Staff recommends motion to approve

advertisement
NO. 02
WORKAUTHORIZATION
Attachment2
Palm BeachCountyWater UtilitiesDepartment
Optimizationand lmprovemenbDesign'BuildContract
ProjectNo.:WUD14-050
District
BudgetLineltemNo.:@
ProjectTitle:
Power lmprovementsPhaseI
and lmprovements
THISAUTHORIZATION
Ng-q?_ to the Contractfor Optimization
(n
by and
ZOtS-OgtS,J,
Servicetda
Design-Build
Entityidentifiedherein,is for the
betweenpalm BeachCountyanOtne Design-Build
Entityprovidesfor
The Design-Build
Servicesof thisWorkAuthorization.
Design/Build
75% SBE participationoverall.This Work {uthorizationincludes 95.74, 7o overall
is
this authorization
including
proposedSBEparticipation,
participatioi-t.
ff," cumulative
'
stated
the
or
exceed
g6.57 yooverall.Additionalauthorizations
will be utilizedto meet
goal.
overallparticipation
Inc'
Entity:Globaltech,
1. Design-Build
2. Address:6001BrokenSoundParkwayNW,Suite610,BocaRaton,FL33487
Entity:
of Services(Scopeof Work)to be providedby the Design-Build
3. Description
- A'
SeeATTACHMENT
Entityto date:
by the Design-Build
4. Servicescompleted
- G.
SeeATTACHMENT
withinthe
Entityshallbeginworkpromptlyor deliverorderedmaterials
S. Design-Build
folloriingcalendaidays from the receiptof BuildingPermitand Noticeto Proceed
with construction:
CalendarDays
Completion 330
Substantial
Completion 360 CalendarDays
FinalConstruction
damageswillapplyas follows:
Liquidated
date'
completion
$-1.00q- perday pastsubstantial
date.past
completion
final
$ 500 perday
- B)
RatesseeATTACHMENT
Damages
tiquiOated
tfor
the requested
Entityfor providing
to be paidto the Design-Build
6. The compensation
MaximumPriceis $198.998.02
withthe Guaranteed
servicesin accordance
CONditiONS
IETMS,
7. EXCEPTAS HEREBYAMENDED,CHANGEDOR MODIFIED,AIIOthCT
and effect.
force
full
in
remain
2015
10,
March
dated
Contract
and obligationsof the
NO. 02
WORKAUTHORIZATION
ProjectNo.:WUDf 4-050
ProjectTitle: WesternReqionWasteWaterTreatmentFacilitv(WRWWTF)Power
lmprovementsPhase1
lN WITNESS WHEREOF, this Authorizationis accepted,subject to the terms, conditionsand
Contract.
obligationsof the aforementioned
PALM BEACHCOUNTY,A POLITICALSUBDIVISIONOF THE STATEOF FLORIDA
SharonR. Bock,Clerk& ComPtroller,
PalmBeachCounty
PalmBeachCounty
Boardof CountyCommissioners
ATTEST:
Signed:
Signed:
ShelleyVana,Mayor
TypedName:
DeputyGlerk
Approvedas to FormandLegal
Sufficiency
Signed:
TypedName:
CountyAttorney
Inc.
CONTMCTOR:Globaltech,
ATTEST:
Manaqer
Thomas.Accounting
Rebecca
(NameandTitle)
P.E./ Secretarv
DavidA. Schuman.
(NameandTitle)
(coRPoMTE SEAL)
J u l v2 0 . 2 0 1 5
Date
Globalt€ch
A D E S I G N- B U I L D ' C O M P A N Y
Engineers. Contractors
6001BrokenSoundPkwyNW,Suite610
BocaRaton,Florida33487
Phone:(561)997-6433;
Fax:(56L)997-5811
'CGC1507203
E80007225
July27,2015
MauriceTobon,P.E.
Directorof Engineering
PalmBeachCountyWaterUtilitiesDepartment
8100ForestHillBoulevard
WestPalmBeach,FL33413
Contract- ContractAuthorization
Subject:2015Design-Build
DearMr. Tobon:
Globaltech's
is authorizedto
CorporateSecretary,
Thisletteristo certifythat DavidSchuman,
Inc. Thereis
or contractswith PalmBeachCountyon the behalfof Globaltech,
signagreements
signature.
no dollarlimit attachedto hisauthorization
this issue.
Pleasecontactus shouldyou havequestionsregarding
Regards,
.4n17
<\x \TroyL. Lyn,P.E.
VicePresident
CC:PaulGandy/Globaltech
LISTOF ATTACHMENTS
NO. 02
WORKAUTHORIZATION
PalmBeachCountyWaterUtilitiesDepartment
Optimizationand lmprovementsDesign-BuildContract
ATTACHMENT- A
Scopeof Work& Compensation
B
ATTACHMENT.
Damages
Ratefor Liquidated
ATTACHMENT- C
Bond
PublicConstruction
.D
ATTACHMENT
Formof Guarantee
-E
ATTACHMENT
Scheduleof Bid ltems
WorkAuthorization
.F
ATTACHMENT
2
1 & Schedule
SBESchedule
ATTACHMENT- G
StatusReport- Summary& Statusof
Authorization
Authorizations
ATTACHMENT- H
StatusReport- Summaryof
Authorization
Tracking
Business
SBE/Minority
.I
ATTACHMENT
LocationMap
.J
ATTACHMENT
CriteriaRePort
Design-Build
.K
ATTACHMENT
VendorQuotes
.A
ATTACHMENT
NO. 02
WORKAUTHORIZATION
Palm BeachCounty Water Utilities Department
Optimizationand lmprovementsDesign-BuildGontract
SCOPEOF WORK
FOR
WesternRegionWasteWater TreatmentFacility (WRWWTF)
PowerlmprovementsPhase1
INTRODUCTION
Palm Beach County (County)entered into an agreemententitledOptimizationand
with
ContractProjectNo. WUD 14-071- (CONTRACT)
Design-Build
tmprovements
various
provide
services
for
design-build
Entity)
to
(Design-Build
Globaltech.lnc.
Contractdated
Design-Build
and lmprovements
generalactivitieson the Optimization
performed
under
will
be
Authorization
This
Work
(R
2015-0315
March10. 2015,
).
that CONTRACT.
with this projectwill be
To meetthe County'sfundingschedule,the work associated
as beingin Phase1 will be performed
dividedintotwo phases.Workitemsdesignated
as beingin Phase2 will be
items
designated
underthis Work Authorization.Work
performedundera futureWorkSupplement.
The work associatedwith Phase 1 of this projectincludethe followingtasks at the
:
Western Region Wastewater Treatment FaciIity (WR\lr/WTF)
.
of auger-casttype pilingsto supportnew generatorslab southeastof
Installation
of new reinforcedconcretegenerator
generator
buitdingand construction
existing
slab.
o Furnishand installnew 500 kW dieselgeneratorwith 4512 gal sub-basefuel
windloadratings.
withapplicable
walkaroundenclosure
tank,andaluminum
Furnish new Main Switchboard(MSB), Automatic Transfer Switch (ATS),
of
air conditioner.Installation
and mini-split
instrumentation
equipment,
electrical
theseitemswill be performedundera futurePhase2 of this project.
The work associatedwith this projectbut will be performedunder a future Phase2
tasks:
includethe following
Removalof existing300 kW dieselgeneratorand abovegroundfuel tank,Phase
2.
Removalof louversand ventsfrom existinggeneratorbuilding,enclosingand
insulationand/or
sealingall openingsin exteriorwall and roof with appropriate
material.Sealand insulategapsbetweenwallsand ceiling,and installmini-split
air conditioner.
(MSB)and AutomaticTransferSwitch
of the new MainSwitchboard
lnstallation
andexistingequipment.
(ATS)connecting
FP&L,newGenerator,
includingremotegeneratorstatusmonitoringon existingPlant
Programming,
SCADAsystem.
.
Installationof new cablingand conduitto connectnew Generatorto new ATS
.
Removal of existing 350 MCM wiring to aerator blower starter cabinets.
Installationof new three phase wiring to individual aerator blower starter
cabinets.
SCOPEOF SERVICES
Entityshallperformthe Scopeof Servicesdescribedin the DesignBuild
Design-Build
Criteria for Western Region Waste Water Treatment Facility (WRVVWTHPower
JulY2015).
Improvemenfs(PBCWUD,
of
the new requirements
whileintegrating
In an effortshowhow pricingwas developed
Entityhas provideda singleline diqqlal as the design
the County,the Design-Build
concept.the titteoithis singlelinediagramis "SINGLELINEDIAGRAM- BELLE
- 06.15-2015''
ANdiS
GLADEWWTF- ALTERNATIVEPOWERIMPROVEMENTS
CriteriaReport.
locatedin the Design-Build
neededto achievethe
the overallmodifications
The belowscopeof work represents
morerecentneedsof the CountY.
Entitygenerallyincludes
The proposedwork to be performedby the Design-Build
and servicesrequiredto
tools,supervision,
materials,
furnishingall labor,equipment,
as follows:
generally
described
workis
test,andstartupthe proposed
design,c-onstruct,
and othermodifications
electricalequipment,
Furnishand installnew generator,
to improveUtilitYServiceNo.1.
(Phase1):
Thefollowingis the scopeof servicesfor thisWorkAuthorization
Services
and Engineering
Task1 - Administrative
1 . Meetwiththe Countyto reviewprojectscope'
utility
engineers,
geotechnical
andelectrical
withstructural,
2 . Developsubcontracis
andotherentitiesas maybe required'
contractor
locator,andelectrical
performsoil boringsand developa support
subcontractor,
3. Utilizea geotechnical
piles.
piledesign.Thisproposalis basedon usingauger-cast
(60%)design.
4. Preparea preliminary
(5)
copiesof the 60% designto the County.Meetwith the
half-iize
five
Submit
5.
Countyto reviewthe design.
6. Incorporatethe County commentsand proceedto final design stage in
acroidancewiththe PBCWUDWaterUtilitiesMinimumDesignand Construction
requirement.
andsecurity
Design-Manual
Engineering
Standards,
and building
Department
Health
County
7. Subm1,DERM,FDEP/PalmBeach
permitapplications.
department
engrneenng
scheduleto includeas a mrnrmum;
8 . Preparedetailedconstruction
and permittingservices,site mobilization,detailed constructionactivities,
deliverytimes,testing,
scheduledshutdownsand durations,equipmenVmaterial
startupandcommissioning.
9 . Prepare submittals(or confirmationof compliancewith County design
andtracksubmittalprocess.
administer
standards),
andtestingwithCountystaff.
inspections,
10.Schedulemeetings,
is being
to confirmconstruction
construction
visits
during
site
11.ProvideEngineer's
and Specifications.
withthe DesignDrawings
performed
in conformance
Drawings.
12.PrepareRecord
Services
Task2 - Construction
of a new500kW dieselgenerator:
1. Installation
of the GeneratorNo. 1
pilingswill be installedsouth-west
a. Newauger-cast
Buildingfor the newgenerator
Pad
concretepad will be formedand pouredto supportthe
b. A new reinforced
tank,andhousing.
newdieselgenerator,
withsub-basefueltank.
c. Furnishandinstalla new500 kW dieselgenerator
i. Generatorfuel tank will have a capacityof 4512 gallons,or
capacityto supply50% ratedstandbypowerfor 10 days at a
usagerateof 18.8gph.
ii. Generatorwill have an aluminumenclosureattachedwhich
providesenoughroomto walkaroundand performmaintenance
on the generator.
batterycharger.
d. Furnishandinstallnewgenerator
e. Providenecessarygroundingsystemaroundnew generator,generator
room.
pad,andelectrical
2. Furnish (for Phase 2 installation)equipmentfor modificationsto existing
No.1 building:
Generator
on the exteriorof
A/C unitfor Phase2 installation
A new3.0 ton mini-split
unitand wall mountedinterior
the buildingwithfloormountedcompressor
fan/evaporator.
b. Lightningprotectionsystem for GeneratorNo. 1 Buildingand new
generator
enclosure
Powerfor equiPment:
3. Temporary
a,. Ouiingtransitionwhen temporarypoweris requiredto run equipment,
Entitywill facilitatethe connectionof temporarypowerto
Desigh-Build
equipment.Temporarypowerwill be providedby the Coulty via mobile
Entitywill coordinatewith Plant,County,
generators.The Design-Build
powerwillbe needed.
whentemporary
ind relevantpersonnel
(MSB-1),automatic
transferswitch,and otherelectrical
4. Furnishnewswitchboard
(forPhase2 installation):
equipment
with integrallybussedautomatictransferswitch
a. Furnishnewswitchboard
to have
in GeneratorNo. 1 Building.Switchboard
for Phase2 installation
layoutand breakersizesas shownin SINGLELINEDIAGRAM- BELLE
_ 06.15GLADEWWTF- ALTERNATIVEPOWERIMPROVEMENTS
2015.
b. Furnish new 50 kVA transformer,200A lighting panel, and SS
for A/C.
disconnect(s)
and malecordcap for centrifuge
c. Furnishnew2004 generatorreceptacle
plug.
generator
generatorreceptacle.
for centrifuge
d. Furnishnew2004SS disconnect
conduitandcablingsystem:
5. Furnish(forPhase2 installation)
one(1)2'PVC conduitfor
to Manhole#5,
No.1 Building
a. FromGenerator
FiberOptic(FO)cable.
to PLCcabinetat MCC1 in
No.1 Building
b. 6-pairFO cablefromGenerator
Building.
MainOperations
c. Four inch (4') PVC conduitbetweennew 500 kW generatorand new
MSB-1
d. Two (2) sets of 4-wire500 MCMwiringbetweennew 500 kW generator
andATS locatedat newMSB-1
e. New conduit,wiring,and junctionbox,to connectexistingwiringfeeding
equipment,and new MSB-1equipmentbreakers.Actualwire size and
on the stateof existingwiring,actualMSB-1
are conditional
connections
withNEC.
andall in accordance
breakersto be installed,
f. New#3/0wiringto fromnewMSBto eachdigesterblowerstartercabinet.
g. New stainlesssteel NEMA 4X junctionbox to marshalnew wiringto
digesterblowers.
and
receptacle
h. Furnishand installconduitand cablingto new centrifuge,
disconnect.
i. Furnishand installconduitand cablingto GeneratorNo. 1 Building
loads.
newA,/C,andancillary
lighting,
j Furnishandinstallnewfeedersfromthe newMSB-1to the FPLvault
controlequipment:
6. Furnish(forPhase2 installation)
a. FurnishMicrologix1400 based PLC, llo, power supply,and media
converterin UL 508 panel for interfacebetweenPlant SCADA and
generator,
ATS,andswitchboard.
monitorfor remoteGeneratorNo. 1 Building
b. Furnisha roomtemperature
statuson plantSCADA.
temperature
Permitsand Fees
to secureall permitsrequiredto
Entity'sresponsibility
It shall be the Design-Build
permits
obtainedby the County.The
except
contract,
work
under
this
the
complete
to closeand requirements
for all inspections
Entityshallbe responsible
Design-Build
out the completedpermits.The Countyshallpay all permitfees. The Design-Build
for all Businesstax fees for work withinthe countyor
Entityshall be responsible
Municipalities.
SALVAGEDMATERIALS
Entity.
1. Scrapmetalto be disposedof by the Design-Build
etc.,to be hauledand legally
wastesuchas concrete,PVC,fiberglass
2. Non-metal
EntitY.
disposedby Design-Build
ASSUMPTIONS
1. Countywill makeavailableall existingrecorddrawingsas may be requiredto
thisscopeof services.
andcomplete
coordinate
withinonecalendarweek
andprovidecomments
2 . Countywill reviewall submittals
Entityof status.
and notifyDesign-Build
POWER
3 . SINGLELINE DIAGRAM- BELLEGLADEWWTF- ALTERNATIVE
- 06-15-2015is providedmerelyas a referencefor how
fMPROVEMENTS
drawing,
as an engineered
pricingwas developed.This is not to be referenced
and is subjectto change.
4 . Unlessotherwisenoted,existingwiring,conduits,and ductbankare assumedto
of damaged
withremediation
be in goodcondition.Timeandmaterialassociated
scope.
out
of
or ductbankwhichmayimpedeworkare
wiring,conduits,
vaultareaare
to the FPLtransformer
5 . Otherthan newfeeders,no modifications
included.
of anyexistingutilitiesis out of scope.
stated,relocation
6 . Unlessspecifically
is required.
contamination
for anypetroleum
7 . No remediation
B . Liquidateddamagesmay be assessedat a rate of $1,000 per day up to
untilFinal
Completion
and $500per day from Substantial
completion
Substantial
Completion.
9. Countyshallprovide:
. lP Addresses
whererequired
. Modbusregisteraddresses
whererequired
COMPENSATION
Maximum
shallnot exceedthe Guaranteed
for this WorkAuthorization
Compensation
for
Contract
prices
in
the
established
with the unit
in accordance
Priceof $598.998.02
servicesdated March 10, 2015, as approvedby the Boardof County
construction
Commissioners.
SBE/M.WBEPARTICIPATION
participation
is includedin
SBE/M-WBE
in the Contract(R 2015-0315),
As described
1
definesthe
Schedule
ATTACHMENTF underthis Authorization.The attached
and Schedule2 establishesthe
SBE/M-WBEappliedto this Authorization/Contract
(Letter
of Intentto performas an
subcontractor
from each
SBE/M-WBEcontribution
sBE/M-WBE).
-".:::i,,'ff11^,"",,
PalmBeachCountyWaterUtilitiesDepartment
Optimizationand lmprovementsDesign-BuildGontract
Ratesfor LiquidatedDamages
damagesrates
shallestablishliquidated
PalmBeachCountyWaterUtilitiesDepartment
of the project.
basedon thedollaramountandtimesensitivity
foreachWorkAuthorization
ratingof 1 through3 assignedto
to a criticality
The ratesshallbe as followsaccording
below:
as established
by the Department
eachWorkAuthorization
Damages
ModeratelylmportantProject(Griticality2): Liquidated
Date
Completion
$1,000perdayafterSubstantial
Date
per
Completion
$500 dayafterFinal
C
ATTACHMENT.
NIELSoN,
RoSENHAUS
& AssoqIATEs
A NIELSONHOOVERGROUPCOMPANY
." July22,20ts
ii1Globaltech,
Inc.
E 6001-BrokenSoundPkwy,Suite610
j BocaRaton,FL33487
=
* RE:
(n
Z
o
;:J
i-)
PalmBeachCounty,asObligee
(WRWWTF)Power
lmprovements
Facility
WasteWaterTreatment
Project:
WesternRegion
Phase
1
BondNo.SU1129888
a
U
u
J DearLadies
andGentlemen:
Z
)* Please
finalbond:
for the abovecaptioned
supplyuswith the followinginformation
Z
fl
:;
()
X
with Date:
Contract
Executed
()
OJ
ft:
U
the authority
and/or PalmBeachCounty,asObligee,
Inc.as Principal
Thisletteris alsogivingGlobaltech,
()
and Powerof Attorney
a to completethesebondsby datingthe bondswith the contractdate,execution
I
to the
The contractdate MAY BETHESAMEdate as the executionof the bond or PRIOR,
executiondate of the bonds.
z-" dates.
(l
V)
a
Z
returnassoonas
ontoyoursuretycompanyuponour receipt.Please
We will forwardthisinformation
;
= possible.
U
Lt-l
u
I) rhankyoufor yourcooperation.
- sincerely,
{)
z
1:
>
()
M
L
o
Agent
FLResident
7
l
F
u
U)
8401 LakeWorth Road
5 u r t ez - 2 5|
Lake Worth, FL 33467
P:561.713.1453
F:561.713.1455
tLw!r/'
rrr!:rt)frtir)ll1l:/ ilrrr
NTELSON,
ROSENHAUS
& ASSOSTATES
A NIELSONHOOVERGROUPCOMPANY
July22,2015
-
7
L
L
u,
-
Globaltech,lnc.
NW
6001BrokenSoundParkway
Suite610
BocaRaton,Fl33487
<s.
l.l I
<1.
:
<1.
I
Z
a
al
ai
Project:WestemRegionWasteWaterTreatmentFacilityWRWWTF)Powerlmprovements
Phase1
Bond. lT NEEDS
TOBE
for you is knownas a PublicConstruction
Theattachedbondwe haveexecuted
ANDSEAIED.
SIGNED
U)
r-_
l!l
II
_-l
(,J
4
.Z
and
SinceOctober1, 1988the PublicWorksBondingLawrequiresthat the recordingof performance
performed.
Any
is being
wherethe publicconstruction
paymentbondsbe filedat the localcourthouses
suchbondwrittenpursuantto Section255.05FloridaStatutemustbe recordedbv the contractorand
of the work.
shouldbe filedbeforethe commencement
.{
L
::
o
& Associates
Nielson,Rosenhaus
d)
U
u
:,
C)
O
1:
Z
C,)
Builders
NoticeCorp.
708S.AndrewsAvenue
P O Box457
FL 33302
Ft.Lauderdale
(800)
Ph:
432-19s9
tJ)
!!
Z
ui
I
L!
I
u
U
a
2_
a
(f
7.
-!:
()
LI:
ll-
o
Z
_)
F
E
-T.
U)
8401 LakeWorth Road
S u i t e2 - 2 3 1
LakeWorth, FL33467
P:561.713.1453
F: 56'1.713.1455
f . i J y J W .| 1 r . r t : i l ) T t t ) r : ] | r . t :
i:rt rJt
FRONTPAGEOF
PUBLIC
PAYMENT
BOND
FloridaStatute255.05
Attached
to andpartof BONDNO.SU1129888
Work.AllotherBondpage(s)
255.05(1)(a),Public
with Florida
Chapter
In Compliance
Statutes
(s)
to thispageregardless
of anynumber that maybe pre-printed
aredeemedsubsequent
thereon.
CONTRACTOR:
Inc.
Globaltech,
NW
SoundParkway
6001Broken
Suite610
BocaRaton,Fl33487
561-997-6433
SURETY:
Archlnsurance
Company
300PlazaThree
JerseyCity,NJO73LL
20L-743-4000
AGENT:
Nielson,
Rosenhaus
& Associates
8401LakeWorthRoad,Suite2-231
LakeWorth,tL33467
56L-7t3-L453
OBLIGEE:
PalmBeach
County
8100ForestHillBoulevard
FL33413
WestPalmBeach,
561-493-6000
WestemRegionWasteWater TreatmentFacility(WRWWTF)Powerlmprovements
PROJECT:
Phase1
-C
ATTA.CHMENT
PUBLICCONSTRUCTION
BOND
B O N DN U M BE R :
su1129888
BONDAMOUNT:
$598,998.02
CONTRACT
AMOUNT:
$598,998.02
CONTRACTOR'S
NAME:
lnc.
Globaltech,
CONTRACTOR'S
ADDRESS:
6001 BrokenSoundParkwayNW
Suite610
BocaRaton,FL 33487
CONTRACTOR'S
PHONE: (561)997-6433
SURETY
COMPANY:
Arch lnsuranceCompany
SURETY'S
ADDRESS:
300 PlazaThree
JerseyCity,NJ 07311
OWNER'S
NAME:
PalmBeachCounty
OWNER'S
ADDRESS:
8100ForestHill Boulevard
West PalmBeach,FL 33413
PHONE:
OWNER'S
(561)4e3-6000
DESCRIPTION
OFWORK: Replacementof Westem RegionWasteWater TreatmentFacility's
(WRWWTF)generator,includingconnectionto SCADAsystemwith
PLC programming
alongwith otherbuildingimprovements.
COUNTY'SPROJECTNo:
wuD 14-050,
wA-2
PROJECTLOCATION:
PBCWUDWRWWTF,2055WestCanalStreetSouth,BeileGlade,FL
33430(PCN00-37-43-1
9-00-000-3060)
LEGALDESCRIPTION:
PCN00-3743-19-00-000-3060
B O N D .l C
Rev10-5-12
BOND
PUBLICCONSTRUCTION
This Bond is issuedin favor of the Countyconditionedon the full and faithfulperformance
of the
Contract.
KNOWALL MENBY THESEPRESENTS:that Contractor
and Surety,are heldand firmlybound
unto
PalmBeaehCountyBoardof CountyCommissioners
301 N. OliveAvenue
WestPalmBeach,Florida33401
as Obligee,hereincalledCounty,for the use and benefitof claimantas hereinbelowdefined,in the
amountof
Dollars$598,998.02
Fivehundredninetyeightthousandninehundredninetyeightdollarsand two cents.
theirheirs,personalrepresentatives,
for the paymentwhereofPrincipaland Suretybindthemselves,
successorsand assigns,jointlyand severatly,firmlyby thesepresents.
executors,administrators,
WHEREAS,
with
2O-., enteredintoa contract
dated
Principalhasbywrittenagreement
the Countyfor:
ProjectName:WesternRegionWasteWater TreatmentFacilityWRWWTF)
Phase1
Powerlmprovements
ProjectNo.:WUD t4-050
ProjectDescription:Replacement
of WRWWTFSgenerator,includingconnectionto
programming
alongwithotherbuildingimprovements.
SCADAsystemwith PLC
ProjectLocation:PBCWUDWRWWTF,2055WestCanalStreetSouth,BelleGlade,
FL 33430(PCN 00-37-43-1
9-00-000-3060)
preparedby:
in accordancewith DesignCriteriaDrawingsand Specifications
lnc.
Nameof DesignFirm:Globaltech,
Locationof Firm:6001 BrokenSoundParkwayNW,Ste.610,BocaRaton,FL 33487
Phone:(561)997-6433
Fax:(561)997-5811
which contractis by referencemadea part hereofin its entirety,and is hereinafterreferredto as the
Contract.
THE CONDITION
OF THISBONDis that if Principal:
1.
betweenPrincipaland Countyfor the design
Performsthe mntractdated
,20-.,
and constructionof WUD 14-050,the contractbeingmadea part of this bond by reference,at the
timesand in the mannerprescribedin the contract;and
2.
Promptlymakes paymentsto all claimants,as defined in Section255.05, FloridaStatutes,
or supplies,useddirectlyor indirectlyby Principalin the
supplyingPrincipalwith labor,materials,
prosecution
of the work providedfor in the contract;and
BOND.2C
Rev 10-5-12
3 . PaysCountyall losses,damages(includingtiquidated
damages),expenses,costs,and attorneys'
fees,includingappellateproceedings,
thatGountysustainsbecauseof a defaultby Principal
under
the contract;and
4 . Performsthe guaranteeof all workand materialsfurnishedunderthe contractfor the timespecified
in the contract,thenthisbondis void;otherwiseit remainsin fullforce.
Any changesin or underthe contractdocumentsand complianceor noncompliance
with any
formalitiesconnectedwith the contractor the changesdoes not affectSurety'sobligationunder
this bondand Suretywaivesnoticeof such changes.
6.
The amountof this bondshallbe reducedby and to the extentof any paymentor paymentsmade
in goodfaith hereunder,inclusiveof the paymentby Suretyof constructionlienswhichmay be filed
of recordagainstsaidimprovement,
whetheror not claimfor the amountof suchlienbe presented
underand againstthe bond.
7 . Principaland Suretyexpresslyacknowledgethat any and all provisionsrelatingto consequential,
delayand liquidateddamagescontainedin the contractare expresslycoveredby and madea part
of this Performance,
Laborand MaterialPaymentBond. Principaland Suretyacknowledge
that
any such provisionslie withintheirobligations
and withinthe policycoverage'sand limitations
of
this instrument.
8 . Section255.05, FloridaStatutes,as amended,togetherwith all notice and time provisions
containedtherein,is incorporatedherein,by reference,in its entireg. Any action institutedby a
claimantunder this bond for paymentmust be in accordancewith the noticeand time limitation
provisionsin Section255.05(2),FloridaStatutes.This instrumentregardlessof its form, shall be
construedand deemed a statutory bond issued in accordancewith Section 255.05, Florida
Statutes.
Anyactionbroughtunderthisinstrument
jurisdiction
shallbe broughtin thestatecourtof competent
in PalmBeachCounty,FlorirCa
and notelsewhere.
Globaltech,Inc.
