ATAL-BELGOPROCESS JOINT VENTURE Contract No. EP/SP/40

advertisement
ATAL-BELGOPROCESS JOINT VENTURE
Contract No. EP/SP/40/02
Low Level Radioactive Waste Storage
Facility at Sin A Chau
Environmental Monitoring and Audit
Quarterly Report (Version 1 .0)
April - June 2005
July 2005
Certified By
(Environmental-Team Leader)
REMARKS :
The information supplied and contained within this report is, to the best of our
knowledge, correct at the time of printing .
CINOTECH accepts no responsibility for changes made to this report by third parties .
CINOTECH CONSULTANTS LTD
Room 1602-1610, Delta House,
3 On Yiu Street,
Shatin, NT, Hong Kong
Tel : (852) 21512083 Fax: (852) 3107 1388
Email: info Lc,cinotech .com.hk
ATAL-Belgoprocess Joint Venture
Contract No.EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Sin A Chau
Quarterly EM&A Report for April to June 2005
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............... ........ ............... ............. ........ ....................... .. ........... ................. ....1
Introduction ...... . ... ........ ... . ... .... . .. ... .. ... ... .... ...... ... . ....... .... ... . .... ... . ... .... .... .... . ... .... . ... . .... ... . . ... .... . .. . . ... . l
Environmental Monitoring and Audit Works . ... .. ...... . ... ... . . ... .... ....... . . .. ..... ... . ... . ... . . ... .... . ... . . .. . ... . ....I
Environmental Licensing and Permitting ... . .... ..... ...... . ... .... . ... .... . ... ... . . ... ....... . ... . .... . ... . .... . . .. . ... ... . ....I
Complaints and Prosecutions ... .. . ....... ... . . ... . . ... . .... ... .... . .. ..... ... . .... ... . . .. . ... . ....... . ... ..... ... . ... . .... . ... .... . ...1
Status of Waste Management ... .... ...... . .... ... . . ... . .... ... . .... . .. .... ... . .... ... . ... . ... . . ... .... ... ...... ... . ... .... . ... . .... ...2
Key Information in the Reporting Quarter .. . ... . . . .. ... . .... ... . ........ . .. ... . .... .... . ... . ... . .. . . ....... . ... ..... ... . .... ...2
1.
INTRODUCTION ....... ............ . . ......................................... . . ................. ........ .... . . .........................3
2.
PROJECT CHARCTERISTICS ...... ............. ............. .. ........ ............................ .... .... ..... .............3
Project Organization and Contacts of Key Management .. .... . ... ... . . ... ..... ... . ...... . .... . .... ... . ... . ... ..... .... .3
Construction Programme and Synopsis of Work .... ... ... .. .. ..... ... .... . ... ..... .... . ..... . . ... . ....... . . ... ..... ... . ....3
3.
4.
5.
6.
ENVIRONMENTAL MONITORING REQUIREMENT.......................... ........................... . ..4
Monitoring Parameters and Monitoring Locations . ... . .... ... . . ...... . ... .... . ... . .... ... ... .. .... . .. . ..... .. . . ... ... . .. ..4
Monitoring Methodology and Calibration Details .. . ....... .... . ... .... . .. ..... ... . . ... ... . .. . . ..... ... ..... ... . ... .... . . ..4
Enviromnental Quality Performance Limits (Action and Limit Levels) . . ... .... . ... . .... ... . .... ... . ... . .... . . .4
Environmental Mitigation Measures ... . .... . ... . ... . . ... ... .... ... . .... .... ... . ... ... . . . .. . . .. .... . ... . .... .... .... ........ ..... ..4
MONITORING RESULTS .................. ..... ............................... . . . .......... ......................................5
Water Quality.. .... . ... ..... ..... . .... .... ... . .. . .... ... . .... ..... ... ... . . ... .... ... ..... ... . .... .... .... .... ...... .. . .. . .... ... . . ... .... . ... . .5
AUDIT RESULTS ..... ............ . ..... ............................ ........ ............... .............. ....... .........................5
Implementation Status of Environmental Mitigation Measures .... . . .. ..... ... . .... ... ..... .... . ... ..... . . .. ....... .5
Status of Environmental Licensing and Permitting . . .. ..... ... ..... ... .... . .. ......... . ... .... . ... ..... ... . .... .... ........6
Status of Waste Management .. . ...... ..... ... ..... ..... ....... . . . . .... ... ..... ... ..... ... . . ....... ... .... . .... .... ... . .... ... . . ... ....6
NON-COMPLICANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY
PERFORMANCE LIMITS (ACTION/LIMIT LEVELS) ............. ........ ................... ......... .......7
Summary of Exceedances . ... . .... ....... . .. . .... .... . . .. . . ... ... .... . ... .... . ... .... .. . ..... .... . ... ... . .... ..... .. . .... .... .. .. .... . ..7
Review of the Reasons for and the Implication of Non-compliance .... ..... ... ... . . ... ..... ... . ........... .......7
Summary of Actions Taken .. .... ... . .... ... .......... .... . ...... .... ... . . .. . ... . ....... . ... ..... ... . .... .... . ... .... . . .. .... .... . .....7
7.
ENVIRONMENTAL COMPLAINTS ......................................................... ............. .................7
8.
NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS ....... .................7
9.
COMMENTS, CONCLUSIONS AND RECOMMENDATIONS ... ............................... ....
10.
CONTACT DETAILS OF THE PROJECT PROPONENT .................... ........... .. ................... 7
F:\Projects\HW3025\R\Rpt 50718 vl .0
1
Cinotech
Contract No. EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Sin A Chau
Quarterly EM&A Report for April to June 2005
ATAL-Belgoprocess Joint Venture
EXECUTIVE SUMMARY
Introduction
This is the seventh quarterly Environmental Monitoring and Audit (EM&A) Report prepared by
Cinotech Consultants Limited for the "Low Level Radioactive Waste Storage Facility at Sin A Chau"
(the Project) . This report documents the findings of Environmental Monitoring and Audit (EM&A)
Works conducted in between 1 5` April 2005 and 30 °'June 2005 inclusively.
The site activities undertaken in the reporting period were Construction of Permanent Jetty, Removal
of temporary working platform, Finishing works, E&M works, and Testing and commissioning.
Environmental Monitoring and Audit Works
Environmental monitoring for the Project was performed regularly as stipulated in the EM&A Manual
and the results were checked and reviewed. It was informed that the marine works were completed on
10°' June 2005 . Therefore, the water quality impact monitoring was conducted up to 10`h June 2005
and has been ceased starting from 11`h June 2005 . Site audits were conducted once per month. The
implementation of the environmental mitigation measures, Event Action Plans and environmental
complaint handling procedures were also checked. A summary of non-compliance in the reporting
quarter is tabulated in Table I.
Table I
Summary Table for Non-compliance Recorded in the Reporting Quarter
Parameter
No. of Events Exceedin
Action Level Limit Level
Station W1-W3
No. of Exceedances
due to the Project
Action Taken
DO (mg/L)
Turbidity
(NTU)
0
0
0
N/A
0
0
0
N/A
SS (mg/L)
0
0
0
N/A
0
0
0
N/A
0
0
0
N/A
Station WS
DO (mg/J-)
Turbrdity
(NTUI
F
Water Quality Monitoring
Water quality monitoring was conducted as schedule until 10°' June 2005 during the reporting quarter.
No exceedance of Action/Limit Level for dissolved oxygen, turbidity and suspended solids was
recorded in the routine and 12-hr continuous water quality monitoring in the reporting quarter.
Environmental Licensing and Permitting
License/Permits granted to the Project include the Environmental Permit (EP), the Further
Environmental Permit (FEP), the Water Discharge License and Construction Noise Permit .
Complaints and Prosecutions
No environmental complaint and prosecution was received in this reporting quarter.
F:\Projects\HW3025\R\Q\Rpt 50718 v1 .0
1
Cinotech
ATAL-Belgoprocess Joint Venture
Contract No.EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Siu A Chan
Quarterly EM&A Report for April to June 2005
1.
