m-«f~ government of India ~~~ ~l ~iC{g~ut~W& ~ ~ 0iT g 9001-2008 ISO: 9001-2008 Western Regional Power Committee ~ -3, ~~ al;r, ~ (¥), ~ - 400 093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093 ~ Phone: 022- 28221681; 28200194; 28200195;28200196 ~ Fax: 022 - 28370193 Website: www.wrpc.nic.in E-mail: opc-wrpc@gov.in.opnwrpc@gmail.com ~:- qjtfcr.~, ~ ct?r ct?r 9tll<1'1 ~ B~;:q£l~ ct?r 9tll<1'1 ~ 468 eft ~ Cf)f Cf)14CJ~ I qft-:qq ~ ~ ~, 16.02.2015 c6r, MUMBAI WHfci r:iw"1' ~ ~ if \3"I1~lMd 468 eft ~ B~;:q£l~ ct?r R'1iCf) Cf)f Cf)14CJ~ ~ I (Q;f Q;f~) \3ftlT~ ~ (ytll<1'1) MINUTES OF 468TH MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 16TH FEBRUARY 2015 IN MUMBAI The 468THmeeting of Operation & Co-ordination Sub-Committee of WRPC was held on 16th February, 2015 in Mumbai hosted by EPTCL. The list of participants is enclosed at Annexure-I. Shri S Bhujade CEO, EPTCL welcomed Sh. SD Taksande, Member Secretary, WRPC & other delegates of 468th OCC meeting. He thanked WRPC Secretariat for giving opportunity to EPTCL for organizing this meeting and expressed pride in organizing the same. He stated that Essar Power Transmission Company Ltd (EPCTL) is an Interstate Transmission Licensee and operate Stage - I Element which consist of following transmission elements: 1. 400KV D/C 22.5 KM Vindhyachal-Kroba LILO at Mahan with 400KV Bays, 2. 400KV D/C 104.8 KM Gandhar–Hazira with Bays at NTPC Gandhar, 3. 400KV/220KV Substation Stage - II which is under construction and shall be completed shortly, consists of 1. 400KV Bays at Mahan and Bays at PGCIL Sipat for Mahan-Sipat Line 2. 400KV D/C Quad Moose 336 KM line Essar Power has seven operational power plants in India and one operational power plant in Algoma, Canada, with a total installed generation capacity of 3,910 MW. Shri S D Taksande, Member Secretary, WRPC extended warm welcome to Shri S Bhujade CEO, EPTCL & all the participants of the 468th OCCM. He expressed his gratitude to CEO, EPTCL and his team of engineers for making excellent arrangement for meeting. He appreciated the diversified business area & effort imparted in the power sector for national growth by ESSAR Group. He informed that since last OCC meeting following important events had taken place and informed about current important issues which need attention of OCC. 1. Declaration of COD : Intimation of CoD by CEA to Ministry of Coal/CIL shall be conveyed based on the confirmation letter of COD by RPC & RLDC/SLDC. 2. Exploration of PSDF fund by Gujarat: Recommendations of Appraisal Committee of PSDF for the ADMS application submitted by SLDC, GETCO, 2 Gujarat for funding from PSDF to the tune of 1.5 crore. 3. A meeting was conducted at NLDC regarding shifting of control area of APL-III. No concrete decision was evolved & the control area is still with SLDC, Gujarat. 4. Methodology for reasonable scheduling of NTPC stations was decided in 467th OCC meeting. NTPC intimated that still they were facing the problems of unreasonable Scheduling. The matter will be further discussed in ensuing WRPC meeting. 5. 28th WRPC meeting is scheduled to be held on 3rd & 4th March 2015 at Udaipur. 6. ATC/TTC calculation methodology at state boundaries: Maharashtra intimated that they have been facing huge curtailment in ATC/TTC and imposing the congestion charges. 7. Transmission line outage planning software being developed by Shri Satyanarayan S, SE(C&P), WRPC is under full swing & expected to implement in next month onwards. MS suggested to call a meeting among transmission licensees/agencies for further feedback and hands on experiences. 8. Possibilities on exploration of pump storage facilities in WR. 9. Welcomed Rattan India(India bull) as a new OCC member. 10. WR unrestricted demand was 44553 MW as compared to 43092 MW during the last year(3 % growth). There after he requested SE(O), WRPC to take up regular agenda items in seriatim for discussion. ITEM No. 1: CONFIRMATION OF THE MINUTES Shri M M Dhakate, S.E(Opn), stated that Minutes of 467th meeting of Operation & Coordination Sub-Committee of WRPC held on 16th January 2015 at Mumbai were forwarded vide letter No. WRPC/OPN/OCC-Minutes/2014-15/944 dated 27.01.2015. GM, WRLDC vide letter dated 9th February, 2015 requested for following amendment in Sr no 3 of Member secretary’s address 467th OCC minutes: Quote “ WRLDC has been fully ring fenced wef 01.01.2015.” Unquote: 468th OCC MINUTES 3 Shall be replaced by following: “ WRLDC has been fully ring fenced wef 01.10.2010.” The committee agreed to modification of date from 01.01.2015 to 01.10.2010. No other comments have been received. The minutes were confirmed with above modification. ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF JANUARY 2015. Member Secretary, WRPC requested WRLDC to brief the Committee on Grid Operation experiences during January 2015. Chief Manager, WRLDC in the presentation (copy attached at Annexure – 2 in soft copy) concentrated broadly on the performance of the grid for month of January 2015 as below: 2.1 Frequency Particulars The average frequency during the month of January, 2015 was 49.99Hz. The maximum instantaneous frequency was 50.56 Hz at 3:03hrs on 1-January-15 while minimum instantaneous frequency was 49.55 Hz at 7:36hrs on 15-January-15. The frequency profile during January, 2015 was as under: 01-Jan-2015 to 31-Jan-2015 % time IEGC band (49.9 < f < 50.05 Hz) 53.73 < 49.9 Hz 17.46 > 50.05 Hz 28.81 The detailed frequency particulars are enclosed at Annex- 2.1. The Sub-Committee noted. 2.2 Operational Discipline There was a net inter-regional export of 3501.00 MUs by WR against net export schedule of 3180.00 MUs. The Sub-Committee noted. 2.3 Voltage Profile Voltage profile at some of 765/400 kV sub-stations during the month of January 2015 furnished by WRLDC is enclosed at Annex-2.3. The Sub-Committee noted as above. 468th OCC MINUTES 4 2.4 U/F Relay Operations As per WRLDC records during January 2015 the system frequency didn’t touch 49.2 Hz and no UFR operation has been reported by WRLDC. The UFR operation status reported by constituents is enclosed at Annexure-2.4. The Sub-Committee noted as above. 2.5 Power Cuts / Load Restrictions Details of Power Cuts and Regulatory measures during January 2015 as furnished by the state utilities are given in Annex. 2.5. The Sub-Committee noted as above. 2.6 Details of Generating Units under Forced outages Details of generating units under forced outages during January 2015 are given in Annex-2.6. The Sub-Committee noted as above. 2.7 Details of Generating Units under Planned outages The details of generating units under Planned Outages during January 2015 are given in Annex-2.7 The Sub-Committee noted as above. ITEM NO.3: OPERATIONAL PLANNING 3.1 Proposed Planned maintenance programme of generating units. The maintenance programme of generating units for February 2015 & March 2015 was discussed. The finalized outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-3.1. The Sub-Committee agreed as above. 3.2 A. Outage Programme of Transmission Lines/elements The committee had received 576 nos. of proposals for outage planning during February 2015 & March 2015. Further some proposals were received at the last moment of the meeting. The committee observed that :- 468th OCC MINUTES 5 1. There were repetitions in the proposals, wherein the same line had been requested for outage a number of times. 2. The lines pertaining to STU were proposed for outage. As per 446th OCCM, such lines should be first approached to concerned STU and only in case of problems faced in outages concern utilities shall approach to OCC of WRPC. 3. Line details/reasons in many cases were not mentioned in proposal. Committee requested that while submitting outage planning data, necessary care may please be taken. 4. All utilities were requested to avail outages as planned. 5. Sub-Committee noted that the outages planning shall be period of 20th of the OCC month to 19th of the following month. 6. In case of any contingencies in parallel rout, online OPGW work etc. A/R shall be brought in service from non auto mode. WRLDC suggested that the request for Emergency outage shall have following information: 1. Name and Voltage level of the Element required to be taken under emergency outage 2. Requesting Agency 3. Element owner 4. Date and duration of the outage Reason of Emergency outage. All approved outage are transparently displayed on the Google excel sheet having URL:https://docs.google.com/spreadsheets/d/1M-JeQbm6Cer8dB0uHStyPcGIMs95U s7TqqFrxq77mGY/edit#gid=863831921 and it is visible to all who have requested for access. It is desired that official representing there organization further delegate these access to all concern in their organization for smooth functioning 24X7. Separate mails are also forwarded to all utilities on D-1 day. The Sub-Committee agreed/noted for the same. Shri Satyanarayan, S. SE(C&P), WRPC is developing a web-based transmission elements outages planning. He updated the status of development. He assured that project shall be implemented from next month onwards. Member Secretary, WRPC suggested to call a meeting among the transmission licensees/agencies, WRPC, WRLDC, SLDC’s to resolve the common issues may be raised during the implementation of Web based planning. The Sub-Committee noted the same. 468th OCC MINUTES 6 3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – FEBRUARY 2015 & MARCH 2015 Details of anticipated restricted & un-restricted demands for the months of February 2015 & March 2015 are given in Annex 3.3. The Sub-Committee noted the same. ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF JANUARY 2015 The details of actual generation, demand, drawl of power from grid; exchanges etc. are given in the following Annexure: Annex 4.1 - Actual Generation and Requirement for January 2015 Annex 4.2 - Peak Demand: Schedule Vs Actual for January 2015 Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines for January 2015. Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector stations, Drawl Schedules and Entitlements of constituents during January 2015 Annex 4.6 - Inter System Exchanges for January 2015. Annex 4.7 – Details of level of Major Reservoirs in Western Region for Month January 2015. The Sub-Committee noted. ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month. The other minor tripping details during the month received from WRLDC is enclosed at Annexure-5. The Sub-Committee noted as above. ITEM NO. 6:Healthiness status of SERs/DRs of equipment in the system. Constituents have furnished the status of healthiness of SER/DRs in their systems on the dates below : Sl No. Name of Date of Receipt constituents 1 PGCIL,WRTS-I 06.02.2015 2 PGCIL,WRTS-II 06.02.2015 3 MPPTCL 09.02.2015 4 NTPC 07.02.2015 5 CSPTCL 06.02.2015 6 GETCO 09.02.2015 7 MSETCL 10.02.2015 468th OCC MINUTES 7 WRLDC informed that as per IEGC DR/EL data is to be forwarded within 24 hours of an event. The DR/EL of the following events in ISTS in December, 2014 is yet to be received at WRLDC. Owner / Agenc y S. N. Name of Element 1 HVDC Badrawati Report on Pole 1 on 11.12.14 0805hrs PGCIL 2 1. 765 KV Aurangabad-Wardha-1 2. 765 kV Aurangabad-Dhule 3. L/R of Aurangabad-Pahe -2 4. 765 kV Aurangabad Bus 1 on 18.12.14 at 1719hrs PGCIL , BDTC L Event HVDC Bhadrawati Pole 1 Trip due to Valve Based Eletronic Gate fault Multiple tripping due to Tie CB Blast of 765 kV WardhaAurangabad 1 at 765 kV Aurangabad S/s DR/EL Status Not Received Not Received MS stated that in time with discussion in earlier OCCs, DR/EL of events be submitted to WRLDC and WRPC within a week time. Constituents of WR were requested to ensure healthiness and sent information to this office regularly as per the recommendation of enquiry committee of Grid disturbances on 25.02.2007 and 28.02.2007. The Sub-Committee noted. ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS, TRANSMISSION LINES AND GENERATING UNITS IN WR. 7.1 Status of completion of ongoing Schemes for Commissioning of reactors. The present status regarding schedule and commissioning of reactors is as below: S. No. 400 Sub/stn. 1 Jabalpur 125 MVAR PGCIL Commissioned 26.03.2014 on 2 Khandwa 125 MVAR PGCIL Commissioned 28.03.2014 on 3 India bulls 80 MVAR MSETCL BR Commissioned 26.11.2013 4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014 5 Sasan Line 240 MVAR reactor-1 RELIANCE Commissioned 16.02.2014 468th OCC MINUTES kV Size (MVAR) Implementing Expected commissioning agency date on 8 6 Shujalpur 125 MVAR PGCIL Commissioned 31.07.2014 on 7 Bhatapara 125 MVAR PGCIL Commissioned 24.07.2014 on 8 Raigarh 125 MVAR PGCIL Commissioned 30.07.2014 on 9 Aurangabad 125 MVAR PGCIL Commissioned 28.04.2014 on 10 Nanded 125 MVAR MSETCL June – 2015 11 Sholapur 125 MVAR MSETCL June – 2015 12 Kolhapur 125 MVAR MSETCL June – 2015 13 Akola 125 MVAR MSETCL June – 2015 *14 Nagda 125 MVAR MPPTCL March – 2015 15 Bhopal 80 MVAR MPPTCL March – 2015 16 Damoh 125 MVAR PGCIL Commissioned 30.09.2014 on 17 Bachau 125 MVAR PGCIL Commissioned 01.12.2014 on 18 Pirana 125 MVAR PGCIL Commissioned 02.10.2014 on 19 Itarsi PGCIL Commissioned 15.08.2014 Commissioned 13.10.2014 on PGCIL March – 2015 20 Seoni 1X125 MVAR(Ist) 1X125 MVAR(IInd ) 125 MVAR 21 Parli 125 MVAR PGCIL March – 2015 22 Raipur 125 MVAR PGCIL Commissioned 30.09.2014 on 23 Gwalior 125 MVAR PGCIL Commissioned 30.06.2014 on 24 ISP 125 MVAR NHDC December 2015 25 Line reactor 50MVAR at Nagda-ISP line at Nagda MPPTCL July 2015 468th OCC MINUTES on 9 end 26 Satpura 27 50 MVAR MPPGCL March-2015 Sasan Line 240 MVAR reactor-2 RELIANCE Commissioned 21.01.2015 28 Sasan reactor RELIANCE May-2015 29 Bus reactor 330 MVAr at Wardha PGCIL Commissioned 01.11.2014 on 30 Bus reactor 330 MVAr at Dhule BDTCL Commissioned 04.12.2014 on Bus 240 MVAR on *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor after commissioning of 125 MVAr reactor at Nagda. *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor. Sub-Committee noted as above. 7.2 Status of completion of 765/400 kV and above ongoing Transmission Schemes being executed/implemented by Transmission Agencies. The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows: S. No. Name of the Line POWERGRID 1 400 kV Navsari – Kudus D/C Line 2 765kV S/C Satna-Gwalior line (359Km + 60Km D/C Portion) Ckt.-II 3 765 kV Durg pooling station Champa Pooling station Dharamjaygarh PS - 2nd ckt 4 765 kV Gwalior - Jaipur line (1st Ckt) S/C 5 765 kV Dharamjaygarh - Jabalpur Pooling Station D/C line 6 765 kV Wardha –NizamabadHyderabad D/C 7 765 kV Narendra-Kolhapur D/C 8 400 kV Aurangabad - Boisar line D/C line 9 765 kV Aurangabad (PG) - Padghe (PG) D/C 10 800kV DC Champa – Kurukshetra 468th OCC MINUTES Target Completion Date Remarks March-15 ROW problem Commissioned 06.08.2014 Commissioned 21.05.2014 March-15 March-15 March-15 March-15 July -2015 June-2015 March 2015 on on 10 11 12 Bipole 765 kV D/C Jharsuguda – Korba Ckt I Commissioned 28.07.14 Ckt II Commissioned 29.07.14 Ckt I Commissioned 01.07.14 Ckt II Commissioned 03.07.14 765 kV Wardha- Aurangabad D/C Line. 13 765 kV Aurangabad- Solapur D/C line June 2015 14 15 765 kV Solapur-Pune line 765KV Durg-Wardha D/C June 2015 16 765 kV Ranchi-DharamjaigarhBilaspur II & 765 kV RanchiDharamgaigad-I 17 LILO of both circuits of Aurangabad – Pune 400 kV D/c line at Pune 765/400 kV GIS LILO of both circuits of Parli– Pune 400 kV D/c line at Pune 765/400 kV GIS 18 CHHATTISHGARH 1 LILO of 400 kV Korba westKhedamara at Marwa 2 400 kV DCDS Raipur(Raita)Jagdalpur(DCDS) 2.1 220 kV Korba-Bishrampur line (DCSS) 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) 2.3 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL S/s Raigarh 2.4 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri S/s 2.5 LILO of 220 kV Raigarh – Jindal (Tamnar) at Girwani 220 kV S/s GUJARAT 1 400 kV D/C Kosamba-Chorania line (Package I 2 400 kV D/C Kosamba-Chorania line (Package II) 3 400 kV D/C Mundra-Zerda line No. 1 4 400 kV D/C Mundra-Zerda line No. 2 5 400 kV D/C Vadinar-Amreli line 468th OCC MINUTES on on on on Commissioned on 15.11.14 Ckt I likely to be commissioned in Jan2015 Ckt II Commissioned on 31.03.14 Feb-15 Feb-15 June- 2015 March 2015 Commissioned 14.08.14 on April- 2015 May-2015 March-2015 Charged on 22.08.14 Commissioned 05.07.14 Commissioned 05.07.14 March-2015 March-2015 June -2015 on on 11 6 400kV APL-Hadala LILO to Halvad March -2015 7 400 kV D/C Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda March 2015 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS Line 2 on Ckt I Commissioned on 04.09.14 Ckt II Commissioned on 07.08.14 Pithampur- Indore 400KV DCDS Line 3 Commissioned 31.10.14 Satpura TPH-Ashta 400KV DCDS March – 2015 Line MAHARASHTRA(STU) 1 2 400KV D/C line from Koradi-(II) to Mar- 2015 Wardha S/S(PG) D/C 400 kV Akola(II)- Taptitanda -I Charged in Jan-14 765 kV Tiroda- Koradi-(III) ckt-II Commissioned 20.01.15 765 kV Koradi-(III)- Akola(II) ckt-II 765 kV Akola(II)- Taptitanda ckt-II 400 kV Akola(APML) to Akola(MSETCL)-II Charged at 400 kV level Commissioned on 02.10.14 3 4 5 6 7 8 9 10 11 400 kV Taptitanda-Bableshwar-D/C LILO of 400 kV Chandrapur-Parli at Nanded 2x1500 MVA 765/400 kV, ICTs at Ektuni 400 kV Bableshwar-Kudus D/C (Quad) 765 kV Akola(II)-Ektuni -2 ( To be charge at 400kV at Tapthithanda) 12 400kV IEPL-Warora May 2015 Jun-15 Aug-15 Jun-15 May 2015 SLDC Maharashtra would give detail of the revised arrangement for IEPL in place of 400kV IEPL-Warora D/c GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd 1 400 kV Rajgarh(PG)-Karamsad May 2015 (GETCO) D/C STERLITE (JTCL) 1 765 kV Dhramjaygarh - Jabalpur (JTCL) May -2015 D/C line 2 765 kV Jabalpur - Bina (JTCL) S/c May -2015 STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) S/C 468th OCC MINUTES on Severe ROW Problem Severe ROW Problem Commissioned on 12 2 765 kV Bhopal-Bhopal (BDTCL) 3 765 kV Vadodara - Dhule (BDTCL) S/C March - 2015 4 765 kV Dhule - Aurangabad (BDTCL) S/C 5 400 kV Dhule-Dhule(D/C) (up to dead end tower) RAICHUR SHOLAPUR TRANSMISSION CO. LTD.(RSTCL) 1 765 kV Raichur - Sholapur line 2nd S/C 19.11.14 Commissioned 16.07.14 Commissioned 04.12.14 Commissioned 05.12.14 on on on Commissioned on 29.06.2014 It was suggested by WRLDC and constituents that important list of line will be sent by each constituent to WRLDC and WRLDC will compile and furnish the list as per priority of commissioning. The Sub-Committee noted and agreed as above. 7.3 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15. A. INTIMATION OF COMMERCIAL DATE OF OPERATION OF THERMAL PROJECTS TO MINISTRY OF COAL/CIL. Secretary, CEA vide letter dated 30.01.2015 intimated that the Chairperson, CEA took a meeting on 28.01.2015 with the Member (Hydro/ Thermal/ E & C), Member I/c (GO & D) and other concerned Officers of CEA to discuss the issue regarding the procedure to be followed for intimation of Commercial Date of Operation (CoD) to Ministry of Coal/CIL for the purpose of supply of coal as per the FSA. The decision taken in this regard is stated below: Henceforth intimation of CoD by CEA to Ministry of Coal/CIL shall be conveyed based on the following: • Confirmation letter by RPC for the Cod received in CEA; or • Confirmation letter from concerned RLDC/SLDC (as the case may be). Since, CEA has to convey the declaration of CoD only for the purpose of supply of coal by CIL as per the FSA, therefore, the matter would be dealt by OM Division. TPM Division will intimate the commissioning date of the Unit to OM Division for this purpose. Member (GO & D) will issue direction to all RPCs to furnish the commercial date of operation (CoD) to CEA immediately after receipt of information. 468th OCC MINUTES 13 OCC DISCUSSION: CM, WRLDC stated that as per the existing regulations, CoD of all the units in the control area jurisdiction of RLDCs have to follow the order of Hon’ble CERC in para 35 of its order dated 8th Aug 2014 in Pet.No.85/MP/2014 in the matter of Consideration of the declaration of COD and scheduling of Sasan UMPP in terms of the judgment dated 12.8.2013 in Appeal No.149/2013 of Appellate Tribunal for Electricity if has been directed that following provisions shall be adopted by RLDCs for declaration of COD by generating stations which are not governed by TCT 2014-19 and adequate provisions are not made in the respective PPAs. Quote “Guidelines with regard to the commercial operation 35.WRLDC has prayed for "issue of specific guidelines with respect to declaration of COD of the generators who are not governed by the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations , 2009 to be in line with CERC regulations so that the same can be implemented in a dispute free manner and eliminate any possibility of gaming by generator". The Commission has taken note of the prayer of WRLDC and is of the view that in case of UMPP, the PPA contains the necessary provisions with regard to the performance testing and commercial operation of the unit of the generating stations and the same should be strictly complied with. In other cases, if adequate provisions are not made in the PPA, the RLDC shall be guided by the provisions in the Central Electricity Regulatory Commission (Terms and conditions of Tariff) Regulations, 2014 in this regard. We direct the NLDC and RLDCs to submit report in consultation with CEA which shall include specific difficulties experienced by RLDCs in dealing with the performance testing and commercial operation of the generating stations which are not governed by the Tariff Regulations of the Commission. The report shall be submitted within two months. We direct the staff of the Commission to study the report of the NLDC/RLDCs and place it before the Commission along with its suggestions for consideration and necessary directions.” 468th OCC MINUTES 14 Unquote Accordingly the following practices have been adopted by WRLDC w.r.t. declaration of COD of any Unit (irrespective of the ownership) by a generating station (CGS/IPP etc). A. While declaration of COD of a unit by a UMPP station, necessary provisions of PPA shall be strictly complied. This means, UMPPs have to submit all the documents stipulated in PPA to RLDCs also before declaring COD for necessary checking before staring the commercial scheduling by RLDCs. B. In case of stations were adequate provisions are not made in PPA, then RLDCs shall be guided by TCT 2014-19 clauses of COD mentioned in Chapter-2. Which means, all the stations have to follow the following clauses of TCT 201419. • COD of a thermal station mean the date by generating company after demonstrating MCR or IC through successful trial run after seven days prior notice issued to its beneficiaries. • Trial run mean, successful running of the generating station or unit thereof at MCR or IC for continuous period of 72hrs. for thermal and 12hrs for hydro stations. • Generating company shall certify to the effect that the generating station meet the key provisions of technical standards of CEA. • Certificate shall be signed by CMD/CEO/MD of the company subsequent to its approval by the Board of directors in the format enclosed at Appendix-VI if TCT 2014-19 and shall be submitted to Member Secretary & concerned RLDC. Member Secretary WRPC stated that during the framing methodology all the rules/regulations shall be maintained. The Sub-committee discussed the matter in detail and decided that all the generators shall be requested to send to SLDC/WRLDC as the case may be, a certificate indicating completion of all the modalities such as continuous running for 72 hrs at 95% of rated capacity etc. and supporting documents viz. SEM meter data etc. SLDC/WRLDC would submit data log of corresponding period when 72 hours of 468th OCC MINUTES 15 continuous running at 95% of rated capacity was achieved. WRPC/WRLDC would then verify the details and confirm the COD of their generating units to CEA for onward communication to CIL for resuming coal supply. Member Secretary, WRPC shall issue a confirmation letter to OM division of CEA with a copy to GM Division of CEA for their further needful. The sub-committee agreed/noted the above methodology of COD for coal linkage purpose. B. STATUS OF GENERATING UNITS COMMISSIONED /EXPECTED TO BE COMMISSIONED DURING THE CURRENT YEAR 2014-15 IN WESTERN REGION The status regarding Generating units, commissioned /expected to be commissioned during the current year 2014-15 according the available information is as below: Name of the Power Projects Unit No. Capacity Date of Commissioning (MW) /Schedule Date GUJARAT NIL CHHATTISGARH Marwa 1 2 500 500 May 2015 May 2015 MAHARASHTRA Dhariwal 2 300 Synd. On 23.04.2014 CHANDRAPUR 8 500 Synd. On 11.01.2015 CHANDRAPUR 9 500 September 2015 KORADI 8 660 April 2015 KORADI 9 660 August 2015 KORADI 10 660 March -2016 PARLI 8 250 December 2015 APML MADHYA PRADESH Singhaji TPS 5 660 COD on 11.10.2014 2 600 Commissioned on 15.10.14 M/s Jhabua Power, Seoni 1 600 Jaiprakash Power, Nigri 1 660 Jaiprakash Power, Nigri Moser Bear (Hindustan power) Moser Bear (Hindustan power) EssarPower MP ltd (Mahan) 2 1 2 660 600 600 1 600 March – 2015 Synchronized on 3.09.14 COD on 17.9.14 March 2015 March – 2015 December 2015 Synchronized on 24.04.13 468th OCC MINUTES 16 EssarPower MP ltd(Mahan) Jhabua Power BLA CENTRAL SECTOR/IPP KSK KSK ACBIL SASAN SASAN Sasan Dgen Dgen Dgen 2 1 2 600 600 45 March 2015 March 2015 June 2015 2 5 600 600 1 5 6 4 51 52 53 300 660 660 660 400 400 400 March 2015 March 2015 March 2015 Synchronized in 22.08.2014 March 2014 Synchronized in May 2014 COD on 11.12.2014 COD on 11.12.2014 COD on 11.12.2014 Sub-committee noted as above. ITEM NO. 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN All the constituents are requested to submit the CMP report for the Third quarter (October 2014 to December 2014) for the year 2014-15. Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 29 stations capable of black start. As per section 5.8(b) of IEGC, “…the Diesel generator sets for black start would be tested on weekly basis& the test report shall be sent to RLDC on quarterly basis.” The list of stations in WR for black start with current status is enclosed at Annexure 8.1. The Sub-Committee noted as above. ITEM NO. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR Status of physical & cyber security in Power Sector for the Third quarter (October 2014 to December 2014) have not been received from some of the constituents. The Sub-Committee noted as above. ITEM NO. 8.3 BUS VOLTAGE DIP IN 220 KV SWITCHYARD & DISTURBANCE IN ELECTRICAL BUSES & GENERATOR : OS, NPCIL Kakarapara intimated that on 19/01/15 voltage dip occurred twice at 08:40 hrs and 08:41 hrs respectively. As per Disturbance Recording System (DRS) first time voltage dipped by 9kV, second time voltage dipped 468th OCC MINUTES 17 b 23 kV. SLDC wa by as contacted & as per them m fault occcurred att Haldarw wa e end (Halda arwa- GE EPCO line e).As per DTR, fau ult persistted for 400msec 4 & fo ollowing are a the ob bservationss from DT TR. 1) R ph hase grid voltage diipped from m 225 to 153 KV. 2) Hal 1 and 2 cu urrent increased to 650A from m -56A. 3) nerator cu urrent inccreased frrom 8500 amps to 13000 amps (Stattor Gen current limiter 92 240 A) nerator terminal volttage dippe ed to 13.8 8 KV from 15.8 KV. 4) Gen 5) SUT T fed bus-B B&C/G &H H voltage dipped to 5.25 KV ffrom 6.6 KV. K 6) UT fed f bus-A//F voltage dipped to o 5.56 KV V from 6.6 KV. Sim milar incide ent also occurred o o 04/12/2 on 2014 whe en bus vo oltage dip p from 220 0 KV to 188 KV V occurred d on 1616 6 hrs & on 28/12/201 14 at 105 54 hrs. Thiss type off disturbances in grid volta age & ge enerator p parameters exp pected at KAPS be ecause off transmission are no ot line isolation during fault & in thiss case fau ult persistted for lo ong time (400msec) ( . The e Sub-Com mmittee discussed d d the mattter & sug ggested to o refer it in a PCM M for furtther delibe eration as s more info ormation is required to analy yse the inc cident. ITE EM NO. 9 : ITEMS S FROM WRLDC: W : 1. OPERATIONAL DIS SCIPLINE • The sta atus of com mpliance to o DSM reg gulation by major Stattes of Wes stern Regio on is as given below w: 468thh OCC MINU UTES 18 The e sub-com mmittee no oted as ab bove. 2. Schedulin ng of NTPC Coal Firred Stations In liine with the e decision n taken in the t 467th OCC O meeting, WRLD DC has cre eated a sep parate web bpage on its website to t facilitate e beneficiaries in sen nding their requisition ns as per p their de ecision takken the OC CC meeting g. The web bpage show ws the follo owing figu ures for eacch 15-minu ute time blo ock: - Declare ed Capability of ISGS S in MW - Entitlem ment of the e beneficia ary computted from th he DC in MW - Requissition receivved from the benefic ciaries in MW M - Requissition receivved from the benefic ciary as % of its entitlement - Injectio on Schedule (Summa ation of the e Requisitio ons) in MW W - Injectio on Schedule as % of Declared Capability The e URL: http://wrldc..in/WebPublish/ISGS S_SurplusP Perc.aspx Alte ernate URL L: http:///wrldc.com m/WebPublish/ISGS_ _SurplusPe erc.aspx Hen nce, the scheduling s g coordina ators of Discoms / SLDCs ass well as Generatin ng Sta ations can transpare ently see the entittlement, re equisition and sche edule of all a Ben neficiaries// ISGS in R0, R R1 and d other sub bsequent re evisions. All cases, where Requissitions sen nt by SLDC Cs are in deviation d frrom the de ecision take en in 4 467th OCC or cases where the e ISGS exp presses re eservationss in their schedule s a are 468thh OCC MINU UTES 19 flagged by WRLDC to the concerned SLDCs with copy to the respective ISGS along with an advice to SLDCs to review their requisitions. The WRLDC & NTPC intimated that they were still facing the problem in implementation of methodology /decision taken in 467th OCC meeting & getting unreasonable schedule. Member Secretary WRPC stated that the matter will be taken up in ensuing WRPC meeting. The sub-committee noted as above. 3. CERC order in petition No. RP/06/2014 in the matter of review petition filed by Tripura State Electricity Corporation Ltd (later joined by M.P.) on Deviation Settlement mechanism Hon’ble CERC vide its order dated 20.01.2015 in petition No. RP/06/2014 has granted relaxation in regulation 5 (1) (iii), 5 (1) (iv) and regulation 7 (3) of the DSM regulation in respect of the utilities having schedule of 400 MW or below w.e.f. 2nd February 2015. In compliance with the CERC directions the aforesaid CERC order has been uploaded on the WRLDC website and is available at the following URL: http://wrldc.in/docs/CERC%20Order%20on%20DSM_Tripura%20State%20Ele ctricity%20Corporation%20Ltd.pdf Alternate URL http://wrldc.com/docs/CERC%20Order%20on%20DSM_Tripura%20State%20E lectricity%20Corporation%20Ltd.pdf a) The salient features of the above order are: The relaxation of Regulations 5 (1) (iii), 5 (1) (iv) and Regulation 7 (3) of the DSM Regulation in respect of utilities having schedule of 400 MW or below with effect from 2nd February, 2015 as under:- a. In case of utilities having schedule of 400 MW or below, Deviation Charges shall be receivable: (i) for under-drawal upto 48 MW in relaxation of Regulation 5 (1) (iii) of the DSM Regulations, and (ii) for over-injection upto 48 MW in relaxation of Regulation 5 (1) (iv) of the DSM Regulations. The sub-committee noted as above. 468th OCC MINUTES 20 4. DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS (FIRST AMENDMENT) REGULATIONS, 2014 DATED 18TH DECEMBER’ 2014 As per the amendment the over drawl / Under Injection at Frequency less than 49.7 Hz is Not Permissible. Likewise Under drawl / Over Injection at Frequency more than 50.1Hz is Not permissible. Summary of DSM regulation from the Grid operation prospective is tabulated below : Frequency Range F < 49.7 Over Drawl Under Drawl Under Injection Over Injection X Not Allowed ✓ X Not Allowed ✓ 49.7 ≤ F <49.9 ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit 49.9 ≤ F <50.05 50.05 ≤ F < 50.1 50.1 ≤ F ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit ✓ X Not Allowed ✓ X Not Allowed Deviation Limit: 12% of Schedule or 150MW whichever is less. ( Relaxation upto 48MW for Schedule ≤ 400MW) The sub-committee noted as above. 