Tender T09-940-01 Parking Lot Reconstruction – 4 Arenas ADDENDUM #2 Issued: November 23, 2009 This addendum shall form an integral part of the specifications and plans for the above project and shall be read in conjunction therewith. This addendum shall however, take precedence over all requirements of the previously issued specifications and plans which it may prove to be at variance, unless otherwise clarified by the Project Coordinator. Please initial this Addendum and enclose it with your submission. 1. A certificate of soil analysis per MOE guidelines will be presented to the parking lot contractor by the Construction Manager. For tendering purposes the bidders are to assume that the soils qualify for table 1, agricultural. End of Addendum No. 2 John Avery, CPPB Manager of Purchasing and Inventory Initials ___________ Page 1 of 1 Tender T09-940-01 Parking Lot Reconstruction – 4 Arenas ADDENDUM #1 Issued: November 23, 2009 This addendum shall form an integral part of the specifications and plans for the above project and shall be read in conjunction therewith. This addendum shall however, take precedence over all requirements of the previously issued specifications and plans which it may prove to be at variance, unless otherwise clarified by the Project Coordinator. Please initial this Addendum and enclose it with your submission. 1. The revised tender form is attached, in its entirety. All bids must be submitted on the revised tender forms. 2. The curbs around the trees at Karl Homuth are precast curbs not wood. The tender form has been revised accordingly. 3. The Construction Manager will have the soil tested and provide a certificate for disposal. 4. The parking lot contractors will be allowed to work during daylight hours. Coordination is required to allow for public use of the facilities. 5. The “Form of Tender” allows for two alternatives, Excavation and replacement of the granulars and asphalt and replacement of the asphalt only. Tenders will be awarded based on the selected bidder for the chosen alternative. 6. The 10 % bid bond will be based on the total for the more expensive alternative. 7. Guarantee and warranty will be one year from the date of “Substantial Completion” for the overall project. Overall Substantial Completion is anticipated to be in December of 2010. 8. Replacement of the asphalt under the exit stair on the north side of the building at the Preston Arena is not required. The quantity of this asphalt has been deducted from the quantities in the tender form. 9. Provide an estimate of the total employee hours on this project. Subcontractor must provide the total actual hours of work on a monthly basis with each invoice. This is an “Infrastructure Project” funded by the Federal and Provincial Governments, who require a report on total employee hours created by this project including clerical staff. A space is provided in the Tender Form to show the estimated hours. Page 1 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge FIVE ARENA FACILITY IMPROVEMENTS For THE CORPORARTION OF THE CITY OF CAMBRIDGE TENDER # T-09-940-01 SECTION 00300 – UNIT PRICE TENDER CONSTRUCTION MANAGER ROSS & ANGLIN ONTARIO LTD. 56 McCULLOCH AVENUE TORONTO ONTARIO M9W 4M6 416-244-0451 PHONE 416-244-8778 FAX Page 2 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Project: FIVE ARENA FACILITY IMPROVEMENTS CONSTRUCTION MANAGER ROSS & ANGLIN ONTARIO LTD. TENDER FOR: TENDER # T09-940-01 PARKING LOT RECONSTRUCTION – FOUR ARENAS BIDDER: (Name) (Address) ____________________________________________ (Phone No.) (Fax No.) Deliver To: The Corporation of the City of Cambridge Purchasing Division 50 Dickson Street, 4th Floor Cambridge Ontario N1R 5W8 Attention: Mr. John Avery, Manager of Purchasing and Inventory We, the undersigned have examined all the Bid Documents for the above project and Addendum No. Dated . Dated . Addendum No. Addendum No. Dated__________________________________. Addendum No. Dated __________________________________. Dated__________________________________. Addendum