NO. 02 WORKAUTHORIZATION Attachment2 Palm BeachCountyWater UtilitiesDepartment Optimizationand lmprovemenbDesign'BuildContract ProjectNo.:WUD14-050 District BudgetLineltemNo.:@ ProjectTitle: Power lmprovementsPhaseI and lmprovements THISAUTHORIZATION Ng-q?_ to the Contractfor Optimization (n by and ZOtS-OgtS,J, Servicetda Design-Build Entityidentifiedherein,is for the betweenpalm BeachCountyanOtne Design-Build Entityprovidesfor The Design-Build Servicesof thisWorkAuthorization. Design/Build 75% SBE participationoverall.This Work {uthorizationincludes 95.74, 7o overall is this authorization including proposedSBEparticipation, participatioi-t. ff," cumulative ' stated the or exceed g6.57 yooverall.Additionalauthorizations will be utilizedto meet goal. overallparticipation Inc' Entity:Globaltech, 1. Design-Build 2. Address:6001BrokenSoundParkwayNW,Suite610,BocaRaton,FL33487 Entity: of Services(Scopeof Work)to be providedby the Design-Build 3. Description - A' SeeATTACHMENT Entityto date: by the Design-Build 4. Servicescompleted - G. SeeATTACHMENT withinthe Entityshallbeginworkpromptlyor deliverorderedmaterials S. Design-Build folloriingcalendaidays from the receiptof BuildingPermitand Noticeto Proceed with construction: CalendarDays Completion 330 Substantial Completion 360 CalendarDays FinalConstruction damageswillapplyas follows: Liquidated date' completion $-1.00q- perday pastsubstantial date.past completion final $ 500 perday - B) RatesseeATTACHMENT Damages tiquiOated tfor the requested Entityfor providing to be paidto the Design-Build 6. The compensation MaximumPriceis $198.998.02 withthe Guaranteed servicesin accordance CONditiONS IETMS, 7. EXCEPTAS HEREBYAMENDED,CHANGEDOR MODIFIED,AIIOthCT and effect. force full in remain 2015 10, March dated Contract and obligationsof the NO. 02 WORKAUTHORIZATION ProjectNo.:WUDf 4-050 ProjectTitle: WesternReqionWasteWaterTreatmentFacilitv(WRWWTF)Power lmprovementsPhase1 lN WITNESS WHEREOF, this Authorizationis accepted,subject to the terms, conditionsand Contract. obligationsof the aforementioned PALM BEACHCOUNTY,A POLITICALSUBDIVISIONOF THE STATEOF FLORIDA SharonR. Bock,Clerk& ComPtroller, PalmBeachCounty PalmBeachCounty Boardof CountyCommissioners ATTEST: Signed: Signed: ShelleyVana,Mayor TypedName: DeputyGlerk Approvedas to FormandLegal Sufficiency Signed: TypedName: CountyAttorney Inc. CONTMCTOR:Globaltech, ATTEST: Manaqer Thomas.Accounting Rebecca (NameandTitle) P.E./ Secretarv DavidA. Schuman. (NameandTitle) (coRPoMTE SEAL) J u l v2 0 . 2 0 1 5 Date Globalt€ch A D E S I G N- B U I L D ' C O M P A N Y Engineers. Contractors 6001BrokenSoundPkwyNW,Suite610 BocaRaton,Florida33487 Phone:(561)997-6433; Fax:(56L)997-5811 'CGC1507203 E80007225 July27,2015 MauriceTobon,P.E. Directorof Engineering PalmBeachCountyWaterUtilitiesDepartment 8100ForestHillBoulevard WestPalmBeach,FL33413 Contract- ContractAuthorization Subject:2015Design-Build DearMr. Tobon: Globaltech's is authorizedto CorporateSecretary, Thisletteristo certifythat DavidSchuman, Inc. Thereis or contractswith PalmBeachCountyon the behalfof Globaltech, signagreements signature. no dollarlimit attachedto hisauthorization this issue. Pleasecontactus shouldyou havequestionsregarding Regards, .4n17 <\x \TroyL. Lyn,P.E. VicePresident CC:PaulGandy/Globaltech LISTOF ATTACHMENTS NO. 02 WORKAUTHORIZATION PalmBeachCountyWaterUtilitiesDepartment Optimizationand lmprovementsDesign-BuildContract ATTACHMENT- A Scopeof Work& Compensation B ATTACHMENT. Damages Ratefor Liquidated ATTACHMENT- C Bond PublicConstruction .D ATTACHMENT Formof Guarantee -E ATTACHMENT Scheduleof Bid ltems WorkAuthorization .F ATTACHMENT 2 1 & Schedule SBESchedule ATTACHMENT- G StatusReport- Summary& Statusof Authorization Authorizations ATTACHMENT- H StatusReport- Summaryof Authorization Tracking Business SBE/Minority .I ATTACHMENT LocationMap .J ATTACHMENT CriteriaRePort Design-Build .K ATTACHMENT VendorQuotes .A ATTACHMENT NO. 02 WORKAUTHORIZATION Palm BeachCounty Water Utilities Department Optimizationand lmprovementsDesign-BuildGontract SCOPEOF WORK FOR WesternRegionWasteWater TreatmentFacility (WRWWTF) PowerlmprovementsPhase1 INTRODUCTION Palm Beach County (County)entered into an agreemententitledOptimizationand with ContractProjectNo. WUD 14-071- (CONTRACT) Design-Build tmprovements various provide services for design-build Entity) to (Design-Build Globaltech.lnc. Contractdated Design-Build and lmprovements generalactivitieson the Optimization performed under will be Authorization This Work (R 2015-0315 March10. 2015, ). that CONTRACT. with this projectwill be To meetthe County'sfundingschedule,the work associated as beingin Phase1 will be performed dividedintotwo phases.Workitemsdesignated as beingin Phase2 will be items designated underthis Work Authorization.Work performedundera futureWorkSupplement. The work associatedwith Phase 1 of this projectincludethe followingtasks at the : Western Region Wastewater Treatment FaciIity (WR\lr/WTF) . of auger-casttype pilingsto supportnew generatorslab southeastof Installation of new reinforcedconcretegenerator generator buitdingand construction existing slab. o Furnishand installnew 500 kW dieselgeneratorwith 4512 gal sub-basefuel windloadratings. withapplicable walkaroundenclosure tank,andaluminum Furnish new Main Switchboard(MSB), Automatic Transfer Switch (ATS), of air conditioner.Installation and mini-split instrumentation equipment, electrical theseitemswill be performedundera futurePhase2 of this project. The work associatedwith this projectbut will be performedunder a future Phase2 tasks: includethe following Removalof existing300 kW dieselgeneratorand abovegroundfuel tank,Phase 2. Removalof louversand ventsfrom existinggeneratorbuilding,enclosingand insulationand/or sealingall openingsin exteriorwall and roof with appropriate material.Sealand insulategapsbetweenwallsand ceiling,and installmini-split air conditioner. (MSB)and AutomaticTransferSwitch of the new MainSwitchboard lnstallation andexistingequipment. (ATS)connecting FP&L,newGenerator, includingremotegeneratorstatusmonitoringon existingPlant Programming, SCADAsystem. . Installationof new cablingand conduitto connectnew Generatorto new ATS . Removal of existing 350 MCM wiring to aerator blower starter cabinets. Installationof new three phase wiring to individual aerator blower starter cabinets. SCOPEOF SERVICES Entityshallperformthe Scopeof Servicesdescribedin the DesignBuild Design-Build Criteria for Western Region Waste Water Treatment Facility (WRVVWTHPower JulY2015). Improvemenfs(PBCWUD, of the new requirements whileintegrating In an effortshowhow pricingwas developed Entityhas provideda singleline diqqlal as the design the County,the Design-Build concept.the titteoithis singlelinediagramis "SINGLELINEDIAGRAM- BELLE - 06.15-2015'' ANdiS GLADEWWTF- ALTERNATIVEPOWERIMPROVEMENTS CriteriaReport. locatedin the Design-Build neededto achievethe the overallmodifications The belowscopeof work represents morerecentneedsof the CountY. Entitygenerallyincludes The proposedwork to be performedby the Design-Build and servicesrequiredto tools,supervision, materials, furnishingall labor,equipment, as follows: generally described workis test,andstartupthe proposed design,c-onstruct, and othermodifications electricalequipment, Furnishand installnew generator, to improveUtilitYServiceNo.1. (Phase1): Thefollowingis the scopeof servicesfor thisWorkAuthorization Services and Engineering Task1 - Administrative 1 . Meetwiththe Countyto reviewprojectscope' utility engineers, geotechnical andelectrical withstructural, 2 . Developsubcontracis andotherentitiesas maybe required' contractor locator,andelectrical performsoil boringsand developa support subcontractor, 3. Utilizea geotechnical piles. piledesign.Thisproposalis basedon usingauger-cast (60%)design. 4. Preparea preliminary (5) copiesof the 60% designto the County.Meetwith the half-iize five Submit 5. Countyto reviewthe design. 6. Incorporatethe County commentsand proceedto final design stage in acroidancewiththe PBCWUDWaterUtilitiesMinimumDesignand Construction requirement. andsecurity Design-Manual Engineering Standards, and building Department Health County 7. Subm1,DERM,FDEP/PalmBeach permitapplications. department engrneenng scheduleto includeas a mrnrmum; 8 . Preparedetailedconstruction and permittingservices,site mobilization,detailed constructionactivities, deliverytimes,testing, scheduledshutdownsand durations,equipmenVmaterial startupandcommissioning. 9 . Prepare submittals(or confirmationof compliancewith County design andtracksubmittalprocess. administer standards), andtestingwithCountystaff. inspections, 10.Schedulemeetings, is being to confirmconstruction construction visits during site 11.ProvideEngineer's and Specifications. withthe DesignDrawings performed in conformance Drawings. 12.PrepareRecord Services Task2 - Construction of a new500kW dieselgenerator: 1. Installation of the GeneratorNo. 1 pilingswill be installedsouth-west a. Newauger-cast Buildingfor the newgenerator Pad concretepad will be formedand pouredto supportthe b. A new reinforced tank,andhousing. newdieselgenerator, withsub-basefueltank. c. Furnishandinstalla new500 kW dieselgenerator i. Generatorfuel tank will have a capacityof 4512 gallons,or capacityto supply50% ratedstandbypowerfor 10 days at a usagerateof 18.8gph. ii. Generatorwill have an aluminumenclosureattachedwhich providesenoughroomto walkaroundand performmaintenance on the generator. batterycharger. d. Furnishandinstallnewgenerator e. Providenecessarygroundingsystemaroundnew generator,generator room. pad,andelectrical 2. Furnish (for Phase 2 installation)equipmentfor modificationsto existing No.1 building: Generator on the exteriorof A/C unitfor Phase2 installation A new3.0 ton mini-split unitand wall mountedinterior the buildingwithfloormountedcompressor fan/evaporator. b. Lightningprotectionsystem for GeneratorNo. 1 Buildingand new generator enclosure Powerfor equiPment: 3. Temporary a,. Ouiingtransitionwhen temporarypoweris requiredto run equipment, Entitywill facilitatethe connectionof temporarypowerto Desigh-Build equipment.Temporarypowerwill be providedby the Coulty via mobile Entitywill coordinatewith Plant,County, generators.The Design-Build powerwillbe needed. whentemporary ind relevantpersonnel (MSB-1),automatic transferswitch,and otherelectrical 4. Furnishnewswitchboard (forPhase2 installation): equipment with integrallybussedautomatictransferswitch a. Furnishnewswitchboard to have in GeneratorNo. 1 Building.Switchboard for Phase2 installation layoutand breakersizesas shownin SINGLELINEDIAGRAM- BELLE _ 06.15GLADEWWTF- ALTERNATIVEPOWERIMPROVEMENTS 2015. b. Furnish new 50 kVA transformer,200A lighting panel, and SS for A/C. disconnect(s) and malecordcap for centrifuge c. Furnishnew2004 generatorreceptacle plug. generator generatorreceptacle. for centrifuge d. Furnishnew2004SS disconnect conduitandcablingsystem: 5. Furnish(forPhase2 installation) one(1)2'PVC conduitfor to Manhole#5, No.1 Building a. FromGenerator FiberOptic(FO)cable. to PLCcabinetat MCC1 in No.1 Building b. 6-pairFO cablefromGenerator Building. MainOperations c. Four inch (4') PVC conduitbetweennew 500 kW generatorand new MSB-1 d. Two (2) sets of 4-wire500 MCMwiringbetweennew 500 kW generator andATS locatedat newMSB-1 e. New conduit,wiring,and junctionbox,to connectexistingwiringfeeding equipment,and new MSB-1equipmentbreakers.Actualwire size and on the stateof existingwiring,actualMSB-1 are conditional connections withNEC. andall in accordance breakersto be installed, f. New#3/0wiringto fromnewMSBto eachdigesterblowerstartercabinet. g. New stainlesssteel NEMA 4X junctionbox to marshalnew wiringto digesterblowers. and receptacle h. Furnishand installconduitand cablingto new centrifuge, disconnect. i. Furnishand installconduitand cablingto GeneratorNo. 1 Building loads. newA,/C,andancillary lighting, j Furnishandinstallnewfeedersfromthe newMSB-1to the FPLvault controlequipment: 6. Furnish(forPhase2 installation) a. FurnishMicrologix1400 based PLC, llo, power supply,and media converterin UL 508 panel for interfacebetweenPlant SCADA and generator, ATS,andswitchboard. monitorfor remoteGeneratorNo. 1 Building b. Furnisha roomtemperature statuson plantSCADA. temperature Permitsand Fees to secureall permitsrequiredto Entity'sresponsibility It shall be the Design-Build permits obtainedby the County.The except contract, work under this the complete to closeand requirements for all inspections Entityshallbe responsible Design-Build out the completedpermits.The Countyshallpay all permitfees. The Design-Build for all Businesstax fees for work withinthe countyor Entityshall be responsible Municipalities. SALVAGEDMATERIALS Entity. 1. Scrapmetalto be disposedof by the Design-Build etc.,to be hauledand legally wastesuchas concrete,PVC,fiberglass 2. Non-metal EntitY. disposedby Design-Build ASSUMPTIONS 1. Countywill makeavailableall existingrecorddrawingsas may be requiredto thisscopeof services. andcomplete coordinate withinonecalendarweek andprovidecomments 2 . Countywill reviewall submittals Entityof status. and notifyDesign-Build POWER 3 . SINGLELINE DIAGRAM- BELLEGLADEWWTF- ALTERNATIVE - 06-15-2015is providedmerelyas a referencefor how fMPROVEMENTS drawing, as an engineered pricingwas developed.This is not to be referenced and is subjectto change. 4 . Unlessotherwisenoted,existingwiring,conduits,and ductbankare assumedto of damaged withremediation be in goodcondition.Timeandmaterialassociated scope. out of or ductbankwhichmayimpedeworkare wiring,conduits, vaultareaare to the FPLtransformer 5 . Otherthan newfeeders,no modifications included. of anyexistingutilitiesis out of scope. stated,relocation 6 . Unlessspecifically is required. contamination for anypetroleum 7 . No remediation B . Liquidateddamagesmay be assessedat a rate of $1,000 per day up to untilFinal Completion and $500per day from Substantial completion Substantial Completion. 9. Countyshallprovide: . lP Addresses whererequired . Modbusregisteraddresses whererequired COMPENSATION Maximum shallnot exceedthe Guaranteed for this WorkAuthorization Compensation for Contract prices in the established with the unit in accordance Priceof $598.998.02 servicesdated March 10, 2015, as approvedby the Boardof County construction Commissioners. SBE/M.WBEPARTICIPATION participation is includedin SBE/M-WBE in the Contract(R 2015-0315), As described 1 definesthe Schedule ATTACHMENTF underthis Authorization.The attached and Schedule2 establishesthe SBE/M-WBEappliedto this Authorization/Contract (Letter of Intentto performas an subcontractor from each SBE/M-WBEcontribution sBE/M-WBE). -".:::i,,'ff11^,"",, PalmBeachCountyWaterUtilitiesDepartment Optimizationand lmprovementsDesign-BuildGontract Ratesfor LiquidatedDamages damagesrates shallestablishliquidated PalmBeachCountyWaterUtilitiesDepartment of the project. basedon thedollaramountandtimesensitivity foreachWorkAuthorization ratingof 1 through3 assignedto to a criticality The ratesshallbe as followsaccording below: as established by the Department eachWorkAuthorization Damages ModeratelylmportantProject(Griticality2): Liquidated Date Completion $1,000perdayafterSubstantial Date per Completion $500 dayafterFinal C ATTACHMENT. NIELSoN, RoSENHAUS & AssoqIATEs A NIELSONHOOVERGROUPCOMPANY ." July22,20ts ii1Globaltech, Inc. E 6001-BrokenSoundPkwy,Suite610 j BocaRaton,FL33487 = * RE: (n Z o ;:J i-) PalmBeachCounty,asObligee (WRWWTF)Power lmprovements Facility WasteWaterTreatment Project: WesternRegion Phase 1 BondNo.SU1129888 a U u J DearLadies andGentlemen: Z )* Please finalbond: for the abovecaptioned supplyuswith the followinginformation Z fl :; () X with Date: Contract Executed () OJ ft: U the authority and/or PalmBeachCounty,asObligee, Inc.as Principal Thisletteris alsogivingGlobaltech, () and Powerof Attorney a to completethesebondsby datingthe bondswith the contractdate,execution I to the The contractdate MAY BETHESAMEdate as the executionof the bond or PRIOR, executiondate of the bonds. z-" dates. (l V) a Z returnassoonas ontoyoursuretycompanyuponour receipt.Please We will forwardthisinformation ; = possible. U Lt-l u I) rhankyoufor yourcooperation. - sincerely, {) z 1: > () M L o Agent FLResident 7 l F u U) 8401 LakeWorth Road 5 u r t ez - 2 5| Lake Worth, FL 33467 P:561.713.1453 F:561.713.1455 tLw!r/' rrr!:rt)frtir)ll1l:/ ilrrr NTELSON, ROSENHAUS & ASSOSTATES A NIELSONHOOVERGROUPCOMPANY July22,2015 - 7 L L u, - Globaltech,lnc. NW 6001BrokenSoundParkway Suite610 BocaRaton,Fl33487 <s. l.l I <1. : <1. I Z a al ai Project:WestemRegionWasteWaterTreatmentFacilityWRWWTF)Powerlmprovements Phase1 Bond. lT NEEDS TOBE for you is knownas a PublicConstruction Theattachedbondwe haveexecuted ANDSEAIED. SIGNED U) r-_ l!l II _-l (,J 4 .Z and SinceOctober1, 1988the PublicWorksBondingLawrequiresthat the recordingof performance performed. Any is being wherethe publicconstruction paymentbondsbe filedat the localcourthouses suchbondwrittenpursuantto Section255.05FloridaStatutemustbe recordedbv the contractorand of the work. shouldbe filedbeforethe commencement .{ L :: o & Associates Nielson,Rosenhaus d) U u :, C) O 1: Z C,) Builders NoticeCorp. 708S.AndrewsAvenue P O Box457 FL 33302 Ft.Lauderdale (800) Ph: 432-19s9 tJ) !! Z ui I L! I u U a 2_ a (f 7. -!: () LI: ll- o Z _) F E -T. U) 8401 LakeWorth Road S u i t e2 - 2 3 1 LakeWorth, FL33467 P:561.713.1453 F: 56'1.713.1455 f . i J y J W .| 1 r . r t : i l ) T t t ) r : ] | r . t : i:rt rJt FRONTPAGEOF PUBLIC PAYMENT BOND FloridaStatute255.05 Attached to andpartof BONDNO.SU1129888 Work.AllotherBondpage(s) 255.05(1)(a),Public with Florida Chapter In Compliance Statutes (s) to thispageregardless of anynumber that maybe pre-printed aredeemedsubsequent thereon. CONTRACTOR: Inc. Globaltech, NW SoundParkway 6001Broken Suite610 BocaRaton,Fl33487 561-997-6433 SURETY: Archlnsurance Company 300PlazaThree JerseyCity,NJO73LL 20L-743-4000 AGENT: Nielson, Rosenhaus & Associates 8401LakeWorthRoad,Suite2-231 LakeWorth,tL33467 56L-7t3-L453 OBLIGEE: PalmBeach County 8100ForestHillBoulevard FL33413 WestPalmBeach, 561-493-6000 WestemRegionWasteWater TreatmentFacility(WRWWTF)Powerlmprovements PROJECT: Phase1 -C ATTA.CHMENT PUBLICCONSTRUCTION BOND B O N DN U M BE R : su1129888 BONDAMOUNT: $598,998.02 CONTRACT AMOUNT: $598,998.02 CONTRACTOR'S NAME: lnc. Globaltech, CONTRACTOR'S ADDRESS: 6001 BrokenSoundParkwayNW Suite610 BocaRaton,FL 33487 CONTRACTOR'S PHONE: (561)997-6433 SURETY COMPANY: Arch lnsuranceCompany SURETY'S ADDRESS: 300 PlazaThree JerseyCity,NJ 07311 OWNER'S NAME: PalmBeachCounty OWNER'S ADDRESS: 8100ForestHill Boulevard West PalmBeach,FL 33413 PHONE: OWNER'S (561)4e3-6000 DESCRIPTION OFWORK: Replacementof Westem RegionWasteWater TreatmentFacility's (WRWWTF)generator,includingconnectionto SCADAsystemwith PLC programming alongwith otherbuildingimprovements. COUNTY'SPROJECTNo: wuD 14-050, wA-2 PROJECTLOCATION: PBCWUDWRWWTF,2055WestCanalStreetSouth,BeileGlade,FL 33430(PCN00-37-43-1 9-00-000-3060) LEGALDESCRIPTION: PCN00-3743-19-00-000-3060 B O N D .l C Rev10-5-12 BOND PUBLICCONSTRUCTION This Bond is issuedin favor of the Countyconditionedon the full and faithfulperformance of the Contract. KNOWALL MENBY THESEPRESENTS:that Contractor and Surety,are heldand firmlybound unto PalmBeaehCountyBoardof CountyCommissioners 301 N. OliveAvenue WestPalmBeach,Florida33401 as Obligee,hereincalledCounty,for the use and benefitof claimantas hereinbelowdefined,in the amountof Dollars$598,998.02 Fivehundredninetyeightthousandninehundredninetyeightdollarsand two cents. theirheirs,personalrepresentatives, for the paymentwhereofPrincipaland Suretybindthemselves, successorsand assigns,jointlyand severatly,firmlyby thesepresents. executors,administrators, WHEREAS, with 2O-., enteredintoa contract dated Principalhasbywrittenagreement the Countyfor: ProjectName:WesternRegionWasteWater TreatmentFacilityWRWWTF) Phase1 Powerlmprovements ProjectNo.:WUD t4-050 ProjectDescription:Replacement of WRWWTFSgenerator,includingconnectionto programming alongwithotherbuildingimprovements. SCADAsystemwith PLC ProjectLocation:PBCWUDWRWWTF,2055WestCanalStreetSouth,BelleGlade, FL 33430(PCN 00-37-43-1 9-00-000-3060) preparedby: in accordancewith DesignCriteriaDrawingsand Specifications lnc. Nameof DesignFirm:Globaltech, Locationof Firm:6001 BrokenSoundParkwayNW,Ste.610,BocaRaton,FL 33487 Phone:(561)997-6433 Fax:(561)997-5811 which contractis by referencemadea part hereofin its entirety,and is hereinafterreferredto as the Contract. THE CONDITION OF THISBONDis that if Principal: 1. betweenPrincipaland Countyfor the design Performsthe mntractdated ,20-., and constructionof WUD 14-050,the contractbeingmadea part of this bond by reference,at the timesand in the mannerprescribedin the contract;and 2. Promptlymakes paymentsto all claimants,as defined in Section255.05, FloridaStatutes, or supplies,useddirectlyor indirectlyby Principalin the supplyingPrincipalwith labor,materials, prosecution of the work providedfor in the contract;and BOND.2C Rev 10-5-12 3 . PaysCountyall losses,damages(includingtiquidated damages),expenses,costs,and attorneys' fees,includingappellateproceedings, thatGountysustainsbecauseof a defaultby Principal under the contract;and 4 . Performsthe guaranteeof all workand materialsfurnishedunderthe contractfor the timespecified in the contract,thenthisbondis void;otherwiseit remainsin fullforce. Any changesin or underthe contractdocumentsand complianceor noncompliance with any formalitiesconnectedwith the contractor the changesdoes not affectSurety'sobligationunder this bondand Suretywaivesnoticeof such changes. 6. The amountof this bondshallbe reducedby and to the extentof any paymentor paymentsmade in goodfaith hereunder,inclusiveof the paymentby Suretyof constructionlienswhichmay be filed of recordagainstsaidimprovement, whetheror not claimfor the amountof suchlienbe presented underand againstthe bond. 7 . Principaland Suretyexpresslyacknowledgethat any and all provisionsrelatingto consequential, delayand liquidateddamagescontainedin the contractare expresslycoveredby and madea part of this Performance, Laborand MaterialPaymentBond. Principaland Suretyacknowledge that any such provisionslie withintheirobligations and withinthe policycoverage'sand limitations of this instrument. 