Principal
_[tbtccct ltorrrti
Printname
(Seal)
(---"__
Printname
Brf n6r.cl P Cf*c\y
0.q.'r,t-0,tk
Title
Attorney in fact
Title
B O N D .3 C
Rev 10-5-12
lrll
Atc 0000147097
manner and to the extent herein stated. Not valid for Mortgage, Note, Loan, Letter of Credit, Bank Deposit, Currency Rate,
Interest Rateor Residential Value Guarantees.
= .:
=1
'n
ir
KnowAll PersonsBy ThesePresents:
This authoritydoes not permitthe sameobligationto be splitinto two or more bondsIn orderto bringeachsuch bondwithinthe dollar
forth herei!.,.
m t of
..
lu.thority:as€et
=.
='
rin
The executionof such bonds, undqrtiSlhgg,fecoSnlzames and other surgp gbligatibrls purpudnceof these piqsents shall.be a=
bindingupon the said CompanyaS fully' and amply to all intents and burposes,as if the same had been duly'executedand
officein JerseyCity,NewJersey.
by its regularlyelectedofficersat its principaladministrative
acknowledged
This Powerof Attorneyis signed,sealedand certifiedby facsimileunderand by authorityof the followingresolutionadoptedby the
unanimousconsentof the Boardof Directorsof the Companyon September15,2011:
tl
or any SeniorVice President,
VOTED,That the signatureof the Chahmanof thq eoirO, ttre President,or the ExecutiveVice Pre_sident,
==of the Sur*v @iness Division,qrl[4"i1 aphgirileg$ddslgnatedin writihg-iar€lqd.wi$.te€ecretary, and thdSignatup=of{he- '
. Secretary,'the
by the Secretary,may be affixedby facsimileon any powerof attorneyor bond
Ceatof the Compan/,add certiflcadons
executedpursuantto the resolutionadoptedby the Boardof Directorson September15,2Af , and any such powerso executed,
to which it is attached,shall continueto be valid and bindingupon the
sealedand certifiedwith respectto any bond or undertaking
il
l , ' '' l,l,l i' li 'lltl
"r,
g_q.M!oo
1=_3=
go.oos
:=_
=l
- : : : ::
=':." ' ' -"'
Page1 of 2
'll'll'
..i
r"l
L.'
Printedin U.S.A.
=-
==..:
Atc 0000147097
In Testimony Whereof, the ComPanY has caused this lnstrument to be signed and lts corporate seal to be affixed by their authorized
officers,this13hdayof March,2015.
Arch InsuranceCompany
AttestedandCertifled
SS
STATEOFPENNSYLVANIA
SS
COUNry OFPHILADELPHIA
personallyknownto me to be the
l, HelenSzafran,a Notarypublic,do herebycertifythat PatrickK. Nailsand DavidM. Finkelstein
whose nar"" aie respectlvelyai Secretaryand ExecutiveVice Presidentof the Arch lnsuranceCompany' a
beforeme
"",n"-f"r"ons
Corporition organizedand exis1ngunderthe laws of the Stateof Missouri,subscribedto the foregoinginstrument'appeared
seal and
this day in perlon and severallyicknowledgedthat they beingthereuntoduly authorizedsigned,sealedwith the corporate
and
the
uses
for
acts
and
voluntary
free
their
own
as
and
of
saiO
corporation
ait
voluntary
the
free
and
as
the
said
instrument
delivered
purposes
thereinsetforth.
r{EL8H
S[yur
I'ldffifi
rNN;&
r0oftlst
My commissionexpires 10103120'17
CERTIFICATION
13.
l, patrick K. Nails, Secretaryof the Arch lnsuranceCompany,do hereby certifythat the attachedPower of Attorneydated March
jots on behalfof the p"oo'n(") as listed above is a true and-correctcopy and that the same has been in full force and effect since the
who
f6l6-mereof and is in iull for&'and effect on the date of this certificate;and I do further certifythat the said David M. Finkelstein'
the duly
executedthe power of attorney as ExecutiveVice President,was on the date of executionof the attachedPower of Attorney
electedExecutiveVice Presidentof the Arch InsuranceCompany.
lN TESTIMONYWHEREOF,I have hereuntosubscribedmy name and affixedthe corporateseal of the Arch lnsurancecompanyon
20-.-'
ot -.-this --day
specificallynamedthereinand they have
This powerof Aftorneylimitsthe acts of thosenamedthereinto the bondsand undertakings
stated.
herein
to
the
extent
and
the
manner
in
except
no authorityto bindthe Company
PLEASESENDALL CLAIM INOUIRIESRELATINGTO THIS BONDTO THE FOLLOWINGADDRESS:
- SuretyDivlslon
Arch Insurance
Suite1500
3 Parkway,
PA 19102
Phlladelphla,
000303
00M10013
Page2of2
in U.S,A.
Printed
ATTACHMENT.
D
FORMOF GUARANTEE
GUAMNTEEFORGLOBALTECH
lNC.(CONTRACTOR)
ANDARCHTNSURANCE
COMPANY
(suRErY)
We the undersignedhereby guaranteethat the Western Region Waste Water Treatment Facility
(WRWWTF)Power lmprovements Phase I, WUD 14-050,WA.2) project located in Palm Beach
County,Florida,whichwe haveconstructed
and bonded,has beendone in accordance
with the plans
and specifications;
thal the work constructedwill fulfillthe requirements
guaranties
of the
includedin the
ContraotDocuments.We agree to repairor replaceany or all of our work, togetherwith any work of
others which may be damagedin so doing, that may prove to be defectivein the workmanshipor
materialswithina periodof one year from the date of SubstantialCompletionof all of the abovenamed
work by the Countyof Palm Beach,Stateof Florida,withoutany expensewhatsoeverto said Countyof
Palm Beach,ordinarywear and tear and unusualabuseor neglectexceptedby the County. When
correctionworkis started,it shallbe caniedthroughto completion.
In the eventof our failureto acknowledgenotice,and commencecorrectionsof defectiveworkwithinfive
(5) calendardays after being notifiedin writing by the Board of County Commissioners,
Palm Beach
County,Florida,we, collectivelyor separately,do herebyauthorizePalm BeachCoun$ to proceedto
have said defectsrepairedand made good at our expenseand we will honorand pay the costsand
chargesthereforeupondemand.
DATED:
(noticeof completion
filingdate)
SEALAND NOTARIALACKNOWLEDGMENT
OF SUREW
Inc. (Seal)
Globaltech.
(Contractor)
,4
By: "Z-*
,f
(Signature)
,r'
..2'24
Arch luuul.luLs
fnLu
InsuranceL,uurycury
Company
(Al,rn*.\ D G.ro\q
r
(PrintedName)
)
(Seal)
(Surety)
By:
B^JrVf r^7
Attorneyinfact
BrettRosenhaus,
(PrintedName)
GUARANTEE.lD
Rev 10-5-12
-E
ATTACHMENT
COSTSCHEDULE
WORKAUTHORIZATION
ATTACHMENT.
E
WA-2:WesternRegionWasteWaterTreatmentFacility(WRWWTF)Powerlmprovements
PhaseI
EngineeringFeeSummary
Task
I
TaskDescrlDtion
*Sub-
E6
E5
E4
E3
Tech lll
os
$77.33
$65.24
$57.37
$42.97
$32.99
$35.43
Total Labor
Services
SubConsultant
troject Coordlnatlon
rrojectManagemenucoordination
z
VleetW staffto reviewprojecucollectinfo
,reparedesign/construction
schedule
1t
Subtotal Task t
2
4t
$
3,503.10 $
1(
$
1,04r.41
Permlttlng
PBCDERM- prepareandsubmitletter
FLDEP- prepareandsubmitpermit
TrepareConstructionapplication
- Urvil/Mecnanrc:ruErec
5U tsUilOtng
FPLfeescoordination
oermits
SubtotalTaskI
3
i0%Deslgn
rroiect ManagemenVCoordination
VlechanicalDesign (4 sheets)
2(
2(
4(
4(
94
62
Structural
Design
:lectricel/l&GL,eslgn(6 sheets)
$
1,500.0(Worcester
$
2,000.0(
ADS
Soecifications
JDdateschedule
Prepare
construction
estimate
Vleetwithstaffandreview
SubtotalTaski
5
1t
2l
$
8,428.7t $
3,500.0(
100%Design
ProjectManagemenUCoordination
VlechanicalDesign
Structural
Design
Electrical/l&C
Design
1
1
$
2,500.0(Worcester
1e
$
3,000.0(
3,402.80 $
5,500.0(
SDecifications
Updateschedule
UDdateconstruction
estimate
I
tc/oA
Subtotal Task !
6
16
1
28
29
$
sDc
rrojectManagemenvcoordination
SiteVisits
1(
6t
1
Submittals
lFls
tecordDrawings
rermitCloseout
z\
4
Subtotal Task G
LaborHours
LaborCosts
LaborMultiolie
Labor Tota
2t
14(
21
tC $
322
3C
25
84,827.7( $1,434.2t $ 13 , 8 3 6 . 3 2 $ 3 , 6 6 1 . 8 t $ 1 , 0 6 2 . 9 (
ena
3.0(
3.0c
3.0(
3.0(
$463.9€ $14,483.2t $4,302.79$ 4 1 , 5 0 9 . 0 i$ 1 0 , 9 8 5 . 6 ; $3,188.7C
8,595.6(
$
2
$154.6€
3.0(
3.0(
$74,933.4(
Tota
Subconsultant
$
9,000.0(
TOTAL ENGINEERINGFEE
$
83,933.4t
ADS
,
Globalteeh,
ADES
rcN_BUILD'"q"_ryt,'
TakeoffWorksheet
07t21t15
PBGWater Utilities Department
150486PBC WRVIMTFPower lmp. Phase 1
Description
Quote/Vendor
Unit
Quantity
1 GeneralGonditions
Temporary
Facilities
TrailerPickup/Delivery
Container
Rental
Sanitary
JobSiteOfficeSupplies
WasteHauling
Ea
Ea
Month
LOT
LOT
z
GeneralConditions
SubmittalLabor
ProgressMeeting
Scheduling
Labor
Construction
PM
Construction
Superintendent
Safety
Building
Permits
HR
HR
HR
HR
HR
HR
HR
32
20
20
100
80
8
20
1
J
J
4
I
200.00
375.00
360.00
100.00
1,200.00
71.08
71.O8
71.08
71.O8
62.13
71.08
71.08
2,274.56
1,421.60
1,421.60
7,108.00
4,970.40
568.64
1,421.60
21,421.40
I
2,028.56
71.08
62.13
962.88
568.64
497.O4
962.88
1
s,s00.00
5,500.00
LOT
HR
HR
CR-D
1
8
SoilBoring& Testing
LOT
Page 1
200.00
125.00
120.00
100.00
600.00
Bid ltemTotals:
2 SiteWork
Mobilization
Construction
PM
Construction
Superintendent
3 ManCrew
Report9-5-0-08
Ext. Gost
Tax (o/ol Markup*
6.00
6.00
6.00
6.00
6.00
Ext.Price
1.1500
1.1500
1.1500
1.1500
1.1500
243.80
457.13
438.84
121.90
1,462.80
1.2992
1.2992
1.2992
1.2992
1.2992
1.2992
1.2992
2,955.11
1,846.94
1,846.94
9,2U.71
6,457.54
738.78
1,U6.94
27,651.43
1.2992
1.2992
1.2992
1,250.97
1.1000
6,050.00
738.78
u5.75
07t21t2015
10:29
AM
TakeoffWorksheet
07t21t15
Continued...
Description
Quote/Vendor
Unit
Quantity
Ext Gost
Bid ltem Totals:
3 Concrete
Generator
Pad
PrepAreafor Generator
Pad
Concrete
Piles
Form& Materials
CastIn PlaceConcrete
Concrete
Pump
TestingServices
3 ManCrew
Construction
PM
CR-D
LOT
LOT
LOT
LOT
LOT
CR.D
HR
2
1
I
50
1
1
Patch& Repair
CR.D
5 Metals
MiscMetals& Fasteners
8
1,925.76
15,000.00
1,681.91
8,750.00
700.00
1,000.00
4,814.40
568.64
2
962.88
1,925.76
Bid ltem Totals:
36,366.47
1,000.00
Bid ltem Totals:
11 Equipment
Cummins
5001(W
Generator
HVAC
LOT
EA
155,644.88
5,400.00
Bid ltemTotals:
13 t&C
Generator
Interface
Panel
17,000.00
Bid ltemTotals:
Report9-5-0-08
Page 2
7,528.56
962.88
15,000.00
1,681.91
175.00
700.00
1,000.00
962.88
71.08
1
Tax(%) Markup*
8,685.50
6.00
6.00
6.00
O.UU
1.2992
1.1000
1.1500
1.1500
1.1500
1.1000
1.2992
1.2992
2,50't.95
17,490.00
2,O50.24
10,666.25
853.30
1,100.00
6,2U.87
738.78
1.2992
2,501.95
44,157.34
1,000.00
1.1500
1,000.00
155,644.88
5,400.00
17,000.00
1,219.00
1,219.00
6.00
6.00
189,731.11
6,582.60
161,044.88
17,000.00
Ext. Price
196,313.71
1.1500
20,723.00
20,723.00
07t21t2015
10:29AM
TakeoffWorksheet
07t21t15
Continued...
Description
15 Mechanical
Generator
lnstallation
SetandInstallGenerator
Quote/Vendor
Unit
CR.D
Quantity
4
Cost
1,614.24
Bid ltem Totals:
16 Electrical
Electrical
Sub
Construction
PM(l&C)
Trenching,
Backfi
lling,andCompaction
LOT
HR
CR-D
1
24
I
138,000.00
71.08
962.88
Bid ltem Totals:
18 RentalEquipment
Crane
ForkLift
Fuel
Backhoe
Equipment
Fuel
5,000psi pressurewasher
Compactor
5000-700018
Equipment
Fuel
DAY
WEEK
LOT
WEEK
LOT
WEEK
WEEK
LOT
I
4
50
4
50
I
1,500.00
2,475.00
5.00
1,200.00
5.00
575.0'1
7An nn
40
5.00
Bid ltem Totals:
50 Engineering
Engineering
Electrical
Engineer
Structural
Engineer
LOT
LOT
LOT
24,977.80
5,000.00
4,000.00
Bid ltem Totals:
60 Bond & Gertification
Bonds& Certifications
BuildersRisklnsurance
Report9-5-0-08
11,977.04
5.289.78
Page 3
Ext.Cost
Tax (o/ol Markup*
6,456.96
1.2992
6,455.96
1.1000
1.2992
1.2992
147,408.96
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
1.1500
1.1500
1.'1500
1.1500
1.1500
1.1500
1.1500
1.1500
1,828.50
12,068.10
304.75
5,851.20
304.75
700.s4
2,742.75
243.80
24,0M.79
3.0000
1.0000
1.0000
74,933.40
5,000.00
4,000.00
83,933.40
33,977.8O
11,977.O4
5,289.78
151,800.00
2,216.33
10,OO7.79
164,024.12
19,725.01
24,977.80
5,000.00
4,000.00
8,388.88
8,399.88
138,000.00
1,705.92
7,703.U
1,500.00
9,900.00
250.00
4,800.00
250.00
575.01
2,250.00
200.00
Ext.Price
1 . 15 0 0
1.1500
13,773.60
6,083.25
07t21t2015
10:29AM
TakeoffWorksheet
07t21t15
Continued...
Description
Quote/Vendor
Ext.Gost
Bid ltem Totals:
Grand Totals:
Tax (%)
Markup*
Ext. Price
17,266.82
19,856.85
469,196.86
598,998.02
Note:CR-D=8Hrs
"ContractMarkupsPer MasterAgreement:
= 1.1, Laborat Burden= 1.2992
Materials= 1. 15, Subcontractors
Report9-5-0-08
Page 4 of4
07t21t2015
10:29AM
ATTACHMENT- F
SBESCHEDULEl&2
F
ATTACHMENT.
SCHEDULE1
E PRIME/SUBCONTRACTORS
LIST OF PROPOSEDSBE-MA/VB
PROJECTNAME:
WesternReoionWasteWaterTreatmentFacility
(WRWWTF) Power lmprovementsPhase 1
NAMEOF PRIMEBIDDERGlobaltech.lnc.
BernardP. Gandy.President
CONTACTPERSON:
N/A
BID OPENINGDATE:
Name,Addressand Telephone
Numberof
PROJECT
No:
WUD 14-050
NW.Suite610
6001BrokenSoundParkway
ADDRESS:
561-997-5811
561-997-6433 FAXNO.:
PHONENO.:
DEPARTMENT:N/A
PLEASEIDENTIFYALL APPLIGABLECATEGORIES
(Checkone or both Categories)
Business Small
DollarAmount
Women
Caucasian Other
Globaltech,lnc., (561)9976433
6001 BrokenSound ParlsuayNW,
430.498.02$
Suite610.BocaR
EnergyEfficientElectric,lnc.
1600MercerAvenue.Suite6
WestPalmBeach.FL 33401
561\655-7211
000.00 $
PLLC
ADS Engineering,
4400 N. FederalHighway,Suite18
Boca Raton.FL 33431
5.000.00
954\ 415-7378
s
PRIME CONTRACTORTO COMPLETE:
B I DP R I C E : $
598.998.02
Total Valueof SBE Participation:$
-
$
-
$
s73,498.02$
573,498.02
2 or a proposalfrom eachSubcontractor
includedon Schedule
by priceor percentage
mustbe supported
1. Theamounttistedon thisformfor a Subcontractor
listedin orderto be countedtowardgoalattainment.
2. Firmsmaybe certifiedby PalmBeachCountyas an SBEand/oran MAI/BE.lf firmsare certifiedas bothan SBEandMMBE, pleaseindicatethe dollar
category.
amountunderthe appropriate
is beingcollectedfor trackingpurposesonly.
3. MA/VBE
information
-F
ATTACHMENT
SCHEDULE
2
LETTEROF INTENTTO PERFORM
AS AN SBE OR M/WBESUBCONTRACTOR
PROJECT
NO. WUD14-O5O
PROJECT NAME Western Region Waste Water
TreatmentFacility (WR\AMTF)Power lmprovements
Phase1
Globaltech.
lnc.
TO:
(Nameof PrimeBidder)
The undersignedis certifiedby Palm BeachCountyas a(n) - (checkone or more,as applicable):
SmallBusiness
Enterprise
XX
Black_
Hispanic
_
Women_
Minority
Business
Enterprise
Caucasian
XX Other(PleaseSpecify)
Dateof PalmBeachCountyCertification:
November
24.2012
The undersigned
is preparedto performthefollowingdescribedworkin connection
withthe aboveproject
(Specifvin detail.particularwork items or parts thereofto be performed):
Line
Item/Lot
No.
1
2
Item Description
Enoineerino
MechanicalConstruction
Qty / Units
Unit Price
Total Price
1
1
N/A
N/A
$ 74.933.40
Bonds& Certifications
$ 335.707.77
$ 19.856.85
at the followingprice:
(Fourhundred
fourhundredninetyeightdollarsandtwocents
thirtythousand
$430.498.02
(Subcontractor's
quote)
for workwithyouconditioned
uponyourexecutionof a contractwith
andwillenterintoa formalagreement
PalmBeachCounty.
any portionof this subcontractto a non-certifiedSBE
lf undersignedintendsto sub-subcontract
mustbe stated:NONE.
subcontractor,
the amountof anysuchsubcontract
thattheprovisionof thisformto primebidderdoesnotprevent
Theundersigned
subcontractor
understands
quotations
fromproviding
to otherbidders
subcontractor
DavidA. Schuman.CorporateSecretary
(Printname/title
of personexecutingon
behalfof SBE-MMBESubcontractor)
Date: Julv21.2015
-F
ATTACHMENT
SCHEDULE
2
LEfiER OF INTENTTO PERFORMAS AN SBE OR M/WBESUBCONTRACTOR
PROJECT
NO. WUD 14.050
TO:
PROJECT NAME WRV/WTF Power lmprovements
Phase1
Globaltech.
lnc.
(Nameof PrimeBidder)
The undersigned
is certifiedby PalmBeachCountyas a(n)- (checkone or more,as applicable):
SmallBusinessEnterprise
[X
Black_
Hispanic_
Women_
MinorityBusinessEnterprise
CaucasianXX Other(PleaseSpecify)
Dateof PalmBeachCountyCertification:
November15.2013
is preparedto performthe followingdescribedworkin connection
The undersigned
withthe aboveproject
(Specifvin detail.oarticularwork items or parts thereof to be performed):
Line
Item/Lot
No.
.l
Item Description
ElectricalEnoineerino
Desiqn
Qty/ Units
Unit Price
Total Price
1
N/A
s 5.000.00
at the followingprice:
(Fivethousanddollarsand no cents)
$.5,000.00
quote)
(Subcontractor's
and willenterintoa formalagreementfor workwithyou conditioned
uponyourexecutionof a contractwith
PalmBepchCounty.
lf undersignedintends to sub-subcontract
any portion of this subcontractto a non-certifiedSBE
the amountof any suchsubcontract
mustbe stated: NONE.
subcontractor,
The undersigned
subcontractor
thatthe provisionof thisformto primebidderdoesnot prevent
understands
to otherbidders
subcontractor
from providingquotations
(Print
AlexanderStojanovic
/ President
(Printname/titleof personexecutingon
behalfof SBE-MAI/BE
Subcontractor)
Date: J u l v 1 5 .2 0 1 5
ATTACHMENT. F
2
SCHEDULE
LETTEROF INTENTTO PERFORMAS AN SBE OR M/WBESUBCONTRACTOR
PROJECTNO. WUD 14-O5O
Power lmprovements
PROJECT NAME WRWWfF
Phase1
lnc.
Globaltech,
(Nameof PrimeBidder)
TO:
The undersignedis certifiedby Palm BeachCountyas a(n) - (checkone or more,as applicable):
EnterPrise
SmallBusiness
$
Hispanic-
Black-
Women-
Business
Enteprise
Minority
CaucasianXX Other(PleaseSpecify)
September4' 20:12
Dateof Palm BeachCountyCertification:
The undersignedis preparedto performthe followingdescribedwork in connectionwith the aboveproject
(Specifvin detail, particular work items or parts thereof to be performed)I
Llne
Item/Lot
No.
1
ItemDescription
Subcontracting
Electrical
Qty/ Units
UnitPrice
TotalPrice
1
N/A
$ 138'000'00
-
at the followingprice;
$138.000.00(9ne hundredthirtv-eiqhtthousanddollarsand no cents
quote)
(Subcontractor's
and will enterinto a formalagreementfor work with you conditioneduponyour executionof a contractwith
PalmBeachCounty.
lf undersignedintends to sub-subcontractany portion of this subcontractto a non-certifiedSBE
subcontractor,
the amountof any such subcontractmust be stated: NONE.
understandsthatthe provisionof thisformto primebidderdoes not prevent
subcontractor
The undersigned
from providingquotationsto other bidders
subcontractor
Inq
EngrgyEfficient.Electric.
(PrintNameof SBE-MA//BESubcontractor)
,/,/
ev: -/L- 7c /-
(Sisnature)
ReneViau/ Vice Prsident
(Printname/tltleof personexecutingon
behalfof SBE-MM/BESubcontractor)
Date:
J u l v1 5 . 2 0 1 5
G
ATTACHMENT.
STATUSREPORT
AUTHORIZATION
July20,2015
ANDSTATUSOFAUTHORIZATIONS
SUMMARY
Auth. No.
Status
Description
Project Total
Amount
Date
Approved
WUDNo.
Assigned
CONSULTANTSERVICE AUTHORIZATIONS
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total CSAs
WORKAUTHORIZATIONS
WA-1
WA.2
Cleaning
SYstem
WTP1'l Degasifier
A/esternRegionWasteWaterTreatmentFacility
Phase1
:IA/R\M/TR Powerlmprovements
Approved $1,051,189.81
04121115 wuD 14-073
$598,998.02
wuD 14-050
Pending
TotalWAs
$1,650,187.83
Total csAs + wAs
$1,650,187.83
Globaltech
Project No.
H
ATTACHMENT.
STATUSREPORT
AUTHORIZATION
ILDGONTRACT
DESIGN.BU
ANDIMPROVEMENTS
OPTIMTZATION
SUMMARYof SBE/MWBETRACKING
WUD 14-0b0: WesternRegionWaste Water TreatmentFacility(WRWWTF)PowerlmprovementsPhase 1
ServiceAuthorization
Valueof Consultant
Valueof WorkAuthorization
Valueof CSAandWA
Valueof SBEMinorityLetterof Intent
ActualPercentages
/ ApprovedAuthorizations
ServiceAuthorization
TotalValueof ApprovedConsultant
WorkAuthorization
TotalValueof Approved
TotalValueof CSAsandWAs
TotalValueof SBESignedSubcontracts
ActualPercentages
SignedAuthorizationsPlus CurrentProposal
TotalValueof ApprovedCSAsPlusCurrentCSAProposal
WAs PlusCurrentWA Proposal
TotalValueof Approved
CSAsandWAs
TotalValueof ApprovedandProposed
and Lettersof Intent
TotalValueof SBESubcontracts
ActualPercentages
$598,998.02
$573,498.02
95.74%
$0.00
$ 1, 0 5 1 , 1 8 9 . 8 1
$ 1, 0 5 1 , 1 8 9 . 8 1
$1,020,112.81
97.04Yo
$0.00
$1,650,187.83
$1,650,187.83
$1,593,610.83
96.57o/o
,J
ATTACHMENT
Design-BgildGriteriaReport
DesignBuildCriteria
WesternRegionWasteWaterTreatmentFacility(WRWWTF)
Powerlmprovements
GL04 ProjectNo.WUD14-050
P.E.,DBIA
n McGrew,
EngineerNo.35004
Stateof FloridaProfessional
PalmBeachCountyWaterUtilitiesDepartment
8100ForestHillBlvd.
WestPdm Beach,FL 33413
7fz/z'rs
DesignBuildCriteria
WRWWTFPowerlmprovements
GL04- ProjectNo.WUD14-050
Part1 General
1.1Summaryof Work
Entitygenerally
A. ProjectBackground:Theproposedworkto be performed
by the Design-Build
includes
materials,
furnishing
tools,supervision,
all labor,equipment,
and servicesrequired
to
work.
design,construct,
test,andstartupthe proposed
The WesternRegionWaste Water TreatmentFacility(WRWWTF)is an activatedsludge
plantwitha permitted
treatment
capacityof 6.5 mgd. Theprocessfacilitiesincludea headworks
withbarscreensandgritseparators,
ditchaerationtanks,foursecondary
two oxidation
clarifiers
(twocircular
fourrotoscreens
andtworectangular),
twosludgethickeners,
oneaerobicdigester,
well systemfor
and one 20" self cleaningstrainerfor effluentpolishing
and a deepinjection
pondsavailable
for backupdisposal.
withpercolation
effluent
disposal,
The electrical
distribution
systemat the WRWWTFconsistsof two utilityFPLservices.Utility
ServiceNo.1 is locatedin the north-east
cornerof the plantandUtilityServiceNo.2 is locatedin
plant.
middle-west
the
of the
The750kVAFPLtransformer
is
UtilityServiceNo.1 is connected
to a 750kVAFPLtransformer.
is
main
FPL
The
the
vault.
locatedin the existing
step-downtransformer connectedto
(MSB-1)locatedin Generator
BuildingNo. 1. MSB-1consistsof one 800Arated
switchboard
main breaker,one 6004 ratedgeneratorbreaker,one 800A ratedautomatictransferswitch
(ATS)MSB-1powersDigester
DitchNo.1aerators
1 and2, Chlorine
Blowers'1
and2, Oxidation
breakersare electrically
facilityand Polymerbuilding. The main breakerand emergency
at the same
interlocked
throughan ATScontrolschemeto preventfromclosingbothbreakers
time.
for the
Engineering,
lnc. on 1122115
by HillersElectrical
AppendixA is a studycompleted
for Utility Service No. 1. The following
necessaryalternativepower improvements
wasmade:
recommendation
Emergency
back-uppowerfor MSB-1is providedby a 300-kW(375kVA)generatorratedat
generator
cannotpowerallloadsconnected
480V,3-phase.Withthecurrentsetup theexisting
in 1982.MSB-1andthe300-kWgenerator
wasinstalled
arewellpast
. Thegenerator
to MSB-1
to be replaced.
lifespanforelectrical
andit is recommended
equipment
theirreliable
systemwithfuel
willincludethedesignandbuildof a newstandalone500kWgenerator
Project
will
have
Generator
a reinforced
resistant
aluminum
enclosure.
hurricane
batteries
and
tank,
generator
permanent
main
will
Current
and
switchboard
maintenance
access.
concrete
slaband
will
Building
#1
be
upgraded
to
from
Building
#1.