No. Addendum No. Dated__________________________________. Including the drawings, specifications and project schedule and having visited the site and examined all the conditions affecting the work does hereby offer to furnish all labour, materials, accessories, hoisting, tools, plant, equipment, transportation and services necessary including Provincial Sales Tax and all other applicable taxes, (Excluding the Goods and Service Tax), permits, licences and fees for the proper execution and completion of the works referred to herein within both the completion date for the work of this contract and the project completion date, based on the quantities given and the unit prices indicated, for the total price of: Page 3 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge TENDER # T09-940-01 Projects may be awarded individually or all four to one contractor, at the discretion of the City of Cambridge. BASE BID: Excavation, Granulars & Asphalt Duncan McIntosh Arena $___________________ Dickson Arena $___________________ Karl Homuth Arena $___________________ Preston Auditorium $___________________ SUB TOTAL $___________________ 5% G.S.T. $___________________ TOTAL $___________________ DISCOUNT IF AWARDED ALL FOUR PARKING LOTS: $______________________ Total Cost of All Locations (including discount and GST). This price will be read out loud at the public opening. $______________________ Page 4 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge ALTERNATIVE BID: Remove & Replace Asphalt (Only) Duncan McIntosh Arena $___________________, + G.S.T. Dickson Arena $___________________, + G.S.T. Karl Homuth Arena $___________________, + G.S.T. Preston Auditorium $___________________, + G.S.T. DISCOUNT IF AWARDED ALL FOUR PARKING LOTS $______________________ Page 5 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Project: FIVE ARENA FACILITY IMPROVEMENTS CONSTRUCTION MANAGER ROSS & ANGLIN ONTARIO LTD. PARKING LOTS – FOUR ARENAS TENDER FOR: BASE PRICE: Excavation, Granulars & Asphalt UNIT PRICE TENDER DUNCAN McINTOSH ARENA Item Description Quantity Unit 1. Remove Existing Asphalt 11,700 M2 2. Sub-drain and Rip Rap 300 M 3. Excavate to Subgrade 11,700 M2 4. Proof-Roll Subgrade 11,700 M2 5. Dispose of Parking Curbs 120 EA 6. Granular “B” and “A” 11,700 M2 7. Base Course Asphalt HL4 11,700 M2 8. Surface Asphalt HL3 11,700 M2 9. Line Painting 1 LS 10. New Precast Curbs 120 EA 11. Restore Sod & Plantings 1 LS Total Tendered Price Duncan McIntosh Arena Unit Price Total $ Page 6 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge ALTERNATIVE PRICE: Remove & Replace Asphalt UNIT PRICE TENDER DUNCAN McINTOSH ARENA Item Description Quantity Unit 1. Remove Existing Asphalt 11,700 M2 2. Sub-drain 300 M 3. Proof-Roll Subgrade 11,700 M2 4. Dispose of Parking Curbs 120 EA 5. Base Course Asphalt HL4 11,700 M2 6. Surface Asphalt HL3 11,700 M2 7. Line Painting 1 LS 8. New Precast Curbs 120 EA 9. Restore Sod & Plantings 1 LS Alternative Price Duncan McIntosh Arena Unit Price Total $ Page 7 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Project: FIVE ARENA FACILITY IMPROVEMENTS CONSTRUCTION MANAGER ROSS & ANGLIN ONTARIO LTD. TENDER FOR: PARKING LOTS – FOUR ARENAS BASE PRICE: Excavation, Granulars & Asphalt UNIT PRICE TENDER DICKSON ARENA Item Description Quantity Unit 1. Remove Existing Asphalt 3,100 M2 2. Excavate to Subgrade 3,220 M2 3. Proof-Roll Subgrade 3,220 M2 4. Granular “B” and “A” 3,220 M2 5. Base Course Asphalt HL4 3,220 M2 6. Surface Asphalt HL3 3,220 M2 7. Line Painting 1 LS 8. 8” Storm from Downspout 25 M 9. Adjust Manhole or Catchbasins Restore Sod & Plantings 3 EA 1 LS 10. Total Tendered Price Dickson Arena Unit Price Total $ Page 8 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge ALTERNATIVE PRICE: Remove & Replace Asphalt UNIT PRICE TENDER DICKSON ARENA Item Description Quantity Unit 1. Remove Existing Asphalt 3,100 M2 2. Excavate to Subgrade in Lawn Area Proof-Roll Subgrade 120 M2 3,220 M2 120 M2 5. Granular A & B in the lawn area Base Course Asphalt HL4 3,220 M2 6. Surface Asphalt HL3 3,220 M2 7. Line Painting 1 LS 8. 