8 . Section255.05, FloridaStatutes,as amended,togetherwith all notice and time provisions containedtherein,is incorporatedherein,by reference,in its entireg. Any action institutedby a claimantunder this bond for paymentmust be in accordancewith the noticeand time limitation provisionsin Section255.05(2),FloridaStatutes.This instrumentregardlessof its form, shall be construedand deemed a statutory bond issued in accordancewith Section 255.05, Florida Statutes. Anyactionbroughtunderthisinstrument jurisdiction shallbe broughtin thestatecourtof competent in PalmBeachCounty,FlorirCa and notelsewhere. Globaltech,Inc. Principal _[tbtccct ltorrrti Printname (Seal) (---"__ Printname Brf n6r.cl P Cf*c\y 0.q.'r,t-0,tk Title Attorney in fact Title B O N D .3 C Rev 10-5-12 lrll Atc 0000147097 manner and to the extent herein stated. Not valid for Mortgage, Note, Loan, Letter of Credit, Bank Deposit, Currency Rate, Interest Rateor Residential Value Guarantees. = .: =1 'n ir KnowAll PersonsBy ThesePresents: This authoritydoes not permitthe sameobligationto be splitinto two or more bondsIn orderto bringeachsuch bondwithinthe dollar forth herei!.,. m t of .. lu.thority:as€et =. =' rin The executionof such bonds, undqrtiSlhgg,fecoSnlzames and other surgp gbligatibrls purpudnceof these piqsents shall.be a= bindingupon the said CompanyaS fully' and amply to all intents and burposes,as if the same had been duly'executedand officein JerseyCity,NewJersey. by its regularlyelectedofficersat its principaladministrative acknowledged This Powerof Attorneyis signed,sealedand certifiedby facsimileunderand by authorityof the followingresolutionadoptedby the unanimousconsentof the Boardof Directorsof the Companyon September15,2011: tl or any SeniorVice President, VOTED,That the signatureof the Chahmanof thq eoirO, ttre President,or the ExecutiveVice Pre_sident, ==of the Sur*v @iness Division,qrl[4"i1 aphgirileg$ddslgnatedin writihg-iar€lqd.wi$.te€ecretary, and thdSignatup=of{he- ' . Secretary,'the by the Secretary,may be affixedby facsimileon any powerof attorneyor bond Ceatof the Compan/,add certiflcadons executedpursuantto the resolutionadoptedby the Boardof Directorson September15,2Af , and any such powerso executed, to which it is attached,shall continueto be valid and bindingupon the sealedand certifiedwith respectto any bond or undertaking il l , ' '' l,l,l i' li 'lltl "r, g_q.M!oo 1=_3= go.oos :=_ =l - : : : :: =':." ' ' -"' Page1 of 2 'll'll' ..i r"l L.' Printedin U.S.A. =- ==..: Atc 0000147097 In Testimony Whereof, the ComPanY has caused this lnstrument to be signed and lts corporate seal to be affixed by their authorized officers,this13hdayof March,2015. Arch InsuranceCompany AttestedandCertifled SS STATEOFPENNSYLVANIA SS COUNry OFPHILADELPHIA personallyknownto me to be the l, HelenSzafran,a Notarypublic,do herebycertifythat PatrickK. Nailsand DavidM. Finkelstein whose nar"" aie respectlvelyai Secretaryand ExecutiveVice Presidentof the Arch lnsuranceCompany' a beforeme "",n"-f"r"ons Corporition organizedand exis1ngunderthe laws of the Stateof Missouri,subscribedto the foregoinginstrument'appeared seal and this day in perlon and severallyicknowledgedthat they beingthereuntoduly authorizedsigned,sealedwith the corporate and the uses for acts and voluntary free their own as and of saiO corporation ait voluntary the free and as the said instrument delivered purposes thereinsetforth. r{EL8H S[yur I'ldffifi rNN;& r0oftlst My commissionexpires 10103120'17 CERTIFICATION 13. l, patrick K. Nails, Secretaryof the Arch lnsuranceCompany,do hereby certifythat the attachedPower of Attorneydated March jots on behalfof the p"oo'n(") as listed above is a true and-correctcopy and that the same has been in full force and effect since the who f6l6-mereof and is in iull for&'and effect on the date of this certificate;and I do further certifythat the said David M. Finkelstein' the duly executedthe power of attorney as ExecutiveVice President,was on the date of executionof the attachedPower of Attorney electedExecutiveVice Presidentof the Arch InsuranceCompany. lN TESTIMONYWHEREOF,I have hereuntosubscribedmy name and affixedthe corporateseal of the Arch lnsurancecompanyon 20-.-' ot -.-this --day specificallynamedthereinand they have This powerof Aftorneylimitsthe acts of thosenamedthereinto the bondsand undertakings stated. herein to the extent and the manner in except no authorityto bindthe Company PLEASESENDALL CLAIM INOUIRIESRELATINGTO THIS BONDTO THE FOLLOWINGADDRESS: - SuretyDivlslon Arch Insurance Suite1500 3 Parkway, PA 19102 Phlladelphla, 000303 00M10013 Page2of2 in U.S,A. Printed ATTACHMENT. D FORMOF GUARANTEE GUAMNTEEFORGLOBALTECH lNC.(CONTRACTOR) ANDARCHTNSURANCE COMPANY (suRErY) We the undersignedhereby guaranteethat the Western Region Waste Water Treatment Facility (WRWWTF)Power lmprovements Phase I, WUD 14-050,WA.2) project located in Palm Beach County,Florida,whichwe haveconstructed and bonded,has beendone in accordance with the plans and specifications; thal the work constructedwill fulfillthe requirements guaranties of the includedin the ContraotDocuments.We agree to repairor replaceany or all of our work, togetherwith any work of others which may be damagedin so doing, that may prove to be defectivein the workmanshipor materialswithina periodof one year from the date of SubstantialCompletionof all of the abovenamed work by the Countyof Palm Beach,Stateof Florida,withoutany expensewhatsoeverto said Countyof Palm Beach,ordinarywear and tear and unusualabuseor neglectexceptedby the County. When correctionworkis started,it shallbe caniedthroughto completion. In the eventof our failureto acknowledgenotice,and commencecorrectionsof defectiveworkwithinfive (5) calendardays after being notifiedin writing by the Board of County Commissioners, Palm Beach County,Florida,we, collectivelyor separately,do herebyauthorizePalm BeachCoun$ to proceedto have said defectsrepairedand made good at our expenseand we will honorand pay the costsand chargesthereforeupondemand. DATED: (noticeof completion filingdate) SEALAND NOTARIALACKNOWLEDGMENT OF SUREW Inc. (Seal) Globaltech. (Contractor) ,4 By: "Z-* ,f (Signature) ,r' ..2'24 Arch luuul.luLs fnLu InsuranceL,uurycury Company (Al,rn*.\ D G.ro\q r (PrintedName) ) (Seal) (Surety) By: B^JrVf r^7 Attorneyinfact BrettRosenhaus, (PrintedName) GUARANTEE.lD Rev 10-5-12 -E ATTACHMENT COSTSCHEDULE WORKAUTHORIZATION ATTACHMENT. E WA-2:WesternRegionWasteWaterTreatmentFacility(WRWWTF)Powerlmprovements PhaseI EngineeringFeeSummary Task I TaskDescrlDtion *Sub- E6 E5 E4 E3 Tech lll os $77.33 $65.24 $57.37 $42.97 $32.99 $35.43 Total Labor Services SubConsultant troject Coordlnatlon rrojectManagemenucoordination z VleetW staffto reviewprojecucollectinfo ,reparedesign/construction schedule 1t Subtotal Task t 2 4t $ 3,503.10 $ 1( $ 1,04r.41 Permlttlng PBCDERM- prepareandsubmitletter FLDEP- prepareandsubmitpermit TrepareConstructionapplication - Urvil/Mecnanrc:ruErec 5U tsUilOtng FPLfeescoordination oermits SubtotalTaskI 3 i0%Deslgn rroiect ManagemenVCoordination VlechanicalDesign (4 sheets) 2( 2( 4( 4( 94 62 Structural Design :lectricel/l&GL,eslgn(6 sheets) $ 1,500.0(Worcester $ 2,000.0( ADS Soecifications JDdateschedule Prepare construction estimate Vleetwithstaffandreview SubtotalTaski 5 1t 2l $ 8,428.7t $ 3,500.0( 100%Design ProjectManagemenUCoordination VlechanicalDesign Structural Design Electrical/l&C Design 1 1 $ 2,500.0(Worcester 1e $ 3,000.0( 3,402.80 $ 5,500.0( SDecifications Updateschedule UDdateconstruction estimate I tc/oA Subtotal Task ! 6 16 1 28 29 $ sDc rrojectManagemenvcoordination SiteVisits 1( 6t 1 Submittals lFls tecordDrawings rermitCloseout z\ 4 Subtotal Task G LaborHours LaborCosts LaborMultiolie Labor Tota 2t 14( 21 tC $ 322 3C 25 84,827.7( $1,434.2t $ 13 , 8 3 6 . 3 2 $ 3 , 6 6 1 . 8 t $ 1 , 0 6 2 . 9 ( ena 3.0( 3.0c 3.0( 3.0( $463.9€ $14,483.2t $4,302.79$ 4 1 , 5 0 9 . 0 i$ 1 0 , 9 8 5 . 6 ; $3,188.7C 8,595.6( $ 2 $154.6€ 3.0( 3.0( $74,933.4( Tota Subconsultant $ 9,000.0( TOTAL ENGINEERINGFEE $ 83,933.4t ADS , Globalteeh, ADES rcN_BUILD'"q"_ryt,' TakeoffWorksheet 07t21t15 PBGWater Utilities Department 150486PBC WRVIMTFPower lmp. Phase 1 Description Quote/Vendor Unit Quantity 1 GeneralGonditions Temporary Facilities TrailerPickup/Delivery Container Rental Sanitary JobSiteOfficeSupplies WasteHauling Ea Ea Month LOT LOT z GeneralConditions SubmittalLabor ProgressMeeting Scheduling Labor Construction PM Construction Superintendent Safety Building Permits HR HR HR HR HR HR HR 32 20 20 100 80 8 20 1 J J 4 I 200.00 375.00 360.00 100.00 1,200.00 71.08 71.O8 71.08 71.O8 62.13 71.08 71.08 2,274.56 1,421.60 1,421.60 7,108.00 4,970.40 568.64 1,421.60 21,421.40 I 2,028.56 71.08 62.13 962.88 568.64 497.O4 962.88 1 s,s00.00 5,500.00 LOT HR HR CR-D 1 8 SoilBoring& Testing LOT Page 1 200.00 125.00 120.00 100.00 600.00 Bid ltemTotals: 2 SiteWork Mobilization Construction PM Construction Superintendent 3 ManCrew Report9-5-0-08 Ext. Gost Tax (o/ol Markup* 6.00 6.00 6.00 6.00 6.00 Ext.Price 1.1500 1.1500 1.1500 1.1500 1.1500 243.80 457.13 438.84 121.90 1,462.80 1.2992 1.2992 1.2992 1.2992 1.2992 1.2992 1.2992 2,955.11 1,846.94 1,846.94 9,2U.71 6,457.54 738.78 1,U6.94 27,651.43 1.2992 1.2992 1.2992 1,250.97 1.1000 6,050.00 738.78 u5.75 07t21t2015 10:29 AM TakeoffWorksheet 07t21t15 Continued... Description Quote/Vendor Unit Quantity Ext Gost Bid ltem Totals: 3 Concrete Generator Pad PrepAreafor Generator Pad Concrete Piles Form& Materials CastIn PlaceConcrete Concrete Pump TestingServices 3 ManCrew Construction PM CR-D LOT LOT LOT LOT LOT CR.D HR 2 1 I 50 1 1 Patch& Repair CR.D 5 Metals MiscMetals& Fasteners 8 1,925.76 15,000.00 1,681.91 8,750.00 700.00 1,000.00 4,814.40 568.64 2 962.88 1,925.76 Bid ltem Totals: 36,366.47 1,000.00 Bid ltem Totals: 11 Equipment Cummins 5001(W Generator HVAC LOT EA 155,644.88 5,400.00 Bid ltemTotals: 13 t&C Generator Interface Panel 17,000.00 Bid ltemTotals: Report9-5-0-08 Page 2 7,528.56 962.88 15,000.00 1,681.91 175.00 700.00 1,000.00 962.88 71.08 1 Tax(%) Markup* 8,685.50 6.00 6.00 6.00 O.UU 1.2992 1.1000 1.1500 1.1500 1.1500 1.1000 1.2992 1.2992 2,50't.95 17,490.00 2,O50.24 10,666.25 853.30 1,100.00 6,2U.87 738.78 1.2992 2,501.95 44,157.34 1,000.00 1.1500 1,000.00 155,644.88 5,400.00 17,000.00 1,219.00 1,219.00 6.00 6.00 189,731.11 6,582.60 161,044.88 17,000.00 Ext. Price 196,313.71 1.1500 20,723.00 20,723.00 07t21t2015 10:29AM TakeoffWorksheet 07t21t15 Continued... Description 15 Mechanical Generator lnstallation SetandInstallGenerator Quote/Vendor Unit CR.D Quantity 4 Cost 1,614.24 Bid ltem Totals: 16 Electrical Electrical Sub Construction PM(l&C) Trenching, Backfi lling,andCompaction LOT HR CR-D 1 24 I 138,000.00 71.08 962.88 Bid ltem Totals: 18 RentalEquipment Crane ForkLift Fuel Backhoe Equipment Fuel 5,000psi pressurewasher Compactor 5000-700018 Equipment Fuel DAY WEEK LOT WEEK LOT WEEK WEEK LOT I 4 50 4 50 I 1,500.00 2,475.00 5.00 1,200.00 5.00 575.0'1 7An nn 40 5.00 Bid ltem Totals: 50 Engineering Engineering Electrical Engineer Structural Engineer LOT LOT LOT 24,977.80 5,000.00 4,000.00 Bid ltem Totals: 60 Bond & Gertification Bonds& Certifications BuildersRisklnsurance Report9-5-0-08 11,977.04 5.289.78 Page 3 Ext.Cost Tax (o/ol Markup* 6,456.96 1.2992 6,455.96 1.1000 1.2992 1.2992 147,408.96 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.1500 1.1500 1.'1500 1.1500 1.1500 1.1500 1.1500 1.1500 1,828.50 12,068.10 304.75 5,851.20 304.75 700.s4 2,742.75 243.80 24,0M.79 3.0000 1.0000 1.0000 74,933.40 5,000.00 4,000.00 83,933.40 33,977.8O 11,977.O4 5,289.78 151,800.00 2,216.33 10,OO7.79 164,024.12 19,725.01 24,977.80 5,000.00 4,000.00 8,388.88 8,399.88 138,000.00 1,705.92 7,703.U 1,500.00 9,900.00 250.00 4,800.00 250.00 575.01 2,250.00 200.00 Ext.Price 1 . 15 0 0 1.1500 13,773.60 6,083.25 07t21t2015 10:29AM TakeoffWorksheet 07t21t15 Continued... Description Quote/Vendor Ext.Gost Bid ltem Totals: Grand Totals: Tax (%) Markup* Ext. Price 17,266.82 19,856.85 469,196.86 598,998.02 Note:CR-D=8Hrs "ContractMarkupsPer MasterAgreement: = 1.1, Laborat Burden= 1.2992 Materials= 1. 15, Subcontractors Report9-5-0-08 Page 4 of4 07t21t2015 10:29AM ATTACHMENT- F SBESCHEDULEl&2 F ATTACHMENT. SCHEDULE1 E PRIME/SUBCONTRACTORS LIST OF PROPOSEDSBE-MA/VB PROJECTNAME: WesternReoionWasteWaterTreatmentFacility (WRWWTF) Power lmprovementsPhase 1 NAMEOF PRIMEBIDDERGlobaltech.lnc. BernardP. Gandy.President CONTACTPERSON: N/A BID OPENINGDATE: Name,Addressand Telephone Numberof PROJECT No: WUD 14-050 NW.Suite610 6001BrokenSoundParkway ADDRESS: 561-997-5811 561-997-6433 FAXNO.: PHONENO.: DEPARTMENT:N/A PLEASEIDENTIFYALL APPLIGABLECATEGORIES (Checkone or both Categories) Business Small DollarAmount Women Caucasian Other Globaltech,lnc., (561)9976433 6001 BrokenSound ParlsuayNW, 430.498.02$ Suite610.BocaR EnergyEfficientElectric,lnc. 1600MercerAvenue.Suite6 WestPalmBeach.FL 33401 561\655-7211 000.00 $ PLLC ADS Engineering, 4400 N. FederalHighway,Suite18 Boca Raton.FL 33431 5.000.00 954\ 415-7378 s PRIME CONTRACTORTO COMPLETE: B I DP R I C E : $ 598.998.02 Total Valueof SBE Participation:$ - $ - $ s73,498.02$ 573,498.02 2 or a proposalfrom eachSubcontractor includedon Schedule by priceor percentage mustbe supported 1. Theamounttistedon thisformfor a Subcontractor listedin orderto be countedtowardgoalattainment. 2. Firmsmaybe certifiedby PalmBeachCountyas an SBEand/oran MAI/BE.lf firmsare certifiedas bothan SBEandMMBE, pleaseindicatethe dollar category. amountunderthe appropriate is beingcollectedfor trackingpurposesonly. 3. MA/VBE information -F ATTACHMENT SCHEDULE 2 LETTEROF INTENTTO PERFORM AS AN SBE OR M/WBESUBCONTRACTOR PROJECT NO. WUD14-O5O PROJECT NAME Western Region Waste Water TreatmentFacility (WR\AMTF)Power lmprovements Phase1 Globaltech. lnc. TO: (Nameof PrimeBidder) The undersignedis certifiedby Palm BeachCountyas a(n) - (checkone or more,as applicable): SmallBusiness Enterprise XX Black_ Hispanic _ Women_ Minority Business Enterprise Caucasian XX Other(PleaseSpecify) Dateof PalmBeachCountyCertification: November 24.2012 The undersigned is preparedto performthefollowingdescribedworkin connection withthe aboveproject (Specifvin detail.particularwork items or parts thereofto be performed): Line Item/Lot No. 1 2 Item Description Enoineerino MechanicalConstruction Qty / Units Unit Price Total Price 1 1 N/A N/A $ 74.933.40 Bonds& Certifications $ 335.707.77 $ 19.856.85 at the followingprice: (Fourhundred fourhundredninetyeightdollarsandtwocents thirtythousand $430.498.02 (Subcontractor's quote) for workwithyouconditioned uponyourexecutionof a contractwith andwillenterintoa formalagreement PalmBeachCounty. any portionof this subcontractto a non-certifiedSBE lf undersignedintendsto sub-subcontract mustbe stated:NONE. subcontractor, the amountof anysuchsubcontract thattheprovisionof thisformto primebidderdoesnotprevent Theundersigned subcontractor understands quotations fromproviding to otherbidders subcontractor DavidA. Schuman.CorporateSecretary (Printname/title of personexecutingon behalfof SBE-MMBESubcontractor) Date: Julv21.2015 -F ATTACHMENT SCHEDULE 2 LEfiER OF INTENTTO PERFORMAS AN SBE OR M/WBESUBCONTRACTOR PROJECT NO. WUD 14.050 TO: PROJECT NAME WRV/WTF Power lmprovements Phase1 Globaltech. lnc. (Nameof PrimeBidder) The undersigned is certifiedby PalmBeachCountyas a(n)- (checkone or more,as applicable): SmallBusinessEnterprise [X Black_ Hispanic_ Women_ MinorityBusinessEnterprise CaucasianXX Other(PleaseSpecify) Dateof PalmBeachCountyCertification: November15.2013 is preparedto performthe followingdescribedworkin connection The undersigned withthe aboveproject (Specifvin detail.oarticularwork items or parts thereof to be performed): Line Item/Lot No. .l Item Description ElectricalEnoineerino Desiqn Qty/ Units Unit Price Total Price 1 N/A s 5.000.00 at the followingprice: (Fivethousanddollarsand no cents) $.5,000.00 quote) (Subcontractor's and willenterintoa formalagreementfor workwithyou conditioned uponyourexecutionof a contractwith PalmBepchCounty. lf undersignedintends to sub-subcontract any portion of this subcontractto a non-certifiedSBE the amountof any suchsubcontract mustbe stated: NONE. subcontractor, The undersigned subcontractor thatthe provisionof thisformto primebidderdoesnot prevent understands to otherbidders subcontractor from providingquotations (Print AlexanderStojanovic / President (Printname/titleof personexecutingon behalfof SBE-MAI/BE Subcontractor) Date: J u l v 1 5 .2 0 1 5 ATTACHMENT. F 2 SCHEDULE LETTEROF INTENTTO PERFORMAS AN SBE OR M/WBESUBCONTRACTOR PROJECTNO. WUD 14-O5O Power lmprovements PROJECT NAME WRWWfF Phase1 lnc. Globaltech, (Nameof PrimeBidder) TO: The undersignedis certifiedby Palm BeachCountyas a(n) - (checkone or more,as applicable): EnterPrise SmallBusiness $ Hispanic- Black- Women- Business Enteprise Minority CaucasianXX Other(PleaseSpecify) September4' 20:12 Dateof Palm BeachCountyCertification: The undersignedis preparedto performthe followingdescribedwork in connectionwith the aboveproject (Specifvin detail, particular work items or parts thereof to be performed)I Llne Item/Lot No. 1 ItemDescription Subcontracting Electrical Qty/ Units UnitPrice TotalPrice 1 N/A $ 138'000'00 - at the followingprice; $138.000.00(9ne hundredthirtv-eiqhtthousanddollarsand no cents quote) (Subcontractor's and will enterinto a formalagreementfor work with you conditioneduponyour executionof a contractwith PalmBeachCounty. lf undersignedintends to sub-subcontractany portion of this subcontractto a non-certifiedSBE subcontractor, the amountof any such subcontractmust be stated: NONE. understandsthatthe provisionof thisformto primebidderdoes not prevent subcontractor The undersigned from providingquotationsto other bidders subcontractor Inq EngrgyEfficient.Electric. (PrintNameof SBE-MA//BESubcontractor) ,/,/ ev: -/L- 7c /- (Sisnature) ReneViau/ Vice Prsident (Printname/tltleof personexecutingon behalfof SBE-MM/BESubcontractor) Date: J u l v1 5 . 2 0 1 5 G ATTACHMENT. STATUSREPORT AUTHORIZATION July20,2015 ANDSTATUSOFAUTHORIZATIONS SUMMARY Auth. No. Status Description Project Total Amount Date Approved WUDNo. Assigned CONSULTANTSERVICE AUTHORIZATIONS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total CSAs WORKAUTHORIZATIONS WA-1 WA.2 Cleaning SYstem WTP1'l Degasifier A/esternRegionWasteWaterTreatmentFacility Phase1 :IA/R\M/TR Powerlmprovements Approved $1,051,189.81 04121115 wuD 14-073 $598,998.02 wuD 14-050 Pending TotalWAs $1,650,187.83 Total csAs + wAs $1,650,187.83 Globaltech Project No. H ATTACHMENT. STATUSREPORT AUTHORIZATION ILDGONTRACT DESIGN.BU ANDIMPROVEMENTS OPTIMTZATION SUMMARYof SBE/MWBETRACKING WUD 14-0b0: WesternRegionWaste Water TreatmentFacility(WRWWTF)PowerlmprovementsPhase 1 ServiceAuthorization Valueof Consultant Valueof WorkAuthorization Valueof CSAandWA Valueof SBEMinorityLetterof Intent ActualPercentages / ApprovedAuthorizations ServiceAuthorization TotalValueof ApprovedConsultant WorkAuthorization TotalValueof Approved TotalValueof CSAsandWAs TotalValueof SBESignedSubcontracts ActualPercentages SignedAuthorizationsPlus CurrentProposal TotalValueof ApprovedCSAsPlusCurrentCSAProposal WAs PlusCurrentWA Proposal TotalValueof Approved CSAsandWAs TotalValueof ApprovedandProposed and Lettersof Intent TotalValueof SBESubcontracts ActualPercentages $598,998.02 $573,498.02 95.74% $0.00 $ 1, 0 5 1 , 1 8 9 . 8 1 $ 1, 0 5 1 , 1 8 9 . 8 1 $1,020,112.81 97.04Yo $0.00 $1,650,187.83 $1,650,187.83 $1,593,610.83 96.57o/o ,J ATTACHMENT Design-BgildGriteriaReport DesignBuildCriteria WesternRegionWasteWaterTreatmentFacility(WRWWTF) Powerlmprovements GL04 ProjectNo.WUD14-050 P.E.,DBIA n McGrew, EngineerNo.35004 Stateof FloridaProfessional PalmBeachCountyWaterUtilitiesDepartment 8100ForestHillBlvd. WestPdm Beach,FL 33413 7fz/z'rs DesignBuildCriteria WRWWTFPowerlmprovements GL04- ProjectNo.WUD14-050 Part1 General 1.1Summaryof Work Entitygenerally A. ProjectBackground:Theproposedworkto be performed by the Design-Build includes materials, furnishing tools,supervision, all labor,equipment, and servicesrequired to work. design,construct, test,andstartupthe proposed The WesternRegionWaste Water TreatmentFacility(WRWWTF)is an activatedsludge plantwitha permitted treatment capacityof 6.5 mgd. Theprocessfacilitiesincludea headworks withbarscreensandgritseparators, ditchaerationtanks,foursecondary two oxidation clarifiers (twocircular fourrotoscreens andtworectangular), twosludgethickeners, oneaerobicdigester, well systemfor and one 20" self cleaningstrainerfor effluentpolishing and a deepinjection pondsavailable for backupdisposal. withpercolation effluent disposal, The electrical distribution systemat the WRWWTFconsistsof two utilityFPLservices.Utility ServiceNo.1 is locatedin the north-east cornerof the plantandUtilityServiceNo.2 is locatedin plant. middle-west the of the The750kVAFPLtransformer is UtilityServiceNo.1 is connected to a 750kVAFPLtransformer. is main FPL The the vault. locatedin the existing step-downtransformer connectedto (MSB-1)locatedin Generator BuildingNo. 1. MSB-1consistsof one 800Arated switchboard main breaker,one 6004 ratedgeneratorbreaker,one 800A ratedautomatictransferswitch (ATS)MSB-1powersDigester DitchNo.1aerators 1 and2, Chlorine Blowers'1 and2, Oxidation breakersare electrically facilityand Polymerbuilding. The main breakerand emergency at the same interlocked throughan ATScontrolschemeto preventfromclosingbothbreakers time. for the Engineering, lnc. on 1122115 by HillersElectrical AppendixA is a studycompleted for Utility Service No. 1. The following necessaryalternativepower improvements wasmade: recommendation Emergency back-uppowerfor MSB-1is providedby a 300-kW(375kVA)generatorratedat generator cannotpowerallloadsconnected 480V,3-phase.Withthecurrentsetup theexisting in 1982.MSB-1andthe300-kWgenerator wasinstalled arewellpast . Thegenerator to MSB-1 to be replaced. lifespanforelectrical andit is recommended equipment theirreliable systemwithfuel willincludethedesignandbuildof a newstandalone500kWgenerator Project will have Generator a reinforced resistant aluminum enclosure. hurricane batteries and tank, generator permanent main will Current and switchboard maintenance access. concrete slaband will Building #1 be upgraded to from Building #1. Generator be removed andrecycled Generator 1.1F for Refer new main switchboard. to buildingto extendthe life of the an air conditioned completescopeof worksfor thisdesignbuildproject. furnishing of andinstallation Theproject willbe splitintotwophases.Thefirstphasewillinclude phase will alsoinclude withfueltank and enclosure.This the standalone500kWgenerator procurement Thesecondphasewillconsistof installation equipment. of all longleadelectrical Building #'1modifications. PLCprogramming andGenerator of electrical equipment, andstart-up Engineering Technical Memorandum Additional information canbe foundin the HillersElectrical (Appendix A). B. Legaldescriptionof the site: S/DOF 36-43-36BY ST SURVEYWLY351.74 Ff OF LT 3, N PropertyControlNo.04-36-43-36-01112OF LT 5 & PT OF N 1/2OF LT 6 lN OR23848P268. Belle Glade,FL33430. 003-0010.Siteaddressis 2055WestCanalStreetSouth, C, Surveyinformationconcerningthe site: Surveyol the propertywas completedon 1411109 B. andis locatedin Appendix D. Interiorspacerequirements:N/A E. Material quality standards: Adhere to Palm Beach County Water Utility Department materiallist. (PBCWUD) approved MinimumDesignStandards F. Schematiclayoutsand conceptualDesignCriteriaof the proiect: all Entitygenerallyincludesfurnishing The proposedworkto be perlormedby the Design-Build labor,equipment(unlessspecifiedOwner Furnishedin Scope ol Works),materials,tools, to the and servicesrequiredto design,construct,test,and startupimprovements supervision, necessaryfor new BelleGladeWasteWaterTreatmentFacility.IncludePLC programming generatorand main switchboard.Connectgeneratorto SCADAand providel/O list with proposal. Palm BeachCountyWater UtilityDepartmentrequiresthe followingitems on the SCADA system: HOA(Hand-Off-Auto)/Heady i. Generator Running ii. Generator iii. Oil Pressure iv. CoolantTemperature v. LinePowertromFPL(voltsandampseachleg) power(voltsandampseachleg) vi. Generator vii. Charging SystemVolts viii. FuelLevelgallons Hours ix. Generator x. DayTankLevel(if included) usingASCE7-10,currentFloridaBuilding windloadcalculations including Alldesigndocuments Codeand all localcodesfor generatorwithtank and enclosureand alsofor generatorbuilding Engineer.Provide envelopeshallbe signedand sealedby a FloridaregisteredProfessional FloridaProductapprovalfor all doors, windowsand louversmeetingrequiredwind load pressures andimpact. itemsareincludedin thisscopeol services: Thefollowing Standalone5fi)kW Generatorwith minimuma 4,500GallonSub-baseFuelTank: i. of new utilitieslor selection to locateunderground necessary investigations Complete in section1.7generator cablesystem.As described locationandnewunderground Utilities. Underground ii. iii. iv. v, vi. vil. vilt. lx. x. xi. xii. xiii, generator locationoptionsfor standalone withsub-base fueltank. Selectandrecommend soilinvestigations Completenecessary to determine slabandfoundation designfor slabon gradethatgenerator willbe securedon as described in section3.1 - PlantSite/Civil Requirements. Excavate andremoveunusedmaterialnecessary to installgenerator slab. reinforced Construct concretefoundation andslabas perapproved design.