MINUTES OF 470TH MEETING OF OPERATION & COORDINATION
SUB-COMMITTEE OF WRPC
HELD ON 13TH APRIL 2015 AT LUCKNOW
The 470TH meeting of Operation & Co-ordination Sub-Committee of WRPC was
held on 13th April, 2015 in Lucknow hosted by NTPC Vindhyachal. The list of
participants is enclosed at Annexure-A.
Shri Malay Mukherjee, General Manager, NTPC Vindhyachal
welcomed Sh. SD
Taksande, Member Secretary, WRPC, P Mukhopadhyay GM, WRLDC & other
delegates of 470th OCC meeting. He thanked WRPC Secretariat for giving opportunity
to NTPC Vindhyachal for organizing this meeting and expressed pride in organizing
the same.
Shri S K Roy, Executive Director, NTPC Vindhyachal in keynote address stated that,
NTPC is committed to provide reliable and quality power to all our beneficiaries. In
line with that NTPC plants are operating at best efficiency regime and setting
benchmarks for the same in the country.
He stated that proper scheduling of generators is very important in maintaining
reliability, quality and stability of the system. He lauded the initiatives of OCC forum in
resolving issues faced by generating stations.
He further informed that in recent past there had been acute shortage of coal in spite
of having FSA for all power stations with the coal companies, NTPC had to resort to
blending of costly imported coal for ensuring power supply to our beneficiaries as per
our commitment resulting in incremental increase in cost of electricity which is
unavoidable. For reliability of power evacuation of VSTPS complete operationalization
of Vindhyachal Pooling Station is critical. NTPC Vindhyachal in the advance stage of
installation and commissioning of Unit 13 of VSTPS and evacuation of power of Unit
12 is still in contingency mode and units are running on split bus condition.
Shri S Benerjee, NTPC Vindhyachal made a presentation. He informed that NTPC
installed capacity as on 13TH APRIL 2015 is 44398 MW( Including thermal, hydro and
renewable energy.)
•
NTPC has been ranked 341 among the world's 2000 most powerful listed
companies as decided by Forbes”
•
NTPC Limited ranked No. 1 in Independent Power Producer & Energy Traders
in Asia. 2nd Independent Power Producers and Energy Traders globally rated
by Platt top 250 global energy company.
2
•
Vindhyachal , largest power plant of the country is always in expanding mode
and recorded increased generation year after year and at the same time
sourced coal in increasing quantity.
•
Vindhyachal is very much concerned about environment management and alert
in discharging social responsibility.
•
Vindhyachal is pioneer in many areas like renovation and modernisation of
ESP, near zero effluent discharge implementation from plant premises, tree
plantation etc.
There after he handed over the forum to Member Secretary, WRPC for further
addressing and presiding over the meeting.
Shri S D Taksande, Member Secretary, WRPC extended warm welcome to Shri S K
Roy, Executive Director, Shri Malay Mukherjee GM, NTPC Vindhyachal & all the
participants of the 470th OCCM. He expressed his gratitude to RED NR, ED, NTPC
Vindhyachal and his team of Engineers for making excellent arrangement for meeting
at Lucknow, the City of Nawab on the bank of Gomati river. He further welcomed to
New entities RattanIndia Power ltd., NLDC & IEPL as special invitee. He highlighted
the following events which took place since last OCC meeting :
1. As per decision taken in 28th TCC/WRPC meetings held on 3rd & 4th March,
2015 at Udaipur, a special meeting on Technical Minimum issues of CGPL was
held on 30.03.2015 at WRPC Mumbai. It was suggested to give minimum 4o%
of its entitlement as minimum schedule. GUVNL & Maharashtra did not agree
on proposal of minimum 40% schedule. Haryana, Rajasthan & Punjab stated
that lot of commercial implications may be there while implementing the
proposal & they told that the proposal will be submitted to their Management for
further decisions.
2. A workshop on restoration process was successfully organized by Madhya
Pradesh on 25th March, 2015 at Jabalpur. He requested to SLDC, Jabalpur to
prepare a reference manual of the outcome of the workshop.
3. He requested CE, SLDC Kalwa to organize a meeting on DSM issues. CE
SLDC, Kalwa informed that meeting would be held on 22nd April 2015 at SLDC
Kalwa Mumbai.
4. A special meeting on integration of Mega solar power Project has been called
by Special Secretary MOP on 21st April 2015 at New Delhi. He requested
470th OCC MINUTES
3
Gujarat, Maharashtra & Madhya Pradesh to furnish the total installed Capacity
from Solar Power Project & proposed project likely to be integrated in their
states.
5. LGBR for year 2015-16 has been prepared & is available at WRPC website.
6. Following capacities were added in WR grid during the month of March 2015:
I.
Installed capacities of 2400 MW, including RattanIndia(2x270 MW), MB
Power(600MW), JPL Ext Unit 4(600 MW) & Sasan Unit-6(660 MW).
II.
ICT of 5315 MVA capacity at Asoj(315 MVA), Badravati(315 MVA),
Koradi(2x1500) & Vindhyachal (1500 MVA).
III.
Total Transmission line added 1384 ckt Km. including important line 765
kV Wardha-Aurangabad-III & IV(370 Ckt Km each) & 765 kV SatnaVindhyachal PS(237 Ckt. Km).
There after he requested SE(O), WRPC to take up regular agenda items in seriatim
for discussion.
ITEM No. 1:
CONFIRMATION OF THE MINUTES
Shri M M Dhakate, S.E(Opn), stated that Minutes of 469th meeting of Operation &
Coordination Sub-Committee of WRPC held on 10th March 2015 at Nagpur were
forwarded vide letter No. WRPC/OPN/OCC-Minutes/2014-15/2616 dated 18.03.2015.
GM, WRLDC vide letter dated 23.03.2015 for amendments in following items in
respect of MoM of 469th OCC meeting:
QUOTE:
“
i)
Item No 3.2 B, “Delay in issuing code by WRLDC”
ii)
Item No. 8.6 , “Unreasonable Scheduling of NTPC stations” and
iii)
Item no 9.10. , “Review of ATC/TTC for each state control area in Western
Region
Item NO.3.2 B : Delay in issuing code by WRLDC
There was no clear agenda on the aforesaid item. However, on the issue of nonavailability of PMU data from Satna station, representative from POWERGRID raised
the issue of non- availability of shutdown the PMU data could not be made available. It
470th OCC MINUTES
4
is to mention that the PMU data from Satna was not available since one year due to
non- establishment of wideband network
WRLDC however, on the issue of clearances of daily outages clearly explained the
methodology adopted during outage co-ordination and stated as follows.
“After getting readiness from utilities, reliability suggestions for all outages are issued
in
advance and the list of outages approved for next day is made available to all
concerned through mail as well as goggle sheet. On the day of outage, real time code
is issued after coordinating with the concerned utilities. In Western region itself daily
around 60-70 numbers of outages are handled and for each outages, coordination
need to be done with two or more agencies. At the same time many emergency
outages are also handled. Handling such large number of outages
without
compromising grid security is a challenging job. It is also observed that many a times
the utilities changed their program in the last minute without availing the approved
outages. Instead of generalizing the issue in OCC forum, utilities are requested to
bring any specific case which are delayed for considerable time and the same may be
brought into the forum through proper agenda.”
Item No.8.6: Unreasonable Scheduling of NTPC stations
GM, WRLDC stated that the methodology circulated by NTPC requires further
deliberation with NTPC. WRLDC suggested that they would like to discuss the
methodology with NTPC for implementing an appropriate procedure for taking the
units under RSD.
Item No. 9.10: Review of ATC/TTC for each state control area in Western Region
GM WRLDC stated that, SLDC Maharashtra may do the necessary studies and
declare the ATC of their respective control area. WRLDC agreed to provide necessary
assistance if any for conducting the studies.”
UNQUOTE:
The Sub-committee discussed the matter & agreed for modification of 469th MOM as
above.
No other comments have been received. The minutes were confirmed with above
modification.
ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF MARCH
2015.
470th OCC MINUTES
5
Member Secretary, WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during March 2015.
Chief Manager, WRLDC in the presentation (copy attached at Annexure – 2 in soft copy)
concentrated broadly on the performance of the grid for month of March 2015 as below:
2.1
Frequency Particulars
The average frequency during the month of March, 2015 was 49.98 Hz. The
maximum instantaneous frequency was 50.54 Hz at 03:37 hrs on 01 st March-15
while minimum instantaneous frequency was 49.52 Hz at 18:57 hrs on 03 rd March15 & 05:51 hrs on 20th March . The frequency profile during March, 2015 was as
under:
01-March-2015 to 31-March-2015
% time
IEGC band (49.9 < f < 50.05 Hz)
58.47
< 49.9 Hz
17.77
> 50.05 Hz
23.76
The detailed frequency particulars are enclosed at Annex- 2.1.
The Sub-Committee noted.
2.2
Operational Discipline
There was a net inter-regional export of 3059.00 MUs by WR against net export
schedule of 2784.00 MUs.
The Sub-Committee noted.
2.3
Voltage Profile
Voltage profile at some of 765/400 kV sub-stations during the month of March
2015 furnished by WRLDC is enclosed at Annex-2.3.
The Sub-Committee noted as above.
2.4 U/F Relay Operations
As per WRLDC records during March 2015 the system frequency didn’t touch 49.2
Hz and no UFR operation has been reported by WRLDC.
The UFR operation status reported by constituents is enclosed at Annexure-2.4.
The Sub-Committee noted as above.
470th OCC MINUTES
6
2.5
Power Cuts / Load Restrictions
Details of Power Cuts and Regulatory measures during March 2015 as furnished by
the state utilities are given in Annex. 2.5.
The Sub-Committee noted as above.
2.6
Details of Generating Units under Forced outages
Details of generating units under forced outages during March 2015 are given in
Annex-2.6.
The Sub-Committee noted as above.
2.7
Details of Generating Units under Planned outages
The details of generating units under Planned Outages during March 2015 are given in
Annex-2.7
The Sub-Committee noted as above.
ITEM NO.3: OPERATIONAL PLANNING
3.1
Proposed Planned maintenance programme of generating units.
The maintenance programme of generating units for April 2015 & May 2015 was
discussed.
The finalized outage schedule of generating units for the above period and the
modified outages plan is placed at Annexure-3.1.
The Sub-Committee agreed as above.
3.2
A. DELAY IN ISSUING CODE BY WRLDC:
The matter of delay in code issued by system operators & concern raised by transmission
elements outages availing agencies was discussed in 469th OCC meeting & decided that
proper care shall be taken by reliability coordinators & system operator to minimize
wastage of mobilization of 1000’s of man-hours, machineries etc. and if there is real time
problem, the same shall be informed to next OCC meeting with satisfactory reason
thereof.
Member Secretary, WRPC suggested that proper coordination among utilities, WRLDC
reliability coordinating group, WRLDC Control room group & WRPC would help in timely
availing the outage which might leads to minimize the wastage of man power &
machineries.
470th OCC MINUTES
7
CM (SO), WRLDC gave a brief presentation on the existing procedure for outage
coordination and highlighted the associated issues that aggravate the complexity in
facilitating the outage such as involvement of multiple agencies, delay / nonsubmission of readiness in D-3 by the utilities for availing the outage, impromptu
request for outage of additional elements over and above those approved (to take
care of induction), delay in restoration of elements already under planned outage
leading to re-scheduling of outage in parallel/same corridor, incomplete Dia due to
pending commissioning of bays or forced outage, dynamically varying grid conditions,
non-availability of telemetry etc. He said that we must learn from the experience of
blackout of Turkey in March 2015, of Europe in Nov 2006 and India in July 2012 and
give due regards to the system reliability while allowing shutdowns.
GM, WRLDC expressed concern that even after issue of reliability consent in D-1 day,
the number of outages actually availed is far less than the number of reliability
consents issued. Also, the average delay in issuing the codes is around 30 minutes
and same can be reduced further if outage timings are staggered.
MS, WRPC said in a large interconnected grid where grid elements are being added
at a rapid pace, SLDCs/RLDCs and NLDC have to see the real-time conditions before
allowing any shutdown. He further added that system security should not be
compromised during outage coordination. He appreciated the responsibility of system
operator (WRLDC) to issue code in real time for multiple outages planned for a day.
After detailed deliberation, it was agreed that compliance to the outage coordination
procedure is essential for availing the outage without compromising grid security. It
was also decided that time of availing the planned outage would be staggered by the
utilities to the extent possible so as to avoid simultaneous requests of multiple
elements starting from 0800 hrs in the morning.
GM, WRLDC ensured that all efforts will be made so that code will be issued with
minimum possible time for the transmission elements which are approved in OCC
meeting after completion of due formalities.
The Sub-Committee agreed/noted for the same.
470th OCC MINUTES
8
B.
OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS
Maintenance programme for transmission lines during the months of April 2015 &
May 2015 is given in Annex 3.2 B.
The Sub-Committee agreed/noted for the same.
3.3
ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – APRIL 2015 &
MAY 2015
Details of anticipated restricted & un-restricted demands for the months of April 2015 &
May 2015 are given in Annex 3.3.
The Sub-Committee noted the same.
ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF MARCH 2015
The details of actual generation, demand, drawl of power from grid; exchanges etc.
are given in the following Annexure:
Annex 4.1 - Actual Generation and Requirement for March 2015
Annex 4.2 - Peak Demand: Schedule Vs Actual for March 2015
Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines
for March 2015.
Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector
stations, Drawl Schedules and Entitlements of constituents during March 2015
Annex 4.6 - Inter System Exchanges for March 2015.
Annex 4.7 – Details of level of Major Reservoirs in Western Region for Month of March
2015.
The Sub-Committee noted.
ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month except
for the case of 29th March 2015 which is discussed below. The other minor tripping
details during the month received from WRLDC is enclosed at Annexure-5.
Representative from WRLDC stated that the tripping of multiple elements due to
failure of primary protection at the time of trial charging of 400 kV Akola2-Taptithanda
ckt-2 of MEGTPCL on 29th March 2015 when 765 kV Wardha-Aurangabad ckt-1 & 2
was under planned outage was deliberated in detail. Members noted that 14 EHV
transmission elements tripped in the event leading to isolation of 765 kV and 400 kV
bus at Akola2, tripping of Unit # 2,3, 5 at Rattan Power (Loss: 440 MW), tripping of
470th OCC MINUTES
9
Unit # 8 Koradi-II (Loss : 110 MW), Blackout at Rattan Power, Loss of supply at 400
kV Akola1 and Akola2, Loading on 400 kV Wardha-Parli D/C > 850 MW, Operation of
SPS resulting in backing down of 100 MW at Mouda plus Load shedding in Southern
Region and 80 MW load distress shedding to control overloading of 220 kV lines from
Akola. It was observed that after the contingency, MW and MVAr support was
instantaneously available from Southern Region due to reversal of power flow on 765
kV Solapur-Raichur D/C and 765 kV Pune-Solapur.
GM, WRLDC expressed concern on the failure of primary protection and lack of basic
due diligence in charging of Akola2-Taptithanda ckt-2.
Member Secretary, WRPC said that such incidents are a threat to grid security and
the event should be examined in detail and proposed to be discussed in the next
Protection Committee meeting scheduled on 21st April 2015. He urged all utilities to
ensure compliance to the laid down procedures for first time charging and
commissioning of new elements.
The Sub-Committee noted as above.
ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.
Constituents have furnished the status of healthiness of SER/DRs in their systems on
the dates below :
Sl No. Name of
Date of Receipt
constituents
1
PGCIL,WRTS-I
08.04.2015
2
PGCIL,WRTS-II
06.04.2015
3
MPPTCL
13.04.2015
4
NTPC
08.04.2015
5
CSPTCL
06.04.2015
6
GETCO
06.04.2015
7
MSETCL
13.04.2015
Constituents of WR were requested to ensure healthiness and sent information to this
office regularly as per the recommendation of enquiry committee of Grid disturbances on
25.02.2007 and 28.02.2007.
The Sub-Committee noted.
470th OCC MINUTES
10
ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR
COMMISSIONING OF REACTORS, TRANSMISSION LINES AND
GENERATING UNITS IN WR.
7.1 Status of completion of ongoing Schemes for Commissioning of reactors.
The present status regarding schedule and commissioning of reactors is as below:
S.
No.
400
Sub/stn.
1
Jabalpur
125 MVAR
PGCIL
Commissioned
26.03.2014
on
2
Khandwa
125 MVAR
PGCIL
Commissioned
28.03.2014
on
3
India bulls
80 MVAR MSETCL
BR
Commissioned 26.11.2013
4
Nagda
50 MVAR
MPPTCL
Commissioned in Feb-2014
5
Sasan Line 240 MVAR
reactor-1
RELIANCE
Commissioned
16.02.2014
on
6
Shujalpur
125 MVAR
PGCIL
Commissioned
31.07.2014
on
7
Bhatapara
125 MVAR
PGCIL
Commissioned
24.07.2014
on
8
Raigarh
125 MVAR
PGCIL
Commissioned
30.07.2014
on
9
Aurangabad
125 MVAR
PGCIL
Commissioned
28.04.2014
on
10
Nanded
125 MVAR
MSETCL
June – 2016
11
Sholapur
125 MVAR
MSETCL
June – 2016
12
Kolhapur
125 MVAR
MSETCL
June – 2016
13
Akola
125 MVAR
MSETCL
June – 2016
*14
Nagda
125 MVAR
MPPTCL
July – 2015
15
Bhopal
80 MVAR
MPPTCL
May – 2015
16
Damoh
125 MVAR
PGCIL
Commissioned
30.09.2014
on
17
Bachau
125 MVAR
PGCIL
Commissioned
01.12.2014
on
470th OCC MINUTES
kV Size
(MVAR)
Implementing Expected commissioning
agency
date
11
18
Pirana
125 MVAR
PGCIL
Commissioned
02.10.2014
on
19
Itarsi
PGCIL
Commissioned
15.08.2014
Commissioned
13.10.2014
on
PGCIL
Commissioned
13.12.2014
on
20
Seoni
1X125
MVAR(Ist)
1X125
MVAR(IInd
)
125 MVAR
21
Parli
125 MVAR
PGCIL
Commissioned
10.01.2015
on
22
Raipur
125 MVAR
PGCIL
Commissioned
30.09.2014
on
23
Gwalior
125 MVAR
PGCIL
Commissioned
30.06.2014
on
24
ISP
125 MVAR
NHDC
December 2015
25
Line reactor 50MVAR
at Nagda-ISP
line at Nagda
end
Satpura
50 MVAR
MPPTCL
July 2015
MPPGCL
April-2016
27
Sasan Line 240 MVAR
reactor-2
RELIANCE
Commissioned
21.01.2015
28
Sasan
reactor
RELIANCE
May-2015
29
Bus reactor 330 MVAr
at Wardha
PGCIL
Commissioned
01.11.2014
on
30
Bus reactor 330 MVAr
at Dhule
BDTCL
Commissioned
04.12.2014
on
26
Bus 240 MVAR
on
on
*50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor after
commissioning of 125 MVAr reactor at Nagda.
Sub-Committee noted as above.
7.2 Status of completion of 765/400 kV and above ongoing Transmission Schemes
being executed/implemented by Transmission Agencies.
The updated status on various ongoing transmission schemes for the current year as
per the current information available is as follows: -
470th OCC MINUTES
12
S.
No.
Name of the Line
POWERGRID
1
400 kV Navsari – Kudus D/C Line
2
765kV S/C Satna-Gwalior line
(359Km + 60Km D/C Portion) Ckt.-II
3
765 kV Durg pooling station Champa
Pooling
station
Dharamjaygarh PS - 2nd ckt
4
765 kV Gwalior - Jaipur line (1st Ckt)
S/C
5
765 kV Dharamjaygarh - Jabalpur
Pooling Station D/C line
6
765 kV Wardha –NizamabadHyderabad D/C
7
765 kV Narendra-Kolhapur D/C
8
400 kV Aurangabad - Boisar line D/C
line
9
765 kV Aurangabad (PG) - Padghe
(PG) D/C
10
11
12
800kV DC Champa – Kurukshetra
Bipole
765 kV D/C Jharsuguda – Korba
Target
Completion
Date
Remarks
June-15
ROW problem
Commissioned
06.08.2014
Commissioned
21.05.2014
on
on
June-15
June-15
March-16
Dec-15
Nov -2015
Sept-2015
Sept 2015
Ckt I Commissioned
28.07.14
Ckt II Commissioned
29.07.14
Ckt I Commissioned
01.07.14
Ckt II Commissioned
03.07.14
765 kV Wardha- Aurangabad D/C
Line.
on
on
on
on
13
765 kV Aurangabad- Solapur D/C
line
14
765 kV Solapur-Pune line
15
765KV Durg-Wardha D/C
16
765 kV Ranchi-DharamjaigarhBilaspur II & 765 kV RanchiDharamgaigad-I
17
LILO of both circuits of Aurangabad –
Pune 400 kV D/c line at Pune
April-15
765/400 kV GIS
LILO of both circuits of Parli– Pune
Commissioned
on
400 kV D/c line at Pune 765/400 kV
02.03.2015
GIS
400 kV Navsari-Magarwada
Lilo
of LILO ON 27.02.2015
18
19
470th OCC MINUTES
Oct- 2015
Commissioned
on
02.03.2015
Commissioned
on
15.11.14
Ckt I likely to be
commissioned in Jan2015
Ckt II Commissioned on
31.03.14
13
400 kV Magarwada-kala
400 kV kala-Vapi
20
21
22
220 kV Magarwada(PG)Magarwada(DD)-I & II
400 kV Sasan – Vindhyachal PS-I
24
765 kV Wardha – Aurangabad-III &
IV
400 kV Solapur(PG) to
Solapur(NTPC)-I & II
Sasan-Vindhyachal PS-I
25
Satna- Vindhyachal PS
23
Navsari Vapi
ckt-II
CHHATTISHGARH
1
LILO of 400 kV Korba westKhedamara at Marwa
2
400
kV
DCDS
Raipur(Raita)Jagdalpur(DCDS)
2.1 220 kV Korba-Bishrampur line
(DCSS)
2.2 220 kV DCDS lines Chhuri to Mopka
(Bilaspur), (DCDS)
2.3 LILO of 220 kV Raigarh-Budipadar at
400 kV PGCIL S/s Raigarh
2.4 LILO of 220 Korba (E)- Bishrampur
line at 220 kV Churri S/s
2.5 LILO of 220 kV Raigarh – Jindal
(Tamnar) at Girwani 220 kV S/s
GUJARAT
1
400 kV D/C Kosamba-Chorania line
(Package I
2
400 kV D/C Kosamba-Chorania line
(Package II)
3
400 kV D/C Mundra-Zerda line No. 1
4
400 kV D/C Mundra-Zerda line No. 2
5
400 kV D/C Vadinar-Amreli line
6
400kV APL-Hadala LILO to Halvad
7
400 kV D/C Amreli-Kasor line(Part-1)
8
400 kV Charanka- Veloda
9
400 kV Mundra – Varsana-I & II
MADHYA PRADESH
1
Chhegaon-Julwania 400 KV DCDS
Line
2
Pithampur- Indore 400KV DCDS
Line
470th OCC MINUTES
Commissioned
17.03.2015
Commissioned
26.03.2015
Commissioned
30.03.2015
Commissioned
30.03.2015
Commissioned
31.03.2015
Commissioned
31.03.2015
on
Commissioned
14.08.14
on
on
on
on
on
on
June- 2015
July 2015
July- 2015
August-2015
July-2015
Charged on 22.08.14
Commissioned
05.07.14
Commissioned
05.07.14
on
Commissioned
31.03.2015
on
on
June -2015
June -2015
June -2015
Sept -2015
Sept -2015
Sept -2015
Commissioned
on
31.10.14
Ckt I Commissioned on
04.09.14
14
Ckt II Commissioned on
07.08.14
3
Satpura TPH-Ashta 400KV DCDS May – 2015
Line
MAHARASHTRA(STU)
1
2
400KV D/C line from Koradi-(II) to June- 2015
Wardha S/S(PG) D/C
400 kV Akola(II)- Taptitanda -I
765 kV Koradi-(III)- Tiroda ckt-I
Commissioned
Commissioned
20.01.15
3
765 kV Tiroda- Koradi-(III) ckt-II
4
5
6
7
8
9
10
11
12
13
14
765 kV Koradi-(III)- Akola(II) ckt-II
765 kV Akola(II)- Taptitanda ckt-II
400 kV Akola(APML) to
Akola(MSETCL)-II
400 kV Taptitanda-Bableshwar-D/C
Dec-15
Dec-15
Jun-16
May 2015
Commissioned
20.03.2015
765 kV Bhopal-Bhopal (BDTCL)
3 765 kV Vadodara - Dhule (BDTCL) S/C
4 765 kV Dhule - Aurangabad (BDTCL)
470th OCC MINUTES
on
May 2015
GUJARAT
(IPTC
route)
by
WR
Transmission (Guj) Pvt. Ltd
1 400
kV
Rajgarh(PG)-Karamsad
July 2015
(GETCO) D/C
STERLITE (JTCL)
1 765 kV Dhramjaygarh - Jabalpur (JTCL) May -2015
D/C line
2 765 kV Jabalpur - Bina (JTCL) S/c
May -2015
STERLITE (BDTCL)
1
765 kV Bhopal - Indore (BDTCL) S/C
2
on
Commissioned
on
06.02.2015
Commissioned
on
24.02.2015
Charged at 400 kV level
Commissioned
on
02.10.14
Commissioned
on
31.12.2014
765 kV Koradi-(III)- Akola(II) ckt-I
LILO of 400 kV Chandrapur-Parli at
Nanded
2x1500 MVA 765/400 kV, ICTs at
Ektuni-D/C
400 kV Bableshwar-Kudus D/C
(Quad)
765 kV Akola(II)-Ektuni -2 ( To be
charge at 400kV at Tapthithanda)
400 kV Akola-II to RattanIndia PL-I
& II
400kV IEPL-Warora
Charged in Jan-14
May-2015
Severe ROW Problem
Severe ROW Problem
Commissioned
19.11.14
Commissioned
16.07.14
Ready for charging
Commissioned
on
on
on
15
S/C
5 400 kV Dhule-Dhule(D/C) (up to dead
end tower)
RAICHUR SHOLAPUR TRANSMISSION
CO. LTD.(RSTCL)
1 765 kV Raichur - Sholapur line 2nd S/C
04.12.14
Commissioned
05.12.14
on
Commissioned
on
29.06.2014
It was suggested by WRLDC and constituents that important list of line will be sent by
each constituent to WRLDC and WRLDC will compile and furnish the list as per
priority of commissioning.
The Sub-Committee noted and agreed as above.
7.3
Commissioning of new Generating units in Western Region and the
capacity expected to be commissioned during the current year 2014-15.
The status regarding Generating units, commissioned /expected to be
commissioned during the current year 2014-15 according the available information is as
below:
Name of the Power Projects
Unit No. Capacity Date of
Commissioning
(MW)
/Schedule Date
GUJARAT
NIL
CHHATTISGARH
Marwa
1
2
500
500
May 2015
July 2015
MAHARASHTRA
Dhariwal
2
300
Synd. On 23.04.2014
CHANDRAPUR
8
500
Synd. On 11.01.2015
CHANDRAPUR
9
500
September 2015
KORADI
8
660
Syn on 25.02.2015
KORADI
9
660
August 2015
KORADI
10
660
March -2016
PARLI
8
250
December 2015
APML
5
660
COD on 11.10.2014
RattanIndia
4
270
Cod on 07.03.2015
RattanIndia
MADHYA PRADESH
Singhaji TPS
5
270
Cod on 13.03.2015
2
600
Commissioned on 15.10.14
M/s Jhabua Power, Seoni
1
600
Jaiprakash Power, Nigri
1
660
May – 2015
Synchronized on 3.09.14
COD on 17.9.14
470th OCC MINUTES
16
Jaiprakash Power, Nigri
Moser Bear (Hindustan power)
Moser Bear (Hindustan power)
EssarPower MP ltd (Mahan)
EssarPower MP ltd(Mahan)
BLA
CENTRAL SECTOR/IPP
Vindhyachal
KSK
KSK
ACBIL
SASAN
SASAN
Sasan
BALCO
Dgen
Dgen
Dgen
JPL
Sasan UMPP
2
1
2
1
2
2
660
600
600
600
600
45
COD on 21.02.2015
Synchronized on 19.03.15
December 2015
Synchronized on 24.04.13
May – 2015
June 2015
13
2
5
1
5
6
4
1
51
52
53
IV
VI
500
600
600
300
660
660
660
300
400
400
400
600
660
Oct -2015
May – 2015
May – 2015
May – 2015
Synchronized in 22.08.2014
April 2015
Synchronized in May 2014
Synchronized in 22.02.2015
COD on 11.12.2014
COD on 11.12.2014
COD on 11.12.2014
Synchronized on 26.03.2015
COD on 27.03.2015
Sub-committee noted as above.
ITEM NO. 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the fourth quarter
(January 2015 to March 2015) for the year 2014-15.
The Sub-Committee noted as above.
ITEM NO. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR
Status of physical & cyber security in Power Sector for the fourth quarter (January
2015 to March 2015) have not been received from some of the constituents.
The Sub-Committee noted as above.
ITEM NO. 8.3 LGBR PREPARATION FOR THE YEAR 2015-16 IN WESTERN
REGION.
WRPC prepared LGB Report for the year 2015-16 in consultation with state utilities.
MUs data has been taken from Generation Target finalized by CEA/MOP & MW data
470th OCC MINUTES
17
has been taken from Utilities. Small hydro, RES & STOA purchase plan has also been
taken into consideration. LGBR for the year 2015-16 is finalized and same is available
at the www.wrpc.gov.in.
Member Secretary, WRPC stated that LGBR shall be reviewed on quarterly basis for
further fine turning. Next review will be on the last quarter of the June 2015.
The Sub-Committee noted as above.
ITEM NO. 8.4 READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FOR
UPGRADATION OF EXISTING SCADA/EMS SYSTEM
During 28th WRPC meeting it was decided that the status of progress of SLDC’s &
Back-up SLDC’s of WR constituents /WRLDC would be regularly monitored in monthly
OCC meeting.
The present status of progress of SLDC’s & Back-up SLDC’s of WR constituents
/WRLDC attached at Annexure – 8.4. All the constituents are requested to update in
attached format.
The Sub-Committee agreed as above.
ITEM NO. 8.5 : CONTINUOUS BACKING DOWN OF POWER FROM SASAN UMPP
Sasan Power Ltd. informed that cheapest power from the Sasan Ultra Mega Power
Project is being continuously backed down primarily by Haryana, Punjab, Rajasthan
and Delhi. For the similar issue faced by NTPC power plants in the recent WRPC and
OCC meetings, it is understood that a methodology has been devised to address unit
is NOT scheduled below technical minimum capacity. Considering above, Sasan
Power Limited (SPL) requests WRLDC and WRPC that same should be made
applicable for Sasan UMPP which is also a Inter-State Generating Station. In this
regard, Sasan Power Limited has highlighted backing down related issues with the
beneficiaries in the Procurers meeting. As advised during the OCC meeting held
on 10.03.2015, a separate meeting is being arranged with Procurers and outcome of
the meeting would be shared. Hence, it is requested to flag this issue till a solution is
arrived at. Further, SPL requested that technical minimum of all generating stations
(including State Gencos) be audited by third party in line with what Maharashtra who
470th OCC MINUTES
18
has experience in this direction and requested the same be adhered to.
During the presentation, WRLDC shown a plot of DC vs schedule of Sasan during
March 2015. It was noted that there was surrender of power by small quantum by
utilities in Sasan on 1st and 7th March 2015 due to inclement weather conditions and
demand crash. Member Secretary, WRPC and GM, WRLDC opined that on all other
days the entire DC of Sasan was getting scheduled. SE, SLDC-M.P. expressed
concern on large variation in DC of Sasan leading to frequent start and stop of their
own units. Sasan Power was advised to make efforts to ensure consistent generation
availability from Sasan.
He requested SASAN to take up with procurer from NR to formulate policies regarding
scheduling to technical minimum in line with decision taken in meeting on 30 th March
2015 regarding CGPL technical minimum scheduling.
The Sub-Committee members noted as above.
ITEM NO. 8.6: WORKSHOP ON BLACK START RESTORATION PROCESS
A Workshop on Black Start Restoration Process in MP System was successfully
organized by SLDC Jabalpur
on 25th March 2015. Approximately 85 participants
attended the above workshop.
Member Secretary, WRPC suggested SLDC MP to compile the discussion/matter
during the work shop for further reference.
SLDC, M.P. agreed to compile and forward the recommendations of the workshop.
GM, WRLDC said that the scheme for extending start-up supply to the large size units
of the new thermal generating stations connected at 765 kV or 400 kV level should be
identified at the planning stage itself. Various issues associated with retaining the
connectivity with STU network at lower voltage level established during construction
stage were discussed. Several members opined that this arrangement could help in
extending start-up supply during system restoration.
CE, CSPTCL stated that regulatory provisions for implementing the above suggestion
would be required.
CE, SLDC Gujarat said that the issue of extending start up supply to CGPL from
220/400 kV ICT at Nanikhakar under system restoration state has been under
470th OCC MINUTES
19
discussion. The ICT would normally be charged only from one end and the O&M
charges could be shared by all beneficiaries of CGPL.
It was decided that CGPL would submit a comprehensive proposal (regarding
installation of 220/400 kV ICT at Nanikhakar for extension of start-up supply to CGPL
units) for further deliberation and approval by the TCC/WRPC.
RattanIndia Power Ltd (RPL) raised concern for its 5x270 MW Nashik TPP to operate
during Black-start Restoration process, as STU, MSETCL has allowed connectivity for
Nashik TPP on 400 KV transmission line from Nashik TPP to Babhaleshwar
substation with prior disconnection of 220 KV LILO on MSETCL Eklahare to
Babhaleshwar transmission line at Nashik TPP.
As such, due to physical
disconnection of 220 KV LILO line alongwith 400/220 KV ICT, constructed earlier in
order to avail Start-up power, RPL may face constraints in start-up power availability
during Black Start restoration process.
The Sub-Committee members noted as above.
ITEM NO. 8.7: OCC APPROVAL FOR ATTENDING MAINTENANCE WORKS IN
400KV BAY OUTAGES
WRTS-II, PGCIL informed vide letter dated 04th April, 2015 that, WRLDC had advised
to obtain OCC approval for issuing code for outage of 400kV Main / Tie bays, for
maintenance works. In one and half breaker scheme, during outage of main / tie bay,
the line/ICT remains in service through its tie/ main CB, and there is no element
outage involved & power supply position is not affected. As such, it is felt that there is
not much requirement of OCC approval of 400kV Bay outages.
Also, there are large no. of 400kV Main / Tie bays in service in various substations
and their inclusion in main OCC agenda will un-necessary increase the OCC list and
time for due diligence in element outage will get affected.
As per IEGC code 2010, clause no. 5.7.1 (a), the outages are planned on element
basis.
470th OCC MINUTES
20
PGCIL have requested that earlier practice of granting 400kV Bay outages by WRLDC
based on real time conditions may please be continued instead of including these in
OCC agenda.
WRLDC during presentation gave examples of grid incidences due incomplete dia due
to outage or non-commissioning of Main/Tie bays at several of the new substations in
WR resulting in unexpected / undesirable tripping of elements during facilitating
planned/emergency outage.
MS, WRPC opined that the construction activities in various substation of WR are in
full swing and the availability of bays needs to be checked thoroughly before
permitting shutdown of other bays.
After discussion it was decided that all planned shutdown of bays in EHV substations
(400 kV and above) would also be forwarded by respective utilities for discussion and
concurrence in the monthly OCC meeting.
The Sub-Committee members noted as above.
ITEM NO: 8.8 SCHEDULING OF TECHNICAL MINIMUM SHARE FROM ISGS AND
SUDDEN WITHDRAWAL OF URS SHARE OF ISGS.
CE, SLDC, Gujarat vide letter dated 06.04.2015 intimated that during 467th OCC
meeting held on 16.01.15 at WRPC, Mumbai, the following was decided with respect
to technical minimum scheduling of ISGS stations of NTPC:

Constituents will give their requisition for more than 30% of their entitlements
for on bar generation for all NTPC ISGS stations.

In case total requisition for a particular on bar unit in a station is lesser than
technical minimum, then deficit for meeting TM would be conveyed by WRLDC
to its beneficiaries.

Beneficiaries will have to send revised requisition so as to meet TM on pro-rata
basis

commensurate with their entitlement percentage by 21:00 Hrs. After 21:00 Hrs,
WRLDC will issue the final schedule i.e. R-1, as received from beneficiaries.

WRLDC will coordinate and issue reasonable schedule based on revised
requisition taking care of ramping up / ramping down and the ratio between
minimum and maximum generation levels as envisaged in IEGC 6.5.14.
470th OCC MINUTES
21
It happens many times that during night hours, the technical minimum share of other
constituents was scheduled to Gujarat State especially from NTPC Mauda Power
Station. It is also observed that many constituents are scheduling their power from
coal based station as a peaking station and in night hours, they are not cooperating to
absorb / schedule their Technical Minimum share.
It is utmost necessary that the practice of using coal based stations as peaking
stations shall have to be stopped. In case total requisition for a particular on bar unit in
a station is lesser than technical minimum, then deficit for meeting TM will have to
commensurate with their entitlement.
Also, it is observed many times that the intimation of URS withdrawal due to
requisition of power by the beneficiaries is received at the last moment or posted on
WRLDC web site just prior to the block of implementation. When there is a sudden
withdrawal of URS power exceeding a quantum of 100 MW especially during peak
hours, it is very difficult to manage the power requirement of the State for the
beneficiary who is availing URS.
Hence, it is necessary that URS shall be withdrawn / scheduled in steps of 100 MW or
less per block so that it would be easier for the State availing URS to manage power
requirement. Also, the intimation of URS revision shall be posted with pop-up block on
WRLDC website to acknowledge changes in schedule easily.
GM (OS & Comml) NTPC informed the forum that:(1) In order to reduce energy cost of Mouda, FSA has been signed with SECL on
24.03.15 (in place of MCL). This was as per recommendations of Inter Ministerial
Task Force (IMTF) for rationalization of coal sources. Further the coal realization
from WCL has also started from February 2015. This will ensure availability of
more domestic coal. With these initiatives energy charges of Mouda is expected to
come down in next 2-3 months.
(2) Govt. of India vide MOP/NG/Ref. No./PPAC/Gas pricing/april-Sept.’15 dated
31.03.15 has fixed up the Gas Fuel price of $ 4.66/mmbtu from 1 st April 2015 to
30th Sept.’15, Accordingly variable charges of Kawas and Gandhar Gas power
stations have reduced. The same will approximately be 303p/kwh.