Generator
be removed
andrecycled Generator
1.1F
for
Refer
new
main
switchboard.
to
buildingto extendthe life of the
an air conditioned
completescopeof worksfor thisdesignbuildproject.
furnishing
of
andinstallation
Theproject
willbe splitintotwophases.Thefirstphasewillinclude
phase
will alsoinclude
withfueltank and enclosure.This
the standalone500kWgenerator
procurement
Thesecondphasewillconsistof installation
equipment.
of all longleadelectrical
Building
#'1modifications.
PLCprogramming
andGenerator
of electrical
equipment,
andstart-up
Engineering
Technical
Memorandum
Additional
information
canbe foundin the HillersElectrical
(Appendix
A).
B. Legaldescriptionof the site: S/DOF 36-43-36BY ST SURVEYWLY351.74 Ff OF LT 3, N
PropertyControlNo.04-36-43-36-01112OF LT 5 & PT OF N 1/2OF LT 6 lN OR23848P268.
Belle
Glade,FL33430.
003-0010.Siteaddressis 2055WestCanalStreetSouth,
C, Surveyinformationconcerningthe site: Surveyol the propertywas completedon 1411109
B.
andis locatedin Appendix
D. Interiorspacerequirements:N/A
E. Material quality standards: Adhere to Palm Beach County Water Utility Department
materiallist.
(PBCWUD)
approved
MinimumDesignStandards
F. Schematiclayoutsand conceptualDesignCriteriaof the proiect:
all
Entitygenerallyincludesfurnishing
The proposedworkto be perlormedby the Design-Build
labor,equipment(unlessspecifiedOwner Furnishedin Scope ol Works),materials,tools,
to the
and servicesrequiredto design,construct,test,and startupimprovements
supervision,
necessaryfor new
BelleGladeWasteWaterTreatmentFacility.IncludePLC programming
generatorand main switchboard.Connectgeneratorto SCADAand providel/O list with
proposal.
Palm BeachCountyWater UtilityDepartmentrequiresthe followingitems on the SCADA
system:
HOA(Hand-Off-Auto)/Heady
i. Generator
Running
ii. Generator
iii. Oil Pressure
iv. CoolantTemperature
v. LinePowertromFPL(voltsandampseachleg)
power(voltsandampseachleg)
vi. Generator
vii. Charging
SystemVolts
viii. FuelLevelgallons
Hours
ix. Generator
x. DayTankLevel(if included)
usingASCE7-10,currentFloridaBuilding
windloadcalculations
including
Alldesigndocuments
Codeand all localcodesfor generatorwithtank and enclosureand alsofor generatorbuilding
Engineer.Provide
envelopeshallbe signedand sealedby a FloridaregisteredProfessional
FloridaProductapprovalfor all doors, windowsand louversmeetingrequiredwind load
pressures
andimpact.
itemsareincludedin thisscopeol services:
Thefollowing
Standalone5fi)kW Generatorwith minimuma 4,500GallonSub-baseFuelTank:
i.
of new
utilitieslor selection
to locateunderground
necessary
investigations
Complete
in section1.7generator
cablesystem.As described
locationandnewunderground
Utilities.
Underground
ii.
iii.
iv.
v,
vi.
vil.
vilt.
lx.
x.
xi.
xii.
xiii,
generator
locationoptionsfor standalone
withsub-base
fueltank.
Selectandrecommend
soilinvestigations
Completenecessary
to determine
slabandfoundation
designfor slabon
gradethatgenerator
willbe securedon as described
in section3.1 - PlantSite/Civil
Requirements.
Excavate
andremoveunusedmaterialnecessary
to installgenerator
slab.
reinforced
Construct
concretefoundation
andslabas perapproved
design.(Assumepile
systemfor DesignBuildpricing).
4,500gallonsub-base
Purchase
500kWdieselGenerator
witha minimum
fuel
standalone
provide
power
generator
willhavea sub-base
fueltankthatwill
for
tank. Thenew
back-up
10dayswhenloadedto 50%capacity. Generator
mustsatisfyall EPAandlocallegislation
regulations
tor emission.
walk-inenclosure
hurricane
resistant
thatwillprotectthe
Generator
shallhavealuminum
generator
fromtheelements.Generator
shallhavescreensandothermeansof protec{ion
to
preventrodentsfromenteringintoand/ordamaging
generator
the standalone
andits
electrical
andfuelsystems,
willneedpermanent
areas.All handrails
Generator
accessto regularlymaintenance
andtoe
(OSHA29 CFR1910.21to
railsshalladhereto currentsafetycodesforlall protection
1910.27,
ASTME894-88,
ASTME935-00,
ASTME985-00andANSI/ASSE
A1264.1-2007)
lightingfor generator
maintenance.
Providepermanent
Providegrounding
system.
protection
necessary
lightning
system.
Provide
for newgenerator
necessary
start-up,
testingandcommissioning
to ensureproper
Complete
further
2.1
Placing
is
in
section
and
Starting
operation.Thisrequirement detailed
- MinimumStart-UpRequirements,
2.3- Equipment
Startupand
Equipment
in Operation,2.2
Personnel.
Testingand2.4- Instruction
of Operations
andMaintenance
Performance
luelforGenerator
DesignBuildEntitywillsupplyall necessary
throughtestingandstartup.
Entity
handover
Design
Build
will
fillthe
Generator's
tank.
Priorto
the
GeneratorBuilding#1:
ii.
iii.
iv.
v.
vi.
vii.
viii.
andremoveanddisposeof
Removeandrecycleexistinglouverson the eastof thebuilding,
is detailedfurther
wallventslocatedon southandwestsideof the building.Thisrequirement
Removal.
in section3.2- Demolitions
andEquipment
MSB-1andabovegroundfueltankalongwithall
Removeandrecycle300kWgenerator,
pipesandpartsassociated
is
withthe300kWgenerator.Thisrequirement
miscellaneous
Removal.
andEquipment
detailedfurtherin section3.2 Demolitions
penetrations
is
Ensure
roof
watertight.
in
root.
the
all
the
Seal
furnishandinstallCMUblockwherepreviouslouversandwallvents
Designconnections,
anddowelrebarintoexistingwallandfloor.
weredemolished
penetrations
in exteriorwall.
Encloseall abandoned
insulation
for roofopenings
Providenecessary
to FPLvaultas wellas sealing/insulating
#1 building.
betweenroofandwallsin generator
connection
andcodes.
All buildingworkswillcomplywithcurrenttireratingstandards
joints
Building#1 withsuitablematerial.
insideGenerator
Cleanandfill allopenexpansion
tx.
X.
xt.
xil.
xiii.
XIV.
XV.
XVI.
XVii.
xviii.
Fillallholesfromnowremoved
bolteddownequipment.
C,
Furnish
curb. Referto Appendix
andinstallequipment
andinstallnewMainSwitchboard
proposed
TheDesignBuild
configuration.
for SingleLineDiagram
of newmainswitchboard
Entityis responsible
thatbestsuitstheplants
forconfirming
electrical
configuration
requirements.
Digester
Provideconnections
for newMainSwitchboard
to FPLVault,new500kWgenerator,
Facility,
HVACandPolymer
Ditch#1 Aerator1 &2, Chlorine
Blower1 &2, Oxidation
for allconnections
to MSB-1.Thisitemwill
Building.SeeAppendix
C, SingleLineDiagram
require
withFloridaPowerandLight.
coordination
Building
Furnish
#1.
andinstallnewPLCforGenerator
PalmBeachCountywillprovide
Provide
shutdown/transfer
of equipment.
costsforoptional
Assumeeverything
mustbe
generators
forshutdown/transfer
of equipment.
temporary
This
powered
schedule. requirement
on shutdown/transfer
butthismaychangedependent
1.8 Maintenance
of Operations
and1.9- PlantShutdowns.
is detailed
furtherin sections
controlled
unitsto providea temperature
Furnish
andinstallnewA/Cairhandling
(Traneor approved
equal).
lifeof newswitchboard
environment
to maximize
Building
unitsto Generator
#1. AHUsshall
Design,
installandconnectnewA/Cairhandling
material.The
withdurableandweatherproof
notbe roofmounted
andmustbeconstructed
or groundso theyaresecurein theeventof a
AHUsshallalsobefastened
to a structure
hurricane.
monitor.Roomtemperature
shallbe addedto
Supply,installandconnectroomtemperature
theSCADAsystem.
paintand
paint(Useplantstandard
withapproved
andexterior
of building
Paintinterior
colors).
andA/Gair
of newMainSwitchboard-1
Completenecessary
testingandconditioning
furtherin section2.1
is detailed
Thisrequirement
handling
unitsto ensureproperoperation.
- Minimum
- Starting
Requirements,
2.3Start-Up
in Operation,2.2
Equipment
andPlacing
and
of Operations
Testingand2.4- Instruction
Equipment
Startup
andPerformance
Personnel.
Maintenance
UndergroundGablingSystem
I
il.
iii.
lv.
V,
vi.
willneedto be
Excavate
trenchfor newcablingsystem.Allspoilpilesnotusedforbackfill
removed
andhauledoffsite.
lhe newMSB-1to the new500kWgenerator.
Installnewcablesystemconnecting
including
butnotlimitedto circuitsfor
connections
Cablesystemshallincludeall necessary
jacketheater,
to starVstop
control/signalwiring
heater,
condensation
batterycharger,
generator
AWGconductors.
andnecessary
Building
#1 to Vault#5 located
Excavate
trenchfor newfiberopticcablesfromGenerator
1 & 2.
nextto SludgeThickeners
#1.
Building
#1 to MCCBuilding
InstallfiberopticsfromGenerator
Blowers
MSB-1
from
to Digester
wiresfromexisting
conduitrunning
Remove
existing
junction
box.
junction
Blowers
fromMSB-1to Digester
wiringin existing
conduit
Installnewcodecompliant
box.
viii.
junctionboxat Digester
Blowerandreplace
witha properly
Remove
existing
sizedjunction
box.
G, Costor budgetestimates:$700,000.00
H. Designandconstructionschedules:
i) Substantial
Construction
330 CalendarDaysafterreceiptof executedWork
Completion
withconstruction.
Authorization
andnoticeto proceed
30 Calendar
DaysafterSubstantial
Construction
Completion.
ii) FinalConstruction
Completion
iii) Liquidated
fordesignandconstruction
willapplyas follows:
damages
date.
completion
$1,000perdaypastsubstantial
date.
$500perdaypastfinalcompletion
(ata minimum)
itemsmustbe complete
to achieve
substantial
completion:
iv) Thefollowing
in placeandoperating
as intended.
a. Allexisting
systems
completed.
b. Commissioning
andTestingof allnewequipment
Building
#1 complete.
of Generator
c. Paintings
of interior
andexterior
d. O&M Manualshave been deliveredto the Countyand equipmenttrainingis
completed.
workcomplete(PBCWUDwill performHMISCADAScreenon
e. PLCprogramming
rFrx).
datesfor eachitem.
f. PunchListcreatedwithforecasted
completion
locationis determined
thena siteplan
requirements:Oncethe generator
l. Site development
mustbe provided
to the theCityof BelleGlade.
for DesignUtilities
1.3Utilities
and1.7Underground
J. Provisionsfor utilities:Referto Sections
BuildEntityrequirements.
barriersfor all existingstormdrainage
K. Stormwaterretentionand disposal: Providesiltation
by construction
activities.
catchbasinsimpacted
L. Parkingrequirements:OnlycurrentCountysecuritybadgeholderscan parkinsidethe plant
gate. Do not disrupttrafficflowfor chemicaldeliveries.Projectmaterialdeliveries
shallbe
publichotidays.
between7:00AMto 3:00PMMondaythroughFridayexcluding
plan,developed
by the
withthe OWNERmustbe prepared
in conjunction
M. Other:A shutdown
plantor process
shutdowns.
Entityfor anyplanned
Design-Build
1.2Permitsand Fees
thework
to complete
Entity's
responsibility
to secureallpermitsrequired
It shallbe the Design-Build
requirements
for
inspections
and
Entity
responsible
all
Design-Build
shall
be
The
underthiscontract.
Entity
permits.The Ownershallpayall permitfees. The Design-Build
to close-out
the completed
Municipalities.
within
fees
for
work
the
county
or
forall Business
tax
shallbe responsible
1.3UtilityServices
The Design-Build
Entityshallobtainthe necessaryutilityservicesby makingapplication
for the
by the utilitycompanies,
services
andpayingsuchfeesandchargesrequired
including
construction
if required.
watermeters,
1.4Tests
The Design-Build
Entityshallpay for all required
tests.Waterrequired
for pressure/leakage
tests
shallbefurnished
bytheOwner.
1.5Siteelevations,
Lines,and Grades
Wherethe dimensions
in the
and locations
of existingpipeand utilitiesare of criticalimportance
Entityshallverifysuchdimensions
installation
work,theDesign-Build
or connection
of proposed
and
locations
whichis dependent
in thefieldpriorto thefabrication
of anymaterials
or equipment,
onthe
The Design-Build
Entityshallemploya landsurveyor
registered
in
correctness
of suchinformation.
Entityshalllocateand protectsurveycontroland reference
The Design-Build
the Stateof Florida.
points.TheDesign-Build
Entityshallbe responsible
lines,andlevels,utilizing
to establish
elevations,
TheDesign-Build
Entityshallprovideall labor,instruments
recognized
surveypractices.
engineering
for markingand maintaining
necessary
all linesand
and stakes,templates,
and othermaterials
grades.The Design-Build
by the land
Entityshallsubmita copyof as-builtdrawings
signed/sealed
are in
surveyorthat the elevationsand locationsof the work in FloridaStateplanecoordinates
geodetic
andwillreference
datumNAD83.
withthecontract
documents
conformance
1.6WorkArea
by Ownerfor the workor
The Design-Build
Entityshaltconfinehisactivities
to the site(s)designated
pipe,and miscellaneous
wasteproducts
storage.All debris,materials,
stagingareasfor materials
Theyshallbe
fromthe proposed
workshallbe removedfromthe projectas soonas possible.
The Design-Build
federal,state,and localregulations.
with applicable
disposedof in accordance
for determining
and shallbearall costsor retainany
Entityshallbe responsible
theseregulations
profitassociated
withdisposalof theseitems.
Entityshallprotecttheirwork. Whenrequiredto completethe-work,the DesignThe Design-Build
BuildEntityshall maintainof suitablelightingto maintaina safe workingenvironment.Work
performed
fromthe owner.The
workinghoursrequires
the permission
outsideof the established
of such
Design-Build
Entityshallalsocomplywithall lawsor ordinances
coveringthe protection
Design-Build
Entityshallcarryout his
therein.The
workandthe safetymeasures
to be employed
work so as not to deny accessto privateproperty.All utilityaccessmanholes,valves,and fire
or
hydrantsshallbe keptaccessible
at all times. No trenchesor holesnearwalkways,in roadways
of the Owner,and
roadshoulders
are to be left openduringnighthourswithoutthe permission
properprotection.
for the security
of theirwork,equipment,
The Design-Build
Entityis responsible
andmaterial
at alltimes.
1.7Underground
Utilities
or powercablesor conduits,
Allwaterpipes,stormdrains,forcemains,gasor otherpipe,telephone
removed
fromor supported
whetheror not shown,shallbe temporarily
and all otherobstructions,
Entityshall
Beforedisconnecting
excavations.
anypipesor cables,the Design-Build
acrosspipeline
for theirdisconnection
by
fromthe Owner,or shallmakesuitablearrangements
obtainpermission
for anydamageto anysuchpipes,conduits
Entityshallbe responsible
theOwner.TheDesign-Build
pastthe
or cables,andshatlrestorethemto servicepromptlyas soonas the workhasprogressed
point involved.Approximate
locationsof knownwater,sanitary,drainage,power,and telephone
installations
alongrouteof newpipelines
or in vicinityof the workareshownon as-builtdrawings,
Entity.The Design-Build
but mustbe verifiedin the fieldby the Design-Build
Entityshalluncover
by hand,to verifylocationand depthof cover.Any
thesepipes,ducts,cables,etc.,carefully,
discrepancies
or differences
foundshallbe broughtto the attentionof the Ownerin orderthat
necessarychangesmay be made.Wherefences,walls,or other man madeobstructions
exist
priornoticeby
illegally
in thepublicright-of-way,
theOwnerwillhavethemremoved
uponadequate
Entity.
the Design-Build
(48)
TheDesign-Build
Entityshallnotify"SUNSHINE
477Qat leastforty-eight
STATE"at 1 (800)-432
prior
performing
Evidence
hours
to
anyexcavating
of suchnoticeshallbefurnished
activities.
to the
Entityis responsible
for all utilitylocateswithinthe project
Ownerpriorto excavating.
Design-Build
locateservice
for all PBCWUDburiedpipelines
siteandwillprovidean independent
andelectrical.
watershallcomplywith the Palm
Designof all underground
water,wastewater,
and reclaimed
(latestedition),GeneralElectrical
Standards
BeachCountyWaterUtilitiesMinimumEngineering
PalmBeachCountyWellfieldProtection
Environmental
DesignRequirements,
Ordinance,
Control
provisions
Environmental
Rule1 (wastewater),
ControlRulell (water),and applicable
of the Florida
withthe PalmBeach
Administrative
Code. Designsubmittal
requirements
shallbe in accordance
DesignManual.
CountyWaterUtilities
1.8Maintenance
of Operations
disruption
to the
The Design-Build
Entity'sactivities
or any partialplantshutdowns
shallminimize
Entityshall scheduleand performthe
The Design-Build
treatmentfacilitiesand conveyance.
proposedworkin a mannersuchthatthe Ownercan keepthe existingtreatmentand conveyance
valves,gatesandequipment
facilities
in continuous
dependable
operation.
Operation
of all existing
shallbe performed
by Owner.
1.9PlantShutdowns
is not requiredin
lf, in the opinionof Owner,a shutdown
Ownershallapproveall plantshutdowns.
perform
proposed
Entityshalluse
Entityto
work,the Design-Build
the
orderfor the Design-Build
withandscheduled
methodsto accomplish
thework.All shutdowns
shallbe coordinated
alternative
a minimumof 7 daysnoticeof Design-Build
at timessuitableto Owner.Ownershallbe provided
Additional
noticemay be requiredfor
Entity'sneedfor any systemor partialsystemshutdown.
certainshutdowns.
1.10 ProjectCoordination
work.He shall
Entityshallbe solelyresponsible
for coordination
of all of theproposed
Design-Build
manufacturers,
fabricators,
tullywith all sub-contractors,
suppliers,
directand cooperate
supervise,
materials
or equipment
are
installers,
testingagencies,
andall otherswhoseservices,
distributors,
workwithinthecontract
time.
required
of theproposed
to ensurecompletion
his work with the work of any other
Entityshall cooperatewith and coordinate
Design-Build
performing
workrelatedto the
additional
utilityservicecompany,
or Owner'semployees
contractor,
for damagedoneby othercontractors
projectat thesite.Design-Build
Entityshallnotbe responsible
jurisdiction
Entity's
exceptwheresuchlossor damageis
on sitewhoarenotunderthe Design-Build
Entityshallalsocoordinate
hiswork
Entity.
Design-Build
negligence
Design-Build
by
the
of
caused
with
withtheworkof othersto assurecompliance schedules.
Design-Build
Entityshallattendand participatein all projectcoordination
or progressmeetingsand
reporton the progressof all work and compliancewith schedules. The Design-Build
Entityshall
provideand maintainrepresentative
at the site at all time duringperformance
of his organization
of
the workwho may be reachedat anytimewhileworkis in progress
1.11ProjectCPMSchedule
Entitymustprepareand maintaina projectscheduleusingPrimaveraP6 softwareand
Design-Build
Critical
Path
Method(CPM)of scheduling.The followingoutlinesthe minimalschedule
the
requirements.
The schedulemustbe updatedeachmonthat a minimumand will be reviewedby the
progress.
Countyto determinedesignand construction
1.11.1 DesignSchedules
The ProgramManagement
Teamwill specifydetailedschedulingrequirements
to each
designconsultant
throughthe professional
servicesagreement,requiringthat:
.
.
.
.
A detailedP6 designschedulebe createdand routinelyupdated
That at a minimum,milestones
be depictedfor:
o Notice-to-proceed
o 60 percentsubmittal
o 100percentsubmittal
An estimateof the construction
durationand stagingbe developed
Linkagesto otherwork packagesbe clearlyindicated
1.11.2ConstructionSchedules
The basicsof the construction
schedulesubmittalsare outlinedbelow.
The Construction
BaselineRequirement:
Schedulewill use P6, the GriticalPathMethod,
will buildthe project,The scheduleshouldshowthe
and shallreflecthowthe Contractor
durationof each activityso that the ProjectManagercan accuratelymonitorthe progressof
with work itemslistedin the Scheduleof
the work. Scheduleactivitiesmustbe consistent
checkon the
Valuesand be cost-loaded
suchthat scheduleupdatesprovidean independent
monthlyprogresspaymentrequest.
amountsshownin the Contractor's
includingany work
activities,
Additionally,
the schedulewill addressthe logicof construction
constraintsdue to:
.
.
.
.
.
.
or permitrequirements
Operational
of the technicalspecifications
Specialrequirements
Standardconstructionpractices
Safetyof the work place
Manpowerloadingand availability
Key Resourceor Materialsquantityloading
will be requiredto submittwo
The Contractor
InitialConstruction
ScheduleSubmittals:
conference.Theseare:
scheduledocumentsat the pre-construction
.
.
planof operationfor the initial30-dayperiodof the contract
The Contractor's
An initialdraft of the P6 BaselineCPM schedule
willmeetto reviewanddiscuss
TheProjectManager
the30-dayplanof
andtheContractor
CPMscheduleshortlyaftersubmittal
operation
andBaseline
to the ProjectManager.The
reviewandcomment
willbe limitedto conformance
with
ProjectManagers
ontheschedules
in theContract
TheContractor
will
requirements
Documents.
thesequencing
andmilestone
necessary
be required
to theschedules
to complywiththerequirements
to makecorrections
requested
information
by the Project
to incorporate
anymissing
andadjusttheschedules
Manager.
reviews
willinclude:
Keyelements
of theschedule
.
.
r
o
.
.
.
ratesfor reasonableness
Production
levelof detail
Appropriate
of contractual
constraints
Satisfaction
procurements,
reflecting
training
andstart-up
tasks
Accurately
submittals,
withapproved
Conforms
schedule
of values
practices
withindustry
Complies
scheduling
riskandcriticalpathdiscussion
Schedule
earlyexecution
activities
Theplanof operation
of theContractor
depictsaccomplishment
permitacquisition,
for earlymaterialandequipment
(mobilization,
necessary
submittals
procurement,
procurement,
CPMsubmittals,
for longleadequipment
necessary
submittals
required
in thefirst30 days).
initialsiteworkandothersubmittals
andactivities
willbe included
in all
P6Baseline
schedule
Schedule:The
Construction
Contractors
progress
and
updates
andwillbe thebasisfor measuring
subsequent
schedule
in the
performance.
willbe detailed
requirements
updates
andotherreporting
Schedule
willprovideinformation
on major
Theconstruction
schedule
specifications.
schedule
pertinent
interface
activities
milestones
tracking.Related
andallowforquantity
construction
Schedule
of
willalsobeshown.Theassociated
andcommissioning
to facilities
start-up
laborwagerates,bulk
information
related
unitratereporting,
Valueswilldelineate
to quantity
pricingandothercosting/pricing
information
as requested.
Specific
schedules
materials
perprojectneeds.
(e.9.,90 daysto Completion,
willbe specified
4-weeklook-ahead)
with
The ProjectManager's
reviewof the scheduleis to ensurebasiccompliance
plan,
does
not
an
approval
of the
reasonableness
of
constitute
requirements
and
and
methods
of
construction.
relative
to meansand
approach
or direction
interim
significant
Progress
Schedule,
shallidentify
TheContractor's
at a minimum,
in addition
schedule,
to:
Summary
milestones
thatrelateto theProjects
.
.
.
.
o
Notice-to-Proceed
Mobilization
SubstantialCompletion
FinalCompletion
StartUp/Commissioning
1.11.3Schedule
Updates
shouldbe updated
to
summary
schedules
On a regularbasis,andnotlessthanmonthly,
interimmilestone
progress
deliverables,
of activities,
completion
of contract
trackandmonitor
dates,andotherrelatedaspectsof scheduling.
achievement,
startandcompletion
in theschedules.
changes
to thescopeof workwillbe reflected
Additionally,
anyapproved
10
I
Progress
is monitored
monthly
workaccomplished
by comparing
againstboththebaseline
plan,andtheprogress
withthefirstmonthof status
of workfromthepriormonth.Starting
progress
for allprojects
willbe measured
against
forstartandfinish
updating,
thebaseline
progress
forchanges
dates,scheduled
andcashflow,alongwithanalysis
in logicand
durations,
activities
Part2 AcceptanceTest Requirements
Entityshallbe responsible
The Design-Build
for coordinating
and completing
the overallsystem
Entityis responsible
for providing
startupand testing.The Design-Build
all labor,equipment,
and
for conducting
materials
systemsstartupandtesting.
2.1Startingand PlacingEquipmentin Operation
Design-Build
Entityshallinitially
intosuccessful
start-upandplaceall installed
equipment
operation
field
manufacturer's
written
instructions
as
instructed
by
manufacturer's
to
and
according
representative.
Design-Build
Entityshallprovideall material,labor,tools,equipment,
chemicals,
No systemor subsystem
required
shallbe started
lubricants,
andexpendables
to complete
start-up.
up for continuousoperationunlessall components
of that systemor subsystem,including
proven
for proposed
work.
instrumentation,
havebeentestedand
to be operableas required
personnel
Entityin the start-up,
but the prime
to assistDesign-Build
Ownershallprovidesufficient
Entity.Manufacturer's
for propermechanical
responsibility
operation
shallbelongto Design-Build
representatives
shall be presentduring initial start-upand operation.Owner shall assume
in
for operation
uponcompletion
responsibility
of the equipment
of start-upandplacingequipment
operation.
2.2 MinimumStart-UpRequirements
pre-start
up checklistin
Entityshallperformthe followingenginegenerator
A. The Design-Build
guidelines:
installation/mounting,
engine
withmanufacturer
Generator
setequipment
accordance
daytankfuel level(if
shroudinstallation,
oil level,enginecoolantsystemlevel,engineradiator
connections,
mechanical
batteryinstallation,
fuelsysteminstallation,
and electrical
applicable),
enginesensorsand controls,all
batteryvoltage,batterychargeroperations
and installation,
remote
interfacewiring with new main switchboard,
equipmentinterfaceinterconnects,
wiring,exhaustsysteminstallation
and connections
and
interface
annunciation/communication
as
is not limitedto itemslistedabove,othersshallbe performed
all otherfluids. Checklist
required
by manufacturer.
Entityshall check each electricalcontrolcircuitto assurethat operation
B, The Design-Build
with
regulations
of proposedwork and to providedesired
and requirements
complies
performance.
forcleanliness,
Entityshallinspect
andcleanandremoveallforeignmaterials,
C, TheDesign-Build
replacedefective
bearings
andthose,whichrunroughor noisy,andgreaseas
verifyalignment,
recommendations.
in accordwithmanufacturer's
necessary
herein.
shallnotbe limitedto thosespecified
D, Systemstart-up
testingprocedures
andoperational
Othersshallbe performed
as requiredto provethat the systemfunctionsand performsas
package.
bythiscriteria
described
andrequired
11
Testing
2.3.EquipmentStartupand Performance
for performance
The Design-Build
Entityshall be responsible
testingduringstartupof all
mechanical,
equipment
andsystems.
electrical
in whichalltestingworkrequired
forthe
A, Provide
a testingplansettingforththesequence
proposed
will
upgrades be implemented.
to theOwner.
B. Documentation
of theresultsof allequipment
andsystemtestsmustbe submitted
certifying
thedateof calibration.
