MINUTES OF 470TH MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 13TH APRIL 2015 AT LUCKNOW The 470TH meeting of Operation & Co-ordination Sub-Committee of WRPC was held on 13th April, 2015 in Lucknow hosted by NTPC Vindhyachal. The list of participants is enclosed at Annexure-A. Shri Malay Mukherjee, General Manager, NTPC Vindhyachal welcomed Sh. SD Taksande, Member Secretary, WRPC, P Mukhopadhyay GM, WRLDC & other delegates of 470th OCC meeting. He thanked WRPC Secretariat for giving opportunity to NTPC Vindhyachal for organizing this meeting and expressed pride in organizing the same. Shri S K Roy, Executive Director, NTPC Vindhyachal in keynote address stated that, NTPC is committed to provide reliable and quality power to all our beneficiaries. In line with that NTPC plants are operating at best efficiency regime and setting benchmarks for the same in the country. He stated that proper scheduling of generators is very important in maintaining reliability, quality and stability of the system. He lauded the initiatives of OCC forum in resolving issues faced by generating stations. He further informed that in recent past there had been acute shortage of coal in spite of having FSA for all power stations with the coal companies, NTPC had to resort to blending of costly imported coal for ensuring power supply to our beneficiaries as per our commitment resulting in incremental increase in cost of electricity which is unavoidable. For reliability of power evacuation of VSTPS complete operationalization of Vindhyachal Pooling Station is critical. NTPC Vindhyachal in the advance stage of installation and commissioning of Unit 13 of VSTPS and evacuation of power of Unit 12 is still in contingency mode and units are running on split bus condition. Shri S Benerjee, NTPC Vindhyachal made a presentation. He informed that NTPC installed capacity as on 13TH APRIL 2015 is 44398 MW( Including thermal, hydro and renewable energy.) • NTPC has been ranked 341 among the world's 2000 most powerful listed companies as decided by Forbes” • NTPC Limited ranked No. 1 in Independent Power Producer & Energy Traders in Asia. 2nd Independent Power Producers and Energy Traders globally rated by Platt top 250 global energy company. 2 • Vindhyachal , largest power plant of the country is always in expanding mode and recorded increased generation year after year and at the same time sourced coal in increasing quantity. • Vindhyachal is very much concerned about environment management and alert in discharging social responsibility. • Vindhyachal is pioneer in many areas like renovation and modernisation of ESP, near zero effluent discharge implementation from plant premises, tree plantation etc. There after he handed over the forum to Member Secretary, WRPC for further addressing and presiding over the meeting. Shri S D Taksande, Member Secretary, WRPC extended warm welcome to Shri S K Roy, Executive Director, Shri Malay Mukherjee GM, NTPC Vindhyachal & all the participants of the 470th OCCM. He expressed his gratitude to RED NR, ED, NTPC Vindhyachal and his team of Engineers for making excellent arrangement for meeting at Lucknow, the City of Nawab on the bank of Gomati river. He further welcomed to New entities RattanIndia Power ltd., NLDC & IEPL as special invitee. He highlighted the following events which took place since last OCC meeting : 1. As per decision taken in 28th TCC/WRPC meetings held on 3rd & 4th March, 2015 at Udaipur, a special meeting on Technical Minimum issues of CGPL was held on 30.03.2015 at WRPC Mumbai. It was suggested to give minimum 4o% of its entitlement as minimum schedule. GUVNL & Maharashtra did not agree on proposal of minimum 40% schedule. Haryana, Rajasthan & Punjab stated that lot of commercial implications may be there while implementing the proposal & they told that the proposal will be submitted to their Management for further decisions. 2. A workshop on restoration process was successfully organized by Madhya Pradesh on 25th March, 2015 at Jabalpur. He requested to SLDC, Jabalpur to prepare a reference manual of the outcome of the workshop. 3. He requested CE, SLDC Kalwa to organize a meeting on DSM issues. CE SLDC, Kalwa informed that meeting would be held on 22nd April 2015 at SLDC Kalwa Mumbai. 4. A special meeting on integration of Mega solar power Project has been called by Special Secretary MOP on 21st April 2015 at New Delhi. He requested 470th OCC MINUTES 3 Gujarat, Maharashtra & Madhya Pradesh to furnish the total installed Capacity from Solar Power Project & proposed project likely to be integrated in their states. 5. LGBR for year 2015-16 has been prepared & is available at WRPC website. 6. Following capacities were added in WR grid during the month of March 2015: I. Installed capacities of 2400 MW, including RattanIndia(2x270 MW), MB Power(600MW), JPL Ext Unit 4(600 MW) & Sasan Unit-6(660 MW). II. ICT of 5315 MVA capacity at Asoj(315 MVA), Badravati(315 MVA), Koradi(2x1500) & Vindhyachal (1500 MVA). III. Total Transmission line added 1384 ckt Km. including important line 765 kV Wardha-Aurangabad-III & IV(370 Ckt Km each) & 765 kV SatnaVindhyachal PS(237 Ckt. Km). There after he requested SE(O), WRPC to take up regular agenda items in seriatim for discussion. ITEM No. 1: CONFIRMATION OF THE MINUTES Shri M M Dhakate, S.E(Opn), stated that Minutes of 469th meeting of Operation & Coordination Sub-Committee of WRPC held on 10th March 2015 at Nagpur were forwarded vide letter No. WRPC/OPN/OCC-Minutes/2014-15/2616 dated 18.03.2015. GM, WRLDC vide letter dated 23.03.2015 for amendments in following items in respect of MoM of 469th OCC meeting: QUOTE: “ i) Item No 3.2 B, “Delay in issuing code by WRLDC” ii) Item No. 8.6 , “Unreasonable Scheduling of NTPC stations” and iii) Item no 9.10. , “Review of ATC/TTC for each state control area in Western Region Item NO.3.2 B : Delay in issuing code by WRLDC There was no clear agenda on the aforesaid item. However, on the issue of nonavailability of PMU data from Satna station, representative from POWERGRID raised the issue of non- availability of shutdown the PMU data could not be made available. It 470th OCC MINUTES 4 is to mention that the PMU data from Satna was not available since one year due to non- establishment of wideband network WRLDC however, on the issue of clearances of daily outages clearly explained the methodology adopted during outage co-ordination and stated as follows. “After getting readiness from utilities, reliability suggestions for all outages are issued in advance and the list of outages approved for next day is made available to all concerned through mail as well as goggle sheet. On the day of outage, real time code is issued after coordinating with the concerned utilities. In Western region itself daily around 60-70 numbers of outages are handled and for each outages, coordination need to be done with two or more agencies. At the same time many emergency outages are also handled. Handling such large number of outages without compromising grid security is a challenging job. It is also observed that many a times the utilities changed their program in the last minute without availing the approved outages. Instead of generalizing the issue in OCC forum, utilities are requested to bring any specific case which are delayed for considerable time and the same may be brought into the forum through proper agenda.” Item No.8.6: Unreasonable Scheduling of NTPC stations GM, WRLDC stated that the methodology circulated by NTPC requires further deliberation with NTPC. WRLDC suggested that they would like to discuss the methodology with NTPC for implementing an appropriate procedure for taking the units under RSD. Item No. 9.10: Review of ATC/TTC for each state control area in Western Region GM WRLDC stated that, SLDC Maharashtra may do the necessary studies and declare the ATC of their respective control area. WRLDC agreed to provide necessary assistance if any for conducting the studies.” UNQUOTE: The Sub-committee discussed the matter & agreed for modification of 469th MOM as above. No other comments have been received. The minutes were confirmed with above modification. ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF MARCH 2015. 470th OCC MINUTES 5 Member Secretary, WRPC requested WRLDC to brief the Committee on Grid Operation experiences during March 2015. Chief Manager, WRLDC in the presentation (copy attached at Annexure – 2 in soft copy) concentrated broadly on the performance of the grid for month of March 2015 as below: 2.1 Frequency Particulars The average frequency during the month of March, 2015 was 49.98 Hz. The maximum instantaneous frequency was 50.54 Hz at 03:37 hrs on 01 st March-15 while minimum instantaneous frequency was 49.52 Hz at 18:57 hrs on 03 rd March15 & 05:51 hrs on 20th March . The frequency profile during March, 2015 was as under: 01-March-2015 to 31-March-2015 % time IEGC band (49.9 < f < 50.05 Hz) 58.47 < 49.9 Hz 17.77 > 50.05 Hz 23.76 The detailed frequency particulars are enclosed at Annex- 2.1. The Sub-Committee noted. 2.2 Operational Discipline There was a net inter-regional export of 3059.00 MUs by WR against net export schedule of 2784.00 MUs. The Sub-Committee noted. 2.3 Voltage Profile Voltage profile at some of 765/400 kV sub-stations during the month of March 2015 furnished by WRLDC is enclosed at Annex-2.3. The Sub-Committee noted as above. 2.4 U/F Relay Operations As per WRLDC records during March 2015 the system frequency didn’t touch 49.2 Hz and no UFR operation has been reported by WRLDC. The UFR operation status reported by constituents is enclosed at Annexure-2.4. The Sub-Committee noted as above. 470th OCC MINUTES 6 2.5 Power Cuts / Load Restrictions Details of Power Cuts and Regulatory measures during March 2015 as furnished by the state utilities are given in Annex. 2.5. The Sub-Committee noted as above. 2.6 Details of Generating Units under Forced outages Details of generating units under forced outages during March 2015 are given in Annex-2.6. The Sub-Committee noted as above. 2.7 Details of Generating Units under Planned outages The details of generating units under Planned Outages during March 2015 are given in Annex-2.7 The Sub-Committee noted as above. ITEM NO.3: OPERATIONAL PLANNING 3.1 Proposed Planned maintenance programme of generating units. The maintenance programme of generating units for April 2015 & May 2015 was discussed. The finalized outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-3.1. The Sub-Committee agreed as above. 3.2 A. DELAY IN ISSUING CODE BY WRLDC: The matter of delay in code issued by system operators & concern raised by transmission elements outages availing agencies was discussed in 469th OCC meeting & decided that proper care shall be taken by reliability coordinators & system operator to minimize wastage of mobilization of 1000’s of man-hours, machineries etc. and if there is real time problem, the same shall be informed to next OCC meeting with satisfactory reason thereof. Member Secretary, WRPC suggested that proper coordination among utilities, WRLDC reliability coordinating group, WRLDC Control room group & WRPC would help in timely availing the outage which might leads to minimize the wastage of man power & machineries. 470th OCC MINUTES 7 CM (SO), WRLDC gave a brief presentation on the existing procedure for outage coordination and highlighted the associated issues that aggravate the complexity in facilitating the outage such as involvement of multiple agencies, delay / nonsubmission of readiness in D-3 by the utilities for availing the outage, impromptu request for outage of additional elements over and above those approved (to take care of induction), delay in restoration of elements already under planned outage leading to re-scheduling of outage in parallel/same corridor, incomplete Dia due to pending commissioning of bays or forced outage, dynamically varying grid conditions, non-availability of telemetry etc. He said that we must learn from the experience of blackout of Turkey in March 2015, of Europe in Nov 2006 and India in July 2012 and give due regards to the system reliability while allowing shutdowns. GM, WRLDC expressed concern that even after issue of reliability consent in D-1 day, the number of outages actually availed is far less than the number of reliability consents issued. Also, the average delay in issuing the codes is around 30 minutes and same can be reduced further if outage timings are staggered. MS, WRPC said in a large interconnected grid where grid elements are being added at a rapid pace, SLDCs/RLDCs and NLDC have to see the real-time conditions before allowing any shutdown. He further added that system security should not be compromised during outage coordination. He appreciated the responsibility of system operator (WRLDC) to issue code in real time for multiple outages planned for a day. After detailed deliberation, it was agreed that compliance to the outage coordination procedure is essential for availing the outage without compromising grid security. It was also decided that time of availing the planned outage would be staggered by the utilities to the extent possible so as to avoid simultaneous requests of multiple elements starting from 0800 hrs in the morning. GM, WRLDC ensured that all efforts will be made so that code will be issued with minimum possible time for the transmission elements which are approved in OCC meeting after completion of due formalities. The Sub-Committee agreed/noted for the same. 470th OCC MINUTES 8 B. OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS Maintenance programme for transmission lines during the months of April 2015 & May 2015 is given in Annex 3.2 B. The Sub-Committee agreed/noted for the same. 3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – APRIL 2015 & MAY 2015 Details of anticipated restricted & un-restricted demands for the months of April 2015 & May 2015 are given in Annex 3.3. The Sub-Committee noted the same. ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF MARCH 2015 The details of actual generation, demand, drawl of power from grid; exchanges etc. are given in the following Annexure: Annex 4.1 - Actual Generation and Requirement for March 2015 Annex 4.2 - Peak Demand: Schedule Vs Actual for March 2015 Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines for March 2015. Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector stations, Drawl Schedules and Entitlements of constituents during March 2015 Annex 4.6 - Inter System Exchanges for March 2015. Annex 4.7 – Details of level of Major Reservoirs in Western Region for Month of March 2015. The Sub-Committee noted. ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month except for the case of 29th March 2015 which is discussed below. The other minor tripping details during the month received from WRLDC is enclosed at Annexure-5. Representative from WRLDC stated that the tripping of multiple elements due to failure of primary protection at the time of trial charging of 400 kV Akola2-Taptithanda ckt-2 of MEGTPCL on 29th March 2015 when 765 kV Wardha-Aurangabad ckt-1 & 2 was under planned outage was deliberated in detail. Members noted that 14 EHV transmission elements tripped in the event leading to isolation of 765 kV and 400 kV bus at Akola2, tripping of Unit # 2,3, 5 at Rattan Power (Loss: 440 MW), tripping of 470th OCC MINUTES 9 Unit # 8 Koradi-II (Loss : 110 MW), Blackout at Rattan Power, Loss of supply at 400 kV Akola1 and Akola2, Loading on 400 kV Wardha-Parli D/C > 850 MW, Operation of SPS resulting in backing down of 100 MW at Mouda plus Load shedding in Southern Region and 80 MW load distress shedding to control overloading of 220 kV lines from Akola. It was observed that after the contingency, MW and MVAr support was instantaneously available from Southern Region due to reversal of power flow on 765 kV Solapur-Raichur D/C and 765 kV Pune-Solapur. GM, WRLDC expressed concern on the failure of primary protection and lack of basic due diligence in charging of Akola2-Taptithanda ckt-2. Member Secretary, WRPC said that such incidents are a threat to grid security and the event should be examined in detail and proposed to be discussed in the next Protection Committee meeting scheduled on 21st April 2015. He urged all utilities to ensure compliance to the laid down procedures for first time charging and commissioning of new elements. The Sub-Committee noted as above. ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system. Constituents have furnished the status of healthiness of SER/DRs in their systems on the dates below : Sl No. Name of Date of Receipt constituents 1 PGCIL,WRTS-I 08.04.2015 2 PGCIL,WRTS-II 06.04.2015 3 MPPTCL 13.04.2015 4 NTPC 08.04.2015 5 CSPTCL 06.04.2015 6 GETCO 06.04.2015 7 MSETCL 13.04.2015 Constituents of WR were requested to ensure healthiness and sent information to this office regularly as per the recommendation of enquiry committee of Grid disturbances on 25.02.2007 and 28.02.2007. The Sub-Committee noted. 470th OCC MINUTES 10 ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS, TRANSMISSION LINES AND GENERATING UNITS IN WR. 7.1 Status of completion of ongoing Schemes for Commissioning of reactors. The present status regarding schedule and commissioning of reactors is as below: S. No. 400 Sub/stn. 1 Jabalpur 125 MVAR PGCIL Commissioned 26.03.2014 on 2 Khandwa 125 MVAR PGCIL Commissioned 28.03.2014 on 3 India bulls 80 MVAR MSETCL BR Commissioned 26.11.2013 4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014 5 Sasan Line 240 MVAR reactor-1 RELIANCE Commissioned 16.02.2014 on 6 Shujalpur 125 MVAR PGCIL Commissioned 31.07.2014 on 7 Bhatapara 125 MVAR PGCIL Commissioned 24.07.2014 on 8 Raigarh 125 MVAR PGCIL Commissioned 30.07.2014 on 9 Aurangabad 125 MVAR PGCIL Commissioned 28.04.2014 on 10 Nanded 125 MVAR MSETCL June – 2016 11 Sholapur 125 MVAR MSETCL June – 2016 12 Kolhapur 125 MVAR MSETCL June – 2016 13 Akola 125 MVAR MSETCL June – 2016 *14 Nagda 125 MVAR MPPTCL July – 2015 15 Bhopal 80 MVAR MPPTCL May – 2015 16 Damoh 125 MVAR PGCIL Commissioned 30.09.2014 on 17 Bachau 125 MVAR PGCIL Commissioned 01.12.2014 on 470th OCC MINUTES kV Size (MVAR) Implementing Expected commissioning agency date 11 18 Pirana 125 MVAR PGCIL Commissioned 02.10.2014 on 19 Itarsi PGCIL Commissioned 15.08.2014 Commissioned 13.10.2014 on PGCIL Commissioned 13.12.2014 on 20 Seoni 1X125 MVAR(Ist) 1X125 MVAR(IInd ) 125 MVAR 21 Parli 125 MVAR PGCIL Commissioned 10.01.2015 on 22 Raipur 125 MVAR PGCIL Commissioned 30.09.2014 on 23 Gwalior 125 MVAR PGCIL Commissioned 30.06.2014 on 24 ISP 125 MVAR NHDC December 2015 25 Line reactor 50MVAR at Nagda-ISP line at Nagda end Satpura 50 MVAR MPPTCL July 2015 MPPGCL April-2016 27 Sasan Line 240 MVAR reactor-2 RELIANCE Commissioned 21.01.2015 28 Sasan reactor RELIANCE May-2015 29 Bus reactor 330 MVAr at Wardha PGCIL Commissioned 01.11.2014 on 30 Bus reactor 330 MVAr at Dhule BDTCL Commissioned 04.12.2014 on 26 Bus 240 MVAR on on *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor after commissioning of 125 MVAr reactor at Nagda. Sub-Committee noted as above. 7.2 Status of completion of 765/400 kV and above ongoing Transmission Schemes being executed/implemented by Transmission Agencies. The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows: - 470th OCC MINUTES 12 S. No. Name of the Line POWERGRID 1 400 kV Navsari – Kudus D/C Line 2 765kV S/C Satna-Gwalior line (359Km + 60Km D/C Portion) Ckt.-II 3 765 kV Durg pooling station Champa Pooling station Dharamjaygarh PS - 2nd ckt 4 765 kV Gwalior - Jaipur line (1st Ckt) S/C 5 765 kV Dharamjaygarh - Jabalpur Pooling Station D/C line 6 765 kV Wardha –NizamabadHyderabad D/C 7 765 kV Narendra-Kolhapur D/C 8 400 kV Aurangabad - Boisar line D/C line 9 765 kV Aurangabad (PG) - Padghe (PG) D/C 10 11 12 800kV DC Champa – Kurukshetra Bipole 765 kV D/C Jharsuguda – Korba Target Completion Date Remarks June-15 ROW problem Commissioned 06.08.2014 Commissioned 21.05.2014 on on June-15 June-15 March-16 Dec-15 Nov -2015 Sept-2015 Sept 2015 Ckt I Commissioned 28.07.14 Ckt II Commissioned 29.07.14 Ckt I Commissioned 01.07.14 Ckt II Commissioned 03.07.14 765 kV Wardha- Aurangabad D/C Line. on on on on 13 765 kV Aurangabad- Solapur D/C line 14 765 kV Solapur-Pune line 15 765KV Durg-Wardha D/C 16 765 kV Ranchi-DharamjaigarhBilaspur II & 765 kV RanchiDharamgaigad-I 17 LILO of both circuits of Aurangabad – Pune 400 kV D/c line at Pune April-15 765/400 kV GIS LILO of both circuits of Parli– Pune Commissioned on 400 kV D/c line at Pune 765/400 kV 02.03.2015 GIS 400 kV Navsari-Magarwada Lilo of LILO ON 27.02.2015 18 19 470th OCC MINUTES Oct- 2015 Commissioned on 02.03.2015 Commissioned on 15.11.14 Ckt I likely to be commissioned in Jan2015 Ckt II Commissioned on 31.03.14 13 400 kV Magarwada-kala 400 kV kala-Vapi 20 21 22 220 kV Magarwada(PG)Magarwada(DD)-I & II 400 kV Sasan – Vindhyachal PS-I 24 765 kV Wardha – Aurangabad-III & IV 400 kV Solapur(PG) to Solapur(NTPC)-I & II Sasan-Vindhyachal PS-I 25 Satna- Vindhyachal PS 23 Navsari Vapi ckt-II CHHATTISHGARH 1 LILO of 400 kV Korba westKhedamara at Marwa 2 400 kV DCDS Raipur(Raita)Jagdalpur(DCDS) 2.1 220 kV Korba-Bishrampur line (DCSS) 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) 2.3 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL S/s Raigarh 2.4 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri S/s 2.5 LILO of 220 kV Raigarh – Jindal (Tamnar) at Girwani 220 kV S/s GUJARAT 1 400 kV D/C Kosamba-Chorania line (Package I 2 400 kV D/C Kosamba-Chorania line (Package II) 3 400 kV D/C Mundra-Zerda line No. 1 4 400 kV D/C Mundra-Zerda line No. 2 5 400 kV D/C Vadinar-Amreli line 6 400kV APL-Hadala LILO to Halvad 7 400 kV D/C Amreli-Kasor line(Part-1) 8 400 kV Charanka- Veloda 9 400 kV Mundra – Varsana-I & II MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS Line 2 Pithampur- Indore 400KV DCDS Line 470th OCC MINUTES Commissioned 17.03.2015 Commissioned 26.03.2015 Commissioned 30.03.2015 Commissioned 30.03.2015 Commissioned 31.03.2015 Commissioned 31.03.2015 on Commissioned 14.08.14 on on on on on on June- 2015 July 2015 July- 2015 August-2015 July-2015 Charged on 22.08.14 Commissioned 05.07.14 Commissioned 05.07.14 on Commissioned 31.03.2015 on on June -2015 June -2015 June -2015 Sept -2015 Sept -2015 Sept -2015 Commissioned on 31.10.14 Ckt I Commissioned on 04.09.14 14 Ckt II Commissioned on 07.08.14 3 Satpura TPH-Ashta 400KV DCDS May – 2015 Line MAHARASHTRA(STU) 1 2 400KV D/C line from Koradi-(II) to June- 2015 Wardha S/S(PG) D/C 400 kV Akola(II)- Taptitanda -I 765 kV Koradi-(III)- Tiroda ckt-I Commissioned Commissioned 20.01.15 3 765 kV Tiroda- Koradi-(III) ckt-II 4 5 6 7 8 9 10 11 12 13 14 765 kV Koradi-(III)- Akola(II) ckt-II 765 kV Akola(II)- Taptitanda ckt-II 400 kV Akola(APML) to Akola(MSETCL)-II 400 kV Taptitanda-Bableshwar-D/C Dec-15 Dec-15 Jun-16 May 2015 Commissioned 20.03.2015 765 kV Bhopal-Bhopal (BDTCL) 3 765 kV Vadodara - Dhule (BDTCL) S/C 4 765 kV Dhule - Aurangabad (BDTCL) 470th OCC MINUTES on May 2015 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd 1 400 kV Rajgarh(PG)-Karamsad July 2015 (GETCO) D/C STERLITE (JTCL) 1 765 kV Dhramjaygarh - Jabalpur (JTCL) May -2015 D/C line 2 765 kV Jabalpur - Bina (JTCL) S/c May -2015 STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) S/C 2 on Commissioned on 06.02.2015 Commissioned on 24.02.2015 Charged at 400 kV level Commissioned on 02.10.14 Commissioned on 31.12.2014 765 kV Koradi-(III)- Akola(II) ckt-I LILO of 400 kV Chandrapur-Parli at Nanded 2x1500 MVA 765/400 kV, ICTs at Ektuni-D/C 400 kV Bableshwar-Kudus D/C (Quad) 765 kV Akola(II)-Ektuni -2 ( To be charge at 400kV at Tapthithanda) 400 kV Akola-II to RattanIndia PL-I & II 400kV IEPL-Warora Charged in Jan-14 May-2015 Severe ROW Problem Severe ROW Problem Commissioned 19.11.14 Commissioned 16.07.14 Ready for charging Commissioned on on on 15 S/C 5 400 kV Dhule-Dhule(D/C) (up to dead end tower) RAICHUR SHOLAPUR TRANSMISSION CO. LTD.(RSTCL) 1 765 kV Raichur - Sholapur line 2nd S/C 04.12.14 Commissioned 05.12.14 on Commissioned on 29.06.2014 It was suggested by WRLDC and constituents that important list of line will be sent by each constituent to WRLDC and WRLDC will compile and furnish the list as per priority of commissioning. The Sub-Committee noted and agreed as above. 7.3 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15. The status regarding Generating units, commissioned /expected to be commissioned during the current year 2014-15 according the available information is as below: Name of the Power Projects Unit No. Capacity Date of Commissioning (MW) /Schedule Date GUJARAT NIL CHHATTISGARH Marwa 1 2 500 500 May 2015 July 2015 MAHARASHTRA Dhariwal 2 300 Synd. On 23.04.2014 CHANDRAPUR 8 500 Synd. On 11.01.2015 CHANDRAPUR 9 500 September 2015 KORADI 8 660 Syn on 25.02.2015 KORADI 9 660 August 2015 KORADI 10 660 March -2016 PARLI 8 250 December 2015 APML 5 660 COD on 11.10.2014 RattanIndia 4 270 Cod on 07.03.2015 RattanIndia MADHYA PRADESH Singhaji TPS 5 270 Cod on 13.03.2015 2 600 Commissioned on 15.10.14 M/s Jhabua Power, Seoni 1 600 Jaiprakash Power, Nigri 1 660 May – 2015 Synchronized on 3.09.14 COD on 17.9.14 470th OCC MINUTES 16 Jaiprakash Power, Nigri Moser Bear (Hindustan power) Moser Bear (Hindustan power) EssarPower MP ltd (Mahan) EssarPower MP ltd(Mahan) BLA CENTRAL SECTOR/IPP Vindhyachal KSK KSK ACBIL SASAN SASAN Sasan BALCO Dgen Dgen Dgen JPL Sasan UMPP 2 1 2 1 2 2 660 600 600 600 600 45 COD on 21.02.2015 Synchronized on 19.03.15 December 2015 Synchronized on 24.04.13 May – 2015 June 2015 13 2 5 1 5 6 4 1 51 52 53 IV VI 500 600 600 300 660 660 660 300 400 400 400 600 660 Oct -2015 May – 2015 May – 2015 May – 2015 Synchronized in 22.08.2014 April 2015 Synchronized in May 2014 Synchronized in 22.02.2015 COD on 11.12.2014 COD on 11.12.2014 COD on 11.12.2014 Synchronized on 26.03.2015 COD on 27.03.2015 Sub-committee noted as above. ITEM NO. 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN All the constituents are requested to submit the CMP report for the fourth quarter (January 2015 to March 2015) for the year 2014-15. The Sub-Committee noted as above. ITEM NO. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR Status of physical & cyber security in Power Sector for the fourth quarter (January 2015 to March 2015) have not been received from some of the constituents. The Sub-Committee noted as above. ITEM NO. 8.3 LGBR PREPARATION FOR THE YEAR 2015-16 IN WESTERN REGION. WRPC prepared LGB Report for the year 2015-16 in consultation with state utilities. MUs data has been taken from Generation Target finalized by CEA/MOP & MW data 470th OCC MINUTES 17 has been taken from Utilities. Small hydro, RES & STOA purchase plan has also been taken into consideration. LGBR for the year 2015-16 is finalized and same is available at the www.wrpc.gov.in. Member Secretary, WRPC stated that LGBR shall be reviewed on quarterly basis for further fine turning. Next review will be on the last quarter of the June 2015. The Sub-Committee noted as above. ITEM NO. 8.4 READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FOR UPGRADATION OF EXISTING SCADA/EMS SYSTEM During 28th WRPC meeting it was decided that the status of progress of SLDC’s & Back-up SLDC’s of WR constituents /WRLDC would be regularly monitored in monthly OCC meeting. The present status of progress of SLDC’s & Back-up SLDC’s of WR constituents /WRLDC attached at Annexure – 8.4. All the constituents are requested to update in attached format. The Sub-Committee agreed as above. ITEM NO. 8.5 : CONTINUOUS BACKING DOWN OF POWER FROM SASAN UMPP Sasan Power Ltd. informed that cheapest power from the Sasan Ultra Mega Power Project is being continuously backed down primarily by Haryana, Punjab, Rajasthan and Delhi. For the similar issue faced by NTPC power plants in the recent WRPC and OCC meetings, it is understood that a methodology has been devised to address unit is NOT scheduled below technical minimum capacity. Considering above, Sasan Power Limited (SPL) requests WRLDC and WRPC that same should be made applicable for Sasan UMPP which is also a Inter-State Generating Station. In this regard, Sasan Power Limited has highlighted backing down related issues with the beneficiaries in the Procurers meeting. As advised during the OCC meeting held on 10.03.2015, a separate meeting is being arranged with Procurers and outcome of the meeting would be shared. Hence, it is requested to flag this issue till a solution is arrived at. Further, SPL requested that technical minimum of all generating stations (including State Gencos) be audited by third party in line with what Maharashtra who 470th OCC MINUTES 18 has experience in this direction and requested the same be adhered to. During the presentation, WRLDC shown a plot of DC vs schedule of Sasan during March 2015. It was noted that there was surrender of power by small quantum by utilities in Sasan on 1st and 7th March 2015 due to inclement weather conditions and demand crash. Member Secretary, WRPC and GM, WRLDC opined that on all other days the entire DC of Sasan was getting scheduled. SE, SLDC-M.P. expressed concern on large variation in DC of Sasan leading to frequent start and stop of their own units. Sasan Power was advised to make efforts to ensure consistent generation availability from Sasan. He requested SASAN to take up with procurer from NR to formulate policies regarding scheduling to technical minimum in line with decision taken in meeting on 30 th March 2015 regarding CGPL technical minimum scheduling. The Sub-Committee members noted as above. ITEM NO. 8.6: WORKSHOP ON BLACK START RESTORATION PROCESS A Workshop on Black Start Restoration Process in MP System was successfully organized by SLDC Jabalpur on 25th March 2015. Approximately 85 participants attended the above workshop. Member Secretary, WRPC suggested SLDC MP to compile the discussion/matter during the work shop for further reference. SLDC, M.P. agreed to compile and forward the recommendations of the workshop. GM, WRLDC said that the scheme for extending start-up supply to the large size units of the new thermal generating stations connected at 765 kV or 400 kV level should be identified at the planning stage itself. Various issues associated with retaining the connectivity with STU network at lower voltage level established during construction stage were discussed. Several members opined that this arrangement could help in extending start-up supply during system restoration. CE, CSPTCL stated that regulatory provisions for implementing the above suggestion would be required. CE, SLDC Gujarat said that the issue of extending start up supply to CGPL from 220/400 kV ICT at Nanikhakar under system restoration state has been under 470th OCC MINUTES 19 discussion. The ICT would normally be charged only from one end and the O&M charges could be shared by all beneficiaries of CGPL. It was decided that CGPL would submit a comprehensive proposal (regarding installation of 220/400 kV ICT at Nanikhakar for extension of start-up supply to CGPL units) for further deliberation and approval by the TCC/WRPC. RattanIndia Power Ltd (RPL) raised concern for its 5x270 MW Nashik TPP to operate during Black-start Restoration process, as STU, MSETCL has allowed connectivity for Nashik TPP on 400 KV transmission line from Nashik TPP to Babhaleshwar substation with prior disconnection of 220 KV LILO on MSETCL Eklahare to Babhaleshwar transmission line at Nashik TPP. As such, due to physical disconnection of 220 KV LILO line alongwith 400/220 KV ICT, constructed earlier in order to avail Start-up power, RPL may face constraints in start-up power availability during Black Start restoration process. The Sub-Committee members noted as above. ITEM NO. 8.7: OCC APPROVAL FOR ATTENDING MAINTENANCE WORKS IN 400KV BAY OUTAGES WRTS-II, PGCIL informed vide letter dated 04th April, 2015 that, WRLDC had advised to obtain OCC approval for issuing code for outage of 400kV Main / Tie bays, for maintenance works. In one and half breaker scheme, during outage of main / tie bay, the line/ICT remains in service through its tie/ main CB, and there is no element outage involved & power supply position is not affected. As such, it is felt that there is not much requirement of OCC approval of 400kV Bay outages. Also, there are large no. of 400kV Main / Tie bays in service in various substations and their inclusion in main OCC agenda will un-necessary increase the OCC list and time for due diligence in element outage will get affected. As per IEGC code 2010, clause no. 5.7.1 (a), the outages are planned on element basis. 470th OCC MINUTES 20 PGCIL have requested that earlier practice of granting 400kV Bay outages by WRLDC based on real time conditions may please be continued instead of including these in OCC agenda. WRLDC during presentation gave examples of grid incidences due incomplete dia due to outage or non-commissioning of Main/Tie bays at several of the new substations in WR resulting in unexpected / undesirable tripping of elements during facilitating planned/emergency outage. MS, WRPC opined that the construction activities in various substation of WR are in full swing and the availability of bays needs to be checked thoroughly before permitting shutdown of other bays. After discussion it was decided that all planned shutdown of bays in EHV substations (400 kV and above) would also be forwarded by respective utilities for discussion and concurrence in the monthly OCC meeting. The Sub-Committee members noted as above. ITEM NO: 8.8 SCHEDULING OF TECHNICAL MINIMUM SHARE FROM ISGS AND SUDDEN WITHDRAWAL OF URS SHARE OF ISGS. CE, SLDC, Gujarat vide letter dated 06.04.2015 intimated that during 467th OCC meeting held on 16.01.15 at WRPC, Mumbai, the following was decided with respect to technical minimum scheduling of ISGS stations of NTPC: Constituents will give their requisition for more than 30% of their entitlements for on bar generation for all NTPC ISGS stations. In case total requisition for a particular on bar unit in a station is lesser than technical minimum, then deficit for meeting TM would be conveyed by WRLDC to its beneficiaries. Beneficiaries will have to send revised requisition so as to meet TM on pro-rata basis commensurate with their entitlement percentage by 21:00 Hrs. After 21:00 Hrs, WRLDC will issue the final schedule i.e. R-1, as received from beneficiaries. WRLDC will coordinate and issue reasonable schedule based on revised requisition taking care of ramping up / ramping down and the ratio between minimum and maximum generation levels as envisaged in IEGC 6.5.14. 470th OCC MINUTES 21 It happens many times that during night hours, the technical minimum share of other constituents was scheduled to Gujarat State especially from NTPC Mauda Power Station. It is also observed that many constituents are scheduling their power from coal based station as a peaking station and in night hours, they are not cooperating to absorb / schedule their Technical Minimum share. It is utmost necessary that the practice of using coal based stations as peaking stations shall have to be stopped. In case total requisition for a particular on bar unit in a station is lesser than technical minimum, then deficit for meeting TM will have to commensurate with their entitlement. Also, it is observed many times that the intimation of URS withdrawal due to requisition of power by the beneficiaries is received at the last moment or posted on WRLDC web site just prior to the block of implementation. When there is a sudden withdrawal of URS power exceeding a quantum of 100 MW especially during peak hours, it is very difficult to manage the power requirement of the State for the beneficiary who is availing URS. Hence, it is necessary that URS shall be withdrawn / scheduled in steps of 100 MW or less per block so that it would be easier for the State availing URS to manage power requirement. Also, the intimation of URS revision shall be posted with pop-up block on WRLDC website to acknowledge changes in schedule easily. GM (OS & Comml) NTPC informed the forum that:(1) In order to reduce energy cost of Mouda, FSA has been signed with SECL on 24.03.15 (in place of MCL). This was as per recommendations of Inter Ministerial Task Force (IMTF) for rationalization of coal sources. Further the coal realization from WCL has also started from February 2015. This will ensure availability of more domestic coal. With these initiatives energy charges of Mouda is expected to come down in next 2-3 months. (2) Govt. of India vide MOP/NG/Ref. No./PPAC/Gas pricing/april-Sept.’15 dated 31.03.15 has fixed up the Gas Fuel price of $ 4.66/mmbtu from 1 st April 2015 to 30th Sept.’15, Accordingly variable charges of Kawas and Gandhar Gas power stations have reduced. The same will approximately be 303p/kwh. 470th OCC MINUTES 22 (3) NTPC has started Hydro Power Generation from its 1st 800 MW Hydro power station “KOLDAM” situated in Himachal Pradesh, out of 4 units of 200 MW, three units have been synchronized and achieved full load. CE, LD, MPPTCL vide letter dated 26.03.2015 (copy enclosed at Annexure-8.8) suggesting modifications/corrections in the MOM of 28 th WRPC meeting, it was clarified by SE(O), WRPC that condition of 30% in R0 is only for the beneficiaries who schedule around 100 % of their entitlement during peak conditions. If flat requisition of “0” is given by any beneficiary then it would be fine and would not count for any violation to agreed methodology. Member Secretary, WRPC stated that the earlier decisions taken in OCC’s & WRPC will be followed in the above matter. The Sub-Committee members noted as above. ITEM NO. 9 : ITEMS FROM WRLDC: ITEM NO 9.1: TRANSMISSION CONSTRAINTS WITHIN MAHARASHTRA SYSTEM The issue of transmission constraint within Maharashtra system has been under deliberation in the past several OCC meetings. The same was also discussed during the 27th and 28th TCC/WRPC meeting. During the discussions, it emerged that several transmissions elements downstream of Aurangabad (PG) / Taptithanda (MSETCL) towards Pune and Bableshwar are heavily loaded viz. • 765/400 kV ICTs Aurangabad (PG) • 400 kV Aurangabad-Waluj D/C • 400 kV Aurangabad-Pune D/C • 400 kV Waluj-Bableshwar Recently the following new elements have been synchronized / commissioned within Maharashtra. 1. LILO of 765 kV Tiroda-Akola2 at Koradi-III 2. 765 kV Tiroda-Koradi-III ckt-2 3. 765 kV Koradi-Akola2 ckt-2 4. 765 kV Wardha-Aurangabad ckt-3 and 4 5. 400 kV Akola2-Taptithanda ckt-2 470th OCC MINUTES 23 6. 400 kV Rattan Power-Akola D/C 7. 765 kV Solapur-Pune S/C However it may be seen that except 765 kV Pune-Solapur S/C all the above elements are located upstream of Aurangabad. Thus, the desired relief on the congested corridor downstream of Aurangabad (PG) towards Pune/Bableshwar is still awaited. During the joint simulation studies conducted at WRLDC following measures were suggested for relieving the congestion downstream of Aurangabad. a) Commissioning of 400 kV Dhule bays for BDTCL line (Action: MSETCL) b) 220 kV outlets from Taptithanda and Aurangabad-PG (Action: MSETCL) c) 220 kV outlets from Pune_PG and Warora (Action: MSETCL) d) Load trimming scheme at Waluj and Boiser (Action: MSETCL) e) Temporary by passing 400 kV Waluj to form 400 kV Aurangabad (PG) to Pune (PG) D/C instead of 400 kV Aurangabad-Waluj D/C and 400 kV Waluj-Pune D/C (Action: POWERGRID and MSETCL) MSETCL said that the Dhule bays are expected to be commissioned by May 2015 end. POWERGRID agreed to explore possibility of bypassing 400 kV Waluj and connecting 400 kV Aurangabad_PG to Pune GIS after completion of 400 kV Dhule bays and LILO of 400 kV Waluj-Pune_AIS D/C at 765/400 kV Pune GIS and revert back. Member Secretary, WRPC suggested that joint survey would be done by MSETCL, PGCIL, WRLDC & WRPC for exploration of connectivity. RPL informed that due to various transmission constraints within Maharashtra State, power from its 5 x 270 MW Amravati TPP is presently restricted at 750 MW Ex-Bus against PPA commitment of 1200 MW with MSEDCL. WRPC forum informed that since RPL is embedded IPP within Maharashtra State and as the Ex-Bus power restriction is imposed by STU, MSETCL, issue to be resolved by STU, MSETCL only. The Sub-Committee members noted as above. 470th OCC MINUTES 24 ITEM NO. 9.2 : CONSTRAINTS IN GRID OPERATION DUE TO NONAVAILABILITY OF TELEMETRY FROM MSETCL/MAHAGENCO STATIONS Non-availability of telemetry from large number of EHV stations of MSETCL and Mahagenco has been flagged by WRLDC and is being deliberated in the OCC forum for more than a year. It is a matter of concern that the despite repeated assurances from representatives of Maharashtra the issue remains unresolved. Consequently the observability of Maharashtra system is poor and achieving convergence of the State Estimator is also a challenge. In the absence of Circuit Breaker Status, Bus voltage, line flow (MW and MVAR), severe constraints are being experienced by WRLDC control room personnel in realtime supervision and operation of the grid. State Estimator is also not converging It may be recalled that there have been several disturbances involving tripping of multiple transmission elements and consequent load/generation loss in Maharashtra. The restoration activities as well as post-facto analysis of events were severely constrained due to non-availability of telemetry. Coordination of outage of EHV elements is also hampered due to non-availability of circuit breaker status and analog values from various stations in Maharashtra. GM, WRLDC expressed concern on the non-availability of telemetry from several substations of Maharashtra particularly 400 kV Taptithanda, Warora, Chandrapur and Lonikhand despite continuous follow up and repeated assurances by MSETCL representatives. Member Secretary, WRPC opined that MSETCL should forward a clear timeline of resolution of telemetry issues of Maharashtra. CE, SLDC-Kalwa confirmed that all the pending telemetry issues of Maharashtra would be resolved by end of May 2015. The Sub-Committee noted as above. ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING 469th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure10. Accordingly, it was proposed to host 471st OCC by Tata Power on 13th May, 2015. Tata Power expressed inability to host the 471st OCC meeting, therefore it will be held at WRPC office, Mumbai. The TATA Power turn will be as modified roster attached at Annexure -10. As per roster, it is proposed to host 472nd OCC by Torrent Power Ltd., Ahmedabad in the month of June 2015. ****************************** 470th OCC MINUTES ANNEXURE-A LIST OF PARTICIPANTS OF 470th OCC MEETING OF WRPC HELD ON 13.04.2015 AT LUCKNOW Sl.No. Organisation, Name & Designation E-mail I 1 2 3 WRPC Shri S.D. Taksande, M.S. Shri M.M. Dhakate, S.E.(O) Shri L.K.S. Rathore, D.D. ms-wrpc@nic.in opc-wrpc@nic.in lksr_2000@yahoo.com II 4 5 6 MSETCL / MSEDCL/MahaGenco Shri Jayant Weekey, C.E. Shri M.N. Kundalkar, Dy. C.E. Shri D.K. Rokade, S.E. jayantweekey@gmail.com k.madhukar.010@gmail.com dkrokade@gmail.com III 7 8 9 MPPTCL / MPPGCL Shri Shri K. K. Prabhakar, S.E. Shri P.K. Saxena, S.E. Shri J. Agasti, E.E. kkparbhakar@yahoo.co.in segcc.mppgcl@gmail.com jwagasti@gmail.com IV 10 11 12 CSPTCL / CSPGCL Shri W.R. Wankhede, C.E. Shri Saneep Shrivastava, S.E. Shri Girish Gupta, E.E. waman5723@gmail.com sndpshrivastava27@gmail.com girishgupaji@gmail.com V 13 14 GETCO / GSLDC/ GSECL Shri B.B. Mehta, C.E. Shri G.J. Mistry, J.E. bbm@gebmail.com emisldc.getco@gebmail.com VI 15 16 17 18 19 20 21 WRLDC / POWERGRID Shri P. Mukhopadhyay, G.M. Shri Kuleshwar Sahu, A.G.M. Smt. Sachala Mishra, A.G.M. Shri Vivek Kumar Pandey, C.M. Shri D. Bruhananda, C.M. Shri Abhishek Kr. Gupta, Dy. Mgr. Shri Anil D. Darode, Dy. Mgr. prithwish.mukhopadhyay@posoco.in kuleshwars@gmail.com mishrasachala@gmail.com vivek.pandey@posoco.in bruhanandad@yahoo.com abhishek_all@yahoo.com anil.darode@powergridindia.com VII 22 23 NLDC Shri N. Nallarasan, D.G.M. Shri Thanibala Krishna, Eng. nallarasan@posoco.in thanibalakrishna@gmail.com VIII 24 25 26 27 28 29 30 31 32 NTPC Shri S.K. Roy, E.D. Shri P.B. Behere, G.M. Shri Malay Mukharjee, G.M. Shri S. Banrjee, A.G.M. Shri S.K. Dubey, A.G.M. Shri S.K. Shrivastava, A.G.M. Shri M.L. Patra, A.G.M. Shri Pravin Chaturvedi, A.G.M. Shri H.S. Agarwal, A.G.M. skroy01@ntpc.co.in pbbehere@ntpc.co.in malaymukharjee@ntpc.co.in sbanrjee02@ntpc.co.in skdubey02@ntpc.co.in sksrivastava09@ntpc.co.in motilalpatra@ntpc. Co.in pchaturvedi01@ntpc.co.in harishankar01@ntpc.co.in IX 33 34 TATA POWER Shri R.M. Sankhe, Head Opn. Shri P.R. Gadave, A.G.M. rmsankhe@tatapower.com prgadave@tatapower.com X 35 36 APL Shri C.S. Bobade, G.M. Shri Akkshay Mathur, G.M. chandrashekhar.bobade@adani.com akshayv.mathur@adani.com XI 37 38 39 RINFRA Shri Sumeet Notani, G.M. Shri P.C. Upadhyay, D.G.M. Shri Ambuj Shukla, Sr. Mgr. sumeet.notani@relianceada.com prakash.c.upadhyay@relianceada.com ambuj.shukla@relianceada.com XII 40 KSK Mahanadi Shri Ramakant Upadhyay, Dy. Mgr. ramakant.u@ksk.co.in XIII 41 ESSAR Shri D.J. Saxena, Sr. Mgr. dsaxena@essar.com XIV 42 TORRENT POWER Shri P.G. Patel, G.M. pramodpatel@torrentpower.com XV 43 JPL Shri Priyabrata Banerjee, A.G.M. priyabratabanerjee@jindalpower.com XVI 44 45 RKM PPL Shri C. Balasubramanian, Sr.Mgr. Shri T. Rajesh Kumar, Mgr. bala.c@rkmpowergen.in rajeshkumart4@gmail.com XVII 46 GMR GROUP Shri N. Ganesh, Jr. Mgr. ganesh.nuli@gmrgroup.in XVIII STERLITE 47 Shri Sachin Deshpande, G.M. sachin.deshpande@sterlite.com XIX 48 ACPL Shri Abhinav.Yadav, A.M. abhinav.y@ath-chhattisgarh.in XX 49 JSW Shri Sanjeev Kumar, Mgr. sanjeev.kumar@jsw.in XXI 50 I.E.P.L. Shri G.V.Sant, D.G.M. gvs.iepl@gmail.com XXII 51 52 RATTAN INDIA POWER LTD. Shri Mukesh Singhal, Sr. V.P. Ms. Reena Kori, D.G.M. mukeshsinghal@rattanindia.com reena.kori@rattanindia.com Anaulagnak 2.1 maah maaca- 2015 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa piScama xao ~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr ) ( FREQUENCY PARTICULARS DURING MARCH 2015 (AS PER FREQUENCY REPORT OF WRLDC) 1. INTEGRATED OVER AN-HOUR ek GaMTo maoM samaakilat 1.1 MAXIMUM FREQUENCY AiQaktma AavaRi%t 1.2 MINIMUM FREQUENCY nyaUnatma AavaRi%t 1.3 AVERAGE FREQUENCY AaOsat AavaRi%t 2. INSTANTANEOUS 50.37 Hz. BETWEEN 0100 Hrs & 0200 Hrs Hrs. ON 02.03.2015 49.77 Hz. BETWEEN 1800 Hrs & 1900 Hrs Hrs. ON 03.03.2015 49.98 Hz. ta%kailak 2.1 MAXIMUM FREQUENCY AiQaktma AavaRi%t 2.2 MINIMUM FREQUENCY nyaUnatma AavaRi%t 3. %AGE OF TIME WHEN FREQUENCY WAS 50.54 Hz. AT 03:37:00 Hrs. ON 01.03.2015 49.52 Hz. AT 18:57:00 hrs Hrs. ON 03.03.2015 MARCH 2015 FEBRUARY 2015 JANUARY 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.57 0.33 0.61 17.20 11.97 16.85 58.47 60.15 53.73 23.76 27.55 28.81 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 AavaRi%t ka samaya p`itSat maoM 3.1 BELOW 48.5 Hz. 48.5 hT\ja ko naIcao 3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 48.5 hT\ja AaOr 48.8 hT\ja ko baIca 3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 48.8 hT\ja AaOr 49.2 hT\ja ko baIca 3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 49.2 hT\ja AaOr 49.5 hT\ja ko baIca 3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 49.5 hT\ja AaOr 49.7 hT\ja ko baIca 3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 49.7 hT\ja AaOr 50.2 hT\ja ko baIca 3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 49.9 hT\ja AaOr 50.05 hT\ja ko baIca 3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 50.05 hT\ja AaOr 51.5 hT\ja ko baIca 3.9 ABOVE 51.5 Hz. 51.5 hT\ja ko }pr 4.1 NO. OF TIMES FREQUENCY TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI 4.2 NO. OF TIMES FREQUENCY TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI 4.3 NO. OF TIMES FREQUENCY TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI ANNEXURE 2.3 Voltage Profile during the month of March 2015 Annex-I Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv 406 402 400 404 405 410 402 402 402 402 399 406 405 404 406 404 405 403 400 402 402 404 399 398 401 402 397 397 397 397 399 397 418 418 412 413 417 413 413 413 414 414 414 415 414 417 415 416 412 411 413 413 413 412 412 414 413 416 413 413 412 412 414 418 404 398 397 400 399 405 397 397 399 399 394 400 400 400 403 399 401 400 397 397 399 399 396 397 399 399 396 396 394 394 399 394 440 440 440 439 439 439 440 437 435 435 434 437 436 436 438 436 435 434 435 432 433 431 423 431 433 428 433 433 437 437 433 440 420 415 400 414 411 420 408 412 410 410 412 413 413 409 415 412 409 407 402 407 410 405 421 412 401 412 415 415 405 405 407 400 438 439 429 432 434 434 432 430 432 432 427 435 434 434 432 431 427 427 428 425 430 425 425 428 427 434 427 427 431 431 428 439 413 405 399 401 403 405 399 395 397 397 398 404 404 408 409 403 402 400 393 400 401 401 392 391 395 387 400 400 382 382 396 382 421 424 417 418 419 424 424 420 417 417 419 417 418 420 419 419 418 417 417 417 417 415 414 415 417 416 415 415 415 415 419 424 407 403 400 404 405 414 403 405 402 402 398 402 404 402 406 404 403 399 400 404 403 405 399 400 399 399 400 400 400 400 402 398 423 423 421 420 420 423 424 420 419 419 420 421 419 422 418 420 419 417 419 420 421 421 420 421 420 420 419 419 422 422 422 424 408 409 400 409 408 416 406 409 406 406 405 409 409 408 408 407 408 406 406 411 409 412 407 410 410 409 409 409 410 410 410 400 421 423 418 419 420 424 424 420 420 420 418 418 417 418 419 419 419 418 417 417 418 417 417 420 419 418 418 418 418 418 418 424 412 409 400 409 408 417 411 410 409 409 407 409 409 409 411 410 409 408 404 409 410 409 406 409 409 408 410 410 407 407 409 400 418 423 418 418 421 419 419 416 418 418 420 420 418 422 419 419 416 419 419 417 416 415 414 417 419 419 413 413 416 416 419 423 398 396 398 396 396 400 397 396 392 392 393 393 396 391 398 398 398 396 396 398 396 398 396 395 397 393 394 394 398 398 398 391 422 भार सूचना , WRLDC, Mumbai MIS 411 409 408 410 409 410 411 409 409 408 413 411 409 411 412 413 409 408 407 410 408 410 410 409 409 410 410 409 409 411 418 Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Bina Gwalior Nagda Khandwa Sipat seoni Bina Gwalior Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv 420 421 421 415 418 416 416 416 413 415 417 418 418 421 420 419 415 416 415 416 416 412 412 415 414 415 412 415 415 417 415 421 407 403 403 403 402 408 400 402 401 403 404 402 405 408 408 406 405 405 402 402 403 404 400 403 403 403 401 403 404 405 404 400 416 409 409 408 407 408 407 405 406 407 405 407 405 408 410 409 406 407 405 411 410 408 407 407 409 408 406 408 410 412 408 416 400 395 395 392 393 400 391 393 390 395 390 390 390 391 395 392 392 392 395 388 397 400 393 392 396 394 396 396 397 400 394 388 424 425 418 420 423 421 421 419 420 420 424 424 424 425 422 421 419 421 421 420 419 419 418 419 421 420 417 417 419 419 421 425 407 403 400 405 406 411 403 402 403 403 400 407 409 406 409 405 407 403 402 403 404 406 399 402 402 402 398 398 400 400 402 398 429 429 423 426 429 423 423 424 426 426 427 427 427 427 425 427 422 421 423 423 423 424 423 426 424 427 423 423 424 424 424 429 413 409 406 406 410 411 404 405 409 409 404 411 410 411 412 409 409 409 406 409 411 410 405 404 405 404 404 404 399 399 405 399 770 772 766 764 766 772 772 768 765 765 764 763 763 763 765 766 763 761 762 765 767 764 764 769 767 768 766 766 765 765 764 772 758 750 748 752 749 761 754 754 753 753 749 751 757 753 754 754 753 751 748 751 762 754 753 757 751 746 748 748 751 751 751 746 790 793 784 779 782 783 786 786 779 783 781 781 784 782 784 783 772 771 771 781 781 780 777 781 782 783 780 781 775 777 779 793 770 760 756 753 756 766 756 764 761 759 755 760 763 763 765 761 758 753 751 751 767 786 755 763 762 763 762 757 751 747 755 747 798 784 784 786 787 788 784 782 783 786 782 785 781 785 789 785 782 784 780 784 786 778 779 780 784 785 778 781 789 792 765 798 765 758 751 753 756 772 759 765 758 762 753 755 753 756 759 758 755 756 752 751 756 764 755 754 760 757 762 761 764 767 760 751 791 791 784 789 791 786 783 789 784 787 788 788 784 790 790 788 786 784 784 784 789 783 788 789 787 791 786 788 792 791 784 792 768 762 758 758 760 773 758 765 754 766 757 760 766 762 769 763 764 763 763 762 766 767 759 769 769 764 763 766 766 768 764 754 भार सूचना , WRLDC, Mumbai MIS ANNEX -2.4 Under Frequency Operation in various Constituent System of Western Region during the month MARCH - 2015 ( Compiled from the data received from the constituents) Sl. No Date Gujarat Chhattisgarh Madhya Pradesh No. of Max Load Relief No. of Max Load Relief No. of Occasions at 49.2 Hz Occasions at 49.2 Hz Occasions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01-Mar-15 02-Mar-15 03-Mar-15 04-Mar-15 05-Mar-15 06-Mar-15 07-Mar-15 08-Mar-15 09-Mar-15 10-Mar-15 11-Mar-15 12-Mar-15 13-Mar-15 14-Mar-15 15-Mar-15 16-Mar-15 17-Mar-15 18-Mar-15 19-Mar-15 20-Mar-15 21-Mar-15 22-Mar-15 23-Mar-15 24-Mar-15 25-Mar-15 26-Mar-15 27-Mar-15 28-Mar-15 29-Mar-15 30-Mar-15 31-Mar-15 Recommonded Load relief at 49.2 Hz / 49.0/48.8/48.6 Hz 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1025 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIL Max Load Relief No. of Max Load Relief at 49.2 Hz Occasions at 49.2 Hz 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIL 91 Maharashtra 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIL 490 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 851 ANNEXURE -2.5 Power Cut/Restrictions in Western Region for the month of March-2015 k : gaujarat Gujarat 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM Power Cut/ Restriction on Industries a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday, then they will have to staggered on notified day only & cannot avail as per their choice. b) All industries are required to keep their recess timings staggered. 