INTRODUCTION
1 .1
Various industrial, educational and medical facilities in Hong Kong have, for a number of
years, used radioactive materials and generated radioactive waste. Most of the existing waste
arisings are stored in disused air raid tunnels close to Queen's Road East in Wan Chai . Other
arisings are stored temporarily (although in some cases for several years) at the point of use in
educational institutions or hospitals .
1 .2
The condition of the Queen's Road East tunnels has been found to be unsatisfactory and
various parts of the tunnel system suffer from leakage and ingress of water. The condition of
some of the waste packages has subsequently deteriorated and they are generally unsatisfactory
for the safe long-term containment and storage of radioactive materials.
1 .3
The existing facilities are unsatisfactory and in addition are located closed to a high density of
population, which make access to, and management of, the waste more problematic. As well as
existing waste, there is also a continuing need to use radioactive materials in Hong Kong and a
continuing predictable amount of future waste arisings. Therefore, the Government has
decided that storage of low-level radioactive waste in Hong Kong requires a dedicated,
purpose-designed facility. After a thorough consultancy study in the "Environmental Impact
and Safety Assessment Report, June 1995 (Stage 1 EISA)" and evaluation, the preferred site
located on the island of Siu A Chau in the Soko Islands, adjacent to the small bay of Sum Wan
on the eastern side of the island was selected .
1 .4
Environmental Protection Department (EPD) commissioned the construction and operation of
the Low-Level Radioactive Waste Storage Facility (LRWF) at Sin A Chau (hereinafter referred
as the "Project") under Contract No. EP/SP/40/02 to ATAL-Belgoprocess Joint Venture
Limited (hereinafter called "the Contractor") in July 2003 . The Project site layout is shown in
Figure 1 .1 and the location of the environmental sensitive receiver is depicted in Figure 1 .2.
1 .5
An Environmental Permit (EP) (No. EP-131/2002) for the Project was issued on 11'" April
2002 to the Special Waste Facilities Group, EPD as Permit Holder . The Contractor
successfully obtained a Further Environmental Permit (FEP) (No. FEP-01/131/2003) on 30 °'
July 2003 .
1.6
Cinotech Consultants Limited (hereinafter called the "ET") was commissioned by the
Contractor to undertake the Environmental Monitoring and Audit (EM&A) works for the
Project. This is the seventh quarterly EM&A report summarizing the EM&A works for the
Project between 15` April 2005 and 30a' June 2005.
2.
PROJECT CHARCTERISTICS
Project Organization and Contacts of Key Management
2.1
An organization structure and the line of communication were set up for the Project between
the Project Proponent, Engineer Representative (ER), Independent Environmental Checker
(IEC), the Contractor and Environmental Team. The Project organization chart and contact
details are shown in Figure 2.1 and Appendix A respectively.
Construction Programme and Synopsis of Work
2 .2
The short-term construction programme is presented in Appendix B . The site activities during
the reporting period are summarized in Table 2.1 .
F:\Prcjects\HW3025\R\Q\Rpt 50718 v1. 0
3
Cinotech
ATAL-Belgoprocess Joint Venture
4.
Contact No .EP/SP/40/02
Level
Radioactive
Waste
Storage
Low
Facility at Siu A Chau
Quarterly EM&A Report for April to June 2005
MONITORING RESULTS
Water Quality
4.1
Water quality monitoring was conducted as schedule during the reporting quarter . It was
informed that the marine works were completed on l00' June 2005 . Therefore, the water
quality impact monitoring was conducted up to 10' h June 2005 and has been ceased starting
from 11 `h June 2005 .
4.2
No exceedance of Action/Limit Level for dissolved oxygen, turbidity and suspended solids in
the routine and 12-hour continuous monitoring was recorded in this reporting quarter.
4.3
Graphical presentations of the variations of water quality parameters are shown in Appendix E.
5.
AUDIT RESULTS
Implementation Status of Environmental Mitigation Measures
5 .1
According to the Environmental Permit and the Environmental Impact and Safety Assessment
(EISA) Reports, the mitigation measures detailed in the documents are required to be
implemented . The implementation schedule of the environmental mitigation (EMIS) is
provided in Appendix F.
5.2
Monthly environmental site audits were conducted on 29`h April 2005, ls` and 30`h June in the
reporting quarter. During site inspection in the reporting period, no non-conformance was
identified. The observations and recommendations are summarized in Table 5-1 .
Table 5-1
Date
Observations and Recommendations of Site Audit
Parameters
Water Quality
Air Quality
Noise
29 April
2005
Waste/
Chemical
Management
Permit/
Licenses
Others
Is' June
2005
Water Quality
Air Quality
Observations
Construction materials were
placed near the coast.
Open stockpiles were not
covered by tarpaulin sheet or
other alternatives .
No environmental deficiency
was identified.
N/A
No environmental deficiency
was identified.
N/A
No environmental deficiency
was identified.
The environmental deficiency
items identified in the previous
site audit was not rectified by
the Contractor .
No environmental deficiency
was identified.
Open stockpiles were not
covered by tarpaulin sheet
or other alternatives.
Haul road was observed dry.
No environmental deficiency
was identified .
5
F:\ProjectsVIW3025\R\Q\Rpt 50718 v1 .0
Noise
Remedial Actions
The Contractor was reminded to
place the materials properly.
The Contractor was reminded to
implement dust mitigation
measures more properly.
N/A
The Contractor was urged to
rectify the deficiency.
N/A
'
,
The Contractor was reminded
to implement dust mitigation
measures more properly.
Water spraying should be
provided to avoid dust
eneration.
N/A
Cinotech
ATAL-Belgoprocess Joint Venture
Contract No.EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Sin A Chan
Quarterly EM&A Report for April to June 2005
approved WMP.
6.
NON-COMPLICANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY
PERFORMANCE LIMITS (ACTION/LIMIT LEVELS)
Summary of Exceedances
6.1
No exceedance of Action/Limit Level for dissolved oxygen, turbidity and suspended solids was
recorded in this reporting quarter.
Review of the Reasons for and the Implication of Non-compliance
6.2
There was no non-compliance from the site audit in the reporting quarter. As mentioned
previously in the Section 5.3 of this report, a summary of observations and recommendations
made in each individual site audit session was presented.
Summary of Actions Taken
6.3
In this reporting quarter, the following mitigation measures were implemented:
Inactive open stockpile and cut slopes were covered with tarpaulin sheets ;
Excavated/dusty materials were sorted on site and covered with tarpaulin sheets ;
Surface channels and a sedimentation tank were cleaned regularly; and
A silt curtain was installed around the discharge point of the sedimentation tank.
11
7.
ENVIRONMENTAL COMPLAINTS
7.1
No environmental complaint was received in this reporting quarter. The complaint log of the
Project is provided in Appendix H.
8.
NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS
8 .1
No notification of summon or successful prosecution was received in this reporting quarter.
There was no notification of summon or successful prosecution received since the Project
commencement.
9.
COMMENTS, CONCLUSIONS AND RECOMMENDATIONS
9.1
Finishing works and E&M works were the main activities in the reporting quarter. No
significant impact on water quality was identified . The mitigation measures adopted were
therefore considered efficient and effective.
9.2
It was informed that the marine works were completed on 10 h June 2005. Therefore, the water
quality impact monitoring was conducted up to 10th June 2005 and has been ceased starting
from IIth June 2005 . It is recommended to whenever marine works is required for the
construction of the Project, water quality monitoring can be reiterated.
10.
CONTACT DETAILS OF THE PROJECT PROPONENT
10.1
Appendix A shows the contact details of the Project Proponent for public enquiry or complaint
relating to the Project.
