NATIONAL HIGHWAY AUTHORITY Procurement & Contr act Administration Section 28-Mauve Area, G-9/ l,Islamabad Tel: 9032727 , Fax: 9260419 Ref:6(406)/cM(P&CA)/NHA/ 16I tsz{ 29ft August, 2016 All Prospective Consultants Subject: Mlnutes of Pre-Proposal Meetins for: Consultancy Senrices for Review. Adjustment of Road and Structures Design. Construction Supervision and Contract Administration of South and North Access Road (Packase-Ill of 7.3 Km Lensth Each (Total 15 Kml of Lowari Tunnel Project Reference: Request for Proposal Notice for subject Seruices appeared. in d.aity newspapers on 76tnAugus\ 2016 Minutes of Pre-Proposal Meeting held on 22"d August, 2016 for subject Services being integral part of the Request for Proposal, are enclosed herewith, for necessary action, please. Enclosure: Minutes of Pre-Proposal Meeting (O4 Pagef Copy for kind information to: Member (Planning), NHA, Islamabad; Member (Engineering Coordination), NHA, Islamabad; General Manager (P&CA), NHA, Islamabad; SO (Tech.)to Chairman, NHA; Office Copy. A Pre-Proposal Meetingwas held in NHA Auditoriumat ll00 hourson 22"dAugust, 2016to -officers discuss the Request for Proposal (RFP) for subject Services.Following NHn and representatives of prospective consultants attendedthe meeting: . NationalHighwayAuthority GeneralManager(Planning) GeneralManager(P&CA) Director(P&CA) - III DeputyDirector(P&CA)- II . Consultants M/s EMS (Pvt.)Ltd. M/s EMS (Pvt.)Ltd. M/s EMS (Pvt.)Ltd. M/s MM Pakistan(Pvt.)Ltd. M/s EGC (Pvt.)Ltd. M/s AA Associates Awan 2. The queriesraisedduringthe abovementionecl pre-proposal meetingand its clarificatiols/ repliesaregivenbelowfor infonnation of all prospective bidders: S. No, I Query Pursuantto clause2.2 of Instructionsto Consultants,we seek clarificationsfrom your good-selfon the followirrg:Prior notice for seeking clarificatiorrs was stipulatedby l8th September, 2016, whereas only ten (10) daysarc available from 23rd August, 2016 till lst September, 2016 for preparingproposals keeping in view the last date of submission on 2nd September, 2016 (Friday).The date of submission of proposalmay thus be shiftedto Jn' Septernber. 2016. 2. There exist apparent inconsistency between the description of itens for evaluation criteria under 5.2.l and the TechnicalProposedFormsand Checklist. Reply RFP noticeand RFP too were issuedon l5-08-16 to provide opporturrityto the prospective applicants for seekiug clarificationby l9-08-16(undertTC 2.2) in writing followed by, otherwise,preproposal conferenceheld on 22-08-16to discussverballyall the queriesand /or otherissues.Whereasyour queries[though indicatingthe dateof l9-08-16as of your Ietter address to GM (P&CA)I were receivedon22-08-16(i.e.3 dayslatertlran required). However, responseto the following queries is provided below; whereasextensiorr of tirne in submissiorr of proposal is neither justifies nor acceoted. Referto the tableon page2l of the RFp which providespagelimits separately for the Forms:TECH-3plusTECH-4:50and TECH-7, TECH-S & TECH-g:N.A Minutes of Pre'Proposal Meeting for ConsultancyServicesfor Rcview, Adiustment of Road and SrnrcrrrrFsDesign, Constructionsupervision and contract Administration ofsourh and Norrh AccessKoad [package-tIJ of 7,3 Km Length Each [Toral 15 Knrl of l,owari Pagei S. No. 3. 4. Query Forms TECH-3 and TECH-4 forms are designated for approachand methodology, commentsand suggestions. Whereaswork programandstaffingscheduleareincluded under approachand rnethodologyin the item describes under5.2.1of Data Sheet. The descriptionunder Tech-7 is "work plari/activityschedule"and the description under Tech-8 is work plan and time schedule for key personnel. Present commitmentof the firm is to be stipulated to be providedunder Tech-9there is not fonnat for past perfonnance.The number of pages for this additional information may be separately accounted for. per As the Footnotel: Under TECH-4 proposedchangesin position/individual inputsshouldbe indicatedand reasonable in the TECHNICAL PROPOSAL.The proposalmay assignperson-month input differentlyfor TOR. The proposalmay includeadditionalexpertpositionhowever additional expefts will be consideredas non-key personal for evaluation. Accordingto Footnote 2: Thereappears to be some ambiguity clarity of expression; when the consultant suggest changes in scope of servicesactivities and output, the consultantmust describein detailedin theFORM TECH4-A and the CHANGES SHOULDNOT BE INCORPORATED IN THE ROPOSAL. QUESTION: How the TechnicalProposal is differentiatedfor TECH-4-A under FootnoteNo.l, it is said that the changesto includein the proposal whereasunder Footnote2, it is said that the changes should not be incorporatedin the proposalbecauseof delicacyand higher degreeof expertise involving legal aspect of the issues, design and variation with financial imoact. In Para (C) of Scope of Services (TOR) - Appendix-A,thereare a uurnber' of following activities,which are uot related to the field Supervision and contract adrninistlationand needs to be performed at Consultant'sOffice Home Office. Sr.