1 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit2. Power supply to Agricultural & Rural Sectors a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply during rest of 16 Hrs by providing LSTC. b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc ivaVut kTaOtI kI maa~a pabandI ka samaya ivavarNa Details Quantum of Restriction Timing power cut (MW) sao From tk To (a) Power Restrictions(Evening SaUnya Nil SaUnya Nil SaUnya Nil peak Hour) on non continuous process HT/LT IndustriesM (b) Baar inayamana Load Shedding (c) Anya jaanakarI Other information 1.Weekly Off 2.Staggering of power supply p`it idna kula }jaa- kTaOtI Total Energy Cut (MUs /day SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil 2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector: ivavarNa Details sao From idnaaMk Date 2.1 Three-Phase 01.03.2015 Supply(DLF) 2.1 Three-Phase Supply(Irrigation) 2.1 Three-Phase Supply(Mixed) tk To p`it idna AapUit- GaMTo Supply Hours per day idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs) 31.03.2015 23:46 21:48 23:14 01.03.2015 31.03.2015 09:55 09:03 09:44 01.03.2015 31.03.2015 23:41 21:23 23:03 3 Anya jaanakarI 3. Any other information SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM ivavarNa Details Scheduled Power cuts in Urban Areas sao From tk To idnaaMk Aaosat p`itidna Date idnaaMk Date AapUit- GaMTo Max. (Hrs) 3.1 Commissionary H. Qtrs. 3.2 District Head Qtrs. 3.3 Tehsil Head Qtrs. 01.03.2015 01.03.2015 01.03.2015 31.03.2015 31.03.2015 31.03.2015 23:55 23:57 23:52 Average Supply Hours per day Min. (Hrs) Average (Hrs) 23:24 23:27 22:45 23:46 23:50 23:36 ga : maharaYT/ Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc ivaVut kTaOtI kI maa~a pabandI ka samaya ivavarNa Details Quantum of Restriction Timing power cut (MW) From To (a) Power Cuts/Restriction on HT/ SaUnya Nil SaUnya Nil SaUnya Nil LT Industries (b) Load Shedding From 01.03.15 to 31.03.15 @ 0-97 MW (c) Any other information 1.Weekly Off 2. Staggering of power supply Industrial Staggering LS withdrawn from 03/02/2012 p`it idna kula }jaa- kTaOtI Total Energy Cut (MUs /day SaUnya Nil @ 1.4 MUs/day 00.00 24.00 SaUnya Nil SaUnya Nil SaUnya Nil tk To idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day SaUnya Nil 2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector ivavarNa Details sao From idnaaMk Date Max. (Hrs) 2.1 Three-Phase Supply Average (Hrs) 10:00 08:00 09:00 01.03.2015 31.03.2015 18:00 3 Anya jaanakarI Any other information: There is no load shedding on industrial feeders in Maharashtra 18:00 18:00 2.2 Single-Phase Supply 01.03.2015 31.03.2015 Min. (Hrs) Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc ivaVut kTaOtI kI maa~a Quantum of power cut (MW) ivavarNa Details pabandI ka samaya Restriction Time tk sao From To p`it idna kula }jaa- kTaOtI Total Energy Cut (MUs /day) (A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump* 00.00(Av) - - - 00.00(Av) - - - 00.00 (Av) 00.00 (Av) 00.00(Av) 00.00 (Av) 00.00 - 00.00 - 0.00 - 1.Rural 109.19(Av) For 101.20 Hrs. 2.Town Feeders (C-1to C-6 & X) : 0.00(Av) - - 0.226 - 0.218 (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding 3. HT Industries 93.77 (Av) For 66.27 Hrs. Total Energy Cut/day ( b) Any other information 1.Weekly Off/staggering of power supply 0.444 1day (In a week as per consumer’s option) 50MW(Av.) - - 0.039 2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector ivavarNa Details 2.1 Three-Phase Supply 2.2 Single-Phase Supply 2.3 Remarks/Note/ sao From idnaaMk Date tk To idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) 01.03.2015 to 31.03.2015, 6.00 Hrs (Power cut) - 3 Anya jaanakarI / Any other information: SaUnya Nil - Min. (Hrs) Average (Hrs) 18.00 - - - Annex-2.6 ( ) , Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID) Western Regional Load DespatchCentre,Mumbai 2015 Details of forced unit outages during the month ofMarch 2015 अनु संघटक Unit Constituent/IPP Sl.No मता मेगावॉट सo सo कारण From From Reason Cap.MW Time Date Date 1. Essar-2 GSECL 172 12:12 22-Feb-13 Still out Still out Shortage of gas 2. GTPS-2 GSECL 120 20:20 10-Oct-14 Still out Still out RSD 3. GTPS-1 GSECL 120 5:36 22-Oct-14 21.03.14 RSD 4. UTPS-1 GSECL 120 02:00 23-Oct-14 9:34 23-Mar-15 Flame failure 5. UTRAN STG-II -1 GSECL 375 8:43 22-Oct-14 5:50 24-Mar-15 RSD 6. UTPS-2 GSECL 120 15:04 10-Nov-14 Still out Still out RSD 7. SLPP-1 GSECL 125 21:50 29-Nov-14 8. SUGEN-2 GSECL 382 11:46 31-Jan-15 Still out Still out RSD 9. GPEC-1 GSECL 218 12:46 16-Feb-15 Still out Still out RSD 10. GPEC-2 GSECL 218 19:56 20-Feb-15 17:11 10-Mar-15 RSD 11. GPEC-3 GSECL 218 20:10 21-Feb-15 15:53 10-Mar-15 RSD 12. STPS-1 GSECL 120 13:30 26-Feb-15 8:55 20-Mar-15 RSD 13. WTPS-5 GSECL 210 22:24 27-Feb-15 6:05 12-Mar-15 RSD 14. DGBP-2 GSECL 112 20:14 28-Feb-15 14:05 11-Mar-15 RSD 15. GTPS-5 GSECL 210 0:28 1-Mar-15 5:45 4-Mar-15 16. WTPS-4 GSECL 210 18:28 1-Mar-15 20:07 11-Mar-15 17. WTPS-6 GSECL 210 23:35 3-Mar-15 03/04/2015 05:58 16-Mar-15 Gt-3 tripped on differential protection Bottom ash hopper leakage RSD RSD 18. GTPS-3 GSECL 210 19:00 5-Mar-15 04:25 16-Mar-15 RSD 19. GTPS-4 GSECL 210 7:50 6-Mar-15 Still out Still out RSD 20. ALTPS-1 GSECL 125 0:41 10-Mar-15 14:02 15-Mar-15 Seal oil leakage problem 21. WTPS-2 GSECL 210 20:43 11-Mar-15 9:45 14-Mar-15 Condenser leakage 22. DGBP-2 GSECL 112 16:51 12-Mar-15 6:13 20-Mar-15 RSD 23. GPEC-3 GSECL 218 16:46 12-Mar-15 05:41 16-Mar-15 RSD 24. SLPP-2 GSECL 125 22:15 15-Mar-15 18-Mar-15 BTL 25. GIPCL STG II-1 GSECL 165 20:30 21-Mar-15 7:19 24-Mar-15 RSD 26. GIPCL STG-II-1 GSECL 165 20:31 24-Mar-15 Still out Still out RSD 27. GPEC-2 GSECL 218 20:09 24-Mar-15 Still out Still out RSD 28. APL-2 ADANI POWER 330 17:32 9-Feb-15 28.03.15 Turbine vibration 29. APL-6 ADANI POWER 660 09:03 14-Feb-15 31.05.15 Control valve problem 30. APL-4 ADANI POWER 330 10:44 23-Feb-15 29.05.15 Hydrogen leakage 31. APL-7 ADANI POWER 660 12:28 11-Mar-15 05:52 15-Mar-15 Heavy air leakage from PA fan problem 32. APL-5 ADANI POWER 660 13:22 21-Mar-15 2:51 25-Mar-15 BTL 33. APL-9 ADANI POWER 660 16:29 23-Mar-15 29.03.15 34. Koradi-5 MAHAGENCO 200 10:30 17-Jun-14 03.04.15 ID fan problem MAHAGENCO 210 7:15 28-Aug-14 Still out Still out ECONOMY S/D Still out ECONOMY S/D 35. C'PUR-1 3:30 DCS fault 36. BHUSAWAL-2 MAHAGENCO 210 12:43 13-Sep-14 Still out 37. JAIGAD I MAHAGENCO 300 14:30 3-Feb-15 10:44 3-Mar-15 Generator tripped 38. JAIGAD-3 MAHAGENCO 300 21:27 3-Feb-15 22:02 5-Mar-15 Unavailability of load 39. URAN-6 MAHAGENCO 108 12:10 18-Feb-15 19:25 8-Mar-15 Gas shortage 40. URAN-8 MAHAGENCO 108 13:32 25-Feb-15 15:17 10-Mar-15 Gas shortage 41. C'PUR-5 MAHAGENCO 500 21:39 26-Feb-15 14:27 3-Mar-15 42. PARLI - 4 MAHAGENCO 210 17:20 8-Mar-15 1:00 11-Mar-15 43. URAN-6 MAHAGENCO 108 8:04 9-Mar-15 14:43 16-Mar-15 Vibration problem 44. C'PUR - 4 MAHAGENCO 210 20:33 16-Mar-15 10:20 20-Mar-15 Low forward power relay operated 45. KORADI-6 MAHAGENCO 210 23:28 17-Mar-15 46. C'PUR - 6 MAHAGENCO 500 22:07 18-Mar-15 20.03.15 4:31 22-Mar-15 BTL PA fan problem ID fan problem BTL 47. B'WAL-5 MAHAGENCO 500 11:49 20-Mar-15 26.03.15 BTL 48. URAN-7 MAHAGENCO 108 13:56 21-Mar-15 01.04.15 CEP line leakage 49. INDIABULLS (A)-1 Rattan India Pvt. ltd(IPP). 270 21:55 27-Jan-15 04:15 8-Mar-15 Coal shortage 50. INDIABULLS (A)-2 Rattan India Pvt. ltd(IPP). 270 23:23 3-Mar-15 19:22 12-Mar-15 PA fan problem 51. WPCL-1 IPP 135 0:43 30-Oct-14 Still out Still out ESP belt damage 52. WPCL-3 IPP 135 0:23 21-Feb-15 16:13 17-Mar-15 ID fan problem 53. WPCL-4 IPP 135 2:34 18-Mar-15 Still out Still out 54. APML-3 ADANI POWER 660 11:42 6-Feb-15 Still out Still out 55. APML - 5 ADANI POWER Tiroda 660 10:08 26-Feb-15 14:27 3-Mar-15 56. TATA-6 TATA 500 21:50 17-Feb-15 18:00 18-Mar-15 57. RGPPL-1B RGPPL 320 23:00 31-Mar-14 Still out Still out Dry preservation 58. RGPPL-3A RGPPL 320 18:57 17-Apr-14 Ready Ready Less requisition 59. RGPPL-1A RGPPL 320 13:30 8-Jul-14 Ready Ready Less requisition 60. RGPPL-2A RGPPL 332 12:00 21-Jul-14 Still out Still out CW pump problem 61. RGPPL-2B RGPPL 332 13:30 1-Sep-14 Still out Still out Less requisition 62. AMARKANTAK-4 MPGCL 120 11:13 30-Apr-14 Still out Still out Electrical fault 63. AMARKANTAK-3 MPGCL 120 0:25 12-Jan-15 Still out Still out Fire caught in turbine floor 64. SGTPS-1 MPGCL 210 0:01 26-Feb-15 Still out Still out RSD 65. SATPURA-6 MPGCL 200 0:05 1-Mar-15 6:20 5-Mar-15 ETL 66. SATPURA-10 MPGCL 250 19:14 4-Mar-15 8:30 9-Mar-15 ETL 67. SATPURA-11 MPGCL 250 11:04 8-Mar-15 0:38 12-Mar-15 FLAME FAILURE 68. SATPURA-9 MPGCL 210 0:05 13-Mar-15 0:46 21-Mar-15 Control valve problem 69. SINGAJI-1 MPGCL 600 0:04 24-Mar-15 Still out Still out RSD 70. SATPURA 10 MPGCL 250 12:50 26-Mar-15 Still out Still out Flame failure 71. DGEN - 51 DGEN 400 12:05 13-Jan-15 Still out Still out No schedule 72. DGEN -52 DGEN 400 12:05 15-Jan-15 Still out Still out No schedule 73. DGEN -53 DGEN 400 11:59 23-Jan-15 Still out Still out No schedule 74. SASAN-5 RELIANCE 660 2:45 9-Mar-15 Still out Still out 75. SASAN-4 RELIANCE 660 11:23 13-Mar-15 Still out Still out 76. JPL STAGE-II -1 JPL 600 17:03 14-Feb-15 9:21 24-Mar-15 Ash evacuation problem 77. JP NIGRI-2 JP-NIGRI 660 14:20 24-Feb-15 7:31 24-Mar-15 ESP works 78. JP NIGRI-1 JP-NIGRI 660 3:37 23-Mar-15 Still out Still out No schedule GT bushing replacement Feed water pump problem Economy S/D To attend bearing vibrations Condenser tube cleaning ESP WORKS 79. VANDANA -1 VANDANA 135 15:00 9-Jan-15 Still out Still out BTL 80. DHARIWAL-2 DHARIWAL 300 0:00 22-Dec-14 Still out Still out No schedule 81. Lanco-2 LANCO AMARKANTAK 300 12:20 21-Aug-13 Still out Still out Coal shortage 82. DBPOWER-1 DBPOWER 600 9:53 24-Aug-14 Still out Still out BTL 83. KMPCL-3 KSK MAHANADI 600 16:29 15-Feb-15 2:36 18-Mar-15 84. KWPCL-1 KWPCL 600 0:37 2-Mar-15 Still out Still out 85. TAPS-3 NPCL 540 12:04 18-Mar-15 22:34 25-Mar-15 Abnormalities observed 86. MOUDA - II NTPC 500 0:00 24-Nov-14 10:10 22-Mar-15 Low schedule 87. KAWAS-2A NTPC 164 21:07 13-Jan-15 16:38 11-Mar-15 Less requisition 88. GANDHAR-3 NTPC 219 10:30 25-Feb-15 6:01 22-Mar-15 Less requisition 89. MOUDA-1 NTPC 500 20:45 26-Feb-15 6:44 17-Mar-15 Less requisition 90. KAWAS-1B NTPC 164 20:04 27-Feb-15 6:32 21-Mar-15 Less requisition 91. GANDHAR-1 NTPC 219 19:57 28-Feb-15 2:01 20-Mar-15 Less requisition 92. VSTPS-5 NTPC 210 0:28 1-Mar-15 7:32 12-Mar-15 Less requisition 93. VSTPS-3 NTPC 210 9:26 1-Mar-15 0:38 12-Mar-15 Low schedule 94. VSTPS-10 NTPC 500 5:24 1-Mar-15 8:46 7-Mar-15 Low schedule 95. SIPAT-3 NTPC 660 22:59 1-Mar-15 10:40 3-Mar-15 Less schedule 96. VSTPS-6 NTPC 210 23:04 1-Mar-15 14:14 12-Mar-15 Less schedule 97. VSTPS-12 NTPC 500 2:29 2-Mar-15 9:05 9-Mar-15 Less schedule 98. KAWAS-1A NTPC 164 0:17 2-Mar-15 8:35 22-Mar-15 Less requisition 99. KAWAS-2B NTPC 164 23:30 3-Mar-15 6:57 20-Mar-15 Less requisition 100. KAWAS-1B NTPC 164 19:08 21-Mar-15 Still out Still out Less requisition 101. KAWAS-1A NTPC 164 1:40 23-Mar-15 Still out Still out Gas shortage 102. SIPAT-5 NTPC 500 8:08 25-Mar-15 Still out Still out BTL Note: Units out for more than 72 hrs are only included. Turbine control valve problem No schedule Annex-2.7 ( ) , Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID) Western Regional Load DespatchCentre,Mumbai 2015 Details of planned unit outages during the month of March2015 अनु संघटक Unit Constituent/IPP Sl.No मता मेगावॉट सo सo कारण From From Reason Cap.MW Time Date Time Date 1. UTPS-5 GSECL 210 0:11 22-Jan-15 1:25 11-Mar-15 AOH 2. DGBP-1 GSECL 112 0:00 16-Feb-15 NA 03-Mar-15 AOH 3. PARLI-3 MAHAGENCO 210 23:51 13-Feb-14 Still out Still out Water supply problem 4. PARAS-4 MAHAGENCO 250 0:00 5-Mar-15 Still out Still out AOH 5. CGPL - 30 TATA 800 1:14 20-Mar-15 07.04.15 AOH 6. SGTPS-5 MPSEB 500 23:43 23-Feb-15 12.04.15 AOH 7. KORBA(EAST)-5 CSPGCL 120 23:05 8-Mar-15 31.03.15 Hydrogen leakage/AOH 8. TAPS - 1 NPC 160 22:39 12-Oct-14 9. JPL STG-I- 4 JPL 250 0:30 3-Feb-15 10. JPL-2 JPL 250 0:19 25-Feb-15 19:36 25-Mar-15 11. GANDHAR-2 NTPC 219 0:00 24-Feb-15 Still out Still out R & M WORK 12. SIPAT - 1 NTPC 660 0:30 20-Mar-15 Still out Still out AOH 13. KORBA - 6 NTPC 500 1:33 20-Mar-15 Still out Still out AOH Still out Still out Refueling works 23:16 19-Feb-15 AOH AOH Annexure- 3.1 DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING APRIL 2015 AND MAY 2015 S. No. Unit No. Capacity (MW) 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 GUVNL WTPS UTPS KLTPS EPGL APL KLTPS EPGL 5 4 210 29-Mar-15 3-Apr-15 10-Apr-15 10-Apr-15 1-May-15 5-May-15 15-May-15 C&I-R&M AOH AOH AOH COH AOH AOH 10-May-15 17-Apr-15 9-May-15 30-Apr-15 10-Jun-15 3-Jun-15 5-Jun-15 CSPGCL KWB # 4 3.1 4 4.1 4.2 210 200 70 500 330 70 500 Reason MPPGCL 2 3 6 3 2 2 1 1 1 Outage as per Annual Maintenance Plan sao From tk To 01.05.2015 25.05.2015 AOH MSPGCL PARLI JSW 7 3 250 300 20.05.15 15.4.15 14.06.15 29.4.15 AOH AOH Central Sector 5.1 5.2 5.3 VINDHYACHAL VINDHYACHAL CGPL 1 3 10 200 200 800 17-May-15 28-May-15 23-May-15 16-Jun-15 Blr License renewal AOH 01/05/2015 31-05.2015 GAH basket replacement 5.4 CGPL 40 800 19/4/2015 30-04-2015 UT repair work ANNEXURE 3.2 B SN 1 2 3 KV 400 Line Raita feeder & Bus-II @ KWB 765/40 Asoj - Indore-3 0 400 400/11/6.6 KV 63 MVA ST 5A @ KWB 4 400 Bus-Coupler @ KWB 5 220 Talandage-Chikodi & Mudshingi-Chikodi Outage Planning of Transmission elements during the Duration 20.04.2015 to 20.05.2015 Reason From To Basis Date Time Date Time Daily 20-Apr-15 8:00 21-Apr-15 18:00 General Maintenenace Basis Continuou Arrangement for charging of Dhule 20-Apr-15 8:00 20-Apr-15 18:00 s Vadodara line Continuou 20-Apr-15 8:00 21-Apr-15 18:00 General Maintenenace s Daily 20-Apr-15 8:00 21-Apr-15 18:00 General Maintenenace Basis For Crossing & construction of 765Kv KudgiKolhapur D/C line. Note outage was approved on 8:00 20-Apr-15 18:00 Daily 20-Apr-15 24/25.03.15 but consent given by KPTCL for availing outage on 18.04.15 to 20.04.15. 6 7 765 765 Seoni - Bilaspur-II Line Main bay Bilaspur -II (716) at Seoni 20-Apr-15 20-Apr-15 8:00 8:00 21-Apr-15 21-Apr-15 18:00 18:00 Daily Daily 8 220 Main Bay ICT-I (201) at Seoni 20-Apr-15 8:00 21-Apr-15 18:00 Conti. 9 400 BUS-1 at Solapur 20-Apr-15 8:00 23-Apr-15 18:00 Daily System Agency CSPGCL CSPGCL PGCIL BDTCL CSPGCL CSPGCL CSPGCL CSPGCL MSETCL WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I R R WRTS-I WRTS-I R Solapur (NTPC) bays works at Solapur(PG) WRTS-I WRTS-I C WRTS-I WRTS-I C WRTS-I WRTS-I C WRTML WRTS-I C WRTML WRTS-I C WRTML WRTS-I C WRTS-I WRTS-I C MSETCL WRTS-I R WRTS-I WRTS-I WRTS-I TEL DGEN GETCO GETCO WRTS-I WRTS-I WRTS-I R C C MSETCL MPPTCL NSPCL NTPC MSETCL MPPTCL NSPCL NTPC SASAN RELIANCE Online OPGW/additional eathing work. A/R to be kept in Non auto mode Online OPGW/additional eathing work. A/R to be kept in Non auto mode Online OPGW work. A/R to be kept in Non auto mode Online OPGW work. A/R to be kept in Non auto mode Online OPGW work. A/R to be kept in Non auto mode Online OPGW work. A/R to be kept in Non auto mode Jointing of OPGW Wire for Kalwa Lonikand Line ICT 89 T Isolator dismantling work Switching Impulse testing at PUNE(GIS) Bay extension works at Solapur(PG) OFFLINE WASHING 400 Bhadrawati - Dhariwal - Parli & Bhadrawati- Parli ckt 1 20-Apr-15 9:00 19-May-15 18:00 Daily 11 400 KOLHAPUR-MAPUSA I & II 20-Apr-15 9:00 19-May-15 18:00 Daily 12 400 Pune(GIS)-Pune # 1& 2 20-Apr-15 9:00 19-May-15 18:00 Daily 13 400 Solapur-Pune # 1& 2 20-Apr-15 9:00 19-May-15 18:00 Daily 14 400 Solapur-Parli # 1& 2 20-Apr-15 9:00 19-May-15 18:00 Daily 15 765 Seoni-Wardha # 1 20-Apr-15 9:00 19-May-15 18:00 Daily 16 400 Kalwa - Pune & Pune-Lonikhand line 20-Apr-15 9:00 20-Apr-15 18:00 Daily 17 18 19 400 765 400 400kv Bus # 2 at Wardha Bus Reactor (240MVAR) at PUNE(GIS) Solapur -Solapur(NTPC) # 2 line 20-Apr-15 20-Apr-15 20-Apr-15 9:00 9:00 9:00 20-Apr-15 24-Apr-15 29-Apr-15 18:00 18:00 18:00 Daily Conti. Conti. 20 400 DGEN 400 KV Bus I 20-Apr-15 8:00 20-Apr-15 18:00 ONE DAY 21 400 400 SSP - Dhule -1 Soja - Kansari 20-Apr-15 20-Apr-15 8:00 8:00 20-Apr-15 20-Apr-15 18:00 18:00 Daily Daily PMM work PMM work Overhauling of Pole-2 Non base AC filter CB MAINTENANCE WORK Annual Maintenance Annual Bay Maintenance For bushing erection, Dropper connection ,LA erection, Isolator alignment, Jack bus jumpering and Equipment testing TEL - DGEN GETCO GETCO 22 500kV HVDC Padgha Pole-2 Non Base AC filter 24 25 26 400 400 KV S/S NAGDA - 315 MVA X-MER - I 400 Station Transformer - 1 AT NSPCL BHILAI 400KV Jhanor-Navsari 1 27 765 28 29 30 31 8:00 20-Apr-15 20/Apr/15 20/Apr/15 20-Apr-15 765 KV BUS 2A at SASAN 400 400 400 400 C Line AMP works AMP works (DCRM & Timing test of CB) AMP works (DCRM & Timing test of CB) {ICT-I will be in service through Transfer bay} 10 23 type SLDC-Gujarat will issue opening / closing code 18:00 8:00 9:00 8:00 2-May-15 20/Apr/15 22/Apr/15 21-Apr-15 17:00 17:00 18:00 Daily daily Cont. Continous 20-Apr-15 9:00 22-Apr-15 18:00 Daily BUS-I at Bina 20-Apr-15 09:00 20-Apr-15 18:00 Daily For carrying out the bus stability to PGCIL integrated the 01 no. 400 kV Bay for NHPTL. WR-II C SJP -Nagda Ckt-II Tie Bay(402) at Nagda S/s. 400 kV Jetpur Mundra Ckt # 1 400 kV Jetpur Mundra Ckt # 2 20-Apr-15 20-Apr-15 20-Apr-15 10:00 10:00 13:00 20-Apr-15 20-Apr-15 20-Apr-15 18:00 12:00 15:00 Daily Daily Daily Bay AMP work. CT Oil sampling works of Alstom make CT Oil sampling works of Alstom make WR-II WR-II WR-II R R R PGCIL PGCIL PGCIL R SN KV Line From Date Time To Date Basis Reason System Agency type PGCIL WR-II C PGCIL WR-II C Time 18:00 Daily 20-Apr-15 18:00 Daily ICT Spare unit Commissioning with ICT # 2 for Swapping with ICT # 2 R Phase. For NTAMC work at Itarsi 9:00 20-Apr-15 17:00 Daily Bay AMP work. PGCIL WR-II R 09:00 9:00 20-Apr-15 20-Apr-15 18:00 18:00 Daily Daily PGCIL PGCIL WR-II WR-II C R 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C Bhachau - Mundra # 1 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 400 Khandwa - Rajgarh # 1 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 40 400 Khandwa - Dhule # 1 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 41 400 Itarsi - Khandwa # 1 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 42 220 Satna (PG) - Satna (MP)# 1 20-Apr-15 7:00 19-May-15 18:00 Daily MPPTCL WR-II C 43 400 Dehgam - Ranchhodpura # 1 20-Apr-15 7:00 19-May-15 18:00 Daily GETCO WR-II C 44 400 Bhachau - Ranchodpura # 1 20-Apr-15 7:00 19-May-15 18:00 Daily GETCO WR-II C 45 400 Asoj - SSP # 1 20-Apr-15 7:00 19-May-15 18:00 Daily GETCO WR-II C 46 220 Navasari - Vav # 1 20-Apr-15 7:00 19-May-15 18:00 Daily GETCO WR-II C 47 765 Bina - Gwalior # 2 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 48 220 Gandhar - Haldarwa # 1 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 49 220 Kawas - Dastan 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 50 220 Dastan - Navsari 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 51 220 Kawas - Haldarwa 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 52 220 Damoh - Damoh 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 53 400 SSP - Rajgarh # 1 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 54 400 Vindhyachal (NTPC) - Sasan (Reliance) 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 55 765 Satna - Gwalior Ckt-I 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 56 400 Gwalior - Agra Ckt-I 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 57 400 Vapi - Kala 20-Apr-15 7:00 19-May-15 18:00 Daily POWERGRID WR-II C 58 220 Khandwa - Chhegaon 20-Apr-15 7:00 19-May-15 18:00 Daily MPPTCL WR-II C 59 220 Indore - Pithampur 20-Apr-15 7:00 19-May-15 18:00 Daily MPPTCL WR-II C 60 220 Indore - Barwatha 20-Apr-15 7:00 19-May-15 18:00 Daily MPPTCL WR-II C 61 220 220 kV Kawas-Vav 20-Apr-15 7:00 19-May-15 18:00 Daily WR-II POWERGRID C 62 220 220 kV Bhopal – Govindpur SLDC (MPPTCL) 20-Apr-15 7:00 19-May-15 18:00 Daily MPPTCL WR-II C 63 220 220 kV Magarwada – Varkood (DD) 20-Apr-15 7:00 19-May-15 18:00 Daily For NTMC work For annual maintenace work Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. A/R shall be kept in non auto mode GETCO C 32 765 765KV ICT # 2 at Jabalpur Pooling Station 20-Apr-15 09:00 33 400 20-Apr-15 10:00 34 400 20-Apr-15 35 36 400 765 Jabalpur-Itarsi#1 Bay 407 at Boisar ( Main Bay of 400 kV Padghe Line ) 125MVAR Bus Reactor at Pirana ss VCHAL-1 MAIN BAY (713) at Satna 20-Apr-15 20-Apr-15 37 400 Shujalpur - Nagda # 2 38 400 39 20-Apr-15 WR-II SN KV Line From Date Time To Date Time Basis 64 220 220 kV Haldarwa-Kakrapar (NPC) 20-Apr-15 7:00 19-May-15 18:00 65 220 Barwatha - Chhegaon 20-Apr-15 7:00 19-May-15 18:00 66 400 Satna - Bina Ckt. 1&2 20-Apr-15 7:00 19-May-15 18:00 67 400 Nagda - Dehgam Ckt. 1&2 20-Apr-15 7:00 19-May-15 18:00 68 400 Indore - Asoj Ckt 1 20-Apr-15 7:00 19-May-15 18:00 69 400 Itarsi - Khandwa Ckt.1&2 20-Apr-15 7:00 19-May-15 18:00 70 400 400 KV JPL-Tamnar(PG) Ckt # 4 20-Apr-15 10:00 71 400 Chakabura- Bharari (Bilaspur) D/C Line 20-Apr-15 8:00 21-Apr-15 18:00 72 765 765KV Bus-1 at Durg Ps 20-Apr-15 9:00 20-Apr-15 18:00 73 400 Raipur-Bhdravati-2&3 20-Apr-15 8:00 15-May-15 18:00 74 400 Sipat-Raipur-1&2 20-Apr-15 8:00 19-May-15 18:00 75 400 Raigarh -Raipur-1&2 20-Apr-15 8:00 19-May-15 18:00 76 765 Line Reactor of 765 kV Kotra - Durg Ckt # 1 at Kotra end 20-Apr-15 10:00 20-Apr-15 14:00 26-Apr-15 18:00 77 400 Sequential outage of Switchyard Breakers at JPL - stage - II 20-Apr-15 8:00 19-May-15 18:00 78 400 EMCO -BHADRAWATI LINE 2 20-Apr-15 9:00 22-Apr-15 18:00 79 400 Tie Bay 10Co2B of Pole=-1 and AC filters 20-Apr-15 9:30 20-Apr-15 12:30 80 81 82 83 84 85 86 87 88 89 400 Anuppur-Jabalpur# 1&2 400/22 315 MVA ICT 1&2 at Magarwada GIS 0 20-Apr-15 8:00 21-Apr-15 18:00 20-Apr-15 10:00 20-Apr-15 13:00 400 K(W)-Korba(NTPC) 20-Apr-15 8:00 21-Apr-15 18:00 400 400/11/6.6 KV 63 MVA ST 5B @ KWB 20-Apr-15 8:00 23-Apr-15 18:00 Tiroda-Koradi Line - 2 Reactor at 765kV Koradi Substation 220 kV Barwatha –Chhegeon 220 (MPPTCL) 200 kV Gwalior (PG) - Gwalior 220 (MPPTCL) 220 kV Bina (MPPTCL) - Bina 220 (MPPTCL) 400 400 KV KHEDAMARA Raita-I 765/40 Asoj - Indore & Pirana Vadodara 0 Daily Daily 17:00 Daily 20-Apr-15 7:00 19-May-15 18:00 Daily 20-Apr-15 7:00 19-May-15 18:00 20-Apr-15 7:00 19-May-15 18:00 20-Apr-15 17:00 8:00 8:00 22-Apr-15 18:00 400 Bhachau-Ranchodpura # 1 & 2 21-Apr-15 8:00 27-Apr-15 18:00 91 400 Bhachau - Ranchodpura # 1 21-Apr-15 7:00 19-May-15 18:00 400 Bhadrawati-1 Main Bay (407) AT PARLI(PG) 21-Apr-15 8:00 21-Apr-15 18:00 Line maintenance AMP SF6 refilling work Terminal tightning and testing work Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. Daily A/R shall be kept in non auto mode Online replacement of E/W with OPGW. Daily A/R shall be kept in non auto mode Daily GEN. MAINTENANCE Continuou Arrangement for charging of Dhule s Vadodara line Tower shifting for SSNL Canal crossing at Continous two locations at two places to maintain electrical clearances. Online replacement of E/W with OPGW. Daily A/R shall be kept in non auto mode Daily AMP works at Parli(PG) s/s Agency type MPPTCL WR-II C MPPTCL WR-II C POWERGRID WR-II R POWERGRID WR-II R POWERGRID WR-II R POWERGRID WR-II R WRTS-I C M/s TRN ACB Ltd. WRTS-I-CG C WRTS-I WRTS-I-CG C WRTS-I WRTS-I-CG C WRTS-I WRTS-I-CG C WRTS-I WRTS-I-CG C WRTS-I WRTS-I-CG C JPL EMCO JPL EMCO ATIL Continuou Crossing work of 765kV DharamjaigarhPGCIL s Jabalpur Line Part-II between loc 39/2 & 3 Simultaneous outage of ICT 1&2 for Daily checkign of Master follower scheme of OLTC PGCIL of both ICTs Continuou General Maintenenace CSPGCL s Continuou General Maintenenace CSPGCL s 20-04-15 90 92 Online replacement of E/W with OPGW. A/R shall be kept in non auto mode Online replacement of E/W with OPGW. Daily A/R shall be kept in non auto mode PID testing of insulator strings. A/R shall be Daily kept In non auto mode for both circuits. PID testing of insulator strings. A/R shall be Daily kept In non auto mode for both circuits. PID testing of insulator strings. A/R shall be Daily kept In non auto mode for both circuits. PID testing of insulator strings. A/R shall be Daily kept In non auto mode for both circuits. ERECTION OF MULTI CIRCUIT TOWER AT Continuous LOCATION 26/0 OF M/s TRN For construction of 765KV D/C Continuous Dharamjaygarh (Korba)-Jabalpur Transmission Line (Part-I) For connecting the Al. pipe of CB to Isolator Daily after erection of 819CB A/R non auto mode for Additional Earthing Daily work on lines. A/R non auto mode for Additional Earthing Daily work on lines & laying of OPGW A/R non auto mode for Additional Earthing Daily work on lines & laying of OPGW Switching of Spare Unit as per guideline on Daily quaterly basis Sequential outage, one breaker at a time for Daily replacement of 400kV Defective CB interrupter [ Power Flow will not be affected ] 9:30 21-Apr-15 System Daily 20-04-15 20-Apr-15 Reason ATIL R WR-II C WRTS-II R CSPGCL CSPGCL MEGPTCLMEGPTCL R MPPTCL WR-II C MPPTCL WR-II C MPPTCL WR-II C CSPTCL CSPTCL PGCIL PGCIL BDTCL WR-II C POWERGRID WR-II C WRTS-I R WRTS-I Annupur consent requi SN KV 93 765 94 95 400 400 96 765 97 400 98 400 99 400 400 Line WARDHA - AURANGABAD(PG) 3 & 4 D/C line Bus Reactor at Kolhapur 315MVA ICT # 1 at Pune(Talegoan) Main Bay Aurangabad # 1(716) at Wardha Main Bay (404) of 765 kV ICT#1 at Wardha 400 / 220 kV ICT 1 at Wardha From Date Basis Reason System Agency type 18:00 Daily Line Rectification work WRTS-I WRTS-I c 18:00 17:00 Daily Daily AMP works at Kolhapur (MSETCL) AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I WRTS-I WRTS-I R R 21-Apr-15 18:00 Daily AMP work and CT Oil sampling WRTS-I WRTS-I R 24-Apr-15 18:00 Conti. Pull rod replacement work at Wardha WRTS-I WRTS-I R WRTS-I WRTS-I R Time To Date Time 21-Apr-15 9:00 23-Apr-15 21-Apr-15 21-Apr-15 9:00 9:00 21-Apr-15 21-Apr-15 21-Apr-15 9:00 21-Apr-15 9:00 AMP and Bushing Oil DGA for all 220 kV BHEL bushings OFFLINE WASHING 21-Apr-15 9:00 21-Apr-15 13:00 Daily DGEN 400 KV Bus II 21-Apr-15 8:00 21-Apr-15 18:00 ONE DAY Asoj - Wanakbori 21-Apr-15 8:00 21-Apr-15 18:00 Daily PMM work 21-Apr-15 21-Apr-15 8:00 8:00 25-Apr-15 21-Apr-15 18:00 18:00 Daily Daily PID testing of insulator strings. A/R shall be kept In non auto mode MSETCL MSETCL Faulty Insulator replacement work MSETCL MSETCL 21-Apr-15 21/Apr/15 21-Apr-15 8:00 9:00 09:00 21-Apr-15 21/Apr/15 21-Apr-15 18:00 17:00 18:00 Daily daily Daily Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL MAINTENANCE WORK MPPTCL MPPTCL PGCIL WR-II For AMP work R R 21-Apr-15 10:00 21-Apr-15 18:00 Daily Bay AMP work. TEL DGEN GETCO TEL - DGEN GETCO 100 101 400kV Koradi-Nandgaonpeth 102 400kV New Koyna-Karad-l 103 400kV Padgha Tarapur II 104 400 105 400 106 400 107 400 400 KV BHOPAL - BINA CKT- I BINA-I (MP) MAIN BAY at Bina Nagda - Dehgam Ckt-II Main Bay(401) at Nagda S/s. 400KV Bhachau-Varsana ckt # 1 SLDC-Gujarat will issue opening / closing code PGCIL WR-II R PGCIL WR-II C PGCIL WR-II C PGCIL PGCIL WR-II WR-II C C 18:00 Daily 18:00 Daily 21-Apr-15 21-Apr-15 18:00 18:00 Daily Daily For Jumpering work for Essar bays at Bhachau 765kV Bus Isolators Earth Switch Erection / Alignment problem Spacer fixing on multi circuit portion. For NTAMC work at Itarsi 9:00 21-Apr-15 17:00 Daily Bay AMP work. PGCIL WR-II R 21-Apr-15 10:00 21-Apr-15 09:00 21-Apr-15 21-Apr-15 9:00 10:00 21-Apr-15 21-Apr-15 112 765 765KV Bus # 1 at Jabalpur Pooling Station Vapi - Kala I Jabalpur-Itarsi#2 Bay 408 at Boisar ( Tie Bay of 400 kV Padghe Line ) VCHAL-1 TIE BAY (714) at Satna 21-Apr-15 9:00 21-Apr-15 18:00 Daily For annual maintenace work PGCIL WR-II R 113 400 63MVAr BUS REACTOR at Indore PG 21-Apr-15 8:00 21-Apr-15 18:00 Daily COMMISSIONING OF CSD IN TIE BAY PGCIL WR-II C 114 765 Kotra # 2 (701) Main Bay at Durg 21-Apr-15 9:00 21-Apr-15 13:00 Continuous WRTS-I WRTS-I-CG C 115 765 Kotra # 2 & AT#1 (702) Tie Bay at Durg 21-Apr-15 14:00 21-Feb-15 18:00 WRTS-I WRTS-I-CG C 116 765 ICT#3 at Bilaspur S/s 21-Apr-15 9:00 22-Apr-15 18:00 WRTS-I WRTS-I-CG R 117 400 Raipur -Wardha #1 Main Bay at Raipur 21-Apr-15 9:00 21-Apr-15 17:00 WRTS-I WRTS-I-CG R 118 765 3x 240 MVAR Bus Reactor Main Bay at Durg Ps 21-Apr-15 9:00 22-Apr-15 WRTS-I WRTS-I-CG C 119 765 765 KV Bus Reactor at Durg 21-Apr-15 8:00 22-Apr-15 18:00 WRTS-I WRTS-I-CG C 21-Apr-15 21-Apr-15 21-Apr-15 21-Apr-15 8:00 8:00 10:00 8:00 21-Apr-15 21-Apr-15 22-Apr-15 22-Apr-15 18:00 18:00 18:00 19:00 Commissioing of Champa Line bay adjoining to Bus reactor MAINTENANCE WORK Daily Daily Crossing of 800 kV Champa-Kurushetra Daily AMP Continous contigency charging arrangement 21-04-15 9:30 21-04-15 17:00 Daily 108 765 109 400 110 400 111 400 KAPS-VAPI-II Bilaspur-Seoni I & II 707 AGRA -1 MAIN BAY at Gwalior ASOG-INDORE& PIRANA-BARODA 10C06A Feerder bay at Mundra HVDC 124 400kV Terminal 120 220 765 121 122 765 123 764/400 125 400KV 126 400 127 400 128 765 BVT- Dhariwal & Dhariwal- Parli 400 KV D/C Tr. Line Kolhapur - Solapur Line -I Tie Bay (408) of Bhadrawati1 & Solapur1 Tie bay of Bilaspur -II (717) at Seoni 21-Apr-15 8:00 21-Apr-15 21-Apr-15 18:00 18:00 Replacement of support latch assembly of 70152 CB Replacement of support latch assembly of Continuous 70252 CB DAILY For attending Oil leakages For CSD Work Daily Daily For AMP /CSD commssioning Continuous Bay Maintenance work To attened/ fixing of line spacers at five span Ten hours locations of 15.5 KM (LILO portion of DIL- BVT & DIL- Parli Line) D/C Transmission line GETCO NPCIL WRTS-I WRTS-I PGCIL WRTS-II BDTDL PGCIL R ATIL R WRTS-I ATIL Dhariwal Infrastructure Ltd. 22-Apr-15 8:00 22-Apr-15 18:00 Daily AMP works at Kolhapur (MSETCL) WRTML WRTS-I R 22-Apr-15 8:00 22-Apr-15 18:00 Daily AMP works at Parli(PG) s/s WRTS-I WRTS-I R 22-Apr-15 8:00 24-Apr-15 18:00 Daily AMP works (DCRM & Timing test of CB) WRTS-I WRTS-I R ONLY BAY LINE MUST C R SN KV Line From Date Time To Date Time Basis Reason System Agency type 129 220 Main bay ICT-II (202) at Seoni 22-Apr-15 8:00 23-Apr-15 18:00 Conti. AMP works (DCRM & Timing test of CB) {ICT-II will be in service through Transfer bay} WRTS-I WRTS-I R 130 400 Raipur-1 Main Bay(415) at Bhadrawati 22-Apr-15 9:00 24-Apr-15 18:00 Conti. CTs replacements works at Bhadrawati WRTS-I WRTS-I R 131 400 400kv BUS # 1 at Pune(Talegoan) Tie Bay Aurangabad # 1(717) at Wardha 22-Apr-15 9:00 22-Apr-15 17:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 22-Apr-15 9:00 22-Apr-15 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R WRTS-I WRTS-I R WRTS-I TEL DGEN WRTS-I R 132 765 stringing work of broken earth wire between span 387 to 390 Oil top in CVT at Koradi (MSETCL) OFFLINE WASHING 133 400 400 KV Wardha- Parli # 2 22-Apr-15 9:00 23-Apr-15 18:00 Daily 134 400 Koradi-Satpura line 22-Apr-15 10:00 22-Apr-15 14:00 Daily 135 400 DGEN 400 KV Transfer Bus 22-Apr-15 8:00 22-Apr-15 18:00 ONE DAY 136 400kV Main Bay of Akola - Aurangabad-II ( Bay No. 407) at Akola 22-Apr-15 8:00 22-Apr-15 18:00 Daily 137 400 400 KV S/S KATNI - 315MVA X-MER 22/Apr/15 9:30 23/Apr/15 17:30 Continuos MAINTENANCE WORK MPPTCL MPPTCL R 22/Apr/15 9:00 23/Apr/15 17:30 daily MAINTENANCE WORK MPPTCL MPPTCL R 22/Apr/15 8:00 22/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 22/Apr/15 9:00 22/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 22/Apr/15 9:00 22/Apr/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 22-Apr-15 8:00 23-Apr-15 18:00 NTPC NTPC PGCIL WR-II C PGCIL WR-II C PGCIL WR-II R PGCIL WR-II C 138 139 140 141 142 400 KV S/S CHHEGAON - 315 MVA X400 MER 400 KV S/S NAGDA - 315 MVA X-MER 400 - II 400 400 KV BHOPAL - BINA CKT- I I 220 KV SEONI( PG )- CHHINDWARA 220 CKT- I 400KV Jhanor-Navsari 2 Routine testing and maintenance work TEL - DGEN MSETCL MSETCL 143 765 GWALIOR-II TIE BAY at Bina 22-Apr-15 09:00 25-Apr-15 18:00 144 400 400KV Bhachau-Varsana ckt # 2 22-Apr-15 10:00 22-Apr-15 18:00 22-Apr-15 09:00 22-Apr-15 10:00 22-Apr-15 18:00 Continous Annual Bay Maintenance For erection of 765kV Isolator & jumpering in Continous main Bay (future) for NHPTL. For Jumpering work for Essar bays at Daily Bhachau Installation of online monitoring devices of Daily ICT. Daily For NTAMC work at Itarsi 22-Apr-15 9:00 22-Apr-15 17:00 Daily Bay AMP work. PGCIL WR-II R 22-Apr-15 9:00 22-Apr-15 18:00 Daily For annual maintenace work PGCIL WR-II R WRTS-I WRTS-I-CG R ATIL ATIL R 765KV BINA # 1 Line Reactor at Jabalpur Pooling Station 146 400 Jabalpur-Itarsi#3 Bay 409 at Boisar ( Main Bay Of 315 147 400 MVA ICT 1 ) GWALIOR-2 MAIN BAY (715) at 148 765 Satna Raipur- Wardha # 2 Main Bay at 149 400 Raipur 10C01C AC Filter - 1 main bay at 150 400kV Mundra HVDC Terminal 151 765kV Bus Reactor at Koradi substation 152 400 400 KV KHEDAMARA Raita-II 145 765 153 400KV 154 400 BVT- Dhariwal & Dhariwal- Parli 400 KV D/C Tr. Line SJP -Nagda Ckt-I Main Bay(404) at Nagda S/s. Kolhapur - Solapur Line -II 400kv BUS # 2 at Pune(Talegoan) Main Bay (424)of 400 KV ICT # 2 at Wardha Kasor - SSP line 22-Apr-15 18:00 22-Apr-15 10:00 22-Apr-15 14:00 Daily 22-04-15 9:30 22-04-15 17:00 Daily 22-04-15 22-Apr-15 9:30 8:00 22-04-15 22-Apr-15 17:00 17:00 Daily Daily 22-Apr-15 8:00 27-Apr-15 Bay Maintenance work MEGPTCLMEGPTCL R Terminal tightning and testing work CSPTCL CSPTCL GEN. MAINTENANCE Hot line maintenance of remaining 9 no of Dhariwal daily basis towers. Outage not required only auto reclosure WRTS-I Infrastructure Ltd. to be bypassed. 