CITY OF MIAMI Capital Improvements Program Miscellaneous Civil Engineering Services RFQ No. 12-13-004 Addendum No. 2 December 10, 2012 TO: ALL PROSPECTIVE PROPOSERS: The following changes, additions, clarifications, and deletions amend the above-captioned Request for Qualifications, and shall become an integral part of the Proposal Responses and the subsequent Agreement. Please note the contents herein and affix same to the documents you have on hand. Clarifications: 1. The changes to Section 4.0 Section A, “Contents of Qualifications Statement” paragraphs 8 and 9”, which were included in Addendum No. 1 and issued on December 5, should be disregarded. The new revisions are reflected in Addendum 2. 2. The changes to Section 4.0 Section B, “Instructions for Submitting a Response Response Submission Format, Section D, No.s 3, 4 and 5”, which were included in Addendum No. 1 and issued on December 5, should be disregarded. The new revisions are reflected in Addendum 2. Requests for Information: Question 1 Is this contract for only one team or firm, or this is for a poll of firms? Answer 1 The responsive firms will be shortlisted and a minimum of three (3) proposers will be selected to enter into a contract with the City. 1 Miscellaneous Civil Engineering Services Addendum No. 2 RFQ No.12-13-004 Question 2 Miami-Dade County does not provide references; would you accept Consultant Evaluation’s for this purpose? Answer 2 As stated in Section 4 “Instructions for Submitting a Response”, Failure to utilize City forms will result in the rejection of the Response as non-responsive. Question Can the City please elaborate on what forms our sub consultants need to 3 provide for the submittal? Answer The RFQ forms are for the prime proposer, however, in addition to the sub 3 consultant resumes, include company licenses and certifications, Business Tax Receipts and Florida Corporate Registrations. Section 6.3, “Debarment and Suspension Certificate”, must be completed by all Respondents in the RFQ submittal. 4 Also, in reference to project experience needing to have been completed within Question the last 5 years, is it based on the design completion date or the construction completion date? 4 The design completion date. Answer Question 5 In regards to the above referenced RFQ, are the minimum of three references are applicable to the sub consultants too, or only to the prime firm? Answer 5 Question 6 Since there is a 15% CBE requirement, is it required to assign those percentages before contract award? Answer 6 Questions pertaining to the 15% CBE requirements will be addressed in Addendum 3. Only for the prime proposer. 2 Miscellaneous Civil Engineering Services Addendum No. 2 RFQ No.12-13-004 A. CONTENTS OF QUALIFICATION STATEMENT - Addendum No. 2 *Revised Order/Deletions 8. **Additions *Civil Engineering Experience for the Proposer Firm: Proposer shall complete and submit Form RFQ-PP for this section of its Response. For each Form RFQ-PP submitted Form RFQ-PP-R must also be submitted with the Response. Proposer shall only include projects that have been completed and are comparable to the types of projects to be awarded under the Agreement. (List a minimum of 3 projects and no more than 5 projects) *9. Civil Engineering Projects Experience Past Five (5) Years: A list of projects of similar size, scope and complexity must be submitted. Information should include: * Client’s Name, address, phone number. * Description of work. * Year the project was completed. * Total of fees paid to firm. * Total cost of the construction, estimated and actual. *10. *Civil Engineering Experience for the Project Manager: Provide a comprehensive summary of the Project Manager’s experience related to Civil engineering. The individual MUST have a minimum of five (5) years’ experience and have served on similar projects on a minimum of three (3) previous occasions. A list of projects of similar size, scope and complexity must be submitted. Information should include; client’s name, address, phone number, description of work, and the year the project was completed. Failure to meet the five (5) year minimum requirement relative to the Project Manager will in and of itself result in the proposal being deemed non-responsive. 9. *Agreement Provisions Provide comments on, and exceptions to the attached Agreement terms and conditions. Proposed changes to the Agreement must be returned to the City in Microsoft Word format with comments reflected by “red-lining” the original document utilizing the tracking feature. The Microsoft Word document must be included in the proposal in both printed format and electronically on a CD-ROM. The City will only consider the identified comments and exceptions during negotiations. Where a proposal is returned without comments it will be deemed that the Proposer has no comments or exceptions to the draft Agreement. 10. *Acknowledgment of Addenda and Proposer Information Forms 11. *Form C-1 List of Sub Consultants 4 Miscellaneous Civil Engineering Services Addendum No. 2 RFQ No.12-13-004 B. Response Submission Format - Addendum No. 2 Responses are to be prepared and submitted in the following format. Failure to comply with this format may result in the Response being determined non-responsive. Deletions (strikethrough)* Section A The following documents shall be included in the order listed. 1. 2. 3. 4. 5. 6. 7. RFQ-PL – Proposal Letter RFQ – N – Narrative RFQ – QP – Qualifications of Firm RFQ-QT – Qualifications of Team Team Organizational Chart Resume of Key Personnel RFQ-WC- Workload Capacity Section B 1. RFQ-PM – Qualifications of Project Manager 2. RFQ-PM-R – Project Manager’s Reference Forms 3. Resume of Project Manager Section C 1. RFQ-DPP – Design Philosophy & Process 2. RFQ-T – Technical Approach Section D* 1. RFQ-PP – Proposer’s Project Experience 2. RFQ-PP-R – Proposer’s Reference Forms 3. Civil Engineering Experience for the Proposer Firm * 4. Civil Engineering Projects Experience the Past Five (5) Years* 5. Civil Engineering Experience for the Project Manager * Section E 1. Agreement Provisions 2. Acknowledgment of Addenda and Proposer Information Forms 3. Form C-1 List of Sub Consultants 5 Miscellaneous Civil Engineering Services Addendum No. 2 RFQ No.12-13-004