5. FAILURE IN ULDC TELECOMMUNICATION SYSTEM RESULTING IN NONAVAILABILITY OF REAL-TIME DATA FOR PROLONGED PERIOD IN THE MONTH OF JANUARY-2015 a) Due to failure of MUX cards at Bhatapara since 11:10 Hrs of 24-jan to 13:26 of 27-Jan, the entire data from Raipur (which is a major concentration point) stopped coming. All RTU’s data from Bhadrawati, Raipur, Parli, GMR, Seoni, Sipat, Bilaspur, Wardha was not available at WRLDC. Complete Chhattisgarh area data was not available. The observability of nearly 10,000 MW was not available at WRLDC control room. b) Again, there was a MUX card failure at Indore POP at 1500 Hrs. of 27-Jan to 11:40 of 29-Jan. Madhya Pradesh and Chhattisgarh area data was not visible. The Indore POP handling about 25,000 MW, causes complete darkness and we are operating in a blind mode. c) Generation of 300MW at Sipat in W3 area was not visible from 22:45hrs of 22Jan-15 to 11:40hrs of 29-Jan at WRLDC, which causing serious inconvenience 468th OCC MINUTES 21 to Grid operation and endanger the Grid security. It is requested to look in to the issue and may kindly resolve the same at the earliest. d) The nodal officer on behalf of POWERGRID may be identified for resolution above such operational issues. The issue of reliability and redundancy of communication channels used for telemetry of data from stations to SLDC/RLDC/NLDC is being deliberated in the OCC forum. There is a need for assigning higher priority by the concerned utilities in this regard. In this matter a meeting was taken by Chairperson CEA on 28th January 2015 wherein the need for ensuring reliable telecommunication up to 33 kV level was emphasized. The constraints experienced during system restoration due to failure of communication system during Cyclone storm Hudhud was discussed in detail. During the meeting it was decided that optical fiber connectivity upto 33kV is desirable to enhance redundancy in day to day operation, beside help in early restoration during natural calamity. It was also decided that all new substation below 132kV should have optical fiber connectivity. Members deliberated on the following issues: 1. Monitoring ULDC telecommunication system by respective utilities 2. Nomination of nodal officers by POWERGRID for resolution of issues and coordination in related with telecommunications 3. Providing redundant communication channel for speech and data transfer from major stations to SLDCs and WRLDC. 4. Providing optical fibre connectivity at all new 132 kV substations. DGM, WRLDC intimated that the following executives from WRLDC & PGCIL would be coordinated for resolution of issues related with telecommunications 1. Smt Sachala Mishra / Smt Jyoti Sharma WRLDC 2. Sh RJ Dubey DGM WR-I Nagpur 3. Dr RK Dubey WR-II Asst GM Vadodara (unless any new name suggested by WR II) 4. Sh RK Agrawal DGM - Powergrid Chhatishgarh System. 468th OCC MINUTES 22 He further informed that because of the radial nature of ULDC communication, any single failure in the chain, data transmission to WRLDC and reverse transmission to SLDCs gets interrupted. The same has been discussed for the Maharastra data loss during 24-27 January due to ULDC link failure at Bhatapara / Indore causing a major deviation on the DSM. WRLDC has submitted a proposal for communication patch up between ULDC and Powergrid Telecom and also has been appraised to POWERGRID LD & C to implement. WRLDC requested WR I / II to implement the communication patch up at all wide band location where both ULDC and POWERGRID Telecom co-exist. State utilities may approach above coordinating officer in case of failure of data in real time for prolonged period. The sub-Committee noted as above. 6. SECURE EVACUATION FROM SASAN-VINDHYACHAL COMPLEX Sasan UMPP has an envisaged capacity of 3960 MW. Presently Five units of Sasan are commercially in operation (3300 MW). The COD process of 6th Unit has also started. The installed capacity at Vindhyachal-I, II, III and IV is 4260 MW. This includes 2x500 MW units of Vindhyachal-IV. The total generation at Sasan and Vindhyachal complex is around 8220 MW. The present position of the envisaged transmission system for evacuation from Sasan-Vindhyachal complex is as under: S No. Element Name Status 1 765 kV Sasan-Satna ckt-1 In operation 2 765 kV Sasan-Satna ckt-2 In operation 3 2x1000 MVA, 765/400 kV ICT at Sasan In operation 4 765 kV Sasan-Vindhyachal Expected in March’2015 5 765 kV Vindhyachal-Satna ckt-1 Expected in March’2015 6 765 kV Vindhyachal-Satna ckt-2 Expected in March’2015 7 2x1500 MVA, 400/765 kV ICT at Expected in March’2015 Vindhyachal PS 8 765 kV Gwalior-Jaipur Representative from POWERGRID, Expected in March’2015 WR-II had intimated that 765kV/400kV Vindhyachal pooling station is in advance stage of commissioning and expected by 468th OCC MINUTES 23 end of Feb 15. The following are the sequence for charging of various elements associated with Vchal pooling stations: Existing contingency arrangement: 1. Circuit no. 1 of 400kV V’chal (NTPC) – V’chal (Pooling) is connected to Rihand (NTPC) (interconnection between WR & NR) 2. Circuit no. 2 of 400kV V’chal (NTPC) – V’chal (pooling) is connected to Sasan UMPP bypassing V’chal (Pooling) station 3.. Circuit no. 1 of 400kV Sasan UMPP – V’chal (Pooling) station is connected to Rihand (NTPC) by passing V’chal (pooling) and presently line is kept open at both ends. Proposed arrangement 1. Circuit no. 1 of 400kV V’chal (NTPC) – V’chal (Pooling) shall remains connected to Rihand (NTPC) (interconnection between WR & NR) 2. Circuit no. 2 of 400kV V’chal (NTPC) – V’chal (pooling) shall remains connected to Sasan UMPP bypassing V’chal (Pooling) station. However, shutdown is proposed on 24.02.15 & 25.02.15 for connecting 400kV Sasan – V’chal (pooling) Ckt.1 from loc.no. 12/0. 3. First time charging of 765/400kV V’chal (pooling) station through charging of 400kV Sasan – V’chal (pooling) Ckt.1 from Sasan end (extending from loc.no.12/0 to pooling station). 4. First time charging of 765/400KV ICT # 2 at V’chal (pooling) station. 5. First time charging of 765kV V’chal (pooling) – Satna Ckt. 1. 6. First time charging of 765kV V’chal (pooling) – Satna Ckt. 2. The line diagram for above arrangement is attached at Annexure 9.6. The sub-Committee noted as above. 468th OCC MINUTES 24 7. Reliability of DG set at Blackstart stations During the workshop on Western Region Recovery Procedure, the agreed on the need for having reliable auxiliary supply for success of black start. Accordingly the matter was discussed in 467th OCC meeting wherein it was decided that the station having black start facility shall have at-least two DG sets for reliability and redundancy of DG set. The list of 23 stations having single DG set along with make and year of Manufacturing are given below. Stations with only one DG set Year S No Station Name Make Madhya Pradesh 1999 1 Pench CUMINS INDIA PVT. LTD. 1999 2 Bargi Cumins India Ltd. Pune 2005 3 Medikheda Cromption Greaves 2005 4 Tons(Bansagar) Cromption Greaves 1995 5 Rajghat KIRLOSKER ELECTRICAL ltd 1958 6 GandhiSagar KATO ENGINEERS 2014 7 Birsinghpur HBL Gujarat 1990 8 GPEC(CLPIPL) Caterpiller Model No. 3608 1991 9 GIPCL-I KIRLOSKAR CUMINS LTD 1987 10 Ukai (H) Kirlosker Electric Co.Ltd 1983 11 Mini Hydro Jyoti Ltd.,Baroda 1990 12 Kadana KIRLOSKAR CUMINS LTD 1991 13 KAWAS Ceglec Ltd. 1994 14 GANDHAR Niigata Engg,Japan Maharashtra 1992 15 Khopoli CUMINS INDIA PVT. LTD. 1997 16 Bhivpuri Catter Pillar 2002 17 Bhira Catter Pillar 1994 18 Bhira PSS CUMINS INDIA PVT. LTD. 1993 19 Trombay Kirloskar 1958 20 KOYNA I & II AEG (Made in Germany) 2006 21 URAN Kirloskar 1991 22 Paithan Kirloskar Chhattisgarh 1996 23 Hasdeo Bango CUMINS INDIA PVT. LTD. The sub-committee noted as above. 8. TESTING AND COMMISSIONING OF NEW GENERATING UNITS IN WESTERN REGION 468th OCC MINUTES 25 As per the available information at WRLDC following units are expected to inject infirm power as part of Testing and commissioning activity for Capacity addition in FY 2014-15.. 1. SASAN UMPP Unit-6 ( 660MW already synchronized) 2. Maruti Clean Coal ltd unit-1 ( 300MW expected on 11/02/2015) 3. Jaypee Nigrie Unit-2 ( 660MW expected on 11/02/2015 ) 4. RKM Power Unit-1 ( 600MW expected on 14/02/2015) Many more units which are planned for commissioning as indicated in Item 7.3-B may add to above list. Other entities may also furnish the details of generating units expected to be under performance test in Feb’15 and March’15 alongwith plan for injecting infirm power into the grid for testing etc so that the infirm power from these units be staggered to avoid any high frequency operation. 9. Extension of start-up supply to large Power station during system restoration A) CGPL UMPP The issue of extending startup supply to CGPL UMPP was discussed in 465th 466th and 467th OCC meeting. It was decided that GETCO, WRTS-II and CGPL officials would visit the site and assess the feasibility of connectivity between CGPL Mundra and 220kV Nanikhakar line for drawing start-up supply under contingency situation. It was also suggested by members and agreed by CGPL Mundra that they would submit a detailed plan to avail start-up power by following alternative methods (used under contingency condition only) a) Interconnection of APL and CGPL b) From 220kV Nanikhakar of GETCO CGPL has confirmed vide its letter dated 29th Jan 2015 that a meeting was held between SLDC Gujarat and CGPL on 10th Jan 2015. The CGPL proposal is as under: 1. GETCO may install 220/400kV ICT of appropriate rating at CGPL Mundra for getting power from 220kV Nani-Khakhar CGPL line. CGPL start-up power requirement would be app. 60MW at 400kV level. 2. Power at 400kV level can be extended to CGPL from Bhachau-CGPL Mundra line which is shortest line to CGPL(approx 110km). Bhachau(PGCIL) 400kV S/s may be charged from 220/400kV ICT at Bhachau or from 400kV VadaviBhachau line or 400 kV Varsana-Bhachau line. 468th OCC MINUTES 26 CE SLDC Gujarat suggested following two alternatives for black-start facilities at CGPL UMPP: 1. Installed the diesel power captive plant of capacity of 60 MW. 2. Be a HT consumer of PGVCL having contract demand of 60 MW for which CGPL has to pay PGVCL. After agreement GETCO shall be provided the necessary transformer etc. Member Secretary, WRPC stated that purchasing of 60 MW rating diesel plant may be too costly, therefore second alternative would be better for CGPL. The sub-committee noted as above. 10.Utilization of available capacity in Pump Storage Hydro Plants in Western Region Western Regional Grid has seen a dramatic increase in the installed capacity of thermal stations, large-scale integration of renewable energy sources and large variation in peak and off-peak demand. The emerging challenges in grid operation call for enhancing the flexibility of generation and explore possibility of energy storage. Operation of available capacity of Pumped Storage hydro plants in pumping mode would provide the following advantages: a) Would enable storage of electrical energy into potential energy during off-peak hours for utilization during peak hours b) Provides a dynamic load during off-peak hours and thus helps in reducing difference between Maximum and Minimum Load in the system c) Limits the quantum of variation in despatch schedule of thermal stations, thus would help in enhancing efficiency of thermal stations d) Would provide spinning reserve in the grid due to its flexibility to quickly change over from motoring mode to generation mode e) Would help in voltage and power factor correction f) Improved System Reliability The above benefits are elaborated in detail in the CBIP Publication No. 265 titled “Pumped Storage in India” published in Nov 1997. There was a discussion on the above issues during the 467th OCC meeting and there was a consensus on the need for full utilization of available capacity of pumped 468th OCC MINUTES 27 storage hydro plants in Western Region. The status of pumped storage hydro capacity in Western Region is as under: Capability of working Station Capacity State Year in pumping mode 1 Paithon Whether being operated in pumping Availability of Telemetry mode Yes SLDC No 1x12 Maharashtra 1984 2 Ujjaini 1x12 Maharashtra 1990 Yes 3 Bhivpuri 1x90 Maharashtra No 4 Bhira 1x150 Maharashtra Yes No No 5 Ghatghar 2x125 Maharashtra Yes Yes No (Jayakwadi) Kalwa to Tail 6 Sardar Sarovar 6x200 confirm No No race Yes reservoir Gujarat to be completed 7 Kadana-I 2x60 Gujarat 8 Kadana-II 2x60 Gujarat 1990 Yes No No 1995- Yes No No 96 The CEA report on “Large Scale Grid Integration of Renewable Energy Sources- Way Forward” issued in November 2013 also emphasizes the need for exploitation of pumped storage hydro stations. The report lists various existing and envisaged PSP schemes in all the States. SLDC-Kalwa to update the following - Status of operating Paithan and Ujjaini hydro plants in pumping mode - Status of operating hydro stations of Bhira and Bhivpuri in pumped storage mode. Constraints if any may be elaborated - Status of completion of PSP scheme in 2x40 MW Koyna left bank, 700 MW Malsej Ghat, 400 MW Humbarli NCA may update the progress of construction of tail race reservoir in SSP 468th OCC MINUTES 28 SLDC Gotri may update the status of healthiness of Kadana PSP (4x60 MW). Constraints if any may be elaborated. SLDC MP representative informed that there is no hydro project like Mara (1100 MW) and Binauda (2250 MW) as mentioned in agenda in Madhya Pradesh. Member(Power), NCA informed that the construction of tail race reservoir in SSP would take around 18 months from now and will be discussed in next power sub-committee of NCA & commercial modalities would be also discussed. Member Secretary, WRPC stated that in order to ensure balance between load and generation, the generation is required to be backed down during off-peak hours and picked up during peaking hours. The difference of demand at Peak & off-peak hours is around 12000 MW. These emerging challenges in grid operation call for enhancing the flexibility of existing fleet of conventional generation and also exploit the available facilities for energy storage and spinning reserve in the form of Pumped Storage hydro stations. The uses of PSP will definitely help in load flattering and smooth operation of grid. He further informed that the matter will be discussed in the 28th WRPC meeting to be held on 3rd & 4th March, 2015 at Udaipur. The sub-committee noted as above. 11. Review of ATC/TTC for each state control area in Western Region. As per the CERC regulations on congestion alleviation in real-time TTC/ATC is to be computed by SLDCs for their States. The need for assessment of import/export ATC for each state was emphasized CERC order on Grid Disturbance of July 2012. The assessment of TTC/ATC for in a meeting taken by Member (GO&D), CEA on 29th Oct 2014. There was a consensus on the issue in the 13th FOLD meeting held on 11-Dec14. 468th OCC MINUTES 29 The matter was further discussed in the 464th, 465th, 466th and 467th OCC meeting. It was decided to have joint study with SLDCs to identifying measures to enhance import/export limits from the grid. One day workshop on TTC/ATC was conducted with nominated representatives from SLDCs and WRPC on 17-Dec-14 at WRLDC, where methodology of TTC/ATC computation was explained and the need for computing TTC for each state control area was emphasized. A hand on training was given to all participants and study cases were shared. SLDC, MSETCL vide letter dated 12.02.2015(Copy enclosed at Annexure – 9.11) intimated that they have not accepted reduced ATC of 6300 MW calculated by WRLDC inspite of commissioning of many new lines and ICTs Maharashtra system. Due to reduced ATC they are facing problem to procuring the power and also during ensuring high demand power the reduced ATC will be a matter of serious concern. Member Secretary stated that the assumptions of WRLDC for arriving at 6300 MW ATC can be verified/re-checked by MSETCL and if any suggestions are there WRLDC should accommodate the same . In this regard it is requested that MSETCL and WRLDC would jointly look into calculation and sort all the matter and revert to OCC. The sub-committee noted as above. 12. Testing of SPS envisaged for SR-NEW grid operation The matter has been deliberated in different OCC’s as well as PCM. In 27th TCC/WRPC, POWERGRID stated that signal was extended to all envisaged generator, accordingly mock trial of SPS was conducted on 1st December-14 and result was shared with the members in 466th OCC. The following is present status of the progress of the activities. Responsible Agency KWPCL/DB Power 468th OCC MINUTES Progress stated in 468 meeting of OCC POWERGRID has extended SPS signal upto KWPCL and DB Power. Wiring for generation reduction within the Station to be completed by respective Stations Pending Action KWPCL and DB Power to complete the wiring for generation reduction within their station. 30 POWERGRID BALCO wiring is completed POWEGRID to complete and LANCO wiring will be the wiring for extending the completed by 28-Feb-15. SPS signal to LANCO Extension of signal from JPL to JPL Extn. has been completed by Jindal. JPL MSETCL and POWERGRID MSETCL and POWERGRID NIL - MSETCL to coordinate with POWERGRID for extending SPS signal for 250 MW Load Shedding OR 250 MW generation increase at Koyna Hydro - MSETCL to coordinate with POWERGRID for extending SPS Signal at IEPL, Koradi , Khaparkheda, Chandrapur The sub-committee noted as above. 13. Implementation of the revised AUFLS in DD and DNH MSETCL have revised its quantum of load relief in all stages of AUFLS scheme and submitted the updated revised quantum of load relief with feeder details. The updated AUFLS scheme of Western Region is as follows. Western Region Stage - I 49.2 Hz States Stage - II 49.0 Hz Stage - III 48.8 Hz Stage - IV 48.6 Hz Implement Required Implement Required Implemen Required Implemented Required ed Load Load ed Load Load ted Load Load relief Load relief Load relief relief relief relief relief relief GUJARAT 580 773 580 726 580 1117 590 1025 MADHYA PRADESH 460 468 460 450 460 460 465 490 CHATTISGARH 150 110 150 114 155 117 155 91 MAHARASHTRA 805 1122 810 1215 815 1044 820 1071 25 10 25 * 25 15 25 * 25 15 25 * 25 15 25 * GOA UT: DD UT: DNH Total load relief 30 * 30 * 35 * 35 * 2060 2497 2070 2530 2085 2763 2105 2702 * UFRs under procurement DNH has informed in 465th OCC that work order has been placed and the agency has been deployed for implementation. It was informed by DD that re-tendering for the relays started on 7th November, 2014 468th OCC MINUTES 31 GOA, DD and DNH representative were not present in the meeting. 14. Status of telemetry in Western Region Detail Summary of Telemetry Status. S No 1 2 3 4 5 6 7 Telemetry not available 400kV Warora 400kV Lonikhand(New) 400kV ChandrapurStgII 400kV Taptithanda 400kV Khaparkheda 400kV Deepnagar Further, 17more stations where 220kV station data is not available Telemetry Updated in 467th Intermittent OCC Maharashtra Total 48 Stations 220kV data is intermittent Updated in 468th OCC Mar-15 Mar-15 Work is under progress. SCADA based System Station not Commission Gujarat 1 220kV Bhatiya 2 220kV Mokha. 220kV Navsari(Getco) Madhya Pradesh 468th OCC MINUTES 32 S No 1 2 Telemetry not available 220kV Dhar 220kV Panagar 36 Station of 132kV where Telemetry is not available 1 1 2 220kV Amona 220kV Cuncolim 1 2 3 Telemetry Updated in 467th Intermittent OCC 220kV Anuppur Work is under 132kVWaidhan progress. 132kVMorwa Chhattisgarh 19 Station of 132kV where Telemetry is intermittent GOA 220kV Tivim, 220kV Ponda, Not Updated 220kV Xeldam 110 kV Kadamba 110kV Verna DD and DNH 220kV Magarwada. 220kV Kharadpara 220kV Khadoli Updated in 468th OCC March-15 March-15 Check and update the status Not Updated Not Updated Not Updated Updated Completion date in 467th OCC Updated Completion date in 468th OCC 31-Jan-15 31-Jan-15 28-Feb-15 28-Feb-15 - Completed Completed 28-Feb-15 28-April-15 - 28-Feb-15 28-Feb-15 31-Mar-15 31-Mar-15 POWERGRID S Nos 1 2 3 4 5 Station Intermittent Telemetry Telemetry Status 765kV Kotra 765kV Tamnar 400kV Navsari 765kV Dharamjaygarh 400kV Magarwara PMU Data 1 Satna PMU data at WRLDC Alternate 2nd Channel 1 Aurangabad alternate 2nd channel IPP S Nos Station Intermittent Telemetry 1 JPL 468th OCC MINUTES Updated Completion date in 467th OCC Updated Completion date in 468th OCC Not Updated Work is in Progress 33 2 ESSAR Mahan Not Updated Within Week Alternate 2nd channel-- Redundant Comm. Channel S No Redundant Comm. Channel Completion date in 467th OCC update Completion date in 468th OCC update 1 2 3 APL Tiroda CGPL SASAN UMPP 28-Feb-15 31-Jan-15 31-Jan-15 28-Feb-15 Software Modification Not informed 15. ADMS(Automatic Demand Management Scheme) Implementation as per Sec. 5.4.2 of IEGC: Gujarat have submitted the updated status of ADMS implementation as on 31.01.2015. Progress Report as on 31.01.15: • The hardware for control centre and field have been received. • Survey work of all selected sites completed. • • Communication has been established between SLDC and Load Management Units of Discoms. Field device installation work is under progress at different sites. • Project completion date is by 31st March,2015 SLDC GETCO have intimated the progress of ADMS in WR as on 31.01.2015 is attached at annexure 15. Member Secretary WRPC requested to expedite the project & submit the present status to WRPC/WRLDC in prescribed format. The sub-Committee noted as above. 16. Non availability of Bus bar Protection at 400 KV Korba (West) CSPGCL representative was not present during the meeting. 17. Lack of Bus bar protection for 220 kV Bus of Birsinghpur Thermal power station causing complete Blackout of 400 kV Birsinghpur Thermal station MPPGCL has informed in 466th and 467th OCC that equipment order has been placed on 27th November to GE and expected date of commissioning is by June’15. No representative were present during the meeting. 18. Failed Mock testing of SPS for 765 AGRA- GWALIOR on 24th December-14 468th OCC MINUTES 34 MS WRPC has taken up matter regarding non receipt of signals to Vindhyachal, Korba and CGPL with Powergrid and requested for early rectification. On confirmation, matter will be taken up with NRPC for further mock testing. Member Secretary, WRPC requested NTPC Vindhyachal, Korba, CGPL and Powergrid sit together & resolve the issue & suggested for again mock-test at the earliest. The Sub-Committee noted as above. ITEM NO.9A : Additional agenda items. 1. Replacement of porcelain disc insulators with composite polymer insulators in all polluted sections of lines in Gujarat POWERGRID, WRTS-II had informed that frequent tripping of various critical lines due to flashover of porcelain disc insulator strings were observed in various lines passing through highly chemical/industrial polluted areas in Central / South Gujarat, which affects the stability of integrity of system and may leads partial system disturbance. In view of above, it has been decided to upgrade the system by replacing all porcelain disc insulator strings with composite longrod (polymer) insulator strings in following lines, during March ‘15 to May ’15, to avoid such undesirable line trippings, on account of insulator failure. • 400kV Gandhar – Navsari Ckt. 1&2 • 400kV Navsari – Magarwada – Kala – Vapi Ckt. 1&2 • 400kV Pirana – Vadodara Ckt. 1&2 • 400kV Dehgam – Pirana Ckt. 1&2 • 220kV Kawas associated tr.lines (Balance portion) • 220kV Kakrapar associated tr.lines. • 220kV Vapi-Magarwada, Vapi- Karadpada & Vapi-Sayali- Khaodli Ckt. 1&2. 468th OCC MINUTES 35 All the constituents, WRPC and WRLDC were agreed for availing shutdown required for replacement of porcelain disc insulator strings with polymer composite insulators, in aforesaid lines. Sub-committee noted as above. 2. Delay in receipt of WRLDC code for online OPGW stringing works: POWERGRID, WR-II informed that the codes for online OPGW stringing works on various lines of WR-II is obtained in OCC meeting (from 07:00 hrs to 18:00 hrs). However, in recent past, it has been observed that in some of lines, the code issued by WRLDC for OPGW stringing works is too late which results poor progress and project getting delayed for completion. It is pertinent to mention that massive gangs have been mobilized on various lines to complete entire master communication project, by end of May 2015. OCC suggested WRLDC to ensure timely issuance of codes for facilitating early completion of project. ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING 468th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure10. Accordingly it was proposed to host 469th OCC by BDTCL/JTCL 10th & 11th March, 2015 at Nagpur. BDTCL/JTCL agreed for the same. The 470th OCC meeting would be hosted by NTPC HQ at Raipur/Mumbai on behalf of NTPC Vindhyachal. ****************************** 468th OCC MINUTES ANNEXURE-I LIST OF PARTICIPANTS OF 468th OCC MEETING OF WRPC HELD ON 16.02.2015 AT WRPC, MUMBAI Sl.No. Organisation, Name & Designation E-mail Mobile I 1 2 3 4 5 6 WRPC Shri S.D. Taksande, M.S. Shri M.M. Dhakate, S.E.(O) Shri Satyanarayan S., S.E. (Comml.) Shri L.K.S. Rathore, D.D. Shri A.C. Suresh, D.D. Shri Ratnesh Yadav, A.D. ms-wrpc@nic.in opc-wrpc@nic.in satyaguru@yahoo.com lksr_2000@yahoo.com acsuresh@yahoo.com 9820878384 9004087224 9223399938 9833371844 9969941273 8903929150 II 7 8 9 10 MSETCL / MSEDCL/MahaGenco Shri Jayant Weekey, C.E. Shri D.K. Rokade, S.E. Shri D.J. Kolhe, E.E. Shri Ajit Pachori, E.E. jayantweekey@gmail.com dkrokade@gmail.com deepakkolhe@yahoo.com 9819962321 9167831551 9820981115 9619461420 III 11 MPPTCL / MPPGCL Shri Sanjay Mehta, E.E. mehtasanjay67@yahoo.co.in 9425805017 IV 12 CSPTCL / CSPGCL Shri V.N. Singh, E.E. cseb.vnsingh@gmail.com 9425561160 V 13 GETCO / GSLDC/ GSECL Shri B.B. Mehta, C.E. bbm@gebmail.com 9879200736 VI 14 15 16 17 WRLDC / POWERGRID Shri J. James, G.M. Shri Kuleshwar Sahu, A.G.M. Shri P.R. Wankhede, D.G.M. Shri Abhimanyu Gartia, D.G.M. jebakerjames@gmail.com 9422808863 kuleshwars@gmail.com 9425294214 wankhede@powergridindia.com agartia@gmail.com 18 19 20 21 22 23 24 25 26 27 Smt. Pushpa S., C.M. Smt. S. Usha, C.M. Shri Vivek Pandey, C.M. Shri D. Bruhananda, Mgr. Shri Chandan Kumar, Eng. Shri Srinivas Chittari, Eng. Miss. Jyoti Shukla, Eng. Shri Mahendra Nath, Eng. Ms. Chitrankshi, Eng. Shri Abhishek Kr. Gupta, Dy. Mgr. pushpa_seshadri@hotmail.com 9869404482 usha_s_gopi@rediffmail.com vpandey76@gmail.com 9869404673 bruhananded@yahoo.com 9428504279 protectionwrldc@gmail.com srinivas.chittari@hotmail.com jyotisharma.22@rediffmail.com 9869082852 mahendranath.malla@gmail.com chitra_20j@yahoo.com abhishek_all@yahoo.com 9869404650 VII 28 29 30 31 NTPC Shri P.B. Behere, G.M. Shri E.P. Rao, A.G.M. Shri S.K. Shrivastava, A.G.M Shri A.K. Chandeliya, D.G.M. pbbehere@ntpc.co.in eprao@ntpc.co.in sksrivastava07@ntpc.co.in akchandeliya@ntpc.co.in 9004497088 9004497144 9425178069 9004497151 VIII 32 33 TATA POWER Shri R.M. Sankhe, Head Opn. Shri P.R. Gadave, A.G.M. rmsankhe@tatapower.com prgadave@tatapower.com 9099006541 9223553341 IX APL 34 35 Shri C.S. Bobade, G.M. Shri Akkshay Mathur, G.M. chandrashekhar.bobade@adani.com 8980802255 akshayv.mathur@adani.com 9870663062 X 36 37 38 39 RINFRA Shri Sachin Zirpe, G.M. Shri R.P. Singh, D.G.M. Shri Deepak Sankhe, D.G.M. Shri Vijay Chavan, Mgr. sachin.zirpe@relianceada.com 9322607630 rajendra.pr.singh@relianceada.com 9770010025 deepak.sankhe@relianceada.com vijay.chavan@relianceada.com 9320167746 XI 40 KSK Mahanadi Shri Manish Upadhyay, A.G.M. manishupadhyay.g@ksk.co.in 9630080704 XII 41 42 NPCIL Shri S.K. Maiti, SCE Shri A.A. Ansari, SCE skmaiti@npcil.co.in aaansari@npcil.co.in 9428821925 9423982716 XIII 43 44 45 46 47 48 ESSAR Shri Arvind Kumar, V.P. Shri Sachidanand Bhujale, CEO Shri Ashim Ganguly, Sr. Mgr. Shri D.J. Saxena, Sr. Mgr. Shri Kamlesh Garg Ashish Kakroo XIV 49 50 TORRENT POWER Shri M.H. Kshatriya, G.M. Ms. Snehal Shah, A.G.M. mhkshatriya@torrentpower.com 9227410148 snehalshah@torrentpower.com 9227250816 XV 51 JPL Shri Ashish Gera, A.G.M. ashishgera@jindalpower.com 7898905117 XVI 52 NHDC Shri Vinod K. Singh, Mgr. vinodnhdc@rediffmail.com 9425952513 XVII 53 RKM PPL Shri N. Krishna Kumar, D.G.M. krishnakumar.n@rkmpowergen.in 8435000264 XVIII 54 GMR GROUP Shri Pramod Khandelwal, G.M. pramod.khandelwa@gmrgroup.in8390903524 XIX 55 NCA Shri M.A.K.P. Singh, Member(P) makpsingh @yahoo.com XX 56 STERLITE Shri Sachin Deshpande, G.M. sachin.deshpande@sterlite.com 8966903047 XXI 57 RATTAN INDIA POWER LTD. Ms. Reena Kori, D.G.M. reena.kori@rattanindia.com arvind.kumar@essar.com sbhujale@essar.com aganguly@essar.com dsaxena@essar.com 9425066437 Anaulagnak 2.1 maah janavarI 2015 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa piScama xao ~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr ) ( FREQUENCY PARTICULARS DURING JANUARY 2015 (AS PER FREQUENCY REPORT OF WRLDC) 1. INTEGRATED OVER AN-HOUR ek GaMTo maoM samaakilat 1.1 MAXIMUM FREQUENCY AiQaktma AavaRi%t 1.2 MINIMUM FREQUENCY nyaUnatma AavaRi%t 1.3 AVERAGE FREQUENCY AaOsat AavaRi%t 2. INSTANTANEOUS 50.38 Hz. BETWEEN 0200 Hrs & 0300 Hrs Hrs. ON 02.01.2015 49.69 Hz. BETWEEN 0800 Hrs & 0900 Hrs Hrs. ON 25.01.2015 49.99 Hz. ta%kailak 2.1 MAXIMUM FREQUENCY AiQaktma AavaRi%t 2.2 MINIMUM FREQUENCY nyaUnatma AavaRi%t 3. %AGE OF TIME WHEN FREQUENCY WAS 50.56 Hz. AT 03:03:00 Hrs. ON 01.01.2015 49.55 Hz. AT 07:36:00 hrs Hrs. ON 15.01.2015 JANUARY 2015 DECEMBER 2014 NOVEMBER 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.61 1.00 0.41 16.85 22.85 16.08 53.73 48.29 53.60 28.81 27.86 29.90 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 AavaRi%t ka samaya p`itSat maoM 3.1 BELOW 48.5 Hz. 48.5 hT\ja ko naIcao 3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 48.5 hT\ja AaOr 48.8 hT\ja ko baIca 3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 48.8 hT\ja AaOr 49.2 hT\ja ko baIca 3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 49.2 hT\ja AaOr 49.5 hT\ja ko baIca 3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 49.5 hT\ja AaOr 49.7 hT\ja ko baIca 3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 49.7 hT\ja AaOr 50.2 hT\ja ko baIca 3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 49.9 hT\ja AaOr 50.05 hT\ja ko baIca 3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 50.05 hT\ja AaOr 51.5 hT\ja ko baIca 3.9 ABOVE 51.5 Hz. 51.5 hT\ja ko }pr 4.1 NO. OF TIMES FREQUENCY TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI 4.2 NO. OF TIMES FREQUENCY TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI 4.3 NO. OF TIMES FREQUENCY TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID) Western Regional Load Despatch Centre,Mumbai 2015 Voltage Profile during the month of January 2015 Annex-I Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Annex-2.3 इंदौर इटारसी कराड धुले असोज कासोर Indore Itarsi Karad Dhule Asoj Kasor जेतपुर Bhilai Jetpur Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv 424 423 420 421 422 420 422 417 419 419 421 419 422 422 421 421 420 419 420 423 421 422 422 424 420 419 419 417 423 422 420 424 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 398 399 402 402 403 404 402 399 407 398 400 398 419 419 416 416 416 417 416 415 415 416 417 417 416 416 417 417 415 414 416 417 416 416 416 415 416 414 413 416 416 416 414 419 400 400 398 399 394 396 397 410 410 397 395 397 396 396 394 394 392 392 394 390 390 391 397 390 396 398 395 397 394 391 393 390 440 438 438 439 440 439 435 422 439 440 440 439 440 440 438 438 439 437 