23-Apr-15 10:00 18:00 Daily Bay AMP work. PGCIL WR-II R 23-Apr-15 23-Apr-15 8:00 9:00 23-Apr-15 23-Apr-15 18:00 17:00 Daily Daily AMP works at Kolhapur (MSETCL) AMP works at Pune-Talegoan (PG) WRTML WRTS-I WRTS-I WRTS-I R R 23-Apr-15 9:00 23-Apr-15 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R 23-Apr-15 8:00 23-Apr-15 18:00 Daily PMM work GETCO GETCO Split bus arrangement will be tried by WRLDC, SLDC Gujarat & SSP 159 400kV New Koyna-Jaigad-ll 23-Apr-15 8:00 23-Apr-15 18:00 Daily Faulty Insulator replacement work MSETCL MSETCL 160 400 400 KV S/S BINA - 315 MVA X-MER - I 23/Apr/15 8:00 24/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 161 400 400 KV SARNI - ISP CkT Station Transformer - 2 AT NSPCL BHILAI 23/Apr/15 9:00 23/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 23/Apr/15 9:00 25/Apr/15 17:00 Conti Annual Maintenance 155 400 156 400 157 400 400 23-Apr-15 18:00 For CSD Work 158 162 400 NSPCL NSPCL Subject to ATC Restric SN KV 163 400 164 765 Line Nagda - Dehgam Ckt-I Main Bay(406) at Nagda S/s. From Date Time To Date Time 23-Apr-15 10:00 23-Apr-15 18:00 type Daily Bay AMP work. PGCIL WR-II R WR-II C WR-II C 23-Apr-15 18:00 Daily 9:00 23-Apr-15 17:00 Daily Bay AMP work. PGCIL WR-II R 23-Apr-15 9:00 23-Apr-15 18:00 Daily For annual maintenace work PGCIL WR-II R ICT#1 at Bilaspur S/s 23-Apr-15 9:00 23-Apr-15 18:00 DAILY WRTS-I WRTS-I-CG R Raipur - Raigarh # 1 Line 3x 240 MVAR Bus Reactor TIE Bay at Durg PS 23-Apr-15 9:00 23-Apr-15 17:00 Daily For bushing oil sampling as per CC-AM instruction For CSD and NTMC Work WRTS-I WRTS-I-CG C 23-Apr-15 9:00 24-Apr-15 Daily For AMP /CSD commssioning WRTS-I WRTS-I-CG C 23-Apr-15 10:00 23-Apr-15 23-Apr-15 23-Apr-15 8:00 10:00 23-Apr-15 24-Apr-15 18:00 18:00 Daily Daily Construction work for LILO of CSPTCL 400KV DCDS Korba (W)-Khedamara line's Ckt-2 to Marwa TPP Crossing of 800 kV Champa-Kurushetra AMP WORKS CSPTCL CSPTCL WRTS-I WRTS-I PGCIL WRTS-II 23-Apr-15 10:00 23-Apr-15 168 765 169 400 170 765 Agency Daily Jabalpur-Itarsi#4 Bay 201 at Boisar (220 kV side Main Bay of 315 MVA ICT 1 ) GWALIOR-2 REACTOR BAY (715R) at Satna 167 765 System 18:00 765KV Bus # 2 at Jabalpur Pooling Station 09:00 166 220 Reason Erection/Alignment of Isolators for Commissioning of 765KV Dharmjaygarh # 4 PGCIL Bays PGCIL For NTAMC work at Itarsi 23-Apr-15 165 400 Basis 23-Apr-15 18:00 172 173 220 765 CSPTCL 400KV DCDS Korba (W)Khedamara line's Ckt-2 D/C Kotimikala-Pendra Rly TL 706 ICT-1 MAIN BAY at Gwalior 174 765 Sundargarh - Dharamjaygarh - 2 23-Apr-15 8:00 25-Apr-15 17:00 Continuous 175 400 400 EMCO -BHADRAWATI LINE # 1 Korba (W) - Khedamara Ckt-II 23-Apr-15 23-Apr-15 8:00 10:00 23-Apr-15 23-Apr-15 19:00 17:00 daily 400 440/220 KV ICT @ Korba(W) 23-Apr-15 8:00 25-Apr-15 18:00 178 765 179 400 Dharamjaygarh-Jharsuguda Ckt -II Bhadrawati-2 Main Bay (410) at Parli 23-Apr-15 24-Apr-15 9:00 8:00 25-Apr-15 24-Apr-15 18:00 18:00 maintenance For Execution of Stringing work to make LILO from Loc. AP69/0(FD60) Continuou General Maintenenace on ICT Bay & Feder s Maintenance Continuous Erection of auxiliary Bus for spare Reactor Daily AMP works at Parli(PG) s/s 180 220 Main bay Seoni- II (205) at Seoni 24-Apr-15 8:00 25-Apr-15 18:00 Conti. 181 400 BUS-2 at Solapur 24-Apr-15 8:00 25-Apr-15 18:00 182 400 Pune(GIS)-Parli # 1 & Pune(GIS)-Pune # 2 24-Apr-15 9:00 26-Apr-15 183 765 Main bay (707) Bus Reactor at Wardha 24-Apr-15 9:00 24-Apr-15 171 400 176 177 17:00 Daily GMR CSPTCL CSPTCL CSPGCL CSPGCL C R AMP works (DCRM & Timing test of CB) WRTS-I {Line will be in service through Transfer bay} WRTS-I R Daily Solapur (NTPC) bays works at Solapur(PG) WRTS-I WRTS-I C 18:00 Daily Maintenance WRTML WRTS-I /WRTS-I c 18:00 Daily AMP work at Wardha WRTS-I R Daily Porcelain Tension insulator replacement with polymer insulator(2 Nos) Bus -1 Gantry to PGCIL Tie gantry PMM work GETCO 184 400 KV Bus 1 & unit 40 CGPL Kasor - SSP line Inter Regional GMR WRTS-I WRTS-I WRTS-I CGPL 24-Apr-15 24-Apr-15 8AM 8:00 24-Apr-15 24-Apr-15 6PM 18:00 Daily 24-Apr-15 8:00 25-Apr-15 18:00 Continuou Crossing of 765 KV D/C Dharamjaygarhs Jabalpur Line(AP54B/0-AP55/0) 24-Apr-15 8:00 24-Apr-15 18:00 Daily Tan-Delta Testing work MSETCL MSETCL Daily Faulty disc replacement ,Fixing of spacers ,damper .and other line maintence work MSETCL MSETCL GETCO 185 400 KV D/C KORBA WEST KHEDAMERA LILO FOR MODWA TPP 187 400kV Padgha-Talegaon(PGCIL) 186 400 188 400kV Koradi-Bhusawal 8:00 24-Apr-15 189 400 190 400 400 KV S/S NAGDA - 315 MVA X-MER - III 400 KV S/S CHHEGAON - 50MVAR BUS REACTOR C R WRTS-I-CG WRTS-I 400 400 Erection of Beam near Dharmjaygarh line-2 for POWERG Dharamjaygarh Line-3&4 Bay extension work. RID 18:00 24-Apr-15 Split bus arrangement will be tried by WRLDC, SLDC Gujarat & SSP CSPTCL JTCL 24/Apr/15 8:00 24/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 24/Apr/15 8:00 24/Apr/15 17:30 daily MAINTENANCE WORK MPPTCL MPPTCL R MPPTCL MPPTCL R MPPTCL MPPTCL R 191 400 400 KV S/S INDORE - ISP - I 24/Apr/15 8:00 24/Apr/15 17:00 daily 192 400 400 kv SEONI - SARNI - CKT 24/Apr/15 9:00 24/Apr/15 17:00 daily MAINTENANCE AND RELAY TESTING WORK MAINTENANCE WORK ONLY BAY LINE MUST SN KV 193 400 194 220 195 220 Line 400 kv RAJGARH (PGCIL )- SSPCKT I 220 KV ANOOPUR - KOTMIKALA CKT -I 220 KV MALANPUR - GWL( PG) CKT I From Date Basis Reason System 18:00 daily MAINTENANCE WORK PGCIL/M WR - II PPTCL R 24/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 25/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R Time To Date Time 24/Apr/15 6:00 24/Apr/15 24/Apr/15 10:00 24/Apr/15 9:00 18:00 196 400KV Jhanor 400KV ICT -1 24-Apr-15 8:00 30-Apr-15 197 220 24-Apr-15 9:00 24-Apr-15 24-Apr-15 09:00 199 220 Kawas - Navsari Ckt - I 765KV ICT # 2 at Jabalpur Pooling Station 220 kV Boisar( MSETCL ) Line 2 24-Apr-15 9:00 24-Apr-15 17:00 200 765 ICT#2 at Bilaspur S/s 24-Apr-15 9:00 24-Apr-15 18:00 201 132 Renki-Mobka D/C 24-Apr-15 8:00 25-Apr-15 18:00 202 400 9:00 24-Apr-15 17:00 198 765 24-Apr-15 Continous 220KV CT Erection ,Commitioning &Testing Agency NTPC NTPC type 16:00 DAIL PGCIL WR-II R 18:00 Daily PGCIL WR-II C PGCIL WR-II R WRTS-I WRTS-I-CG R CSPTCL WRTS-I-CG C WRTS-I C 400 Raipur - Raigarh # 2 Line ( KWPCL) 400KV JPL-JPL Extension Interconnector Line 24-Apr-15 203 24-Apr-15 9:00 24-Apr-15 19:00 204 400 Damoh - Birshingpur # 1&2 24-Apr-15 9:00 25-Apr-15 18:00 400 KV KHEDAMARA Raita-III Pune(GIS) - Solapur SSP - Dhule -2 Kawas - Navsari Ckt - I I COMPLETE 765KV (GIS) Equipment Solpaur-Pune line, ICT-1&2, Bus Reactor along with associated bays Main bay Bus reactor (713) at Seoni Main bay(706) ICT # 2 at Wardha 24-Apr-15 25-Apr-15 25-Apr-15 25-Apr-15 8:00 9:00 8:00 9:00 24-Apr-15 27-Apr-15 27-Apr-15 25-Apr-15 25-Apr-15 9:00 25-Apr-15 25-Apr-15 400 400 KV Bus 1 & unit 40 CGPL Asoj - Wanakbori 400 Kasor - Chorania AMP of Kawas I Bay at Navsari GIS ICT Spare unit Commissioning with ICT # 2 for Swapping with ICT # 2 Y Phase. Daily For AMP of Line Equipment For bushing oil sampling as per CC-AM DAILY instruction For construction of 765KV D/C Continuous Dharamjaygarh (Korba)-Jabalpur Transmission Line (Part-I) AP 4A/0-4A/1 Daily For CSD and NTMC Work WRTS-I-CG Daily Relay/Protection Testing/Line maintenence. 17:00 18:00 18:00 16:00 Continuou s Daily Daily Daily DAIL For crossing of 800kV HVDC Champa Kurukshetra TL. GEN. MAINTENANCE Line Rectification work PMM work AMP of Kawas II Bay at Navsari GIS CSPTCL WRTS-I GETCO PGCIL CSPTCL WRTS-I GETCO WR-II 30-Apr-15 18:00 Conti. Switching Impulse testing at PUNE(GIS) WRTS-I WRTS-I C 8:00 9:00 25-Apr-15 25-Apr-15 18:00 18:00 Daily Daily Daily WRTS-I WRTS-I WRTS-I WRTS-I CGPL R R 25-Apr-15 25-Apr-15 8AM 8:00 25-Apr-15 25-Apr-15 6PM 18:00 Daily AMP works (Timing test of CB) AMP work at Wardha Porcelain Tension insulator replacement with polymer insulator(2 Nos) Bus -1 Gantry to Tie gantry PMM work GETCO GETCO 25-Apr-15 8:00 25-Apr-15 18:00 Daily PMM work GETCO GETCO SLDC-Gujarat will issue opening / closing code SLDC-Gujarat will issue opening / closing code 215 400kV Babheleshwar-Padgha-ll 400 KV S/S BINA - 315 MVA X-MER - I 216 400 I 400 kv RAJGARH (PGCIL )- SSPCKT 217 400 II 218 400 400 CHHEGAON - MALWA CKT 25-Apr-15 8:00 26-Apr-15 18:00 Daily Replacement of faulty insulator strings MSETCL MSETCL 25/Apr/15 8:00 25/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL 25/Apr/15 6:00 25/Apr/15 18:00 daily MAINTENANCE WORK 25/Apr/15 9:00 25/Apr/15 17:30 daily 400 KV S/S INDORE - 400 KV ISP - I I 25/Apr/15 8:00 25/Apr/15 17:00 daily 220 765 765KV Bay No.: 814 Tie Bay of Bina # 1 at Jabalpur Pooling Station 25/Apr/15 09:00 18:00 Daily 25-Apr-15 10:00 25-Apr-15 18:00 Daily 25-Apr-15 9:00 25-Apr-15 17:00 Daily For AMP of Line Equipment PGCIL WR-II R 223 400 Itarsi-Indore#2 220 kV Boisar ( PG ) - Vasai (MSETCL) 400KV Kansari- Bhinmal line MAINTENANCE WORK MAINTENANCE AND RELAY TESTING MPPTCL MPPTCL WORK Erection/Testing of Current Transformer for WR-II Commissioning of 765KV Dharmjaygarh # 3 PGCIL Bays PGCIL WR-II For NTAMC work at Itarsi R 219 400 25-Apr-15 10:00 25-Apr-15 18:00 Daily For bay AMP work at Kansari SS PGCIL NR-I R 224 765 Gwalior 1 Line Reactor at Satna, 25-Apr-15 9:00 26-Apr-15 18:00 Continous For attending oil leakage, line will be taken in PGCIL service with spare reactor within 1 hr WR-II R 225 765 Dharamjaygarh- Champa-Durg (Bypassing Champa) 25-Apr-15 8:00 29-Apr-15 18:00 For terminating 765kV Durg -Champa & Continuou Dharamjaygarh-Champa lines at 765kv s Champa PS WRTS-I-CG C 205 206 207 208 400 765 400 220 209 765 210 765 211 765 400 212 JPL JPL PGCIL WR-II R PGCIL 214 222 220 WR-SR TTC REVISION WR-SR ATC RESTRIC 213 221 400 C 25/Apr/15 PGCIL/M WR - II PPTCL MPPTCL MPPTCL WRTS-I R R R C C GETCO WILL ALSO W SN KV Line From Date Time To Date Time Basis 226 400 Raipur-Wardha-1&2 25-Apr-15 8:00 10-May-15 18:00 Daily 227 765 BUS-I at Bina 26-Apr-15 09:00 27-Apr-15 18:00 Daily 400 Daily 228 400 KV Bus 1 & unit 40 CGPL Akola -Bhusawal Line ( Bay No. 409 & 229 400kV 410) at Akola 230 400kV Padgha-Kharghar 400 KV S/S BINA - 315 MVA X-MER - I 231 400 II 400KV Bus # 2 at Jabalpur Pooling 232 400 Station 26-Apr-15 26-Apr-15 26-Apr-15 26/Apr/15 8AM 8:00 26-Apr-15 8:00 26-Apr-15 26-Apr-15 8:00 27/Apr/15 6PM 18:00 Reason System A/R non auto mode for Additional Earthing WRTS-I work on lines. For removing of Bus Isolator Jumper & reerection of Jumper & carrying out the bus PGCIL stability to integrated the 01 no. 765 kV Bay for NHPTL. Porcelain Tension insulator replacement with polymer insulator(2 Nos) Bus -1 Gantry to PGCIL Tie gantry Agency type WRTS-I-CG C WR-II C CGPL 18:00 Daily Daily Routine testing and maintenance work Replacement of faulty insulator string MSETCL MSETCL MSETCL MSETCL 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R PGCIL WR-II C PGCIL WR-II C PGCIL WRTS-I WRTS-I WR-II WRTS-I WRTS-I C R R 26-Apr-15 9:00 28-Apr-15 18:00 234 400 Itarsi-Satpura 235 400/220 315MVA ICT-2 at Seoni 236 400 Bhilai-1 Main Bay(410) at Bhadrawati Tie Bay of Chakan - Padghe (402) at 237 400 Pune 238 400 Tie Bay Raipur #2 ( 411) at Wardha 26-Apr-15 27-Apr-15 27-Apr-15 10:00 8:00 9:00 26-Apr-15 27-Apr-15 29-Apr-15 18:00 18:00 18:00 Erection/Jumper with Isolators for 400KV Daily Bay No.: 413 of Jhabua Power Bays Continuou For crossing of 800kV HVDC Champa s Kurukshetra TL. Daily For NTAMC work at Itarsi Daily Trail of RTCC panel Conti. CTs replacements works at Bhadrawati 27-Apr-15 9:00 27-Apr-15 13:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 27-Apr-15 9:00 30-Apr-15 18:00 Conti. Pull rod replacement work at Wardha WRTS-I WRTS-I R 239 765 765 KV Bus Reactor # 2 at Wardha 27-Apr-15 9:00 28-Apr-15 18:00 Daily LA Connector replacement work at Wardha WRTS-I WRTS-I R 240 400 Tie Bay Akola 2 at Wardha Main Bay Bus Reactor (718) at Solapur Tie Bay of Pune GIS-1 & ICT # 1 at Pune Navasri - Nasik - 1 Asoj - Chornia - 1 27-Apr-15 9:00 27-Apr-15 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R 27-Apr-15 9:00 27-Apr-15 18:00 Daily AMP and Precommissioning works WRTS-I WRTS-I R 27-Apr-15 13:00 27-Apr-15 17:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 27-Apr-15 27-Apr-15 8:00 8:00 28-Apr-15 27-Apr-15 18:00 18:00 Daily Daily PMM work PMM work GETCO GETCO GETCO GETCO Daily PID testing of insulator strings. A/R shall be kept In non auto mode MSETCL MSETCL 233 765 241 765 242 400 243 220 400 244 Satna - Bina # 2 Main Bay of Akola - Yelwan – II Bay No. 417) at Akola 247 400kV New Koyna -Stage lV ckt-1 09:00 26/Apr/15 8:00 245 400kV Akola-Nandgaonpeth 246 400kV 26/Apr/15 27-Apr-15 ( 400 KV S/S INDORE - 400 KV BUS 248 400 TRANSFER 400 KV S/S NAGDA- 50MVAR BUS 249 400 REACTOR- I 250 400 400 KV ISP- NAGDA CkT 251 400 400 KV KATNI - BIRSINGPUR - I 400 KV S/S CHHEGAON 252 400 JULWANIYA 220 KV MALANPUR - (GWL) PG CKT 253 220 II 254 220KV Kawas-Navsari 1 255 765 765 KV Sasan - Satna Line -1 256 400 18:00 2-May-15 8:00 27-Apr-15 27-Apr-15 27/Apr/15 Daily 18:00 27-Apr-15 8:00 SLDC-Gujarat will issue opening / closing code 18:00 27-Apr-15 8:00 27/Apr/15 18:00 Daily Routine testing and maintenance work Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay MAINTENANCE AND RELAY TESTING WORK MSETCL MSETCL MPPTCL MPPTCL R MSETCL MSETCL 27/Apr/15 17:00 daily 27/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 27/Apr/15 27/Apr/15 16:00 17:30 daily daily MAINTENANCE WORK MAINTENANCE WORK MPPTCL MPPTCL MPPTCL MPPTCL R R 27/Apr/15 27/Apr/15 8:00 9:00 9:30 27/Apr/15 9:00 27/Apr/15 17:30 daily MAINTENANCE WORK MPPTCL MPPTCL R 27/Apr/15 9:00 28/Apr/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 27-Apr-15 27-Apr-15 8:00 8:00 27-Apr-15 28-Apr-15 18:00 18:00 Daily Daily PM & Relay testing Replacment of Line and Rector LAs NTPC SASAN NTPC RELIANCE BINA-I/315 MVA ICT TIE BAY at Bina 27-Apr-15 09:00 27-Apr-15 18:00 Daily Bay AMP work. PGCIL WR-II R 257 400 400 kV BUS-2 at Bhachau 27-Apr-15 10:00 27-Apr-15 18:00 Daily WR-II C 258 765 765KV Bus # 2 at Jabalpur Pooling Station 27-Apr-15 09:00 18:00 Daily WR-II C 27-Apr-15 Jumpering and BUS Stability, Integration of PGCIL New Bays Erection/Alignment of Isolators for Commissioning of 765KV Dharmjaygarh # 3 PGCIL Bays SN KV Line From Date Time 259 765 765KV Bay No.: 817 Tie Bay of Bina # 2 at Jabalpur Pooling Station 27-Apr-15 09:00 260 400 Itarsi-Bhopal#1 27-Apr-15 10:00 To Date 27-Apr-15 27-Apr-15 Basis Reason System Agency type WR-II C WR-II C PGCIL WR-II R Time 18:00 Daily 18:00 Daily Erection/Testing of Current Transformer for Commissioning of 765KV Dharmjaygarh # 4 PGCIL Bays PGCIL For NTAMC work at Itarsi Replacing of porcelain dis isulators in all polluted sections of line 261 400 Itarsi - Khandwa Ckt.1 27-Apr-15 8:00 28-Apr-15 18:00 Daily 262 765 AT#2 of Tamnar PS Seoni#2-Sipat#1 Tie bay(708) at Bilaspur S/s Raipur -Bhadrawati #1 Main Bay at Raipur ICT Main bay at Durg PS 765 kV Main Bus- 1 at Durg 400 KV KHEDAMARA Seoni 27-Apr-15 10:00 27-Apr-15 14:00 Continuous AMP WORKS WRTS-I WRTS-I-CG C 27-Apr-15 9:00 27-Apr-15 18:00 DAILY WRTS-I WRTS-I-CG R 27-Apr-15 9:00 27-Apr-15 17:00 Daily WRTS-I WRTS-I-CG C 27-Apr-15 27-Apr-15 27-Apr-15 9:00 8:00 8:00 28-Apr-15 28-Apr-15 27-Apr-15 17:00 16:00 17:00 Daily Daily Daily WRTS-I WRTS-I-CG WRTS-I WRTS-I-CG CSPTCL CSPTCL C R 27-Apr-15 8:00 28-Apr-15 17:00 Daily 263 765 264 400 265 765 266 765 267 400 268 400 269 270 400 400 400kV DCDS Raikheda-Medesara Quad Line , 11/0(DC+0) & 11/1(DA+0) WARDHA-PARLI -1 Indore (MP) - Asoj # 3 27-Apr-15 27-Apr-15 8:00 8:00 27-Apr-15 30-Apr-15 18:00 Daily For AMP work For CSD Work For AMP /CSD commssioning AMP : 2015 - 16 GEN. MAINTENANCE Construction of 400KV Raita-Jagdalpur Line. Location : AP 7/0 (FD-60+30) & AP 8/0 (FD60+30) Replacement of broken insulator at loc 626 CSPTCL CSPTCL WRTS-I WRTS-I R 18:00 Line is presently charged under contingency scheme . Shutdown required for removing jumper, shifting of line to new tower and from 400kV switchyard to 765kV yard at Indore . Lines finally charged as per original Continous approved schemes i.e. 400kV Indore (PG) Indore (MP) Ckt.2 and 765kV Indore (PG) Vadodara (pooling) line. Also testing of all protection and PLCC system at Indore and Vadodara ends before commissioning. PGCIL WR-II C Line is presently charged under contingency scheme. Shutdown required for removing bunching connection and terminating Pirana Continous PGCIL Vadodara ckt.1 at 765kV Vadodara GIS. Also testing of all protection and PLCC system at Asoj, Vadodara and Pirana ends. WR-II C PGCIL WRTS-II R EPTCL EPTCL 271 400 Pirana - Asoj D/C 27-Apr-15 8:00 30-Apr-15 18:00 272 765 712 BINA -1 L/R BAY at Gwalior 27-Apr-15 10:00 28-Apr-15 18:00 Daily 273 400 Ghandhar Hazira circuit 1 or 2 27-Apr-15 7:00 05-May-15 19:00 Daily 400 400 Kv KW-Khedamara Ckt-I Bay 09 @ KWB 27-Apr-15 8:00 29-Apr-15 18:00 AMP WORKS shutdown required for pre monsoon maintenanceactivities. One linewill remain in service. Line will be restored in the evening at 19:00 hrs. 28-Apr-15 8AM 6PM Continuou General Maintenenace CSPGCL CSPGCL s Porcelain Tension insulator replacement with Daily CGPL polymer insulator(3 Nos) Bus -2 Gantry to PGCIL Line gantry 276 400 28-Apr-15 8:00 28-Apr-15 18:00 Daily AMP works at Parli(PG) s/s WRTS-I WRTS-I R 277 278 279 280 28-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 8:00 9:00 9:00 9:00 28-Apr-15 28-Apr-15 28-Apr-15 29-Apr-15 18:00 13:00 18:00 18:00 Daily Daily Daily Daily Daily WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I CGPL R R R C 28-Apr-15 28-Apr-15 8AM 8:00 28-Apr-15 28-Apr-15 6PM 18:00 Daily AMP works AMP works at Pune-Talegoan (PG) AMP work at Wardha CSD commissioning work at Solapur Porcelain Tension insulator replacement with polymer insulator(3 Nos) Bus-2 Gantry to Tie gantry PMM work GETCO SLDC-Gujarat will issue opening / closing code 28/Apr/15 8:00 28/Apr/15 17:00 daily 274 400 275 281 CGPL Mundra Jetpur 2 & unit 40 Tie Bay (411) of Bhadrawati2 & Solapur2 at Parli 400/220 315MVA ICT-1 at Seoni 400 Main Bay of Padghe (403) at Pune 400 Tie Bay Akola 1 at Wardha 400 Bus Reactor at Solapur 400 400 KV Bus 2, CGPL Mundra Bachau2 & unit 40 400 Kasor - CLPIPL line 28-Apr-15 PGCIL GETCO 282 283 400 400 KV S/S INDORE - 400 KV BUS COUPLER MAINTENANCE AND RELAY TESTING WORK MPPTCL MPPTCL R Subject to ATC Restric SN KV Line 400 KV S/S BHOPAL - 400 KV TRANSER BUS COUPLER 285 220KV Kawas-Navsari 2 400KV, 315 MVA ICT MAIN BAY at 286 400 Bina 284 400 From Date Basis Reason System 17:30 daily MAINTENANCE WORK MPPTCL MPPTCL 18:00 Daily PM & Relay testing NTPC NTPC 18:00 Daily Bay AMP work. PGCIL WR-II R PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WRTS-I WR-II WRTS-I-CG C C CSPTCL WRTS-I-CG C WRTS-I WRTS-I-CG POWERG Inter Regional RID CGPL PGCIL C Time To Date Time 28/Apr/15 9:00 28/Apr/15 28-Apr-15 8:00 28-Apr-15 28-Apr-15 09:00 28-Apr-15 291 400 292 765 765KV ICT # 2 at Jabalpur Pooling Station Itarsi-Bhopal#2 765 KV VCHAL 2 LINE REACTOR Satna Pithampur Ckt.2 bay at Indore PG Bus Reactor of Tamnar PS 293 400 Korba- Raita S/C 28-Apr-15 8:00 29-Apr-15 294 400 Raipur - Wardha # 2 Line 28-Apr-15 9:00 28-Apr-15 295 Sundargarh - Raigarh - 1 28-Apr-15 297 400 298 400 CGPL Mundra Jetpur 2, Bus 2 & unit 40 Vindhyacha Tie-Line-1 Vindhyacha Tie-Line-2 29-Apr-15 29-Apr-15 29-Apr-15 8AM 8:30 8:30 29-Apr-15 29-Apr-15 29-Apr-15 299 400 400 KV Wardha- Raipur # 1 29-Apr-15 9:00 30-Apr-15 300 301 302 303 400 400 400 220 400 Seoni- Khandwa-I Line Main Bay Pune GIS # 2 (407) Main Bay Aurangabad-2(410) Navasri - Nasik - 2 Asoj - Chornia - 2 29-Apr-15 29-Apr-15 29-Apr-15 29-Apr-15 29-Apr-15 8:00 9:00 13:00 8:00 8:00 29-Apr-15 29-Apr-15 29-Apr-15 30-Apr-15 29-Apr-15 Jumpering and BUS Stability, Integration of 18:00 Daily New Bays ICT Spare unit Commissioning with ICT # 2 18:00 Daily for Swapping with ICT # 2 B Phase. 18:00 Daily For NTAMC work at Itarsi For detailed integrated checking of 18:00 Continous REACTOR along with scheme of line 18:00 Daily Signal testing for Remote HMI at Indore 14:00 Continuous AMP WORKS For construction of 765KV D/C 18:00 Continuous Dharamjaygarh (Korba)-Jabalpur Transmission Line (Part-I) 17:00 Daily For CSD and NTMC Work For tightness checking of Jumpers, tightening of 17:00 Daily Corona Ring at various locations. Porcelain Tension insulator replacement with Daily polymer insulator(3 Nos) Bus -2 Gantry to Tie gantry 6PM 17:30 Hrs. Continuous LILO work (StageV) 17:30 Hrs. Continuous LILO work (StageV) stringing work of broken earth wire at 18:00 Daily location 549, 550. 18:00 Daily Commissioning of CSD at Seoni 13:00 Daily AMP works at Pune-Talegoan (PG) 17:00 Daily AMP works at Pune-Talegoan (PG) 18:00 Daily PMM work 18:00 Daily PMM work 400 Kasor - GPEC line 29-Apr-15 8:00 29-Apr-15 18:00 Daily 29/Apr/15 9:00 29/Apr/15 17:30 287 400 288 765 289 400 290 765 400 400 kV BUS-2 at Bhachau 28-Apr-15 10:00 28-Apr-15 09:00 28-Apr-15 10:00 28-Apr-15 28-Apr-15 9:00 29-Apr-15 28-Apr-15 28-Apr-15 8:00 10:00 28-Apr-15 28-04.-015 9:00 28-Apr-15 28-Apr-15 28-Apr-15 400 296 Agency NTPC NTPC WRTS-I WRTS-I R WRTS-I WRTS-I WRTS-I GETCO GETCO WRTS-I WRTS-I WRTS-I GETCO GETCO R R R PMM work GETCO GETCO daily MAINTENANCE WORK MPPTCL MPPTCL R MPPTCL MPPTCL R 305 311 400 400 KV S/S BHOPAL - 400 KV BUS TIE 400 KV S/S INDORE - 400 KV MAIN BUS - I 400 KV S/S NAGDA- 50MVAR BUS REACTOR- I I 400KV BINA-II MAIN BAY at Bina 765KV Bus # 2 at Jabalpur Pooling Station Itarsi-Khandwa#1 312 765 Indore - Bhopal 29-Apr-15 8:00 30-Apr-15 18:00 313 765 314 400 AT#3 of Tamnar PS Raipur - KSK # 4 Line Kotra-1 & Bus Reactor Tie Bay (811) at durgPs 29-Apr-15 29-Apr-15 10:00 9:00 29-Apr-15 29-Apr-15 14:00 17:00 Bay AMP work. To carry out Bus Stability Test for Daily Commissioning of 765kV Bus Reactor # 1 Daily For NTAMC work at Itarsi signal testing for remote HMI and Integration Continous of spare reactor with Indore-Bhopal Line raector at Indore Continuous AMP WORKS Daily For CSD and NTMC Work 29-Apr-15 9:00 30-Apr-15 17:00 Daily 316 765 Main Bay of Korba BUS REACTOR-1 29-Apr-15 9:00 30-Apr-15 317 765 765 KV SATNA-1 LINE at Gwalior 29-Apr-15 318 400 307 400 308 400 309 400 310 765 315 765 319 400 29/Apr/15 29/Apr/15 8:00 29/Apr/15 17:00 daily MAINTENANCE AND RELAY TESTING WORK 29/Apr/15 17:00 daily MAINTENANCE WORK 29-Apr-15 18:00 Daily 29-Apr-15 8:00 09:00 29/Apr/15 09:00 29-Apr-15 10:00 29-Apr-15 18:00 Rourkela - Raigarh - 2 29-Apr-15 315 MVA ICT- bank-III AT KHEDAMARA 29-Apr-15 10:00 8:00 8:00 29/Apr/15 29-Apr-15 29-Apr-15 30-Apr-15 18:00 18:00 18:00 18:00 17:00 R NTPC NTPC 304 306 400 type For AMP Continuous AMP Daily Daily Daily A/R testing, point to point testing AMP Work GEN. MAINTENANCE SLDC-Gujarat will issue opening / closing code SLDC-Gujarat will issue opening / closing code MPPTCL MPPTCL R PGCIL WR-II R PGCIL WR-II C PGCIL WR-II C Sterilite WR-II C WRTS-I WRTS-I WRTS-I-CG WRTS-I-CG C C WRTS-I WRTS-I-CG R WRTS-I WRTS-I-CG R PGCIL POWERG RID WRTS-II Inter Regional CSPTCL CSPTCL C SN KV Line From Date Time To Date Basis Reason Daily CGPL Mundra Jetpur 2, Bus 2 & unit 40 30-Apr-15 8AM 30-Apr-15 6PM 321 400 Aurangabad-Pune # 1 30-Apr-15 9:00 30-Apr-15 18:00 Daily 322 400 Itarsi - Khandwa Ckt.2 30-Apr-15 8:00 30-Apr-15 18:00 Daily 323 400 30-Apr-15 8:00 30-Apr-15 18:00 Daily 30-Apr-15 9:00 30-Apr-15 18:00 Daily 30-Apr-15 9:00 30-Apr-15 13:00 326 765 Seoni- Khandwa-II Line Aurangabad(Waluj)-2 Main Bay at Aurangabad(PG) Tie Bay Pune GIS - 2 & Aurangabad # 1 (408) at Pune 765KV Bus-1 at Wardha Porcelain Tension insulator replacement with polymer insulator(3 Nos) Bus -2 Gantry to Tie gantry Attending problem of TBC isolator at MSETCL Waluj S/S. Replacing of porcelain dis isulators in all polluted sections of line Commissioning of CSD at Seoni 30-Apr-15 9:00 30-Apr-15 327 400 Main Bay (418) Bus Reactor at Wardha 30-Apr-15 9:00 30-Apr-15 328 400 Solapur-Kolhapur # 1 Tie Bay of Aurangabad-2 & ICT # 2 (411) at Pune Chorania - Asoj 2 30-Apr-15 9:00 30-Apr-15 13:00 30-Apr-15 Akola Main Bus-I 400 KV S/S INDORE - 400 KV MAIN BUS - II 400 KV BINA-II/1200 KV ICT TIE BAY at Bina 409 315 MVA ICT#1 Main Bay at Bhachau 400 320 324 400 325 400 329 400 400 System Agency CGPL PGCIL WRTS-I WRTS-I R PGCIL WR-II R WRTS-I WRTS-I R AMP works at Aurangabad(PG) WRTS-I WRTS-I R Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 18:00 Daily Bus Extension Work for Raipur Ckt 3&4 WRTS-I WRTS-I R 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R 1-May-15 18:00 Daily CSD commissioning work at Solapur WRTML WRTS-I C 30-Apr-15 17:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 8:00 30-Apr-15 18:00 Daily PMM work GETCO GETCO SLDC-Gujarat will issue opening / closing code 30-Apr-15 8:00 30-Apr-15 18:00 Daily MSETCL MSETCL 30/Apr/15 8:00 30/Apr/15 17:30 daily Routine testing and maintenance work MAINTENANCE AND RELAY TESTING WORK MPPTCL MPPTCL R 30-Apr-15 09:00 30-Apr-15 18:00 Daily Bay AMP work. PGCIL WR-II R 30-Apr-15 10:00 30-Apr-15 12:00 Daily CT Oil sampling works of CGL make PGCIL WR-II R 30-Apr-15 09:00 30-Apr-15 11:30 Daily PGCIL WR-II C 30-Apr-15 09:00 30-Apr-15 18:00 PGCIL WR-II C 30-Apr-15 10:00 30-Apr-15 18:00 PGCIL WR-II C 30-Apr-15 9:00 30-Apr-15 18:00 PGCIL WR-II C 30-Apr-15 8:00 30-Apr-15 20:00 WRTS-I WRTS-I-CG C 30-Apr-15 8:00 1-May-15 17:00 WRTS-I CSPTCL 330 331 400kV 332 400 333 400 334 400 335 765 336 400 337 400 338 765 339 400 340 400 765KV Bay No.: 806 (Main Bay) of ICT # 2 at Jabalpur Pooling Station 400KV Bus # 2 at Jabalpur Pooling Station Itarsi-Khandwa#2 765 KV VCHAL 1 LINE REACTOR Satna Jindal # 2 (413) Main Bay at Raipur 400 KV DC Raigarh--Raipur (I & II ) Between Locations 112(DA+3) & 113 (DA+0) For replacement of 765kV Current Transformers of ICT # 2 Main Bay (R & Y Phase) Erection/Jumper with Isolators for 400KV Daily Bay No.: 413 of Jhabua Power Bays Daily For NTAMC work at Itarsi For completion of Auxiliary bus scheme for Continous taking spare reactor into service Continuous AMP WORKS Line crossing of 400kV Raita (Raipur)Daily Jagdalpur Line (U/C) bt location AP 10/0(FD60+30) & AP 11/0(FD-60+30) 341 