Provide
calibration
tagsfor allequipment
and Maintenance
Personnel
2.4.lnstructionof Operations
mainswitchboard
priorto turningovertheoperation
of thenewgenerator,
Training
shallbe provided
shallbe startedup
andA/C unitsto the owner.No system,unitprocessor anypieceof equipment
manualsbeingturned
withoutthe approved
and maintenance
for continuous
operation
operation
overto Owner.
training
Entity shall provideservicesof supplie/soperationand maintenance
Design-Build
procedures
personnel
maintenance
in
recommended
and
instruct
operation
Owner's
specialists
to
statedin
at the site,unlessotherwise
for products
andequipment.All trainingshallbe conducted
sessions.
therightto videotape
training
Ownerreserves
theSpecifications.
Trainingof plant'spersonnelshall commenceonly after acceptablepreliminaryoperationand
hasbeenstartedand placedintooperation,
datahasbeenprovided
and,equipment
maintenance
testinghas beencompleted.The Design-Build
equipment
and systemstartupand performance
trainingitems,and
outliningimportant
and checklists
Entityshallprovidewrittendocumentation
for inputby operators.
providespreadsheets
newprocesses
neededto document
Part3 TechnicalRequirements
3.1.PlantSite/ Civil Requirements
familiarwith the site
for becomingcompletely
Entityshall be responsible
The Design-Build
lf
all site investigations.
with developing
the finalsite planincluding
in connection
conditions
geotechnical
and soil boringsare requiredto
conditions,
conditions,
analysisof subsurface
Entityto perform
thiswork.
Design-Build
responsibility
of
work,
be
the
it
the
shall
complete
the
and EquipmentRemoval
3.2Demolitions
required
andincidentals
equipment,
for all labor,materials,
Entityshallbe responsible
Design-Build
without
the
Entityshallnotstartremovals
for demolitions
and payfor all disposalfees.Design-Build
the
activities,
of anydemolition
permission
of the Owner.At least48 hourspriorto commencement
of theproposed
schedule.
EntityshalladvisetheOwner,in writing,
Design-Build
with Owner'soperations
Entityshallcarryout operations
so as to avoidinterference
Design-Build
work
andremoval
Entityshallperformall demolition
Design-Build
facilities.
andworkin the existing
so as not to interferewith the use and safe passageto and from adjacentstructuresand shall
whichmightresultfrom
features,
and adjacent
preventdamageor injuryto structures,
occupants,
Entityshallerectand maintainbarriers,lights,sidewalk
fallingdebrisor othercauses.Design-Build
12
protective
sheds,andothernecessary
devices.
The Design-Build
Entityis responsible
for repairing
property
damageto theOwner's
or facilities,
causedby theDesign-Build
Entity's
activities
Surfaces
of walls,floors,ceilings,
or otherareas,whichare exposedby any of the removals,
and
whichwill remainas architecturally
finishedsurfacesshallbe repaired
and re{inishedby DesignBuild Entitywith the same or matchingmaterialsas the existingadjacentsurface.Adjacent
structures,
facilities,
impactedby dust,dirt, and debriscausedby demolition
and improvements
operations
shallbe cleaned
andreturned
to pre-construction
conditions.
passesthroughexisting
Wherepipingthatis to be removed
walls,the pipingshallbe cut off and
properly
cappedon eachsideof thewall.
All materials
removed
fromexisting
andequipment
workshallbecomethe property
of Design-Build
Entity,exceptfor thosewhichOwnerhas identified
and markedfor theiruse.All materials
and
equipment
markedby theOwnerfor its useshallbe carefully
removed
Entityso as
by Design-Build
notto be damaged,
andshallbe cleanedandstoredin a protected
location
by the Owner.
specified
Design-Build
Entityshalldisposeof all demolition
materials,
equipment,
debris,andall otheritems
notmarkedby theOwner,offtheworksiteandin conformance
withall existing
lawsand
applicable
regulations.
Uponcompletion
of thework,all materials,
waste,anddebrisof everysort
equipment,
shallbe removed
andpremises
shallbe left,clean,neat,andorderly.
Removeand recycle300kW generator,MSB-1 and above groundfuel tank along with all
pipesandpartsassociated
miscellaneous
withthe300kWgenerator:
Removeexisting300 KW generatorwith muffler,transferswitchgearand recycle.Remove
and disposeof exhaustpiping.Removeand disposeof existingof all electricalconduitand
wiring associatedwith generator.Non-metalwaste such as insulation,concrete,PVG,
fiberglassetc to be hauledand legallydisposedby Design-Build
Entity.
b. Removeand legallydisposeof existingfuel tank and all associatedfuel pipingbetweenfuel
with FAC 62-762includingclosurereporting.
tankand generatorin accordance
i . Remove
remaining
dieselfuelandallaccumulated
sludgefromdieseltank.
piping,andremoveandlegallydisposeof dieseltank.
ii. Disconnect
and Backlill
3.3 Trenching,Excavation
The DesignBuildEntitywilladhereto all OSHAand PBCregulations
whenexcavating
for cabling
pad.
systemandgenerator
Allremaining
fromsite.
spoilpilesshallbe removed
Goncrete
3.4Cast-ln-Place
pipesupports,
Whererequired
for wallpenetrations,
required
to
andotherrepairor replacements
providing
Entityshallbe responsible
for
complete
thework,the Design-Build
concrete
consisting
water,andapproved
of portland
thencombined,
cement,fineandcoarseaggregate,
admixtures;
placed,finishedand cured to accommodate
mixed,transported,
the proposedwork. All
which
admixtures,
curingcompounds,
etc.usedin concreteor the curingand repairof concrete,
water,shallbe certified
cancontactpotable
as conforming
to the requirements
61for
of ANSI/NSF
potable
finished
with
water
when
in
contact
concrete.
the
Metals
3.5Miscellaneous
All metalsshallbe non-ferrous
exceptof steelreinforcing
and as approvedby the Owner. All bolt,
nutsandwashersshallbe 316 stainless
steelthe nutsshallbe coatedto preventgalling.Anchor
pipesupports,
boltsshallbe 316stainless
steel. Stanchions,
equipment
bases,braces,andstraps
shallbe316stainless
steelor aluminum.
3.6Paintingand Coating
Design-Build
Entityshallprovidealllabor,materials,
tools,equipment,
andincidentals
as required
to
furnishand applycoatingsystemsfor surfacepreparation
and coatingof all new and existing
surfacesidentifiedas part of the work. Manufacturer's
recommendations
includingsurface
preparation,
paintings
curetimes,application
thickness,
application
method,
applicability
of selected
andcoatings
for theirintended
process
use,etc.mustbe strictlyfollowed.Mechanical
and
itemsto
be coatedaredefinedpreviously
underSection1.1F.
Owner'sapprovalshallbe required
for all components
of the surfacepreparation,
selection
of colors,
andpaintsystemapplication
beforestartof proposed
work.
Color-coding
valves,equipment
of pipelines,
and ductsshallcomplywithapplicable
standards
of
ANSIA13.1, ANSI2535.1
Finishcoatsof paintfor pipelines
andequipment
, and40 CFR1910.144.
shallbe codedin basiccolors.Colorsshallbe brilliant,
distinctive
shadesmatchingsafetyand
pipelinecolorsper ANSI 2535.1,Recommended
Standardsfor WaterWorks;Recommended
Standards
for Wastewater
Facilities,
for safetycolorsandotherprimarycolors.
colorspecifications
pipelabelswithflowarrowsat eachchangein direction,
Provide
tees(allsides)andevery20 feetof
run.
straight
3.7PipeRequirements
The Design-Build
Entityis responsible
for the finalsizingand selection
and
of all pipe,supports,
associated
materials.The Design-Build
Entityshallconformto the PalmBeachCountyWater
Utilities
Manualof Minimum
DesignandConstruction
Standards.
At a minimum,
information
the following
to the Ownerfor reviewand approval
shallbe submitted
priorto installation:
r
.
.
gaskets,
Detailed
drawings
andmanufacturers
datafor pipe,fittings,
newsupports,
boltkits,
couplings,
andallotherpertinent
materials
required
to complete
thework.;
Certificates
withapplicable
of compliance
referenced
standards
for pipe,
andanyprovisions
joints,fittings,
gaskets,
linings,
harnessing,
coatings,
sleeves,
andallotherappurtenances;
Fieldpressure
testing.
progress
Materials
shallbe delivered
to the siteto ensureuninterrupted
of the work.Pipe,fittings,
handled
handling
andassociated
othermaterials
withapproved
devices.
Materials
shallbe
carefully
shallbe storedon heavywoodblockingor platforms
so theyare not in contactwiththe ground.
gouged,chipped,
Delivered
materials
for cracked,
shallbe inspected
dentedor otherdamageto the
packagingor .materials.lf such damageis found,damagedmaterialsshall be rejectedand
immediately
removedfrom the site. lf in the processof manufacture,
transportation,
storageor
handling,
any pipe,fittings,or associated
othermaterialsare damaged,such materialshallbe
rejected
andreplaced
Entity's
at theDesign-Build
expense.
14
Pipeinteriors
shallbe keptcompletely
freefromdirtandforeignmatter.All pipeshallbe installed
in
'strictaccordance
withthemanufacturer's
instructions
Whenpipemustbe cut
andrecommendations.
to fit in thefield,the workshallbe performed
utilizing
toolsandequipment
specifically
designed
for
cuttingthe pipe,so as to avoiddamageto thepipeandto leavea smoothend.lmproperly
cut and/or
fittedpipewillbe rejected
Entity's
andreplaced
at the Design-Build
expense.
Part4 ElectricalRequirements
4.1BasicRequirements
Design-Build
Entityshalldesignand provideall labor,materials,
equipment,
and incidentals
to
grounded.NewGenerator
complete
work. All systemsshallbe properly
the electrical
shallhave
protection
previously.
lightning
as outlined
4.2 Godes
Materialand equipmentshall be installedin accordance
with the currentstandardsand
recommendations
of the NationalElectrical
Code,the NationalElectrical
SafetyCode,andwithlocal
discrepancies
regulation
codes,whichapply.Where
arisebetween
codes,the mostrestrictive
shall
apply.
4.3AreaClassifications
A Wet Locations
Thefollowing
wetlocations:
areasshallbe considered
l. Alloutdoor
areas.
2. Allindoorareasbelowgradeunlessotherwise
specified.
3. Materials,
in areasidentified
equipment,
and incidentals
as wet locations
shallmeetNECand
for wetlocations.
Enclosures
NEMArequirements
shallmeetNEMA4 requirements
as a minimum.
withwatertight
hubs.
Conduits
at enclosures
shallbeterminated
threaded
B. CorrosiveLocations
Materials,
in areasidentified
equipment,
and incidentals
shallmeetNECand NEMA
as corrosive
for
locations.
requirements corrosive
Conduit
systemsshallbe Aluminum
andenclosures
shallmeet
NEMA 4X requirements.
Conduitsshall be terminatedat enclosureswith watertighthubs.
Independent
supports
shallbe Aluminum.
4.4ElectricalEquipment
load,without
All new electrical
successfully
equipment
shallbe capableof operating
at full-rated
faifure,
withan ambientoutsideairtemperature
of 0 degreesF to 122degreesF andan elevation
of
400 feet (MSL).All electrical
devicesand equipment
shallhaveratingsbasedon 75 degreesC
Allelectrical
shallmeetNEMA12 requirements.
terminations.
enclosures
at a minimum
equipment
4.5SchematicDiagrams
Entityto actas guidance
in fulfilling
diagrams
by the Design-Build
Schematic
shallbe prepared
the
intentof the conceptual
lt shallbe the Design-Build
Entity'sresponsibility
documents.
operational
to
meetall safetyand electrical
codes,and to provideall equipment,
appurtenances
and specialty
itemsrequired
Reviewof controlschemes
to providefor complete
andoperable
systems.
submitted
15
|.
Entityof theircontractual
responsibility
Entityshall not relieveDesign-Build
by Design-Build
to
provide
operating
systems.
complete
andsuccessfully
4.6 RacewaySystems
Design-Build
Entityshallfurnishandinstallconduitandfittingsto formcomplete,
coordinated,
and
groundedracewaysystems.Design-Build
Entityshall providefor the properinstallation
of all
for eachsystem.
conduits
A. Rigidaluminum
for exposed
indoorconduitrunsin non-corrosive
areasandrigid
conduit
aluminum
at allothersites.
B. PVCSchedule
80forindividual
conduitrunsdirectburiedin earthandPVCcoatedrigidsteelat
(minimum
24-inchburialdepth).
allothersites
40 PVCforconduitrunsembedded
in or understructural
concrete
slabsor in concrete
c. Schedule
(allsites).
ductbanks
forexposed
indoorandoutdoorrunsin corrosive
areasandPVC
D . PVCschedule
80 conduit
coatedrigidsteelat allothersites.
E . Flexibleconduitfor connections
to motorsandequipment.
Testing,and Adjustments
4.7ElectricalInspections,
of the
to the satisfaction
to demonstrate
Accompany
testswithinspections
the normalinstallation
judicialauthorities
required
thefollowing:
in accordance
withthedrawings
andapplicable
Allcircuits
A. Connections:
areproperly
connected
shop
drawings.
approved
Allcircuitsanddevicesareoperable.
B. Operation:
identified
Allconductors
at eachterminal.
C. ldentification:
areproperly
that the circuitand
cablesare in placeto demonstrate
Test eachelectricalcircuitafterpermanent
groundsandshort
performsatisfactorily
andthattheyarefreefromimproper
equipment
connected
resistance
betweenphasesand fromeach
circuits.Individually
test 600-voltcablesfor insulation
phaseto ground.Testaftercablesare installed
and beforetheyare put in servicewitha Megger
of
specifications
for the testedcircuit.Testsshallmeetwiththe applicable
whoseratingis suitable
resistance
for anygivenconductor
shallnotbe
ICEAS 66 524andNEMAWC71971.Theinsulation
lessthan1 megohmfor 600voltand lessservice.Anycablenot meetingthisvalueor whichfails
witha newcableforthefulllength.
shallbe replaced
whentestedunderfullloadconditions
for continuity
alongthe full lengthof
instrumentation
Testshielded
cableshieldswithan ohmmeter
instrumentation
cablesto a calibrated
shielded
to ground.Connect
thecableandforshieldcontinuity
settings.
Testat 4, 12,and20 miltiamp
transmitter
DCsignaltransmitter
andreceiver.
4-20miltiamp
groundsystemsfor continuity
to groundusingan electrical
and for resistance
Testthe completed
less
resistance
must
5 ohms.Add up to two
groundresistance
be
than
system
Ground
tester.
16
additionatrods,spacedat 20 feet minimumfrom otherelectrodes,
untilresistanceis lessthan 5
ohms.
Operateall starters,circuitbreakers,and associated
equipment
to demonstrate
suitability
and
withSpecitications
compliance
andreference
standards,
exceptfor shortcircuitinterrupting
ratingor
otherinherentdesignfeaturescoveredby shoptests.Testall motorsfor direction
of rotationand
if necessary.
reverseconnections
Checkcontrolcircuitsto determine
thatoperation
andsequence
are correctand adjustlimitswitches,pressureswitches,floatswitches,timersand otherdevicesto
giveproperoperation.
Testgenerator
underloadfor24 hourswithoutfailureor shutdown.
Part5 Instrumentation
and ControlRequirements
5.1General
Design-Build
Entityshallprovidealllabor,materials,
equipment,
andincidentals
as shown,specified,
install,
to furnish,
calibrate,
andplacein satisfactory
operation
a complete
andrequired
test,start-up,
and operatingsystemfor proposedwork, includingprogramming
of the PLC,SCADA,and all
number,
required
wireterminations.
Tagnumber,
shallmatchtheOwners
equipment
anddescription
numbering
convention
standards.
5.2Calibration,
Start-Upand Testing
priorto start-upof the associated
of eachinstrument
Fieldverifythe calibration
and performance
anddocument
on a separate
equipment,
sheetforeach.
and Start-UpResponsibilities
5.3SystemCheck-Out
Entityshallretainthe servicesof the systemsupplierto supervise
and/orperform
Design-Build
part
As
shall
of theseservices,
thesystemsupplier
checkoutandstartup of allsystemcomponents.
not
manufactured
items
or
and includecheck-outand start-upfor thoseequipment
coordinate
providedby him. The servicesof an authorizedmanufacturer's
representative
to check the
in operation
maybe required.
The manufacturer's
installation
and placethe equipment
equipment
knowledgeable
operation
andmaintenance
representative
aboutthe installation,
shallbe thoroughly
of theequipment.
and all
of all instrumentation
and controlsystemcomponents
Checkand approvethe installation
priorto placingthevarious
between
the varioussystemcomponents
cableandwiringconnections
processes
into operation.
Conducta completesystemcheckoutand adjustment,
and equipment
includingcalibration
of all instruments,
tuningof controlloops,checkingoperationfunctions,and
included
in thiswork,they
functions
Whentherearefutureoperational
testingof finalcontrolactions.
Allproblems
corrected
to
in thesystemcheckout.
encountered
shallbe promptly
shouldbe included
preventanydelaysin startup of thevariousunitprocesses.
necessary
to performthe testingduringsystem
Systemsuppliershallprovideall test equipment
Entityandsystem
mainswitchboard
andA/Cunits.Design-Build
checkout
andstartup of generator,
monitoring
initial
and
control
system
and shallmake
be
responsible
for
of
shall
operation
supplier
for
monitoring,
controlof the
replacements
operation,
and
required
changes,
adjustment
or
any
perform
functions
intended.
necessary
variousprocesses
equipment
to
the
and
17
calibration
reportsfor fieldinstruments
Design-Build
Entityshallfurnishto the Ownercertified
and
panelmounteddevicesspecified
Design-Build
is completed.
in thisSectionas soonas calibration
reportfor the powerimprovements
inspection
at Belle
EntityshallfurnishOwneran installation
hasbeeninstalledcorrectlyand
GladeWasteWaterTreatmentFacilitycertifying
that all equipment
properly.
representatives
of bothDesign-Build
Thereportshallbe signedby authorized
is operating
Entityandthesystemsupplier.
5.4.Instrumentation
andControlSystemFieldTest
systemsupplier,
and initialoperation,
Following
the plantmonitoring
and controlsystemcheckout
Entity,shallperforma complete
systemtestto verifythat
underthe supervision
of the Design-Build
properly
is operating
system,andthat
as a fullyintegrated
andprogrammed
software
all equipment
Anydefectsor
andoperational.
monitoring
arefullyimplemented
andcontrolfunctions
the intended
problemsfound duringthe test shall be correctedby systemsupplier,and then retestedto
properoperation,
demonstration
of all systemfunctlons,
the plantmonitoring
Following
demonstrate
andtelemetry
systemshall
fieldsensors/transducers
andinstruments,
andcontrolsystemincluding
for a continuous
72 hourperiod.
be running
andfullyoperational
5.5GontrolPanelsand Enclosures
roomareasshallbe NEMA12 ratedunless
Controlpanelslocatedinsidecontrolor electrical
NEMA4 exceptin
steelor non-metallic
notedon drawings.
All othersshallbe stainless
differently
panel
if required
by
ventilation
Provide
or
air
conditioning
corrosive
areas,whichshallbe NEMA4X.
pan
Door
widths
not
36-inches.
for doors.
shall
exceed
Use
typeconstruction
ambientconditions.
steelwith
panelwithdisplays
controlpanelsshallbe 316stainless
Exterior
shallfacenorth.Exterior
powdercoatedwhiteepoxyexteriorfinish.
5.6SurgeProtection
fromsurgespropagating
instrumentation
to protectall electronic
Surgeprotection
shallbe provided
deviceas closeas
and powersupplylines.Locatethe suppression
alongthe signal,telephone,
levelshallnot
possibleto the loaddevice.The protection
systemsshallbe suchthatthe protection
level,andbe
surgewithstand
butshallbe lowerthanthe instrument
interfere
wilhnormaloperation,
metallic
cases,properly
Instruments
shallbe housedin suitable
freeandself-restoring.
maintenance
to a goodearthgroundand
grounded.
shallbe connected
Groundwiresfor all surgeprotectors
fromeachother.
andinsulated
wherepractical
eachgroundwirerunindividually
Engineering
A - HillersElectrical
Appendix
Memorandum
Technical
FINAL TECHNICAL MEMORANDUM
PROJECT: BelleGlade\ AI/TPAlternativePowerlmprovements
SUBJECT: GeneratorBuildingNo.1ElectricalGear
DATE:
1.0
January21,2015
Existing ElectricalDistributionSystems
systemat the BelleGlade\ A/VTFconsistsof two utility
The electricaldistribution
cornerof the plant.
FPLservices.UtilityServiceNo. 1 is locatedin the north-east
of the plant.
UtilityServiceNo,2is locatedin the middle-west
1.'l
Existing Utility ServiceNo.1
The 750kVAFPL
to a 750kVAFPLtransformer.
UtilityServiceNo. 1 is connected
transformeris locatedin the existingFPL vault.The step-downtransformeris
(MSB-1)locatedin Generator
BuildingNo. 1.
connected
to the mainswitchboard
Main Switchboard
No.1 (MSB-1)consistsof one 800A ratedmain breaker,one
600A ratedgeneratorbreaker,one 800A ratedautomatictransferswitch(ATS).
DitchNo.1aerators1 and 2,
Blowers1 and 2, Oxidation
MSB-1powersDigester
breakers
The mainbreakerandemergency
facilityand Polymerbuilding.
Ghlorine
interlocked
throughan ATS controlschemeto preventfrom closing
are electrically
at thesametime.
bothbreakers
Emergency
back-uppowerfor MSB-1is providedby a 300-kW(375kVA)generator
Withthe currentset up the existinggenerator
cannotpower
ratedat 480V,3-phase.
wasinstalled
in 1982.MSB-1andthe
all loadsconnected
to MSB-1,Thegenerator
lifespanfor electrical
equipment
andit
arewellpasttheirreliable
300-kWgenerator
is recommended
to be replaced.
1.2
Existing Utility ServiceNo.2
Utility Service No.2 consistsof two feeders derived from the same FPL
point.Eachfeederis connectedto an individual1000kVAoutdoor
distribution
pad mountedFPL transformerto step-downthe utility power to 480V, 3phase,60-Hzsystem.The step-downtransformersare feedingthe existing
main switchboardNo.2 (MSB-2)locatedat generatorbuildingNo.2. One
feeder is connectedto the Main Breaker No.1 and another feeder is
connectedto Main BreakerNo.2. The existingmain switchboard(MSB-2)
consistsof two main breakersand two emergencybreakers,rated 16004.
One main breakerand emergencybreakerpair is connectedto one bus and
the other remainingpair is connectedto anotherbus. Each set of main and
generatorbreakersare electricallyinterlockedthru an automatictransfer
switch (ATS) control scheme and cannot close both breakersat the same
time.The two 1600Aratedbusesin the MSB-2are isolatedand there is no
tie breakerto connectthem together.lf one pair of main and generator
breakersis out of serviceat the sametime,the electricalloadsconnectedto
20
the associatedbus will be withoutelectricity.
The outdoorswitchboardMainTie-Main(MTM)locatedoutsidethb existingMCC roomwas installedin 2012
to give Main-Tie-Main
arrangementfor the down-streamof the switchboard
No.2 (MSB-2). The existingswitchboardMTM is poweringthe existing
switchboardSWBD-IWAon one side and SWBD-IWBon the other side.
Althoughthe switchboardMTM has no improvementson the switchboard
MSB-2,the electricalloadsassociatedeitherSWBD-IWAor S\NBD-IWBcan
be poweredfrom one side of switchboardMTM by closingthe Tie Breaker
and openingone of the desiredMainBreaker.The existinggeneratorNo.2is
1500kW(1875kVA)rated at 480V,3-phasesystem and is in very good
condition.
Although there are some deficiencyin the existingelectricaldistribution
system No.2/ MSB-2, this technicalmemorandumis mainly focus on the
improvementof the existing electricaldistributionsystem at Generator
BuildingNo.1.Somedeficiencies
of the switchboard
MSB-2is not havinga
tie breaker, no available space to add additionalfeeder breakers, no
replacement
breakerdue to discontinued
fromthe manufacturer,
etc.
2.0
Replacement Options for Electrical Distribution System at
GeneratorBuildingNo.1
Therearethreeoptionsfor improving
the electrical
distribution
systemat Generator
Bu i l d i nNgo .1 .
panelboard
(DP
Optionone is to replaceexistingMSB-1with a new distribution
panel)installedat the existingGeneratorBuildingNo.l and re-feedall of the
fromUtilityServiceNo.2 withredundant
existingelectrical
loadsat newpanelboard
powerfromexisting
2 (MSB-2)
andeliminate
UtilityServiceNo.1
MainSwitchboard
generator.
andexisting300kW
powerfrom
Optiontwo is to replacethe existingMSB-1andconnectthe emergency
generator
Building
No.2to thenewMSBtheexisting1500.kW
located
at Generator
A new8004breaker
will be added
1 andeliminate
the existing300-kWgenerator.
generator
will
installed
to
MSB-1.
and
new
conduits/cables
be
at the 1500-kW
Option three is to replaceexistingMSB-1 and replacethe existing300-kW
generatorwith a new 500-kWgeneratorin a non-walk-in
weatherproof
enclosure
witha sub-base
fueltank.
performed
by
Thistechnical
summarizes
theresultsof theevaluation
memorandum
for
identified
above;as wellas,recommendations
HEEandaddresses
theelements
the mostfeasibleapproachto providereliablepowerfor the equipmentpowered
fromGenerator
Building
No.1
2.1
Option 1 - Re:feed Generator Building No.1 from Utility No.2 &
Eliminate300kWGenerator
power
Building
Re-feeding
Generator
No.1fromUtilityNo.2servicewithredundant
a new800ampdouble
fromexisting
MSB-2willrequirea new800amppanelboard,
throw safety switch,two new 800 amp enclosedcircuitbreakersinstalledat
21
BuildingNo.2(seeFigure3) and a cableand conduitsystemfromthe
Generator
existingMCC Building.See figure1, PlantSite Planfor buildinglocationsand
proposedconduitand cable routing.The existingloads currentlypoweredform
existingMSB-1are shownin figure2. The conduitand cable requiredbetween
the two buildingswould consist of four 5 setsof 4-500-kcmil
AWG conductors
from each new 800 amp enclosedcircuitbreakerand 1-2" conduit with
control/signalwiring
to starVstopthe existing1500-kWgeneratorin the event
of a Utilitypoweroutageat UtilityNo.1service.Currentlythe existing1500kW (1875 kVA) generatoris runningat approximately59.5% of its rated
capacity.The additionalload from GeneratorBuildingNo.1 would increase
the load on the generatorto79.5%. Theestimated
costof Option1 is shownin
T a b l e1 .
power
Dueto the lackof tie breakerat the existingswitchboard
MSB-2,redundant
feedersarerecommended.
lf onlyonefeederis designed
andthemainbreakerand
generatorbreakerpairassociated
withthatfeederare out of service,the electrical
powerduringthat
systemat the Generator
BuildingNo.1will be withoutavailable
period.
2.2
Option 2 - ReplaceMSB-1and EliminateExisting 300-kWGen
ReplacingMSB-1and eliminatingthe existing300-kWgeneratorwill involve
addinga new 800 amp circuitbreakerto the existing1500kWgenerator
locatedat GeneratorBuildingNo.2for back-uppower.A conduitand cable
systembetweenthe new MSB-1and the existing1500-kWgeneratorwould
be installedconsistingof 5 sets of 4-500-kcmil
AWG and control/signal
wiring
to starUstop
the existing1500-kWgeneratorin the eventof an Utilitypower
outageat UtilityNo.1service.A new enclosed800 amp circuitbreakerfor a
localmeansof disconnectas requiredby the nationalelectricalcode
(N.E.C.)
wouldbe installed
at Generator
BuildingNo.1.Seefigure1, Plant
SitePlanfor buildinglocations
and proposedconduitand cablerouting.The
estimatedcostfor Option2 is shownin Table2.