F:\Projects\HW3025\R\Q\Rpt 50718 v1 .0
CONTRACT NO . EP/SP/40/02
LOW LEVEL RADIOACTIVE WASTE STORAGE FACILITY AT SIU A CHAU
SITE LAYOUT PLAN
r.%PEVEnskxwazewRPVEw~ensamE~REaw*lrn~E lxnvc
o sec
Scale
NTS
I"°'
HW3025
L.V.
1 .1
Dote
NOV
03
(INitanfs
Irml£a
Jrc,SIHIV3o75-UJtIV
NoRadioactive
Government
EP/SP/40/02
Administrolivc
rrilily
ofProjection
Ho,
natrickho@ala
aeriuACbnuvtdwnt[narredylOJOJ
the
Waste
Engineer
Region
Hong
BEng
MSc2565
Team
(Civil
Kong
(Hon
Department
Storage
(BS,
3433,
3477,
Vi,
cam
Lee,
Eng
Electrical)
/&
Yem,
BEng
2565
2565
chr
Elva
2565
key
hk
Fax
ravin
Fax
Construction
kelvinklcha
-Engineer
M
MSc
/Organization
Facility
Assistant
Engineer-in-charge
3159,
ivanvinatal
Chan,
3155,
staffs
Yeung,
3155,
covet
(Hon
281
2811
GradDip
tdvemOatal
/(Real
13321,
Graduate
Fax
Fax
BEng
Fax
332
being
MSc
(Mechanical)
BEng
rzEstate),
Project
1,Manager
atal
2811
2811
(Tech
At
Mobile
(Hon
(Meth
shown)
(Hon
com
Engineers
3321
3321
Sin
MIStructE,
Manager
Mgt)
z3tk/lEng
9612
/9688
Site
-cannnsriun
/A
Felix
Chart
Chan
6369
Agent
(BS,
1854
Lo
ICIOB
Mechanical)
BEng
rca,n(Rev
o,0,
(Hon)(ne,2)l)As
2
Environmental
The
Special
Contract
.
Low-Level
Construction
.
(Only
Raymond
BEng.(Chem),
Tel.:
.:
e
Email:
:
.lik
Christopher
BSc,
.),
.:
:
Tel.:
Email: i~hedeenatal.com.h k
Ivan
E
Tel:
Email:
Kelvin
Project
Tel:
Email :
Patrick
Assistant
Email :
F.v'r
.srnmge
.
.)
l
Tel:
.
.),
.
.:
.com.hk
.
n
.)
.)
.:
.coni
.
.)
.
.
nenatal .com .hk felixlo@atal .com.hk
.ofor~figumsV"'iSnm .
.,,
Fig
.1
Mogow
Environmental protection Department
ThvGovemmentaMeRgngngng
SlwcinlAdminkInliveRegion
Rev. 2, 26 April 04
Contract No. EP/SP/40/02
Low-Level Radioactive Waste Stor
Project Organization Chart
Project ManagementTeam
fr. C. Y. Fong
Project Director
It. Raymond Chan
Deputy Project Director
Mr. Rik Vanbrabant
Assistant Project Director
It. Barry Lee
Project Manager
It. Simon Chung
Project Director
It. Lawrence Fung
Project Manager
It. Sam Tsoi
Environmental Specialist & IEC
Mr. Tso Chi Fung
Radioactive Waste Specialist
Environmental Monitoring & Audit Team
Dr. H . R Chan (Cinotech)
Project Manager (EISA Stage 2)
Dr. John Leung (HKU)
Radioactive Waste Specialist
Mr. Jesse Yuen (Cinotech)
EM&A Team Leader
Radioactive Waste Management Town
Mr. Hansen, Jurgen
Project Manager
Mr. Goetschalckx, Rene
Assistant Project Manager
Mr. Giclen, Paul
Mr. Van Laer, Wim
Safety Issues
Mr. Sannen, Herman
Transport Issues
fr. Rupert Leung
Project Manager
Ms . Celia Lee
Architect, Authorized Person
It . Ben Kwok
Project Engineer (Marine, Geotech .)
In John Wang
Project Engineer (Structural)
It . Terrence Cheung
Project Engineer (BS, E & M)
Please refer to the attached sheet
for more details of the site
construction team
Mr. Deckers, Jan
Operation Manager
Mr. Hansen, Jurgen
Assistant Operation Manager
Mr. Gbys, Bart
Operation Issues
fr. Nelson Hong
Maintenance Manager
Mr. Dresselaers, Rudy
Saferv Issues
Category I Site Supervision
Mr. Sidney Wong
Tel. 2911 2523
Mobile 9260 9585
Category III Site Supervision
Mr. Pui Wing Fat
Tel . 2981 9378
Mobile 9304 2004
AFAL Belgoprocess Joint Venture Limited
~~i7~1~
.-mo
ATALEnOwe~In91NWe4
R.Impm«u
o
FIG 2.1
LEGEND
W
- WATER SAMPLING STATIONS
WS - WATER MONITORING STATION WITH
LOGGING WATER QUALITY INSTRUMENT
Title
CONTRACT NO . EP/SP/40/02
LOW LEVEL RADIOACTIVE WASTE STORAGE FACILITY AT SIU A CHAU
LOCATIONS OF WATER nlJALITY MONITORING STATIONS
~\PEGJEETS\XV70t5\OFWING\EXA4\200<\FIGIWE LI.UVG
Scale
Date
N .T .S
2004
Project
HW3025
CINOTC ~
rcanr~,
IEmI
o
APPENDIX A
CONTACT DETAILS OF THE PROJECT
ORGANIZATION
Appendix A-Contact Details of the Project Organization
Party
EPD
Role
Employer's
Representative
ATALBelgoprocess
Joint Venture
Contractor
Cinotech
Environmental
Team
Ove Arup
Independent
Environmental
Checker
Name
Position
Phone No.
Fax No.
Mr. Alex Ng
PEPO
2872 1800
2591 6662
Mr. Davie Kan
SEPO
2872 1682
2591 0636
Mr. Richard Fok
EPO
2872 1686
2591 0636
Project Manager
2565 3150
2811 3321
Construction
Manager
2565 3477
2811 3321
ET Leader
2151 2091
31071388
Audit Team Leader
2151 2083
3107 1388
IEC
2268 3211
2268 3950
Mr. Barry Lee
Mr.
Christopher
Lee
Mr . Jesse Yuen
Mr. Henry Leung
Mr. Sam Tsoi
APPENDIX B
CONSTRUCTION PORGRAMME
~a1a,bra -'1- .aI19
rn
..,1a..
-o
`m
A
~°i4
5YYe,ll:- ;d . °.G±GG e,
e .
3~ ,. 3
3° ''3 :~ .
3i"
zn-xr°'.
-~_~_~y
31x,
9 .Le:Y ..R ..k .d .3o.B u a e;
I$
$
-8§ .?I4
'. v, saaava
.
R
xd
B .G°5 .,
o .5'vR °°
0
eao
o
io s
u
Hi :l:ir:.g 'f .i.313 :mIf,R.$A:tixa°1 .§i .IfSin
.r._-va.7aa.°.aa
aa
a a
a rasv., e°,~maac~x
:a°an oaa:,a°~
o
0
ATAL BELGOPROCE
ES
SS JOINT VENTURE
EP/SPI40/02 LG")_EVEL RADIOACTIVE WASTE STORAGE FACILITY), SIU A CHAU
Design and the Works Programme
(Rev . G)
v IV~+iNbigsmJeIN.pirvrdtni bJICpa'avp
1<ppr5
Ihxy o,+-< aArr-R+pa-oxlerxx,h,ISSIM
<sa*n
huxvvaxm.wpLwlwdp+s
ssoa<Tx
R`. :,nyaval a,xy,9me,nrE:MMwar.IVPmngICrE SUb/e
vr,wmpw.+h tp1-~ui : : .un
Truer
C^. .vdpe cTC4vnEWg11:kN
i3aArs
RIMS, p'a au1v7 Gp<vC Tx:b,F73ALyIVER 7UVM
ppp W p' v`anOP .Cb EW L7 (JFR
301+1
Pr,w ,a~anpoam mpnw ,9crsn
3oa<ys
Iq, 1,®MhxMNbypWddpeayrvvmveRSSI,Mb 47Mri
P ~ a,p Novel a V :mv pUn
- 177 apra
R (m'r,v W a UwpbnaylGER
EUMrx
np,.w,MyA,<a&
y~.br7crEri
1wcry5
P ,;ax::e,.1G,a 1
uemr"
R w,alode alysiEa
aa,:
n odNtMys
vNMQ4A1
.u16rIbEP
w
1<arya
P I:arexMxupMrL da
d<MYs
. Mx++sd IyERAW'pypORwb
3 ,[
r,v.>'eiwJwbIRtomrgnrc7eia,
niMrs
nw..wn....ml rgecrc~:Ly1W>.apt
wean
I M:1(ovye(:ryy b Ly1GpWaCe
1, - aa,5
A exseai,Ul'N h'dv,RIC9,~aUp2R
Mr.