765 716 BAY (SATNA -2 MAIN) at Gwalior 30-Apr-15 10:00 1-May-15 18:00 Daily 342 400 Sundargarh - Raigarh - 2 30-Apr-15 9:00 30-Apr-15 17:00 Daily 345 765 346 220 Main bay Seoni I (204) at Seoni 344 400 347 400 348 400 349 400 Aurangabad(Waluj)-2 Tie Bay at Aurangabad(PG) Pune(GIS)-Parli # 2 & Pune(GIS)-Pune # 1 Main Bay (421)ICT #1 at Wardha PGCIL WRTS-II 8AM 1-May-15 6PM 01-May-15 9:00 01-May-15 17:00 Daily 1-May-15 8:00 2-May-15 18:00 Daily Line AMP works WRTS-I WRTS-I R 1-May-15 8:00 2-May-15 18:00 Conti. AMP works (DCRM & Timing test of CB) WRTS-I {Line will be in service through Transfer bay} WRTS-I R 1-May-15 9:00 1-May-15 18:00 Daily AMP works at Aurangabad(PG) WRTS-I R 1-May-15 9:00 3-May-15 18:00 Daily Line Rectification work 1-May-15 9:00 1-May-15 18:00 Daily AMP work at Wardha WRTS-I WRTML WRTS-I /WRTS-I WRTS-I WRTS-I Subject to ATC Restric C 1-May-15 Daily 400 KV Bus 2, CGPL Mundra Bachau 2 & unit 40 Raipur -Bhadrawati # 2 Main Bay at Raipur Seoni - Bilaspur-I Line alstom CB problem For tightness checking of Jumpers, tightening of POWERG Inter Regional Corona Ring at various locations. RID Porcelain Tension insulator replacement with CGPL polymer insulator(3 Nos) Bus-2 Gantry to Tie PGCIL gantry For CSD Work WRTS-I WRTS-I-CG 400 343 type Time C c R SN KV 400 Line Asoj - SSP From Date 01-May-15 To Date 01-May-15 Basis Reason System Agency type Time 8:00 Time 18:00 Daily PMM work GETCO GETCO Split bus arrangement will be tried by WRLDC, SLDC Gujarat & SSP 01-May-15 09:00 01-May-15 18:00 Daily Bay AMP work. PGCIL WR-II R Daily ICT Spare unit Commissioning with ICT # 1 for Swapping with ICT # 1 R Phase. PGCIL WR-II C PGCIL WR-II C PGCIL PGCIL WR-II WR-II C R 350 351 400 352 765 353 400 354 400 355 220 356 400 357 400 358 765 400 KV (1200/400 KV ICT) MAIN BAY at Bina 765KV ICT # 1 at Jabalpur Pooling Station 400KV Bus Reactor # 1 (Main & Tie Bay) at Jabalpur Pooling Station 315MVA ICT#1at Itarsi 220 kV Boisar( MSETCL ) Line 1 Jindal # 2 & AT#3 (414) Tie Bay at Raipur Raipur -Bhadrawati # 1 Line 765KV 3x240 MVAR Chamap-1 Line reactor at Durg Ps 01-May-15 09:00 1-May-2015 18:00 01-May-15 09:00 2-May-2015 18:00 01-May-15 01-May-15 10:00 9:00 01-May-15 01-May-15 18:00 17:00 Continuou Installation & Commissioning of CSD Relay s Daily For NTAMC work at Itarsi Daily For AMP of Line Equipment 01-May-15 8:00 01-May-15 20:00 Continuous AMP WORKS WRTS-I WRTS-I-CG C 01-May-15 9:00 01-May-15 17:00 Daily For CSD & NTMC Work WRTS-I WRTS-I-CG C 01-May-15 9:00 04-May-15 17:00 continous For Spatre reactor Aux bus Erection WRTS-I WRTS-I-CG C 02-May-15 2-May-15 02-May-15 2-May-15 10:00 9:00 8:00 8:00 02-May-15 2-May-15 02-May-15 3-May-15 18:00 18:00 18:00 18:00 400kV Deepnagar-Khadka Ckt - l 400 KV S/S NAGDA- RAJGARH - I 368 400 WITH REACTOR 369 400 400 KV KATNI - BIRSINGPUR - I I 2-May-15 8:00 2-May-15 18:00 For repacement of trip & Close coils by M/s Daily ALSTOM FOR STRINGING OF 765KV DC AngulDaily Jharsuguda (new line) shutdown required forTower erection and Continous stringing Continuou General Maintenenace s Daily For NTAMC work at Itarsi Daily AMP work at Wardha Daily PMM work Replacement of faulty insulator strings Daily Relay testing, CB Timing, CRM Measurement & routine bay Maintenance. Daily 8:00 9:30 2/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 2/May/15 2/May/15 17:30 daily MAINTENANCE WORK MPPTCL MPPTCL R 370 400 400 KV SATNA-III MAIN BAY at Bina 02-May-15 09:00 02-May-15 18:00 Daily Bay AMP work. PGCIL WR-II R 371 372 373 374 Khandwa-Nepanagar Bus Reactor#1 at Itarsi Indore -Bina line with line reactor AT#3 (415) Main Bay at Raipur 02-May-15 02-May-15 02-May-15 02-May-15 10:00 10:00 8:00 8:00 02-May-15 02-May-15 02-May-15 02-May-15 18:00 18:00 18:00 20:00 MPPTCL PGCIL PGCIL WRTS-I WR-II WR-II WR-II WRTS-I-CG C C C C 02-May-15 9:00 02-May-15 17:00 Daily For NTAMC work at Khandwa Daily For NTAMC work at Itarsi To integrate Spare reactor unit at Indore Daily Continuous AMP WORKS CSD Work Daily WRTS-I WRTS-I-CG C 02-May-15 10:00 02-May-15 12:00 Daily WRTS-I WRTS-I-CG R 359 360 361 362 363 364 365 366 765 703 ICT-I Main Bay at Bina 1-May-15 18:00 Rourkela - Raigarh - 1 01-May-15 8:00 02-May-15 17:00 400 KSK - RKMPL Ckt # 3 01-May-15 9:00 16-May-15 19:00 1-May-15 8:00 3-May-15 18:00 400 400 Kv KW-Khedamara Ckt-II Bay 11 @ KWB 400 Itarsi-Indore#1 400 Tie Bay (420) ICT #1 at Wardha 220 Kawas - Ichhapore - 1 400kV Babheleshwar-Padgha-l 220 400 765 400 375 400 376 765 Raipur- Korba # 4 Main Bay at Raipur 765 kV Tie Bay of Durg Ckt # 2 (714) 377 705 Satna-II & ICT-II Tie Bay at Bina 379 09:00 400 367 378 01-May-15 765 400 400 380 400 381 400 382 765 383 220 384 400 385 765 400 386 Rourkela - Raigarh - 2 MOUDA-IEPL-WARDHA-1 400KV Choraniya-Vadavi line 50 MVAr A'bad 2 LR at Akola 765KV/400KV ICT # 2 (Main & Tie Bay) at Jabalpur Pooling Station Khandwa-Omkareshwer Bus Reactor#2 at Itarsi 765 kV Tie Bay of Durg Ckt # 1 (719) 400 KV Bus 2, CGPL Mundra Jetpur 1 & unit 40 2/May/15 02-May-15 02-May-15 3-May-15 09:00 9:00 9:00 2-May-15 02-May-15 4-May-15 18:00 18:00 18:00 Daily Daily Conti. 03-May-15 10:00 03-May-15 18:00 Daily 03-May-15 10:00 03-May-15 12:00 Daily 03-May-15 09:00 4-May-2015 18:00 03-May-15 03-May-15 03-May-15 10:00 10:00 10:00 03-May-15 03-May-15 03-May-15 18:00 18:00 12:00 4-May-15 8AM 4-May-15 6PM Continuou s Daily Daily Daily Daily Tan Delta Monitoring of CT For repacement of trip & Close coils by M/s ALSTOM AMP Work PGCIL WRTS-II POWERG RID Inter Regional KSK KMPCL CSPGCL CSPGCL PGCIL WRTS-I PGCIL MSETCL WR-II WRTS-I GETCO MSETCL C C R MSETCL MSETCL PGCIL WRTS-II POWERG RID Inter Regional WRTS-I IEPL C Delilo of IEPL plant, charging of line as MoudaWardha # 1 For bay AMP work at Choraniya and vadavi end SS Bushing Oil DGA for Y ph. 400 kV Alstom bushing, line in service without reactor. Reliance WR-II R WRTS-I WRTS-I R Installation & Commissioning of CSD Relay PGCIL WR-II C For NTAMC work at Khandwa For NTAMC work at Itarsi Tan Delta Monitoring of CT Porcelain Tension insulator replacement with polymer insulator(3 Nos) Bus-2 Gantry to Tie gantry MPPTCL WR-II PGCIL WR-II WRTS-I WRTS-I-CG CGPL PGCIL C C C R SN KV Line 388 400 400KV Aurangabad(PG)Aurangabad(MSETCL) # 1 Main Bay Parli # 2(409) at Wardha 389 400 400 KV Wardha- Raipur # 2 387 400 390 400 391 400 400 392 400 From Date Time To Date Time Basis 4-May-15 9:00 5-May-15 18:00 Conti. 4-May-15 9:00 7-May-15 18:00 Conti. 4-May-15 9:00 4-May-15 18:00 Daily Reason System Replacement of CTs, IPS tubes, connectors WRTS-I and jumpers at Waluj end. Pull rod replacement work at Wardha WRTS-I stringing work of broken earth wire at location 549, 550. Agency type WRTS-I R WRTS-I R R Main Bay Wardha # 1 at MSETCL Akola Solapur-Kolhapur # 2 CGPL Bus 2 and Unit 10 4-May-15 9:00 4-May-15 18:00 Daily AMP work at Akola (MSETCL) WRTS-I WRTS-I R 4-May-15 04-May-15 9:00 8AM 5-May-15 04-May-15 18:00 6PM Daily Daily WRTS-I CGPL C Kasor - SSP 04-May-15 8:00 04-May-15 18:00 Daily CSD commissioning work at Solapur WRTML Porcelain Tension insulator replacement with PGCIL polymer insulator(3 Nos) Bus -2 Gantry to tie Gantry with Bus -2 outage PMM work GETCO GETCO Split bus arrangement will be tried by WRLDC, SLDC Gujarat & SSP Kawas - Ichhapore - 2 04-May-15 8:00 04-May-15 18:00 Daily 4-May-15 8:00 4-May-15 18:00 4-May-15 8:00 9-May-15 4-May-15 8:00 9-May-15 18:00 18:00 393 394 220 395 400kV New Koyna -Stage lV ckt-ll 396 400kV Akola-Bhusawal 397 400KV Jhanor 400KV ICT -2 PMM work PGCIL Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay Daily MSETCL PID testing of insulator strings. A/R shall be kept In non auto mode Daily MSETCL 220KV CT Erection ,Commitioning &Testing Continous NTPC 398 765 765KV Bay No.: 814 Tie Bay of Bina # 1 at Jabalpur Pooling Station 399 765 Satna - Bina # 1 04-May-15 9:00 06-May-15 18:00 400 220 401 220 402 400 Bus Coupler at Navsari Khandwa-Chhegaon-2 Bus Reactor#3 at Itarsi Bay 410 at Boisar ( Main Bay of 400 kV Tarapur Line 2 ) Raipur -Bhadrawati # 2 Line EMCO -BHADRAWATI LINE 1 717 BAY(SATNA 2 TIE) at Gwalior Wardha -1 Reactor at Aurangabad(PG) 04-May-15 04-May-15 04-May-15 15:00 10:00 10:00 04-May-15 04-May-15 04-May-15 19:00 18:00 18:00 Erection of 765kV Circuit Breakers for Daily Commissioning of 765KV Dharmjaygarh # 3 Bays Continuou For crossing of 800kV HVDC Champa s Kurukshetra TL. Daily For NTAMC work at Navsari Daily For NTAMC work at Khandwa Daily For NTAMC work at Itarsi 04-May-15 9:00 04-May-15 17:00 Daily 04-May-15 04-May-15 04-May-15 9:00 9:00 10:00 04-May-15 17:00 07-May-15 18:00 5-May-15 18:00 Daily Daily Daily 403 400 404 400 405 400 406 765 407 400 4-May-2015 09:00 4-May-15 8:00 6-May-2015 18:00 4-May-15 17:00 400 GETCO MSETCL MSETCL NTPC PGCIL WR-II C PGCIL WR-II C PGCIL WR-II MPPTCL WR-II PGCIL WR-II C C C Bay AMP work. PGCIL WR-II R For CSD & NTMC Work Line maintenance alstom CB problem WRTS-I EMCO PGCIL WRTS-I-CG EMCO WRTS-II C Daily AMP works at Aurangabad(PG) WRTS-I WRTS-I R Daily Porcelain Tension insulator replacement with polymer insulator(3 Nos) Bus-2 Gantry to Tie PGCIL gantry AMP works at Parli(PG) s/s WRTS-I Spare reactor shall taken in service WRTS-I C CGPL 409 400 410 765 400 KV Bus 2, CGPL Mundra Jetpur 1 & unit 40 Pune-1 Main Bay (403) at parli 240MVAr Bus reactor at Seoni 5-May-15 5-May-15 5-May-15 8AM 8:00 8:00 5-May-15 5-May-15 8-May-15 6PM 18:00 18:00 Daily Conti. 411 220 Main bay Chhindwara- I(208) at Seoni 5-May-15 8:00 6-May-15 18:00 Conti. 5-May-15 9:00 5-May-15 18:00 Daily 05-May-15 9:00 05-May-15 13:00 Daily 9:00 8AM 6-May-15 05-May-15 18:00 6PM cont Daily Bushing Oil DGA for all 400 kV Alstom WRTS-I WRTS-I bushings for LILO with Koradi-Warda line MSETCL IEPL+MSETCL Porcelain Tension insulator replacement with PGCIL CGPL polymer insulator(3 Nos) Bus -2 Gantry to tie Gantry with Bus -2 outage 5/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 6/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 408 412 400 413 400 414 400 400 415 Subject to ATC Restric Main Bay Wardha # 2 at MSETCL Akola 125 MVAr Bus Reactor at Aurangabad Wardha-Warora-I CGPL Bus 2 and Unit 10 5-May-15 05-May-15 416 400 400 KV S/S NAGDA- RAJGARH -I I WITH REACTOR 5/May/15 417 220 220 KV MALANPUR - AURAIYA CKT 5/May/15 8:00 9:00 WRTS-I WRTS-I R R AMP works (DCRM & Timing test of CB) WRTS-I {Line will be in service through Transfer bay} WRTS-I R AMP work at Akola (MSETCL) WRTS-I R 418 400 Korba- Balco line 5-May-15 08:30 hrs 6-May-15 400KV CTS replacement and normalization 17:30 Hrs. Continuous and testing of breaker. 419 400 400 KV SATNA-III/SHUJALPUR-I TIE BAY at Bina 05-May-15 09:00 18:00 05-May-15 Daily Bay AMP work. WRTS-I NTPC NTPC PGCIL WR-II R C R SUBJECTED TO MSE SN KV Line 421 400 422 400 423 220 765KV ICT # 1 at Jabalpur Pooling Station Navsari - DGEN#1 Navsari - DGEN#2 Khandwa-Chhegaon-1 424 400 125 MVAR Bus Reactor-II at Shujalpur 420 765 425 400 426 765 427 400 428 765 Bay 411 at Boisar ( Tie Bay of 400 kV Tarapur Line 2 and Vapi Line ) 765 KV Sasan 2 LINE REACTOR at Satna Bay no. 413(main bay of ICT#2) at Indore Basis Time To Date 05-May-15 09:00 5-May-2015 18:00 Daily 05-May-15 05-May-15 05-May-15 10:00 15:00 10:00 05-May-15 05-May-15 05-May-15 14:00 19:00 18:00 Daily Daily Daily ICT Spare unit Commissioning with ICT # 1 for Swapping with ICT # 1 Y Phase. For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa 05-May-15 10:00 05-May-15 18:00 Daily 05-May-15 9:00 05-May-15 17:00 05-May-15 9:00 05-May-15 05-May-15 8:00 05-May-15 05-May-15 C C C For NTAMC work at Shujalpur PGCIL WR-II C Daily Bay AMP work. PGCIL WR-II R 18:00 Continous For commissioning & taking spare reactor into service PGCIL WR-II C 05-May-15 18:00 Daily AMP of bay equipments PGCIL WR-II C 9:00 06-May-15 18:00 DAILY For AMP work WRTS-I WRTS-I-CG R 8:00 05-May-15 20:00 Continuous AMP WORKS For CSD & NTMC Work Daily WRTS-I WRTS-I-CG C WRTS-I WRTS-I-CG C Raipur- Korba # 3 Main Bay at Raipur 05-May-15 9:00 05-May-15 17:00 ICT Main bay 403 at Durg PS 05-May-15 9:00 06-May-15 17:00 432 765 706 ICT-II Main Bay at Bina 05-May-15 09:00 5-May-15 18:00 433 434 220 400 Navsari GIS - Navsari (GETCO) Bhopal-Damoh D/c 400KV Aurangabad(PG)Aurangabad(MSETCL) # 2 05-May-15 05-May-15 8:00 8:00 05-May-15 06-May-15 16:00 19:00 6-May-15 9:00 7-May-15 18:00 Tie Bay (417) Bus Reactor at Wardha 6-May-15 9:00 6-May-15 18:00 continous SCOPE CSD commssioning WRTS-I WRTS-I-CG For repacement of trip & Close coils by M/s Daily PGCIL WRTS-II ALSTOM Daily To attend hot spots idetified in thermovision scanning PGCIL WRTS-II Continous contigency charging arrangement BDTDL PGCIL Replacement of CTs, IPS tubes, connectors Conti. WRTS-I WRTS-I and jumpers at Waluj end. C Daily WRTS-I R WRTS-I C 9:00 6-May-15 18:00 Daily 06-May-15 8AM 06-May-15 6PM Daily Khanpur- Dehgam (PG)-1 06-May-15 8:00 06-May-15 18:00 Daily 6-May-15 8:00 6-May-15 18:00 Daily Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL 6-May-15 8:00 6-May-15 18:00 Daily Faulty disc replacement ,Fixing of spacers ,damper .and other line maintence work 6-May-15 8:00 6-May-15 18:00 Daily 6/May/15 9:00 6/May/15 16:00 daily 06-May-15 09:00 06-May-15 18:00 Daily Bay AMP work. PGCIL WR-II R 06-May-15 06-May-15 06-May-15 06-May-15 10:00 15:00 10:00 10:00 06-May-15 06-May-15 06-May-15 06-May-15 14:00 19:00 18:00 18:00 Daily Daily Daily Daily For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur PGCIL PGCIL PGCIL PGCIL WR-II WR-II WR-II WR-II C C C C 06-May-15 9:00 06-May-15 17:00 Daily Bay AMP work. PGCIL WR-II R 06-May-15 06-May-15 06-May-15 8:00 9:00 9:00 06-May-15 06-May-15 07-May-15 18:00 17:00 18:00 Daily AMP of bay equipments Daily For NTMC Work Continuous Erection of auxiliary Bus for spare Reactor For repacement of trip & Close coils by M/s Daily ALSTOM PGCIL WRTS-I WRTS-I WR-II WRTS-I-CG WRTS-I-CG C C C Tie Bay of Akola - Yelwan – I 442 400kV Bay No. 415) at Akola 400 KV INDORE - NAGDA Ckt 450 400 451 400 452 765 453 711 BR & Gwalior-I Tie Bay at Bina 400 400 400 400 449 400 765 765 KV JAIPUR -2 REACTOR at Gwalior Wardha -2 Reactor at 455 400 Aurangabad(PG) 456 400/220 315MVA ICT -1 at Aurangabad(PG) 315 MVA ICT- bank-II AT 457 400 KHEDAMARA 454 765 Subject to ATC Restric CGPL GETCO MSETCL MSETCL ( 400 KV SHUJALPUR-I MAIN BAY at Bina 315MVA ICT#1 at Navsari 315MVA ICT#2 at Navsari Khandwa-Dhule-1 63 MVAR Bus Reactor-I at Shujalpur Bay 412 at Boisar ( Main Bay of 400 kV Vapi Line ) Bay 414(Tie bayof ICT#2) at Indore ICT # 2 at Raipur SS Ranchi-Korba Ckt-II 445 446 447 448 R 6-May-15 441 400kV Akola-Bhusawal 444 400 WRTS-I R CSD commissioning work at Solapur, line in WRTML service w/o reactor Porcelain Tension insulator replacement with PGCIL polymer insulator(3 Nos) Bus -1 Gantry to Tie gantry With Bus -1 outage PMM work GETCO 440 400kV Padgha-Nagothane-l 443 400 AMP work at Wardha C Karad Switchable line Reactor at Solapur CGPL Bus -1 and Unit 10 438 439 220 PGCIL C 431 400 400 type WR-II 430 400 437 400 Agency PGCIL WR-II PGCIL WR-II MPPTCL WR-II Seoni#1 Main Bay(704) at Bilaspur s/s Jindal # 1 (416) Main Bay at Raipur 436 400 System Time 429 400 435 400 Reason From Date 06-May-15 09:00 6-May-15 18:00 06-May-15 10:00 7-May-15 18:00 6-May-15 8:00 6-May-15 6-May-15 9:00 8:00 6-May-15 18:00 6-May-15 7-May-15 18:00 17:00 Daily Routine testing and maintenance work MSETCL MSETCL MAINTENANCE WORK &RELAY TESTING MPPTCL MPPTCL WORK A/R TESTING Continuou AMP works at Aurangabad(PG) s Daily AMP works at Aurangabad(PG) Daily GEN. MAINTENANCE R PGCIL WRTS-II C PGCIL WRTS-II C WRTS-I WRTS-I R WRTS-I WRTS-I R CSPTCL CSPTCL SN KV Line From Date 458 400 Aurangabad-Pune # 2 400 459 460 765 BHADRAWATI-RAMAGUNDAM # 2 Seoni#1 Tie Bay(705) at Bilaspur s/s 7-May-15 07-May-15 9:00 9:00 461 400 Nagda - Dehgam Ckt. 1 07-May-15 462 220 Main bay Chhindwara-2(209) at Seoni 463 400 Main Bay of Lonikand Line (413) Raichur-2 Switchable line Reactor at Solapur Main Bay of Kalwa(416) at Pune CGPL Bus -1 and Unit 10 Khanpur- Dehgam (PG)-2 464 765 465 400 400 466 467 220 468 400kV Chakan-Talegaon PG 7-May-15 Time 9:00 To Date 7-May-15 Basis Reason System Agency type WRTS-I WRTS-I R WRTS-I WRTS-I WRTS-I WRTS-I-CG R PGCIL WR-II C WRTS-I R WRTS-I WRTS-I R WRTS-I WRTS-I C WRTS-I PGCIL WRTS-I CGPL R GETCO GETCO Time Attending problem of TBC isolator at MSETCL Waluj S/S. Line AMP works For AMP work Replacing of porcelain dis isulators with polymer insulators in all polluted sections of line 18:00 Daily 7-May-15 08-May-15 18:00 18:00 Daily DAILY 8:00 08-May-15 18:00 Daily 7-May-15 8:00 8-May-15 18:00 Conti. 7-May-15 9:00 7-May-15 13:00 Daily 7-May-15 9:00 7-May-15 18:00 Daily 7-May-15 07-May-15 13:00 8AM 7-May-15 07-May-15 17:00 6PM Daily Daily 07-May-15 8:00 07-May-15 18:00 Daily AMP works at Pune-Talegoan (PG) CSD commissioning work at Solapur, line in service w/o reactor AMP works at Pune-Talegoan (PG) Porcelain Tension insulator replacement with polymer insulator(3 Nos) Bus -1 Gantry to Tie gantry With Bus -1 outage PMM work 7-May-15 8:00 7-May-15 18:00 Daily Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL 7/May/15 9:00 7/May/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R R AMP works (DCRM & Timing test of CB) WRTS-I {Line will be in service through Transfer bay} R 7/May/15 9:00 7/May/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL 471 765 220 KV SEONI( PG )- CHHINDWARA CKT- II 220 KV DAMOH PG - TIKAMGARH CKT 765/400KV ICT-1 At Sasan 7-May-15 9:00 8-May-15 18:00 Daily For LA Replacement SASAN RELIANCE 472 400 400 KV SATNA-IV MAIN BAY at Bina 07-May-15 09:00 07-May-15 18:00 Daily Bay AMP work. PGCIL WR-II R PGCIL WR-II C PGCIL PGCIL PGCIL MPPTCL MPPTCL WR-II WR-II WR-II WR-II WR-II C C C C C 469 220 470 220 7-May-15 09:00 9-May-2015 18:00 Daily 500MVA ICT#3 at Navsari Bus Reactor at Navsari Khandwa-Dhule-2 Shujalpur-Rajgarh Ckt-II Shujalpur-Rajgarh Ckt-I Bay 204 at Boisar ( 220 kV Bus Coupler Bay ) 07-May-15 07-May-15 07-May-15 07-May-15 07-May-15 10:00 15:00 10:00 10:00 15:00 07-May-15 07-May-15 07-May-15 07-May-15 07-May-15 14:00 19:00 18:00 14:00 19:00 Daily Daily Daily Daily Daily Erection of 765kV Circuit Breakers for Commissioning of 765KV Dharmjaygarh # 4 Bays For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur For NTAMC work at Shujalpur 07-May-15 9:00 07-May-15 17:00 Daily Bay AMP work. PGCIL WR-II R 480 400 Bay 419 (Main bay of ICT#1) at Indore 07-May-15 8:00 07-May-15 18:00 Daily AMP of bay equipments PGCIL WR-II C 481 400 Jindal # 4 (407) Main Bay 765 kV Main Bay of Autotransformer # 1 (Bay No 723) 07-May-15 8:00 07-May-15 20:00 Continuous AMP WORKS WRTS-I WRTS-I-CG C 07-May-15 8:00 08-May-15 16:00 Daily WRTS-I WRTS-I-CG R 473 765 474 475 476 477 478 400 400 400 220 220 479 220 482 765 765KV Bay No.: 817 Tie Bay of Bina # 2 at Jabalpur Pooling Station 483 400 Parli -1 LR at Shikrapur(Pune GIS) 7-May-15 10:00 7-May-15 14:00 Daily 484 765 714 Gwalior-II Tie Bay at Bina 07-May-15 09:00 7-May-15 18:00 Daily 485 400 Itarsi - Indore Ckt.2 07-May-15 8:00 12-May-15 18:00 Cont. 486 765 Sasa - Satan Ckt. 1 07-May-15 8:00 07-May-15 16:00 Daily 487 400 Ramagundam - Chandrapur - 2 07-May-15 7:00 08-May-15 19:00 Daily Main Bay of Aurangabad Line # 1(409) 8-May-15 9:00 8-May-15 8:00 8-May-15 8-May-15 8-May-15 488 400 489 400 490 400 491 765 492 400 Aurangabad(Waluj)-1 Main Bay at Aurangabad(PG) Tie Bay of Lonikand Line & Bus Reactor (414) at Pune Main Bay (713) Raichur-2 at Solapur Tie Bay of Kalwa & ICT # 3 (417) at Pune 8-May-15 AMP : 2015 - 16 Recator shall be taken out and line will be taken WRTS-I in service.(Non-switchable reactor) for Bushing oil DGA for Alstom bushings For repacement of trip & Close coils by M/s PGCIL ALSTOM Dismantlign of existing deformed tower at PGCIL loc.no. 509, erection of new tower and shifting the line on new tower. To attend hot spots idetified in thermovision scanning PGCIL POWERG Replacement of Insulators RID WRTS-I R WRTS-II C WRTS-II C WRTS-II R Inter Regional 13:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 8-May-15 18:00 Daily AMP works at Aurangabad(PG) WRTS-I WRTS-I R 9:00 8-May-15 13:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R 9:00 8-May-15 18:00 Daily Replacement of CB latch. WRTS-I WRTS-I C 13:00 8-May-15 17:00 Daily AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R Subject to ATC Restric WR-SR ATC RESTRIC SN KV 493 400 Line 400 KV D/C Korba-Khedamara Akola - Aurangabad-I Line ( Bay No. 494 400kV 404 & 403) at Akola 400 KV SATNA-IV/SHUJALPUR-II TIE 495 400 BAY at Bina 765KV Bus Reactor # 2 (Main & Tie 496 765 Bay) at Jabalpur Pooling Station From Date Basis 8-May-15 8:00 9-May-15 18:00 Continuou Crossing of 765 KV D/C Dharamjaygarhs Jabalpur Line(AP65/1-AP65/2) 8-May-15 8:00 8-May-15 18:00 Daily Replacement of faulty insulator strings MSETCL MSETCL 08-May-15 09:00 08-May-15 18:00 Daily Bay AMP work. PGCIL WR-II R Installation & Commissioning of CSD Relay PGCIL WR-II C PGCIL WR-II R PGCIL PGCIL PGCIL MPPTCL MPPTCL WR-II WR-II WR-II WR-II WR-II C C C C C PGCIL WR-II R WR-II C WR-II WRTS-I-CG C C WRTS-I-CG C WRTS-I-CG C V'chal - Jabalpur # 3&4 08-May-15 9:00 09-May-15 18:00 498 499 500 501 502 Kawas Navsari#1 Kawas Navsari#2 Khandwa-Itarsi-1 Shujalpur-Shujalpur Ckt-I Shujalpur-Shujalpur Ckt-II 08-May-15 08-May-15 08-May-15 08-May-15 08-May-15 10:00 15:00 10:00 10:00 15:00 08-May-15 08-May-15 08-May-15 08-May-15 08-May-15 14:00 19:00 18:00 14:00 19:00 Bay 205 at Boisar ( Transfer Bus Bay ) 08-May-15 9:00 08-May-15 17:00 Daily 8-May-2015 09:00 9-May-2015 18:00 For crossing of 800kV HVDC Champa Kurukshetra TL. For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur For NTAMC work at Shujalpur Bay AMP work. 8-May-15 10:00 8-May-15 14:00 08-May-15 09:00 8-May-15 18:00 511 765 512 765 08-May-15 9-May-15 8:00 8:00 08-May-15 16:00 9-May-15 18:00 513 9-May-15 9:00 9-May-15 18:00 Daily AMP works at Aurangabad(PG) 9-May-15 9:00 9-May-15 13:00 Daily 9-May-15 9-May-15 9-May-15 9:00 13:00 8:00 9-May-15 9-May-15 10-May-15 18:00 17:00 18:00 Daily Daily Daily 9-May-15 9/May/15 9/May/15 8:00 9:00 9:00 9-May-15 9/May/15 9/May/15 18:00 18:00 18:00 09-May-15 09:00 09-May-15 18:00 504 400 Nagda - Dehgam Ckt.2 08-May-15 8:00 09-May-15 18:00 505 400 506 400 Bay 420 (Tie bay of ICT#1) at Boisar Jindal # 3 (410) Main Bay at Raipur 08-May-15 08-May-15 8:00 8:00 08-May-15 08-May-15 18:00 20:00 507 220 Korba-Mobka D/C 08-May-15 8:00 09-May-15 18:00 508 400 ICT # 3 at Raipur SS 08-May-15 9:00 08-May-15 17:00 400 Parli -2 LR at Shikrapur(Pune GIS) 510 765 718 Gwalior-III Main Bay at Bina 514 515 516 517 Sasan - Satan Ckt.2 Tie bay Bus reactor (714) at Seoni Aurangabad(Waluj)-1 Tie Bay at 400 Aurangabad(PG) Main Bay of Bus Reactor (415) at 400 Raipur 765 Main Bay (716) Raichur-1 at Solapur 400 Main Bay of ICT # 3 (418) at Pune 400kV Babheleshwar-Padgha-ll 518 400kV 519 220 520 220 400 521 522 765 523 220 524 220 525 400 526 220 527 765 528 400 529 765 Deepnagar-Khadka Ckt - ll 220 KV DAMOH PGCIL I/C - I I 220 KV DAMOH PG - SAGAR CKT 400 KV SHUJALPUR-II MAIN BAY at Bina 765KV ICT # 1 at Jabalpur Pooling Station Navsari Navsari#1 Navsari Navsari#2 Khandwa-Itarsi-2 Bay 206 at Boisar ( Main Bay of 220 kV Boisar( MSETCL ) Line 1 Indore -Bhopal Line with reactor at Indore 400 KV BUS-I at Raipur ICT TIE bay at Durg PS type CSPTCL JTCL Replacing of porcelain dis isulators with Daily polymer insulators in all polluted sections of PGCIL line PGCIL Daily AMP of bay equipments Continuous AMP WORKS WRTS-I For construction of 765KV D/C Continuou CSPTCL Dharamjaygarh (Korba)-Jabalpur s Transmission Line (Part-I) Daily WRTS-I For NTMC Work Recator shall be taken out and line will be taken Daily WRTS-I in service.(Non-switchable reactor) for Bushing oil DGA for Alstom bushings For repacement of trip & Close coils by M/s Daily PGCIL ALSTOM Daily To attend hot spots idetified in thermovision scanning PGCIL Daily AMP works (Timing test of CB) WRTS-I 509 Agency Time 497 400 503 220 System To Date Continuou s Continuou s Daily Daily Daily Daily Daily 220 220 400 220 220 Reason Time WRTS-I R WRTS-II C WRTS-II WRTS-I R WRTS-I WRTS-I R AMP works at Pune-Talegoan (PG) WRTS-I WRTS-I R WRTS-I WRTS-I WRTS-I WRTS-I MSETCL MSETCL Daily daily daily Replacement of CB latch. AMP works at Pune-Talegoan (PG) Replacement of faulty insulator strings Relay testing, CB Timing, CRM Measurement & routine bay Maintenance. MAINTENANCE WORK MAINTENANCE WORK MSETCL MSETCL MPPTCL MPPTCL MPPTCL MPPTCL R R Daily Bay AMP work. PGCIL WR-II R PGCIL WR-II C PGCIL PGCIL PGCIL WR-II WR-II WR-II C C C PGCIL WR-II R PGCIL WR-II C WRTS-I WRTS-I WRTS-I-CG WRTS-I-CG C C 09-May-15 09:00 9-May-2015 18:00 Daily 09-May-15 09-May-15 09-May-15 10:00 15:00 10:00 09-May-15 09-May-15 09-May-15 14:00 19:00 18:00 Daily Daily Daily ICT Spare unit Commissioning with ICT # 1 for Swapping with ICT # 1 B Phase. For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa 09-May-15 9:00 09-May-15 17:00 Daily Bay AMP work. 09-May-15 8:00 09-May-15 18:00 Daily 09-May-15 09-May-15 6:00 9:00 09-May-15 10-May-15 22:00 17:00 To make spare unit free at Indore Continuous AMP WORKS continous CSD commssioning R C R SN KV Line From Date Time To Date Basis Reason System Agency type Time For repacement of trip & Close coils by M/s ALSTOM 530 765 718R Gwalior-III Reactor CB (Single phase) at Bina 09-May-15 09:00 9-May-15 18:00 Daily 531 400 Ramagundam - Chandrapur - 1 09-May-15 7:00 09-May-15 19:00 Daily PGCIL WRTS-II Replacement of Insulators POWERG RID Inter Regional KMPCL KMPCL MSETCL POWERGRID CB along with switchable Line Reactor to be taken out of service. Gwalior-Bina#III Line will be remain in service 532 400 KSK - RKMPL Ckt # 4 09-May-15 9:00 11-May-15 19:00 Continous shutdown required forTower erection and stringing 533 220 Jalna-Wakuj 09-May-15 8:00 10-May-15 8:00 Continous Commissioning of 765kV Aurangabad-Solapur 534 400kV Padgha-Kalwa-ll 535 765 536 400 765KV JBP - Dharmjaygarh Reactor Line # 1 Reactor at Jabalpur Pooling Station Khandwa-Seoni-1 10-May-15 8:00 10-May-15 10-May-15 09:00 10-May-15 10:00 10-May-15 18:00 11-May-15 18:00 c Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL Continuou Installation & Commissioning of CSD Relay s PGCIL WR-II C WR-II C WR-II C WRTS-II MPPTCL WRTS-I WRTS-I WRTS-I R R R C 537 765 Bus-I at Indore PG 10-May-15 8:00 10-May-15 538 539 540 541 542 Vindhyachhal (Poolig) - Satna Ckt.1 220 KV MEHGAON - AURAIYA CKT Seoni - Bina line Wardha-Aurangbad # 1 line Tie Bay (705) ICT-2 at Solapur 10-May-15 11/May/15 11-May-15 11-May-15 11-May-15 8:00 9:00 8:00 9:00 9:00 10-May-15 12/May/15 11-May-15 12-May-15 11-May-15 16:00 17:00 18:00 18:00 18:00 Daily daily Daily Daily Daily 11-May-15 8:00 20-May-15 18:00 Daily PGCIL For NTAMC work at Khandwa Busbar Integration for 714bay(Tie bay for PGCIL 765kV Indore vadodara line) To attend hot spots idetified in thermovision scanning PGCIL MAINTENANCE WORK MPPTCL Line AMP works WRTS-I NGR replacement work at Wardha WRTS-I Replacement of CB latch. WRTS-I PID testing of insulator strings. A/R shall be kept In non auto mode MSETCL 11/May/15 9:00 11/May/15 16:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 17:00 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL 220KV CT Erection ,Commitioning &Testing NTPC NTPC R Continous 18:00 14:00 19:00 18:00 14:00 19:00 18:00 Daily Daily Daily Daily Daily Daily Daily Bay AMP work. For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur For NTAMC work at Shujalpur For annual maintenace work PGCIL PGCIL PGCIL PGCIL PGCIL PGCIL PGCIL WR-II WR-II WR-II WR-II WR-II WR-II WR-II R C C C C C R WR-II C 765 220 765 765 765 543 400kV Koradi -Bhusawal 544 220 545 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 220 KV ITARSI ( PG ) - ITARSI CKT 11/May/15 9:00 11/May/15 546 220KV Jhanor-Haldharwa 1 11-May-15 8:00 15-May-15 547 548 549 550 551 552 553 11-May-15 11-May-15 11-May-15 11-May-15 11-May-15 11-May-15 11-May-15 09:00 10:00 15:00 10:00 10:00 15:00 9:00 11-May-15 11-May-15 11-May-15 11-May-15 11-May-15 11-May-15 11-May-15 400 400 400 400 400 400 765 554 400 555 765 556 400 557 400 558 765 559 560 400 KV SATNA-I MAIN BAY at Bina Gandhar Navsari#1 Gandhar Navsari#2 Khandwa-Seoni-2 Bina-Shujalpur Ckt-I Bina-Shujalpur Ckt-II 1000 MVA ICT#1 at Satna Indore (MP) - Asoj # 3 Bus Reactor Main Bay(706) at Bilaspur S/s 80 MVAR Bus Reactor at Raipur Line Terminal Equipment's of 400 kv Kotra - Raigarh Ckt # 1 18:00 Daily C Daily Daily MSETCL Gujarat Consent required 11-May-15 8:00 17-May-15 18:00 Line is presently charged under contingency scheme . Shutdown required for removing jumper, shifting of line to new tower and from 400kV switchyard to 765kV yard at Indore . Lines finally charged as per original Continous PGCIL approved schemes i.e. 400kV Indore (PG) Indore (MP) Ckt.2 and 765kV Indore (PG) Vadodara (pooling) line. Also testing of all protection and PLCC system at Indore and Vadodara ends before commissioning. 