2.3
Option 3 - ReplaceMSB-I and ReplaceExisting 300-kWGen
generator
ReplacingexistingswitchboardMSB-1and the existing300-1ev
with a new switchboard
and a new outdoor500-kWgeneratorwill requirethe
removalof an existingunderground
dieselfuelstoragetank (currentlynot
used)and installinga new conduitand cablesystembetweenthe new MSB1 and the new generator.The new conduitand cablesystemwill consistof 2
AWG conductors,
sets of 4-500-kcmil
3-120vcircuitsfor the generator
heater,jacketheaterand control/signalwiring
batterycharger,condensation
to start/stopthe generator.The newgeneratorwill be housedin a non-walkin enclosurewith a 2000gallonsub-basefuel tankto provideback-uppower
for 3 dayswhen loadedto 75% of the generatorscapacity.Removingthe
generator
andfillingin the existinglouverson the buildingwithCBSblock
wouldallowGenerator
BuildingNo.1to be modifiedin orderto installtwo 3
units(to be verifiedduringthe designphase)whichwill
ton air conditioning
greatlyextendthe lifeof the new switchboard.
Thesemodifications
would
involveconnectingthe existingloads(seefigure2) to temporarygenerators
for a periodof time duringthe replacement
of the existingswitchboardand
generator.The estimatedcostfor Option3 is shownin Table3.
3.0
Preliminary
Cost Estimate
'at
A preliminary
cost opinionfor improvingthe electricaldistribution
system
GeneratorBuildingNo.1.is presentedbelow. The cost estimateis an orderof
pastcontractor
magnitude
estimatebasedon published
cost literature,
bidsand
previousexperience.
The accuracyof this type of cost estimatetypicallyranges
from+50to -30 percent.All costsare roundedto the nearestdollarandpresented
in present-day
dollarsas definedby theAssociation
for theAdvancement
of Cost
(AACEI),
Engineering
lnternational
Table1 - Option1 CostEstimate
Description
4" PVC Conduit
2" PVC Conduit
500kcmilAWG Conductors
#4/0AWG BareCopper
#12 AWG Conductors
48" Manhole
New MSB-1
New 8004 Generator
Breaker
New 800A DoubleThrow
Switch
Concrete
New 800A Panelboard
Miscellaneous
Electrical
Total
Quantity Unit UnitPrice
9000 LF
$21,00
$189,000
9OO LF
$8.s0
$8,010
36000 LF
$14.65
$527,400
9OO LF
$s.72
$5,148
5400 LF
$1'20
$6,480
3EA
$5,700.00
$17,100
1EA
$40,000.00
$40,000
1EA
$8,500.00
$8,500
1EA
144 CY
1EA
1LS
$6,500.00
$125.00
$12.500.00
$6,500
$18,000
$12,500
$6,500
Subtotal
Contractor
o&P (20%)
Subtotal
25%
Contingency
15o/o
$845.138
$169,028
$1,014,166
$253,541
Engineering
$152,125
Total
$1,419,831.84
Table 2 - Option 2 Gost Estimate
Description
4" PVC Conduit
2" PVC Conduit
500kcmilAWG Conductors
#4/0AWG BareCopper
#12 AWG Conductors
48" Manhole
New MSB-1
New 8004 GeneratorBreaker
New 800A EnclosedCircuit
Breaker
Quantity
4500
900
18000
900
5400
a
1
I
1
Unit UnitPrice Total
LF
$21.00
$94,500
LF
$8.90
$8,010
LF
$14.65 $263,700
LF
55.72
$5,148
LF
$1.20
$6,480
EA
$5,700.00
$17,100
EA
$40,000.00 $40,000
EA
$8,s00.00
$8,500
EA
$6,500.00
$6;500
4
23
Concrete
New8004Panelboard
Miscellaneous
Electrical
75 CY
1EA
1LS
$125.00
$12.500.00
$6,500.00
Subtotal
$9,375
$12,500
$6,500
$478,313
Contractor
o&P(20%)
Subtotal
$95,663
$573,976
25%
Contingency $143,494
15%
Enqineerinq
$86,096
Total
$803,565.84
Table3 - Option3 CostEstimate
Description
4'PVC Conduit
1" PVC Conduit
500kcmilAWG
Conductors
#4/0AWG BareCopper
#12 AWG Conductors
New MSB-1
New 500-kWGenerator*
w/20009a1
sub-basefuel
tank in a weatherproof
Enclosure
3-TonA/C dAHU
ConcreteGenerator
(14'Lx 8'W x
Foundation
3'D)
ExistingUnderground**
FuelTank Removal
LouverModsat Gen.
Bldg.No.1
Electrical
Miscellaneous
Quantity Unit
1 6 0 LF
1 0 0 LF
640
900
1500
1
LF
LF
LF
EA
1EA
2EA
13
CY
1EA
1 LOT
1LS
UnitPrice
$21.00
$8.90
Total
$3,360
$890
$14.65
$5.72
$1.20
$40,000.00
$9,376
$5,148
$1,800
$40,000
$175,000.00
$6,500.00
$175,000
$13,000
$125.00
$1,625
$10,000.00
$10,000
$6,500.00
$6,500
$6,500.00
Subtotal
Contractor
o&P (20%)
Subtotal
25%
Contingency
15o/o
Engineering
Total
$6,500
99
$273,1
$54,640
$327,839
$81,960
$49,176
$458,974.32
" - costof generatoris basedon Kohlerif Caterpillaris desiredthe costwill
be $225,000.
** - additional
if required.
funds($5,000)
addedto costforde-mucking
4.0
ConclusionsandRecommendations
Installinga copperconnectionbetweenexistingGeneratorBuildingNo.1and
existingElectricalBuildingand GeneratorBuildingNo.2for redundantpowerto the
loadspoweredformexistingMSB-1wouldbe the mostdesirablesolution.The
impactto the plantduringinstallation
wouldbe substantial.
Installingan electrical
duct bank betweenthe electricalbuildingswould involvedigginga trench
approximately
24 incheswide and a minimum42 inchesdeepthroughthe existing
plantat the risk of hittingexistingburiedelectricallinesand or existingburied
processpiping.Dueto the extensiveexistingunderground
obstacles,
the trench
wouldrequirehanddiggingthe entireroute.This is very laborintensiveand time
consuming.
Replacingboththe existingswitchboard,MSB-1and the 300-kWgeneratorwith a
new 500-kwgeneratorwith a sub-basefuel tank in a weatherproofenclosurewould
be lessintrusiveto the plantduringinstallation.
A furthersavingscouldbe madeby
usingCountyportablegenerators
for poweringthe existingequipmentduring
replacementof the existingswitchboard.
Severaloptionswere investigatedto replace/re-feed
the electricaldistribution
equipmentat existingGeneratorBuitdingNo.1.As shownin the cost estimate,
Option1 and Option2 bothincludeinstallinga ductbankthroughthe plantfor
powerto existingGeneratorBuildingNo.1.The optionto re-feedloadsfromexisting
MCC-1and MCC-2were considered.
The existingelectricroomat the Operations
Buildinghas existingcodeviolationswith respectto clearworkingdistancein front
of electricalequipmentwith only38 inchesin frontof MCC-1and40 inchesin front
of MCC-2;NECrequiresa minimumof 42 inchesin frontof MCC-1and 48 inchesin
front of MCC-2.Also the optionto re-feedGeneratorBuildingNo.1from existing
switchboards
IWA and IWB locatedin the MCC Buildingwere considered.
SwitchboardsIWA and lWB, beingof a later modelof switchboardthe available
spacein the existingswitchboards
will not accommodate
the additionof 800-amp
circuitbreakers.The largestsize breakerthat can be installedin existingIWA and
IWB is a 600-amp,compactdesigncircuitbreakerwhichis not largeenoughto
powerthe loadsat GeneratorBuildingNo.1.Hillersrecommends
Option3, as it is
less intrusiveto plantoperationswhile providereliablepowerfor plantoperations.
6
25
Appendix
B - WesternRegionWasteWater
Treatment
Facility
Survey
SKETCH
& DESCRIPTION
LOCATION
MAP
NOT TO SCALE
SURVEYOR'S
NOTES:
DEPICTED
1. BEARINGS
HEREON
AREBASEDUPONTHENORTHLINEOF LOT 5 ACOORDING
TO fiE TRUS:IEES
OF THE INTERNAL
IMPROVEMENT
FUNDUNRECORDED
SUBDIVISION
OF
SECTION
36, TOWNSFJIP
43 SOUTH,
RANGE
36 EAST,PALMAEACII;COUIIN,
TIONTOA,
1, 1,916,SAID,NORTH
LINEHAVJNc
A BEARTNG
OF SOUTH
88.56'01,'i'
IAIED _DF^C!yBE$
EAST,tsASED
UFONTHE,NORTH
AMERICAN
DATUMOF 1985, ON THE 1990
ADJUSTMENT
FORTHEFLORIDA
TRANSVERSE
MERCATOR_EAST
ZONE.
2. THISIruSTRUUENT
NOTVALIDWTHOUTTHESIGNAruREANDTHEORIGINAL
RAISEDSEAL
OF A FLORIDA
LICENSED
SURVEYOR
AND[4APPER.
J. THE UNDERSIGI.IED
OR GUARANTEES
AS To THE
MAKESNO REPRES-ENTATIONS
tNrgnn,|nloN REFLECTED
HEREON
PERTA|NING
TO TASEMENTS,
nrCHrSoF WAy.
SETBACK
LII..IES,
AGREEMENTS
ANDO:THER
MATTERS,
ANDFURTHER.
TFIIsiNsIRuuTuT
IS NOT INTENDEDTO REFLECTOR SET FORTHALL SUCH MATTERS.SUCH INFORUETION
sHouLDBE OBTAINED
AN9 CoNFTRMED
By'oTHERS
THRoUGH
AppROpRtATE
nrLE
VERIFICATION.
LANDSSHOWNHEREONWEREttOr IASTRACTEDrOn R|CHTSOF WAy
AND/OR EASEMENTS
OF RECORD.
4. THE LICENSED
BUSINESS
NUMBER
FOR DENNISJ. LEAVY& ASSOCIATES
- INC.IS LB
rHr
SURVEYQRS
LICENSE
CrnrrFytNG
NUMtsERtS LS #5388.
465SS,
5. THIS IS NOT A SURVEY.
DennisJ. Leavy& Associates,
Inc.
*
Land Surveyors Mappers
46O BusinessPOrk'Woy'+ Suite B
Royol Pofm Beoch, Florido 33-411
Phone: 561 75it-0650
Fox 561 753-0290
SKETCH& DESCRIPTION
PalmBeachCoqntyWater
Utilities
Department
DATH-12/11/oe
A porcel o.f lond being comprised of o portion of Lgt 3, the North one-hptf (N 1/Z)
of Lot 5 ond_o portion of the North one-hotf (N 1/2) of Lot 6, oqcordingto the
Trustees of The lnternol lmprovement Fund UniecoiOddSr.rbdivision
of Section 36,
doibd: December1.
Jgylr{p 43 South" Rglgg 36 Eost, Potm Beoch County,Flo-rido,
1916. Being mor:e porticulorlydescribedos follows,
BEGINNING
ot the Northwestc6rner of soid Lot 5; thence South 88'56'01" fsgt (qs
o b o s i s o f b e o - r i n g so) l o n g t h e N o r t h l i n e o f s o i d L o t 5 , o d i s t a n c eo f s g J . J J ' f ; ; t
th:; Soltfrwest corner.of soid Lo!.5i_ll,gl"e trlorth OO'A7'42"West otong the West
l?
line of soid Lot 3, o distonce of 1,zO3.sg feet to o point beinq on ihe south
Right-of-Woy line c'f 'the Sbuth Flor:idoWoter M;;";#;"i
bi;fi"i
l*t4 conol
(ttiltsnoroConol); thence South 61'25'07'"Eost otong soid South Right-of-Woy,
o
diston'ce of 58O.95 -fee! thenge South 00'55',52oEo-;t, o distsnce o-f 5J0.0J feet;
thence South 0O'.|7'02"Eost; q distonce of 21O.bJ feet; thence Sorrth O7.SJ,SO';
Eostno d'istqnceof 9a.00 feet'to o point bging ori q fine lying JS1.74,feei Eost-of,
ond poroflet wit,lr(os meosured ot right ongleri tnr West line of sqid L,ot J; thence
South OOIQV'42"-ost oiong soio porollel line, o distonce of 194.06 feet t,o o point
being on the North line of sqid Lot 6; thence North 88'56:01'West otong soid North
line, o distonce'of 300.05 feet; thence South 01.0J'Sg"West; o distonce of 100.0J
feet; thence south 4z'3o'27" west, 'o distonce of J9,01 feet; therrce south.
02'23'33" Eost,-o distonce of 2g5.g+ feet to the point of curvoture of o circulor
CurVeto the left; thence ,southeosterlyolong the src of soid curve hoving o r:odius
of 65.00 feej, g cerilrol onQleof 7839'02" ond on orc length of g9.2J feet; thence
South 81"02'35" E-os!,o distonce,of ?;47,96 feet; thence-South 07'06'47:'f""i;
distsnce oI 2O2,2Q feet tp q p,oint being on the South line of the North. ohe-hotf"
(N-1/2) of s:oid Lot 6; thense Nolth.gs'so'z+" wes-t otong soid, south iine, o
distonce of 356.72 feet to the Southwestcorner of the North one-holf:(N 1/Z)'af
soid Lot 6, o,lso being the Southeos,tcorner of the North one-hotf (N 1/Z) iiir"iO
Lot 5; th.ence c.ontinueNoirth 88' 56"24" Wes.tolong the South line of the North
one-holf (N 1lZ) of soid Lot 5, o distonce of 586,8i feet to o point being bn the
wes't line of soid Lot 5; thence l\,lorth oo'lo'J4" Eost olong soid west line, o
dist,onceof 659.57 feet to the PATNTOF BEGINNING.
Soid londs situste, lying
1n$ ulng .ln_section,s6, Township43 south, Ronge J6
Eost" City of tselleGlode,Fotm Beoch County, Florido.
C o n t o i n i n g1 9 . 6 7 q q r e s m o r e o r l e s s .
DennisJ. Leavy& Associates,
Inc,
Land,
Surveyors'*
Mappers
r
\
460 Business Por-k Woy * Suite B
Royof Polm Beqch, florido 33411
DRAWN:.
RRM
SCATE:
y7a
Phone: 561 755-0650
OHK:
IOB$99-g79-4-e SHEEI:2oF yl
Fox..561 753-0290
DAB
DAIF;12/11/os
LINE
L'l
L2
L4
L5
L6
LINETABLE
DIRECTJON LENGTH
N88:56101"W 300.05'
s01:03r5g'W', 100.03'
s,42'36'27"W
s0223133"E
s81'02'35"E
s07?6'47"E
39.01'
235.9'4'
2.47.96'
2A2.2fr'
CURVETABLE
EURVE RADIUSCENTRAL
:ANGLEARC LENGTH
c1
65.00:
78!39'02"
89.23'
LEGEND:
= Ri:GHT-gp-vvtry
R,/W
= .SOUTHELORIEAWATER
S .F .W,M.D
MANAGEMENT
DiS"TRICT
ft
CENTERLINE
Y
+
MOREOR LESS
NOTE:
TFIE:SURVEY
PREP,ARED
BY K,C, MOCK:& ASSOCIATES,
REFERENCES
4336-36, WO 58_350, L-825, DATED:
8_13-58 WAS REFERENbED
DURiNGTHE PREPARATION
OF THIS SKETCHAND DESCRIPTION.
DennisJ. Leavy& Associates,
Inc.
r
\
LandSurveyors" Mappers
460 BusinessPork Woy r' Suite B
Royol Pdm Beoch.,Flqrido33411
DRAIYN:RRM
Phone: 561 753-0650
GHK: DAB
Fotr 561 753.-O290
SCALE:p/a
DATEIz/1i/os
IOB$99-s79-6-6SHEFf:.3ar y
:r.;
29
MATCHLINE'A'
(sEE SFTEET
5)
ffi'
Eu&l6ffi
GMr
@mqk
Eriffi
&c
@gj4
3
POINTOF BEGNNNING
NORTHWEST
CORNER
OF LOT5
bE
i-
WESTLINE
OF LOT 3
753'55"E
94.00'
fti
EF
o
@s
351.74'
z
s8956:01"E 593,33'
(BEARtNcEASE)
SOUTHWEST
CORNER.
LOT
s00'07r42"E
194.06'
NOR]H LINE OF LOT 5
DESC.R|BED
ARE,A=
19.67 ACRES*
WESTLINE
oF t_oT5
EAST LINE
0F LoT 5
L4
NORTH
1/2 LOT6
Ld
+
J")
o
F
o
o
z
NORTHt/2
tAT 5
SOUTHEAST
CORNER
oF THE NORT}{112
OF LOT 5
SOUTI'JLINE OF THE
N0RrH1/2 AF Lor s
SOUTI{WEST
CORNEROF THE
NORTH1/2 OF
LOT 6
SOUTHLINE OF
THE NORTH1/2
N8856'|24:',W '596.93'
souTH1/2 LOT 5
DennisJ, Leavy& Associates,
Inc.
*
Land Surveyors Mappers
46O Business Fork Woy * Suite, B
Royol Pclrn Beoch, Flor:idc 53411
Phone:661 7e3-0650 Fsx 561 755-0290
DAIEItz/r/og
"fr,t(u,
\
o\
"crof),-/<
\
^
"riUa,
f.1
rvav
v
SOUTHR/W LINE
OF THE S.F.W.M.D.
L_14 CANAL
.6
a
.T
"7
,I?
204
100
r.O
o
c;
Ol.
t"?
lC,
11*
lr)
o
(\
WESTLINE
OFLOT'3
0
trJ
=
.N
GRAPHICSC4LE IN'.FEET
SCALE:'1"' = ZQQ'
-$
F
AREA=
DESCRIBED,
19"67 ACRES*
o
c{
rO
i,o
r.)
o
v1
EASTLINE
OF LOT 3
LOT
O
,O
z.
s00'17'02"E
2i0,55'
-
n
MATCHLINE'A'
(sEESHEET
4)
DennisJ. Leavy& Associates,
* MappersInc.
LandSurveyors
I
\
460 BuEinessPork Woy * Suite ts
Royol Pofm Bsoqh, Flqrido 55411
DFIAWN:
RRM
SCALE:i" =.2OA'
Phona: 561 753-0650
CHK: DAB
SHEEI5 OFy
JOB#os-ozg-r-o
ri.:;s\,;i.l
Fqx:'561'753-0290
DArEztz/f/as:
AppendixC - SingleLineDiagram- BelleGlade
WWTF- Alternative
Powerlmprovements
6-15-2015
32
L----rg{rglgr"rr.nL"r'--W':"
m, iuc
9R s.*^E
dRfirilrown6i!rcU!
__]
uru
\""""J
!s!ge
m6rd@1u;il
I
RMdrf,hJ|Md&rm
UURilJ4WffiEM
!
wElffir4o*baamEro
ffixildreFilRddE
tffde@oEilrdffieD
ffiIGEffi
.
wi&flrubufffiE4uo
MnrdFeqrre.mo
l
WWdSrdB@d
r
wffiretu*rErMFrcxfid
id!r+&ffiMftffiFe
mi4dMddnorsd
RIil'dIIIAi1m
ATTACHMENT- K
VendorQuotes
ElectricalSubcontractorQuotes
Three subcontractorswere approachedto bid the electricalwork for Western RegionWaste Water
Treatment Facility(WRWWTF)Power lmprovementsProject. The electricalsubcontractorswere
requestedto provide quotes basedoff completingwork in PhaseL and Phase2 of the project. The
following priceswere received:
ElectricalSubcontractor
Powerlineof SouthFlorida
EnergyEfficientElectric
l2 Electric
BidAmount SBECertified
YES
5198,800.00
YES
s195,500.00
NO
s181,954.00
Powerlinewas not selectedbecausethey had the highest bid. 12Electricwas the lowest bid, however
EnergyEfficientis a Countycertified SBEwhere 12Electricis not. GlobaltechInc'scontract grants a LA%
pricing advantageto certified SBEs.EnergyEfficientElectricwas chosenas the most comprehensiveand
competitive bid to effectivelycompletethe work required.
EnergyEfficienthas provided a supplementalscopeand estimate which reflectsthe scopeof work for
Phase1 and associatedcosts. This cost is carried in GlobaltechInc.Work Authorization No. 2 WRWWTFAlternative Power lmprovementsPhase1.
- PhaseL
EnergyEfficientElectric
$138,000.00
EnergyEfficient Electric,Inc.
1600Mercer
Ave.Unit6
WestPalmBeach,
FL. 33401
Phone(561)655-7211
Fax(561)6s5-9661
Mobile(561)722-1381
E-MailAddress:
rene@energyeff.com
StateLicense#EC 000L096
J u n e1 8 , 2 0 1 5
Electrical Scope of Work
Belle Glade Generator ReplacementPhase1
electricalwork
We arepleasedto provideyour firm with our scopeandproposalfor thenecessary
project.Our scopeandproposalis basedon phase1 oforiginal quote# 30983.
on the abovereferenced
fncluded:
1 . Furnishandinstall all gearper original quote.
to existingelectricalbuilding.
2 . Furnishandinstallall oonduitsfrom newgenerator
3 . Furnishandinstall lightring protectionandgroundingfor the generatorandelectrical
building.
4. Furnishandinstallconduitfrom existingelectricalbuildingto existingmainbuildingPLC.
Excavatingandbackfill by Globaltech.
Lump Sum
$138.000
We appreciatethe opportunityto quoteyour organizationon this project.If you haveany
pleasecall me at the office.
questions,
ThankYou Very Kindly,
fone'liau
Vice President
----- Commercial
----- Industrial
-*- LightingSystems
Residential
sr@Ewacww&lircDacoMwrpffiswAewwmoNEurcf,rutqeMm(lg86trw^DE@lMmvs$-8cotE-truEt_NomlTNmM&kAos-xlr-6-l|Ww-Efflcm-!tr88I
8@tgm
EnergyEfficient Electric,Inc.
1600MercerAve. Unit 6
WestPalmBeach,FL.33401
Phone(561) 65s-7211Fax (561) 6s5-9661
Mobile (s61)722-1381
E-Mail Address:rene@energyeff.com
StateLicense#EC 000tr096
May 29,2015
Revised Electrical Scope of Work
Belle Gtade Generator Replacement
Quote# 30983
electricalwork
We arepleasedto provideyour firm with our scopeandproposalfor thenecessary
(Globaltech);
Nico
thru
with
a
walk
proposal
on
is
based
and
project.Our scope
on the abovereferenced
from
DaveDaltonandJosePozo(PBC)andAdamWard(MWH) anda final technicalmemorandum
2L,2014andnew 1 line diagram.
PBCdatedJanuary
Included:
existinggeneratorfor removalby others'Disconnect
1. Demowill consistof disconnecting
of Globaltechandtheir lifting equipment.
existingMSB-I andremovewith the assistance
fumishedby othersat the elechicalbuilding,by
Z. Electricallyconnecta temporarygenerator
the digesterblowers,chlorinebuilding PNL C andOxidationditch MCC-3. All gables
firnished with generator'
3. Furnishandinstalla newMSB-1perthe new 1 line diagram'
for
4. Furnishandinstalla new 50 KVA transformer,200 arrylightingpanel,(4) disconnects
for
disconnect
SS
and
200
amp
cord
cap
receptacle,
male
air conditioning,200ampgenerator
in
the
new
the centrifugeanda terrninaljunctionbox andpowerdistributionblocksto tie
wiresfrom MSB-I to existingloadwiresunderexistingMSB-I'
5. Furnishandinstallnew feedersfrom thenewMSB-I to the FPL vault,newMSB-I to new
andnewMSB-I to existingwiresunderthe existingMSB-I.
generator
6.. Fumishandinstallconduitand 100ampratedwiresfrom newpanelLP to a lightingpanelin
All loadsfrom generatorlightingpanelprewiredin enclosure.
the generatorenclosure.
7. Furnishandinstall new wire in the existingconduitfrom the new terminaljunction box in the
elechicalroomto the (2) existingdigesterblowersvia a newjunctionbox betweenthetwo
blowers.
monitorfurnishedby others.
8. Assistwith the installationof a newPLC andtemperature
bYothers.
Programming
g. Furnishandinsiallup to 335 feetof 2" conduitfrom thenewPLC to existingmainbuilding
of a backhoeandoperatorfurnishedby Globaltech.Installup to 500
PLC with the assistance
by others.
feetof fiber opticfurnishedby others.FO terminations
building1 and
grounding
on
existinggenerator
and
protection
lightrring
install
and
10. Furnish
' newgenerator
enclosure.
Excluded:
1. PermitandFPL fees.
2. Concreteandasphaltcuttingandpatching.
3. Concrete
Pads.
ductbanks.
4. Concreteencased
5. Trashdisposalto an onsitedumpster.
6. Reuseexistinglightsandreceptacles,
q\w,**N8w!*r^*W."*"-*"-#;:3*;;JHl1Tffi;
--' Industrial
:*"#5cia1
EnergyEfficient Electric,Inc.
1600MercerAve. Unit 6
WestPalmBeach,FL. 33401
Phone(561)655-72II Fax (561) 655-9661
Mobile (s6L)722-r38r
E-Mail Address:rene@energyeff.com
Lumn Sum
$195.500
We appreciatethe opportunity to quoteyour organizationon this project. Ifyou have any
questions,pleasecall me at the office.
ThankYou Very Kindln
Rpne'l/i.au
VicePresident
*-- Industrial
----- Commercial
*-- LightingSystems
Residential
MNtr
TIINNImOIJ]@XPNWMQreUSED
Qffi
('}rc
,x'n
, { ELECTRIG
Esruare Rev2.0
561-270-3182
admin@i2-Solutions.com
1250WallaceDr.SuiteH
DelrayBeach,FL33444
June3, 2015
Gustomer:
'
GlobalTech
6001BrokenSoundPkwyNW#610
BocaRaton,Florida33487
Contact:
Mr.NicoShaner
Project:
(opt3)
BelleGladeWWTP- Alternative
Powerlmprovements
Scope:
As a memberof GlobalTech's projectteami2Solutionsdlblai2 Electricwill performthe following:
L
GeneralScope:
. Upgradeelectrical
switchgearin existinggeneratorbuilding1 (whichwill becomeswitchgear
generator.
new(outdoorinstalled)
building)to accommodate
a
Installa fiberopticlinkbetweenswitchgearbuildingand mainPLCcabinet
a
and lightingpanelas wellas 2 futuresoft
lncludescompleteEatonswitchgear,transformer
startswithfullspeedby-passup to 125HP(180FLA)forfutureaerators,as specifledto Global
perhis 1-Line2015_05_14-Model.
Techengineer
items
added
June3, 2015.Includeslightningprotection
Addition
and groundloopfor electrical
building(155ft) and newgenerator(80ft), buildingtemperature
monitor,electricalbuilding
temperature
monitorandcircuitin conduit(50ft) and controlcircuitfromATSto RTUin conduit
(50ft).
il.
switchgear
DetailedScope- Upgradeelectrical
r Demoand removeold switchgear.
transferswitch(ATS),mainbreakerand main
Provideand installEaton800ampautomatic
panel(MDP).
distribution
a
transformer
Provideand install50KVA480v-1201240v
a
indoorpanelwithtwenty20 ampsingle
Provideand installEaton200 amp42 circuit1201240
poleandtwo 30 amp2 polebolt-inbreakers.
hubs,unions,sealoffs,etc;wire;ground
i2 will provideand installconduitand all associated
pullboxesandjunctionboxesas requiredperone linedrawing.
rodsand connectors;
i. Aluminumrigidconduitfor abovegroundinstallation
ii. PVCConduitfor belowgroundinstallation
iii. Gabletrayand racewaypenetrations
intoswitchgearwithinswitchgearbuilding.
iv. Excavation
and backfillfor conduitrunsas neededto installnecessaryconduits.
groundingsystem,tie to existingsystem.
v. Installnewgeneratorandswitchgear
. i2willwireandterminateelectrical
devices,panels,etc as required,Including:
i. Newgeneratorconduitsandcable.
ii. Reconnection
of FPLtransformer
feedto ATS
iii. Reconnect
old servicecabinetand newswitchgear.
. Powerwiringto be meggertestedto insureno damageto insulation
followinginstallation.
. Wringto be labeledat eachend.