Su - dpp£a rcrPV..00U M' ~Mp71G~E 7daay
IlArpl 1
BJaMp
GSrS,:rd " MaLpttal7rf30.A5n
7aWn
mp, yir wRx e
R:^rvgrwaILyS . sam
Ja-P,.<lySe. z Mrx
N,IISwyMO.a hr
~d m,amivarev L no.n
P nayp Y
Ihc'vS4nE1 2fags
r++av'slm
r}p:l
C4
drq
SO
C.
al I M
S9My5
/Lp7
orrpa rrsaw'w amppnmM paepa,paxza, zuw/x
lA aeda Stlrla,sal nv ppNel
dvMR
E axeap>,rFLC,m_ :s,.
a vpa+alnyEro
Inaa;,
A ' rclbr~wp,4 ' - p,! a:Myn,pmMlyEPn Saar:
/ M IF been 1mpyR avLttMU -N
Mil,,,
I AKavv SwNfp p plkv
0avy,
7 a,
I aEVUlpm IS h I
Yavv<
N M
701
pm ryluf,
G a ,.e1vn.V r Imv:" ml YM ],UVgS
p . ad,L,m del~7.v
.4..adari
a epow7d en wad MI w,l siMn
31iMrx
vm+r e~:aIpxrlP~e w axe
P
brir. Mm a,a ra' Idnn,sM INh xaa,ebrc Izse,t5
r zpl 7lpluYMhag <sm,
soam
c
his Pn a IIpmSrdw,n,rsalava"b,M¢ ,wa,1x
r oxax,pn n.pa rvxe,.mM
sedan
(
b71C
awalpp:nrd T aavaLYJmR 13am
M .-0wANlpmgv< h"af
1n3Mra
c, .NIC
,e mpa- Iwr+rn:-,nm«o-~lPn ITlieap
rap: -iea,M,ILVp+nlbpvma0mpsbp
stain
.by-CaIdLVywIdIMR,%1Nbvvxsbv
rK;O
70Mri
r aw ML,MaI .<b, lereel .Me
cam INC m am ,sw
,sJUF .
zzop
sxw
z3A,u
3a sop
ZJA,p
8Nw
1Ra
.6Jav
13Jan
zloa
A
Is .
iswls
1v
sJp
1 Fb
rJW
Sap
nee
sA,r
NtMr
,91
tGpup
p
,7S,
one
nx
37Lki
1 Nw
tans
z ran
'3ne
3Mq
e0 Ly
3F6
9N r
Isup<
23N
Ulan
AAp
z Jl
,sl
7111
,si
,ad .
19 NW
nn,
7911,.
SS .t,
z*I,.
Jav
xNw
9F86
z(k
n
< M21 M,
z,FON
1aN,v
TNb
tUps
ldJan
SrAV
12JmM
2feb
apv
~
17da,
z
11 .
J
s:
$7 F b
36,
SS p
anP
;dr/Ry
91I N1,
Npi
Bldu
PN
<ls.,oli<5
111fe.
77 nee
<IJ. ,
n 1.,
7PF
dnC
31 .F/
91A
9Alp
v+,.
3JJ,1
3410
1.10
1531p
avox
- Airy
islr,c
nuay
edkm
zswr
79Nry
<i7a
1 ~.
iAR
ram
,Ap
- adb~ .
_:a
.81,
Esy.
ax
Z
10m
7W%
1.
70U
es
UA
's
IMUG
sss
,ax
as=
sk
atF
fOC%
iNOF
WA
sc
4.
I.M.
PT
7Sx"RVOri
7wa3
am
7,M
ar
np~.
.spX'
100%
IPoT
10a.
ios "
:UO% w
UyR
a'
U
tom.
10m
ICM6 'yr.nem
- 700
loot:
;,
lob
;oU. eat;
,0ok
took
laoa
:Um;
101%
100%
,sue
;07F
II
yl
I I
I
I
I I
r.inm
I
"
iy
III
I
I~
I
LLL
j
I ~
I Ej
F~~
II
.I ~I
I
1
I
I II1 II
il
M
I~
,I
I
I'
II
I
'
~
II
I
I
I
I
I
I
I' L~_, i_ I I
_
II
~_I
I .,._
li I' l
~I I
1 1 I
!.
_a l
_IIG~I
1
II
I
I
1
I
i
.
I~
I
<~e
-2
I
I
L
i
,
.L
is
i
1
~
.,xebm..i I .
I
I
li I
V
1!1 I! .1-1
I d ,l
; I
~~TI
~ I
I
, I
!
(
I!
I1
I
I I
I
alI : II - II III !I
1r
I I. .I
II
i II I
I
Il;;~~
Il Ii I
;I
. .II.
,71 11
LI
III- .
llil
~ ~~f-~ll
III
_I
I
III Il tl71: 1 i
I~
11 1 1
II
I1I
II
~
I ~e~~L
IJ li I
II I ~ Iil ~~~I
. IIi
I I i II
I
h l '. I I I i 1
! III
'?
,I
I
I,
" ATAL BELGOPROCESS JOINT VENTURE
EP/SP/40102 LQ".EVEL RADIOACTIVE WASTE STORAGE FACILITY'-'~SIU A CHAU
Design and the Works Programme
(Rev. G)
Lmav
'rGai :
FIM.71ngLxp!""y5.vyu
PY "gDevI
k'Sfl_nv'v0"]Prs%aliena(MCANaIOn
PAe ~..dwmleereb ;ay'
vla a-~-~
voAUD:raIaywYIq
zle'S
FmcIpaF
.81Wdt7gxM<iaTM.." drcIYICIevFw
Ip7dap
ap
dBddy
mDuanPbmUmMalIaIa`uYdl
'.NGip
EvIaWiAMV.rpu;ienbcPNpdvmSNmIUnnFea]P'aCa
5^. GAYS
NaYmtty.bvJUnnlmb
Im1ayADmolcePCCAmbpe~IZUAmzeMCpA<PDS
7.
III(
'elv7vGVnN[seee[RmcdSeMVAPGAdSalhs7[NXpBn
2<dap
fenymGV"" dcFmvandhvmF
Idda75
fle "mrvAlNsa:W!"l4%19nWaryxvpnpW'8m
7GH5
flemGMdgncre!eDbJS
1VWY5
flcv.JINK[c,cCGUb ..
lnn5DY7ene13"+DS(Wnxrvn .o".P~["AUU" i91
10dM
SeAMGNGVeyArdRPP'.NRn]Palm7WyY
7dwn
1 .sWI ;rMIdjS.YIVLW
Lomhu[71Pno1Perm3eeelLVUSerey6YWdAr[v
176Wyn
aa .
vra,3~n :.Aala':iIAIAI"y
ama5i"DDGlaarsea.a
I 110
66dA
66 ~
PIDI%D:311dp'eoLladlDS7FbLIgMY
Ws
~M Raw
10dap
F7lindv7knb3rv[]SS~eiX
Nni[mmlsrmOlOAH+.iY76dP)9
78dat'3
CvnsducbnbFbLDa :NY.r
Ln ,M
YVnC IDarJIYB
6fsr+
iGrys
blavnbbdy
t tt wfawny
>Va7s
G rp01cm7C FDMUN
]Slays
L Ira JenelMl
R nwSL,G
. 21WyD
laINCICG N244CddWaDYbr75WPNPHINNN"I'
EI" [DnnbNe
N"gppeN9w0'ndsfivYIMr<SAC 11GPY5
m deys
Fp'uhN0V7vd".andAlMwn]nvvu5
no
1L Ils
WemaIN'tllDgvayclllok "Jatcn
IIGwngF»yvqxaPS mr ma,T[aISvAYrwnxTBen3Hlmn tadiy3
InYna14"59Y.7na1.'.la maintubv9
TO ."
rI
=`a d
Ele"wlf5v5Nmwll:v
<
SE'
ay'.