(Assumepile systemfor DesignBuildpricing). 4,500gallonsub-base Purchase 500kWdieselGenerator witha minimum fuel standalone provide power generator willhavea sub-base fueltankthatwill for tank. Thenew back-up 10dayswhenloadedto 50%capacity. Generator mustsatisfyall EPAandlocallegislation regulations tor emission. walk-inenclosure hurricane resistant thatwillprotectthe Generator shallhavealuminum generator fromtheelements.Generator shallhavescreensandothermeansof protec{ion to preventrodentsfromenteringintoand/ordamaging generator the standalone andits electrical andfuelsystems, willneedpermanent areas.All handrails Generator accessto regularlymaintenance andtoe (OSHA29 CFR1910.21to railsshalladhereto currentsafetycodesforlall protection 1910.27, ASTME894-88, ASTME935-00, ASTME985-00andANSI/ASSE A1264.1-2007) lightingfor generator maintenance. Providepermanent Providegrounding system. protection necessary lightning system. Provide for newgenerator necessary start-up, testingandcommissioning to ensureproper Complete further 2.1 Placing is in section and Starting operation.Thisrequirement detailed - MinimumStart-UpRequirements, 2.3- Equipment Startupand Equipment in Operation,2.2 Personnel. Testingand2.4- Instruction of Operations andMaintenance Performance luelforGenerator DesignBuildEntitywillsupplyall necessary throughtestingandstartup. Entity handover Design Build will fillthe Generator's tank. Priorto the GeneratorBuilding#1: ii. iii. iv. v. vi. vii. viii. andremoveanddisposeof Removeandrecycleexistinglouverson the eastof thebuilding, is detailedfurther wallventslocatedon southandwestsideof the building.Thisrequirement Removal. in section3.2- Demolitions andEquipment MSB-1andabovegroundfueltankalongwithall Removeandrecycle300kWgenerator, pipesandpartsassociated is withthe300kWgenerator.Thisrequirement miscellaneous Removal. andEquipment detailedfurtherin section3.2 Demolitions penetrations is Ensure roof watertight. in root. the all the Seal furnishandinstallCMUblockwherepreviouslouversandwallvents Designconnections, anddowelrebarintoexistingwallandfloor. weredemolished penetrations in exteriorwall. Encloseall abandoned insulation for roofopenings Providenecessary to FPLvaultas wellas sealing/insulating #1 building. betweenroofandwallsin generator connection andcodes. All buildingworkswillcomplywithcurrenttireratingstandards joints Building#1 withsuitablematerial. insideGenerator Cleanandfill allopenexpansion tx. X. xt. xil. xiii. XIV. XV. XVI. XVii. xviii. Fillallholesfromnowremoved bolteddownequipment. C, Furnish curb. Referto Appendix andinstallequipment andinstallnewMainSwitchboard proposed TheDesignBuild configuration. for SingleLineDiagram of newmainswitchboard Entityis responsible thatbestsuitstheplants forconfirming electrical configuration requirements. Digester Provideconnections for newMainSwitchboard to FPLVault,new500kWgenerator, Facility, HVACandPolymer Ditch#1 Aerator1 &2, Chlorine Blower1 &2, Oxidation for allconnections to MSB-1.Thisitemwill Building.SeeAppendix C, SingleLineDiagram require withFloridaPowerandLight. coordination Building Furnish #1. andinstallnewPLCforGenerator PalmBeachCountywillprovide Provide shutdown/transfer of equipment. costsforoptional Assumeeverything mustbe generators forshutdown/transfer of equipment. temporary This powered schedule. requirement on shutdown/transfer butthismaychangedependent 1.8 Maintenance of Operations and1.9- PlantShutdowns. is detailed furtherin sections controlled unitsto providea temperature Furnish andinstallnewA/Cairhandling (Traneor approved equal). lifeof newswitchboard environment to maximize Building unitsto Generator #1. AHUsshall Design, installandconnectnewA/Cairhandling material.The withdurableandweatherproof notbe roofmounted andmustbeconstructed or groundso theyaresecurein theeventof a AHUsshallalsobefastened to a structure hurricane. monitor.Roomtemperature shallbe addedto Supply,installandconnectroomtemperature theSCADAsystem. paintand paint(Useplantstandard withapproved andexterior of building Paintinterior colors). andA/Gair of newMainSwitchboard-1 Completenecessary testingandconditioning furtherin section2.1 is detailed Thisrequirement handling unitsto ensureproperoperation. - Minimum - Starting Requirements, 2.3Start-Up in Operation,2.2 Equipment andPlacing and of Operations Testingand2.4- Instruction Equipment Startup andPerformance Personnel. Maintenance UndergroundGablingSystem I il. iii. lv. V, vi. willneedto be Excavate trenchfor newcablingsystem.Allspoilpilesnotusedforbackfill removed andhauledoffsite. lhe newMSB-1to the new500kWgenerator. Installnewcablesystemconnecting including butnotlimitedto circuitsfor connections Cablesystemshallincludeall necessary jacketheater, to starVstop control/signalwiring heater, condensation batterycharger, generator AWGconductors. andnecessary Building #1 to Vault#5 located Excavate trenchfor newfiberopticcablesfromGenerator 1 & 2. nextto SludgeThickeners #1. Building #1 to MCCBuilding InstallfiberopticsfromGenerator Blowers MSB-1 from to Digester wiresfromexisting conduitrunning Remove existing junction box. junction Blowers fromMSB-1to Digester wiringin existing conduit Installnewcodecompliant box. viii. junctionboxat Digester Blowerandreplace witha properly Remove existing sizedjunction box. G, Costor budgetestimates:$700,000.00 H. Designandconstructionschedules: i) Substantial Construction 330 CalendarDaysafterreceiptof executedWork Completion withconstruction. Authorization andnoticeto proceed 30 Calendar DaysafterSubstantial Construction Completion. ii) FinalConstruction Completion iii) Liquidated fordesignandconstruction willapplyas follows: damages date. completion $1,000perdaypastsubstantial date. $500perdaypastfinalcompletion (ata minimum) itemsmustbe complete to achieve substantial completion: iv) Thefollowing in placeandoperating as intended. a. Allexisting systems completed. b. Commissioning andTestingof allnewequipment Building #1 complete. of Generator c. Paintings of interior andexterior d. O&M Manualshave been deliveredto the Countyand equipmenttrainingis completed. workcomplete(PBCWUDwill performHMISCADAScreenon e. PLCprogramming rFrx). datesfor eachitem. f. PunchListcreatedwithforecasted completion locationis determined thena siteplan requirements:Oncethe generator l. Site development mustbe provided to the theCityof BelleGlade. for DesignUtilities 1.3Utilities and1.7Underground J. Provisionsfor utilities:Referto Sections BuildEntityrequirements. barriersfor all existingstormdrainage K. Stormwaterretentionand disposal: Providesiltation by construction activities. catchbasinsimpacted L. Parkingrequirements:OnlycurrentCountysecuritybadgeholderscan parkinsidethe plant gate. Do not disrupttrafficflowfor chemicaldeliveries.Projectmaterialdeliveries shallbe publichotidays. between7:00AMto 3:00PMMondaythroughFridayexcluding plan,developed by the withthe OWNERmustbe prepared in conjunction M. Other:A shutdown plantor process shutdowns. Entityfor anyplanned Design-Build 1.2Permitsand Fees thework to complete Entity's responsibility to secureallpermitsrequired It shallbe the Design-Build requirements for inspections and Entity responsible all Design-Build shall be The underthiscontract. Entity permits.The Ownershallpayall permitfees. The Design-Build to close-out the completed Municipalities. within fees for work the county or forall Business tax shallbe responsible 1.3UtilityServices The Design-Build Entityshallobtainthe necessaryutilityservicesby makingapplication for the by the utilitycompanies, services andpayingsuchfeesandchargesrequired including construction if required. watermeters, 1.4Tests The Design-Build Entityshallpay for all required tests.Waterrequired for pressure/leakage tests shallbefurnished bytheOwner. 1.5Siteelevations, Lines,and Grades Wherethe dimensions in the and locations of existingpipeand utilitiesare of criticalimportance Entityshallverifysuchdimensions installation work,theDesign-Build or connection of proposed and locations whichis dependent in thefieldpriorto thefabrication of anymaterials or equipment, onthe The Design-Build Entityshallemploya landsurveyor registered in correctness of suchinformation. Entityshalllocateand protectsurveycontroland reference The Design-Build the Stateof Florida. points.TheDesign-Build Entityshallbe responsible lines,andlevels,utilizing to establish elevations, TheDesign-Build Entityshallprovideall labor,instruments recognized surveypractices. engineering for markingand maintaining necessary all linesand and stakes,templates, and othermaterials grades.The Design-Build by the land Entityshallsubmita copyof as-builtdrawings signed/sealed are in surveyorthat the elevationsand locationsof the work in FloridaStateplanecoordinates geodetic andwillreference datumNAD83. withthecontract documents conformance 1.6WorkArea by Ownerfor the workor The Design-Build Entityshaltconfinehisactivities to the site(s)designated pipe,and miscellaneous wasteproducts storage.All debris,materials, stagingareasfor materials Theyshallbe fromthe proposed workshallbe removedfromthe projectas soonas possible. The Design-Build federal,state,and localregulations. with applicable disposedof in accordance for determining and shallbearall costsor retainany Entityshallbe responsible theseregulations profitassociated withdisposalof theseitems. Entityshallprotecttheirwork. Whenrequiredto completethe-work,the DesignThe Design-Build BuildEntityshall maintainof suitablelightingto maintaina safe workingenvironment.Work performed fromthe owner.The workinghoursrequires the permission outsideof the established of such Design-Build Entityshallalsocomplywithall lawsor ordinances coveringthe protection Design-Build Entityshallcarryout his therein.The workandthe safetymeasures to be employed work so as not to deny accessto privateproperty.All utilityaccessmanholes,valves,and fire or hydrantsshallbe keptaccessible at all times. No trenchesor holesnearwalkways,in roadways of the Owner,and roadshoulders are to be left openduringnighthourswithoutthe permission properprotection. for the security of theirwork,equipment, The Design-Build Entityis responsible andmaterial at alltimes. 1.7Underground Utilities or powercablesor conduits, Allwaterpipes,stormdrains,forcemains,gasor otherpipe,telephone removed fromor supported whetheror not shown,shallbe temporarily and all otherobstructions, Entityshall Beforedisconnecting excavations. anypipesor cables,the Design-Build acrosspipeline for theirdisconnection by fromthe Owner,or shallmakesuitablearrangements obtainpermission for anydamageto anysuchpipes,conduits Entityshallbe responsible theOwner.TheDesign-Build pastthe or cables,andshatlrestorethemto servicepromptlyas soonas the workhasprogressed point involved.Approximate locationsof knownwater,sanitary,drainage,power,and telephone installations alongrouteof newpipelines or in vicinityof the workareshownon as-builtdrawings, Entity.The Design-Build but mustbe verifiedin the fieldby the Design-Build Entityshalluncover by hand,to verifylocationand depthof cover.Any thesepipes,ducts,cables,etc.,carefully, discrepancies or differences foundshallbe broughtto the attentionof the Ownerin orderthat necessarychangesmay be made.Wherefences,walls,or other man madeobstructions exist priornoticeby illegally in thepublicright-of-way, theOwnerwillhavethemremoved uponadequate Entity. the Design-Build (48) TheDesign-Build Entityshallnotify"SUNSHINE 477Qat leastforty-eight STATE"at 1 (800)-432 prior performing Evidence hours to anyexcavating of suchnoticeshallbefurnished activities. to the Entityis responsible for all utilitylocateswithinthe project Ownerpriorto excavating. Design-Build locateservice for all PBCWUDburiedpipelines siteandwillprovidean independent andelectrical. watershallcomplywith the Palm Designof all underground water,wastewater, and reclaimed (latestedition),GeneralElectrical Standards BeachCountyWaterUtilitiesMinimumEngineering PalmBeachCountyWellfieldProtection Environmental DesignRequirements, Ordinance, Control provisions Environmental Rule1 (wastewater), ControlRulell (water),and applicable of the Florida withthe PalmBeach Administrative Code. Designsubmittal requirements shallbe in accordance DesignManual. CountyWaterUtilities 1.8Maintenance of Operations disruption to the The Design-Build Entity'sactivities or any partialplantshutdowns shallminimize Entityshall scheduleand performthe The Design-Build treatmentfacilitiesand conveyance. proposedworkin a mannersuchthatthe Ownercan keepthe existingtreatmentand conveyance valves,gatesandequipment facilities in continuous dependable operation. Operation of all existing shallbe performed by Owner. 1.9PlantShutdowns is not requiredin lf, in the opinionof Owner,a shutdown Ownershallapproveall plantshutdowns. perform proposed Entityshalluse Entityto work,the Design-Build the orderfor the Design-Build withandscheduled methodsto accomplish thework.All shutdowns shallbe coordinated alternative a minimumof 7 daysnoticeof Design-Build at timessuitableto Owner.Ownershallbe provided Additional noticemay be requiredfor Entity'sneedfor any systemor partialsystemshutdown. certainshutdowns. 1.10 ProjectCoordination work.He shall Entityshallbe solelyresponsible for coordination of all of theproposed Design-Build manufacturers, fabricators, tullywith all sub-contractors, suppliers, directand cooperate supervise, materials or equipment are installers, testingagencies, andall otherswhoseservices, distributors, workwithinthecontract time. required of theproposed to ensurecompletion his work with the work of any other Entityshall cooperatewith and coordinate Design-Build performing workrelatedto the additional utilityservicecompany, or Owner'semployees contractor, for damagedoneby othercontractors projectat thesite.Design-Build Entityshallnotbe responsible jurisdiction Entity's exceptwheresuchlossor damageis on sitewhoarenotunderthe Design-Build Entityshallalsocoordinate hiswork Entity. Design-Build negligence Design-Build by the of caused with withtheworkof othersto assurecompliance schedules. Design-Build Entityshallattendand participatein all projectcoordination or progressmeetingsand reporton the progressof all work and compliancewith schedules. The Design-Build Entityshall provideand maintainrepresentative at the site at all time duringperformance of his organization of the workwho may be reachedat anytimewhileworkis in progress 1.11ProjectCPMSchedule Entitymustprepareand maintaina projectscheduleusingPrimaveraP6 softwareand Design-Build Critical Path Method(CPM)of scheduling.The followingoutlinesthe minimalschedule the requirements. The schedulemustbe updatedeachmonthat a minimumand will be reviewedby the progress. Countyto determinedesignand construction 1.11.1 DesignSchedules The ProgramManagement Teamwill specifydetailedschedulingrequirements to each designconsultant throughthe professional servicesagreement,requiringthat: . . . . A detailedP6 designschedulebe createdand routinelyupdated That at a minimum,milestones be depictedfor: o Notice-to-proceed o 60 percentsubmittal o 100percentsubmittal An estimateof the construction durationand stagingbe developed Linkagesto otherwork packagesbe clearlyindicated 1.11.2ConstructionSchedules The basicsof the construction schedulesubmittalsare outlinedbelow. The Construction BaselineRequirement: Schedulewill use P6, the GriticalPathMethod, will buildthe project,The scheduleshouldshowthe and shallreflecthowthe Contractor durationof each activityso that the ProjectManagercan accuratelymonitorthe progressof with work itemslistedin the Scheduleof the work. Scheduleactivitiesmustbe consistent checkon the Valuesand be cost-loaded suchthat scheduleupdatesprovidean independent monthlyprogresspaymentrequest. amountsshownin the Contractor's includingany work activities, Additionally, the schedulewill addressthe logicof construction constraintsdue to: . . . . . . or permitrequirements Operational of the technicalspecifications Specialrequirements Standardconstructionpractices Safetyof the work place Manpowerloadingand availability Key Resourceor Materialsquantityloading will be requiredto submittwo The Contractor InitialConstruction ScheduleSubmittals: conference.Theseare: scheduledocumentsat the pre-construction . . planof operationfor the initial30-dayperiodof the contract The Contractor's An initialdraft of the P6 BaselineCPM schedule willmeetto reviewanddiscuss TheProjectManager the30-dayplanof andtheContractor CPMscheduleshortlyaftersubmittal operation andBaseline to the ProjectManager.The reviewandcomment willbe limitedto conformance with ProjectManagers ontheschedules in theContract TheContractor will requirements Documents. thesequencing andmilestone necessary be required to theschedules to complywiththerequirements to makecorrections requested information by the Project to incorporate anymissing andadjusttheschedules Manager. reviews willinclude: Keyelements of theschedule . . r o . . . ratesfor reasonableness Production levelof detail Appropriate of contractual constraints Satisfaction procurements, reflecting training andstart-up tasks Accurately submittals, withapproved Conforms schedule of values practices withindustry Complies scheduling riskandcriticalpathdiscussion Schedule earlyexecution activities Theplanof operation of theContractor depictsaccomplishment permitacquisition, for earlymaterialandequipment (mobilization, necessary submittals procurement, procurement, CPMsubmittals, for longleadequipment necessary submittals required in thefirst30 days). initialsiteworkandothersubmittals andactivities willbe included in all P6Baseline schedule Schedule:The Construction Contractors progress and updates andwillbe thebasisfor measuring subsequent schedule in the performance. willbe detailed requirements updates andotherreporting Schedule willprovideinformation on major Theconstruction schedule specifications. schedule pertinent interface activities milestones tracking.Related andallowforquantity construction Schedule of willalsobeshown.Theassociated andcommissioning to facilities start-up laborwagerates,bulk information related unitratereporting, Valueswilldelineate to quantity pricingandothercosting/pricing information as requested. Specific schedules materials perprojectneeds. (e.9.,90 daysto Completion, willbe specified 4-weeklook-ahead) with The ProjectManager's reviewof the scheduleis to ensurebasiccompliance plan, does not an approval of the reasonableness of constitute requirements and and methods of construction. relative to meansand approach or direction interim significant Progress Schedule, shallidentify TheContractor's at a minimum, in addition schedule, to: Summary milestones thatrelateto theProjects . . . . o Notice-to-Proceed Mobilization SubstantialCompletion FinalCompletion StartUp/Commissioning 1.11.3Schedule Updates shouldbe updated to summary schedules On a regularbasis,andnotlessthanmonthly, interimmilestone progress deliverables, of activities, completion of contract trackandmonitor dates,andotherrelatedaspectsof scheduling. achievement, startandcompletion in theschedules. changes to thescopeof workwillbe reflected Additionally, anyapproved 10 I Progress is monitored monthly workaccomplished by comparing againstboththebaseline plan,andtheprogress withthefirstmonthof status of workfromthepriormonth.Starting progress for allprojects willbe measured against forstartandfinish updating, thebaseline progress forchanges dates,scheduled andcashflow,alongwithanalysis in logicand durations, activities Part2 AcceptanceTest Requirements Entityshallbe responsible The Design-Build for coordinating and completing the overallsystem Entityis responsible for providing startupand testing.The Design-Build all labor,equipment, and for conducting materials systemsstartupandtesting. 2.1Startingand PlacingEquipmentin Operation Design-Build Entityshallinitially intosuccessful start-upandplaceall installed equipment operation field manufacturer's written instructions as instructed by manufacturer's to and according representative. Design-Build Entityshallprovideall material,labor,tools,equipment, chemicals, No systemor subsystem required shallbe started lubricants, andexpendables to complete start-up. up for continuousoperationunlessall components of that systemor subsystem,including proven for proposed work. instrumentation, havebeentestedand to be operableas required personnel Entityin the start-up, but the prime to assistDesign-Build Ownershallprovidesufficient Entity.Manufacturer's for propermechanical responsibility operation shallbelongto Design-Build representatives shall be presentduring initial start-upand operation.Owner shall assume in for operation uponcompletion responsibility of the equipment of start-upandplacingequipment operation. 