FL ElechicalConhactor# 13005565
to assistwithstartup
MasterElectrician
.
Scope- Installfiberopticlink
il1. Detailed
300ft.
Provideand install2-inchpvc belowgradeconduitapproximately
and backfillfor conduitrunas neededto installconduit'
Excavation
20 feet underexistingdriveway
drill/boreapproximately
Directional
fiber.
700feet- 6 fibermultimode
Provideand installapproximately
r
.
.
.
tv.
perShaneremailof May27,2015
Additions
(seeparagraph
. LightningProtection
V below).
- aroundthe building
155
is approximately
enclosure.Building
andthegenerator
. Grounding
- generatorpadis approximately
80 ft perimeter.Bondingof the generator
ft perimeter
frame,and lightningProtection.
buildingthatwillconnectto the
monitorfor the interiorof the switchboard
RoomTemperature
conduitand cable.Analog4-20output' (50ft max)
LocalRTUandassociated
Conduit,wireand cablebetweenthe localRTUandthe ATS (50ft max).Assumesfourteen
conduit.
and associated
#14 wiresfor discretesignals,datacablefor Modbuscommunication
V.
for buildingand generatorenclosure.
LightningProtection
Scopeof Proposal
materials
. Priceis basedon utilizingclass1 aluminumlightningprotection
drawings
unlessnotedbelow
shop
and
shipping,
a
labor,
materials,
all
Proposalincludes
a
systemwill be installedper UL96A,LPI175,and NFPA780 lightning
The lightningprotection
protection
standards
Systemas specified
a completeLightningProtection
a
Priceincludesfurnishingand installing
as specified
a groundcounterpoise
a
Priceincludesfurnishingand installing
Exclusions
All cuttingand patchingof concreteand/orasphaltis by others,if required
(50)of 1' PVCconduit
to furnishandinstallapproximately
Contractor
Electrical
priceis basedon adheringdirectlyto the roofmembraneand doesnot includefurnishingand
installinganysacrificialroofing
approximately
0
pads,pavers,membranestrips,etc.lf requiredby the roofingmanufacturer,
are required
a
to furnishand installall flashingandsealingfor all roofpenetrations
Roofingcontractor
a
SurgeProtectionis excluded
Vl. Clarifications
Excludes:
i. Estimateassumesthat itemssuchas design,drawingsandspecs,loadcalculations,
of othersandarespecifically
O&Mmanual,andtraining,etc.arethe responsibility
excluded.
Clarification:
availableas of dateof estimate.
i. Estimatebaseduponlimitedinformation
intoestimate.
(if any)requirereviewand integration
ii. Uniquecustomerspecifications
Froposalbasedupon:
.
.
r
as; 1-Line-2015-05-14-Model
1 drawingreceivedfrom Customeron May 15,2015,labeled
withGlobalTechengineerNicoShaner
Conversations
Sitevisit
Fnicing:
Labor,Materials,Equipment& Salestax:
$ 181,954 (Note:price excludesperformancebond)
FL ElechicalConh'actor# 13005565
Exceptions/ Additiona[wor]<:
for materialsprovidedand installedare excludedfrompricingabove.Pleaseverify
Costsfor SiteSecurityand Insurance
for
sitesecuriiywithyourinsuranceprovider'
and
items
coveragefor suchinstalled
excluded.Changesto the siteare not
withinthe scopeaboveare specifically
identified
Workand ltemsnotspecifically
costsas follows:
includedin the Scopeoutlinedaboveand mayresultin additional
.
to the agreedscopewillbe deliveredon a
Unlessotherwiseagreedby the partiesin writing,anyadditions
on
site)
still
(@
assuming
mobilized
/hr
basis.
time and material
$86'25
sf the Customer:
Requirements
excludedfromthisproposal:
for the followingand is specifically
willbe responsible
The customer
' .
.
.
.
as outlinedin the PlansandSpecifications
of the contractor
Responsibilities
soil disposalfees (if required)
Contaminated
permitpulledby i2 if required)
Primarypermit(Electrical
(AHJ)
withAuthorityHavingJurisdiction
Assistwithcoordination
T'ermsand Payrnent:
Cornmercla!
Thisproposalis validfor 30 daysfromthe proposaldatestatedon thefirstpageof thisdocumentor as setforthby the bid
documents,
All billingshallbe per
and mutuallyagreedby the customerand i2 Electric.
A Scheduleof Values(SOV)shallbe established
the SOV.
workand
variationfromthisProposalis foreseen,bothpartiesmustagreein writingto the additional
Wherea substantial
accordingly.Servicesare providedon fixedfee basisandare billedas delivered.
amendthis Proposal
rendersthe servicesor Customer
charges,as contractor
i2 ElectricwillinvoiceCustomerfor all servicesandapplicable
incursthe charges,as applicable.Customerwill pay eachinvoicewithinthirty (30)daysof the dateof invoice.Invoicesnot
balancedue'
paidwithin30 daysshaliincura financechargeof 1.5%interestper monthon the outstanding
Warrantee:
Electrical
or improperinstallation.
i2 Electricwillwaranteetheirlaborfor oneyearagainstanydefectsin workmanship
of thosedevices.
warrantees,
suchas providedby Eatonare as setforthby the manufacture
component
Acceptanceof FroPosal:
to
and are herebyaccepted.i2 Electricis authorized
aresatisfactory
andconditions
The aboveprices,specifications
as
outlined
above'
will
be
made
Payments
performthe workas specifled.
Acceptedby:
(Signature)
(printednameandtitle)
Dateof Acceptance:
FL Electical Contractor# 13005565
FIBEROPT1C/ NETWORK
WTRIN6 OFrTIONSFOR
3OOt( GENERATOR
I' FROM 3OOKGENERATOR
To t/AlN PLc 1=
10.0FT
LE6END
F-O. CABLE
COAXCABLE
FROI\'13OOI(GENERATOR
TO Clz PLC3 =
408 Fr.
!
:
I GEl.leRAlOF.BtOG--.
I'
.-
EITIERI.IET
i J'''
I
l
z" PIPE
ivaur-isr.z,s HAVE
&
i AVAILABLEFoRF/o
480vAc
. "-
.-.-
tr""
rl
SPEED,I
BUIViPI
COAX
I
.l
,i
r, Il
,-r I
r
lOrfl.'LI
!
atoc
170.0FT.
MN il $-06
Pt[ |
:*".
+
I
t--
,-)
t..
l-;-"
I
/
40 FT.TO PLC3
/
r-+
65 FT. /
rcPLCL
/l
F
l;
'
' l
viutl I
;;
14.0
i:ill(l
O I
N F
90.0Fi
t,
/-
n -;-rE,F*s,ra,tu."
-:-'
i
;
r).:hY
,\Fr
.
ll'*'*r
|
eHol8t
latrc.l€@
r@ldBal
/
r
@,Eta
n
.t
5ZlIffii
da;f,:xmlg
*r' r" rr
f{!l
+
I
!-.*,."*"*
'6@0l
I
rI
I
,
-_1
16 wtnr.@-?
affii@cr.€
"*i
s!
zE
eB
Ee
ii5 ;
|
"2 'i
I
ffiR@--_9
Ee
<i>ermow
'
Ln:-r.iA.
NOTES:
Et@l@
EUSEE TESGColsi
sfrric ,6 FL{ UW rTn. 0 ls srcie
EAts
M3EltsaP&ard1.l
rt
lI
2
J. |R-Vsdu
NOE
6
3
XMaECH4C4TOS&D
FOi AEIIOE
I&Iffi
dA
GriRilE-@6E
$5tdo6
GrsffiusqslG
s
! rrrr!i,r.dEtouvaF€sEM
|:,j.,,q1. i'olaq6d@E,
.or-:..{EBtEc€Pr^tla
!
rer?F$G]&t@rt;io@!Y
!
ilEilW.NOiO8SrgilDFR4Sflc
;irno rorr.L cdDrnEhilF&
I
-1
I
lan
I
*
+r
tl
LI
*'"1TT'
E%Cg4$6Std$1601!ifr
SwRts.Axc
u464 S Jd.lS
gG€co'st
dE
1: rt
r: lvt rw
StateCertificate# EC-13003753
Date:8 July15
To: Globaltech,Inc.
1075BrokenSoundPkwYNW
Suite103
BocaRaton,FL33487
Ref, Belle Glade WWTP Alternate Power Improvements WUD 14-050
Information,Plans
We purposeto provide a completeElectricalInstallationper Provided
& Specifications
Option #3
Temp.Powerincludedfor changeover
711 CommerceWay Suite # 6 Jupiter' FL' 33458
ph. 561-57S-427O Fax 561-575-4269 Email: Powerlineofsouth(Dbellsouth.net
Exceptions: l.Motors/PumPs
2.PLCProgramming
Set
3. Generator
This Proposal subiect to renegotiation after (90 Day Period)
Amount:8 198800.00
Purposed
oni Hundred Ninety Eight ThausandEight Hundred Dollars
Thankyou for theopportunityto providethisEroposal'
Sincerely
ThomasLaessig
President
# EC-13003753
StateCertificate
Generator
Quotes
to providequotesfor the new500kWgeneratorat Western
Threegeneratorsupplierswereapproached
ProjectPhase1. The
Powerlmprovements
RegionWasteWaterTreatmentFacility{WRWWTF)
generatorsupplierswere requestedto providequotesfor a 500kWgeneratorwith a 2,000gallonsubThefollowingpriceswerereceived:
basefueltankandaluminumwalk-inenclosure.
Generator
Supplier
QuoteAmount
Manufacturer
Generator
CumminsPowerSouthLLC.
Inc.
TAWPowerSystems,
PantropicPower,lnc.
$t43,779.88
Cummins
Kohler
Caterpillar(CAT)
S215,ooo.oo
S162,525.00
CumminsPower South LLCwas chosenas the most comprehensiveand competitive quote. Cummins
Power South LLCwas later askedto provide pricingto upsizethe sub-basefuel tank from 2,000 gallons
to 4,500 gallons. In addition to the tank upsizeCumminsPower South LLCwas requestedto price an
enclosurethat had a minimum wind loadingof 190 MPHto satisfythe new buildingcode.
CumminsPower South LLC.has provided a supplementalscopeand estimate which reflectsthe
requestedchangesto the original quote. The quote is as follows:
PowerSouthLLC.
Cummins
St5S,6++.88
**S155,644.88includesS151,894.88
for generator,enclosureand fuel tank; 53,750.00for additional
engineeringto satisfywind loading requirement**
Quotation
LLC
CUMMINS
POWERSOUTH
E-Mail: Tim.Alban@Cummins.com
3777lnterstate Park Road W.
West Palm BeachFL 33404UnitedStates
Direct:561-281-3638
April 16,2015
Project Name:Belle GladeWWTP
t 9535
Quotation:20270000001
Thankyoufor yourinquiry.We are pleasedto quoteas follows:
50H2440/400kW
Diesel Genset:60Hz-500/tt55kW
Application
Emeruency
lnstall-US-Stat U.S.EPA,Stationary
Rating
500kW-Standby
Genset-Diesel,60Hz,
5OODFEK
Power
Rating-Standby
Duty
A331-2
Listing-Ul2200
1090-2
Emergency
EPA,Tier2,NSPSCI Stationary
EmissionCert,
L170-2
Wire
Phase,Wye,4
Voltage-277/480,3
R002-2
0 Hz, 12 Lead,ExtendedRange,1251105C
Alternator-O
8,258-2
2100
sET CONTROL-PCC
H643-2
DisplayLanguage-English
H536-2
Display-Control,Graphical
H605-2
Status,UserConfigured
Relays-Genset
K631-2
Ffi-1 0
Interface-CommunicationsNtwk,
KP60-2
Output,Analog
Meterc-AC
H606-2
Facing
ControlMounting-Left
H609-2
120VoltAC
Heater-Alternator,
M92-2
Only
CB or EB orTB-Right
KUg4-2
15V,SSRMS,80%UUl EC
Right,3P,600/4
CirBrkr-800A,
RUl4-2
CB or EB orTB-BottomEntry,Right
KB72-2
Separator-FuelMater
c127-2
50CAmbient
EngineCooling-Radiatot
EA74-2
Coolant
Level
Shutdown-Low
H389-2
40F MinimumAmbientTemp
CoolantHeater-2081240/480v,
H556-2
Duty
EngineAir Cleaner-Normal
D041-2
On
ExhaustConnector-Slip
AC9E-2
Gensetwananty-Base,Standby2 years/ 400 hours,PrimePower1 year/
L028-2
unlimitedhours,Continuous
Power1 year/ unlimitedhours
Literature-English
Packing-None
ProductRevision- M
CommonPartsListing
1050-2
A358-2
SPEC-M
cP01-2
ST12OSN3RSL,
PILNCCB,
E STOPBRKGlassNEMA3 w/ contacts
PILNOCB
WCONTACT
DeliveryOption3 FactoryDireciShipment
to Customer
WeatherResistant.Level 2 Sound Attenuated.Walk in.
AluminumEnclosure:
. Approximate
Dimensions:
20'Lx 11'Wx9'
H (plusFuelTank)
. EnclosureExteriorto be of .090',5052-H32
Aluminum,Formed,PanelConstruction,
Pre-Painted
FinishStandardColor\tVhite
(Customcolorextra)
o Air Intake:SoundAttenuatedIntakeScoopswith
PunchedBirdScreen
. Air Discharge:SoundAttenuatedDischargeHoodwith
GravityDampersand BirdScreen
. 3" SoundAttenuating
FireBlanketin Walls,
Doors,Hoodsand Ceilings.Insulation
Aluminum
Retainedwith .032"Perforated
Liner.Enclosureis Designedto Reduce
SourceSPLby 25 dB (A) @ 1M in a FreeFieldEnvironment.
. (2) Lockable,HingedAccessDoorswith
PanicBarsand CorrosionResistant
Hardware
o SilencerMountingBrackets,Supports,and
Bandsfor AMPSProvided,Interior
Mounted,Internally
Insulated,
CriticalGrade
Silencer
o AMPSSuppliedExhaustFlexConnector
o AMPSProvidedMiteredExhaustOutlet
o All ExteriorHardwareto be StainlessSteel
o Extendoil, Coolantand Silencerdrainsto
EnclosureExterior
. Enclosure
Suitablefor 180MPHWindLoading
5.175-Gallon.
UL 142.FDEPSub BaseFuelTank(EQ#
1
1
1
1
(4512UsableGallons)
533):
. Approximate
: 235"Lx 138"Wx 45"H
Dimensions:
Tank
. Ti'Mild SteelSecondary
o RuptureBasinwith FDEPApprovedLeakDetection
LS600)
Switch(Pneumercator
o Mechanical
FuelLevelGauge(Visibleat FillPoint)
o Supplyand ReturnConnections
o 2" Fillwith LockableGapwith FDEPSpillGontainment
Per ULVentFittingsInstalled
o Normaland Emergency
142
o LowLevelFuelAlarmSwitch(MadisonM-7000
EQ#682)Set @ 67% RemainingCapacityWiredto Fuel
AlarmConsole
. HighLevelFuelAlarmSwitch(MadisonM-7000
EQ#682)Set @ 90%TankCapacityWiredto Fuel
AlarmConsole
r CableStubUp OpeningUnderCircuitBreaker
. GeneratorMountingPads
o 2LiftingPointsper Side(4 Total)for LiftingGenerator
andTank(EmPtY)
Set,Enclosure
o TankcoatedwithTwo PartEpoxyPrimerand painted
GlossBlack
ElectricalPackaqe:
lncluded
1 Phase
o Provide,InstallandWire(1) 100A,12O|24OV
MLOLoadCenterwith BranchCircuitBreakers
o Provide,InstallandWire(3)48' DualTubeFluorescent
LightFixtureswith (2) 3-WaySwitchesLocatedby
EntranceDoors.
e Provide,InstallandWire(3) DC LightFixtureswith (1)
60 MinuteTimerSwitchesLocatedby EntranceDoors
o Provide,InstallandWire (2) 2OA,125VDuplexGFCI
Locatedby EntranceDoors
Receptacles
r Wire CustomerProvidedand lnstalledJacketWater
Heatersto LoadCenter
o Wire CustomerProvidedand InstalledGeneratorStrip
Heatersto LoadCenter
. MountandWire CustomerProvidedBatteryChargerto
LoadCenterand DC Outputto Batteries
. All Electrical
to be Runin EMTor FlexibleConduitto meet
NFPA70.
OSHACompliantStairs and
Walkwavs:
. (2) Set of OSHACompliantStairswithRailingsand48"
WideWalkwaywith Railings
o Railingsto be Constructed
40
of 1Tz"Schedule
Aluminum
Tube
of Extruded
Stepsand WalkwaysConstructed
Aluminum
a
StainlessSteelLevelingPads
a
on Site
StairsSetto be ShippedLooseandAssembled
by Others
/ O&MManuals
Submittals
Start-Up/Training
FOBAMPS
Quote based on PBG Design Build Criteria & Drawing(s)
Alternate I
GrandTotal $151,894.88
(checkappropriate
adion):
HoldforAPProval
RELEASE
ApprovalandtermsaccePtance
CustomerSignature
CUMMINSPOWERSOUTH.LLC
POWERGENERATION
of Sale."Thesetermsalsoappear
of Oders and Conditions
Thefollowingarethe "Termsof Acceptance
here.CUMMINSPOWERSOUTH,LLCsales
of Saleformandare reproduced
on the Acknowledgment
onthesetermsandCUMMINSPOWERSOUTH,LLC'sacceptance
are limitedto andmadeexclusively
termscontainedin any
of anyorderis limitedto the termsof the Sellerand rejectsanyadditional
documentthatmay be proposedby the Buyer
1. ThisQuotationis validfor 60 days* of the datequotation,Priceshallremainfirm providedour
andthe shipdateof the
submittaldrawingsare approvedand retumedwithin60 daysaftersubmission,
equipment
is notextendedby you or yourcustomerbeyondour publishedleadtimes. Delaysor
charges,on someor all equipment
escalation
extensionof the aboveleadtimesmay necessitate
ordered.
withinthe continental
2. Deliveryis F.O.B.Factory.Freightis prepaidand allowedto the firstdestination
enclosed
truck.
Opentrucking
an
(smallerthan601 kW)are shippedin
UnitedStates.Generators
via
flat
bed
truck.
are
shipped
cost.Largerunits
deliveriesare availableat an additional
3. Pricesfor generators,transferswitches,switchgearand looseaccessoriesas required,will be invoiced
at thetimeof shipment,or whenreadyfor shipment.Shouldthe buyerdelay,deferor refusedelivery,
charges.
andstoragechargesmay be assessedin lieuof the abovestatedescalation
additionalhandling
to orderandis subjectto
is customfabricated
suppliedby thismanufacturer
4. The equipment
cancellation
charges.
andall buildto orderequipmentare subjectto thefollowingminimumcharyes
Switchgear,
Generatorc
assessedfor cancellationof any order:25oloof totalorderpriceif cancellationis receivedin our oftice
betweenthe date of orderentryandthe datewe receivewrittensubmittaldrawingapproval.50% of total
is receivedin ourofficeafterwereceivesubmittaldrawingapproval.
oder priceif cancellation
is receivedin ouroffice60 or fewerdaysbeforethe scheduled
of totalorderpriceif cancellation
75olo
is receivedin our officeafterthe
shippingdateof the order.85%of totalorderpriceif cancellation
equipmentis assembled.
afterourcostsdueto the cancellation
chargewill be determined
The exactdollarvalueof the cancellation
generatorcancellation
Standard
is required.The
aredetermined.A writtennoticeof cancellation
our
price
fadory.
of
order
from
release
after
of the total order
chargesare 25o/o
at the
5. Paymenttermsare net30 daysfromdateof invoice,subjectto approvalof ourcreditdepartment
locationsoutsidethe U.S.)aresubjecttoa deposit
timeof the order.Nondomesticorderc(finaldelivery
of 25o/o
at the timeof order.Balanceshallbe paidpriorto shipment.Exportorder(deliveryoutsidethe
shallbe limitedto10%.Paymentof
US)mayrequirea letterof creditdrawnon a U.S.bank.Retainage
of startup or payableno laterthan90 daysfromthe originalinvoice.
retainageis due at completion
Actsof
for delaysin deliverydueto fire,strikes,accidents,
6. CumminsPowerSouthis not responsible
schedules
shipping
our
control.
beyond
Quoted
other
causes
or
accidents
flood,
Nature,war,explosion,
andsubjectto changewithoutnotice.In no caseis CumminsPowerSouth
are notguaranteed
damages.CumminsPowerSouthdoesnotacceptliquidated
or consequential
responsible
for incidental
damagesas a partof thirdpartycontracts.
7. Eachproductofferedin this quotationis accompaniedby an expressedwrittenmanufacturefswarranty
and is the onlywanantyoffered.
coveredby thisquotationwill be acceptedon a holdfor releasebasis.Your
8. An orderfor the equipment
untilwrittenapprovalto proceedis receivedin our
for production
orderwill not be releasedandscheduled
office.
sectionslistedon ourquotation.
9. Thequotationofferedherein is limitedto the plansandspecification
itemsmayrequireadditional
for
administrative
requirements
apply.
Additional
other
sections
shall
No
cost.
setsof
O&Mmanualsare limitedto oneset.Additional
statedon ourquotation,
10.Unlessotherwise
standardformatshallapply.
cost.The manufacturer's
O&Mmanualsare availableat an additional
CustomO&Mmanualswill be availableat an additionalchage.
11. Startup services,loadbanktesting,andownertrainingare not providedunlessstatedon our
quotation.
Startup serviceswill notproceeduntilthebuye/saccountis currentandin goodstanding.
off loading,rigging,
12.Ourstandardquotationdoesnot includeoff unitwiring,off unitplumbing,
or fuel.
installation,
exhaustinsulation
for testingof fueltank(s)providedby any party,as
Responsibility
13. Noticeto FloridaCustomers.
Chapters62-761and62-762,is
Protection)
of Environmental
requiredunderFDEP( FloridaDepartment
CumminsPowerSouthLLC
Applicant.
Permit
andGenerator
of the installingContractor
the responsibility
party,
a
fuel
tank
is filledbeforefieldtesting
when
by
any
costs
incuned
for damagesor
is not responsible
FBC,is performed.
under
of
Authority
lnspector
a
Local
by
mandated
requiredunderFDEPor testing
14. Taxesunlessotherwisestatedare notincludedin our price.
withall localandfederal
with highregardto safetyand in compliance
15. All CPSworkwill be performed
by the equipment
Safeaccessmustbe providedandmaintained
requirements.
safety/ environmental
perconnel.
beingstartedup by our
ownerto all equipment
to any NETAtesting.Thistestingshallbe conductedby a ceftifiedthirdparty
Cumminstakesexception
the testingprocesswithour projed
coordinating
companyprovidedby otherc.Cumminsrecommends
In
damagethe generatorc.
that can potentially
andservicegroupto avoidany procedures
management
generator
windings.Uponcustomefs
repeatedhi-pottestingof
addition,Cumminsdoesnot recommend
of the generator.
request,Cumminscan providea listof theteststhat aredoneduringthe manufacturing
of FleldTestingon DieselFuelTanks.
Exclusion
for AHJ Requirements
The localAHJmayrequirethe GeneratorPermitholder(Owner,Contractor/Installeror CM) to perform
of the fieldtesting
liquids.A detailedexplanation
oneor morefieldtestson fueltanksholdingcombustible
purchaser,
installerand
requirements
for dieselfueltanksis outlinedin FDEPand NFPA-30,2013.The
testing,
before
for
field
ownershoutdcontactthe localAHJ in regardto meetingall localrequirements
(Vendor)
in
a
supplier
as
acting
only
is
Cummins
Be advised,that
orderingdieselfuelstorageequipment.
the
for
coordinating
any
allowances
make
NOT
and
does
by this Quotation,
the tranlactionrepresented
for paymentof the samein the priceas Quoted.By
executionof fieldtestingor, makeallowances
this Exclusion.
acknowledges
hereby
Purchaser
the
of thisQuotation,
acceptance
Submittedby
Tim Alban , PowerGenerationSalesManager
ns.com
Tim.Alban@cummi
Fax:561-840-7704
Adam Ward
From:
Sent:
To:
Subject:
NicoShaner[NShaner@globaltechdb.com]
Friday,June12,20154:44PM
Tim Alban
RE: 500 kw generatorfor PBCWWTF
Excellent.Thankyou.
Regards,
NicoShaner
Globaltech,
Inc.
6001-BrokenSoundPkwyNW
Suite6L0
BocaRaton,FL33487
nshaner@globaltechdb.com
561-997-5433- office
M+226-7645 - cell
www.globaltechdb.com
ban@cum m ins.com]
From:Tim Alban[mailto:tim.al
Sent: Friday,June 12, 20154:42 PM
To: NicoShaner
Subject RE:500 kw generatorfor PBCWWTF
Nico,
Adder.
The enclosureMfg. stateswe can do 200MPHwith PEcertificatesfor SSZSO.O0
IndustrialPower GenerationSales
CumminsPower South,LLC
E-Mail:Tim.Alban@Cummins.Com
3754 lnterstate ParkWay
RivieraBeach,FL33404
Phone:(561)- 281 - 3638
Fax:(561)-277 -9L86
www.cumminspowersouth.com
From:NicoShanertmailto:Nshaner@s
t:22PM
Sent: Friday,JuneL2,?:OLS
To: Tim Alban
Subject RE:500 kw generatorfor PBCWWTF
l
ThanksTim.
mightaskfor 190 MPH ratings.
Apologies,
but lt lookslike new buildingcoderequirements
What would it costto verifythat the enclosuremeetsthat criteria(if it does)or what would it costto get one.
The countyhasapparentlycaughtwind of a possiblebuildingcoderequirementchangein the wind loading.
1
Thanksagain.
Regards,
NicoShaner
Inc.
Globaltech,
600LBrokenSoundPkwyNW
Suite6L0
BocaRaton,FL33487
nshaner@globaltechdb.com
55L-997-6433- office
40+226-7645 - cell
www.globaltechdb.com
From:Tim Alban[mailto:tim.alban@cu
m mins.com]
Sent: Friday,June 12, 2015 9:46 AM
To: NicoShaner
Subject RE:500 kw generatorfor PBCWWTF
Nico,
Hereis the new quote with tank we spokeabout. Note that enclosurewas alreadyrated 180MPHwind load.Thisnew
configurationdoes not changethe footprint of the drawing you have depictingthis unit. Tank is longerfoi extra capacity
and matched length of the enclosure.Call me with any questions.
IndustrialPower GenerationSales
CumminsPower South,LLC
E-Mail:Tim.Alban@Cummins.Com
3754 lnterstate ParkWay
RivieraBeach,FL33404
Phone:(561)- 281- 3638
Fax:(561)-277 -9L86
www.cumminspowersouth.com
From:NicoShaner[mailto:NShaner@elobaltechdb.com]
Sent: Thursday,June LL,20LS 11:50AM
To: Tim Alban
Subject 500 kw generatorfor PBCWWTF
HiTim.
Thanksfor speakingwith me this morning. Just a few questionsfor you.
What sizefuel tank would we needto run at 50%load on the generatorfor 10 days? What would the new dimensions
be and cost be with that tank?
The building code requirementsmay be changing,would it be possibleto get an enclosurerated for 180mph wind
loadingwith the new tank, and what would the additional cost be if any?
Any associatedcostsin putting a largertank on the generator,stairs,railings,etc. pleaselet us know. I am looking up
the datasheetinfo right now to see if I can guestimate a tank size basedon the consumptiontables/curves.
2
Thanks.
Regards,
NicoShaner
Inc.
Globaltech,
600LBrokenSoundPkwyNW
Suite61.0
BocaRaton,FL33487
ltechdb.com
nshaner@globa
office
561-997-6433
N+226-7645 - cell
www.globaltechdb.com
Adam Ward
JohnPottspohn.Potts@tawinc.coml
April16,20153:50PM
Thurcday,
NicoShaner
RE: budgetarypricing
From:
Sent:
To:
Subject:
HelloNicofind budgetarypricinglistedbelow.
