Specifications, Installation, and Operating Instructions Model: SP 50 Family CAUTION: The installation of a surge protection device (SPD) must be done by qualified electrical personnel. SPD must be grounded through the power system ground for proper operation. WARNING: Before installing the suppressor, AC power must be off. Failure to do so could result in damage to the suppressor and poses a potential electrical shock hazard to personnel. WARNING: Read SPD label on side of the enclosure to verify voltage configuration. WARNING: Discontinue installation if the measured voltage is not in the range of the model voltage configuration of the SPD being installed. Contact Transtector’s technical support with any questions concerning the voltage configuration prior to installation and application of power. © Smiths Power 2015. All Rights Reserved. 1 Table of Contents Specifications Pre-Installation Notes Installation Procedure Installation Checklist Troubleshooting Wiring Diagrams 3 5 6 7 7 8 Part Number Model SP50-1201P SP 50-1201P MOV 50 kA, NEMA 4X plastic encl., Single phase 1 SP50-240SP SP 50-240SP MOV 50 kA, NEMA 4X plastic encl., 120/240 Split phase 2 SP50-2401P SP 50-2401P MOV 50 kA, NEMA 4X plastic encl., Single phase 1 SP50-1203Y SP 50-1203Y MOV 50 kA, NEMA 4X plastic encl., Wye 3 SP50-4803Y SP 50-4803Y MOV 50 kA, NEMA 4X plastic encl., Wye 3 SP50-6003Y SP 50-6003Y MOV 50 kA, NEMA 4X plastic encl., Wye 3 SP50-2403D SP 50-2403D MOV 50 kA, NEMA 4X plastic encl., Delta 4 SP50-4803D SP 50-4803D MOV 50 kA, NEMA 4X plastic encl., Delta 4 Description Figure Reference © Smiths Power 2015. All Rights Reserved. 2 Specifications: All Models Product Type Type 1 SPD Type 2 Canada Listed Protection Provided L-N, L-G, N-G (Single Phase) L-L, L-N (120/240V Split Phase) L-L, L-N (Wye) L-L, L-G (Delta) Maximum Surge Current 50 kA Nominal Discharge Current (In) 20 kA (120, 120/240-SP, 240, 120/208-3Y, 240-3D) 10 kA (277/480-3Y, 347/600-3Y, 480-3D) Maximum Load Current per Phase Unlimited Connection Parallel Operating Frequency 50/60 Hz Surge Capacity per Mode 50 kA Surge Capacity per Phase 50 kA IEEE Location C-High, B-Medium Fault Rating (SCCR) 200 kA Response Time <1 ns Weight (Max) lb, kg 1.3 lbs / 0.59 kg Lead Length ≤ 1.5’ (recommended) Wire Gauge 16” (0.4m) #12 AWG integral leads provided Breaker Connection 30 A (recommended) Operating Temperature Range -40°C to +85°C Operating Humidity (noncondensing) 5% to 95% © Smiths Power 2015. All Rights Reserved. 3 Operating Altitude (feet) Up to 12,000 Warranty 2 Years Certifications UL 1449 3rd Edition Listed UL 96A (for 20 kA In models) RoHS NEC 100/285 ANSI/IEEE C62.41, C62.45 Model V (Vac) Phase Mode(s) @ VPR (Vpk) In (8/20 µs) MCOV SP 50-1201P 120 1 L-N L-G N-G 700 1200 600 20 kA 180 Vac (L-N) SP 50-240SP 120/240 Split L-N L-L 700 1200 20 kA 180 Vac (L-N) SP 50-2401P 240 1 L-N L-G N-G 1000 1500 700 20 kA 275 Vac (L-N) SP 50-1203Y 120/208 3Y L-N L-L 700 1200 20 kA 180 Vac (L-N) SP 50-4803Y 277/480 3Y L-N L-L 1200 2000 10 kA 320 Vac (L-N) SP 50-6003Y 347/600 3Y L-N L-L 1500 2500 10 kA 420 Vac (L-N) SP 50-2403D 240 3D L-G L-L 1000 1800 20 kA 275 Vac (L-G) SP 50-4803D 480 3D L-G L-L 1800 3000 10 kA 550 Vac (L-G) © Smiths Power 2015. All Rights Reserved. 4 Pre-Installation Notes • • • • • • Read entire installation manual prior to installing this SPD. Unpack unit carefully, removing packing material. Inspect for damages during shipment. If unit seems damaged, contact Transtector and shipping agency. Do not continue to install unit. Confirm install location temperature will not exceed SPD rating (-40°C to +85°C). Verify all nuts and bolts have tight connections. Verify install location meets SPD enclosure NEMA type 4X location requirements. Electrical Specification for SPD Installation: Verify voltage configuration of the SPD matches actual system voltage configuration of service point. Ground resistance is less than 25 ohms and all wiring conductors are in accordance with appropriate layout/installation drawing. © Smiths Power 2015. All Rights Reserved. 