DATE: April 27, 2015
PROJECT: Municipal Park Comfort Station
PROJECT NUMBER: 0270-0073
OWNER: City of Rochester
ARCHITECT/ENGINEER: Anderson, Eckstein & Westrick, Inc.
TO: Prospective Bidders
This Addendum forms a part of the Contract Documents and modifies the Bidding
Documents dated April 2015; Addendum Number 1 issued April 27, 2015, with
amendments and additions noted below.
This Addendum consists of (7) total pages.
The following changes to and/or clarifications of the Contract Documents will be
incorporated in said Contract Documents and such changes shall be allowed for in the
price bid by the Contractor, such that the price indicated in the Proposal shall represent
the conditions as set forth in the original Contract Documents as modified by this
Addendum.
Acknowledgment of receipt of this Addendum and the Bidder’s Acceptance of these
revised conditions prior to submittal of his bid shall be indicated by adding the Addendum
number in the space provided in the Bid Form. Failure to do so may disqualify the Bidder.
CITY OF ROCHESTER
MUNICIPAL PARK COMFORT STATION
AEW #0270-0073
A.
ADDENDA
SECTION 00910 – Page 2
BIDDER QUESTIONS AND RESPONSE:
1. Is the entire roof covered with Ice and Water Shield?
a. No, minimum two rows.
2. What is the depth of the adjacent 54” sanitary sewer?
a. Approximately 19.8’ deep.
3. Can the sanitary lead be directional bored with a grinder pump?
a. No.
4. On the site plan decorative grass is called out, what type of decorative grass?
a. Karl Foerster Feather Reed Grass.
5. What is the overall size of the pavilion slab?
a. 55’-4”x30’-10”
6. The quantity of the concrete sidewalk shown on page C1 seems like it should be
close to double, please verify what the length of this sidewalk is?
a. 164’ long, revise” Concrete Walk” quantity to 936 Sft.
7. Are earth formed footings allowable?
a. Earth forming of footings is not recommended due to the potential of
mushrooming and frost heaving. Coordinate with geo-technical engineer
agency to evaluate soil conditions.
B.
DRAWING REVISIONS:
1. Sheet C1, Site Plan
a. Add electrical manhole location numbers 4 and 5.
b. Add enclosure and concrete pad location at manhole 5.
c. Revise “Concrete Walk” quantity to 936 Sft.
2. Sheet A4, Electrical and Plumbing Plans
a. Revised electrical riser diagram.
b. Add General Electrical Work Scope Notes.
c. Add floor slope arrows at floor drains.
3. Sheet Spec, Specifications
a. Revise General Lighting and Electrical Notes 5 and 14.
CITY OF ROCHESTER
MUNICIPAL PARK COMFORT STATION
AEW #0270-0073