470th OCC MINUTES
22
(3) NTPC has started Hydro Power Generation from its 1st 800 MW Hydro power
station “KOLDAM” situated in Himachal Pradesh, out of 4 units of 200 MW, three
units have been synchronized and achieved full load.
CE, LD, MPPTCL vide letter dated 26.03.2015 (copy enclosed at Annexure-8.8)
suggesting modifications/corrections in the MOM of 28 th WRPC meeting, it was clarified
by SE(O), WRPC that condition of 30% in R0 is only for the beneficiaries who schedule
around 100 % of their entitlement during peak conditions. If flat requisition of “0” is given
by any beneficiary then it would be fine and would not count for any violation to agreed
methodology.
Member Secretary, WRPC stated that the earlier decisions taken in OCC’s & WRPC will
be followed in the above matter.
The Sub-Committee members noted as above.
ITEM NO. 9 : ITEMS FROM WRLDC:
ITEM NO 9.1: TRANSMISSION CONSTRAINTS WITHIN MAHARASHTRA SYSTEM
The issue of transmission constraint within Maharashtra system has been under
deliberation in the past several OCC meetings. The same was also discussed during
the 27th and 28th TCC/WRPC meeting. During the discussions, it emerged that several
transmissions elements downstream of Aurangabad (PG) / Taptithanda (MSETCL)
towards Pune and Bableshwar are heavily loaded viz.
•
765/400 kV ICTs Aurangabad (PG)
•
400 kV Aurangabad-Waluj D/C
•
400 kV Aurangabad-Pune D/C
•
400 kV Waluj-Bableshwar
Recently the following new elements have been synchronized / commissioned within
Maharashtra.
1. LILO of 765 kV Tiroda-Akola2 at Koradi-III
2. 765 kV Tiroda-Koradi-III ckt-2
3. 765 kV Koradi-Akola2 ckt-2
4. 765 kV Wardha-Aurangabad ckt-3 and 4
5. 400 kV Akola2-Taptithanda ckt-2
470th OCC MINUTES
23
6. 400 kV Rattan Power-Akola D/C
7. 765 kV Solapur-Pune S/C
However it may be seen that except 765 kV Pune-Solapur S/C all the above elements
are located upstream of Aurangabad. Thus, the desired relief on the congested
corridor downstream of Aurangabad (PG) towards Pune/Bableshwar is still awaited.
During the joint simulation studies conducted at WRLDC following measures were
suggested for relieving the congestion downstream of Aurangabad.
a) Commissioning of 400 kV Dhule bays for BDTCL line (Action: MSETCL)
b) 220 kV outlets from Taptithanda and Aurangabad-PG (Action: MSETCL)
c) 220 kV outlets from Pune_PG and Warora (Action: MSETCL)
d) Load trimming scheme at Waluj and Boiser (Action: MSETCL)
e) Temporary by passing 400 kV Waluj to form 400 kV Aurangabad (PG) to Pune
(PG) D/C instead of 400 kV Aurangabad-Waluj D/C and 400 kV Waluj-Pune
D/C (Action: POWERGRID and MSETCL)
MSETCL said that the Dhule bays are expected to be commissioned by May 2015
end. POWERGRID agreed to explore possibility of bypassing 400 kV Waluj and
connecting 400 kV Aurangabad_PG to Pune GIS after completion of 400 kV Dhule
bays and LILO of 400 kV Waluj-Pune_AIS D/C at 765/400 kV Pune GIS and revert
back.
Member Secretary, WRPC suggested that joint survey would be done by MSETCL,
PGCIL, WRLDC & WRPC for exploration of connectivity.
RPL informed that due to various transmission constraints within Maharashtra State,
power from its 5 x 270 MW Amravati TPP is presently restricted at 750 MW Ex-Bus
against PPA commitment of 1200 MW with MSEDCL.
WRPC forum informed that since RPL is embedded IPP within Maharashtra State and
as the Ex-Bus power restriction is imposed by STU, MSETCL, issue to be resolved by
STU, MSETCL only.
The Sub-Committee members noted as above.
470th OCC MINUTES
24
ITEM NO. 9.2 : CONSTRAINTS IN GRID OPERATION DUE TO NONAVAILABILITY OF TELEMETRY FROM MSETCL/MAHAGENCO STATIONS
Non-availability of telemetry from large number of EHV stations of MSETCL and
Mahagenco has been flagged by WRLDC and is being deliberated in the OCC forum
for more than a year. It is a matter of concern that the despite repeated assurances
from representatives of Maharashtra the issue remains unresolved. Consequently the
observability of Maharashtra system is poor and achieving convergence of the State
Estimator is also a challenge.
In the absence of Circuit Breaker Status, Bus voltage, line flow (MW and MVAR),
severe constraints are being experienced by WRLDC control room personnel in realtime supervision and operation of the grid. State Estimator is also not converging It
may be recalled that there have been several disturbances involving tripping of
multiple transmission elements and consequent load/generation loss in Maharashtra.
The restoration activities as well as post-facto analysis of events were severely
constrained due to non-availability of telemetry.
Coordination of outage of EHV elements is also hampered due to non-availability of
circuit breaker status and analog values from various stations in Maharashtra.
GM, WRLDC expressed concern on the non-availability of telemetry from several
substations of Maharashtra particularly 400 kV Taptithanda, Warora, Chandrapur and
Lonikhand despite continuous follow up and repeated assurances by MSETCL
representatives.
Member Secretary, WRPC opined that MSETCL should forward a clear timeline of
resolution of telemetry issues of Maharashtra.
CE, SLDC-Kalwa confirmed that all the pending telemetry issues of Maharashtra
would be resolved by end of May 2015.
The Sub-Committee noted as above.
ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING
469th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure10. Accordingly, it was proposed to host 471st OCC by Tata Power on 13th May, 2015.
Tata Power expressed inability to host the 471st OCC meeting, therefore it will be held
at WRPC office, Mumbai. The TATA Power turn will be as modified roster attached at
Annexure -10.
As per roster, it is proposed to host 472nd OCC by Torrent Power Ltd., Ahmedabad in
the month of June 2015.
******************************
470th OCC MINUTES
ANNEXURE-A
LIST OF PARTICIPANTS OF 470th OCC MEETING OF WRPC HELD ON 13.04.2015 AT LUCKNOW
Sl.No.
Organisation, Name & Designation
E-mail
I
1
2
3
WRPC
Shri S.D. Taksande, M.S.
Shri M.M. Dhakate, S.E.(O)
Shri L.K.S. Rathore, D.D.
ms-wrpc@nic.in
opc-wrpc@nic.in
lksr_2000@yahoo.com
II
4
5
6
MSETCL / MSEDCL/MahaGenco
Shri Jayant Weekey, C.E.
Shri M.N. Kundalkar, Dy. C.E.
Shri D.K. Rokade, S.E.
jayantweekey@gmail.com
k.madhukar.010@gmail.com
dkrokade@gmail.com
III
7
8
9
MPPTCL / MPPGCL
Shri Shri K. K. Prabhakar, S.E.
Shri P.K. Saxena, S.E.
Shri J. Agasti, E.E.
kkparbhakar@yahoo.co.in
segcc.mppgcl@gmail.com
jwagasti@gmail.com
IV
10
11
12
CSPTCL / CSPGCL
Shri W.R. Wankhede, C.E.
Shri Saneep Shrivastava, S.E.
Shri Girish Gupta, E.E.
waman5723@gmail.com
sndpshrivastava27@gmail.com
girishgupaji@gmail.com
V
13
14
GETCO / GSLDC/ GSECL
Shri B.B. Mehta, C.E.
Shri G.J. Mistry, J.E.
bbm@gebmail.com
emisldc.getco@gebmail.com
VI
15
16
17
18
19
20
21
WRLDC / POWERGRID
Shri P. Mukhopadhyay, G.M.
Shri Kuleshwar Sahu, A.G.M.
Smt. Sachala Mishra, A.G.M.
Shri Vivek Kumar Pandey, C.M.
Shri D. Bruhananda, C.M.
Shri Abhishek Kr. Gupta, Dy. Mgr.
Shri Anil D. Darode, Dy. Mgr.
prithwish.mukhopadhyay@posoco.in
kuleshwars@gmail.com
mishrasachala@gmail.com
vivek.pandey@posoco.in
bruhanandad@yahoo.com
abhishek_all@yahoo.com
anil.darode@powergridindia.com
VII
22
23
NLDC
Shri N. Nallarasan, D.G.M.
Shri Thanibala Krishna, Eng.
nallarasan@posoco.in
thanibalakrishna@gmail.com
VIII
24
25
26
27
28
29
30
31
32
NTPC
Shri S.K. Roy, E.D.
Shri P.B. Behere, G.M.
Shri Malay Mukharjee, G.M.
Shri S. Banrjee, A.G.M.
Shri S.K. Dubey, A.G.M.
Shri S.K. Shrivastava, A.G.M.
Shri M.L. Patra, A.G.M.
Shri Pravin Chaturvedi, A.G.M.
Shri H.S. Agarwal, A.G.M.
skroy01@ntpc.co.in
pbbehere@ntpc.co.in
malaymukharjee@ntpc.co.in
sbanrjee02@ntpc.co.in
skdubey02@ntpc.co.in
sksrivastava09@ntpc.co.in
motilalpatra@ntpc. Co.in
pchaturvedi01@ntpc.co.in
harishankar01@ntpc.co.in
IX
33
34
TATA POWER
Shri R.M. Sankhe, Head Opn.
Shri P.R. Gadave, A.G.M.
rmsankhe@tatapower.com
prgadave@tatapower.com
X
35
36
APL
Shri C.S. Bobade, G.M.
Shri Akkshay Mathur, G.M.
chandrashekhar.bobade@adani.com
akshayv.mathur@adani.com
XI
37
38
39
RINFRA
Shri Sumeet Notani, G.M.
Shri P.C. Upadhyay, D.G.M.
Shri Ambuj Shukla, Sr. Mgr.
sumeet.notani@relianceada.com
prakash.c.upadhyay@relianceada.com
ambuj.shukla@relianceada.com
XII
40
KSK Mahanadi
Shri Ramakant Upadhyay, Dy. Mgr.
ramakant.u@ksk.co.in
XIII
41
ESSAR
Shri D.J. Saxena, Sr. Mgr.
dsaxena@essar.com
XIV
42
TORRENT POWER
Shri P.G. Patel, G.M.
pramodpatel@torrentpower.com
XV
43
JPL
Shri Priyabrata Banerjee, A.G.M.
priyabratabanerjee@jindalpower.com
XVI
44
45
RKM PPL
Shri C. Balasubramanian, Sr.Mgr.
Shri T. Rajesh Kumar, Mgr.
bala.c@rkmpowergen.in
rajeshkumart4@gmail.com
XVII
46
GMR GROUP
Shri N. Ganesh, Jr. Mgr.
ganesh.nuli@gmrgroup.in
XVIII STERLITE
47 Shri Sachin Deshpande, G.M.
sachin.deshpande@sterlite.com
XIX
48
ACPL
Shri Abhinav.Yadav, A.M.
abhinav.y@ath-chhattisgarh.in
XX
49
JSW
Shri Sanjeev Kumar, Mgr.
sanjeev.kumar@jsw.in
XXI
50
I.E.P.L.
Shri G.V.Sant, D.G.M.
gvs.iepl@gmail.com
XXII
51
52
RATTAN INDIA POWER LTD.
Shri Mukesh Singhal, Sr. V.P.
Ms. Reena Kori, D.G.M.
mukeshsinghal@rattanindia.com
reena.kori@rattanindia.com
Anaulagnak 2.1
maah maaca- 2015 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa
piScama
xao
~
Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )
(
FREQUENCY PARTICULARS DURING MARCH 2015
(AS PER FREQUENCY REPORT OF WRLDC)
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY
AaOsat AavaRi%t
2. INSTANTANEOUS
50.37
Hz. BETWEEN 0100 Hrs & 0200 Hrs Hrs. ON 02.03.2015
49.77
Hz. BETWEEN 1800 Hrs & 1900 Hrs Hrs. ON 03.03.2015
49.98 Hz.
ta%kailak
2.1 MAXIMUM FREQUENCY
AiQaktma AavaRi%t
2.2 MINIMUM FREQUENCY
nyaUnatma AavaRi%t
3. %AGE OF TIME WHEN FREQUENCY WAS
50.54
Hz. AT 03:37:00 Hrs. ON 01.03.2015
49.52
Hz. AT 18:57:00 hrs Hrs. ON 03.03.2015
MARCH 2015
FEBRUARY 2015
JANUARY 2015
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.57
0.33
0.61
17.20
11.97
16.85
58.47
60.15
53.73
23.76
27.55
28.81
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz.
48.5
hT\ja ko naIcao
3.2 BETWEEN 48.5 Hz. AND 48.8 Hz.
48.5
hT\ja AaOr 48.8 hT\ja ko baIca
3.3 BETWEEN 48.8 Hz. AND 49.2 Hz.
48.8
hT\ja AaOr 49.2 hT\ja ko baIca
3.4 BETWEEN 49.2 Hz. AND 49.5 Hz.
49.2
hT\ja AaOr
49.5
hT\ja ko baIca
3.5 BETWEEN 49.5 Hz. AND 49.7 Hz.
49.5
hT\ja AaOr 49.7 hT\ja ko baIca
3.6 BETWEEN 49.7 Hz. AND 49.9 Hz.
49.7
hT\ja AaOr 50.2 hT\ja ko baIca
3.7 BETWEEN 49.9 Hz. AND 50.05 Hz.
49.9
hT\ja AaOr
50.05
hT\ja ko baIca
3.8 BETWEEN 50.05 Hz. AND 51.5 Hz.
50.05
hT\ja AaOr
51.5
hT\ja ko baIca
3.9 ABOVE 51.5 Hz.
51.5
hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY
TOUCHED 48.80 Hz.
AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY
TOUCHED 48.60 Hz.
AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY
TOUCHED 51.00 Hz.
AavaRi%t 51.00 hT\ja kao CUhI
ANNEXURE 2.3
Voltage Profile during the month of March 2015
Annex-I
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Indore
Itarsi
Karad
Dhule
Asoj
Kasor
Bhilai
Jetpur
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
406
402
400
404
405
410
402
402
402
402
399
406
405
404
406
404
405
403
400
402
402
404
399
398
401
402
397
397
397
397
399
397
418
418
412
413
417
413
413
413
414
414
414
415
414
417
415
416
412
411
413
413
413
412
412
414
413
416
413
413
412
412
414
418
404
398
397
400
399
405
397
397
399
399
394
400
400
400
403
399
401
400
397
397
399
399
396
397
399
399
396
396
394
394
399
394
440
440
440
439
439
439
440
437
435
435
434
437
436
436
438
436
435
434
435
432
433
431
423
431
433
428
433
433
437
437
433
440
420
415
400
414
411
420
408
412
410
410
412
413
413
409
415
412
409
407
402
407
410
405
421
412
401
412
415
415
405
405
407
400
438
439
429
432
434
434
432
430
432
432
427
435
434
434
432
431
427
427
428
425
430
425
425
428
427
434
427
427
431
431
428
439
413
405
399
401
403
405
399
395
397
397
398
404
404
408
409
403
402
400
393
400
401
401
392
391
395
387
400
400
382
382
396
382
421
424
417
418
419
424
424
420
417
417
419
417
418
420
419
419
418
417
417
417
417
415
414
415
417
416
415
415
415
415
419
424
407
403
400
404
405
414
403
405
402
402
398
402
404
402
406
404
403
399
400
404
403
405
399
400
399
399
400
400
400
400
402
398
423
423
421
420
420
423
424
420
419
419
420
421
419
422
418
420
419
417
419
420
421
421
420
421
420
420
419
419
422
422
422
424
408
409
400
409
408
416
406
409
406
406
405
409
409
408
408
407
408
406
406
411
409
412
407
410
410
409
409
409
410
410
410
400
421
423
418
419
420
424
424
420
420
420
418
418
417
418
419
419
419
418
417
417
418
417
417
420
419
418
418
418
418
418
418
424
412
409
400
409
408
417
411
410
409
409
407
409
409
409
411
410
409
408
404
409
410
409
406
409
409
408
410
410
407
407
409
400
418
423
418
418
421
419
419
416
418
418
420
420
418
422
419
419
416
419
419
417
416
415
414
417
419
419
413
413
416
416
419
423
398
396
398
396
396
400
397
396
392
392
393
393
396
391
398
398
398
396
396
398
396
398
396
395
397
393
394
394
398
398
398
391
422
भार
सूचना
,
WRLDC, Mumbai
MIS
411
409
408
410
409
410
411
409
409
408
413
411
409
411
412
413
409
408
407
410
408
410
410
409
409
410
410
409
409
411
418
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Bina
Gwalior
Nagda
Khandwa
Sipat
seoni
Bina
Gwalior
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
Max. Kv
Min. Kv
420
421
421
415
418
416
416
416
413
415
417
418
418
421
420
419
415
416
415
416
416
412
412
415
414
415
412
415
415
417
415
421
407
403
403
403
402
408
400
402
401
403
404
402
405
408
408
406
405
405
402
402
403
404
400
403
403
403
401
403
404
405
404
400
416
409
409
408
407
408
407
405
406
407
405
407
405
408
410
409
406
407
405
411
410
408
407
407
409
408
406
408
410
412
408
416
400
395
395
392
393
400
391
393
390
395
390
390
390
391
395
392
392
392
395
388
397
400
393
392
396
394
396
396
397
400
394
388
424
425
418
420
423
421
421
419
420
420
424
424
424
425
422
421
419
421
421
420
419
419
418
419
421
420
417
417
419
419
421
425
407
403
400
405
406
411
403
402
403
403
400
407
409
406
409
405
407
403
402
403
404
406
399
402
402
402
398
398
400
400
402
398
429
429
423
426
429
423
423
424
426
426
427
427
427
427
425
427
422
421
423
423
423
424
423
426
424
427
423
423
424
424
424
429
413
409
406
406
410
411
404
405
409
409
404
411
410
411
412
409
409
409
406
409
411
410
405
404
405
404
404
404
399
399
405
399
770
772
766
764
766
772
772
768
765
765
764
763
763
763
765
766
763
761
762
765
767
764
764
769
767
768
766
766
765
765
764
772
758
750
748
752
749
761
754
754
753
753
749
751
757
753
754
754
753
751
748
751
762
754
753
757
751
746
748
748
751
751
751
746
790
793
784
779
782
783
786
786
779
783
781
781
784
782
784
783
772
771
771
781
781
780
777
781
782
783
780
781
775
777
779
793
770
760
756
753
756
766
756
764
761
759
755
760
763
763
765
761
758
753
751
751
767
786
755
763
762
763
762
757
751
747
755
747
798
784
784
786
787
788
784
782
783
786
782
785
781
785
789
785
782
784
780
784
786
778
779
780
784
785
778
781
789
792
765
798
765
758
751
753
756
772
759
765
758
762
753
755
753
756
759
758
755
756
752
751
756
764
755
754
760
757
762
761
764
767
760
751
791
791
784
789
791
786
783
789
784
787
788
788
784
790
790
788
786
784
784
784
789
783
788
789
787
791
786
788
792
791
784
792
768
762
758
758
760
773
758
765
754
766
757
760
766
762
769
763
764
763
763
762
766
767
759
769
769
764
763
766
766
768
764
754
भार
सूचना
,
WRLDC, Mumbai
MIS
ANNEX -2.4
Under Frequency Operation in various Constituent System of Western Region during the month MARCH - 2015
( Compiled from the data received from the constituents)
Sl. No
Date
Gujarat
Chhattisgarh
Madhya Pradesh
No. of
Max Load Relief No. of
Max Load Relief No. of
Occasions
at 49.2 Hz
Occasions
at 49.2 Hz
Occasions
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
01-Mar-15
02-Mar-15
03-Mar-15
04-Mar-15
05-Mar-15
06-Mar-15
07-Mar-15
08-Mar-15
09-Mar-15
10-Mar-15
11-Mar-15
12-Mar-15
13-Mar-15
14-Mar-15
15-Mar-15
16-Mar-15
17-Mar-15
18-Mar-15
19-Mar-15
20-Mar-15
21-Mar-15
22-Mar-15
23-Mar-15
24-Mar-15
25-Mar-15
26-Mar-15
27-Mar-15
28-Mar-15
29-Mar-15
30-Mar-15
31-Mar-15
Recommonded Load relief at
49.2 Hz / 49.0/48.8/48.6 Hz
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1025
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NIL
Max Load Relief No. of
Max Load Relief
at 49.2 Hz
Occasions
at 49.2 Hz
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NIL
91
Maharashtra
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NIL
490
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
851
ANNEXURE -2.5
Power Cut/Restrictions in Western Region for the month of March-2015
k : gaujarat
Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM
Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.
1
2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit2. Power supply to Agricultural & Rural Sectors
a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase
supply during rest of 16 Hrs by providing LSTC.
b) Jyotigram Yojana 24 hrs.
3 Anya jaanakarI
3. Any other information: NIL.
K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivaVut kTaOtI kI maa~a
pabandI ka samaya
ivavarNa Details
Quantum of
Restriction Timing
power cut (MW)
sao From
tk To
(a) Power Restrictions(Evening
SaUnya Nil
SaUnya Nil
SaUnya Nil
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar
inayamana Load Shedding
(c) Anya jaanakarI Other information
1.Weekly Off
2.Staggering of power supply
p`it idna kula }jaa- kTaOtI
Total Energy Cut
(MUs /day
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector: ivavarNa Details
sao From
idnaaMk Date
2.1 Three-Phase
01.03.2015
Supply(DLF)
2.1 Three-Phase
Supply(Irrigation)
2.1 Three-Phase
Supply(Mixed)
tk To
p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
31.03.2015
23:46
21:48
23:14
01.03.2015
31.03.2015
09:55
09:03
09:44
01.03.2015
31.03.2015
23:41
21:23
23:03
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM
ivavarNa Details
Scheduled Power cuts in Urban Areas
sao From
tk To idnaaMk Aaosat p`itidna
Date
idnaaMk Date
AapUit- GaMTo
Max.
(Hrs)
3.1 Commissionary H. Qtrs.
3.2 District Head Qtrs.
3.3 Tehsil Head Qtrs.
01.03.2015
01.03.2015
01.03.2015
31.03.2015
31.03.2015
31.03.2015
23:55
23:57
23:52
Average Supply
Hours per day
Min. (Hrs)
Average (Hrs)
23:24
23:27
22:45
23:46
23:50
23:36
ga : maharaYT/ Maharashtra
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivaVut kTaOtI kI maa~a
pabandI ka samaya
ivavarNa Details
Quantum of
Restriction Timing
power cut (MW)
From
To
(a) Power Cuts/Restriction on HT/
SaUnya Nil
SaUnya Nil
SaUnya Nil
LT Industries
(b) Load Shedding
From 01.03.15 to 31.03.15
@ 0-97 MW
(c) Any other information
1.Weekly Off
2. Staggering of power supply
Industrial Staggering LS
withdrawn from 03/02/2012
p`it idna kula }jaa- kTaOtI
Total Energy Cut
(MUs /day
SaUnya Nil
@ 1.4 MUs/day
00.00
24.00
SaUnya Nil
SaUnya Nil
SaUnya Nil
tk To
idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector
ivavarNa Details
sao From
idnaaMk Date
Max. (Hrs)
2.1 Three-Phase Supply
Average (Hrs)
10:00
08:00
09:00
01.03.2015 31.03.2015
18:00
3 Anya jaanakarI Any other information:
There is no load shedding on industrial feeders in Maharashtra
18:00
18:00
2.2 Single-Phase Supply
01.03.2015 31.03.2015
Min. (Hrs)
Ga : C%tIsagaZ, Chhattisgarh:
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivaVut kTaOtI kI maa~a
Quantum of power cut (MW)
ivavarNa Details
pabandI ka samaya
Restriction Time
tk
sao From
To
p`it idna kula
}jaa- kTaOtI
Total
Energy Cut
(MUs /day)
(A) Scheduled
(a) (i) Power Cuts/
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries
(iii) Power Cuts/Restriction
on Rural
(iv) Agriculture pump*
00.00(Av)
-
-
-
00.00(Av)
-
-
-
00.00 (Av)
00.00 (Av)
00.00(Av)
00.00 (Av)
00.00
-
00.00
-
0.00
-
1.Rural 109.19(Av) For 101.20 Hrs.
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
-
-
0.226
-
0.218
(v)Urban/ Sub-Urban
(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled
(a) Load Shedding
3. HT Industries 93.77 (Av) For 66.27 Hrs.
Total Energy Cut/day
( b) Any other information
1.Weekly Off/staggering of
power supply
0.444
1day (In a week as per
consumer’s option) 50MW(Av.)
-
-
0.039
2 kRiYa xao~ kao ivaVut AapUit2. Power supply to Agricultural Sector
ivavarNa Details
2.1 Three-Phase Supply
2.2 Single-Phase Supply
2.3 Remarks/Note/
sao From
idnaaMk Date
tk To
idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max. (Hrs)
01.03.2015 to 31.03.2015, 6.00
Hrs (Power cut)
-
3 Anya jaanakarI / Any other information: SaUnya Nil
-
Min. (Hrs)
Average (Hrs)
18.00
-
-
-
Annex-2.6
(
)
,
Power System Operation Corporation Ltd.
(A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentre,Mumbai
2015
Details of forced unit outages during the month ofMarch 2015
अनु
संघटक
Unit
Constituent/IPP
Sl.No
मता
मेगावॉट
सo
सo
कारण
From
From
Reason
Cap.MW
Time
Date
Date
1.
Essar-2
GSECL
172
12:12
22-Feb-13
Still out
Still out
Shortage of gas
2.
GTPS-2
GSECL
120
20:20
10-Oct-14
Still out
Still out
RSD
3.
GTPS-1
GSECL
120
5:36
22-Oct-14
21.03.14
RSD
4.
UTPS-1
GSECL
120
02:00
23-Oct-14
9:34
23-Mar-15
Flame failure
5.
UTRAN STG-II -1
GSECL
375
8:43
22-Oct-14
5:50
24-Mar-15
RSD
6.
UTPS-2
GSECL
120
15:04
10-Nov-14
Still out
Still out
RSD
7.
SLPP-1
GSECL
125
21:50
29-Nov-14
8.
SUGEN-2
GSECL
382
11:46
31-Jan-15
Still out
Still out
RSD
9.
GPEC-1
GSECL
218
12:46
16-Feb-15
Still out
Still out
RSD
10.
GPEC-2
GSECL
218
19:56
20-Feb-15
17:11
10-Mar-15
RSD
11.
GPEC-3
GSECL
218
20:10
21-Feb-15
15:53
10-Mar-15
RSD
12.
STPS-1
GSECL
120
13:30
26-Feb-15
8:55
20-Mar-15
RSD
13.
WTPS-5
GSECL
210
22:24
27-Feb-15
6:05
12-Mar-15
RSD
14.
DGBP-2
GSECL
112
20:14
28-Feb-15
14:05
11-Mar-15
RSD
15.
GTPS-5
GSECL
210
0:28
1-Mar-15
5:45
4-Mar-15
16.
WTPS-4
GSECL
210
18:28
1-Mar-15
20:07
11-Mar-15
17.
WTPS-6
GSECL
210
23:35
3-Mar-15
03/04/2015
05:58
16-Mar-15
Gt-3 tripped on
differential protection
Bottom ash hopper
leakage
RSD
RSD
18.
GTPS-3
GSECL
210
19:00
5-Mar-15
04:25
16-Mar-15
RSD
19.
GTPS-4
GSECL
210
7:50
6-Mar-15
Still out
Still out
RSD
20.
ALTPS-1
GSECL
125
0:41
10-Mar-15
14:02
15-Mar-15
Seal oil leakage
problem
21.
WTPS-2
GSECL
210
20:43
11-Mar-15
9:45
14-Mar-15
Condenser leakage
22.
DGBP-2
GSECL
112
16:51
12-Mar-15
6:13
20-Mar-15
RSD
23.
GPEC-3
GSECL
218
16:46
12-Mar-15
05:41
16-Mar-15
RSD
24.
SLPP-2
GSECL
125
22:15
15-Mar-15
18-Mar-15
BTL
25.
GIPCL STG II-1
GSECL
165
20:30
21-Mar-15
7:19
24-Mar-15
RSD
26.
GIPCL STG-II-1
GSECL
165
20:31
24-Mar-15
Still out
Still out
RSD
27.
GPEC-2
GSECL
218
20:09
24-Mar-15
Still out
Still out
RSD
28.
APL-2
ADANI POWER
330
17:32
9-Feb-15
28.03.15
Turbine vibration
29.
APL-6
ADANI POWER
660
09:03
14-Feb-15
31.05.15
Control valve problem
30.
APL-4
ADANI POWER
330
10:44
23-Feb-15
29.05.15
Hydrogen leakage
31.
APL-7
ADANI POWER
660
12:28
11-Mar-15
05:52
15-Mar-15
Heavy air leakage from
PA fan problem
32.
APL-5
ADANI POWER
660
13:22
21-Mar-15
2:51
25-Mar-15
BTL
33.
APL-9
ADANI POWER
660
16:29
23-Mar-15
29.03.15
34.
Koradi-5
MAHAGENCO
200
10:30
17-Jun-14
03.04.15
ID fan problem
MAHAGENCO
210
7:15
28-Aug-14
Still out
Still out
ECONOMY S/D
Still out
ECONOMY S/D
35.
C'PUR-1
3:30
DCS fault
36.
BHUSAWAL-2
MAHAGENCO
210
12:43
13-Sep-14
Still out
37.
JAIGAD I
MAHAGENCO
300
14:30
3-Feb-15
10:44
3-Mar-15
Generator tripped
38.
JAIGAD-3
MAHAGENCO
300
21:27
3-Feb-15
22:02
5-Mar-15
Unavailability of load
39.
URAN-6
MAHAGENCO
108
12:10
18-Feb-15
19:25
8-Mar-15
Gas shortage
40.
URAN-8
MAHAGENCO
108
13:32
25-Feb-15
15:17
10-Mar-15
Gas shortage
41.
C'PUR-5
MAHAGENCO
500
21:39
26-Feb-15
14:27
3-Mar-15
42.
PARLI - 4
MAHAGENCO
210
17:20
8-Mar-15
1:00
11-Mar-15
43.
URAN-6
MAHAGENCO
108
8:04
9-Mar-15
14:43
16-Mar-15
Vibration problem
44.
C'PUR - 4
MAHAGENCO
210
20:33
16-Mar-15
10:20
20-Mar-15
Low forward power
relay operated
45.
KORADI-6
MAHAGENCO
210
23:28
17-Mar-15
46.
C'PUR - 6
MAHAGENCO
500
22:07
18-Mar-15
20.03.15
4:31
22-Mar-15
BTL
PA fan problem
ID fan problem
BTL
47.
B'WAL-5
MAHAGENCO
500
11:49
20-Mar-15
26.03.15
BTL
48.
URAN-7
MAHAGENCO
108
13:56
21-Mar-15
01.04.15
CEP line leakage
49.
INDIABULLS (A)-1
Rattan India Pvt.
ltd(IPP).
270
21:55
27-Jan-15
04:15
8-Mar-15
Coal shortage
50.
INDIABULLS
(A)-2
Rattan India Pvt.
ltd(IPP).
270
23:23
3-Mar-15
19:22
12-Mar-15
PA fan problem
51.
WPCL-1
IPP
135
0:43
30-Oct-14
Still out
Still out
ESP belt damage
52.
WPCL-3
IPP
135
0:23
21-Feb-15
16:13
17-Mar-15
ID fan problem
53.
WPCL-4
IPP
135
2:34
18-Mar-15
Still out
Still out
54.
APML-3
ADANI POWER
660
11:42
6-Feb-15
Still out
Still out
55.
APML - 5
ADANI POWER
Tiroda
660
10:08
26-Feb-15
14:27
3-Mar-15
56.
TATA-6
TATA
500
21:50
17-Feb-15
18:00
18-Mar-15
57.
RGPPL-1B
RGPPL
320
23:00
31-Mar-14
Still out
Still out
Dry preservation
58.
RGPPL-3A
RGPPL
320
18:57
17-Apr-14
Ready
Ready
Less requisition
59.
RGPPL-1A
RGPPL
320
13:30
8-Jul-14
Ready
Ready
Less requisition
60.
RGPPL-2A
RGPPL
332
12:00
21-Jul-14
Still out
Still out
CW pump problem
61.
RGPPL-2B
RGPPL
332
13:30
1-Sep-14
Still out
Still out
Less requisition
62.
AMARKANTAK-4
MPGCL
120
11:13
30-Apr-14
Still out
Still out
Electrical fault
63.
AMARKANTAK-3
MPGCL
120
0:25
12-Jan-15
Still out
Still out
Fire caught in turbine floor
64.
SGTPS-1
MPGCL
210
0:01
26-Feb-15
Still out
Still out
RSD
65.
SATPURA-6
MPGCL
200
0:05
1-Mar-15
6:20
5-Mar-15
ETL
66.
SATPURA-10
MPGCL
250
19:14
4-Mar-15
8:30
9-Mar-15
ETL
67.
SATPURA-11
MPGCL
250
11:04
8-Mar-15
0:38
12-Mar-15
FLAME FAILURE
68.
SATPURA-9
MPGCL
210
0:05
13-Mar-15
0:46
21-Mar-15
Control valve problem
69.
SINGAJI-1
MPGCL
600
0:04
24-Mar-15
Still out
Still out
RSD
70.
SATPURA 10
MPGCL
250
12:50
26-Mar-15
Still out
Still out
Flame failure
71.
DGEN - 51
DGEN
400
12:05
13-Jan-15
Still out
Still out
No schedule
72.
DGEN -52
DGEN
400
12:05
15-Jan-15
Still out
Still out
No schedule
73.
DGEN -53
DGEN
400
11:59
23-Jan-15
Still out
Still out
No schedule
74.
SASAN-5
RELIANCE
660
2:45
9-Mar-15
Still out
Still out
75.
SASAN-4
RELIANCE
660
11:23
13-Mar-15
Still out
Still out
76.
JPL STAGE-II -1
JPL
600
17:03
14-Feb-15
9:21
24-Mar-15
Ash evacuation problem
77.
JP NIGRI-2
JP-NIGRI
660
14:20
24-Feb-15
7:31
24-Mar-15
ESP works
78.
JP NIGRI-1
JP-NIGRI
660
3:37
23-Mar-15
Still out
Still out
No schedule
GT bushing replacement
Feed water pump
problem
Economy S/D
To attend bearing
vibrations
Condenser tube
cleaning
ESP WORKS
79.
VANDANA -1
VANDANA
135
15:00
9-Jan-15
Still out
Still out
BTL
80.
DHARIWAL-2
DHARIWAL
300
0:00
22-Dec-14
Still out
Still out
No schedule
81.
Lanco-2
LANCO
AMARKANTAK
300
12:20
21-Aug-13
Still out
Still out
Coal shortage
82.
DBPOWER-1
DBPOWER
600
9:53
24-Aug-14
Still out
Still out
BTL
83.
KMPCL-3
KSK
MAHANADI
600
16:29
15-Feb-15
2:36
18-Mar-15
84.
KWPCL-1
KWPCL
600
0:37
2-Mar-15
Still out
Still out
85.
TAPS-3
NPCL
540
12:04
18-Mar-15
22:34
25-Mar-15
Abnormalities observed
86.
MOUDA - II
NTPC
500
0:00
24-Nov-14
10:10
22-Mar-15
Low schedule
87.
KAWAS-2A
NTPC
164
21:07
13-Jan-15
16:38
11-Mar-15
Less requisition
88.
GANDHAR-3
NTPC
219
10:30
25-Feb-15
6:01
22-Mar-15
Less requisition
89.
MOUDA-1
NTPC
500
20:45
26-Feb-15
6:44
17-Mar-15
Less requisition
90.
KAWAS-1B
NTPC
164
20:04
27-Feb-15
6:32
21-Mar-15
Less requisition
91.
GANDHAR-1
NTPC
219
19:57
28-Feb-15
2:01
20-Mar-15
Less requisition
92.
VSTPS-5
NTPC
210
0:28
1-Mar-15
7:32
12-Mar-15
Less requisition
93.
VSTPS-3
NTPC
210
9:26
1-Mar-15
0:38
12-Mar-15
Low schedule
94.
VSTPS-10
NTPC
500
5:24
1-Mar-15
8:46
7-Mar-15
Low schedule
95.
SIPAT-3
NTPC
660
22:59
1-Mar-15
10:40
3-Mar-15
Less schedule
96.
VSTPS-6
NTPC
210
23:04
1-Mar-15
14:14
12-Mar-15
Less schedule
97.
VSTPS-12
NTPC
500
2:29
2-Mar-15
9:05
9-Mar-15
Less schedule
98.
KAWAS-1A
NTPC
164
0:17
2-Mar-15
8:35
22-Mar-15
Less requisition
99.
KAWAS-2B
NTPC
164
23:30
3-Mar-15
6:57
20-Mar-15
Less requisition
100.
KAWAS-1B
NTPC
164
19:08
21-Mar-15
Still out
Still out
Less requisition
101.
KAWAS-1A
NTPC
164
1:40
23-Mar-15
Still out
Still out
Gas shortage
102.
SIPAT-5
NTPC
500
8:08
25-Mar-15
Still out
Still out
BTL
Note: Units out for more than 72 hrs are only included.
Turbine control valve
problem
No schedule
Annex-2.7
(
)
,
Power System Operation Corporation Ltd.
(A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentre,Mumbai
2015
Details of planned unit outages during the month of March2015
अनु
संघटक
Unit
Constituent/IPP
Sl.No
मता
मेगावॉट
सo
सo
कारण
From
From
Reason
Cap.MW
Time
Date
Time
Date
1.
UTPS-5
GSECL
210
0:11
22-Jan-15
1:25
11-Mar-15 AOH
2.
DGBP-1
GSECL
112
0:00
16-Feb-15
NA
03-Mar-15 AOH
3.
PARLI-3
MAHAGENCO
210
23:51
13-Feb-14
Still out
Still out
Water supply
problem
4.
PARAS-4
MAHAGENCO
250
0:00
5-Mar-15
Still out
Still out
AOH
5.
CGPL - 30
TATA
800
1:14
20-Mar-15
07.04.15
AOH
6.
SGTPS-5
MPSEB
500
23:43
23-Feb-15
12.04.15
AOH
7.
KORBA(EAST)-5
CSPGCL
120
23:05
8-Mar-15
31.03.15
Hydrogen
leakage/AOH
8.
TAPS - 1
NPC
160
22:39
12-Oct-14
9.
JPL STG-I- 4
JPL
250
0:30
3-Feb-15
10.