8” Storm from Downspout 25 M 9. Adjust Manholes and Catchbasins Restore Sod & Plantings 3 EA 1 LS 3. 4. 10. Alternative Price Dickson Arena Unit Price Total $ Page 9 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Project: FIVE ARENA FACILITY IMPROVEMENTS CONSTRUCTION MANAGER ROSS & ANGLIN ONTARIO LTD. TENDER FOR: PARKING LOTS – FOUR ARENAS BASE PRICE: Excavation, Granulars & Asphalt UNIT PRICE TENDER KARL HOMUTH ARENA Item Description Quantity Unit 1. Remove Existing Asphalt 1,135 M2 2. Excavate to Subgrade 1,135 M2 3. Proof-Roll Subgrade 1,135 M2 4. Granular “B” and “A” 1,135 M2 5. Base Course Asphalt HL4 1,135 M2 6. Surface Asphalt HL3 1,135 M2 7. Line Painting 1 LS 8. Remove & Replace Precast Curbs at Three Trees 1 LS 9. Restore Sod & Plantings 1 LS Total Tendered Price Karl Homuth Arena Unit Price Total $ Page 10 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge ALTERNATIVE PRICE: Remove & Replace Asphalt UNIT PRICE TENDER KARL HOMUTH ARENA Item Description Quantity Unit 1. Remove Existing Asphalt 1,135 M2 2. Proof-Roll Subgrade 1,135 M2 3. Base Course Asphalt HL4 1,135 M2 4. Surface Asphalt HL3 1,135 M2 5. Line Painting 1 LS 9. Remove & Replace Precast Curbs at Three Trees 1 LS 10. Restore Sod & Plantings 1 LS Alternative Price Karl Homuth Arena Unit Price Total $ Page 11 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Project: FIVE ARENA FACILITY IMPROVEMENTS CONSTRUCTION MANAGER ROSS & ANGLIN ONTARIO LTD. TENDER FOR: PARKING LOTS – FOUR ARENAS BASE PRICE: Excavation, Granulars & Asphalt UNIT PRICE TENDER PRESTON AUDITORIUM Item Description Quantity Unit 1. Remove Existing Asphalt 8,100 M2 2. Excavate to Subgrade 6,250 M2 3. Proof-Roll Subgrade 8,100 M2 4. Granular “B” and “A” 6,250 M2 5. 1,950 M2 1,950 M2 6,250 M2 6,250 M2 2 EA 4 EA 11. Base Course Asphalt HL4 North Lot – 75 mm Surface Asphalt HL3 North Lot – 45 mm Base Course Asphalt HL4 Other Lot s– 45 mm Surface Asphalt HL3 Other Lots – 35 mm Adjust Manholes and Catchbasins Remove and Replace Precast Curbs Line Painting 1 LS 12. Restore Sod & Plantings 1 LS 6. 7. 8. 9. 10. Total Tendered Price Preston Auditorium Unit Price Total $ Page 12 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge ALTERNATIVE PRICE: Remove & Replace Asphalt UNIT PRICE TENDER PRESTON AUDITORIUM Item Description Quantity Unit 1. Remove Existing Asphalt 8,100 M2 2. Proof-Roll Subgrade 8,100 M2 3. Base Course Asphalt HL4 8,100 M2 4. Surface Asphalt HL3 8,100 M2 5. 2 EA 4 EA 7. Adjust Manholes and Catchbasins Remove and Replace Precast Curbs Line Painting 1 LS 8. Restore Sod & Plantings 1 LS 6. Unit Price Alternative Price Preston Auditorium Total $ Schedule: The undersigned agrees to meet the schedule in the Bid Documents. The undersigned submits that immediately upon notification of an award of a contract, the Subcontractor shall proceed with diligence, place all orders for materials and products in such time that delays will not occur and agrees to complete all the work of the contract in accordance with the overall project schedule and agrees to obtain substantial performance as required by the Project Construction Schedule. Bonding: An agreement to Bond for 50 % Performance Bond and 50 % Labour and Material Payment Bond is required to be included with the Bid. The cost of such bonds has been included in the Bid price and includes for a term covering the warranty period and any extended warranty period specified for the work of this Bid. Bonding Rates: 50 % Performance Bond $ / $1,000.00. 