Bridge Completion Module BCM
for GSV-2TSD and GSV-1T8
BCM for GSV-2TSD
BCM for GSV-1T8
The bridge completion modules are used for supplementing quarter-bridges and halfbridges to full bridges.
In the case of the measuring amplifier GSV-2TSD, the bridge completion module has the
form of a 6-pole plug with 3 screw type terminals. The quarter-bridges or half-bridges are
connected with the contacts of the 3 terminals.
For the measuring amplifier GSV-1T8 as well as for other measuring amplifiers with 15pole sub-D input socket, the bridge completion modules are designed as sub-D plugs with
5m connecting cable.
The bridge completion modules are available as 120 Ohm, 350 Ohm and 1000 Ohm
modules. They are fitted with resistors of tolerance 0.1%, TK25.
Order numbers
GSV-2
GSV-1
(Phoenix plug module)
BCM-QB-120
(15-pole Sub-D plug)
BCM-QB-S-120
120 Ohm, quarter bridge
BCM-QB-350
BCM-QB-S-350
350 Ohm, quarter bridge
BCM-QB-1000
BCM-QB-S-1000
1000 Ohm, quarter bridge
BCM-HB-120
BCM-HB-S-120
120 Ohm, half-bridge
BCM-HB-350
BCM-HB-S-350
350 Ohm, half-bridge
BCM-HB-1000
BCM-HB-S-1000
1000 Ohm, half-bridge
ME-Meßsysteme GmbH, Neuendorfstr. 18b, D-16761 Hennigsdorf
Tel +49 3302 559 282, Fax: +49 3302 559 141, info@me-systeme.de, www.me-systeme.de
1
Pin configurations
Modules in the 15-pole sub-D plug for GSV-1T8
15-pol.
Sub-D
Kabel
15 pole
sub-DStecker
plug
cable
6
15 pole
sub-D
plug
15-pol.
Sub-D
Stecker
6
cable
Kabel
brown
braun
R4
R1
R1
brown
braun
15 Ud
Us
Us
8
grün
green
gelb
yellow
Schirm
shield
1
green
8 grün
R3
R2
white
weiß
5
R4
gelb
yellow
R3
R2
Ud
15
weiß
white
5
1
shield
Schirm
Modules in the 6-pole plug housing for GSV-2TSD
66-pol.
pole plug
Stecker
33-pol.
pole
terminal
Klemme
2
66-pol.
pole plug
Stecker
2
33-pol.
pole
terminal
Klemme
2
R1
R1
R4
4a
4b
R2
7
5
Us
5 Ud 4
Us
R3
R2
7
Ud
R4
4
R3
7
7
The modules BCM-QB and BCM-QB-S offer the possibility to connect quarter bridges in “threeconductor technique”. The wires from terminals 4a and 4b resp. the brown and green wires are
brought together at the soldering node of the external strain gage. The conductor resistance thus
effects both the positive and the negative branch of the bridge circuit. Errors due to changes in
conductor resistances and interferences are compensated thereby. If a three-conductor
technology is not to be used, a short circuit bridge must be laid between 4a and 4b. At the bridge
completion modules with connecting cable BCM-QB-S additionally the pin 15 is led through with a
yellow connecting wire to enable shunt calibration, if necessary.
Positive strain at R3 results in a positive output signal.
Negative strain at R4 results in a positive output signal.
2
ME-Meßsysteme GmbH, Neuendorfstr. 18b, D-16761 Hennigsdorf
Tel +49 3302 559 282, Fax +49 3302 559 141, info@me-systeme.de , www.me-systeme.de
Download