11-May-15 9:00 12-May-15 18:00 DAILY For AMP work WRTS-I WRTS-I-CG R 11-May-15 9:00 11-May-15 17:00 Daily For NTMC Work WRTS-I WRTS-I-CG C 11-May-15 8:00 11-May-15 12:00 Daily AMP : 2015 - 16 WRTS-I WRTS-I-CG R 719 Jabalpur-I Main Bay at Bina 11-May-15 09:00 11-May-15 18:00 Daily 765 765/400 KV ICT -1 at Gwalior 11-May-15 10:00 11-May-15 18:00 Daily 400 Taptitanda-Bableswar 11-May-15 8:00 11-May-15 8:00 daily Seoni - Wardha II & Seoni-Bina Line 12-May-15 561 765 R 8:00 12-May-15 18:00 Conti. For repacement of trip & Close coils by M/s ALSTOM CSD IN TIE CB shutdown required forTower erection and stringing Shutdown required on both the lines for stringing aux bus. PGCIL WRTS-II C PGCIL WRTS-II C MSETCL POWERGRID WRTS-I WRTS-I C SN Line From Date 12-May-15 12-May-15 To Date 12-May-15 12-May-15 Basis Reason System Agency type Time 9:00 8:00 Time 18:00 18:00 Daily Daily Replacement of CB latch. PMM work WRTS-I PGCIL WRTS-I GETCO C Gujarat Consent required 12-May-15 8:00 12-May-15 18:00 Daily Routine testing and maintenance work MSETCL MSETCL 12/May/15 9:00 12/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 12/May/15 10:00 12/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 12/May/15 9:00 12/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 12-May-15 12-May-15 08:30 hrs 13-May-15 9:00 12-May-15 17:30 Hrs. Continuous for Breaker and CT replacement. Daily 18:00 For LA Replacement NTPC SASAN NTPC RELIANCE 12-May-15 09:00 18:00 PGCIL WR-II R 12-May-15 09:00 PGCIL WR-II C 12-May-15 9:00 14-May-15 18:00 PGCIL WR-II C Navsari-Magarwada#1 Navsari-Magarwada#2 Khandwa-Rajgarh -2 Nagda-Shujalpur Ckt-I Nagda-Shujalpur Ckt-II 1000 MVA ICT#2 at Satna Main Bay of Autotransformer # 1 (Bay 579 400/220 No 430) at Raipur 720 Jabalpur-I/Jabalpur-III Tie Bay at 580 765 Bina 12-May-15 12-May-15 12-May-15 12-May-15 12-May-15 12-May-15 10:00 15:00 10:00 10:00 15:00 9:00 12-May-15 12-May-15 12-May-15 12-May-15 12-May-15 12-May-15 PGCIL PGCIL PGCIL PGCIL PGCIL PGCIL WR-II WR-II WR-II WR-II WR-II WR-II C C C C C R 12-May-15 8:00 12-May-15 WRTS-I WRTS-I-CG R 581 765 Seoni - Wardha I & II Line 13-May-15 8:00 15-May-15 18:00 Conti. Bus Reactor at Aurangabad(PG) Pune(GIS) Switchable line Reactor at Solapur 765KV Bus-1 at Seoni WTPS - Dehgam (PG) Haldarva - Jhanor - 2 (NTPC) 13-May-15 9:00 13-May-15 18:00 Daily 13-May-15 9:00 13-May-15 18:00 Daily 13-May-15 13-May-15 13-May-15 9:00 8:00 8:00 13-May-15 14-May-15 13-May-15 18:00 18:00 18:00 Daily Daily Daily 13-May-15 8:00 13-May-15 18:00 Daily For repacement of trip & Close coils by M/s ALSTOM Shutdown required on both the lines for stringing aux bus. AMP works at Aurangabad(PG) CSD commissioning work & Replacement of CB latch.at Solapur AMP Work PMM work PMM work Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper 13/May/15 9:00 13/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R KV 562 765 563 220 Tie Bay (705) ICT-1 at Solapur Haldarva - Jhanor-1 (NTPC) Main Bay of Akola -Wardha-II ( Bay 564 400kV No. 411) at Akola 220 KV ITARSI ( PG ) 565 220 HOSHANGABAD CKT 220 KV ANOOPUR - KOTMIKALA CKT 566 220 - Il 220 KV RAJGARH - SUJALPUR( PG) 567 220 CKT - I 568 400 Korba- Vandana line 569 765 765/400KV ICT-2 at Sasan 400 KV SATNA-I/BUS REACTOR TIE 570 400 BAY at Bina 765KV JBP - BINA # 3 Line Reactors 571 765 (Main & Tie Bay) at Jabalpur Pooling Station 572 400 573 574 575 576 577 578 Satna - Bina # 3&4 400 400 400 400 400 765 582 400 583 765 584 765 585 400 586 220 12-May-15 09:00 12-May-15 13-May-15 18:00 12-May-15 Daily Continuou Installation & Commissioning of CSD Relay s 14:00 19:00 18:00 14:00 19:00 18:00 Continuou s Daily Daily Daily Daily Daily Daily For crossing of 800kV HVDC Champa Kurukshetra TL. For NTAMC work at Navsari For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur For NTAMC work at Shujalpur For annual maintenace work 20:00 Daily AMP : 2015 - 16 18:00 Daily 587 400kV Chandrapur ll-Chandrapur l Ckt-ll 588 220 589 220 590 400 591 592 593 594 595 400 400 400 400 765 596 765 597 400 220 KV RAJGARH - SUJALPUR( PG) CKT - II 220 KV BADOD - KOTA CKT 400 KV BUS REACTOR MAIN BAY at Bina Bus#1 at Navsari Khandwa-Rajgarh-1 315MVA ICT#1 at Shujalpur Raipur- Sipat # 2 Line WRTS-II C WRTS-I WRTS-I C WRTS-I WRTS-I R WRTS-I WRTS-I C WRTS-I GETCO PGCIL WRTS-I GETCO GETCO R Gujarat Consent required MSETCL MSETCL 13/May/15 6:00 13/May/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 09:00 13-May-15 18:00 Daily Bay AMP work. PGCIL WR-II R 13-May-15 13-May-15 13-May-15 13-May-15 10:00 10:00 10:00 9:00 13-May-15 13-May-15 13-May-15 13-May-15 18:00 18:00 14:00 17:00 Daily Daily Daily Daily For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur For NTMC Work For repacement of trip & Close coils by M/s ALSTOM CB along with Bus Reactor-II to be taken out of service CSD commissioning work at Solapur PMM work Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper MAINTENANCE WORK PGCIL PGCIL PGCIL WRTS-I WR-II WR-II WR-II WRTS-I-CG C C C C 710 Bus Reactor-II CB at Bina 13-May-15 Bus Reactor at Solapur SSP - Rajgarh - 1 14-May-15 14-May-15 9:00 8:00 14-May-15 14-May-15 18:00 18:00 Daily Daily 14-May-15 8:00 14-May-15 18:00 Daily 09:00 13-May-15 18:00 Daily 14-May-15 14/May/15 8:00 9:00 14-May-15 14/May/15 18:00 18:00 Daily daily 599 400kV Lonikand-Lonikand II ckt ll 400 kv SEONI - SARNI - CKT PGCIL 13-May-15 598 400kV Parli-Lonikand II ckt ll 600 400 Bay AMP work. PGCIL WRTS-I GETCO WRTS-II WRTS-I GETCO C C MSETCL MSETCL MSETCL MSETCL MPPTCL MPPTCL R SN KV Line To Date 14/May/15 Basis Reason System Time 6:00 Time 18:00 Agency 601 220 220 KV BADOD - MODAK CKT From Date 14/May/15 daily MAINTENANCE WORK MPPTCL MPPTCL R 602 220 220 KV BINA( PG )- SHIVNPURI CKT 14/May/15 9:00 15/May/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 603 400 400 KV SATNA-II MAIN BAY at Bina 400KV Bus Reactor # 2 (Main & Tie Bay) at Jabalpur Pooling Station Bus#2 at Navsari ICT-1 at Khandwa 315MVA ICT#2 at Shujalpur ICT#1-50MVAR Bus Reactor Tie Bay (408 Bay) at Satna Main Bay of Autotransformer # 1 (Bay No 431) at Raipur 14-May-15 09:00 14-May-15 18:00 Daily Continuou s Daily Daily Daily Bay AMP work. PGCIL WR-II R Installation & Commissioning of CSD Relay PGCIL WR-II C For NTAMC work at Navsari For NTAMC work at Khandwa For NTAMC work at Shujalpur For Overhauling of Drive Mechanism of 408 Continous bay CB PGCIL PGCIL PGCIL WR-II WR-II WR-II C C C PGCIL WR-II R Daily AMP : 2015 - 16 WRTS-I WRTS-I-CG R PGCIL WRTS-I WRTS-I NPCIL WRTS-I WRTS-I R R C WRTS-I WRTS-I C 604 400 605 400 606 400 607 400 608 400 609 400 610 765 716 Jabalpur-II Main Bay at Bina TAPS-BOISAR -II 611 400 612 400/220 315MVA ICT -2 at Aurangabad(PG) 613 400 KOLHAPUR-MAPUSA I & II Raichur-1 Switchable line Reactor at 614 765 Solapur 400 CGPL Mundra Limbdi Line -2 and Unit 10 615 14-May-15 14-May-15 14-May-15 14-May-15 09:00 18:00 10:00 10:00 15:00 15-May-15 14-May-15 18:00 14-May-15 18:00 14-May-15 19:00 14-May-15 9:00 17-May-15 18:00 14-May-15 8:00 14-May-15 20:00 9:00 9:00 9:00 15-May-15 15-May-15 20-May-15 18:00 13:00 18:00 Daily Daily Conti. For repacement of trip & Close coils by M/s ALSTOM MAINTENANCE WORK AMP works at Aurangabad(PG) For LILO of line at KOLHAPUR(GIS) S/s 15-May-15 9:00 15-May-15 18:00 Daily CSD commissioning work at Solapur 15-May-15 8AM 15-May-15 6PM Daily 15-May-15 8:00 15-May-15 18:00 Daily Porcelain Tension insulator replacement with PGCIL CGPL polymer insulator(3 Nos)Bus -2 Gantry to line gantry of limbdi line -2 With limbdi line -2 outage Bay Maint. Work & dignostic Testing of reactor, CB, CT & relay, Replacement of broken spacer cum vibration damper MSETCL MSETCL 15-May-15 8:00 15-May-15 18:00 Daily Faulty disc replacement ,Fixing of spacers ,damper .and other line maintence work 14-May-15 15-May-15 15-May-15 15-May-15 09:00 14-May-15 18:00 Daily 616 400kV Parli- Chandrapur ll Ckt-ll 617 400kV Akola-Nandgaonpeth 618 400kV Waluj-Tapthitanda PGCIL type WRTS-II C MSETCL MSETCL 619 400 Korba- Bhatapara line 15-May-15 15-May-15 8:00 15-May-15 08:30 hrs 16-May-15 MSETCL NTPC 620 765 765 KV JABALPUR-BINA#2 LINE 15-May-15 9:00 WR-II R 621 220 622 400 Bus#1 at Navsari ICT-2 at Khandwa 15-May-15 15-May-15 10:00 10:00 WR-II WR-II C C 623 400 Pirana - Asoj D/C 15-May-15 8:00 WR-II C 624 8:00 BUS-II at Indore 15-May-15 625 765 Bilaspur-Korba Line 15-May-15 9:00 626 400 Korba-Raipur D/C 15-May-15 8:00 627 400 Raipur- Sipat # 1 Line 15-May-15 9:00 628 Dehgam - Pirana Ckt.1 15-May-15 765 400 8:00 18:00 Dignostic Testing of reactor, CB, CT & relay MSETCL Daily 17:30 Hrs. Continuous for Breaker and CT replacement. NTPC To carry out the Jumper rectorfication work 15-May-15 15:00 Daily PGCIL in Line at Bina end. 15-May-15 18:00 PGCIL Daily For NTAMC work at Navsari 15-May-15 18:00 PGCIL Daily For NTAMC work at Khandwa Line is presently charged under contingency scheme. Shutdown required for removing jumpers, line shifting to new tower for terminating at 765kV Vadodara GIS. Lines 19-May-15 18:00 Continous finally charged as per original approved PGCIL schemes i.e. 400kV D/C Vadodara (Pooling) Asoj and 400kV D/C Vadodara (Pooling) Pirana lines. Also testing of all protection and PLCC system at Asoj, Vadodara and Pirana ends. DT scheme test for vadodara line with LBB 18:00 Daily PGCIL and BB relay 15-May-15 For installation & commiissiong of Stand15-May-15 18:00 DAILY WRTS-I alone DR For construction of 765KV D/C Continuou 16-May-15 18:00 WRTS-I Dharamjaygarh (Korba)-Jabalpur s Transmission Line (Part-I) 15-May-15 17:00 Daily WRTS-I For NTMC Work Replacement of defective porcelain disc insulator strings with polymer insulators in 15-May-15 18:00 Daily PGCIL complete line to avoid undersirable line tripping due to insulator flashover due to heavy pollution subjected to real time c WR-II C WRTS-I-CG R WRTS-I-CG C WRTS-I-CG C WR-II C SN KV Line From Date Time To Date Basis Reason System Agency type Time To facilitate for insulator replacement of 400kV Dehgam - Pirana Ckt.1 in Multi circuit towers. Crossing work of 765kV DharamjaigarhContinuou Jabalpur Line Part-II between loc 54A/6s 54A/7 and 67A/1-67B/0 For repacement of trip & Close coils by M/s Daily ALSTOM Dismantlign of existing deformed tower at Cont. loc.no. 153, erection of new tower and shifting the line on new tower. 629 400 Pirana - Vadodara Ckt.2 15-May-15 8:00 15-May-15 18:00 630 400 Anuppur-Jabalpur# 1&2 15-May-15 8:00 17-May-15 18:00 631 765 717 Jabalpur-II/Gwalior-III Tie Bay at Bina 15-May-15 09:00 15-May-15 18:00 632 400 Indore - Asoj Ckt.2 15-May-15 8:00 19-May-15 18:00 633 400 Parli-Lonikand-1 15-May-15 8:00 16-May-15 19:00 Durg PS-Wardha # 1 Line 16-May-15 9:00 17-May-15 18:00 Daily LA Connector replacement work at Wardha WRTS-I WRTS-I R 635 765 765KV Bus-2 at Seoni 636 400 Bus reactor (125 MVAR) at Seoni 637 765/400 1500MVA ICT-1 at Seoni 16-May-15 16-May-15 16-May-15 9:00 8:00 8:00 16-May-15 18:00 16-May-15 18:00 16-May-15 18:00 Daily Daily Daily WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I WRTS-I R R R 638 765 WARDHA - AURANGABAD(PG) I 16-May-15 9:00 16-May-15 18:00 Conti. WRTS-I WRTS-I R CGPL Mundra Limbdi Line -2 and Unit 10 16-May-15 8AM 16-May-15 6PM Daily PGCIL CGPL 640 400kV Babheleshwar-Padgha-l 641 220 220 KV DAMOH PGCIL I/C - I 16-May-15 16/May/15 8:00 9:00 17-May-15 16/May/15 Daily daily 642 220KV Jhanor-Haldharwa 2 16-May-15 8:00 19-May-15 18:00 18:00 18:00 AMP Work DGA sampling of bushing. AMP works For the commissioning of spare reactor at Aurangabad(PG) Porcelain Tension insulator replacement with polymer insulator(3 Nos)Bus -2 Gantry to line gantry of limbdi line -2 With limbdi line -2 outage Replacement of faulty insulator strings MAINTENANCE WORK 220KV CT Erection ,Commitioning &Testing 16-May-15 09:00 16-May-15 16-May-15 10:00 10:00 16-May-15 16-May-15 18:00 18:00 Continuou Installation & Commissioning of CSD Relay s Daily For NTAMC work at Navsari Daily For NTAMC work at Khandwa 16-May-15 8:00 16-May-15 20:00 Daily 634 765 400 639 643 765 644 220 645 400 646 400 765KV Bus Reactor # 1 (Main & Tie Bay) at Jabalpur Pooling Station Bus#2 at Navsari Bus Reactor-1 at Khandwa 400 KV Bay No 441 (Main Bay Kotra Raigarh Ckt # 1) 16-May-15 18:00 Daily Continous Replacement of defective porcelain disc insulator strings with polymer insulators in complete line to avoid undersirable line tripping due to insulator flashover due to heavy pollution Dehgam - Pirana Ckt.2 16-May-15 8:00 16-May-15 18:00 648 400 Parli-Lonikand-2 17-May-15 8:00 18-May-15 19:00 17-May-15 17-May-15 9:00 09:00 17-May-15 09:00 652 400 765KV Bus-1 at Solapur 400 KV BINA(PG)-BINA(MPPTCL)#3 400KV Bus # 2 at Jabalpur Pooling Station Bus Reactor-2 at Khandwa 17-May-15 10:00 653 Dehgam - Pirana Ckt.1 17-May-15 654 400 Indore - Asoj Ckt.2 18-May-15 8:00 19-May-15 18:00 Daily 655 765 656 220 Tie bay Bina (726) at Seoni Bus Coupler bay (207) at Seoni 18-May-15 18-May-15 8:00 8:00 20-May-15 19-May-15 18:00 18:00 Daily Daily AMP Work For AMP work Testing & Commissioning of 400KV Bay No.: 413 of Jhabua Power Bays For NTAMC work at Khandwa Replacement of defective porcelain disc insulator strings with polymer insulators in complete line to avoid undersirable line tripping due to insulator flashover due to heavy pollution Replacing of porcelain dis isulators with polymer insulators in all polluted sections of line AMP works (DCRM & Timing test of CB) AMP works (DCRM & Timing test of CB) 657 765 Durg PS-Wardha # 2 Line 18-May-15 9:00 19-May-15 18:00 658 765 659 765 765KV Bus-2 at Wardha 765KV Bus-2 at Solapur 18-May-15 18-May-15 9:00 9:00 19-May-15 18-May-15 18:00 18:00 651 400 400 8:00 18:00 14:00 18-May-15 18:00 17-May-15 17-May-15 18:00 18:00 Daily AMP : 2015 - 16 400 17-May-15 17-May-15 WR-II C PGCIL WR-II C PGCIL WRTS-II C PGCIL WRTS-II C Continous Crossing of 765 kV Solapur-Aurngabad new line MSETCL 647 649 765 650 400 PGCIL MSETCL MSETCL MPPTCL MPPTCL R NTPC NTPC Gujarat Consent required PGCIL WR-II C PGCIL PGCIL WR-II WR-II C C WRTS-I WRTS-I-CG R PGCIL WR-II Continous Crossing of 765 kV Solapur-Aurngabad new line MSETCL Daily Daily Continuou s Daily Daily POWERGRID C POWERGRID WRTS-I PGCIL WRTS-I WR-II R R PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C PGCIL WR-II C WRTS-I WRTS-I WRTS-I WRTS-I R R Daily LA Connector replacement work at Wardha WRTS-I WRTS-I R Daily Daily Bus Extension Work for Raipur Ckt 3&4 AMP Work WRTS-I WRTS-I R R WRTS-I WRTS-I SN Line From Date 18-May-15 To Date 18-May-15 Basis Reason Time 8AM Time 6PM Daily Porcelain Tension insulator replacement with PGCIL polymer insulator(2 Nos) Bus -2 Gantry to tie side gantry with Bus -2 and Limbdi line -2 outage 18-May-15 8:00 18-May-15 18:00 Daily MSETCL MSETCL 18-May-15 8:00 18-May-15 18:00 Daily 18/May/15 9:00 18/May/15 16:00 daily MAINTENANCE WORK MPPTCL MPPTCL R 664 400 Dhule-Bableshwar-l 220 KV PITHAMPUR - RAJGARH PG CKT - II 400 KV BINA(PG)-BINA(MPPTCL)#4 Replacement of faulty insulator strings Relay testing, CB Timing, CRM Measurement & routine bay Maintenance. 18-May-15 09:00 18-May-15 14:00 Daily WR-II R ICT#1 Main Bay (409 Bay) at Satna 18-May-15 9:00 21-May-15 18:00 Continous PGCIL WR-II R 666 Indore (PG) -Indore (MP) -2 18:00 Daily PGCIL WR-II C 17:00 Daily For AMP work For Overhauling of Drive Mechanism of 409 bay CB protection transfer scheme test at 400kV MPPTCL SS For NTMC Work PGCIL 665 400 WRTS-I WRTS-I-CG C 12:00 Daily AMP : 2015 - 16 WRTS-I WRTS-I-CG R PGCIL WR-II C PGCIL WR-II C KV 400 660 661 400kV 662 400kV 663 220 400 667 400 668 400 CGPL Bus 2 and CGPL Mundra Limbdi Line -2 and Unit 10 Akola - Aurangabad-II Line ( Bay No. 406 & 407 at Akola Raipur- NSPCL # 1 Line Line Terminal Equipment's of 400 kv Kotra - Raigarh Ckt # 2 18-May-15 18-May-15 18-May-15 8:00 9:00 18-May-15 18-May-15 8:00 18-May-15 669 400 Dehgam - Pirana Ckt.2 18-May-15 8:00 18-May-15 18:00 Daily 670 400 Pirana - Vadodara Ckt.1 18-May-15 8:00 18-May-15 18:00 Daily 765KV Bus-1 at Aurangabad(PG) CGPL Bus 2 and CGPL Mundra Limbdi Line -2 and Unit 10 19-May-15 19-May-15 9:00 8AM 19-May-15 19-May-15 18:00 6PM Daily Daily 673 400kV Warora-Chandrapur ll Ckt-1 674 400 400 KV DAMOH - KATNI - CKT 220 KV SUJALPUR - SUJALPUR( PG) 675 220 CKT - I 220 KV SUJALPUR - SUJALPUR( PG) 676 220 CKT - II 19-May-15 19/May/15 8:00 9:00 19-May-15 19/May/15 18:00 18:00 Daily daily Replacement of defective porcelain disc insulator strings with polymer insulators in complete line to avoid undersirable line tripping due to insulator flashover due to heavy pollution To facilitate for insulator replacement of 400kV Dehgam - Pirana Ckt.2 in Multi circuit towers. AMP Work Porcelain Tension insulator replacement with polymer insulator(2 Nos) Bus -2 Gantry to tie side gantry with Bus -2 and Limbdi line -2 outage Bay Maintenance work MAINTENANCE WORK 19/May/15 9:00 19/May/15 17:00 daily 19/May/15 9:00 19/May/15 17:00 daily 19-May-15 09:00 19-May-15 17:00 Daily 671 765 400 672 677 765 678 500 679 765 680 400 681 400 765 KV INDORE LINE REACTOR at Bina HVDC Chandrapur-Padghe Bipole 765KV Bus-2 at Aurangabad(PG) SSNL - Dhule - 1 Vadavi - Dehgam (PG) - 2 682 400kV Padgha-Nagothane-ll 683 400 Satna - Bina # 1&2 684 400 Raipur- NSPC # 2 Line NOTE: 1 2 3 19-May-15 8:00 20-May-15 19:00 20-May-15 20-May-15 20-May-15 9:00 8:00 8:00 20-May-15 20-May-15 20-May-15 18:00 18:00 18:00 20-May-15 8:00 20-May-15 18:00 20-May-15 9:00 22-May-15 18:00 20-May-15 9:00 20-May-15 17:00 Agency type CGPL MSETCL MSETCL WRTS-I PGCIL WRTS-I CGPL R MSETCL MSETCL MPPTCL MPPTCL R MAINTENANCE WORK MPPTCL MPPTCL R MAINTENANCE WORK MPPTCL MPPTCL R PGCIL R Switcheable Reactor to be taken out of service to carry out the AMP work. Line shall be remain in service. Crossing of 765 kV Solapur-Aurangabad new Continous line Daily AMP Work Daily PMM work Daily PMM work Daily Continuou s Daily System MSETCL WRTS-I GETCO GETCO WR-II POWERGRID WRTS-I GETCO GETCO Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL For crossing of 800kV HVDC Champa PGCIL WR-II Kurukshetra TL. WRTS-I WRTS-I-CG For NTMC Work Maharashtra consent required R C C FROM SINGLE NODE EITHE LINE OUTAGE OR AUTORECLOSING FOR OPGW WILL BE ALLOW AT A TIME. LINE WISE OPGW WORK SHALL BE INTIMATED TO WRPC/WRLDC ON D-3 BASIS OTHERWISE IT OUTAGES PROPOSAL GET AUTOMATICALLY CANCELLED. GOOGLE SHEET SHALL BE USED FOR INTIMATION & CONFIRMATION PURPOSE IN IP ADDRESS URL:https://docs.google.com/spreadsheets/d/1M-JeQbm6Cer8dB0uHStyPcGIMs95U s7TqqFrxq77mGY/edit#gid=863831921 Anaulagnak Ap`Ola 2015 AaOr ma[- 2015 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR APRIL 2015 maaMga rajya State AND MAY 2015 }jaa- kI AavaSyakta DEMAND ENERGY REQUIREMENT maogaavaaT (MW) Ap`Ola 2015 ma[- 2015 imailayana yauinaTsa (MUs) Ap`Ola 2015 ma[- 2015 APRIL 2015 MAY 2015 APRIL 2015 MAY 2015 1 gaujarat GUJARAT saIimat AsaIimat RESTRICTED 13700 14200 8730 9150 UNRESTRICTED 13740 14240 8740 9160 RESTRICTED 7220 7395 4680 4960 UNRESTRICTED 7220 7395 4680 4960 RESTRICTED 3625 3522 2125 1914 UNRESTRICTED 3675 3597 2135 1926 2 maQya p`doSa saIimat AsaIimat 3 C<aIsagaZ, saIimat AsaIimat 4 maharaYT/ MADHYA PRADESH CHHATISGARH MAHARASHTRA saIimat AsaIimat RESTRICTED 20400 20800 12500 12700 UNRESTRICTED 20450 20850 12550 12750 5 gaaovaa GOA RESTRICTED 405 410 290 295 UNRESTRICTED 410 415 295 295 RESTRICTED 315 315 190 190 UNRESTRICTED 320 320 195 195 RESTRICTED 635 640 455 460 UNRESTRICTED 640 645 460 465 RESTRICTED 45305 46265 28000 28500 UNRESTRICTED 44668 45637 28500 29500 saIimat AsaIimat 6 dmana dIva saIimat AsaIimat 7 DI ena eca saIimat AsaIimat 8 piScama xao~ saIimat AsaIimat 3.3 DD DNH WESTERN REGION Anaulagnak 4.1 maah maaca- 2015 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata ACTUAL GENERATION & AVALABILITY FOR MARCH 2015 Schedule yaaojanaa k`maaMk Sr. No. sToSana ka naama }jaa- Station Name Energy (Gwh) Actual vaastivak carma }jaa- Peak (Mw) carma Energy (Gwh) Auxillary Consumption Peak (Mw) (Gwh) k (A) gaujarat GUJARAT jalaIya 1. 2. 3. 4. 6. tapIya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 HYDRO ]k[- Ukai - 1 ]k[- Ukai - 2 ]k[- Ukai - 3 ]k[- Ukai - 4 ]k[- Ukai (Total) ]k[- ela baI saI eca Ukai LBCH - 1 ]k[- ela baI saI eca Ukai LBCH - 2 ]k[- ela baI saI eca Ukai LBCH (Total) kDanaa Kadana - 1 kDanaa Kadana - 2 kDanaa Kadana - 3 kDanaa Kadana - 4 kDanaa Kadana (Total) pnama PANAM & Madhuban Dam 1 & 2 kula jalaIya TOTAL(H) 36.63 0.00 20.81 0.00 57.44 0.76 0.63 1.39 1.01 2.09 0.00 4.35 7.45 6.77 73.05 75 0 75 0 150 2 2 4 60 62 0 62 62 9 225 0.00 77.10 75.75 79.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.27 16.63 0.00 130.46 113.24 83.47 266.20 0.00 0.00 84.52 20.76 119.80 126.71 108.28 124.32 86.97 82.75 69.86 124.14 0.00 0.00 0 124 123 124 0 0 0 0 0 0 0 100 92 0 183 202 211 371 0 0 212 210 212 210 210 195 212 214 211 211 0 0 42 150 2 3 16 0 60 120 0 273 42 85 0 74 60 120 0 121 0 0 0 0 0 0 0 0 70 70 36 140 19 100 100 200 200 50 70 70 136 145 37 0 145 145 89 145 145 145 0 0 100 100 210 210 210 0 210 210 150 210 210 210 0 0 0 0 0.00 0 0.000 0 0 13.28 228 1.318 0 0 0.00 0 0.000 0 0 10.32 145 0.000 Sr. No. 37 38 39 40 41 42 43 44 0.024 0.000 0.000 0.013 0.006 0.002 0.417 THERMAL TaoronT pavar ilaimaToD yauinaT saI TaoronT pavar ilaimaToD yauinaT DI TaoronT pavar ilaimaToD yauinaT [TaoronT pavar ilaimaToD yauinaT ef TaoronT pavar ilaimaToD yauinaT jaI TI 1 TaoronT pavar ilaimaToD yauinaT jaI TI 2 TaoronT pavar ilaimaToD yauinaT esa TI jaI Qauvarna tapIya Dhuvaran - 5 Qauvarna tapIya Dhuvaran - 6 Qauvarna tapIya Dhuvaran - GT 1 Qauvarna tapIya Dhuvaran - GT 2 Qauvarna tapIya Dhuvaran - STG ]ka[- yauinaT 1 Ukai -1 ]ka[- yauinaT 2 Ukai -2 ]ka[- yauinaT 3 Ukai -3 ]ka[- yauinaT 4 Ukai -4 ]ka[- yauinaT 5 Ukai -5 ]ka[- yauinaT 6 Ukai -6 gaaMQaInagar 1 Gandhinagar - 1 gaaMQaInagar 2 Gandhinagar - 2 gaaMQaInagar 3 Gandhinagar - 3 gaaMQaInagar 4 Gandhinagar - 4 gaaMQaInagar 5 Gandhinagar - 5 vaNakbaaorI 1 Wanakbori - 1 vaaNakbaaOrI 2 Wanakbori - 2 vaaNakbaaOrI 3 Wanakbori - 3 vaaNakbaaOrI 4 Wanakbori - 4 vaaNakbaaOrI 5 Wanakbori - 5 vaaNakbaaOrI 6 Wanakbori - 6 vaaNakbaaOrI 7 Wanakbori - 7 ]%trna Utran GT 1 ]%trna Utran GT 2 ]%trna UTRAN - GT- 3 ]%trna UTRAN - GT-4 ]%trna UTRAN - STG-I ]%trna UTRAN - STG-II Schedule yaaojanaa k`maaMk 0.000 sToSana ka naama }jaa- Station Name Energy (Gwh) isa@ka Sikka - 1 isa@ka Sikka - 2 kcC ilagnaa[-T Kutch Lignite - 1 kcC ilagnaa[-T Kutch Lignite - 2 kcC ilagnaa[-T Kutch Lignite - 3 kcC ilagnaa[-T Kutch Lignite - 4 saUrt ilagnaa[-T Surat Lignite - 1 saUrt ilagnaa[-T Surat Lignite - 2 0.430 6.608 6.398 6.999 0.000 0.000 1.138 0.558 1.911 0.145 11.260 11.126 8.128 20.302 0.088 0.061 9.145 2.758 12.227 0.000 0.006 0.000 Actual vaastivak carma }jaa- Peak (Mw) 70 70 45 45 47 0 110 110 70 70 75 0 173 240 carma Energy (Gwh) 24.82 70.67 44.19 44.80 31.02 32.39 0.00 78.11 Auxillary Consumption (Gwh) Peak (Mw) 111 117 69 71 63 54 0 130 3.216 7.853 7.989 7.206 0.250 7.557 saUrt ilagnaa[-T Surat Lignite - 3 saUrt ilagnaa[-T Surat Lignite - 4 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 jaI Aa[- pI saI ela GIPCL GT - 1 jaI Aa[- pI saI ela GIPCL GT - 2 jaI Aa[- pI saI ela GIPCL GT - 3 jaI Aa[- pI saI ela GIPCL ST - 1 jaI Aa[- pI saI ela GIPCL GT - 4 jaI Aa[- pI saI ela GIPCL ST - 2 [- esa esa e Aar ESSAR GT - 1 [- esa esa e Aar ESSAR GT - 2 [- esa esa e Aar ESSAR GT - 3 [- esa esa e Aar ESSAR STG jaI pI [- saI GPEC GT - 1 jaI pI [- saI GPEC GT - 2 jaI pI [- saI GPEC GT - 3 jaI pI [- saI GPEC STG jaI esa [- jaI GSEG GT - 1 jaI esa [- jaI GSEG GT - 2 jaI esa [- jaI GSEG STG 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 60 kula tapIya Total (T) kula jalaIya+tapIya Total (H+T) ivaMD [najaI- Wind Energy kula jalaIya+tapIya+hvaa Total (H+T+Wind) ivainamaya Exchanges saIimat }jaa- maaMga Restricted Energy Req. jalaIya 1.1 1.2 1.3 2 3 4 5 6 7 8 9 10 11 12 13 14 140 95 140 480 430 600 90 150 0 50 0 100 5277 6130 7992 9359 (+) 8730 MADHYA PRADESH 1 95 350 Sugen (GT 1 + GT 2) saIpIpI sao Aayaat Imp from CPP+MUNDRA K (B) 100 79.74 89.59 53.27 74.17 14.89 11.61 10.42 20.98 1.72 0.66 0.00 0.00 0.00 0.00 0.00 5.32 14.74 7.62 11.83 1.05 6.44 254.15 1282.27 128 129 99 107 31 32 32 48 94 47 0 0 0 0 0 149 145 151 51 46 49 382 1781 8.136 8.796 7.989 4091.82 4164.87 487.58 4652.44 3780.20 8432.64 11450 11668 383.442 383.859 26.57 23.06 18.68 11.40 8.03 45.83 2.18 95.54 8.28 10.01 9.46 1.59 0.07 0.00 2.14 96.76 208.78 507.20 166 115 118 99 156 89 5 316 0 32 21 56 20 0 11 384 860 2217 Sr. No. 2 3 4 5 6 7 8 9 10 11 12 13 14 0.206 0.307 0.199 0.243 1.115 7.347 12418 maQya p`doSa 50 114 40 50 75 90 130 0 30 0 30 15 0 20 210 610 1185 315 0 60 0 60 20 0 30 360 990 2114 Schedule yaaojanaa k`maaMk 1 0.000 HYDRO cambala pir Chambal Pr.(50%share) gaaMQaI saagar Gandhi Sagar raNaa p`tap sagar R.P.Sagar javaahr sagar Jawahar Sagar ponca Pench baargaI Bargi baargaI Bargi (LBCH) banasaagar Toansa Bansagar-1 (Tons) banasaagar Bansagar-2 (Deolondh) banasaagar Bansagar-3 (Silpara) banasaagar Bansagar-4 (Zinaha) maoDIKoDa Medikheda ibarisaMGapur Birsingpur Tavaa Tawa rajaGaaT Rajghat Omkareshwar [Midra saagar Indira Sagar kula jalaIya TOTAL(H) MPPGCL tapIya 0.000 sToSna ka naama }jaa- Station Name Energy (Gwh) 0.120 0.040 0.020 0.090 0.060 0.220 0.080 0.040 0.010 0.090 0.449 0.870 1.708 Actual vaastivak carma }jaa- Peak (Mw) Energy (Gwh) carma Peak (Mw) Auxillary Consumption (Gwh) THERMAL AmarkMTk II AMK II Unit -1 AmarkMTk II AMK II Unit -2 AmarkMTk III AMK III Unit -5 satpura I Satpura-I(60%Share) satpura II Satpura-II Unit 6 satpura II Satpura-II Unit 7 satpura II Satpura-II Unit 8 satpura II Satpura-II Unit 9 satpura III Satpura-III Unit 10 satpura III Satpura-III Unit 11 esajaITIpIesa 1 SGTPS Unit - 1 esajaITIpIesa 2 SGTPS Unit - 2 esajaITIpIesa 3 SGTPS Unit - 3 esajaITIpIesa 4 SGTPS Unit - 4 esajaITIpIesa 5 SGTPS Unit - 5 15 16 SSTPS kula tapIya Total (T) kula jalaIya+tapIya Total (H+T) Injection from WIND 61 82 0 50 0 67 128 163 122 163 142 191 144 194 291 390 1057 2572 1409 4036 0.00 0.00 154.58 0.00 69.74 106.35 119.99 83.80 101.39 34.76 34.76 106.96 32.06 110.60 0.00 321.72 1026.41 1533.61 131.01 0 0 217 0 195 190 192 180 189 187 187 180 178 186 0 1218 2790 5110 0 14.790 0 0.000 16.830 19.990 24.620 15.150 15.150 2.940 22.360 134.650 136.358 kula jalaIya+tapIya + ivaMD Total (H+T+WIND) ivainamaya Exchanges saIimat }jaa- maaMga Rest. En. Req. (+) 5183 1664.62 1951.65 3616.28 5110 4.80 6.82 0.53 12.15 120 10 7 137 0.050 0.070 27.64 27.64 27.64 27.84 36.85 66.82 116.93 116.93 116.93 116.93 181.76 182.79 1413.55 0.00 0.00 1413.55 1425.70 799.41 2225.11 43 0 44 46 120 120 210 210 210 210 255 255 1917 0 0 1917 2054 0 2054 11.780 124.08 50.99 109.96 8.89 89.85 32.79 3.83 4.84 20.95 9.08 4.56 30.56 78.27 537.35 550 320 1120 37 472 61 18 4 39 64 80 250 0 1665 2.138 CHHATTISGARH C<aIsagaZ, ga (C) jalaIya HYDRO 1 hsadova baaMgaao Hasdeo Bango 2 Gangrel 3 Mini Micro KWB kula jalaIya TOTAL(H) CSEB tapIya 1 2 3 4 5 6 7 8 9 14 kaorbaa (pU) Korba (E) Unit-1 kaorbaa (pU) Korba (E) Unit-2 kaorbaa (pU) Korba (E) Unit-3 kaorbaa (pU) Korba (E) Unit-4 kaorbaa (pU) Korba (E) Unit -5 kaorbaa (pU) Korba (E) Unit -6 kaorbaa (p) Korba (W) Unit -1 kaorbaa (p) Korba (W) Unit -2 kaorbaa (p) Korba (W) Unit -3 kaorbaa (p) Korba (W) Unit -4 baalakao sao Aayaat BALCO Import ijandla sao Aayaat JINDAL Import kula tapIya Total (T+IPP) kula jalaIya+tapIya Total (H+T) ivainamaya Exchanges saIimat }jaa- maaMga Rest. En. Req. Ga (D) jalaIya 2 3 4 5 6 7 8 9 10 11 12 13 61 139 30 30 30 30 71 71 125 125 125 125 0 149 50 50 50 50 120 120 210 210 210 210 250 250 911 966 1780 1900 (+) 2125 MAHARASHTRA 1 120 19 tapIya 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 24.830 21.560 7.590 7.480 97.460 97.590 HYDRO 74 49 165 10 120 3 5 3 0 0 9 37 32 506 300 150 600 20 444 60 10 5 0 0 80 250 47 1966 Schedule yaaojanaa Sr. No. 21.480 maharaYT/ kaoyanaa 1AaOr 2 Koyna 1 & 2 kaoyanaa III Koyna III kaoyanaa IV Koyna IV kaoyanaa DIpIeca Koyna DPH TaTa jalaIya TATA Hydro vaOtrNaa Vaitarna eladarI Eldari BaTgar AaOr vaIr Bhatgar & Vir pOzana Paithan itlaarI Tillari BaIra Tola rosa Bhira Tail Race GaTGar Ghatghar Anya CaoTo jalaIya Small Hydro (others) kula jalaIya TOTAL(H) k`maaMk 3 0.130 THERMAL 10 11 KORBA(EB) Extn - 1 12 KORBA(EB) Extn - 2 kula tapIya Total (T) 13 55 6 sToSana ka naama }jaa- Station Name Energy (Gwh) 2.533 4.671 Actual vaastivak carma }jaa- Peak (Mw) Energy (Gwh) carma Auxillary Consumption (Gwh) Peak (Mw) THERMAL naaisak 3 Nasik Unit -3 naaisak 4 Nasik Unit -4 naaisak 5 Nasik Unit -5 T/ambao 4 Trombay Unit -4 T/ambao 5 Trombay Unit -5 T/ambao 6 Trombay Unit -6 T/ambao 8 Trombay Unit -8 T/ambao 7A gaOsa Trombay -7A (Gas) T/ambao 7ba Trombay -7B (WHR) kaoraD,I 5 Koradi Unit -5 kaoraD,I 6 Koradi Unit -6 kaoraD,I 7 Koradi Unit -7 Bausaavala 2 Bhusawal Unit -2 Bausaavala 3 Bhusawal Unit -3 Bausaavala 4 Bhusawal Unit -4 Bausaavala 4 Bhusawal Unit -5 parlaI 3 Parli Unit -3 parlaI 4 Parli Unit -4 parlaI 5 Parli Unit -5 parlaI 6 Parli Unit -6 parlaI 7 Parli Unit -7 KaprKoD,a 1 Khaperkheda Unit -1 KaprKoD,a 2 Khaperkheda Unit -2 KaprKoD,a 3 Khaperkheda Unit -3 105 85 133 0 250 130 0 140 115 180 0 500 500 0 0 0 65 75 75 110 100 250 0 0 0 0 155 40 80 100 350 85 100 100 150 135 335 0 0 0 0 210 55 110 135 470 137.40 136.10 118.44 0.00 283.50 38.35 170.53 66.98 43.00 0.00 67.42 118.67 0.00 0.00 110.46 0.00 0.00 98.53 83.70 144.31 132.18 125.76 117.62 124.00 210 202 192 0 502 246 253 128 72 0 175 188 0 0 200 0 0 178 163 250 250 205 185 215 2.898 27 28 30 31 32 33 34 35 36 37 38 39 40 41 42 KaprKoD,a 4 Khaperkheda Unit -4 KaprKoD,a 5 Khaperkheda Unit -5 parsa Paras-3 parsa Paras-4 ]rna Uran (Gas) ]rna Uran (WHR) caMd`pur 1 Chandrapur Unit -1 caMd`pur 2 Chandrapur Unit -2 caMd`pur 3 Chandrapur Unit -3 caMd`pur 4 Chandrapur Unit - 4 caMd`pur 5 Chandrapur Unit -5 caMd`pur 6 Chandrapur Unit -6 caMd`pur 7 Chandrapur Unit -7 DhaNaU 1 Dahanu Unit-1 DhaNaU 2 Dahanu Unit-2 CPP 43 44 RGPPL Share kula tapIya Total (T) 135 135 200 200 100 100 100 90 70 80 190 150 180 180 430 430 220 135 135 120 95 110 255 200 372 500 0.00 200 6290 0.00 300 9090 6966 9960 (+) MAH. Wind + Solar Generation kula jalaIya +tapIya Total (H+T+Wind) Exchanges TOTAL (H+T) ivainamaya saIimat }jaa- maaMga Rest. En. Req. gaaovaa GOA Aa[- pI pI irlaayaMsa IPP Reliance ivainamaya Exchanges saIimat }jaa- maaMga Rest. En. Req. dmana AaOr dIva DAMAN & DIU dadra nagar hvaolaI DNH kula DD &DNH (T) ca (E) C (F) ja (G) 12400 131.14 323.91 129.04 18.35 287.04 0.00 0.00 101.42 134.11 115.00 261.85 243.44 282.27 172.31 172.54 2780.80 0.00 7099.00 250.45 7886.80 2768.55 10655.35 200 518 237 232 554 0 148 210 199 455 436 456 0 250 250 3862.22 0 10664 0 12746 17.55 25 Sr. No. (H) 1. 