Irrsbl MT"e5a[n.Gwtle.,bAN "clu.IromIVpeIies
4ShpN7lvxJl,
21My5
I<ESyS
Inb]le~7yhv5e[yaies
', y5
InsankD)Iwpnhm" 391d
7 dAfx
NsmPAPrvDnPArtlN4ngaTnnl
MBdayf
Eb1AVJAIkS
21SCe'Ja
l.Smufa".vInMNHdeIhpybzMO
2
AN :"uSCU(mdvMhlirepdOVbFw]va"Ie
tn7dd
dx,5
un'gn .TGVWn7NUEttYmdvN"v
~GayS
"IenNP7Y "agYEdYivttYbmmMalmlbla4b
iCddayS
a"Iala7Yn'gzMdF'NaryP'lVw ;1DDF+N
AInmImlxlgv" dde'YmyDimrt.'bf9el .C.
'.7Bfsrs
d,,5
ntA iiWAV arndfie
'"
"yM1v'xv'n"avsxI"3eulq
IM
III,,
1
,oJmAJmld P. .nbwn'm+YS:~m
137Gay5
pAMMYr .YYD`AIVALq¢(Aevl
ItOd,ys
1A ,dsW " ryNgGe .eybPNqUVn]nl
IMG,YS
I7 S 1 ]mJmIG FMpe1F$M+JPn M
"YIA'Ja""o;,IdGAL.,Syegs.I ;w.r .aa.[Imez.a
_ _
fbJ
26d'vI
wya
20 .75
aza,p
2<Ga l.
$10.
WIT
13
nnp
Iam,
211Y1
21 1a1
6Aad
2<A"y
27 SP
27 SIP
160d
P
IBJ
".7J.n72 FAD
dMp
21
F
72
2 FM
ItA:a
dMw
7]AUg
IXw
nnaz
I I..
Jee
ItJNI
PJNI
27JAP
$1.
FJ
1. Jan
IVJM
77JVe
17AVe
31
1
31/IY V
II naD
75 av
29 Nw
17ie0
4 V.,
<Mm
37 Jan
I
15MI,
22 .
16 .'
21 .V"
18,Y0
7Ap
8AV
.1,I
7~
2'..,
21JUn
20JV
I1 sa,
livai
601
7p1t
IM
I63Iry
1.
7.Ln
12'1
2811
1M
a5ns.5 ..
n7<q
fow,
va .1m7
z6AIa
tm°.
ZYSYUn
30<c
&554
10
.
T5
771M
7Wa
SDA 9r ."uva
.stu
dbe
LNi
_
N.7
18 Jan
V`.4
I ., POT
31KK
PF N7I
tVIAN
G:
UFeG
0'F
1.U,
M <v.7uT5'7
12y
Ui
11
IAIA>I
qi Su,fi ..<Ms
1BFV0
Dn
7nne
7VJanz
IOC,d
7yoc
IWpp
vmF
n
7De,A
'I Jan
tVJan
2N
P.6 aon"
VK
75Wn
_
%:
28JVn
DPp
dtJa'.
.
M
7FeD
M
»I
yMi
p-A
19 F.
D`n
7BFYe
" ,I
vMS
3VJaA
Pq
IBFCG
0`3 y:EP "[" aan
7
OY
MMnI
IPM ~TB.Ia/a "r
DMt
30 "LM
.
135a
IM
B
0Jee
7V% 7]5'ao ;
:DJ .-m,
%555SF?IN
I5<ry ;
t2JAn
VFS
ex
mn..~
~
dt.:x
77 Ir
70 MS
"Fm`
" .a,
eEac
160y
t65w
16S
76AP
7<6eP
IIP
I
161"'1
1600
.
d0
.:
sNm
12 .
Crb
CA
Vn
IW"n
"COY
7M%.
'
1WS. ly7r .aan
lei:
1%:;
t~
toti%
;
1D7 n'Fa,n
IM
IW57
IIOS,
I
L
t
C
IT
T
£
1
~
1®".r~
I ~
I
5
,
Nr ;nHn
i
i°i
l
'
C
APPENDIX
MONITORING
REQUIREMENTS
Appendix C - Monitoring Requirement
Monitoring
Stations
Co-ordinates
Northing
Easting
Wl
804471 .4
809611.2
W2
804330.9
809558 .6
W3
804393.9
809725.0
Parameters, unit
" DO Saturation, %
" DO, mg/L
" Temperature, °C
" Turbidity, NTU
" SS, mg/L
" Conductivity
" Water depth, m
12-Hour
" DO Saturation, %
809535 .9
804555.2
Monitoring
, DO, mg/L
Station: WS
" Temperature, °C
" Turbidity, NTU
No-772-consecutive readings of in-situ parameters will betaken in order to agree accuracy within 25%
Depth
Three depths (lm below
surface, mid-depth and lm
above seabed) at mid-flood
and mid-ebb tides
data
Mid-depth,
with
at
every
5
minutes
logging
for 12 hours between 0700
and 1900
Frequency
t
wekmc during
construction of
unloading
facility
APPENDIX D
ENVIRONMENTAL QUALITY
PERFORMANCE (ACTION/LIMIT)
LEVELS
Appendix D - Environmental Quality Performance (Action/Limit) Levels
(1) Action and Limit Levels for Water Quality at Stations W1 to W3
Parameter
Mid-Ebb
DO, mg/L
Action
6.3
Bottom
6.1
2 or 5 .9 (1%-ile of baseline data)
13 .4
14 .8
or 120% of upstream control
station's Turbidity at the same
tide of the same day
9.9
SS, mgt
DO, mg/L
4 except 5 for Fish Culture Zone
or 6.1(1%-ile of baseline data)
Surface and
Middle
Turbidity, NTU
Mid-Flood
Limit
or 130% of upstream control
station's Turbidity at the same
tide of the same day
10 .5
or 130% of upstream control
station's SS at the same tide of
or 120% of upstream control
station's SS at the same tide of the same day and specific
the same day
sensitive receiver water quality
requirements
Surface and
Middle
6.4
4 except 5 for Fish Culture Zone
or 6.3 (1%-ile of baseline data)
Bottom
4.1
2 or 3 .6 (1%-ile of baseline data)
22 .7
25.1
Turbidity, NTU
or 120% of upstream control
station's Turbidity at the same
tide of the same day
17 .7
SS, mg/L
or 130% of upstream control
station's Turbidity at the same
tide of the same day
20.1
or 130% of upstream control
station's SS at the same tide of
or 120% of upstream control
station's SS at the same tide of the same day and specific
the same day
sensitive receiver water quality
requirements
(2) Action and Limit Levels for Water Quality at Station WS
Parameter
Action
DO' mg/L
5.9
Turbidity, NTU
8.0
Limit
4
or 5.5 (1 %-ile of baseline data)
9.2
APPENDIX E
GRAPHICAL PRESENTATION OF
WATER QUALITY MONITORING
RESULTS
Dissolved
Oxygen
(Surface
&
Middle)
at
Tide
Mid-Ebb
"
- - -Action
WI Level : 0.3 mg/L
W1
12
----- Limit Level : e.1 mg/L
11
10
J
9
"
o
a
u
5
0
U
q
3
2
'I,OAPy 1\OAP
y
O
O
~''Py 1P9Py
I
APy
PAP
y ^
PP\Oy
'1
I
O
Py
"Ilk
^\04\Oy y\OP\Oy ^\Op\O6 yPP\py
'~
ti
ti
P4\py y\Oy\py
O
Py\py yPy\py
O
^Py\py y\Oy\py ^Py\py
ti
A
ti
\p0
O\Oy\py
ti?