5 Installation Procedure • Length of leads and conductor size: Leads must be as short as possible, not exceeding the recommended length of a foot and a half (1.5’); and routed with gradual bends avoiding sharp or 90° bends. SPD comes with #12 AWG wire pre-cut for installation. Extending existing wire by splicing is not recommended. • Mounting: 1. Turn off all power supplied to this equipment. 2. Panel Mount: Punch out 1/2” enclosure knockout from panel or mounting location as close as possible to where the wires will terminate. Please consult Transtector application support where another type of mounting is required. 3. Insert a 1/2” close nipple to the Myers Hub provided and attached to the SP 50 SPD. Insert SPD wires carefully through the knockout hole. Tighten a 1/2” steel conduit lock nut to secure the SPD to the enclosure (as shown in Figure 1 Panel Mount). 4. Connect the wires as shown in the appropriate wiring diagram. 5. Overcurrent Protection: Type 1 SPDs are UL Listed and tested to be selfprotecting. They do not require upstream protection according to UL 1449 3rd Edition and Section 285 of the NEC. However, it is recommended an upstream disconnect or breaker be installed for maintenance and safety. Many switches and circuit breakers have limitations regarding more than one wire in a connector. Breaker manufacturers can provide information on limitations of available terminals. Where additional wires are prohibited under the same terminal, many times installing a new circuit breaker is convenient. Typical sizes are 15, 20 and 30 amps. 6. For optimal device performance, use shortest wire length possible. Cut off excess wire. Avoid sharp edges. 7. Before energizing, installer must verify service and separately derived system Neutral to Ground bonding jumper per NEC requirements. © Smiths Power 2015. All Rights Reserved. 6 • Final check: Check installation of unit as indicated in installation drawings. Apply external AC power to the SPD. The unit is operational if all green indicator lamps are illuminated. If not, contact Transtector’s technical support at 800-882-9110 or 208-772-8515. • Visual inspection: Operational status of the SPD is verified by observing the phase status indicator LED(s). The LED, illuminated Green indicates normal operation with all protection modes functioning. Installation Checklist YES [ ] NO [ ] [ [ [ [ [ [ [ [ [ [ [ [ [ [ ] ] ] ] ] ] ] ] ] ] ] ] ] ] Voltage configuration of SPD matches actual voltage configuration of service point. Ground resistance is less than 25 ohms. All wiring conforms to national electric code (NEC). All conductors are in accordance with appropriate layout/installation drawing. All lead lengths are as short as possible. SPD is installed in parallel with incoming phase conductors. After installation, all lights are illuminated green. All critical loads are protected by the SPD. If not, additional SPD(s) may be required. Troubleshooting Problem Solution Status LED(s) are red Indicates protection loss in phase(s). Unit needs replacement. Status LED(s) are not illuminated Indicates power loss. Verify power is being supplied to service point. If problem persists, call Transtector technical support. Transtector Technical Support is available at 800-882-9110 or 208-772-8515. © Smiths Power 2015. All Rights Reserved. 7 Wiring Diagrams Following section contains all layout/installation drawings found within the SP 50 Family. Locate appropriate drawing based on the model number of your system. © Smiths Power 2015. All Rights Reserved. 8 Transtector Systems, Inc. 10701 Airport Drive, Hayden ID 83835 (TF) 800.882.9110 | (FX) 208.762.6034 www.Transtector.com | www.SmithsPower.com DRAWN Heather Bakke DATE 6/16/15 ENG APPD Jeff Molitor 7/29/15 PRODUCT MANAGER APPD Vrajesh Davé. July 29, 2015 MARKETING APPD Linda Johnson 7/31/15 Notice: The information and design in this document is the property of Transtector Systems. All rights reserved. SP50-S008 Rev A © Smiths Power 2015. All Rights Reserved. 9