437 436 440 438 439 439 439 440 436 437 438 436 437 440 415 412 408 413 417 409 417 422 422 413 412 415 413 413 414 414 407 406 412 410 409 413 410 408 411 419 411 410 412 407 408 406 435 435 432 434 434 430 431 426 430 431 432 428 432 432 433 433 434 432 433 432 430 433 432 433 434 432 425 433 429 430 429 435 403 397 398 399 401 394 391 412 414 401 399 398 396 396 395 395 396 388 395 393 394 394 393 391 392 399 398 399 396 394 394 388 424 424 421 423 423 419 418 419 420 420 421 421 420 420 426 426 422 420 421 419 420 420 421 422 423 423 423 421 421 420 420 426 406 403 403 407 403 402 399 414 415 404 405 403 406 406 407 407 403 401 400 402 401 401 401 406 403 409 405 398 404 402 403 398 421 421 418 420 420 419 420 415 417 419 420 420 420 420 420 420 418 419 419 420 420 420 420 420 421 421 420 421 420 420 418 421 409 405 406 406 406 405 403 412 413 406 408 406 404 404 406 406 405 406 402 406 406 405 406 406 409 408 407 404 406 406 406 402 426 408 407 408 411 408 407 405 416 419 407 408 410 409 409 407 407 404 405 404 404 405 407 409 405 406 411 407 406 405 405 405 404 414 419 412 418 416 413 414 412 415 415 414 415 413 415 418 417 415 417 414 414 414 407 416 417 418 420 418 417 415 414 414 420 403 400 395 402 401 395 401 400 402 402 404 402 401 398 406 403 402 399 400 402 401 403 404 406 403 405 404 406 405 403 403 395 भार सूचना , WRLDC, Mumbai MIS 423 421 423 423 422 420 420 422 421 422 419 422 422 423 423 421 420 423 420 422 422 421 421 424 424 423 419 419 419 419 426 Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Bina Gwalior नागदा खंडवा Nagda Khandwa Sipat seoni Bina Gwalior Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv 424 424 421 419 419 418 417 417 418 423 420 419 420 421 423 419 418 418 419 418 420 427 421 424 420 421 419 424 420 415 414 427 404 407 404 405 402 401 402 402 402 406 400 404 404 406 404 402 399 399 400 398 398 409 405 403 407 405 406 403 402 396 398 396 412 413 411 408 409 408 407 406 409 410 411 412 416 418 411 410 409 411 412 410 414 414 410 411 411 413 408 410 409 406 404 418 385 394 392 391 389 389 390 387 390 394 390 394 394 400 392 395 390 393 394 392 397 394 398 390 399 398 396 396 390 384 385 384 425 423 420 421 422 421 421 417 419 421 421 420 423 423 422 422 423 421 423 424 423 426 424 424 424 424 422 421 426 424 421 426 406 402 400 403 400 397 397 411 414 399 398 399 401 401 399 399 397 397 399 396 395 400 403 401 405 406 405 416 408 399 400 395 428 427 424 426 427 426 425 423 423 426 429 426 426 426 426 426 427 424 427 428 427 426 427 423 425 425 423 427 426 427 426 429 407 403 403 404 403 400 400 417 417 404 402 404 406 406 402 402 399 396 403 399 399 399 402 396 399 406 405 411 401 402 402 396 789 789 762 761 789 789 789 789 789 789 767 761 789 789 789 789 789 789 766 765 777 778 773 773 773 773 772 773 755 755 766 789 752 752 743 740 752 752 752 752 752 752 747 747 752 752 752 752 752 752 741 744 744 755 755 755 755 773 753 755 755 755 752 740 793 783 776 784 786 784 780 789 788 784 792 783 782 788 789 783 781 788 784 783 791 790 787 785 796 790 790 784 781 785 786 796 751 749 753 757 757 752 751 753 757 757 752 753 752 757 756 744 748 751 747 749 745 757 759 748 758 759 757 755 755 751 753 744 795 793 788 788 786 783 783 783 789 789 789 792 798 800 792 791 789 792 793 791 791 799 791 793 795 795 788 791 789 780 786 800 762 759 757 754 752 749 755 750 754 759 759 758 760 766 759 762 753 761 749 756 751 760 770 754 767 771 754 750 751 742 777 742 799 797 791 788 788 788 791 789 791 793 795 795 795 797 798 791 791 793 794 795 799 804 798 794 794 794 792 793 789 782 784 804 757 768 764 765 758 759 762 762 762 763 757 768 764 765 765 763 759 765 761 756 759 772 772 759 768 769 768 754 758 747 751 747 भार सूचना , WRLDC, Mumbai MIS ANNEX -2.4 Sl. No Under Frequency Operation in various Constituent System of Western Region during the month JANUARY 15 ( Compiled from the data received from the constituents) Date Gujarat Chhattisgarh Madhya Pradesh No. of Max Load Relief No. of Max Load Relief No. of Occasions at 49.2 Hz Occasions at 49.2 Hz Occasions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01-Jan-15 02-Jan-15 03-Jan-15 04-Jan-15 05-Jan-15 06-Jan-15 07-Jan-15 08-Jan-15 09-Jan-15 10-Jan-15 11-Jan-15 12-Jan-15 13-Jan-15 14-Jan-15 15-Jan-15 16-Jan-15 17-Jan-15 18-Jan-15 19-Jan-15 20-Jan-15 21-Jan-15 22-Jan-15 23-Jan-15 24-Jan-15 25-Jan-15 26-Jan-15 27-Jan-15 28-Jan-15 29-Jan-15 30-Jan-15 31-Jan-15 Recommonded Load relief at 49.2 Hz / 49.0/48.8/48.6 Hz 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 211.2 0 0 0 0 0 0 0 0 0 0 0 0 1025 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIL Max Load Relief No. of Max Load Relief at 49.2 Hz Occasions at 49.2 Hz 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIL 91 Maharashtra 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIL 490 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 851 Annexure -2.5 POWER CUT/RESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JANUARY-2015 k : gaujarat Gujarat 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM Power Cut/ Restriction on Industries a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday, then they will have to staggered on notified day only & cannot avail as per their choice. b) All industries are required to keep their recess timings staggered. 1 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit2. Power supply to Agricultural & Rural Sectors a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply during rest of 16 Hrs by providing LSTC. b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc ivaVut kTaOtI kI maa~a pabandI ka samaya ivavarNa Details Quantum of Restriction Timing power cut (MW) sao From tk To (a) Power Restrictions(Evening SaUnya Nil SaUnya Nil SaUnya Nil peak Hour) on non continuous process HT/LT IndustriesM (b) Baar inayamana Load Shedding (c) Anya jaanakarI Other information 1.Weekly Off 2.Staggering of power supply p`it idna kula }jaa- kTaOtI Total Energy Cut (MUs /day SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil 2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector: ivavarNa Details sao From idnaaMk Date 2.1 Three-Phase 01.01.2015 Supply(DLF) 2.1 Three-Phase Supply(Irrigation) 2.1 Three-Phase Supply(Mixed) tk To p`it idna AapUit- GaMTo Supply Hours per day idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs) 31.01.2015 23:38 21:52 23:22 01.01.2015 31.01.2015 10:13 09:10 09:49 01.01.2015 31.01.2015 23:29 21:34 23:13 3 Anya jaanakarI 3. Any other information SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM ivavarNa Details Scheduled Power cuts in Urban Areas sao From tk To idnaaMk Aaosat p`itidna Date idnaaMk Date AapUit- GaMTo Max. (Hrs) 3.1 Commissionary H. Qtrs. 3.2 District Head Qtrs. 3.3 Tehsil Head Qtrs. 01.01.2015 01.01.2015 01.01.2015 31.01.2015 31.01.2015 31.01.2015 23:50 23:53 23:51 Average Supply Hours per day Min. (Hrs) Average (Hrs) 23:20 23:28 23:09 23:42 23:47 23:41 ga : maharaYT/ Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc ivaVut kTaOtI kI maa~a pabandI ka samaya ivavarNa Details Quantum of Restriction Timing power cut (MW) From To (a) Power Cuts/Restriction on HT/ SaUnya Nil SaUnya Nil SaUnya Nil LT Industries (b) Load Shedding From 01.01.15 to 31.01.15 @ 0-837 MW (c) Any other information 1.Weekly Off 2. Staggering of power supply Industrial Staggering LS withdrawn from 03/02/2012 p`it idna kula }jaa- kTaOtI Total Energy Cut (MUs /day SaUnya Nil @ 3.1 MUs/day 00.00 24.00 SaUnya Nil SaUnya Nil SaUnya Nil tk To idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day SaUnya Nil 2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector ivavarNa Details sao From idnaaMk Date Max. (Hrs) 2.1 Three-Phase Supply Average (Hrs) 10:00 08:00 09:00 01.01.2015 31.01.2015 18:00 3 Anya jaanakarI Any other information: There is no load shedding on industrial feeders in Maharashtra 18:00 18:00 2.2 Single-Phase Supply 01.01.2015 31.01.2015 Min. (Hrs) Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc ivaVut kTaOtI kI maa~a Quantum of power cut (MW) ivavarNa Details pabandI ka samaya Restriction Time tk sao From To p`it idna kula }jaa- kTaOtI Total Energy Cut (MUs /day) (A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump* (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding 00.00(Av) - - - 00.00(Av) - - - 00.00 (Av) 113.51 (Av) of 31days 00.00(Av) 00.00 (Av) 17.00 - 23.00 - 0.681 - 1.Rural 80.06(Av) For 124.75 Hrs. 2.Town Feeders (C-1to C-6 & X) : 0.00(Av) - - 0.327 - 0.156 3. HT Industries 76.74 (Av) For 75.03 Hrs. Total Energy Cut/day ( b) Any other information 1.Weekly Off/staggering of power supply 1.146 1day (In a week as per consumer’s option) 50MW(Av.) - - 0.039 2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector ivavarNa Details 2.1 Three-Phase Supply 2.2 Single-Phase Supply 2.3 Remarks/Note/ sao From idnaaMk Date tk To idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) 01.01.2015 to 31.01.2015, 6.00 Hrs (Power cut) - 3 Anya jaanakarI / Any other information: SaUnya Nil - Min. (Hrs) Average (Hrs) 18.00 - - - संल नक Annex-2.6 अिनवाय यिु नट आऊटे ज का जनवर 2015 का व ता रत यौरा Details of forced unit outages during the month of Jan.2015 अनु क्रमांक युिनट Unit संघटक मता सo Constituent/IPP मेगावॉट Cap.MW समय Sl.No Time From िदनांक समय Date Date सo कारण From Reason िदनांक 1. Essar-2 GSECL 172 12:12 22-Feb-13 Still out Still out Shortage of gas 2. GTPS-2 GSECL 120 20:20 10-Oct-14 Still out Still out RSD 3. GTPS-1 GSECL 120 5:36 22-Oct-14 Still out Still out Flame failure 4. UTPS-1 GSECL 120 5:36 22-Oct-14 Still out Still out Flame failure 5. UTRAN STG-II -1 GSECL 375 8:43 22-Oct-14 Still out Still out RSD 6. SUGEN-2 GSECL 382 14:45 8-Nov-14 11:16 31-Jan-15 7. UTPS-2 GSECL 120 15:04 10-Nov-14 Still out Still out RSD 8. SLPP-1 GSECL 125 21:50 29-Nov-14 Still out Still out Gt-3 tripped on differential protection 9. GPEC-2 GSECL 218 12:15 22-Dec-14 6:58 16-Jan-15 RSD 10. DGBP-2 GSECL 107 19:02 22-Dec-14 9:12 19-Jan-15 RSD 11. STPS-2 GSECL 120 19:00 1-Jan-15 11:05 3-Feb-15 RSD 12. WTPS-6 GSECL 210 0:41 4-Jan-15 4:12 22-Jan-15 RSD 13. GTPS-3 GSECL 210 20:55 4-Jan-15 4:30 22-Jan-15 RSD 14. WTPS-5 GSECL 210 19:40 4-Jan-15 10:22 8-Jan-15 RSD 15. GPEC-3 GSECL 218 19:39 9-Jan-15 7:56 19-Jan-15 RSD 16. DGBP-1 GSECL 107 21:08 12-Jan-15 11:46 16-Jan-15 RSD 17. WTPS-2 GSECL 210 23:35 13-Jan-15 10:33 16-Jan-15 RSD 18. WTPS-5 GSECL 210 21:53 13-Jan-15 Still out Still out RSD 19. AECO-E GSECL 110 7:33 14-Jan-15 13:09 27-Jan-15 Turbine temperature High 20. SLPP-2 GSECL 125 07:25 17-Jan-15 16:58 20-Jan-15 BTL 21. DGBP-1 GSECL 107 19:43 17-Jan-15 Still out Still out RSD 22. GPEC-2 GSECL 219 11:46 20-Jan-15 10:33 2-Feb-15 RSD Electrical fault 23. SLPP-3 GSECL 125 1:15 21-Jan-15 1:21 24-Jan-15 BTL 24. UTPS-5 GSECL 210 0:11 22-Jan-15 Still out Still out AOH 25. GPEC-3 GSECL 219 19:31 22-Jan-15 8:50 2-Feb-15 RSD 26. SLPP-3 GEB 125 0:00 27-Jan-15 02:30 30-Jan-15 BTL 27. SUGEN-2 GEB 382 11:46 31-Jan-15 Still out Still out RSD 28. SLPP-2 GEB 125 21:00 31-Jan-15 4-Feb-15 BTL 29. TORRENT POWER -E TORRENT POWER 110 7:33 14-Jan-15 13:09 27-Jan-15 30. APL-1 APL 330 19:00 29-Dec-14 Still out Still out Coal shortage 31. APML-4 ADANI POWER 660 3:26 4-Jan-15 09:38 6-Feb-15 Valve leakages 32. Koradi-5 MAHAGENCO 200 10:30 17-Jun-14 Still out Still out ID fan problem 33. चंद्रपुर C'PUR-1 MAHAGENCO 210 7:15 28-Aug-14 Still out Still out Economy shutdown 34. BHUSAWAL-2 210 12:43 13-Sep-14 Still out Still out Economy shutdown 35. WPCL-1 135 0:43 30-Oct-14 Still out Still out ESP belt damage 36. INDIABULLS(A)-2 INDIABULLS 270 16:16 30-Oct-14 1:07 25-Jan-15 37. INDIABULLS(A)-1 INDIABULLS 270 21:55 27-Jan-15 Still out Still out MAHAGENCO MAHAGENCO 12:30 Turbine temperature High Electrical protection Coal shortage 38. URAN-7 MAHAGENCO 108 4:49 28-Dec-14 21:06 27-Jan-15 Boiler validity expire 39. JAIGAD - 2 MAHAGENCO 300 20:57 2-Jan-15 18:50 14-Jan-15 Less schedule 40. NASIK - 5 MAHAGENCO 210 19:55 2-Jan-15 7:10 5-Jan-15 ID fan problem 41. BHUSAWAL-3 MAHAGENCO 210 0:36 20:15 10-Jan-15 BTL 42. C'PUR - 3 MAHAGENCO 210 23:38 9-Jan-15 14:48 14-Jan-15 BTL KHAPERKHEDA-4 MAHAGENCO 210 22:03 9-Jan-15 7:30 12-Jan-15 Turbine maintenance 210 8:23 11-Jan-15 7:41 18-Jan-15 BTL MAHAGENCO 108 6:40 12-Jan-15 8:43 26-Jan-15 Gas shortage CHANDRAPUR-4 MAHAGENCO 210 23:03 18-Jan-15 8:07 21-Jan-15 BTL 20.02.15 BTL 43. 44. BHUSAWAL-3 45. URAN-8 46. MAHAGENCO 4-Jan-15 47. B'WAL-3 MAHAGENCO 210 8:01 20-Jan-15 48. PARAS-4 MAHAGENCO 250 15:45 20-Jan-15 11:27 25-Jan-15 GT LV side testing 49. K'KHEDA-5 MAHAGENCO 500 19:22 22-Jan-15 21:29 27-Jan-15 BTL 50. B'WAL-5 MAHAGENCO 500 13:50 25-Jan-15 18:03 3-Feb-15 BTL 51. URAN-8 MAHAGENCO 108 15:08 26-Jan-15 19:48 2-Feb-15 Tripped due to jerk of tripping of 220kv lines 52. URAN-5 MAHAGENCO 108 23:57 27-Jan-15 18:45 31-Jan-15 Generator trip 53. WPCL-3 IPP 135 14:02 25-Dec-14 0:55 26-Jan-15 ID fan problem 54. WPCL-4 IPP 135 22:27 25-Jan-15 Still out Still out ID fan problem 55. DAHANU-2 Reliance Energy 250 1:55 4-Jan-15 Still out Still out Stator earth fault 56. SASAN - 1 REL 660 11:23 13-Jan-15 19:52 31-Jan-15 Ash evacuation problem 57. SASAN - 4 RELIANCE ENERGY 660 12:51 13-Jan-15 11:17 26-Jan-15 Ash evacuation problem 58. RGPPL-1B RGPPL 320 23:00 31-Mar-14 Still out Still out Dry preservation 59. RGPPL-3A RGPPL 320 18:57 17-Apr-14 Ready Ready Less requisition 60. RGPPL-1A RGPPL 320 13:30 8-Jul-14 Ready Ready Less requisition 61. RGPPL-2A RGPPL 332 12:00 21-Jul-14 Still out Still out CW pump problem 62. RGPPL-2B RGPPL 332 13:30 1-Sep-14 Still out Still out Less requisition 63. Amarkantak-4 120 11:13 30-Apr-14 30.04.15 Electrical fault 64. SATPURA-7 210 22:00 6-Dec-14 21.02.15 Critical coal shortage 65. SGTPS-1 MPGCL 210 22:55 31-Dec-15 16:49 12-Jan-15 Less requisition 66. SGTPS-2 MPGCL 210 10:20 1-Jan-15 16:22 12-Jan-15 Less requisition 67. SGTPS-4 MPGCL 210 20:22 1-Jan-15 7:34 12-Jan-15 Less requisition 68. SSTPS-1 MPGCL 600 11:30 1-Jan-15 28.02.15 Less requisition 69. SSTPS-2 MPGCL 600 20:00 1-Jan-15 23:10 12-Jan-15 Less requisition 70. JP BINA - 2 MPGCL 250 20:38 1-Jan-15 5:17 11-Jan-15 Less requisition 71. SATPURA-8 MPGCL 210 6:32 7-Jan-15 11:43 10-Jan-15 72. AMARKANTAK -3 MPGC 120 0:25 12-Jan-15 Still out Still out 73. SSTPS-2 600 13:44 21-Jan-15 Still out Still out 74. KORBA(W)-5 500 12:30 18-Jan-15 9:05 23-Jan-15 Flame failure 75. KORBA(W )-4 210 16:30 6-Jan-15 20:06 10-Jan-15 Gen transformer oil leakage 76. KORBA (E) EXTN-2 CSEB 250 21:15 28-Jan-15 31-Jan-15 Bottom ash problem 77. DGEN - 52 DGEN 400 0:00 11-Dec-14 11:00 15-Jan-15 No schedule 78. DGEN - 53 DGEN 400 0:00 11-Dec-14 11:00 23-Jan-15 No schedule 79. DGEN - 51 DGEN 400 12:05 Still out Still out No schedule MPGCL MPGCL MPGC CSPGCL CSPGCL 13-Jan-15 23:55 Suspected tube leakage Fire caught in turbine floor Arcing in GT Y-ph bushing 80. DGEN -52 DGEN 400 12:05 15-Jan-15 Still out Still out No schedule 81. DGEN -53 DGEN 400 11:59 23-Jan-15 Still out Still out No schedule 82. JPL STAGE II-1 600 0:04 14-Nov-14 19:06 18-Jan-15 83. JPL STAGE I-4 250 21:07 9-Jan-15 3:06 12-Jan-15 84. JPL STAGE II-2 JPL 600 5:52 9-Nov-14 85. ACBIL-1 ACBIL 135 22:48 8-Jan-15 4:51 11-Jan-15 Fire in turbine insulation 86. ACBIL II ACBIL 135 20:38 25-Jan-15 0:06 29-Jan-15 BTL 87. VANDANA -1 VANDANA 135 15:00 9-Jan-15 Still out Still out BTL 88. DHARIWAL-2 DHARIWAL 300 0:00 22-Dec-14 Still out Still out No schedule 89. Lanco-2 LANCO AMARKANTAK 300 12:20 21-Aug-13 Still out Still out Coal shortage 90. EMCO-2 EMCO 300 0:47 6-Jan-15 12:18 19-Jan-15 Low coal stock 91. EMCO-I EMCO 300 2:46 23-Jan-15 Still out Still out Over hauling 92. DBPOWER-1 DBPOWER 600 9:53 24-Aug-14 Still out Still out BTL 93. KSK Mahanadi-4 KSK MAHANADI 600 16:50 26-Aug-14 Still out Still out Testing and maintenance 94. KWPCL I KWPCL 600 9:04 31-Jan-15 1:01 9-Feb-15 No schedule 95. TAPS - 4 NPC 540 19:04 19-Dec-14 23:13 31-Jan-15 Biennial shutdown 96. TAPS - 2 NPC 160 20:06 13-Jan-15 0:23 22-Jan-15 Reactor recycling & pump maintenance 97. GANDHAR-3 NTPC 219 20:07 7-Nov-14 13:57 21-Jan-15 Less requisition 98. KAWAS-1A NTPC 164 22:10 15-Nov-14 7:07 16-Jan-15 Less requisition 99. KAWAS-1B NTPC 164 19:12 16-Nov-14 8:31 20-Jan-15 Less requisition 100. MOUDA - II NTPC 500 0:00 24-Nov-14 Still out Still out 101. GANDHAR-1 NTPC 219 20:45 3-Dec-14 8:00 16-Jan-15 Less requisition 102. GANDHAR-2 NTPC 219 18:00 30-Dec-14 NA 15-Jan-15 Less requisition 103. VSTPS-4 NTPC 210 21:36 31-Dec-14 22:45 9-Jan-15 Less requisition 104. MOUDA-1 NTPC 500 0:25 1-Jan-15 17:02 19-Jan-15 Less requisition 105. KAWAS-2B NTPC 164 11:09 1-Jan-15 Still out Still out Less requisition 106. VSTPS-3 NTPC 210 7:11 4-Jan-15 6:55 8-Jan-15 107. VSTPS-4 NTPC 210 22:45 9-Jan-15 5:54 16-Jan-15 108. VSTPS-2 NTPC 210 15:00 10-Jan-15 18:13 17-Jan-15 109. KAWAS-2A NTPC 164 21:07 13-Jan-15 Still out Still out Less requisition 110. GANDHAR-2 NTPC 219 18:01 15-Jan-15 7:59 23-Jan-15 Less requisition 111. KAWAS-1B NTPC 164 20:26 20-Jan-15 6:52 29-Jan-15 Less requisition 112. GANDHAR-3 NTPC 219 19:05 21-Jan-15 Still out Still out Less requisition 113. GANDHAR-1 NTPC 219 18:00 24-Jan-15 Still out Still out Less requisition 114. MOUDA-1 NTPC 500 21:37 24-Jan-15 Still out Still out Less requisition JINDAL POWER JINDAL POWER 21:56 1-Feb-15 Ash evacuation problem/ CHP problem Leakage in vacuum pump Ash evacuation problem Low schedule Drum level low/less requisition RSD for better System Operation RSD for better System Operation 115. GANDHAR-2 NTPC 219 17:59 25-Jan-15 Still out Still out Less requisition 116. KAWAS-1A NTPC 164 0:14 26-Jan-15 Still out Still out Less requisition Note: Units out for more than 72 hrs are only included. संल नक Annex-2.7 िनयोिजत युिनट आऊटे ज का जनवर 2015 का व ता रत यौरा Details of planned unit outages during the month of Jan. 2015 अनु क्रमांक यिु नट संघटक Unit Constituent/IPP Sl.No मता मेगावॉट Cap.MW समय Time सo सo कारण From From Reason िदनांक समय Date Time िदनांक Date 1. Torrent Power-F Torrent Power 121 0:07 31-Dec-14 4:55 14-Jan-15 AOH 2. APL-3 APL 330 3:01 31-Dec-14 21:57 6-Feb-15 COH 3. PARLI-3 MAHAGENCO 210 23:51 13-Feb-13 Still out Still out Water supply problem 4. TATA-5 TATA 500 20:30 3-Jan-15 Still out Still out COH 5. KORBA(W) - 3 CSPGCL 210 23:50 10-Jan-15 Still out Still out AOH 6. SASAN-3 RELIANCE ENERGY 660 0:10 9-Dec-14 6:27 21-Jan-15 AOH 7. APL-3 APL 330 3:01 31-Dec-14 21:57 6-Feb-15 AOH 8. NSPCL-1 NTPC-SAIL 250 0:00 22-Nov-14 15:26 26-Jan-15 COH 9. TAPS - 1 NPC 160 22:39 12-Oct-14 Still out Still out Refueling works Annex- 3.1 DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING JANUARY 2015 AND FEBRUARY 2015 S. No. Unit No. Capacity (MW) 1 Reason GUVNL 1.1 UTPS 1.2 SUGEN UNIT 30 5 210 30 9:00 20-Jan-15 17-Feb-15 6-Mar-15 COH 20-Feb-15 Preventive Maintenance and Boiler Annual Inspection MPPGCL 2 2.1 Outage as per Annual Maintenance Plan sao From tk To AMARKANTAK 3 120 12.01.15 10.04.15 R&M WORK 3 CSPGCL 3.1 Korba (W)-III 3 210 10-Jan-15 07-Feb-15 AOH 3.2 Korba (W)-I 1 210 14-Mar-15 29-Mar-15 AOH 3.3 Korba (W)-IV 4 210 05-Feb-15 28-Feb-15 AOH 3.4 JPL 2 250 25-Feb-15 26-Mar-15 AOH 25.02.15 10.04.15 15.03.15 15.05.15 C-Inspection and R&M Boiler,HPT module Replacement, R & M of ESP MSPGCL 4 4.1 4.2 5 Central Sector 5.1 5.2 GANDHAR KORBA GT-2 6 500 5.3 SIPAT 1 600 20.03.15 15.05.15 Turbine,Boiler & Generator Overhauling 5.4 SASAN 4 660 07.03.15 21.03.15 CONDENSER CLEANING 5.5 SASAN 5 660 23.02.15 05.03.15 BEARING HIGH VIBRATION 5.6 SASAN 2 660 22.03.15 31.03.15 BEARING HIGH VIBRATION 5.7 CGPL 30 800 15.03.15 31.03.15 AOH ANNEXURE 3.2 Line Outage Planning of Transmission elements during the Duration 20.02.2015 to 19.03.2015 From To Basis Reason Date Time Date Time SN KV 1 400kv MAIN BUS-1 AT 400 BANSIA(RAIGARH)S/S 19-Feb-15 7:00 2 400 Korba Tie transformer # 3 19-Feb-15 07:30 h21-Feb-15 3 400kv TIE BUS AT 400 BANSIA(RAIGARH)S/S 20-Feb-15 7:00 24-Feb-15 4 Tie Bay of Akola(II)-Amravati at 400 Akola-II 20-Feb-15 7:00 20-Feb-15 5 765 Sipat- Bilaspur CKT- I 20/Feb/15 08:00 19-Mar-15 6 400 Korba-Bhilai-1 20-Feb-15 9:00 05-Mar-15 7 400 Korba-Bhilai-2 20-Feb-15 9:00 05-Mar-15 8 400 Jabalpur-Jabalpur (pool)# 2 20-Feb-15 10:00 20-Feb-15 20-Feb-15 9:00 20-Feb-15 18:00 Daily 20-Feb-15 9:00 20-Feb-15 18:00 Daily 9 10 AURANGABAD(PG) I (716) Bay at WARDHA Seoni- Bilaspur-I Main bay (710) at 765 SEONI 765 11 20-Feb-15 9.00 400 400 KV D/C Jabalpur-Itrasi Ckt-1 & 2. 20-Feb-15 8:00 Agency RKMPL RKMPL NTPC NTPC RKMPL RKMPL APTCL MEGPTCL WRTS-I PGCIL C WRTS-I PGCIL C WRTS-I PGCIL C PGCIL WR-II R AMP work and CT Oil sampling WRTS-I WRTS-I R AMP works WRTS-I WRTS-I R 1 NO CB ERECTION & CONT. NECESSARY IPS TUBE & JUMPERING JOB 400KV CTS replacement and 19:00 Hrs Continu normalization and testing of breaker. 1 NO CB ERECTION & 18:00 CONT. NECESSARY IPS TUBE & JUMPERING JOB 1 NO CB ERECTION & 18:00 DAILY NECESSARY IPS TUBE & JUMPERING JOB A/R kept in Non Auto Mode for 18:00 Daily OPGW stringing work on ckt I A/R non auto mode for Additional 18:00 Daily Earthing work on lines by Raipur TLM A/R non auto mode for Additional 18:00 Daily Earthing work on lines by Raipur TLM AMP of terminal equipment & 17:00 Daily associated bay equipment, 22-Feb-15 18:00 22-Feb-15 17.00 400 Parli- Chandrapur ll Ckt-2 12 System 21-Feb-15 18:00 Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer Daily cum vibration damper MSETCL Contin Crossing of 765 KV S/C JabalpurPGCIL uous Bina Line(AP10-AP10/1) 13 400 Vindhyachal (NTPC) - Sasan Ckt.2 20-Feb-15 08:00 21-Feb-15 18:00 Dismantling of existing connection and connecting both Vchal (pool) Contin Sasan Ckt.1 &2 at V'chal (pooling) PGCIL ous SS as per the original scheme, for charging Vchal (Pooling) SS. 14 765 Bus # 2 at Jabalpur Pooling Station 20-Feb-15 09:00 20-Feb-15 18:00 Daily 15 220 Bus #II at Pirana sub-station 20-Feb-15 8:00 Daily 21-Feb-15 18:00 Erection of Isolators for Commissioning of 765KV Dharmjaygarh # 3 Bays For aluminium tube connection under Bus #II FOR NEW 220kv BAY type MSETCL JTCL WR-II C PGCIL WR-II C PGCIL WR-II R SN KV Line From Date Time To Date Basis Reason System Agency type WR-II C PGCIL C Time For commissioning of CSD relay in Tie Bay with the permission to Daily switch On- Off 3 to 4 times, for PGCIL checking current wave form in CSD relay For construction of 765KV D/C Contin Dharamjaygarh (Korba)-Jabalpur CSPTCL uous Transmission Line (Part-I) 16 765 1500 MVA ICT -I at Indore (PG) 20-Feb-15 9:00 20-Feb-15 18:00 17 400 Korba- Khedamara D/C 20-Feb-15 8:00 21-Feb-15 18:00 18 765kV S/C 765 Dharamjaygarh_champa(Durg) main 20-Feb-15 and Tie bay along with Line 9:00 21-Feb-15 18:00 Continu For erection of auxiliary bus of spare reactor WRTS-I PGCIL C 19 220 BUS I at Boisar 20-Feb-15 8:00 20-Feb-15 18:00 Daily For jumpering of existing 220 kV BUS I to Bay Extension area . PGCIL WR-II C 20 220 Boisar ( PGCIL ) - Boisar ( MSETCL 20-Feb-15 ) Line 2 8:00 20-Feb-15 18:00 Daily For jumpering of existing TBC Bay MSETCL to Bay Extension area . WR-II C 21 400 Raigarh 1 tie Bay (06) at Raipur S/S 20-Feb-15 9:00 22-Feb-15 17:00 Daily For NTAMC Work WRTS-I PGCIL C 22 400 20-Feb-15 8:00 20-Feb-15 18:00 Daily For NTAMC work PGCIL WR-II C 23 400 400KV Pirana (TPL) – Sugen Line 2 20-Feb-15 8:00 20-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R 24 400 400KV Bus 2 at Pirana (TPL) 20-Feb-15 8:00 20-Feb-15 18:00 TPL TPL R 25 400 Bus # 2 at Jabalpur 20-Feb-15 08:00 21-Feb-15 18:00 PGCIL WR-II C 26 400 KOLHAPUR-MAPUSA I 20-Feb-15 9:00 24-Feb-15 18:00 WRTS-I WRTS-I R 27 400 Tarapur-Padghe # II 20-Feb-15 8:00 20-Feb-15 18:00 PGCIL WR-II R 28 400 Shujalpur - Nagda # 2 20-Feb-15 07:00 19-Mar-15 18:00 PGCIL WR-II C 29 400 Bhachau - Mundra # 1 20-Feb-15 07:00 19-Mar-15 18:00 PGCIL WR-II C 30 400 Khandwa - Rajgarh # 1 20-Feb-15 07:00 19-Mar-15 18:00 PGCIL WR-II C 31 400 Khandwa - Dhule # 1 20-Feb-15 07:00 19-Mar-15 18:00 PGCIL WR-II C 32 400 Itarsi - Khandwa # 1 20-Feb-15 07:00 19-Mar-15 18:00 For Silicon Coating Work for upgradation of Itarsi # 4 Main Contin Bay equipment from 2000Amp to ous 3150Amp rating at 400kV Substation, Jabalpur. Insulator replacement & AMP of Daily Kolhapur end bays Insulator Replacement works by Daily Polymer Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode PGCIL WR-II C Pirana-Dehgam line #I Daily SN KV Line From Date Time To Date Basis 33 220 Satna (PG) - Satna (MP)# 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 34 400 Dehgam - Ranchhodpura # 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 35 400 Bhachau - Ranchodpura # 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 36 400 Asoj - SSP # 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 37 220 Navasari - Vav # 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 38 765 Bina - Gwalior # 2 20-Feb-15 07:00 19-Mar-15 18:00 Daily 39 220 Gandhar - Haldarwa # 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 40 220 Kawas - Dastan 20-Feb-15 07:00 19-Mar-15 18:00 Daily 41 220 Dastan - Navsari 20-Feb-15 07:00 19-Mar-15 18:00 Daily 42 220 Kawas - Haldarwa 20-Feb-15 07:00 19-Mar-15 18:00 Daily 43 220 Damoh - Damoh 20-Feb-15 07:00 19-Mar-15 18:00 Daily 44 400 SSP - Rajgarh # 1 20-Feb-15 07:00 19-Mar-15 18:00 Daily 45 400 20-Feb-15 07:00 19-Mar-15 18:00 Daily 46 765 Satna - Gwalior Ckt-I 20-Feb-15 07:00 19-Mar-15 18:00 Daily 47 400 Gwalior - Agra Ckt-I 20-Feb-15 07:00 19-Mar-15 18:00 Daily Vindhyachal (NTPC) - Sasan (Reliance) Reason System Agency type PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C Time Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode SN KV Line From Date Time To Date Basis 48 400 Vapi - Kala 20-Feb-15 07:00 19-Mar-15 18:00 49 220 Khandwa - Chhegaon 20-Feb-15 07:00 19-Mar-15 18:00 50 220 Indore - Pithampur 20-Feb-15 07:00 19-Mar-15 18:00 51 220 Indore - Barwatha 20-Feb-15 07:00 19-Mar-15 18:00 52 220 Barwatha - Chhegaon 20-Feb-15 07:00 19-Mar-15 18:00 53 400 KOLHAPUR-MAPUSA I & II 20-Feb-15 8:00 19-Mar-15 18:00 54 400 BHADRAVATI-PARLI I & II 20-Feb-15 9:00 19-Mar-15 18:00 55 400 BHADRAVATI-CHANDRAPUR I & II 20-Feb-15 9:00 19-Mar-15 18:00 56 400 20-Feb-15 9:00 19-Mar-15 18:00 57 400 RAIPUR-BHADRAVATI II & III 20-Feb-15 9:00 19-Mar-15 18:00 58 400 KOLHAPUR-MAPUSA I & II 20-Feb-15 9:00 19-Mar-15 18:00 59 400 Satna - Bina Ckt. 1&2 20-Feb-15 08:00 19-Mar-15 18:00 60 400 Nagda - Dehgam Ckt. 1&2 20-Feb-15 08:00 19-Mar-15 18:00 61 400 Indore - Asoj Ckt 2 20-Feb-15 08:00 19-Mar-15 18:00 62 400 Dehgam - Pirana Ckt. 1&2 20-Feb-15 08:00 19-Mar-15 18:00 63 400 Kansari-Vadavi-1 20-Feb-15 8:00 20-Feb-15 18:00 64 765 AURANGABAD(PG)# 2 Line Reactor 20-Feb-15 Switchable at WARDHA 9:00 28-Feb-15 18:00 65 765 1500MVA ICT-2 at Solapur 9:00 21-Feb-15 18:00 BHADRAVATI-CHANDRAPUR III & IV 20-Feb-15 Reason System Agency type PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C WRTS-I WRTS-I C WRTS-I WRTS-I C WRTS-I WRTS-I C WRTS-I WRTS-I C WRTS-I WRTS-I C WRTS-I WRTS-I C PGCIL WR-II R PGCIL WR-II R PGCIL WR-II R PGCIL WR-II R WRTGPL GETCO WRTS-I WRTS-I R WRTS-I WRTS-I c Time Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Online replacement of E/W with Daily OPGW. A/R shall be kept in non auto mode Daily OPGW Work, A/R OFF OPGW/additional eathing work. Daily A/R OFF OPGW/additional eathing work. Daily A/R OFF OPGW/additional eathing work. Daily A/R OFF OPGW/additional eathing work. Daily A/R OFF OPGW/additional eathing work. Daily A/R OFF PID testing of insulator strings. Daily A/R shall be kept In non auto mode for both circuits. PID testing of insulator strings. Daily A/R shall be kept In non auto mode for both circuits. PID testing of insulator strings. A/R shall be kept In non auto Daily mode for both circuits. And Replacement of defective insulator strings thorugh Hot Line Maintenance PID testing of insulator strings. Daily A/R shall be kept In non auto mode for both circuits. Daily PMM work Reactor Dismantling and Erection Conti. of New Reactor, line remain in service. Daily Repalcement of Bph Bushing. Daily SN KV Line Date From Time To Date Basis Reason System Agency type WRTS-I PGCIL R JPL JPL WRTS-I WRTS-I C DB Power PGCIL C WRTS-I M/s TRN C PGCIL WR-II R WRTS-I DHARIWAL R Time 8:00 20-Feb-15 15:00 8:00 20-Feb-15 18:00 8:00 21-Feb-15 18:00 Replacement of WTI and AMP of 718R CB. Sequential outage, one breaker at Daily a time for replacement of 400kV Defective CB interrupter [ Power Flow will not be affected ] Shutdown required on both the lines for erection of spare reactor Daily LA BPI and IPS tube at SEONI. And Shutdown required on both the lines for stringing aux bus at SEONI Stringing of 765kV, S/C RaigarhContin Champa TL between AP 9/2 uous (E+18) - AP 10/0 (E+9) Contin Stringing of Main Bus-II of M/s uous TRN Bays Daily Testing of Remote Operation To attened/ fixing of line spacers Daily by M/s Dhariwal in lilo portion. Contin Tremination of conductor at gantry uous 9:00 21-Feb-15 17:00 Daily AMP OF BAY Equipment 10:00 21-Feb-15 14:00 Daily R 21-Feb-15 9:00 21-Feb-15 18:00 Daily AMP of ICT and associated bay equPGCIL WR-II Attending problem of TBC isolator WRTMPL / WRTS-I MSETCL at MSETCL Waluj S/S. 765 765 KV Bus # 1 at WARDHA 21-Feb-15 9:00 21-Feb-15 18:00 Daily Bus extention for Abad # 3 & 4 ckt WRTS-I WRTS-I C 78 400k 400 KV Bus 1 at Akola II substation 21-Feb-15 7:00 20-Feb-15 18:00 Daily checking Primary stability of busbar protection with existing bay MEGPTCL & new bay MEGPTCL C 79 765 21-Feb-15 9:00 23-Feb-15 18:00 Commossioning of RTCC, Spare WRTS-I ICT unit & DGA of bushing oil. WRTS-I C 66 765 Line Reactor of 765 kV Kotra - Durg Ckt # 1 at Kotra P/S 20-Feb-15 8:00 21-Feb-15 18:00 67 400 Sequential outage of Switchyard Breakers at JPL - stage - II 20-Feb-15 8:00 19-Mar-15 68 765 Seoni - Bina & Seoni-Wardha II 20-Feb-15 9:00 21-Feb-15 18:00 69 400kV D/C DB POWER - Kotra PS 400 (765) Ckt-I & Ckt-II 20-Feb-15 8:00 21-Feb-15 18:00 70 400 400 KV Main Bus-II at Tamnar PS 20-Feb-15 10:00 25-Feb-15 18:00 71 75 400 500 MVA ICT 3 at Boisar 20-Feb-15 BHADRAVATI-DHARIWAL & 400 20-Feb-15 DHARIWAL -PARLI 765 Jabalpur PS -Bhopal & Jbalpur PSBina line bays with reactor(at Hirapur - 20-Feb-15 Bandha pooling station 765 kV Dharamjaygarh # 1 Tie Bay 21-Feb-15 765 (808) at PS/Jabapur 400 315 MVA ICT 1 at Bhachau 21-Feb-15 76 400 Aurangabad-Pune # 1 77 72 73 74 1500MVA ICT-2 at AURANGABAD(PG) Conti. 80 400 Bus # 2 at Jabalpur Pooling Station 81 82 400 AT#1 Tie Bay(402) at Bilaspur S/S 21-Feb-15 400 ICT-I Main Bay at Bhatapara ss 21-Feb-15 Jabalpur-II/Gwalior-III Tie Bay at Bina 765 21-Feb-15 SS 83 84 765 1500 MVA ICT -II at Indore (PG) 18:00 Daily 21-Feb-15 21-Feb-15 WR-II R R PGCIL WR-II C Daily Daily WRTS-I WRTS-I PGCIL PGCIL R R Daily For Bay Maintenance work PGCIL WR-II R Daily For commissioning of CSD relay in Tie Bay (switch On- Off 3 to 4 PGCIL times ) for chacking current wave form in CSD relay WR-II C Daily 9:00 9:00 21-Feb-15 18:00 21-Feb-15 17:00 09:00 21-Feb-15 18:00 21-Feb-15 18:00 PGCIL Erection/Jumper with Isolators for 400KV Bay No.: 413 of Jhabua Power Bays For AMP work For AMP works 09:00 21-Feb-15 18:00 9:00 BDTCL/JTCL PGCIL SN KV Line Date From Time To Date Basis Reason System For commissioning of Tie Bay 402 PGCIL Agency type WR-II C Time 85 400 BUS 2 at Boisar 21-Feb-15 8:00 21-Feb-15 18:00 Daily 86 765 Champa-I Bus Reactor at Durg PS 21-Feb-15 9:00 24-Feb-15 18:00 Continu 87 400 Pirana-Dehgam line -II 21-Feb-15 8:00 21-Feb-15 18:00 88 400 400KV Pirana (TPL) – Sugen Line 2 21-Feb-15 8:00 89 400 400KV Bus 1 at Pirana (TPL) 21-Feb-15 90 765 1000 MVA ICT#1 at Satna 91 765 92 WRTS-I PGCIL C Daily For erection of auxiliary bus of spare reactor For NTAMC work PGCIL WR-II C 21-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R 8:00 21-Feb-15 18:00 Daily TPL TPL R 21-Feb-15 9:00 21-Feb-15 18:00 Daily PGCIL WR-II R 21-Feb-15 09:00 21-Feb-15 18:00 Daily For Silicon Coating Work FOR WINDING TAN DELTA, RELAY FIRMWARE UPGRADATION & RECTIFICATION OF PLAIN OIL GAUGE ICT Spare Phase Commissioning in place of ICT # 1 R Phase PGCIL WR-II C 400 Tarapur-Padghe # I 21-Feb-15 8:00 21-Feb-15 18:00 Daily PGCIL WR-II R 93 400 400 KV Bus # 2 at WARDHA 21-Feb-15 9:00 21-Feb-15 18:00 WRTS-I WRTS-I R 94 400 PARLI-PUNE D/C line 21-Feb-15 9:00 25-Feb-15 18:00 WRTMPL WRTS-I C 95 220 KV Kawas-Ichhapore 1 21-Feb-15 08:30 h21-Feb-15 18:00 Hrs Continu NTPC NTPC 96 400 kAkola-Aurangabad D/C 22-Feb-15 8:00 22-Feb-15 18:00 Daily PGCIL MEGPTCL / MC 9:00 23-Feb-15 18:00 Daily Yearly AMP work WRTS-I WRTS-I R 9:00 22-Feb-15 18:00 Daily AMP works. WRTS-I WRTS-I R WR-II C WR-II R 97 98 1500 MVA ICT # 1 at Jabalpur Pooling Station HVDC Pole-1 & 400kV Ramagundam22-Feb-15 HVDC 1 at Bhadrawati Seoni- Bilaspur-II Main bay (716) at 765 22-Feb-15 SEONI Insulator Replacement works by Polymer Daily Isolator dismantling work Lilo of line at PGCIL PUNE(GIS) Conti. S/S PM of bay equipment. 