I apologize
for the delayin gettingbackwith you. Please
galsubbase
w/2OOO
fueltank
1) 500kw generatorstandalone
StandbyEPACertified,OpenSkidwith 2000galUtL42SubBaseTankTierll Emergency
Kohler500REOZB,
BudgetPrice$150,000.00
21 500kw generatorenclosed(walk-in)w/2000galsubbasefuel tank
with 2000galU1142SubBase
StandbyEPACertified,Walkin Enclosure
Tier ll Emergency
Kohler500REOZB,
Tank- BudgetPrice5215,000.00
3) ATS
3 pole,NEMAl ATS- 525,000.00
OpenTransition,
Kohler2OO0A
4l Daytank
Simplex150galOutdoordaytankwith TransferPumps- 5g,5o0.oO
Letme knowif you haveanyadditionalquestions.
Regards,
John
. **t,rritt@"
John Potts I Kohler Generators
mw_.*
74t$-
TAW PowerSystems,Inc.
1500 NW 15th AvenueI PompanoBeach,FL 33059
tel | 954-977-O2O2xl7 04 | fax : 954-977'9249 | cellI 954-23 4'4226
Exellen@ in creating innovative solutions for the supply'
control and use of energy
:NShaner@globaltechd
b.com]
From:NicoShaner
[mailto
April15,20158:37AM
Senh Wednesday,
To: lohn Potts
pricing
Subject RE:budgetary
John,
H a v e n ' t h e a r d b a c k f r o m y ol hu a. v e p r i c i n g d u e i n a c o u p l e d a lyfsl d. o n ' t h e a r b a c k f r o m y o u t o d al 'yl l,a s s u m e y o u ' r e
not interested.
Thanks.
Regards,
NicoShaner
Inc.
Globaltech,
5001 BrokenSoundPkwyNW
Suite610
BocaRaton,FL33487
nshaner@globaltechdb.com
1
561-997-5433- office
40+226-7645 - cell
www.slobaltechdb.com
From: NicoShaner
Sent: Monday,March30, 2015 3:12 PM
To:'john.potts@tawinc.com'
SubjecUbudgetarypricing
Hi John.
We spokeearlier about a generator replacementat Belleglade WWTP in palm beachcounty.
Attached are the designcriteria and technicalmemorandumthat was done by Hillers Engineering.
Pleasequote as separateline items:
fuel tank
1) 500kw generatorstandalone
dZOOOgalsubbase
gal
(walk-in)
basefuel tank
sub
w/ZOOO
generator
enclosed
2l 500kw
3) ATS
4l Daytank
pleasecall to discussif necessary.I am lookingfor pricing in the next day or so if you can.
Thanks.
to be virus free.TAW@is
This emailhasbeenscannedby the TAW@Email SecuritySystemandis guaranteed
a registeredtrademarkof TampaArmatureWorks, Inc. andSubsidiaries.
CONFIDENTIALITY NOTICE :
This email,andanyfi1estransmittedwith it, may containconfidential,proprietaryor privilegedinformationthat
If you arenot the intendedrecipient,you are
is intendedonly for the personor entityto which it is addressed.
of this document
distribution,copying,or retransmission
herebynotifiedthat anyunauthorizeddissemination,
if any,is strictlyprohibited.If you havereceivedthis
or its attachments,
emailin error,pleasenotifu the senderimmediatelyanddeletethis materialfrom all known records.
to be virus free.TAW@is
This emailhasbeenscannedby the TAW@Email SecuritySystemandis guaranteed
a registeredtrademarkof TampaArmatureWorks,Inc. andSubsidiaries.
Quotation
POWERSOUTH
LLC
CUMMINS
E-Mail:Tim.Alban@Gummins.com
3777lnterstate Park Road W.
West Palm Beach FL 33404United States
Direct:561-281-3638
April ,|6,2015
Proiect Name:Belle GladeVITWTP
19535
Quotation:20270000001
Thankyoufor yourinquiry.We are pleasedto quoteas follows:
DiesefGenset:60H2600/455kW50H2440| 400kW
Application
Emergency
lnstall-US-Stat U.S.EPA,Stationary
Rating
Genset-Diesel,60Hz,500kW-Standby
5OODFEK
Power
A331-2
DutyRating-Standby
Listing-UL
2200
1090-2
Emergency
2,NSPSCl Stationary
EmissionCert,EPA,Tier
t170-2
7I 480,3 Phase,Wye,4\Mre
R002-2
Y oftage-27
Hz, 12 Lead,ExtendedRange,125l1O5C
Aftemator-B0
8258-2
21OO
H643-2
SETCONTROL-PCC
DisplayLanguage-English
H536-2
Graphical
H605-2
Display-Control,
UserConfigured
Status,
Relays-Genset
K631-2
Ffi-1 0
Interface-CommunicationsNtwk,
KP6o-2
Meters-ACOutput,Analog
H606-2
Facing
ControlMounting-Left
H609-2
120VoltAC
Heater-Alternator,
4292-2
Only
CB or EB orTB-Right
KUg4-2
Ul EC
5V,SSRMS,E0%U
Right,3P,600/41
KU14-2
CirBrkr-8OOA,
CB or EB orTB-BottomEntry,Right
KB72-2
Separator-Fue[4/Vater
c127-2
50CAmbient
E074-2
EngineCooling-Radiatot
CoolantLevel
Shutdown-Low
H389-2
24A| 480V,40F Minimum AmbientTemp
Coofant Heater-2081
H556-2
Duty
EngineAir Cleaner-Normal
D041-2
On
Connector-Slip
Exhaust
PA98-2
L028-2
Gensetwarranty-Base,Standby2 years/ 400 hours,PrimePower1 yearI
Power1 year/ unlimitedhours
unlimitedhours,Continuous
Literature-English
Packing-None
ProductRevision- M
CommonPartsListing
1050-2
4358-2
SPEC-M
cPo1-2
ST12OSN3RSL,
PILNCCB,
E STOPBRKGlassNEMA3 W contacts
PILNOCB
W/CONTACT
DeliveryOption3 FactoryDirectShipmentto Customer
WeatherResistant.Level 2 Sound Attenuated.Walk in.
AluminumEnclosure:
. Approximate
20'Lx 11'Wx9'
Dimensions:
H (plusFuelTank)
EnclosureExteriorto be of .090',5052-H32
Formed,PanelConstruction,
Aluminum,
FinishStandardColorWhite
Pre-Painted
(Customcolorextra)
Air Intake:SoundAttenuatedIntakeScoopswith
PunchedBirdScreen
Air Discharge:SoundAttenuatedDischargeHoodwith
GravityDampersand BirdScreen
3" SoundAttenuatingFire Blanketin Walls,
Doors,Hoodsand Ceilings.Insulation
Retainedwith .032"PerforatedAluminum
Liner.Enclosureis Designedto Reduce
SourceSPLby 25 dB (A) @ 1M in a FreeFieldEnvironment.
(2) Lockable,HingedAccessDoorswith
PanicBarsand CorrosionResistant
Hardware
and
Supports,
SilencerMountingBrackets,
Bandsfor AMPSProvided,Interior
CriticalGrade
lnsulated,
Mounted,Internally
Silencer
o
AMPSSuppliedExhaustFlexConnector
o
AMPSProvidedMiteredExhaustOutlet
o
All ExteriorHardwareto be StainlessSteel
a
Extendoil, Coolantand Silencerdrainsto
EnclosureExterior
Enclosure
Suitablefor 180MPHWindLoading
2.000-Gallon.
UL 142.FDEPSub BaseFuelTank(EQ#
1
1
1
1
533):
a
186"Lx 108"Wx 30"H
Dimensions:
Approximate
o
Tank
Mild
Secondary
Steel
Yi'
a
RuptureBasinwith FDEPApprovedLeakDetection
LS600)
Switch(Pneumercator
o
Mechanical
FuelLevelGauge(Visibleat FillPoint)
a
Supplyand ReturnConnections
o
2'Fill with LockableCapwith FDEPSpillContainment
a
Per ULVentFittingsInstalled
Normaland Emergency
142
LowLevelFuelAlarmSwitch(MadisonM-7000
EQ#682)Set @ 67% RemainingCapacityWiredto Fuel
AlarmConsole
HighLevelFuelAlarmSwitch(MadisonM-7000
EQ#682)Set @ 90%Tank CapacityWiredto Fuel
AlarmConsole
. CableStubUp OpeningUnderCircuitBreaker
. GeneratorMountingPads
o 2LiftingPointsper Side(4 Total)for LiftingGenerator
Set, Enclosureand Tank(Empty)
o Tankcoatedwith Two PartEpoxyPrimerand painted
GlossBlack
ElectricalPackaqe:
lncluded
r Provide,InstallandWire(1) 100A,12O|24OV
1 Phase
MLOLoadCenterwith BranchCircuitBreakers
o Provide,InstallandWire(3)48' DualTubeFluorescent
LightFixtureswith (2) 3-WaySwitchesLocatedby
EntranceDoors.
e Provide,InstallandWire(3) DC LightFixtureswith(1)
60 MinuteTimerSwitchesLocatedby EntranceDoors
. Provide,InstallandWire (2) 2OA,125VDuplexGFCI
Locatedby EntranceDoors
Receptacles
. Wre CustomerProvidedand InstalledJacketWater
Heatersto LoadCenter
o Wire CustomerProvidedand InstalledGeneratorStrip
Heatersto LoadCenter
. MountandWire CustomerProvidedBatteryChargerto
LoadCenterand DC Outputto Batteries
. All Electrical
to be Runin EMTor FlexibleConduitto meet
NFPA70.
OSHAGompliantStairs and
Walkwavs:
. (2) Setof OSHACompliant
StairswithRailingsand48"
WideWalkwaywith Railings
o Railingsto be Constructed
of 1 Tz"Schedule40
AluminumTube
. Stepsand WalkwaysConstructed
of Extruded
Aluminum
o StainlessSteelLevelingPads
. StairsSet to be ShippedLooseandAssembledon Site
by Others
/ O&MManuals
Submiftals
Start-Up/Training
FOBAMPS
Quotebasedon PBGDesignBuild Griteria& Drawing(s)
Alternate I
Grand Total $143,779.88
(checkappropriateaction):
HoldforApproval
RELEASE
Approvalandtermsacceptance
CustomerSignature
Date
CUMMINS
POWERSOUTH,LLC
POWERGENERATION
of Sale."Thesetermsalsoappear
of Ordercand Conditions
Thefollowingarethe nTermsof Acceptance
here.CUMMINSPOWERSOUTH,LLCsales
on the Acknowledgment
of Saleforn andare reproduced
on thesetermsandCUMMINSPOWERSOUTH,LLC'sacceptance
are limitedto andmadeexclusively
termscontainedin any
of anyoder is limitedto the termsof the Sellerand rejec{sany additional
documentthat may be proposedby the Buyer
1. ThisQuotationis validfor 60 days* of the datequotation,Priceshallremainfirm providedour
andthe shipdateof the
submittaldrawingsare approvedand returnedwithin60 daysaftersubmission,
equipment
is notextendedby you or yourcustomerbeyondour publishedleadtimes. Delaysor
charges,on someor all equipment
escalation
extensionof the aboveleadtimesmay necessitate
odered.
withinthe continental
2. Deliveryis F.O.B.Factory,Freightis prepaidandallowedto the firstdestination
(smallerthan601 kW)areshippedin an enclosedtruck.Opentrucking
UnitedStates.Generators
cost.Largerunitsare shippedvia flat bedtruck.
deliveriesare availableat an additional
switchgearand looseaccessoriesas required,will be invoiced
3. Pricesfor generatorc,transfers-witches,
shipment.
Shouldthe buyerdelay,deferor refusedelivery,
at thetimeof shipment,or whenreadyfor
charges.
additionalhandlingandstoragechargesmay be assessedin lieuof the abovestatedescalation
to orderandis subjectto
is customfabricated
4. The equipment
suppliedby thismanufacturer
charges.
cancellation
Switchgear,
Generators
andall buildto oder equipmentare subjectto thefollowingminimumcharges
assessedfor cancellationof any order:25Voof total orderpriceif cancellationis receivedin our office
betweenthe date of oder entryandthe datewe receivewrittensubmittaldrawingapproval.50%of total
orderpriceif cancellation
is receivedin our officeafterwereceivesubmittaldrawingapproval.
is receivedin ouroffice60 or fewerdaysbeforethe scheduled
75%of totalorderpriceif cancellation
is receivedin our officeafterthe
shippingdateof the order.85%of totalorderpriceif cancellation
is assembled.
equipment
afterour costsdueto the cancellation
chargewill be determined
The exactdollarvalueof the cancellation
is required.The Standardgeneratorcancellation
aredetermined.A writtennoticeof cancellation
chargesare25o/oof the total oder priceafterreleaseof orderfrom our fadory.
at the
5. Paymenttermsare net30 daysfromdateof invoice,subjectto approvalof ourcreditdepartment
time of the order.Nondomesticorders(finaldeliverylocationsoutsidethe U.S.)aresubjectto a deposit
of 25o/o
at the timeof oder. Balanceshallbe paidpriorto shipment.Exportorder(deliveryoutsidethe
shallbe limitedto10%.Paymentof
US)mayrequirea letterof creditdrawnon a U.S.bank.Retainage
of startup or payableno laterthan90 daysfromthe originalinvoice.
retainageis due at completion
Actsof
for delaysin deliverydueto fire,strikes,accidents,
6. CumminsPowerSouthis not responsible
Nature,war,explosion,
flood,accidentsor othercausesbeyondour control.Quotedshippingschedules
are notguaranteed
andsubjectto changewithoutnotice.ln no caseis CumminsPowerSouth
damages.CumminsPowerSouthdoesnot acceptliquidated
or consequential
responsible
for incidental
damagesas a partof third partycontracts.
writtenmanufactureds
wananty
by an expressed
7. Eachproductofferedin thisquotationis accompanied
and is the onlywanantyoffered.
coveredby this quotationwill be acceptedon a holdfor releasebasis.Your
8. An orderfor the equipment
untilwrittenapprovalto proceedis receivedin our
for production
oder will not be releasedandscheduled
office.
9. The quotationofferedherein is limitedto the pfansand specificationsectionslistedon our quotation.
itemsmayrequireadditional
for administrative
requirements
No othersectionsshallapply.Additional
cost.
setsof
O&Mmanualsare limitedto oneset.Additional
statedon ourquotation,
10.Unlessotherwise
shall
apply.
standard
format
cost.
manufac-turefs
The
at
additional
are
an
O&Mmanuals available
charge.
CustomO&Mmanualswill be availableat an additional
11.Startup services,loadbanktesting,andownertrainingare not providedunlessstatedon our
quotation.Startup serviceswill not proceeduntilthe buyefsaccountis cunentandin goodstanding.
off loading,rigging,
12.Ourstandardquotationdoesnot includeoff unitwiring,off unitplumbing,
or fuel.
exhaustinsulation
installation,
for testingof fueltank(s)providedby any party,as
Responsibility
13. Noticeto FloridaCustomers.
Chapters62-761and62-762,is
Protection)
of Environmental
requiredunderFDEP( FloridaDepartment
andGeneratorPermitApplicant.CumminsPowerSouthLLC
Contractor
of the installing
the responsibility
for damagesor costsincunedby any party,whena fuel tank is filledbeforefieldtesting
is not responsible
of AuthorityunderFBC,is performed.
requiredunderFDEPortestingmandatedby a Locallnspec{or
statedare not includedin our price.
14. Taxesunlessotherwise
withall localandfederal
withhighregardto safetyandin compliance
15. All CPSworkwill be performed
by the equipment
Safeaccessmustbe providedandmaintained
requirements.
safety/ environmental
ownerto all equipmentbeingstartedup by our pesonnel.
to any NETAtesting.Thistestingshallbe conductedby a certifiedthirdparty
Cumminstakesexception
the testingprocesswithour project
coordinating
provided
by others.Cumminsrecommends
company
In
potentially
procedures
damagethe generatorc.
that
can
group
any
avoid
to
andservice
management
generator
Upon
customefs
windings.
testing
of
repeated
hi-pot
not
recommend
does
Gummins
addition,
of the generator.
request,Cumminscan providea listof theteststhat aredoneduringthe manufaduring
of FieldTestingon DieselFuelTanks'
for AHJ Requirements
Exclusion
The localAHJmay requirethe GeneratorPermitholder(Owner,Contractor/Installeror CM) to perform
of the fieldtesting
liquids.A detailedexplanation
oneor morefieldtestson fueltanksholdingcombustible
purchaser,
installerand
2013.
The
and
NFPA-3O,
in
outlined
FDEP
tanks
is
fuet
for diesel
requirements
for fieldtesting,before
ownershouldcontactthe localAHJ in regardto meetingall localrequirements
Be advised,thatCumminsis actingonlyas a supplier(Vendor)in
oderingdieselfuelstorageequipment.
the
for coordinating
anddoesNOTmakeany allowances
by thisQuotation,
the tranlactionrepresented
for paymentof the samein the priceas Quoted.By
executionof fieldtestingor, makeallowances
this Exclusion.
herebyacknowledges
the Purchaser
of thisQuotation,
acceptance
Submittedby
Tim Alban , PowerGenerationSalesManager
Tim.Alban@cummins.com
Fax:561-E40-7704
PanuopicPawei lng.
- oflEcArr-0NE
s0lult0tt"
oNE
90UfrCE
!jy\!i,iv.0antr0pic,coft
RobertCosgrove- EPGSales
8205N.W.58St.Miami,Fl. 33166
F: 305.471.1943
P: 305.592.49441
Date: 04-16-15
Quote#:15R8TC0059-03
Reference:Belle Glade WWTF
Palm Beach, Florida
of
General
Otv
VL
L
Description
bne (1) New Caterpillar Model C-15 Diesel Engine Generatorset,8 22109!!$9!t rated @
500kW Standby, n7 A80V AC, 3 Phase,6O Hz', 1800 rpm Diesel Engine Generator Set,
with the following accessories:
.
Cost
$ 163,525.00
IJL-220A Listed - UL Standardof Safety for stationary engine generator assembliesof
600 Volts or less
Requirements
Generator with a temp rise of 125 C or less.
UL listed voltage regulator.
EMCP4.2 control panel.
Neutral ground connection
.
EPA Tier II Emission compliant unit - meets USA Environmental Protection Agency
(EPA) Tier 2 and California Air ResourcesBoard (CARB) Non-Road Emissions
Certifications and USA Environmental Protection Ageucy (EPA) Tier 2 Emissions
Certification for stationary use. (per NSPS rule)
r
DesignCriteria
The generatorset accepts 1007orated load in one step per NFPA I l0 and meetsISO
8528-5 transient response
.
EPA Tie.r II Emission compliant unit
o
Isochronous electronic governor
o
Air lnlet
Air cleaner with filter restriction indicator
Combustionair inlet flow rate = 1405.5cfm
.
Engine Auto-start Control Panel EMCP 4.2 (unit mounted )
4.2 controls including:
El$,{lCP
Run / Auto / Stop Conkol
Speedand voltageadiust
lliani
82ffil{WSStrsst
fl-33166
Miami,
tol
305.59?.4941
lax
305.477.1943
htllsodedllo
2501
tuad84
Slats
Ft.t ud€rdale.
Ft33312
95{.797.7972
el
fax
954.791.711S
WoltPdmB*h
hulevard
5460
0keeclnhe
&ach,R 3341i
tt{estPalm
hl
58t.040.ffi18
fax
561.640.7894
Smrt
272N.flqlorAvsilB
Stuart
Fl34994
tel
t2.6S2.3442
j'l2 6923757
far
tut$;tn
2471
Rocmlltud
fI339tb
fortMysrs.
Ul
2S.337.424
lar
?39.337.4211
PantmpicPower.lnc.
0il8swfrcE^ oNE
uu - oilEsounofl*
rrr.lw.oalttopic.rxm
Engine Cycle crank
VI volt DC operation
Environrrental sealedfront face
Tex alarm / event description.
Lamp test pushbutton
Digital indication for:
RPM
DC volts
Operating hours
Oil pressure(psi, kPa or bar)
Coolant terperature
Volts (L-L & L-N), frequency (Hz)
Amps (per phase & average)
ekW, kVA, kVAR, kw-hr, %kw,PF
Warning / shutdown with common LED indication of:
l,ow Oil pressure
High coolant temperature
Over-speed
Emergency stop
Failure to start (over-crank)
Low coolant temperature
Low coolantlevel
Programmableprotective relaying functions:
Generatorphasesequence
Over / under voltage(27159)
Over / underfrequency(81)
Reversepower (kW) (32)
Reversereactive power (kVAr) (32RV)
Over-current(50 / 51)
Common Alarm
Generatorrunning
Communications:
Six digital inputs
Four relay outputs (form A)
Two relay outputs (form C)
Generatorrun relav
Siami
NW50Slrost
8206
F13316{i
Miami,
tsl
il5.592.4944
fax
$5.477.1943
forl budsrdElo
2501StaEEoad
84
Ft buderdalq
tl 33312
954.797.i972
bl
fax
Stf.7gl.7/19
WegtPlln SorGh
Boulet/ard
Blfl)Okeeddee
FL33417
WestPalm
Beach,
56t.841r.08r8
bl
5{i1.640.78{4
tar
Sflart
?2 N.tlaglaAwnue
Stur(t134994
nLffiz.3MZtal
il2.692.9757
far
hilltltus
2471
Bo*fillRmd
i,lysr&
R3391E
Fon
a9$7.422d
?fl9.$7.l2l1lax
Pantropic
Power,lnc.
- ONECAU- ONESOLUTION"
OfiESAUNCE
lww.oanttoolc.com
Common alarm relay
Two digital outputs
Custorrer data link (Modbus RTU)
Accessory module data link
Serial annunciator module data link
Eurergency stop pushbutton
Alarm horn with silencing pushbutton
Device Server: RM85/Modbus to Ethemet / Modbus TCP gateway optically
isolated ports 2 Ethernet ports and Wi-Fi capable
llirmi
82(bNWSStrsst
F133166
Miami,
305.532.4944
tel
S5.477.lglilfu
o
Engine
Caterpillar model C- 15, ln-line 6 cylinder, 4-stroke-cycle water-cooled
Cylinder bore diameter = 5.4 inches
Piston stroke= 6.75 inches
ratio = 16.1:l
Compression
Total cylinder displacement= 927.56cubic inches
Aspiration = ATAAC
Fuel system= MEUI
Governor type = ADEM control system
Heat rejectedto the atmospherefromthe engine= 5,346 Btu/min
Heat rejected to the jacket water 10,748 Btu/min
Heat rejected to the after-cooler = 6,8M Bnr/min
Fuel consumption:
Full load = 36.6 gallonsper hour
Three - quartersload = 28.0 gallons per hour
Half load = 23.3 gallonsper hour
.
PerlrlanentMagnet Excited Generator System
Line voltage = 480 volts
Phasevoltage=277 volts
Ratedcurrent=751.8 amlleres
Power factor = 0.8
Frequency = 60 Hertz
3 phase
4 pole
Sync Speed= 1,800RPM
Class H insulation
"WYE'connected
2/3 thirds or 0.6667 coil pitch
Permanentmagnetic excitation system
hn budcrdrlg
2S!lState
84
Road
Ft buderdale.
Fl33312
w.nltglztd
tax
9F,4.7S1.7719
WertPrln B8.ch
0keedobge
Boulward
5160
Beach,
n il41,
WestPalm
bl
50t.64{1.0018
tux
561.640.78S4
Slur.t
?72N.FlaglerAvenue
Stuart,
tl 34994
I/2892.M2tgl
n2.ffi2.9751lax
tul[|oG
Ro*fillnmd
2471
FmtMyeru,
fL33918
a9$7.42281
4€$7.Atlfu
PantropicPowar,Inc.
- OIIECALL-ONESoI:UIION^
ONESOUNCE
rlwrv.Dan[0prc,c0m
ULLM6 recognized
Random wound
Single bearing
Four (4) pole
Twelve (12) leads
Two (2) wires be lead
Generatorrated (kw): 500.0
Generator rated (kva): 625.0
Generator efficiency
Full load =94.4Vo
Three quarters load = 94.4Vo
Half load =93.57o
Quarterload = 9L0Vo
Voltage regulator
Regulator sensing,true RMS 3-phasesensing
lnw voltage extension box (used for customer low voltage power and engine control
wiring entrancefor easeof terminating)
Segregatedlow voltage (AC/DC) wiring panel
Anti-condensation spaceheaters208 - 2N Y AC,600 watt
Generator set up for bottom conduit entry into generator housing
One (1) 800 amp frame / 6fi) amp trip, 3 pole, I00Vo rated, I^SI trip unit, Thermal
Magnetic Circuit Breaker wittr 24VDC shunt trip and auxiliary contacts
lltumi
&tbNW50
Stoot
Miami,
tr 3il'166
305.592.4944
tel
far
3ffi.477.!9t43
r
StartingSystem/ CtrargingSystem
Two (2) lead acid engine starting batteries & cables
Meets NFPA ll0 kvel lstarting requirements
Battery disconnect switch
Battery charger(shippedloose); ?/[VDC, l0 Amp output. 120 VAC, 1 Phaselnput,
wall mountable
Dual rate charger with automatic switching from equalize to float. Includes
high voltage, low voltage and AC failure alarm outputs, DCAmmeter and
Voltmeter. NEMA I enclosure.
For I 10-120 VAC 60Hz Input. Regulated.Meets alarm requirements of NFPA
99 and NFPA 110.C-UL listed
Meets NFPA ll0Irvel I (Z hour) RechargeTime Requirement
UVDC electric starting motor
45amp battery charging alternator
JacketWater Heater,240vac input I phase
r
Eneine Cooline svstem
hn Lrudedalc
25{llShteBosd
84
Ft laudedale,
FL33312
954.797.7S72
tsl
954.791.7719
fax
We3tPrln Bsrch
5460
0keedobee
Eoulevard
WestPalm
Beach,
t[ 33417
561,64l).mt8bl
56,'.8t10.7ffi4
fax
Sturt
?2 N.FlaglaAvenw
Stuar(
R34991
nLffi2.3442rel
I/26!2.9i57
fat
fuliltotr
2471
Sockfill
Road
Fon
Mven,
R33S16
frs.337.422d
239.337.42t1
fu
PantopicPower,Inc.
- ONECALI- 0NESolrliltofl*
oNESOUnCE
nrtrnr.panttottic,mm
Ambient radiator cooling capabilities of 51 degreeC or 124 degreesFahrenheit
Air flow restriction (system) = 0.48 inches in water
Air flow (max @ rated speedfor radiator arrangement)=77,828 cfm
Engine coolantcapacitywith radiator = 13.3gallons
Engine coolantcapacity= 5.5 gallons
Radiatorcoolantcapacity= 7.3 gallons
Coolant drain line with valve terminated at edge of base
Low water level switch mounted on radiator for shutdown of engine
Fan and belt guards
Coolantlevel sight gauge
Caterpillar Extended life coolant
llirmi
Streel
826NW58
R 33166
Miami,
tsl
S5.592.4944
fax
$5.477.1943
o
ExhaustSystem
Dry exhaustmanifold
Flanged faced outlets
Exhaust flange size (internal diameter) = 6.0 in
Exhaust stack gas temperature(engine ovt) = 942.I degreesF
Exhaustgasflow rate=3,842.2cfm
Exhaust systembackpressure(maximum allowable) = 40.2 in water
o
Fuel System
Primary fuel hlter with integral water separator
Secondaryfuel filters
Fuel priming pump
Fuel pressuregauge
Fuel impervious flexible fuel lines
Fuel oil cooler
o
Lube System
Lubricating oil and filter
Sump rehll with frlter = 15.9 gallons
Oil drain line with valve
Fumesdisposal
Lube oil level indicator
o
Emissions(Nominal)
NOx g/hp-hr =5.14ghq-fu
CO g/hp-h = 0.4 g/hp-hr
HC g/hp-hr = 0.01 g/hP-hr
PM e/hp-hr = 0.018 slhp-hr
Fo.tlrudedllr
84
2$ll stateBoad
ftlau&rdale,tL33312
gtl.797.iSntel
fax
s5tt.79l.7719
Wrd Plln B.Nch
0keechobw
Eoulevard
5460
Beac[t[ 3341
7
WestPalm
bl
56r.640.m18
far
561.040.7894
Slur(
?7211.flaglerArcnue
Stua(tl34gg4
nLffi2.U42|d,l
n2.ffi2.9151tax
ftnlh$
flo*fillfimd
2471
Fort
i.ly€r$
R3S16
m$7.442s|
fax
49.337.i1211
PantropicPower,lnc.
