Amendment

advertisement
ROWAN UNIVERSITY
ROWAN UNIVERSITY DEPARTMENT OF FACILITIES MANAGEMENT
BOLE HALL HVAC REPLACEMENT
IAL
ORL
M
ME HAL
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
PARKING
LOT R
T
BU HE
GR RN
OU S
P
N
LE
BO LL
A
H
S T R E E T
TEAM
HOUSE
RESIDENT LOT
PARKING LOT B
TENNIS COURT
COMPLEX
50
BUI 0
LDIN
G
PRACTICE
FOOTBALL
SOFTBALL
FIELD
FIELD
PARKING LOT D
FOOTBALL STADIUM
NORTH HALLS
PARKING
SOCCER FIELD
2
BUI 00
LDIN
G
PARKING LOT C
TO
30
BUI 0
LDIN
G
4
BUI 00
LDIN
G
TO ROUTE 47
C A R P E N T E R
ABBOTT'S
POND
PARKING LOT M
S
ITIE
L
I
G
C
FA ILDIN
BU
WILLOW
HALL
B O U L E V A R D
G
RIN G
E
N
H
ATI
E
H
T
AN
PL
MIMOSA HALL
R
PA
WILSON HALL
T
EN
D
U
R
ST NTE
E
C
3
R
PARKING LOT A
H
55
I
R
A
R
CARRIAGE HOUSE
D
LL
HA
PARKING
LE X
O
B
LOT P
NE
AN
LL
HA
PARKING LOT Z-1
O
A
BASEBALL
FIELD
D
DAY CARE
CENTER
PROJECT
LOCATION
1
CS001
LE
BO LL
HA
N
A
E
G001
DM001
DM002
DM003
M001
M002
M003
M004
M005
M006
M007
M008
M009
M010
M011
M012
M013
M014
MEP NOTES, SYMBOLS, AND ABBREVIATIONS
BASEMENT HVAC REMOVALS
FIRST FLOOR HVAC REMOVALS
SECOND FLOOR HVAC REMOVALS
BASEMENT HVAC INSTALLATIONS
FIRST FLOOR HVAC DUCT INSTALLATIONS
FIRST FLOOR HVAC PIPE INSTALLATIONS
SECOND FLOOR HVAC DUCT INSTALLATIONS
SECOND FLOOR HVAC PIPE INSTALLATIONS
ENLARGED FIRST FLOOR DUCT INSTALLATIONS
ENLARGED FIRST FLOOR PIPE INSTALLATIONS
FLOW DIAGRAMS
CONTROL IDENTIFICATION
CONTROL DIAGRAMS
SEQUENCE OF OPERATION
P&ID DIAGRAMS
DETAILS
SCHEDULES
DP001
DP002
P001
P002
P003
BASEMENT PLUMBING REMOVALS
1ST FLOOR PLUMBING REMOVALS
BASEMENT PLUMBING INSTALLATIONS
1ST FLOOR PLUMBING INSTALLATIONS
RISER DIAGRAMS, SCHEDULES, AND DETAILS
2
1
12/23/14
12/3/14
No.
ADDENDUM #1
ISSUED FOR BID
Date
DE001 BASEMENT POWER REMOVALS
DE002 FIRST FLOOR POWER AND LIGHTING
REMOVALS
DE003 SECOND FLOOR POWER AND LIGHTING
REMOVALS
E001
BASEMENT POWER INSTALLATIONS
E002
FIRST FLOOR POWER INSTALLATIONS
E003
SECOND FLOOR POWER INSTALLATIONS
E004
LIGHTING PLAN-REMOVALS AND
INSTALLATIONS
Revision
ROWAN
UNIVERSITY
S001
S002
STRUCTURAL PLAN AND DETAILS
DETAILS
Y
A
E
NC
U
B
R
HOLLYBUSH
B
E
L
C
A501
ARCHITECTURAL CONVENTIONS
FIRST FLOOR DEMOLITION PLAN
SECOND FLOOR DEMOLITION PLAN
DOOR SCHEDULE AND DETAILS
WINDOW DETAILS
PARTIAL ENLARGED FIRST FLOOR PLAN
PARTIAL ROOF PLAN AND DETAILS
BUILDING SECTIONS
FIRST FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN
ENLARGED TOILET ROOM PLANS AND INTERIOR
ELEVATIONS
INTERIOR ELEVATIONS AND MILWORK DETAILS
E
E
US
O
H
EN
E
GR
BOZORTH HALL
G
TO
LAUREL
HALL
A
TRIAD
E
UT
RO
HAWTHORN
HALL
TITLE
N
L
OAK
HALL
I T
M
U
L
I C
LL
HA
H
LO
T
I L
H
L
RIA
O
M
ME HALL
D
E
EVERGREEN
HALL
S
N
DE
LIN
P
E
W
PA
RK
IN
G
L
O
A
MULLICA HALL
E
G
KIN
R
PA
T
LO
2
U
LL
HA
WESTBY
HALL
TR
IA
D
U
SAVITZ
HALL
O
2
N
E
NC
E
I
SC
R
T
T
LO
ALUMNI CENTER
E
B O W E
LIBRARY
U
KEY PLAN
V
ROBINSON
HALL
G
KIN
PARKING
LOT U
OK
BO RE
O
ST
ROWAN
HALL
AC000
D100
D101
A000
A001
A101
A102
A300
A401
A402
A500
MAGNOLIA
HALL
D
N LL
A
RM HA
NO
2
CS001 COVER SHEET
EDGEWOOD PARK APARTMENTS
STUDENT
REC. CENTER
NO.