290 405 133 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 4.6 sToSana ka naama }jaa- Station Name Energy (Gwh) koMd`Iya xao~ Central Sector ena pI saI N.P.C. tara`pur 1 TAPS Unit -1 tara`pur 2 TAPS Unit -2 tara`pur 3 TAPS Unit -3 tara`pur 4 TAPS Unit -4 kakrapr 1 KAPS Unit -1 kakrapr 2 KAPS Unit -2 kula ena pI saI NPC Total ena TI pI saI N.T.P.C. kaorbaa esaTIpIesa 1 KSTPS Unit-1 kaorbaa esaTIpIesa 2 KSTPS Unit-2 kaorbaa esaTIpIesa 3 KSTPS Unit-3 kaorbaa esaTIpIesa 4 KSTPS Unit-4 kaorbaa esaTIpIesa 5 KSTPS Unit-5 kaorbaa esaTIpIesa 6 KSTPS Unit-6 kaorbaa esaTIpIesa 7 KSTPS Unit-7 kula kaorbaa KSTPS Total ivanQa esaTIpIesa 1 VSTPS Unit-1 ivanQa esaTIpIesa 2 VSTPS Unit-2 ivanQa esaTIpIesa 3 VSTPS Unit-3 ivanQa esaTIpIesa 4 VSTPS Unit-4 ivanQa esaTIpIesa 5 VSTPS Unit-5 ivanQa esaTIpIesa 6 VSTPS Unit-6 ivanQa esaTIpIesa 7 VSTPS Unit-7 ivanQa esaTIpIesa 8 VSTPS Unit-8 ivanQa esaTIpIesa 9 VSTPS Unit-9 ivanQa esaTIpIesa 10 VSTPS Unit-10 ivanQa esaTIpIesa 11 VSTPS Unit-11 kula ivanQayaacala VSTPS Total saIpt -1 -SIPAT-1 saIpt -2 -SIPAT-2 saIpt -3 -SIPAT-3 saIpt -4 -SIPAT-4 saIpt -5 SIPAT-5 kula saIpt -SIPAT TOTAL kvaasa gaOsa 1e Kawas GT-1A kvaasa gaOsa 1baI Kawas GT-1B kvaasa esaTI 1saI Kawas ST-1C kvaasa gaOsa 2e Kawas GT-2A kvaasa gaOsa 2baI Kawas GT-2B kvaasa esaTI 2saI Kawas ST-2C 14.954 14.954 372.581 415.920 378.61 242 396.16 465 180.63 302 447.48 715 628.11 1016 Schedule yaaojanaa k`maaMk 5.862 80 80 300 300 125 125 1010 1510 2294 Actual vaastivak carma Peak (Mw) 160 160 480 480 200 200 1680 2600 4260 }jaaEnergy (Gwh) carma Peak (Mw) 137.94 126.70 301.46 396.97 166.41 154.19 1283.67 160 160 545 546 545 546 2502 151.08 123.29 153.08 365.98 368.67 199.74 367.62 1729.47 124.90 126.05 87.77 125.08 85.02 87.66 317.82 309.49 212 214 214 515 513 512 510 2458 212 215 214 212 214 215 510 513 335.09 278.78 323.22 2454.36 269.80 460.80 406.84 358.80 311.00 1807.24 12.42 8.15 11.11 28.18 18.69 25.03 512 511 515 #REF! 663.00 665.00 668.00 512.00 513.00 2578.00 113 118 139 115 114 135 Auxillary Consumption (Gwh) 5.479 66.340 32.407 108.658 167.48 99.74 kula kvaasa KGPS Total gaMQaar gaOsa 1 Gandhar GT-1 gaMQaar gaOsa 2 Gandhar GT-2 gaMQaar gaOsa 3 Gandhar GT-3 gaMQaar esaTI 4 Gandhar ST-4 kula gaMQaar GGPS Total maaOda 1 Mauda -1 maaOda 2 Mauda -2 kula maaOda MAUDA Total 5.1 5.2 5.3 5.4 6.1 6.2 6.1 6.2 6.3 RGPPL Block I RGPPL Block II RGPPL Block III RGPPL TOTAL esa esa pI SSP RBPH - 1 7.1 esa esa pI SSP RBPH - 2 esa esa pI SSP RBPH - 3 esa esa pI SSP RBPH - 4 esa esa pI SSP RBPH - 5 esa esa pI SSP RBPH - 6 esa esa pI SSP CHPH - 1 esa esa pI SSP CHPH - 2 esa esa pI SSP CHPH - 3 esa esa pI SSP CHPH - 4 esa esa pI SSP CHPH - 5 kula esa esa pI SSP Total kula poMca Pench Total Jindal Injection Amarkantak Lanco 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 8.1 8.2 8.3 (I) piScamaI xao~ 193 630 80 630 186 500 540 750 103.58 30.90 0.00 24.19 30.83 85.92 133.92 70.74 204.66 0.00 0.00 0.00 0.00 20.00 188 20.12 187 17.08 183 15.49 182 46.60 187 44.49 187 7.55 34 15.63 37 11.71 35 11.19 36 6.65 580 40 900 75 216.53 8.03 384.15 144.34 WESTERN REGION ga`aosa ]%padna Gross generation (J) ]plabQata Availability naoT ivainamaya Net Exchanges ]plabQa }jaa- Energy Availability (+) 28000 450 113 0 112 148 305 500 505 1000 0 0 0 31 24069.05 23218.60 -2877.68 20340.92 3.890 3.370 0.000 0.000 15.330 0.000 39 1293 156 0 0 2.165 0.090 maah maaca- 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak PEAK DEMAND - SCHEDULE VS ACTUAL FOR rajya gaujarat pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga maQya p`doSa pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga C<aIsagaZ, pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga maharaYT/ pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga gaaovaa pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga essaar pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga dmana evaM dIva pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga dadra va na hvoalaI pMjaIkRt AsaIimat nyaUnatma pMjaIkRt maaMga piScama xao~ pMjaIkRt saIimat AsaIimat nyaUnatma pMjaIkRt maaMga State MARCH Anaulagnak 4.2 ANNEX-4.2 2015 idnaaMk samaya AavaRi<a Date Time Frequency 13414 26.03.15 1600 49.99 13419 26.03.15 1600 49.99 7244 07.03.15 0400 50.09 11.03.15 1930 50.02 50.02 vaastivak Actual (MW) Anticipated Apoixat AapUit- (MW) Catered UNSCH LS FC SCH LS kula Total 13414 - - - 13414 0 5 0 GUJARAT Registered Restricted 13700 Unrestricted 13740 7244 Min. Registered Demand MADHYA PRADESH Registered Restricted 8032 Unrestricted 8032 Min. Registered Demand 7185 - - - 7185 7185 0 -4 0 7181 11.03.15 1930 3338 3338 15.03.2015 5:00 3770 3770 24.03.15 2000 49.89 3950 25.03.15 1900 49.96 2028 02.03.2015 9:00 50.09 26.03.15 1200 49.89 CHHATTISGARH Registered Restricted 3625 Unrestricted 3675 3712 232.4 5 0 2028 Min. Registered Demand MAHARASHTRA Registered Restricted 19600 Unrestricted 19650 20424 - - - 20424 20424 53 79 0 20556 26.03.15 1200 49.89 9377 01.03.2015 5:00 50.14 9377 Min. Registered Demand *GOA Registered 405 465 Unrestricted 405 465 - - 465 19.03.15 1900 49.96 0 0.65 - 466 19.03.15 1900 49.96 - - 605 10.03.15 1900 50.02 0 0 - 605 10.03.15 1900 50.02 - - 306 18.03.15 1800 50.02 0 0 - 306 18.03.15 1800 50.02 - - 714 16.03.15 1200 49.95 0 1 - 715 16.03.15 1200 49.95 325 06.03.15 Min. Registered Demand ESSAR(ESIL) Registered 605 Unrestricted 605 Min. Registered Demand DD Registered 306 Unrestricted 306 Min. Registered Demand DNH Registered 714 Unrestricted 714 Min. Registered Demand 325 WESTERN REGION Registered Restricted 46197 Unrestricted 45545 Min. Registered Demand NOTE: LS PC/RM FC Registered Restricted Unrestricted = = = = = = 45283 - - - 45283 26.03.15 1200 49.89 45283 261 174 0 45718 26.03.15 1200 49.89 25460 25460 02.03.15 Load Shedding Power Cuts/Regulatory Measures Frequency Correction Actual Demand Met Registered + LS + FC Registered + LS + FC + PC + Holiday Staggering + Recess Staggering. 0400 50.17 2015 Mar-15 समांतर/ अनु. . PARALLEL / RADIAL OPERATION TOTAL OPERATING HOURS 1 HVDC back-to back link(WR-NR) NA 2 HVDC back-to back link(WR-SR) 738:27:00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 टाई लाईन 765 -I 765 -II TIE LINE 765 -I 765 -II 765 -I 765 -II 400 400 400 -I 400 –II 400 –III 400 केवी सातपुरा से कोराडी 400 केवी खंडवा से धुले-I 400 केवी खंडवा से धुले-II 400 केवी इंदौर से असोज-I 400 केवी इंदौर से असोज-II 400 केवी इंदौर से असोज-III 400 -I 400 -II 400 केवी वापी से बोईसर 400 -I 400 -II 400 केवी रायगढ़ से झरसुगुड़ा-I 400 केवी रायगढ़ से झरसुगुड़ा-II 400 केवी नागदा से दे हगाम-I 400 केवी नागदा से दे हगाम-II 400 –I 400 –II 400 220 –II -III 765kV Soni to Wardha 197:57:00 765kV Seoni to Wardha 310:55:00 765kV Seoni to Bilaspur-I 744:00:00 765kV Seoni to Bilaspur-II 744:00:00 765kV Durg to Wardha 638:34:00 765kV Durg to Wardha 400:07:00 400kV Bhilai to Koradi 744:00:00 400kV Bhilai to Bhadravati 744:00:00 400kV Raipur to Bhadravati-I 744:00:00 400kV Raipur to Bhadravati-II 744:00:00 400kV Raipur to Bhadravati-III 744:00:00 400kV Satpura to Koradi 744:00:00 400kV Khandwa-Dhule-I 744:00:00 400kV Khandwa-Dhule-II 744:00:00 400kV Indore to Asoj-I 736:37:00 400kV Indore to Asoj-II 728:29:00 400kV Indore to Asoj-III 739:31:00 400kV Kolhapur-Mapusa-I 366:16:00 400kV Kolhapur-Mapusa-II 600:07:00 400kV Vapi-Boisar 744:00:00 400kV Raigarh to Sterlight-I 744:00:00 400kV Raigarh to Sterlight -II 732:07:00 400kV Raigarh to Jharsuguda-I 744:00:00 400kV Raigarh to Jharsuguda-II 744:00:00 400kV Nagda to Dehgam 734:52:00 400kV Nagda to Dehgam 739:12:00 400kV Raipur to Wardha-I 744:00:00 400kV Raipur to Wardha-II 741:56:00 400kV Wardha to Mouda-II 744:00:00 220kV K(E) to Budhipadar-III 744:00:00 भार , WRLDC, Mumbai Anaulagnak 4.5 maah maaca- 2015 ko daOrana pa~ta , iSaD\yaUla , GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoM sao D`avala AaOr ivainamayaaoM ka ivavarNa DETAILS OF ENTITLEMENT/SCHEDULE/DRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS MONTH OF MARCH 2015 1 1 (pxaoivasa` Wara jaarI xao~Iya }jaa- laoKa ko AaQaar pr) koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta Declared Capcity (ex-bus) of Central Gen. Stns/Dedicated CG Stns/Jointly owned Stns & entitlement of beneficieries (MUs) GaaoiYat xamata (A) AND EXCHANGES FOR THE koMd`Iya ibajalaIGar A. Central Gen. Stns. kaorbaa esaTIpIesa kaorbaa esaTIpIesa -III ivanQa esaTIpIesa I ivanQa esaTIpIesa II ivanQa esaTIpIesa III ivanQa esaTIpIesa IV kvaasa gaOsa gaMQaar gaOsa saIpt kakrapar tara`pur 3 AaOr 4 (ba) samaip-t koMd`Iya ibajalaIGar [Midra saagar Korba STPS (sa) saMyau@t inajaI sToSana tara`pur 1 AaOr 2 esaesapI ponca C. Jointly owned Stations kula ([M saagar kao CaoD, kr) Total (excl. Indira Sagar) Korba STPS-III Vindhyachal STPS-I Vindhyachal STPS-II Vindhyachal STPS-III Vindhyachal STPS-IV Kawas GPP Gandhar GPP Sipat Kakrapar APS* Tarapur APS 3&4* gau}ivainaila map`iva]kM Dec. Cap. GUVNL MPPGCL 1296.896 351.188 830.526 692.533 667.767 681.989 477.251 313.304 1850.482 286.507 631.827 222.321 67.428 151.867 165.515 177.716 163.703 136.004 112.951 504.864 81.394 160.297 Craivabaao 302.791 54.870 295.521 223.049 166.337 196.049 101.938 55.850 333.693 72.374 135.136 B. Dedicated CG Stations maraiva]kM 107.290 211.544 7.793 Tarapur APS 1&2* SSP* Pench* 13147.766 dmana dIva da na h MSPGCL GOA DD DNH 132.640 106.168 1.709 1.601 71.660 44.146 0.000 0.000 296.747 0.000 28.081 412.578 94.661 304.257 247.554 198.068 220.816 148.592 95.489 564.187 97.899 256.335 132.210 4.519 25.520 10.221 8.523 10.280 9.014 6.032 24.945 10.424 8.433 30.446 4.216 8.790 6.428 7.534 8.661 22.577 14.951 21.846 5.403 7.474 32.499 15.724 28.465 22.710 23.252 31.336 59.081 27.996 74.001 8.154 24.923 ecavaIDIsaI + ecaDblyaubaI HVDC+HWB 14.397 10.859 245.570 53.645 33.847 kula TOTAL 1296.896 351.188 830.526 692.533 667.767 681.989 477.251 313.304 1850.482 286.507 631.827 * vaas%aivak [njao@Sana * Actual injection 245.570 Indira Sagar* gaaovaa CSEB 245.570 0.000 120.580 5.195 0.000 0.000 0.000 53.645 57.117 2.598 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 107.290 211.544 7.793 3335.220 2710.477 755.403 3523.407 260.429 187.669 437.630 1937.531 13147.766 dmana dIva da na h * Actual injection 2 koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI ]%padna SaoD\yaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoD\yaUla 2 Generation Schedule (ex-bus) of Central Gen. Stations/Dedicated CG Stations/Jointly owned Stations & schedule of benificieries (MUs) SaoD\yaUla (A) koMd`Iya ibajalaIGar kaorbaa esaTIpIesa kaorbaa esaTIpIesa -III $ ivanQa esaTIpIesa I ivanQa esaTIpIesa II ivanQa esaTIpIesa III ivanQa esaTIpIesa IV kvaasa gaOsa gaMQaar gaOsa saIpt kakrapar tara`pur 3 AaOr 4 (ba) samaip-t koMd`Iya ibajalaIGar [Midra saagar A. Central Gen. Stns. Schedule 1263.769 344.420 541.385 573.098 575.057 534.903 101.998 83.363 1699.114 286.507 631.827 Korba STPS Korba STPS-III $ Vindhyachal STPS-I Vindhyachal STPS-II Vindhyachal STPS- III Vindhyachal STPS- IV Kawas GPP** Gandhar GPP** Sipat Kakrapar APS* Tarapur APS 3&4* gau}ivainaila map`iva]kM Craivabaao GUVNL MPPGCL 220.799 67.231 114.273 148.329 169.181 138.917 70.420 61.158 491.543 81.394 160.297 285.963 52.285 189.789 162.956 133.717 155.739 0.707 0.594 295.898 72.374 135.136 CSEB MSPGCL GOA DD DNH 398.694 91.854 169.214 203.837 163.735 155.479 15.941 16.593 501.672 97.899 256.335 132.306 4.519 21.054 10.353 8.409 9.672 0.007 0.000 24.912 10.424 8.433 30.119 4.098 7.614 6.210 7.229 7.900 3.623 2.192 21.039 5.403 7.474 32.548 15.335 25.208 25.243 22.639 28.505 11.291 2.822 67.467 8.154 24.923 Note:- $ ecavaIDIsaI+ ecaDblyaubaI HVDC+HWB / Outside region(NR & SR) 12.522 0.000 0.000 10.859 kula TOTAL 1263.769 344.420 541.385 573.098 575.057 534.903 101.998 83.363 1699.114 286.507 631.827 B. Dedicated CG Stations 245.570 Indira Sagar* 245.570 13.795 245.570 RPPC(NVVNL) KAWAS(RLNG) saMyau@t inajaI sToSana tara`pur 1 AaOr 2 esaesapI ponca kula [M saagar kao CaoD, kr gaaovaa 132.127 105.611 1.709 1.601 56.352 32.957 0.000 0.000 268.460 0.000 28.081 C. Jointly owned Stations 0.000 * vaas%aivak [njao@Sana * Actual injection 107.290 211.544 7.793 10729.465 Tarapur APS 1&2* SSP* Pench* Total (excl. Ind. Sagar) 53.645 0.000 33.847 120.580 0.000 5.195 2941.038 2120.854 0.000 0.000 GANDHAR(RLNG) (sa) maraiva]kM 0.000 0.000 0.000 701.132 53.645 57.117 2.598 2527.211 0.000 0.000 0.000 232.033 0.000 0.000 0.000 161.393 0.000 0.000 0.000 332.025 dmana dIva da na h 107.290 211.544 7.793 1713.779 10729.465 * Actual injection These Scheduled Transactions are done by WRLDC under STOA. 3 AMtrxao~Iya ivainamayaaoM / iWpxaIya ivanamayaaoM kI SaoD\yaUla 3 Schedule for interregional exchanges/bilateral exchanges (MUs) (ima yauinaT\sa) k xao~ / rajya pUvaI- xao~ ko rasto Aayaat SaoD\yaUla SaoD\yaUla Region/State Import SDLs through ER Schedule gau}ivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa GUVNL MPPGCL CSEB MSPGCL GOA DD DNH 0.000 0.000 61.623 0.000 0.000 0.000 -0.271 0.000 0.000 0.000 0.000 -14.976 -13.200 0.000 0.000 0.000 0.000 -0.058 -0.426 -0.451 0.000 0.000 0.000 0.000 15.612 0.000 1.354 -2.031 0.000 -0.809 -0.812 -1.056 0.000 0.000 0.000 0.000 0.000 3.693 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 55.298 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.400 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.369 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.106 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ecavaIDIsaI HVDC kula TOTAL 302.626 Indian Energy Exchange (WR to ER) Power Exchange of India (ER to WR) ER (NTPC) DVC to MPPTCL (Long Term Open Access) Hirakud to CSEB CSEB to APPCC ( NVVNL) EPGL GUVNL to APPCC ( INSTINCT) JPL-II to APPCC ( KISPL) JPL-II to APPCC ( NVVNL) JPL-II to APPCC ( PTC LTD) JNSTPP to APPCC ( NVVNL) APL1 GUVNL to BIHAR ( AEL) APL2 GUVNL to BIHAR ( AEL) EMCO to BIHAR ( IEXL) ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) STERLITE to BALCO ( BALCO) MPPMCL MPSEB to DPL WBSEB ( IEXL) GSCL GUVNL to GRIDCO SOLAR ( SECI) GSECL GUVNL to GRIDCO SOLAR ( SECI) GPCL GUVNL to GRIDCO SOLAR ( SECI) STERLITE to HZLD_NR ( JSW PTL) STERLITE to HZLG_NR ( JSW PTL) 0.000 0.000 19.819 173.770 0.000 0.000 0.000 0.000 0.000 0.000 -0.765 0.000 0.000 0.000 -0.782 0.000 -0.780 0.000 0.000 0.000 0.000 0.000 0.000 0.000 155.826 173.770 1.354 -2.031 -0.271 -0.809 -0.812 -1.056 -0.765 -14.976 -13.200 -0.400 -0.782 3.693 -0.780 -0.058 -0.426 -0.451 0.000 0.000 0.000 -9.058 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -8.694 0.000 0.000 0.000 0.000 JPL to MANIPUR ( PTC LTD) APL3 GUVNL to MAL MEGHALAYA ( PTC LTD) JNSTPP to NGLD ( PTC LTD) STERLITE to RINFRA MSEB ( SCL) NSPCL to SAIL ROURKELA ( SAIL ROURKELA) STERLITE to TPC MSEB ( GMRETL) CSEB to TGPCC ( NVVNL) JPL-II to TGPCC ( KISPL) JPL-II to TGPCC ( NVVNL) JPL-II to TGPCC ( PTC LTD) JNSTPP to TGPCC ( NVVNL) STERLITE to VYL MPSEB ( TPTCL) APL3 GUVNL to WBSEB ( AEL) EMCO to WBSEB ( IEXL) JNSTPP to WBSEB ( IEXL) JNSTPP to WBSEB ( PTC LTD) MPPMCL MPSEB to WBSEB ( IEXL) SaoD\yaUla K xao~ / rajya dixaNa xao~ ko rasto Aayaat SaoD\yaUla Region/State Import SDLs through SR Schedule -177.275 Indian Energy Exchange (SR to NR) Power Exchange of India (SR to ER) RSTPS-SR to GOA ( WHEELING) RSTPS-SR to GOA ( WHEELING GOA) ACBIL CSEB to APPCC KSK TO TGPCC LANCO TO TNEB JPL TO TNEB ga ]%trI xao~ ko rasto Aayaat SaoD\yaUla Import SDLs through NR Indian Energy Exchange (NR to WR) Power Exchange of India (NR to WR) Rihand (Hydro) to MPPTCL (Long Term Open Access) Matathilla (Hydro) to MPPTCL (Long Term Open Access) JNSTPP to BSES YM (DTL)-NR ( IEXL) HIMACHAL to CSEB ( AAPL) HIMACHAL to CSEB ( MPPL) MPL_ER to CSEB ( TPTCL) HIMACHAL to DNH ( AAPL) HIMACHAL to DNH ( MPPL) TPCH WBSEB to ESIL_WR ( TPTCL) TPTCL_DHPPB to ESIL_WR ( TPTCL) TPTCL_DHPPB to ESIL MSEB ( TPTCL) STERLITE to HZLD_NR ( JSW PTL) STERLITE to HZLG_NR ( JSW PTL) EMCO to JVVNL-NR ( IEXL) JPL-II to NPCL ( KISPL) TPTCL_DHPPB to TPC MSEB ( TPTCL) TISCO to TSLB MSEB ( TSLB MSEB) JNSTPP to UPPCL-NR ( PTC LTD) Ga iWpxaIya SaoD\yaUlsa gau}ivainaila 0.000 0.000 -10.579 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.894 13.595 0.000 0.000 -0.150 -28.554 -2.600 map`iva]kM GUVNL MPPGCL -14.725 0.000 0.000 0.000 -7.998 0.000 -2.374 -0.945 -0.949 -1.233 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Craivabaao 0.000 0.000 0.000 3.087 0.000 77.071 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.200 0.000 0.000 0.000 maraiva]kM 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 gaaovaa 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 dmana dIva 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 da na h CSEB MSPGCL GOA DD DNH -14.725 -9.058 -10.579 3.087 -7.998 77.071 -2.374 -0.945 -0.949 -1.233 -0.894 13.595 -8.694 -0.200 -0.150 -28.554 -2.600 ecavaIDIsaI HVDC kula TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -73.382 -0.172 -111.600 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.222 0.657 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.222 0.657 0.000 -73.382 -0.172 -111.600 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.666 2.053 -0.170 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.300 0.000 0.000 0.000 0.000 0.000 1.350 18.750 14.384 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.091 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.029 0.000 0.000 -0.315 0.000 0.483 6.696 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.549 33.027 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.666 2.053 -0.170 1.350 18.750 14.384 3.549 33.027 0.000 0.000 0.029 0.000 0.000 -0.315 -0.091 0.483 6.696 -0.300 0.000 1.728 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.195 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.479 0.000 0.000 0.000 0.000 0.000 -133.320 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12.434 10.800 14.400 1.080 133.320 1.637 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.585 0.870 3.162 2.946 9.360 18.320 3.652 0.730 0.887 0.000 0.850 0.000 0.000 0.000 0.000 0.000 0.000 1.098 0.776 3.703 0.000 0.608 1.111 1.086 1.098 0.000 4.008 0.759 0.866 1.382 0.824 1.300 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.728 1.585 0.870 3.162 2.946 9.360 18.320 3.652 0.730 0.887 5.479 0.850 12.434 10.800 14.400 1.080 0.000 1.637 1.098 0.776 3.703 2.195 0.608 1.111 1.086 1.098 38.880 4.008 0.759 0.866 1.382 0.824 1.300 85.111 Exchanges within WR Mundra APL to Gujarat (LTOA) JPL-II to ARVIND GUVNL ( MPPL) JPL to AIGL MSEB ( AIGL MSEB) JPL to ARPIPL MSEB ( ARPIPL MSEB) JPL to ACCIL MSEB ( ACCIL MSEB) JPL to ARVIND MSEB ( ARVIND MSEB) ACBIL to BEST MSEB ( KISPL) JPL to BEST MSEB ( KISPL) JPL to BOSCH MSEB ( BOSCH MSEB) JPL to BCSIL MSEB ( BCSIL MSEB) JPL to BHL MSEB ( BHL MSEB) JPL-II to BIPL MPSEB ( MPPL) JPL-II to BLVL MSEB ( MPPL) ACBIL to CSEB ( CSPTRDCL CSEB) JPL to CSEB ( JPL) JPL-II to CSEB ( JPL) JNSTPP to CSEB ( TPTCL) MPPMCL MPSEB to CSEB ( CSEB) SPECT ACBIL to CSEB ( CSPTRDCL CSEB) JPL to CLASSIC MSEB ( CLASSIC MSEB) JPL to CIPLA MSEB ( CIPLA MSEB) JPL to CEAT MSEB ( MPPL) APL3 GUVNL to CHLM GUVNL ( AEL) JPL to CIPLA-22 MSEB ( CIPLA-22 MSEB) JPL to DNL MSEB ( DNL MSEB) JPL to ETLC MSEB ( ETLC MSEB) JPL to ETLT MSEB ( ETLT MSEB) JPL-II to ESIL_WR ( PXIL) JPL-II to ESIL MSEB ( JPL) JPL to ETLW MSEB ( ETLW MSEB) JPL to ETLB MSEB ( ETLB MSEB) JPL to EILR MSEB ( MPPL) JPL to ETLK MSEB ( ETLK MSEB) JPL to EXIDE MSEB ( EXIDE MSEB) JPL to EIPL MSEB ( EIPL MSEB) JPL to EXIDE2 MSEB ( EXIDE2 MSEB) JPL to FBML MSEB ( FBML MSEB) APL3 GUVNL to GOA ( AEL) JPL to GSL MSEB ( GSL MSEB) EMCO to GCEL ( EMCO) JPL to GODREJ MSEB ( GODREJ MSEB) JCFPL GUVNL to SOLAR GOA ( NVVNL) JPL-II to GIPL MSEB ( JPL) JPL-II to GIPL MSEB ( MPPL) JPL to GPIL MSEB ( MPPL) JPL-II to GWRLHP MSEB ( MPPL) JPL-II to GWRLHW MSEB ( MPPL) JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) JNSTPP TO MP EMCO TO DNH TORRENT TO MP EMCO TO MSEB LANCO TO MP KSK TO TGPCC MP TO TORRENT NSPCL to DD ( DD) MSEB SOLAR TO CSEB SOLAR MSEB SOLAR TO CSEB SOLAR RAJ MP SOLAR TO CSEB SOLAR IEE PEI ca 4 5 6 7 8 9 10 11 kula Aayaat Total Import kula inayaa-t Total Export naoT Aayaat / inayaa-t Net Imp. (+)/Exp. (-) AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM Total Entitlement incl. IR and bi-lateral exchange kI iSaD\yaUla imalaakr kula pa~ta schedule AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI kula iSaDUyala ibanaa xait ko kula D`avala xait imalaakr kula D`avala p p`NaalaI maoM kula pUla xait p xao`~ sToSanaaoM sao vaastivak [njao@Sana (ima yauinaT\sa) vaas%aivak AMtrxao~Iya ivainamaya (ima yauinaT\sa) AMtrxao~Iya ivainamaya iSaD\yaUla (ima yauinaT\sa) Total Sdl. incl. IR/ bi-lateral exch. Sdl. Total Drl excl. Tr. Loss Total Drl incl. Tr. Loss 1312.454 1101.992 210.462 kula Total 13358.228 10939.927 10260.768 9182.811 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -73.686 0.000 0.000 0.000 28.176 0.000 0.000 0.000 0.000 265.740 8.245 367.707 120.819 246.887 gau}ivainaila 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 126.599 0.000 73.686 0.000 151.012 0.000 -28.176 0.000 0.000 0.000 -0.774 -246.983 -5.987 571.680 460.813 110.867 map`iva]kM GUVNL MPPGCL 3582.107 3187.925 3780.200 3780.200 2821.344 2231.722 1958.973 1958.973 0.000 0.000 0.000 0.000 0.000 2.772 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.734 2.734 0.774 -282.092 -2.449 235.093 502.719 -267.625 Craivabaao 1.083 1.000 0.740 0.000 0.789 0.000 0.870 0.000 0.353 1.535 0.736 0.843 1.316 2.535 0.000 0.000 0.000 145.640 0.000 0.000 0.000 0.000 -2.734 -2.734 0.000 -0.069 0.000 361.085 3.718 357.367 0.000 0.000 0.000 27.440 0.000 0.000 0.000 1.046 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -13.923 0.000 36.365 13.923 22.442 maraiva]kM gaaovaa 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.902 0.000 0.000 0.000 32.864 0.000 45.135 0.000 45.135 dmana dIva 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 135.765 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 174.446 0.000 174.446 da na h 1.083 1.000 0.740 27.440 0.789 2.772 0.870 1.046 0.353 1.535 0.736 0.843 1.316 2.535 126.599 135.765 0.000 145.640 151.012 0.000 0.000 10.902 0.000 0.000 0.000 32.704 -0.191 1312.454 1101.992 210.462 ecavaIDIsaI MSPGCL GOA DD DNH HVDC TOTAL 487.778 433.506 799.407 799.407 3880.775 2884.578 2768.547 2768.547 282.871 254.475 324.629 324.629 232.804 206.528 180.626 180.626 612.077 506.471 447.483 447.483 14.397 12.522 0.903 0.903 13358.228 10939.927 10260.768 10260.768 -1077.957 Pooled loss in WR System kaorbaa Actual Inj. - WR Stns. KSTPS (MUs) Actual IR Exchanges ivanQa 1 AaOr 2 ivanQa 3 VSTPS-1& 2 VSTPS-3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula KGPS GGPS KAPS TAPS SSP PENCH TOTAL 7.793 12107.153 1620.810 1156.439 1130.441 286.507 739.117 ] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net (MUs) 23.705 2147.433 -2123.728 IR Exchange Schedule NRI sdl 85.247 NRE sdl 2323.999 (MUs) kula CSEB Net NR sdl -2238.752 100.298 82.546 0.000 902.913 SRI sdl 0.000 SREsdl 883.274 -902.913 Net SR sdl -883.274 211.544 188.879 86.580 102.299 -2924.342 ERI sdl 302.626 ERE sdl 12.136 Net ER sdl 290.490 Net WR sdl -2831.536 maah maaca- 2015 ko AMtr-ajyaIya / AMtrxao~Iya ivainamayaaoM ka ivavarNa DETAILS OF INTERSTATE/INTER-REGIONAL EXCHANGES FOR THE MONTH OF MARCH 2015 From/ To k`maaMk A gau}ivainaila map`iva]kMila Craivabaao maraiva]kMila GUVNL MPPGCL CSEB MSPGCL gaaovaa dmana dIva da na h kula 0.000 4 maraiva]kM ila MSPGCL 0.000 5 gaaovaa GOA 0.000 6 da na h DNH 0.000 7 8 kaorbaa KORBA-III JPL 1.728 2.195 12 laonakao Lanco -Pathadi 13 ACBIL 14 KSK MAHANADI 15 JNSTPP(NIGRIE) 16 DB POWER 17 VANDANA 18 EMCO 19 ESIL 20 ER piScama xao~ Craivabaao CSEB JAYPEE SR pU xao~ 3 11 NR d xao~ map`iva]kMila MPPGCL ESSAR MAHAN ESIL ] xao~ 2 ADanaI pavar APL DNH [ssaar 1 9 DD Annex-4.6 Interstate/Inter-regional Schedules included in ISGS gau}ivainaila GUVNL 10 GOA Anaulagnak 4.6 WR TOTAL 1.046 1.046 133.320 133.320 0.000 25.200 68.902 38.880 134.710 27.440 29.635 0.000 0.000 14.071 9.360 23.431 1.080 2.772 0.000 NSPCL 21 ]<arI xao~ N.Region (WR end) 23.705 22 dixaNaI xao~ S. Region (S. Bus) 0.000 0.000 23 pUvaI- xao~ E. Region (WR end) 188.879 188.879 24 p xao~ W.Region (WR end) 25 enaTIpIsaI NTPC Injection 5798.034 26 enapIsaI NPC Injection 1025.624 27 Total ISGS drawal from the Grid incl. interregional/ bi-lateral exchange , UIExchanges and trans.not loss Interstate/IR included in ISGS B ####### 902.913 3780.200 1958.973 799.407 2768.547 324.629 180.626 86.580 23.705 3136.926 447.483 20 knaa-Tk Karnataka 21 yaUpIpIsaIela UPPCL 0.000 0.000 22 AarvaIpIenaela RVPNL -7.32 -7.320 23 UPPCL ( Excess Drawn From Rajghat 0.000 0.000 24 kaoTa ]jjaOna Kota - Ujjain 0.000 25 kula ba Total B (13 to 17) 53.98 0.000 0.000 -7.320 0.000 3780.200 1951.653 799.407 C inavala ivainamaya Net Exchange (12+18) D kula Aayaat Total Imp. by WR E kula inayaa-t Total Export by WR F inavala ivainamaya Net Exchange (D-E) G p xao~ Wara vaIlD }jaa- Energy wheeled by WR 26 pU xao~ sao d xao~ kao inayaa-t ER export to SR 53.980 0.000 53.980 0.000 0.000 46.660 2768.547 378.609 180.626 447.483 10306.525 259.244 3136.926 -2877.682 0.000 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ER/WR 0.000 28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR 0.000 29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR 0.000 30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR 31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR 27 0.000 0.000 0.000 478.999 0.000 32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NR/WR 0.000 33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR 0.000 0.000 0.000 478.999 0.000 0.000 0.000 Anaulagnak 4.7 Annex-4.7 maah maaca- 2015 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MARCH 2015 ivavarNa Particulars kmaaMk gau ] iva ina ila GUVNL ]ka[- Sl. No. Ukai map`iva]kM ila gaaMQaIsaagar MPPGCL Gandhisagar ena eca DI saI NHDC [Midra saagar Indira Sagar maraiva]kM ila MSEGCL kaoyanaa 1 Levels in Mtrs. str maITr maoM 1.1 maah ko AMt maoM 96.10 392.24 252.24 648.04 100.30 396.31 252.02 639.99 At the end of the month 1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM Corresponding Figure of the month Last Year Koyna ANNEXURE- 5 List of Grid Disturbances and Grid incidents (GD/GI) in March-2015: Western Region Sr. Details of incident (Elements / Generation Tripped) Owner Utility No. 1 2 Multiple Tripping of Karad, kolhapur and GOA on over voltage Akola(II) ICT tripping Date Time MSETCL 01/03/2015 3:31 MEGPTCL 29/03/2015 14:04 Effect (Loss of generation/ Load), if Category as per CEA Grid any Standards Load Loss : 700+ 280 MW Gen loss of : 400MW Gen Loss: 458 MW GD-1 GD-1 ANNEXURE 8.4 Sr. No. Utility CC Location Site ready for Hardware installatio supplied n Hardware installation Commissioning Start Dates 1 WR-LDC BCC Delhi No Yes MPPTCL BCC Bhopal No Yes SAT Remark DGM WRLDC informed that back up control centre for WRLDC New Delhi building would be ready by May 2015. Representative from PGCIL informed that building construction is under progress and building would 2 th be ready for installation by 30 April 2015 3 4 5 6 7 GETCO BCC Gandhi Nagar Yes Yes CSPTCL BCC Bhilai No Yes Yes Yes In Progress Yes Yes Yes Yes Done GSED BCC Cuncolim DDED MCC Daman DNHED MCC Silvasa Done Done CE (LD) informed that building is ready for installation CSPTCL informed that Backup SLDC Bhilai would th Done be ready by 30 June 2015 Representative from GOA informed that installation is under progress Installation under progress Site not ready . Interior work to be done ANNEXURE-8.8 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR Telephone: (0761) 2702744/2702753 Fax: (0761) 2664343 e-mail sldcmpseb@yahoo.com No. SE/LD:E&T/ RPC-15/967 v kbZ, l v ks: 9001-2008 ISO: 9001-2008 Jabalpur, dated 26.03.2015 To, Member Secretary, Western Regional Power Committee F-3, Central Road, MIDC Area, Marol, Andheri (East), MUMBAI 400 093. Sub: - Issue of less requisition/RSD of NTPC stations discussed in 28th WRPC meeting and procedure submitted by NTPC in 469th OCC meeting. Dear Sir, The issue of problems due to less requisition in ISGS stations particularly Mauda TPS was discussed in the 28th WRPC meeting and a consensus was reached on MPPMCL proposal. The procedure for RSD submitted by NTPC in 469th OCCM mentions that at least 30% of entitlement should be scheduled by beneficiaries in R0, which is not as per the consensus reached in 28th WRPC meeting. In the 28th WRPC meeting, MPPMCL had not agreed to give schedule equal to at least 30% of its entitlement in R0 and with this the methodology was agreed. Hence the methodology should be as detailed below to reflect the decision taken in 28th WRPC : 1. If requisition of any beneficiary is zero, or very less and generation schedule is less than Technical Minimum, beneficiary can ask WRLDC to take out the unit in RSD.in case beneficiary is not asking for RSD:- a) NTPC will inform beneficiaries and RLDC to enhance schedule to Technical minimum. b) If Schedule is still less, NTPC will inform RLDC and SLDCs and propose for withdrawal of unit. c) Even then if no corrections are done and schedule is less than technical minimum level, NTPC will withdraw the unit in RSD and inform to all SLDCs and WRLDC. d) Earlier only beneficiaries were declaring and asking for RSD. Now NTPC can also initiate for RSD. Duration of RSD will be 72 hours, however in case of emergency, NTPC will be asked to bring the unit early. 