2.2 MinimumStart-UpRequirements pre-start up checklistin Entityshallperformthe followingenginegenerator A. The Design-Build guidelines: installation/mounting, engine withmanufacturer Generator setequipment accordance daytankfuel level(if shroudinstallation, oil level,enginecoolantsystemlevel,engineradiator connections, mechanical batteryinstallation, fuelsysteminstallation, and electrical applicable), enginesensorsand controls,all batteryvoltage,batterychargeroperations and installation, remote interfacewiring with new main switchboard, equipmentinterfaceinterconnects, wiring,exhaustsysteminstallation and connections and interface annunciation/communication as is not limitedto itemslistedabove,othersshallbe performed all otherfluids. Checklist required by manufacturer. Entityshall check each electricalcontrolcircuitto assurethat operation B, The Design-Build with regulations of proposedwork and to providedesired and requirements complies performance. forcleanliness, Entityshallinspect andcleanandremoveallforeignmaterials, C, TheDesign-Build replacedefective bearings andthose,whichrunroughor noisy,andgreaseas verifyalignment, recommendations. in accordwithmanufacturer's necessary herein. shallnotbe limitedto thosespecified D, Systemstart-up testingprocedures andoperational Othersshallbe performed as requiredto provethat the systemfunctionsand performsas package. bythiscriteria described andrequired 11 Testing 2.3.EquipmentStartupand Performance for performance The Design-Build Entityshall be responsible testingduringstartupof all mechanical, equipment andsystems. electrical in whichalltestingworkrequired forthe A, Provide a testingplansettingforththesequence proposed will upgrades be implemented. to theOwner. B. Documentation of theresultsof allequipment andsystemtestsmustbe submitted certifying thedateof calibration. Provide calibration tagsfor allequipment and Maintenance Personnel 2.4.lnstructionof Operations mainswitchboard priorto turningovertheoperation of thenewgenerator, Training shallbe provided shallbe startedup andA/C unitsto the owner.No system,unitprocessor anypieceof equipment manualsbeingturned withoutthe approved and maintenance for continuous operation operation overto Owner. training Entity shall provideservicesof supplie/soperationand maintenance Design-Build procedures personnel maintenance in recommended and instruct operation Owner's specialists to statedin at the site,unlessotherwise for products andequipment.All trainingshallbe conducted sessions. therightto videotape training Ownerreserves theSpecifications. Trainingof plant'spersonnelshall commenceonly after acceptablepreliminaryoperationand hasbeenstartedand placedintooperation, datahasbeenprovided and,equipment maintenance testinghas beencompleted.The Design-Build equipment and systemstartupand performance trainingitems,and outliningimportant and checklists Entityshallprovidewrittendocumentation for inputby operators. providespreadsheets newprocesses neededto document Part3 TechnicalRequirements 3.1.PlantSite/ Civil Requirements familiarwith the site for becomingcompletely Entityshall be responsible The Design-Build lf all site investigations. with developing the finalsite planincluding in connection conditions geotechnical and soil boringsare requiredto conditions, conditions, analysisof subsurface Entityto perform thiswork. Design-Build responsibility of work, be the it the shall complete the and EquipmentRemoval 3.2Demolitions required andincidentals equipment, for all labor,materials, Entityshallbe responsible Design-Build without the Entityshallnotstartremovals for demolitions and payfor all disposalfees.Design-Build the activities, of anydemolition permission of the Owner.At least48 hourspriorto commencement of theproposed schedule. EntityshalladvisetheOwner,in writing, Design-Build with Owner'soperations Entityshallcarryout operations so as to avoidinterference Design-Build work andremoval Entityshallperformall demolition Design-Build facilities. andworkin the existing so as not to interferewith the use and safe passageto and from adjacentstructuresand shall whichmightresultfrom features, and adjacent preventdamageor injuryto structures, occupants, Entityshallerectand maintainbarriers,lights,sidewalk fallingdebrisor othercauses.Design-Build 12 protective sheds,andothernecessary devices. The Design-Build Entityis responsible for repairing property damageto theOwner's or facilities, causedby theDesign-Build Entity's activities Surfaces of walls,floors,ceilings, or otherareas,whichare exposedby any of the removals, and whichwill remainas architecturally finishedsurfacesshallbe repaired and re{inishedby DesignBuild Entitywith the same or matchingmaterialsas the existingadjacentsurface.Adjacent structures, facilities, impactedby dust,dirt, and debriscausedby demolition and improvements operations shallbe cleaned andreturned to pre-construction conditions. passesthroughexisting Wherepipingthatis to be removed walls,the pipingshallbe cut off and properly cappedon eachsideof thewall. All materials removed fromexisting andequipment workshallbecomethe property of Design-Build Entity,exceptfor thosewhichOwnerhas identified and markedfor theiruse.All materials and equipment markedby theOwnerfor its useshallbe carefully removed Entityso as by Design-Build notto be damaged, andshallbe cleanedandstoredin a protected location by the Owner. specified Design-Build Entityshalldisposeof all demolition materials, equipment, debris,andall otheritems notmarkedby theOwner,offtheworksiteandin conformance withall existing lawsand applicable regulations. Uponcompletion of thework,all materials, waste,anddebrisof everysort equipment, shallbe removed andpremises shallbe left,clean,neat,andorderly. Removeand recycle300kW generator,MSB-1 and above groundfuel tank along with all pipesandpartsassociated miscellaneous withthe300kWgenerator: Removeexisting300 KW generatorwith muffler,transferswitchgearand recycle.Remove and disposeof exhaustpiping.Removeand disposeof existingof all electricalconduitand wiring associatedwith generator.Non-metalwaste such as insulation,concrete,PVG, fiberglassetc to be hauledand legallydisposedby Design-Build Entity. b. Removeand legallydisposeof existingfuel tank and all associatedfuel pipingbetweenfuel with FAC 62-762includingclosurereporting. tankand generatorin accordance i . Remove remaining dieselfuelandallaccumulated sludgefromdieseltank. piping,andremoveandlegallydisposeof dieseltank. ii. Disconnect and Backlill 3.3 Trenching,Excavation The DesignBuildEntitywilladhereto all OSHAand PBCregulations whenexcavating for cabling pad. systemandgenerator Allremaining fromsite. spoilpilesshallbe removed Goncrete 3.4Cast-ln-Place pipesupports, Whererequired for wallpenetrations, required to andotherrepairor replacements providing Entityshallbe responsible for complete thework,the Design-Build concrete consisting water,andapproved of portland thencombined, cement,fineandcoarseaggregate, admixtures; placed,finishedand cured to accommodate mixed,transported, the proposedwork. All which admixtures, curingcompounds, etc.usedin concreteor the curingand repairof concrete, water,shallbe certified cancontactpotable as conforming to the requirements 61for of ANSI/NSF potable finished with water when in contact concrete. the Metals 3.5Miscellaneous All metalsshallbe non-ferrous exceptof steelreinforcing and as approvedby the Owner. All bolt, nutsandwashersshallbe 316 stainless steelthe nutsshallbe coatedto preventgalling.Anchor pipesupports, boltsshallbe 316stainless steel. Stanchions, equipment bases,braces,andstraps shallbe316stainless steelor aluminum. 3.6Paintingand Coating Design-Build Entityshallprovidealllabor,materials, tools,equipment, andincidentals as required to furnishand applycoatingsystemsfor surfacepreparation and coatingof all new and existing surfacesidentifiedas part of the work. Manufacturer's recommendations includingsurface preparation, paintings curetimes,application thickness, application method, applicability of selected andcoatings for theirintended process use,etc.mustbe strictlyfollowed.Mechanical and itemsto be coatedaredefinedpreviously underSection1.1F. Owner'sapprovalshallbe required for all components of the surfacepreparation, selection of colors, andpaintsystemapplication beforestartof proposed work. Color-coding valves,equipment of pipelines, and ductsshallcomplywithapplicable standards of ANSIA13.1, ANSI2535.1 Finishcoatsof paintfor pipelines andequipment , and40 CFR1910.144. shallbe codedin basiccolors.Colorsshallbe brilliant, distinctive shadesmatchingsafetyand pipelinecolorsper ANSI 2535.1,Recommended Standardsfor WaterWorks;Recommended Standards for Wastewater Facilities, for safetycolorsandotherprimarycolors. colorspecifications pipelabelswithflowarrowsat eachchangein direction, Provide tees(allsides)andevery20 feetof run. straight 3.7PipeRequirements The Design-Build Entityis responsible for the finalsizingand selection and of all pipe,supports, associated materials.The Design-Build Entityshallconformto the PalmBeachCountyWater Utilities Manualof Minimum DesignandConstruction Standards. At a minimum, information the following to the Ownerfor reviewand approval shallbe submitted priorto installation: r . . gaskets, Detailed drawings andmanufacturers datafor pipe,fittings, newsupports, boltkits, couplings, andallotherpertinent materials required to complete thework.; Certificates withapplicable of compliance referenced standards for pipe, andanyprovisions joints,fittings, gaskets, linings, harnessing, coatings, sleeves, andallotherappurtenances; Fieldpressure testing. progress Materials shallbe delivered to the siteto ensureuninterrupted of the work.Pipe,fittings, handled handling andassociated othermaterials withapproved devices. Materials shallbe carefully shallbe storedon heavywoodblockingor platforms so theyare not in contactwiththe ground. gouged,chipped, Delivered materials for cracked, shallbe inspected dentedor otherdamageto the packagingor .materials.lf such damageis found,damagedmaterialsshall be rejectedand immediately removedfrom the site. lf in the processof manufacture, transportation, storageor handling, any pipe,fittings,or associated othermaterialsare damaged,such materialshallbe rejected andreplaced Entity's at theDesign-Build expense. 14 Pipeinteriors shallbe keptcompletely freefromdirtandforeignmatter.All pipeshallbe installed in 'strictaccordance withthemanufacturer's instructions Whenpipemustbe cut andrecommendations. to fit in thefield,the workshallbe performed utilizing toolsandequipment specifically designed for cuttingthe pipe,so as to avoiddamageto thepipeandto leavea smoothend.lmproperly cut and/or fittedpipewillbe rejected Entity's andreplaced at the Design-Build expense. Part4 ElectricalRequirements 4.1BasicRequirements Design-Build Entityshalldesignand provideall labor,materials, equipment, and incidentals to grounded.NewGenerator complete work. All systemsshallbe properly the electrical shallhave protection previously. lightning as outlined 4.2 Godes Materialand equipmentshall be installedin accordance with the currentstandardsand recommendations of the NationalElectrical Code,the NationalElectrical SafetyCode,andwithlocal discrepancies regulation codes,whichapply.Where arisebetween codes,the mostrestrictive shall apply. 4.3AreaClassifications A Wet Locations Thefollowing wetlocations: areasshallbe considered l. Alloutdoor areas. 2. Allindoorareasbelowgradeunlessotherwise specified. 3. Materials, in areasidentified equipment, and incidentals as wet locations shallmeetNECand for wetlocations. Enclosures NEMArequirements shallmeetNEMA4 requirements as a minimum. withwatertight hubs. Conduits at enclosures shallbeterminated threaded B. CorrosiveLocations Materials, in areasidentified equipment, and incidentals shallmeetNECand NEMA as corrosive for locations. requirements corrosive Conduit systemsshallbe Aluminum andenclosures shallmeet NEMA 4X requirements. Conduitsshall be terminatedat enclosureswith watertighthubs. Independent supports shallbe Aluminum. 4.4ElectricalEquipment load,without All new electrical successfully equipment shallbe capableof operating at full-rated faifure, withan ambientoutsideairtemperature of 0 degreesF to 122degreesF andan elevation of 400 feet (MSL).All electrical devicesand equipment shallhaveratingsbasedon 75 degreesC Allelectrical shallmeetNEMA12 requirements. terminations. enclosures at a minimum equipment 4.5SchematicDiagrams Entityto actas guidance in fulfilling diagrams by the Design-Build Schematic shallbe prepared the intentof the conceptual lt shallbe the Design-Build Entity'sresponsibility documents. operational to meetall safetyand electrical codes,and to provideall equipment, appurtenances and specialty itemsrequired Reviewof controlschemes to providefor complete andoperable systems. submitted 15 |. Entityof theircontractual responsibility Entityshall not relieveDesign-Build by Design-Build to provide operating systems. complete andsuccessfully 4.6 RacewaySystems Design-Build Entityshallfurnishandinstallconduitandfittingsto formcomplete, coordinated, and groundedracewaysystems.Design-Build Entityshall providefor the properinstallation of all for eachsystem. conduits A. Rigidaluminum for exposed indoorconduitrunsin non-corrosive areasandrigid conduit aluminum at allothersites. B. PVCSchedule 80forindividual conduitrunsdirectburiedin earthandPVCcoatedrigidsteelat (minimum 24-inchburialdepth). allothersites 40 PVCforconduitrunsembedded in or understructural concrete slabsor in concrete c. Schedule (allsites). ductbanks forexposed indoorandoutdoorrunsin corrosive areasandPVC D . PVCschedule 80 conduit coatedrigidsteelat allothersites. E . Flexibleconduitfor connections to motorsandequipment. Testing,and Adjustments 4.7ElectricalInspections, of the to the satisfaction to demonstrate Accompany testswithinspections the normalinstallation judicialauthorities required thefollowing: in accordance withthedrawings andapplicable Allcircuits A. Connections: areproperly connected shop drawings. approved Allcircuitsanddevicesareoperable. B. Operation: identified Allconductors at eachterminal. C. ldentification: areproperly that the circuitand cablesare in placeto demonstrate Test eachelectricalcircuitafterpermanent groundsandshort performsatisfactorily andthattheyarefreefromimproper equipment connected resistance betweenphasesand fromeach circuits.Individually test 600-voltcablesfor insulation phaseto ground.Testaftercablesare installed and beforetheyare put in servicewitha Megger of specifications for the testedcircuit.Testsshallmeetwiththe applicable whoseratingis suitable resistance for anygivenconductor shallnotbe ICEAS 66 524andNEMAWC71971.Theinsulation lessthan1 megohmfor 600voltand lessservice.Anycablenot meetingthisvalueor whichfails witha newcableforthefulllength. shallbe replaced whentestedunderfullloadconditions for continuity alongthe full lengthof instrumentation Testshielded cableshieldswithan ohmmeter instrumentation cablesto a calibrated shielded to ground.Connect thecableandforshieldcontinuity settings. Testat 4, 12,and20 miltiamp transmitter DCsignaltransmitter andreceiver. 4-20miltiamp groundsystemsfor continuity to groundusingan electrical and for resistance Testthe completed less resistance must 5 ohms.Add up to two groundresistance be than system Ground tester. 16 additionatrods,spacedat 20 feet minimumfrom otherelectrodes, untilresistanceis lessthan 5 ohms. Operateall starters,circuitbreakers,and associated equipment to demonstrate suitability and withSpecitications compliance andreference standards, exceptfor shortcircuitinterrupting ratingor otherinherentdesignfeaturescoveredby shoptests.Testall motorsfor direction of rotationand if necessary. reverseconnections Checkcontrolcircuitsto determine thatoperation andsequence are correctand adjustlimitswitches,pressureswitches,floatswitches,timersand otherdevicesto giveproperoperation. Testgenerator underloadfor24 hourswithoutfailureor shutdown. Part5 Instrumentation and ControlRequirements 5.1General Design-Build Entityshallprovidealllabor,materials, equipment, andincidentals as shown,specified, install, to furnish, calibrate, andplacein satisfactory operation a complete andrequired test,start-up, and operatingsystemfor proposedwork, includingprogramming of the PLC,SCADA,and all number, required wireterminations. Tagnumber, shallmatchtheOwners equipment anddescription numbering convention standards. 5.2Calibration, Start-Upand Testing priorto start-upof the associated of eachinstrument Fieldverifythe calibration and performance anddocument on a separate equipment, sheetforeach. and Start-UpResponsibilities 5.3SystemCheck-Out Entityshallretainthe servicesof the systemsupplierto supervise and/orperform Design-Build part As shall of theseservices, thesystemsupplier checkoutandstartup of allsystemcomponents. not manufactured items or and includecheck-outand start-upfor thoseequipment coordinate providedby him. The servicesof an authorizedmanufacturer's representative to check the in operation maybe required. The manufacturer's installation and placethe equipment equipment knowledgeable operation andmaintenance representative aboutthe installation, shallbe thoroughly of theequipment. and all of all instrumentation and controlsystemcomponents Checkand approvethe installation priorto placingthevarious between the varioussystemcomponents cableandwiringconnections processes into operation. Conducta completesystemcheckoutand adjustment, and equipment includingcalibration of all instruments, tuningof controlloops,checkingoperationfunctions,and included in thiswork,they functions Whentherearefutureoperational testingof finalcontrolactions. Allproblems corrected to in thesystemcheckout. encountered shallbe promptly shouldbe included preventanydelaysin startup of thevariousunitprocesses. necessary to performthe testingduringsystem Systemsuppliershallprovideall test equipment Entityandsystem mainswitchboard andA/Cunits.Design-Build checkout andstartup of generator, monitoring initial and control system and shallmake be responsible for of shall operation supplier for monitoring, controlof the replacements operation, and required changes, adjustment or any perform functions intended. necessary variousprocesses equipment to the and 17 calibration reportsfor fieldinstruments Design-Build Entityshallfurnishto the Ownercertified and panelmounteddevicesspecified Design-Build is completed. in thisSectionas soonas calibration reportfor the powerimprovements inspection at Belle EntityshallfurnishOwneran installation hasbeeninstalledcorrectlyand GladeWasteWaterTreatmentFacilitycertifying that all equipment properly. representatives of bothDesign-Build Thereportshallbe signedby authorized is operating Entityandthesystemsupplier. 5.4.Instrumentation andControlSystemFieldTest systemsupplier, and initialoperation, Following the plantmonitoring and controlsystemcheckout Entity,shallperforma complete systemtestto verifythat underthe supervision of the Design-Build properly is operating system,andthat as a fullyintegrated andprogrammed software all equipment Anydefectsor andoperational. monitoring arefullyimplemented andcontrolfunctions the intended problemsfound duringthe test shall be correctedby systemsupplier,and then retestedto properoperation, demonstration of all systemfunctlons, the plantmonitoring Following demonstrate andtelemetry systemshall fieldsensors/transducers andinstruments, andcontrolsystemincluding for a continuous 72 hourperiod. be running andfullyoperational 5.5GontrolPanelsand Enclosures roomareasshallbe NEMA12 ratedunless Controlpanelslocatedinsidecontrolor electrical NEMA4 exceptin steelor non-metallic notedon drawings. All othersshallbe stainless differently panel if required by ventilation Provide or air conditioning corrosive areas,whichshallbe NEMA4X. pan Door widths not 36-inches. for doors. shall exceed Use typeconstruction ambientconditions. steelwith panelwithdisplays controlpanelsshallbe 316stainless Exterior shallfacenorth.Exterior powdercoatedwhiteepoxyexteriorfinish. 5.6SurgeProtection fromsurgespropagating instrumentation to protectall electronic Surgeprotection shallbe provided deviceas closeas and powersupplylines.Locatethe suppression alongthe signal,telephone, levelshallnot possibleto the loaddevice.The protection systemsshallbe suchthatthe protection level,andbe surgewithstand butshallbe lowerthanthe instrument interfere wilhnormaloperation, metallic cases,properly Instruments shallbe housedin suitable freeandself-restoring. maintenance to a goodearthgroundand grounded. shallbe connected Groundwiresfor all surgeprotectors fromeachother. andinsulated wherepractical eachgroundwirerunindividually Engineering A - HillersElectrical Appendix Memorandum Technical FINAL TECHNICAL MEMORANDUM PROJECT: BelleGlade\ AI/TPAlternativePowerlmprovements SUBJECT: GeneratorBuildingNo.1ElectricalGear DATE: 1.0 January21,2015 Existing ElectricalDistributionSystems systemat the BelleGlade\ A/VTFconsistsof two utility The electricaldistribution cornerof the plant. FPLservices.UtilityServiceNo. 1 is locatedin the north-east of the plant. UtilityServiceNo,2is locatedin the middle-west 1.'l Existing Utility ServiceNo.1 The 750kVAFPL to a 750kVAFPLtransformer. UtilityServiceNo. 1 is connected transformeris locatedin the existingFPL vault.The step-downtransformeris (MSB-1)locatedin Generator BuildingNo. 1. connected to the mainswitchboard Main Switchboard No.1 (MSB-1)consistsof one 800A ratedmain breaker,one 600A ratedgeneratorbreaker,one 800A ratedautomatictransferswitch(ATS). DitchNo.1aerators1 and 2, Blowers1 and 2, Oxidation MSB-1powersDigester breakers The mainbreakerandemergency facilityand Polymerbuilding. Ghlorine interlocked throughan ATS controlschemeto preventfrom closing are electrically at thesametime. bothbreakers Emergency back-uppowerfor MSB-1is providedby a 300-kW(375kVA)generator Withthe currentset up the existinggenerator cannotpower ratedat 480V,3-phase. wasinstalled in 1982.MSB-1andthe all loadsconnected to MSB-1,Thegenerator lifespanfor electrical equipment andit arewellpasttheirreliable 300-kWgenerator is recommended to be replaced. 1.2 Existing Utility ServiceNo.2 Utility Service No.2 consistsof two feeders derived from the same FPL point.Eachfeederis connectedto an individual1000kVAoutdoor distribution pad mountedFPL transformerto step-downthe utility power to 480V, 3phase,60-Hzsystem.The step-downtransformersare feedingthe existing main switchboardNo.2 (MSB-2)locatedat generatorbuildingNo.2. One feeder is connectedto the Main Breaker No.1 and another feeder is connectedto Main BreakerNo.2. The existingmain switchboard(MSB-2) consistsof two main breakersand two emergencybreakers,rated 16004. One main breakerand emergencybreakerpair is connectedto one bus and the other remainingpair is connectedto anotherbus. Each set of main and generatorbreakersare electricallyinterlockedthru an automatictransfer switch (ATS) control scheme and cannot close both breakersat the same time.The two 1600Aratedbusesin the MSB-2are isolatedand there is no tie breakerto connectthem together.lf one pair of main and generator breakersis out of serviceat the sametime,the electricalloadsconnectedto 20 the associatedbus will be withoutelectricity. The outdoorswitchboardMainTie-Main(MTM)locatedoutsidethb existingMCC roomwas installedin 2012 to give Main-Tie-Main arrangementfor the down-streamof the switchboard No.2 (MSB-2). The existingswitchboardMTM is poweringthe existing switchboardSWBD-IWAon one side and SWBD-IWBon the other side. Althoughthe switchboardMTM has no improvementson the switchboard MSB-2,the electricalloadsassociatedeitherSWBD-IWAor S\NBD-IWBcan be poweredfrom one side of switchboardMTM by closingthe Tie Breaker and openingone of the desiredMainBreaker.The existinggeneratorNo.2is 1500kW(1875kVA)rated at 480V,3-phasesystem and is in very good condition. Although there are some deficiencyin the existingelectricaldistribution system No.2/ MSB-2, this technicalmemorandumis mainly focus on the improvementof the existing electricaldistributionsystem at Generator BuildingNo.1.Somedeficiencies of the switchboard MSB-2is not havinga tie breaker, no available space to add additionalfeeder breakers, no replacement breakerdue to discontinued fromthe manufacturer, etc. 2.0 Replacement Options for Electrical Distribution System at GeneratorBuildingNo.1 Therearethreeoptionsfor improving the electrical distribution systemat Generator Bu i l d i nNgo .1 . panelboard (DP Optionone is to replaceexistingMSB-1with a new distribution panel)installedat the existingGeneratorBuildingNo.l and re-feedall of the fromUtilityServiceNo.2 withredundant existingelectrical loadsat newpanelboard powerfromexisting 2 (MSB-2) andeliminate UtilityServiceNo.1 MainSwitchboard generator. andexisting300kW powerfrom Optiontwo is to replacethe existingMSB-1andconnectthe emergency generator Building No.2to thenewMSBtheexisting1500.kW located at Generator A new8004breaker will be added 1 andeliminate the existing300-kWgenerator. generator will installed to MSB-1. and new conduits/cables be at the 1500-kW Option three is to replaceexistingMSB-1 and replacethe existing300-kW generatorwith a new 500-kWgeneratorin a non-walk-in weatherproof enclosure witha sub-base fueltank. performed by Thistechnical summarizes theresultsof theevaluation memorandum for identified above;as wellas,recommendations HEEandaddresses theelements the mostfeasibleapproachto providereliablepowerfor the equipmentpowered fromGenerator Building No.1 2.1 Option 1 - Re:feed Generator Building No.1 from Utility No.2 & Eliminate300kWGenerator power Building Re-feeding Generator No.1fromUtilityNo.2servicewithredundant a new800ampdouble fromexisting MSB-2willrequirea new800amppanelboard, throw safety switch,two new 800 amp enclosedcircuitbreakersinstalledat 21 BuildingNo.2(seeFigure3) and a cableand conduitsystemfromthe Generator existingMCC Building.See figure1, PlantSite Planfor buildinglocationsand proposedconduitand cable routing.The existingloads currentlypoweredform existingMSB-1are shownin figure2. The conduitand cable requiredbetween the two buildingswould consist of four 5 setsof 4-500-kcmil AWG conductors from each new 800 amp enclosedcircuitbreakerand 1-2" conduit with control/signalwiring to starVstopthe existing1500-kWgeneratorin the event of a Utilitypoweroutageat UtilityNo.1service.Currentlythe existing1500kW (1875 kVA) generatoris runningat approximately59.5% of its rated capacity.The additionalload from GeneratorBuildingNo.1 would increase the load on the generatorto79.5%. Theestimated costof Option1 is shownin T a b l e1 . power Dueto the lackof tie breakerat the existingswitchboard MSB-2,redundant feedersarerecommended. lf onlyonefeederis designed andthemainbreakerand generatorbreakerpairassociated withthatfeederare out of service,the electrical powerduringthat systemat the Generator BuildingNo.1will be withoutavailable period. 