Stadium Redevelopment Update

advertisement
Stadium Redevelopment Update
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
January 21, 2016
Stadium Redevelopment Update
OVERVIEW:
Working through more detailed design and engineering since Development
Permit open houses, held in May of 2015
Development Permit Submission at the end of January 2016
Expect City circulation to be anywhere from 3 to 6 months
Completion of construction documentation following Ciy approvals
Potential construction start end of 2016; beginning of 2017
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Stadium Redevelopment Update
PUBLIC REALM
MIXED USE BUILDINGS PARKING
CONCEPT DESIGN
The open space concept aims to create an active public realm that is connected to the surrounding
urban fabric and creates a pedestrian focused environment. The framework layers many elements to
develop multiple types of spaces, including: flexible / programmable plaza, retail streets, gateways,
outdoor patios and accessible green roofs.
1
2
3
4
5
Residential / Retail
Office / Retail
Hotel
Medical Offices
Cafe / Parkade Access
GATEWAYS + EDGES
6
7
8
Access off Uxbridge Dr
Gateway Plaza off 16 Avenue
West Pedestrian Green Link
PUBLIC OPEN SPACES
9
10
11
12
13
1
Central Plaza - Main Square
South East Plaza Gateway
West Pedestrian Green Link
Green Roof
East Retail Strip
14 Entry Ramp to Underground
Parking
15 Short Stay Parking
16 Pedestrian Access to
Underground Parking
17 Underground Parking Exit Lane
PUBLIC REALM SURFACES
18
19
20
21
22
Servicing Lane (also pedestrian link)
Pedestrian Priority - Shared Surface
Public Sidewalk / Multi-Use Pathway
Vehicular Access / Pedestrian Priority
Pedestrian Walkway
SOUTH EAST PLAZA GATEWAY
20
12
12
15
21
6
1
13
15
11
9
19
20
2
8
CENTRAL PLAZA LOOKING SOUTH
SUMMER
5
18
14
16
17
21
10
4
3
7
3
22
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
CENTRAL PLAZA LOOKING NORTH
WINTER
Stadium Redevelopment Update
Updated Site Plan
DRAFT
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
N
Stadium Redevelopment Update
3
2
1
4
1
5
2
1
6
3
4
1
AERIAL VIEW FROM THE SOUTH
AERIAL VIEW FROM THE NORTH
MIXED USE BUILDINGS
1
2
3
4
5
6
N
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Residential / Retail
Office / Retail
Hotel
Medical Offices
Cafe / Parkade Access
Central Plaza / Main Square
N
Stadium Redevelopment Update
Grocery / Residential Building
Building Notes:
- Approximately 97,000 square feet
- Main level grocery store and restaurant
- Main level residential wrapping around grocery
- Three levels of residential above grocery
- 70 Residential units (mix of 1 and 2 bedrooms)
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Stadium Redevelopment Update
Residential / Retail Building
Building Notes:
- Approximately 200,000 square feet
- Main level drug store, retail units, and residential lobby
- Main level residential on west side
- 14 level building
- 189 Residential units (mix of 1 and 2 bedrooms)
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Stadium Redevelopment Update
Medical Office Building
Building Notes:
- Approximately 143,000 square feet
- Main level retail units and potential day care
- 8 level building
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Stadium Redevelopment Update
Hotel Building
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Building Notes:
- Approximately 139,000 square feet
- Select service hotel (flag brand)
- Main and second levels to consist of hotel
programming (food and beverage, meeting space, fitness
and pool area, offices, etc.)
- 11 level building and 189 Room Keys (mix of king, double
queen and extended stay rooms)
Stadium Redevelopment Update
Office Building
Building Notes:
- Approximately 216,000 square feet
- Main level retail units, food and beverage and potential
bank use
- 10 level building
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
Stadium Redevelopment Update
5(6,'(17,$/5$031181:,152$'
+
57
12
81:,15
2$'
(;,75$03381:,152$'
35,0$5<5$0333/$=$/(9(/
35,0$5<5$0333
Parkade
The user experience and design of the proposed parkade has been given careful
consideration and will incorporate proper way finding, lighting and safety.
The Parkade is a level underground structure
situated below the entire site. It contains the vast
majority of on-site public and private parking,
secured bicycle parking, mechanical and electrical
building systems as well as waste and recycling
storage for the development. The parkade provides
connections from parking to the above plaza
amenities and retail areas.
Level P1 parking serves the Retail, Hotel, and
Office users. The primary ramp for vehicles using
the site is on the west side of the site with a
secondary parkade ramp at north-west corner of
the site FROM Unwin Road!LSOANEXITONLY
RAMP at the east edge of the site turning south
onto Uxbridge Drive.
7
+$
9(
18
(
(6&$/$725(/(9$725723/$=$
(
5,9
('
*
5,'
8;%
2)),&(+27(/5$0333/$=$/(9(/
%,&<&/(5$03
(;,721/<5$0338;%5,'*('5,9(
ULJKWWXUQRQO\
5(6,'(17,$/5$03181:,152$'
35,0$5<5$0333
Within level P2 the majority of the parking stalls
serves Office parkingAND2ESIDENTIAL
2)),&(+27(/5$0333/$=$/(9(/
Bicycle parking for Residential use (±120 stalls)
are allocated on level P. Bicycle parking for
Office use are allocated on level P1 complete with
the potential for a dedicated bike ramp connecting
to the pathway on Uxbridge Drive and showers
and lockers for bicycle commuters.
Given the size and overall scale of the parkade,
our consultant team is currently analyzing the
total number of parking stalls required for the site
including peak hour demands.
5(6,'(17,$/5$03381:,152$'
35,0$5<5$0333
2)),&(5$0333
/(*(1'
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016
5(7$,/3$5.,1*
0(',&$/2)),&(3$5.,1*
+27(/3$5.,1*
5(6,'(17,$/3$5.,1*
727$/3529,'('
67$//6
67$//6
67$//6
67$//6
67$//6
3$5.,1*67$//&28176$5($3352;,0$7($1'68%-(&772&+$1*($//2&$7,212)
67$//6729$5,28686(56$6,1',&$7(',6)256&+(0$7,&385326(621/<
QUESTIONS ?
DISCLAIMER: DRAFT - SUBJECT TO CHANGE
•
•
•
•
The master plan shown in this presentation depicts a conceptual vision for the redevelopment of Stadium
Redevelopment and is subject to change during the detailed design and development permit process.
Plans, diagrams, drawings and images shown are for progress information only and will subject to change as
part of the normal design process.
All photos and reference images are copyrighted to their respective owners and not for distribution.
Retail uses are suggested and may be changed.
21 JANUARY 2016