JPL-2
JPL
250
0:19
25-Feb-15
19:36
25-Mar-15
11.
GANDHAR-2
NTPC
219
0:00
24-Feb-15
Still out
Still out
R & M WORK
12.
SIPAT - 1
NTPC
660
0:30
20-Mar-15
Still out
Still out
AOH
13.
KORBA - 6
NTPC
500
1:33
20-Mar-15
Still out
Still out
AOH
Still out
Still out
Refueling works
23:16 19-Feb-15 AOH
AOH
Annexure- 3.1
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING APRIL 2015 AND MAY 2015
S. No. Unit
No.
Capacity
(MW)
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
GUVNL
WTPS
UTPS
KLTPS
EPGL
APL
KLTPS
EPGL
5
4
210
29-Mar-15
3-Apr-15
10-Apr-15
10-Apr-15
1-May-15
5-May-15
15-May-15
C&I-R&M
AOH
AOH
AOH
COH
AOH
AOH
10-May-15
17-Apr-15
9-May-15
30-Apr-15
10-Jun-15
3-Jun-15
5-Jun-15
CSPGCL
KWB # 4
3.1
4
4.1
4.2
210
200
70
500
330
70
500
Reason
MPPGCL
2
3
6
3
2
2
1
1
1
Outage as per Annual
Maintenance Plan
sao From
tk To
01.05.2015
25.05.2015 AOH
MSPGCL
PARLI
JSW
7
3
250
300
20.05.15
15.4.15
14.06.15
29.4.15
AOH
AOH
Central Sector
5.1
5.2
5.3
VINDHYACHAL
VINDHYACHAL
CGPL
1
3
10
200
200
800
17-May-15
28-May-15
23-May-15
16-Jun-15
Blr License renewal
AOH
01/05/2015
31-05.2015
GAH basket replacement
5.4
CGPL
40
800
19/4/2015
30-04-2015
UT repair work
ANNEXURE 3.2 B
SN
1
2
3
KV
400
Line
Raita feeder & Bus-II @ KWB
765/40
Asoj - Indore-3
0
400 400/11/6.6 KV 63 MVA ST 5A @ KWB
4
400
Bus-Coupler @ KWB
5
220
Talandage-Chikodi & Mudshingi-Chikodi
Outage Planning of Transmission elements during the Duration 20.04.2015 to 20.05.2015
Reason
From
To
Basis
Date
Time
Date
Time
Daily
20-Apr-15
8:00
21-Apr-15
18:00
General Maintenenace
Basis
Continuou Arrangement for charging of Dhule 20-Apr-15
8:00
20-Apr-15
18:00
s
Vadodara line
Continuou
20-Apr-15
8:00
21-Apr-15
18:00
General Maintenenace
s
Daily
20-Apr-15
8:00
21-Apr-15
18:00
General Maintenenace
Basis
For Crossing & construction of 765Kv KudgiKolhapur D/C line. Note outage was approved on
8:00
20-Apr-15
18:00
Daily
20-Apr-15
24/25.03.15 but consent given by KPTCL for
availing outage on 18.04.15 to 20.04.15.
6
7
765
765
Seoni - Bilaspur-II Line
Main bay Bilaspur -II (716) at Seoni
20-Apr-15
20-Apr-15
8:00
8:00
21-Apr-15
21-Apr-15
18:00
18:00
Daily
Daily
8
220
Main Bay ICT-I (201) at Seoni
20-Apr-15
8:00
21-Apr-15
18:00
Conti.
9
400
BUS-1 at Solapur
20-Apr-15
8:00
23-Apr-15
18:00
Daily
System
Agency
CSPGCL
CSPGCL
PGCIL
BDTCL
CSPGCL
CSPGCL
CSPGCL
CSPGCL
MSETCL
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
R
R
WRTS-I
WRTS-I
R
Solapur (NTPC) bays works at Solapur(PG)
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
C
WRTML
WRTS-I
C
WRTML
WRTS-I
C
WRTML
WRTS-I
C
WRTS-I
WRTS-I
C
MSETCL WRTS-I
R
WRTS-I
WRTS-I
WRTS-I
TEL DGEN
GETCO
GETCO
WRTS-I
WRTS-I
WRTS-I
R
C
C
MSETCL
MPPTCL
NSPCL
NTPC
MSETCL
MPPTCL
NSPCL
NTPC
SASAN
RELIANCE
Online OPGW/additional eathing work. A/R
to be kept in Non auto mode
Online OPGW/additional eathing work. A/R
to be kept in Non auto mode
Online OPGW work. A/R to be kept in Non
auto mode
Online OPGW work. A/R to be kept in Non
auto mode
Online OPGW work. A/R to be kept in Non
auto mode
Online OPGW work. A/R to be kept in Non
auto mode
Jointing of OPGW Wire for Kalwa Lonikand
Line
ICT 89 T Isolator dismantling work
Switching Impulse testing at PUNE(GIS)
Bay extension works at Solapur(PG)
OFFLINE WASHING
400
Bhadrawati - Dhariwal - Parli & Bhadrawati- Parli ckt 1
20-Apr-15
9:00
19-May-15
18:00
Daily
11
400
KOLHAPUR-MAPUSA I & II
20-Apr-15
9:00
19-May-15
18:00
Daily
12
400
Pune(GIS)-Pune # 1& 2
20-Apr-15
9:00
19-May-15
18:00
Daily
13
400
Solapur-Pune # 1& 2
20-Apr-15
9:00
19-May-15
18:00
Daily
14
400
Solapur-Parli # 1& 2
20-Apr-15
9:00
19-May-15
18:00
Daily
15
765
Seoni-Wardha # 1
20-Apr-15
9:00
19-May-15
18:00
Daily
16
400
Kalwa - Pune & Pune-Lonikhand line
20-Apr-15
9:00
20-Apr-15
18:00
Daily
17
18
19
400
765
400
400kv Bus # 2 at Wardha
Bus Reactor (240MVAR) at PUNE(GIS)
Solapur -Solapur(NTPC) # 2 line
20-Apr-15
20-Apr-15
20-Apr-15
9:00
9:00
9:00
20-Apr-15
24-Apr-15
29-Apr-15
18:00
18:00
18:00
Daily
Conti.
Conti.
20
400
DGEN 400 KV Bus I
20-Apr-15
8:00
20-Apr-15
18:00
ONE DAY
21
400
400
SSP - Dhule -1
Soja - Kansari
20-Apr-15
20-Apr-15
8:00
8:00
20-Apr-15
20-Apr-15
18:00
18:00
Daily
Daily
PMM work
PMM work
Overhauling of Pole-2 Non base AC filter CB
MAINTENANCE WORK
Annual Maintenance
Annual Bay Maintenance
For bushing erection, Dropper connection
,LA erection, Isolator alignment, Jack bus
jumpering and Equipment testing
TEL - DGEN
GETCO
GETCO
22
500kV HVDC Padgha Pole-2 Non Base AC filter
24
25
26
400
400 KV S/S NAGDA - 315 MVA X-MER - I
400
Station Transformer - 1 AT NSPCL BHILAI
400KV Jhanor-Navsari 1
27
765
28
29
30
31
8:00
20-Apr-15
20/Apr/15
20/Apr/15
20-Apr-15
765 KV BUS 2A at SASAN
400
400
400
400
C
Line AMP works
AMP works (DCRM & Timing test of CB)
AMP works (DCRM & Timing test of CB)
{ICT-I will be in service through Transfer
bay}
10
23
type
SLDC-Gujarat will
issue opening /
closing code
18:00
8:00
9:00
8:00
2-May-15
20/Apr/15
22/Apr/15
21-Apr-15
17:00
17:00
18:00
Daily
daily
Cont.
Continous
20-Apr-15
9:00
22-Apr-15
18:00
Daily
BUS-I at Bina
20-Apr-15
09:00
20-Apr-15
18:00
Daily
For carrying out the bus stability to
PGCIL
integrated the 01 no. 400 kV Bay for NHPTL.
WR-II
C
SJP -Nagda Ckt-II Tie Bay(402) at Nagda S/s.
400 kV Jetpur Mundra Ckt # 1
400 kV Jetpur Mundra Ckt # 2
20-Apr-15
20-Apr-15
20-Apr-15
10:00
10:00
13:00
20-Apr-15
20-Apr-15
20-Apr-15
18:00
12:00
15:00
Daily
Daily
Daily
Bay AMP work.
CT Oil sampling works of Alstom make
CT Oil sampling works of Alstom make
WR-II
WR-II
WR-II
R
R
R
PGCIL
PGCIL
PGCIL
R
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
PGCIL
WR-II
C
PGCIL
WR-II
C
Time
18:00
Daily
20-Apr-15
18:00
Daily
ICT Spare unit Commissioning with ICT # 2
for Swapping with ICT # 2 R Phase.
For NTAMC work at Itarsi
9:00
20-Apr-15
17:00
Daily
Bay AMP work.
PGCIL
WR-II
R
09:00
9:00
20-Apr-15
20-Apr-15
18:00
18:00
Daily
Daily
PGCIL
PGCIL
WR-II
WR-II
C
R
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
Bhachau - Mundra # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
400
Khandwa - Rajgarh # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
40
400
Khandwa - Dhule # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
41
400
Itarsi - Khandwa # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
42
220
Satna (PG) - Satna (MP)# 1
20-Apr-15
7:00
19-May-15
18:00
Daily
MPPTCL WR-II
C
43
400
Dehgam - Ranchhodpura # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
GETCO
WR-II
C
44
400
Bhachau - Ranchodpura # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
GETCO
WR-II
C
45
400
Asoj - SSP # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
GETCO
WR-II
C
46
220
Navasari - Vav # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
GETCO
WR-II
C
47
765
Bina - Gwalior # 2
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
48
220
Gandhar - Haldarwa # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
49
220
Kawas - Dastan
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
50
220
Dastan - Navsari
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
51
220
Kawas - Haldarwa
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
52
220
Damoh - Damoh
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
53
400
SSP - Rajgarh # 1
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
54
400
Vindhyachal (NTPC) - Sasan
(Reliance)
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
55
765
Satna - Gwalior Ckt-I
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
56
400
Gwalior - Agra Ckt-I
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
57
400
Vapi - Kala
20-Apr-15
7:00
19-May-15
18:00
Daily
POWERGRID
WR-II
C
58
220
Khandwa - Chhegaon
20-Apr-15
7:00
19-May-15
18:00
Daily
MPPTCL WR-II
C
59
220
Indore - Pithampur
20-Apr-15
7:00
19-May-15
18:00
Daily
MPPTCL WR-II
C
60
220
Indore - Barwatha
20-Apr-15
7:00
19-May-15
18:00
Daily
MPPTCL WR-II
C
61
220
220 kV Kawas-Vav
20-Apr-15
7:00
19-May-15
18:00
Daily
WR-II
POWERGRID
C
62
220
220 kV Bhopal – Govindpur SLDC
(MPPTCL)
20-Apr-15
7:00
19-May-15
18:00
Daily
MPPTCL WR-II
C
63
220
220 kV Magarwada – Varkood (DD)
20-Apr-15
7:00
19-May-15
18:00
Daily
For NTMC work
For annual maintenace work
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
GETCO
C
32
765
765KV ICT # 2 at Jabalpur Pooling Station
20-Apr-15
09:00
33
400
20-Apr-15
10:00
34
400
20-Apr-15
35
36
400
765
Jabalpur-Itarsi#1
Bay 407 at Boisar ( Main Bay of 400 kV
Padghe Line )
125MVAR Bus Reactor at Pirana ss
VCHAL-1 MAIN BAY (713) at Satna
20-Apr-15
20-Apr-15
37
400
Shujalpur - Nagda # 2
38
400
39
20-Apr-15
WR-II
SN
KV
Line
From
Date
Time
To
Date
Time
Basis
64
220
220 kV Haldarwa-Kakrapar (NPC)
20-Apr-15
7:00
19-May-15
18:00
65
220
Barwatha - Chhegaon
20-Apr-15
7:00
19-May-15
18:00
66
400
Satna - Bina Ckt. 1&2
20-Apr-15
7:00
19-May-15
18:00
67
400
Nagda - Dehgam Ckt. 1&2
20-Apr-15
7:00
19-May-15
18:00
68
400
Indore - Asoj Ckt 1
20-Apr-15
7:00
19-May-15
18:00
69
400
Itarsi - Khandwa Ckt.1&2
20-Apr-15
7:00
19-May-15
18:00
70
400
400 KV JPL-Tamnar(PG) Ckt # 4
20-Apr-15
10:00
71
400
Chakabura- Bharari (Bilaspur) D/C Line
20-Apr-15
8:00
21-Apr-15
18:00
72
765
765KV Bus-1 at Durg Ps
20-Apr-15
9:00
20-Apr-15
18:00
73
400
Raipur-Bhdravati-2&3
20-Apr-15
8:00
15-May-15
18:00
74
400
Sipat-Raipur-1&2
20-Apr-15
8:00
19-May-15
18:00
75
400
Raigarh -Raipur-1&2
20-Apr-15
8:00
19-May-15
18:00
76
765
Line Reactor of 765 kV Kotra - Durg
Ckt # 1 at Kotra end
20-Apr-15
10:00
20-Apr-15
14:00
26-Apr-15
18:00
77
400
Sequential outage of Switchyard Breakers
at JPL - stage - II
20-Apr-15
8:00
19-May-15
18:00
78
400
EMCO -BHADRAWATI LINE 2
20-Apr-15
9:00
22-Apr-15
18:00
79
400
Tie Bay 10Co2B of Pole=-1 and AC filters
20-Apr-15
9:30
20-Apr-15
12:30
80
81
82
83
84
85
86
87
88
89
400
Anuppur-Jabalpur# 1&2
400/22
315 MVA ICT 1&2 at Magarwada GIS
0
20-Apr-15
8:00
21-Apr-15
18:00
20-Apr-15
10:00
20-Apr-15
13:00
400
K(W)-Korba(NTPC)
20-Apr-15
8:00
21-Apr-15
18:00
400
400/11/6.6 KV 63 MVA ST 5B @ KWB
20-Apr-15
8:00
23-Apr-15
18:00
Tiroda-Koradi Line - 2 Reactor at
765kV
Koradi Substation
220 kV Barwatha –Chhegeon
220
(MPPTCL)
200 kV Gwalior (PG) - Gwalior
220
(MPPTCL)
220 kV Bina (MPPTCL) - Bina
220
(MPPTCL)
400
400 KV KHEDAMARA Raita-I
765/40
Asoj - Indore & Pirana Vadodara
0
Daily
Daily
17:00
Daily
20-Apr-15
7:00
19-May-15
18:00
Daily
20-Apr-15
7:00
19-May-15
18:00
20-Apr-15
7:00
19-May-15
18:00
20-Apr-15
17:00
8:00
8:00
22-Apr-15
18:00
400
Bhachau-Ranchodpura # 1 & 2
21-Apr-15
8:00
27-Apr-15
18:00
91
400
Bhachau - Ranchodpura # 1
21-Apr-15
7:00
19-May-15
18:00
400
Bhadrawati-1 Main Bay (407) AT
PARLI(PG)
21-Apr-15
8:00
21-Apr-15
18:00
Line maintenance AMP
SF6 refilling work
Terminal tightning and testing work
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
Daily
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
Daily
A/R shall be kept in non auto mode
Daily
GEN. MAINTENANCE
Continuou Arrangement for charging of Dhule s
Vadodara line
Tower shifting for SSNL Canal crossing at
Continous two locations at two places to maintain
electrical clearances.
Online replacement of E/W with OPGW.
Daily
A/R shall be kept in non auto mode
Daily
AMP works at Parli(PG) s/s
Agency
type
MPPTCL WR-II
C
MPPTCL WR-II
C
POWERGRID
WR-II
R
POWERGRID
WR-II
R
POWERGRID
WR-II
R
POWERGRID
WR-II
R
WRTS-I
C
M/s TRN
ACB Ltd. WRTS-I-CG
C
WRTS-I
WRTS-I-CG
C
WRTS-I
WRTS-I-CG
C
WRTS-I
WRTS-I-CG
C
WRTS-I
WRTS-I-CG
C
WRTS-I
WRTS-I-CG
C
JPL
EMCO
JPL
EMCO
ATIL
Continuou Crossing work of 765kV DharamjaigarhPGCIL
s
Jabalpur Line Part-II between loc 39/2 & 3
Simultaneous outage of ICT 1&2 for
Daily
checkign of Master follower scheme of OLTC PGCIL
of both ICTs
Continuou
General Maintenenace
CSPGCL
s
Continuou
General Maintenenace
CSPGCL
s
20-04-15
90
92
Online replacement of E/W with OPGW.
A/R shall be kept in non auto mode
Online replacement of E/W with OPGW.
Daily
A/R shall be kept in non auto mode
PID testing of insulator strings. A/R shall be
Daily
kept In non auto mode for both circuits.
PID testing of insulator strings. A/R shall be
Daily
kept In non auto mode for both circuits.
PID testing of insulator strings. A/R shall be
Daily
kept In non auto mode for both circuits.
PID testing of insulator strings. A/R shall be
Daily
kept In non auto mode for both circuits.
ERECTION OF MULTI CIRCUIT TOWER AT
Continuous
LOCATION 26/0 OF M/s TRN
For construction of 765KV D/C
Continuous Dharamjaygarh (Korba)-Jabalpur
Transmission Line (Part-I)
For connecting the Al. pipe of CB to Isolator
Daily
after erection of 819CB
A/R non auto mode for Additional Earthing
Daily
work on lines.
A/R non auto mode for Additional Earthing
Daily
work on lines & laying of OPGW
A/R non auto mode for Additional Earthing
Daily
work on lines & laying of OPGW
Switching of Spare Unit as per guideline on
Daily
quaterly basis
Sequential outage, one breaker at a time for
Daily
replacement of 400kV Defective CB interrupter [
Power Flow will not be affected ]
9:30
21-Apr-15
System
Daily
20-04-15
20-Apr-15
Reason
ATIL
R
WR-II
C
WRTS-II
R
CSPGCL
CSPGCL
MEGPTCLMEGPTCL
R
MPPTCL WR-II
C
MPPTCL WR-II
C
MPPTCL WR-II
C
CSPTCL CSPTCL
PGCIL
PGCIL
BDTCL
WR-II
C
POWERGRID
WR-II
C
WRTS-I
R
WRTS-I
Annupur consent requi
SN
KV
93
765
94
95
400
400
96
765
97
400
98
400
99
400
400
Line
WARDHA - AURANGABAD(PG) 3 & 4
D/C line
Bus Reactor at Kolhapur
315MVA ICT # 1 at Pune(Talegoan)
Main Bay Aurangabad # 1(716) at
Wardha
Main Bay (404) of 765 kV ICT#1 at
Wardha
400 / 220 kV ICT 1 at Wardha
From
Date
Basis
Reason
System
Agency
type
18:00
Daily
Line Rectification work
WRTS-I
WRTS-I
c
18:00
17:00
Daily
Daily
AMP works at Kolhapur (MSETCL)
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
WRTS-I
WRTS-I
R
R
21-Apr-15
18:00
Daily
AMP work and CT Oil sampling
WRTS-I
WRTS-I
R
24-Apr-15
18:00
Conti.
Pull rod replacement work at Wardha
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
R
Time
To
Date
Time
21-Apr-15
9:00
23-Apr-15
21-Apr-15
21-Apr-15
9:00
9:00
21-Apr-15
21-Apr-15
21-Apr-15
9:00
21-Apr-15
9:00
AMP and Bushing Oil DGA for all 220 kV
BHEL bushings
OFFLINE WASHING
21-Apr-15
9:00
21-Apr-15
13:00
Daily
DGEN 400 KV Bus II
21-Apr-15
8:00
21-Apr-15
18:00
ONE DAY
Asoj - Wanakbori
21-Apr-15
8:00
21-Apr-15
18:00
Daily
PMM work
21-Apr-15
21-Apr-15
8:00
8:00
25-Apr-15
21-Apr-15
18:00
18:00
Daily
Daily
PID testing of insulator strings. A/R shall be
kept In non auto mode
MSETCL MSETCL
Faulty Insulator replacement work
MSETCL MSETCL
21-Apr-15
21/Apr/15
21-Apr-15
8:00
9:00
09:00
21-Apr-15
21/Apr/15
21-Apr-15
18:00
17:00
18:00
Daily
daily
Daily
Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL
MAINTENANCE WORK
MPPTCL MPPTCL
PGCIL
WR-II
For AMP work
R
R
21-Apr-15
10:00
21-Apr-15
18:00
Daily
Bay AMP work.
TEL DGEN
GETCO
TEL - DGEN
GETCO
100
101 400kV
Koradi-Nandgaonpeth
102 400kV New Koyna-Karad-l
103 400kV Padgha Tarapur II
104 400
105 400
106 400
107 400
400 KV BHOPAL - BINA CKT- I
BINA-I (MP) MAIN BAY at Bina
Nagda - Dehgam Ckt-II Main Bay(401)
at Nagda S/s.
400KV Bhachau-Varsana ckt # 1
SLDC-Gujarat will
issue opening /
closing code
PGCIL
WR-II
R
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
PGCIL
WR-II
WR-II
C
C
18:00
Daily
18:00
Daily
21-Apr-15
21-Apr-15
18:00
18:00
Daily
Daily
For Jumpering work for Essar bays at
Bhachau
765kV Bus Isolators Earth Switch Erection /
Alignment problem
Spacer fixing on multi circuit portion.
For NTAMC work at Itarsi
9:00
21-Apr-15
17:00
Daily
Bay AMP work.
PGCIL
WR-II
R
21-Apr-15
10:00
21-Apr-15
09:00
21-Apr-15
21-Apr-15
9:00
10:00
21-Apr-15
21-Apr-15
112 765
765KV Bus # 1 at Jabalpur Pooling
Station
Vapi - Kala I
Jabalpur-Itarsi#2
Bay 408 at Boisar ( Tie Bay of 400 kV
Padghe Line )
VCHAL-1 TIE BAY (714) at Satna
21-Apr-15
9:00
21-Apr-15
18:00
Daily
For annual maintenace work
PGCIL
WR-II
R
113 400
63MVAr BUS REACTOR at Indore PG
21-Apr-15
8:00
21-Apr-15
18:00
Daily
COMMISSIONING OF CSD IN TIE BAY
PGCIL
WR-II
C
114 765
Kotra # 2 (701) Main Bay at Durg
21-Apr-15
9:00
21-Apr-15
13:00
Continuous
WRTS-I
WRTS-I-CG
C
115 765
Kotra # 2 & AT#1 (702) Tie Bay at Durg
21-Apr-15
14:00
21-Feb-15
18:00
WRTS-I
WRTS-I-CG
C
116 765
ICT#3 at Bilaspur S/s
21-Apr-15
9:00
22-Apr-15
18:00
WRTS-I
WRTS-I-CG
R
117 400
Raipur -Wardha #1 Main Bay at Raipur
21-Apr-15
9:00
21-Apr-15
17:00
WRTS-I
WRTS-I-CG
R
118 765
3x 240 MVAR Bus Reactor Main Bay at
Durg Ps
21-Apr-15
9:00
22-Apr-15
WRTS-I
WRTS-I-CG
C
119 765
765 KV Bus Reactor at Durg
21-Apr-15
8:00
22-Apr-15
18:00
WRTS-I
WRTS-I-CG
C
21-Apr-15
21-Apr-15
21-Apr-15
21-Apr-15
8:00
8:00
10:00
8:00
21-Apr-15
21-Apr-15
22-Apr-15
22-Apr-15
18:00
18:00
18:00
19:00
Commissioing of Champa Line bay
adjoining to Bus reactor
MAINTENANCE WORK
Daily
Daily
Crossing of 800 kV Champa-Kurushetra
Daily
AMP
Continous
contigency charging arrangement
21-04-15
9:30
21-04-15
17:00
Daily
108 765
109 400
110 400
111 400
KAPS-VAPI-II
Bilaspur-Seoni I & II
707 AGRA -1 MAIN BAY at Gwalior
ASOG-INDORE& PIRANA-BARODA
10C06A Feerder bay at Mundra HVDC
124 400kV
Terminal
120 220
765
121
122
765
123 764/400
125
400KV
126 400
127 400
128 765
BVT- Dhariwal & Dhariwal- Parli 400 KV D/C
Tr. Line
Kolhapur - Solapur Line -I
Tie Bay (408) of Bhadrawati1 &
Solapur1
Tie bay of Bilaspur -II (717) at Seoni
21-Apr-15
8:00
21-Apr-15
21-Apr-15
18:00
18:00
Replacement of support latch assembly of
70152 CB
Replacement of support latch assembly of
Continuous
70252 CB
DAILY
For attending Oil leakages
For CSD Work
Daily
Daily
For AMP /CSD commssioning
Continuous
Bay Maintenance work
To attened/ fixing of line spacers at five span
Ten hours locations of 15.5 KM (LILO portion of DIL- BVT &
DIL- Parli Line) D/C Transmission line
GETCO NPCIL
WRTS-I
WRTS-I
PGCIL
WRTS-II
BDTDL
PGCIL
R
ATIL
R
WRTS-I
ATIL
Dhariwal
Infrastructure Ltd.
22-Apr-15
8:00
22-Apr-15
18:00
Daily
AMP works at Kolhapur (MSETCL)
WRTML
WRTS-I
R
22-Apr-15
8:00
22-Apr-15
18:00
Daily
AMP works at Parli(PG) s/s
WRTS-I
WRTS-I
R
22-Apr-15
8:00
24-Apr-15
18:00
Daily
AMP works (DCRM & Timing test of CB)
WRTS-I
WRTS-I
R
ONLY BAY LINE MUST
C
R
SN
KV
Line
From
Date
Time
To
Date
Time
Basis
Reason
System
Agency
type
129 220
Main bay ICT-II (202) at Seoni
22-Apr-15
8:00
23-Apr-15
18:00
Conti.
AMP works (DCRM & Timing test of CB)
{ICT-II will be in service through Transfer
bay}
WRTS-I
WRTS-I
R
130 400
Raipur-1 Main Bay(415) at Bhadrawati
22-Apr-15
9:00
24-Apr-15
18:00
Conti.
CTs replacements works at Bhadrawati
WRTS-I
WRTS-I
R
131 400
400kv BUS # 1 at Pune(Talegoan)
Tie Bay Aurangabad # 1(717) at
Wardha
22-Apr-15
9:00
22-Apr-15
17:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
22-Apr-15
9:00
22-Apr-15
18:00
Daily
AMP work at Wardha
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
R
WRTS-I
TEL DGEN
WRTS-I
R
132 765
stringing work of broken earth wire between
span 387 to 390
Oil top in CVT at Koradi (MSETCL)
OFFLINE WASHING
133 400
400 KV Wardha- Parli # 2
22-Apr-15
9:00
23-Apr-15
18:00
Daily
134 400
Koradi-Satpura line
22-Apr-15
10:00
22-Apr-15
14:00
Daily
135 400
DGEN 400 KV Transfer Bus
22-Apr-15
8:00
22-Apr-15
18:00
ONE DAY
136 400kV
Main Bay of Akola - Aurangabad-II (
Bay No. 407) at Akola
22-Apr-15
8:00
22-Apr-15
18:00
Daily
137 400
400 KV S/S KATNI - 315MVA X-MER
22/Apr/15
9:30
23/Apr/15
17:30
Continuos MAINTENANCE WORK
MPPTCL MPPTCL
R
22/Apr/15
9:00
23/Apr/15
17:30
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
22/Apr/15
8:00
22/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
22/Apr/15
9:00
22/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
22/Apr/15
9:00
22/Apr/15
18:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
22-Apr-15
8:00
23-Apr-15
18:00
NTPC
NTPC
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
R
PGCIL
WR-II
C
138
139
140
141
142
400 KV S/S CHHEGAON - 315 MVA X400
MER
400 KV S/S NAGDA - 315 MVA X-MER
400
- II
400
400 KV BHOPAL - BINA CKT- I I
220 KV SEONI( PG )- CHHINDWARA
220
CKT- I
400KV Jhanor-Navsari 2
Routine testing and maintenance work
TEL - DGEN
MSETCL MSETCL
143 765
GWALIOR-II TIE BAY at Bina
22-Apr-15
09:00
25-Apr-15
18:00
144 400
400KV Bhachau-Varsana ckt # 2
22-Apr-15
10:00
22-Apr-15
18:00
22-Apr-15
09:00
22-Apr-15
10:00
22-Apr-15
18:00
Continous Annual Bay Maintenance
For erection of 765kV Isolator & jumpering in
Continous
main Bay (future) for NHPTL.
For Jumpering work for Essar bays at
Daily
Bhachau
Installation of online monitoring devices of
Daily
ICT.
Daily
For NTAMC work at Itarsi
22-Apr-15
9:00
22-Apr-15
17:00
Daily
Bay AMP work.
PGCIL
WR-II
R
22-Apr-15
9:00
22-Apr-15
18:00
Daily
For annual maintenace work
PGCIL
WR-II
R
WRTS-I
WRTS-I-CG
R
ATIL
ATIL
R
765KV BINA # 1 Line Reactor at
Jabalpur Pooling Station
146 400
Jabalpur-Itarsi#3
Bay 409 at Boisar ( Main Bay Of 315
147 400
MVA ICT 1 )
GWALIOR-2 MAIN BAY (715) at
148 765
Satna
Raipur- Wardha # 2 Main Bay at
149 400
Raipur
10C01C AC Filter - 1 main bay at
150 400kV
Mundra HVDC Terminal
151 765kV Bus Reactor at Koradi substation
152 400
400 KV KHEDAMARA Raita-II
145 765
153
400KV
154 400
BVT- Dhariwal & Dhariwal- Parli 400 KV D/C
Tr. Line
SJP -Nagda Ckt-I Main Bay(404) at
Nagda S/s.
Kolhapur - Solapur Line -II
400kv BUS # 2 at Pune(Talegoan)
Main Bay (424)of 400 KV ICT # 2 at
Wardha
Kasor - SSP line
22-Apr-15
18:00
22-Apr-15
10:00
22-Apr-15
14:00
Daily
22-04-15
9:30
22-04-15
17:00
Daily
22-04-15
22-Apr-15
9:30
8:00
22-04-15
22-Apr-15
17:00
17:00
Daily
Daily
22-Apr-15
8:00
27-Apr-15
Bay Maintenance work
MEGPTCLMEGPTCL
R
Terminal tightning and testing work
CSPTCL CSPTCL
GEN. MAINTENANCE
Hot line maintenance of remaining 9 no of
Dhariwal
daily basis towers. Outage not required only auto reclosure
WRTS-I
Infrastructure Ltd.
to be bypassed.
23-Apr-15
10:00
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
23-Apr-15
23-Apr-15
8:00
9:00
23-Apr-15
23-Apr-15
18:00
17:00
Daily
Daily
AMP works at Kolhapur (MSETCL)
AMP works at Pune-Talegoan (PG)
WRTML
WRTS-I
WRTS-I
WRTS-I
R
R
23-Apr-15
9:00
23-Apr-15
18:00
Daily
AMP work at Wardha
WRTS-I
WRTS-I
R
23-Apr-15
8:00
23-Apr-15
18:00
Daily
PMM work
GETCO
GETCO
Split bus
arrangement will
be tried by
WRLDC, SLDC
Gujarat & SSP
159 400kV New Koyna-Jaigad-ll
23-Apr-15
8:00
23-Apr-15
18:00
Daily
Faulty Insulator replacement work
MSETCL MSETCL
160 400
400 KV S/S BINA - 315 MVA X-MER - I
23/Apr/15
8:00
24/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
161 400
400 KV SARNI - ISP CkT
Station Transformer - 2 AT NSPCL
BHILAI
23/Apr/15
9:00
23/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
23/Apr/15
9:00
25/Apr/15
17:00
Conti
Annual Maintenance
155 400
156 400
157 400
400
23-Apr-15
18:00
For CSD Work
158
162 400
NSPCL
NSPCL
Subject to ATC Restric
SN
KV
163 400
164 765
Line
Nagda - Dehgam Ckt-I Main Bay(406)
at Nagda S/s.
From
Date
Time
To
Date
Time
23-Apr-15
10:00
23-Apr-15
18:00
type
Daily
Bay AMP work.
PGCIL
WR-II
R
WR-II
C
WR-II
C
23-Apr-15
18:00
Daily
9:00
23-Apr-15
17:00
Daily
Bay AMP work.
PGCIL
WR-II
R
23-Apr-15
9:00
23-Apr-15
18:00
Daily
For annual maintenace work
PGCIL
WR-II
R
ICT#1 at Bilaspur S/s
23-Apr-15
9:00
23-Apr-15
18:00
DAILY
WRTS-I
WRTS-I-CG
R
Raipur - Raigarh # 1 Line
3x 240 MVAR Bus Reactor TIE Bay at
Durg PS
23-Apr-15
9:00
23-Apr-15
17:00
Daily
For bushing oil sampling as per CC-AM
instruction
For CSD and NTMC Work
WRTS-I
WRTS-I-CG
C
23-Apr-15
9:00
24-Apr-15
Daily
For AMP /CSD commssioning
WRTS-I
WRTS-I-CG
C
23-Apr-15
10:00
23-Apr-15
23-Apr-15
23-Apr-15
8:00
10:00
23-Apr-15
24-Apr-15
18:00
18:00
Daily
Daily
Construction work for LILO of CSPTCL
400KV DCDS Korba (W)-Khedamara line's
Ckt-2 to Marwa TPP
Crossing of 800 kV Champa-Kurushetra
AMP WORKS
CSPTCL CSPTCL
WRTS-I
WRTS-I
PGCIL
WRTS-II
23-Apr-15
10:00
23-Apr-15
168 765
169 400
170 765
Agency
Daily
Jabalpur-Itarsi#4
Bay 201 at Boisar (220 kV side Main
Bay of 315 MVA ICT 1 )
GWALIOR-2 REACTOR BAY (715R)
at Satna
167 765
System
18:00
765KV Bus # 2 at Jabalpur Pooling
Station
09:00
166 220
Reason
Erection/Alignment of Isolators for
Commissioning of 765KV Dharmjaygarh # 4 PGCIL
Bays
PGCIL
For NTAMC work at Itarsi
23-Apr-15
165 400
Basis
23-Apr-15
18:00
172
173
220
765
CSPTCL 400KV DCDS Korba (W)Khedamara line's Ckt-2
D/C Kotimikala-Pendra Rly TL
706 ICT-1 MAIN BAY at Gwalior
174
765
Sundargarh - Dharamjaygarh - 2
23-Apr-15
8:00
25-Apr-15
17:00
Continuous
175
400
400
EMCO -BHADRAWATI LINE # 1
Korba (W) - Khedamara Ckt-II
23-Apr-15
23-Apr-15
8:00
10:00
23-Apr-15
23-Apr-15
19:00
17:00
daily
400
440/220 KV ICT @ Korba(W)
23-Apr-15
8:00
25-Apr-15
18:00
178 765
179 400
Dharamjaygarh-Jharsuguda Ckt -II
Bhadrawati-2 Main Bay (410) at Parli
23-Apr-15
24-Apr-15
9:00
8:00
25-Apr-15
24-Apr-15
18:00
18:00
maintenance
For Execution of Stringing work to make
LILO from Loc. AP69/0(FD60)
Continuou General Maintenenace on ICT Bay & Feder
s
Maintenance
Continuous Erection of auxiliary Bus for spare Reactor
Daily
AMP works at Parli(PG) s/s
180 220
Main bay Seoni- II (205) at Seoni
24-Apr-15
8:00
25-Apr-15
18:00
Conti.
181 400
BUS-2 at Solapur
24-Apr-15
8:00
25-Apr-15
18:00
182 400
Pune(GIS)-Parli # 1 &
Pune(GIS)-Pune # 2
24-Apr-15
9:00
26-Apr-15
183 765
Main bay (707) Bus Reactor at Wardha
24-Apr-15
9:00
24-Apr-15
171 400
176
177
17:00
Daily
GMR
CSPTCL
CSPTCL
CSPGCL
CSPGCL
C
R
AMP works (DCRM & Timing test of CB)
WRTS-I
{Line will be in service through Transfer bay}
WRTS-I
R
Daily
Solapur (NTPC) bays works at Solapur(PG)
WRTS-I
WRTS-I
C
18:00
Daily
Maintenance
WRTML
WRTS-I
/WRTS-I
c
18:00
Daily
AMP work at Wardha
WRTS-I
R
Daily
Porcelain Tension insulator replacement with
polymer insulator(2 Nos) Bus -1 Gantry to
PGCIL
Tie gantry
PMM work
GETCO
184
400 KV Bus 1 & unit 40 CGPL
Kasor - SSP line
Inter Regional
GMR
WRTS-I
WRTS-I
WRTS-I
CGPL
24-Apr-15
24-Apr-15
8AM
8:00
24-Apr-15
24-Apr-15
6PM
18:00
Daily
24-Apr-15
8:00
25-Apr-15
18:00
Continuou Crossing of 765 KV D/C Dharamjaygarhs
Jabalpur Line(AP54B/0-AP55/0)
24-Apr-15
8:00
24-Apr-15
18:00
Daily
Tan-Delta Testing work
MSETCL MSETCL
Daily
Faulty disc replacement ,Fixing of spacers
,damper .and other line maintence work
MSETCL MSETCL
GETCO
185
400 KV D/C KORBA WEST
KHEDAMERA LILO FOR MODWA
TPP
187 400kV Padgha-Talegaon(PGCIL)
186 400
188 400kV Koradi-Bhusawal
8:00
24-Apr-15
189 400
190 400
400 KV S/S NAGDA - 315 MVA X-MER
- III
400 KV S/S CHHEGAON - 50MVAR
BUS REACTOR
C
R
WRTS-I-CG
WRTS-I
400
400
Erection of Beam near Dharmjaygarh line-2 for POWERG
Dharamjaygarh Line-3&4 Bay extension work.
