13:56
15:12
16:28
17:44
19:00
20:16
21:32
22:48
10000
0:00
1:16
2:32
3:48
5:04
6:20
7:36
8:52
10:08
11:24
12:40
13:56
15:12
16:28
17:44
19:00
20:16
21:32
22:48
14000
CSEB Demand 250115
CSEB Demand 260115
CSEB Demand 270115
Gujarat- Schedule Vs Drawal
2500
Exceptional day: 14th Jan-2014 (Kite festival in Gujarat, Makar Sankranti)
12000
2000
11000
1500
GUJ DEMAND- KITE FEST
11-Jan-14
12-Jan-14
13-Jan-14
14-01-2014-KITE FESTIVAL
15-01-14
10000
41 MU reduction in
Western Region’s
Daily Energy consumption
~ 3500 MW reduction in
peak demand in Gujarat
9000
1000
8000
500
0:00
0:43
1:26
2:09
2:52
3:35
4:18
5:01
5:44
6:27
7:10
7:53
8:36
9:19
10:02
10:45
11:28
12:11
12:54
13:37
14:20
15:03
15:46
16:29
17:12
17:55
18:38
19:21
20:04
20:47
21:30
22:13
22:56
23:39
6000
0:00
0:39
1:18
1:57
2:36
3:15
3:54
4:33
5:12
5:51
6:30
7:09
7:48
8:27
9:06
9:45
10:24
11:03
11:42
12:21
13:00
13:39
14:18
14:57
15:36
16:15
16:54
17:33
18:12
18:51
19:30
20:09
20:48
21:27
22:06
22:45
23:24
7000
0
-500
GEBSCH 14.01.15
GEBDRWL 14.01.15
GEBSCH 15.01.15
GEBDRWL 15.01.15
15
23/02/2015
Gujarat
One day before
Surrender of ~ 1700 MW from
ISGS
Next day
One day after
Reduction of ~ 1000 MW
generation within Gujarat
during morning peak hours
Festival day
Reduction of ~ 1500 MW
generation within Gujarat
during evening peak hours
Drawal
Schedule
Festival day
WR Demand met : Republic Day- 26th
Jan 2014
37000
25th Jan
WRDMD_260114
WRDMD_250114
35000
33000
31000
3884 MW
26th Jan
29000
25000
0:00
0:39
1:18
1:57
2:36
3:15
3:54
4:33
5:12
5:51
6:30
7:09
7:48
8:27
9:06
9:45
10:24
11:03
11:42
12:21
13:00
13:39
14:18
14:57
15:36
16:15
16:54
17:33
18:12
18:51
19:30
20:09
20:48
21:27
22:06
22:45
23:24
27000
42 MU
Reduction in WR
Energy consumption
2500-3700MW
reduction in demand
During evening peak
hours
1700-2000MW
Reduction in demand
During night off peak
hours
16
23/02/2015
9.5 Pumped Storage Hydro Stations
Ghatgarh Pumping and Generation data on 28.10.2014
MW
150
122.68
100
Generating
Mode
122.44
0
M
W
-50
0:15
0:45
1:15
1:45
2:15
2:45
3:15
3:45
4:15
4:45
5:15
5:45
6:15
6:45
7:15
7:45
8:15
8:45
9:15
9:45
10:15
10:45
11:15
11:45
12:15
12:45
13:15
13:45
14:15
14:45
15:15
15:45
16:15
16:45
17:15
17:45
18:15
18:45
19:15
19:45
20:15
20:45
21:15
21:45
22:15
22:45
23:15
23:45
50
Time- Block
Pumping
Mode
-100
Hydraulic Batteries for storage of energy
Reduce difference between Maximum and Minimum Load in the system
Enhance efficiency of thermal stations
Spinning Reserve
Voltage and power factor correction
Improved System Reliability
Capability of
working in
pumping
mode
-150
-152.32
-200
Whether
being
operated in
pumping
mode
SLDC Kalwa
to confirm
Capacity
State
Year
1
Paithon
(Jayakwadi)
1x12
Maharashtra
1984
2
Ujjaini
1x12
Maharashtra
1990
3
Bhivpuri
1x90
Maharashtra
No
4
Bhira
1x150
Maharashtra
Yes
No
No
5
Ghatghar
2x125
Maharashtra
Yes
Yes
No
Yes
No
Yes
Generation Mode
Availability of
Telemetry
Station
Yes
Pumping Mode
No
No
No
6
Sardar Sarovar
6x200
Gujarat
7
Kadana-I
2x60
Gujarat
1990
Tail race
reservoir to be
completed
Yes
No
8
Kadana-II
2x60
Gujarat
1995-96
Yes
No
No
17
23/02/2015
18