Date
-
WZ
~
wz
- -Action Leve1:8 .3 mglL
" - " Limit Level: 8.1 mg/L
12
11
10
E
J
9
`o_
s
c
- "+-~"
" -----__!t -.--. . . . . . . . . . . . . . . . . . . . "" ~ -.~""
"
~:
s
u
0O
0
U
q
3
2
Oo'fa
Py
Py
611P
~AP9
^'V
py\09
^^\
09
3\
0
9P
9
~pP
y
\o
a
V
e
6\py
y\p6
0\Oy
yPy pyPy
Pe ^yP°\Oy
yPy
6P
pOP6
.
oaPy
p°P0
ryp\
pr,P
^~P
"\,
,~1\
,9P
.`P
p9P
rt
rib\
"~\P
p"~\
Date
"
W3
pOP6
",O\
W3
- -Adioe Level: a.3 mg/L
. . . Limit Level:6 .1mg/L
12
11
to
J
g
E
e
O
A
C
U
0O
U
7
8
-___-----f~.
--
5
4
3
2
,PI
,PIP
O9
Py
°
1P\
'\PPy
a
O
~
'~
10
PP
~P
ti
\9
,P°Py
O
/y
O
Py
'0
1
NPe
yPy
yP9
yPy
yPy 6P9Py ~Py\py
9Py
9Py
sPy
°
,\pyPy
"°
' .PNO
'
P
P
O\
9
O3
40
O
"o
'~.P
"9
'1 .P h
A
ti
Date
Contract No .EP/SP/40/02
Scale
Low Level Radioactive Waste Storage Facility at Siu A Chao
Graphical Presentation of Water Quality Monitoring
Results
Project
No.
N.T .S
HW3025
Appendi
Date
Jun 05
I
E
CINOTECH
Dissolved Oxygen (Bottom) at Mid-Ebb Tide
"
wt
--
W1
-Action Level : 6.1 mg/L
- - - Limit Level: 5 .9 mg,L
12
11
10
m
B
J
a
"
7
c
a
5
U
0
U
4
3
2
A~9
Oa0
A\Oy
A\o9
O'\\p
4'~O
A\oh
A\ph
A\oh
'1\O
/4
w~\p
P\oh
Ow\O
P\Oh
06\O
PO
Op
ww\
a\o0
\p
w6
\oh
pa
w\
'4
\00
Oa
6\
b
0\09
Ow\O
yPh
O6\O
y\ph
ww\O
hAh
h\Oh
wb~J
~5w\O
h\o0
h\oh
iYh\p
Aw\p
"
w2
h\ob
Oh\O
h\Oh
w0\O
Date
- - -Action Level : 6.1 mg/l.
W2
12
" . . . . . Limit Level : 6 .9 mg/L
11
10
E
J
g
E
`o_
--l~
_-.__ ._____.:__---.
s
c
uc
"
. .-.-"
._ .:!
. .!
._------_- ---_--_ ._
. .
5
U
4
3
2
0
p
A\oh
ap
OA\p
~pA\ph
w'V
A\ph
"\p
\Oh
op
0\ph
AAA
Ph
Ow
\oh
o",
\oh
"0
~p\o°'
w0\
_p\09
Awl
_p\09
h0~
0\09
pw\o
0\Oh
e\o
0\Oh
"\O
h0
"A
90
,5w\O
9\oh
,V6\O
0\oh
,yw\p
Ah
Ob\p
Date
\oh
op
"
W3
-Action Level : 6 .1 mg/L
----- Limit Level: 5.9 mgIL
W3
--
12
11
10
E
J
A
A
7
u
5
.2
"
"
c
a
0
3
2
.VA'P9
O
p1\OA\Oy w~APO
1\
w oA0 .t'11oA0 ~1\oA0 Ow\APO Op~~O
ww~Py
w0~~h Aw~~y Ay~ h ow\oh~0 oy\oO~y ww\oOPO wp\o0 0 ryw\phy ~\p0~h Aw\ph~y oy\o0~y
wp\p0A9
Date
Title
Contract No .EP/SP/40/02
Scale
N.T .S
Low Level Radioactive Waste Storage Facility at Siu A Chau
Graphical Presentation of Water Quality Monitoring
Results
Project
INe.
HW3025
Date
Appendix
Jun 05
I
E
CINOTCCN
Turbidity at Mid-Ebb Tide
- "
W,
-Action Level : 13 .4 NTU
- - - Limit Level: 14 .8 NTU
W1
50
45
40
35
F=-
30
C
o
A
.~.
c
y5
20
uC
75 -- - - - - ~- - - - - - - - - G
to
0
,P
h
o
PhPh ^'S
\Oh ^A\03\
'S\oh
o~
A\hh
ti
o\o
^~°
b\oh
OtAOh
\hh
oo\
o^P
^^\oa
oz
-- - - - - -
pp Oph PPh
tio\o
'
6\Oh
o^P
--
6
hPh
oyP
- - - ---
^
^P
0\oh
"P
hPh
h^\o
Date
6\Oh
oz
h\Oh
h^P
&h
oho
6\oh
^oP
"
W2
- - -Action Level : 13.4 NTU
- - - Limit Level: 14 .0 NTU
W2
45
40
F=
-
35
30
c
o_ zs
m
c
u
20
16 -
U
" ~ .~ .::~ _~ . . .~: .~:~ ~_ : "
""
0
APh
14,
oPh
01\0
hPh
^~
hPh
^1\O
APh
Ph
oA
e
,~~
P
h
O^e
Ph
"o,
Ph
^^e
50
^6\~
h
P
Ph
P
h
Ph
hPh
'4^e
~ e OO
0, r°\o
Date
h\O6
^^\o
h\hh
^0\h
h~9
'4^\~
yAh
4\O
y~h
le
~h
O
h\o
\ph
^
Op6
W3
"
- - -Action Level : 13 .4 NTU
- " " Limit Level: 14.8 NTU
W3
46
40
F
C
O
N
r
C
d
C
0
U
35
30
26
20
16 . - - - - . _ - - - - - - - -
10
- __ -- -- - - - - - _- -- - - - . - -- - -
0
0'V Ph oPPh
"'o'
oh\oh
^a0\ h ^01)
r°
OA6\oh o^\OhAy oliP,"
'41\0\0y o^~~h o~~y ^^~\y ^y\opAh ^,~h , V
^
(\oh\h eh\y eh`oh A^\oh~y 0h\o0\0h
^o\oh\0h
Date
Title
Contract No .EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Silt A Chau
Graphical Presentation of Water Quality Monitoring
Results
(Scale
N.T .S
Date
project
No.