RID
18:00
24-Apr-15
Split bus
arrangement will
be tried by
WRLDC, SLDC
Gujarat & SSP
CSPTCL JTCL
24/Apr/15
8:00
24/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
24/Apr/15
8:00
24/Apr/15
17:30
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
MPPTCL MPPTCL
R
MPPTCL MPPTCL
R
191 400
400 KV S/S INDORE - ISP - I
24/Apr/15
8:00
24/Apr/15
17:00
daily
192 400
400 kv SEONI - SARNI - CKT
24/Apr/15
9:00
24/Apr/15
17:00
daily
MAINTENANCE AND RELAY TESTING
WORK
MAINTENANCE WORK
ONLY BAY LINE MUST
SN
KV
193 400
194 220
195 220
Line
400 kv RAJGARH (PGCIL )- SSPCKT I
220 KV ANOOPUR - KOTMIKALA CKT
-I
220 KV MALANPUR - GWL( PG) CKT I
From
Date
Basis
Reason
System
18:00
daily
MAINTENANCE WORK
PGCIL/M
WR - II
PPTCL
R
24/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
25/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
Time
To
Date
Time
24/Apr/15
6:00
24/Apr/15
24/Apr/15
10:00
24/Apr/15
9:00
18:00
196 400KV Jhanor 400KV ICT -1
24-Apr-15
8:00
30-Apr-15
197 220
24-Apr-15
9:00
24-Apr-15
24-Apr-15
09:00
199 220
Kawas - Navsari Ckt - I
765KV ICT # 2 at Jabalpur Pooling
Station
220 kV Boisar( MSETCL ) Line 2
24-Apr-15
9:00
24-Apr-15
17:00
200 765
ICT#2 at Bilaspur S/s
24-Apr-15
9:00
24-Apr-15
18:00
201 132
Renki-Mobka D/C
24-Apr-15
8:00
25-Apr-15
18:00
202 400
9:00
24-Apr-15
17:00
198 765
24-Apr-15
Continous
220KV CT Erection ,Commitioning &Testing
Agency
NTPC
NTPC
type
16:00
DAIL
PGCIL
WR-II
R
18:00
Daily
PGCIL
WR-II
C
PGCIL
WR-II
R
WRTS-I
WRTS-I-CG
R
CSPTCL WRTS-I-CG
C
WRTS-I
C
400
Raipur - Raigarh # 2 Line ( KWPCL)
400KV JPL-JPL Extension Interconnector
Line
24-Apr-15
203
24-Apr-15
9:00
24-Apr-15
19:00
204
400
Damoh - Birshingpur # 1&2
24-Apr-15
9:00
25-Apr-15
18:00
400 KV KHEDAMARA Raita-III
Pune(GIS) - Solapur
SSP - Dhule -2
Kawas - Navsari Ckt - I I
COMPLETE 765KV (GIS) Equipment
Solpaur-Pune line, ICT-1&2, Bus
Reactor along with associated bays
Main bay Bus reactor (713) at Seoni
Main bay(706) ICT # 2 at Wardha
24-Apr-15
25-Apr-15
25-Apr-15
25-Apr-15
8:00
9:00
8:00
9:00
24-Apr-15
27-Apr-15
27-Apr-15
25-Apr-15
25-Apr-15
9:00
25-Apr-15
25-Apr-15
400
400 KV Bus 1 & unit 40 CGPL
Asoj - Wanakbori
400
Kasor - Chorania
AMP of Kawas I Bay at Navsari GIS
ICT Spare unit Commissioning with ICT # 2
for Swapping with ICT # 2 Y Phase.
Daily
For AMP of Line Equipment
For bushing oil sampling as per CC-AM
DAILY
instruction
For construction of 765KV D/C
Continuous Dharamjaygarh (Korba)-Jabalpur
Transmission Line (Part-I) AP 4A/0-4A/1
Daily
For CSD and NTMC Work
WRTS-I-CG
Daily
Relay/Protection Testing/Line maintenence.
17:00
18:00
18:00
16:00
Continuou
s
Daily
Daily
Daily
DAIL
For crossing of 800kV HVDC Champa Kurukshetra TL.
GEN. MAINTENANCE
Line Rectification work
PMM work
AMP of Kawas II Bay at Navsari GIS
CSPTCL
WRTS-I
GETCO
PGCIL
CSPTCL
WRTS-I
GETCO
WR-II
30-Apr-15
18:00
Conti.
Switching Impulse testing at PUNE(GIS)
WRTS-I
WRTS-I
C
8:00
9:00
25-Apr-15
25-Apr-15
18:00
18:00
Daily
Daily
Daily
WRTS-I
WRTS-I
WRTS-I
WRTS-I
CGPL
R
R
25-Apr-15
25-Apr-15
8AM
8:00
25-Apr-15
25-Apr-15
6PM
18:00
Daily
AMP works (Timing test of CB)
AMP work at Wardha
Porcelain Tension insulator replacement with
polymer insulator(2 Nos) Bus -1 Gantry to
Tie gantry
PMM work
GETCO
GETCO
25-Apr-15
8:00
25-Apr-15
18:00
Daily
PMM work
GETCO
GETCO
SLDC-Gujarat will
issue opening /
closing code
SLDC-Gujarat will
issue opening /
closing code
215 400kV Babheleshwar-Padgha-ll
400 KV S/S BINA - 315 MVA X-MER - I
216 400
I
400 kv RAJGARH (PGCIL )- SSPCKT
217 400
II
218 400
400 CHHEGAON - MALWA CKT
25-Apr-15
8:00
26-Apr-15
18:00
Daily
Replacement of faulty insulator strings
MSETCL MSETCL
25/Apr/15
8:00
25/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
25/Apr/15
6:00
25/Apr/15
18:00
daily
MAINTENANCE WORK
25/Apr/15
9:00
25/Apr/15
17:30
daily
400 KV S/S INDORE - 400 KV ISP - I I
25/Apr/15
8:00
25/Apr/15
17:00
daily
220 765
765KV Bay No.: 814 Tie Bay of Bina #
1 at Jabalpur Pooling Station
25/Apr/15
09:00
18:00
Daily
25-Apr-15
10:00
25-Apr-15
18:00
Daily
25-Apr-15
9:00
25-Apr-15
17:00
Daily
For AMP of Line Equipment
PGCIL
WR-II
R
223 400
Itarsi-Indore#2
220 kV Boisar ( PG ) - Vasai
(MSETCL)
400KV Kansari- Bhinmal line
MAINTENANCE WORK
MAINTENANCE AND RELAY TESTING
MPPTCL MPPTCL
WORK
Erection/Testing of Current Transformer for
WR-II
Commissioning of 765KV Dharmjaygarh # 3 PGCIL
Bays
PGCIL
WR-II
For NTAMC work at Itarsi
R
219 400
25-Apr-15
10:00
25-Apr-15
18:00
Daily
For bay AMP work at Kansari SS
PGCIL
NR-I
R
224 765
Gwalior 1 Line Reactor at Satna,
25-Apr-15
9:00
26-Apr-15
18:00
Continous
For attending oil leakage, line will be taken in
PGCIL
service with spare reactor within 1 hr
WR-II
R
225 765
Dharamjaygarh- Champa-Durg
(Bypassing Champa)
25-Apr-15
8:00
29-Apr-15
18:00
For terminating 765kV Durg -Champa &
Continuou
Dharamjaygarh-Champa lines at 765kv
s
Champa PS
WRTS-I-CG
C
205
206
207
208
400
765
400
220
209 765
210 765
211 765
400
212
JPL
JPL
PGCIL
WR-II
R
PGCIL
214
222 220
WR-SR TTC REVISION
WR-SR ATC RESTRIC
213
221 400
C
25/Apr/15
PGCIL/M
WR - II
PPTCL
MPPTCL MPPTCL
WRTS-I
R
R
R
C
C
GETCO WILL ALSO W
SN
KV
Line
From
Date
Time
To
Date
Time
Basis
226 400
Raipur-Wardha-1&2
25-Apr-15
8:00
10-May-15
18:00
Daily
227 765
BUS-I at Bina
26-Apr-15
09:00
27-Apr-15
18:00
Daily
400
Daily
228
400 KV Bus 1 & unit 40 CGPL
Akola -Bhusawal Line ( Bay No. 409 &
229 400kV
410) at Akola
230 400kV Padgha-Kharghar
400 KV S/S BINA - 315 MVA X-MER - I
231 400
II
400KV Bus # 2 at Jabalpur Pooling
232 400
Station
26-Apr-15
26-Apr-15
26-Apr-15
26/Apr/15
8AM
8:00
26-Apr-15
8:00
26-Apr-15
26-Apr-15
8:00
27/Apr/15
6PM
18:00
Reason
System
A/R non auto mode for Additional Earthing
WRTS-I
work on lines.
For removing of Bus Isolator Jumper & reerection of Jumper & carrying out the bus
PGCIL
stability to integrated the 01 no. 765 kV Bay
for NHPTL.
Porcelain Tension insulator replacement with
polymer insulator(2 Nos) Bus -1 Gantry to
PGCIL
Tie gantry
Agency
type
WRTS-I-CG
C
WR-II
C
CGPL
18:00
Daily
Daily
Routine testing and maintenance work
Replacement of faulty insulator string
MSETCL MSETCL
MSETCL MSETCL
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WRTS-I
WRTS-I
WR-II
WRTS-I
WRTS-I
C
R
R
26-Apr-15
9:00
28-Apr-15
18:00
234 400
Itarsi-Satpura
235 400/220 315MVA ICT-2 at Seoni
236 400
Bhilai-1 Main Bay(410) at Bhadrawati
Tie Bay of Chakan - Padghe (402) at
237 400
Pune
238 400
Tie Bay Raipur #2 ( 411) at Wardha
26-Apr-15
27-Apr-15
27-Apr-15
10:00
8:00
9:00
26-Apr-15
27-Apr-15
29-Apr-15
18:00
18:00
18:00
Erection/Jumper with Isolators for 400KV
Daily
Bay No.: 413 of Jhabua Power Bays
Continuou For crossing of 800kV HVDC Champa s
Kurukshetra TL.
Daily
For NTAMC work at Itarsi
Daily
Trail of RTCC panel
Conti.
CTs replacements works at Bhadrawati
27-Apr-15
9:00
27-Apr-15
13:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
27-Apr-15
9:00
30-Apr-15
18:00
Conti.
Pull rod replacement work at Wardha
WRTS-I
WRTS-I
R
239 765
765 KV Bus Reactor # 2 at Wardha
27-Apr-15
9:00
28-Apr-15
18:00
Daily
LA Connector replacement work at Wardha WRTS-I
WRTS-I
R
240 400
Tie Bay Akola 2 at Wardha
Main Bay Bus Reactor (718) at
Solapur
Tie Bay of Pune GIS-1 & ICT # 1 at
Pune
Navasri - Nasik - 1
Asoj - Chornia - 1
27-Apr-15
9:00
27-Apr-15
18:00
Daily
AMP work at Wardha
WRTS-I
WRTS-I
R
27-Apr-15
9:00
27-Apr-15
18:00
Daily
AMP and Precommissioning works
WRTS-I
WRTS-I
R
27-Apr-15
13:00
27-Apr-15
17:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
27-Apr-15
27-Apr-15
8:00
8:00
28-Apr-15
27-Apr-15
18:00
18:00
Daily
Daily
PMM work
PMM work
GETCO
GETCO
GETCO
GETCO
Daily
PID testing of insulator strings. A/R shall be
kept In non auto mode
MSETCL MSETCL
233 765
241 765
242 400
243 220
400
244
Satna - Bina # 2
Main Bay of Akola - Yelwan – II
Bay No. 417) at Akola
247 400kV
New Koyna -Stage lV ckt-1
09:00
26/Apr/15
8:00
245 400kV Akola-Nandgaonpeth
246 400kV
26/Apr/15
27-Apr-15
(
400 KV S/S INDORE - 400 KV BUS
248 400
TRANSFER
400 KV S/S NAGDA- 50MVAR BUS
249 400
REACTOR- I
250 400
400 KV ISP- NAGDA CkT
251 400
400 KV KATNI - BIRSINGPUR - I
400 KV S/S CHHEGAON 252 400
JULWANIYA
220 KV MALANPUR - (GWL) PG CKT 253 220
II
254 220KV Kawas-Navsari 1
255 765
765 KV Sasan - Satna Line -1
256 400
18:00
2-May-15
8:00
27-Apr-15
27-Apr-15
27/Apr/15
Daily
18:00
27-Apr-15
8:00
SLDC-Gujarat will
issue opening /
closing code
18:00
27-Apr-15
8:00
27/Apr/15
18:00
Daily
Routine testing and maintenance work
Bay Maint. Work & dignostic Testing of
reactor, CB, CT & relay
MAINTENANCE AND RELAY TESTING
WORK
MSETCL MSETCL
MPPTCL MPPTCL
R
MSETCL MSETCL
27/Apr/15
17:00
daily
27/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
27/Apr/15
27/Apr/15
16:00
17:30
daily
daily
MAINTENANCE WORK
MAINTENANCE WORK
MPPTCL MPPTCL
MPPTCL MPPTCL
R
R
27/Apr/15
27/Apr/15
8:00
9:00
9:30
27/Apr/15
9:00
27/Apr/15
17:30
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
27/Apr/15
9:00
28/Apr/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
27-Apr-15
27-Apr-15
8:00
8:00
27-Apr-15
28-Apr-15
18:00
18:00
Daily
Daily
PM & Relay testing
Replacment of Line and Rector LAs
NTPC
SASAN
NTPC
RELIANCE
BINA-I/315 MVA ICT TIE BAY at Bina
27-Apr-15
09:00
27-Apr-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
257 400
400 kV BUS-2 at Bhachau
27-Apr-15
10:00
27-Apr-15
18:00
Daily
WR-II
C
258 765
765KV Bus # 2 at Jabalpur Pooling
Station
27-Apr-15
09:00
18:00
Daily
WR-II
C
27-Apr-15
Jumpering and BUS Stability, Integration of
PGCIL
New Bays
Erection/Alignment of Isolators for
Commissioning of 765KV Dharmjaygarh # 3 PGCIL
Bays
SN
KV
Line
From
Date
Time
259 765
765KV Bay No.: 817 Tie Bay of Bina #
2 at Jabalpur Pooling Station
27-Apr-15
09:00
260 400
Itarsi-Bhopal#1
27-Apr-15
10:00
To
Date
27-Apr-15
27-Apr-15
Basis
Reason
System
Agency
type
WR-II
C
WR-II
C
PGCIL
WR-II
R
Time
18:00
Daily
18:00
Daily
Erection/Testing of Current Transformer for
Commissioning of 765KV Dharmjaygarh # 4 PGCIL
Bays
PGCIL
For NTAMC work at Itarsi
Replacing of porcelain dis isulators in all
polluted sections of line
261 400
Itarsi - Khandwa Ckt.1
27-Apr-15
8:00
28-Apr-15
18:00
Daily
262 765
AT#2 of Tamnar PS
Seoni#2-Sipat#1 Tie bay(708) at
Bilaspur S/s
Raipur -Bhadrawati #1 Main Bay at
Raipur
ICT Main bay at Durg PS
765 kV Main Bus- 1 at Durg
400 KV KHEDAMARA Seoni
27-Apr-15
10:00
27-Apr-15
14:00
Continuous AMP WORKS
WRTS-I
WRTS-I-CG
C
27-Apr-15
9:00
27-Apr-15
18:00
DAILY
WRTS-I
WRTS-I-CG
R
27-Apr-15
9:00
27-Apr-15
17:00
Daily
WRTS-I
WRTS-I-CG
C
27-Apr-15
27-Apr-15
27-Apr-15
9:00
8:00
8:00
28-Apr-15
28-Apr-15
27-Apr-15
17:00
16:00
17:00
Daily
Daily
Daily
WRTS-I WRTS-I-CG
WRTS-I WRTS-I-CG
CSPTCL CSPTCL
C
R
27-Apr-15
8:00
28-Apr-15
17:00
Daily
263 765
264 400
265 765
266 765
267 400
268 400
269
270
400
400
400kV DCDS Raikheda-Medesara
Quad Line , 11/0(DC+0) & 11/1(DA+0)
WARDHA-PARLI -1
Indore (MP) - Asoj # 3
27-Apr-15
27-Apr-15
8:00
8:00
27-Apr-15
30-Apr-15
18:00
Daily
For AMP work
For CSD Work
For AMP /CSD commssioning
AMP : 2015 - 16
GEN. MAINTENANCE
Construction of 400KV Raita-Jagdalpur Line.
Location : AP 7/0 (FD-60+30) & AP 8/0 (FD60+30)
Replacement of broken insulator at loc 626
CSPTCL CSPTCL
WRTS-I
WRTS-I
R
18:00
Line is presently charged under contingency
scheme . Shutdown required for removing
jumper, shifting of line to new tower and
from 400kV switchyard to 765kV yard at
Indore . Lines finally charged as per original
Continous
approved schemes i.e. 400kV Indore (PG) Indore (MP) Ckt.2 and 765kV Indore (PG) Vadodara (pooling) line. Also testing of all
protection and PLCC system at Indore and
Vadodara ends before commissioning.
PGCIL
WR-II
C
Line is presently charged under contingency
scheme. Shutdown required for removing
bunching connection and terminating Pirana Continous
PGCIL
Vadodara ckt.1 at 765kV Vadodara GIS.
Also testing of all protection and PLCC
system at Asoj, Vadodara and Pirana ends.
WR-II
C
PGCIL
WRTS-II
R
EPTCL
EPTCL
271
400
Pirana - Asoj D/C
27-Apr-15
8:00
30-Apr-15
18:00
272
765
712 BINA -1 L/R BAY at Gwalior
27-Apr-15
10:00
28-Apr-15
18:00
Daily
273
400
Ghandhar Hazira circuit 1 or 2
27-Apr-15
7:00
05-May-15
19:00
Daily
400
400 Kv KW-Khedamara Ckt-I Bay 09
@ KWB
27-Apr-15
8:00
29-Apr-15
18:00
AMP WORKS
shutdown required for pre monsoon
maintenanceactivities. One linewill remain in
service. Line will be restored in the evening at
19:00 hrs.
28-Apr-15
8AM
6PM
Continuou
General Maintenenace
CSPGCL
CSPGCL
s
Porcelain Tension insulator replacement with
Daily
CGPL
polymer insulator(3 Nos) Bus -2 Gantry to
PGCIL
Line gantry
276 400
28-Apr-15
8:00
28-Apr-15
18:00
Daily
AMP works at Parli(PG) s/s
WRTS-I
WRTS-I
R
277
278
279
280
28-Apr-15
28-Apr-15
28-Apr-15
28-Apr-15
8:00
9:00
9:00
9:00
28-Apr-15
28-Apr-15
28-Apr-15
29-Apr-15
18:00
13:00
18:00
18:00
Daily
Daily
Daily
Daily
Daily
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
CGPL
R
R
R
C
28-Apr-15
28-Apr-15
8AM
8:00
28-Apr-15
28-Apr-15
6PM
18:00
Daily
AMP works
AMP works at Pune-Talegoan (PG)
AMP work at Wardha
CSD commissioning work at Solapur
Porcelain Tension insulator replacement with
polymer insulator(3 Nos) Bus-2 Gantry to Tie
gantry
PMM work
GETCO
SLDC-Gujarat will
issue opening /
closing code
28/Apr/15
8:00
28/Apr/15
17:00
daily
274
400
275
281
CGPL Mundra Jetpur 2 & unit 40
Tie Bay (411) of Bhadrawati2 &
Solapur2 at Parli
400/220 315MVA ICT-1 at Seoni
400
Main Bay of Padghe (403) at Pune
400
Tie Bay Akola 1 at Wardha
400
Bus Reactor at Solapur
400
400 KV Bus 2, CGPL Mundra Bachau2
& unit 40
400
Kasor - CLPIPL line
28-Apr-15
PGCIL
GETCO
282
283 400
400 KV S/S INDORE - 400 KV BUS
COUPLER
MAINTENANCE AND RELAY TESTING
WORK
MPPTCL MPPTCL
R
Subject to ATC Restric
SN
KV
Line
400 KV S/S BHOPAL - 400 KV
TRANSER BUS COUPLER
285 220KV Kawas-Navsari 2
400KV, 315 MVA ICT MAIN BAY at
286 400
Bina
284 400
From
Date
Basis
Reason
System
17:30
daily
MAINTENANCE WORK
MPPTCL MPPTCL
18:00
Daily
PM & Relay testing
NTPC
NTPC
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WRTS-I
WR-II
WRTS-I-CG
C
C
CSPTCL WRTS-I-CG
C
WRTS-I WRTS-I-CG
POWERG
Inter Regional
RID
CGPL
PGCIL
C
Time
To
Date
Time
28/Apr/15
9:00
28/Apr/15
28-Apr-15
8:00
28-Apr-15
28-Apr-15
09:00
28-Apr-15
291 400
292 765
765KV ICT # 2 at Jabalpur Pooling
Station
Itarsi-Bhopal#2
765 KV VCHAL 2 LINE REACTOR
Satna
Pithampur Ckt.2 bay at Indore PG
Bus Reactor of Tamnar PS
293 400
Korba- Raita S/C
28-Apr-15
8:00
29-Apr-15
294 400
Raipur - Wardha # 2 Line
28-Apr-15
9:00
28-Apr-15
295
Sundargarh - Raigarh - 1
28-Apr-15
297 400
298 400
CGPL Mundra Jetpur 2, Bus 2 & unit
40
Vindhyacha Tie-Line-1
Vindhyacha Tie-Line-2
29-Apr-15
29-Apr-15
29-Apr-15
8AM
8:30
8:30
29-Apr-15
29-Apr-15
29-Apr-15
299 400
400 KV Wardha- Raipur # 1
29-Apr-15
9:00
30-Apr-15
300
301
302
303
400
400
400
220
400
Seoni- Khandwa-I Line
Main Bay Pune GIS # 2 (407)
Main Bay Aurangabad-2(410)
Navasri - Nasik - 2
Asoj - Chornia - 2
29-Apr-15
29-Apr-15
29-Apr-15
29-Apr-15
29-Apr-15
8:00
9:00
13:00
8:00
8:00
29-Apr-15
29-Apr-15
29-Apr-15
30-Apr-15
29-Apr-15
Jumpering and BUS Stability, Integration of
18:00
Daily
New Bays
ICT Spare unit Commissioning with ICT # 2
18:00
Daily
for Swapping with ICT # 2 B Phase.
18:00
Daily
For NTAMC work at Itarsi
For detailed integrated checking of
18:00
Continous
REACTOR along with scheme of line
18:00
Daily
Signal testing for Remote HMI at Indore
14:00
Continuous AMP WORKS
For construction of 765KV D/C
18:00
Continuous Dharamjaygarh (Korba)-Jabalpur
Transmission Line (Part-I)
17:00
Daily
For CSD and NTMC Work
For tightness checking of Jumpers, tightening of
17:00
Daily
Corona Ring at various locations.
Porcelain Tension insulator replacement with
Daily
polymer insulator(3 Nos) Bus -2 Gantry to
Tie gantry
6PM
17:30 Hrs. Continuous LILO work (StageV)
17:30 Hrs. Continuous LILO work (StageV)
stringing work of broken earth wire at
18:00
Daily
location 549, 550.
18:00
Daily
Commissioning of CSD at Seoni
13:00
Daily
AMP works at Pune-Talegoan (PG)
17:00
Daily
AMP works at Pune-Talegoan (PG)
18:00
Daily
PMM work
18:00
Daily
PMM work
400
Kasor - GPEC line
29-Apr-15
8:00
29-Apr-15
18:00
Daily
29/Apr/15
9:00
29/Apr/15
17:30
287 400
288 765
289 400
290 765
400
400 kV BUS-2 at Bhachau
28-Apr-15
10:00
28-Apr-15
09:00
28-Apr-15
10:00
28-Apr-15
28-Apr-15
9:00
29-Apr-15
28-Apr-15
28-Apr-15
8:00
10:00
28-Apr-15
28-04.-015
9:00
28-Apr-15
28-Apr-15
28-Apr-15
400
296
Agency
NTPC
NTPC
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
WRTS-I
GETCO
GETCO
WRTS-I
WRTS-I
WRTS-I
GETCO
GETCO
R
R
R
PMM work
GETCO
GETCO
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
MPPTCL MPPTCL
R
305
311 400
400 KV S/S BHOPAL - 400 KV BUS
TIE
400 KV S/S INDORE - 400 KV MAIN
BUS - I
400 KV S/S NAGDA- 50MVAR BUS
REACTOR- I I
400KV BINA-II MAIN BAY at Bina
765KV Bus # 2 at Jabalpur Pooling
Station
Itarsi-Khandwa#1
312 765
Indore - Bhopal
29-Apr-15
8:00
30-Apr-15
18:00
313 765
314 400
AT#3 of Tamnar PS
Raipur - KSK # 4 Line
Kotra-1 & Bus Reactor Tie Bay (811)
at durgPs
29-Apr-15
29-Apr-15
10:00
9:00
29-Apr-15
29-Apr-15
14:00
17:00
Bay AMP work.
To carry out Bus Stability Test for
Daily
Commissioning of 765kV Bus Reactor # 1
Daily
For NTAMC work at Itarsi
signal testing for remote HMI and Integration
Continous of spare reactor with Indore-Bhopal Line
raector at Indore
Continuous AMP WORKS
Daily
For CSD and NTMC Work
29-Apr-15
9:00
30-Apr-15
17:00
Daily
316 765
Main Bay of Korba BUS REACTOR-1
29-Apr-15
9:00
30-Apr-15
317
765
765 KV SATNA-1 LINE at Gwalior
29-Apr-15
318
400
307 400
308 400
309 400
310 765
315 765
319 400
29/Apr/15
29/Apr/15
8:00
29/Apr/15
17:00
daily
MAINTENANCE AND RELAY TESTING
WORK
29/Apr/15
17:00
daily
MAINTENANCE WORK
29-Apr-15
18:00
Daily
29-Apr-15
8:00
09:00
29/Apr/15
09:00
29-Apr-15
10:00
29-Apr-15
18:00
Rourkela - Raigarh - 2
29-Apr-15
315 MVA ICT- bank-III AT
KHEDAMARA
29-Apr-15
10:00
8:00
8:00
29/Apr/15
29-Apr-15
29-Apr-15
30-Apr-15
18:00
18:00
18:00
18:00
17:00
R
NTPC
NTPC
304
306 400
type
For AMP
Continuous AMP
Daily
Daily
Daily
A/R testing, point to point testing
AMP Work
GEN. MAINTENANCE
SLDC-Gujarat will
issue opening /
closing code
SLDC-Gujarat will
issue opening /
closing code
MPPTCL MPPTCL
R
PGCIL
WR-II
R
PGCIL
WR-II
C
PGCIL
WR-II
C
Sterilite
WR-II
C
WRTS-I
WRTS-I
WRTS-I-CG
WRTS-I-CG
C
C
WRTS-I
WRTS-I-CG
R
WRTS-I
WRTS-I-CG
R
PGCIL
POWERG
RID
WRTS-II
Inter Regional
CSPTCL CSPTCL
C
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
Daily
CGPL Mundra Jetpur 2, Bus 2 & unit
40
30-Apr-15
8AM
30-Apr-15
6PM
321 400
Aurangabad-Pune # 1
30-Apr-15
9:00
30-Apr-15
18:00
Daily
322 400
Itarsi - Khandwa Ckt.2
30-Apr-15
8:00
30-Apr-15
18:00
Daily
323 400
30-Apr-15
8:00
30-Apr-15
18:00
Daily
30-Apr-15
9:00
30-Apr-15
18:00
Daily
30-Apr-15
9:00
30-Apr-15
13:00
326 765
Seoni- Khandwa-II Line
Aurangabad(Waluj)-2 Main Bay at
Aurangabad(PG)
Tie Bay Pune GIS - 2 & Aurangabad #
1 (408) at Pune
765KV Bus-1 at Wardha
Porcelain Tension insulator replacement with
polymer insulator(3 Nos) Bus -2 Gantry to
Tie gantry
Attending problem of TBC isolator at
MSETCL Waluj S/S.
Replacing of porcelain dis isulators in all
polluted sections of line
Commissioning of CSD at Seoni
30-Apr-15
9:00
30-Apr-15
327 400
Main Bay (418) Bus Reactor at Wardha
30-Apr-15
9:00
30-Apr-15
328 400
Solapur-Kolhapur # 1
Tie Bay of Aurangabad-2 & ICT # 2
(411) at Pune
Chorania - Asoj 2
30-Apr-15
9:00
30-Apr-15
13:00
30-Apr-15
Akola Main Bus-I
400 KV S/S INDORE - 400 KV MAIN
BUS - II
400 KV BINA-II/1200 KV ICT TIE BAY
at Bina
409 315 MVA ICT#1 Main Bay at
Bhachau
400
320
324 400
325 400
329 400
400
System
Agency
CGPL
PGCIL
WRTS-I
WRTS-I
R
PGCIL
WR-II
R
WRTS-I
WRTS-I
R
AMP works at Aurangabad(PG)
WRTS-I
WRTS-I
R
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
18:00
Daily
Bus Extension Work for Raipur Ckt 3&4
WRTS-I
WRTS-I
R
18:00
Daily
AMP work at Wardha
WRTS-I
WRTS-I
R
1-May-15
18:00
Daily
CSD commissioning work at Solapur
WRTML
WRTS-I
C
30-Apr-15
17:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
8:00
30-Apr-15
18:00
Daily
PMM work
GETCO
GETCO
SLDC-Gujarat will
issue opening /
closing code
30-Apr-15
8:00
30-Apr-15
18:00
Daily
MSETCL MSETCL
30/Apr/15
8:00
30/Apr/15
17:30
daily
Routine testing and maintenance work
MAINTENANCE AND RELAY TESTING
WORK
MPPTCL MPPTCL
R
30-Apr-15
09:00
30-Apr-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
30-Apr-15
10:00
30-Apr-15
12:00
Daily
CT Oil sampling works of CGL make
PGCIL
WR-II
R
30-Apr-15
09:00
30-Apr-15
11:30
Daily
PGCIL
WR-II
C
30-Apr-15
09:00
30-Apr-15
18:00
PGCIL
WR-II
C
30-Apr-15
10:00
30-Apr-15
18:00
PGCIL
WR-II
C
30-Apr-15
9:00
30-Apr-15
18:00
PGCIL
WR-II
C
30-Apr-15
8:00
30-Apr-15
20:00
WRTS-I
WRTS-I-CG
C
30-Apr-15
8:00
1-May-15
17:00
WRTS-I
CSPTCL
330
331 400kV
332 400
333 400
334 400
335 765
336 400
337 400
338 765
339 400
340 400
765KV Bay No.: 806 (Main Bay) of ICT
# 2 at Jabalpur Pooling Station
400KV Bus # 2 at Jabalpur Pooling
Station
Itarsi-Khandwa#2
765 KV VCHAL 1 LINE REACTOR
Satna
Jindal # 2 (413) Main Bay at Raipur
400 KV DC Raigarh--Raipur (I & II )
Between Locations 112(DA+3) & 113
(DA+0)
For replacement of 765kV Current
Transformers of ICT # 2 Main Bay (R & Y
Phase)
Erection/Jumper with Isolators for 400KV
Daily
Bay No.: 413 of Jhabua Power Bays
Daily
For NTAMC work at Itarsi
For completion of Auxiliary bus scheme for
Continous
taking spare reactor into service
Continuous AMP WORKS
Line crossing of 400kV Raita (Raipur)Daily
Jagdalpur Line (U/C) bt location AP 10/0(FD60+30) & AP 11/0(FD-60+30)
341
765
716 BAY (SATNA -2 MAIN) at Gwalior
30-Apr-15
10:00
1-May-15
18:00
Daily
342
400
Sundargarh - Raigarh - 2
30-Apr-15
9:00
30-Apr-15
17:00
Daily
345 765
346 220
Main bay Seoni I (204) at Seoni
344 400
347 400
348 400
349 400
Aurangabad(Waluj)-2 Tie Bay at
Aurangabad(PG)
Pune(GIS)-Parli # 2 &
Pune(GIS)-Pune # 1
Main Bay (421)ICT #1 at Wardha
PGCIL
WRTS-II
8AM
1-May-15
6PM
01-May-15
9:00
01-May-15
17:00
Daily
1-May-15
8:00
2-May-15
18:00
Daily
Line AMP works
WRTS-I
WRTS-I
R
1-May-15
8:00
2-May-15
18:00
Conti.
AMP works (DCRM & Timing test of CB)
WRTS-I
{Line will be in service through Transfer bay}
WRTS-I
R
1-May-15
9:00
1-May-15
18:00
Daily
AMP works at Aurangabad(PG)
WRTS-I
R
1-May-15
9:00
3-May-15
18:00
Daily
Line Rectification work
1-May-15
9:00
1-May-15
18:00
Daily
AMP work at Wardha
WRTS-I
WRTML
WRTS-I
/WRTS-I
WRTS-I WRTS-I
Subject to ATC Restric
C
1-May-15
Daily
400 KV Bus 2, CGPL Mundra Bachau
2 & unit 40
Raipur -Bhadrawati # 2 Main Bay at
Raipur
Seoni - Bilaspur-I Line
alstom CB problem
For tightness checking of Jumpers, tightening of POWERG
Inter Regional
Corona Ring at various locations.
RID
Porcelain Tension insulator replacement with
CGPL
polymer insulator(3 Nos) Bus-2 Gantry to Tie PGCIL
gantry
For CSD Work
WRTS-I WRTS-I-CG
400
343
type
Time
C
c
R
SN
KV
400
Line
Asoj - SSP
From
Date
01-May-15
To
Date
01-May-15
Basis
Reason
System
Agency
type
Time
8:00
Time
18:00
Daily
PMM work
GETCO
GETCO
Split bus
arrangement will
be tried by
WRLDC, SLDC
Gujarat & SSP
01-May-15
09:00
01-May-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
Daily
ICT Spare unit Commissioning with ICT # 1
for Swapping with ICT # 1 R Phase.
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
PGCIL
WR-II
WR-II
C
R
350
351 400
352 765
353 400
354 400
355 220
356 400
357 400
358 765
400 KV (1200/400 KV ICT) MAIN BAY
at Bina
765KV ICT # 1 at Jabalpur Pooling
Station
400KV Bus Reactor # 1 (Main & Tie
Bay) at Jabalpur Pooling Station
315MVA ICT#1at Itarsi
220 kV Boisar( MSETCL ) Line 1
Jindal # 2 & AT#3 (414) Tie Bay at
Raipur
Raipur -Bhadrawati # 1 Line
765KV 3x240 MVAR Chamap-1 Line
reactor at Durg Ps
01-May-15
09:00
1-May-2015 18:00
01-May-15
09:00
2-May-2015 18:00
01-May-15
01-May-15
10:00
9:00
01-May-15
01-May-15
18:00
17:00
Continuou
Installation & Commissioning of CSD Relay
s
Daily
For NTAMC work at Itarsi
Daily
For AMP of Line Equipment
01-May-15
8:00
01-May-15
20:00
Continuous AMP WORKS
WRTS-I
WRTS-I-CG
C
01-May-15
9:00
01-May-15
17:00
Daily
For CSD & NTMC Work
WRTS-I
WRTS-I-CG
C
01-May-15
9:00
04-May-15
17:00
continous For Spatre reactor Aux bus Erection
WRTS-I
WRTS-I-CG
C
02-May-15
2-May-15
02-May-15
2-May-15
10:00
9:00
8:00
8:00
02-May-15
2-May-15
02-May-15
3-May-15
18:00
18:00
18:00
18:00
400kV Deepnagar-Khadka Ckt - l
400 KV S/S NAGDA- RAJGARH - I
368 400
WITH REACTOR
369 400
400 KV KATNI - BIRSINGPUR - I I
2-May-15
8:00
2-May-15
18:00
For repacement of trip & Close coils by M/s
Daily
ALSTOM
FOR STRINGING OF 765KV DC AngulDaily
Jharsuguda (new line)
shutdown required forTower erection and
Continous
stringing
Continuou
General Maintenenace
s
Daily
For NTAMC work at Itarsi
Daily
AMP work at Wardha
Daily
PMM work
Replacement of faulty insulator strings
Daily
Relay testing, CB Timing, CRM
Measurement & routine bay Maintenance.
Daily
8:00
9:30
2/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
2/May/15
2/May/15
17:30
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
370 400
400 KV SATNA-III MAIN BAY at Bina
02-May-15
09:00
02-May-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
371
372
373
374
Khandwa-Nepanagar
Bus Reactor#1 at Itarsi
Indore -Bina line with line reactor
AT#3 (415) Main Bay at Raipur
02-May-15
02-May-15
02-May-15
02-May-15
10:00
10:00
8:00
8:00
02-May-15
02-May-15
02-May-15
02-May-15
18:00
18:00
18:00
20:00
MPPTCL
PGCIL
PGCIL
WRTS-I
WR-II
WR-II
WR-II
WRTS-I-CG
C
C
C
C
02-May-15
9:00
02-May-15
17:00
Daily
For NTAMC work at Khandwa
Daily
For NTAMC work at Itarsi
To integrate Spare reactor unit at Indore
Daily
Continuous AMP WORKS
CSD Work
Daily
WRTS-I
WRTS-I-CG
C
02-May-15
10:00
02-May-15
12:00
Daily
WRTS-I
WRTS-I-CG
R
359
360
361
362
363
364
365
366
765
703 ICT-I Main Bay at Bina
1-May-15
18:00
Rourkela - Raigarh - 1
01-May-15
8:00
02-May-15
17:00
400
KSK - RKMPL Ckt # 3
01-May-15
9:00
16-May-15
19:00
1-May-15
8:00
3-May-15
18:00
400
400 Kv KW-Khedamara Ckt-II Bay 11
@ KWB
400
Itarsi-Indore#1
400
Tie Bay (420) ICT #1 at Wardha
220
Kawas - Ichhapore - 1
400kV Babheleshwar-Padgha-l
220
400
765
400
375 400
376 765
Raipur- Korba # 4 Main Bay at Raipur
765 kV Tie Bay of Durg Ckt # 2 (714)
377
705 Satna-II & ICT-II Tie Bay at Bina
379
09:00
400
367
378
01-May-15
765
400
400
380 400
381 400
382 765
383 220
384 400
385 765
400
386
Rourkela - Raigarh - 2
MOUDA-IEPL-WARDHA-1
400KV Choraniya-Vadavi line
50 MVAr A'bad 2 LR at Akola
765KV/400KV ICT # 2 (Main & Tie
Bay) at Jabalpur Pooling Station
Khandwa-Omkareshwer
Bus Reactor#2 at Itarsi
765 kV Tie Bay of Durg Ckt # 1 (719)
400 KV Bus 2, CGPL Mundra Jetpur 1
& unit 40
2/May/15
02-May-15
02-May-15
3-May-15
09:00
9:00
9:00
2-May-15
02-May-15
4-May-15
18:00
18:00
18:00
Daily
Daily
Conti.