2.2 Option 2 - ReplaceMSB-1and EliminateExisting 300-kWGen ReplacingMSB-1and eliminatingthe existing300-kWgeneratorwill involve addinga new 800 amp circuitbreakerto the existing1500kWgenerator locatedat GeneratorBuildingNo.2for back-uppower.A conduitand cable systembetweenthe new MSB-1and the existing1500-kWgeneratorwould be installedconsistingof 5 sets of 4-500-kcmil AWG and control/signal wiring to starUstop the existing1500-kWgeneratorin the eventof an Utilitypower outageat UtilityNo.1service.A new enclosed800 amp circuitbreakerfor a localmeansof disconnectas requiredby the nationalelectricalcode (N.E.C.) wouldbe installed at Generator BuildingNo.1.Seefigure1, Plant SitePlanfor buildinglocations and proposedconduitand cablerouting.The estimatedcostfor Option2 is shownin Table2. 2.3 Option 3 - ReplaceMSB-I and ReplaceExisting 300-kWGen generator ReplacingexistingswitchboardMSB-1and the existing300-1ev with a new switchboard and a new outdoor500-kWgeneratorwill requirethe removalof an existingunderground dieselfuelstoragetank (currentlynot used)and installinga new conduitand cablesystembetweenthe new MSB1 and the new generator.The new conduitand cablesystemwill consistof 2 AWG conductors, sets of 4-500-kcmil 3-120vcircuitsfor the generator heater,jacketheaterand control/signalwiring batterycharger,condensation to start/stopthe generator.The newgeneratorwill be housedin a non-walkin enclosurewith a 2000gallonsub-basefuel tankto provideback-uppower for 3 dayswhen loadedto 75% of the generatorscapacity.Removingthe generator andfillingin the existinglouverson the buildingwithCBSblock wouldallowGenerator BuildingNo.1to be modifiedin orderto installtwo 3 units(to be verifiedduringthe designphase)whichwill ton air conditioning greatlyextendthe lifeof the new switchboard. Thesemodifications would involveconnectingthe existingloads(seefigure2) to temporarygenerators for a periodof time duringthe replacement of the existingswitchboardand generator.The estimatedcostfor Option3 is shownin Table3. 3.0 Preliminary Cost Estimate 'at A preliminary cost opinionfor improvingthe electricaldistribution system GeneratorBuildingNo.1.is presentedbelow. The cost estimateis an orderof pastcontractor magnitude estimatebasedon published cost literature, bidsand previousexperience. The accuracyof this type of cost estimatetypicallyranges from+50to -30 percent.All costsare roundedto the nearestdollarandpresented in present-day dollarsas definedby theAssociation for theAdvancement of Cost (AACEI), Engineering lnternational Table1 - Option1 CostEstimate Description 4" PVC Conduit 2" PVC Conduit 500kcmilAWG Conductors #4/0AWG BareCopper #12 AWG Conductors 48" Manhole New MSB-1 New 8004 Generator Breaker New 800A DoubleThrow Switch Concrete New 800A Panelboard Miscellaneous Electrical Total Quantity Unit UnitPrice 9000 LF $21,00 $189,000 9OO LF $8.s0 $8,010 36000 LF $14.65 $527,400 9OO LF $s.72 $5,148 5400 LF $1'20 $6,480 3EA $5,700.00 $17,100 1EA $40,000.00 $40,000 1EA $8,500.00 $8,500 1EA 144 CY 1EA 1LS $6,500.00 $125.00 $12.500.00 $6,500 $18,000 $12,500 $6,500 Subtotal Contractor o&P (20%) Subtotal 25% Contingency 15o/o $845.138 $169,028 $1,014,166 $253,541 Engineering $152,125 Total $1,419,831.84 Table 2 - Option 2 Gost Estimate Description 4" PVC Conduit 2" PVC Conduit 500kcmilAWG Conductors #4/0AWG BareCopper #12 AWG Conductors 48" Manhole New MSB-1 New 8004 GeneratorBreaker New 800A EnclosedCircuit Breaker Quantity 4500 900 18000 900 5400 a 1 I 1 Unit UnitPrice Total LF $21.00 $94,500 LF $8.90 $8,010 LF $14.65 $263,700 LF 55.72 $5,148 LF $1.20 $6,480 EA $5,700.00 $17,100 EA $40,000.00 $40,000 EA $8,s00.00 $8,500 EA $6,500.00 $6;500 4 23 Concrete New8004Panelboard Miscellaneous Electrical 75 CY 1EA 1LS $125.00 $12.500.00 $6,500.00 Subtotal $9,375 $12,500 $6,500 $478,313 Contractor o&P(20%) Subtotal $95,663 $573,976 25% Contingency $143,494 15% Enqineerinq $86,096 Total $803,565.84 Table3 - Option3 CostEstimate Description 4'PVC Conduit 1" PVC Conduit 500kcmilAWG Conductors #4/0AWG BareCopper #12 AWG Conductors New MSB-1 New 500-kWGenerator* w/20009a1 sub-basefuel tank in a weatherproof Enclosure 3-TonA/C dAHU ConcreteGenerator (14'Lx 8'W x Foundation 3'D) ExistingUnderground** FuelTank Removal LouverModsat Gen. Bldg.No.1 Electrical Miscellaneous Quantity Unit 1 6 0 LF 1 0 0 LF 640 900 1500 1 LF LF LF EA 1EA 2EA 13 CY 1EA 1 LOT 1LS UnitPrice $21.00 $8.90 Total $3,360 $890 $14.65 $5.72 $1.20 $40,000.00 $9,376 $5,148 $1,800 $40,000 $175,000.00 $6,500.00 $175,000 $13,000 $125.00 $1,625 $10,000.00 $10,000 $6,500.00 $6,500 $6,500.00 Subtotal Contractor o&P (20%) Subtotal 25% Contingency 15o/o Engineering Total $6,500 99 $273,1 $54,640 $327,839 $81,960 $49,176 $458,974.32 " - costof generatoris basedon Kohlerif Caterpillaris desiredthe costwill be $225,000. ** - additional if required. funds($5,000) addedto costforde-mucking 4.0 ConclusionsandRecommendations Installinga copperconnectionbetweenexistingGeneratorBuildingNo.1and existingElectricalBuildingand GeneratorBuildingNo.2for redundantpowerto the loadspoweredformexistingMSB-1wouldbe the mostdesirablesolution.The impactto the plantduringinstallation wouldbe substantial. Installingan electrical duct bank betweenthe electricalbuildingswould involvedigginga trench approximately 24 incheswide and a minimum42 inchesdeepthroughthe existing plantat the risk of hittingexistingburiedelectricallinesand or existingburied processpiping.Dueto the extensiveexistingunderground obstacles, the trench wouldrequirehanddiggingthe entireroute.This is very laborintensiveand time consuming. Replacingboththe existingswitchboard,MSB-1and the 300-kWgeneratorwith a new 500-kwgeneratorwith a sub-basefuel tank in a weatherproofenclosurewould be lessintrusiveto the plantduringinstallation. A furthersavingscouldbe madeby usingCountyportablegenerators for poweringthe existingequipmentduring replacementof the existingswitchboard. Severaloptionswere investigatedto replace/re-feed the electricaldistribution equipmentat existingGeneratorBuitdingNo.1.As shownin the cost estimate, Option1 and Option2 bothincludeinstallinga ductbankthroughthe plantfor powerto existingGeneratorBuildingNo.1.The optionto re-feedloadsfromexisting MCC-1and MCC-2were considered. The existingelectricroomat the Operations Buildinghas existingcodeviolationswith respectto clearworkingdistancein front of electricalequipmentwith only38 inchesin frontof MCC-1and40 inchesin front of MCC-2;NECrequiresa minimumof 42 inchesin frontof MCC-1and 48 inchesin front of MCC-2.Also the optionto re-feedGeneratorBuildingNo.1from existing switchboards IWA and IWB locatedin the MCC Buildingwere considered. SwitchboardsIWA and lWB, beingof a later modelof switchboardthe available spacein the existingswitchboards will not accommodate the additionof 800-amp circuitbreakers.The largestsize breakerthat can be installedin existingIWA and IWB is a 600-amp,compactdesigncircuitbreakerwhichis not largeenoughto powerthe loadsat GeneratorBuildingNo.1.Hillersrecommends Option3, as it is less intrusiveto plantoperationswhile providereliablepowerfor plantoperations. 6 25 Appendix B - WesternRegionWasteWater Treatment Facility Survey SKETCH & DESCRIPTION LOCATION MAP NOT TO SCALE SURVEYOR'S NOTES: DEPICTED 1. BEARINGS HEREON AREBASEDUPONTHENORTHLINEOF LOT 5 ACOORDING TO fiE TRUS:IEES OF THE INTERNAL IMPROVEMENT FUNDUNRECORDED SUBDIVISION OF SECTION 36, TOWNSFJIP 43 SOUTH, RANGE 36 EAST,PALMAEACII;COUIIN, TIONTOA, 1, 1,916,SAID,NORTH LINEHAVJNc A BEARTNG OF SOUTH 88.56'01,'i' IAIED _DF^C!yBE$ EAST,tsASED UFONTHE,NORTH AMERICAN DATUMOF 1985, ON THE 1990 ADJUSTMENT FORTHEFLORIDA TRANSVERSE MERCATOR_EAST ZONE. 2. THISIruSTRUUENT NOTVALIDWTHOUTTHESIGNAruREANDTHEORIGINAL RAISEDSEAL OF A FLORIDA LICENSED SURVEYOR AND[4APPER. J. THE UNDERSIGI.IED OR GUARANTEES AS To THE MAKESNO REPRES-ENTATIONS tNrgnn,|nloN REFLECTED HEREON PERTA|NING TO TASEMENTS, nrCHrSoF WAy. SETBACK LII..IES, AGREEMENTS ANDO:THER MATTERS, ANDFURTHER. TFIIsiNsIRuuTuT IS NOT INTENDEDTO REFLECTOR SET FORTHALL SUCH MATTERS.SUCH INFORUETION sHouLDBE OBTAINED AN9 CoNFTRMED By'oTHERS THRoUGH AppROpRtATE nrLE VERIFICATION. LANDSSHOWNHEREONWEREttOr IASTRACTEDrOn R|CHTSOF WAy AND/OR EASEMENTS OF RECORD. 4. THE LICENSED BUSINESS NUMBER FOR DENNISJ. LEAVY& ASSOCIATES - INC.IS LB rHr SURVEYQRS LICENSE CrnrrFytNG NUMtsERtS LS #5388. 465SS, 5. THIS IS NOT A SURVEY. DennisJ. Leavy& Associates, Inc. * Land Surveyors Mappers 46O BusinessPOrk'Woy'+ Suite B Royol Pofm Beoch, Florido 33-411 Phone: 561 75it-0650 Fox 561 753-0290 SKETCH& DESCRIPTION PalmBeachCoqntyWater Utilities Department DATH-12/11/oe A porcel o.f lond being comprised of o portion of Lgt 3, the North one-hptf (N 1/Z) of Lot 5 ond_o portion of the North one-hotf (N 1/2) of Lot 6, oqcordingto the Trustees of The lnternol lmprovement Fund UniecoiOddSr.rbdivision of Section 36, doibd: December1. Jgylr{p 43 South" Rglgg 36 Eost, Potm Beoch County,Flo-rido, 1916. Being mor:e porticulorlydescribedos follows, BEGINNING ot the Northwestc6rner of soid Lot 5; thence South 88'56'01" fsgt (qs o b o s i s o f b e o - r i n g so) l o n g t h e N o r t h l i n e o f s o i d L o t 5 , o d i s t a n c eo f s g J . J J ' f ; ; t th:; Soltfrwest corner.of soid Lo!.5i_ll,gl"e trlorth OO'A7'42"West otong the West l? line of soid Lot 3, o distonce of 1,zO3.sg feet to o point beinq on ihe south Right-of-Woy line c'f 'the Sbuth Flor:idoWoter M;;";#;"i bi;fi"i l*t4 conol (ttiltsnoroConol); thence South 61'25'07'"Eost otong soid South Right-of-Woy, o diston'ce of 58O.95 -fee! thenge South 00'55',52oEo-;t, o distsnce o-f 5J0.0J feet; thence South 0O'.|7'02"Eost; q distonce of 21O.bJ feet; thence Sorrth O7.SJ,SO'; Eostno d'istqnceof 9a.00 feet'to o point bging ori q fine lying JS1.74,feei Eost-of, ond poroflet wit,lr(os meosured ot right ongleri tnr West line of sqid L,ot J; thence South OOIQV'42"-ost oiong soio porollel line, o distonce of 194.06 feet t,o o point being on the North line of sqid Lot 6; thence North 88'56:01'West otong soid North line, o distonce'of 300.05 feet; thence South 01.0J'Sg"West; o distonce of 100.0J feet; thence south 4z'3o'27" west, 'o distonce of J9,01 feet; therrce south. 02'23'33" Eost,-o distonce of 2g5.g+ feet to the point of curvoture of o circulor CurVeto the left; thence ,southeosterlyolong the src of soid curve hoving o r:odius of 65.00 feej, g cerilrol onQleof 7839'02" ond on orc length of g9.2J feet; thence South 81"02'35" E-os!,o distonce,of ?;47,96 feet; thence-South 07'06'47:'f""i; distsnce oI 2O2,2Q feet tp q p,oint being on the South line of the North. ohe-hotf" (N-1/2) of s:oid Lot 6; thense Nolth.gs'so'z+" wes-t otong soid, south iine, o distonce of 356.72 feet to the Southwestcorner of the North one-holf:(N 1/Z)'af soid Lot 6, o,lso being the Southeos,tcorner of the North one-hotf (N 1/Z) iiir"iO Lot 5; th.ence c.ontinueNoirth 88' 56"24" Wes.tolong the South line of the North one-holf (N 1lZ) of soid Lot 5, o distonce of 586,8i feet to o point being bn the wes't line of soid Lot 5; thence l\,lorth oo'lo'J4" Eost olong soid west line, o dist,onceof 659.57 feet to the PATNTOF BEGINNING. Soid londs situste, lying 1n$ ulng .ln_section,s6, Township43 south, Ronge J6 Eost" City of tselleGlode,Fotm Beoch County, Florido. C o n t o i n i n g1 9 . 6 7 q q r e s m o r e o r l e s s . DennisJ. Leavy& Associates, Inc, Land, Surveyors'* Mappers r \ 460 Business Por-k Woy * Suite B Royof Polm Beqch, florido 33411 DRAWN:. RRM SCATE: y7a Phone: 561 755-0650 OHK: IOB$99-g79-4-e SHEEI:2oF yl Fox..561 753-0290 DAB DAIF;12/11/os LINE L'l L2 L4 L5 L6 LINETABLE DIRECTJON LENGTH N88:56101"W 300.05' s01:03r5g'W', 100.03' s,42'36'27"W s0223133"E s81'02'35"E s07?6'47"E 39.01' 235.9'4' 2.47.96' 2A2.2fr' CURVETABLE EURVE RADIUSCENTRAL :ANGLEARC LENGTH c1 65.00: 78!39'02" 89.23' LEGEND: = Ri:GHT-gp-vvtry R,/W = .SOUTHELORIEAWATER S .F .W,M.D MANAGEMENT DiS"TRICT ft CENTERLINE Y + MOREOR LESS NOTE: TFIE:SURVEY PREP,ARED BY K,C, MOCK:& ASSOCIATES, REFERENCES 4336-36, WO 58_350, L-825, DATED: 8_13-58 WAS REFERENbED DURiNGTHE PREPARATION OF THIS SKETCHAND DESCRIPTION. DennisJ. Leavy& Associates, Inc. r \ LandSurveyors" Mappers 460 BusinessPork Woy r' Suite B Royol Pdm Beoch.,Flqrido33411 DRAIYN:RRM Phone: 561 753-0650 GHK: DAB Fotr 561 753.-O290 SCALE:p/a DATEIz/1i/os IOB$99-s79-6-6SHEFf:.3ar y :r.; 29 MATCHLINE'A' (sEE SFTEET 5) ffi' Eu&l6ffi GMr @mqk Eriffi &c @gj4 3 POINTOF BEGNNNING NORTHWEST CORNER OF LOT5 bE i- WESTLINE OF LOT 3 753'55"E 94.00' fti EF o @s 351.74' z s8956:01"E 593,33' (BEARtNcEASE) SOUTHWEST CORNER. LOT s00'07r42"E 194.06' NOR]H LINE OF LOT 5 DESC.R|BED ARE,A= 19.67 ACRES* WESTLINE oF t_oT5 EAST LINE 0F LoT 5 L4 NORTH 1/2 LOT6 Ld + J") o F o o z NORTHt/2 tAT 5 SOUTHEAST CORNER oF THE NORT}{112 OF LOT 5 SOUTI'JLINE OF THE N0RrH1/2 AF Lor s SOUTI{WEST CORNEROF THE NORTH1/2 OF LOT 6 SOUTHLINE OF THE NORTH1/2 N8856'|24:',W '596.93' souTH1/2 LOT 5 DennisJ, Leavy& Associates, Inc. * Land Surveyors Mappers 46O Business Fork Woy * Suite, B Royol Pclrn Beoch, Flor:idc 53411 Phone:661 7e3-0650 Fsx 561 755-0290 DAIEItz/r/og "fr,t(u, \ o\ "crof),-/< \ ^ "riUa, f.1 rvav v SOUTHR/W LINE OF THE S.F.W.M.D. L_14 CANAL .6 a .T "7 ,I? 204 100 r.O o c; Ol. t"? lC, 11* lr) o (\ WESTLINE OFLOT'3 0 trJ = .N GRAPHICSC4LE IN'.FEET SCALE:'1"' = ZQQ' -$ F AREA= DESCRIBED, 19"67 ACRES* o c{ rO i,o r.) o v1 EASTLINE OF LOT 3 LOT O ,O z. s00'17'02"E 2i0,55' - n MATCHLINE'A' (sEESHEET 4) DennisJ. Leavy& Associates, * MappersInc. LandSurveyors I \ 460 BuEinessPork Woy * Suite ts Royol Pofm Bsoqh, Flqrido 55411 DFIAWN: RRM SCALE:i" =.2OA' Phona: 561 753-0650 CHK: DAB SHEEI5 OFy JOB#os-ozg-r-o ri.:;s\,;i.l Fqx:'561'753-0290 DArEztz/f/as: AppendixC - SingleLineDiagram- BelleGlade WWTF- Alternative Powerlmprovements 6-15-2015 32 L----rg{rglgr"rr.nL"r'--W':" m, iuc 9R s.*^E dRfirilrown6i!rcU! __] uru \""""J !s!ge m6rd@1u;il I RMdrf,hJ|Md&rm UURilJ4WffiEM ! wElffir4o*baamEro ffixildreFilRddE tffde@oEilrdffieD ffiIGEffi . wi&flrubufffiE4uo MnrdFeqrre.mo l WWdSrdB@d r wffiretu*rErMFrcxfid id!r+&ffiMftffiFe mi4dMddnorsd RIil'dIIIAi1m ATTACHMENT- K VendorQuotes ElectricalSubcontractorQuotes Three subcontractorswere approachedto bid the electricalwork for Western RegionWaste Water Treatment Facility(WRWWTF)Power lmprovementsProject. The electricalsubcontractorswere requestedto provide quotes basedoff completingwork in PhaseL and Phase2 of the project. The following priceswere received: ElectricalSubcontractor Powerlineof SouthFlorida EnergyEfficientElectric l2 Electric BidAmount SBECertified YES 5198,800.00 YES s195,500.00 NO s181,954.00 Powerlinewas not selectedbecausethey had the highest bid. 12Electricwas the lowest bid, however EnergyEfficientis a Countycertified SBEwhere 12Electricis not. GlobaltechInc'scontract grants a LA% pricing advantageto certified SBEs.EnergyEfficientElectricwas chosenas the most comprehensiveand competitive bid to effectivelycompletethe work required. EnergyEfficienthas provided a supplementalscopeand estimate which reflectsthe scopeof work for Phase1 and associatedcosts. This cost is carried in GlobaltechInc.Work Authorization No. 2 WRWWTFAlternative Power lmprovementsPhase1. - PhaseL EnergyEfficientElectric $138,000.00 EnergyEfficient Electric,Inc. 1600Mercer Ave.Unit6 WestPalmBeach, FL. 33401 Phone(561)655-7211 Fax(561)6s5-9661 Mobile(561)722-1381 E-MailAddress: rene@energyeff.com StateLicense#EC 000L096 J u n e1 8 , 2 0 1 5 Electrical Scope of Work Belle Glade Generator ReplacementPhase1 electricalwork We arepleasedto provideyour firm with our scopeandproposalfor thenecessary project.Our scopeandproposalis basedon phase1 oforiginal quote# 30983. on the abovereferenced fncluded: 1 . Furnishandinstall all gearper original quote. to existingelectricalbuilding. 2 . Furnishandinstallall oonduitsfrom newgenerator 3 . Furnishandinstall lightring protectionandgroundingfor the generatorandelectrical building. 4. Furnishandinstallconduitfrom existingelectricalbuildingto existingmainbuildingPLC. Excavatingandbackfill by Globaltech. Lump Sum $138.000 We appreciatethe opportunityto quoteyour organizationon this project.If you haveany pleasecall me at the office. questions, ThankYou Very Kindly, fone'liau Vice President ----- Commercial ----- Industrial -*- LightingSystems Residential sr@Ewacww&lircDacoMwrpffiswAewwmoNEurcf,rutqeMm(lg86trw^DE@lMmvs$-8cotE-truEt_NomlTNmM&kAos-xlr-6-l|Ww-Efflcm-!tr88I 8@tgm EnergyEfficient Electric,Inc. 1600MercerAve. Unit 6 WestPalmBeach,FL.33401 Phone(561) 65s-7211Fax (561) 6s5-9661 Mobile (s61)722-1381 E-Mail Address:rene@energyeff.com StateLicense#EC 000tr096 May 29,2015 Revised Electrical Scope of Work Belle Gtade Generator Replacement Quote# 30983 electricalwork We arepleasedto provideyour firm with our scopeandproposalfor thenecessary (Globaltech); Nico thru with a walk proposal on is based and project.Our scope on the abovereferenced from DaveDaltonandJosePozo(PBC)andAdamWard(MWH) anda final technicalmemorandum 2L,2014andnew 1 line diagram. PBCdatedJanuary Included: existinggeneratorfor removalby others'Disconnect 1. Demowill consistof disconnecting of Globaltechandtheir lifting equipment. existingMSB-I andremovewith the assistance fumishedby othersat the elechicalbuilding,by Z. Electricallyconnecta temporarygenerator the digesterblowers,chlorinebuilding PNL C andOxidationditch MCC-3. All gables firnished with generator' 3. Furnishandinstalla newMSB-1perthe new 1 line diagram' for 4. Furnishandinstalla new 50 KVA transformer,200 arrylightingpanel,(4) disconnects for disconnect SS and 200 amp cord cap receptacle, male air conditioning,200ampgenerator in the new the centrifugeanda terrninaljunctionbox andpowerdistributionblocksto tie wiresfrom MSB-I to existingloadwiresunderexistingMSB-I' 5. Furnishandinstallnew feedersfrom thenewMSB-I to the FPL vault,newMSB-I to new andnewMSB-I to existingwiresunderthe existingMSB-I. generator 6.. Fumishandinstallconduitand 100ampratedwiresfrom newpanelLP to a lightingpanelin All loadsfrom generatorlightingpanelprewiredin enclosure. the generatorenclosure. 7. Furnishandinstall new wire in the existingconduitfrom the new terminaljunction box in the elechicalroomto the (2) existingdigesterblowersvia a newjunctionbox betweenthetwo blowers. monitorfurnishedby others. 8. Assistwith the installationof a newPLC andtemperature bYothers. Programming g. Furnishandinsiallup to 335 feetof 2" conduitfrom thenewPLC to existingmainbuilding of a backhoeandoperatorfurnishedby Globaltech.Installup to 500 PLC with the assistance by others. feetof fiber opticfurnishedby others.FO terminations building1 and grounding on existinggenerator and protection lightrring install and 10. Furnish ' newgenerator enclosure. Excluded: 1. PermitandFPL fees. 2. Concreteandasphaltcuttingandpatching. 3. Concrete Pads. ductbanks. 4. Concreteencased 5. Trashdisposalto an onsitedumpster. 6. Reuseexistinglightsandreceptacles, q\w,**N8w!*r^*W."*"-*"-#;:3*;;JHl1Tffi; --' Industrial :*"#5cia1 EnergyEfficient Electric,Inc. 1600MercerAve. Unit 6 WestPalmBeach,FL. 33401 Phone(561)655-72II Fax (561) 655-9661 Mobile (s6L)722-r38r E-Mail Address:rene@energyeff.com Lumn Sum $195.500 We appreciatethe opportunity to quoteyour organizationon this project. Ifyou have any questions,pleasecall me at the office. ThankYou Very Kindln Rpne'l/i.au VicePresident *-- Industrial ----- Commercial *-- LightingSystems Residential MNtr TIINNImOIJ]@XPNWMQreUSED Qffi ('}rc ,x'n , { ELECTRIG Esruare Rev2.0 561-270-3182 admin@i2-Solutions.com 1250WallaceDr.SuiteH DelrayBeach,FL33444 June3, 2015 Gustomer: ' GlobalTech 6001BrokenSoundPkwyNW#610 BocaRaton,Florida33487 Contact: Mr.NicoShaner Project: (opt3) BelleGladeWWTP- Alternative Powerlmprovements Scope: As a memberof GlobalTech's projectteami2Solutionsdlblai2 Electricwill performthe following: L GeneralScope: . Upgradeelectrical switchgearin existinggeneratorbuilding1 (whichwill becomeswitchgear generator. new(outdoorinstalled) building)to accommodate a Installa fiberopticlinkbetweenswitchgearbuildingand mainPLCcabinet a and lightingpanelas wellas 2 futuresoft lncludescompleteEatonswitchgear,transformer startswithfullspeedby-passup to 125HP(180FLA)forfutureaerators,as specifledto Global perhis 1-Line2015_05_14-Model. Techengineer items added June3, 2015.Includeslightningprotection Addition and groundloopfor electrical building(155ft) and newgenerator(80ft), buildingtemperature monitor,electricalbuilding temperature monitorandcircuitin conduit(50ft) and controlcircuitfromATSto RTUin conduit (50ft). il. switchgear DetailedScope- Upgradeelectrical r Demoand removeold switchgear. transferswitch(ATS),mainbreakerand main Provideand installEaton800ampautomatic panel(MDP). distribution a transformer Provideand install50KVA480v-1201240v a indoorpanelwithtwenty20 ampsingle Provideand installEaton200 amp42 circuit1201240 poleandtwo 30 amp2 polebolt-inbreakers. hubs,unions,sealoffs,etc;wire;ground i2 will provideand installconduitand all associated pullboxesandjunctionboxesas requiredperone linedrawing. rodsand connectors; i. Aluminumrigidconduitfor abovegroundinstallation ii. PVCConduitfor belowgroundinstallation iii. Gabletrayand racewaypenetrations intoswitchgearwithinswitchgearbuilding. iv. Excavation and backfillfor conduitrunsas neededto installnecessaryconduits. groundingsystem,tie to existingsystem. v. Installnewgeneratorandswitchgear . i2willwireandterminateelectrical devices,panels,etc as required,Including: i. Newgeneratorconduitsandcable. ii. Reconnection of FPLtransformer feedto ATS iii. Reconnect old servicecabinetand newswitchgear. . Powerwiringto be meggertestedto insureno damageto insulation followinginstallation. . Wringto be labeledat eachend. FL ElechicalConhactor# 13005565 to assistwithstartup MasterElectrician . Scope- Installfiberopticlink il1. Detailed 300ft. Provideand install2-inchpvc belowgradeconduitapproximately and backfillfor conduitrunas neededto installconduit' Excavation 20 feet underexistingdriveway drill/boreapproximately Directional fiber. 