CHESTNUT HALL
ES
JAM
ALL PURPOSE FIELD
DRAWING LIST
MANSION PARK
APARTMENTS
INTRAMURAL FIELD
FIELD HOCKEY
MAIN
STR
EET
Project Title
BOLE HALL
RENOVATIONS
PARKING
LOT R
Drawing Title
COVER SHEET
ROWAN UNIVERSITY CAMPUS MAP
1" = 160'-0"
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
CS001
Printed: 12/23/2014 12:12:06 PM
30
DEMOLITION NOTES
3
2
2
1
1
5
1
5
4
3
1
5
2
6
S
3
2
2
REMOVE EXISTING LIGHT FIXTURE AND SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION
3
REMOVE EXISTING SUPPLY AIR DIFFUSER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
4
REMOVE EXISTING RETURN AIR GRILL. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
5
COORDINATE REMOVAL OF EXISTING FIRE ALARM DEVICES WITH OWNER
6
REMOVE INDICATED PORTION OF EXISTING WALL
7
REMOVE EXISTING DOOR, FRAME, AND ALL ASSOCIATED HARDWARE
3
8
OWNER TO REMOVE EXISTING WINDOW, FRAME, AND ALL ASSOCIATED HARDWARE. CONTRACTOR
TO PATCH EXISTING FLOOR, WALL AND CEILING SURFACES.
12
1
9
REMOVE EXISTING FLOOR FINISH AND 2" THICK MUD BED. POUR NEW CONCRETE FLOWABLE FILL AND
PREPARE SUBSTRATE FOR NEW FINISHES
10
REMOVE EXISTING CEILINGS, LIGHT FIXTURES, WALLS, WALL PANELS, WINDOW TREATMENTS AND
FLOOR FINISHES IN ALL SPACES IN THIS AREA. REFER TO ASBESTOS ABATEMENT REPORT FOR
FURTHER INFORMATION. PATCH ALL WALLS WITH MATERIALS TO MATCH EXISTING.
9
2
6
28
13
1
30
30
6
3
16
17
5
28
S
12
30
12
2
ROWAN UNIVERSITY
S
2
S
2
2
3
S
5
5
REMOVE EXISTING ACOUSTIC CEILING TILE SYSTEM IN IT'S ENTIRETY, INCLUDING BUT NOT LIMITED TO
ACOUSTIC TILE, GRID, AND SUSPENSION WIRE. REMOVE EXISTING Z-TILE CEILING, PLASTER, AND
METAL BAR SUPPORTS AND TIES ABOVE ACOUSTIC CEILING TILE SYSTEM.
3
2
S
1
10
13
7
L
RIA
MO LL
E
M HA
11
REMOVE EXISTING ACOUSTIC CEILING TILES AND GRID. SAVE FOR REUSE. AFTER MECHANICAL AND
ELECTRICAL WORK IS COMPLETED REINSTALL GRID.
12
REMOVE EXISTING WALL MOUNTED LAVATORY. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
13
REMOVE EXISTING WATER CLOSET. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
14
REMOVE EXISTING URINAL. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
15
REMOVE EXISTING JANITOR SINK.SEE PLUMBING DRAWINGS FOR MORE INFORMATION
16
REMOVE EXISTING TOILET PARTITION
17
REMOVE AND REINSTALL ALL TOILET ROOM ACCESSORIES, UNLESS OTHERWISE NOTED.
18
REMOVE EXISTING SILL, PORTION OF BLOCK WALL AND PLASTER. SEE DETAIL 2/D100 FOR MORE
INFORMATION
19
REMOVE EXISTING SILL. PROTECT EXISTING WINDOW SYSTEM FROM DAMAGE
20
REMOVE EXISTING PORTION OF BLOCK WALL AND STEEL ANGLE
21
REMOVE EXISTING PORTION OF PLASTER WALL
22
REMOVE EXISTING RETURN AIR GRILL
23
PROVIDE METAL PLATE OVER HOLES IN SLAB. CONTRACTOR TO ASSUME 24 HOLES @ 8" X 12". SEAL
AROUND PLATES
24
CUT TRENCH INTO EXISTING SLAB SO THAT NEW FLOOR RECEPTACLES AND NEW ELECTRIC CAN BE
INSTALLED
25
REMOVE EXISTING HVAC WINDOW UNIT. INSTALL NEW GLASS TO MATCH EXISTING
26
OWNER TO REMOVE ASBESTOS CONTAINING TRANSITE PANELS, WALLS AND DOORS AND DISPOSE
OF AS ASBESTOS WASTE. CONTRACTOR TO PATCH EXISTING FLOOR, WALL AND CEILING SURFACES.