03-May-15
10:00
03-May-15
18:00
Daily
03-May-15
10:00
03-May-15
12:00
Daily
03-May-15
09:00
4-May-2015 18:00
03-May-15
03-May-15
03-May-15
10:00
10:00
10:00
03-May-15
03-May-15
03-May-15
18:00
18:00
12:00
4-May-15
8AM
4-May-15
6PM
Continuou
s
Daily
Daily
Daily
Daily
Tan Delta Monitoring of CT
For repacement of trip & Close coils by M/s
ALSTOM
AMP Work
PGCIL
WRTS-II
POWERG
RID
Inter Regional
KSK
KMPCL
CSPGCL
CSPGCL
PGCIL
WRTS-I
PGCIL
MSETCL
WR-II
WRTS-I
GETCO
MSETCL
C
C
R
MSETCL MSETCL
PGCIL
WRTS-II
POWERG
RID
Inter Regional
WRTS-I
IEPL
C
Delilo of IEPL plant, charging of line as MoudaWardha # 1
For bay AMP work at Choraniya and vadavi
end SS
Bushing Oil DGA for Y ph. 400 kV Alstom
bushing, line in service without reactor.
Reliance WR-II
R
WRTS-I
WRTS-I
R
Installation & Commissioning of CSD Relay
PGCIL
WR-II
C
For NTAMC work at Khandwa
For NTAMC work at Itarsi
Tan Delta Monitoring of CT
Porcelain Tension insulator replacement with
polymer insulator(3 Nos) Bus-2 Gantry to Tie
gantry
MPPTCL WR-II
PGCIL
WR-II
WRTS-I WRTS-I-CG
CGPL
PGCIL
C
C
C
R
SN
KV
Line
388 400
400KV Aurangabad(PG)Aurangabad(MSETCL) # 1
Main Bay Parli # 2(409) at Wardha
389 400
400 KV Wardha- Raipur # 2
387 400
390 400
391 400
400
392
400
From
Date
Time
To
Date
Time
Basis
4-May-15
9:00
5-May-15
18:00
Conti.
4-May-15
9:00
7-May-15
18:00
Conti.
4-May-15
9:00
4-May-15
18:00
Daily
Reason
System
Replacement of CTs, IPS tubes, connectors
WRTS-I
and jumpers at Waluj end.
Pull rod replacement work at Wardha
WRTS-I
stringing work of broken earth wire at
location 549, 550.
Agency
type
WRTS-I
R
WRTS-I
R
R
Main Bay Wardha # 1 at MSETCL
Akola
Solapur-Kolhapur # 2
CGPL Bus 2 and Unit 10
4-May-15
9:00
4-May-15
18:00
Daily
AMP work at Akola (MSETCL)
WRTS-I
WRTS-I
R
4-May-15
04-May-15
9:00
8AM
5-May-15
04-May-15
18:00
6PM
Daily
Daily
WRTS-I
CGPL
C
Kasor - SSP
04-May-15
8:00
04-May-15
18:00
Daily
CSD commissioning work at Solapur
WRTML
Porcelain Tension insulator replacement with PGCIL
polymer insulator(3 Nos) Bus -2 Gantry to tie
Gantry with Bus -2 outage
PMM work
GETCO
GETCO
Split bus
arrangement will
be tried by
WRLDC, SLDC
Gujarat & SSP
Kawas - Ichhapore - 2
04-May-15
8:00
04-May-15
18:00
Daily
4-May-15
8:00
4-May-15
18:00
4-May-15
8:00
9-May-15
4-May-15
8:00
9-May-15
18:00
18:00
393
394 220
395 400kV New Koyna -Stage lV ckt-ll
396 400kV Akola-Bhusawal
397 400KV Jhanor 400KV ICT -2
PMM work
PGCIL
Bay Maint. Work & dignostic Testing of
reactor, CB, CT & relay
Daily
MSETCL
PID testing of insulator strings. A/R shall be
kept In non auto mode
Daily
MSETCL
220KV CT Erection ,Commitioning &Testing
Continous
NTPC
398 765
765KV Bay No.: 814 Tie Bay of Bina #
1 at Jabalpur Pooling Station
399 765
Satna - Bina # 1
04-May-15
9:00
06-May-15
18:00
400 220
401 220
402 400
Bus Coupler at Navsari
Khandwa-Chhegaon-2
Bus Reactor#3 at Itarsi
Bay 410 at Boisar ( Main Bay of 400 kV
Tarapur Line 2 )
Raipur -Bhadrawati # 2 Line
EMCO -BHADRAWATI LINE 1
717 BAY(SATNA 2 TIE) at Gwalior
Wardha -1 Reactor at
Aurangabad(PG)
04-May-15
04-May-15
04-May-15
15:00
10:00
10:00
04-May-15
04-May-15
04-May-15
19:00
18:00
18:00
Erection of 765kV Circuit Breakers for
Daily
Commissioning of 765KV Dharmjaygarh # 3
Bays
Continuou For crossing of 800kV HVDC Champa s
Kurukshetra TL.
Daily
For NTAMC work at Navsari
Daily
For NTAMC work at Khandwa
Daily
For NTAMC work at Itarsi
04-May-15
9:00
04-May-15
17:00
Daily
04-May-15
04-May-15
04-May-15
9:00
9:00
10:00
04-May-15 17:00
07-May-15
18:00
5-May-15
18:00
Daily
Daily
Daily
403 400
404 400
405
400
406
765
407 400
4-May-2015 09:00
4-May-15
8:00
6-May-2015 18:00
4-May-15
17:00
400
GETCO
MSETCL
MSETCL
NTPC
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
MPPTCL WR-II
PGCIL
WR-II
C
C
C
Bay AMP work.
PGCIL
WR-II
R
For CSD & NTMC Work
Line maintenance
alstom CB problem
WRTS-I
EMCO
PGCIL
WRTS-I-CG
EMCO
WRTS-II
C
Daily
AMP works at Aurangabad(PG)
WRTS-I
WRTS-I
R
Daily
Porcelain Tension insulator replacement with
polymer insulator(3 Nos) Bus-2 Gantry to Tie PGCIL
gantry
AMP works at Parli(PG) s/s
WRTS-I
Spare reactor shall taken in service
WRTS-I
C
CGPL
409 400
410 765
400 KV Bus 2, CGPL Mundra Jetpur 1
& unit 40
Pune-1 Main Bay (403) at parli
240MVAr Bus reactor at Seoni
5-May-15
5-May-15
5-May-15
8AM
8:00
8:00
5-May-15
5-May-15
8-May-15
6PM
18:00
18:00
Daily
Conti.
411 220
Main bay Chhindwara- I(208) at Seoni
5-May-15
8:00
6-May-15
18:00
Conti.
5-May-15
9:00
5-May-15
18:00
Daily
05-May-15
9:00
05-May-15
13:00
Daily
9:00
8AM
6-May-15
05-May-15
18:00
6PM
cont
Daily
Bushing Oil DGA for all 400 kV Alstom
WRTS-I WRTS-I
bushings
for LILO with Koradi-Warda line
MSETCL IEPL+MSETCL
Porcelain Tension insulator replacement with PGCIL
CGPL
polymer insulator(3 Nos) Bus -2 Gantry to tie
Gantry with Bus -2 outage
5/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
6/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
408
412 400
413 400
414 400
400
415
Subject to ATC Restric
Main Bay Wardha # 2 at MSETCL
Akola
125 MVAr Bus Reactor at Aurangabad
Wardha-Warora-I
CGPL Bus 2 and Unit 10
5-May-15
05-May-15
416 400
400 KV S/S NAGDA- RAJGARH -I I
WITH REACTOR
5/May/15
417 220
220 KV MALANPUR - AURAIYA CKT
5/May/15
8:00
9:00
WRTS-I
WRTS-I
R
R
AMP works (DCRM & Timing test of CB)
WRTS-I
{Line will be in service through Transfer bay}
WRTS-I
R
AMP work at Akola (MSETCL)
WRTS-I
R
418 400
Korba- Balco line
5-May-15
08:30 hrs 6-May-15
400KV CTS replacement and normalization
17:30 Hrs. Continuous
and testing of breaker.
419 400
400 KV SATNA-III/SHUJALPUR-I TIE
BAY at Bina
05-May-15
09:00
18:00
05-May-15
Daily
Bay AMP work.
WRTS-I
NTPC
NTPC
PGCIL
WR-II
R
C
R
SUBJECTED TO MSE
SN
KV
Line
421 400
422 400
423 220
765KV ICT # 1 at Jabalpur Pooling
Station
Navsari - DGEN#1
Navsari - DGEN#2
Khandwa-Chhegaon-1
424 400
125 MVAR Bus Reactor-II at Shujalpur
420 765
425 400
426 765
427 400
428 765
Bay 411 at Boisar ( Tie Bay of 400 kV
Tarapur Line 2 and Vapi Line )
765 KV Sasan 2 LINE REACTOR at
Satna
Bay no. 413(main bay of ICT#2) at
Indore
Basis
Time
To
Date
05-May-15
09:00
5-May-2015 18:00
Daily
05-May-15
05-May-15
05-May-15
10:00
15:00
10:00
05-May-15
05-May-15
05-May-15
14:00
19:00
18:00
Daily
Daily
Daily
ICT Spare unit Commissioning with ICT # 1
for Swapping with ICT # 1 Y Phase.
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
05-May-15
10:00
05-May-15
18:00
Daily
05-May-15
9:00
05-May-15
17:00
05-May-15
9:00
05-May-15
05-May-15
8:00
05-May-15
05-May-15
C
C
C
For NTAMC work at Shujalpur
PGCIL
WR-II
C
Daily
Bay AMP work.
PGCIL
WR-II
R
18:00
Continous
For commissioning & taking spare reactor
into service
PGCIL
WR-II
C
05-May-15
18:00
Daily
AMP of bay equipments
PGCIL
WR-II
C
9:00
06-May-15
18:00
DAILY
For AMP work
WRTS-I
WRTS-I-CG
R
8:00
05-May-15
20:00
Continuous AMP WORKS
For CSD & NTMC Work
Daily
WRTS-I
WRTS-I-CG
C
WRTS-I
WRTS-I-CG
C
Raipur- Korba # 3 Main Bay at Raipur
05-May-15
9:00
05-May-15
17:00
ICT Main bay 403 at Durg PS
05-May-15
9:00
06-May-15
17:00
432
765
706 ICT-II Main Bay at Bina
05-May-15
09:00
5-May-15
18:00
433
434
220
400
Navsari GIS - Navsari (GETCO)
Bhopal-Damoh D/c
400KV Aurangabad(PG)Aurangabad(MSETCL) # 2
05-May-15
05-May-15
8:00
8:00
05-May-15
06-May-15
16:00
19:00
6-May-15
9:00
7-May-15
18:00
Tie Bay (417) Bus Reactor at Wardha
6-May-15
9:00
6-May-15
18:00
continous SCOPE CSD commssioning
WRTS-I WRTS-I-CG
For repacement of trip & Close coils by M/s
Daily
PGCIL
WRTS-II
ALSTOM
Daily
To attend hot spots idetified in thermovision scanning
PGCIL
WRTS-II
Continous
contigency charging arrangement
BDTDL
PGCIL
Replacement of CTs, IPS tubes, connectors
Conti.
WRTS-I WRTS-I
and jumpers at Waluj end.
C
Daily
WRTS-I
R
WRTS-I
C
9:00
6-May-15
18:00
Daily
06-May-15
8AM
06-May-15
6PM
Daily
Khanpur- Dehgam (PG)-1
06-May-15
8:00
06-May-15
18:00
Daily
6-May-15
8:00
6-May-15
18:00
Daily
Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL
6-May-15
8:00
6-May-15
18:00
Daily
Faulty disc replacement ,Fixing of spacers
,damper .and other line maintence work
6-May-15
8:00
6-May-15
18:00
Daily
6/May/15
9:00
6/May/15
16:00
daily
06-May-15
09:00
06-May-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
06-May-15
06-May-15
06-May-15
06-May-15
10:00
15:00
10:00
10:00
06-May-15
06-May-15
06-May-15
06-May-15
14:00
19:00
18:00
18:00
Daily
Daily
Daily
Daily
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
PGCIL
PGCIL
PGCIL
PGCIL
WR-II
WR-II
WR-II
WR-II
C
C
C
C
06-May-15
9:00
06-May-15
17:00
Daily
Bay AMP work.
PGCIL
WR-II
R
06-May-15
06-May-15
06-May-15
8:00
9:00
9:00
06-May-15
06-May-15
07-May-15
18:00
17:00
18:00
Daily
AMP of bay equipments
Daily
For NTMC Work
Continuous Erection of auxiliary Bus for spare Reactor
For repacement of trip & Close coils by M/s
Daily
ALSTOM
PGCIL
WRTS-I
WRTS-I
WR-II
WRTS-I-CG
WRTS-I-CG
C
C
C
Tie Bay of Akola - Yelwan – I
442 400kV
Bay No. 415) at Akola
400 KV INDORE - NAGDA Ckt
450 400
451 400
452 765
453
711 BR & Gwalior-I Tie Bay at Bina
400
400
400
400
449 400
765
765 KV JAIPUR -2 REACTOR at
Gwalior
Wardha -2 Reactor at
455 400
Aurangabad(PG)
456 400/220 315MVA ICT -1 at Aurangabad(PG)
315 MVA ICT- bank-II AT
457 400
KHEDAMARA
454
765
Subject to ATC Restric
CGPL
GETCO
MSETCL MSETCL
(
400 KV SHUJALPUR-I MAIN BAY at
Bina
315MVA ICT#1 at Navsari
315MVA ICT#2 at Navsari
Khandwa-Dhule-1
63 MVAR Bus Reactor-I at Shujalpur
Bay 412 at Boisar ( Main Bay of 400 kV
Vapi Line )
Bay 414(Tie bayof ICT#2) at Indore
ICT # 2 at Raipur SS
Ranchi-Korba Ckt-II
445
446
447
448
R
6-May-15
441 400kV Akola-Bhusawal
444 400
WRTS-I
R
CSD commissioning work at Solapur, line in
WRTML
service w/o reactor
Porcelain Tension insulator replacement with PGCIL
polymer insulator(3 Nos) Bus -1 Gantry to
Tie gantry With Bus -1 outage
PMM work
GETCO
440 400kV Padgha-Nagothane-l
443 400
AMP work at Wardha
C
Karad Switchable line Reactor at
Solapur
CGPL Bus -1 and Unit 10
438
439 220
PGCIL
C
431 400
400
type
WR-II
430 400
437 400
Agency
PGCIL
WR-II
PGCIL
WR-II
MPPTCL WR-II
Seoni#1 Main Bay(704) at Bilaspur s/s
Jindal # 1 (416) Main Bay at Raipur
436 400
System
Time
429 400
435 400
Reason
From
Date
06-May-15
09:00
6-May-15
18:00
06-May-15
10:00
7-May-15
18:00
6-May-15
8:00
6-May-15
6-May-15
9:00
8:00
6-May-15
18:00
6-May-15
7-May-15
18:00
17:00
Daily
Routine testing and maintenance work
MSETCL MSETCL
MAINTENANCE WORK &RELAY TESTING
MPPTCL MPPTCL
WORK
A/R TESTING
Continuou
AMP works at Aurangabad(PG)
s
Daily
AMP works at Aurangabad(PG)
Daily
GEN. MAINTENANCE
R
PGCIL
WRTS-II
C
PGCIL
WRTS-II
C
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
R
CSPTCL CSPTCL
SN
KV
Line
From
Date
458 400
Aurangabad-Pune # 2
400
459
460 765
BHADRAWATI-RAMAGUNDAM # 2
Seoni#1 Tie Bay(705) at Bilaspur s/s
7-May-15
07-May-15
9:00
9:00
461 400
Nagda - Dehgam Ckt. 1
07-May-15
462 220
Main bay Chhindwara-2(209) at Seoni
463 400
Main Bay of Lonikand Line (413)
Raichur-2 Switchable line Reactor at
Solapur
Main Bay of Kalwa(416) at Pune
CGPL Bus -1 and Unit 10
Khanpur- Dehgam (PG)-2
464 765
465 400
400
466
467 220
468 400kV Chakan-Talegaon PG
7-May-15
Time
9:00
To
Date
7-May-15
Basis
Reason
System
Agency
type
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
WRTS-I
WRTS-I-CG
R
PGCIL
WR-II
C
WRTS-I
R
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
C
WRTS-I
PGCIL
WRTS-I
CGPL
R
GETCO
GETCO
Time
Attending problem of TBC isolator at
MSETCL Waluj S/S.
Line AMP works
For AMP work
Replacing of porcelain dis isulators with
polymer insulators in all polluted sections of
line
18:00
Daily
7-May-15
08-May-15
18:00
18:00
Daily
DAILY
8:00
08-May-15
18:00
Daily
7-May-15
8:00
8-May-15
18:00
Conti.
7-May-15
9:00
7-May-15
13:00
Daily
7-May-15
9:00
7-May-15
18:00
Daily
7-May-15
07-May-15
13:00
8AM
7-May-15
07-May-15
17:00
6PM
Daily
Daily
07-May-15
8:00
07-May-15
18:00
Daily
AMP works at Pune-Talegoan (PG)
CSD commissioning work at Solapur, line in
service w/o reactor
AMP works at Pune-Talegoan (PG)
Porcelain Tension insulator replacement with
polymer insulator(3 Nos) Bus -1 Gantry to
Tie gantry With Bus -1 outage
PMM work
7-May-15
8:00
7-May-15
18:00
Daily
Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL
7/May/15
9:00
7/May/15
18:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
R
AMP works (DCRM & Timing test of CB)
WRTS-I
{Line will be in service through Transfer bay}
R
7/May/15
9:00
7/May/15
18:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
471 765
220 KV SEONI( PG )- CHHINDWARA
CKT- II
220 KV DAMOH PG - TIKAMGARH
CKT
765/400KV ICT-1 At Sasan
7-May-15
9:00
8-May-15
18:00
Daily
For LA Replacement
SASAN
RELIANCE
472 400
400 KV SATNA-IV MAIN BAY at Bina
07-May-15
09:00
07-May-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
PGCIL
WR-II
C
PGCIL
PGCIL
PGCIL
MPPTCL
MPPTCL
WR-II
WR-II
WR-II
WR-II
WR-II
C
C
C
C
C
469 220
470 220
7-May-15
09:00
9-May-2015 18:00
Daily
500MVA ICT#3 at Navsari
Bus Reactor at Navsari
Khandwa-Dhule-2
Shujalpur-Rajgarh Ckt-II
Shujalpur-Rajgarh Ckt-I
Bay 204 at Boisar ( 220 kV Bus
Coupler Bay )
07-May-15
07-May-15
07-May-15
07-May-15
07-May-15
10:00
15:00
10:00
10:00
15:00
07-May-15
07-May-15
07-May-15
07-May-15
07-May-15
14:00
19:00
18:00
14:00
19:00
Daily
Daily
Daily
Daily
Daily
Erection of 765kV Circuit Breakers for
Commissioning of 765KV Dharmjaygarh # 4
Bays
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
For NTAMC work at Shujalpur
07-May-15
9:00
07-May-15
17:00
Daily
Bay AMP work.
PGCIL
WR-II
R
480 400
Bay 419 (Main bay of ICT#1) at Indore
07-May-15
8:00
07-May-15
18:00
Daily
AMP of bay equipments
PGCIL
WR-II
C
481 400
Jindal # 4 (407) Main Bay
765 kV Main Bay of Autotransformer #
1 (Bay No 723)
07-May-15
8:00
07-May-15
20:00
Continuous AMP WORKS
WRTS-I
WRTS-I-CG
C
07-May-15
8:00
08-May-15
16:00
Daily
WRTS-I
WRTS-I-CG
R
473 765
474
475
476
477
478
400
400
400
220
220
479 220
482 765
765KV Bay No.: 817 Tie Bay of Bina #
2 at Jabalpur Pooling Station
483
400
Parli -1 LR at Shikrapur(Pune GIS)
7-May-15
10:00
7-May-15
14:00
Daily
484
765
714 Gwalior-II Tie Bay at Bina
07-May-15
09:00
7-May-15
18:00
Daily
485
400
Itarsi - Indore Ckt.2
07-May-15
8:00
12-May-15
18:00
Cont.
486
765
Sasa - Satan Ckt. 1
07-May-15
8:00
07-May-15
16:00
Daily
487
400
Ramagundam - Chandrapur - 2
07-May-15
7:00
08-May-15
19:00
Daily
Main Bay of Aurangabad Line # 1(409)
8-May-15
9:00
8-May-15
8:00
8-May-15
8-May-15
8-May-15
488 400
489 400
490 400
491 765
492 400
Aurangabad(Waluj)-1 Main Bay at
Aurangabad(PG)
Tie Bay of Lonikand Line & Bus
Reactor (414) at Pune
Main Bay (713) Raichur-2 at Solapur
Tie Bay of Kalwa & ICT # 3 (417) at
Pune
8-May-15
AMP : 2015 - 16
Recator shall be taken out and line will be taken
WRTS-I
in service.(Non-switchable reactor) for Bushing
oil DGA for Alstom bushings
For repacement of trip & Close coils by M/s
PGCIL
ALSTOM
Dismantlign of existing deformed tower at
PGCIL
loc.no. 509, erection of new tower and
shifting the line on new tower.
To attend hot spots idetified in thermovision scanning
PGCIL
POWERG
Replacement of Insulators
RID
WRTS-I
R
WRTS-II
C
WRTS-II
C
WRTS-II
R
Inter Regional
13:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
8-May-15
18:00
Daily
AMP works at Aurangabad(PG)
WRTS-I
WRTS-I
R
9:00
8-May-15
13:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
9:00
8-May-15
18:00
Daily
Replacement of CB latch.
WRTS-I
WRTS-I
C
13:00
8-May-15
17:00
Daily
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
Subject to ATC Restric
WR-SR ATC RESTRIC
SN
KV
493 400
Line
400 KV D/C Korba-Khedamara
Akola - Aurangabad-I Line ( Bay No.
494 400kV
404 & 403) at Akola
400 KV SATNA-IV/SHUJALPUR-II TIE
495 400
BAY at Bina
765KV Bus Reactor # 2 (Main & Tie
496 765
Bay) at Jabalpur Pooling Station
From
Date
Basis
8-May-15
8:00
9-May-15
18:00
Continuou Crossing of 765 KV D/C Dharamjaygarhs
Jabalpur Line(AP65/1-AP65/2)
8-May-15
8:00
8-May-15
18:00
Daily
Replacement of faulty insulator strings
MSETCL MSETCL
08-May-15
09:00
08-May-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
Installation & Commissioning of CSD Relay
PGCIL
WR-II
C
PGCIL
WR-II
R
PGCIL
PGCIL
PGCIL
MPPTCL
MPPTCL
WR-II
WR-II
WR-II
WR-II
WR-II
C
C
C
C
C
PGCIL
WR-II
R
WR-II
C
WR-II
WRTS-I-CG
C
C
WRTS-I-CG
C
WRTS-I-CG
C
V'chal - Jabalpur # 3&4
08-May-15
9:00
09-May-15
18:00
498
499
500
501
502
Kawas Navsari#1
Kawas Navsari#2
Khandwa-Itarsi-1
Shujalpur-Shujalpur Ckt-I
Shujalpur-Shujalpur Ckt-II
08-May-15
08-May-15
08-May-15
08-May-15
08-May-15
10:00
15:00
10:00
10:00
15:00
08-May-15
08-May-15
08-May-15
08-May-15
08-May-15
14:00
19:00
18:00
14:00
19:00
Bay 205 at Boisar ( Transfer Bus Bay )
08-May-15
9:00
08-May-15
17:00
Daily
8-May-2015 09:00
9-May-2015 18:00
For crossing of 800kV HVDC Champa Kurukshetra TL.
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
For NTAMC work at Shujalpur
Bay AMP work.
8-May-15
10:00
8-May-15
14:00
08-May-15
09:00
8-May-15
18:00
511
765
512 765
08-May-15
9-May-15
8:00
8:00
08-May-15
16:00
9-May-15
18:00
513
9-May-15
9:00
9-May-15
18:00
Daily
AMP works at Aurangabad(PG)
9-May-15
9:00
9-May-15
13:00
Daily
9-May-15
9-May-15
9-May-15
9:00
13:00
8:00
9-May-15
9-May-15
10-May-15
18:00
17:00
18:00
Daily
Daily
Daily
9-May-15
9/May/15
9/May/15
8:00
9:00
9:00
9-May-15
9/May/15
9/May/15
18:00
18:00
18:00
09-May-15
09:00
09-May-15
18:00
504 400
Nagda - Dehgam Ckt.2
08-May-15
8:00
09-May-15
18:00
505 400
506 400
Bay 420 (Tie bay of ICT#1) at Boisar
Jindal # 3 (410) Main Bay at Raipur
08-May-15
08-May-15
8:00
8:00
08-May-15
08-May-15
18:00
20:00
507 220
Korba-Mobka D/C
08-May-15
8:00
09-May-15
18:00
508 400
ICT # 3 at Raipur SS
08-May-15
9:00
08-May-15
17:00
400
Parli -2 LR at Shikrapur(Pune GIS)
510
765
718 Gwalior-III Main Bay at Bina
514
515
516
517
Sasan - Satan Ckt.2
Tie bay Bus reactor (714) at Seoni
Aurangabad(Waluj)-1 Tie Bay at
400
Aurangabad(PG)
Main Bay of Bus Reactor (415) at
400
Raipur
765
Main Bay (716) Raichur-1 at Solapur
400
Main Bay of ICT # 3 (418) at Pune
400kV Babheleshwar-Padgha-ll
518
400kV
519 220
520 220
400
521
522 765
523 220
524 220
525 400
526 220
527 765
528 400
529 765
Deepnagar-Khadka Ckt - ll
220 KV DAMOH PGCIL I/C - I I
220 KV DAMOH PG - SAGAR CKT
400 KV SHUJALPUR-II MAIN BAY at
Bina
765KV ICT # 1 at Jabalpur Pooling
Station
Navsari Navsari#1
Navsari Navsari#2
Khandwa-Itarsi-2
Bay 206 at Boisar ( Main Bay of 220
kV Boisar( MSETCL ) Line 1
Indore -Bhopal Line with reactor at
Indore
400 KV BUS-I at Raipur
ICT TIE bay at Durg PS
type
CSPTCL JTCL
Replacing of porcelain dis isulators with
Daily
polymer insulators in all polluted sections of PGCIL
line
PGCIL
Daily
AMP of bay equipments
Continuous AMP WORKS
WRTS-I
For construction of 765KV D/C
Continuou
CSPTCL
Dharamjaygarh (Korba)-Jabalpur
s
Transmission Line (Part-I)
Daily
WRTS-I
For NTMC Work
Recator shall be taken out and line will be taken
Daily
WRTS-I
in service.(Non-switchable reactor) for Bushing
oil DGA for Alstom bushings
For repacement of trip & Close coils by M/s
Daily
PGCIL
ALSTOM
Daily
To attend hot spots idetified in thermovision scanning
PGCIL
Daily
AMP works (Timing test of CB)
WRTS-I
509
Agency
Time
497 400
503 220
System
To
Date
Continuou
s
Continuou
s
Daily
Daily
Daily
Daily
Daily
220
220
400
220
220
Reason
Time
WRTS-I
R
WRTS-II
C
WRTS-II
WRTS-I
R
WRTS-I
WRTS-I
R
AMP works at Pune-Talegoan (PG)
WRTS-I
WRTS-I
R
WRTS-I WRTS-I
WRTS-I WRTS-I
MSETCL MSETCL
Daily
daily
daily
Replacement of CB latch.
AMP works at Pune-Talegoan (PG)
Replacement of faulty insulator strings
Relay testing, CB Timing, CRM
Measurement & routine bay Maintenance.
MAINTENANCE WORK
MAINTENANCE WORK
MSETCL MSETCL
MPPTCL MPPTCL
MPPTCL MPPTCL
R
R
Daily
Bay AMP work.
PGCIL
WR-II
R
PGCIL
WR-II
C
PGCIL
PGCIL
PGCIL
WR-II
WR-II
WR-II
C
C
C
PGCIL
WR-II
R
PGCIL
WR-II
C
WRTS-I
WRTS-I
WRTS-I-CG
WRTS-I-CG
C
C
09-May-15
09:00
9-May-2015 18:00
Daily
09-May-15
09-May-15
09-May-15
10:00
15:00
10:00
09-May-15
09-May-15
09-May-15
14:00
19:00
18:00
Daily
Daily
Daily
ICT Spare unit Commissioning with ICT # 1
for Swapping with ICT # 1 B Phase.
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
09-May-15
9:00
09-May-15
17:00
Daily
Bay AMP work.
09-May-15
8:00
09-May-15
18:00
Daily
09-May-15
09-May-15
6:00
9:00
09-May-15
10-May-15
22:00
17:00
To make spare unit free at Indore
Continuous AMP WORKS
continous CSD commssioning
R
C
R
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
Time
For repacement of trip & Close coils by M/s
ALSTOM
530
765
718R Gwalior-III Reactor CB (Single
phase) at Bina
09-May-15
09:00
9-May-15
18:00
Daily
531
400
Ramagundam - Chandrapur - 1
09-May-15
7:00
09-May-15
19:00
Daily
PGCIL
WRTS-II
Replacement of Insulators
POWERG
RID
Inter Regional
KMPCL
KMPCL
MSETCL
POWERGRID
CB along with switchable Line Reactor to be
taken out of service. Gwalior-Bina#III Line
will be remain in service
532
400
KSK - RKMPL Ckt # 4
09-May-15
9:00
11-May-15
19:00
Continous
shutdown required forTower erection and
stringing
533
220
Jalna-Wakuj
09-May-15
8:00
10-May-15
8:00
Continous
Commissioning of 765kV Aurangabad-Solapur
534 400kV Padgha-Kalwa-ll
535 765
536 400
765KV JBP - Dharmjaygarh Reactor
Line # 1 Reactor at Jabalpur Pooling
Station
Khandwa-Seoni-1
10-May-15
8:00
10-May-15
10-May-15
09:00
10-May-15
10:00
10-May-15
18:00
11-May-15 18:00
c
Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL
Continuou
Installation & Commissioning of CSD Relay
s
PGCIL
WR-II
C
WR-II
C
WR-II
C
WRTS-II
MPPTCL
WRTS-I
WRTS-I
WRTS-I
R
R
R
C
537 765
Bus-I at Indore PG
10-May-15
8:00
10-May-15
538
539
540
541
542
Vindhyachhal (Poolig) - Satna Ckt.1
220 KV MEHGAON - AURAIYA CKT
Seoni - Bina line
Wardha-Aurangbad # 1 line
Tie Bay (705) ICT-2 at Solapur
10-May-15
11/May/15
11-May-15
11-May-15
11-May-15
8:00
9:00
8:00
9:00
9:00
10-May-15
12/May/15
11-May-15
12-May-15
11-May-15
16:00
17:00
18:00
18:00
18:00
Daily
daily
Daily
Daily
Daily
11-May-15
8:00
20-May-15
18:00
Daily
PGCIL
For NTAMC work at Khandwa
Busbar Integration for 714bay(Tie bay for
PGCIL
765kV Indore vadodara line)
To attend hot spots idetified in thermovision scanning
PGCIL
MAINTENANCE WORK
MPPTCL
Line AMP works
WRTS-I
NGR replacement work at Wardha
WRTS-I
Replacement of CB latch.
WRTS-I
PID testing of insulator strings. A/R shall be
kept In non auto mode
MSETCL
11/May/15
9:00
11/May/15
16:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
17:00
18:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
220KV CT Erection ,Commitioning &Testing
NTPC
NTPC
R
Continous
18:00
14:00
19:00
18:00
14:00
19:00
18:00
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Bay AMP work.
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
For NTAMC work at Shujalpur
For annual maintenace work
PGCIL
PGCIL
PGCIL
PGCIL
PGCIL
PGCIL
PGCIL
WR-II
WR-II
WR-II
WR-II
WR-II
WR-II
WR-II
R
C
C
C
C
C
R
WR-II
C
765
220
765
765
765
543 400kV Koradi -Bhusawal
544 220
545 220
220 KV PITHAMPUR - RAJGARH PG
CKT - I
220 KV ITARSI ( PG ) - ITARSI CKT
11/May/15
9:00
11/May/15
546 220KV Jhanor-Haldharwa 1
11-May-15
8:00
15-May-15
547
548
549
550
551
552
553
11-May-15
11-May-15
11-May-15
11-May-15
11-May-15
11-May-15
11-May-15
09:00
10:00
15:00
10:00
10:00
15:00
9:00
11-May-15
11-May-15
11-May-15
11-May-15
11-May-15
11-May-15
11-May-15
400
400
400
400
400
400
765
554 400
555 765
556 400
557 400
558
765
559
560
400 KV SATNA-I MAIN BAY at Bina
Gandhar Navsari#1
Gandhar Navsari#2
Khandwa-Seoni-2
Bina-Shujalpur Ckt-I
Bina-Shujalpur Ckt-II
1000 MVA ICT#1 at Satna
Indore (MP) - Asoj # 3
Bus Reactor Main Bay(706) at Bilaspur
S/s
80 MVAR Bus Reactor at Raipur
Line Terminal Equipment's of 400 kv
Kotra - Raigarh Ckt # 1
18:00
Daily
C
Daily
Daily
MSETCL
Gujarat Consent required
11-May-15
8:00
17-May-15
18:00
Line is presently charged under contingency
scheme . Shutdown required for removing
jumper, shifting of line to new tower and
from 400kV switchyard to 765kV yard at
Indore . Lines finally charged as per original
Continous
PGCIL
approved schemes i.e. 400kV Indore (PG) Indore (MP) Ckt.2 and 765kV Indore (PG) Vadodara (pooling) line. Also testing of all
protection and PLCC system at Indore and
Vadodara ends before commissioning.
11-May-15
9:00
12-May-15
18:00
DAILY
For AMP work
WRTS-I
WRTS-I-CG
R
11-May-15
9:00
11-May-15
17:00
Daily
For NTMC Work
WRTS-I
WRTS-I-CG
C
11-May-15
8:00
11-May-15
12:00
Daily
AMP : 2015 - 16
WRTS-I
WRTS-I-CG
R
719 Jabalpur-I Main Bay at Bina
11-May-15
09:00
11-May-15
18:00
Daily
765
765/400 KV ICT -1 at Gwalior
11-May-15
10:00
11-May-15
18:00
Daily
400
Taptitanda-Bableswar
11-May-15
8:00
11-May-15
8:00
daily
Seoni - Wardha II & Seoni-Bina Line
12-May-15
561 765
R
8:00
12-May-15
18:00
Conti.
For repacement of trip & Close coils by M/s
ALSTOM
CSD IN TIE CB
shutdown required forTower erection and
stringing
Shutdown required on both the lines for
stringing aux bus.
PGCIL
WRTS-II
C
PGCIL
WRTS-II
C
MSETCL
POWERGRID
WRTS-I
WRTS-I
C
SN
Line
From
Date
12-May-15
12-May-15
To
Date
12-May-15
12-May-15
Basis
Reason
System
Agency
type
Time
9:00
8:00
Time
18:00
18:00
Daily
Daily
Replacement of CB latch.
PMM work
WRTS-I
PGCIL
WRTS-I
GETCO
C
Gujarat Consent required
12-May-15
8:00
12-May-15
18:00
Daily
Routine testing and maintenance work
MSETCL MSETCL
12/May/15
9:00
12/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
12/May/15
10:00
12/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
12/May/15
9:00
12/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
12-May-15
12-May-15
08:30 hrs 13-May-15
9:00
12-May-15
17:30 Hrs. Continuous for Breaker and CT replacement.
Daily
18:00
For LA Replacement
NTPC
SASAN
NTPC
RELIANCE
12-May-15
09:00
18:00
PGCIL
WR-II
R
12-May-15
09:00
PGCIL
WR-II
C
12-May-15
9:00
14-May-15
18:00
PGCIL
WR-II
C
Navsari-Magarwada#1
Navsari-Magarwada#2
Khandwa-Rajgarh -2
Nagda-Shujalpur Ckt-I
Nagda-Shujalpur Ckt-II
1000 MVA ICT#2 at Satna
Main Bay of Autotransformer # 1 (Bay
579 400/220
No 430) at Raipur
720 Jabalpur-I/Jabalpur-III Tie Bay at
580
765
Bina
12-May-15
12-May-15
12-May-15
12-May-15
12-May-15
12-May-15
10:00
15:00
10:00
10:00
15:00
9:00
12-May-15
12-May-15
12-May-15
12-May-15
12-May-15
12-May-15
PGCIL
PGCIL
PGCIL
PGCIL
PGCIL
PGCIL
WR-II
WR-II
WR-II
WR-II
WR-II
WR-II
C
C
C
C
C
R
12-May-15
8:00
12-May-15
WRTS-I
WRTS-I-CG
R
581 765
Seoni - Wardha I & II Line
13-May-15
8:00
15-May-15
18:00
Conti.
Bus Reactor at Aurangabad(PG)
Pune(GIS) Switchable line Reactor at
Solapur
765KV Bus-1 at Seoni
WTPS - Dehgam (PG)
Haldarva - Jhanor - 2 (NTPC)
13-May-15
9:00
13-May-15
18:00
Daily
13-May-15
9:00
13-May-15
18:00
Daily
13-May-15
13-May-15
13-May-15
9:00
8:00
8:00
13-May-15
14-May-15
13-May-15
18:00
18:00
18:00
Daily
Daily
Daily
13-May-15
8:00
13-May-15
18:00
Daily
For repacement of trip & Close coils by M/s
ALSTOM
Shutdown required on both the lines for
stringing aux bus.
AMP works at Aurangabad(PG)
CSD commissioning work & Replacement of
CB latch.at Solapur
AMP Work
PMM work
PMM work
Bay Maint. Work & dignostic Testing of
reactor, CB, CT & relay, Replacement of
broken spacer cum vibration damper
13/May/15
9:00
13/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
KV
562 765
563 220
Tie Bay (705) ICT-1 at Solapur
Haldarva - Jhanor-1 (NTPC)
Main Bay of Akola -Wardha-II ( Bay
564 400kV
No. 411) at Akola
220 KV ITARSI ( PG ) 565 220
HOSHANGABAD CKT
220 KV ANOOPUR - KOTMIKALA CKT
566 220
- Il
220 KV RAJGARH - SUJALPUR( PG)
567 220
CKT - I
568 400
Korba- Vandana line
569 765
765/400KV ICT-2 at Sasan
400 KV SATNA-I/BUS REACTOR TIE
570 400
BAY at Bina
765KV JBP - BINA # 3 Line Reactors
571 765
(Main & Tie Bay) at Jabalpur Pooling
Station
572 400
573
574
575
576
577
578
Satna - Bina # 3&4
400
400
400
400
400
765
582 400
583 765
584 765
585 400
586 220
12-May-15
09:00
12-May-15
13-May-15 18:00
12-May-15
Daily
Continuou
Installation & Commissioning of CSD Relay
s
14:00
19:00
18:00
14:00
19:00
18:00
Continuou
s
Daily
Daily
Daily
Daily
Daily
Daily
For crossing of 800kV HVDC Champa Kurukshetra TL.