765 kV S/C Akola-II-Aurangabad Ckt-II crossing work for upgradation of Itarsi # 4 Main Bay equipment from 2000Amp to PGCIL 3150Amp rating at 400kV Substation, Jabalpur. For aluminium tube connection PGCIL under Bus #I for new 220KV bay 99 400 Jabalpur - Itarsi # 4 22-Feb-15 08:00 23-Feb-15 18:00 Daily 100 220 Bus #I at Pirana sub-station 22-Feb-15 8:00 22-Feb-15 18:00 Daily 101 400 Pirana-Asoj line #I 22-Feb-15 8:00 22-Feb-15 18:00 Daily For NTAMC work PGCIL WR-II C 102 400 400KV Pirana (TPL) –Pirana(PG)- 2 22-Feb-15 8:00 22-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R 103 400 400KV Bus 1 at Pirana 22-Feb-15 8:00 22-Feb-15 18:00 Daily TPL TPL R 104 400 Tarapur-Padghe # II 22-Feb-15 8:00 22-Feb-15 18:00 Daily PGCIL WR-II R 105 400 Navsari- Magarwada 22-Feb-15 7:00 22-Feb-15 20:00 Daily For Silicon Coating Work Insulator Replacement works by Polymer Jumpering of line in Multicircuit towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2. PGCIL WR-II C SN KV Line Date From Time To Date Basis Reason System Agency type PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C WRTS-I WRTS-I R PGCIL WRPC ERPC PGCIL WR-II R WRTS-I WRTS-I R RKMPL RKMPL Time 106 400 Navsari- Vapi 22-Feb-15 7:00 22-Feb-15 20:00 107 400 Magarwada- Kala 22-Feb-15 7:00 22-Feb-15 20:00 108 400 Vapi- Kala 22-Feb-15 7:00 22-Feb-15 20:00 109 400 RAIPUR-WARDHA- I 22-Feb-15 9:00 23-Feb-15 18:00 110 400 22-Feb-15 8:00 22-Feb-15 17:00 SEL - Raigarh - 2 111 400 Line reactor of Itarsi-Indore-1 22-Feb-15 9:00 19-Mar-15 112 765 765 KV ICT # 2 at WARDHA 23-Feb-15 9:00 24-Feb-15 18:00 113 400kv MAIN BUS-2 AT 400 BANSIA(RAIGARH)S/S 23-Feb-15 7:00 26-Feb-15 18:00 114 765 Bus # 1 at Jabalpur Pooling Station 23-Feb-15 09:00 23-Feb-15 18:00 Daily PGCIL WR-II 115 765/ Sipat 400KV ICT-1 MAIN BAY-15 400 23-Feb-15 07:30 19:00 28-Feb-15 hrs hrs All burnt control cable replacement Contin (ICT-1 TRANSFORMER S/D NOT NTPC ous REQUIRED) NTPC 116 765 23-Feb-15 8:00 23-Feb-15 16:00 Daily WRTS-I PGCIL R 117 765 23-Feb-15 7:00 23-Feb-15 18:00 Daily 118 220 23-Feb-15 10:00 23-Feb-15 17:00 119 765 23-Feb-15 10:00 24-Feb-15 120 121 765 400 23-Feb-15 23-Feb-15 122 400 Aurangabad-Pune # 2 23-Feb-15 Bay No 721 (Main Bay of 765 kV Bus Reactor) at Kotra P/S 240 MVAR Bus Reactor at PS / Jabalpur BUS -I at Khandwa s/s 707 Bay (AGRA -1 MAIN) AT GWALIOR 765KV BUS-2 at Solapur 315MVA ICT-3 at PUNE 18:00 Jumpering of line in Multicircuit towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2. Jumpering of line in Multicircuit Daily towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2. Jumpering of line in Multicircuit Daily towers & charging of Navsari Magarwada-Kala-Vapi Ckt.2. Stringing work of broken earth wire Daily at location 549, 550. & to attend clearance between earth wire & conductor. Stringing works of 765KV S/C Contin Angul-Jharsuguda Transmission uous line, Line-I, Part-II To Take Line Reacter Out for attending oil leakage & Cont. replacement of gaskat, also oil filteration/refilling should be done. Line will be taken into service without line reactor Bushing replacement and LA Conti. replacement work 1 NO CB ERECTION & CONT. NECESSARY IPS TUBE & JUMPERING JOB Daily 765kV Bus Isolators Earth Switch Erection / Alignment problem AMP C PGCIL WR-II R Daily AMP of Bus reactor & associated bay equipment, AMP work PGCIL WR-II R 18:00 Daily AMP WORKS PGCIL WR-II R 9:00 9:00 24-Feb-15 18:00 23-Feb-15 18:00 Daily Daily 9:00 23-Feb-15 18:00 Daily AMP works. AMP works. Attending problem of TBC isolator at MSETCL Waluj S/S. WRTS-I WRTS-I WRTS-I WRTS-I WRTMPL / WRTS-I MSETCL R R R SN KV Line Date From Time To Date Basis Reason System checking Primary stability of busbar protection with existing bay MEGPTCL & new bay Agency type MEGPTCL C Time 123 400k 400 KV Bus 2 at Akola II substation 23-Feb-15 7:00 22-Feb-15 18:00 Daily 124 765 765 kV Bus Reactor at Kotra P/S 23-Feb-15 8:00 24-Feb-15 22:00 Contin Commissioing of CSD uous WRTS-I PGCIL C 125 400 AT#2 Main Bay(404) at Bilaspur S/S 23-Feb-15 9:00 23-Feb-15 18:00 Daily For AMP work WRTS-I PGCIL R 126 127 400 ICT-I Tie Bay at Bhatapara ss 765 Bus- 1 at Bina 23-Feb-15 23-Feb-15 9:00 23-Feb-15 17:00 09:00 23-Feb-15 18:00 Daily Daily For AMP works For Bus AMP WRTS-I PGCIL PGCIL WR-II R R 128 765kV Dharmjaygarh_bilaspur Main 765 bay along with Line shutdown also required during testing of SAS. 23-Feb-15 9:00 25-Feb-15 18:00 Continu For erection of auxiliary bus of spare reactor WRTS-I PGCIL C 129 400 23-Feb-15 9:00 23-Feb-15 17:00 Daily For NTAMC Work WRTS-I PGCIL C 130 Raigarh 2 Main Bay (04) at Raipur S/S 400 315MVA ICT # I at Shujalpur 23-Feb-15 10:00 23-Feb-15 14:00 Daily For NTAMC Works PGCIL WR-II C 131 400 400KV Pirana (TPL) –Pirana(PG)- 2 23-Feb-15 8:00 23-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R 132 400 400KV Bus 2 at Pirana (TPL) 400KV Transfer Bus Coupler at 400 Pirana 23-Feb-15 8:00 23-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R 23-Feb-15 8:00 23-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R WR-II R WR-II R 133 134 765 1000 MVA ICT# 2 at Satna 23-Feb-15 9:00 23-Feb-15 18:00 Daily 135 400 Tarapur-Padghe # I 23-Feb-15 8:00 23-Feb-15 18:00 Daily 23-Feb-15 9.00 23-Feb-15 17.00 Daily 23-Feb-15 9:00 24-Feb-15 18:00 Daily 23-Feb-15 9:00 23-Feb-15 13:00 Daily 23-Feb-15 14:00 23-Feb-15 18:00 Daily 136 FOR WINDING TAN DELTA, RELAY FIRMWARE PGCIL UPGRADATION & RECTIFICATION OF PLAIN OIL GAUGE Insulator Replacement works by PGCIL Polymer Q.M.work., C & tan Delta testing of CT MSETCL MSETCL 220 Talandge- Chikodi line. 137 765 1500MVA-ICT I at SEONI 138 765 139 Kotra # 2 (701) Main Bay at Tamnar PS Kotra # 2 & AT#1 (702) Tie Bay at 765 Tamnar PS 140 400 Vapi - Kala 23-Feb-15 08:00 23-Feb-15 18:00 Daily 141 400 400kV Bus#1 at Dehgam 23-Feb-15 10:00 23-Feb-15 18:00 Daily Replacement of 390 KV LA with 336 KV LA. Replacement of support latch assembly of 70152 CB Replacement of support latch assembly of 70252 CB TESTING OF REMOTE OPERATION To attend Hot-Spot in Bus#1 Isolator of Bay No. 424 WRTS-I WRTS-I R WRTS-I PGCIL C WRTS-I PGCIL C PGCIL WR-II C PGCIL WR-II R SN KV Line From Date Time To Date Basis 142 220 Kakrapar - Haldarwa ckt 1&2 23-Feb-15 8:00 25-Feb-15 18:00 143 400 Bus-1 (at MPPTCL End) at Indore 23-Feb-15 9:00 23-Feb-15 18:00 144 400 145 23-Feb-15 9:00 400 Jabalpur-Sasan 23-Feb-15 10:00 23-Feb-15 14:00 146 400 BHADRAVATI-PARLI I 23-Feb-15 9:00 23-Feb-15 147 765 Seoni - Wardha I & II Line 24-Feb-15 9:00 01-Mar-15 148 400 Vindhyachal Bus-Section-2 24-Feb-15 07:30 h26-Feb-15 149 765 1500MVA ICT # 2 at PS / Jabalpur 24-Feb-15 9:00 150 151 152 400 BUS -I at Khandwa s/s 220 Amona Bay (203) at MAPUSA 400 Parli-2 Main Bay (407) at PUNE 10:00 24-Feb-15 9:00 24-Feb-15 9:00 24-Feb-15 153 400KV Bus -1 at Waluj S/S with 400 Aurangabad-Pune # 1 on TBC & then 24-Feb-15 Aurangabad-Pune # 2 on TBC 154 765 155 156 157 158 Indore (PG) Indore (MP) -2 1500MVA ICT-1 at AURANGABAD(PG) 24-Feb-15 24-Feb-15 24-Feb-15 24-Feb-15 23-Feb-15 18:00 24-Feb-15 9:00 25-Feb-15 18:00 9:00 26-Feb-15 18:00 25-Feb-15 18:00 24-Feb-15 9:00 26-Feb-15 18:00 24-Feb-15 9:00 26-Feb-15 18:00 24-Feb-15 09:00 24-Feb-15 18:00 765 Bus # 2 at Jabalpur Pooling Station Daily With Asoj-2 to be put on TBC bay of MPPTCL and line out . For busbar integration & replacement of damaged Isolater Parts Daily Attending problem of Pune -1&2 Conti. Bus -1 Isolator at MSETCL Waluj S/S. Conti. 8:00 220 Korba-Suhela- Banari System Agency type WR-II C WR-II C PGCIL WR-II C PGCIL WR-II R WRTS-I WRTS-I R WRTS-I WRTS-I C NTPC NTPC PGCIL WR-II R PGCIL WRTS-I WRTS-I WR-II WRTS-I WRTS-I R R R WRTMPL / WRTS-I MSETCL R Tower erection at loc.no. 119 & 124 and stringing between span Contin 118-119 & 124-125 for diversion of line due to GIPCL lignite mines. PGCIL ous Also replacement of existing CTs with higher rating CTs at Haldarwa SS With Asoj-2 to be put on TBC bay of MPPTCL and line out . For Daily PGCIL busbar integration & replacement of damaged Isolater Parts Y ph Line CVT replacement at Jabalpur 18:00 Daily Yearly AMP work Shutdown required on both the 18:00 Conti. lines for erection of aux bus tower at SEONI. 19:00 hrs ContinuAMP AMP of ICT #2 & associated bay 18:00 Daily equipment, 17:00 Daily AMP work 18:00 Daily AMP Works 18:00 Daily AMP works. 400 400 KV D/C Jabalpur-Itrasi Ckt-3 & 4 24-Feb-15 765 Seoni- Bina Reason Time Commossioning of RTCC, Spare WRTS-I ICT unit & DGA of bushing oil. Crossing of 765 KV S/C JabalpurContin PGCIL Bina Line(AP 10/1-AP 11) uous contin Crossing of Bhopal - Jabalpur line BDTCL uous contin Crossing Of JabalpurJTCL uous Dharamjaygarh line Erection of Isolators for Daily Commissioning of 765KV PGCIL Dharmjaygarh # 4 Bays WRTS-I C JTCL PGCIL CSPTCL WR-II C SN KV Line From Date Time To Date Basis Reason System Agency type WRTS-I PGCIL R WR-II R PGCIL C PGCIL WR-II C C Time For AMP works 159 400 Korba Line Main Bay at Bhatapara ss 24-Feb-15 9:00 24-Feb-15 17:00 Daily 160 400 Bus- 1 at Bina 24-Feb-15 09:00 24-Feb-15 18:00 Daily 161 220 Korba(W)- Banari D/C 24-Feb-15 8:00 162 163 400 Raigarh 2 Tie Bay at Raipur S/S 400 315MVA ICT # II at Shujalpur 24-Feb-15 24-Feb-15 9:00 24-Feb-15 17:00 10:00 24-Feb-15 14:00 PGCIL For Bus AMP For construction of 765KV D/C Contin Dharamjaygarh (Korba)-Jabalpur CSPTCL uous Transmission Line (Part-I) AP 4A/04A/1 Daily For NTAMC Work WRTS-I Daily For NTAMC Works PGCIL 164 400 400KV Pirana (TPL) –Pirana(PG)- 1 24-Feb-15 8:00 24-Feb-15 18:00 Daily For Silicon Coating Work TPL TPL R 165 400 400KV Bus 1 at Pirana 24-Feb-15 8:00 24-Feb-15 18:00 Daily TPL TPL R 166 400 Bus # 1 at Jabalpur 400kV S/S 24-Feb-15 10:00 25-Feb-15 18:00 Daily PGCIL WR-II R 167 400 Boisar-Padghe 24-Feb-15 8:00 24-Feb-15 18:00 Daily For Silicon Coating Work Hyvelm make Isolator ARM replacement work at 400Kv Jabalpue SS Insulator Replacement works by Polymer PGCIL WR-II R 168 400 400 kv Rajgarh (Pgcil )- Ssp CKT I 24-Feb-15 6.00 24-Feb-15 18.00 daily Maintenance Work PGCIL/MPP WR - II TCL R 169 220 10.00 24-Feb-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 170 220 9.00 24-Feb-15 18.00 daily Maintenance Work MPPTCL MPPTCL R 171 220 9.00 24-Feb-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 172 173 400 400 8:00 8:00 24-Feb-15 18:00 24-Feb-15 18:00 Daily Daily WRTGPL GETCO GETCO GETCO 24-Feb-15 9.00 24-Feb-15 17.00 MSETCL MSETCL 24-Feb-15 13:00 WRTS-I PGCIL C WRTS-I PGCIL C PGCIL WR-II C WRTS-I PGCIL C PGCIL WR-II C PGCIL WR-II C 174 220 KV ANOOPUR - KOTMIKALA 24-Feb-15 CKT - I 220 KV SEONI ( PGCIL) -SEONI I/C 24-Feb-15 I 220 KV MALANPUR - GWL( PG) 24-Feb-15 CKT - I Kansari-Vadavi-2 24-Feb-15 Kasor- Chorania Line 24-Feb-15 Bhusawal-Koradi 25-Feb-15 18:00 400 175 765 AT#1 (703) Main Bay at Tamnar PS 24-Feb-15 9:00 176 765 Kotra # 1 (704) Main Bay at Tamnar PS 24-Feb-15 14:00 24-Feb-15 18:00 177 220 220kV Dehgam-Ranasan#1 24-Feb-15 10:00 24-Feb-15 17:00 178 400 24-Feb-15 8:00 179 400 BUS REACTOR at Kala 24-Feb-15 08:00 24-Feb-15 18:00 180 400 KALA - MAGARWADA 24-Feb-15 7:00 i) 400kV RKM Power - KSK Ckt-III ii) 400kV RKM Power - Kotra P/S 25-Feb-15 18:00 24-Feb-15 18:00 PMM work PMM work Q.M. and Disc string Daily replacement,fixing of spacers,dampers,earthbond Contin Replacement of support latch uous assembly of 70352 CB Contin Replacement of support latch uous assembly of 70452 CB Site Acceptance Test (SAT) work Daily of NTAMC Stringing of 765kV, S/C RaigarhContin Champa TL between Loc 14/6 uous (A+3) - Loc 14/7 (A+3) TESTING OF REMOTE Daily OPERATION TESTING OF REMOTE Daily OPERATION SN KV Line From Date Time To Date Basis Reason System Agency type WR-II C WRTS-I R Time 181 400 Bus-2 (at MPPTCL End) at indore 24-Feb-15 9:00 24-Feb-15 18:00 Daily 182 HVDCDIA 10 Q50 Bay at BHADRAWATI Main Bay of Kotra - Durg Ckt # 1 at 765 Kotra P/S 400 BUS -II at Khandwa s/s 705 Bay (TIE BAY JAIP-1 & ICT-1) 765 AT GWALIOR Seoni- Bilaspur-II Tie bay (717) at 765 SEONI 400 Parli-2 Tie Bay (408) at PUNE 24-Feb-15 9:00 24-Feb-15 18:00 Daily With Asoj-2 to be put on TBC bay of MPPTCL and 400KV IndoreIndore-2 TBC Bay of PGCIL . For PGCIL busbar intrigation & replacement of Isolater Parts WRTS-I Yealy AMP 25-Feb-15 8:00 26-Feb-15 18:00 Daily AMP WRTS-I PGCIL R 25-Feb-15 10:00 25-Feb-15 17:00 Daily AMP work PGCIL WR-II R 25-Feb-15 10:00 26-Feb-15 18:00 Daily AMP WORKS PGCIL WR-II R 25-Feb-15 9:00 27-Feb-15 18:00 Daily AMP works. WRTS-I WRTS-I R 25-Feb-15 9:00 25-Feb-15 18:00 WRTS-I WRTS-I R 09-Mar-15 9:00 10-Mar-15 JTCL PGCIL 25-Feb-15 9.00 25-Feb-15 17.00 MSETCL MSETCL 25-Feb-15 9:00 26-Feb-15 18:00 Daily AMP works. contin Crossing Of Jabalpuruous Dharamjaygarh line Dignostic Testing of reactor, CB, Daily CT & relay Erecetion of Isolator & BPI for Daily NTPC bay WRTS-I WRTS-I c 25-Feb-15 09:00 25-Feb-15 18:00 Daily WR-II C WRTS-I WRTS-I PGCIL PGCIL R WRTS-I PGCIL R PGCIL WR-II R NTPC NTPC PGCIL WR-II R WRTS-I PGCIL C 183 184 185 186 187 188 189 400 Korba - Bhilai ckt 2 400 Karad-Jaigad I 18:00 190 400 400KV BUS-2 at Solapur 191 765 192 193 765 ICT-2 Main Bay ( 720) at Kotra PS 400 AT#2 Tie Bay(405) at Bilaspur S/S 25-Feb-15 25-Feb-15 9:00 9:00 26-Feb-15 18:00 25-Feb-15 18:00 Daily Daily 194 400 Bhilai Line Main Bay at Bhatapara ss 25-Feb-15 9:00 25-Feb-15 17:00 Daily 195 220 Kawas - Navsari 1 25-Feb-15 09:00 25-Feb-15 18:00 Daily 196 400 Korba Bus coupler #2 25-Feb-15 07:30 h14-Mar-15 197 400 25-Feb-15 09:00 25-Feb-15 18:00 198 765 Bus Reactor at Durg PS 25-Feb-15 9:00 28-Feb-15 18:00 For Bus AMP For erection of auxiliary bus of Continu spare reactor 199 400 Sipat #1 Main Bay (13) at Raipur S/S 25-Feb-15 9:00 26-Feb-15 17:00 Daily For NTAMC Work WRTS-I PGCIL C 200 201 220 Shujalpur - Rajgarh Ckt.2 400 Bachau - Ranchodpura Ckt.1 25-Feb-15 25-Feb-15 10:00 25-Feb-15 18:00 9:00 25-Feb-15 18:00 Daily Daily MPPTCL PGCIL WR-II WR-II C R 202 400 KOLHAPUR-MAPUSA II 25-Feb-15 9:00 01-Mar-15 18:00 Daily WRTS-I WRTS-I R 203 400 Vapi-Boisar 25-Feb-15 8:00 25-Feb-15 18:00 Daily For NTAMC Works For rectification of hot spots Insulator replacement & AMP of Kolhapur end bays Insulator Replacement works by Polymer PGCIL WR-II R 204 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 25-Feb-15 6.00 25-Feb-15 18.00 daily Maintenance Work PGCIL/MPP WR - II TCL R 205 220 25-Feb-15 9.00 25-Feb-15 17.00 daily Maintenance Work MPPTCL R Bay No.: 814 Tie Bay of Bina # 1 at Jabalpur Pooling Station Bus- 2 at Bina 220 KV MALANPUR - (GWL) PG CKT - II Erection/Testing of Current Transformer for Commissioning of PGCIL 765KV Dharmjaygarh # 3 Bays For AMP For AMP work For AMP works For attending line defects 19:00 Hrs Continufor Breaker and CT replacement. Daily MPPTCL R SN 206 KV 220 Line 220 KV DAMOH PG - TIKAMGARH CKT 400 KV Vandana-Birsinghpur line and 400 KV Balco-Birsinghpur line 207 400 208 765 Satna - Gwalior Ckt.1 209 765 210 240 MVAr BUS REACTOR at Jabalpur pooling SS Kotra # 1 & AT#2 (705) Tie Bay at 765 Tamnar PS Date From Time To Date 25-Feb-15 9.00 25-Feb-15 18.00 Basis Reason System Agency type daily Maintenance Work MPPTCL MPPTCL R EPTCL C WR-II R PGCIL WR-II C WRTS-I PGCIL C WRTS-I PGCIL C PGCIL WR-II C Time 25-Feb-15 6:00 26-Feb-15 19:00 Daily 25-Feb-15 8:00 28-Feb-15 18:00 Daily 25-Feb-15 9:00 25-Feb-15 18:00 25-Feb-15 9:00 25-Feb-15 13:00 Overhead crossing of 400KV D/c (Quad) Mahan-Sipat line of M/s Essar Power Transmission PGCIL company Limited( shutdown required of 400 kv VandanaBirsinghpur & Balco-Birsinghpur line) Rectifiction of various line defects PGCIL RELAY FIRMWARE UPGRADATION Contin Replacement of support latch uous assembly of 70552 CB Contin Replacement of support latch uous assembly of 70652 CB Site Acceptance Test (SAT) work Daily of NTAMC Daily 211 765 AT#2 (706) Main Bay at Tamnar PS 25-Feb-15 14:00 25-Feb-15 18:00 212 220 220kV Dehgam-Ranasan#2 25-Feb-15 10:00 25-Feb-15 17:00 213 400/ 315 MVA ICT - I at KALA 220 25-Feb-15 7:00 25-Feb-15 18:00 Daily TESTING OF REMOTE OPERATION PGCIL WR-II C 214 400 SOLAPUR-PARLI # 2 25-Feb-15 9:00 26-Feb-15 18:00 Daily To replace conductor connecting HV bushing & Isolator with IPS tube of 765/400kv ICT spare unit. WRTMPL WRTS-I C 215 216 HVDCDIA 10 Q51 Bay at BHADRAWATI 220 Jhanor Haldarwa 1 AURANGABAD I Main Bay (409) at 400 PUNE 25-Feb-15 26-Feb-15 9:00 9:00 25-Feb-15 18:00 26-Feb-15 17:00 Daily Daily Yealy AMP AMP of bays WRTS-I PGCIL WRTS-I WR-II R R 26-Feb-15 9:00 26-Feb-15 18:00 Daily AMP works. WRTS-I WRTS-I R 218 400KV Bus -2 at Waluj S/S with 400 Aurangabad-Pune # 1 on TBC & then 26-Feb-15 Aurangabad-Pune # 2 on TBC 9:00 27-Feb-15 18:00 Attending problem of Pune -1&2 Conti. Bus -1 Isolator at MSETCL Waluj S/S. WRTMPL / WRTS-I MSETCL R 219 765 765/400KV ICT -2 at Aurangabad 26-Feb-15 9:00 01-Mar-15 Conti. Commossioning of RTCC. WRTS-I WRTS-I C 220 765 Bay No.: 817 Tie Bay of Bina # 2 at Jabalpur Pooling Station 26-Feb-15 09:00 26-Feb-15 18:00 Daily WR-II C Parali-Lonikand II ckt 1 26-Feb-15 9.00 26-Feb-15 17.00 Daily Lonikand-Lonikand II ckt 1 400 400 Raipur-KSK-3 400 ICT-II Tie Bay at Bhatapara ss 220 Kawas -Navsari 2 26-Feb-15 9.00 26-Feb-15 17.00 Daily 26-Feb-15 26-Feb-15 26-Feb-15 9:00 26-Feb-15 18:00 9:00 26-Feb-15 17:00 09:00 26-Feb-15 18:00 Daily Daily Daily 217 221 222 223 224 225 400 18:00 Erection/Testing of Current Transformer for Commissioning of PGCIL 765KV Dharmjaygarh # 4 Bays Faulty insulator string replacement. Faulty insulator string replacement. For AMP work For AMP works For attending line defects MSETCL MSETCL MSETCL MSETCL WRTS-I WRTS-I PGCIL PGCIL PGCIL WR-II R R R SN KV Line From Date 765kV S/C Korba_jharsuguda-1 Line 26-Feb-15 shutdown Time To Date Basis Reason System Agency type 9:00 28-Feb-15 18:00 Continu For erection of auxiliary bus of spare reactor WRTS-I PGCIL C 9:00 27-Feb-15 17:00 Daily For NTAMC Work WRTS-I PGCIL C For NTAMC Works PGCIL WR-II C PGCIL WR-II R PGCIL WR-II C PGCIL WR-II R Time 226 765 227 400 Sipat # 3 Tie Bay (14) at Raipur S/S 228 400 63 MVAR Bus Reactor-I at Shujalpur 26-Feb-15 10:00 26-Feb-15 14:00 Daily 229 400 Bus # 2 at Jabalpur 400kV S/S 26-Feb-15 10:00 27-Feb-15 18:00 Daily 230 765 26-Feb-15 09:00 26-Feb-15 18:00 Daily 231 400 Boisar-Padghe 26-Feb-15 8:00 26-Feb-15 18:00 Daily 232 220 220 KV DAMOH PG - SAGAR CKT 26-Feb-15 9.00 26-Feb-15 18.00 daily Maintenance Work MPPTCL MPPTCL R 233 26-Feb-15 9.00 26-Feb-15 18.00 daily Maintenance Work MPPTCL MPPTCL R 234 220 220 KV DAMOH PGCIL I/C - II 220 KV BINA(PGCIL) -SHIVPURI 220 CKT 26-Feb-15 9.00 27-Feb-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 235 765 SASAN-SATNA#1 Line 26-Feb-15 9:00 26-Feb-15 18:00 Daily RELAY FIRMWARE UPGRADATION PGCIL WR-II C 236 400 9:00 01-Mar-15 Conti. Replacement of CTs and jumpers WRTS-I WRTS-I C 9:00 26-Feb-15 13:00 WRTS-I PGCIL C WRTS-I PGCIL C PGCIL WR-II C WRTS-I PGCIL C PGCIL WR-II C MSETCL MSETCL WRTS-I EPTCL WRTS-I EPTCL PGCIL WRPC ERPC WRTS-I PGCIL R PGCIL WR-II R 237 238 1500 MVA ICT # 1 at Jabalpur Pooling Station 26-Feb-15 Aurangabad(PG)26-Feb-15 Aurangabad(MSETCL) # I Bus Reactor (707) Main Bay at 765 26-Feb-15 Tamnar PS Bus Reactor & AT#3 (708) Tie Bay at 765 26-Feb-15 Tamnar PS 18:00 14:00 26-Feb-15 18:00 239 220 220kV Dehgam-Dehgam#1 26-Feb-15 10:00 26-Feb-15 17:00 240 400 400kV D/C Sipat-Ranchi TL 26-Feb-15 8:00 27-Feb-15 18:00 241 220 KALA - KHADOLI - I 26-Feb-15 7:00 26-Feb-15 18:00 242 26-Feb-15 9.00 26-Feb-15 17.00 243 244 Khadka-Babhleswar 400 HVDCDIA 10 Q52 Bay at BHADRAWATI 400/2500MVA ICT-2 at EPTCL(Hazira) 26-Feb-15 26-Feb-15 9:00 6:00 26-Feb-15 18:00 3/42015 19:00 245 765 26-Feb-15 8:00 02-Mar-15 246 Ranchi - Dharamjaygarh - 1 400 Main Bay of AT # 4 at Kotra P/S 27-Feb-15 8:00 27-Feb-15 18:00 247 400 315 MVA ICT 1 at Boisar 27-Feb-15 8:00 27-Feb-15 18:00 18:00 Contin uous Contin uous Hyvelm make Isolator ARM replacement work at 400Kv Jabalpue SS ICT Spare Phase Swapping in place of ICT # 1 Y Phase Insulator Replacement works by Polymer Replacement of support latch assembly of 70752 CB Replacement of support latch assembly of 70852 CB Site Acceptance Test (SAT) work Daily of NTAMC Stringing of 765kV, S/C RachiContin Korba TL between AP 42C/0 uous (D+25) - 42D/0 (D+25) TESTING OF REMOTE Daily OPERATION To attend the Aux. Bus PG Daily isolator problem ,CT tan delta, CVT TAN DELTA Measurement Daily Yealy AMP Conti Internal Inspection of ICTs FR RECTIFICATION OF Contin LOCATION NO 50/0 WHICH uous MEMBER HAS BEEN CUT AND IS IN BEND CONDITION DUE TO NAXALITE EFFECT Daily AMP AMP , Attending Leakages & Daily Painting R SN 248 249 250 251 252 KV Line 400 315 MVA ICT 2 at Bhachau 220 BUS -II at Khandwa s/s AURANGABAD II Main Bay (410) at 400 PUNE 400 Padgha-Kharghar 407 Main Bay of 765 KV ICT # 2 at 400 WARDHA 253 Khadka-Akola From Basis Reason Agency type 10:00 27-Feb-15 14:00 10:00 27-Feb-15 17:00 Daily Daily AMP of ICT and associated bay equPGCIL PGCIL AMP work WR-II WR-II R R 27-Feb-15 9:00 27-Feb-15 18:00 Daily AMP works. WRTS-I WRTS-I R 27-Feb-15 8.00 27-Feb-15 18.00 Daily Cross arm Painting work MSETCL MSETCL 27-Feb-15 9:00 27-Feb-15 18:00 Conti. CT N2 valve Replacement work WRTS-I WRTS-I 27-Feb-15 8.00 27-Feb-15 18.00 Daily MSETCL MSETCL WRTS-I WRTS-I R PGCIL WR-II R Date Time 27-Feb-15 27-Feb-15 To Date System Time 400 CT tan delta,Relay testing, CB DCRM Measurement & Routine Line maint. Erecetion of Isolator & BPI for NTPC bay Fixing of dislocated spacers,hot spot R 254 400 400KV BUS-1 at Solapur 27-Feb-15 9:00 28-Feb-15 18:00 Daily 255 400 Mundra-Jetpur Circuit#1 27-Feb-15 08:00 27-Feb-15 18:00 Daily 256 765 27-Feb-15 9:00 28-Feb-15 18:00 Daily For AMP WRTS-I PGCIL R 257 400 ACBIL Main Bay(414) at Bilaspur S/S 27-Feb-15 9:00 27-Feb-15 18:00 Daily For AMP work WRTS-I PGCIL R 258 400 KSK Main Bay (40) at Raipur S/S 27-Feb-15 9:00 28-Feb-15 17:00 Daily WRTS-I 259 400 ICT-II Main Bay at Bhatapara ss 27-Feb-15 9:00 27-Feb-15 17:00 Daily For AMP Work For AMP works R PGCIL POWERGRI R D 260 220 Navsari (PG) - Navsari (GETCO) # 1 27-Feb-15 09:00 27-Feb-15 18:00 Daily For attending line defects POWERGRI WR-II R 261 400 27-Feb-15 10:00 28-Feb-15 18:00 Daily For NTAMC Works POWERGRI WR-II C 262 400 Vapi-Boisar 27-Feb-15 8:00 27-Feb-15 18:00 POWERGRI WR-II R 263 400 400 KV Isp- Nagda Ckt 27-Feb-15 9.00 27-Feb-15 16.00 MPPTCL MPPTCL R 264 220 220 KV D/C Korba-Kotmikala-1 and 2 27-Feb-15 of CSPTCL 6:00 28-Feb-15 19:00 CSPTCL EPTCL 265 765 AT#2 (709) Main Bay at Tamnar PS 27-Feb-15 9:00 27-Feb-15 13:00 WRTS-I POWERGRI C D 266 220 220kV Dehgam-Dehgam#2 27-Feb-15 10:00 27-Feb-15 17:00 267 400/ 315MVA ICT - II at KALA 220 27-Feb-15 7:00 27-Feb-15 18:00 Daily 268 765 Bus # 2 at Jabalpur Pooling Station 27-Feb-15 09:00 27-Feb-15 18:00 269 HVDCDIA 20 Q 50 Bay at BHADRAWATI 27-Feb-15 9:00 270 220 Jhanor Haldarwa 2 28-Feb-15 271 765 Bus reactor Main bay (713) at SEONI 28-Feb-15 Tie Bay of 400kV ICT-2 & Bus Reactor at Kotra PS 125 MVAR Bus Reactor-II at Shujalpur Insulator Replacement works by Polymer daily Maintenance Work Overhead crossing of 400KV D/c Daily (Quad) Mahan-Sipat line of M/s Essar Power Transmission company Limited Contin Replacement of support latch uous assembly of 70952 CB Site Acceptance Test (SAT) work Daily of NTAMC Daily WRTS-I POWERGR WR-II ID C TESTING OF REMOTE OPERATION POWERGR WR-II ID C Daily To carry out Bus Stability Test for Commissioning of 765kV Bus Reactor # 1 POWERGRI WR-II C 27-Feb-15 18:00 Daily Yealy AMP WRTS-I R 9:00 28-Feb-15 17:00 Daily AMP of bays POWERGRI WR-II R 9:00 28-Feb-15 18:00 Daily AMP works. WRTS-I R WRTS-I WRTS-I SN 272 KV Line AURANGABAD II Tie Bay (411) at PUNE Bus Reactor # 2 (330MVAR) at 765 WARDHA 400 Date From Time To Date 28-Feb-15 9:00 28-Feb-15 18:00 28-Feb-15 9:00 01-Mar-15 Basis Reason System Agency type Daily AMP works. WRTS-I WRTS-I R WRTS-I C WRTS-I C WRTS-I R Time 274 765 WARDHA - AURANGABAD(PG) I 28-Feb-15 9:00 28-Feb-15 18:00 275 400 Parli # 2 (408) Tie Bay at WARDHA 28-Feb-15 9:00 28-Feb-15 18:00 Auxiliary Bus connection work at WRTS-I WARDHA Commissioning of Spare Reactor unit & DGA of bushing oil at Daily Aurangabad and NGR WRTS-I Replacement& DGA of bushing oil at WARDHA Conti. CT N2 valve Replacement work WRTS-I 28-Feb-15 9.00 28-Feb-15 17.00 Daily 273 276 Khadka-Koradi 18:00 Conti. 400 CT tan delta,Relay testing, CB DCRM Measurement & Routine Line maint. Fixing of dislocated spacers,hot spot For AMP works 277 400 Mundra-Jetpur Circuit#2 28-Feb-15 08:00 28-Feb-15 18:00 Daily 278 220 ICT-I Bay at Bhatapara ss 28-Feb-15 9:00 28-Feb-15 17:00 Daily 279 220 Navsari (PG) - Navsari (GETCO) -2 28-Feb-15 09:00 28-Feb-15 18:00 Daily 280 400 Main Bus-1 at Kalwa 28-Feb-15 09:00 01-Mar-15 18:00 281 765 SASAN-SATNA-2 Line REACTOR 28-Feb-15 9:00 02-Mar-15 18:00 282 765 Bay No.: 803 (Main Bay) of ICT # 1 at 28-Feb-15 Jabalpur Pooling Station 10:00 28-Feb-15 11:30 283 765 Bay No.: 806 (Main Bay) of ICT # 2 at 28-Feb-15 Jabalpur Pooling Station 11:45 28-Feb-15 02:30 284 400 Boisar-Padghe 28-Feb-15 8:00 28-Feb-15 18:00 285 400 Kasor- CPEC Line 28-Feb-15 8:00 28-Feb-15 18:00 Conti. Isolator Maintenance For attending of Fire Fighting. Line Cont. will be taken into service without line reactor at Satna For Collection of Current Daily Transformer Oil Samples of ICT # 1 Main Bay For Collection of Current Daily Transformer Oil Samples of ICT # 2 Main Bay Insulator Replacement works by Daily Polymer Daily PMM work 286 765 SASAN-SATNA#2 Line 28-Feb-15 9:00 28-Feb-15 18:00 Daily 287 220 220kV Bus Coupler at Dehgam 28-Feb-15 10:00 28-Feb-15 16:00 288 400 28-Feb-15 10:00 04-Mar-15 289 220 KALA - KHADOLI - II 28-Feb-15 7:00 28-Feb-15 18:00 290 HVDCDIA 20 Q 52 Bay at BHADRAWATI 28-Feb-15 9:00 28-Feb-15 18:00 291 400 Kalwa-Padgha 01-Mar-15 09:00 01-Mar-15 AT#01 and 400 KV Main Bus-I of Tamnar PS at Tamnar PS 18:00 18:00 For attending line defects RELAY FIRMWARE UPGRADATION MSETCL MSETCL POWERGRI WR-II WRTS-I POWERGRI R D POWERGRI WR-II MSETCl R R MSETCl POWERGRI WR-II R POWERGRI WR-II C POWERGRI WR-II C POWERGRI WR-II R GETCO GETCO POWERGRI WR-II C Site Acceptance Test (SAT) work of NTAMC Contin Stringing of Main Bus-I of M/s TRN uous Bays TESTING OF REMOTE Daily OPERATION POWERGR WR-II ID C WRTS-I C POWERGR WR-II ID C Daily Yealy AMP WRTS-I WRTS-I R Daily maintenance work MSETCL MSETCL R Daily M/s TRN SN KV Line From Date Time To Date Basis Reason System Agency type For collection of oil sample from ABB make 765 kV Bushings to carry out the DGA analysis. Line will be charged within 15 minutes POWERGRI WR-II R POWERGRI WR-II POWERGRI WR-II C C POWERGRI WR-II R WRTS-II WRTS-I C MEGPTCL MEGPTCL R Time 292 765 Satna - Bina # 2 line reactor at Bina 01-Mar-15 09:00 01-Mar-15 18:00 Daily 293 294 400 ICT # 1 at Damoh 400 ICT # 2 at Damoh 01-Mar-15 01-Mar-15 10:00 01-Mar-15 15:00 01-Mar-15 14:00 19:00 Daily Daily 295 400 Mundra-Limbdi Circuit #1 01-Mar-15 08:00 01-Mar-15 18:00 Daily 296 400 Seoni-Khandwa-I 02-Mar-15 9:00 02-Mar-15 18:00 Daily 297 409 Main Bay of Akola-1 Line-1 at 400 K Akola II substation 02-Mar-15 7:00 28-Feb-15 18:00 Daily 298 765 Bina-Jabalpur (Pool )# 1 02-Mar-15 8:00 02-Mar-15 19:00 Daily 299 220 KAPP- Haldarwa 1 706 BAY ICT-1 MAIN BAY AT 765 GWALIOR 02-Mar-15 9:00 02-Mar-15 17:00 Daily AMP of terminal equipment & associated bay equipment and rectification of line defects AMP of bays 02-Mar-15 10:00 03-Mar-15 18:00 Daily 301 765 Bus reactor-Tie bay (714) at SEONI 02-Mar-15 9:00 03-Mar-15 18:00 302 765 Raichur-2 Tie Bay (714) at Solapur 02-Mar-15 9:00 02-Mar-15 303 400 Karad (80MVAr) Reactor at Solapur 02-Mar-15 9:00 304 765 765KV BUS-1 at AURANGABAD(PG) 02-Mar-15 305 400 400 KV S/C Bina Thermal Power Station-MPPTCL 400kV S/S Bina For NTAMC work For NTAMC work Rectification of Jumper mismatching Replacement of Distance Relay and CSD commissioining at SEONI 409 CT Testing POWERGRI WR-II R POWERGRI WR-II R AMP WORKS POWERGRI WR-II R Daily AMP works. WRTS-I WRTS-I R 18:00 Daily WRTS-I WRTS-I R 05-Mar-15 18:00 Daily AMP works. AMP, DGA of bushing oil & Fire Fighting works. WRTS-I WRTS-I R 9:00 02-Mar-15 18:00 Daily Bus Extension at Aurangabad WRTS-I WRTS-I C 02-Mar-15 8:00 03-Mar-15 18:00 Crossing of 765 KV S/C JabalpurJAYPEE/M Contin JTCL Bina Line-Pkg-B(AP111/2PPTCL uous AP111/3) 02-Mar-15 9:00 02-Mar-15 18:00 Conti. CT N2 valve Replacement work WRTS-I WRTS-I R 02-Mar-15 9:00 02-Mar-15 16:00 Daily DGA of Bushing oil. WRTS-I WRTS-I R 02-Mar-15 9:00 02-Mar-15 16:00 Daily DGA of Bushing oil. WRTS-I WRTS-I R 02-Mar-15 9:00 03-Mar-15 18:00 Daily For AMP WRTS-I 310 765 ICT#2 Main Bay(721) at Bilaspur S/S 02-Mar-15 9:00 03-Mar-15 18:00 Daily For AMP work WRTS-I 311 400 02-Mar-15 9:00 02-Mar-15 17:00 Daily For AMP Work WRTS-I 312 220 ICT-II Bay at Bhatapara ss 02-Mar-15 9:00 02-Mar-15 17:00 Daily 313 400k 02-Mar-15 9:00 02-Mar-15 18:00 Daily 300 306 307 308 309 424 Main Bay of 400 KV ICT # 2 at WARDHA 400 125MVAR Bus Reactor at PARLI 125MVAR Bus Reactor at 400 AURANGABAD(PG) Main Bay of 765kV Wardha-I at Durg 765 PS 400 Raigarh 4 Main Bay (39) at Raipur S/S 400KV BUS-2 of Ph-3 APL generation plant switchyard. For AMP works For Bus jumper Disconnection to isolate the jack bus for CB retrofitting. WRTS-I APL POWERGRI D POWERGRI D POWERGRI D POWERGRI D APL R R R R C SN KV Line From Date Time To Date Basis Reason System Agency type POWERGRI WR-II R Time 314 Gwalior - Bina # 1 line reactor at 765 Bina (along with line outage for 30 minutes) 02-Mar-15 09:00 02-Mar-15 18:00 Daily For collection of oil sample from ABB make 765 kV Bushings to carry out the DGA analysis. Line will be charged within 30 minutes 315 316 400 Damoh - Bhopal # 1 TL 400 Damoh - Bhopal # 2 TL 02-Mar-15 02-Mar-15 10:00 02-Mar-15 15:00 02-Mar-15 14:00 19:00 Daily Daily For NTAMC work For NTAMC work POWERGRI WR-II POWERGRI WR-II C C 317 400 02-Mar-15 10:00 02-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 318 400 Bachau - Varsana Ckt.2 Bus Reactor # 1 (Main & Tie Bay) at 400 Jabalpur Pooling Station 02-Mar-15 10:00 02-Mar-15 14:00 Daily C 02-Mar-15 09:00 03-Mar-15 18:00 Cont. 320 400 Vapi-Boisar 02-Mar-15 8:00 02-Mar-15 18:00 Daily For replacement of pentrograph iso POWERGRI WR-II Installation & Commissioning of POWERGRI WR-II CSD Relay Insulator Replacement works by POWERGRI WR-II Polymer 321 400 400 KV BUS REACTOR AT 400 KV S/S BINA 02-Mar-15 9.00 02-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 322 400k Sectionalizer 442 Betweem Ph-3 & 4 02-Mar-15 of APL generation plant Switchyard. 