technics D Reference Current D H Module 80 LED WW CRI83 Module 80 LED WW CRI98 Module 80 LED FIXED CRI83 Module 80 LED FIXED CRI98 KR91733x-83xx KR91733x-98xx KR917033-83xx KR917033-98xx 700mA 500mA 700mA 500mA 74 74 74 74 79 79 57 57 H Led assembly Name Reflector in case of WW 1 dimensions Please make sure that main voltage is disconnected before proceeding! Min. 20cm + 2 installation Install the correct gear with strain relief on the hollow ceiling. To install the plasterkit. See installation manual KR8170001755 or KR8170001758. click! Important: always check the polarity!! + = red wire - = black wire In case of WW Put the LED assembly in the plasterkit. Min. 20cm installation WW 4 installation To install the louvre see manual KR8170001761 or KR8170001762 kreon nv Industrieweg Noord 1152 3660 Opglabbeek Belgium Fixed In case of WW Lightbeam Wall 3 Tel + 32 89 81 97 80 Fax + 32 89 81 97 90 Light www.kreon.com mailbox@kreon.be revision date: 07/06/2016 KR8173301880 technics B H L 1 Name Reference LxBxH Louvre down 40 double KR707616 /KR707612 87x 40 x 12,8 Louvre down in line 40 KR707116 /KR707112 40 x 40 x 11,3 Louvre down in line 40 IP44 KR70731x 40 x 40 x 13 Louvre down in line 80 KR717116 /KR717112 80 x 80 x 22,5 Louvre IP44 down in line 80 KR717316 /KR717312 90 x 80 x 22,5 Louvre down in line 120 KR707216 /KR707212 120 x 120 x 34 Louvre IP44 down in line 120 KR707416 /KR707412 120 x 120 x 34 Louvre down in line 165 KR717216 /KR717212 164 x 164 x 39 dimensions Align the springs with the slots. 2 installation In case of 165, fix the fall safety cable with added screw to the louvre. Insert the louvre in the plasterkit. In case IP44 louvre. remove IP44 louvre with suction cup In case of 40, 80 and 165 version: Result without shadow gap, when plasterkit KR707104/KR717114/ KR717214 is used. kreon nv Industrieweg Noord 1152 3660 Opglabbeek Belgium mod 80/120: led module can not rotate when the IP44 louvre is installed mod 40: IP louvre only compatible wiht downlight. In case of 80 and 165 version: Result with shadow gap, when plasterkit KR717118/KR717218 is used. Tel + 32 89 81 97 80 Fax + 32 89 81 97 90 www.kreon.com mailbox@kreon.be revision date: 01/04/16 KR8170001762 KR technics Min dimension for rotation (can be applied with non combustuble matter, gear exclusive) H Min dimension for cooling, gear inclusive E A T 1 Down IL 40 plasterkit KR707114 B KR917703 KR917733 KR91733x /KR917033 KR91779x LED MR16 dir/fix KR917803/KR917233 KR917843/KR917253 LED PAR16 dir/fix LED dir, fixed, WW KR907733 /KR907333 /KR907033 QR-CBC51 KR917703 LED dir KR917733 WW/ LED fix KR91733x /KR917033 Audio KR91779x CxD Emin FxG Hmin 102x102 102x102 102x102 102x102 102x102 102x102 63x63 170x170 170x170 200x200 150x150 191x191 176x176 110x110 130 140 100 130 110 130 80 320x320 300x300 260x260 200x200 350x350 330x330 110x110 200 157 100 130 110 130 80 102x177 102x177 102x177 102x177 220x220 220x220 254x254 150x220 130 140 105 130 400x400 400x400 552x552 230x230 200 200 105 130 Tmin-Tmax Plasterboard thickness 80 range Plasterboard thickness 40 range 9-26 9-14 IxJ cut out AxB CxD FxG Reference QR-CBC51dir KR717114 (8) LED dir WW/ LED fix Audio Down IL 80 plaster double KR727114 AxB Lamptype Name Down IL80 plasterkit (shadow gap) Name Reference Visible IxJ Down in-line 80 plasterkit no shadow gap KR717114 80x80 37 Down in-line 80 plasterkit shadow gap KR717118 86x86 37 Down in-line 80 plasterkit double KR727114 80x165 37 Down in-line 40 plasterkit KR707114 40x40 27 H dimensions 2 Please make sure that sticker is removed before proceeding! installation 3 Put the plasterkit through the hole. MAX 1 Assembling torque max 20 CN.m. Fix the plasterkit with the screws. Min 75 4 installation kreon nv Fill around perimeter of plasterkit using suitable filler and plasterto hide screws and plasterkit. Assembling principle Industrieweg Noord 1152 3660 Opglabbeek Belgium Tel + 32 89 81 97 80 Fax + 32 89 81 97 90 www.kreon.com mailbox@kreon.be Minimum filler distance, spread out until zero. revision date: 28/04/16 KR8170001758 KR Sheet 1/1 ExF G D B A cut out A Concrete plasterkit down IL 80 (shadow gap) KR717111 QR-CBC51 (9) LED dir fixed, WW Audio Concrete plasterkit down IL 80 double KR727119 QR-CBC51 LED dir Fixed, WW Audio Concrete plasterkit down IL 165 KR717211 QT12-ax (shadow gap) (9) QR-LP111 HIT_TC 246 140 140 140 140 210 210 210 210 252 or 200 252 or 252 or 252 or 270 E F G 320 300 260 200 400 320 300 260 200 400 200 157 100 130 200 400 552 230 200 200 200 400 552 230 450 450 200 105 130 200 230 230 200 450 450 D B or or or or or or or 230 170 170 250 150 220 220 220 130 140 100 130 130 140 105 150x220 130 210 195 210 178 210 225 210 203 73 246 Down in-line 80 double Down in-line 80 200 200 200 270 37 246 250 180 37 250 dimensions Lamptype HIR-CE111 180 2 Reference Name 246 270 1 In case of finished concrete ceiling, gear exclusive. 191 In case of precast concrete panels, gear inclusive. 270 technics Down in-line 165 In case of down IL 165. 3 installation Put the plasterkit through the hole. Align the box with the plasterboard using the thumb screw. Fix these screws with a hexagon screw key. Fix the plasterkit with screws. In case of 80 range please make sure that sticker is removed before proceeding! Min 75 4 Fill around perimeter of plasterkit using suitable filler and plaster to hide screws and plasterkit. installation kreon nv Industrieweg Noord 1152 3660 Opglabbeek Belgium Tel + 32 89 81 97 80 Fax + 32 89 81 97 90 www.kreon.com mailbox@kreon.be Minimum filler distance, spread out until zero. revision date: 28/04/16 KR8170001801 KR sheet 1/1