For NTAMC work at Navsari
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
For NTAMC work at Shujalpur
For annual maintenace work
20:00
Daily
AMP : 2015 - 16
18:00
Daily
587 400kV Chandrapur ll-Chandrapur l Ckt-ll
588 220
589 220
590 400
591
592
593
594
595
400
400
400
400
765
596 765
597 400
220 KV RAJGARH - SUJALPUR( PG)
CKT - II
220 KV BADOD - KOTA CKT
400 KV BUS REACTOR MAIN BAY at
Bina
Bus#1 at Navsari
Khandwa-Rajgarh-1
315MVA ICT#1 at Shujalpur
Raipur- Sipat # 2 Line
WRTS-II
C
WRTS-I
WRTS-I
C
WRTS-I
WRTS-I
R
WRTS-I
WRTS-I
C
WRTS-I
GETCO
PGCIL
WRTS-I
GETCO
GETCO
R
Gujarat Consent required
MSETCL MSETCL
13/May/15
6:00
13/May/15
18:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
09:00
13-May-15
18:00
Daily
Bay AMP work.
PGCIL
WR-II
R
13-May-15
13-May-15
13-May-15
13-May-15
10:00
10:00
10:00
9:00
13-May-15
13-May-15
13-May-15
13-May-15
18:00
18:00
14:00
17:00
Daily
Daily
Daily
Daily
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
For NTMC Work
For repacement of trip & Close coils by M/s
ALSTOM
CB along with Bus Reactor-II to be taken
out of service
CSD commissioning work at Solapur
PMM work
Bay Maint. Work & dignostic Testing of
reactor, CB, CT & relay, Replacement of
broken spacer cum vibration damper
Bay Maint. Work & dignostic Testing of
reactor, CB, CT & relay, Replacement of
broken spacer cum vibration damper
MAINTENANCE WORK
PGCIL
PGCIL
PGCIL
WRTS-I
WR-II
WR-II
WR-II
WRTS-I-CG
C
C
C
C
710 Bus Reactor-II CB at Bina
13-May-15
Bus Reactor at Solapur
SSP - Rajgarh - 1
14-May-15
14-May-15
9:00
8:00
14-May-15
14-May-15
18:00
18:00
Daily
Daily
14-May-15
8:00
14-May-15
18:00
Daily
09:00
13-May-15
18:00
Daily
14-May-15
14/May/15
8:00
9:00
14-May-15
14/May/15
18:00
18:00
Daily
daily
599 400kV
Lonikand-Lonikand II ckt ll
400 kv SEONI - SARNI - CKT
PGCIL
13-May-15
598 400kV Parli-Lonikand II ckt ll
600 400
Bay AMP work.
PGCIL
WRTS-I
GETCO
WRTS-II
WRTS-I
GETCO
C
C
MSETCL MSETCL
MSETCL MSETCL
MPPTCL MPPTCL
R
SN
KV
Line
To
Date
14/May/15
Basis
Reason
System
Time
6:00
Time
18:00
Agency
601 220
220 KV BADOD - MODAK CKT
From
Date
14/May/15
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
602 220
220 KV BINA( PG )- SHIVNPURI CKT
14/May/15
9:00
15/May/15
17:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
603 400
400 KV SATNA-II MAIN BAY at Bina
400KV Bus Reactor # 2 (Main & Tie
Bay) at Jabalpur Pooling Station
Bus#2 at Navsari
ICT-1 at Khandwa
315MVA ICT#2 at Shujalpur
ICT#1-50MVAR Bus Reactor Tie Bay
(408 Bay) at Satna
Main Bay of Autotransformer # 1 (Bay
No 431) at Raipur
14-May-15
09:00
14-May-15
18:00
Daily
Continuou
s
Daily
Daily
Daily
Bay AMP work.
PGCIL
WR-II
R
Installation & Commissioning of CSD Relay
PGCIL
WR-II
C
For NTAMC work at Navsari
For NTAMC work at Khandwa
For NTAMC work at Shujalpur
For Overhauling of Drive Mechanism of 408
Continous
bay CB
PGCIL
PGCIL
PGCIL
WR-II
WR-II
WR-II
C
C
C
PGCIL
WR-II
R
Daily
AMP : 2015 - 16
WRTS-I
WRTS-I-CG
R
PGCIL
WRTS-I
WRTS-I
NPCIL
WRTS-I
WRTS-I
R
R
C
WRTS-I
WRTS-I
C
604 400
605 400
606 400
607 400
608 400
609 400
610
765
716 Jabalpur-II Main Bay at Bina
TAPS-BOISAR -II
611 400
612 400/220 315MVA ICT -2 at Aurangabad(PG)
613 400
KOLHAPUR-MAPUSA I & II
Raichur-1 Switchable line Reactor at
614 765
Solapur
400
CGPL Mundra Limbdi Line -2 and Unit
10
615
14-May-15
14-May-15
14-May-15
14-May-15
09:00
18:00
10:00
10:00
15:00
15-May-15
14-May-15 18:00
14-May-15 18:00
14-May-15 19:00
14-May-15
9:00
17-May-15
18:00
14-May-15
8:00
14-May-15
20:00
9:00
9:00
9:00
15-May-15
15-May-15
20-May-15
18:00
13:00
18:00
Daily
Daily
Conti.
For repacement of trip & Close coils by M/s
ALSTOM
MAINTENANCE WORK
AMP works at Aurangabad(PG)
For LILO of line at KOLHAPUR(GIS) S/s
15-May-15
9:00
15-May-15
18:00
Daily
CSD commissioning work at Solapur
15-May-15
8AM
15-May-15
6PM
Daily
15-May-15
8:00
15-May-15
18:00
Daily
Porcelain Tension insulator replacement with PGCIL
CGPL
polymer insulator(3 Nos)Bus -2 Gantry to
line gantry of limbdi line -2 With limbdi line -2
outage
Bay Maint. Work & dignostic Testing of
reactor, CB, CT & relay, Replacement of
broken spacer cum vibration damper
MSETCL MSETCL
15-May-15
8:00
15-May-15
18:00
Daily
Faulty disc replacement ,Fixing of spacers
,damper .and other line maintence work
14-May-15
15-May-15
15-May-15
15-May-15
09:00
14-May-15
18:00
Daily
616 400kV Parli- Chandrapur ll Ckt-ll
617 400kV Akola-Nandgaonpeth
618 400kV Waluj-Tapthitanda
PGCIL
type
WRTS-II
C
MSETCL MSETCL
619 400
Korba- Bhatapara line
15-May-15
15-May-15
8:00
15-May-15
08:30 hrs 16-May-15
MSETCL
NTPC
620 765
765 KV JABALPUR-BINA#2 LINE
15-May-15
9:00
WR-II
R
621 220
622 400
Bus#1 at Navsari
ICT-2 at Khandwa
15-May-15
15-May-15
10:00
10:00
WR-II
WR-II
C
C
623 400
Pirana - Asoj D/C
15-May-15
8:00
WR-II
C
624
8:00
BUS-II at Indore
15-May-15
625 765
Bilaspur-Korba Line
15-May-15
9:00
626 400
Korba-Raipur D/C
15-May-15
8:00
627 400
Raipur- Sipat # 1 Line
15-May-15
9:00
628
Dehgam - Pirana Ckt.1
15-May-15
765
400
8:00
18:00
Dignostic Testing of reactor, CB, CT & relay MSETCL
Daily
17:30 Hrs. Continuous for Breaker and CT replacement.
NTPC
To carry out the Jumper rectorfication work
15-May-15 15:00
Daily
PGCIL
in Line at Bina end.
15-May-15 18:00
PGCIL
Daily
For NTAMC work at Navsari
15-May-15 18:00
PGCIL
Daily
For NTAMC work at Khandwa
Line is presently charged under contingency
scheme. Shutdown required for removing
jumpers, line shifting to new tower for
terminating at 765kV Vadodara GIS. Lines
19-May-15 18:00
Continous finally charged as per original approved
PGCIL
schemes i.e. 400kV D/C Vadodara (Pooling) Asoj and 400kV D/C Vadodara (Pooling) Pirana lines. Also testing of all protection
and PLCC system at Asoj, Vadodara and
Pirana ends.
DT scheme test for vadodara line with LBB
18:00
Daily
PGCIL
and BB relay
15-May-15
For installation & commiissiong of Stand15-May-15 18:00
DAILY
WRTS-I
alone DR
For construction of 765KV D/C
Continuou
16-May-15 18:00
WRTS-I
Dharamjaygarh (Korba)-Jabalpur
s
Transmission Line (Part-I)
15-May-15 17:00
Daily
WRTS-I
For NTMC Work
Replacement of defective porcelain disc
insulator strings with polymer insulators in
15-May-15
18:00
Daily
PGCIL
complete line to avoid undersirable line
tripping due to insulator flashover due to
heavy pollution
subjected to real time c
WR-II
C
WRTS-I-CG
R
WRTS-I-CG
C
WRTS-I-CG
C
WR-II
C
SN
KV
Line
From
Date
Time
To
Date
Basis
Reason
System
Agency
type
Time
To facilitate for insulator replacement of
400kV Dehgam - Pirana Ckt.1 in Multi circuit
towers.
Crossing work of 765kV DharamjaigarhContinuou
Jabalpur Line Part-II between loc 54A/6s
54A/7 and 67A/1-67B/0
For repacement of trip & Close coils by M/s
Daily
ALSTOM
Dismantlign of existing deformed tower at
Cont.
loc.no. 153, erection of new tower and
shifting the line on new tower.
629
400
Pirana - Vadodara Ckt.2
15-May-15
8:00
15-May-15
18:00
630
400
Anuppur-Jabalpur# 1&2
15-May-15
8:00
17-May-15
18:00
631
765
717 Jabalpur-II/Gwalior-III Tie Bay at
Bina
15-May-15
09:00
15-May-15
18:00
632
400
Indore - Asoj Ckt.2
15-May-15
8:00
19-May-15
18:00
633
400
Parli-Lonikand-1
15-May-15
8:00
16-May-15
19:00
Durg PS-Wardha # 1 Line
16-May-15
9:00
17-May-15
18:00
Daily
LA Connector replacement work at Wardha WRTS-I
WRTS-I
R
635 765
765KV Bus-2 at Seoni
636 400
Bus reactor (125 MVAR) at Seoni
637 765/400 1500MVA ICT-1 at Seoni
16-May-15
16-May-15
16-May-15
9:00
8:00
8:00
16-May-15 18:00
16-May-15 18:00
16-May-15 18:00
Daily
Daily
Daily
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
WRTS-I
R
R
R
638 765
WARDHA - AURANGABAD(PG) I
16-May-15
9:00
16-May-15
18:00
Conti.
WRTS-I
WRTS-I
R
CGPL Mundra Limbdi Line -2 and Unit
10
16-May-15
8AM
16-May-15
6PM
Daily
PGCIL
CGPL
640 400kV Babheleshwar-Padgha-l
641 220
220 KV DAMOH PGCIL I/C - I
16-May-15
16/May/15
8:00
9:00
17-May-15
16/May/15
Daily
daily
642 220KV Jhanor-Haldharwa 2
16-May-15
8:00
19-May-15
18:00
18:00
18:00
AMP Work
DGA sampling of bushing.
AMP works
For the commissioning of spare reactor at
Aurangabad(PG)
Porcelain Tension insulator replacement with
polymer insulator(3 Nos)Bus -2 Gantry to
line gantry of limbdi line -2 With limbdi line -2
outage
Replacement of faulty insulator strings
MAINTENANCE WORK
220KV CT Erection ,Commitioning &Testing
16-May-15
09:00
16-May-15
16-May-15
10:00
10:00
16-May-15
16-May-15
18:00
18:00
Continuou
Installation & Commissioning of CSD Relay
s
Daily
For NTAMC work at Navsari
Daily
For NTAMC work at Khandwa
16-May-15
8:00
16-May-15
20:00
Daily
634 765
400
639
643 765
644 220
645 400
646 400
765KV Bus Reactor # 1 (Main & Tie
Bay) at Jabalpur Pooling Station
Bus#2 at Navsari
Bus Reactor-1 at Khandwa
400 KV Bay No 441 (Main Bay Kotra Raigarh Ckt # 1)
16-May-15 18:00
Daily
Continous
Replacement of defective porcelain disc
insulator strings with polymer insulators in
complete line to avoid undersirable line
tripping due to insulator flashover due to
heavy pollution
Dehgam - Pirana Ckt.2
16-May-15
8:00
16-May-15
18:00
648
400
Parli-Lonikand-2
17-May-15
8:00
18-May-15
19:00
17-May-15
17-May-15
9:00
09:00
17-May-15
09:00
652 400
765KV Bus-1 at Solapur
400 KV BINA(PG)-BINA(MPPTCL)#3
400KV Bus # 2 at Jabalpur Pooling
Station
Bus Reactor-2 at Khandwa
17-May-15
10:00
653
Dehgam - Pirana Ckt.1
17-May-15
654 400
Indore - Asoj Ckt.2
18-May-15
8:00
19-May-15
18:00
Daily
655 765
656 220
Tie bay Bina (726) at Seoni
Bus Coupler bay (207) at Seoni
18-May-15
18-May-15
8:00
8:00
20-May-15
19-May-15
18:00
18:00
Daily
Daily
AMP Work
For AMP work
Testing & Commissioning of 400KV Bay No.:
413 of Jhabua Power Bays
For NTAMC work at Khandwa
Replacement of defective porcelain disc
insulator strings with polymer insulators in
complete line to avoid undersirable line
tripping due to insulator flashover due to
heavy pollution
Replacing of porcelain dis isulators with
polymer insulators in all polluted sections of
line
AMP works (DCRM & Timing test of CB)
AMP works (DCRM & Timing test of CB)
657 765
Durg PS-Wardha # 2 Line
18-May-15
9:00
19-May-15
18:00
658 765
659 765
765KV Bus-2 at Wardha
765KV Bus-2 at Solapur
18-May-15
18-May-15
9:00
9:00
19-May-15
18-May-15
18:00
18:00
651 400
400
8:00
18:00
14:00
18-May-15 18:00
17-May-15
17-May-15
18:00
18:00
Daily
AMP : 2015 - 16
400
17-May-15
17-May-15
WR-II
C
PGCIL
WR-II
C
PGCIL
WRTS-II
C
PGCIL
WRTS-II
C
Continous Crossing of 765 kV Solapur-Aurngabad new line MSETCL
647
649 765
650 400
PGCIL
MSETCL MSETCL
MPPTCL MPPTCL
R
NTPC
NTPC
Gujarat Consent required
PGCIL
WR-II
C
PGCIL
PGCIL
WR-II
WR-II
C
C
WRTS-I
WRTS-I-CG
R
PGCIL
WR-II
Continous Crossing of 765 kV Solapur-Aurngabad new line MSETCL
Daily
Daily
Continuou
s
Daily
Daily
POWERGRID
C
POWERGRID
WRTS-I
PGCIL
WRTS-I
WR-II
R
R
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
PGCIL
WR-II
C
WRTS-I
WRTS-I
WRTS-I
WRTS-I
R
R
Daily
LA Connector replacement work at Wardha WRTS-I
WRTS-I
R
Daily
Daily
Bus Extension Work for Raipur Ckt 3&4
AMP Work
WRTS-I
WRTS-I
R
R
WRTS-I
WRTS-I
SN
Line
From
Date
18-May-15
To
Date
18-May-15
Basis
Reason
Time
8AM
Time
6PM
Daily
Porcelain Tension insulator replacement with PGCIL
polymer insulator(2 Nos) Bus -2 Gantry to tie
side gantry with Bus -2 and Limbdi line -2
outage
18-May-15
8:00
18-May-15
18:00
Daily
MSETCL MSETCL
18-May-15
8:00
18-May-15
18:00
Daily
18/May/15
9:00
18/May/15
16:00
daily
MAINTENANCE WORK
MPPTCL MPPTCL
R
664 400
Dhule-Bableshwar-l
220 KV PITHAMPUR - RAJGARH PG
CKT - II
400 KV BINA(PG)-BINA(MPPTCL)#4
Replacement of faulty insulator strings
Relay testing, CB Timing, CRM
Measurement & routine bay Maintenance.
18-May-15
09:00
18-May-15
14:00
Daily
WR-II
R
ICT#1 Main Bay (409 Bay) at Satna
18-May-15
9:00
21-May-15
18:00
Continous
PGCIL
WR-II
R
666
Indore (PG) -Indore (MP) -2
18:00
Daily
PGCIL
WR-II
C
17:00
Daily
For AMP work
For Overhauling of Drive Mechanism of 409
bay CB
protection transfer scheme test at 400kV
MPPTCL SS
For NTMC Work
PGCIL
665 400
WRTS-I
WRTS-I-CG
C
12:00
Daily
AMP : 2015 - 16
WRTS-I
WRTS-I-CG
R
PGCIL
WR-II
C
PGCIL
WR-II
C
KV
400
660
661 400kV
662 400kV
663 220
400
667 400
668 400
CGPL Bus 2 and CGPL Mundra Limbdi
Line -2 and Unit 10
Akola - Aurangabad-II Line ( Bay No.
406 & 407 at Akola
Raipur- NSPCL # 1 Line
Line Terminal Equipment's of 400 kv
Kotra - Raigarh Ckt # 2
18-May-15
18-May-15
18-May-15
8:00
9:00
18-May-15
18-May-15
8:00
18-May-15
669
400
Dehgam - Pirana Ckt.2
18-May-15
8:00
18-May-15
18:00
Daily
670
400
Pirana - Vadodara Ckt.1
18-May-15
8:00
18-May-15
18:00
Daily
765KV Bus-1 at Aurangabad(PG)
CGPL Bus 2 and CGPL Mundra Limbdi
Line -2 and Unit 10
19-May-15
19-May-15
9:00
8AM
19-May-15
19-May-15
18:00
6PM
Daily
Daily
673 400kV Warora-Chandrapur ll Ckt-1
674 400
400 KV DAMOH - KATNI - CKT
220 KV SUJALPUR - SUJALPUR( PG)
675 220
CKT - I
220 KV SUJALPUR - SUJALPUR( PG)
676 220
CKT - II
19-May-15
19/May/15
8:00
9:00
19-May-15
19/May/15
18:00
18:00
Daily
daily
Replacement of defective porcelain disc
insulator strings with polymer insulators in
complete line to avoid undersirable line
tripping due to insulator flashover due to
heavy pollution
To facilitate for insulator replacement of
400kV Dehgam - Pirana Ckt.2 in Multi circuit
towers.
AMP Work
Porcelain Tension insulator replacement with
polymer insulator(2 Nos) Bus -2 Gantry to tie
side gantry with Bus -2 and Limbdi line -2
outage
Bay Maintenance work
MAINTENANCE WORK
19/May/15
9:00
19/May/15
17:00
daily
19/May/15
9:00
19/May/15
17:00
daily
19-May-15
09:00
19-May-15
17:00
Daily
671 765
400
672
677 765
678 500
679 765
680 400
681 400
765 KV INDORE LINE REACTOR at
Bina
HVDC Chandrapur-Padghe Bipole
765KV Bus-2 at Aurangabad(PG)
SSNL - Dhule - 1
Vadavi - Dehgam (PG) - 2
682 400kV Padgha-Nagothane-ll
683 400
Satna - Bina # 1&2
684 400
Raipur- NSPC # 2 Line
NOTE:
1
2
3
19-May-15
8:00
20-May-15
19:00
20-May-15
20-May-15
20-May-15
9:00
8:00
8:00
20-May-15
20-May-15
20-May-15
18:00
18:00
18:00
20-May-15
8:00
20-May-15
18:00
20-May-15
9:00
22-May-15
18:00
20-May-15
9:00
20-May-15
17:00
Agency
type
CGPL
MSETCL MSETCL
WRTS-I
PGCIL
WRTS-I
CGPL
R
MSETCL MSETCL
MPPTCL MPPTCL
R
MAINTENANCE WORK
MPPTCL MPPTCL
R
MAINTENANCE WORK
MPPTCL MPPTCL
R
PGCIL
R
Switcheable Reactor to be taken out of
service to carry out the AMP work. Line shall
be remain in service.
Crossing of 765 kV Solapur-Aurangabad new
Continous
line
Daily
AMP Work
Daily
PMM work
Daily
PMM work
Daily
Continuou
s
Daily
System
MSETCL
WRTS-I
GETCO
GETCO
WR-II
POWERGRID
WRTS-I
GETCO
GETCO
Dignostic Testing of reactor, CB, CT & relay MSETCL MSETCL
For crossing of 800kV HVDC Champa PGCIL
WR-II
Kurukshetra TL.
WRTS-I WRTS-I-CG
For NTMC Work
Maharashtra consent required
R
C
C
FROM SINGLE NODE EITHE LINE OUTAGE OR AUTORECLOSING FOR OPGW WILL BE ALLOW AT A TIME.
LINE WISE OPGW WORK SHALL BE INTIMATED TO WRPC/WRLDC ON D-3 BASIS OTHERWISE IT OUTAGES PROPOSAL GET AUTOMATICALLY CANCELLED.
GOOGLE SHEET SHALL BE USED FOR INTIMATION & CONFIRMATION PURPOSE IN IP ADDRESS URL:https://docs.google.com/spreadsheets/d/1M-JeQbm6Cer8dB0uHStyPcGIMs95U
s7TqqFrxq77mGY/edit#gid=863831921
Anaulagnak
Ap`Ola 2015
AaOr
ma[- 2015
maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR
APRIL 2015
maaMga
rajya
State
AND
MAY 2015
}jaa- kI AavaSyakta
DEMAND
ENERGY REQUIREMENT
maogaavaaT (MW)
Ap`Ola 2015
ma[- 2015
imailayana yauinaTsa (MUs)
Ap`Ola 2015
ma[- 2015
APRIL 2015
MAY 2015
APRIL 2015
MAY 2015
1 gaujarat
GUJARAT
saIimat
AsaIimat
RESTRICTED
13700
14200
8730
9150
UNRESTRICTED
13740
14240
8740
9160
RESTRICTED
7220
7395
4680
4960
UNRESTRICTED
7220
7395
4680
4960
RESTRICTED
3625
3522
2125
1914
UNRESTRICTED
3675
3597
2135
1926
2 maQya p`doSa
saIimat
AsaIimat
3 C<aIsagaZ,
saIimat
AsaIimat
4 maharaYT/
MADHYA PRADESH
CHHATISGARH
MAHARASHTRA
saIimat
AsaIimat
RESTRICTED
20400
20800
12500
12700
UNRESTRICTED
20450
20850
12550
12750
5 gaaovaa
GOA
RESTRICTED
405
410
290
295
UNRESTRICTED
410
415
295
295
RESTRICTED
315
315
190
190
UNRESTRICTED
320
320
195
195
RESTRICTED
635
640
455
460
UNRESTRICTED
640
645
460
465
RESTRICTED
45305
46265
28000
28500
UNRESTRICTED
44668
45637
28500
29500
saIimat
AsaIimat
6 dmana dIva
saIimat
AsaIimat
7 DI ena eca
saIimat
AsaIimat
8 piScama xao~
saIimat
AsaIimat
3.3
DD
DNH
WESTERN REGION
Anaulagnak
4.1
maah maaca- 2015 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata
ACTUAL GENERATION & AVALABILITY FOR MARCH 2015
Schedule yaaojanaa
k`maaMk
Sr.
No.
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
Actual vaastivak
carma
}jaa-
Peak
(Mw)
carma
Energy
(Gwh)
Auxillary
Consumption
Peak
(Mw)
(Gwh)
k (A) gaujarat GUJARAT
jalaIya
1.
2.
3.
4.
6.
tapIya
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
HYDRO
]k[- Ukai - 1
]k[- Ukai - 2
]k[- Ukai - 3
]k[- Ukai - 4
]k[- Ukai (Total)
]k[- ela baI saI eca Ukai LBCH - 1
]k[- ela baI saI eca Ukai LBCH - 2
]k[- ela baI saI eca Ukai LBCH (Total)
kDanaa Kadana - 1
kDanaa Kadana - 2
kDanaa Kadana - 3
kDanaa Kadana - 4
kDanaa Kadana (Total)
pnama PANAM & Madhuban Dam 1 & 2
kula jalaIya TOTAL(H)
36.63
0.00
20.81
0.00
57.44
0.76
0.63
1.39
1.01
2.09
0.00
4.35
7.45
6.77
73.05
75
0
75
0
150
2
2
4
60
62
0
62
62
9
225
0.00
77.10
75.75
79.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.27
16.63
0.00
130.46
113.24
83.47
266.20
0.00
0.00
84.52
20.76
119.80
126.71
108.28
124.32
86.97
82.75
69.86
124.14
0.00
0.00
0
124
123
124
0
0
0
0
0
0
0
100
92
0
183
202
211
371
0
0
212
210
212
210
210
195
212
214
211
211
0
0
42
150
2
3
16
0
60
120
0
273
42
85
0
74
60
120
0
121
0
0
0
0
0
0
0
0
70
70
36
140
19
100
100
200
200
50
70
70
136
145
37
0
145
145
89
145
145
145
0
0
100
100
210
210
210
0
210
210
150
210
210
210
0
0
0
0
0.00
0
0.000
0
0
13.28
228
1.318
0
0
0.00
0
0.000
0
0
10.32
145
0.000
Sr.
No.
37
38
39
40
41
42
43
44
0.024
0.000
0.000
0.013
0.006
0.002
0.417
THERMAL
TaoronT pavar ilaimaToD yauinaT saI
TaoronT pavar ilaimaToD yauinaT DI
TaoronT pavar ilaimaToD yauinaT [TaoronT pavar ilaimaToD yauinaT ef
TaoronT pavar ilaimaToD yauinaT jaI TI 1
TaoronT pavar ilaimaToD yauinaT jaI TI 2
TaoronT pavar ilaimaToD yauinaT esa TI jaI
Qauvarna tapIya Dhuvaran - 5
Qauvarna tapIya Dhuvaran - 6
Qauvarna tapIya Dhuvaran - GT 1
Qauvarna tapIya Dhuvaran - GT 2
Qauvarna tapIya Dhuvaran - STG
]ka[- yauinaT 1 Ukai -1
]ka[- yauinaT 2 Ukai -2
]ka[- yauinaT 3 Ukai -3
]ka[- yauinaT 4 Ukai -4
]ka[- yauinaT 5 Ukai -5
]ka[- yauinaT 6 Ukai -6
gaaMQaInagar 1 Gandhinagar - 1
gaaMQaInagar 2 Gandhinagar - 2
gaaMQaInagar 3 Gandhinagar - 3
gaaMQaInagar 4 Gandhinagar - 4
gaaMQaInagar 5 Gandhinagar - 5
vaNakbaaorI 1 Wanakbori - 1
vaaNakbaaOrI 2 Wanakbori - 2
vaaNakbaaOrI 3 Wanakbori - 3
vaaNakbaaOrI 4 Wanakbori - 4
vaaNakbaaOrI 5 Wanakbori - 5
vaaNakbaaOrI 6 Wanakbori - 6
vaaNakbaaOrI 7 Wanakbori - 7
]%trna Utran GT 1
]%trna Utran GT 2
]%trna UTRAN - GT- 3
]%trna UTRAN - GT-4
]%trna UTRAN - STG-I
]%trna UTRAN - STG-II
Schedule yaaojanaa
k`maaMk
0.000
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
isa@ka Sikka - 1
isa@ka Sikka - 2
kcC ilagnaa[-T Kutch Lignite - 1
kcC ilagnaa[-T Kutch Lignite - 2
kcC ilagnaa[-T Kutch Lignite - 3
kcC ilagnaa[-T Kutch Lignite - 4
saUrt ilagnaa[-T Surat Lignite - 1
saUrt ilagnaa[-T Surat Lignite - 2
0.430
6.608
6.398
6.999
0.000
0.000
1.138
0.558
1.911
0.145
11.260
11.126
8.128
20.302
0.088
0.061
9.145
2.758
12.227
0.000
0.006
0.000
Actual vaastivak
carma
}jaa-
Peak
(Mw)
70
70
45
45
47
0
110
110
70
70
75
0
173
240
carma
Energy
(Gwh)
24.82
70.67
44.19
44.80
31.02
32.39
0.00
78.11
Auxillary
Consumption
(Gwh)
Peak
(Mw)
111
117
69
71
63
54
0
130
3.216
7.853
7.989
7.206
0.250
7.557
saUrt ilagnaa[-T Surat Lignite - 3
saUrt ilagnaa[-T Surat Lignite - 4
e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1
e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2
jaI Aa[- pI saI ela GIPCL GT - 1
jaI Aa[- pI saI ela GIPCL GT - 2
jaI Aa[- pI saI ela GIPCL GT - 3
jaI Aa[- pI saI ela GIPCL ST - 1
jaI Aa[- pI saI ela GIPCL GT - 4
jaI Aa[- pI saI ela GIPCL ST - 2
[- esa esa e Aar ESSAR GT - 1
[- esa esa e Aar ESSAR GT - 2
[- esa esa e Aar ESSAR GT - 3
[- esa esa e Aar ESSAR STG
jaI pI [- saI GPEC GT - 1
jaI pI [- saI GPEC GT - 2
jaI pI [- saI GPEC GT - 3
jaI pI [- saI GPEC STG
jaI esa [- jaI GSEG GT - 1
jaI esa [- jaI GSEG GT - 2
jaI esa [- jaI GSEG STG
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
60
kula tapIya Total (T)
kula jalaIya+tapIya Total (H+T)
ivaMD [najaI- Wind Energy
kula jalaIya+tapIya+hvaa Total (H+T+Wind)
ivainamaya Exchanges
saIimat }jaa- maaMga Restricted Energy Req.
jalaIya
1.1
1.2
1.3
2
3
4
5
6
7
8
9
10
11
12
13
14
140
95
140
480
430
600
90
150
0
50
0
100
5277
6130
7992
9359
(+)
8730
MADHYA PRADESH
1
95
350
Sugen (GT 1 + GT 2)
saIpIpI sao Aayaat Imp from CPP+MUNDRA
K (B)
100
79.74
89.59
53.27
74.17
14.89
11.61
10.42
20.98
1.72
0.66
0.00
0.00
0.00
0.00
0.00
5.32
14.74
7.62
11.83
1.05
6.44
254.15
1282.27
128
129
99
107
31
32
32
48
94
47
0
0
0
0
0
149
145
151
51
46
49
382
1781
8.136
8.796
7.989
4091.82
4164.87
487.58
4652.44
3780.20
8432.64
11450
11668
383.442
383.859
26.57
23.06
18.68
11.40
8.03
45.83
2.18
95.54
8.28
10.01
9.46
1.59
0.07
0.00
2.14
96.76
208.78
507.20
166
115
118
99
156
89
5
316
0
32
21
56
20
0
11
384
860
2217
Sr.
No.
2
3
4
5
6
7
8
9
10
11
12
13
14
0.206
0.307
0.199
0.243
1.115
7.347
12418
maQya p`doSa
50
114
40
50
75
90
130
0
30
0
30
15
0
20
210
610
1185
315
0
60
0
60
20
0
30
360
990
2114
Schedule yaaojanaa
k`maaMk
1
0.000
HYDRO
cambala pir Chambal Pr.(50%share)
gaaMQaI saagar Gandhi Sagar
raNaa p`tap sagar R.P.Sagar
javaahr sagar Jawahar Sagar
ponca Pench
baargaI Bargi
baargaI Bargi (LBCH)
banasaagar Toansa Bansagar-1 (Tons)
banasaagar Bansagar-2 (Deolondh)
banasaagar Bansagar-3 (Silpara)
banasaagar Bansagar-4 (Zinaha)
maoDIKoDa Medikheda
ibarisaMGapur Birsingpur
Tavaa Tawa
rajaGaaT Rajghat
Omkareshwar
[Midra saagar Indira Sagar
kula jalaIya TOTAL(H) MPPGCL
tapIya
0.000
sToSna ka naama
}jaa-
Station Name
Energy
(Gwh)
0.120
0.040
0.020
0.090
0.060
0.220
0.080
0.040
0.010
0.090
0.449
0.870
1.708
Actual vaastivak
carma
}jaa-
Peak
(Mw)
Energy
(Gwh)
carma
Peak
(Mw)
Auxillary
Consumption
(Gwh)
THERMAL
AmarkMTk II AMK II Unit -1
AmarkMTk II AMK II Unit -2
AmarkMTk III AMK III Unit -5
satpura I Satpura-I(60%Share)
satpura II Satpura-II Unit 6
satpura II Satpura-II Unit 7
satpura II Satpura-II Unit 8
satpura II Satpura-II Unit 9
satpura III Satpura-III Unit 10
satpura III Satpura-III Unit 11
esajaITIpIesa 1 SGTPS Unit - 1
esajaITIpIesa 2 SGTPS Unit - 2
esajaITIpIesa 3 SGTPS Unit - 3
esajaITIpIesa 4 SGTPS Unit - 4
esajaITIpIesa 5 SGTPS Unit - 5
15
16 SSTPS
kula tapIya Total (T)
kula jalaIya+tapIya Total (H+T)
Injection from WIND
61
82
0
50
0
67
128
163
122
163
142
191
144
194
291
390
1057
2572
1409
4036
0.00
0.00
154.58
0.00
69.74
106.35
119.99
83.80
101.39
34.76
34.76
106.96
32.06
110.60
0.00
321.72
1026.41
1533.61
131.01
0
0
217
0
195
190
192
180
189
187
187
180
178
186
0
1218
2790
5110
0
14.790
0
0.000
16.830
19.990
24.620
15.150
15.150
2.940
22.360
134.650
136.358
kula jalaIya+tapIya + ivaMD Total (H+T+WIND)
ivainamaya Exchanges
saIimat }jaa- maaMga Rest. En. Req.
(+)
5183
1664.62
1951.65
3616.28
5110
4.80
6.82
0.53
12.15
120
10
7
137
0.050
0.070
27.64
27.64
27.64
27.84
36.85
66.82
116.93
116.93
116.93
116.93
181.76
182.79
1413.55
0.00
0.00
1413.55
1425.70
799.41
2225.11
43
0
44
46
120
120
210
210
210
210
255
255
1917
0
0
1917
2054
0
2054
11.780
124.08
50.99
109.96
8.89
89.85
32.79
3.83
4.84
20.95
9.08
4.56
30.56
78.27
537.35
550
320
1120
37
472
61
18
4
39
64
80
250
0
1665
2.138
CHHATTISGARH C<aIsagaZ,
ga (C)
jalaIya
HYDRO
1 hsadova baaMgaao Hasdeo Bango
2 Gangrel
3 Mini Micro KWB
kula jalaIya TOTAL(H) CSEB
tapIya
1
2
3
4
5
6
7
8
9
14
kaorbaa (pU) Korba (E) Unit-1
kaorbaa (pU) Korba (E) Unit-2
kaorbaa (pU) Korba (E) Unit-3
kaorbaa (pU) Korba (E) Unit-4
kaorbaa (pU) Korba (E) Unit -5
kaorbaa (pU) Korba (E) Unit -6
kaorbaa (p) Korba (W) Unit -1
kaorbaa (p) Korba (W) Unit -2
kaorbaa (p) Korba (W) Unit -3
kaorbaa (p) Korba (W) Unit -4
baalakao sao Aayaat BALCO Import
ijandla sao Aayaat JINDAL Import
kula tapIya Total (T+IPP)
kula jalaIya+tapIya Total (H+T)
ivainamaya Exchanges
saIimat }jaa- maaMga Rest. En. Req.
Ga (D)
jalaIya
2
3
4
5
6
7
8
9
10
11
12
13
61
139
30
30
30
30
71
71
125
125
125
125
0
149
50
50
50
50
120
120
210
210
210
210
250
250
911
966
1780
1900
(+)
2125
MAHARASHTRA
1
120
19
tapIya
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
24.830
21.560
7.590
7.480
97.460
97.590
HYDRO
74
49
165
10
120
3
5
3
0
0
9
37
32
506
300
150
600
20
444
60
10
5
0
0
80
250
47
1966
Schedule yaaojanaa
Sr.
No.
21.480
maharaYT/
kaoyanaa 1AaOr 2 Koyna 1 & 2
kaoyanaa III Koyna III
kaoyanaa IV Koyna IV
kaoyanaa DIpIeca Koyna DPH
TaTa jalaIya TATA Hydro
vaOtrNaa Vaitarna
eladarI Eldari
BaTgar AaOr vaIr Bhatgar & Vir
pOzana Paithan
itlaarI Tillari
BaIra Tola rosa Bhira Tail Race
GaTGar Ghatghar
Anya CaoTo jalaIya Small Hydro (others)
kula jalaIya TOTAL(H)
k`maaMk
3
0.130
THERMAL
10
11 KORBA(EB) Extn - 1
12 KORBA(EB) Extn - 2
kula tapIya Total (T)
13
55
6
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
2.533
4.671
Actual vaastivak
carma
}jaa-
Peak
(Mw)
Energy
(Gwh)
carma
Auxillary
Consumption
(Gwh)
Peak
(Mw)
THERMAL
naaisak 3 Nasik Unit -3
naaisak 4 Nasik Unit -4
naaisak 5 Nasik Unit -5
T/ambao 4 Trombay Unit -4
T/ambao 5 Trombay Unit -5
T/ambao 6 Trombay Unit -6
T/ambao 8 Trombay Unit -8
T/ambao 7A gaOsa Trombay -7A (Gas)
T/ambao 7ba Trombay -7B (WHR)
kaoraD,I 5 Koradi Unit -5
kaoraD,I 6 Koradi Unit -6
kaoraD,I 7 Koradi Unit -7
Bausaavala 2 Bhusawal Unit -2
Bausaavala 3 Bhusawal Unit -3
Bausaavala 4 Bhusawal Unit -4
Bausaavala 4 Bhusawal Unit -5
parlaI 3 Parli Unit -3
parlaI 4 Parli Unit -4
parlaI 5 Parli Unit -5
parlaI 6 Parli Unit -6
parlaI 7 Parli Unit -7
KaprKoD,a 1 Khaperkheda Unit -1
KaprKoD,a 2 Khaperkheda Unit -2
KaprKoD,a 3 Khaperkheda Unit -3
105
85
133
0
250
130
0
140
115
180
0
500
500
0
0
0
65
75
75
110
100
250
0
0
0
0
155
40
80
100
350
85
100
100
150
135
335
0
0
0
0
210
55
110
135
470
137.40
136.10
118.44
0.00
283.50
38.35
170.53
66.98
43.00
0.00
67.42
118.67
0.00
0.00
110.46
0.00
0.00
98.53
83.70
144.31
132.18
125.76
117.62
124.00
210
202
192
0
502
246
253
128
72
0
175
188
0
0
200
0
0
178
163
250
250
205
185
215
2.898
27
28
30
31
32
33
34
35
36
37
38
39
40
41
42
KaprKoD,a 4 Khaperkheda Unit -4
KaprKoD,a 5 Khaperkheda Unit -5
parsa Paras-3
parsa Paras-4
]rna Uran (Gas)
]rna Uran (WHR)
caMd`pur 1 Chandrapur Unit -1
caMd`pur 2 Chandrapur Unit -2
caMd`pur 3 Chandrapur Unit -3
caMd`pur 4 Chandrapur Unit - 4
caMd`pur 5 Chandrapur Unit -5
caMd`pur 6 Chandrapur Unit -6
caMd`pur 7 Chandrapur Unit -7
DhaNaU 1 Dahanu Unit-1
DhaNaU 2 Dahanu Unit-2
CPP
43
44 RGPPL Share
kula tapIya Total (T)
135
135
200
200
100
100
100
90
70
80
190
150
180
180
430
430
220
135
135
120
95
110
255
200
372
500
0.00
200
6290
0.00
300
9090
6966
9960
(+)
MAH. Wind + Solar Generation
kula jalaIya +tapIya Total (H+T+Wind)
Exchanges
TOTAL
(H+T)
ivainamaya
saIimat }jaa- maaMga Rest. En. Req.
gaaovaa GOA
Aa[- pI pI irlaayaMsa IPP Reliance
ivainamaya Exchanges
saIimat }jaa- maaMga Rest. En. Req.
dmana AaOr dIva DAMAN & DIU
dadra nagar hvaolaI DNH
kula DD &DNH (T)
ca (E)
C (F)
ja (G)
12400
131.14
323.91
129.04
18.35
287.04
0.00
0.00
101.42
134.11
115.00
261.85
243.44
282.27
172.31
172.54
2780.80
0.00
7099.00
250.45
7886.80
2768.55
10655.35
200
518
237
232
554
0
148
210
199
455
436
456
0
250
250
3862.22
0
10664
0
12746
17.55
25
Sr.