2. In case of unit is taken on RSD, generation schedule for NTPC will be restricted to On-Bar capacity. 3. For this NTPC will declare both ON BAR & OFF BAR and the resultant total DC (to WRLDC). (NTPC will not give DC for Units under forced and planned outages). 4. WRLDC will also indicate on bar and total DC entitlements of constituents. 5. Constituents will give requisitions in R0 as per their requirement in entitlements only on ON BAR DC. 6. WRLDC will ask constituents to increase their requisition at least up to Technical Minimum of ONBAR DC. Accordingly, R1 schedule will be issued. 7. If a unit is taken on RSD and any constituent has requisitioned more than their entitlement from on bar DC, the same will be scheduled to him limited up to his entitlement from total DC and this will not be considered as URS. 8. When requisition of any constituent is shifted to other stage or other station and the same is scheduled, it will be on Variable cost only. It will not be considered as URS for fixed cost sharing. Accordingly, it is requested to please include the same in the MOM of 28th WRPC meeting and inform the same in 470th OCCM. Thanking You, Yours faithfully, Sd/Chief Engineer (SLDC) MPPTCL, Jabalpur. Copy to : 1. The CGM(Regulatory, MPPMCL, Jabalpur 2. The G.M. (PM), MPPMCL, Jabalpur. ANNEXURE 10 SR NO 1 2 3 UTILITIES CHHATTISHGARH DD GUJARAT OCC NO. 454 455 456 STATUS MONTH Dec-14 HOSTED ON 10.12.13 AT RAIPUR Jan-14 HOSTED ON 16.01.14 AT DIU HOSTED ON 13.02.14 AT Feb-14 VADODARA - 4 RGPPL* 457 Mar-14 5 MAHARASHTRA 458 Apr-14 NTPC, HQ-II Raipur* 459 May-14 7 WRTS-I 460 Jun-14 HOSTED ON 11.03.14 AT MUMBAI BY NTPC MUMBAI HQ-I HOSTED ON 16.04.14 BY MSETCL AT MUMBAI - 6 REMARK HOSTED ON 12.05.14 AT MUMBAI BY WRPC AT RELIANCE HOSTED ON 13.06.14 AT NAGPUR 8 9 10 11 KWPCL TAPS-1&2 NTPC Gandhar/Kawas RELIANCE SASAN 461 462 463 464 Jul-14 Aug-14 Sep-14 Oct-14 12 WRPC 465 Nov-14 13 MADHYA PRADESH 466 Dec-14 14 WRPC 467 Jan-15 15 ESSAR TRANSMISSION 468 Feb-15 held on 16.02.2015 at Mumbai 16 BDTCL/JBTCL 469 Mar-15 17 NTPC VINDHYACHAL 470 Apr-15 held on 10th March 2015 at Nagpur held on 13th April 2015 AT LUCKNOW 18 WRPC 471 May-15 19 TORRENT POWER 472 Jun-15 20 TATA POWER 473 Jul-15 21 JPL 474 Aug-15 22 TAPS-3&4 475 Sep-15 23 ESSAR ESIL 476 Oct-15 24 NTPC SIPAT, CG 477 Nov-15 25 CGPL 478 Dec-15 26 NTPC Mouda 479 Jan-16 27 KSK 480 Feb-16 28 RELIANCE TRANSMISSION 481 Mar-16 29 APL 482 Apr-16 30 DNH 483 May-16 31 NCA 484 Jun-16 32 GOA 485 Jul-16 33 KAPS 486 Aug-16 34 RKM POWER GEN 487 Sep-16 35 NHDC 488 Oct-16 36 NTPC, Mumbai 489 Nov-16 37 38 39 40 ADANI TRANSMISSION WRTS-II SUGEN (TPL) NTPC KORBA 490 491 492 493 Dec-16 Jan-17 Feb-17 Mar-17 HOSTING ON 10.07.14 AT RAIPUR BY KWPCL(IPP) hosted on 11.08.2014 at TARAPUR hosted on 12.09.2014 at Bharuch Hosted on 13.10.2014 at Varanasi 11.11.2014 at WRPC Mumbai Hosted on 09.12.2014 at Jabalpur held on 16.01.2015 at WRPC Mumbai TO BE HELD ON 13.05.2015AT WRPC 21/04/2015 Grid Operation Highlights for Year 2014-15 • Installed capacity as on 28th Feb2015 93876 MW. Growth in installed capacity is 7.42 % compared to last year(87389 MW). • Average Frequency for the year 2014-15 was 49.97Hz. 470th OCC Meeting 13th April, 2015 Average Freq touched 50 Hz in the month February’15. Maximum Demand Met- 45283 MW on 26th March 2015 at12:00 hrs. ( Second highest - 45081 MW on 29th Sept 2014). (Last year 42253MW on 11th Feb 2014) Growth - 7.17% compared to previous year. Max Energy Consumption - 1028 Mus on 29thSept 2014 (943 Mus last year on dtd 5th Feb 2014) Growth - 9.01% compared to previous year. Grid Operation Highlights Grid Operation Highlights for Year 2014-15 New Element addition Capacity Addition- Generating units of 12886 MW capacity. - (1.47 MW/hr) Transmission lines (765, 400 kV & 220Kv (PG)) - 9192 Ckt km. • Total 52 Nos 765 KV lines in WR out of which 20 Nos.765 KV lines added this year) – (1.05 ckt km/hr) ICTs added- 17260 MVA MVAR added-10705 MVAR ( line reactor- 6635 MVAR and bus reactor- 4435 MVAR) Addition of New Elements – March 2015 GENERATING UNITS Added in March-15 S.NO. STATE/ISGS/IPP STATION NAME CAPACITY (MW) UNIT 1 IPP (Maharashtra) Ratan India Pvt Ltd. 270 IV 2 IPP (Maharashtra) Ratan India Pvt Ltd. 270 V 3 IPP (Madhya Pradesh) MBPOWER 600 I 4 IPP (Chhatisgarh) JPL Stage -II 600 IV 5 IPP(Reliance Power,MP) Sasan UMPP 660 VI Total Capacity added in Mar’15- 2400 MW 2014-15 – 13156 MW 2400 Total Capacity added in DATE 07/03/2015 (COD) 13/03/2015 (COD) 19/3/2015(Syn) 26/03/2015 (Syn) 27/03/2015 (COD) ICTS Added in March-15 SL.NO. CONSTITUENT STATION NAME KV RATIO CAPACITY(MVA) DATE 1 GETCO Asoj 400/220 315 17/03/2015 2 Powergrid Bhadrawati 400/220 315 17/03/2015 3 MEGPTCL Koradi ICT-I 765/400 1500 26/03/2015 4 MEGPTCL Koradi ICT-II 765/400 1500 27/03/2015 5 Powergrid Vindhayachal PS ICT-II 765/400 1500 29/03/2015 Total 5315 Total Added in Year 2014-15 – 17445 MVA 1 21/04/2015 Transmission Lines added in March-15 S. No. CONSTITUENT 1 LINE NAME POWERGRID Magarwada (PG)-Magarwada (DD) D/c CKT No KV DATE CKT.KM I & II 220 17/03/2015 2 LINE Reactors added in March-15 S.No CONSTITUENT STATION NAME Line Name KV CAPACITY (MVAR) DATE 765 240 29/03/2015 765 240 27/03/2015 Total 480 1 POWERGRID Vindhyachal Satna-Vindhyachal ckt-I 2 POWERGRID Aurangabad* Wardha-Aurangabad cktIV 2 MEGPTCL Akola(2) -RIPL (Ratan India Power L) 3 POWERGRID Sasan-Vindhayachal PS-I 4 POWERGRID Wardha-Aurangabad III 765 30/03/2015 370 5 POWERGRID Wardha-Aurangabad IV 765 30/03/2015 370 6 POWERGRID Powergrid Solapur- NTPC Solapur I&II 400 30/03/2015 11 BUS Reactors added in March -15 7 GETCO Mundra-Varsana* II 400 31/03/2015 85 SL.NO. CONSTITUENT STATION NAME KV CAPACITY (MVAR) DATE 8 GETCO Mundra-Varsana* III 400 31/03/2015 85 1 POWERGRID WARDHA BR-3 765 330 28/03/2015 9 POWERGRID Sasan-Vindhayachal PS-I I 765 31/03/2015 8 2 POWERGRID WARDHA BR-4 765 330 28/03/2015 10 POWERGRID Satna-Vindhyachal PS I 765 31/03/2015 237 Total 660 Total 1384 I & II 400 20/03/2015 208 I 400 26/03/2015 8 * Interim arrangement of Mundra-Zerda Line. * Line Reactor charged as Bus Reactor Total MVAR added in year 2014-15 - 10705 MVA Ckt km added in Mar-15 is 1384 ckt km. and Total Added in year 2014-15 = 9192 ckt.km ( Line reactor- 6635 MVAR and Bus reactor- 4070 MVAR) Energy Met of WR constituents over a period 8 Years Maharashtra Energy Met in Mus 500 450 CAGR-6.38% 400 300 200 Energy in Mus 350 250 250 150 200 100 01-Oct-14 01-Oct-14 01-Oct-13 01-Apr-14 01-Apr-14 01-Oct-12 01-Oct-11 01-Apr-13 01-Apr-12 01-Oct-10 01-Oct-09 01-Apr-10 01-Oct-08 01-Apr-09 01-Oct-07 60 50 40 30 20 01-Oct-13 01-Oct-12 01-Apr-13 01-Apr-12 01-Oct-11 Time 01-Apr-11 01-Oct-10 01-Apr-10 01-Oct-09 01-Apr-09 01-Oct-08 01-Oct-07 01-Oct-14 01-Oct-13 01-Apr-14 01-Oct-12 01-Apr-13 01-Oct-11 01-Apr-12 01-Oct-10 01-Apr-11 01-Oct-09 01-Apr-10 01-Oct-08 01-Apr-09 01-Oct-07 01-Apr-08 01-Apr-07 01-Oct-06 0 Time Chhatisgarh Energy Met Linear (Chhatisgarh Energy Met) 10 Madhya Pradesh Energy Met 01-Apr-08 50 01-Apr-06 01-Apr-06 01-Jul-06 01-Oct-06 01-Jan-07 01-Apr-07 01-Jul-07 01-Oct-07 01-Jan-08 01-Apr-08 01-Jul-08 01-Oct-08 01-Jan-09 01-Apr-09 01-Jul-09 01-Oct-09 01-Jan-10 01-Apr-10 01-Jul-10 01-Oct-10 01-Jan-11 01-Apr-11 01-Jul-11 01-Oct-11 01-Jan-12 01-Apr-12 01-Jul-12 01-Oct-12 01-Jan-13 01-Apr-13 01-Jul-13 01-Oct-13 01-Jan-14 01-Apr-14 01-Jul-14 01-Oct-14 01-Jan-15 01-Apr-08 70 100 Time CAGR-7.97% 80 150 0 01-Apr-07 01-Apr-… 01-Oct-14 01-Apr-… 01-Oct-13 01-Apr-… 01-Oct-12 01-Apr-… 01-Oct-11 01-Apr-… 01-Oct-10 01-Apr-… 01-Oct-09 01-Apr-… 90 CAGR-5.51% 200 Time Chhatisgarh Energy Met in Mus 01-Apr-07 Linear (WR Energy Met) 0 Gujarat Energy Met 100 Energy in Mus WR Energy Met 01-Oct-08 01-Apr-… 01-Oct-07 MP Energy Met in Mus 250 200 Time 0 Energy in Mus 400 01-Apr-… 600 01-Oct-06 Energy in Mus 50 0 50 Maharashtra Energy Met Linear (Maharashtra Energy Met) 01-Oct-06 100 01-Apr-11 150 800 01-Apr-06 CAGR- 6.38% (period of 8 years) CAGR-6.88% 300 Energy in Mus 1000 Gujarat Energy Met in Mus 350 01-Oct-06 1200 01-Apr-06 WR Max.Energy Met (2006-07 to 2014-15) 2 21/04/2015 ENERGY CONSUMPTION OF WESTERN REGION (2012-13 TO 2014-15) 1100 Annual Growth – 9.01% (Max) 1,028 722 700 Energy Feb-15 Mar-14 Consumpti Mar-15 on MU/Day Average 892 933 858 Max 1013 993 941 Date 26-Mar-15 24-Feb-15 29-Mar-14 % Change w.r.t last month -4.46 2.07 ~ Annual Growth – 8.62 % 20424 20399 202 Mus drop in Energy Consumption on 1st March 2015 compared to 28th Feb’15 % Change w.r.t last Year 3.95 7.68 ~ Demand Met Mar-15 Feb-15 Mar-14 % Change w.r.t last month Average 39977 43074 37156 -7.19 7.59 Max 45283 44750 40236 1.19 12.54 ~ ~ Date when 26-Mar-15 24-Feb-15 26-Mar-14 Max. Annual Growth – 11.35 % 15000 14000 19000 70 14005 13000 18000 60 52.3353.19 12000 16000 MW MW 17000 15000 10000 14000 9000 13000 8000 12000 7000 50 Madhyapradesh Demand Met 2013-14 to 201415 11000 Annual Growth 0.78 % 10000 MONTH Chhattisgarh Demand Met 2013-14 to 201415 3770 MW MW 6000 Annual Growth – 8.99 % 2000 5000 2013-14 MONTH Mar Feb Jan Dec Nov Oct Sep Jul Jun Apr Feb Aug 2014-15 MONTH Mar Jan Dec Nov Oct Sep Jul Jun May Apr Aug 2013-14 May 1500 4000 10 Month 2500 7000 45.36 0 3000 8000 48.29 20 3500 9000 53.73 IEGC Band Jan Feb Mar Dec Oct Nov Sep Jul Jun Aug 2013-14 4000 10,050 60.15 58.47 52.9453.60 30 Apr MONTH 55.7 50.16 49.5 40 May Feb Mar Jan Dec Nov Oct Sep Jul Aug Jun May Apr 11000 2013-14 Frequency Profile IEGC Band 49.9-50.05 Gujarat Demand Met 2013-14 to Maharashtra Demand Met 2013-14 to 2014-15 20000 Mar Jan MONTHS ----> Feb Dec Oct Nov Sep Jul Aug Jun May Apr 600 2013-14 • Average demand met (hourly)in Mar’15 increased by 7.59% wrt last year. Minimum Energy Consumption : 722 Mus on 1st March 2015 (Min of 2014-15 also) ( heavy rainfall/Weekend effect/ tripping in Maharashtra) 800 21000 • Max Demand Met 45283 MW on 26th March Consumption : 1013 MUs on 26th Mar’15 (7.68% higher than last year). 900 2012-13 Max Annual Growth 7.17% 1013 Maximum Energy CONSUMPTION IN MUs ----> 1000 • High Frequency Day : (On 1st March)- All India Demand low (116 GW)due to inclement weather. 13000 MW load loss in Maharashtra due to multiple trippings. % Change w.r.t last Year Regional Demand met Max: 45283 MW on 26th Mar’15 at 12:00 hrs Min: 25460 MW (2nd Mar’15, 04:00 hrs) Average: 39977 MW 49.9-50.05 Months <49.9 >50.05 FVI April'14 30.64 52.33 17.03 0.16 IEGC Band May'14 22.48 53.19 24.33 0.13 June’14 37.15 45.36 17.49 0.24 July’14 34.51 50.16 15.33 0.2 Aug’14 37.87 49.5 12.63 0.19 Sept’14 28.13 55.7 16.16 0.43 Oct’14 25.55 52.94 21.52 0.13 Nov'14 16.49 53.60 29.90 0.10 Dec'14 23.85 48.29 27.86 0.14 Jan'15 17.46 53.73 28.81 0.12 Feb'15 12.30 60.15 27.56 0.08 Mar'15 17.77 58.47 23.76 0.10 Maximum on 1st March at 50.54 Hz 03:37 hrs. instantaneous frq on 3rd March at Minimum 49.52 Hz 18:57 Hrs and 20th instantaneous frq March at 5:51 hrs Avg Freq of the Low Frequency Day : On 3rd March at 18:57hrs due to load month change over time and O/D of MAH and Gujarat. On 20th Mar at 5:51 hrs due to O/D by Delhi, UP, Tamilnadu, Gujarat, MP, Chhattisgarh & Rajasthan. 49.98 Hz 3 21/04/2015 Average 17.77 50.54 80.00 60.00 49.52 40.00 49.52 20.00 <49.9 49.9-50.05 31-Mar 29-Mar 27-Mar 25-Mar 23-Mar 21-Mar 19-Mar 17-Mar 15-Mar 13-Mar 0.00 9-Mar 23.76 100.00 11-Mar 58.47 Frequency Profile as per the IEGC band for March 2015 120.00 7-Mar >50.05 53.08 37.09 25.66 26.91 21.99 47.64 33.61 35.42 25.09 22.60 17.83 25.66 17.92 16.78 16.78 32.47 16.59 17.49 17.35 7.47 4.22 15.51 18.89 10.93 20.03 17.10 17.10 25.81 29.11 34.36 28.18 53.08 5-Mar 49.9-50.05 42.95 45.58 58.30 60.36 68.50 47.62 51.02 59.81 61.62 65.11 61.17 66.19 65.63 53.07 53.07 57.22 66.84 68.22 60.38 47.30 48.99 64.54 62.09 57.25 64.99 60.49 60.49 60.58 62.05 50.61 60.54 68.50 3-Mar <49.9 3.97 17.33 16.04 12.73 9.51 4.74 15.37 4.77 13.29 12.29 21.00 8.15 16.45 30.15 30.15 10.31 16.57 14.29 22.27 45.23 46.79 19.95 19.02 31.82 14.98 22.41 22.41 13.61 8.84 15.03 11.28 46.79 1-Mar Date 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar 7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar Max >50.05 Compliance to DSM : MAR-2015 3000 63 2106 1863 70 62 53 1849 1582 1000 60 50 40 30 20 500 10 0 90 2000 Blocks=2976 89 2500 No of Blocks No of Blocks 80 71 2000 1500 100 90 in % 2500 2634 2336 1500 1000 500 0 0 Compliance: When drawl is within 12% of the schedule or 150 MW whichever is lower Gujarat Wind Generation 2013-14 Vs 55.70 2014-15 60.00 Maharashtra Wind Generation 2013-14 Vs 2014-15 on 23rd June 2014 100 90 78 2671 60.00 50.00 50.00 40.00 40.00 49.19 on 19th July,2014 80 62 1849 70 60 50 40 in Mus 3000 Compilance of DSM Polarity Reversal : March-15Total no.of in Mus Total no. of Blocks=2976 in % Compilance of DSM Volume Limit : March-15 30.00 30.00 30 20 20.00 20.00 10.00 10.00 10 0 Compliance: When drawl changes sign within 12 consecutive time block 0.00 0.00 Deviation of MP remained within 12% of schedule for 71 % of time blocks Maharashtra reverse its deviation polarity for 90 % of time 2013-14 2014-15 Month 2013-14 2014-15 Month 4 21/04/2015 GUJARAT SOLAR GENERATION Total = 152.64 MU Wind Generation(in Mus) 2000 8.00 7.00 6.00 7.28 5.00 4.35 1155 1051 868 1000 4.00 868 % MUs 1500 4.51 567 1.36 3.00 708 2.52 500 3.33 3.33 31-Mar 29-Mar 27-Mar 25-Mar 23-Mar 21-Mar Date 0.43 104 100 568 347 401 1.15 1.38 100 95 0.39 0.41 0.44 130 0.48 0.50 2.49 2.12 516 1.98 582 2.00 2.11 1.00 0 0.00 Apr-14May-14Jun-14Jun-14Jul-14Aug-14Sep-14Oct-14Nov-14Dec-14Jan-15Feb-15Mar-15 RES Installed Capacity (in MW) Constituent Wind Solar Gujarat 3478 903 Maharashtra 4080 230 Madhya 347 321 Pradesh Total 7905 1454 180 160 140 120 100 80 60 40 20 0 Solar Generation 2014-15 0.40 0.40 0.40 0.36 Total Wind Generation 1927 1818 116 120 Maharashtra Total Wind Generation in WR 2500 123 0.47 120 0 MUs Months 1 0.50 0.55 126 127 0.30 80 % Gujarat 153 %of energy met 138 0.49 19-Mar March 15 0 140 17-Mar Max – 44.27 Mus on 10th 2 15-Mar 200 Total MUs 139 9-Mar Maharashtra- 214 Mus 0.60 160 3 13-Mar 400 4 7-Mar Gujarat- 369 Mus 180 11-Mar WR – 582 Mus 600 5-Mar 800 Total Solar Generation in WR GUJARAT 5 3-Mar Generation(in Mus) Total Wind Generation of MUs 1000 6 1-Mar Wind Generation in March-15 153 139 138 Generation(in Mus) 1200 120 123 104 95 100 116 126 127 130 60 0.20 40 0.10 20 0 0.00 Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar14 14 14 14 14 14 14 14 14 15 15 15 Months Agenda Items 5 21/04/2015 Outage Coordination - Uncertainties • Description of Element(s) whose outage is required • Incomplete Dia – Additional outage required due to unforeseen site conditions – Yet to be commissioned – Forced outage – Reactor / Line opened on H.V Agenda Item Nos-3.2 • – – – – • • • • • • 4-Nov 2006 (Saturday), Blackout in Poland, France, Portugal, Spain, Morocco, Greece, Balkans • • • • • • In September, a shipyard requested shut down of 380 kV Conneforde–Diele red and white line in Northwest Germany from 01:00 hrs on 5 Nov to allow a ship to pass beneath the overhead cables. Planned S/D was approved. Message sent to all neighboring TSOs. Scheduled power flow between TSOs was limited for 00: 00 to 06:00 hrs on 5th Nov. In D-2 i.e. on 3rd Nov, the shipyard requested to prepone the shut-down by three hours and allow SD from 2200 hrs on 4 Nov. Germany Operator allowed it. However, by the time message reached the neighboring TSOs the transfer capacity had already been sold and it was not possible to change it except for force majeure. The moment Shut dwon was availed system was overloaded, Relay over reach led to cascade tripping and UCTE area split The cause of this major blackout was a planned routine disconnection of a powerline crossing Uncertainty in network Availability Delay in restoration of elements already under planned outage Forced outage Emergency outage Rescheduled planned outage Weather conditions Grid conditions Network observability, Telemetry non-availability Multi utility and wide area co-ordination Socio political issues Human factors, Communication gap during Baton transfer Blackout in Turkey on 31st March 2015 • The outage had reportedly began after shutdowns linked to technical faults at two power plants in the western city of İzmir and southern city of Adana. • The outage occurred when the maintenance work on transmission lines were conducted simultaneously in several cities connected with the same grid. • "Confidence in the system, the self-confidence of the personnel and a tendency to take too many risks brought us to this [outage]. The personnel should have postponed the maintenance of one line when there was a failed line," Turkey Official said. 6 21/04/2015 Shut down of 400kV Sasan-VSTPS-2 Agra NR Transmission Lines Before Vindhyachal Pooling Station S No Requested Date WRLDC Approval Status 1 20-Feb-15 Yes Deferred by CPCC 2 21-Feb Yes Deferred by CPCC 3 24-Feb Yes Deferred by CPCC 4 26-Feb Approved on 28-Feb after restoration of Telemetry Not availed by CPCC 5 2-March Yes Reschedule by CPCC 6 3-March Yes Availed 7 23-March Yes Deferred by CPCC 8 28-March Yes Availed 9 4-April Yes Deferred by CPCC 10 12-April Yes Reschedule by CPCC 11 13-April Yes Reschedule by CPCC 12 14-April Under Review Agra NR Gwalior Present Status of Transmission Lines After commissioning of Vindhyachal Pooling Station Gwalior Satna VSTPS Unit-12 Bina(PG) Vindhyachal PS (PG) Satna Rihand NR Rihand NR VSTPS Unit-12 HVDC Bina(PG) HVDC VSTPS IV Sasan Jabalpur PS (PG) VSTPS IV Sasan VSTPS VSTPS Jabalpur PS (PG) Jabalpur(PG) Jabalpur(PG) 7 21/04/2015 Item No -5 Grid Disturbance Akola(II) • Antecedent conditions before the Disturbance 29-03-2015 • 765 kV Wardha-Aurangabad 1 & 2 under planned outage (for commissioning of ckt-III and IV) • SR TTC reduced by 200 MW • Tirora generation was limited to 1800 MW • Maharashtra drawal within 5300 MW • Permission issued to test charge the 400 kV Akola2-Taptithanda ckt2 for 15minutes as requested • Event • Tripping of 14 EHV transmission elements at 14:03 • Isolation of 765 kV and 400 kV bus at Akola2 due to tripping of single 765/400 kV ICT • Tripping of Unit # 2,3, 5 at Rattan Power (Loss: 440 MW) • Unit # 8 Koradi-II (Loss : 110 MW) • Blackout at 400 kV Akola1, Akola2 and Rattan Power • 400 kV Wardha-Parli D/C > 850 MW, SPS operated: Mouda: BD=100 MW, LS in SR • Reverse power flow on 765 kV Solapur-Raichur D/C and 765 kV Solapur-Pune thus relieving the line loading on 400 kV lines from Eastern Maharashtra to Western Maharashtra (load Centers) • 80 MW load distress shedding to control overloading of 220 kV lines from Akola • Fault • Uncleared B-Ph fault on 400 kV Akola2-Taptithanda ckt2 at 14:03:55.090 • Failure of Distance protection at Akola2…Loose CVT connections on secondary side • Working online in protection system at Akola2 • Failure of Distance protection at India Bulls/Rattan Power • Non-graded O/V settings leading to uncontrolled O/V tripping • Issues • Lack of due diligence during first time charging of new elements at Akola2 and at Rattan Power. • False certificate by utilities. • DR not configured completely • Telemetry not available from 400 kV Taptithanda • Request was to test charge the line for 15 minutes only but the lines was not hand tripped even when CVT voltage was seen to be zero. (fault occurred 26 minutes after the test charging) 8 21/04/2015 Outage of Bay Elements Ideally each element must be connected to two buses. But in reality, Facts are different • Several bays are not commissioned, elements may be connected to only one bus • More than one element is charged through a common breaker instead of independent breaker • Circuit breaker status not available at WRLDC, so it becomes difficult for ascertaining the configuration • Bay outages already availed for construction /emergency / maintenance, so, additional outage may lead to bus split and loss of elements more than intended In view of the surprises in the network, approval of bay outage also requires careful examination which is possible only in offline mode by reliability coordinators. Item Nos 8.7 OCC approval for 400kV Bay Outages Case 2: Not Commissioned/Not in service Tie Bays at 765kV Aurangabad Case 1: Not Commissioned/Not in service Tie Bays at 400kV Aurangabad Aurangabad-1 BR-1 Boisar-1 Boisar-2 Akola-2 Akola-1 Aurangabad-2 Future 400/220 ICT-3 400/765 ICT-I 400/765 ICT-II Future Wardha-1Wardha-2 Future Future Padghe-I Padghe-II Dhule BR Bus-I Bus-I Bus-II Bus-II 400/220ICT-1 400/220ICT-2 Future Emergency outage of 400kV Bus-2 on 12-Mar-15 • CPCC Nagpur confirmed that there will be no loss of other elements • After availing outage on 400kV Bus-2 • 400kV Boisar-1 LR, 400kV Boisar-2 LR and 400/220kV ICTs got tripped. Wardha-4 Wardha-3 Wardha-1 Future Wardha-2 ICT-II ICT-I 4 Tie CB not Commissioned at 765kV Aurangabad: • 765kV Wardha-Aurangabad-1 , 2 , 3 connected to 765kV Bus-II only • 240 MVAR LR of Aurangabad-Padghe-II charged as BR is connected to 765 kV Bus-I only ( On 13th March ) 9 21/04/2015 Case 3: Bus-1 Shutdown at 400kV Kotra Raigarh-1 RKM-2 RKM-1 Athena-2 Athena-1 DB Power-2 DB Power-1 ICT-1 Bus-2 Bus-1 Item Nos-8.5 Sasan Continuous Backing down • 400 kV Kotra - Raigarh-1 connected only to 400 kV Bus-1 at Kotra • Outage on Bus-I on 16-18 March by Athena Power results in forced outage of 400 kV Kotra-Raigarh-I • 400 kV DB Power-2 connected only to 400 kV Bus-2 at Kotra • Outage on Bus-II on 19-21 March by Athena Power results in forced outage of 400 kV Kotra-DB Power-II Item Nos 9.1 Transmission Constraints in Maharashtra 10 21/04/2015 Heavy Over Loaded Elements From Indore(PG) From Vadodara GIS From Seoni Ratan Power Aurangabad II (Taptithanda) Dhule(BDTCL) From Raipur Akola Wardha Aurangabad(PG) Bableshwar From Durg Akola(II) Aurangabad (Ektuni) Dhule Koradi(III) Tirora Recently Added New Elements Waluj Padghe(MS) Pune GIS Heavy Over Loaded Element 1. 765/400kV ICTs Aurangabad(PG) 2. Aurangabad(PG)-Waluj D/c 3. Waluj-Pune 4. Bableswar-Padghe Parli(PG) Pune(PG) Solapur (PG) To Raichur WRLDC New Element New Elements From Indore(PG) From Vadodara GIS Aurangabad II (Taptithanda) Koradi(III) Ratan Power Tirora From Durg Akola(II) Dhule(BDTCL) Aurangabad (Ektuni) Dhule From Raipur Akola Wardha From Vadodara GIS From Seoni Koradi(III) Tirora Except 765kV Pune-Solapur all the commissioned elemets are upstream of Aurangabad Indiabulls Dhule(BDTCL) Aurangabad II (Taptithanda) Aurangabad (Ektuni) Dhule From Durg Akola(II) From Raipur Akola Wardha Bableshwar Bableshwar Aurangabad(PG) Aurangabad(PG) Aurangabad(MS) Aurangabad(MS) Padghe(MS) Padghe(MS) Pune GIS Pune GIS Parli(PG) Pune(PG) 1. 2. 3. 4. 5. Solapur (PG) Parli(PG) Pune(PG) 765kV Tiroda-Akola D/c LILO at Koradi(III) 765kV Wardha-A’bad-3,4 400kV Akola(II)-Tapthithanda-2 Rattan Power-Akola D/c 765kV Solapur-Pune S/c 1. 2. 3. 4. 5. Solapur (PG) To Raichur WRLDC From Indore(PG) From Seoni 765kV Tiroda-Akola LILO at Koradi(III) 765kV Wardha-A’bad-3,4 400kV Akola(II)-Tapthithanda-2 Rattan Power-Akola 765kV Solapur-Pune To Raichur WRLDC 11 21/04/2015 Measures Suggested to Relieve Congestion From Indore(PG) From Vadodara GIS From Seoni Ratan Power Aurangabad II (Taptithanda) Koradi(III) Tirora Akola(II) Warora Dhule(BDTCL) Measure suggested to relieve congestion Aurangabad (Ektuni) Dhule From Durg Akola From Raipur Wardha Bableshwar Aurangabad(PG) Aurangabad(MS) Padghe(MS) Pune GIS Parli(PG) Pune(PG) Solapur (PG) To Raichur 1. 400kV Dhule MSETCL bays for BDTCL(Dhule) Line 2. 220kV Outlet from Tapthithanda 3. 220kV Outlet from Aurangabad(PG) 4. 220kV Outlet from Warora 5. By passing of Waluj from Aurangabad(PG) to Pune WRLDC Maharashtra Telemetry Status Item Nos 9.2 Constraints in Grid operation due to NonAvailability of Telemetry from MSETCL/ MAHAGENCO Stations 1 2 3 4 5 7 Telemetry not available 400kV Warora 400kV Lonikhand(New) 400kV Chandrapur StgII 400kV Taptithanda 400kV Khaparkheda Further, 17 more stations where 220kV station data is not available Telemetry highly Intermittent 400kV Jaigard 400kV Deepnagar 400kV Bhusawal Total 48 Stations 220kV data is intermittent S No. Event Date Event Description Telemetry Not Available from 1 29-March-15 Grid Disturbance at Akola(II) 14 EHV element tripped, Generation Loss 650MW and Load Shedding of 80MW Tapthithanda, Akola(II), Warora, Chandrapur(II), Bhusawal, Deepnagar, Bableswar 2 1-March-15 Blackout at Kolhapur, Karad, GOA N Koyna, Jaigarh, Koyna, Jejuri Stg-IV, Chakan, Lonikhand 12 21/04/2015 Item Nos- 8.8 Scheduling Technical Minimum Share from ISGS 13 21/04/2015 14