50 % Lab. & Mat. Payment Bond $ / $1,000.00. Page 13 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Open for Acceptance: The undersign agrees that this Bid shall remain open for acceptance by the Owner and Construction Manager for a period of thirty (30) calendar days from the Tender closing date. Employee Hours: Provide an estimate of the total employee hours on this project. Subcontractor must provide the actual total hours of work on a monthly basis with each invoice. This is an “Infrastructure Project” funded by the Federal and Provincial Governments, who require a report on total employee hours created by this project including clerical staff. Total Estimated Employee Hours ____________________________. Page 14 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Project: FIVE ARENA FACILITY IMPROVEMENTS – Construction Manager: Ross & Anglin Ontario Ltd. PARKING LOTS – FOUR ARENAS TENDER FOR: Signed, Sealed and Submitted on behalf of: Bidding Company . (Name) . (Street Address) . (City, Province & Postal Code) . (Telephone No.) . (Fax No.) . (Email) Signature . (Signature) . (Name) . (Title) Witness: . Dated at: . This .day of , 20 Page 15 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Appendix “A” Schedule Modifications Herewith are the schedule modifications to the preliminary construction schedule contained in section 01311. We are unable to meet the completion date specified in the project schedule and have identified below the completion date we can meet stating the reasons for the revisions. Revised Completion Date Reason for Revision . . Being unable to meet the completion date specified in the project schedule and having so indicated a revised completion date above, we identify below the alternatives we are proposing in order to meet the original completion date, together with the associated costs. Such associated costs reflect the full cost of the change including the cost of changes to or of additional work to the other trades involved. Proposed Alternative Cost (Addition or Deduction) . . Page 16 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Appendix “B” List of Subcontractors Herewith is the list of Subcontractors that we propose to use for the Divisions or Sections of Work listed herein and that we have carried in our Unit Price Bid. Division of Work Name of Subcontractor Name of Supervisor B.1 B.2 B.3 Page 17 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Appendix “C” Unit Prices The following unit rates shall be for the purpose of valuating changes in the Work. The unit rates shall include all costs for labour, supervision, materials, plant, equipment, taxes, overhead, profit and services for the execution of the unit price work and shall be applied to the net difference between additions and deletions for each change. Description C.1 100 mm Subdrain Unit M C.2 Remove & Replace New Precast Parking Curbs EA. C.3 Remove & Re-Install Existing Precast Curbs EA. C.4 Remove & Replace New Poured Concrete Curbs M C.5 Remove & Replace 4” Thick Concrete Sidewalks M C.6 Machine Excavation C.M. C.7 Hand Excavation C.M. C.8 Granular “B” Supply & Place C.9 Granular “A” Supply & Place Tonne Addition Unit Price Deletion Price Tonne Time & Material Changes: Where changes to the Work may only be valuated on a time and material basis the fee for overhead and profit will be: 1. Work carried out by own forces 2. Work carried out by Subcontractors %. %. Page 18 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Appendix “D” Hourly Labour Rates The labour rates and equipment rates (Including Operator) quoted include the cost of wages, insurances, statutory labour charges, union agreement benefits, all other benefits, overhead and profit and are all-inclusive. Description D.1 Supervisor / Foreman D.2 Equipment Operator D.3 Labourer D.4 1 C.Y. Track Excavator D.5 2 C.Y. Front End Loader D.6 Tractor Backhoe D.7 Tandem Dump Truck D.8 Ride-On Compactor D.9 Tamper or Jump Jack Straight Time Per Hour Page 19 of 20 Addendum No. 1 – Parking Lots – Four Arenas - Cambridge Appendix “E” Supervisory Staff The Subcontractor shall provide full time supervision throughout the duration of the Subcontractor’s Work, to the satisfaction of the Construction Manager. The Subcontractor proposes the following individuals. shall be responsible for supervision of the Work (Resume is attached) shall be responsible for administration of the Work (Resume is attached) Page 20 of 20