No.
(H)
1.
290
405
133
1.1
1.2
1.3
1.4
1.5
1.6
2.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
3.1
3.2
3.3
3.4
3.5
4.1
4.2
4.3
4.4
4.5
4.6
sToSana ka naama
}jaa-
Station Name
Energy
(Gwh)
koMd`Iya xao~ Central Sector
ena pI saI N.P.C.
tara`pur 1 TAPS Unit -1
tara`pur 2 TAPS Unit -2
tara`pur 3 TAPS Unit -3
tara`pur 4 TAPS Unit -4
kakrapr 1 KAPS Unit -1
kakrapr 2 KAPS Unit -2
kula ena pI saI NPC Total
ena TI pI saI N.T.P.C.
kaorbaa esaTIpIesa 1 KSTPS Unit-1
kaorbaa esaTIpIesa 2 KSTPS Unit-2
kaorbaa esaTIpIesa 3 KSTPS Unit-3
kaorbaa esaTIpIesa 4 KSTPS Unit-4
kaorbaa esaTIpIesa 5 KSTPS Unit-5
kaorbaa esaTIpIesa 6 KSTPS Unit-6
kaorbaa esaTIpIesa 7 KSTPS Unit-7
kula kaorbaa KSTPS Total
ivanQa esaTIpIesa 1 VSTPS Unit-1
ivanQa esaTIpIesa 2 VSTPS Unit-2
ivanQa esaTIpIesa 3 VSTPS Unit-3
ivanQa esaTIpIesa 4 VSTPS Unit-4
ivanQa esaTIpIesa 5 VSTPS Unit-5
ivanQa esaTIpIesa 6 VSTPS Unit-6
ivanQa esaTIpIesa 7 VSTPS Unit-7
ivanQa esaTIpIesa 8 VSTPS Unit-8
ivanQa esaTIpIesa 9 VSTPS Unit-9
ivanQa esaTIpIesa 10 VSTPS Unit-10
ivanQa esaTIpIesa 11 VSTPS Unit-11
kula ivanQayaacala VSTPS Total
saIpt -1 -SIPAT-1
saIpt -2 -SIPAT-2
saIpt -3 -SIPAT-3
saIpt -4 -SIPAT-4
saIpt -5 SIPAT-5
kula saIpt -SIPAT TOTAL
kvaasa gaOsa 1e Kawas GT-1A
kvaasa gaOsa 1baI Kawas GT-1B
kvaasa esaTI 1saI Kawas ST-1C
kvaasa gaOsa 2e Kawas GT-2A
kvaasa gaOsa 2baI Kawas GT-2B
kvaasa esaTI 2saI Kawas ST-2C
14.954
14.954
372.581
415.920
378.61
242
396.16
465
180.63
302
447.48
715
628.11
1016
Schedule yaaojanaa
k`maaMk
5.862
80
80
300
300
125
125
1010
1510
2294
Actual vaastivak
carma
Peak
(Mw)
160
160
480
480
200
200
1680
2600
4260
}jaaEnergy
(Gwh)
carma
Peak
(Mw)
137.94
126.70
301.46
396.97
166.41
154.19
1283.67
160
160
545
546
545
546
2502
151.08
123.29
153.08
365.98
368.67
199.74
367.62
1729.47
124.90
126.05
87.77
125.08
85.02
87.66
317.82
309.49
212
214
214
515
513
512
510
2458
212
215
214
212
214
215
510
513
335.09
278.78
323.22
2454.36
269.80
460.80
406.84
358.80
311.00
1807.24
12.42
8.15
11.11
28.18
18.69
25.03
512
511
515
#REF!
663.00
665.00
668.00
512.00
513.00
2578.00
113
118
139
115
114
135
Auxillary
Consumption
(Gwh)
5.479
66.340
32.407
108.658
167.48
99.74
kula kvaasa KGPS Total
gaMQaar gaOsa 1 Gandhar GT-1
gaMQaar gaOsa 2 Gandhar GT-2
gaMQaar gaOsa 3 Gandhar GT-3
gaMQaar esaTI 4 Gandhar ST-4
kula gaMQaar GGPS Total
maaOda 1 Mauda -1
maaOda 2 Mauda -2
kula maaOda MAUDA Total
5.1
5.2
5.3
5.4
6.1
6.2
6.1
6.2
6.3
RGPPL Block I
RGPPL Block II
RGPPL Block III
RGPPL TOTAL
esa esa pI SSP RBPH - 1
7.1
esa esa pI SSP RBPH - 2
esa esa pI SSP RBPH - 3
esa esa pI SSP RBPH - 4
esa esa pI SSP RBPH - 5
esa esa pI SSP RBPH - 6
esa esa pI SSP CHPH - 1
esa esa pI SSP CHPH - 2
esa esa pI SSP CHPH - 3
esa esa pI SSP CHPH - 4
esa esa pI SSP CHPH - 5
kula esa esa pI SSP Total
kula poMca Pench Total
Jindal Injection
Amarkantak Lanco
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
8.1
8.2
8.3
(I)
piScamaI xao~
193
630
80
630
186
500
540
750
103.58
30.90
0.00
24.19
30.83
85.92
133.92
70.74
204.66
0.00
0.00
0.00
0.00
20.00
188
20.12
187
17.08
183
15.49
182
46.60
187
44.49
187
7.55
34
15.63
37
11.71
35
11.19
36
6.65
580
40
900
75
216.53
8.03
384.15
144.34
WESTERN REGION
ga`aosa ]%padna Gross generation
(J) ]plabQata Availability
naoT ivainamaya Net Exchanges
]plabQa }jaa- Energy Availability
(+)
28000
450
113
0
112
148
305
500
505
1000
0
0
0
31
24069.05
23218.60
-2877.68
20340.92
3.890
3.370
0.000
0.000
15.330
0.000
39
1293
156
0
0
2.165
0.090
maah maaca- 2015 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak
PEAK DEMAND - SCHEDULE VS ACTUAL FOR
rajya
gaujarat
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
maQya p`doSa
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
C<aIsagaZ,
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
maharaYT/
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
gaaovaa
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
essaar
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
dmana evaM dIva
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
dadra va na hvoalaI
pMjaIkRt
AsaIimat
nyaUnatma pMjaIkRt maaMga
piScama xao~
pMjaIkRt
saIimat
AsaIimat
nyaUnatma pMjaIkRt maaMga
State
MARCH
Anaulagnak 4.2
ANNEX-4.2
2015
idnaaMk
samaya
AavaRi<a
Date
Time
Frequency
13414
26.03.15
1600
49.99
13419
26.03.15
1600
49.99
7244
07.03.15
0400
50.09
11.03.15
1930
50.02
50.02
vaastivak Actual (MW)
Anticipated
Apoixat
AapUit-
(MW)
Catered
UNSCH LS
FC
SCH LS
kula Total
13414
-
-
-
13414
0
5
0
GUJARAT
Registered
Restricted
13700
Unrestricted
13740
7244
Min. Registered Demand
MADHYA PRADESH
Registered
Restricted
8032
Unrestricted
8032
Min. Registered Demand
7185
-
-
-
7185
7185
0
-4
0
7181
11.03.15
1930
3338
3338
15.03.2015
5:00
3770
3770
24.03.15
2000
49.89
3950
25.03.15
1900
49.96
2028
02.03.2015
9:00
50.09
26.03.15
1200
49.89
CHHATTISGARH
Registered
Restricted
3625
Unrestricted
3675
3712
232.4
5
0
2028
Min. Registered Demand
MAHARASHTRA
Registered
Restricted
19600
Unrestricted
19650
20424
-
-
-
20424
20424
53
79
0
20556
26.03.15
1200
49.89
9377
01.03.2015
5:00
50.14
9377
Min. Registered Demand
*GOA
Registered
405
465
Unrestricted
405
465
-
-
465
19.03.15
1900
49.96
0
0.65
-
466
19.03.15
1900
49.96
-
-
605
10.03.15
1900
50.02
0
0
-
605
10.03.15
1900
50.02
-
-
306
18.03.15
1800
50.02
0
0
-
306
18.03.15
1800
50.02
-
-
714
16.03.15
1200
49.95
0
1
-
715
16.03.15
1200
49.95
325
06.03.15
Min. Registered Demand
ESSAR(ESIL)
Registered
605
Unrestricted
605
Min. Registered Demand
DD
Registered
306
Unrestricted
306
Min. Registered Demand
DNH
Registered
714
Unrestricted
714
Min. Registered Demand
325
WESTERN REGION
Registered
Restricted
46197
Unrestricted
45545
Min. Registered Demand
NOTE: LS
PC/RM
FC
Registered
Restricted
Unrestricted
=
=
=
=
=
=
45283
-
-
-
45283
26.03.15
1200
49.89
45283
261
174
0
45718
26.03.15
1200
49.89
25460
25460
02.03.15
Load Shedding
Power Cuts/Regulatory Measures
Frequency Correction
Actual Demand Met
Registered + LS + FC
Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.
0400
50.17
2015
Mar-15
समांतर/
अनु. .
PARALLEL / RADIAL OPERATION
TOTAL OPERATING HOURS
1
HVDC back-to back link(WR-NR)
NA
2
HVDC back-to back link(WR-SR)
738:27:00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
टाई लाईन
765
-I
765
-II
TIE LINE
765
-I
765
-II
765
-I
765
-II
400
400
400
-I
400
–II
400
–III
400 केवी सातपुरा से कोराडी
400 केवी खंडवा से धुले-I
400 केवी खंडवा से धुले-II
400 केवी इंदौर से असोज-I
400 केवी इंदौर से असोज-II
400 केवी इंदौर से असोज-III
400
-I
400
-II
400 केवी वापी से बोईसर
400
-I
400
-II
400 केवी रायगढ़ से झरसुगुड़ा-I
400 केवी रायगढ़ से झरसुगुड़ा-II
400 केवी नागदा से दे हगाम-I
400 केवी नागदा से दे हगाम-II
400
–I
400
–II
400
220
–II
-III
765kV Soni to Wardha
197:57:00
765kV Seoni to Wardha
310:55:00
765kV Seoni to Bilaspur-I
744:00:00
765kV Seoni to Bilaspur-II
744:00:00
765kV Durg to Wardha
638:34:00
765kV Durg to Wardha
400:07:00
400kV Bhilai to Koradi
744:00:00
400kV Bhilai to Bhadravati
744:00:00
400kV Raipur to Bhadravati-I
744:00:00
400kV Raipur to Bhadravati-II
744:00:00
400kV Raipur to Bhadravati-III
744:00:00
400kV Satpura to Koradi
744:00:00
400kV Khandwa-Dhule-I
744:00:00
400kV Khandwa-Dhule-II
744:00:00
400kV Indore to Asoj-I
736:37:00
400kV Indore to Asoj-II
728:29:00
400kV Indore to Asoj-III
739:31:00
400kV Kolhapur-Mapusa-I
366:16:00
400kV Kolhapur-Mapusa-II
600:07:00
400kV Vapi-Boisar
744:00:00
400kV Raigarh to Sterlight-I
744:00:00
400kV Raigarh to Sterlight -II
732:07:00
400kV Raigarh to Jharsuguda-I
744:00:00
400kV Raigarh to Jharsuguda-II
744:00:00
400kV Nagda to Dehgam
734:52:00
400kV Nagda to Dehgam
739:12:00
400kV Raipur to Wardha-I
744:00:00
400kV Raipur to Wardha-II
741:56:00
400kV Wardha to Mouda-II
744:00:00
220kV K(E) to Budhipadar-III
744:00:00
भार
,
WRLDC, Mumbai
Anaulagnak 4.5
maah maaca- 2015
ko daOrana pa~ta , iSaD\yaUla , GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoM sao D`avala AaOr ivainamayaaoM ka ivavarNa
DETAILS OF ENTITLEMENT/SCHEDULE/DRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS
MONTH OF MARCH 2015
1
1
(pxaoivasa` Wara jaarI xao~Iya }jaa- laoKa ko AaQaar pr)
koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta
Declared Capcity (ex-bus) of Central Gen. Stns/Dedicated CG Stns/Jointly owned Stns & entitlement of beneficieries (MUs)
GaaoiYat xamata
(A)
AND EXCHANGES FOR THE
koMd`Iya ibajalaIGar
A. Central Gen. Stns.
kaorbaa esaTIpIesa
kaorbaa esaTIpIesa -III
ivanQa esaTIpIesa I
ivanQa esaTIpIesa II
ivanQa esaTIpIesa III
ivanQa esaTIpIesa IV
kvaasa gaOsa
gaMQaar gaOsa
saIpt
kakrapar
tara`pur 3 AaOr 4
(ba) samaip-t koMd`Iya ibajalaIGar
[Midra saagar
Korba STPS
(sa)
saMyau@t inajaI sToSana
tara`pur 1 AaOr 2
esaesapI
ponca
C. Jointly owned Stations
kula ([M saagar kao CaoD, kr)
Total (excl. Indira Sagar)
Korba STPS-III
Vindhyachal STPS-I
Vindhyachal STPS-II
Vindhyachal STPS-III
Vindhyachal STPS-IV
Kawas GPP
Gandhar GPP
Sipat
Kakrapar APS*
Tarapur APS 3&4*
gau}ivainaila
map`iva]kM
Dec. Cap.
GUVNL MPPGCL
1296.896
351.188
830.526
692.533
667.767
681.989
477.251
313.304
1850.482
286.507
631.827
222.321
67.428
151.867
165.515
177.716
163.703
136.004
112.951
504.864
81.394
160.297
Craivabaao
302.791
54.870
295.521
223.049
166.337
196.049
101.938
55.850
333.693
72.374
135.136
B. Dedicated CG Stations
maraiva]kM
107.290
211.544
7.793
Tarapur APS 1&2*
SSP*
Pench*
13147.766
dmana dIva
da na h
MSPGCL
GOA
DD
DNH
132.640
106.168
1.709
1.601
71.660
44.146
0.000
0.000
296.747
0.000
28.081
412.578
94.661
304.257
247.554
198.068
220.816
148.592
95.489
564.187
97.899
256.335
132.210
4.519
25.520
10.221
8.523
10.280
9.014
6.032
24.945
10.424
8.433
30.446
4.216
8.790
6.428
7.534
8.661
22.577
14.951
21.846
5.403
7.474
32.499
15.724
28.465
22.710
23.252
31.336
59.081
27.996
74.001
8.154
24.923
ecavaIDIsaI + ecaDblyaubaI
HVDC+HWB
14.397
10.859
245.570
53.645
33.847
kula
TOTAL
1296.896
351.188
830.526
692.533
667.767
681.989
477.251
313.304
1850.482
286.507
631.827
* vaas%aivak [njao@Sana
* Actual injection
245.570
Indira Sagar*
gaaovaa
CSEB
245.570
0.000
120.580
5.195
0.000
0.000
0.000
53.645
57.117
2.598
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
107.290
211.544
7.793
3335.220 2710.477
755.403
3523.407
260.429
187.669
437.630
1937.531 13147.766
dmana dIva
da na h
* Actual injection
2
koMd`Iya sToSanaaoM / samaip-t koMd`Iya sToSanaoMa / saMyau@t inajaI sToSanaaoM kI ]%padna SaoD\yaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoD\yaUla
2
Generation Schedule (ex-bus) of Central Gen. Stations/Dedicated CG Stations/Jointly owned Stations & schedule of benificieries (MUs)
SaoD\yaUla
(A)
koMd`Iya ibajalaIGar
kaorbaa esaTIpIesa
kaorbaa esaTIpIesa -III $
ivanQa esaTIpIesa I
ivanQa esaTIpIesa II
ivanQa esaTIpIesa III
ivanQa esaTIpIesa IV
kvaasa gaOsa
gaMQaar gaOsa
saIpt
kakrapar
tara`pur 3 AaOr 4
(ba) samaip-t koMd`Iya ibajalaIGar
[Midra saagar
A. Central Gen. Stns.
Schedule
1263.769
344.420
541.385
573.098
575.057
534.903
101.998
83.363
1699.114
286.507
631.827
Korba STPS
Korba STPS-III $
Vindhyachal STPS-I
Vindhyachal STPS-II
Vindhyachal STPS- III
Vindhyachal STPS- IV
Kawas GPP**
Gandhar GPP**
Sipat
Kakrapar APS*
Tarapur APS 3&4*
gau}ivainaila
map`iva]kM
Craivabaao
GUVNL MPPGCL
220.799
67.231
114.273
148.329
169.181
138.917
70.420
61.158
491.543
81.394
160.297
285.963
52.285
189.789
162.956
133.717
155.739
0.707
0.594
295.898
72.374
135.136
CSEB
MSPGCL
GOA
DD
DNH
398.694
91.854
169.214
203.837
163.735
155.479
15.941
16.593
501.672
97.899
256.335
132.306
4.519
21.054
10.353
8.409
9.672
0.007
0.000
24.912
10.424
8.433
30.119
4.098
7.614
6.210
7.229
7.900
3.623
2.192
21.039
5.403
7.474
32.548
15.335
25.208
25.243
22.639
28.505
11.291
2.822
67.467
8.154
24.923
Note:- $
ecavaIDIsaI+ ecaDblyaubaI
HVDC+HWB /
Outside region(NR &
SR)
12.522
0.000
0.000
10.859
kula
TOTAL
1263.769
344.420
541.385
573.098
575.057
534.903
101.998
83.363
1699.114
286.507
631.827
B. Dedicated CG Stations
245.570
Indira Sagar*
245.570
13.795
245.570
RPPC(NVVNL)
KAWAS(RLNG)
saMyau@t inajaI sToSana
tara`pur 1 AaOr 2
esaesapI
ponca
kula [M saagar kao CaoD, kr
gaaovaa
132.127
105.611
1.709
1.601
56.352
32.957
0.000
0.000
268.460
0.000
28.081
C. Jointly owned Stations
0.000
* vaas%aivak [njao@Sana
* Actual injection
107.290
211.544
7.793
10729.465
Tarapur APS 1&2*
SSP*
Pench*
Total (excl. Ind. Sagar)
53.645
0.000
33.847 120.580
0.000
5.195
2941.038 2120.854
0.000
0.000
GANDHAR(RLNG)
(sa)
maraiva]kM
0.000
0.000
0.000
701.132
53.645
57.117
2.598
2527.211
0.000
0.000
0.000
232.033
0.000
0.000
0.000
161.393
0.000
0.000
0.000
332.025
dmana dIva
da na h
107.290
211.544
7.793
1713.779 10729.465
* Actual injection
These Scheduled Transactions are done by WRLDC under STOA.
3
AMtrxao~Iya ivainamayaaoM / iWpxaIya ivanamayaaoM kI SaoD\yaUla
3
Schedule for interregional exchanges/bilateral exchanges (MUs)
(ima yauinaT\sa)
k
xao~ / rajya
pUvaI- xao~ ko rasto
Aayaat SaoD\yaUla
SaoD\yaUla
Region/State
Import SDLs through ER
Schedule
gau}ivainaila
map`iva]kM
Craivabaao
maraiva]kM
gaaovaa
GUVNL MPPGCL
CSEB
MSPGCL
GOA
DD
DNH
0.000
0.000
61.623
0.000
0.000
0.000
-0.271
0.000
0.000
0.000
0.000
-14.976
-13.200
0.000
0.000
0.000
0.000
-0.058
-0.426
-0.451
0.000
0.000
0.000
0.000
15.612
0.000
1.354
-2.031
0.000
-0.809
-0.812
-1.056
0.000
0.000
0.000
0.000
0.000
3.693
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
55.298
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.400
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.369
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.106
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
ecavaIDIsaI
HVDC
kula
TOTAL
302.626
Indian Energy Exchange (WR to ER)
Power Exchange of India (ER to WR)
ER (NTPC)
DVC to MPPTCL (Long Term Open Access)
Hirakud to CSEB
CSEB to APPCC ( NVVNL)
EPGL GUVNL to APPCC ( INSTINCT)
JPL-II to APPCC ( KISPL)
JPL-II to APPCC ( NVVNL)
JPL-II to APPCC ( PTC LTD)
JNSTPP to APPCC ( NVVNL)
APL1 GUVNL to BIHAR ( AEL)
APL2 GUVNL to BIHAR ( AEL)
EMCO to BIHAR ( IEXL)
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN)
STERLITE to BALCO ( BALCO)
MPPMCL MPSEB to DPL WBSEB ( IEXL)
GSCL GUVNL to GRIDCO SOLAR ( SECI)
GSECL GUVNL to GRIDCO SOLAR ( SECI)
GPCL GUVNL to GRIDCO SOLAR ( SECI)
STERLITE to HZLD_NR ( JSW PTL)
STERLITE to HZLG_NR ( JSW PTL)
0.000
0.000
19.819
173.770
0.000
0.000
0.000
0.000
0.000
0.000
-0.765
0.000
0.000
0.000
-0.782
0.000
-0.780
0.000
0.000
0.000
0.000
0.000
0.000
0.000
155.826
173.770
1.354
-2.031
-0.271
-0.809
-0.812
-1.056
-0.765
-14.976
-13.200
-0.400
-0.782
3.693
-0.780
-0.058
-0.426
-0.451
0.000
0.000
0.000
-9.058
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-8.694
0.000
0.000
0.000
0.000
JPL to MANIPUR ( PTC LTD)
APL3 GUVNL to MAL MEGHALAYA ( PTC LTD)
JNSTPP to NGLD ( PTC LTD)
STERLITE to RINFRA MSEB ( SCL)
NSPCL to SAIL ROURKELA ( SAIL ROURKELA)
STERLITE to TPC MSEB ( GMRETL)
CSEB to TGPCC ( NVVNL)
JPL-II to TGPCC ( KISPL)
JPL-II to TGPCC ( NVVNL)
JPL-II to TGPCC ( PTC LTD)
JNSTPP to TGPCC ( NVVNL)
STERLITE to VYL MPSEB ( TPTCL)
APL3 GUVNL to WBSEB ( AEL)
EMCO to WBSEB ( IEXL)
JNSTPP to WBSEB ( IEXL)
JNSTPP to WBSEB ( PTC LTD)
MPPMCL MPSEB to WBSEB ( IEXL)
SaoD\yaUla
K
xao~ / rajya
dixaNa xao~ ko rasto
Aayaat SaoD\yaUla
Region/State
Import SDLs through SR
Schedule
-177.275
Indian Energy Exchange (SR to NR)
Power Exchange of India (SR to ER)
RSTPS-SR to GOA ( WHEELING)
RSTPS-SR to GOA ( WHEELING GOA)
ACBIL CSEB to APPCC
KSK TO TGPCC
LANCO TO TNEB
JPL TO TNEB
ga
]%trI xao~ ko rasto
Aayaat SaoD\yaUla
Import SDLs through NR
Indian Energy Exchange (NR to WR)
Power Exchange of India (NR to WR)
Rihand (Hydro) to MPPTCL (Long Term Open Access)
Matathilla (Hydro) to MPPTCL (Long Term Open Access)
JNSTPP to BSES YM (DTL)-NR ( IEXL)
HIMACHAL to CSEB ( AAPL)
HIMACHAL to CSEB ( MPPL)
MPL_ER to CSEB ( TPTCL)
HIMACHAL to DNH ( AAPL)
HIMACHAL to DNH ( MPPL)
TPCH WBSEB to ESIL_WR ( TPTCL)
TPTCL_DHPPB to ESIL_WR ( TPTCL)
TPTCL_DHPPB to ESIL MSEB ( TPTCL)
STERLITE to HZLD_NR ( JSW PTL)
STERLITE to HZLG_NR ( JSW PTL)
EMCO to JVVNL-NR ( IEXL)
JPL-II to NPCL ( KISPL)
TPTCL_DHPPB to TPC MSEB ( TPTCL)
TISCO to TSLB MSEB ( TSLB MSEB)
JNSTPP to UPPCL-NR ( PTC LTD)
Ga
iWpxaIya SaoD\yaUlsa
gau}ivainaila
0.000
0.000
-10.579
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.894
13.595
0.000
0.000
-0.150
-28.554
-2.600
map`iva]kM
GUVNL MPPGCL
-14.725
0.000
0.000
0.000
-7.998
0.000
-2.374
-0.945
-0.949
-1.233
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Craivabaao
0.000
0.000
0.000
3.087
0.000
77.071
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.200
0.000
0.000
0.000
maraiva]kM
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
gaaovaa
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
dmana dIva
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
da na h
CSEB
MSPGCL
GOA
DD
DNH
-14.725
-9.058
-10.579
3.087
-7.998
77.071
-2.374
-0.945
-0.949
-1.233
-0.894
13.595
-8.694
-0.200
-0.150
-28.554
-2.600
ecavaIDIsaI
HVDC
kula
TOTAL
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-73.382
-0.172
-111.600
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
7.222
0.657
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
7.222
0.657
0.000
-73.382
-0.172
-111.600
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
5.666
2.053
-0.170
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.300
0.000
0.000
0.000
0.000
0.000
1.350
18.750
14.384
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.091
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.029
0.000
0.000
-0.315
0.000
0.483
6.696
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.549
33.027
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
5.666
2.053
-0.170
1.350
18.750
14.384
3.549
33.027
0.000
0.000
0.029
0.000
0.000
-0.315
-0.091
0.483
6.696
-0.300
0.000
1.728
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.195
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
5.479
0.000
0.000
0.000
0.000
0.000
-133.320
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
12.434
10.800
14.400
1.080
133.320
1.637
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.585
0.870
3.162
2.946
9.360
18.320
3.652
0.730
0.887
0.000
0.850
0.000
0.000
0.000
0.000
0.000
0.000
1.098
0.776
3.703
0.000
0.608
1.111
1.086
1.098
0.000
4.008
0.759
0.866
1.382
0.824
1.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.728
1.585
0.870
3.162
2.946
9.360
18.320
3.652
0.730
0.887
5.479
0.850
12.434
10.800
14.400
1.080
0.000
1.637
1.098
0.776
3.703
2.195
0.608
1.111
1.086
1.098
38.880
4.008
0.759
0.866
1.382
0.824
1.300
85.111
Exchanges within WR
Mundra APL to Gujarat (LTOA)
JPL-II to ARVIND GUVNL ( MPPL)
JPL to AIGL MSEB ( AIGL MSEB)
JPL to ARPIPL MSEB ( ARPIPL MSEB)
JPL to ACCIL MSEB ( ACCIL MSEB)
JPL to ARVIND MSEB ( ARVIND MSEB)
ACBIL to BEST MSEB ( KISPL)
JPL to BEST MSEB ( KISPL)
JPL to BOSCH MSEB ( BOSCH MSEB)
JPL to BCSIL MSEB ( BCSIL MSEB)
JPL to BHL MSEB ( BHL MSEB)
JPL-II to BIPL MPSEB ( MPPL)
JPL-II to BLVL MSEB ( MPPL)
ACBIL to CSEB ( CSPTRDCL CSEB)
JPL to CSEB ( JPL)
JPL-II to CSEB ( JPL)
JNSTPP to CSEB ( TPTCL)
MPPMCL MPSEB to CSEB ( CSEB)
SPECT ACBIL to CSEB ( CSPTRDCL CSEB)
JPL to CLASSIC MSEB ( CLASSIC MSEB)
JPL to CIPLA MSEB ( CIPLA MSEB)
JPL to CEAT MSEB ( MPPL)
APL3 GUVNL to CHLM GUVNL ( AEL)
JPL to CIPLA-22 MSEB ( CIPLA-22 MSEB)
JPL to DNL MSEB ( DNL MSEB)
JPL to ETLC MSEB ( ETLC MSEB)
JPL to ETLT MSEB ( ETLT MSEB)
JPL-II to ESIL_WR ( PXIL)
JPL-II to ESIL MSEB ( JPL)
JPL to ETLW MSEB ( ETLW MSEB)
JPL to ETLB MSEB ( ETLB MSEB)
JPL to EILR MSEB ( MPPL)
JPL to ETLK MSEB ( ETLK MSEB)
JPL to EXIDE MSEB ( EXIDE MSEB)
JPL to EIPL MSEB ( EIPL MSEB)
JPL to EXIDE2 MSEB ( EXIDE2 MSEB)
JPL to FBML MSEB ( FBML MSEB)
APL3 GUVNL to GOA ( AEL)
JPL to GSL MSEB ( GSL MSEB)
EMCO to GCEL ( EMCO)
JPL to GODREJ MSEB ( GODREJ MSEB)
JCFPL GUVNL to SOLAR GOA ( NVVNL)
JPL-II to GIPL MSEB ( JPL)
JPL-II to GIPL MSEB ( MPPL)
JPL to GPIL MSEB ( MPPL)
JPL-II to GWRLHP MSEB ( MPPL)
JPL-II to GWRLHW MSEB ( MPPL)
JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB)
JNSTPP TO MP
EMCO TO DNH
TORRENT TO MP
EMCO TO MSEB
LANCO TO MP
KSK TO TGPCC
MP TO TORRENT
NSPCL to DD ( DD)
MSEB SOLAR TO CSEB SOLAR
MSEB SOLAR TO CSEB SOLAR
RAJ MP SOLAR TO CSEB SOLAR
IEE
PEI
ca
4
5
6
7
8
9
10
11
kula Aayaat
Total Import
kula inayaa-t
Total Export
naoT Aayaat / inayaa-t
Net Imp. (+)/Exp. (-)
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM Total Entitlement incl. IR and bi-lateral exchange
kI iSaD\yaUla imalaakr kula pa~ta schedule
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM
kI kula iSaDUyala
ibanaa xait ko kula D`avala
xait imalaakr kula D`avala
p p`NaalaI maoM kula pUla xait
p xao`~ sToSanaaoM sao
vaastivak [njao@Sana
(ima yauinaT\sa)
vaas%aivak AMtrxao~Iya
ivainamaya (ima yauinaT\sa)
AMtrxao~Iya ivainamaya
iSaD\yaUla (ima yauinaT\sa)
Total Sdl. incl. IR/ bi-lateral exch. Sdl.
Total Drl excl. Tr. Loss
Total Drl incl. Tr. Loss
1312.454
1101.992
210.462
kula
Total
13358.228
10939.927
10260.768
9182.811
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-73.686
0.000
0.000
0.000
28.176
0.000
0.000
0.000
0.000
265.740
8.245
367.707
120.819
246.887
gau}ivainaila
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
126.599
0.000
73.686
0.000
151.012
0.000
-28.176
0.000
0.000
0.000
-0.774
-246.983
-5.987
571.680
460.813
110.867
map`iva]kM
GUVNL MPPGCL
3582.107
3187.925
3780.200
3780.200
2821.344
2231.722
1958.973
1958.973
0.000
0.000
0.000
0.000
0.000
2.772
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.734
2.734
0.774
-282.092
-2.449
235.093
502.719
-267.625
Craivabaao
1.083
1.000
0.740
0.000
0.789
0.000
0.870
0.000
0.353
1.535
0.736
0.843
1.316
2.535
0.000
0.000
0.000
145.640
0.000
0.000
0.000
0.000
-2.734
-2.734
0.000
-0.069
0.000
361.085
3.718
357.367
0.000
0.000
0.000
27.440
0.000
0.000
0.000
1.046
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-13.923
0.000
36.365
13.923
22.442
maraiva]kM
gaaovaa
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.902
0.000
0.000
0.000
32.864
0.000
45.135
0.000
45.135
dmana dIva
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
135.765
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
174.446
0.000
174.446
da na h
1.083
1.000
0.740
27.440
0.789
2.772
0.870
1.046
0.353
1.535
0.736
0.843
1.316
2.535
126.599
135.765
0.000
145.640
151.012
0.000
0.000
10.902
0.000
0.000
0.000
32.704
-0.191
1312.454
1101.992
210.462
ecavaIDIsaI
MSPGCL
GOA
DD
DNH
HVDC
TOTAL
487.778
433.506
799.407
799.407
3880.775
2884.578
2768.547
2768.547
282.871
254.475
324.629
324.629
232.804
206.528
180.626
180.626
612.077
506.471
447.483
447.483
14.397
12.522
0.903
0.903
13358.228
10939.927
10260.768
10260.768
-1077.957
Pooled loss in WR System
kaorbaa
Actual Inj. - WR Stns.
KSTPS
(MUs)
Actual IR Exchanges
ivanQa 1 AaOr 2
ivanQa 3
VSTPS-1& 2 VSTPS-3
kvaasa
gaMQaar
kakrapar
tara`pur
esaesapI
ponca
kula
KGPS
GGPS
KAPS
TAPS
SSP
PENCH
TOTAL
7.793
12107.153
1620.810
1156.439 1130.441
286.507
739.117
] xao~ Aa
]xao kao ina
] xao naoT
d xao Aa
d xao inayaa-t
d xao naoT
pU xao Aa
pU xao inayaa-t
pU xao naoT
kula naoT
NR Imp
NR Exp
NR Net
SR Imp
SR Exp
SR Net
ER Imp
ER Exp
ER Net
Total Net
(MUs)
23.705
2147.433 -2123.728
IR Exchange Schedule
NRI sdl
85.247
NRE sdl
2323.999
(MUs)
kula
CSEB
Net NR sdl
-2238.752
100.298
82.546
0.000 902.913
SRI sdl
0.000
SREsdl
883.274
-902.913
Net SR sdl
-883.274
211.544
188.879
86.580
102.299
-2924.342
ERI sdl
302.626
ERE sdl
12.136
Net ER sdl
290.490
Net WR sdl
-2831.536
maah maaca- 2015 ko AMtr-ajyaIya / AMtrxao~Iya ivainamayaaoM ka ivavarNa
DETAILS OF INTERSTATE/INTER-REGIONAL EXCHANGES FOR THE MONTH OF MARCH 2015
From/ To
k`maaMk
A
gau}ivainaila map`iva]kMila
Craivabaao
maraiva]kMila
GUVNL MPPGCL
CSEB
MSPGCL
gaaovaa
dmana dIva
da na h
kula
0.000
4
maraiva]kM ila MSPGCL
0.000
5
gaaovaa GOA
0.000
6
da na h DNH
0.000
7
8
kaorbaa KORBA-III
JPL
1.728
2.195
12
laonakao Lanco -Pathadi
13
ACBIL
14
KSK MAHANADI
15
JNSTPP(NIGRIE)
16
DB POWER
17
VANDANA
18
EMCO
19
ESIL
20
ER
piScama xao~
Craivabaao CSEB
JAYPEE
SR
pU xao~
3
11
NR
d xao~
map`iva]kMila MPPGCL
ESSAR MAHAN
ESIL
] xao~
2
ADanaI pavar APL
DNH
[ssaar
1
9
DD
Annex-4.6
Interstate/Inter-regional Schedules
included in ISGS
gau}ivainaila GUVNL
10
GOA
Anaulagnak 4.6
WR TOTAL
1.046
1.046
133.320
133.320
0.000
25.200
68.902
38.880
134.710
27.440
29.635
0.000
0.000
14.071
9.360
23.431
1.080
2.772
0.000
NSPCL
21
]<arI xao~ N.Region (WR end)
23.705
22
dixaNaI xao~ S. Region (S. Bus)
0.000
0.000
23
pUvaI- xao~ E. Region (WR end)
188.879
188.879
24
p xao~ W.Region (WR end)
25
enaTIpIsaI NTPC Injection
5798.034
26
enapIsaI NPC Injection
1025.624
27
Total ISGS drawal from the Grid
incl. interregional/ bi-lateral
exchange
, UIExchanges
and trans.not
loss
Interstate/IR
included in ISGS
B
####### 902.913
3780.200 1958.973
799.407
2768.547 324.629 180.626
86.580
23.705
3136.926
447.483
20
knaa-Tk Karnataka
21
yaUpIpIsaIela UPPCL
0.000
0.000
22
AarvaIpIenaela RVPNL
-7.32
-7.320
23 UPPCL ( Excess Drawn From Rajghat
0.000
0.000
24
kaoTa ]jjaOna Kota - Ujjain
0.000
25
kula ba Total B (13 to 17)
53.98
0.000
0.000
-7.320
0.000
3780.200 1951.653
799.407
C
inavala ivainamaya Net Exchange (12+18)
D
kula Aayaat Total Imp. by WR
E
kula inayaa-t Total Export by WR
F
inavala ivainamaya Net Exchange (D-E)
G
p xao~ Wara vaIlD }jaa- Energy wheeled by WR
26
pU xao~ sao d xao~ kao inayaa-t ER export to SR
53.980
0.000
53.980
0.000
0.000
46.660
2768.547 378.609 180.626
447.483
10306.525
259.244
3136.926
-2877.682
0.000
d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ER/WR
0.000
28
d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR
0.000
29
pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR
0.000
30
] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR
31
pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR
27
0.000
0.000
0.000
478.999
0.000
32
pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NR/WR
0.000
33
]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR
0.000
0.000
0.000
478.999
0.000
0.000
0.000
Anaulagnak 4.7
Annex-4.7
maah maaca- 2015 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MARCH 2015
ivavarNa Particulars
kmaaMk
gau ] iva ina ila GUVNL
]ka[-
Sl. No.
