To present Line Construction training courses on Eskom premises utilising Eskom facilities, material and equipment, based on the curriculum as set out below and according to the attached standard; To present Line Contraction training course on providers premises utilising provider facilities and equipment. To provide Training (as per SAQA and relevant legislative requirements) to all formal Eskom’s operating units on the following subjects. Training by an instructor/facilitator Supplying training literature and training aids – modules, presentations, hand-outs, assessment tools Electrical Line Mechanic training to be provided as per curriculum below: SAP No Module Description 49932701 L2C 04 Fundamentals of Electricity US 10237 Select use and care for electrical Measuring instrument 49932702 L2C 02 Use and care of hand tools 3 ½ days 49931187 US 9888 Select, use and care for marking off/out equipment 3 ½ days L2C 04 Select use and care of power tools CATO 06 ORHVS Awareness CATO 06 Construction Regulations US 13622 Ensure Safety at Road Works in Urban Areas SAP No 49999025 Module No ELW 001 Day Allocation 5 ½ days 2 days 3 days 1 ½ days ½ day 2 ½ days Description Day Allocation Supervision 2 Days Construction Servitudes and Drawing interpretation 49992576 ELW 002 Construction Servitudes and Drawing interpretation 2 Days Excavation and Barricading of Pole and Stay holes 49979887 ELW 003 Excavation and Barricading of Pole and Stay holes 5 – 10 Days ID, Handle and Assemble MV Line Hardware 49979814 ELW 004 ID, Handle and Assemble Medium Voltage (MV) Line Hardware And related material 5 Days Planting and Installation of Pole and Stays 49979907 ELW 005 Planting and Installation of Pole and Stays 5 - 10 Days Equipotential earthing 49981031 OL2 002 Equipotential earthing 2 Days Crimping 49996861 ELW 006 Crimping 3 Days String, Tension, and Install Conductors and Jumpers 49998140 ELW 007 String, Tension, and Install Conductors and Jumpers 10 – 15 Days POLE MOUNTED EQUIPMENT 49979886 ELW 008 Erect and Install Pole-Mounted Transformers and Meter Kiosks 5 Days EARTHING OF INSTALLATIONS 49995802 ELW 010 Earth Resistance Testing Clerking and Handover procedure 2 Days 49997120 ELW 009 Clerking and Handover procedure 2 Days Medium Voltage Line Construction SAP No 49999025 Module No ELW 001 Description Day Allocation Supervision 2 Days Construction Servitudes and Drawing interpretation 49992576 ELW 002 Construction Servitudes and Drawing interpretation 2 Days Excavation and Barricading of Pole and Stay holes 49979887 ELW 003 Excavation and Barricading of Pole and Stay holes 5 – 10 Days ID, Handle and Assemble MV Line Hardware 49979814 ELW 004 ID, Handle and Assemble Medium Voltage (MV) Line Hardware And related material 5 Days Planting and Installation of Pole and Stays 49979907 ELW 005 Planting and Installation of Pole and Stays 5 - 10 Days Equipotential earthing 49981031 OL2 002 Equipotential earthing 2 Days Crimping 49996861 ELW 006 Crimping 3 Days String, Tension, and Install Conductors and Jumpers 49998140 ELW 007 String, Tension, and Install Conductors and Jumpers 10 – 15 Days POLE MOUNTED EQUIPMENT 49979886 ELW 008 Erect and Install Pole-Mounted Transformers and Meter Kiosks 5 Days EARTHING OF INSTALLATIONS 49995802 ELW 010 Earth Resistance Testing 2 Days Clerking and Handover procedure 49997120 ELW 009 Clerking and Handover procedure 2 Days Low Voltage Line construction and Low Voltage Top up SAP No Module No Description Day allocation LV Line Construction 49997396 ELW 011 Low Voltage Line Construction 10 Days LV Cables 49932709 ELW 012 Low Voltage Cables 10 Days Single Phase Tester (01T1-04) US 258966 Test and Inspect Single Phase domestic installations. US 113898 Complete certificate of compliance for single phase domestic installations 4 days 4 days Pre-Paid Metering OTO 06a Electricity Dispensers: Introduction To Pre-Paid Metres 49990080 OTO 06b Electricity Dispensers: Basic Sts Training 49979882 OTO 06c Electricity Dispensers : Installation Procedure And Commissioning OTO 06d Electricity Dispensers: Fault Finding And Change Out 5 Days OTO 06G Pre-Paid meters Split metering LVMT 004 Testing of service connection LV Operating and Protection 49997432 L3C 03 Operate On LV Networks TO 089 LV Protection Induction TO 019 Identification Of LV Fuses 5 Days Performing Live Low Voltage Work 49979904 L3E 06 Perform work on energised Low Voltage networks 5 Days Street lighting LVFT 009 Streetlights 5 Days Installation Of Streetlights Inspection Of Lighting, Lamps And Security Lights Line Inspection SAP No Module No Description Day allocation LV Line Inspection LV Line Inspection MV Line Inspection MV Line Inspection HV Line Inspection HV Live Inspection Dismantling and Repair of LV, MV and HV Lines SAP No Module No Description Day allocation Dismantling and Repair of LV Lines Dismantling and Repair of LV Lines Dismantling and Repair of MV Lines Dismantling and Repair of MV Lines Dismantling and Repair of HV Lines Dismantling and Repair of HV Lines MV/LV construction training: a) All tools required to facilitate the training process according to the National Eskom approved tool list. This includes but not limited to all necessary hand tools, lifting equipment, digging tools, crimpers, drilling machines, ladders. b) A truck fitted with a hydraulic crane to facilitate the practical training for the planting of poles, transformer installations, loading and off-loading material, setting up of conductor drum stations. This includes the operator for the vehicle. c) Construction material such as insulators, stay assemblies, conductor, PVC able, wood poles, line hardware, preform line products, transformers and steel wire used to facilitate the practical training such as the assembly on line components, stringing and tensioning conductor, installation of stay assemblies, pole planting, making off and terminating low voltage cables, transformer installations. d) Min 10 Max 10 students per group MV/LV e) Min 10 Max 10 students (team) per group HV Line construction