- onEsulJlt0il*
- OttE
c/.LL
oNE
S0URCE
rr,nrv+.Uanltopic.com
I
L
o
Mounting System
Spring vibration isolator (to be placed betweenrails and sub-basetank)
Pad type isolators (to be placed between tank and concrete pad)
o
Weather Resistant.NC)N Sound Attenuated Aluminum Enclosure:
Included
HVFIZ Enclosure
Construction:
Weather protective, aluminum enclosure (skin tight design)
Aluminum modular panel design
Color: selectedby owner (paint chip neededto rratch)
PE Certified to 181 MPH wind load
Florida Department of Business & professional Regulation Certification and Label
Florida Building Code Large Missile lmpact Rated Enclosure (Florida Product
Approval #121U, #12868,and #1287l)
Sound Attenuation:
Not applicable
Airflow Through Enclosure
Intake: hooded intake with bird /rodent screen
Discharge: hooded discharge with gravity dampe'rsand bird rodent screen
Designed to minimize water penetration into enclosure during heavy rainfall
EnclosureEntrances:
Four (4) enclosure accessdoors with stainlesssteel hardware. (four (4) single access
doors )
Reinforced door framing
Door drip guards
Exhaust and Fluids:
Interior hospital srade silencer
lnterior muffler mounting hardware
Stainlesssteel exhaust flex
Exhaust elbow and rain cap
Exhaust rain shield
Furres disposals and engine drains piped to outside ofenclosure
ilirmi
e26 NW58Stroot
Miami,
F133156
tol
305.532.4944
far
il5.477.1943
fon lruderdlls
84
ShteBoad
2501
2
tL3331
R.kuderdale,
bl
954.797.iS72
.7719
fax
Il5[791
W83tPllmBerch
Boulevard
frlfll 0keechobee
7
Beach.
n 3341
WestPalm
561.840.0818
bl
fax
56.|.8411.784
SlrNrt
?2 N.tlaglerAvenue
Stur(FL34994
n2.ffi2.3442ta!
fax
772692.9757
tortilywr
Bockfill
Rmd
2471
R33916
fortMy€rs.
23S.337.422
U
fax
239.337.4211
Pantropic
Power,lnc.
- olttE
CALLoNEsoUnCE
otIESolUTlI,rl"
v{r,,&v.oantto0ki.csrn
Electrical Package:
Quantity three (3) D/C lights with one-hour wind up timer
Enclosuredimensions:
Length =298"
Widttr = 7?'
Height = 108"
Weight = 2,785 lbs.
One (l) year warranty against material defects & workmanship the foregoing
warranty is in lieu of and excludes all other Warranties, expressor implied by
operation of law or otherwise, Including, but not limited to, any implied warranties
of Merchantability or fitness, both of which are expressly disclaimed. Buyer
understandsand agreesthat all wa.ranties implied by the Provisions of the uniform
commercial code are excluded. Buyer's exclusive remedy and Phoenix Producls'
limit of liability for Any and all lossesor damagesresulting from nonconforming
goods or tender, or from any other cause,shall be the contract price of the goods.
Under no circumsiancesshall Phoenix Products be Responsible for any indirect,
incidental or consequentialdamagesor economic lossesrelating to any alleged
defect in, or failure of, the goods or any component part of, or attachmentto, thereof.
I
L
o
Included
2250-Gallon.UL-142 FDEP Sub-BaseFuel Tank:
GSDW -2250
-
2250 Gallons
2054 gallons usable fuel
73 hours ofusable fuel at 757o load
Dimensions:
lrngth =238"
Width = 72"
Height = 43" (includes2'' tall bottom channel)
Weight = 9,863 lbs.
Construction:
2250 gallons
UL-L42 Listed generator sub-basetank
FDEP: EQ625
0.1875" Steelprimary tank and 0.1875" steelsecondarycontainment
Ships with vacuum in interstitial for on-site integrity verification
Mirmi
82tENW58St€$t
Fl"33166
Miami,
tel
S5.592.4944
fu
il5.477.1943
ton hudedole
84
StateRoad
2501
Fr.lateilale. F133312
t€l
S51.797.792
far
!l!f 791.7719
WostP6lmEoech
0kee$obee
5460
Boulevsrd
86ach,
R 33417
WbstPalm
st.640.0818b|
Sl.64l.7S4fax
6'ftr|t
Z2 N.FlaglerAwmu
Stlnl tt 34934
t€l
t2692.3442
T12ffi2.9151iax
hnMlttr
2471
Ro*fillRmd
tu i,{y€rtR33918
239.337.421281
239.33L4211
fax
PantropicPowenInc
OM SWBCE. ONEf,,,LL. ONESOLUTIOJI*
wtrw,D0ntr0p'r4.fi,m
Normal and Emergency Vents
?' atmosphericvent with 12' above grade riser
6" primary tank and 6" secondarytank emergency vents
Fuel Ievel and l-eal Sensors
High fuel, low fuel level, and interstitial switch (rupture basin) leak switches ( wired
to generator control panel for alarms)
Mechanical fuel level gauge, visible from fuel frll
Internal Conduit Stub-up Area:
Exterior Fill Wittr Spill Containment
7.5 gallons overfiIl / spill containment with hinged cover and padlockable
Spring - loaded drain valve to transfer spilled fuel to primary tank
Overf,rll prevention valve, shutoff at 95% full tank
Exterior Finish
lndustrial exterior grade enamel over primed surface
Finish color: Phoenix Products standardblack satin
t
L
Included
Additional Items
Thrce (3) bound copies of generator set submittals for review
Three (3) Sets of Operation and Maintenance Manuals
One (1) Nerra 3R remotebreak-glassstation(shippedloose)
Factory Certified test report at 0.8 pf
I
.
Included
Start -Up and Trainine
Start-Up and Building Inad Test of generator set by a factory trained technician
during normal businesshours of 8:00amto 5:00pm)
Resistive load - bank test on-site after start-up of unit is completed four (4) hour test
at L00Voload using utilizing a resistive load bank on-site after completed
installation.(during norrral businesshours of 8:@am to 5:00pm)
Maintenance Personneltraining during normal businesshours of 8:00am to 5:00pm)
llhni
NW58Stro€t
8205
Mhmi,F|33166
tol
S5.$t2.4944
fu
$5.477.1943
foil toudsdrle
Boad
84
2501
Star€
tL333U
tt- buderdale,
tol
9!1.7971972
g54.7gl.77lg
rax
W83tPrlmBerct
goulevard
54d)0keectdee
7
Beach.
FL3341
WestPalm
bl
501.640.m18
tax
561.M].7894
8luril
Z2 N.tlaglerAvenw
Sruart
tI34994
n2.692g42r$l
tax
TI2M23157
hrtllpn
Rmd
2471Rockfill
tonMyen.R 33916
w.fi7.4n2d
lax
239.337.4211
PannopicPower,Inc.
- ONE6,,LL- ONESOLUI/,ON"
OITESOUfrCE
n$,fw.oantroltic.Dom
L
a
Included
Wanantv
Two (2) year Caterpillar Factory Warranty
Budgetary Price F.O.B. Miami (freight prepaid to jobsite)........$
163,525.00 (sales tax not included)
Adder for EnclosureCertified to UL CCN # FTPP Program
(Classifiedfor constructiononly Per LiL 2200)
The Combinationof this enclosureandUL Listedstationaryenginegeneratorassemblywill requireadditionalevaluationandI or
with
testingper 1JL2200.The elecfical equipmentsystemscoveredunderthis categoryareintendedfor installationin accordance
jurisdiction
determine
if tests
inspection
shall
the
final
accepting
authority
having
Code".
The
Electrical
ANSI / NFPA 70, "National
areto be conductedsinceno testingfor this combinationof enclosureandenginegeneratorassemblyhasbeenconductednor
by UL.
Represented
$ 1F00.00 (salestax not included)
Two (2) Free standing Stairs package:
Hot dipped galvanized A36 steel construction
42" tall handrail (affixed on the side opposite of the fuel tank)
One (1) stair set with 152" x 4?'platform
... $ 7,350.00(salestax not included)
Adder: Upgrade to walk-in Enclosure
$ 1,350.00(salestax not included)
ilhmi
NW68Strost
0205
F[3166
Miami,
36.592.4944
tsl
far
&5.477.19'63
hrt lrudeflhlo
Boad
84
2501
State
tL3331
Ft.buderdale,
2
tsl
954.797.73T1
fax
ll!1791.7719
l{est Polmleacft
Boulevard
51600keedobes
Ft3341
Bsach,
7
WestPalm
hl
561.840.0818
hx
56t.M.7894
$!rn
?2 N.flaglerAventn
Sturrt,t[ 34994
n2.692.3442161
nzffilgl'7 tax
hrtMpr
SocKill
Ro€d
2471
FrtMwrs,tt33916
El
239.337-422
fax
49.337.i1211
Pantropic
Power,lnc"
^ oNE
SowTnfl',"
fJ.LL-oNE
oEES0UaCE
W,r,|\,.patltr00iC.Com
Adder: Increasetank to have a 6 day runtime @ 75Voload
$ 5,250.00(salestax not included)
4-20MA Magnetostrictive Probe to provide fuel level to Scada
.... $ 1560.00(salestax not included)
Fuel level monitor with 4-20MA output
Provides digital fuel level display
Low - low, low, high, high-high, and leak alarms
$ 6,000.00(salestax not included)
llhmi
82lEl{W58Suoet
FLi|3166
Miami.
tel
S5.592.4944
fax
305.477-1943
hnhudsrhle
84
2501StateBoad
FL3331
2
Ft.buderdale.
tel
954.197.7972
954.791
J7l9fax
Wb3t
PrlmBsrsft
Boulevard
0keechobee
5160
7
F[3311
West
Palm
Beach,
bl
561.640,mr8
fax
56.|.64t).7894
Slud
272N.FlaglsAwrue
StudtR 34994
nLN2. 42tel
tex
t2.m2.9i57
hrttdlcn
Rosd
2471
tuckfill
n 93910
tonlvlyors.
233.&37.422
bl
239.il17.42t
I fax
'll'erracon
M a r c h3 0 , 2 0 1 5
Globaltech,lnc.
6001 BrokenSound ParkwaYNW
Boca Raton,FL 33487
Attn: DavidSchuman
9976433
Phone:561
Email:dschuman@globaltechdb.com
Re:
EngineeringServices
ProposalforGeotechnical
support
Plant(wwTP) Generator
Treatment
BelleGladewastewater
2055W. CanalStreetSouth
BelleGlade,Florida
No.PHD150113
Proposal
DearMr.Schuman:
TerraconConsultants,lnc. (Terracon)appreciatesthe opportunityto submitthis proposalto
project'The purposeof the
servicesfor the above-referenced
engineering
providegeotechnical
serviceswill be to evaluatethe subsurfaceconditionsat the site and to providegeotechnical
relatedto the design and constructionof the project. This
engineeringrecommendations
of the pioject,and providesa scope of servicesand
proposaloulines our understanding
for our servicesis alsodescribedherein.
schedulefor thework.Compensation
A.
INFORMATION
PROJECT
concreteslabis plannedat the BelleGladeWWTP. We
that a newgenerator
We understand
assumethe loadson theslabimposedby the generatorwill be relativelylight'
B.
SCOPEOF SERVICES
EVALUATION
GEOTECHNICAL
EngineeringEvaluationto be providedby Terraconare
The servicesfor the Geotechnicat
paragraphs.
in thefollowing
summarized
programto evaluatethe
Field proqram- We proposethe followingfield testing/exploration
at the projectsite.
conditions
subsurface
r.
Underground
and contactthe Sunshine
Visitthe projectsite,fieldmarkboringlocations,
UtilitYClearancenetwork.
lnc. 1225OnarRoad,WestPalmBeach,Florida
Consultants,
Terracon
P 561.689.42sg F 561.6s9'5955 http://www.dunkelberger-engineering'com/
Proposal,GeotechnicalEngineeringServices
Slab n BelleGlade.Florida
BelleGladeWWTPGenerator
March30,2015u Proposal
No.PHD150113
Iterracon
Once.underground
utilityclearance
is.obtained,
mobilizea truckmounteddrillingrig and
drill two StandardPenetrationTest (SPT) boringsat (or near) the locationof the
proposedconcreteslab. The boringswill be drilledto 30 feet belowgradeusingmud
rotarymethods. Samplesof the subsufacematerialswill be obtainedat frequent
procedures
verticalintervals
in accordancewith
outlinedin ASTMD 1586(theStandard
Penetration
Test). Oncethe sampleshavebeencollectedand classifiedin the field,they
willbe placedin appropriate
samplecontainers
for transport
to our laboratory.
Subsurfaceconditionsmay be encountered
which merit alterationsof the field boringand/or
samplingprogramsdescribedherein. However,we will not performadditionalscopeor incur
additional
expensewithoutyourauthorization.
Testing- The samplesobtainedfromthe boringswill be returnedto our laboratory
Laboratory
for visualclassification
by a geotechnical
engineer.Limitedlaboratory
testing(suchas moisture
contentand organicconlenttesting)will be peformedas neededto aid in soils classification
of the subsurface
materials.
and assessment
Analvsisand Reoort- The resultsof ourfieldworkwill be evaluated
Geotechnical
Enqineering
geotechnical
(by a professional
engineerlicensedin the Stateof Florida)in lightof the proposed
an engineering
reportwill be preparedthat
construction.Basedon the resultsof our evaluation,
detailsthe resultsof the testingperformed,provideslogs of the borings,and geotechnical
criteriafor designof the project.Thereportwillincludeallowable
engineering
axialcompressive
piles.
for helicalpilesandaugercast
capacities
SCHEDULE
We can commencethe workafterreceiptof authorization
to proceed.Thiswill beginwith field
and clearingthe locations
for buriedutilities.Oncethe
markingthe proposedboringlocations
to the siteto beginthefieldwork(withinaboutone
arecleared,
we will mobilize
boringlocations
week of receivingthe signedAgreementfor Services). We expectthe field explorationwill
reportcan be
requireone day, if the weatherconditionspermit. We estimatethe geotechnical
submittedwithinabouttwo weeksafterthefieldworkis completed.
c.
GOMPENSATION
We proposeto do the workfor a fixedfee of $5,500.00.Thisfee will not be exceededwithout
Shouldadditional
workbe neededbeyondthe
due causeandyourpriorwrittenauthorization.
agreement.
scopedescribedherein,thatworkwill be coveredby supplemental
Flesponsiveu Resourcefulll R.eliable
EngineeringSenrices
Proposal,Geotechnical
BelleGladeWWTPGenerator
Slab 'i BelleGlade,Florida
March30,2015wProposal
No.PHD150113
D.
Tl'ernacon
AUTHORIZATIOt{
We understand
that the work will be authorized
with a Task Orderissuedunderan existing
Subcontract
AgreementbetweenDunkelberger
Engineering
& Testing,A TenaconCompany
and Globaltech,
Inc.datedNovember12,2014. The fee is validfor 90 daysfromthe dateof
this proposaland is basedon the assumption
that all fieldserviceswill be performedunder
safety Level D personalprotectiveprocedures.The fee is based on the assumptionsand
provided
conditions
at thetimeof thisproposal.
We appreciate
the opportunity
to providethis proposaland lookforuardto workingwith you on
project.
you
questions
this
lf
haveany
or comments
regarding
thisproposal
or requireadditional
pleasegiveme a call.
seruices,
Sincerely,
TerraconConsultants,Inc.
A
4 //
a./
JaimeVelez,P.E.
SeniorProjectEngineer
r Reliable
ResponsivemResounceful
'tr:'r/ (/,,,*=,
DanielJ.Marieni,
P.E.
ProjectEngineer
If{ G, INE.
E'Af
G/A/F'FR
WORCESTE'R
STRUCTT]RAI. EI'{GII\-EERING
e-mail jbw@jbw-engr.com
I 500SouthMountainRoad
Dillsburg,PA, 17019
717-432-9436
voice
Apil20,2015
ProjectNo.
20rs-020
Globaltech,Inc.
6001BrokenSoundParkway
Suite610
BocaRaton.FL33487
Attention:
Subject:
Mr. David Schuman,PE
Fort PierceUtility Authority
Belle GladeWWTP GeneratorReplacement
DearMr. Schuman:
WorcesterEngineering,Inc. to providestructuralengineering
Tha* you for considering
servicesfor this project.I look forwardto continuingour long relationship.
SCOPEOB PROF'ESSIONALSERVICES:
we will beprovidinga designfor a new
ProposedStructure:Basedon our conversations,
generatorslabto be constructed
on pilings,filling and/orcreatingnewwall penetrations
in an existingstructure,providing supportfor new IIVAC equipment,andaddressingfire
ratings,asrequiredto obtaina buildingpermit.
for your projectto
Documents:
We proposea setof structuraldocuments
Construction
project,
plansanddetails,as
pertarnto
this
as
they
consistof our GeneralStructuralNotes
requiredto obtaina buildingpermit.Globaltechwill preparea baseplan andWorcester
Engineeringwill providethe structuralinformation.
Reviewof submittedstructuralshopdrawingsand
ServicesDwing Construction:
for lnformationor Clarificationwill beprovidedin a
to writtenRequests
responses
areincludedin thisproposal,butmay
or observations
timely manner.No siteinspections
in writing by Owneror Architect,to be billedhourly
be providedif specificallyrequested
with the attachedschedule.It is understoodandexpectedthat all submittals
in accordance
to WorcesterEngineeringshallcometfuoughtheArchitect.
COMPENSATION
Payment:Forthe abovescopeof services,we requesta total fee of $4000for structural
anddrawings,payableuponcompletionof our Permit
consultation
engineering,
Drawings.
z
suchasplotting,printinganddeliveryservicesshallbebilled in
expenses
Reimbursable
or per vendorsinvoices.Plotting,printingand
with the enclosedschedule,
accordance
DocumentphaseandPermitting
during
Construction
design
coordination
deliveryfor
by anyparty
All plots,printinganddeliveryrequiredtherea.fter
shallnotbe reimbursable.
perthe attachedschedule.
shallbereimbursable
dateabove.
This proposalshallbe valid for 90 calendardaysfrom the submission
causefor
at
a
time
be
30
days
shall
progress
for
more
than
in work in
Stoppages
of the Contract,with a minimumincreaseof 70%of the designfee.
renegotiation
Permits: It will be the Owner/Developer'sresponsibilityto pursuebuildingpermitsand
asrequiredby Stateor otherjurisdiction.Failwe of the
obtainall inspections
ajustifiable
to pursueandobtainthebuildingpermitis not considered
Owner/Developer
of thedesignfees.
causefor nonpayment
Paymentis duewithin 30
Invoiceswill beprovidedat the completionof milestones.
a
for morethan90 daysmaybe assessed
calendardays,andpaymentsoutstanding
financechargeof 75% on theunpaidbalance.
Ratestor 2015
ForensicEngineering$'100.00/hour
Engineering
$85.00/hour
Drafting
$50.00/hour
Office
$40.00/hour
Printing
Plotting
Mileage
$3.00/Sheet
$10.00/Sheet
$0.35/mile
TERMS AI\D CONDITIONS
WorcesterEngineering'sContract is with the architectof record,assignedbelow.Due
this contractandits termsandconditions,or your firm's
requirements,
to insurance
this proposal,mustbe signedandreturnedto us
referencing
fomr
standardAIA contract
on this project.Engineersfaiiureto enforceanyportionof
beforework cancommence
this proposaldoesnot constitutea waiverof otherrightshereunder.
Substitutions:Uponrequestby the Client,the Consultantshallevaluateandmake
of materials,productsor equipmentproposed
regardingsubstitutions
recommendations
for these
The Consultantshallbe compensated
or contractors.
by the Client'sconsultants
the
construction
and
coordinate
services,aswell asanyservicesrequiredto modiff
asadditional
preparedby the consultantwith thoseof the client'sconsultants,
documents
caused
by this
in
an
adjustment
schedule
to
be
entitled
services.The Consultantalsoshall
additionaleffort..
nor thepresence
of the
activitiesof the consultant,
Job site:Neithertheprofessional
duties
and
job
its
obligations,
Contractor
of
the
General
relieve
shall
at
a
site,
consultant
sequence,
means,methods,
including,but not limitedto, construction
responsibilities
andcoordinatingthe
necessary
for performing,superintending
or procedures
techniques
J
Work in accordance
andanyhealthor safetyprecautions
with the contractdocuments
requiredby anyregulatoryagency.
Instrumentsof Service: All reports,drawings,specifications,
computerfiles, field dat4
notesandotherdocumentsandinstrumentspreparedby the Consultantasinstrumentsof
serviceshallremainingthe propertyof the Consultant.The consultantshallretainall
commonlaw, statutoryandotherreservedrights.
professional
ProfessionalLiability: WorcesterEngineering's
liability shallbe limitedto
the designfeefor theprojector $50,000.00
which everis greater.
Termination: In the eventof terminationof this agreement
by eitherpffity,the Client
(15)
shallwithin fifteen
calendardaysof terminationpaythe Consultantfor services
costsincurredby the Consultantup to the dateof the
renderedandall reimbursable
termination,in accordance
with thepaymentprovisionsof this Agreement.The Client
may terminatethis agreementfor the Client's convenienceandwithout causeupongiving
the Consultant
not lessthanseven(7) calendardayswrittennotice.TheEngineermay
terminatethe agreementwith seven(7) calendardayswritten noticefor any of the
followingreasons:
Substantialfailure of the otherparty to perforrnin accordance
with the
termsof this agreementandthroughno fault of the terminatingparty.
Assignmentof this agreement
or transferof the Projectby eitherpartyto
any otherentity without theprior written consentof eitherparfy
Suspension
of theprojector the Consultants
servicesby the Clientfor
morethanninety(90)calendardays,consecutive
or in the aggregate.
Material changesin the conditionsunderwhich this Agreementwas
enteredinto,the Scopeof Servicesor thenatureof theproject,andfailure
of thepartiesto reachagreement
on the compensation
andschedule
adjustrnents
necessitated
by suchchanges.
Acceptance:Returnof this proposal,signedanddated,by fax or e-mail,shallserveas
our authorizationtoproceed.In lieu of anyotherwrittenandsignedagreement,
services,consultation,
and/ or stucturaldrawingsfor this
acceptance
of engineering
projectshallbe construedasacceptance
of thisproposalasthe corrtmctand
beheld
binding.We look forwardto workingwith you andyour staffon this excitingproject.If
you haveanyquestions,
pleasedo not hesitateto call.
RespectfirliySubmitted,
JosephB. WorcesterPE
President
FL Prof.Reg.No. 35308
For Globaltech,lnc.
Date
Engineering
March3l,2Al5
Dave Schuman
GlobalTectuINC
1075BrokenSoundPkwy.NW, Suite103
BocaRaton,FL 33487
Belle GladeWWTF AlternativePowerImprovements
QA/QC
DearDave:
Inc. (ADS) is pleasedto provideGlobaltech
Pursuantto your request,ADS Engineering,
for electricaldesignfor the abovereferenced
(GT), Inc. a proposalfor the QA/QC assistance
project.Our scopeofwork consistsof the following:
project,whichis a design/build
o
o
o
o
Onesitevisits(8 hours)
duringelectricaldesign
Assistance
The QA/QC for electricaldrawingsfor aboveproject
Overseeingandprovidingthe guidancefor electricalengineerin record.
Our Total Lump Sum is 5'000.00
Note: We will checkthe submittedwork andgve our inputsto the bestof our knowledge
for signingand
andinformationprovidedfrom GT. ADS Engineeringis not responsible
sealingthe drawingsnor hasanyother liability for this project.
Sincerely,
AIex Stojanovic
BodaxFoundations, Inc.
11oI NW 55rHstreet
Ft.Lauderdale,FL 33309
954-77I-7888Fax 954-77l-8908
Telephone
Awger Cast Piles - Helical Piles - Pin Piles
June23,2015
Globaltech,Inc.
7075 Broken Sound Boulevard, N.l4/. #103
Boca Raton, Florida 33487
Contact:
David Schuman
Phone:
s61-997-6433
Project: Belle Glade WIryTP
2p55 tYestCanalStreetSouth
Belle Glade
Fax: 561-997-5811
dschuman@gIobaltechdb,com
Specifications (please initial)
and estimatesfortheinstallationof 15Aager CastPiles,asspecified,
W, herebysubmitspecifications
location
mentioned
at theabove
o Pilesare to be14 inch in diameter,20ft. in lengthandreinforcedwiththefollowing:
\
4 #5w/#3 ties@8" O.C.fuA
o Pile steelinstalledasstraightbars,field bentby others
o Groutis to be4000 PSL
.
for mobilization(providedby others)(pleuseinitiaQ
Site Conditions-necessarv
.
.
o
o
o
Afirm, dry and level sitefor our equipmentand concretettuclcs
Engineering layout; including pile locations and elevation calculations.
Outlet supplying city water with a %" hose bib within 100ft. of our drill rig
Locatian,protection, remoyal or replacementof undergrotmdor overheadobstructionsincluding
utilities, buildings, lighting, sprinklers, etc.
Protection, repair or replacement of adjacent structures and work sites including buildings, trees
shrubs, lswns and driveways.
Included-(pleaseiniliuA
o
o
o
o
Onemobilization.
Installationof piles, all labor and materials
Pile elevationswitt be clippedto the desiredlevel if working grade is at + / - 6 inchesfrom top of pile.
Drilling refusalwiII bedefinedas lessthanonefoot ofpenetrationovera period of oneminute(Deep
F oundationInstitute).
Workers Compensation and General Liability Insurance'
Chansesin BaseBid (pleaseinitiul)
Additional piles require a te-bid ot change order.
Inspection and logging of piles, and certification by a Florida Registered Engineer.
For eachpile with grout in excessof 1.5 times the theoreticalpile volume add $ 225.00per yard'
For piles longer than bid length add 528.88per linealfoot'
Standbytime will be invoiced at $400.00per hour.
For piles not installed during initial mobilization, deduct 5303.00each.
Pile elevations in excessof +/- 6 inchesfrom working grade, an additional per pile charge to cut or chip
thepile witl be incurred. This price excludes excavation, marking of cut-off point and renzoval of pile
debris.
c Removalor hauling of gtout spoils.
o Sonotube,cosingsor steel sleeves
1 Of
INC 2055WESTCANALSTREETSOUTHBELLEGLADE15ACPA TE 'dOCPAgC
23,2OI5GLOBALTECH
JUNE
PriNtEd
2
o
o
.
t
.
.
o
Preparedby Rich Burnes BuseBid Amount $15,000.00
Predicatedon mobilerig uccessund installation. Engineering cettification is
excluded,provided by others. Budget bid needpile pluns'
Pavmentsund tpaditigns
t
Depositpcrymentof $1,082.00
for matetialsis requiredwitlt signedcontruct.Depositis nonrefrmdable.
Paymentsnot received
No retainagewillbe withheldanclfinalpaymentis dueuponcompletion.
within thetermsdescribedaboveshall accrueinterestat 1.75%per month (ANNUAL
MTE IS 21%o)
PERCENTAGE
Engineeringlogsare available5 to 7 daysafter completionof pile installation. EngineeringLogs
yl,::!,::;:;::::"Y:",0,y#:;';*h*",t
($400.00),
tienfees
incruding,
ornon-pavment,
for all legalactionsshall
reasoiableattorney'sfeesand coit,shaltbepaid by thecustomer.Venue
Iie exclusivelyin Broward County,Florida'
Thisproposal is subjectto acceptancewithin 10 daysand can bemodffiedor voidedthereafterat the
option of Bodm Fotmdations,Inc.
iacsimile of this contractshall bedeemedavalid counterpartof theoriginal'
AuthorizedSignature:BUDGETONLY
Title:
Date:
Accepted by:
BUDGETONLY
Title:
Date:
pleasesign and initial and return byfax both sheetsof the executedcontract,
in our office,we will proceedwith scheduling,
once rec,eived
Thank You.
15ACPA TE
printed 6tl3tl0t5 3:53:00PMGLOBALTECHINC 2055WESTCANAI STREETSOUTHBELLE GLADE
2
of
Page2
.doc