Ukai
map`iva]kM ila
gaaMQaIsaagar
MPPGCL
Gandhisagar
ena eca DI saI
NHDC
[Midra saagar
Indira Sagar
maraiva]kM ila
MSEGCL
kaoyanaa
1 Levels in Mtrs. str maITr maoM
1.1
maah ko AMt maoM
96.10
392.24
252.24
648.04
100.30
396.31
252.02
639.99
At the end of the month
1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM
Corresponding Figure of the
month Last Year
Koyna
ANNEXURE- 5
List of Grid Disturbances and Grid incidents (GD/GI) in March-2015: Western Region
Sr.
Details of incident (Elements / Generation Tripped) Owner Utility
No.
1
2
Multiple Tripping of Karad, kolhapur and GOA on
over voltage
Akola(II) ICT tripping
Date
Time
MSETCL
01/03/2015
3:31
MEGPTCL
29/03/2015
14:04
Effect (Loss of generation/ Load), if Category as per CEA Grid
any
Standards
Load Loss : 700+ 280 MW Gen loss of
: 400MW
Gen Loss: 458 MW
GD-1
GD-1
ANNEXURE 8.4
Sr. No.
Utility
CC Location
Site
ready for Hardware
installatio supplied
n
Hardware
installation
Commissioning
Start Dates
1
WR-LDC BCC Delhi
No
Yes
MPPTCL BCC Bhopal
No
Yes
SAT
Remark
DGM WRLDC informed that back up control centre for
WRLDC New Delhi building would be ready by May
2015.
Representative from PGCIL informed that building
construction is under progress and building would
2
th
be ready for installation by 30 April 2015
3
4
5
6
7
GETCO BCC Gandhi Nagar
Yes
Yes
CSPTCL BCC Bhilai
No
Yes
Yes
Yes
In Progress
Yes
Yes
Yes
Yes
Done
GSED
BCC Cuncolim
DDED MCC Daman
DNHED MCC Silvasa
Done
Done
CE (LD) informed that building is ready for installation
CSPTCL informed that Backup SLDC Bhilai would
th
Done
be ready by 30 June 2015
Representative from GOA informed that installation
is under progress
Installation under progress
Site not ready . Interior work to be done
ANNEXURE-8.8
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE,
NAYAGAON, JABALPUR
Telephone: (0761) 2702744/2702753 Fax: (0761) 2664343 e-mail sldcmpseb@yahoo.com
No. SE/LD:E&T/ RPC-15/967
v kbZ, l v ks: 9001-2008
ISO: 9001-2008
Jabalpur, dated 26.03.2015
To,
Member Secretary,
Western Regional Power Committee
F-3, Central Road, MIDC Area,
Marol, Andheri (East), MUMBAI 400 093.
Sub: - Issue of less requisition/RSD of NTPC stations discussed in 28th WRPC
meeting and procedure submitted by NTPC in 469th OCC meeting.
Dear Sir,
The issue of problems due to less requisition in ISGS stations particularly
Mauda TPS was discussed in the 28th WRPC meeting and a consensus was reached
on MPPMCL proposal. The procedure for RSD submitted by NTPC in 469th OCCM
mentions that at least 30% of entitlement should be scheduled by beneficiaries in R0,
which is not as per the consensus reached in 28th WRPC meeting. In the 28th WRPC
meeting, MPPMCL had not agreed to give schedule equal to at least 30% of its
entitlement in R0 and with this the methodology was agreed. Hence the methodology
should be as detailed below to reflect the decision taken in 28th WRPC :
1. If requisition of any beneficiary is zero, or very less and generation
schedule is less than Technical Minimum, beneficiary can ask WRLDC to
take out the unit in RSD.in case beneficiary is not asking for RSD:-
a) NTPC will inform beneficiaries and RLDC to enhance schedule
to Technical minimum.
b) If Schedule is still less, NTPC will inform RLDC and SLDCs and
propose for withdrawal of unit.
c) Even then if no corrections are done and schedule is less than
technical minimum level, NTPC will withdraw the unit in RSD and
inform to all SLDCs and WRLDC.
d) Earlier only beneficiaries were declaring and asking for RSD. Now
NTPC can also initiate for RSD. Duration of RSD will be 72 hours,
however in case of emergency, NTPC will be asked to bring the unit
early.
2.
In case of unit is taken on RSD, generation schedule for NTPC will be
restricted to On-Bar capacity.
3.
For this NTPC will declare both ON BAR & OFF BAR and the resultant
total DC (to WRLDC). (NTPC will not give DC for Units under forced and
planned outages).
4. WRLDC will also indicate on bar and total DC entitlements of constituents.
5. Constituents will give requisitions in R0 as per their requirement in
entitlements only on ON BAR DC.
6. WRLDC will ask constituents to increase their requisition at least up to
Technical Minimum of ONBAR DC. Accordingly, R1 schedule will be
issued.
7. If a unit is taken on RSD and any constituent has requisitioned more than
their entitlement from on bar DC, the same will be scheduled to him limited
up to his entitlement from total DC and this will not be considered as URS.
8. When requisition of any constituent is shifted to other stage or other
station and the same is scheduled, it will be on Variable cost only. It will
not be considered as URS for fixed cost sharing.
Accordingly, it is requested to please include the same in the MOM of 28th
WRPC meeting and inform the same in 470th OCCM.
Thanking You,
Yours faithfully,
Sd/Chief Engineer (SLDC)
MPPTCL, Jabalpur.
Copy to :
1. The CGM(Regulatory, MPPMCL, Jabalpur
2. The G.M. (PM), MPPMCL, Jabalpur.
ANNEXURE 10
SR NO
1
2
3
UTILITIES
CHHATTISHGARH
DD
GUJARAT
OCC NO.
454
455
456
STATUS
MONTH
Dec-14 HOSTED ON 10.12.13 AT RAIPUR
Jan-14 HOSTED ON 16.01.14 AT DIU
HOSTED ON 13.02.14 AT
Feb-14 VADODARA
-
4
RGPPL*
457
Mar-14
5
MAHARASHTRA
458
Apr-14
NTPC, HQ-II Raipur*
459
May-14
7
WRTS-I
460
Jun-14
HOSTED ON 11.03.14
AT MUMBAI BY NTPC
MUMBAI HQ-I
HOSTED ON 16.04.14 BY MSETCL
AT MUMBAI
-
6
REMARK
HOSTED ON 12.05.14
AT MUMBAI BY WRPC
AT RELIANCE
HOSTED ON 13.06.14 AT NAGPUR
8
9
10
11
KWPCL
TAPS-1&2
NTPC Gandhar/Kawas
RELIANCE SASAN
461
462
463
464
Jul-14
Aug-14
Sep-14
Oct-14
12
WRPC
465
Nov-14
13
MADHYA PRADESH
466
Dec-14
14
WRPC
467
Jan-15
15
ESSAR TRANSMISSION
468
Feb-15
held on 16.02.2015 at Mumbai
16
BDTCL/JBTCL
469
Mar-15
17
NTPC VINDHYACHAL
470
Apr-15
held on 10th March 2015 at Nagpur
held on 13th April 2015 AT
LUCKNOW
18
WRPC
471
May-15
19
TORRENT POWER
472
Jun-15
20
TATA POWER
473
Jul-15
21
JPL
474
Aug-15
22
TAPS-3&4
475
Sep-15
23
ESSAR ESIL
476
Oct-15
24
NTPC SIPAT, CG
477
Nov-15
25
CGPL
478
Dec-15
26
NTPC Mouda
479
Jan-16
27
KSK
480
Feb-16
28
RELIANCE TRANSMISSION
481
Mar-16
29
APL
482
Apr-16
30
DNH
483
May-16
31
NCA
484
Jun-16
32
GOA
485
Jul-16
33
KAPS
486
Aug-16
34
RKM POWER GEN
487
Sep-16
35
NHDC
488
Oct-16
36
NTPC, Mumbai
489
Nov-16
37
38
39
40
ADANI TRANSMISSION
WRTS-II
SUGEN (TPL)
NTPC KORBA
490
491
492
493
Dec-16
Jan-17
Feb-17
Mar-17
HOSTING ON 10.07.14
AT RAIPUR BY
KWPCL(IPP)
hosted on 11.08.2014 at TARAPUR
hosted on 12.09.2014 at Bharuch
Hosted on 13.10.2014 at Varanasi
11.11.2014 at WRPC
Mumbai
Hosted on 09.12.2014 at Jabalpur
held on 16.01.2015 at
WRPC Mumbai
TO BE HELD ON
13.05.2015AT WRPC
21/04/2015
Grid Operation Highlights for Year 2014-15
• Installed capacity as on 28th Feb2015 93876 MW. Growth in
installed capacity is 7.42 % compared to last year(87389 MW).
• Average Frequency for the year 2014-15 was 49.97Hz.
470th OCC Meeting
13th April, 2015
Average Freq touched 50 Hz in the month February’15.
Maximum Demand Met- 45283 MW on 26th March 2015
at12:00 hrs. ( Second highest - 45081 MW on 29th Sept 2014).
(Last year
42253MW on 11th Feb 2014)
 Growth - 7.17% compared to previous year.
Max Energy Consumption - 1028 Mus on 29thSept 2014 (943
Mus last year on dtd 5th Feb 2014)
 Growth - 9.01% compared to previous year.
Grid Operation Highlights
Grid Operation Highlights for Year 2014-15
New Element addition
 Capacity Addition- Generating units of 12886 MW
capacity. - (1.47 MW/hr)
 Transmission lines (765, 400 kV & 220Kv (PG)) - 9192
Ckt km.
• Total 52 Nos 765 KV lines in WR out of which 20
Nos.765 KV lines added this year) – (1.05 ckt km/hr)
 ICTs added- 17260 MVA
 MVAR added-10705 MVAR ( line reactor- 6635 MVAR
and bus reactor- 4435 MVAR)
Addition of New Elements – March
2015
GENERATING UNITS Added in March-15
S.NO.
STATE/ISGS/IPP
STATION NAME
CAPACITY
(MW)
UNIT
1
IPP (Maharashtra)
Ratan India Pvt Ltd.
270
IV
2
IPP (Maharashtra)
Ratan India Pvt Ltd.
270
V
3
IPP (Madhya Pradesh)
MBPOWER
600
I
4
IPP (Chhatisgarh)
JPL Stage -II
600
IV
5
IPP(Reliance Power,MP)
Sasan UMPP
660
VI
Total
Capacity added in Mar’15- 2400 MW
2014-15 – 13156 MW
2400
Total Capacity added in
DATE
07/03/2015
(COD)
13/03/2015
(COD)
19/3/2015(Syn)
26/03/2015 (Syn)
27/03/2015
(COD)
ICTS Added in March-15
SL.NO.
CONSTITUENT
STATION NAME
KV RATIO
CAPACITY(MVA)
DATE
1
GETCO
Asoj
400/220
315
17/03/2015
2
Powergrid
Bhadrawati
400/220
315
17/03/2015
3
MEGPTCL
Koradi ICT-I
765/400
1500
26/03/2015
4
MEGPTCL
Koradi ICT-II
765/400
1500
27/03/2015
5
Powergrid
Vindhayachal PS ICT-II
765/400
1500
29/03/2015
Total
5315
Total Added in Year 2014-15 –
17445 MVA
1
21/04/2015
Transmission Lines added in March-15
S. No. CONSTITUENT
1
LINE NAME
POWERGRID Magarwada (PG)-Magarwada (DD) D/c
CKT No
KV
DATE
CKT.KM
I & II
220
17/03/2015
2
LINE Reactors added in March-15
S.No CONSTITUENT
STATION
NAME
Line Name
KV
CAPACITY
(MVAR)
DATE
765
240
29/03/2015
765
240
27/03/2015
Total
480
1
POWERGRID
Vindhyachal
Satna-Vindhyachal ckt-I
2
POWERGRID
Aurangabad*
Wardha-Aurangabad cktIV
2
MEGPTCL
Akola(2) -RIPL (Ratan India Power L)
3
POWERGRID
Sasan-Vindhayachal PS-I
4
POWERGRID
Wardha-Aurangabad
III
765
30/03/2015
370
5
POWERGRID
Wardha-Aurangabad
IV
765
30/03/2015
370
6
POWERGRID
Powergrid Solapur- NTPC Solapur
I&II
400
30/03/2015
11
BUS Reactors added in March -15
7
GETCO
Mundra-Varsana*
II
400
31/03/2015
85
SL.NO. CONSTITUENT
STATION NAME
KV
CAPACITY
(MVAR)
DATE
8
GETCO
Mundra-Varsana*
III
400
31/03/2015
85
1
POWERGRID
WARDHA BR-3
765
330
28/03/2015
9
POWERGRID
Sasan-Vindhayachal PS-I
I
765
31/03/2015
8
2
POWERGRID
WARDHA BR-4
765
330
28/03/2015
10
POWERGRID
Satna-Vindhyachal PS
I
765
31/03/2015
237
Total
660
Total
1384
I & II
400
20/03/2015
208
I
400
26/03/2015
8
* Interim arrangement of Mundra-Zerda Line.
* Line Reactor charged as Bus Reactor
Total MVAR added in year 2014-15 - 10705 MVA
Ckt km added in Mar-15 is 1384 ckt km. and
Total Added in year 2014-15 = 9192 ckt.km
( Line reactor- 6635 MVAR and Bus reactor- 4070 MVAR)
Energy Met of WR constituents over a period 8 Years
Maharashtra Energy Met in Mus
500
450
CAGR-6.38%
400
300
200
Energy in Mus
350
250
250
150
200
100
01-Oct-14
01-Oct-14
01-Oct-13
01-Apr-14
01-Apr-14
01-Oct-12
01-Oct-11
01-Apr-13
01-Apr-12
01-Oct-10
01-Oct-09
01-Apr-10
01-Oct-08
01-Apr-09
01-Oct-07
60
50
40
30
20
01-Oct-13
01-Oct-12
01-Apr-13
01-Apr-12
01-Oct-11
Time
01-Apr-11
01-Oct-10
01-Apr-10
01-Oct-09
01-Apr-09
01-Oct-08
01-Oct-07
01-Oct-14
01-Oct-13
01-Apr-14
01-Oct-12
01-Apr-13
01-Oct-11
01-Apr-12
01-Oct-10
01-Apr-11
01-Oct-09
01-Apr-10
01-Oct-08
01-Apr-09
01-Oct-07
01-Apr-08
01-Apr-07
01-Oct-06
0
Time
Chhatisgarh Energy Met
Linear (Chhatisgarh Energy Met)
10
Madhya Pradesh Energy Met
01-Apr-08
50
01-Apr-06
01-Apr-06
01-Jul-06
01-Oct-06
01-Jan-07
01-Apr-07
01-Jul-07
01-Oct-07
01-Jan-08
01-Apr-08
01-Jul-08
01-Oct-08
01-Jan-09
01-Apr-09
01-Jul-09
01-Oct-09
01-Jan-10
01-Apr-10
01-Jul-10
01-Oct-10
01-Jan-11
01-Apr-11
01-Jul-11
01-Oct-11
01-Jan-12
01-Apr-12
01-Jul-12
01-Oct-12
01-Jan-13
01-Apr-13
01-Jul-13
01-Oct-13
01-Jan-14
01-Apr-14
01-Jul-14
01-Oct-14
01-Jan-15
01-Apr-08
70
100
Time
CAGR-7.97%
80
150
0
01-Apr-07
01-Apr-…
01-Oct-14
01-Apr-…
01-Oct-13
01-Apr-…
01-Oct-12
01-Apr-…
01-Oct-11
01-Apr-…
01-Oct-10
01-Apr-…
01-Oct-09
01-Apr-…
90
CAGR-5.51%
200
Time
Chhatisgarh Energy Met in Mus
01-Apr-07
Linear (WR Energy Met)
0
Gujarat Energy Met
100
Energy in Mus
WR Energy Met
01-Oct-08
01-Apr-…
01-Oct-07
MP Energy Met in Mus
250
200
Time
0
Energy in Mus
400
01-Apr-…
600
01-Oct-06
Energy in Mus
50
0
50
Maharashtra Energy Met
Linear (Maharashtra Energy Met)
01-Oct-06
100
01-Apr-11
150
800
01-Apr-06
CAGR- 6.38% (period of
8 years)
CAGR-6.88%
300
Energy in Mus
1000
Gujarat Energy Met in Mus
350
01-Oct-06
1200
01-Apr-06
WR Max.Energy Met (2006-07 to 2014-15)
2
21/04/2015
ENERGY CONSUMPTION OF WESTERN REGION
(2012-13 TO 2014-15)
1100
Annual Growth –
9.01% (Max)
1,028
722
700
Energy
Feb-15
Mar-14
Consumpti Mar-15
on MU/Day
Average
892
933
858
Max
1013
993
941
Date
26-Mar-15 24-Feb-15 29-Mar-14
% Change
w.r.t last
month
-4.46
2.07
~
Annual Growth –
8.62 %
20424
20399
202 Mus drop in Energy
Consumption on 1st
March 2015 compared to
28th Feb’15
% Change
w.r.t last
Year
3.95
7.68
~
Demand
Met
Mar-15
Feb-15
Mar-14
% Change
w.r.t last
month
Average
39977
43074
37156
-7.19
7.59
Max
45283
44750
40236
1.19
12.54
~
~
Date when
26-Mar-15 24-Feb-15 26-Mar-14
Max.
Annual Growth –
11.35 %
15000
14000
19000
70
14005
13000
18000
60
52.3353.19
12000
16000
MW
MW
17000
15000
10000
14000
9000
13000
8000
12000
7000
50
Madhyapradesh Demand Met 2013-14 to 201415
11000
Annual Growth 0.78 %
10000
MONTH
Chhattisgarh Demand Met 2013-14 to 201415
3770
MW
MW
6000
Annual Growth –
8.99 %
2000
5000
2013-14
MONTH
Mar
Feb
Jan
Dec
Nov
Oct
Sep
Jul
Jun
Apr
Feb
Aug
2014-15 MONTH
Mar
Jan
Dec
Nov
Oct
Sep
Jul
Jun
May
Apr
Aug
2013-14
May
1500
4000
10
Month
2500
7000
45.36
0
3000
8000
48.29
20
3500
9000
53.73
IEGC Band
Jan
Feb
Mar
Dec
Oct
Nov
Sep
Jul
Jun
Aug
2013-14
4000
10,050
60.15
58.47
52.9453.60
30
Apr
MONTH
55.7
50.16 49.5
40
May
Feb
Mar
Jan
Dec
Nov
Oct
Sep
Jul
Aug
Jun
May
Apr
11000
2013-14
Frequency
Profile
IEGC Band 49.9-50.05
Gujarat Demand Met 2013-14 to
Maharashtra Demand Met 2013-14 to 2014-15
20000
Mar
Jan
MONTHS ---->
Feb
Dec
Oct
Nov
Sep
Jul
Aug
Jun
May
Apr
600
2013-14
• Average
demand met
(hourly)in
Mar’15
increased by
7.59% wrt last
year.
Minimum Energy
Consumption : 722 Mus
on 1st March 2015 (Min of
2014-15 also)
( heavy rainfall/Weekend
effect/ tripping in
Maharashtra)
800
21000
• Max Demand
Met 45283
MW on 26th
March
Consumption : 1013 MUs
on 26th Mar’15 (7.68%
higher than last year).
900
2012-13
Max Annual
Growth 7.17%
1013 Maximum Energy
CONSUMPTION IN MUs ---->
1000
•
High Frequency Day : (On 1st March)- All India Demand low
(116 GW)due to inclement weather. 13000 MW load loss in
Maharashtra due to multiple trippings.
% Change
w.r.t last
Year
Regional Demand met
Max: 45283 MW on 26th
Mar’15 at 12:00 hrs
Min: 25460 MW
(2nd Mar’15, 04:00 hrs)
Average: 39977 MW
49.9-50.05
Months
<49.9
>50.05
FVI
April'14
30.64
52.33
17.03
0.16
IEGC Band
May'14
22.48
53.19
24.33
0.13
June’14
37.15
45.36
17.49
0.24
July’14
34.51
50.16
15.33
0.2
Aug’14
37.87
49.5
12.63
0.19
Sept’14
28.13
55.7
16.16
0.43
Oct’14
25.55
52.94
21.52
0.13
Nov'14
16.49
53.60
29.90
0.10
Dec'14
23.85
48.29
27.86
0.14
Jan'15
17.46
53.73
28.81
0.12
Feb'15
12.30
60.15
27.56
0.08
Mar'15
17.77
58.47
23.76
0.10
Maximum
on 1st March at
50.54 Hz 03:37 hrs.
instantaneous frq
on 3rd March at
Minimum
49.52 Hz 18:57 Hrs and 20th
instantaneous frq
March at 5:51 hrs
Avg Freq of the
Low Frequency Day : On 3rd March at 18:57hrs due to load
month
change over time and O/D of MAH and Gujarat. On 20th Mar at
5:51 hrs due to O/D by Delhi, UP, Tamilnadu, Gujarat, MP,
Chhattisgarh & Rajasthan.
49.98 Hz
3
21/04/2015
Average 17.77
50.54
80.00
60.00
49.52
40.00
49.52
20.00
<49.9
49.9-50.05
31-Mar
29-Mar
27-Mar
25-Mar
23-Mar
21-Mar
19-Mar
17-Mar
15-Mar
13-Mar
0.00
9-Mar
23.76
100.00
11-Mar
58.47
Frequency Profile as per the IEGC band
for March 2015
120.00
7-Mar
>50.05
53.08
37.09
25.66
26.91
21.99
47.64
33.61
35.42
25.09
22.60
17.83
25.66
17.92
16.78
16.78
32.47
16.59
17.49
17.35
7.47
4.22
15.51
18.89
10.93
20.03
17.10
17.10
25.81
29.11
34.36
28.18
53.08
5-Mar
49.9-50.05
42.95
45.58
58.30
60.36
68.50
47.62
51.02
59.81
61.62
65.11
61.17
66.19
65.63
53.07
53.07
57.22
66.84
68.22
60.38
47.30
48.99
64.54
62.09
57.25
64.99
60.49
60.49
60.58
62.05
50.61
60.54
68.50
3-Mar
<49.9
3.97
17.33
16.04
12.73
9.51
4.74
15.37
4.77
13.29
12.29
21.00
8.15
16.45
30.15
30.15
10.31
16.57
14.29
22.27
45.23
46.79
19.95
19.02
31.82
14.98
22.41
22.41
13.61
8.84
15.03
11.28
46.79
1-Mar
Date
1-Mar
2-Mar
3-Mar
4-Mar
5-Mar
6-Mar
7-Mar
8-Mar
9-Mar
10-Mar
11-Mar
12-Mar
13-Mar
14-Mar
15-Mar
16-Mar
17-Mar
18-Mar
19-Mar
20-Mar
21-Mar
22-Mar
23-Mar
24-Mar
25-Mar
26-Mar
27-Mar
28-Mar
29-Mar
30-Mar
31-Mar
Max
>50.05
Compliance to DSM : MAR-2015
3000
63
2106
1863
70
62
53
1849
1582
1000
60
50
40
30
20
500
10
0
90
2000
Blocks=2976
89
2500
No of Blocks
No of Blocks
80
71
2000
1500
100
90
in %
2500
2634
2336
1500
1000
500
0
0
Compliance: When drawl is within 12% of the schedule or
150 MW whichever is lower
Gujarat Wind Generation 2013-14 Vs
55.70 2014-15
60.00
Maharashtra Wind Generation 2013-14 Vs
2014-15
on 23rd June 2014
100
90
78
2671
60.00
50.00
50.00
40.00
40.00
49.19 on 19th July,2014
80
62
1849
70
60
50
40
in Mus
3000
Compilance of DSM Polarity Reversal :
March-15Total no.of
in Mus
Total no. of Blocks=2976
in %
Compilance of DSM Volume Limit :
March-15
30.00
30.00
30
20
20.00
20.00
10.00
10.00
10
0
Compliance: When drawl changes sign within 12 consecutive time block
0.00
0.00
Deviation of MP remained within 12% of schedule for 71 % of time blocks
Maharashtra reverse its deviation polarity for 90 % of time
2013-14
2014-15
Month
2013-14
2014-15
Month
4
21/04/2015
GUJARAT SOLAR GENERATION Total = 152.64
MU
Wind Generation(in Mus)
2000
8.00
7.00
6.00
7.28
5.00
4.35
1155
1051
868
1000
4.00
868
%
MUs
1500
4.51
567
1.36
3.00
708
2.52
500
3.33
3.33
31-Mar
29-Mar
27-Mar
25-Mar
23-Mar
21-Mar
Date
0.43
104
100
568
347
401
1.15 1.38
100
95
0.39
0.41
0.44
130
0.48 0.50
2.49
2.12
516
1.98
582
2.00
2.11 1.00
0
0.00
Apr-14May-14Jun-14Jun-14Jul-14Aug-14Sep-14Oct-14Nov-14Dec-14Jan-15Feb-15Mar-15
RES Installed Capacity (in MW)
Constituent
Wind Solar
Gujarat
3478
903
Maharashtra
4080
230
Madhya
347
321
Pradesh
Total
7905 1454
180
160
140
120
100
80
60
40
20
0
Solar Generation 2014-15
0.40
0.40
0.40
0.36
Total Wind
Generation
1927
1818
116
120
Maharashtra
Total Wind Generation in WR
2500
123
0.47
120
0
MUs
Months
1
0.50
0.55
126 127
0.30
80
%
Gujarat
153
%of energy met
138
0.49
19-Mar
March 15
0
140
17-Mar
 Max – 44.27 Mus on 10th
2
15-Mar
200
Total MUs
139
9-Mar
 Maharashtra- 214 Mus
0.60
160
3
13-Mar
400
4
7-Mar
 Gujarat- 369 Mus
180
11-Mar
WR – 582 Mus
600
5-Mar
800
Total Solar Generation in WR
GUJARAT
5
3-Mar
Generation(in Mus)
 Total Wind Generation of
MUs
1000
6
1-Mar
 Wind Generation in March-15
153
139 138
Generation(in Mus)
1200
120
123
104
95 100
116
126 127 130
60
0.20
40
0.10
20
0
0.00
Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar14 14 14 14 14 14 14 14 14 15 15 15
Months
Agenda Items
5
21/04/2015
Outage Coordination - Uncertainties
•
Description of Element(s) whose outage is required
•
Incomplete Dia
– Additional outage required due to unforeseen site conditions
– Yet to be commissioned
– Forced outage
– Reactor / Line opened on H.V
Agenda Item Nos-3.2
•
–
–
–
–
•
•
•
•
•
•
4-Nov 2006 (Saturday), Blackout in Poland, France,
Portugal, Spain, Morocco, Greece, Balkans
•
•
•
•
•
•
In September, a shipyard requested shut down of 380 kV Conneforde–Diele red
and white line in Northwest Germany from 01:00 hrs on 5 Nov to allow a ship
to pass beneath the overhead cables.
Planned S/D was approved. Message sent to all neighboring TSOs. Scheduled
power flow between TSOs was limited for 00: 00 to 06:00 hrs on 5th Nov.
In D-2 i.e. on 3rd Nov, the shipyard requested to prepone the shut-down by
three hours and allow SD from 2200 hrs on 4 Nov.
Germany Operator allowed it. However, by the time message reached the
neighboring TSOs the transfer capacity had already been sold and it was not
possible to change it except for force majeure.
The moment Shut dwon was availed system was overloaded, Relay over reach
led to cascade tripping and UCTE area split
The cause of this major blackout was a planned routine disconnection of a
powerline crossing
Uncertainty in network Availability
Delay in restoration of elements already under planned outage
Forced outage
Emergency outage
Rescheduled planned outage
Weather conditions
Grid conditions
Network observability, Telemetry non-availability
Multi utility and wide area co-ordination
Socio political issues
Human factors, Communication gap during Baton transfer
Blackout in Turkey on 31st March 2015
• The outage had reportedly began after shutdowns
linked to technical faults at two power plants in the
western city of İzmir and southern city of Adana.
• The outage occurred when the maintenance work on
transmission lines were conducted simultaneously in
several cities connected with the same grid.
• "Confidence in the system, the self-confidence of the
personnel and a tendency to take too many risks
brought us to this [outage]. The personnel should
have postponed the maintenance of one line when
there was a failed line," Turkey Official said.
6
21/04/2015
Shut down of 400kV Sasan-VSTPS-2
Agra
NR
Transmission Lines Before Vindhyachal Pooling Station
S No
Requested Date
WRLDC Approval
Status
1
20-Feb-15
Yes
Deferred by CPCC
2
21-Feb
Yes
Deferred by CPCC
3
24-Feb
Yes
Deferred by CPCC
4
26-Feb
Approved on 28-Feb after
restoration of Telemetry
Not availed by CPCC
5
2-March
Yes
Reschedule by CPCC
6
3-March
Yes
Availed
7
23-March
Yes
Deferred by CPCC
8
28-March
Yes
Availed
9
4-April
Yes
Deferred by CPCC
10
12-April
Yes
Reschedule by CPCC
11
13-April
Yes
Reschedule by CPCC
12
14-April
Under Review
Agra
NR
Gwalior
Present Status of Transmission Lines After commissioning of
Vindhyachal Pooling Station
Gwalior
Satna
VSTPS
Unit-12
Bina(PG)
Vindhyachal PS
(PG)
Satna
Rihand
NR
Rihand
NR
VSTPS
Unit-12
HVDC
Bina(PG)
HVDC
VSTPS IV
Sasan
Jabalpur PS
(PG)
VSTPS IV
Sasan
VSTPS
VSTPS
Jabalpur PS
(PG)
Jabalpur(PG)
Jabalpur(PG)
7
21/04/2015
Item No -5
Grid Disturbance Akola(II)
•
Antecedent conditions before the Disturbance
29-03-2015
• 765 kV Wardha-Aurangabad 1 & 2 under planned outage (for commissioning of
ckt-III and IV)
• SR TTC reduced by 200 MW
• Tirora generation was limited to 1800 MW
• Maharashtra drawal within 5300 MW
•
Permission issued to test charge the 400 kV Akola2-Taptithanda ckt2 for 15minutes as requested
•
Event
• Tripping of 14 EHV transmission elements at 14:03
• Isolation of 765 kV and 400 kV bus at Akola2 due to tripping of single 765/400 kV
ICT
• Tripping of Unit # 2,3, 5 at Rattan Power (Loss: 440 MW)
• Unit # 8 Koradi-II (Loss : 110 MW)
• Blackout at 400 kV Akola1, Akola2 and Rattan Power
• 400 kV Wardha-Parli D/C > 850 MW, SPS operated: Mouda: BD=100 MW, LS in SR
• Reverse power flow on 765 kV Solapur-Raichur D/C and 765 kV Solapur-Pune thus
relieving the line loading on 400 kV lines from Eastern Maharashtra to Western
Maharashtra (load Centers)
• 80 MW load distress shedding to control overloading of 220 kV lines from Akola
• Fault
• Uncleared B-Ph fault on 400 kV Akola2-Taptithanda ckt2 at
14:03:55.090
• Failure of Distance protection at Akola2…Loose CVT
connections on secondary side
• Working online in protection system at Akola2
• Failure of Distance protection at India Bulls/Rattan Power
• Non-graded O/V settings leading to uncontrolled O/V tripping
• Issues
• Lack of due diligence during first time charging of new
elements at Akola2 and at Rattan Power.
• False certificate by utilities.
• DR not configured completely
• Telemetry not available from 400 kV Taptithanda
• Request was to test charge the line for 15 minutes only but
the lines was not hand tripped even when CVT voltage was
seen to be zero. (fault occurred 26 minutes after the test
charging)
8
21/04/2015
Outage of Bay Elements
Ideally each element must be connected to two buses. But in
reality, Facts are different
• Several bays are not commissioned, elements may be
connected to only one bus
• More than one element is charged through a common
breaker instead of independent breaker
• Circuit breaker status not available at WRLDC, so it
becomes difficult for ascertaining the configuration
• Bay outages already availed for construction /emergency /
maintenance, so, additional outage may lead to bus split
and loss of elements more than intended
In view of the surprises in the network, approval of bay
outage also requires careful examination which is possible
only in offline mode by reliability coordinators.
Item Nos 8.7
OCC approval for 400kV Bay Outages
Case 2: Not Commissioned/Not in service Tie Bays at
765kV Aurangabad
Case 1: Not Commissioned/Not in service Tie Bays at 400kV
Aurangabad Aurangabad-1
BR-1
Boisar-1
Boisar-2 Akola-2 Akola-1 Aurangabad-2
Future
400/220 ICT-3
400/765 ICT-I 400/765 ICT-II Future Wardha-1Wardha-2
Future
Future Padghe-I Padghe-II Dhule
BR
Bus-I
Bus-I
Bus-II
Bus-II
400/220ICT-1
400/220ICT-2
Future
Emergency outage of 400kV Bus-2 on 12-Mar-15
• CPCC Nagpur confirmed that there will be no loss of other elements
• After availing outage on 400kV Bus-2
• 400kV Boisar-1 LR, 400kV Boisar-2 LR and 400/220kV ICTs got
tripped.
Wardha-4
Wardha-3
Wardha-1
Future
Wardha-2
ICT-II ICT-I
4 Tie CB not Commissioned at 765kV Aurangabad:
• 765kV Wardha-Aurangabad-1 , 2 , 3 connected to 765kV Bus-II only
• 240 MVAR LR of Aurangabad-Padghe-II charged as BR is connected
to 765 kV Bus-I only ( On 13th March )
9
21/04/2015
Case 3: Bus-1 Shutdown at 400kV Kotra
Raigarh-1 RKM-2
RKM-1 Athena-2 Athena-1 DB Power-2 DB Power-1 ICT-1
Bus-2
Bus-1
Item Nos-8.5
Sasan Continuous Backing down
• 400 kV Kotra - Raigarh-1 connected only to 400 kV Bus-1 at
Kotra
• Outage on Bus-I on 16-18 March by Athena Power results in
forced outage of 400 kV Kotra-Raigarh-I
• 400 kV DB Power-2 connected only to 400 kV Bus-2 at Kotra
• Outage on Bus-II on 19-21 March by Athena Power results in
forced outage of 400 kV Kotra-DB Power-II
Item Nos 9.1
Transmission Constraints in Maharashtra
10
21/04/2015
Heavy Over Loaded Elements
From
Indore(PG)
From Vadodara
GIS
From Seoni
Ratan Power
Aurangabad II
(Taptithanda)
Dhule(BDTCL)
From
Raipur
Akola
Wardha
Aurangabad(PG)
Bableshwar
From Durg
Akola(II)
Aurangabad
(Ektuni)
Dhule
Koradi(III)
Tirora
Recently Added New Elements
Waluj
Padghe(MS)
Pune GIS
Heavy Over Loaded Element
1. 765/400kV ICTs Aurangabad(PG)
2. Aurangabad(PG)-Waluj D/c
3. Waluj-Pune
4. Bableswar-Padghe
Parli(PG)
Pune(PG)
Solapur
(PG)
To Raichur
WRLDC
New Element
New Elements
From
Indore(PG)
From Vadodara
GIS
Aurangabad II
(Taptithanda)
Koradi(III)
Ratan Power
Tirora
From Durg
Akola(II)
Dhule(BDTCL)
Aurangabad
(Ektuni)
Dhule
From
Raipur
Akola
Wardha
From Vadodara
GIS
From Seoni
Koradi(III)
Tirora
Except 765kV Pune-Solapur all the
commissioned elemets are upstream
of Aurangabad
Indiabulls
Dhule(BDTCL)
Aurangabad II
(Taptithanda)
Aurangabad
(Ektuni)
Dhule
From Durg
Akola(II)
From
Raipur
Akola
Wardha
Bableshwar
Bableshwar
Aurangabad(PG)
Aurangabad(PG)
Aurangabad(MS)
Aurangabad(MS)
Padghe(MS)
Padghe(MS)
Pune GIS
Pune GIS
Parli(PG)
Pune(PG)
1.
2.
3.
4.
5.
Solapur
(PG)
Parli(PG)
Pune(PG)
765kV Tiroda-Akola D/c LILO at Koradi(III)
765kV Wardha-A’bad-3,4
400kV Akola(II)-Tapthithanda-2
Rattan Power-Akola D/c
765kV Solapur-Pune S/c
1.
2.
3.
4.
5.
Solapur
(PG)
To Raichur
WRLDC
From
Indore(PG)
From Seoni
765kV Tiroda-Akola LILO at Koradi(III)
765kV Wardha-A’bad-3,4
400kV Akola(II)-Tapthithanda-2
Rattan Power-Akola
765kV Solapur-Pune
To Raichur
WRLDC
11
21/04/2015
Measures Suggested to Relieve Congestion
From
Indore(PG)
From Vadodara
GIS
From Seoni
Ratan Power
Aurangabad II
(Taptithanda)
Koradi(III)
Tirora
Akola(II)
Warora
Dhule(BDTCL)
Measure suggested to relieve
congestion
Aurangabad
(Ektuni)
Dhule
From Durg
Akola
From
Raipur
Wardha
Bableshwar
Aurangabad(PG)
Aurangabad(MS)
Padghe(MS)
Pune GIS
Parli(PG)
Pune(PG)
Solapur
(PG)
To Raichur
1. 400kV Dhule MSETCL bays for
BDTCL(Dhule) Line
2. 220kV Outlet from Tapthithanda
3. 220kV Outlet from Aurangabad(PG)
4. 220kV Outlet from Warora
5. By passing of Waluj from
Aurangabad(PG) to Pune
WRLDC
Maharashtra Telemetry Status
Item Nos 9.2
Constraints in Grid operation due to NonAvailability of Telemetry from MSETCL/
MAHAGENCO Stations
1
2
3
4
5
7
Telemetry not available
400kV Warora
400kV Lonikhand(New)
400kV Chandrapur StgII
400kV Taptithanda
400kV Khaparkheda
Further, 17 more stations where 220kV
station data is not available
Telemetry highly Intermittent
400kV Jaigard
400kV Deepnagar
400kV Bhusawal
Total 48 Stations 220kV data
is intermittent
S No.
Event Date
Event Description
Telemetry Not Available from
1
29-March-15
Grid Disturbance at Akola(II)
14 EHV element tripped,
Generation Loss 650MW and
Load Shedding of 80MW
Tapthithanda, Akola(II), Warora,
Chandrapur(II), Bhusawal,
Deepnagar, Bableswar
2
1-March-15
Blackout at Kolhapur, Karad,
GOA
N Koyna, Jaigarh, Koyna, Jejuri
Stg-IV, Chakan, Lonikhand
12
21/04/2015
Item Nos- 8.8
Scheduling Technical Minimum
Share from ISGS
13
21/04/2015
14
Download