9:00 07-Mar-15 18:00 Continu Retrofitting of SIEMENS 400KV CB in place of chinese CB. APL APL C 323 765 1500MVA-ICT-3 & Seoni-Wardha I line 02-Mar-15 9:00 07-Mar-15 18:00 Shutdown required on both the line Conti. & transformer for erection of aux WRTS-I bus tower at SEONI. WRTS-I C 324 HVDCDIA 30 Q 50 Bay at BHADRAWATI 02-Mar-15 9:00 02-Mar-15 18:00 Daily WRTS-I R 325 400 Seoni-Khandwa-II 03-Mar-15 9:00 03-Mar-15 18:00 Daily 326 765 03-Mar-15 8:00 05-Mar-15 17:00 327 Sundargarh - Dharamjaygarh 1&2 400 Vindhyachal Bus- Coupler-3 03-Mar-15 07:30 h03-Mar-15 19:00 hrs Daily 328 765 Dharamjaygarh # 1 Line/Bus reactor 03-Mar-15 at PS / Jabapur 09:00 03-Mar-15 17:00 Daily 329 765 Bina-Jabalpur (Pool )# 2 03-Mar-15 8:00 03-Mar-15 19:00 Daily 330 400 03-Mar-15 9:00 03-Mar-15 18:00 Daily AMP works. WRTS-I WRTS-I R 03-Mar-15 03-Mar-15 9:00 9:00 03-Mar-15 03-Mar-15 18:00 18:00 Daily Daily AMP works. AMP works. WRTS-I WRTS-I WRTS-I WRTS-I R R 03-Mar-15 9:00 03-Mar-15 18:00 Daily Bus Extension at Aurangabad WRTS-I WRTS-I C 319 331 332 333 Khandwa-Dhule-2 Main Bay of 400kv ICT-2 (407) at Solapur 400 Parli # 1 Main Bay (415) at PARLI 400 ICT-2 Main Bay (412) at PUNE 765KV BUS-2 at 765 AURANGABAD(PG) Yealy AMP WRTS-I Replacement of Distance Relay WRTS-II WRTS-I and CSD commissioining at SEONI To attened punch point of Trnsmission Line. And Erection of Contin Beam near Dharmjaygarh line-2 POWERGR WRPC uous for Dharamjaygarh Line-3&4 Bay ID ERPC extension work. And For erection of auxiliary bus of spare reactor NTPC NTPC AMP AMP of Line reactor charged as a POWERGRI WR-II Bus Reactor & associated bay equipment, AMP of terminal equipment & POWERGRI WR-II associated bay equipment and rectification of line defects C R C R R SN KV Line Date From Time To Date Time Basis Reason System 334 400 Akola-Aurangabad # 1 03-Mar-15 9:00 03-Mar-15 13:00 Daily Bushing oil DGA of Reactor at Akola (MSETCL), line charged w/o WRTS-I reactor. 335 400 Sipat # 2 Main Bay (09) at Raipur S/S 03-Mar-15 8:00 04-Mar-15 18:00 Daily For AMP Work 336 220 Transfer Bus at Bhatapara 9:00 3-Mar-15 17:00 Daily 337 Gwalior - Bina # 2 line reactor at 765 Bina (along with line outage for 30 minutes) V,chal -SATNA#2 Line REACTOR (charged as bus reactor) 338 765 339 400 Korba(W)- Khedamara S/C 3/Mar/15 03-Mar-15 09:00 03-Mar-15 18:00 Daily For AMP works For collection of oil sample from ABB make 765 kV Bushings to carry out the DGA analysis. Line will be charged within 30 minutes WRTS-I WRTS-I Agency type WRTS-I R POWERGRI R D POWERGRI R D POWERGRI WR-II R For Commissioning of Auto Reclosing Scheme of the line, C Cont. outage of line reactor (presently POWERGRI WR-II charged as bus reactor) is required at Satna For construction of 765KV D/C Contin POWERGRI C Dharamjaygarh (Korba)-Jabalpur CSPTCL uous D Transmission Line (Part-I) 03-Mar-15 9:00 04-Mar-15 18:00 03-Mar-15 8:00 04-Mar-15 18:00 340 400 315MVA ICT#II at Pirana Sub-Station 03-Mar-15 8:00 03-Mar-15 18:00 Daily For NTAMC work POWERGRI WR-II C 341 400 Damoh - Birshingpur # 1 TL 03-Mar-15 10:00 03-Mar-15 14:00 Daily For NTAMC work at Damoh S/S. POWERGRI WR-II C 342 400 Damoh - Birshingpur # 2 TL 03-Mar-15 15:00 03-Mar-15 19:00 Daily For NTAMC work at Damoh S/S. POWERGRI WR-II C 343 400 Khandwa-Itarsi-1 03-Mar-15 10:00 03-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 344 400 03-Mar-15 8:00 03-Mar-15 17:00 Daily 03-Mar-15 8:00 03-Mar-15 18:00 Daily 03-Mar-15 9.00 03-Mar-15 17.00 daily 03-Mar-15 9.00 03-Mar-15 17.00 03-Mar-15 03-Mar-15 03-Mar-15 10:00 03-Mar-15 8:00 03-Mar-15 8:00 03-Mar-15 03-Mar-15 9:00 03-Mar-15 03-Mar-15 SEL - Raigarh - 2 345 400 Boisar-Padghe 346 400 347 348 349 350 351 352 353 400 KV LINE REACTOR- I AT 400 KV S/S BINA 315MVA XMER - I AT400 KV S/S 400 BHOPAL 400 400kV Dehgam-Sami#2 400 Kansari Kankaroli 400 Asoj-indore line-1 Station Transformer - II, 400 /11.5 400 KV, 90 MVA at JPL AURANGABAD(PG)400 AURANGABAD(MSETCL)- II 412 Main Bay of Akola-1 Line-2 at 400 K Akola II substation For tightening of Jumpers, Adjustment of VD, Corona Ring and spacer at various locations Insulator Replacement works by Polymer POWERGR WRPC ID ERPC POWERGRI WR-II R Maintenance Work MPPTCL MPPTCL R daily Maintenance Work MPPTCL MPPTCL R 17:00 18:00 18.00 Daily Daily Daily APL PGCIL PGCIL WR-II GETCO GETCO C 18-Mar-15 17:00 Daily NTAMC Adaptation Work PMM work PMM work Preventive maintenence /AOH (JPL Unit - II under shutdown) JPL JPL 9:00 04-Mar-15 18:00 Replacement of HCB Isolator WRTS-I WRTS-I C 7:00 03-Mar-15 18:00 SF6 Filteration of 412 CB MEGPTCL MEGPTCL R Conti. Daily SN KV Line Date From Time To Date Time Basis Reason 354 400 400kV Athena (ACPL) - Kotra PS 03-Mar-15 8:00 04-Apr-15 18:00 355 765 765 KV ICT # 3 at WARDHA 04-Mar-15 9:00 06-Mar-15 18:00 356 400 RAIPUR-WARDHA II 04-Mar-15 9:00 05-Mar-15 18:00 357 220 KAPP- Haldarwa 2 04-Mar-15 9:00 04-Mar-15 17:00 Stringing of 765kV, S/C RaigarhContin Champa TL between Loc 13/5 uous (A+3) - Loc 13/6 (A+3) Daily LA replacement work To attend clearance between earth Daily wire & conductor. Daily AMP of bays 358 400 04-Mar-15 8:00 04-Mar-15 18:00 Daily AMP Work 359 400 315MVA ICT-2 at Solapur 04-Mar-15 9:00 04-Mar-15 18:00 Daily 360 765 Seoni- Bina Tie bay (726) at SEONI 04-Mar-15 9:00 06-Mar-15 18:00 Rourkela - Raigarh - 2 361 362 363 04-Mar-15 400 Parli- Chandrapur ll Ckt-1 Tie Bay of 765kV Wardha-I at Durg 765 PS Bus Reactor Main Bay(706) at 765 Bilaspur S/S 9.00 06-Mar-15 System Agency WRTS-I POWERGRI C D WRTS-I WRTS-I R WRTS-I WRTS-I R POWERGRI WR-II POWERGR WRPC ID ERPC R AMP works & DGA of bushing oil. WRTS-I WRTS-I R Daily AMP works. WRTS-I WRTS-I R Daily Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper MSETCL 17.00 04-Mar-15 9:00 05-Mar-15 18:00 Daily For AMP WRTS-I 04-Mar-15 9:00 05-Mar-15 18:00 Daily For AMP work WRTS-I 05-Mar-15 17:00 Daily For AMP Work WRTS-I 18:00 Daily 364 400 Sipat # 2 Tie Bay (08) at Raipur S/S 04-Mar-15 9:00 365 220 Bus-I at Bhatapara 4/Mar/15 10:00 4-Mar-15 type For AMP works For collection of oil sample from Daily ABB make 765 kV & 400 kV Bushings to carry out the DGA analysis. For commissioning of 765kV side Daily CSD of ICT-1 at Gwalior For erection of auxiliary bus of Continu spare reactor WRTS-I MSETCL POWERGRI D POWERGRI D POWERGRI D POWERGRI D R R R R 366 765 1000 MVA ICT 1 at Bina 04-Mar-15 09:00 04-Mar-15 18:00 367 765 1500 MVA ICT-1 AT GWALIOR 04-Mar-15 10:00 04-Mar-15 18:00 368 765 765kV Korba-Ranchi-2 Ckt 02 04-Mar-15 9:00 05-Mar-15 18:00 369 400 Bus Reactor # 1 at Damoh 04-Mar-15 10:00 04-Mar-15 14:00 Daily For NTAMC work at Damoh S/S. POWERGRI WR-II C 370 400 Bus Reactor # 2 at Damoh 04-Mar-15 15:00 04-Mar-15 19:00 Daily For NTAMC work at Damoh S/S. POWERGRI WR-II C 371 400 Khandwa-Itarsi-2 04-Mar-15 10:00 04-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 372 765 1500MVA ICT # 1 (Main & Tie Bay) at Jabalpur Pooling Station 04-Mar-15 09:00 05-Mar-15 18:00 Cont. 373 400 Boisar-Padghe 04-Mar-15 8:00 04-Mar-15 18:00 Daily 374 400 04-Mar-15 9.00 04-Mar-15 17.00 daily Maintenance Work 375 400 400kV Dehgam-Gandhar#2 04-Mar-15 10:00 04-Mar-15 17:00 Daily NTAMC Adaptation Work & SAT of POWERGR WR-II NTAMC ID 400 KV LINE REACTOR- II AT 400 KV S/S BINA Installation & Commissioning of CSD Relay Insulator Replacement works by Polymer POWERGRI WR-II R POWERGRI WR-II C WRTS-I POWERGRI C D POWERGRI WR-II C POWERGRI WR-II R MPPTCL R MPPTCL C SN KV Line Date From Time To Date Basis Reason System Agency type PMM work PMM work PMM work Rectification of line construction defects PGCIL PGCIL PGCIL GETCO GETCO GETCO WRTS-I WRTS-I C WRTS-I R Time 376 377 378 400 Asoj-indore line-2 220 ichapur-Kawas-1 400 Kansari Bhinmal 04-Mar-15 04-Mar-15 04-Mar-15 8:00 8:00 8:00 04-Mar-15 18.00 04-Mar-15 18:00 04-Mar-15 18:00 Daily Daily Daily 379 765 DURG PS - WARDHA_1 & 2_D/C 04-Mar-15 9:00 04-Mar-15 18:00 Daily 380 400 04-Mar-15 9:00 04-Mar-15 18:00 Daily Yealy AMP WRTS-I 381 765 Bina - Gwalior # 3 05-Mar-15 8:00 05-Mar-15 19:00 Daily AMP of terminal equipment & associated bay equipment and rectification of line defects POWERGRI WR-II R 382 765 9:00 05-Mar-15 18:00 Daily AMP work WRTS-I WRTS-I R 8:00 05-Mar-15 20:00 WRTS-I POWERGRI R D 383 50MVAR Bus reactor at BHADRAWATI Bus Reactor-2 (709) Main bay at 05-Mar-15 WARDHA Jindal # 2 (413) Main Bay at Tamnar 400 05-Mar-15 PS Contin AMP WORKS uous AMP works ( TL and Substation Daily Line Equipment ) Daily AMP works. Daily AMP works. Dignostic Testing of reactor, CB, Daily CT & relay WRTS-I 384 220 Tarapur-Boisar 05-Mar-15 8:00 05-Mar-15 18:00 385 386 765 ICT-2 Tie Bay (705) at Solapur 400 Parli # 2 Main Bay (418) at PARLI 05-Mar-15 05-Mar-15 9:00 9:00 05-Mar-15 05-Mar-15 18:00 18:00 05-Mar-15 9.00 05-Mar-15 17.00 05-Mar-15 9:00 06-Mar-15 17:00 Daily 5/Mar/15 11:00 5-Mar-15 19:00 Daily 387 388 389 400 Lonikand-koyna Stage IV Wardha1 Main Bay (34) at Raipur 400 S/S 220 Bus-II at Bhatapara For AMP Work For AMP works POWERGRI WR-II R WRTS-I WRTS-I WRTS-I WRTS-I R R MSETCL MSETCL POWERGRI R D POWERGRI R D WRTS-I 390 765 1000 MVA ICT 2 at Bina 05-Mar-15 09:00 05-Mar-15 18:00 Daily 391 220 Damoh - Damoh MPPTCL # 1 TL 05-Mar-15 10:00 05-Mar-15 14:00 Daily For collection of oil sample from ABB make 765 kV & 400 kV Bushings to carry out the DGA analysis. For NTAMC work at Damoh S/S. 392 220 Damoh - Damoh MPPTCL # 2 TL 05-Mar-15 15:00 05-Mar-15 19:00 Daily For NTAMC work at Damoh S/S. WR-II C 393 400 05-Mar-15 10:00 05-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 394 400 05-Mar-15 9.00 05-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 05-Mar-15 8:00 05-Mar-15 18:00 Daily PMM work PGCIL GETCO 05-Mar-15 9:00 06-Mar-15 18:00 05-Mar-15 9:00 05-Mar-15 18:00 Daily 395 396 397 Khandwa-Seoni-1 315MVA XMER - I & BDTCL - I Tie AT400 KV S/S BOPAL 220 I'pore-Kawas-2 AURANGABAD(PG)400 AURANGABAD(MSETCL)-I HVDC-2 & Chandrapur -1Tie bay 400 (405) at BHADRAWATI Conti. 398 400 Korba-Raipur-3&4 06-Mar-15 9:00 20-Mar-15 18:00 Daily 399 400 Bhatapra-Bhilai 06-Mar-15 9:00 20-Mar-15 18:00 Daily POWERGRI WR-II R MPPTCL WR-II C MPPTCL Replacement of CTs and jumpers WRTS-I WRTS-I C Yealy AMP WRTS-I WRTS-I R WRTS-I PGCIL C WRTS-I PGCIL C A/R non auto mode for Additional Earthing work on lines by Raipur TLM A/R non auto mode for Additional Earthing work on lines by Raipur TLM SN 400 401 402 403 404 405 KV Line Basis Reason System Agency type 18:00 Daily AMP work WRTS-I WRTS-I R 06-Mar-15 18:00 8:00 06-Mar-15 20:00 06-Mar-15 8:00 06-Mar-15 18:00 06-Mar-15 400 Bhusawal-Akola Main Bay of 765kV Wardha-II at Durg 765 06-Mar-15 PS 9.00 06-Mar-15 17.00 Daily AMP works Contin AMP WORKS uous Daily Attending Leakages & Painting Disc string replacement,fixing of Daily spacers,dampers,earthbond MSETCL 9:00 07-Mar-15 18:00 Daily For AMP WRTS-I Bus Reactor-2 (708) Tie bay at WARDHA 400 Tarapur-Boisar # I Jindal # 2 & AT#3 (414) Tie Bay at 400 Tamnar PS 400 315 MVA ICT 2 at Boisar 765 Date From Time To Date Time 06-Mar-15 9:00 06-Mar-15 06-Mar-15 8:00 06-Mar-15 R POWERGRI WR-II POWERGRI R WRTS-I D R POWERGRI WR-II MSETCL POWERGRI R D POWERGRI R D 406 400 Bus Coupler # 1 at Raipur S/S 06-Mar-15 9:00 07-Mar-15 17:00 Daily For AMP Work WRTS-I 407 220 Damoh - Sagar MPPTCL 06-Mar-15 10:00 06-Mar-15 14:00 Daily For NTAMC work at Damoh S/S. MPPTCL WR-II C 408 220 Damoh - Tikamgarh MPPTCL 06-Mar-15 15:00 06-Mar-15 19:00 Daily For NTAMC work at Damoh S/S. MPPTCL WR-II C 409 765 06-Mar-15 09:00 07-Mar-15 18:00 POWERGRI WR-II C 410 765 DURG PS - WARDHA_1 & 2_D/C 07-Mar-15 9:00 07-Mar-15 18:00 WRTS-I WRTS-I C 411 765 07-Mar-15 9:00 11-Mar-15 18:00 WRTS-I WRTS-I C 412 413 220 Kawas Haldarwa 1 400 Tarapur-Boisar # II 07-Mar-15 07-Mar-15 09:00 07-Mar-15 17:00 8:00 07-Mar-15 18:00 414 400 AT#3 (415) Main Bay at Tamnar PS 07-Mar-15 8:00 07-Mar-15 20:00 415 765 Seoni- Bina Main bay (727) at SEONI 07-Mar-15 9:00 07-Mar-15 416 765 ICT-1 Main Bay (703) at Solapur 07-Mar-15 9:00 07-Mar-15 9.00 1500MVA ICT # 2 (Main & Tie Bay) at Jabalpur Pooling Station WARDHA - AURANGABAD(PG) I & II _D/C 417 Daily AMP of bays Daily AMP works Contin AMP WORKS uous R POWERGRI WR-II R POWERGRI WR-II POWERGRI R WRTS-I D 18:00 Daily AMP works. WRTS-I WRTS-I R 07-Mar-15 18:00 Daily WRTS-I WRTS-I R 08-Mar-15 17.00 AMP works. Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper Bus extention for Raipur # 3 & 4 ckt Commissioning of Line Reactor at AURANGABAD(PG) & Bushing oil DGA of Reactor at Akola (MSETCL) For AMP works MSETCL MSETCL WRTS-I WRTS-I C WRTS-I WRTS-I C WRTS-I POWERGRI R D 400 Parli- Chandrapur-lll 418 765 765 KV Bus # 2 at WARDHA 419 400 420 400 Bus-I at Bhatapara AURANGABAD(PG)AKOLA(MSETCL)-II Installation & Commissioning of CSD Relay Rectification of LA terminal pad Daily replacement work of Ckt-1 at WARDHA For construction ,crossing & swapping work of up-coming new 765kV WARDHA Conti. AURANGABAD(PG) 3 & 4 _D/C line. AND NGR Replacement at Wardha-Aurangabad-1 Cont. Daily 07-Mar-15 9:00 07-Mar-15 18:00 Daily 07-Mar-15 9:00 07-Mar-15 18:00 Daily 7/Mar/15 9:00 7-Mar-15 17:00 Daily SN KV Line 400KV BUS-2 of Ph-3 APL generation plant switchyard. Date From Time To Date Time Basis Reason System Agency type 07-Mar-15 9:00 07-Mar-15 18:00 Daily For Bus jumper Reconnection to normalize the jack bus after CB retrofitting. APL APL C 421 400k 422 220 Damoh - Katni MPPTCL # 1 TL 07-Mar-15 10:00 07-Mar-15 14:00 Daily For NTAMC work at Damoh S/S. MPPTCL WR-II C 423 220 Damoh - Katni MPPTCL # 2 TL 07-Mar-15 15:00 07-Mar-15 19:00 Daily For NTAMC work at Damoh S/S. MPPTCL WR-II C 424 400 07-Mar-15 10:00 07-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 07-Mar-15 9.00 07-Mar-15 17.00 07-Mar-15 09:00 07-Mar-15 18:00 08-Mar-15 9:00 08-Mar-15 18:00 08-Mar-15 9.00 08-Mar-15 17.00 Khandwa-Seoni-2 429 765/ Sipat 400KV ICT-1 TO IBT-1 TIE 400 BAY-14 09-Mar-15 07:30 14-Mar-15 hrs 19:00 hrs 430 220 Kawas Haldarwa 2 09-Mar-15 09:00 09-Mar-15 17:00 Replacement of faulty insulator string Swiitcheable Line Reactor to be taken out of service for carrying Daily out the AMP work of switcheable CB. Line shall be remain in service Stringing work of broken earth wire Daily between span 387 to 390 Dignostic Testing of reactor, CB, Daily CT & relay All burnt control cable replacement Contin (ICT-1 AND IBT-1 ous TRANSFORMERS S/D NOT REQUIRED) Daily AMP of bays 431 400 09-Mar-15 9:00 09-Mar-15 17:00 Daily AMP Work 432 400 09-Mar-15 9:00 09-Mar-15 18:00 Daily 433 765 09-Mar-15 10:00 10-Mar-15 18:00 Daily 434 400 09-Mar-15 8:00 09-Mar-15 20:00 Contin AMP WORKS uous WRTS-I POWERGRI R D 435 765 09-Mar-15 9:00 11-Mar-15 18:00 Daily WRTS-I WRTS-I R 436 765 Pune Line Reacator at Solapur 09-Mar-15 9:00 09-Mar-15 18:00 Daily WRTS-I WRTS-I R 437 765 WARDHA - AURANGABAD(PG) II 09-Mar-15 9:00 09-Mar-15 18:00 Daily WRTS-I WRTS-I C 438 765 09-Mar-15 9:00 10-Mar-15 18:00 439 765 ICT#1 at Bilaspur S/S 09-Mar-15 8:00 10-Mar-15 440 400 Bus Coupler # 2 at Raipur S/S 09-Mar-15 8:00 08-Mar-15 425 400 Dhule-Babhleswar ckt 2 426 765 427 400 WARDHA-PARLI II 428 Gwalior-III lIne Reactor at Bina SS 400 Akola-Wardha-ll Rourkela - Raigarh - 2 BUS REACTOR (80MVAR) AT KOLHAPUR 712 L/R BAY OF BINA -1 AT GWALIOR Jindal # 1 (416) Main Bay at Tamnar PS 1500MVA-ICT I Main bay (712) at SEONI Tie Bay of 765kV Wardha-II at Durg PS Daily MSETCL MSETCL POWERGRI WR-II R WRTS-I WRTS-I R MSETCL MSETCL NTPC NTPC POWERGRI WR-II POWERGR WRPC ID ERPC R AMP WORKS WRTS-I R AMP works POWERGRI WR-II AMP works. Daily AMP, DGA of bushing oil & Fire Fighting works. Commissioning of Spare Reactor unit at Aurangabad & Commissioning of Illumination system at WARDHA For AMP WRTS-I 18:00 Daily For AMP work WRTS-I 18:00 Daily For AMP Work WRTS-I WRTS-I C POWERGRI R D POWERGRI R D POWERGRI R D SN KV Line Date From Time To Date Time Basis Reason System Agency type 441 765 Bus-2 at Satna 09-Mar-15 9:00 10-Mar-15 18:00 Daily For extension of Bus-2 & Bus Bar POWERGRI WR-II testing for Bus Reactor-2 C 442 400 09-Mar-15 10:00 09-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 443 765 Raipur PS -Dharamjaygarh PS S/C 09-Mar-15 8:00 09-Mar-15 18:00 Daily For overhead crossing of 800 kV HVDC Champa-Kurukshetra TL 444 400 Itarsi-Indore-2 09-Mar-15 9:00 10-Mar-15 18:00 Cont. 445 765 09-Mar-15 09:00 10-Mar-15 18:00 Cont. Khandwa-Rajgarh -2 WRTS-I POWERGRI C D For Retrofitting of Main-I Distance POWERGRI WR-II Relay Installation & Commissioning of POWERGRI WR-II CSD Relay C 09-Mar-15 9.00 09-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 447 448 Bus Reactor # 2 (Main & Tie Bay) at Jabalpur Pooling Station 315MVA XMER - I I AT400 KV S/S 400 BHOPAL 400 400 kv Indore - Nagda Ckt 220 Sartanpar-Bhimasr Line No. 1 09-Mar-15 09-Mar-15 9.00 8:00 09-Mar-15 16.00 09-Mar-15 18:00 daily Daily 400 400kV Dehgam-Nagda#1 09-Mar-15 10:00 09-Mar-15 17:00 Daily MPPTCL MPPTCL GETCO GETCO POWERGR WR-II ID R 449 Maintenance Work PMM work Site Acceptance Test (SAT) work of NTAMC 450 400 9:00 09-Mar-15 18:00 Daily Yealy AMP WRTS-I 451 220 Transfer Bus at Damoh 10-Mar-15 10:00 10-Mar-15 17:00 Daily AMP of Bus & associated BAY Equipment POWERGRI WR-II 452 400 10-Mar-15 8:00 10-Mar-15 20:00 Contin AMP WORKS uous 453 765 Raichur-2 Line Recator at Solapur 10-Mar-15 9:00 10-Mar-15 18:00 Daily AMP works & DGA of bushing oil . WRTS-I WRTS-I R 454 400 400KV BUS-2 at PARLI 10-Mar-15 9:00 10-Mar-15 18:00 Daily WRTS-I WRTS-I R 455 220 TAPS-Bhilad 10-Mar-15 8:00 11-Mar-15 19:00 Daily AMP works. Annual maintenance of equipments & painting GETCO NPCIL 456 400 Bhadrawati # 2 LR Bay at Raipur S/S 10-Mar-15 8:00 09-Mar-15 18:00 Daily For AMP Work WRTS-I POWERGRI R D 457 Mundra - Jetpur # 2 line reactor at 400 Jetpur 14:00 Daily For bushing tan delta measurement. Line charged within POWERGRI WR-II 15 min. wihtout LR at Jetpur end. 458 Chakabura- Bharari (Bilaspur) D/C 400 Line 10-Mar-15 8:00 11-Mar-15 18:00 For construction of 765KV D/C Contin Dharamjaygarh (Korba)-Jabalpur uous Transmission Line (Part-I) 459 400 10-Mar-15 10:00 10-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 460 400 Bina-Shujalpur Ckt-I 220 KV PITHAMPUR - RAJGARH 220 PG CKT - I 10-Mar-15 10:00 10-Mar-15 18:00 Daily For NTAMC Works POWERGRI WR-II C 10-Mar-15 9.00 10-Mar-15 16.00 daily Maintenance Work MPPTCL MPPTCL R 462 220 220 KV MALANPUR - AURAIYA CKT 10-Mar-15 9.00 11-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 463 464 220 Haldarva-Jhanor-1(NTPC) 400 Vadavi - Dehgam (PG) - 2 8:00 8:00 10-Mar-15 10-Mar-15 18:00 18:00 Daily Daily PMM work PMM work PGCIL GETCO GETCO GETCO 446 461 HVDC -2 interconnector (404) Bay at 09-Mar-15 BHADRAWATI Jindal # 1 & Future (417) Tie Bay at Tamnar PS Khandwa-Rajgarh-1 10-Mar-15 10-Mar-15 10-Mar-15 10:00 10-Mar-15 WRTS-I ACB WRTS-I C C R R POWERGRI R D R POWERGRI C D SN KV Line From Time To Date Time 8:00 10-Mar-15 9:00 10-Mar-15 467 10-Mar-15 220 Sartanpar-Bhimasr Line No. 2 400KV JPL - JPL Extn Interconnector 400 10-Mar-15 Line 10-Mar-15 132 Vindhyachal-Wadhan-1 07:30 h10-Mar-15 19:00 hrs Daily 468 400 400kV Dehgam-Pirana#1 10-Mar-15 10:00 10-Mar-15 17:00 Daily 469 220 11-Mar-15 9:00 11-Mar-15 18:00 Daily 470 765 AT#3 (709) Main Bay at Tamnar PS 11-Mar-15 6:00 11-Mar-15 22:00 Contin AMP WORKS uous 471 400 Raichur-1 Line Reactor at Solapur 11-Mar-15 9:00 11-Mar-15 18:00 Daily AMP works & DGA of bushing oil . WRTS-I 11-Mar-15 9.00 11-Mar-15 17.00 Daily Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay MSETCL Date 465 466 GED Line-5 (Future) Bay (210) at Mapusa 472 473 474 475 400 Parli- Solapur Main Bay of 765kV Kotra-I at Durg 765 PS Jindal #1 Main Bay (33) at Raipur 400 S/S Satna-GWALIOR#1 Reactor Bay 765 (712R) at Satna Basis Reason System Agency 18:00 Daily GETCO GETCO 17:00 Daily PMM work Relay/Protection Testing/Line maintenence. Replacement of R,Y and B Ph PT Site Acceptance Test (SAT) work of NTAMC JPL JPL NTPC NTPC POWERGR WR-II ID AMP Works WRTMPL WRTS-I WRTS-I POWERGRI R D WRTS-I type C R R MSETCL POWERGRI R D POWERGRI R D 11-Mar-15 9:00 12-Mar-15 18:00 Daily For AMP WRTS-I 11-Mar-15 8:00 10-Mar-15 18:00 Daily For AMP Work WRTS-I 11-Mar-15 9:00 11-Mar-15 18:00 Daily For Annual maintenance work POWERGRI WR-II R 476 400 315 MVA ICT-1 at Khandwa 11-Mar-15 10:00 11-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 477 400 Bina-Shujalpur Ckt-II 11-Mar-15 10:00 11-Mar-15 18:00 Daily For NTAMC Works POWERGRI WR-II C 478 765 JBP - Dharmjaygarh Reactor Line # 1 11-Mar-15 Reactor at Jabalpur Pooling Station 09:00 12-Mar-15 18:00 Cont. Installation & Commissioning of CSD Relay POWERGRI WR-II C 479 400 11-Mar-15 9.00 11-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 480 400 11-Mar-15 9.00 11-Mar-15 18.00 daily Maintenance Work MPPTCL MPPTCL R 481 220 11-Mar-15 9.00 11-Mar-15 18.00 daily Maintenance Work MPPTCL MPPTCL R 482 400 11-Mar-15 8:00 11-Mar-15 18:00 Daily GETCO GETCO 483 400 11-Mar-15 9:00 12-Mar-15 18:00 PMM work Replacement of CT'S at Conti. Bhadrawati WRTS-I WRTS-I R 484 220 12-Mar-15 9:00 12-Mar-15 18:00 Daily WRTS-I WRTS-I R 485 765 AT#3 of Tamnar PS 12-Mar-15 8:00 12-Mar-15 18:00 Contin AMP WORKS uous WRTS-I POWERGRI R D 486 765 1500MVA ICT-1 at Solapur 12-Mar-15 9:00 12-Mar-15 18:00 Daily AMP works & DGA of bushing oil. WRTS-I WRTS-I R 487 765 12-Mar-15 9:00 14-Mar-15 18:00 Daily AMP works. WRTS-I WRTS-I R 488 220 TAPS-Borivali 12-Mar-15 8:00 14-Mar-15 19:00 Daily Annual maintenance of equipments & painting MSETCL NPCIL 315MVA XMER - I I & BDTCL - II Tie AT400 KV S/S BHOPAL 400 kv Birsinghpur - Katni Ckt - I 220 KV SEONI PG - CHHINDWARA CKT- II Vadavi - Dehgam (PG) - 2 Bhilai-1 & Raipur-1 Tie bay (414 ) Bay at BHADRAWATI GED Line-6 (Future) Bay (211) at Mapusa 1500MVA-ICT-2 Main bay (715) at SEONI AMP Works SN KV Line 489 Date From Time To Date Time Basis 12-Mar-15 9.00 12-Mar-15 17.00 400 Parli- Parli PG-1 490 9.00 14-Mar-15 Daily 17.00 400 Parli- Chandrapur ll Ckt-2 System Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay MSETCL Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper MSETCL Daily 12-Mar-15 Reason Agency type MSETCL MSETCL POWERGRI R D POWERGRI R D 491 765 BUS#1 at Bilaspur S/S 12-Mar-15 8:00 13-Mar-15 18:00 Daily For AMP work WRTS-I 492 400 Jindal #1 Tie Bay (32) at Raipur S/S 12-Mar-15 8:00 11-Mar-15 18:00 Daily For AMP Work WRTS-I 493 400 63MVAR BUS REACTOR at Satna 12-Mar-15 9:00 12-Mar-15 18:00 Daily For Annual maintenance work POWERGRI WR-II R 494 400 315 MVA ICT-2 at Khandwa 12-Mar-15 10:00 12-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 495 496 400 Nagda-Shujalpur Ckt-I 400 Nagda-Shujalpur Ckt-II 12-Mar-15 12-Mar-15 10:00 12-Mar-15 14:00 12-Mar-15 14:00 18:00 Daily Daily POWERGRI WR-II POWERGRI WR-II C C 497 220 12-Mar-15 8:00 14-Mar-15 18:00 Daily 498 220 220 KV MEHGAON - AURAIYA CKT 12-Mar-15 9.00 13-Mar-15 17.00 daily For NTAMC Works For NTAMC Works For Replacment of damage Twin -Zebra Bus- Section above Kota-RAPP -A Ckt No.01 and Kota -Barod Bay Maintenance Work 499 500 220 Haldarva-Jhanor-2(NTPC) 400 Indore-Pithampur-1 12-Mar-15 12-Mar-15 8:00 9:00 12-Mar-15 12-Mar-15 18:00 18:00 Daily Daily 12-Mar-15 9.00 12-Mar-15 17.00 12-Mar-15 9.00 12-Mar-15 17.00 12-Mar-15 8:00 14-Mar-15 18:00 Daily 504 400 Bus Reactor Tie Bay (402) at Solapur 13-Mar-15 9:00 13-Mar-15 18:00 Daily 505 506 400 Aurangabad-Akola II 400 125MVAR Bus Reactor at SEONI 13-Mar-15 13-Mar-15 9.00 9:00 13-Mar-15 13-Mar-15 17.00 16:00 Daily Daily 13-Mar-15 9.00 13-Mar-15 17.00 508 765 Tie Bay of 765kV Kotra-II at Durg PS 13-Mar-15 9:00 14-Mar-15 509 400 Bhilai # 1 Main Bay at Raipur S/S 13-Mar-15 8:00 510 400 V'chal-Satna#3 13-Mar-15 9:00 Badod - Kota 501 502 503 400 Parali-Lonikand II ckt 2 400 Lonikand-Lonikand II ckt 2 220 Daily Daily Badod - Modak 507 400 Akola-Nandgaonpeth PMM work Reamote HMI Testing Replacement of faulty insulator string Replacement of faulty insulator string Restringing work between Location No. 159 to 185. Concern Officer Sh. B R S Gautam. Schedule Maintenance, Concern Officer Sh. Raghuvir Singh AEN(M) AMP works. Daily Bay Maintenance work DGA of Bushing oil. Disc string replacement,fixing of spacers,dampers,earthbond 18:00 Daily For AMP 12-Mar-15 18:00 Daily For AMP Work 13-Mar-15 18:00 Daily For Annual maintenance work MPPTCL NRPC WRPC MPPTCL MPPTCL R GETCO MPPTCL GETCO WR-II C MSETCL MSETCL MSETCL MSETCL MPPTCL NRPC WRPC WRTS-I WRTS-I R MSETCL WRTS-I MSETCL WRTS-I R MSETCL MSETCL POWERGRI R WRTS-I D POWERGRI R WRTS-I D R POWERGRI WR-II SN KV Line From Date Time To Date Basis Reason System Agency type Time 511 400 125 MVAr Bus Reactor-1 at Khandwa 13-Mar-15 10:00 13-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 512 513 13-Mar-15 13-Mar-15 10:00 13-Mar-15 14:00 13-Mar-15 14:00 18:00 Daily Daily For NTAMC Works For NTAMC Works POWERGRI WR-II POWERGRI WR-II C C 13-Mar-15 09:00 14-Mar-15 18:00 Cont. Installation & Commissioning of CSD Relay POWERGRI WR-II C 13-Mar-15 9.00 13-Mar-15 18.00 daily Maintenance Work MPPTCL MPPTCL R 516 220 Shujalpur-Shujalpur Ckt-II 220 Shujalpur-Shujalpur Ckt-I JBP - BINA # 3 Line Reactors (Main 765 & Tie Bay) at Jabalpur Pooling Station 220 KV SEONI PG - CHHINDWARA 220 CKT- I 400 Indore-Pithampur-2 13-Mar-15 9:00 13-Mar-15 18:00 Daily MPPTCL WR-II C 517 400 Bhachau-Ranchodpura-1&2 13-Mar-15 08:00 19-Mar-15 18:00 Cont. POWERGRI WR-II C 518 400 400kV Dehgam-Pirana#2 13-Mar-15 10:00 13-Mar-15 17:00 Daily POWERGR WR-II ID C 14-Mar-15 9.00 14-Mar-15 17.00 Daily Reamote HMI Testing Shiifting of Towers for SSNL Canal crossing to maintain electrical clearance Site Acceptance Test (SAT) work of NTAMC C & tan Delta testing of CT Bay maint. Work MSETCL MSETCL 520 765 Raichur-1 Main Bay (716) at Solapur 14-Mar-15 9:00 14-Mar-15 18:00 Daily AMP works. WRTS-I WRTS-I R 521 522 765 765 KV Bus # 2 at WARDHA 400 Satna-Bina#4 9:00 9:00 14-Mar-15 18:00 14-Mar-15 18:00 Daily Daily Extended Bus Jumpering work For Annual maintenance work WRTS-I WRTS-I POWERGRI WR-II C R 523 400 125 MVAr Bus Reactor-2 at Khandwa 14-Mar-15 10:00 14-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. POWERGRI WR-II C 524 220 Shujalpur-Rajgarh Ckt-I 14-Mar-15 10:00 13-Mar-15 14:00 Daily For NTAMC Works POWERGRI WR-II C 525 400 14-Mar-15 8:00 14-Mar-15 18:00 Daily For overhead crossing of 800 kV HVDC Champa-Kurukshetra TL CSPTCL POWERGRI C D 526 765 Indore-Bhopal line 14-Mar-15 9:00 15-Mar-15 18:00 STERLITE WR-II C 527 400 400kV Dehgam-Gandhar#1 14-Mar-15 10:00 14-Mar-15 POWERGR WR-II ID C 528 765 15-Mar-15 9:00 POWERGRI WR-II C 529 530 400 Bina -Shujalpur LR-I 400 Bina -Shujalpur LR-II 15-Mar-15 15-Mar-15 10:00 15-Mar-15 14:00 15-Mar-15 POWERGRI WR-II POWERGRI WR-II C C 531 400 AURANGABAD-PUNE D/C line 15-Mar-15 9:00 WRTMPL WRTS-I C 532 533 400 Vindhyachal Tie-Line-1 400 Vindhyachal Tie-Line-2 15-Mar-15 15-Mar-15 07:30 h20-Mar-15 07:30 h20-Mar-15 NTPC NTPC NTPC NTPC 534 400/ Sipat 400KV IBT-1 MAIN BAY-13 132 16-Mar-15 07:30 21-Mar-15 hrs NTPC NTPC 514 515 519 400 Dhule-Khandwa Ckt.I DCDS (Quad) Marwa TPP - Raipur (Raita) TL V,chal -SATNA#1 Line REACTOR(charged as bus reactor) 14-Mar-15 14-Mar-15 16-Mar-15 19-Mar-15 Reamote HMI Testing & Testing of CT selection scheme for spare reactor Site Acceptance Test (SAT) work 17:00 Daily of NTAMC For Commissioning of Auto Reclosing Scheme of the line, 18:00 Cont. outage of line reactor (presently charged as bus reactor) is required at Satna 14:00 Daily For NTAMC Works 18:00 Daily For NTAMC Works Lilo of line at PGCIL PUNE(GIS) 18:00 Conti. S/S 19:00 hrs ContinuLILO work (StageV) 19:00 hrs ContinuLILO work (StageV) All burnt control cable 19:00 Contin replacement(IBT-1 hrs ous TRANSFORMER S/D NOT REQUIRED) Cont. SN KV Line Seoni # 2 (701) Main bay at WARDHA SOLAPUR-KOLHAPUR I Bay 704 (Indore - Bina, Main Bay ) 1500MVA-ICT-3 Main bay (718) at SEONI Raichur-1 Tie Bay (717) at Solapur 535 765 536 537 400 765 538 765 539 765 540 220 TAPS-Vapi 541 542 543 544 Pole 2 Main bay (10C03c)at HVDC 400 APL 400 New Koyna-Dabhol ckt 1 400 KV D/C KORBA WEST 400 KHEDAMERA LILO FOR MODWA PPP Main Bay of 400kV GMR-I at Durg 400 PS 545 400 ICT # 1 Bay (01) at Raipur S/S 546 765 547 Bay No 709 (Main Bay of Autotransformer # 3) at Kotra P/S Ranchi Line Reactor (716LR) at 765 Bilaspur S/S 548 220 Khandwa-Nepanagar 549 400 550 400 551 220 552 220 553 400 554 400 Navasari - Vapi (Magarwada Ckt.2) Date From Time To Date Time Basis Reason System Agency type 16-Mar-15 9:00 16-Mar-15 18:00 Daily AMP work WRTS-I WRTS-I R 16-Mar-15 16-Mar-15 9:00 9:00 16-Mar-15 16-Mar-15 18:00 18:00 Daily Daily AMP Works AMP WORKS WRTMPL WRTS-I POWERGRI WR-II R R 16-Mar-15 9:00 18-Mar-15 18:00 Daily AMP works. WRTS-I WRTS-I R 16-Mar-15 9:00 16-Mar-15 18:00 Daily WRTS-I WRTS-I R 16-Mar-15 8:00 18-Mar-15 19:00 Daily AMP works. Annual maintenance of equipments & painting GETCO NPCIL 16-Mar-15 9:00 16-Mar-15 18:00 Daily CB time testing in 400kV side APL WR-II 16-Mar-15 8.30 25-Mar-15 17.30 Daily MSETCL MSETCL 16-Mar-15 8:00 17-Mar-15 18:00 Cold line insulator cleaning Crossing of 765 KV D/C Contin Dharamjaygarh-Jabalpur uous Line(AP54B-AP55) CSPDCL JTCL 16-Mar-15 9:00 16-Mar-15 18:00 Daily For AMP WRTS-I 16-Mar-15 9:00 13-Mar-15 18:00 Daily For AMP Work WRTS-I 16-Mar-15 8:00 17-Mar-15 18:00 Daily For AMP Work WRTS-I 16-Mar-15 9:00 17-Feb-15 18:00 Daily For attending leakages WRTS-I 16-Mar-15 10:00 16-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. MPPTCL 16-Mar-15 09:00 17-Mar-15 18:00 Cont. 16-Mar-15 9.00 17-Mar-15 17.00 16-Mar-15 10.00 16-Mar-15 16-Mar-15 9.00 16-Mar-15 POWERGRI D POWERGRI D POWERGRI D POWERGRI D R R R R R WR-II C Installation & Commissioning of CSD Relay POWERGRI WR-II C daily Maintenance Work MPPTCL MPPTCL R 17.00 daily Maintenance Work MPPTCL MPPTCL R 16-Mar-15 16.00 daily Maintenance Work MPPTCL MPPTCL R 9:00 17-Mar-15 18:00 Conti. WRTS-I WRTS-I R 16-Mar-15 8:00 17-Mar-15 18:00 Daily 555 765 Seoni # 2 (702) Tie bay at WARDHA 17-Mar-15 9:00 17-Mar-15 18:00 Daily 556 557 400 SOLAPUR-KOLHAPUR II 765 ICT-2 Main Bay (706) at Solapur Pole 2 tie bay (10C03A)at HVDC 400 APL 17-Mar-15 17-Mar-15 9:00 9:00 17-Mar-15 17-Mar-15 18:00 18:00 17-Mar-15 9:00 17-Mar-15 18:00 558 Bus Reactor # 2 (Main & Tie Bay) at Jabalpur Pooling Station 315MVA XMER - I AT400 KV S/S BINA 220 KV ANOOPUR - KOTMIKALA CKT - Il 220 KV PITHAMPUR - RAJGARH PG CKT - II Bhilai-1 Main bay (415) at BHADRAWATI Replacement of CT'S at Bhadrawati Replacement of porcelain disc insulator strings with polymer insulator strings in complete line POWERGRI WR-II C AMP work WRTS-I WRTS-I R Daily Daily AMP Works AMP works. WRTMPL WRTS-I WRTS-I WRTS-I R R Daily CB time testing in 400kV side APL WR-II R SN KV Line From Date Time To Date Basis Reason System Agency type Time Construction of 400KV RaitaDaily Jagdalpur Line. Location : AP 10/0 (FD-60+30) & AP 11/0 (FDCSPTCL 60+30) Crossing of 765 KV S/C JabalpurContin PGCIL Bina Line(AP54-AP55) uous 400KV DCDS Raipur-Raigarh CKT 1&2 , Location : 112(DA+3) & 400 113(DA+0) 17-Mar-15 560 400 400 KV D/C Damoh - Bhopal. 