HW3025
Appendix
Jun 05
E
CINOTECH
Suspended Solids at Mid-Ebb Tide
-
W1
"
w,
-AClion Level : 9.9 mgIL
- - - Limit Level : 10.5 myL
W
l
i
50
E
e0
_
30
i
.nO
20,
y
u
0
U
10
9
Oa0~6
dp\Oy l~A~y 1~PAPy'L~AAy ^.1\03\00
Ò^PPAO ,~\~\00
"0\y ~L~~~O ~O\O\y O.Py\y OyPO~y ,~Py\00 ,~OAyPy ,~.^P~O byAO\00 A~\00\00 Oy\000
O\OOAy
I
Date
"
W2
w2
- - -Action Level : 9.9 mgIL
I - - - - - Limit Level : 10.5 mgIL
50
50
J
49
c
3o
Nu
20
0
9
10\00
7
OCRo0 01\00
^1\0\00
0 1\000 wP'\O6
0\0
ti
^x\00
0N~0 4
O
O
Oh
P\
~_P\00 \3P
,~O
'.OA
h
Date
0
3\00 y 0\06 O ,J
06 0
0~0 ,J0y~0 O\000 ,JOy\0y h\00Ay O\00 0
O
0
9
O
3
100
h
'4
-
W3
w3
"
- -Aden Level : 9.9 mg/L
- - - Limit Level : 10 .5 mg/L
50
J
m
E
cO
N
y
u
40
30
20
o
9
~p000
Of
Title
\O'h\O6
01
~3\Oy \03\Oh
,'V
,1
0
3\09
N~
\O~0
,51
0y
O
~~\
Op 1\0P\Oy
00\O
OP\0h
P\Oy
OP\0h
h\O(a
h\0y
^O\
3
\\0
3y\
O^\O
00\O
Date
Contract No.EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Siu A Chau
Scale
Graphical Presentation of Water Quality Monitoring
Results
Date
0\~
`a
"\O
N .T .S
Jun
h\Oh
Oh\0y
h\Oy
O6\0''v
,6\0
,~y\O
,~^\
33\
O
Project
No .
HW3025
Appendix
05
E
\00
06\00
,O\
CINOTCCH
F-
7-
12-Hours Continuous Water Quality Monitoring at WS
Temperature
30.00
28.00
26.00
0
Iw
24.00
E
22.00
q
20.00
a
F
-1
18.00
16.00
14.00
-
_
12.00
10.00
~P \Ob P0
.~P~A~0
.
, , ,
04'~b~b\p9~6
,Vw
^
~ ~p,P~P~\`~~\`O;
e~e~e~e\o5\oe~e\oePe
^A, ^
1^\^0~,\~',p,
a^
e
eAe eke y ea ePeAePe e~h Pe~a~ePS~e~e b6
~a
~a^ '\O
e~PO,~1O 0A11fh\A^v~"\^A\^A\^A\^^\^'h
A\,
9~90~9~9
~
^A\^P\AA
05 a \oe \oe~e \oa \oe \oe~y~e \oe \oy
A\
^A\^A~^P\^0~h~
y
a~e~5 oa\oe Pe~e~e \oe \oh \oe oe 5 \Pe \oe~e
A\~~d
^P\'" y\ACS\ y\ ,6\^y\,any\^6\,y\v°0\'~°yt~y\ti°6\^6\a6
6~y\9~,~
Date
Conductivity
ss.oe
E 50.00
O
C
U
C
O
v
1
40.00
35 .00
30 .00
25.00
\oA~P \oP~A oa~P \oA PP
,~', , ,~a^'~a^;a^;~°
Title
\
~P~P \oA\oA Pe~e Pe~h y~e~e~5~e~e PS~e\oe e~h~a oe\o5~h~5 e~e~y~e e\oe PhPePe~e\oh~a e~ePe~e\o5~e~h~5 oe~h\oa~e\oe \oe 5~5~e \oe\oa~e oeAe\oa oy~eAe~y\oa\oe \oe~h y oe~e\o5~¢
.J~r~p~p~OA~A\P'h5A\~.y\^r~\,A\,by\^~yt~~y~A~~^P\^P\PP~A~\^P\^A~^A\^~p\~Pp\~~~S~~1A\'~y\Ay\yy\~0\~0\~y\^y\~0\~etL°0\tiy\~y~~6\6\~6t~6~6b\^O
;~0~~s'o,PoPO,P~,\`O;O`P^~~,\^~\`l~^'VPO^\~Br~^a~,~~`a~aa^6rJ~
Date
Contract No .EP/SP/40/02
Low Level Radioactive Waste Storage Facility at Siu A Chau
Graphical Presentation of 12 Hours Water Quality Monitoring Results
Project
Scale
N .T .S
Date
Jun 05
No .
HW3025
Aooendix
CINOTECH
APPENDIX F
IMPLEMENTATION STATUS OF
ENVIROMENTAL MITIGATION
MEASURES (EMIS)
Appendix F-Implementation Status of the Environmental Mitigation (Non-Radiological)
Item
No.
Status
Apr 05 May 05 Jun OS
Recommended Mitigation Measures
Noise
1.
The noise level measured at lm from the most affected external fagade of any noise sensitive receivers from the construction work alone during any 30
minute period shall not exceed an equivalent sound level (Leq) of 75 dB(A) .
2.
Before the commencement of any work, the Employer may require the methods of working, equipment and sound-reducing measures intended to be used
on the Site to be made available for inspection and approval to ensure that they are suitable for the project.
3.
The Contractor shall devise, arrange methods of working and carry the Works in such a manner so as to minimiz e noise impacts on the surrounding
environmental, and shall provide experienced personnel with suitable training to ensure that these methods are implemented .
N/A
N/A
N/A
A
A
N/A
N/A
N/A
A
A
A
4.
The nature and routing of construction plant both within and outside the Site limits shall be subject to the Employer's approval . Plant used for
construction shall be effectively silenced and deployed in such a manner so as to cause as little nuisance to the public as possible .
5.
The Contractor shall ensure that all plant and equipment to be used on Site are properly maintained in good operating condition and noisy construction
activities shall be effectively sound-reduced by means of silences, mufflers, acoustic linings or shields or screens other means to avoid disturbance to any
nearby noise sensitive receivers.
6.
Notwithstanding the requirement set out in clause B2.2(i) of EISA Ref. above and subject to compliance with statutory requirements, the Employer may
upon application in writing by the Contractor, allow the use of any equipment and the carrying out of any construction activities provided that he is
satisfied the application is of absolute necessity or of emergency nature, and not in contravention with the Noise Control Ordinance in any respect.
N/A
N/A
N/A
7.
For the purposes of the above clauses, any domestic premises, hotels, hostel, temporary housing accommodation, hospital, medical clinic, educational
institution, place of public worship, library, court of law, performing arts centre or office building shall be considered a noise sensitive receiver.
N/A
N/A
N/A
8.
The Contractor shall, when necessary, apply as soon as possible for a construction noise permit in accordance with theNoise Control (General)
Regulations, display the permit as required and copy to the Employer.
A
A
A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
9.
Operational noise from the LRWF is subject to the provisions of the Noise Control Ordinance Environmental Guidelines for Planning in Hong Kong and
the Technical Memorandum for the Assessment of Noise from Places other than Domestic Premises, Public Places or Construction Sites .
Air Quality
10.
The Contractor shall undertake at all times to prevent dust nuisance as a result of his activities.
operated whenever the plant is in operation.
11 .
The Contractor shall at its own cost, and to the satisfaction of the Employer, install effective dust suppression equipment and take such other measures as
may be necessary to ensure that the statutory criteria are not exceeded.
Any air pollution control systems installed shall be
Item
Recommended Mitigation Measures
No.
23. The Contractor shall use ventilated dry latrine type toilets at the LRWF unless otherwise agreed by the Director.
N/A
N/A
N/A
N/A
N/A
N/A
n
n
n
n
n
n
n
n
n
The Contractor's attention is drawn to the Building Ordinance, Water Pollution Control Ordinance and the Technical Memorandum "Standards for
Effluent Discharged into Drainage and Sewerage Systems, Inland and Costal Waters" issued by EPD.
N/A
N/A
N/A
The Contractor shall operate the Facility under the principle of minimi sing the volume of water or other liquids that shall be used in areas where potential
radioactive contamination exists, to minimize the generation of contaminated effluents and discharges.
N/A
N/A
N/A
n
n
n
n
n
n
n
n
n
n
n
n
24.
The Contractor shall use electric powered vehicles at the LRWF unless otherwise agreed by the Director.
25.
