installation manual

advertisement
technics
D
Reference
Current
D
H
Module 80 LED WW CRI83
Module 80 LED WW CRI98
Module 80 LED FIXED CRI83
Module 80 LED FIXED CRI98
KR91733x-83xx
KR91733x-98xx
KR917033-83xx
KR917033-98xx
700mA
500mA
700mA
500mA
74
74
74
74
79
79
57
57
H
Led assembly
Name
Reflector in case of WW
1
dimensions
Please make sure that
main voltage is disconnected
before proceeding!
Min. 20cm
+
2
installation
Install the correct gear with strain relief
on the hollow ceiling.
To install the plasterkit. See installation manual
KR8170001755 or KR8170001758.
click!
Important: always check the polarity!!
+ = red wire
- = black wire
In case of WW
Put the LED assembly in
the plasterkit.
Min. 20cm
installation
WW
4
installation
To install the louvre see manual
KR8170001761 or KR8170001762
kreon nv
Industrieweg Noord 1152
3660 Opglabbeek
Belgium
Fixed
In case of WW
Lightbeam
Wall
3
Tel + 32 89 81 97 80
Fax + 32 89 81 97 90
Light
www.kreon.com
mailbox@kreon.be
revision date: 07/06/2016
KR8173301880
technics
B
H
L
1
Name
Reference
LxBxH
Louvre down 40 double
KR707616 /KR707612
87x 40 x 12,8
Louvre down in line 40
KR707116 /KR707112
40 x 40 x 11,3
Louvre down in line 40 IP44
KR70731x
40 x 40 x 13
Louvre down in line 80
KR717116 /KR717112
80 x 80 x 22,5
Louvre IP44 down in line 80
KR717316 /KR717312
90 x 80 x 22,5
Louvre down in line 120
KR707216 /KR707212
120 x 120 x 34
Louvre IP44 down in line 120
KR707416 /KR707412
120 x 120 x 34
Louvre down in line 165
KR717216 /KR717212
164 x 164 x 39
dimensions
Align the springs with the slots.
2
installation
In case of 165, fix the fall safety cable with added screw to the louvre.
Insert the louvre in the plasterkit.
In case IP44 louvre.
remove IP44 louvre with suction cup
In case of 40, 80 and 165 version:
Result without shadow gap, when plasterkit
KR707104/KR717114/ KR717214 is used.
kreon nv
Industrieweg Noord 1152
3660 Opglabbeek
Belgium
mod 80/120: led module can not rotate when the IP44
louvre is installed
mod 40: IP louvre only compatible wiht downlight.
In case of 80 and 165 version:
Result with shadow gap, when plasterkit
KR717118/KR717218 is used.
Tel + 32 89 81 97 80
Fax + 32 89 81 97 90
www.kreon.com
mailbox@kreon.be
revision date: 01/04/16
KR8170001762
KR
technics
Min dimension for rotation
(can be applied with non
combustuble
matter, gear exclusive)
H
Min dimension for cooling,
gear inclusive
E
A
T
1
Down IL 40 plasterkit
KR707114
B
KR917703
KR917733
KR91733x /KR917033
KR91779x
LED MR16 dir/fix
KR917803/KR917233
KR917843/KR917253
LED PAR16 dir/fix
LED dir, fixed, WW KR907733 /KR907333
/KR907033
QR-CBC51
KR917703
LED dir
KR917733
WW/ LED fix
KR91733x /KR917033
Audio
KR91779x
CxD
Emin
FxG
Hmin
102x102
102x102
102x102
102x102
102x102
102x102
63x63
170x170
170x170
200x200
150x150
191x191
176x176
110x110
130
140
100
130
110
130
80
320x320
300x300
260x260
200x200
350x350
330x330
110x110
200
157
100
130
110
130
80
102x177
102x177
102x177
102x177
220x220
220x220
254x254
150x220
130
140
105
130
400x400
400x400
552x552
230x230
200
200
105
130
Tmin-Tmax
Plasterboard thickness 80 range
Plasterboard thickness 40 range
9-26
9-14
IxJ
cut out
AxB
CxD
FxG
Reference
QR-CBC51dir
KR717114
(8) LED dir
WW/ LED fix
Audio
Down IL 80 plaster double KR727114
AxB
Lamptype
Name
Down IL80 plasterkit
(shadow gap)
Name
Reference
Visible IxJ
Down in-line 80 plasterkit no shadow gap
KR717114
80x80
37
Down in-line 80 plasterkit shadow gap
KR717118
86x86
37
Down in-line 80 plasterkit double
KR727114
80x165
37
Down in-line 40 plasterkit
KR707114
40x40
27
H
dimensions
2
Please make sure that
sticker is removed
before proceeding!
installation
3
Put the plasterkit through the hole.
MAX 1
Assembling torque max 20 CN.m.
Fix the plasterkit with the screws.
Min 75
4
installation
kreon nv
Fill around perimeter of plasterkit using suitable filler
and plasterto hide screws and plasterkit.
Assembling principle
Industrieweg Noord 1152
3660 Opglabbeek
Belgium
Tel + 32 89 81 97 80
Fax + 32 89 81 97 90
www.kreon.com
mailbox@kreon.be
Minimum filler distance, spread out until zero.
revision date: 28/04/16
KR8170001758
KR
Sheet 1/1
ExF
G
D
B
A
cut out
A
Concrete plasterkit down IL 80
(shadow gap)
KR717111 QR-CBC51
(9) LED dir
fixed, WW
Audio
Concrete plasterkit down IL 80 double KR727119 QR-CBC51
LED dir
Fixed, WW
Audio
Concrete plasterkit down IL 165
KR717211 QT12-ax
(shadow gap)
(9) QR-LP111
HIT_TC
246
140
140
140
140
210
210
210
210
252 or 200
252 or
252 or
252 or
270
E
F
G
320
300
260
200
400
320
300
260
200
400
200
157
100
130
200
400
552
230
200
200
200
400
552
230
450
450
200
105
130
200
230
230
200
450
450
D
B
or
or
or
or
or
or
or
230
170
170
250
150
220
220
220
130
140
100
130
130
140
105
150x220 130
210 195
210 178
210 225
210 203
73
246
Down in-line 80 double
Down in-line 80
200
200
200
270
37
246
250
180
37
250
dimensions
Lamptype
HIR-CE111
180
2
Reference
Name
246
270
1
In case of finished concrete ceiling,
gear exclusive.
191
In case of precast concrete panels,
gear inclusive.
270
technics
Down in-line 165
In case of down IL 165.
3
installation
Put the plasterkit through the hole.
Align the box with the plasterboard using the thumb screw.
Fix these screws with a hexagon screw key.
Fix the plasterkit with screws.
In case of 80 range
please make sure that
sticker is removed
before proceeding!
Min 75
4
Fill around perimeter of plasterkit using suitable filler
and plaster to hide screws and plasterkit.
installation
kreon nv
Industrieweg Noord 1152
3660 Opglabbeek
Belgium
Tel + 32 89 81 97 80
Fax + 32 89 81 97 90
www.kreon.com
mailbox@kreon.be
Minimum filler distance, spread out until zero.
revision date: 28/04/16
KR8170001801
KR
sheet 1/1
Download