17-Mar-15 8:00 18-Mar-15 18:00 561 400 Tie Bay of 400kV GMR-I at Durg PS 17-Mar-15 9:00 17-Mar-15 18:00 Daily For AMP WRTS-I 562 400 Bus Coupler (06) at Raipur S/S 17-Mar-15 8:00 14-Mar-15 18:00 Daily For AMP Work WRTS-I 563 765 SATNA - GWL#1 Line 17-Mar-15 9:00 18-Mar-15 18:00 Cont. For CSD commissining for Line Reactor at Gwalior POWERGRI WR-II 564 220 Khandwa-Omkareshwer 17-Mar-15 10:00 17-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. MPPTCL WR-II C 565 566 567 568 220 220 220 220 17-Mar-15 17-Mar-15 17-Mar-15 17-Mar-15 8:00 9.00 6.00 8:00 18-Mar-15 17:00 17-Mar-15 18.00 17-Mar-15 18.00 17-Mar-15 18:00 Daily daily daily Daily R R R 400 400kV Dehgam-Nagda#2 17-Mar-15 10:00 17-Mar-15 17:00 Daily PGCIL MPPTCL MPPTCL GETCO POWERGR ID NPCIL MPPTCL MPPTCL GETCO 569 WR-II C 570 400 Gandhar - Navsari Ckt.1 17-Mar-15 8:00 17-Mar-15 18:00 Daily MAINTENANCE WORK Maintenance Work Maintenance Work PMM work Site Acceptance Test (SAT) work of NTAMC To facilitate insulator repalcement in 400kV Navsari - Vapi (Magarwada Ckt.2) in multi circuit towers due to low electrical clearance POWERGRI WR-II C 571 765 Bay No 707 (Main Bay of 765 kV Kotra - Tamnar Ckt# 1) at Kotra P/S 18-Mar-15 8:00 19-Mar-15 18:00 Daily AMP WRTS-I 572 765 Bay 706 ( 765/400 KV ICT#2, Main Bay ) AT INDORE 18-Mar-15 9:00 18-Mar-15 18:00 Daily AMP WORKS POWERGRI WR-II R 573 400 Bhachau-Ranchodpura-1&2 18-Mar-15 08:00 18-Mar-15 18:00 Daily Crossing of 400 KV D/C Essar Bhachau Line POWERGRI WR-II C 574 765 Raichur-2 Main Bay (713) at Solapur 18-Mar-15 9:00 18-Mar-15 18:00 Daily CT oil Sampling. WRTS-I R 575 400 18-Mar-15 9:00 18-Mar-15 18:00 Daily For AMP WRTS-I 576 765 ICT#3 at Bilaspur S/S 18-Mar-15 8:00 19-Mar-15 18:00 Daily For AMP work WRTS-I 577 400 Doma # 1 Bay (11) at Raipur S/S 18-Mar-15 8:00 15-Mar-15 18:00 Daily For AMP Work WRTS-I 578 220 Khandwa-Chhegaon-2 18-Mar-15 10:00 18-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. MPPTCL 579 765 18-Mar-15 09:00 19-Mar-15 18:00 Cont. 18-Mar-15 9.00 17.00 daily 559 580 TARAPUR - BOISAR 220 KV DAMOH PGCIL I/C - I 220 KV BADOD - KOTA CKT Khanpur- Dehgam (PG)-1 Main Bay of 400kV GMR-II at Durg PS Bus Reactor # 1 (Main & Tie Bay) at Jabalpur Pooling Station 315MVA XMER - I I AT400 KV S/S 400 BINA 8:00 17-Mar-15 19-Mar-15 17:00 R CSPTCL JTCL POWERGRI R D POWERGRI R D C POWERGRI R D WRTS-I POWERGRI R D POWERGRI R D POWERGRI R D WR-II C Installation & Commissioning of CSD Relay POWERGRI WR-II C Maintenance Work MPPTCL R MPPTCL SN 581 582 583 KV Line 400 KV S/S BHOPL - 400 KV ITARSI - I 400 400 kv Birsinghpur - Katni Ckt - II 220 220 KV BADOD - MODAK CKT Raipur-1 Main bay (410) at 400 BHADRAWATI 400 Date From Time To Date Time Basis Reason System Agency type 18-Mar-15 9.00 18-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 18-Mar-15 18-Mar-15 9.00 6.00 18-Mar-15 18-Mar-15 18.00 18.00 daily daily MPPTCL MPPTCL MPPTCL MPPTCL R R 18-Mar-15 9:00 19-Mar-15 18:00 WRTS-I WRTS-I R 585 400 Navasari - Magarwada Ckt.1 19-Mar-15 8:00 20-Mar-15 18:00 586 587 400 Padgha-Talegaon 765 ICT#1, Main Bay at indore Seoni-Wardha-I Main bay (721) at 765 SEONI 19-Mar-15 19-Mar-15 9.00 9:00 19-Mar-15 19-Mar-15 17.00 18:00 Maintenance Work Maintenance Work Replacement of CT'S at Conti. Bhadrawati Replacement of porcelain disc Daily insulator strings with polymer insulator strings in complete line Daily C & tan Delta testing of CT Daily AMP WORKS 19-Mar-15 9:00 20-Mar-15 18:00 Daily 589 220 TAPS-Boisar 19-Mar-15 8:00 20-Mar-15 19:00 Daily 590 400 Karad-Lonikand 19-Mar-15 9.00 19-Mar-15 17.00 Daily 19-Mar-15 9.00 19-Mar-15 17.00 Bay Maint. Work & dignostic Daily Testing of reactor, CB, CT & relay MSETCL Contin Crossing of 765 KV D/C uous Dharamjaygarh-Jabalpur Line(AP3- PGCIL AP4) 584 588 591 400 Parli(MS)- Parli PG-2 AMP works. Annual maintenance of equipments & painting Annual Maintenance work. POWERGRI WR-II C MSETCL MSETCL POWERGRI WR-II R WRTS-I WRTS-I R MSETCL NPCIL MSETCL MSETCL MSETCL 592 765 765 kv line Champa-Dharamjaygarh 19-Mar-15 8:00 20-Mar-15 18:00 593 400 Tie Bay of 400kV GMR-I at Durg PS 19-Mar-15 9:00 19-Mar-15 18:00 Daily For AMP WRTS-I 594 220 Doma # 2 Bay (12) at Raipur S/S 19-Mar-15 8:00 16-Mar-15 18:00 Daily For AMP Work WRTS-I 595 400 (i) Korba(NTPC)-Bhilai -1 &2 19-Mar-15 8:00 20-Mar-15 18:00 For construction of 765KV D/C Contin Dharamjaygarh (Korba)-Jabalpur uous Transmission Line (Part-I) 596 220 Khandwa-Chhegaon-1 19-Mar-15 10:00 19-Mar-15 18:00 Daily For NTAMC work at Khandwa S/S. MPPTCL WR-II 597 220 DCDS Korba - Suhela TL 19-Mar-15 8:00 19-Mar-15 18:00 Daily For overhead crossing of 800 kV HVDC Champa-Kurukshetra TL CSPTCL POWERGRI C D 598 400 19-Mar-15 9.00 19-Mar-15 17.00 daily Maintenance Work MPPTCL MPPTCL R 19-Mar-15 9.00 19-Mar-15 18.00 daily MPPTCL MPPTCL R 19-Mar-15 10:00 19-Mar-15 17:00 Daily Maintenance Work Site Acceptance Test (SAT) work of NTAMC APL WR-II C Daily To facilitate insulator repalcement in 400kV - Navsari - Magarwada POWERGRI WR-II Ckt.1 in multi circuit towers due to low electrical clearance C 599 400 KV S/S BHOPL - 400 KV ITARSI - I I 400 400 kv Damoh - Katni - Ckt 600 400 400kV Dehgam-Sami#1 601 400 Gandhar - Navsari Ckt.2 19-Mar-15 8:00 19-Mar-15 18:00 WRTS-I JTCL POWERGRI R D POWERGRI R D POWERGRI C D C Anaulagnak frvarI 2015 AaOr maaca- 2015 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR FEBRUARY 2015 maaMga rajya State AND MARCH 2015 }jaa- kI AavaSyakta DEMAND ENERGY REQUIREMENT maogaavaaT (MW) frvarI 2015 maaca- 2015 imailayana yauinaTsa (MUs) frvarI 2015 maaca- 2015 FEBRUARY 2015 MARCH 2015 FEBRUARY 2015 MARCH 2015 1 gaujarat GUJARAT saIimat AsaIimat RESTRICTED 12500 13500 7290 8390 UNRESTRICTED 12540 13540 7300 8400 RESTRICTED 9130 8260 5025 5330 UNRESTRICTED 9130 8260 5025 533o RESTRICTED 3000 3100 1675 1922 UNRESTRICTED 3000 3100 1693 1928 2 maQya p`doSa saIimat AsaIimat 3 C<aIsagaZ, saIimat AsaIimat 4 maharaYT/ MADHYA PRADESH CHHATISGARH MAHARASHTRA saIimat AsaIimat RESTRICTED 19500 19800 10700 11800 UNRESTRICTED 19550 19850 10750 11850 5 gaaovaa GOA saIimat AsaIimat RESTRICTED 400 405 285 290 UNRESTRICTED 410 410 290 295 RESTRICTED 300 315 205 190 UNRESTRICTED 305 320 210 195 RESTRICTED 635 615 450 455 UNRESTRICTED 640 620 460 460 RESTRICTED 44099 44613 27000 28000 UNRESTRICTED 43822 44327 27150 28500 6 dmana dIva saIimat AsaIimat 7 DI ena eca saIimat AsaIimat 8 piScama xao~ saIimat AsaIimat 3.3 DD DNH WESTERN REGION Anaulagnak 4.1 maah janavarI 2015 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata ACTUAL GENERATION & AVALABILITY FOR JANUARY 2015 Schedule yaaojanaa k`maaMk Sr. No. sToSana ka naama }jaa- Station Name Energy (Gwh) Actual vaastivak carma }jaa- Peak (Mw) carma Energy (Gwh) Auxillary Consumption Peak (Mw) (Gwh) k (A) gaujarat GUJARAT jalaIya 1. 2. 3. 4. 6. tapIya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 HYDRO ]k[- Ukai - 1 ]k[- Ukai - 2 ]k[- Ukai - 3 ]k[- Ukai - 4 ]k[- Ukai (Total) ]k[- ela baI saI eca Ukai LBCH - 1 ]k[- ela baI saI eca Ukai LBCH - 2 ]k[- ela baI saI eca Ukai LBCH (Total) kDanaa Kadana - 1 kDanaa Kadana - 2 kDanaa Kadana - 3 kDanaa Kadana - 4 kDanaa Kadana (Total) pnama PANAM & Madhuban Dam 1 & 2 kula jalaIya TOTAL(H) Sr. No. 37 38 39 40 41 42 43 44 75 75 75 0 152 3 0 3 60 60 0 60 60 10 225 61 123 123 124 0 0 0 0 0 0 0 98 0 0 202 203 211 506 0 0 212 214 212 0 210 210 213 210 210 211 0 0 42 150 2 3 16 0 60 120 0 273 0.000 42 85 0 74 60 120 0 121 0 0 0 0 0 0 0 0 70 70 36 140 19 100 100 200 200 50 70 70 136 145 37 0 145 145 89 145 145 145 0 0 100 100 210 210 210 0 210 210 150 210 210 210 0 0 37.91 80.64 40.70 46.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.13 0.00 0.00 120.56 115.67 87.36 277.63 0.00 0.00 51.00 113.78 132.42 0.00 112.39 118.13 48.67 36.44 35.54 120.07 0.00 0.00 0 0 0.00 0 0.000 0 0 0.00 0 0.503 0 0 0.00 0 0.000 0 0 0.00 0 0.000 0.024 0.005 0.000 0.000 0.005 0.025 0.343 THERMAL TaoronT pavar ilaimaToD yauinaT saI TaoronT pavar ilaimaToD yauinaT DI TaoronT pavar ilaimaToD yauinaT [TaoronT pavar ilaimaToD yauinaT ef TaoronT pavar ilaimaToD yauinaT jaI TI 1 TaoronT pavar ilaimaToD yauinaT jaI TI 2 TaoronT pavar ilaimaToD yauinaT esa TI jaI Qauvarna tapIya Dhuvaran - 5 Qauvarna tapIya Dhuvaran - 6 Qauvarna tapIya Dhuvaran - GT 1 Qauvarna tapIya Dhuvaran - GT 2 Qauvarna tapIya Dhuvaran - STG ]ka[- yauinaT 1 Ukai -1 ]ka[- yauinaT 2 Ukai -2 ]ka[- yauinaT 3 Ukai -3 ]ka[- yauinaT 4 Ukai -4 ]ka[- yauinaT 5 Ukai -5 ]ka[- yauinaT 6 Ukai -6 gaaMQaInagar 1 Gandhinagar - 1 gaaMQaInagar 2 Gandhinagar - 2 gaaMQaInagar 3 Gandhinagar - 3 gaaMQaInagar 4 Gandhinagar - 4 gaaMQaInagar 5 Gandhinagar - 5 vaNakbaaorI 1 Wanakbori - 1 vaaNakbaaOrI 2 Wanakbori - 2 vaaNakbaaOrI 3 Wanakbori - 3 vaaNakbaaOrI 4 Wanakbori - 4 vaaNakbaaOrI 5 Wanakbori - 5 vaaNakbaaOrI 6 Wanakbori - 6 vaaNakbaaOrI 7 Wanakbori - 7 ]%trna Utran GT 1 ]%trna Utran GT 2 ]%trna UTRAN - GT- 3 ]%trna UTRAN - GT-4 ]%trna UTRAN - STG-I ]%trna UTRAN - STG-II Schedule yaaojanaa k`maaMk 4.03 8.54 10.59 0.00 23.16 1.85 0.00 1.85 6.43 3.64 0.00 5.44 15.51 3.83 44.35 sToSana ka naama }jaa- Station Name Energy (Gwh) isa@ka Sikka - 1 isa@ka Sikka - 2 kcC ilagnaa[-T Kutch Lignite - 1 kcC ilagnaa[-T Kutch Lignite - 2 kcC ilagnaa[-T Kutch Lignite - 3 kcC ilagnaa[-T Kutch Lignite - 4 saUrt ilagnaa[-T Surat Lignite - 1 saUrt ilagnaa[-T Surat Lignite - 2 3.481 1.115 6.545 6.963 0.000 0.000 1.134 0.918 0.146 0.146 11.030 9.753 10.939 19.817 0.093 0.072 5.884 10.490 13.629 0.000 0.204 0.000 Actual vaastivak carma }jaa- Peak (Mw) 70 70 45 45 47 0 110 110 70 70 75 0 173 240 carma Energy (Gwh) 63.83 1.66 41.52 49.07 33.74 29.22 0.00 80.90 Auxillary Consumption (Gwh) Peak (Mw) 112 92 72 71 62 54 0 130 3.405 1.613 8.766 6.118 0.325 8.759 saUrt ilagnaa[-T Surat Lignite - 3 saUrt ilagnaa[-T Surat Lignite - 4 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 jaI Aa[- pI saI ela GIPCL GT - 1 jaI Aa[- pI saI ela GIPCL GT - 2 jaI Aa[- pI saI ela GIPCL GT - 3 jaI Aa[- pI saI ela GIPCL ST - 1 jaI Aa[- pI saI ela GIPCL GT - 4 jaI Aa[- pI saI ela GIPCL ST - 2 [- esa esa e Aar ESSAR GT - 1 [- esa esa e Aar ESSAR GT - 2 [- esa esa e Aar ESSAR GT - 3 [- esa esa e Aar ESSAR STG jaI pI [- saI GPEC GT - 1 jaI pI [- saI GPEC GT - 2 jaI pI [- saI GPEC GT - 3 jaI pI [- saI GPEC STG jaI esa [- jaI GSEG GT - 1 jaI esa [- jaI GSEG GT - 2 jaI esa [- jaI GSEG STG 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 60 kula tapIya Total (T) kula jalaIya+tapIya Total (H+T) ivaMD [najaI- Wind Energy kula jalaIya+tapIya+hvaa Total (H+T+Wind) ivainamaya Exchanges saIimat }jaa- maaMga Restricted Energy Req. jalaIya 1.1 1.2 1.3 2 3 4 5 6 7 8 9 10 11 12 13 14 140 95 140 480 430 600 90 150 0 50 0 100 5277 6130 7992 9359 (+) 7290 MADHYA PRADESH 1 95 350 Sugen (GT 1 + GT 2) saIpIpI sao Aayaat Imp from CPP+MUNDRA K (B) 100 71.54 90.85 61.73 71.81 16.87 17.63 1.03 20.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.29 5.68 2.76 4.02 5.61 4.90 195.91 1669.09 129 129 103 105 34 34 29 46 0 0 0 0 0 0 0 218 161 27 52 51 23 292 2318 8.179 8.637 8.766 4132.23 4176.58 561.18 4737.76 3215.35 7953.11 11337 11555 358.705 359.049 80.65 62.05 58.00 41.25 47.35 38.44 2.18 79.46 0.00 8.65 8.72 6.27 1.00 0.00 0.00 128.15 292.65 646.17 194 117 172 99 163 91 5 310 0 30 22 60 20 0 0 387 1014 2378 Sr. No. 2 3 4 5 6 7 8 9 10 11 12 13 14 0.191 0.040 0.097 0.040 0.835 7.213 12418 maQya p`doSa 50 114 40 50 75 90 130 0 30 0 30 15 0 20 210 610 1185 315 0 60 0 60 20 0 30 360 990 2114 Schedule yaaojanaa k`maaMk 1 0.000 HYDRO cambala pir Chambal Pr.(50%share) gaaMQaI saagar Gandhi Sagar raNaa p`tap sagar R.P.Sagar javaahr sagar Jawahar Sagar ponca Pench baargaI Bargi baargaI Bargi (LBCH) banasaagar Toansa Bansagar-1 (Tons) banasaagar Bansagar-2 (Deolondh) banasaagar Bansagar-3 (Silpara) banasaagar Bansagar-4 (Zinaha) maoDIKoDa Medikheda ibarisaMGapur Birsingpur Tavaa Tawa rajaGaaT Rajghat Omkareshwar [Midra saagar Indira Sagar kula jalaIya TOTAL(H) MPPGCL tapIya 0.000 sToSna ka naama }jaa- Station Name Energy (Gwh) 0.080 0.045 0.020 0.100 0.070 0.220 0.080 0.030 0.020 0.080 . 1.002 1.261 Actual vaastivak carma }jaa- Peak (Mw) Energy (Gwh) carma Peak (Mw) Auxillary Consumption (Gwh) THERMAL AmarkMTk II AMK II Unit -1 AmarkMTk II AMK II Unit -2 AmarkMTk III AMK III Unit -5 satpura I Satpura-I(60%Share) satpura II Satpura-II Unit 6 satpura II Satpura-II Unit 7 satpura II Satpura-II Unit 8 satpura II Satpura-II Unit 9 satpura III Satpura-III Unit 10 satpura III Satpura-III Unit 11 esajaITIpIesa 1 SGTPS Unit - 1 esajaITIpIesa 2 SGTPS Unit - 2 esajaITIpIesa 3 SGTPS Unit - 3 esajaITIpIesa 4 SGTPS Unit - 4 esajaITIpIesa 5 SGTPS Unit - 5 15 16 SSTPS kula tapIya Total (T) kula jalaIya+tapIya Total (H+T) Injection from WIND 61 82 0 50 0 67 128 163 122 163 142 191 144 194 291 390 1057 2572 1409 4036 18.47 0.00 155.73 0.00 103.41 0.00 108.23 118.51 111.79 62.29 62.29 69.51 107.09 79.64 312.72 78.45 1318.65 1964.82 100.63 74 0 217 0 180 0 187 190 182 184 184 176 180 183 507 627 2985 5675 0 16.560 0 0.000 9.950 21.250 22.210 16.400 16.400 16.570 9.580 132.520 133.781 kula jalaIya+tapIya + ivaMD Total (H+T+WIND) ivainamaya Exchanges saIimat }jaa- maaMga Rest. En. Req. (+) 5800 2065.45 3298.51 5363.96 5675 1.75 5.39 0.69 7.83 120 10 7 137 0.050 0.050 27.64 27.64 27.64 27.84 36.85 66.82 116.93 116.93 116.93 116.93 181.69 145.00 1271.98 0.00 0.00 1271.98 1279.81 474.76 1754.57 44 40 46 48 120 120 210 210 210 210 255 255 1917 0 0 1917 2054 0 2054 12.890 81.42 22.38 17.20 8.86 142.58 0.00 2.97 5.92 2.05 7.11 8.01 23.25 25.75 373.50 560 240 711 38 471 0 19 6 67 65 80 126 0 1795 CHHATTISGARH C<aIsagaZ, ga (C) jalaIya HYDRO 1 hsadova baaMgaao Hasdeo Bango 2 Gangrel 3 Mini Micro KWB kula jalaIya TOTAL(H) CSEB tapIya 1 2 3 4 5 6 7 8 9 14 kaorbaa (pU) Korba (E) Unit-1 kaorbaa (pU) Korba (E) Unit-2 kaorbaa (pU) Korba (E) Unit-3 kaorbaa (pU) Korba (E) Unit-4 kaorbaa (pU) Korba (E) Unit -5 kaorbaa (pU) Korba (E) Unit -6 kaorbaa (p) Korba (W) Unit -1 kaorbaa (p) Korba (W) Unit -2 kaorbaa (p) Korba (W) Unit -3 kaorbaa (p) Korba (W) Unit -4 baalakao sao Aayaat BALCO Import ijandla sao Aayaat JINDAL Import kula tapIya Total (T+IPP) kula jalaIya+tapIya Total (H+T) ivainamaya Exchanges saIimat }jaa- maaMga Rest. En. Req. Ga (D) jalaIya 2 3 4 5 6 7 8 9 10 11 12 13 61 139 30 30 30 30 71 71 125 125 125 125 0 149 50 50 50 50 120 120 210 210 210 210 250 250 911 966 1780 1900 (+) 1675 MAHARASHTRA 1 120 19 tapIya 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27.660 15.620 13.610 11.230 171.020 171.130 HYDRO 74 49 165 10 120 3 5 3 0 0 9 37 32 506 300 150 600 20 444 60 10 5 0 0 80 250 47 1966 Schedule yaaojanaa Sr. No. 26.570 maharaYT/ kaoyanaa 1AaOr 2 Koyna 1 & 2 kaoyanaa III Koyna III kaoyanaa IV Koyna IV kaoyanaa DIpIeca Koyna DPH TaTa jalaIya TATA Hydro vaOtrNaa Vaitarna eladarI Eldari BaTgar AaOr vaIr Bhatgar & Vir pOzana Paithan itlaarI Tillari BaIra Tola rosa Bhira Tail Race GaTGar Ghatghar Anya CaoTo jalaIya Small Hydro (others) kula jalaIya TOTAL(H) k`maaMk 3 0.110 THERMAL 10 11 KORBA(EB) Extn - 1 12 KORBA(EB) Extn - 2 kula tapIya Total (T) 13 55 6 sToSana ka naama }jaa- Station Name Energy (Gwh) 0.908 2.995 3.903 Actual vaastivak carma }jaa- Peak (Mw) Energy (Gwh) carma Auxillary Consumption (Gwh) Peak (Mw) THERMAL naaisak 3 Nasik Unit -3 naaisak 4 Nasik Unit -4 naaisak 5 Nasik Unit -5 T/ambao 4 Trombay Unit -4 T/ambao 5 Trombay Unit -5 T/ambao 6 Trombay Unit -6 T/ambao 8 Trombay Unit -8 T/ambao 7A gaOsa Trombay -7A (Gas) T/ambao 7ba Trombay -7B (WHR) kaoraD,I 5 Koradi Unit -5 kaoraD,I 6 Koradi Unit -6 kaoraD,I 7 Koradi Unit -7 Bausaavala 2 Bhusawal Unit -2 Bausaavala 3 Bhusawal Unit -3 Bausaavala 4 Bhusawal Unit -4 Bausaavala 4 Bhusawal Unit -5 parlaI 3 Parli Unit -3 parlaI 4 Parli Unit -4 parlaI 5 Parli Unit -5 parlaI 6 Parli Unit -6 parlaI 7 Parli Unit -7 KaprKoD,a 1 Khaperkheda Unit -1 KaprKoD,a 2 Khaperkheda Unit -2 KaprKoD,a 3 Khaperkheda Unit -3 105 85 133 0 250 130 0 140 115 180 0 500 500 0 0 0 65 75 75 110 100 250 0 0 0 0 155 40 80 100 350 85 100 100 150 135 335 0 0 0 0 210 55 110 135 470 132.60 131.19 122.12 0.00 21.75 102.67 170.35 0.00 0.00 0.00 94.55 104.85 0.00 27.63 297.02 227.05 0.00 82.21 110.98 150.09 134.95 129.89 107.89 139.47 205 198 204 0 459 235 254 0 0 0 180 184 0 170 515 515 0 169 163 250 250 210 185 217 0.920 27 28 30 31 32 33 34 35 36 37 38 39 40 41 42 KaprKoD,a 4 Khaperkheda Unit -4 KaprKoD,a 5 Khaperkheda Unit -5 parsa Paras-3 parsa Paras-4 ]rna Uran (Gas) ]rna Uran (WHR) caMd`pur 1 Chandrapur Unit -1 caMd`pur 2 Chandrapur Unit -2 caMd`pur 3 Chandrapur Unit -3 caMd`pur 4 Chandrapur Unit - 4 caMd`pur 5 Chandrapur Unit -5 caMd`pur 6 Chandrapur Unit -6 caMd`pur 7 Chandrapur Unit -7 DhaNaU 1 Dahanu Unit-1 DhaNaU 2 Dahanu Unit-2 CPP 43 44 RGPPL Share kula tapIya Total (T) 135 135 200 200 100 100 100 90 70 80 190 150 180 180 430 430 220 135 135 120 95 110 255 200 372 500 0.00 200 6290 0.00 300 9090 6966 9960 (+) MAH. Wind + Solar Generation kula jalaIya +tapIya Total (H+T+Wind) Exchanges TOTAL (H+T) ivainamaya saIimat }jaa- maaMga Rest. En. Req. gaaovaa GOA Aa[- pI pI irlaayaMsa IPP Reliance ivainamaya Exchanges saIimat }jaa- maaMga Rest. En. Req. dmana AaOr dIva DAMAN & DIU dadra nagar hvaolaI DNH kula DD &DNH (T) ca (E) C (F) ja (G) 11200 115.85 263.52 144.15 111.60 165.99 89.95 0.00 95.37 104.16 117.04 290.80 249.77 255.19 161.79 12.36 2876.83 0.00 7341.63 172.27 7887.40 3123.12 11010.51 211 500 253 253 554 0 144 213 200 470 440 492 0 250 250 3931.00 0 10664 0 12746 19.21 16 Sr. No. (H) 1. 285 400 132 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 4.6 sToSana ka naama }jaa- Station Name Energy (Gwh) koMd`Iya xao~ Central Sector ena pI saI N.P.C. tara`pur 1 TAPS Unit -1 tara`pur 2 TAPS Unit -2 tara`pur 3 TAPS Unit -3 tara`pur 4 TAPS Unit -4 kakrapr 1 KAPS Unit -1 kakrapr 2 KAPS Unit -2 kula ena pI saI NPC Total ena TI pI saI N.T.P.C. kaorbaa esaTIpIesa 1 KSTPS Unit-1 kaorbaa esaTIpIesa 2 KSTPS Unit-2 kaorbaa esaTIpIesa 3 KSTPS Unit-3 kaorbaa esaTIpIesa 4 KSTPS Unit-4 kaorbaa esaTIpIesa 5 KSTPS Unit-5 kaorbaa esaTIpIesa 6 KSTPS Unit-6 kaorbaa esaTIpIesa 7 KSTPS Unit-7 kula kaorbaa KSTPS Total ivanQa esaTIpIesa 1 VSTPS Unit-1 ivanQa esaTIpIesa 2 VSTPS Unit-2 ivanQa esaTIpIesa 3 VSTPS Unit-3 ivanQa esaTIpIesa 4 VSTPS Unit-4 ivanQa esaTIpIesa 5 VSTPS Unit-5 ivanQa esaTIpIesa 6 VSTPS Unit-6 ivanQa esaTIpIesa 7 VSTPS Unit-7 ivanQa esaTIpIesa 8 VSTPS Unit-8 ivanQa esaTIpIesa 9 VSTPS Unit-9 ivanQa esaTIpIesa 10 VSTPS Unit-10 ivanQa esaTIpIesa 11 VSTPS Unit-11 kula ivanQayaacala VSTPS Total saIpt -1 -SIPAT-1 saIpt -2 -SIPAT-2 saIpt -3 -SIPAT-3 saIpt -4 -SIPAT-4 saIpt -5 SIPAT-5 kula saIpt -SIPAT TOTAL kvaasa gaOsa 1e Kawas GT-1A kvaasa gaOsa 1baI Kawas GT-1B kvaasa esaTI 1saI Kawas ST-1C kvaasa gaOsa 2e Kawas GT-2A kvaasa gaOsa 2baI Kawas GT-2B kvaasa esaTI 2saI Kawas ST-2C 14.263 3.150 348.627 376.725 272.00 241 291.21 393 167.56 298 463.62 680 631.18 977 Schedule yaaojanaa k`maaMk 5.862 80 80 300 300 125 125 1010 1510 2294 Actual vaastivak carma Peak (Mw) 160 160 480 480 200 200 1680 2600 4260 }jaaEnergy (Gwh) carma Peak (Mw) 0.00 64.06 404.22 0.04 171.24 157.16 796.72 0 160 546 151 546 151 1554 141.36 148.27 141.74 357.31 363.03 348.80 369.05 1869.57 123.83 88.20 108.05 63.31 113.80 123.68 314.35 300.12 215 213 216 513 518 514 517 2439 219 212 215 211 214 215 513 514 298.58 309.20 298.82 2459.71 416.31 384.66 408.82 320.24 324.51 1854.54 20.71 6.92 13.13 26.55 0.72 14.17 513 512 514 #REF! 664.00 663.00 667.00 514.00 512.00 2589.00 114 112 135 113 114 136 Auxillary Consumption (Gwh) 5.479 42.400 31.966 117.325 164.28 99.04 kula kvaasa KGPS Total gaMQaar gaOsa 1 Gandhar GT-1 gaMQaar gaOsa 2 Gandhar GT-2 gaMQaar gaOsa 3 Gandhar GT-3 gaMQaar esaTI 4 Gandhar ST-4 kula gaMQaar GGPS Total maaOda 1 Mauda -1 maaOda 2 Mauda -2 kula maaOda MAUDA Total 5.1 5.2 5.3 5.4 6.1 6.2 6.1 6.2 6.3 RGPPL Block I RGPPL Block II RGPPL Block III RGPPL TOTAL esa esa pI SSP RBPH - 1 7.1 esa esa pI SSP RBPH - 2 esa esa pI SSP RBPH - 3 esa esa pI SSP RBPH - 4 esa esa pI SSP RBPH - 5 esa esa pI SSP RBPH - 6 esa esa pI SSP CHPH - 1 esa esa pI SSP CHPH - 2 esa esa pI SSP CHPH - 3 esa esa pI SSP CHPH - 4 esa esa pI SSP CHPH - 5 kula esa esa pI SSP Total kula poMca Pench Total Jindal Injection Amarkantak Lanco 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 8.1 8.2 8.3 (I) piScamaI xao~ 193 630 80 630 186 500 540 750 82.18 2.49 1.59 0.49 0.00 4.57 24.74 0.00 24.74 0.00 0.00 0.00 0.00 42.25 189 30.95 187 1.75 187 43.24 188 51.70 187 42.62 187 13.46 36 20.82 36 11.95 37 13.14 36 10.25 580 40 900 75 282.11 47.35 573.87 148.67 WESTERN REGION ga`aosa ]%padna Gross generation (J) ]plabQata Availability naoT ivainamaya Net Exchanges ]plabQa }jaa- Energy Availability (+) 27000 194 119 117 84 0 119 507 0 507 0 0 0 31 24133.65 23946.32 -3563.33 20383.00 2.841 1.098 0.000 0.000 5.836 0.000 36 1305 163 0 0 2.821 0.100 maah janavarI 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak PEAK DEMAND - SCHEDULE VS ACTUAL FOR rajya gaujarat pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga maQya p`doSa pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga C<aIsagaZ, pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga maharaYT/ pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga gaaovaa pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga essaar pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga dmana evaM dIva pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga dadra va na hvoalaI pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga piScama xao~ pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga State JANUARY Anaulagnak 4.2 ANNEX-4.2 2015 idnaaMk samaya AavaRi<a Date Time Frequency 12418 10.01.15 1100 49.91 12457 10.01.15 1100 49.91 7434 15.01.15 0300 50.00 1000 49.84 49.84 vaastivak Actual (MW) Anticipated Apoixat AapUit- (MW) Catered UNSCH LS FC SCH LS kula Total 12418 - - - 12418 0 39 0 GUJARAT Registered Restricted 12500 Unrestricted 12540 7434 Min. Registered Demand MADHYA PRADESH Registered Restricted 9180 Unrestricted 9180 Min. Registered Demand 9766 - - - 9766 21.01.15 9766 0 45 0 9811 21.01.15 1000 4421 4421 13.01.15 04:00 3269 3269 30.01.15 1900 49.94 3372 30.01.15 1900 49.94 1959 03.01.15 1300 49.76 1000 49.94 CHHATTISGARH Registered Restricted 3000 Unrestricted 3000 3269 96 7 0 1959 Min. Registered Demand MAHARASHTRA Registered Restricted 19600 Unrestricted 19650 18408 - - - 18408 15.01.15 18408 559 39 0 19006 15.01.15 1000 49.94 10572 05.01.15 04:00 50.15 10572 Min. Registered Demand *GOA Registered 400 393 Unrestricted 400 393 1 - - 393 09.01.15 1900 49.96 0.55 - 395 09.01.15 1900 49.96 185 13.01.15 09:00 49.90 185 Min. Registered Demand ESSAR(ESIL) Registered 440 Unrestricted 440 - - 440 30.01.15 0200 50.03 0 0 - 440 30.01.15 0200 50.03 - - 271 30.01.15 1100 50.01 0 0 - 271 30.01.15 1100 50.01 - - 672 24.01.15 2000 49.95 0 1 - 673 24.01.15 2000 49.95 463 26.01.15 Min. Registered Demand DD Registered 271 Unrestricted 271 Min. Registered Demand DNH Registered 672 Unrestricted 672 Min. Registered Demand 463 WESTERN REGION Registered Restricted 44438 Unrestricted 44159 Min. Registered Demand NOTE: LS PC/RM FC Registered Restricted Unrestricted = = = = = = 43839 - - - 43839 20.01.15 1000 49.83 43839 433 261 0 44533 20.01.15 1000 49.83 26214 26214 02.01.15 Load Shedding Power Cuts/Regulatory Measures Frequency Correction Actual Demand Met Registered + LS + FC Registered + LS + FC + PC + Holiday Staggering + Recess Staggering. 0400 50.33 ANNEXURE 4.3 2015 Jan-15 समांतर/ अनु. . PARALLEL / RADIAL OPERATION TOTAL OPERATING HOURS 1 HVDC back-to back link(WR-NR) 729:43:00 2 HVDC back-to back link(WR-SR) 743:03:00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 टाई लाईन 765 -I 765 -II TIE LINE 765 -I 765 -II 765 -I 400 400 400 -I 400 –II 400 –III 400 केवी सातपुरा से कोराडी 400 केवी खंडवा से धुले-I 400 केवी खंडवा से धुले-II 400 केवी इंदौर से असोज-I 400 केवी इंदौर से असोज-II 400 केवी इंदौर से असोज-III 400 -I 400 -II 400 केवी वापी से बोईसर 400 -I 400 -II 400 केवी रायगढ़ से झरसुगुड़ा-I 400 केवी रायगढ़ से झरसुगुड़ा-II 400 केवी नागदा से दे हगाम-I 400 केवी नागदा से दे हगाम-II 400 –I 400 –II 400 220 –II -III 765kV Soni to Wardha 678:03:00 765kV Seoni to Wardha 475:27:00 765kV Seoni to Bilaspur-I 744:00:00 765kV Seoni to Bilaspur-II 744:00:00 765kV Durg to Wardha 636:41:00 400kV Bhilai to Koradi 572:35:00 400kV Bhilai to Bhadravati 744:00:00 400kV Raipur to Bhadravati-I 744:00:00 400kV Raipur to Bhadravati-II 744:00:00 400kV Raipur to Bhadravati-III 744:00:00 400kV Satpura to Koradi 744:00:00 400kV Khandwa-Dhule-I 736:51:00 400kV Khandwa-Dhule-II 737:12:00 400kV Indore to Asoj-I 744:00:00 400kV Indore to Asoj-II 742:52:00 400kV Indore to Asoj-III 701:10:00 400kV Kolhapur-Mapusa-I 552:51:00 400kV Kolhapur-Mapusa-II 478:38:00 400kV Vapi-Boisar 744:00:00 400kV Raigarh to Sterlight-I 744:00:00 400kV Raigarh to Sterlight -II 744:00:00 400kV Raigarh to Jharsuguda-I 744:00:00 400kV Raigarh to Jharsuguda-II 744:00:00 400kV Nagda to Dehgam 744:00:00 400kV Nagda to Dehgam 743:13:00 400kV Raipur to Wardha-I 736:39:00 400kV Raipur to Wardha-II 728:52:00 400kV Wardha to Mouda-II 734:11:00 220kV K(E) to Budhipadar-III 744:00:00 भार , WRLDC, Mumbai Anaulagnak 4.5 maah janavarI 2015 ko daOrana pa~ta , iSaD\yaUla, GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoM sao D`avala AaOr ivainamayaaoM ka ivavarNa DETAILS OF ENTITLEMENT/SCHEDULE/DRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS JANUARY 2015 1 1 (pxaoivasa` Wara jaarI xao~Iya }jaa- laoKa ko AaQaar pr) koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta Declared Capcity (ex-bus) of Central Gen. Stns/Dedicated CG Stns/Jointly owned Stns & entitlement of beneficieries (MUs) GaaoiYat xamata (A) AND EXCHANGES FOR THE MONTH OF koMd`Iya ibajalaIGar A. Central Gen. Stns. kaorbaa esaTIpIesa kaorbaa esaTIpIesa -III ivanQa esaTIpIesa I ivanQa esaTIpIesa II ivanQa esaTIpIesa III ivanQa esaTIpIesa IV kvaasa gaOsa gaMQaar gaOsa saIpt kakrapar tara`pur 3 AaOr 4 (ba) samaip-t koMd`Iya ibajalaIGar [Midra saagar Korba STPS (sa) saMyau@t inajaI sToSana tara`pur 1 AaOr 2 esaesapI ponca C. Jointly owned Stations kula ([M saagar kao CaoD, kr) Total (excl. Indira Sagar) Korba STPS-III Vindhyachal STPS-I Vindhyachal STPS-II Vindhyachal STPS-III Vindhyachal STPS-IV Kawas GPP Gandhar GPP Sipat Kakrapar APS* Tarapur APS 3&4* gau}ivainaila map`iva]kM Dec. Cap. GUVNL MPPGCL 1428.813 350.403 846.345 692.577 708.696 686.114 486.351 492.784 2081.445 294.857 361.711 244.940 67.277 154.516 165.527 188.513 164.613 138.597 177.657 567.860 83.766 91.767 Craivabaao 333.589 54.749 301.048 223.065 176.521 197.368 103.882 87.844 374.592 74.483 77.362 B. Dedicated CG Stations maraiva]kM 57.606 275.525 46.699 Tarapur APS 1&2* SSP* Pench* 13536.437 dmana dIva da na h MSPGCL GOA DD DNH 146.132 105.931 1.920 1.599 76.052 44.502 0.000 0.000 333.791 0.000 16.076 454.547 94.446 309.558 247.567 210.096 222.037 151.425 150.191 635.293 100.752 146.748 145.661 4.510 25.967 10.224 9.043 10.342 9.186 9.488 28.118 10.728 4.827 33.539 4.210 8.946 6.435 7.997 8.722 23.008 23.517 24.684 5.560 4.277 35.812 15.682 28.956 22.699 24.655 31.487 60.207 44.034 83.861 8.392 14.271 ecavaIDIsaI + ecaDblyaubaI HVDC+HWB 15.433 11.176 245.570 28.803 44.084 kula TOTAL 1428.813 350.403 846.345 692.577 708.696 686.114 486.351 492.784 2081.445 294.857 361.711 * vaas%aivak [njao@Sana * Actual injection 245.570 Indira Sagar* gaaovaa CSEB 245.570 0.000 157.050 31.133 0.000 0.000 0.000 28.803 74.392 15.566 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 57.606 275.525 46.699 3624.540 2706.052 808.876 3712.437 279.148 209.614 474.326 1721.445 13536.437 gaaovaa dmana dIva da na h * Actual injection 2 koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI ]%padna SaoD\yaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoD\yaUla 2 Generation Schedule (ex-bus) of Central Gen. Stations/Dedicated CG Stations/Jointly owned Stations & schedule of benificieries (MUs) SaoD\yaUla (A) koMd`Iya ibajalaIGar kaorbaa esaTIpIesa kaorbaa esaTIpIesa -III $ ivanQa esaTIpIesa I ivanQa esaTIpIesa II ivanQa esaTIpIesa III ivanQa esaTIpIesa IV kvaasa gaOsa gaMQaar gaOsa saIpt kakrapar tara`pur 3 AaOr 4 (ba) samaip-t koMd`Iya ibajalaIGar [Midra saagar A. Central Gen. Stns. Schedule 1406.427 348.576 545.992 560.125 569.602 575.518 80.508 5.694 1744.912 294.857 361.711 Korba STPS Korba STPS-III $ Vindhyachal STPS-I Vindhyachal STPS-II Vindhyachal STPS- III Vindhyachal STPS- IV Kawas GPP** Gandhar GPP** Sipat Kakrapar APS* Tarapur APS 3&4* gau}ivainaila map`iva]kM Craivabaao GUVNL MPPGCL 243.856 66.979 74.596 130.756 150.267 133.106 42.121 1.004 425.844 83.766 91.767 326.160 55.208 178.882 154.126 115.948 151.422 13.776 0.757 347.532 74.483 77.362 CSEB MSPGCL GOA DD DNH 144.754 105.194 1.920 1.599 58.557 35.159 0.000 0.000 283.561 0.000 16.076 443.999 93.196 219.906 218.993 187.852 199.772 6.871 0.000 521.411 100.752 146.748 145.661 4.510 15.146 10.211 9.043 10.335 0.187 0.059 28.118 10.728 4.827 33.539 4.210 8.473 6.240 7.784 8.544 2.063 0.000 24.684 5.560 4.277 35.546 15.682 32.321 23.481 25.110 30.176 15.471 3.864 81.747 8.392 14.271 245.570 245.570 15.041 14.747 0.000 0.000 11.176 kula TOTAL 1406.427 348.576 545.992 560.125 569.602 575.518 80.508 5.694 1744.912 294.857 361.711 245.570 RPPC(NVVNL) KAWAS(RLNG) saMyau@t inajaI sToSana tara`pur 1 AaOr 2 esaesapI ponca kula [M saagar kao CaoD, kr ecavaIDIsaI+ ecaDblyaubaI HVDC+HWB / Outside region(NR & SR) B. Dedicated CG Stations Indira Sagar* C. Jointly owned Stations 0.000 * vaas%aivak [njao@Sana * Actual injection 57.606 275.525 46.699 10486.650 Tarapur APS 1&2* SSP* Pench* Total (excl. Ind. Sagar) 28.803 0.000 44.084 157.050 0.000 31.133 2625.445 2077.574 0.000 0.000 GANDHAR(RLNG) (sa) maraiva]kM 0.000 0.000 0.000 699.408 28.803 74.392 15.566 2694.455 0.000 0.000 0.000 238.984 0.000 0.000 0.000 151.293 0.000 0.000 0.000 357.894 maraiva]kM gaaovaa dmana dIva da na h 57.606 275.525 46.699 1641.597 10486.650 * Actual injection Note:- $ These Scheduled Transactions are done by WRLDC under STOA. (ima yauinaT\sa) 3 AMtrxao~Iya ivainamayaaoM / iWpxaIya ivanamayaaoM kI SaoD\yaUla 3 Schedule for interregional exchanges/bilateral exchanges (MUs) k xao~ / rajya pUvaI- xao~ ko rasto Aayaat SaoD\yaUla SaoD\yaUla Region/State Import SDLs through ER Schedule gau}ivainaila map`iva]kM GUVNL MPPGCL Craivabaao CSEB MSPGCL GOA DD DNH 0.000 0.000 13.117 0.000 1.354 0.000 -1.749 -0.025 0.000 0.000 0.000 24.000 0.000 0.000 0.000 0.248 -2.100 0.000 0.000 -14.213 0.000 0.000 43.368 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.480 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.322 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.034 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ecavaIDIsaI HVDC kula TOTAL 307.224 Indian Energy Exchange (WR to ER) Power Exchange of India (ER to WR) ER (NTPC) DVC to MPPTCL (Long Term Open Access) Hirakud to CSEB APL1 GUVNL to APPCC ( AEL) CSEB to APPCC ( NVVNL) JPL-II to APPCC ( NVVNL) JNSTPP to APPCC ( NVVNL) APL2 GUVNL to BIHAR ( AEL) APL3 GUVNL to BIHAR ( AEL) STERLITE to CSEB ( NVVNL) STERLITE to ESIL_WR ( PTC LTD) STERLITE to ESIL_WR ( PXIL) STERLITE to ESIL MSEB ( PTC LTD) STERLITE to GCEL ( GMRETL) CSEB to KSEB ( NVVNL) WBSEB to MPPMCL MPSEB ( IEXL) WBSEB to MPPMCL MPSEB ( PTC LTD) JPL to MANIPUR ( PTC LTD) 0.000 0.000 24.672 0.000 0.000 -0.025 0.000 0.000 0.000 -81.758 -0.108 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 27.322 206.694 0.000 0.000 0.000 0.000 -0.660 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.400 0.450 0.000 -5.918 0.273 111.835 206.694 1.354 -0.025 -1.749 -0.025 -0.660 -81.758 -0.108 24.000 6.480 39.720 0.480 0.248 -2.100 0.400 0.450 -14.213 -9.113 0.000 0.000 -0.029 0.000 0.000 0.000 0.000 0.000 0.000 APL1 GUVNL to MAL MEGHALAYA ( PTC LTD) JNSTPP to NGLD ( PTC LTD) STERLITE to TPC MSEB ( STERLITE) APL3 GUVNL to TGPCC ( AEL) CSEB to TGPCC ( NVVNL) JPL-II to TGPCC ( NVVNL) JNSTPP to TGPCC ( NVVNL) WBSEB to VYL MPSEB ( TPTCL) MPPMCL MPSEB to WBSEB ( IEXL) MPPMCL MPSEB to WBSEB ( PTC LTD) SaoD\yaUla K xao~ / rajya dixaNa xao~ ko rasto Aayaat SaoD\yaUla Region/State Import SDLs through SR Schedule -219.829 Indian Energy Exchange (SR to NR) Power Exchange of India (SR to WR) CSEB to APPCC ( NVVNL) JNSTPP to APPCC ( NVVNL) CSEB to KSEB ( NVVNL) JPL to TNEB ( JPL) JPL-II to TNEB ( JPL) JPL-II to TGPCC ( KISPL) JPL-II to TGPCC ( PTC LTD) JNSTPP to TGPCC ( NVVNL) KSK TO TGPCC LANCO TO TNEB JPL II TO TNEB ga ]%trI xao~ ko rasto Aayaat SaoD\yaUla Import SDLs through NR Indian Energy Exchange (WR to NR) Power Exchange of India (NR to WR) Rihand (Hydro) to MPPTCL (Long Term Open Access) Matathilla (Hydro) to MPPTCL (Long Term Open Access) BSES_RAJ to MPPMCL MPSEB ( MPPL) BSES YM (DTL)-NR to MPPMCL MPSEB ( MPPL) HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) TPDL_DTL to MPPMCL MPSEB ( MPPL) WBSEB to MPPMCL MPSEB ( PTC LTD) JPL to NPCL ( KISPL) JPL to NPCL ( NPCL) JSPL_DCPP to NPCL ( KISPL) JNSTPP to NPCL ( NPCL) JNSTPP to NPCL ( SCL) TISCO to TSLB MSEB ( TSLB MSEB) Ga iWpxaIya SaoD\yaUlsa gau}ivainaila 0.000 -10.571 0.000 0.000 0.000 0.000 -0.774 0.248 -1.300 -0.600 map`iva]kM GUVNL MPPGCL 0.000 0.000 0.000 0.000 -2.043 -0.029 0.000 0.000 0.000 0.000 Craivabaao 0.000 0.000 46.056 0.000 0.000 0.000 0.000 0.000 0.000 0.000 maraiva]kM 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 gaaovaa 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 dmana dIva 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 da na h CSEB MSPGCL GOA DD DNH -9.113 -10.571 46.056 -0.029 -2.043 -0.029 -0.774 0.248 -1.300 -0.600 ecavaIDIsaI HVDC kula TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -1.189 0.000 0.000 0.000 0.000 0.000 -1.116 0.000 0.000 0.000 0.000 0.000 -3.366 0.000 -4.406 -12.192 -4.406 -1.283 -0.235 0.000 -82.851 -10.310 -98.480 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.003 0.003 -3.366 -1.189 -4.406 -12.192 -4.406 -1.283 -0.235 -1.116 -82.851 -10.310 -98.480 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.466 1.853 21.700 24.800 75.700 52.080 