The Contractor shall not discharge directly or indirectly (by runoff) or cause or permit or suffer to be discharged into any channel, stream-course or sea
any effluent or foul or contaminated water or cooling or hot water without the prior consent of the Employer who may require the Contractor to provide,
operate and maintain at the Contractor's own expense, within the premises or otherwise, suitable works for the treatment and disposal of such effluent or
foul or contaminated or cooling or hot water. The design of such treatment works shall be submitted to the Independent Consultants or, as the case may be,
the Employer for approval.
26.
27.
28.
29.
Status
Apr 05 May 05 Jun 05
All water and other liquid waste products arising on the Site shall be collected, removed from Site via a suitable and properly designed temporary
drainage system and disposed of at a location and in a manner that shall not cause either pollution or nuisance. In addition, the effluent shall comply with
the standards stated in the "Technical Memorandum on Standards for Effluent discharged into Drainage and Sewerage Systems, Inland and Costal Waters"
for the appropriate Water Control Zone, whether or not the Zone has been declared as one subject to control of discharges.
If any office, site canteen or toilet facilities are erected, foul water effluent shall be directed to a foul sewer or to a sewage treatment facility either directly
or indirectly by means of pumping or other means approved by the Independent Consultants or, as the case may be, the Employer.
30.
Carry out earth works in dry season as much as possible.
31 .
Cover areas of exposed earth.
32 .
Install sand traps or catchpits at all drainage discharge points.
33.
Oil and fuel bunkers to be bunded.
34.
Immediate disposal and correct handling of any chemical spill .
n
n
n
35.
Prevent surface runoff into coastal water through construction of bonds between works area and sea shore .
n
36.
Provide proper sewage treatment facilities for site workers.
n
n
N/A
N/A
N/A
N/A
N/A
N/A
Good site practices to be undertaken during marine works:
37.
Unnecessary disturbance to the seabed will be minimized by exerting care when lowering and lifting the tools/equipment into seabed;
F-3
Item
51 .
Recommended Mitigation Measures
Inert material deemed unsuitable for reclamation or land formation and all non-inert construction waste material deemed unsuitable for reclamation or
land formation and all other waste material will be disposed of at a public landfill.
Status
Apr 05 May OS Jun OS
A
A
A
Chemical waste as defined by Schedule 1 of the Waste Regulations (Chemical 1992), will be stored in accordance with approved methods defined inthe
Regulations and the chemical waste disposed of at the Chemical Waste Treatment Facility located at Tsing Y.
A
A
A
53 .
The Contractor's attention is drawn to the Waste Disposal Ordinance, the Public Health the Municipal Services Ordinance and the Water Pollution Control
Ordinance .
A
A
A
54.
Any dredged material will be disposed of at an approved marine dumping ground .
55 .
The Contractor will operate the Facility under the principle of minimising the volume of consumables or other materials that will be taken into areas
where potential radioactive contamination exists, to minimise the generation of contaminated waste . Volumes of material entering the active areas are to
be kept to a minimum, for instance by the removal of packaging from incoming waste, prior to transfer into the active areas and only allowing essential
items into such areas.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
"
A
52.
Ecoloev
56.
The Contractor shall restore the grassland and low shrub habitat affected by the construction works with the use of native, local grass and shrub species .
Shotcrete shall not be used for re-establishment of the cut slope behind the LRWR
57.
The Contractor shall ensure that work takes place only within agreed site boundaries, that care shall be taken to minimise damage within the area and that
materials are not burnt on site. Discharges and disposal of waste to sea will not be permitted and measures shall be taken to minimise the risk of spillage .
58.
No smoking, cooking or any fires shall be allowed on the Siu A Chan Island and all staff shall be made aware of the high fire risk of the construction site.
Should a fire accidentally break out due to site work, the contractor shall supply adequate manpower and equipment to fight the fire.
A
A
A
59.
All topsoil and soil on site shall be suitably stored at an agreed location for reuse on site once the project is completed.
A
A
A
60.
Whenever possible, machinery that does not require water shall be utilised. If machinery does require water, then this shall be imported onto site . This is
to ensure that water courses are retained in their natural state . No substances shall be discharged into existing water courses on or near the working areas
or into the marine environment .
N/A
N/A
N/A
The Contractor shall specify whether underwater blasting and use of explosives is proposed and if so, bubble curtains shall be used to minimi se damage to
the marine environment . The Contractor shall specify the methods to be used for jetty construction and these shall be agreed, with suitable mitigating
measures to minimise damage or nuisance to the marine environment, prior to carrying out the work.
N/A
N/A
N/A
62.
Following construction, the Site shall be restored to an agreed plan using plants native to the area and which have been recorded within the Site prior to
the construction .
N/A
N/A
N/A
63 .
The Contractor shall design the Facility under the principle of minimis ing the detrimental impact on the ecology of the terrestrial and marine environment.
A
A
A
61 .
F- 5
APPENDIX G
SUMMARY STATUS OF
ENVIRONMENTAL LICENSES AND
PERMITS
Appendix G- Summary of Environmental Licensing and Permit Status
Valid Period
Permit No.
From
To
11/04/02
N/A
Section
Status
Environmental Permit
EP-131/2002
Design, construct and operate a
waste disposal facility for industrial
or special waste.
The site is of 0.6
The EP has
not been
surrendered .
ha constructed with a single storey
FEP-01/131/2003
30/07/03
N/A
building of approximately 44m x 24
(a copy was
m in size. Scope of the construction
attached in the first
includes :
monthly report)
(i)
Valid
civil engineering works,
(ii) building works including
building services, and
(iii) operation of the facility
Construction Noise Permit
GW-LTW0313-04
06/01/05
01/07/05
The use of powered mechanical
(a copy is attached
equipment for carrying out
in the monthly
construction work at Sum Wan, Siu
report for January
A Chau on general holiday
2005)
(including Sunday) between 0700
Valid
and 0700 hours on next day and on
any day not being a general holiday
between 1900 and 0700 horns on
next day.
Water Discharge License
EP760/934/008541I
22/12/03
31/12/08
Discharge of Industrial Trade
(a copy was
Effluent arising from the
attached in the
construction activities (settlement
monthly report for
facility) at the construction site for
December 2003)
Low-Level Radioactive Waste
Storage Facility at Sun Wan, Sin A
Chau, Hong Kong.
Valid
0a
xz
~~a
za
w a~.
ao
QU
Appendix H - Complaint Log
Log
Ref.
Location
50111
Site
boundary and
area
Received
Date
11 January
2005
Details of Complaint
Investigation/Mitigation Action
Based on the site investigation, no environmental
deficiency on the concerned items was observed
on site .However, the Contractor was recommended to
tighten up the environmental control measures in
The following items were concerned in the
order to uphold and enhance the environmental
complaint:
performance. The following measures includes :
" muddy water discharge from construction
site
" No water discharge into the sea;
" dust emission from construction site
" placing construction material beyond site " Installation and maintenance of the silt curtains ;
" Enhancement of dust control measures such
boundary
covering the sand and aggregates and regular
" no provision of chemical toilets for workers
spraying for exposed dusty areas;
" No construction materials or works outside the
site boundary; and
" Maintenance of the toilet facility.
The investigation report has been submitted on 28
Janu
2005 .
Status
Closed
APPENDIXI
SUMMARY OF EVENTS SHOWING
EXCEEDANCES
7-7
77
ATAL-Eelgoprocess Joint Venture
Table I-1
Summary Table for Non-compliance Recorded in the Reporting Quarter
Parameter
Station WI-W3
DO (mg/L)
Turbidity
(NM
SS (mg/L)
Contract No.EP/SP/40/02
Low-Level Radioactive Waste Storage Facility at Sin A Chan
EM&A Quarterly Report for April 2005 to June 2005-Appendix I
No. of Events Exi
Limit
Action Level
L t Level
0
No. of Exceedances due to
the Project
0
0
0
0
0
0
0
0
0
0
0
0
0
Action Taken
N/A
Station WS
DO (mg/L)
Turbidity
(IVTU)
0
N/A