700feet- 6 fibermultimode Provideand installapproximately r . . . tv. perShaneremailof May27,2015 Additions (seeparagraph . LightningProtection V below). - aroundthe building 155 is approximately enclosure.Building andthegenerator . Grounding - generatorpadis approximately 80 ft perimeter.Bondingof the generator ft perimeter frame,and lightningProtection. buildingthatwillconnectto the monitorfor the interiorof the switchboard RoomTemperature conduitand cable.Analog4-20output' (50ft max) LocalRTUandassociated Conduit,wireand cablebetweenthe localRTUandthe ATS (50ft max).Assumesfourteen conduit. and associated #14 wiresfor discretesignals,datacablefor Modbuscommunication V. for buildingand generatorenclosure. LightningProtection Scopeof Proposal materials . Priceis basedon utilizingclass1 aluminumlightningprotection drawings unlessnotedbelow shop and shipping, a labor, materials, all Proposalincludes a systemwill be installedper UL96A,LPI175,and NFPA780 lightning The lightningprotection protection standards Systemas specified a completeLightningProtection a Priceincludesfurnishingand installing as specified a groundcounterpoise a Priceincludesfurnishingand installing Exclusions All cuttingand patchingof concreteand/orasphaltis by others,if required (50)of 1' PVCconduit to furnishandinstallapproximately Contractor Electrical priceis basedon adheringdirectlyto the roofmembraneand doesnot includefurnishingand installinganysacrificialroofing approximately 0 pads,pavers,membranestrips,etc.lf requiredby the roofingmanufacturer, are required a to furnishand installall flashingandsealingfor all roofpenetrations Roofingcontractor a SurgeProtectionis excluded Vl. Clarifications Excludes: i. Estimateassumesthat itemssuchas design,drawingsandspecs,loadcalculations, of othersandarespecifically O&Mmanual,andtraining,etc.arethe responsibility excluded. Clarification: availableas of dateof estimate. i. Estimatebaseduponlimitedinformation intoestimate. (if any)requirereviewand integration ii. Uniquecustomerspecifications Froposalbasedupon: . . r as; 1-Line-2015-05-14-Model 1 drawingreceivedfrom Customeron May 15,2015,labeled withGlobalTechengineerNicoShaner Conversations Sitevisit Fnicing: Labor,Materials,Equipment& Salestax: $ 181,954 (Note:price excludesperformancebond) FL ElechicalConh'actor# 13005565 Exceptions/ Additiona[wor]<: for materialsprovidedand installedare excludedfrompricingabove.Pleaseverify Costsfor SiteSecurityand Insurance for sitesecuriiywithyourinsuranceprovider' and items coveragefor suchinstalled excluded.Changesto the siteare not withinthe scopeaboveare specifically identified Workand ltemsnotspecifically costsas follows: includedin the Scopeoutlinedaboveand mayresultin additional . to the agreedscopewillbe deliveredon a Unlessotherwiseagreedby the partiesin writing,anyadditions on site) still (@ assuming mobilized /hr basis. time and material $86'25 sf the Customer: Requirements excludedfromthisproposal: for the followingand is specifically willbe responsible The customer ' . . . . as outlinedin the PlansandSpecifications of the contractor Responsibilities soil disposalfees (if required) Contaminated permitpulledby i2 if required) Primarypermit(Electrical (AHJ) withAuthorityHavingJurisdiction Assistwithcoordination T'ermsand Payrnent: Cornmercla! Thisproposalis validfor 30 daysfromthe proposaldatestatedon thefirstpageof thisdocumentor as setforthby the bid documents, All billingshallbe per and mutuallyagreedby the customerand i2 Electric. A Scheduleof Values(SOV)shallbe established the SOV. workand variationfromthisProposalis foreseen,bothpartiesmustagreein writingto the additional Wherea substantial accordingly.Servicesare providedon fixedfee basisandare billedas delivered. amendthis Proposal rendersthe servicesor Customer charges,as contractor i2 ElectricwillinvoiceCustomerfor all servicesandapplicable incursthe charges,as applicable.Customerwill pay eachinvoicewithinthirty (30)daysof the dateof invoice.Invoicesnot balancedue' paidwithin30 daysshaliincura financechargeof 1.5%interestper monthon the outstanding Warrantee: Electrical or improperinstallation. i2 Electricwillwaranteetheirlaborfor oneyearagainstanydefectsin workmanship of thosedevices. warrantees, suchas providedby Eatonare as setforthby the manufacture component Acceptanceof FroPosal: to and are herebyaccepted.i2 Electricis authorized aresatisfactory andconditions The aboveprices,specifications as outlined above' will be made Payments performthe workas specifled. Acceptedby: (Signature) (printednameandtitle) Dateof Acceptance: FL Electical Contractor# 13005565 FIBEROPT1C/ NETWORK WTRIN6 OFrTIONSFOR 3OOt( GENERATOR I' FROM 3OOKGENERATOR To t/AlN PLc 1= 10.0FT LE6END F-O. CABLE COAXCABLE FROI\'13OOI(GENERATOR TO Clz PLC3 = 408 Fr. ! : I GEl.leRAlOF.BtOG--. I' .- EITIERI.IET i J''' I l z" PIPE ivaur-isr.z,s HAVE & i AVAILABLEFoRF/o 480vAc . "- .-.- tr"" rl SPEED,I BUIViPI COAX I .l ,i r, Il ,-r I r lOrfl.'LI ! atoc 170.0FT. MN il $-06 Pt[ | :*". + I t-- ,-) t.. l-;-" I / 40 FT.TO PLC3 / r-+ 65 FT. / rcPLCL /l F l; ' ' l viutl I ;; 14.0 i:ill(l O I N F 90.0Fi t, /- n -;-rE,F*s,ra,tu." -:-' i ; r).:hY ,\Fr . ll'*'*r | eHol8t latrc.l€@ r@ldBal / r @,Eta n .t 5ZlIffii da;f,:xmlg *r' r" rr f{!l + I !-.*,."*"* '6@0l I rI I , -_1 16 wtnr.@-? affii@cr.€ "*i s! zE eB Ee ii5 ; | "2 'i I ffiR@--_9 Ee <i>ermow ' Ln:-r.iA. NOTES: Et@l@ EUSEE TESGColsi sfrric ,6 FL{ UW rTn. 0 ls srcie EAts M3EltsaP&ard1.l rt lI 2 J. |R-Vsdu NOE 6 3 XMaECH4C4TOS&D FOi AEIIOE I&Iffi dA GriRilE-@6E $5tdo6 GrsffiusqslG s ! rrrr!i,r.dEtouvaF€sEM |:,j.,,q1. i'olaq6d@E, .or-:..{EBtEc€Pr^tla ! rer?F$G]&t@rt;io@!Y ! ilEilW.NOiO8SrgilDFR4Sflc ;irno rorr.L cdDrnEhilF& I -1 I lan I * +r tl LI *'"1TT' E%Cg4$6Std$1601!ifr SwRts.Axc u464 S Jd.lS gG€co'st dE 1: rt r: lvt rw StateCertificate# EC-13003753 Date:8 July15 To: Globaltech,Inc. 1075BrokenSoundPkwYNW Suite103 BocaRaton,FL33487 Ref, Belle Glade WWTP Alternate Power Improvements WUD 14-050 Information,Plans We purposeto provide a completeElectricalInstallationper Provided & Specifications Option #3 Temp.Powerincludedfor changeover 711 CommerceWay Suite # 6 Jupiter' FL' 33458 ph. 561-57S-427O Fax 561-575-4269 Email: Powerlineofsouth(Dbellsouth.net Exceptions: l.Motors/PumPs 2.PLCProgramming Set 3. Generator This Proposal subiect to renegotiation after (90 Day Period) Amount:8 198800.00 Purposed oni Hundred Ninety Eight ThausandEight Hundred Dollars Thankyou for theopportunityto providethisEroposal' Sincerely ThomasLaessig President # EC-13003753 StateCertificate Generator Quotes to providequotesfor the new500kWgeneratorat Western Threegeneratorsupplierswereapproached ProjectPhase1. The Powerlmprovements RegionWasteWaterTreatmentFacility{WRWWTF) generatorsupplierswere requestedto providequotesfor a 500kWgeneratorwith a 2,000gallonsubThefollowingpriceswerereceived: basefueltankandaluminumwalk-inenclosure. Generator Supplier QuoteAmount Manufacturer Generator CumminsPowerSouthLLC. Inc. TAWPowerSystems, PantropicPower,lnc. $t43,779.88 Cummins Kohler Caterpillar(CAT) S215,ooo.oo S162,525.00 CumminsPower South LLCwas chosenas the most comprehensiveand competitive quote. Cummins Power South LLCwas later askedto provide pricingto upsizethe sub-basefuel tank from 2,000 gallons to 4,500 gallons. In addition to the tank upsizeCumminsPower South LLCwas requestedto price an enclosurethat had a minimum wind loadingof 190 MPHto satisfythe new buildingcode. CumminsPower South LLC.has provided a supplementalscopeand estimate which reflectsthe requestedchangesto the original quote. The quote is as follows: PowerSouthLLC. Cummins St5S,6++.88 **S155,644.88includesS151,894.88 for generator,enclosureand fuel tank; 53,750.00for additional engineeringto satisfywind loading requirement** Quotation LLC CUMMINS POWERSOUTH E-Mail: Tim.Alban@Cummins.com 3777lnterstate Park Road W. West Palm BeachFL 33404UnitedStates Direct:561-281-3638 April 16,2015 Project Name:Belle GladeWWTP t 9535 Quotation:20270000001 Thankyoufor yourinquiry.We are pleasedto quoteas follows: 50H2440/400kW Diesel Genset:60Hz-500/tt55kW Application Emeruency lnstall-US-Stat U.S.EPA,Stationary Rating 500kW-Standby Genset-Diesel,60Hz, 5OODFEK Power Rating-Standby Duty A331-2 Listing-Ul2200 1090-2 Emergency EPA,Tier2,NSPSCI Stationary EmissionCert, L170-2 Wire Phase,Wye,4 Voltage-277/480,3 R002-2 0 Hz, 12 Lead,ExtendedRange,1251105C Alternator-O 8,258-2 2100 sET CONTROL-PCC H643-2 DisplayLanguage-English H536-2 Display-Control,Graphical H605-2 Status,UserConfigured Relays-Genset K631-2 Ffi-1 0 Interface-CommunicationsNtwk, KP60-2 Output,Analog Meterc-AC H606-2 Facing ControlMounting-Left H609-2 120VoltAC Heater-Alternator, M92-2 Only CB or EB orTB-Right KUg4-2 15V,SSRMS,80%UUl EC Right,3P,600/4 CirBrkr-800A, RUl4-2 CB or EB orTB-BottomEntry,Right KB72-2 Separator-FuelMater c127-2 50CAmbient EngineCooling-Radiatot EA74-2 Coolant Level Shutdown-Low H389-2 40F MinimumAmbientTemp CoolantHeater-2081240/480v, H556-2 Duty EngineAir Cleaner-Normal D041-2 On ExhaustConnector-Slip AC9E-2 Gensetwananty-Base,Standby2 years/ 400 hours,PrimePower1 year/ L028-2 unlimitedhours,Continuous Power1 year/ unlimitedhours Literature-English Packing-None ProductRevision- M CommonPartsListing 1050-2 A358-2 SPEC-M cP01-2 ST12OSN3RSL, PILNCCB, E STOPBRKGlassNEMA3 w/ contacts PILNOCB WCONTACT DeliveryOption3 FactoryDireciShipment to Customer WeatherResistant.Level 2 Sound Attenuated.Walk in. AluminumEnclosure: . Approximate Dimensions: 20'Lx 11'Wx9' H (plusFuelTank) . EnclosureExteriorto be of .090',5052-H32 Aluminum,Formed,PanelConstruction, Pre-Painted FinishStandardColor\tVhite (Customcolorextra) o Air Intake:SoundAttenuatedIntakeScoopswith PunchedBirdScreen . Air Discharge:SoundAttenuatedDischargeHoodwith GravityDampersand BirdScreen . 3" SoundAttenuating FireBlanketin Walls, Doors,Hoodsand Ceilings.Insulation Aluminum Retainedwith .032"Perforated Liner.Enclosureis Designedto Reduce SourceSPLby 25 dB (A) @ 1M in a FreeFieldEnvironment. . (2) Lockable,HingedAccessDoorswith PanicBarsand CorrosionResistant Hardware o SilencerMountingBrackets,Supports,and Bandsfor AMPSProvided,Interior Mounted,Internally Insulated, CriticalGrade Silencer o AMPSSuppliedExhaustFlexConnector o AMPSProvidedMiteredExhaustOutlet o All ExteriorHardwareto be StainlessSteel o Extendoil, Coolantand Silencerdrainsto EnclosureExterior . Enclosure Suitablefor 180MPHWindLoading 5.175-Gallon. UL 142.FDEPSub BaseFuelTank(EQ# 1 1 1 1 (4512UsableGallons) 533): . Approximate : 235"Lx 138"Wx 45"H Dimensions: Tank . Ti'Mild SteelSecondary o RuptureBasinwith FDEPApprovedLeakDetection LS600) Switch(Pneumercator o Mechanical FuelLevelGauge(Visibleat FillPoint) o Supplyand ReturnConnections o 2" Fillwith LockableGapwith FDEPSpillGontainment Per ULVentFittingsInstalled o Normaland Emergency 142 o LowLevelFuelAlarmSwitch(MadisonM-7000 EQ#682)Set @ 67% RemainingCapacityWiredto Fuel AlarmConsole . HighLevelFuelAlarmSwitch(MadisonM-7000 EQ#682)Set @ 90%TankCapacityWiredto Fuel AlarmConsole r CableStubUp OpeningUnderCircuitBreaker . GeneratorMountingPads o 2LiftingPointsper Side(4 Total)for LiftingGenerator andTank(EmPtY) Set,Enclosure o TankcoatedwithTwo PartEpoxyPrimerand painted GlossBlack ElectricalPackaqe: lncluded 1 Phase o Provide,InstallandWire(1) 100A,12O|24OV MLOLoadCenterwith BranchCircuitBreakers o Provide,InstallandWire(3)48' DualTubeFluorescent LightFixtureswith (2) 3-WaySwitchesLocatedby EntranceDoors. e Provide,InstallandWire(3) DC LightFixtureswith (1) 60 MinuteTimerSwitchesLocatedby EntranceDoors o Provide,InstallandWire (2) 2OA,125VDuplexGFCI Locatedby EntranceDoors Receptacles r Wire CustomerProvidedand lnstalledJacketWater Heatersto LoadCenter o Wire CustomerProvidedand InstalledGeneratorStrip Heatersto LoadCenter . MountandWire CustomerProvidedBatteryChargerto LoadCenterand DC Outputto Batteries . All Electrical to be Runin EMTor FlexibleConduitto meet NFPA70. OSHACompliantStairs and Walkwavs: . (2) Set of OSHACompliantStairswithRailingsand48" WideWalkwaywith Railings o Railingsto be Constructed 40 of 1Tz"Schedule Aluminum Tube of Extruded Stepsand WalkwaysConstructed Aluminum a StainlessSteelLevelingPads a on Site StairsSetto be ShippedLooseandAssembled by Others / O&MManuals Submittals Start-Up/Training FOBAMPS Quote based on PBG Design Build Criteria & Drawing(s) Alternate I GrandTotal $151,894.88 (checkappropriate adion): HoldforAPProval RELEASE ApprovalandtermsaccePtance CustomerSignature CUMMINSPOWERSOUTH.LLC POWERGENERATION of Sale."Thesetermsalsoappear of Oders and Conditions Thefollowingarethe "Termsof Acceptance here.CUMMINSPOWERSOUTH,LLCsales of Saleformandare reproduced on the Acknowledgment onthesetermsandCUMMINSPOWERSOUTH,LLC'sacceptance are limitedto andmadeexclusively termscontainedin any of anyorderis limitedto the termsof the Sellerand rejectsanyadditional documentthatmay be proposedby the Buyer 1. ThisQuotationis validfor 60 days* of the datequotation,Priceshallremainfirm providedour andthe shipdateof the submittaldrawingsare approvedand retumedwithin60 daysaftersubmission, equipment is notextendedby you or yourcustomerbeyondour publishedleadtimes. Delaysor charges,on someor all equipment escalation extensionof the aboveleadtimesmay necessitate ordered. withinthe continental 2. Deliveryis F.O.B.Factory.Freightis prepaidand allowedto the firstdestination enclosed truck. Opentrucking an (smallerthan601 kW)are shippedin UnitedStates.Generators via flat bed truck. are shipped cost.Largerunits deliveriesare availableat an additional 3. Pricesfor generators,transferswitches,switchgearand looseaccessoriesas required,will be invoiced at thetimeof shipment,or whenreadyfor shipment.Shouldthe buyerdelay,deferor refusedelivery, charges. andstoragechargesmay be assessedin lieuof the abovestatedescalation additionalhandling to orderandis subjectto is customfabricated suppliedby thismanufacturer 4. The equipment cancellation charges. andall buildto orderequipmentare subjectto thefollowingminimumcharyes Switchgear, Generatorc assessedfor cancellationof any order:25oloof totalorderpriceif cancellationis receivedin our oftice betweenthe date of orderentryandthe datewe receivewrittensubmittaldrawingapproval.50% of total is receivedin ourofficeafterwereceivesubmittaldrawingapproval. oder priceif cancellation is receivedin ouroffice60 or fewerdaysbeforethe scheduled of totalorderpriceif cancellation 75olo is receivedin our officeafterthe shippingdateof the order.85%of totalorderpriceif cancellation equipmentis assembled. afterourcostsdueto the cancellation chargewill be determined The exactdollarvalueof the cancellation generatorcancellation Standard is required.The aredetermined.A writtennoticeof cancellation our price fadory. of order from release after of the total order chargesare 25o/o at the 5. Paymenttermsare net30 daysfromdateof invoice,subjectto approvalof ourcreditdepartment locationsoutsidethe U.S.)aresubjecttoa deposit timeof the order.Nondomesticorderc(finaldelivery of 25o/o at the timeof order.Balanceshallbe paidpriorto shipment.Exportorder(deliveryoutsidethe shallbe limitedto10%.Paymentof US)mayrequirea letterof creditdrawnon a U.S.bank.Retainage of startup or payableno laterthan90 daysfromthe originalinvoice. retainageis due at completion Actsof for delaysin deliverydueto fire,strikes,accidents, 6. CumminsPowerSouthis not responsible schedules shipping our control. beyond Quoted other causes or accidents flood, Nature,war,explosion, andsubjectto changewithoutnotice.In no caseis CumminsPowerSouth are notguaranteed damages.CumminsPowerSouthdoesnotacceptliquidated or consequential responsible for incidental damagesas a partof thirdpartycontracts. 7. Eachproductofferedin this quotationis accompaniedby an expressedwrittenmanufacturefswarranty and is the onlywanantyoffered. coveredby thisquotationwill be acceptedon a holdfor releasebasis.Your 8. An orderfor the equipment untilwrittenapprovalto proceedis receivedin our for production orderwill not be releasedandscheduled office. sectionslistedon ourquotation. 9. Thequotationofferedherein is limitedto the plansandspecification itemsmayrequireadditional for administrative requirements apply. Additional other sections shall No cost. setsof O&Mmanualsare limitedto oneset.Additional statedon ourquotation, 10.Unlessotherwise standardformatshallapply. cost.The manufacturer's O&Mmanualsare availableat an additional CustomO&Mmanualswill be availableat an additionalchage. 11. Startup services,loadbanktesting,andownertrainingare not providedunlessstatedon our quotation. Startup serviceswill notproceeduntilthebuye/saccountis currentandin goodstanding. off loading,rigging, 12.Ourstandardquotationdoesnot includeoff unitwiring,off unitplumbing, or fuel. installation, exhaustinsulation for testingof fueltank(s)providedby any party,as Responsibility 13. Noticeto FloridaCustomers. Chapters62-761and62-762,is Protection) of Environmental requiredunderFDEP( FloridaDepartment CumminsPowerSouthLLC Applicant. Permit andGenerator of the installingContractor the responsibility party, a fuel tank is filledbeforefieldtesting when by any costs incuned for damagesor is not responsible FBC,is performed. under of Authority lnspector a Local by mandated requiredunderFDEPor testing 14. Taxesunlessotherwisestatedare notincludedin our price. withall localandfederal with highregardto safetyand in compliance 15. All CPSworkwill be performed by the equipment Safeaccessmustbe providedandmaintained requirements. safety/ environmental perconnel. beingstartedup by our ownerto all equipment to any NETAtesting.Thistestingshallbe conductedby a ceftifiedthirdparty Cumminstakesexception the testingprocesswithour projed coordinating companyprovidedby otherc.Cumminsrecommends In damagethe generatorc. that can potentially andservicegroupto avoidany procedures management generator windings.Uponcustomefs repeatedhi-pottestingof addition,Cumminsdoesnot recommend of the generator. request,Cumminscan providea listof theteststhat aredoneduringthe manufacturing of FleldTestingon DieselFuelTanks. Exclusion for AHJ Requirements The localAHJmayrequirethe GeneratorPermitholder(Owner,Contractor/Installeror CM) to perform of the fieldtesting liquids.A detailedexplanation oneor morefieldtestson fueltanksholdingcombustible purchaser, installerand requirements for dieselfueltanksis outlinedin FDEPand NFPA-30,2013.The testing, before for field ownershoutdcontactthe localAHJ in regardto meetingall localrequirements (Vendor) in a supplier as acting only is Cummins Be advised,that orderingdieselfuelstorageequipment. the for coordinating any allowances make NOT and does by this Quotation, the tranlactionrepresented for paymentof the samein the priceas Quoted.By executionof fieldtestingor, makeallowances this Exclusion. acknowledges hereby Purchaser the of thisQuotation, acceptance Submittedby Tim Alban , PowerGenerationSalesManager ns.com Tim.Alban@cummi Fax:561-840-7704 Adam Ward From: Sent: To: Subject: NicoShaner[NShaner@globaltechdb.com] Friday,June12,20154:44PM Tim Alban RE: 500 kw generatorfor PBCWWTF Excellent.Thankyou. Regards, NicoShaner Globaltech, Inc. 6001-BrokenSoundPkwyNW Suite6L0 BocaRaton,FL33487 nshaner@globaltechdb.com 561-997-5433- office M+226-7645 - cell www.globaltechdb.com ban@cum m ins.com] From:Tim Alban[mailto:tim.al Sent: Friday,June 12, 20154:42 PM To: NicoShaner Subject RE:500 kw generatorfor PBCWWTF Nico, Adder. The enclosureMfg. stateswe can do 200MPHwith PEcertificatesfor SSZSO.O0 IndustrialPower GenerationSales CumminsPower South,LLC E-Mail:Tim.Alban@Cummins.Com 3754 lnterstate ParkWay RivieraBeach,FL33404 Phone:(561)- 281 - 3638 Fax:(561)-277 -9L86 www.cumminspowersouth.com From:NicoShanertmailto:Nshaner@s t:22PM Sent: Friday,JuneL2,?:OLS To: Tim Alban Subject RE:500 kw generatorfor PBCWWTF l ThanksTim. mightaskfor 190 MPH ratings. Apologies, but lt lookslike new buildingcoderequirements What would it costto verifythat the enclosuremeetsthat criteria(if it does)or what would it costto get one. The countyhasapparentlycaughtwind of a possiblebuildingcoderequirementchangein the wind loading. 1 Thanksagain. Regards, NicoShaner Inc. Globaltech, 600LBrokenSoundPkwyNW Suite6L0 BocaRaton,FL33487 nshaner@globaltechdb.com 55L-997-6433- office 40+226-7645 - cell www.globaltechdb.com From:Tim Alban[mailto:tim.alban@cu m mins.com] Sent: Friday,June 12, 2015 9:46 AM To: NicoShaner Subject RE:500 kw generatorfor PBCWWTF Nico, Hereis the new quote with tank we spokeabout. Note that enclosurewas alreadyrated 180MPHwind load.Thisnew configurationdoes not changethe footprint of the drawing you have depictingthis unit. Tank is longerfoi extra capacity and matched length of the enclosure.Call me with any questions. IndustrialPower GenerationSales CumminsPower South,LLC E-Mail:Tim.Alban@Cummins.Com 3754 lnterstate ParkWay RivieraBeach,FL33404 Phone:(561)- 281- 3638 Fax:(561)-277 -9L86 www.cumminspowersouth.com From:NicoShaner[mailto:NShaner@elobaltechdb.com] Sent: Thursday,June LL,20LS 11:50AM To: Tim Alban Subject 500 kw generatorfor PBCWWTF HiTim. Thanksfor speakingwith me this morning. Just a few questionsfor you. What sizefuel tank would we needto run at 50%load on the generatorfor 10 days? What would the new dimensions be and cost be with that tank? The building code requirementsmay be changing,would it be possibleto get an enclosurerated for 180mph wind loadingwith the new tank, and what would the additional cost be if any? Any associatedcostsin putting a largertank on the generator,stairs,railings,etc. pleaselet us know. I am looking up the datasheetinfo right now to see if I can guestimate a tank size basedon the consumptiontables/curves. 2 Thanks. Regards, NicoShaner Inc. Globaltech, 600LBrokenSoundPkwyNW Suite61.0 BocaRaton,FL33487 ltechdb.com nshaner@globa office 561-997-6433 N+226-7645 - cell www.globaltechdb.com Adam Ward JohnPottspohn.Potts@tawinc.coml April16,20153:50PM Thurcday, NicoShaner RE: budgetarypricing From: Sent: To: Subject: HelloNicofind budgetarypricinglistedbelow. I apologize for the delayin gettingbackwith you. Please galsubbase w/2OOO fueltank 1) 500kw generatorstandalone StandbyEPACertified,OpenSkidwith 2000galUtL42SubBaseTankTierll Emergency Kohler500REOZB, BudgetPrice$150,000.00 21 500kw generatorenclosed(walk-in)w/2000galsubbasefuel tank with 2000galU1142SubBase StandbyEPACertified,Walkin Enclosure Tier ll Emergency Kohler500REOZB, Tank- BudgetPrice5215,000.00 3) ATS 3 pole,NEMAl ATS- 525,000.00 OpenTransition, Kohler2OO0A 4l Daytank Simplex150galOutdoordaytankwith TransferPumps- 5g,5o0.oO Letme knowif you haveanyadditionalquestions. Regards, John . **t,rritt@" John Potts I Kohler Generators mw_.