18.729 0.000 0.000 0.000 -0.300 -0.102 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -3.178 -0.114 -0.060 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.696 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -547.519 15.629 6.466 1.853 21.700 24.800 75.700 52.080 18.729 -3.178 -0.114 -0.060 -0.300 -0.102 6.696 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.124 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.150 -1.320 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.096 1.637 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.183 0.084 2.373 2.946 9.394 9.394 3.652 0.073 0.818 0.000 0.000 1.098 0.776 3.228 0.000 1.015 0.730 0.722 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.450 0.000 0.000 0.000 0.024 4.674 0.967 0.845 1.481 0.939 1.282 1.037 1.098 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.183 0.084 2.373 2.946 9.394 9.394 3.652 0.073 0.818 6.096 1.637 1.098 0.776 3.228 2.124 1.015 0.730 0.722 0.276 0.350 0.050 9.360 1.560 22.920 49.953 0.000 0.000 0.000 2.365 0.024 4.674 0.967 0.845 1.481 0.939 1.282 1.037 1.098 -327.619 Exchanges within WR Mundra APL to Gujarat (LTOA) JPL to AIGL MSEB ( AIGL MSEB) JPL to ARPIPL MSEB ( ARPIPL MSEB) JPL to ACCIL MSEB ( ACCIL MSEB) JPL to ARVIND MSEB ( ARVIND MSEB) JNSTPP to BEST MSEB ( PTC LTD) JNSTPP to BEST MSEB ( SCL) JPL to BOSCH MSEB ( BOSCH MSEB) JPL to BCSIL MSEB ( BCSIL MSEB) JPL to BHL MSEB ( BHL MSEB) ACBIL to CSEB ( CSPTRDCL CSEB) SPECT ACBIL to CSEB ( CSPTRDCL CSEB) JPL to CLASSIC MSEB ( CLASSIC MSEB) JPL to CIPLA MSEB ( CIPLA MSEB) JPL to CEAT MSEB ( MPPL) APL1 GUVNL to CHLM GUVNL ( AEL) JPL to DNL MSEB ( DNL MSEB) JPL to ETLC MSEB ( ETLC MSEB) JPL to ETLT MSEB ( ETLT MSEB) APL3 GUVNL to ESIL_WR ( PTC LTD) EMCO to ESIL_WR ( IEXL) EMCO to ESIL_WR ( PXIL) JPL to ESIL_WR ( PXIL) JSPL_DCPP to ESIL_WR ( PXIL) JPL-II to ESIL_WR ( PXIL) JNSTPP to ESIL_WR ( PTC LTD) MSEB to ESIL_WR ( PXIL) MPPMCL MPSEB to ESIL_WR ( IEXL) MPPMCL MPSEB to ESIL_WR ( PXIL) VANDANA to ESIL_WR ( PXIL) APL3 GUVNL to ESIL MSEB ( PTC LTD) JNSTPP to ESIL MSEB ( PTC LTD) JPL to ETLW MSEB ( ETLW MSEB) JPL to ETLB MSEB ( ETLB MSEB) JPL to EILR MSEB ( MPPL) JPL to ETLK MSEB ( ETLK MSEB) JPL to EXIDE MSEB ( EXIDE MSEB) JPL to EIPL MSEB ( EIPL MSEB) JPL to EXIDE2 MSEB ( EXIDE2 MSEB) JPL to FBML MSEB ( FBML MSEB) APL3 GUVNL to GOA ( AEL) JPL to GSL MSEB ( GSL MSEB) EMCO to GCEL ( EMCO) JPL to GODREJ MSEB ( GODREJ MSEB) JCFPL GUVNL to SOLAR GOA ( NVVNL) JPL to GIPL MSEB ( MPPL) JPL to GPIL MSEB ( MPPL) JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) EMCO TO MSEB JNSTPP TO MP EMCO TO DNH TORRENT TO MP LANCO TO MP MP TO TORRENT NSPCL to DD ( DD) MSEB SOLAR TO CSEB SOLAR RAJ MP SOLAR TO CSEB SOLAR IEE PEI ca 4 5 6 7 8 9 10 11 kula Aayaat Total Import kula inayaa-t Total Export naoT Aayaat / inayaa-t Net Imp. (+)/Exp. (-) AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM Total Entitlement incl. IR and bi-lateral exchange kI iSaD\yaUla imalaakr kula pa~ta schedule kI kula iSaDUyala ibanaa xait ko kula D`avala xait imalaakr kula D`avala p p`NaalaI maoM kula pUla xait p xao`~ sToSanaaoM sao vaastivak [njao@Sana (ima yauinaT\sa) vaas%aivak AMtrxao~Iya ivainamaya (ima yauinaT\sa) AMtrxao~Iya ivainamaya iSaD\yaUla (ima yauinaT\sa) Total Sdl. incl. IR/ bi-lateral exch. Sdl. Total Drl excl. Tr. Loss Total Drl incl. Tr. Loss -1319.569 -1079.345 -240.224 kula Total 13296.213 10246.426 10828.586 9786.643 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -48.817 0.000 0.000 0.000 0.000 0.000 158.099 7.848 -86.955 -139.849 52.894 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 127.918 0.000 48.817 162.437 0.000 0.000 -0.605 -2.504 -134.736 -0.407 462.946 -156.333 619.280 0.000 0.000 0.000 3.810 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.605 2.504 -489.180 -18.379 -1443.826 -748.598 -695.228 gau}ivainaila map`iva]kM Craivabaao GUVNL MPPGCL 3677.434 2678.339 3215.350 3215.350 3325.332 2696.854 3225.600 2633.924 0.705 0.000 0.830 0.000 0.870 0.000 4.082 0.538 1.789 107.150 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -1.576 -5.089 248.169 -7.114 255.283 0.000 21.150 0.000 0.000 0.000 0.948 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -27.450 0.000 -32.802 -27.450 -5.352 maraiva]kM gaaovaa 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.811 0.000 0.000 27.400 0.000 33.533 0.000 33.533 dmana dIva 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 108.370 0.000 0.000 0.000 0.000 0.000 0.000 11.856 0.000 122.260 0.000 122.260 da na h 0.705 21.150 0.830 3.810 0.870 0.948 4.082 0.538 1.789 107.150 127.918 108.370 0.000 162.437 0.000 4.811 0.000 0.000 -373.852 -16.026 -1319.569 -1079.345 -240.224 ecavaIDIsaI MSPGCL GOA DD DNH HVDC TOTAL 113.648 4.180 416.718 637.104 3967.720 2949.738 3123.117 3123.117 273.796 233.632 214.721 214.721 243.147 184.826 168.520 177.000 596.586 480.154 463.616 463.616 15.433 14.747 0.944 0.853 13296.213 10246.426 10828.586 10465.685 -1041.943 Pooled loss in WR System kaorbaa Actual Inj. - WR Stns. KSTPS (MUs) Actual IR Exchanges (MUs) IR Exchange Schedule (MUs) ivanQa 1 AaOr 2 ivanQa 3 VSTPS-1& 2 VSTPS-3 kula CSEB kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula KGPS GGPS KAPS TAPS SSP PENCH TOTAL 46.699 13209.169 1752.240 1127.016 1168.414 294.857 419.317 ] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net 0.000 2825.000 -2825.000 79.340 3.470 0.000 960.836 -960.836 275.525 402.003 38.693 363.310 -3422.526 NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl 0.326 1300.925 -1300.599 0.000 1578.177 -1578.177 307.224 239.417 67.807 -2810.969 maah janavarI 2015 ko AMtr-ajyaIya / AMtrxao~Iya ivainamayaaoM ka ivavarNa DETAILS OF INTERSTATE/INTER-REGIONAL EXCHANGES FOR THE MONTH OF JANUARY 2015 From/ To k`maaMk A 1 Interstate/Inter-regional Schedules included in ISGS gau}ivainaila GUVNL 2 map`iva]kMila MPPGCL 3 Craivabaao CSEB 4 maraiva]kM ila MSPGCL 5 gau}ivainaila map`iva]kMila Craivabaao maraiva]kMila GUVNL MPPGCL CSEB MSPGCL 48.817 0.000 gaaovaa GOA dmana dIva DD da na h DNH [ssaar ESIL ] xao~ NR Anaulagnak 4.6 Annex-4.6 d xao~ SR pU xao~ ER piScama xao~ kula WR TOTAL 0.948 49.765 3.109 3.109 0.000 1.920 1.920 gaaovaa GOA 0.000 6 da na h DNH 0.000 7 kaorbaa KORBA-III iMjadla pavar JPL 0.000 8 9 ADanaI pavar APL 10 ESSAR MAHAN 11 JAYPEE 12 laonakao Lanco -Pathadi 13 esaIbaIAa[-ela -ACBIL 14 KSK MAHANADI 15 JNSTPP(NIGRIE) 16 DB POWER 17 VANDANA 18 0.000 2.124 0.024 ESIL 20 ena esa pI saI ela NSPCL 21 ]<arI xao~ N.Region (WR end) 0.276 23.574 0.000 35.161 33.840 162.437 162.437 7.733 127.918 7.733 23.462 49.953 2.365 3.810 EMCO 19 21.150 107.150 108.370 0.400 4.811 4.811 0.000 0.000 22 dixaNaI xao~ S. Region (S. Bus) 0.000 0.000 23 pUvaI- xao~ E. Region (WR end) 402.003 402.003 24 p xao~ W.Region (WR end) 25 enaTIpIsaI NTPC Injection 26 enapIsaI NPC Injection 27 Total ISGS drawal from the Grid incl. interregional/ bi-lateral B Interstate/IR Exchanges not included in ISGS 20 knaa-Tk Karnataka 21 yaUpIpIsaIela UPPCL 22 AarvaIpIenaela RVPNL ####### 960.836 38.693 3824.529 5885.980 714.174 3215.350 2633.924 637.104 3123.117 214.721 177.000 463.616 57.28 57.280 0.000 0.000 -19.97 -19.970 23 UPPCL ( Excess Drawn From Rajghat -0.060 -0.060 24 kaoTa ]jjaOna Kota - Ujjain 0.000 25 kula ba Total B (13 to 17) 0.000 C inavala ivainamaya Net Exchange (12+18) D kula Aayaat Total Imp. by WR E kula inayaa-t Total Export by WR F inavala ivainamaya Net Exchange (D-E) G p xao~ Wara vaIlD }jaa- Energy wheeled by WR 26 pU xao~ sao d xao~ kao inayaa-t ER export to SR -20.030 0.000 0.000 3215.350 2613.894 637.104 0.000 57.280 0.000 0.000 37.250 3123.117 272.001 177.000 463.616 10502.082 439.253 3824.529 -3385.276 0.000 27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ER/WR 0.000 28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR 0.000 29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR 0.000 30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR 31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR 32 33 0.000 0.000 0.000 438.637 59.026 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NR/WR 0.000 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR 0.000 0.000 0.000 438.637 59.026 0.000 0.000 Anaulagnak 4.7 Annex-4.7 maah janavarI 2015 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JANUARY 2015 ivavarNa Particulars kmaaMk gau ] iva ina ila GUVNL ]ka[- Sl. No. Ukai map`iva]kM ila gaaMQaIsaagar MPPGCL Gandhisagar ena eca DI saI NHDC [Midra saagar Indira Sagar maraiva]kM ila MSEGCL kaoyanaa 1 Levels in Mtrs. str maITr maoM 1.1 maah ko AMt maoM 99.35 394.23 255.91 652.79 102.90 397.66 255.99 648.10 At the end of the month 1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM Corresponding Figure of the month Last Year Koyna ANNEXURE 5 List of Grid Disturbances and Grid incidents (GD/GI) in Jan-2015: Western Region Sr. No. Details of incident (Elements / Generation Tripped) 1 Bus Fault at 400 kV JPL Stage 2 S/s 2 3 4 5 Multiple element tripping at 220 kV Bus of 400/220 kV Nagda S/s Multiple tripping from 220 kV Sagar S/s Blackout at 220 /132 kV Ponda S/s Tripping of HVDC Vindhyachal both poles 6 7 Multiple Tripping at Shingaji S/s 220 kV Bus Fault at 400/220 kV Wanakbori S/s 8 Blackout of 220/66 kv Sartanpur S/s 9 10 Bus Fault at 220/132 kV Damoh(MP) S/s Multiple 400 kV lInes tripping from Karad on Over Voltage Owner Utility Date Time JPL 06/01/2015 13:16 MPPTCL MPPTCL Goa PGCIL MPPGCL GSECL GETCO MPPTCL MSETCL 12/01/2015 13/01/2015 13/01/2015 19/01/2015 21/01/2015 21/01/2015 22/01/2015 23/01/2015 26/01/2015 20:42 16:49 16:30 22:39 13:44 12:53 17:25 11:28 16:37 Effect (Loss of generation/ Load), if Category as per CEA any Grid Standards Nil load Loss : Not Known To be submitted by Gujarat SLDC Nil Load Loss : 140 MW Nil Gen loss : Not Known To be submitted by MP SLDC Gen loss : 600 MW load Loss : Not Known To be submitted by Gujarat SLDC Load Loss : Not Known To be submitted by MP SLDC Nil GI-2 GI-1 GI-1 GD-1 GI-2 GI-2 GI-2 GD-1 GD-1 GI-2 Annexure-6 LINES DHARIWAL-BHADRAVATI - S/C DHARIWAL-PARLI - S/C ASOJ-CHORONIA - II KASOR-CHORANIA - S/C END S/S OWNER DHARIWAL DHARIWAL GETCO GETCO KV OUT TIME OUT DATE 400 18:23 01-Jan-15 400 18:23 01-Jan-15 400 04:00 02-Jan-15 400 07:29 14-Jan-15 ASOJ - CHORANIA - I GETCO 400 12:55 14-Jan-15 SSP -KASOR - S/C GETCO 400 12:59 14-Jan-15 220 12:54 21-Jan-15 220 12:54 21-Jan-15 220 12:54 21-Jan-15 220 12:54 21-Jan-15 220 12:54 21-Jan-15 220 12:54 21-Jan-15 220 12:54 21-Jan-15 REMARKS FLASHOVER AT DHARIWAL FLASHOVER AT DHARIWAL TREIPPED ON O/V R PHASE TO EARTH FAULT R-B FAULT ASOJ-PIRANA - S/C GETCO 400 17:46 15-Jan-15 R-Y FAULT 200KV BUS - I FAULT AT WANAKBARI 200KV BUS - I FAULT AT WANAKBARI 200KV BUS - I FAULT AT WANAKBARI 200KV BUS - I FAULT AT WANAKBARI 200KV BUS - I FAULT AT WANAKBARI 200KV BUS - I FAULT AT WANAKBARI 200KV BUS - I FAULT AT WANAKBARI R-B PHASE NASIK-NAVSARI - I GETCO 220 09:11 08-Jan-15 POLE DISCREPENCY DEHGAAM-RANCHORPURA - I GETCO 400 08:19 01-Jan-15 400 19:55 21-Jan-15 GETCO GOA 400 220 15:06 16:30 07-Jan-15 13-Jan-15 B-Y FAULT B PHASE TO EARTH FAULT TRIPPED ON O/V DIRECTIONAL E/F RELAY AMONA-PONDA - S/C GOA 220 16:30 13-Jan-15 DIRECTIONAL E/F RELAY TILLARI-PONDA - S/C GOA 220 16:30 13-Jan-15 DIRECTIONAL E/F RELAY MAPUSA-PONDA - S/C GOA 220 16:30 13-Jan-15 Y PHASE TO EARTH FAULT JINDAL-JINDAL STAGE 2 - S/C JPL 400 13:31 06-Jan-15 R- B BUS FAULT AT JPL JINDAL - TAMNAR - II JPL 400 13:31 06-Jan-15 R- B BUS FAULT AT JPL JINDAL - TAMNAR - I JPL 400 13:31 06-Jan-15 R- B BUS FAULT AT JPL RAIPUR - KSK - I KSK 400 13:12 29-Jan-15 400 15:24 02-Jan-15 R-B FUALT DT RECEIVED FROM ANUPUR TRIPPED ON O/V WANAKBARI - KAPADWAJ - I WANAKBARI - KAPADWAJ - II WANAKBARI-ASOJ - I WANAKBARI-ASOJ - II WANAKBARI - DHANSURA - I WANAKBARI - DHANSURA - II WANAKBARI - GODHARA - S/C BHACHAU-RANCHORPURA - II INDORE-ASOJ - II KOLHAPUR-PONDA - S/C JABALPUR-ANUPUR - II GETCO GETCO GETCO GETCO GETCO GETCO GETCO GETCO MOSERBEAR BINA-BHOPAL - II MPPTCL 400 03:02 01-Jan-15 KATNI - B'PUR - II MPPTCL 400 01:28 01-Jan-15 400 01:48 11-Jan-15 ISP-INDORE - II SINGHAJI - CHEAGAON - S/C SINGHAJI -PITAMPUR - I SINGHAJI -PITAMPUR - II MPPTCL MPPTCL MPPTCL MPPTCL 400 400 400 13:44 13:44 13:44 21-Jan-15 21-Jan-15 21-Jan-15 TRIPPED ON O/V R PHASE TO EARTH FAULT ARCING IN GT-2 Y-PH BUSHING ARCING IN GT-2 Y-PH BUSHING ARCING IN GT-2 Y-PH LINES END S/S OWNER KV OUT TIME OUT DATE REMARKS BUSHING DAMOH(MP)-SAGAR - S/C 220/132KV DAMOH(MP) ICT I 220/132KV DAMOH(MP) ICT II DAMOH(MP)-KATNI S/C - S/C MPPTCL 220 11:28 23-Jan-15 BUS FAULT AT DAMOH 220/132 11:28 23-Jan-15 BUS FAULT AT DAMOH 220/132 11:28 23-Jan-15 BUS FAULT AT DAMOH MPPTCL 220 11:28 23-Jan-15 BUS FAULT AT DAMOH INDORE-ASOJ - II MPPTCL 400 15:06 07-Jan-15 TRIPPED ON O/V DAMOH(MP)-DAMOH(PG) - I MPPTCL 220 11:28 23-Jan-15 BUS FAULT AT DAMOH MPPTCL 220 11:28 23-Jan-15 400 04:43 25-Jan-15 220 00:57 08-Jan-15 220 06:11 18-Jan-15 220 23:32 19-Jan-15 220 01:12 19-Jan-15 220 01:19 24-Jan-15 220 08:17 25-Jan-15 DAMOH(MP)-DAMOH(PG) - II MPPTCL MPPTCL KARAD - KOLHPAUR - II MSETCL 400 17:05 01-Jan-15 BUS FAULT AT DAMOH R PHASE TO EARTH FAULT R PHASE TO EARTH FAULT R-E FAULT R PHASE TO EARTH FAULT R-N FAULT B PHASE TO EARTH FAULT R PHASE TO EARTH FAULT TRIPPED ON O/V KARAD-KOLHAPUR - I MSETCL 400 02:02 01-Jan-15 TRIPPED ON O/V BABLESHWAR-PADGHE - I MSETCL 400 23:48 07-Jan-15 DPR OPTD KARAD-KOLHAPUR - II MSETCL 400 04:01 09-Jan-15 TRIPPED ON O/V KARAD-KOLHAPUR - II MSETCL 400 02:58 11-Jan-15 TRIPPED ON O/V KARAD-KOLHAPUR - I CHANDRAPUR-PADGHE POLE II JAIGARH-KARAD - II MSETCL 400 03:02 13-Jan-15 500 00:50 23-Jan-15 MSETCL 400 16:37 26-Jan-15 TRIPPED ON O/V PROBLEM IN CONTROL PANAL TRIPPED ON O/V KARAD-L'KHAND - S/C TAPTITANDA-BABLESHWAR II NASIK-NAVSARI - I MSETCL 400 16:37 26-Jan-15 TRIPPED ON O/V 400 19:19 01-Feb-15 TRIPPED ON O/V MSETCL 220 09:11 08-Jan-15 POLE DISCREPENCY KOLHAPUR-SOLAPUR - II MSETCL 400 02:02 01-Jan-15 400 19:47 09-Jan-15 MSETCL 400 16:33 26-Jan-15 TRIPPED ON O/V R PHASE TO EARTH FAULT TRIPPED ON O/V MSETCL 400 07:02 18-Jan-15 400 06:40 03-Jan-15 NAGADA-RAJGARH - I BADOD-KOTA - S/C BADOD-KOTA - S/C BADOD-KOTA - S/C BADOD - KOTA - S/C BADOD - KOTA - S/C BADOD-KOTA - S/C KARAD - SHOLAPUR - S/C KARAD-SOLAPUR - S/C SSP -DHULE - II SOLAPUR - SOLAPUR (MSETCL) - S/C SOLAPUR -KOLHAPUR - II MPPTCL MPPTCL MPPTCL MPPTCL MPPTCL MPPTCL MPPTCL MSETCL MSETCL MSETCL MSETCL 400 03:02 13-Jan-15 TRIPPED ON SOTF B PHASE TO EARTH FAULT TRIPPED ON O/V SHOLAPUR - KOLHAPUR - I MSETCL 400 16:37 26-Jan-15 TRIPPED ON O/V DHABOL-NAGOTHANE - I MSETCL 400 01:58 01-Jan-15 TRIPPED ON O/V DHABOL-NAGOTHANE - I MSETCL 400 03:01 02-Jan-15 TREIPPED ON O/V DHABOL-NAGOTHANE - II MSETCL 400 21:30 21-Jan-15 TRIPPED ON O/V MSETCL MSETCL 400 OUT TIME 18:00 22-Jan-15 TRIPPED ON O/V DHABOL- NAGOTHANE - II MSETCL 400 01:47 23-Jan-15 TRIPPED ON O/V DABHOL-N'KOYNA-I - I MSETCL 400 18:00 25-Jan-15 TRIPPED ON O/V DABHOL-NAGOTHANE - II MSETCL 400 03:57 28-Jan-15 400 06:48 28-Jan-15 TRIPPED ON O/V TRIPPED ON DISTANCE PROTECTION Y-B FAULT LINES DHABOL-NAGOTHANE - II DABHOL -NAGOTHANE - II END S/S OWNER KV MSETCL OUT DATE SSP-RAJGARH - II NCA 400 11:22 14-Jan-15 SASAN - V'CHAL - II NTPC 400 09:15 29-Jan-15 400 06:53 14-Jan-15 REMARKS KORBA -MAHAN - S/C NTPC 400 16:28 16-Jan-15 Y-B FAULT B PHASE TO EARTH FAULT TRIPPED AT KORBA END GANDHAR - SUJEN - S/C NTPC 400 10:37 30-Jan-15 R-N FAULT KOLHAPUR-SOLAPUR - II PCGIL 400 02:02 01-Jan-15 400 19:47 09-Jan-15 TRIPPED ON O/V R PHASE TO EARTH FAULT TRIPPED ON O/V GANDHAR-HAZIRA - II KARAD - SHOLAPUR - S/C NTPC PCGIL KARAD-SOLAPUR - S/C PCGIL 400 16:33 26-Jan-15 WARDHA-DURG - I PCGIL 765 03:02 01-Jan-15 400 17:05 21-Jan-15 INDORE-INDORE(PG) - S/C PGCIL DAMOH(MP)-DAMOH(PG) - I PGCIL 220 11:28 23-Jan-15 DAMOH(MP)-DAMOH(PG) - II PGCIL 220 11:28 23-Jan-15 400 04:43 25-Jan-15 400 18:23 01-Jan-15 400 18:23 01-Jan-15 TREIPPED ON O/V TRIPPED AT INDORE(PG) END BUS FAULT AT DAMOH JINDAL - TAMNAR - II PGCIL 400 13:31 06-Jan-15 BUS FAULT AT DAMOH R PHASE TO EARTH FAULT FLASHOVER AT DHARIWAL FLASHOVER AT DHARIWAL R- B BUS FAULT AT JPL JINDAL - TAMNAR - I PGCIL 400 13:31 06-Jan-15 R- B BUS FAULT AT JPL VINDHYACHAL - SATNA - II PGCIL 400 17:03 16-Jan-15 TRIPPED AT SATNA END DURG-WARDHA - I PGCIL 765 17:28 03-Jan-15 TREIPPED ON O/V DURG-WARDHA - II PGCIL 765 03:42 04-Jan-15 TREIPPED ON O/V WARDHA-A'BAD(PG) - I PGCIL 765 17:08 08-Jan-15 TREIPPED ON O/V SEONI - WARDHA - II PGCIL 765 21:40 09-Jan-15 TRIPPED ON O/V SEONI- WARDHA - II PGCIL 765 21:55 14-Jan-15 400 07:27 14-Jan-15 NAGADA-RAJGARH - I DHARIWAL-BHADRAVATI - S/C DHARIWAL-PARLI - S/C PGCIL PGCIL PGCIL SEONI- WARDHA - I PGCIL 765 19:50 15-Jan-15 TRIPPED ON O/V B PHASE TO EARTH FAULT TRIPPED ON O/V SEONI-WARDHA - II PGCIL 765 20:55 15-Jan-15 TRIPPED ON O/V SEONI- WARDHA - I PGCIL 765 09:53 15-Jan-15 765 10:59 16-Jan-15 400 19:05 18-Jan-15 400 16:16 19-Jan-15 400 22:39 19-Jan-15 TRIPPED ON O/V B PHASE TO EARTH FAULT Y-B FAULT R PHASE TO EARTH FAULT SHORT CIRCUIT ALARM IN BLOCK 2 DEHGAM-PIRANA - II SEONI- WARDHA - I NAVSARI-MAGARWADA - S/C KHANDWA-RAJGARH - I VINDHYACHAL HVDC POLE - I PGCIL PGCIL PGCIL PGCIL PGCIL LINES END S/S OWNER KV OUT TIME OUT DATE 400 22:39 19-Jan-15 REMARKS SEONI-WARDHA - II PGCIL 765 18:02 20-Jan-15 SHORT CIRCUIT ALARM IN BLOCK 2 TRIPPED ON O/V SEONI-WARDHA - II PGCIL 765 18:03 21-Jan-15 TRIPPED ON O/V SEONI-WARDHA - II PGCIL 765 18:01 28-Jan-15 TRIPPED ON O/V PGCIL 765 18:01 28-Jan-15 400 08:19 01-Jan-15 400 08:19 01-Jan-15 400 19:55 21-Jan-15 TRIPPED ON O/V TRIPPED AT DEHGAUM END B-Y FAULT B PHASE TO EARTH FAULT Y PHASE TO EARTH FAULT VINDHYACHAL HVDC POLE - II DURG -WARDHA - I DEHGAM-W'BORI - S/C DEHGAAM-RANCHORPURA - I BHACHAU-RANCHORPURA - II PGCIL PGCIL PGCIL PGCIL MAPUSA-PONDA - S/C PGCIL 220 16:30 13-Jan-15 RAIPUR - KSK - I PGCIL 400 13:12 29-Jan-15 400 15:24 02-Jan-15 400 06:40 03-Jan-15 PGCIL 400 03:02 13-Jan-15 R-B FUALT DT RECEIVED FROM ANUPUR B PHASE TO EARTH FAULT TRIPPED ON O/V SHOLAPUR - KOLHAPUR - I PGCIL 400 16:37 26-Jan-15 TRIPPED ON O/V DHABOL-NAGOTHANE - I JABALPUR-ANUPUR - II SOLAPUR - SOLAPUR (MSETCL) - S/C SOLAPUR -KOLHAPUR - II PGCIL PGCIL RGPPL 400 01:58 01-Jan-15 TRIPPED ON O/V DHABOL-NAGOTHANE - I RGPPL 400 03:01 02-Jan-15 TREIPPED ON O/V DHABOL-NAGOTHANE - II RGPPL 400 21:30 21-Jan-15 TRIPPED ON O/V DHABOL-NAGOTHANE - II RGPPL 400 18:00 22-Jan-15 TRIPPED ON O/V DHABOL- NAGOTHANE - II RGPPL 400 01:47 23-Jan-15 TRIPPED ON O/V DABHOL-N'KOYNA-I - I RGPPL 400 18:00 25-Jan-15 TRIPPED ON O/V DABHOL-NAGOTHANE - II RGPPL 400 03:57 28-Jan-15 400 06:48 28-Jan-15 SASAN - V'CHAL - II SASAN 400 09:15 29-Jan-15 TRIPPED ON O/V TRIPPED ON DISTANCE PROTECTION Y-B FAULT GANDHAR - SUJEN - S/C SUGEN 400 10:37 30-Jan-15 R-N FAULT TORRENT 400 17:46 15-Jan-15 R-B PHASE DABHOL -NAGOTHANE - II ASOJ-PIRANA - S/C RGPPL SUGEN-PIRANA - S/C 400 12:13 15-Jan-15 R-Y FAULT TORRENT Note : 1. DR is either to be submitted by Line owner or the sub-station owner to Following Mail id : protectionwrldc@gmail.com, protectionwrpc@gmail.com 2. Non Receipt of DR/EL from Sub-Station will be taken as Non-Compliance of IEGC 5.2 (r) and CEA grid Standard 15.3 3. Further In case of GD/GI If Details are not received following additional non-compliance is noted :5.9.6.c (VI) and In case of lines under conenctivity CEA (Technical standards for connectivity to the Grid) Regulation, 2007-6. 4.d ANNEXURE 8.1 Tentative Schedule for Mock- Drill of Units with Black Start Facility in Western Region Power Station Ukai (H) Gandhisagar Koyna I & II Kadana State Gujarat Tentative dates (Jan’15Jun’15) Feb’15 Madhya Pradesh Feb’15 Maharashtra Feb’15 Gujarat 4th wk. of Feb’15 Birsinghpur Madhya Pradesh 4th wk. of Feb’15 Pench Madhya Pradesh 1st wk. of Mar’15 Maharashtra 2nd wk of Mar'15 Uran (Gas) Dhuvaran Ghatghar GIPCL-I Gujarat Maharashtra Gujarat 3rd wk of Mar’15 4th wk of Mar’15 1st wk of April’15 Khopoli Maharashtra 2nd wk of April’15 Hasdeo Bango Chattisgarh 2nd wk.of April’15 Bargi Madhya Pradesh 2st wk of April’15 CLPIPL Gujarat 3rd wk of April’15 Bansagar Stage-I Madhya Pradesh 4th wk.of April’15 Bhivpuri Maharashtra 4th wk of April’15 Sugen SSP Indira Sagar Bhira Omkareshwar Bhira PSS Kawas Gandhar Medikheda Rajghat Paithan Trombay Mini Hydro Gujarat Gujarat Madhya Pradesh Maharashtra Madhya Pradesh Maharashtra Gujarat Gujarat Madhya Pradesh Madhya Pradesh Maharashtra Maharashtra Gujarat 4th wk.of April’15 1st wk of May’15 1st wk of May’15 1st wk of May’15 4th wk of May’15 4th wk of May’15 4th wk of May’15 1st wk.of june’15 1st wk. of june’15 4th wk of June’15 2nd wk. of june’15 4th wk of June’15 ~ 12,702 _ 7C)1"_ 1 1.27 --~---~- MS L 0 C KAL ',II ,u, 02227601768 ..--. - 1:1622 P.001/002 .~ ;.;..;....; •.•..A,I .•. '~RA' .~~oit!-~-:!.». MAllARASHTRA .'N'..sea· STATE ELECTRICITY TRANSMISSION CO.LTD. I Office of The Chief Engineer 0 A' li Maharashtra Stllte Load Dispatch Center, Thane-Belapur Road. P. . iro t, Navi Mumbai Pin - 400 708. Te\e :91_22-27601765 11766 Fax:91-22-27601769 Email: cesldc@mahasldc.in website; htt ;/lwww.mahasldc.in Ref: CELDKlSOrrECHI 002 68 1 2 FE B 20i5 Date: ~ To, The General Manager WRLOC, Mumbai Sub;-Oepletion of Import TTC/ATC of Maharashtra Ret-1) WRLDC/MO-1/1683/141815 2) WRLDC/MO-1/1683/14/15 &ystem dated 24/0912014 dated 03/02/2015 Dear Sir, It has been pointed out vide ref. (1) that Import TIC and ATC of Maharashtra system 7300 WWVand 7000 WV respectively. Later reduced to 6600 MW and 6300 Mt/V for system security reasons and due to the addition of following elements, . 1.765 kV Raipur-Wardha DIC 2.400 kV Bableshwar-Taptitanda ole 3. Addittion of 400/220 kV 500 MVA Bolser (PG)-ICT And Generation at APML., Tiroda, 2700 MW (ex-bus) from all units of (5"'560 MW) units. It is bring to your kind notice that Maharashtra system has fun LT AlMTOA share of 6300 MW from Central sector, UMPP and private owned units. Reduced ATC means that Maharasntra system is not entitled, to draw additional MW of power due to security reasons as per ref.(2) and permitted to draw only scheduled l TAiMTOA share. This means that. State has to maintain intra-state generation of 15000 MW to meet the demand of21300 MW, if demands picks in summer, conSidering ATC of 6300 MW. This will cause, 1. As Mumbai system has Operational capacity of 1877 MW, to deliver load of 3500 MW in summer ,Mumbai discerns are unable to purchase power through ATe will be resorted to load shedding. ' 2. In the case of tripping of unit, there is no option to carry the load shedding till the restoration of units in MSEDCL and Mumbai system ' The foU~wing is major bottleneck created in Maharashtra system due CTU-STU interconnection, at Auranqabad, endangering the security of the system. Following are the observation at 765 kV and 400 kV Autangabad (PG) bus, lZfOZ ZOl~ 11.Zl .,16ZZ P.OOZ/OOZ OZZZ160116~ 1. 765 kV Wardha-Aurangabad DIC is loaded to 190()"2000 MW and on 400 KV Akola-(M}Aurangabad·(PG) DIC is loaded to 400-500 MW. 2. Henoe, Net l..oading on 400 kV Aurangabad (PG)-Aurangabad (M) D/C lines is around 2500 MW and on 7651400 kV icrs Aurangabad (PG)-is around "tPOO MW. 3. Out of 2500 MW Power 400 kV Aurangabad (PG)-Aurangabad MW is on Aurangabad (M)-Pune (PG) Die lines. (M) D/C lines, 1000-1200 4. This pattern of loading continues, without abnormal change, even if Maharashtra schedule changes from 5200 MW and above. In the recent study forwarded by RLDC, in event of outage on one 765/400 kV 1500 MVA ICT Aurangabad (PG) along with 400 kV Aurangabad (M)-Aurangabc!d (PG) SIC, ATC needs to be restricted to 5300 MW only. The outage is proposed for RTCC wor1< at leT and changing CTs of lines. This means that, State has to maintain generation of 14000 MW to meet the demand of 19300 MW, considering the ATC of 5300 MW, Otherwise, if intra-state generation is not adequate, the load shedding in Mumbai and MSEDCL is inevitable in current scenario. The copy of SCADA prints (Demand/400 kV line flows )dated 13/1012014 having, Maharashtra schedule of 7726 MW,MSEDCL demand of 15698 MW,Mumbai demand 3267 MW with state demand 18965 MW is enclosed herewith, which itself shows that we have managed the grid in secure manner at above ATe. It seems that massive expansion plan of CTU is at 765 kV and 400 kV voltage level connecting to STU network is not proving boon for enhancing. Import nC/ATC of Maharashtra system and plus and it is against the commercial ethics. It light of abol/e, It is suggested to study. the results of re-orientation. by forming, 400 kV Aurangabad (PG)-Pune -(PG) lines by disoonnecting Aurangabad (PG)- Aurangabad(M) lines from Aurangabad(M) sub-station for enhancing ATC and secure operation. Due to Reduced ATC vide ref. (2), Load shedding in Mumbai and MSEDCL is inevitable in summer season and balance Koyna water will be utilized before completion of Water year ending on 31/05/2015. The group having one of the member from STU is under process for finalizing Maharashtra system, hence reduced ATC of 6300 MW is not acceptable. TIC/ATC for Thanking you, Yours faithfully, ~ Chief Engineer MSLDC~~. Copy s.w.r to: 1) The Director (Operation) MSETCL Mumbai 2) The Member Secretary, WRPC, Mumbai ANNEXURE 10 SR NO UTILITIES OCC NO. MONTH 1 2 CHHATTISHGARH DD 454 455 Dec-14 Jan-14 3 GUJARAT 456 Feb-14 STATUS - 4 RGPPL* 457 Mar-14 5 MAHARASHTRA 458 Apr-14 NTPC, HQ-II Raipur* WRTS-I 459 460 May-14 Jun-14 KWPCL TAPS-1&2 NTPC Gandhar/Kawas RELIANCE SASAN 461 462 463 464 Jul-14 Aug-14 Sep-14 Oct-14 12 WRPC 465 Nov-14 13 MADHYA PRADESH 466 Dec-14 14 WRPC 467 Jan-15 15 ESSAR TRANSMISSION 468 Feb-15 16 BDTCL/JBTCL 469 Mar-15 17 NTPC VINDHYACHAL 470 Apr-15 18 TATA POWER 471 May-15 19 TORRENT POWER 472 Jun-15 20 CGPL 473 Jul-15 21 JPL 474 Aug-15 22 TAPS-3&4 475 Sep-15 23 ESSAR ESIL 476 Oct-15 24 APL 477 Nov-15 25 DNH 478 Dec-15 26 NTPC Mouda 479 Jan-16 27 KSK 480 Feb-16 28 RELIANCE TRANSMISSION 481 Mar-16 29 NTPC SIPAT, CG 482 Apr-16 30 NTPC KORBA 483 May-16 31 NCA 484 Jun-16 32 GOA 485 Jul-16 33 KAPS 486 Aug-16 34 RKM POWER GEN 487 Sep-16 35 NHDC 488 Oct-16 36 NTPC, Mumbai 489 Nov-16 37 38 39 ADANI TRANSMISSION WRTS-II SUGEN (TPL) 490 491 492 Dec-16 Jan-17 Feb-17 HOSTED ON 12.05.14 AT MUMBAI BY WRPC AT RELIANCE HOSTED ON 13.06.14 AT NAGPUR - 8 9 10 11 HOSTED ON 11.03.14 AT MUMBAI BY NTPC MUMBAI HQ-I HOSTED ON 16.04.14 BY MSETCL AT MUMBAI - 6 7 REMARK HOSTED ON 10.12.13 AT RAIPUR HOSTED ON 16.01.14 AT DIU HOSTED ON 13.02.14 AT VADODARA HOSTING ON 10.07.14 AT RAIPUR BY KWPCL(IPP) hosted on 11.08.2014 at TARAPUR hosted on 12.09.2014 at Bharuch Hosted on 13.10.2014 at Varanasi 11.11.2014 at WRPC Mumbai Hosted on 09.12.2014 at Jabalpur held on 16.01.2015 at WRPC Mumbai held on 16.02.2015 at Mumbai to be held on 10 & 11 March 2015 ANNEXURE-15 PROGRESS OF AUTOMATIC DEMAND MANAGEMENT SCHEME (ADMS) IN GUJARAT Sr. No ACTIVITY DESCRIPTION 1 Identification of feeders for ADMS (Y/N) The details of substations / feeders identified for ADMS are as under: Total No. of 132 / 66 KV S/S. - 100 Nos. Total No. of 11 KV feeders - 730 Nos. Total load in MW - 650 MW. 2 Preparation of action plan / detailed project report (Y/N) 3 Details of action plan (Description) 4 Management / Administrative funding approval Road map of project: Identification of technology, Prototype demonstration by the developers, Budgetary offer collections from developers: (Two developers has shown interest for providing solutions, they also given DEMO of the product. Budgetary offer is given by one developer) By 15th March 2014. (completed) Detail project report submission to Competent authority and getting administrative approval of budgetary provision etc: By 15th April 2014. (Project report submitted to the Competent authority in June-14) Preparation & Publication of tender: By 15th May 2014. (Tender was published on August' 14) Finalization of vender: Executing agency has been finalized. Time limit to vender for completion of job : By 31st March 2015. Management approval has been received in July-14. 5 Status of submission to CERC (Y/N) 6 Target date of project completion By the end of March - 15. 7 Pilot project / demonstration If any (Y/S) Yes 8 Remarks Progress Report as on 31.01.15: Recently, the hardwares for control centre and field have been received. Survey work of all selected sites have been completed. Communication has been establshed between SLDC and Load Management Unit of Discoms. Field device installation work is under progress at different sites. The progress report had been submitted on 20.05.14 to Hon'ble CERC. The progress report was also submitted to WRPC on 27.08.14. 23/02/2015 DAILY CONSUMPTION OF WESTERN REGION (2010-11 TO 2014-15) 1100 468th OCC Meeting Maximum Energy Consumption : 916MUs on 20th Jan’15 (2.8% higher than last year) CONSUMPTION IN MUs ----> 1000 900 Minimum Energy Consumption : 767 MUs on 1st Jan’15 (WR Demand dropped by 3000MW/ approx 100 Mus). 800 Republic day Effect 700 600 44 Mus drop in Energy Consumption on 26th Jan 2015 (Republic day). 2012-13 Mar Jan Feb Dec Oct Nov Sep Jul Jan-15 Dec-14 Jan-14 % Change w.r.t last month % Change w.r.t last Year Average Max Date 861 916 20-Jan-15 919 982 11-Dec-14 851 891 9-Jan-14 -6.30 -6.71 ~ 1.20 2.81 ~ LOAD DURATION CURVE (Jan-2015) Demand met - Jan'15, Dec'14 & Jan'14 Max. 43839 MW on dt. 20.01.14 at 10:00 hrs Load growth- 13.82 % against last year Festival/Holiday effect on Demand 46000 • Max Demand Met increased by 13.82% in Jan’15 compared to last year. MONTHS ----> 2014-15 Energy Consumption MU/Day Grid Operation Highlights Dec-14 44000 45000 50 % of time load above 35500 MW 42000 Jan-15 MW • Average demand met (hourly)in Jan’15 increased by 9.85% compared to last year. 2013-14 40000 40000 Peak Demand met (MW) Mumbai 16th February, 2015 Aug Jun May Apr 500 38000 35000 Jan-14 36000 34000 30000 Kite Festival 32000 Republic Day 30000 1 3 Demand Met Average Max Date when Max. 5 7 9 Demand met 11 13 15 17 19 Date Demand met 21 23 25 27 29 Demand met 31 25000 0% 40855 43839 42796 44946 36856 38515 -4.53 -2.46 % Change w.r.t last Year 10.85 13.82 20-Jan-15 9-Dec-14 6-Jan-14 ~ ~ Jan-15 Dec-14 Jan-14 % Change w.r.t last month 20% 40% 60% % of Time 80% 100% Regional Demand met Max: 43839 MW on 20th Jan’15 at 10:00 hrs Min: 26214 MW (2nd Jan, 04:00 hrs) 1 23/02/2015 Maharashtra Demand Met 2012-13 to 2014-15 21000 12000 8000 MW 17000 16000 7000 15000 11000 6000 2014-15 Jan Feb Mar Dec Oct Jul Sep 2014-15 MONTH 6000 3100 5000 11000 0:00 0:52 1:44 2:36 3:28 4:20 5:12 6:04 6:56 7:48 8:40 9:32 10:24 11:16 12:08 13:00 13:52 14:44 15:36 16:28 17:20 18:12 19:04 19:56 20:48 21:40 22:32 23:24 MW 12000 2600 10000 GEB Dmd 130115 2100 9000 ≈1500 MW drop 7000 3472 3600 13000 ≈3300 MW drop 9000 8000 Chhattisgarh Demand Met 2012-13 to 2014-15 14005 14000 Jun 2013-14 Gujarat Demand Met 2012-13 to 2014-15 15000 Aug MONTH May Jan Feb 2012-13 Mar Dec Oct Nov Sep Jul Aug Jun May Apr 2013-14 Apr 4000 12000 10000 Demand dropped by 3000 MW due to rain 5000 13000 Nov 14000 Gujarat Demand dropped in the range of 1000 to 3300 MW after morning 7 o’clock 13000 9000 18000 GEB Dmd 140115 GEB Dmd 150115 8000 2014-15 2013-14 2012-13 MONTH 2014-15 MONTH 10000 One day before 9000 Mar Feb Jan 2 units of Vindhyachal were taken out for better system operation. 50 MUs reduced in Gujarat(46 MUs reduced last year) WR Demand on 25th, 26th and 27th Jan 2015 42000 40000 34000 Festival day Reduction of ~ 1500 MW generation within Gujarat during morning peak hours 6000 Reduction of ~ 1000 MW generation within Gujarat during evening peak hours 0:00 0:44 1:28 2:12 2:56 3:40 4:24 5:08 5:52 6:36 7:20 8:04 8:48 9:32 10:16 11:00 11:44 12:28 13:12 13:56 14:40 15:24 16:08 16:52 17:36 18:20 19:04 19:48 20:32 21:16 22:00 22:44 23:28 5000 GUJGEN 13.01.15 GUJGEN 14.01.15 56 MU reduction in Western Region’s Daily Energy consumption(41 MUs reduced last year) GUJGEN15.01.15 44 MU Reduction in WR Energy consumption (42 MU reduced in last year) 2500-3500MW reduction in demand During evening peak hours 36000 One day after 7000 Approx 1500 MW drop in Demand compare to 15th Jan 2015 during Peak hours. 