Stadium Redevelopment Update DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 January 21, 2016 Stadium Redevelopment Update OVERVIEW: Working through more detailed design and engineering since Development Permit open houses, held in May of 2015 Development Permit Submission at the end of January 2016 Expect City circulation to be anywhere from 3 to 6 months Completion of construction documentation following Ciy approvals Potential construction start end of 2016; beginning of 2017 DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Stadium Redevelopment Update PUBLIC REALM MIXED USE BUILDINGS PARKING CONCEPT DESIGN The open space concept aims to create an active public realm that is connected to the surrounding urban fabric and creates a pedestrian focused environment. The framework layers many elements to develop multiple types of spaces, including: flexible / programmable plaza, retail streets, gateways, outdoor patios and accessible green roofs. 1 2 3 4 5 Residential / Retail Office / Retail Hotel Medical Offices Cafe / Parkade Access GATEWAYS + EDGES 6 7 8 Access off Uxbridge Dr Gateway Plaza off 16 Avenue West Pedestrian Green Link PUBLIC OPEN SPACES 9 10 11 12 13 1 Central Plaza - Main Square South East Plaza Gateway West Pedestrian Green Link Green Roof East Retail Strip 14 Entry Ramp to Underground Parking 15 Short Stay Parking 16 Pedestrian Access to Underground Parking 17 Underground Parking Exit Lane PUBLIC REALM SURFACES 18 19 20 21 22 Servicing Lane (also pedestrian link) Pedestrian Priority - Shared Surface Public Sidewalk / Multi-Use Pathway Vehicular Access / Pedestrian Priority Pedestrian Walkway SOUTH EAST PLAZA GATEWAY 20 12 12 15 21 6 1 13 15 11 9 19 20 2 8 CENTRAL PLAZA LOOKING SOUTH SUMMER 5 18 14 16 17 21 10 4 3 7 3 22 DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 CENTRAL PLAZA LOOKING NORTH WINTER Stadium Redevelopment Update Updated Site Plan DRAFT DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 N Stadium Redevelopment Update 3 2 1 4 1 5 2 1 6 3 4 1 AERIAL VIEW FROM THE SOUTH AERIAL VIEW FROM THE NORTH MIXED USE BUILDINGS 1 2 3 4 5 6 N DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Residential / Retail Office / Retail Hotel Medical Offices Cafe / Parkade Access Central Plaza / Main Square N Stadium Redevelopment Update Grocery / Residential Building Building Notes: - Approximately 97,000 square feet - Main level grocery store and restaurant - Main level residential wrapping around grocery - Three levels of residential above grocery - 70 Residential units (mix of 1 and 2 bedrooms) DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Stadium Redevelopment Update Residential / Retail Building Building Notes: - Approximately 200,000 square feet - Main level drug store, retail units, and residential lobby - Main level residential on west side - 14 level building - 189 Residential units (mix of 1 and 2 bedrooms) DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Stadium Redevelopment Update Medical Office Building Building Notes: - Approximately 143,000 square feet - Main level retail units and potential day care - 8 level building DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Stadium Redevelopment Update Hotel Building DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Building Notes: - Approximately 139,000 square feet - Select service hotel (flag brand) - Main and second levels to consist of hotel programming (food and beverage, meeting space, fitness and pool area, offices, etc.) - 11 level building and 189 Room Keys (mix of king, double queen and extended stay rooms) Stadium Redevelopment Update Office Building Building Notes: - Approximately 216,000 square feet - Main level retail units, food and beverage and potential bank use - 10 level building DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 Stadium Redevelopment Update 5(6,'(17,$/5$031181:,152$' + 57 12 81:,15 2$' (;,75$03381:,152$' 35,0$5<5$0333/$=$/(9(/ 35,0$5<5$0333 Parkade The user experience and design of the proposed parkade has been given careful consideration and will incorporate proper way finding, lighting and safety. The Parkade is a level underground structure situated below the entire site. It contains the vast majority of on-site public and private parking, secured bicycle parking, mechanical and electrical building systems as well as waste and recycling storage for the development. The parkade provides connections from parking to the above plaza amenities and retail areas. Level P1 parking serves the Retail, Hotel, and Office users. The primary ramp for vehicles using the site is on the west side of the site with a secondary parkade ramp at north-west corner of the site FROM Unwin Road!LSOANEXITONLY RAMP at the east edge of the site turning south onto Uxbridge Drive. 7 +$ 9( 18 ( (6&$/$725(/(9$725723/$=$ ( 5,9 (' * 5,' 8;% 2)),&(+27(/5$0333/$=$/(9(/ %,&<&/(5$03 (;,721/<5$0338;%5,'*('5,9( ULJKWWXUQRQO\ 5(6,'(17,$/5$03181:,152$' 35,0$5<5$0333 Within level P2 the majority of the parking stalls serves Office parkingAND2ESIDENTIAL 2)),&(+27(/5$0333/$=$/(9(/ Bicycle parking for Residential use (±120 stalls) are allocated on level P. Bicycle parking for Office use are allocated on level P1 complete with the potential for a dedicated bike ramp connecting to the pathway on Uxbridge Drive and showers and lockers for bicycle commuters. Given the size and overall scale of the parkade, our consultant team is currently analyzing the total number of parking stalls required for the site including peak hour demands. 5(6,'(17,$/5$03381:,152$' 35,0$5<5$0333 2)),&(5$0333 /(*(1' DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016 5(7$,/3$5.,1* 0(',&$/2)),&(3$5.,1* +27(/3$5.,1* 5(6,'(17,$/3$5.,1* 727$/3529,'(' 67$//6 67$//6 67$//6 67$//6 67$//6 3$5.,1*67$//&28176$5($3352;,0$7($1'68%-(&772&+$1*($//2&$7,212) 67$//6729$5,28686(56$6,1',&$7(',6)256&+(0$7,&385326(621/< QUESTIONS ? DISCLAIMER: DRAFT - SUBJECT TO CHANGE • • • • The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium Redevelopment and is subject to change during the detailed design and development permit process. Plans, diagrams, drawings and images shown are for progress information only and will subject to change as part of the normal design process. All photos and reference images are copyrighted to their respective owners and not for distribution. Retail uses are suggested and may be changed. 21 JANUARY 2016