* 74t$- TAW PowerSystems,Inc. 1500 NW 15th AvenueI PompanoBeach,FL 33059 tel | 954-977-O2O2xl7 04 | fax : 954-977'9249 | cellI 954-23 4'4226 Exellen@ in creating innovative solutions for the supply' control and use of energy :NShaner@globaltechd b.com] From:NicoShaner [mailto April15,20158:37AM Senh Wednesday, To: lohn Potts pricing Subject RE:budgetary John, H a v e n ' t h e a r d b a c k f r o m y ol hu a. v e p r i c i n g d u e i n a c o u p l e d a lyfsl d. o n ' t h e a r b a c k f r o m y o u t o d al 'yl l,a s s u m e y o u ' r e not interested. Thanks. Regards, NicoShaner Inc. Globaltech, 5001 BrokenSoundPkwyNW Suite610 BocaRaton,FL33487 nshaner@globaltechdb.com 1 561-997-5433- office 40+226-7645 - cell www.slobaltechdb.com From: NicoShaner Sent: Monday,March30, 2015 3:12 PM To:'john.potts@tawinc.com' SubjecUbudgetarypricing Hi John. We spokeearlier about a generator replacementat Belleglade WWTP in palm beachcounty. Attached are the designcriteria and technicalmemorandumthat was done by Hillers Engineering. Pleasequote as separateline items: fuel tank 1) 500kw generatorstandalone dZOOOgalsubbase gal (walk-in) basefuel tank sub w/ZOOO generator enclosed 2l 500kw 3) ATS 4l Daytank pleasecall to discussif necessary.I am lookingfor pricing in the next day or so if you can. Thanks. to be virus free.TAW@is This emailhasbeenscannedby the TAW@Email SecuritySystemandis guaranteed a registeredtrademarkof TampaArmatureWorks, Inc. andSubsidiaries. CONFIDENTIALITY NOTICE : This email,andanyfi1estransmittedwith it, may containconfidential,proprietaryor privilegedinformationthat If you arenot the intendedrecipient,you are is intendedonly for the personor entityto which it is addressed. of this document distribution,copying,or retransmission herebynotifiedthat anyunauthorizeddissemination, if any,is strictlyprohibited.If you havereceivedthis or its attachments, emailin error,pleasenotifu the senderimmediatelyanddeletethis materialfrom all known records. to be virus free.TAW@is This emailhasbeenscannedby the TAW@Email SecuritySystemandis guaranteed a registeredtrademarkof TampaArmatureWorks,Inc. andSubsidiaries. Quotation POWERSOUTH LLC CUMMINS E-Mail:Tim.Alban@Gummins.com 3777lnterstate Park Road W. West Palm Beach FL 33404United States Direct:561-281-3638 April ,|6,2015 Proiect Name:Belle GladeVITWTP 19535 Quotation:20270000001 Thankyoufor yourinquiry.We are pleasedto quoteas follows: DiesefGenset:60H2600/455kW50H2440| 400kW Application Emergency lnstall-US-Stat U.S.EPA,Stationary Rating Genset-Diesel,60Hz,500kW-Standby 5OODFEK Power A331-2 DutyRating-Standby Listing-UL 2200 1090-2 Emergency 2,NSPSCl Stationary EmissionCert,EPA,Tier t170-2 7I 480,3 Phase,Wye,4\Mre R002-2 Y oftage-27 Hz, 12 Lead,ExtendedRange,125l1O5C Aftemator-B0 8258-2 21OO H643-2 SETCONTROL-PCC DisplayLanguage-English H536-2 Graphical H605-2 Display-Control, UserConfigured Status, Relays-Genset K631-2 Ffi-1 0 Interface-CommunicationsNtwk, KP6o-2 Meters-ACOutput,Analog H606-2 Facing ControlMounting-Left H609-2 120VoltAC Heater-Alternator, 4292-2 Only CB or EB orTB-Right KUg4-2 Ul EC 5V,SSRMS,E0%U Right,3P,600/41 KU14-2 CirBrkr-8OOA, CB or EB orTB-BottomEntry,Right KB72-2 Separator-Fue[4/Vater c127-2 50CAmbient E074-2 EngineCooling-Radiatot CoolantLevel Shutdown-Low H389-2 24A| 480V,40F Minimum AmbientTemp Coofant Heater-2081 H556-2 Duty EngineAir Cleaner-Normal D041-2 On Connector-Slip Exhaust PA98-2 L028-2 Gensetwarranty-Base,Standby2 years/ 400 hours,PrimePower1 yearI Power1 year/ unlimitedhours unlimitedhours,Continuous Literature-English Packing-None ProductRevision- M CommonPartsListing 1050-2 4358-2 SPEC-M cPo1-2 ST12OSN3RSL, PILNCCB, E STOPBRKGlassNEMA3 W contacts PILNOCB W/CONTACT DeliveryOption3 FactoryDirectShipmentto Customer WeatherResistant.Level 2 Sound Attenuated.Walk in. AluminumEnclosure: . Approximate 20'Lx 11'Wx9' Dimensions: H (plusFuelTank) EnclosureExteriorto be of .090',5052-H32 Formed,PanelConstruction, Aluminum, FinishStandardColorWhite Pre-Painted (Customcolorextra) Air Intake:SoundAttenuatedIntakeScoopswith PunchedBirdScreen Air Discharge:SoundAttenuatedDischargeHoodwith GravityDampersand BirdScreen 3" SoundAttenuatingFire Blanketin Walls, Doors,Hoodsand Ceilings.Insulation Retainedwith .032"PerforatedAluminum Liner.Enclosureis Designedto Reduce SourceSPLby 25 dB (A) @ 1M in a FreeFieldEnvironment. (2) Lockable,HingedAccessDoorswith PanicBarsand CorrosionResistant Hardware and Supports, SilencerMountingBrackets, Bandsfor AMPSProvided,Interior CriticalGrade lnsulated, Mounted,Internally Silencer o AMPSSuppliedExhaustFlexConnector o AMPSProvidedMiteredExhaustOutlet o All ExteriorHardwareto be StainlessSteel a Extendoil, Coolantand Silencerdrainsto EnclosureExterior Enclosure Suitablefor 180MPHWindLoading 2.000-Gallon. UL 142.FDEPSub BaseFuelTank(EQ# 1 1 1 1 533): a 186"Lx 108"Wx 30"H Dimensions: Approximate o Tank Mild Secondary Steel Yi' a RuptureBasinwith FDEPApprovedLeakDetection LS600) Switch(Pneumercator o Mechanical FuelLevelGauge(Visibleat FillPoint) a Supplyand ReturnConnections o 2'Fill with LockableCapwith FDEPSpillContainment a Per ULVentFittingsInstalled Normaland Emergency 142 LowLevelFuelAlarmSwitch(MadisonM-7000 EQ#682)Set @ 67% RemainingCapacityWiredto Fuel AlarmConsole HighLevelFuelAlarmSwitch(MadisonM-7000 EQ#682)Set @ 90%Tank CapacityWiredto Fuel AlarmConsole . CableStubUp OpeningUnderCircuitBreaker . GeneratorMountingPads o 2LiftingPointsper Side(4 Total)for LiftingGenerator Set, Enclosureand Tank(Empty) o Tankcoatedwith Two PartEpoxyPrimerand painted GlossBlack ElectricalPackaqe: lncluded r Provide,InstallandWire(1) 100A,12O|24OV 1 Phase MLOLoadCenterwith BranchCircuitBreakers o Provide,InstallandWire(3)48' DualTubeFluorescent LightFixtureswith (2) 3-WaySwitchesLocatedby EntranceDoors. e Provide,InstallandWire(3) DC LightFixtureswith(1) 60 MinuteTimerSwitchesLocatedby EntranceDoors . Provide,InstallandWire (2) 2OA,125VDuplexGFCI Locatedby EntranceDoors Receptacles . Wre CustomerProvidedand InstalledJacketWater Heatersto LoadCenter o Wire CustomerProvidedand InstalledGeneratorStrip Heatersto LoadCenter . MountandWire CustomerProvidedBatteryChargerto LoadCenterand DC Outputto Batteries . All Electrical to be Runin EMTor FlexibleConduitto meet NFPA70. OSHAGompliantStairs and Walkwavs: . (2) Setof OSHACompliant StairswithRailingsand48" WideWalkwaywith Railings o Railingsto be Constructed of 1 Tz"Schedule40 AluminumTube . Stepsand WalkwaysConstructed of Extruded Aluminum o StainlessSteelLevelingPads . StairsSet to be ShippedLooseandAssembledon Site by Others / O&MManuals Submiftals Start-Up/Training FOBAMPS Quotebasedon PBGDesignBuild Griteria& Drawing(s) Alternate I Grand Total $143,779.88 (checkappropriateaction): HoldforApproval RELEASE Approvalandtermsacceptance CustomerSignature Date CUMMINS POWERSOUTH,LLC POWERGENERATION of Sale."Thesetermsalsoappear of Ordercand Conditions Thefollowingarethe nTermsof Acceptance here.CUMMINSPOWERSOUTH,LLCsales on the Acknowledgment of Saleforn andare reproduced on thesetermsandCUMMINSPOWERSOUTH,LLC'sacceptance are limitedto andmadeexclusively termscontainedin any of anyoder is limitedto the termsof the Sellerand rejec{sany additional documentthat may be proposedby the Buyer 1. ThisQuotationis validfor 60 days* of the datequotation,Priceshallremainfirm providedour andthe shipdateof the submittaldrawingsare approvedand returnedwithin60 daysaftersubmission, equipment is notextendedby you or yourcustomerbeyondour publishedleadtimes. Delaysor charges,on someor all equipment escalation extensionof the aboveleadtimesmay necessitate odered. withinthe continental 2. Deliveryis F.O.B.Factory,Freightis prepaidandallowedto the firstdestination (smallerthan601 kW)areshippedin an enclosedtruck.Opentrucking UnitedStates.Generators cost.Largerunitsare shippedvia flat bedtruck. deliveriesare availableat an additional switchgearand looseaccessoriesas required,will be invoiced 3. Pricesfor generatorc,transfers-witches, shipment. Shouldthe buyerdelay,deferor refusedelivery, at thetimeof shipment,or whenreadyfor charges. additionalhandlingandstoragechargesmay be assessedin lieuof the abovestatedescalation to orderandis subjectto is customfabricated 4. The equipment suppliedby thismanufacturer charges. cancellation Switchgear, Generators andall buildto oder equipmentare subjectto thefollowingminimumcharges assessedfor cancellationof any order:25Voof total orderpriceif cancellationis receivedin our office betweenthe date of oder entryandthe datewe receivewrittensubmittaldrawingapproval.50%of total orderpriceif cancellation is receivedin our officeafterwereceivesubmittaldrawingapproval. is receivedin ouroffice60 or fewerdaysbeforethe scheduled 75%of totalorderpriceif cancellation is receivedin our officeafterthe shippingdateof the order.85%of totalorderpriceif cancellation is assembled. equipment afterour costsdueto the cancellation chargewill be determined The exactdollarvalueof the cancellation is required.The Standardgeneratorcancellation aredetermined.A writtennoticeof cancellation chargesare25o/oof the total oder priceafterreleaseof orderfrom our fadory. at the 5. Paymenttermsare net30 daysfromdateof invoice,subjectto approvalof ourcreditdepartment time of the order.Nondomesticorders(finaldeliverylocationsoutsidethe U.S.)aresubjectto a deposit of 25o/o at the timeof oder. Balanceshallbe paidpriorto shipment.Exportorder(deliveryoutsidethe shallbe limitedto10%.Paymentof US)mayrequirea letterof creditdrawnon a U.S.bank.Retainage of startup or payableno laterthan90 daysfromthe originalinvoice. retainageis due at completion Actsof for delaysin deliverydueto fire,strikes,accidents, 6. CumminsPowerSouthis not responsible Nature,war,explosion, flood,accidentsor othercausesbeyondour control.Quotedshippingschedules are notguaranteed andsubjectto changewithoutnotice.ln no caseis CumminsPowerSouth damages.CumminsPowerSouthdoesnot acceptliquidated or consequential responsible for incidental damagesas a partof third partycontracts. writtenmanufactureds wananty by an expressed 7. Eachproductofferedin thisquotationis accompanied and is the onlywanantyoffered. coveredby this quotationwill be acceptedon a holdfor releasebasis.Your 8. An orderfor the equipment untilwrittenapprovalto proceedis receivedin our for production oder will not be releasedandscheduled office. 9. The quotationofferedherein is limitedto the pfansand specificationsectionslistedon our quotation. itemsmayrequireadditional for administrative requirements No othersectionsshallapply.Additional cost. setsof O&Mmanualsare limitedto oneset.Additional statedon ourquotation, 10.Unlessotherwise shall apply. standard format cost. manufac-turefs The at additional are an O&Mmanuals available charge. CustomO&Mmanualswill be availableat an additional 11.Startup services,loadbanktesting,andownertrainingare not providedunlessstatedon our quotation.Startup serviceswill not proceeduntilthe buyefsaccountis cunentandin goodstanding. off loading,rigging, 12.Ourstandardquotationdoesnot includeoff unitwiring,off unitplumbing, or fuel. exhaustinsulation installation, for testingof fueltank(s)providedby any party,as Responsibility 13. Noticeto FloridaCustomers. Chapters62-761and62-762,is Protection) of Environmental requiredunderFDEP( FloridaDepartment andGeneratorPermitApplicant.CumminsPowerSouthLLC Contractor of the installing the responsibility for damagesor costsincunedby any party,whena fuel tank is filledbeforefieldtesting is not responsible of AuthorityunderFBC,is performed. requiredunderFDEPortestingmandatedby a Locallnspec{or statedare not includedin our price. 14. Taxesunlessotherwise withall localandfederal withhighregardto safetyandin compliance 15. All CPSworkwill be performed by the equipment Safeaccessmustbe providedandmaintained requirements. safety/ environmental ownerto all equipmentbeingstartedup by our pesonnel. to any NETAtesting.Thistestingshallbe conductedby a certifiedthirdparty Cumminstakesexception the testingprocesswithour project coordinating provided by others.Cumminsrecommends company In potentially procedures damagethe generatorc. that can group any avoid to andservice management generator Upon customefs windings. testing of repeated hi-pot not recommend does Gummins addition, of the generator. request,Cumminscan providea listof theteststhat aredoneduringthe manufaduring of FieldTestingon DieselFuelTanks' for AHJ Requirements Exclusion The localAHJmay requirethe GeneratorPermitholder(Owner,Contractor/Installeror CM) to perform of the fieldtesting liquids.A detailedexplanation oneor morefieldtestson fueltanksholdingcombustible purchaser, installerand 2013. The and NFPA-3O, in outlined FDEP tanks is fuet for diesel requirements for fieldtesting,before ownershouldcontactthe localAHJ in regardto meetingall localrequirements Be advised,thatCumminsis actingonlyas a supplier(Vendor)in oderingdieselfuelstorageequipment. the for coordinating anddoesNOTmakeany allowances by thisQuotation, the tranlactionrepresented for paymentof the samein the priceas Quoted.By executionof fieldtestingor, makeallowances this Exclusion. herebyacknowledges the Purchaser of thisQuotation, acceptance Submittedby Tim Alban , PowerGenerationSalesManager Tim.Alban@cummins.com Fax:561-E40-7704 PanuopicPawei lng. - oflEcArr-0NE s0lult0tt" oNE 90UfrCE !jy\!i,iv.0antr0pic,coft RobertCosgrove- EPGSales 8205N.W.58St.Miami,Fl. 33166 F: 305.471.1943 P: 305.592.49441 Date: 04-16-15 Quote#:15R8TC0059-03 Reference:Belle Glade WWTF Palm Beach, Florida of General Otv VL L Description bne (1) New Caterpillar Model C-15 Diesel Engine Generatorset,8 22109!!$9!t rated @ 500kW Standby, n7 A80V AC, 3 Phase,6O Hz', 1800 rpm Diesel Engine Generator Set, with the following accessories: . Cost $ 163,525.00 IJL-220A Listed - UL Standardof Safety for stationary engine generator assembliesof 600 Volts or less Requirements Generator with a temp rise of 125 C or less. UL listed voltage regulator. EMCP4.2 control panel. Neutral ground connection . EPA Tier II Emission compliant unit - meets USA Environmental Protection Agency (EPA) Tier 2 and California Air ResourcesBoard (CARB) Non-Road Emissions Certifications and USA Environmental Protection Ageucy (EPA) Tier 2 Emissions Certification for stationary use. (per NSPS rule) r DesignCriteria The generatorset accepts 1007orated load in one step per NFPA I l0 and meetsISO 8528-5 transient response . EPA Tie.r II Emission compliant unit o Isochronous electronic governor o Air lnlet Air cleaner with filter restriction indicator Combustionair inlet flow rate = 1405.5cfm . Engine Auto-start Control Panel EMCP 4.2 (unit mounted ) 4.2 controls including: El$,{lCP Run / Auto / Stop Conkol Speedand voltageadiust lliani 82ffil{WSStrsst fl-33166 Miami, tol 305.59?.4941 lax 305.477.1943 htllsodedllo 2501 tuad84 Slats Ft.t ud€rdale. Ft33312 95{.797.7972 el fax 954.791.711S WoltPdmB*h hulevard 5460 0keeclnhe &ach,R 3341i tt{estPalm hl 58t.040.ffi18 fax 561.640.7894 Smrt 272N.flqlorAvsilB Stuart Fl34994 tel t2.6S2.3442 j'l2 6923757 far tut$;tn 2471 Rocmlltud fI339tb fortMysrs. Ul 2S.337.424 lar ?39.337.4211 PantmpicPower.lnc. 0il8swfrcE^ oNE uu - oilEsounofl* rrr.lw.oalttopic.rxm Engine Cycle crank VI volt DC operation Environrrental sealedfront face Tex alarm / event description. Lamp test pushbutton Digital indication for: RPM DC volts Operating hours Oil pressure(psi, kPa or bar) Coolant terperature Volts (L-L & L-N), frequency (Hz) Amps (per phase & average) ekW, kVA, kVAR, kw-hr, %kw,PF Warning / shutdown with common LED indication of: l,ow Oil pressure High coolant temperature Over-speed Emergency stop Failure to start (over-crank) Low coolant temperature Low coolantlevel Programmableprotective relaying functions: Generatorphasesequence Over / under voltage(27159) Over / underfrequency(81) Reversepower (kW) (32) Reversereactive power (kVAr) (32RV) Over-current(50 / 51) Common Alarm Generatorrunning Communications: Six digital inputs Four relay outputs (form A) Two relay outputs (form C) Generatorrun relav Siami NW50Slrost 8206 F13316{i Miami, tsl il5.592.4944 fax $5.477.1943 forl budsrdElo 2501StaEEoad 84 Ft buderdalq tl 33312 954.797.i972 bl fax Stf.7gl.7/19 WegtPlln SorGh Boulet/ard Blfl)Okeeddee FL33417 WestPalm Beach, 56t.841r.08r8 bl 5{i1.640.78{4 tar Sflart ?2 N.tlaglaAwnue Stur(t134994 nLffiz.3MZtal il2.692.9757 far hilltltus 2471 Bo*fillRmd i,lysr& R3391E Fon a9$7.422d ?fl9.$7.l2l1lax Pantropic Power,lnc. - ONECAU- ONESOLUTION" OfiESAUNCE lww.oanttoolc.com Common alarm relay Two digital outputs Custorrer data link (Modbus RTU) Accessory module data link Serial annunciator module data link Eurergency stop pushbutton Alarm horn with silencing pushbutton Device Server: RM85/Modbus to Ethemet / Modbus TCP gateway optically isolated ports 2 Ethernet ports and Wi-Fi capable llirmi 82(bNWSStrsst F133166 Miami, 305.532.4944 tel S5.477.lglilfu o Engine Caterpillar model C- 15, ln-line 6 cylinder, 4-stroke-cycle water-cooled Cylinder bore diameter = 5.4 inches Piston stroke= 6.75 inches ratio = 16.1:l Compression Total cylinder displacement= 927.56cubic inches Aspiration = ATAAC Fuel system= MEUI Governor type = ADEM control system Heat rejectedto the atmospherefromthe engine= 5,346 Btu/min Heat rejected to the jacket water 10,748 Btu/min Heat rejected to the after-cooler = 6,8M Bnr/min Fuel consumption: Full load = 36.6 gallonsper hour Three - quartersload = 28.0 gallons per hour Half load = 23.3 gallonsper hour . PerlrlanentMagnet Excited Generator System Line voltage = 480 volts Phasevoltage=277 volts Ratedcurrent=751.8 amlleres Power factor = 0.8 Frequency = 60 Hertz 3 phase 4 pole Sync Speed= 1,800RPM Class H insulation "WYE'connected 2/3 thirds or 0.6667 coil pitch Permanentmagnetic excitation system hn budcrdrlg 2S!lState 84 Road Ft buderdale. Fl33312 w.nltglztd tax 9F,4.7S1.7719 WertPrln B8.ch 0keedobge Boulward 5160 Beach, n il41, WestPalm bl 50t.64{1.0018 tux 561.640.78S4 Slur.t ?72N.FlaglerAvenue Stuart, tl 34994 I/2892.M2tgl n2.ffi2.9751lax tul[|oG Ro*fillnmd 2471 FmtMyeru, fL33918 a9$7.42281 4€$7.Atlfu PantropicPowar,Inc. - OIIECALL-ONESoI:UIION^ ONESOUNCE rlwrv.Dan[0prc,c0m ULLM6 recognized Random wound Single bearing Four (4) pole Twelve (12) leads Two (2) wires be lead Generatorrated (kw): 500.0 Generator rated (kva): 625.0 Generator efficiency Full load =94.4Vo Three quarters load = 94.4Vo Half load =93.57o Quarterload = 9L0Vo Voltage regulator Regulator sensing,true RMS 3-phasesensing lnw voltage extension box (used for customer low voltage power and engine control wiring entrancefor easeof terminating) Segregatedlow voltage (AC/DC) wiring panel Anti-condensation spaceheaters208 - 2N Y AC,600 watt Generator set up for bottom conduit entry into generator housing One (1) 800 amp frame / 6fi) amp trip, 3 pole, I00Vo rated, I^SI trip unit, Thermal Magnetic Circuit Breaker wittr 24VDC shunt trip and auxiliary contacts lltumi &tbNW50 Stoot Miami, tr 3il'166 305.592.4944 tel far 3ffi.477.!9t43 r StartingSystem/ CtrargingSystem Two (2) lead acid engine starting batteries & cables Meets NFPA ll0 kvel lstarting requirements Battery disconnect switch Battery charger(shippedloose); ?/[VDC, l0 Amp output. 120 VAC, 1 Phaselnput, wall mountable Dual rate charger with automatic switching from equalize to float. Includes high voltage, low voltage and AC failure alarm outputs, DCAmmeter and Voltmeter. NEMA I enclosure. For I 10-120 VAC 60Hz Input. Regulated.Meets alarm requirements of NFPA 99 and NFPA 110.C-UL listed Meets NFPA ll0Irvel I (Z hour) RechargeTime Requirement UVDC electric starting motor 45amp battery charging alternator JacketWater Heater,240vac input I phase r Eneine Cooline svstem hn Lrudedalc 25{llShteBosd 84 Ft laudedale, FL33312 954.797.7S72 tsl 954.791.7719 fax We3tPrln Bsrch 5460 0keedobee Eoulevard WestPalm Beach, t[ 33417 561,64l).mt8bl 56,'.8t10.7ffi4 fax Sturt ?2 N.FlaglaAvenw Stuar( R34991 nLffi2.3442rel I/26!2.9i57 fat fuliltotr 2471 Sockfill Road Fon Mven, R33S16 frs.337.422d 239.337.42t1 fu PantopicPower,Inc. - ONECALI- 0NESolrliltofl* oNESOUnCE nrtrnr.panttottic,mm Ambient radiator cooling capabilities of 51 degreeC or 124 degreesFahrenheit Air flow restriction (system) = 0.48 inches in water Air flow (max @ rated speedfor radiator arrangement)=77,828 cfm Engine coolantcapacitywith radiator = 13.3gallons Engine coolantcapacity= 5.5 gallons Radiatorcoolantcapacity= 7.3 gallons Coolant drain line with valve terminated at edge of base Low water level switch mounted on radiator for shutdown of engine Fan and belt guards Coolantlevel sight gauge Caterpillar Extended life coolant llirmi Streel 826NW58 R 33166 Miami, tsl S5.592.4944 fax $5.477.1943 o ExhaustSystem Dry exhaustmanifold Flanged faced outlets Exhaust flange size (internal diameter) = 6.0 in Exhaust stack gas temperature(engine ovt) = 942.I degreesF Exhaustgasflow rate=3,842.2cfm Exhaust systembackpressure(maximum allowable) = 40.2 in water o Fuel System Primary fuel hlter with integral water separator Secondaryfuel filters Fuel priming pump Fuel pressuregauge Fuel impervious flexible fuel lines Fuel oil cooler o Lube System Lubricating oil and filter Sump rehll with frlter = 15.9 gallons Oil drain line with valve Fumesdisposal Lube oil level indicator o Emissions(Nominal) NOx g/hp-hr =5.14ghq-fu CO g/hp-h = 0.4 g/hp-hr HC g/hp-hr = 0.01 g/hP-hr PM e/hp-hr = 0.018 slhp-hr Fo.tlrudedllr 84 2$ll stateBoad ftlau&rdale,tL33312 gtl.797.iSntel fax s5tt.79l.7719 Wrd Plln B.Nch 0keechobw Eoulevard 5460 Beac[t[ 3341 7 WestPalm bl 56r.640.m18 far 561.040.7894 Slur( ?7211.flaglerArcnue Stua(tl34gg4 nLffi2.U42|d,l n2.ffi2.9151tax ftnlh$ flo*fillfimd 2471 Fort i.ly€r$ R3S16 m$7.442s| fax 49.337.i1211 PantropicPower,lnc. - onEsulJlt0il* - OttE c/.LL oNE S0URCE rr,nrv+.Uanltopic.com I L o Mounting System Spring vibration isolator (to be placed betweenrails and sub-basetank) Pad type isolators (to be placed between tank and concrete pad) o Weather Resistant.NC)N Sound Attenuated Aluminum Enclosure: Included HVFIZ Enclosure Construction: Weather protective, aluminum enclosure (skin tight design) Aluminum modular panel design Color: selectedby owner (paint chip neededto rratch) PE Certified to 181 MPH wind load Florida Department of Business & professional Regulation Certification and Label Florida Building Code Large Missile lmpact Rated Enclosure (Florida Product Approval #121U, #12868,and #1287l) Sound Attenuation: Not applicable Airflow Through Enclosure Intake: hooded intake with bird /rodent screen Discharge: hooded discharge with gravity dampe'rsand bird rodent screen Designed to minimize water penetration into enclosure during heavy rainfall EnclosureEntrances: Four (4) enclosure accessdoors with stainlesssteel hardware. (four (4) single access doors ) Reinforced door framing Door drip guards Exhaust and Fluids: Interior hospital srade silencer lnterior muffler mounting hardware Stainlesssteel exhaust flex Exhaust elbow and rain cap Exhaust rain shield Furres disposals and engine drains piped to outside ofenclosure ilirmi e26 NW58Stroot Miami, F133156 tol 305.532.4944 far il5.477.1943 fon lruderdlls 84 ShteBoad 2501 2 tL3331 R.kuderdale, bl 954.797.iS72 .7719 fax Il5[791 W83tPllmBerch Boulevard frlfll 0keechobee 7 Beach. n 3341 WestPalm 561.840.0818 bl fax 56.