# L u. Assist with interpretationof the Conlract Docuruents,explainand or reconcile any ambiguities and or DISCREPANCIES in the Contract Reply (because all threeprovidetheformatsto be followed) and they are not countedagain (at their location)but limit on numberof pagesunderTECH-3 and TECH-4 shall remainrestrictedassuch. Under Note-I, the proposalfollows the client's describedselvices (refer TOR page 48 to 63 of RFP) wherein the consultant may propose change in (Personnel) positionand input to acirieve the requiredoLltputas envisagedby the Client. UnderNote-2,the Consultantmay suggest changein scopeof servicesleadingto better output if so consideredby the consultant. The activities accfue and remain responsibility of the colrsultant dr.rring executiouof ConstructionWorks at the Site (in the field). The consultanrshall perform these from the site (inspection may be required)or its Head Office as Back Up support to its field formation (Supervisory Staft) against which overhead expeltsesare covered in the Person-Months Ratesof the field staff. Minutes of Pre'Proposal Meeting for ConsultancyServicesfor Revtew,Adjustment of Road and Structures Design,ConstructionSuDervisionancl ContracrAdmlnlstrarionofSouth and North Accessl(oad [Package-llJof 7 3 I(m LengrhEach(Totat 15 l(Dr)ofLowari Tunnel P a g e2 a S. No. Query Reply Documents, and apply various provisions of the contract docuntents; and provide NHA all relevant documentation needed for settling disputes (if any) with the Contractors, and make recontmendations to NHA for resolving the Contractors' escalation claims, contract time extensions, variation orders, subletting, additional cost, rate and price fixing etc. Sr#2: aa) Provide any other specialist services requested by NHA under conditions to be mutually agreed and ensure that the construction methods as proposed by the contractor for carrying out the works are satisfactory, inspeclion of contractor's construction equipment,' and safety of the works, property, personnel, and general public; the schedule of mitigation nteasures for adverse environmenlal impac ts. Sr.#3:i. Carry out any subsequent design changes, and expeditiously issue supplementary drawings, site instructions, VANATION ORDERS and day v,ork orders to avoid delay to the works and to ensure that the works are executed in accordance with Contract. Sr.# 4: g. Assure the receipt of and maintain as permanent records of all warranties required under terms and conditions of the Contract Agreement for materials including their source and equipment accepted and incorporated in the proiect. 5. To effectivelyperformthe abovetasks,it Refer to Note-l uuder Fonn TECH-4 is suggestedthat a team for home office (page28 ofRFP). supportwith corresponding man-months may be included for coordination, guidanceto field office, Iiaisonwith the Client, Processingof Clairn of Contractor & DisputeResolutionand supportto NHA in the matterof Arbitrationand arnicable settlement. if reouired. Minutes of Pre-PrcPosal Meeting for ConsultancySeruicesfor Review, Adiustment of Road and structures Design,construction supervision and ContractAdministration of Southand North AccessRoad (Package-ll)of 7 3 Km LengthEach(Total 15 Kntl of Lowari Tunnel project pase 3 a In Para (D) of Scope of Services (TOR) - Appendix-A, the following positionsare included against the Key ProfessionalStaff but in "Summary of Evaluation Sheet for Technical Proposal(QCBS)", these positionswith corresponding markingis omitted:- To have separate Key Professionals deployedfor eachSouthandNofth Access Roadssimultaneously, the numberof Key Professional Staffdoubled;Weightages for the lower formationis considered too low to be ignoredkeepingin view required weightages for the higher formation. However;deployment of Key Staffin each formationshall be in accordance witlr the requiredqualificationsandexperience. AL STAFF Keepingin view the Scopeof Services Refer to Note-I under Form TECH-4 as give in the Appendix-A(TOR),itis (page28 of RFP). strongly suggested tbat a position of "ContractSpecialist"may be includedfor effective Contract Adrninistration and takingtimely contractualactionsrelatedto cost, time, and quality controls and finishing of the contracts,refenal to the adjudication and arbitration in case of In Sub-Para (viii)of "Detail of Key Refer to Note-l under Form TECH-4 Experts:of Appendix-A(TOR),eight (08) (page28 of RFP). Positions of "Site Engineers" with minimurnexperience and qualificationis givenbut the positionsof SiteEngineers are not reflectedin Para (D)Staffing)of TOR and "Surnmaryof EvaluationSheet for TechnicalProposal(QCBS)".Please In order to preparea good responsive Not accededto, proceedas per sclredule, proposal,it is requestedthat the date of submissionof proposalsof the subject Projectmay be extendedat leastup to 20tr' qd;; Minut€s of Pre-Proposal Meeting for Consultancyseruies for Review, Adjustment of Road and Structures Design,Construction Supervision and contract Administration of so u th and North AccessRoad (PackageI l) o f 7.3 Knr LengrhEach(Total 15 Knt) of Lowari Tin nel project pase 4