38000 32000 1500-2000MW Reduction in demand During night off peak hours 30000 28000 26000 0:00 0:48 1:36 2:24 3:12 4:00 4:48 5:36 6:24 7:12 8:00 8:48 9:36 10:24 11:12 12:00 12:48 13:36 14:24 15:12 16:00 16:48 17:36 18:24 19:12 20:00 20:48 21:36 22:24 23:12 8000 2012-13 Approx 3300 MW drop in Demand Compare to 13th Jan during Peak hours.(3500 MW reduced last year) WR Demand met : Republic Day- 26th Jan 2015 GEB State Generation 11000 Dec Nov Oct Sep Aug Jul Jun Mar Jan Feb Dec Oct Nov Sep Aug Jul Jun May Apr 2013-14 Apr 1600 7000 May MW 10050 10000 19000 MW Exceptional day: 14th Jan-2015 (Kite festival in Gujarat, Makar Sankranti) Madhyapradesh Demand Met 2012-13 to 2014-15 11000 20399 20000 WRDMD 250115 WRDMD 260115 WRDMD 270115 units ware taken out for better system operation. 2 23/02/2015 Max Average 37.21 17.46 >50.05 51.01 42.15 27.28 46.89 34.71 20.59 21.91 16.08 22.99 26.52 38.56 30.22 26.26 45.12 16.22 12.11 16.98 21.59 22.58 18.34 23.85 35.86 17.95 25.27 36.03 47.51 27.57 21.16 35.19 31.22 33.29 64.83 53.73 Frequency Profile Frequency Profile for JANUARY 2015 120.00 52.33 100.00 50 55.7 53.19 47.83 50.16 49.5 52.94 53.73 53.60 48.29 45.36 IEGC Band 40 80.00 60.00 30 20 10 40.00 0 20.00 Month 51.01 28.81 49.9-50.05 >50.05 31-Jan 29-Jan 27-Jan 25-Jan 23-Jan 21-Jan 19-Jan 17-Jan 15-Jan 9-Jan 13-Jan 7-Jan <49.9 11-Jan 0.00 High Frequency Day : On 1st Jan, due to drop in all India demand by 6000 MW and Under drawal by MP, Maharashtra and Chhatisgarh. Low Frequency Day : On and Maharashtra. 15th Jan, falling freq trend due to O/D by MP 49.9-50.05 Months <49.9 >50.05 FVI March'14 12.91 47.83 39.27 0.12 April'14 30.64 52.33 17.03 0.16 May'14 22.48 53.19 24.33 0.13 June’14 37.15 45.36 17.49 0.24 July’14 34.51 50.16 15.33 0.2 Aug’14 37.87 49.5 12.63 0.19 Sept’14 IEGC Band 49.9-50.05 60 5-Jan 49.9-50.05 41.92 43.14 53.51 48.48 51.47 53.75 50.52 54.78 56.82 55.60 55.79 55.89 57.02 49.02 64.83 50.68 61.26 58.95 51.90 53.60 43.22 53.64 58.57 61.05 47.35 48.33 47.96 64.14 53.10 59.28 60.03 3-Jan <49.9 7.07 14.71 19.21 4.63 13.82 25.66 27.57 29.14 20.19 17.88 5.65 13.89 16.72 5.86 18.95 37.21 21.76 19.46 25.52 28.06 32.93 10.50 23.48 13.68 16.62 4.16 24.47 14.70 11.71 9.50 6.68 1-Jan Date 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan IEGC Band 28.13 55.7 16.16 0.43 Oct’14 25.55 52.94 21.52 0.13 Nov'14 16.49 53.60 29.90 0.10 Dec'14 23.85 48.29 27.86 0.14 Jan'15 17.46 53.73 28.81 0.12 Maximum instantaneous 50.56 Hz frq on 1st January at 03:03 hrs Minimum instantaneous 49.55 Hz frq on 15th January at 7:36 hrs Avg Freq of the month 49.99 Hz Compliance to DSM : JAN-2015 Frequency Jan-15 1-Jan-15 1-Jan-15 1-Jan-15 2-Jan-15 2-Jan-15 3-Jan-15 3-Jan-15 4-Jan-15 4-Jan-15 4-Jan-15 5-Jan-15 5-Jan-15 6-Jan-15 6-Jan-15 7-Jan-15 7-Jan-15 7-Jan-15 8-Jan-15 8-Jan-15 9-Jan-15 9-Jan-15 10-Jan-15 10-Jan-15 1-Jan-15 1-Jan-15 1-Jan-15 1-Jan-15 1-Jan-15 13-Jan-15 13-Jan-15 14-Jan-15 14-Jan-15 14-Jan-15 15-Jan-15 15-Jan-15 16-Jan-15 16-Jan-15 17-Jan-15 17-Jan-15 18-Jan-15 18-Jan-15 18-Jan-15 19-Jan-15 19-Jan-15 20-Jan-15 20-Jan-15 21-Jan-15 21-Jan-15 21-Jan-15 22-Jan-15 22-Jan-15 50.8 50.6 50.4 50.2 50 49.8 49.6 49.4 49.2 49 FRQ Lower 49.9 Low Freq Day 15.01.2015 at 07:36 hrs 50.4 50.3 50.2 50.1 50 49.9 49.8 49.7 49.6 49.5 49.4 Time 0:00 0:56 1:52 2:48 3:44 4:40 5:36 6:32 7:28 8:24 9:20 10:16 11:12 12:08 13:04 14:00 14:56 15:52 16:48 17:44 18:40 19:36 20:32 21:28 22:24 23:20 in Hz 0:00 0:58 1:56 2:54 3:52 4:50 5:48 6:46 7:44 8:42 9:40 10:38 11:36 12:34 13:32 14:31 15:29 16:27 17:25 18:23 19:21 20:19 21:17 22:15 23:13 in Hz High Frequency Dat 01.01.2015 at 03:03 hrs 50.8 50.6 50.4 50.2 50 49.8 49.6 49.4 49.2 Upper 50.05 Time Deviation of MP remained within 12% of schedule for 70 % of time blocks Gujarat was able to reverse polarity of its deviation for 94 % of time 3 23/02/2015 Gujarat Wind Generation 2013-14 Vs 2014-15 60.00 60.00 55.70 Max Wind gen: 55.70 Mus on 23rd June 2014 50.00 Wind Generation(in Mus) 1200 Max. Wind Gen. 49.19 Mus on 19th July 2014 49.19 50.00 1000 Wind Generation in Jan-15 40.00 30.00 Generation(in Mus) 40.00 in Mus in Mus Maharashtra Wind Generation 2013-14 Vs 2014-15 30.00 20.00 20.00 800 Total Wind Generation of WR – 569 Mus 600 Gujarat- 428 Mus 400 Maharashtra- 141 Mus 10.00 10.00 200 0.00 0 Max – 35.57 Mus on 1st Jan 0.00 Month 2013-14 2014-15 2013-14 Month 2014-15 Months Gujarat Addition of New Elements - Jan 2015 ICTS SL.NO. SL.NO. 1 GENERATING UNITS STATION NAME CAPACITY (MW) UNIT DATE Maharashtra Chandrapur 500 8 11/01/2015* *Written communication/information to control room yet to be received from Maharashtra. Total Capacity added from Apr’14 to Jan’15 – 7071 MW 1 2 3 Bahachau (PG) & Varsana (GETCO) Bahachau (PG) & Varsana (GETCO) GETCO SL.NO. CONSTITUENT STATION NAME 1 POWERGRID Boisar* Boisar* 2 POWERGRID KV DATE CKT.KM. 3 POWERGRID Bachau-Varsana I 400 6/1/2015 10 4 IPP(Reliance Power) Bachau-Varsana II 400 6/1/2015 10 Chornia-Mundra II (LILO at Mansar) 400 23/01/2015 0.5 Total 20.5 LINE NAME Total Ckt.Km added in Jan’15 is 20.5 ckt Km. and from Apr’14 to Jan’15 - 7028.5 ckt.km KV RATIO CAPACITY(MVA) LINE REACTORS CKT NO TRANSMISSION LINES CONSTITUENT STATION NAME DATE NIL STATE/ISGS/IPP SL.NO. CONSTITUENT Maharashtra Line Name Satna* Boisar-Aurangabad ckt I Boisar-Aurangabad ckt II Vindhyachal-Satna ckt II Sasan SASAN-Satna Ckt-II * Line Reactor charged as Bus Reactor CONSTITUENT 1 POWERGRID 2 POWERGRID CAPACITY (MVAR) DATE 80 9/1/2015 400 765 765 Total BUS REACTORS SL.NO. KV 400 80 9/1/2015 240 12/1/2015 240 21/01/2015 640 CAPACITY (MVAR) DATE 80 9/1/2015 125 8/1/2015 STATION NAME KV Magarwada GIS (DAMAN) Parli 400 400 Total 205 4 23/02/2015 3.2 Outage Coordination • A web based Google sheet transparently shared with all. Agenda Items • Case-1: ELEMENT NAMES HAS TO BE CLEARLY RECORDED in OCC – OCC SI.No 317, Utility has requested for outage of “ICT 2 & Boisar-2 L/R”. – It is not clear whether it’s a bay shutdown, LR shutdown or ICT shutdown. • Case-2: Utilities insisting for major changes in outages at last moment – 467th OCC SI.NO.194: Hotline maintenance of 400kV EMCO-Bhadrawati 1 & 2 from 25-Jan to 15Feb-15. – WRLDC reliability approved for hotline maintenance with caution “Ok, Work should be performed carefully”. – However, the agency was pressuring WRLDC control room for line outage stating there is no generation at EMCO (SCADA data shows generation at EMCO). • Case-3: Insisting for Multiple outages at nearby nodes at the same time – Reliability has given consent for carrying OPGW work on 765kV Sipat-Bilaspur-1 from 20-Jan to 19-Feb-15. – 467th OCC also approved the Seoni Bus-1 outage for 4th and 5th Feb. – WRLDC had concurred the Seoni Bus-1 outage with condition that “all Auto Re-closer to be in service at Seoni, Bilaspur and Sipat”. – This issue for not facilitating the OPGW outage was referred to WRLDC seniors. ISSUES • Many time the elements proposed for shutdown are not clear • Major changes proposed at the last moment • Too much pressure in Real Time to control room even when reliability advise to reschedule the outage is uploaded in real-time 6: Non Receipt of DR/EL detail for Jan-15 • Non Receipt of DR/EL from Sub-Station within 24hrs is taken as NonCompliance of IEGC 5.2 (r) and CEA grid Standard 15.3 Following number of tripping, Utilities have not send the DR/EL to analyse at WRLDC for the month of Jan-15 Utility PCGIL MSETCL MPPTCL GETCO GOA NTPC JPL No. of Tripping DR/EL not Received 40 26 20 16 4 4 3 Utility DHARIWAL TORRENT KSK MOSERBEAR NCA SASAN SUGEN No. of Tripping DR/EL not Received 2 2 1 1 1 1 1 5 23/02/2015 7.2 Transmission Constraints in Maharashtra….Conti 7.2 Transmission Constraints in Maharashtra In OCC -466 Target Completion Date In OCC -467 Target Completion Date Date will be updated Date will be updated Aug-15 Jun-15 SLDC Maharashtra would give detail of the revised arrangement for IEPL in place of 400kV IEPLWarora D/c LILO of 400 kV Chandrapur-Parli at Nanded Mar-15 Jun-15 Additional 220 kV outlets from Pune(PG) MEGPTL 765 kV Akola(II)-Ektuni -2 (To be charge at 400kV at Tapthithanda) 765 kV Koradi-III- Akola(II)-2 BDTCL 400 kV Dhule_MH-Dhule_BDTCL ( Line idle charged) Date will be updated Sep-15 Name of the line Maharashtra 2x1500 MVA 765/400 kV, ICTs at Ektuni 400 kV Bableshwar-Kudus D/C (Quad) 400kV IEPL-Warora Feb’15 Feb’15 Jan-15 Charged on Ist week of Feb’15 Non-readiness of Bays at MSETCL end Non-readiness of Bays at MSETCL end Name of the line POWERGRID 765kV Pune(GIS)-Sholapur(PG) 400kV Aurangabad-Boisar-D/c 765 kV Aurangabad-Sholapur -1 765 kV Aurangabad-Sholapur -2 LILO of both circuits of Aurangabad – Pune 400 kV D/c line at Pune 765/400 kV GIS LILO of both circuits of Parli– Pune 400 kV D/c line at Pune 765/400 kV GIS 2. Healthiness status of DG set in SLDCs received from Gujarat, Madhya Pradesh and Chhattisgarh. 3. Maharashtra SLDC – In 465th , 466th and 467th OCC informed that an order has been placed for procuring DG set at SLDC Kalwa and would be available by March-15. In OCC -467 Target Completion Date Dec-14 Dec-14 Nov-15 Nov-15 Feb-15 /June-15 Jul-15 Jun-15 Jun-15 Date will be updated Feb-15 Date will be updated 400 kV DGEN-Vadodara D/C Date will be updated 765kV Aurangabad(PG)-Padghe(PG)-D/c Date will be updated 8.1: Healthiness status of DG set at Black Start stations 1. WRLDC has received the healthiness status of DG set in Black Start Generating Stations for 3rd Quarter (Oct’14-Dec’14). In OCC -466 Target Completion Date Feb-15 Contingency arrangement to be discussed in CEA Standing committee Jun-15 8.1 Mock Black Start Exercise in Western Region • Tentative Schedule for Mock-Dill of Black start Station was approved in last OCC-467th. Accordingly, concern representative may update the status and plan for pending Mock-dill exercise 1 2 3 4 5 6 7 8 9 10 Power Station State Ukai (H) Gandhisagar Kadana Birsinghpur Pench Uran (Gas) Dhuvaran Ghatghar GIPCL-I Khopoli Gujarat Madhya Pradesh Gujarat Madhya Pradesh Madhya Pradesh Maharashtra Gujarat Maharashtra Gujarat Maharashtra Tentative dates (Jan’15Jun’15) 1st wk. of Feb’15 st 1 wk. of Feb’15 4th wk. of Feb’15 4th wk. of Feb’15 1st wk. of Mar’15 2nd wk of Mar'15 3rd wk of Mar’15 4th wk of Mar’15 1st wk of April’15 2nd wk of April’15 6 23/02/2015 8.1 Mock Black Start Exercise in Western Region…. Conti 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Power Station State Tentative dates (Jan’15- Jun’15) Hasdeo Bango Bargi CLPIPL Bansagar Stage-I Bhivpuri Sugen SSP Indira Sagar Bhira Chattisgarh Madhya Pradesh Gujarat Madhya Pradesh Maharashtra Gujarat Gujarat Madhya Pradesh Maharashtra 2nd wk.of April’15 2st wk of April’15 3rd wk of April’15 4th wk.of April’15 4th wk of April’15 4th wk.of April’15 1st wk of May’15 1st wk of May’15 1st wk of May’15 Koyna I & II Maharashtra 2nd wk of May’15 Omkareshwar Bhira PSS Kawas Gandhar Medikheda Rajghat Paithan Trombay Mini Hydro Madhya Pradesh Maharashtra Gujarat Gujarat Madhya Pradesh Madhya Pradesh Maharashtra Maharashtra Gujarat 4th wk of May’15 4th wk of May’15 4th wk of May’15 1st wk.of june’15 1st wk. of june’15 4th wk of June’15 2nd wk. of june’15 4th wk of June’15 Sl No Power Station State/ Owner Installed Cap. (MW) Black Start Source Capacity 15 Rajghat,Hydro Madhya Prapradesh 3x15 DG set 250KVA 16 17 18 19 20 GandhiSagar,Hydro GPEC(CLPIPL) GIPCL-I Sugen KAWAS Madhya Prapradesh Gujarat Gujarat Gujarat NTPC 5x23 3x138+1x241 3x32+1x49 3x382.5 MW DG set DG set DG set DG set DG set 125 KVA 3000 kVA 500 kVA 2x6MVA 21 GANDHAR NTPC 657.39 MW (3*144.3+224.49) DG set 22 Dhuvaran Gujarat 1x107+1x112 DG set 4250 kVA 2x1600 KVA+ 1x700 KVA Total=3900 KVA 4 MW PH1: 412KVA PH2:450KVA WH:520KVA 200 KVA 23 URAN Maharashtra 4*60(GT)+4*108(GT)+2 *120WHR DG Set 24 Paithan,Hydro Maharashtra 1*12 DG set 1*20 220V BATTERY AND HOUSE GENERATOR MADHYAPRADESH Is the DG set Healthy & Ready for black start ? (Yes /No) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 25 BIRSINGHPUR,Hydro 26 SSP(RBPH & CHPH),Hydro NCA 27 Ukai (H),Hydro Gujarat 4 x 75 DG set 500 kVA Yes Yes 28 Mini Hydro,Hydro Gujarat 2 x 2.5 DG set 50 KW Yes 29 Kadana,Hydro Gujarat 4 x 60 DG set DG set Yes 500 KVA Black Start Diesel Generator (DG) Set Test Report for the Quarter (Oct-Dec-14) - In compliance to Sec 5.8(b) of IEGC Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Power Station State/ Owner Tata Power / Maharashtra Khopoli,Hydro Tata Power / Maharashtra Bhivpuri,Hydro Tata Power / Maharashtra Bhira,Hydro Tata Power / Maharashtra Bhira PSS,Hydro Tata Power / Maharashtra Trombay Ghatghar,Hydro Maharashtra KOYNA I & II,Hydro Maharashtra Hasdeo Bango,Hydro Chhattisgarh Indira Sagar,Hydro Madhya Prapradesh Omkareswar,Hydro Madhya Prapradesh Pench,Hydro Madhya Pradesh Bargi,Hydro Madhya Prapradesh Medikheda,Hydro Madhya Prapradesh Tons(Bansagar),Hydr o Madhya Prapradesh Rajghat,Hydro Madhya Prapradesh Installed Cap. (MW) Black Start Source Capacity 3 x 24 3 x 24 2 x 1.5 DG set 250 kVA DG set 250 KW 6 x 25 DG set 250 KVA 1 x 150 DG set 500 KVA 1 x 20 + 1 x 60 2*125 4*65+4*75 DG set DG Set HG Set 2.5 MW 2*1250 KVA 2 MVA 3*40 8x125 8x65 2x80 2x45 3x20 DG set DG set DG set DG set DG set DG set 250KVA 2X1000KVA 2X1010KVA 250KVA 250KVA 275KVA 3x105 3x15 DG set DG set 250KVA 250KVA Is the DG set Healthy & Ready for black start ? (Yes /No) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 9.2 Scheduling of NTPC Coal Fired Stations • WRLDC has created a separate webpage showing the following figures for each 15minute time block • Declared Capability of ISGS in MW • Entitlement of the beneficiary computed from the DC in MW • Requisition received from the beneficiaries in MW • Requisition received from the beneficiary as % of its entitlement • Injection Schedule (Summation of the Requisitions) in MW • Injection Schedule as % of Declared Capability • The scheduling coordinators of Discoms / SLDCs as well as Generating Stations can transparently see the entitlement, requisition and schedule of all Beneficiaries/ ISGS in R0, R1 and other subsequent revisions • Beneficiaries and NTPC may confirm the methodology and share their experience regarding implementation of the decisions taken in 467th OCC meeting Yes 7 23/02/2015 9.3 CERC order on petition by Tripura and M.P. on DSM • CERC has granted relaxation in regulation 5 (1) (iii), 5 (1) (iv) and regulation 7 (3) of the DSM regulation in respect of the utilities having schedule of 400 MW or below w.e.f. 2nd February 2015 Deviation Charges shall be receivable: • For under-drawal upto 48 MW in relaxation of Regulation 5 (1) (iii) of the DSM Regulations, and • For over-injection upto 48 MW in relaxation of Regulation 5 (1) (iv) of the DSM Regulations. 9.4 Deviation Settlement Mechanism (First Amendment) As per the Amendment the over drawl / Under Injection at Frequency less than 49.7 Hz is Not Permissible. Likewise Under drawl / Over Injection at Frequency more than 50.1Hz is Not permissible. Summary of DSM regulation from the Grid operation prospective is tabulated below Frequency Range Over Drawl Under Drawl Under Injection X Not Allowed ✓ X Not Allowed ✓ 49.7 ≤ F <49.9 ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit F < 49.7 49.9 ≤ F <50.05 ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit 50.05 ≤ F < 50.1 ✓Within Limit ✓Within Limit ✓Within Limit ✓Within Limit 50.1 ≤ F ✓ X Not Allowed ✓ X Not Allowed Deviation Limit : 9.5 Multiple Failure in ULDC Telecommunication System in Jan-15 • Continuous 74hrs, 10000 MW of SCADA data was not available due to MUX failure at Bhatapara (11:10 of 24-jan to 13:26 of 27-Jan) • Continuous 46hrs, blackout of nearly 25000MW of SCADA data due to MUX Failure at Indore (15:00 of 27-Jan to 11:40 of 29-Jan) • Continuous 158 hrs Sipat Generation in W3 Area of 3000MW not visible (22:45 of 22-Jan to 11:40 of 29-Jan) Over Injection 12% of Schedule or 150MW whichever is less. ( Relaxation upto 48MW for Schedule ≤ 400MW) 9.5 Multiple Failure in ULDC Telecommunication…Conti Members may like to deliberate on the following issues: i. Monitoring ULDC telecommunication system by respective utilities ii. Nomination of nodal officers by POWERGRID for resolution of issues iii. Providing redundant communication channel for speech and data transfer from major stations to SLDCs and WRLDC. iv. Providing optical fiber connectivity at all substation upto 132 kV. 8 23/02/2015 9.6 Secure evacuation from Sasan-Vindhyachal complex 9.7 Reliability of DG set at Blackstart stations Action Plan for Two DG sets at Blackstart stations ? Total generation at Sasan and Vindhyachal complex is around 8220 MW. Envisaged transmission system for evacuation from Sasan-Vindhyachal complex is as under Stations with only one DG set Station Name Status 765 kV Sasan-Satna ckt-1 765 kV Sasan-Satna ckt-2 2x1000 MVA, 765/400 kV ICT at Sasan 765 kV Sasan-Vindhyachal 765 kV Vindhyachal-Satna ckt-1 765 kV Vindhyachal-Satna ckt-2 2x1500 MVA, 400/765 kV ICT at Vindhyachal PS In operation In operation In operation Expected in March’2015 Expected in March’2015 Expected in March’2015 Expected in March’2015 765 kV Gwalior-Jaipur Expected in March’2015 Pench Bargi Medikheda Tons(Bansagar) 1 Khopoli CUMINS INDIA PVT. LTD. 1992 2 Bhivpuri Catter Pillar 1997 3 Bhira Catter Pillar 2002 4 Bhira PSS CUMINS INDIA PVT. LTD. 1994 Kirloskar 1993 5 Trombay 6 KOYNA I & II 7 8 9 Stations with only one DG set 10 11 12 13 Year AEG (Made in Germany) 1958 URAN Kirloskar 2006 Paithan Kirloskar 1991 Chhattisgarh 9.7 Reliability of DG set at Blackstart stations …Conti Station Name Make Maharashtra Element Name Make Madhya Pradesh CUMINS INDIA PVT. LTD. Cumins India Ltd. Pune Cromption Greaves Cromption Greaves Year 1999 1999 2005 2005 KIRLOSKER ELECTRICAL ltd 1995 KATO ENGINEERS HBL Gujarat 1958 2014 14 Rajghat 15 16 GandhiSagar Birsinghpur 17 GPEC(CLPIPL) Caterpiller Model No. 3608 1990 18 GIPCL-I KIRLOSKAR CUMINS LTD 1991 19 Ukai (H) Kirlosker Electric Co.Ltd 1987 20 21 22 23 Mini Hydro Kadana KAWAS GANDHAR Jyoti Ltd.,Baroda KIRLOSKAR CUMINS LTD Ceglec Ltd. Niigata Engg,Japan 1983 1990 1991 1994 • a) b) c) d) e) f) g) h) i) Hasdeo Bango CUMINS INDIA PVT. LTD. 1996 9.8 Testing and commissioning of New Generating units Following are expected to inject infirm power as part of Testing and commissioning activity for Capacity addition in FY 2014-15 SASAN UMPP Unit-6 – 660 MW Maruti Clean Coal ltd unit-1 - 300 MW Jaypee Nigrie Unit-2 – 660 MW RKM Power Unit-1 - 360 MW GMR, Chhatisgarh – 685 MW SKS Power Ltd, Chhatisgarh- 300 MW Chandrapur-8 – 500 MW ? Koradi stage 2- 500 MW ? D B power –Unit 2 – 600 MW ? • Other entities may also furnish the details of Generating units expected to be under performance test in Feb’15 and March’15. 9 23/02/2015 9.9 Extension of start-up supply to large Power station during system restoration A. CGPL UMPP proposal is as under: i. GETCO may install 220/400kV ICT of appropriate rating at CGPL Mundra for getting power from 220kV NaniKhakhar CGPL line. CGPL start-up power requirement would be app. 60MW at 400kV level. ii. Power at 400kV level can be extended to CGPL from BhachauCGPL Mundra line which is shortest line to CGPL(approx 110km). Bhachau(PGCIL) 400kV S/s may be charged from 220/400kV ICT at Bhachau or from 400kV Vadavi-Bhachau line or Varsana-Bhachau 400kV line. Extension of start up supply to Sipat • Unit size: 500 MW / 660 MW • Start up power requirement: 100 MW • Alternate-1: Extension of supply from ER – 220 kV Budhipadar- Korba (E)- Korba (W) – 220/400 kV ICT Korba (W) – KSTPS – Sipat (after start up of KSTPS units) – 400 kV Ranchi-Sipat • Alternate-2: Extension of supply from NR – 400 kV Vindhyachal – Korba- Sipat (after starting of unit at Korba) • Alternate-3: Extension of supply from SR – HVDC AC bypass at Bhadravati- 400 kV Raipur-Sipat • Alternate-4: from Chattisgarh – Chattisgarh subsystem built with black start of Bango hydro Extension of Start up supply to Sasan_UMPP • Unit size: 660 MW • Requirement of start power : 76 MW • Extension of Start-up supply : Alternate-1 – from NR via AC bypass of HVDC Vindhyachal BTB station – NR grid –> 400 kV Vindhyachal -> 400 kV Sasan • Extension of Start-up supply : Alternate-2 – M.P. subsystem build up from nearby black start sources – Bansagar Tons Hydro : 3x105 – Birsinghpur Hydro : 20 MW 9.10 Utilization of available Pump Storage Hydro Plants • SLDC-Kalwa to update pumping mode of operation at i. Paithan, Ujjaini ii. Bhira, Bhivpuri iii. Status of completion of PSP scheme in 2x40 MW Koyna left bank, 700 MW Malsej Ghat, 400 MW Humbarli • NCA: Construction of tail race reservoir in SSP • SLDC Gotri: Healthiness status of Kadana PSP (4x60 MW). • SLDC Jabalpur: Status of Mara (1100 MW) and Binauda (2250 MW) 10 23/02/2015 9.11: TTC/ATC computation for each STATE control area • • • • • • Mandated by CERC regulation on Real Time Congestion alleviation Several workshop on TTC/ATC already conducted in the past Advised as per Minutes of meeting by Member (GO&D), CEA on 29th Oct 2014. Agreed in 13th FOLD meeting held on 11-Dec-14. Revival of WR study group agreed in 465, 466, 467 OCC Workshop conducted on TTC/ATC computation on 17-Dec-14 by WRLDC. a) b) c) d) Participated by Maharashtra, Madhya Pradesh , Gujarat and WRPC. Base case was given to all Methodology of TTC/ATC computation was explained Hands on training was given on the study cases. • SLDCs may appraise the progress status. 11 23/02/2015 9.12: SPS envisaged for SR-NEW Grid Operation • Inadequate participation of generators envisaged for SPS related with SR-NEW grid synchronization was discussed in 464th, 465th, 466 and 467th OCC as well as in PCM. Concern representative may update the progress. Responsible Agency KWPCL/DB Power Progress Stated in 466 OCC Pending Action - Wiring for Generation Reduction within the Station - POWERGRID LANCO and BALCO Communication Channel to be Checked Balco wiring will be completed in 7 day and Lanco Balco wiring is completed and wiring will be completed by Lanco wiring will be completed by 28-Feb-15. Jan 15. JPL Signal to be extended from JPL Stg-1 to JPL Stg-2 Signal extention work will be completed by end of Dec'14 Work is completed ready for testing. - - - - MSETCL (250 MW Load Shedding or Generator Pickup SPS Signal to be Extended at Koyna) and POWERGRID MSETCL and POWERGRID SPS Signal to be Extended at IEPL, Koradi , Khaparkheda, Chandrapur in cordination with MSETCL SPS Operation for Sholapur-Parli > 800MW (February-2015) Date Time JPL+JPL DB NSPCL Lanco KWPCL Balco Total (Extn) KSK Power (Desired (Desired (Desired (Desired (Desired (Desired (Desired (Desired 50MW) 100MW) 100MW) 50MW) 800MW) 300MW) 100MW) 100MW) % 10/2/2015 7:55 203 40 48 0 0 0 0 291 36.4 10/2/2015 16:24 262 47 40 0 0 0 0 349 43.6 10/2/2015 22:52 212 40 0 0 0 0 0 252 31.5 11/2/2015 9:46 265 50 47 0 0 0 0 362 45.3 11/2/2015 14:16 235 40 41 0 0 0 0 316 39.5 155 40 166.5 32.125 50 28.25 0 0 0 0 0 0 0 245 0 226.875 30.6 28.4 11/2/2015 15:03 Average Response SPS Operation for Sholapur-Parli > 800MW (January 2015) Progress Stated in 467 OCC Date Time 02/01/2015 06:36 07/01/2015 06:44 11/01/2015 10:40 11/01/2015 11:13 11/01/2015 11:29 17/01/2015 13:22 18/01/2015 07:03 19/01/2015 07:02 24/01/2015 07:01 29/01/2015 07:02 Average Response DB NSPCL KSK JPL+JPL (Extn) Total (Desired Lanco Power KWPCL Balco (Desired (Desired 50MW) (Desired (Desired (Desired (Desired (Desired 100MW) 300MW) 100MW) 100MW) 100MW) 50MW) 800MW) 0 121 137 60 0 105 191 252 254 271 173.875 0 30 40 54 35 0 0 20 45 40 33 0 25 25 25 25 25 25 25 25 25 28.125 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 176 202 139 60 130 216 297 324 336 235 % 0 22 25.2 17.3 7.5 16.2 27 37.1 40.5 42 29.3 9.18: Mock testing of SPS for 765 AGRA- GWALIOR on 24th December-14 • POWERGRID has requested to again Mock test of SPS for 765kV Agra-Gwalior. MS WRPC stated that Mock test may be conducted after talk with NRPC • Member may deliberate 12 23/02/2015 9.14: Status of telemetry in Western Region 9.13 Implementation of the revised AUFLS • MSETCL have revised its quantum of load relief in all stages of AUFLS scheme. The updated AUFLS scheme of Western Region is as follows. Western Region Stage - I 49.2 Hz Stage - II 49.0 Hz Stage - III 48.8 Hz Stage - IV 48.6 Hz Implement Required Implement Required Implemen Required Implemented Required ed Load Load ed Load Load ted Load Load relief Load relief Load relief relief relief relief relief relief States GUJARAT 580 773 580 726 580 1117 590 MADHYA PRADESH 460 468 460 450 460 460 465 CHATTISGARH 150 110 150 114 155 117 155 91 MAHARASHTRA 805 1122 810 1215 815 1044 820 1071 UT: DD 25 10 25 * 25 15 25 * 25 15 25 * 25 15 25 * UT: DNH 30 * 30 * 35 * 35 * 2060 2497 2070 2530 2085 2763 2105 2702 GOA Total load relief 1025 490 * UFRs under procurement • DD and DNH may appraise the member about the status of revised AUFLS 9.14 Status of telemetry in Western Region S Telemetry not available Telemetry Intermittent Updated in 466th OCC Nos Maharashtra 1 400kV Warora 2 400kV Lonikhand(New) 3 400kV Chandrapur StgII 4 400kV Taptithanda Total 48 Stations 220kV Mar-15 5 400kV Khaparkheda data is intermittent 6 400kV Deepnagar Further, 17 more stations where 7 220kV station data is not available Gujarat 1 220kV Bhatiya 220kV Navsari (Getco) Work is under progress. 2 220kV Mokha. Madhya Pradesh 1 220kV Dhar 220kV ANUPPUR 2 220kV Panagar 132kvVWAIDHAN 132kVMORWA 9.14 Status of telemetry in Western Region … Conti Updated in 467th OCC S Telemetry not available No Chhattisgarh 1 Mar-15 Work is under progress. Work is under progress. 36 Station of 132kV where Telemetry is not available GOA 1 220kV Amona 2 220kV Cuncolim DD and DNH 1 220kV Magarwada. 2 220kV Kharadpara 3 220kV Khadoli Telemetry Intermittent 19 Station of 132kV where Telemetry is intermittent 220kV Tivim, 220kV Ponda, 220kV Xeldam 110 kV Kadamba 110kV Verna Updated in 466th OCC Updated in 467th OCC - - Not Updated Not Updated Not Updated Not Updated 13 23/02/2015 9.14 Status of telemetry in Western Region … Conti 9.14 Status of telemetry in Western Region … Conti POWERGRID S Nos Station Intermittent Telemetry 1 Telemetry Status 765kV Kotra 765kV Tamnar 400kV Navsari 765kV Dharamjaygarh 400kV Magarwara PMU Data Satna PMU data at WRLDC 1 Alternate 2nd Channel Aurangabad alternate 2nd channel 1 2 3 4 5 Updated Completion date in 466th OCC Updated Completion date in 467th OCC 31-Dec-15 31-Dec-15 31-Jan-15 31-Jan-15 - 31-Jan-15 31-Jan-15 28-Feb-15 28-Feb-15 - 31-Jan-15 28-Feb-15 31-Mar-15 31-Mar-15 9.15 ADMS(Automatic Demand Management Scheme) Implementation as per Sec. 5.4.2 of IEGC: • Gujarat have submitted the updated status of ADMS implementation as on 31.01.2015. Progress Report as on 31.01.15: • • • • • The hardware for control centre and field have been received. Survey work of all selected sites completed. Communication has been established between SLDC and Load Management Units of Discoms. Field device installation work is under progress at different sites. Project completion date is by 31st March,2015 S Nos Station Intermittent Telemetry 1 JPL * 2 ESSAR Mahan IPP Updated Completion date Updated Completion date in 466th OCC in 467th OCC Issue is not Resolved Not Updated* Not Updated Not Updated * Data not coming from 5th Feb 2015 S No 1 2 3 Redundant Comm. Channel Completion date in 466th Completion date in 467th OCC update OCC update APL Tiroda 31-Jan-15 28-Feb-15 CGPL 31-Jan-15 31-Jan-15 SASAN UMPP 31-Jan-15 31-Jan-15 Redundant Comm. Channel 9. 16: Non availability of Bus bar Protection at 400 kV Korba (West) • As per the Last two OCC expected commissioning date of Korba(West ) bus bar protection is March’15. The present status may be updated. 9.17: Lack of Bus bar protection at 220 kV Bus cause complete Blackout of 400 kV Birsinghpur Thermal station • MPPGCL may update the present status. • Other utilities Chhattisgarh, Madhya Pradesh, Maharashtra, Goa , DD and DNH may furnish the updated status to WRPC/WRLDC 14 23/02/2015 Maharashtra Demand on 25th, 26th and 27th Jan 2015 18000 Gujarat Demand on 25th, 26th and 27th Jan 2015 13000 11000 16000 9000 Approx 1500 MW dropped compare to previous day (Sunday) 12000 MAHADmd 250115 5000 MAHADmd 270115 GEB Dmd 250115 3400 3200 3000 2800 2600 2400 2200 2000 7000 6000 Marginal Drop 5000 4000 0:00 1:09 2:18 3:27 4:36 5:45 6:54 8:03 9:12 10:21 11:30 12:39 13:48 14:57 16:06 17:15 18:24 19:33 20:42 21:51 23:00 3000 MPSEB Dmd 250115 MPSEB Dmd 260115 GEB Dmd 260115 GEB Dmd 270115 Chhatisgarh Demand on 25th, 26th and 27th Jan 2015 MP Demand on 25th, 26th and 27th Jan 2015 MPSEB Dmd 270115 Marginal Drop 0:00 1:12 2:24 3:36 4:48 6:00 7:12 8:24 9:36 10:48 12:00 13:12 14:24 15:36 16:48 18:00 19:12 20:24 21:36 22:48 8000 MAHADmd 260115 Approx 1000 MW dropped compare to previous day (Sunday) 7000 0:00 1:16 2:32 3:48 5:04 6:20 7:36 8:52 10:08 11:24 12:40 13:56 15:12 16:28 17:44 19:00 20:16 21:32 22:48 10000 0:00 1:16 2:32 3:48 5:04 6:20 7:36 8:52 10:08 11:24 12:40 13:56 15:12 16:28 17:44 19:00 20:16 21:32 22:48 14000 CSEB Demand 250115 CSEB Demand 260115 CSEB Demand 270115 Gujarat- Schedule Vs Drawal 2500 Exceptional day: 14th Jan-2014 (Kite festival in Gujarat, Makar Sankranti) 12000 2000 11000 1500 GUJ DEMAND- KITE FEST 11-Jan-14 12-Jan-14 13-Jan-14 14-01-2014-KITE FESTIVAL 15-01-14 10000 41 MU reduction in Western Region’s Daily Energy consumption ~ 3500 MW reduction in peak demand in Gujarat 9000 1000 8000 500 0:00 0:43 1:26 2:09 2:52 3:35 4:18 5:01 5:44 6:27 7:10 7:53 8:36 9:19 10:02 10:45 11:28 12:11 12:54 13:37 14:20 15:03 15:46 16:29 17:12 17:55 18:38 19:21 20:04 20:47 21:30 22:13 22:56 23:39 6000 0:00 0:39 1:18 1:57 2:36 3:15 3:54 4:33 5:12 5:51 6:30 7:09 7:48 8:27 9:06 9:45 10:24 11:03 11:42 12:21 13:00 13:39 14:18 14:57 15:36 16:15 16:54 17:33 18:12 18:51 19:30 20:09 20:48 21:27 22:06 22:45 23:24 7000 0 -500 GEBSCH 14.01.15 GEBDRWL 14.01.15 GEBSCH 15.01.15 GEBDRWL 15.01.15 15 23/02/2015 Gujarat One day before Surrender of ~ 1700 MW from ISGS Next day One day after Reduction of ~ 1000 MW generation within Gujarat during morning peak hours Festival day Reduction of ~ 1500 MW generation within Gujarat during evening peak hours Drawal Schedule Festival day WR Demand met : Republic Day- 26th Jan 2014 37000 25th Jan WRDMD_260114 WRDMD_250114 35000 33000 31000 3884 MW 26th Jan 29000 25000 0:00 0:39 1:18 1:57 2:36 3:15 3:54 4:33 5:12 5:51 6:30 7:09 7:48 8:27 9:06 9:45 10:24 11:03 11:42 12:21 13:00 13:39 14:18 14:57 15:36 16:15 16:54 17:33 18:12 18:51 19:30 20:09 20:48 21:27 22:06 22:45 23:24 27000 42 MU Reduction in WR Energy consumption 2500-3700MW reduction in demand During evening peak hours 1700-2000MW Reduction in demand During night off peak hours 16 23/02/2015 9.5 Pumped Storage Hydro Stations Ghatgarh Pumping and Generation data on 28.10.2014 MW 150 122.68 100 Generating Mode 122.44 0 M W -50 0:15 0:45 1:15 1:45 2:15 2:45 3:15 3:45 4:15 4:45 5:15 5:45 6:15 6:45 7:15 7:45 8:15 8:45 9:15 9:45 10:15 10:45 11:15 11:45 12:15 12:45 13:15 13:45 14:15 14:45 15:15 15:45 16:15 16:45 17:15 17:45 18:15 18:45 19:15 19:45 20:15 20:45 21:15 21:45 22:15 22:45 23:15 23:45 50 Time- Block Pumping Mode -100 Hydraulic Batteries for storage of energy Reduce difference between Maximum and Minimum Load in the system Enhance efficiency of thermal stations Spinning Reserve Voltage and power factor correction Improved System Reliability Capability of working in pumping mode -150 -152.32 -200 Whether being operated in pumping mode SLDC Kalwa to confirm Capacity State Year 1 Paithon (Jayakwadi) 1x12 Maharashtra 1984 2 Ujjaini 1x12 Maharashtra 1990 3 Bhivpuri 1x90 Maharashtra No 4 Bhira 1x150 Maharashtra Yes No No 5 Ghatghar 2x125 Maharashtra Yes Yes No Yes No Yes Generation Mode Availability of Telemetry Station Yes Pumping Mode No No No 6 Sardar Sarovar 6x200 Gujarat 7 Kadana-I 2x60 Gujarat 1990 Tail race reservoir to be completed Yes No 8 Kadana-II 2x60 Gujarat 1995-96 Yes No No 17 23/02/2015 18