|.8411.784 SlrNrt ?2 N.tlaglerAvenue Stur(FL34994 n2.ffi2.3442ta! fax 772692.9757 tortilywr Bockfill Rmd 2471 R33916 fortMy€rs. 23S.337.422 U fax 239.337.4211 Pantropic Power,lnc. - olttE CALLoNEsoUnCE otIESolUTlI,rl" v{r,,&v.oantto0ki.csrn Electrical Package: Quantity three (3) D/C lights with one-hour wind up timer Enclosuredimensions: Length =298" Widttr = 7?' Height = 108" Weight = 2,785 lbs. One (l) year warranty against material defects & workmanship the foregoing warranty is in lieu of and excludes all other Warranties, expressor implied by operation of law or otherwise, Including, but not limited to, any implied warranties of Merchantability or fitness, both of which are expressly disclaimed. Buyer understandsand agreesthat all wa.ranties implied by the Provisions of the uniform commercial code are excluded. Buyer's exclusive remedy and Phoenix Producls' limit of liability for Any and all lossesor damagesresulting from nonconforming goods or tender, or from any other cause,shall be the contract price of the goods. Under no circumsiancesshall Phoenix Products be Responsible for any indirect, incidental or consequentialdamagesor economic lossesrelating to any alleged defect in, or failure of, the goods or any component part of, or attachmentto, thereof. I L o Included 2250-Gallon.UL-142 FDEP Sub-BaseFuel Tank: GSDW -2250 - 2250 Gallons 2054 gallons usable fuel 73 hours ofusable fuel at 757o load Dimensions: lrngth =238" Width = 72" Height = 43" (includes2'' tall bottom channel) Weight = 9,863 lbs. Construction: 2250 gallons UL-L42 Listed generator sub-basetank FDEP: EQ625 0.1875" Steelprimary tank and 0.1875" steelsecondarycontainment Ships with vacuum in interstitial for on-site integrity verification Mirmi 82tENW58St€$t Fl"33166 Miami, tel S5.592.4944 fu il5.477.1943 ton hudedole 84 StateRoad 2501 Fr.lateilale. F133312 t€l S51.797.792 far !l!f 791.7719 WostP6lmEoech 0kee$obee 5460 Boulevsrd 86ach, R 33417 WbstPalm st.640.0818b| Sl.64l.7S4fax 6'ftr|t Z2 N.FlaglerAwmu Stlnl tt 34934 t€l t2692.3442 T12ffi2.9151iax hnMlttr 2471 Ro*fillRmd tu i,{y€rtR33918 239.337.421281 239.33L4211 fax PantropicPowenInc OM SWBCE. ONEf,,,LL. ONESOLUTIOJI* wtrw,D0ntr0p'r4.fi,m Normal and Emergency Vents ?' atmosphericvent with 12' above grade riser 6" primary tank and 6" secondarytank emergency vents Fuel Ievel and l-eal Sensors High fuel, low fuel level, and interstitial switch (rupture basin) leak switches ( wired to generator control panel for alarms) Mechanical fuel level gauge, visible from fuel frll Internal Conduit Stub-up Area: Exterior Fill Wittr Spill Containment 7.5 gallons overfiIl / spill containment with hinged cover and padlockable Spring - loaded drain valve to transfer spilled fuel to primary tank Overf,rll prevention valve, shutoff at 95% full tank Exterior Finish lndustrial exterior grade enamel over primed surface Finish color: Phoenix Products standardblack satin t L Included Additional Items Thrce (3) bound copies of generator set submittals for review Three (3) Sets of Operation and Maintenance Manuals One (1) Nerra 3R remotebreak-glassstation(shippedloose) Factory Certified test report at 0.8 pf I . Included Start -Up and Trainine Start-Up and Building Inad Test of generator set by a factory trained technician during normal businesshours of 8:00amto 5:00pm) Resistive load - bank test on-site after start-up of unit is completed four (4) hour test at L00Voload using utilizing a resistive load bank on-site after completed installation.(during norrral businesshours of 8:@am to 5:00pm) Maintenance Personneltraining during normal businesshours of 8:00am to 5:00pm) llhni NW58Stro€t 8205 Mhmi,F|33166 tol S5.$t2.4944 fu $5.477.1943 foil toudsdrle Boad 84 2501 Star€ tL333U tt- buderdale, tol 9!1.7971972 g54.7gl.77lg rax W83tPrlmBerct goulevard 54d)0keectdee 7 Beach. FL3341 WestPalm bl 501.640.m18 tax 561.M].7894 8luril Z2 N.tlaglerAvenw Sruart tI34994 n2.692g42r$l tax TI2M23157 hrtllpn Rmd 2471Rockfill tonMyen.R 33916 w.fi7.4n2d lax 239.337.4211 PannopicPower,Inc. - ONE6,,LL- ONESOLUI/,ON" OITESOUfrCE n$,fw.oantroltic.Dom L a Included Wanantv Two (2) year Caterpillar Factory Warranty Budgetary Price F.O.B. Miami (freight prepaid to jobsite)........$ 163,525.00 (sales tax not included) Adder for EnclosureCertified to UL CCN # FTPP Program (Classifiedfor constructiononly Per LiL 2200) The Combinationof this enclosureandUL Listedstationaryenginegeneratorassemblywill requireadditionalevaluationandI or with testingper 1JL2200.The elecfical equipmentsystemscoveredunderthis categoryareintendedfor installationin accordance jurisdiction determine if tests inspection shall the final accepting authority having Code". The Electrical ANSI / NFPA 70, "National areto be conductedsinceno testingfor this combinationof enclosureandenginegeneratorassemblyhasbeenconductednor by UL. Represented $ 1F00.00 (salestax not included) Two (2) Free standing Stairs package: Hot dipped galvanized A36 steel construction 42" tall handrail (affixed on the side opposite of the fuel tank) One (1) stair set with 152" x 4?'platform ... $ 7,350.00(salestax not included) Adder: Upgrade to walk-in Enclosure $ 1,350.00(salestax not included) ilhmi NW68Strost 0205 F[3166 Miami, 36.592.4944 tsl far &5.477.19'63 hrt lrudeflhlo Boad 84 2501 State tL3331 Ft.buderdale, 2 tsl 954.797.73T1 fax ll!1791.7719 l{est Polmleacft Boulevard 51600keedobes Ft3341 Bsach, 7 WestPalm hl 561.840.0818 hx 56t.M.7894 $!rn ?2 N.flaglerAventn Sturrt,t[ 34994 n2.692.3442161 nzffilgl'7 tax hrtMpr SocKill Ro€d 2471 FrtMwrs,tt33916 El 239.337-422 fax 49.337.i1211 Pantropic Power,lnc" ^ oNE SowTnfl'," fJ.LL-oNE oEES0UaCE W,r,|\,.patltr00iC.Com Adder: Increasetank to have a 6 day runtime @ 75Voload $ 5,250.00(salestax not included) 4-20MA Magnetostrictive Probe to provide fuel level to Scada .... $ 1560.00(salestax not included) Fuel level monitor with 4-20MA output Provides digital fuel level display Low - low, low, high, high-high, and leak alarms $ 6,000.00(salestax not included) llhmi 82lEl{W58Suoet FLi|3166 Miami. tel S5.592.4944 fax 305.477-1943 hnhudsrhle 84 2501StateBoad FL3331 2 Ft.buderdale. tel 954.197.7972 954.791 J7l9fax Wb3t PrlmBsrsft Boulevard 0keechobee 5160 7 F[3311 West Palm Beach, bl 561.640,mr8 fax 56.|.64t).7894 Slud 272N.FlaglsAwrue StudtR 34994 nLN2. 42tel tex t2.m2.9i57 hrttdlcn Rosd 2471 tuckfill n 93910 tonlvlyors. 233.&37.422 bl 239.il17.42t I fax 'll'erracon M a r c h3 0 , 2 0 1 5 Globaltech,lnc. 6001 BrokenSound ParkwaYNW Boca Raton,FL 33487 Attn: DavidSchuman 9976433 Phone:561 Email:dschuman@globaltechdb.com Re: EngineeringServices ProposalforGeotechnical support Plant(wwTP) Generator Treatment BelleGladewastewater 2055W. CanalStreetSouth BelleGlade,Florida No.PHD150113 Proposal DearMr.Schuman: TerraconConsultants,lnc. (Terracon)appreciatesthe opportunityto submitthis proposalto project'The purposeof the servicesfor the above-referenced engineering providegeotechnical serviceswill be to evaluatethe subsurfaceconditionsat the site and to providegeotechnical relatedto the design and constructionof the project. This engineeringrecommendations of the pioject,and providesa scope of servicesand proposaloulines our understanding for our servicesis alsodescribedherein. schedulefor thework.Compensation A. INFORMATION PROJECT concreteslabis plannedat the BelleGladeWWTP. We that a newgenerator We understand assumethe loadson theslabimposedby the generatorwill be relativelylight' B. SCOPEOF SERVICES EVALUATION GEOTECHNICAL EngineeringEvaluationto be providedby Terraconare The servicesfor the Geotechnicat paragraphs. in thefollowing summarized programto evaluatethe Field proqram- We proposethe followingfield testing/exploration at the projectsite. conditions subsurface r. Underground and contactthe Sunshine Visitthe projectsite,fieldmarkboringlocations, UtilitYClearancenetwork. lnc. 1225OnarRoad,WestPalmBeach,Florida Consultants, Terracon P 561.689.42sg F 561.6s9'5955 http://www.dunkelberger-engineering'com/ Proposal,GeotechnicalEngineeringServices Slab n BelleGlade.Florida BelleGladeWWTPGenerator March30,2015u Proposal No.PHD150113 Iterracon Once.underground utilityclearance is.obtained, mobilizea truckmounteddrillingrig and drill two StandardPenetrationTest (SPT) boringsat (or near) the locationof the proposedconcreteslab. The boringswill be drilledto 30 feet belowgradeusingmud rotarymethods. Samplesof the subsufacematerialswill be obtainedat frequent procedures verticalintervals in accordancewith outlinedin ASTMD 1586(theStandard Penetration Test). Oncethe sampleshavebeencollectedand classifiedin the field,they willbe placedin appropriate samplecontainers for transport to our laboratory. Subsurfaceconditionsmay be encountered which merit alterationsof the field boringand/or samplingprogramsdescribedherein. However,we will not performadditionalscopeor incur additional expensewithoutyourauthorization. Testing- The samplesobtainedfromthe boringswill be returnedto our laboratory Laboratory for visualclassification by a geotechnical engineer.Limitedlaboratory testing(suchas moisture contentand organicconlenttesting)will be peformedas neededto aid in soils classification of the subsurface materials. and assessment Analvsisand Reoort- The resultsof ourfieldworkwill be evaluated Geotechnical Enqineering geotechnical (by a professional engineerlicensedin the Stateof Florida)in lightof the proposed an engineering reportwill be preparedthat construction.Basedon the resultsof our evaluation, detailsthe resultsof the testingperformed,provideslogs of the borings,and geotechnical criteriafor designof the project.Thereportwillincludeallowable engineering axialcompressive piles. for helicalpilesandaugercast capacities SCHEDULE We can commencethe workafterreceiptof authorization to proceed.Thiswill beginwith field and clearingthe locations for buriedutilities.Oncethe markingthe proposedboringlocations to the siteto beginthefieldwork(withinaboutone arecleared, we will mobilize boringlocations week of receivingthe signedAgreementfor Services). We expectthe field explorationwill reportcan be requireone day, if the weatherconditionspermit. We estimatethe geotechnical submittedwithinabouttwo weeksafterthefieldworkis completed. c. GOMPENSATION We proposeto do the workfor a fixedfee of $5,500.00.Thisfee will not be exceededwithout Shouldadditional workbe neededbeyondthe due causeandyourpriorwrittenauthorization. agreement. scopedescribedherein,thatworkwill be coveredby supplemental Flesponsiveu Resourcefulll R.eliable EngineeringSenrices Proposal,Geotechnical BelleGladeWWTPGenerator Slab 'i BelleGlade,Florida March30,2015wProposal No.PHD150113 D. Tl'ernacon AUTHORIZATIOt{ We understand that the work will be authorized with a Task Orderissuedunderan existing Subcontract AgreementbetweenDunkelberger Engineering & Testing,A TenaconCompany and Globaltech, Inc.datedNovember12,2014. The fee is validfor 90 daysfromthe dateof this proposaland is basedon the assumption that all fieldserviceswill be performedunder safety Level D personalprotectiveprocedures.The fee is based on the assumptionsand provided conditions at thetimeof thisproposal. We appreciate the opportunity to providethis proposaland lookforuardto workingwith you on project. you questions this lf haveany or comments regarding thisproposal or requireadditional pleasegiveme a call. seruices, Sincerely, TerraconConsultants,Inc. A 4 // a./ JaimeVelez,P.E. SeniorProjectEngineer r Reliable ResponsivemResounceful 'tr:'r/ (/,,,*=, DanielJ.Marieni, P.E. ProjectEngineer If{ G, INE. E'Af G/A/F'FR WORCESTE'R STRUCTT]RAI. EI'{GII\-EERING e-mail jbw@jbw-engr.com I 500SouthMountainRoad Dillsburg,PA, 17019 717-432-9436 voice Apil20,2015 ProjectNo. 20rs-020 Globaltech,Inc. 6001BrokenSoundParkway Suite610 BocaRaton.FL33487 Attention: Subject: Mr. David Schuman,PE Fort PierceUtility Authority Belle GladeWWTP GeneratorReplacement DearMr. Schuman: WorcesterEngineering,Inc. to providestructuralengineering Tha* you for considering servicesfor this project.I look forwardto continuingour long relationship. SCOPEOB PROF'ESSIONALSERVICES: we will beprovidinga designfor a new ProposedStructure:Basedon our conversations, generatorslabto be constructed on pilings,filling and/orcreatingnewwall penetrations in an existingstructure,providing supportfor new IIVAC equipment,andaddressingfire ratings,asrequiredto obtaina buildingpermit. for your projectto Documents: We proposea setof structuraldocuments Construction project, plansanddetails,as pertarnto this as they consistof our GeneralStructuralNotes requiredto obtaina buildingpermit.Globaltechwill preparea baseplan andWorcester Engineeringwill providethe structuralinformation. Reviewof submittedstructuralshopdrawingsand ServicesDwing Construction: for lnformationor Clarificationwill beprovidedin a to writtenRequests responses areincludedin thisproposal,butmay or observations timely manner.No siteinspections in writing by Owneror Architect,to be billedhourly be providedif specificallyrequested with the attachedschedule.It is understoodandexpectedthat all submittals in accordance to WorcesterEngineeringshallcometfuoughtheArchitect. COMPENSATION Payment:Forthe abovescopeof services,we requesta total fee of $4000for structural anddrawings,payableuponcompletionof our Permit consultation engineering, Drawings. z suchasplotting,printinganddeliveryservicesshallbebilled in expenses Reimbursable or per vendorsinvoices.Plotting,printingand with the enclosedschedule, accordance DocumentphaseandPermitting during Construction design coordination deliveryfor by anyparty All plots,printinganddeliveryrequiredtherea.fter shallnotbe reimbursable. perthe attachedschedule. shallbereimbursable dateabove. This proposalshallbe valid for 90 calendardaysfrom the submission causefor at a time be 30 days shall progress for more than in work in Stoppages of the Contract,with a minimumincreaseof 70%of the designfee. renegotiation Permits: It will be the Owner/Developer'sresponsibilityto pursuebuildingpermitsand asrequiredby Stateor otherjurisdiction.Failwe of the obtainall inspections ajustifiable to pursueandobtainthebuildingpermitis not considered Owner/Developer of thedesignfees. causefor nonpayment Paymentis duewithin 30 Invoiceswill beprovidedat the completionof milestones. a for morethan90 daysmaybe assessed calendardays,andpaymentsoutstanding financechargeof 75% on theunpaidbalance. Ratestor 2015 ForensicEngineering$'100.00/hour Engineering $85.00/hour Drafting $50.00/hour Office $40.00/hour Printing Plotting Mileage $3.00/Sheet $10.00/Sheet $0.35/mile TERMS AI\D CONDITIONS WorcesterEngineering'sContract is with the architectof record,assignedbelow.Due this contractandits termsandconditions,or your firm's requirements, to insurance this proposal,mustbe signedandreturnedto us referencing fomr standardAIA contract on this project.Engineersfaiiureto enforceanyportionof beforework cancommence this proposaldoesnot constitutea waiverof otherrightshereunder. Substitutions:Uponrequestby the Client,the Consultantshallevaluateandmake of materials,productsor equipmentproposed regardingsubstitutions recommendations for these The Consultantshallbe compensated or contractors. by the Client'sconsultants the construction and coordinate services,aswell asanyservicesrequiredto modiff asadditional preparedby the consultantwith thoseof the client'sconsultants, documents caused by this in an adjustment schedule to be entitled services.The Consultantalsoshall additionaleffort.. nor thepresence of the activitiesof the consultant, Job site:Neithertheprofessional duties and job its obligations, Contractor of the General relieve shall at a site, consultant sequence, means,methods, including,but not limitedto, construction responsibilities andcoordinatingthe necessary for performing,superintending or procedures techniques J Work in accordance andanyhealthor safetyprecautions with the contractdocuments requiredby anyregulatoryagency. Instrumentsof Service: All reports,drawings,specifications, computerfiles, field dat4 notesandotherdocumentsandinstrumentspreparedby the Consultantasinstrumentsof serviceshallremainingthe propertyof the Consultant.The consultantshallretainall commonlaw, statutoryandotherreservedrights. professional ProfessionalLiability: WorcesterEngineering's liability shallbe limitedto the designfeefor theprojector $50,000.00 which everis greater. Termination: In the eventof terminationof this agreement by eitherpffity,the Client (15) shallwithin fifteen calendardaysof terminationpaythe Consultantfor services costsincurredby the Consultantup to the dateof the renderedandall reimbursable termination,in accordance with thepaymentprovisionsof this Agreement.The Client may terminatethis agreementfor the Client's convenienceandwithout causeupongiving the Consultant not lessthanseven(7) calendardayswrittennotice.TheEngineermay terminatethe agreementwith seven(7) calendardayswritten noticefor any of the followingreasons: Substantialfailure of the otherparty to perforrnin accordance with the termsof this agreementandthroughno fault of the terminatingparty. Assignmentof this agreement or transferof the Projectby eitherpartyto any otherentity without theprior written consentof eitherparfy Suspension of theprojector the Consultants servicesby the Clientfor morethanninety(90)calendardays,consecutive or in the aggregate. Material changesin the conditionsunderwhich this Agreementwas enteredinto,the Scopeof Servicesor thenatureof theproject,andfailure of thepartiesto reachagreement on the compensation andschedule adjustrnents necessitated by suchchanges. Acceptance:Returnof this proposal,signedanddated,by fax or e-mail,shallserveas our authorizationtoproceed.In lieu of anyotherwrittenandsignedagreement, services,consultation, and/ or stucturaldrawingsfor this acceptance of engineering projectshallbe construedasacceptance of thisproposalasthe corrtmctand beheld binding.We look forwardto workingwith you andyour staffon this excitingproject.If you haveanyquestions, pleasedo not hesitateto call. RespectfirliySubmitted, JosephB. WorcesterPE President FL Prof.Reg.No. 35308 For Globaltech,lnc. Date Engineering March3l,2Al5 Dave Schuman GlobalTectuINC 1075BrokenSoundPkwy.NW, Suite103 BocaRaton,FL 33487 Belle GladeWWTF AlternativePowerImprovements QA/QC DearDave: Inc. (ADS) is pleasedto provideGlobaltech Pursuantto your request,ADS Engineering, for electricaldesignfor the abovereferenced (GT), Inc. a proposalfor the QA/QC assistance project.Our scopeofwork consistsof the following: project,whichis a design/build o o o o Onesitevisits(8 hours) duringelectricaldesign Assistance The QA/QC for electricaldrawingsfor aboveproject Overseeingandprovidingthe guidancefor electricalengineerin record. Our Total Lump Sum is 5'000.00 Note: We will checkthe submittedwork andgve our inputsto the bestof our knowledge for signingand andinformationprovidedfrom GT. ADS Engineeringis not responsible sealingthe drawingsnor hasanyother liability for this project. Sincerely, AIex Stojanovic BodaxFoundations, Inc. 11oI NW 55rHstreet Ft.Lauderdale,FL 33309 954-77I-7888Fax 954-77l-8908 Telephone Awger Cast Piles - Helical Piles - Pin Piles June23,2015 Globaltech,Inc. 7075 Broken Sound Boulevard, N.l4/. #103 Boca Raton, Florida 33487 Contact: David Schuman Phone: s61-997-6433 Project: Belle Glade WIryTP 2p55 tYestCanalStreetSouth Belle Glade Fax: 561-997-5811 dschuman@gIobaltechdb,com Specifications (please initial) and estimatesfortheinstallationof 15Aager CastPiles,asspecified, W, herebysubmitspecifications location mentioned at theabove o Pilesare to be14 inch in diameter,20ft. in lengthandreinforcedwiththefollowing: \ 4 #5w/#3 ties@8" O.C.fuA o Pile steelinstalledasstraightbars,field bentby others o Groutis to be4000 PSL . for mobilization(providedby others)(pleuseinitiaQ Site Conditions-necessarv . . o o o Afirm, dry and level sitefor our equipmentand concretettuclcs Engineering layout; including pile locations and elevation calculations. Outlet supplying city water with a %" hose bib within 100ft. of our drill rig Locatian,protection, remoyal or replacementof undergrotmdor overheadobstructionsincluding utilities, buildings, lighting, sprinklers, etc. Protection, repair or replacement of adjacent structures and work sites including buildings, trees shrubs, lswns and driveways. Included-(pleaseiniliuA o o o o Onemobilization. Installationof piles, all labor and materials Pile elevationswitt be clippedto the desiredlevel if working grade is at + / - 6 inchesfrom top of pile. Drilling refusalwiII bedefinedas lessthanonefoot ofpenetrationovera period of oneminute(Deep F oundationInstitute). Workers Compensation and General Liability Insurance' Chansesin BaseBid (pleaseinitiul) Additional piles require a te-bid ot change order. Inspection and logging of piles, and certification by a Florida Registered Engineer. For eachpile with grout in excessof 1.5 times the theoreticalpile volume add $ 225.00per yard' For piles longer than bid length add 528.88per linealfoot' Standbytime will be invoiced at $400.00per hour. For piles not installed during initial mobilization, deduct 5303.00each. Pile elevations in excessof +/- 6 inchesfrom working grade, an additional per pile charge to cut or chip thepile witl be incurred. This price excludes excavation, marking of cut-off point and renzoval of pile debris. c Removalor hauling of gtout spoils. o Sonotube,cosingsor steel sleeves 1 Of INC 2055WESTCANALSTREETSOUTHBELLEGLADE15ACPA TE 'dOCPAgC 23,2OI5GLOBALTECH JUNE PriNtEd 2 o o . t . . o Preparedby Rich Burnes BuseBid Amount $15,000.00 Predicatedon mobilerig uccessund installation. Engineering cettification is excluded,provided by others. Budget bid needpile pluns' Pavmentsund tpaditigns t Depositpcrymentof $1,082.00 for matetialsis requiredwitlt signedcontruct.Depositis nonrefrmdable. Paymentsnot received No retainagewillbe withheldanclfinalpaymentis dueuponcompletion. within thetermsdescribedaboveshall accrueinterestat 1.75%per month (ANNUAL MTE IS 21%o) PERCENTAGE Engineeringlogsare available5 to 7 daysafter completionof pile installation. EngineeringLogs yl,::!,::;:;::::"Y:",0,y#:;';*h*",t ($400.00), tienfees incruding, ornon-pavment, for all legalactionsshall reasoiableattorney'sfeesand coit,shaltbepaid by thecustomer.Venue Iie exclusivelyin Broward County,Florida' Thisproposal is subjectto acceptancewithin 10 daysand can bemodffiedor voidedthereafterat the option of Bodm Fotmdations,Inc. iacsimile of this contractshall bedeemedavalid counterpartof theoriginal' AuthorizedSignature:BUDGETONLY Title: Date: Accepted by: BUDGETONLY Title: Date: pleasesign and initial and return byfax both sheetsof the executedcontract, in our office,we will proceedwith scheduling, once rec,eived Thank You. 15ACPA TE printed 6tl3tl0t5 3:53:00PMGLOBALTECHINC 2055WESTCANAI STREETSOUTHBELLE GLADE 2 of Page2 .doc