27
OWNER TO REMOVE EXISTING ASBESTOS CONTAINING FLOOR & MASTIC AND DISPOSE OF WASTE.
CONTRACTOR TO PREPARE SUBSTRATE FOR NEW FINISHES
28
REMOVE EXISTING FLOOR FINISH & 2" THICK MUD BED, EXISTING WALL FINISHES AND EXISTING
CEILING. POUR NEW CONCRETE FLOWABLE FILL AND PREPARE SUBSTRATE, WALLS AND CEIING FOR
NEW FINISHES
29
REMOVE AND REPLACE PORTION OF EXISTING CHASE WALL TO ACCESS EXISTING DUCTWORK. SEE
DETAIL 2/A401 - PIPE CHASE PHOTO DETAIL FOR MORE INFORMATION.
30
REMOVE EXISING WINDOW IN ITS ENTIRETY AND PREPARE OPENING FOR NEW WINDOW. CONTRACTOR
IS RESPONSIBLE FOR ASBESTOS REMOVAL OF CAULKING AND GLAZING AT WINDOWS, SEE
UNIVERSITY'S ASBESTOS SPECIFICATIONS FOR ADDIITONAL INFORMATION
12
30
9
14
9
15
1
16
30
18
18
30
27
18
30
30
18
26
9
18
28
6
30
26
27
26
30
6
26
26
1
26
26
29
26
18
2
1
26
2
30
26
27
8
24
2
26
26
27
26
27
26
26
11
27
26
27
8
24
8
2
1
2
26
26
26
27
27
27
26
26
1
26
2
27
26
2
30
26
27
1
18
26
1
27
27
26
8
2
26
11
2
26
2
26
26
7
CARRIAGE HOUSE
PARKING
LOT R
KEY PLAN
2
12/23/2014
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
LEGEND
1
1
EXISTING CONSTRUCTION TO REMAIN.
2
2
25
18
30
LE
BO LL
HA
2
30
26
HOLLYBUSH
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
24
11
LAUREL
HALL
26
26
1
OAK
HALL
27
30
18
18
30
27
18
30
27
30
18
EXISTING CONSTRUCTION TO BE REMOVED.
GENERAL NOTE
2
1. CONTRACTOR SHALL PROTECT EXISTING FURNITURE AND FINISHES IN OCCUPIED AREA DURING
CONSTRUCTION.
1
D100
First Floor Demolition Plan
30
30
1/8" = 1'-0"
A
B
P
A
P
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
William P. Lammey AIA
Anthony R. Giorgio AIA
D
C
4
D100
D
D
E
F
F
F
ROWAN
UNIVERSITY
1/16" = 1'-0"
2
E
19
Partial Basement Window Key Plan
NJ C6793
NJ 07626
G
G
Project Title
20
H
21
BOLE HALL
RENOVATIONS
22
Drawing Title
H
23
I
J
2
D100
Window Sill Demolition Detail
1 1/2" = 1'-0"
3
D100
First Floor Window Key Plan
1/16" = 1'-0"
J
H
H
H
FIRST FLOOR
DEMOLITION
PLAN &
WINDOW KEY
H
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
D100
DEMOLITION NOTES
1
REMOVE EXISTING ACOUSTIC CEILING TILE SYSTEM IN IT'S ENTIRETY, INCLUDING BUT NOT LIMITED TO
ACOUSTIC TILE, GRID, AND SUSPENSION WIRE. REMOVE EXISTING Z-TILE CEILING, PLASTER, AND
METAL SUPPORTS AND TIES ABOVE ACOUSTIC CEILING TILE SYSTEM. PROTECT EXISTING GYPSUM
BOARD SOFFITS AT WINDOWS THAT WILL REMAIN.
2
REMOVE EXISTING LIGHT FIXTURE AND SAVE FOR REUSE. SEE ELECTRICAL DRAWINGS FOR MORE
INFORMATION
3
REMOVE EXISTING SUPPLY AIR DIFFUSER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
4
REMOVE EXISTING RETURN AIR GRILL. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
5
COORDINATE REMOVAL OF EXISTING FIRE ALARM DEVICES WITH OWNER.
6
REMOVE EXISTING SPEAKER AND WIRE
7
REMOVE EXISTING PLASTER CEILING, AND METAL SUPPORTS AND TIES. PREPARE AREA TO RECEIVE
NEW ACOUSTICAL TILE CEILING SYSTEM
8
REMOVE EXISTING WINDOW HVAC UNIT. REPLACE GLAZING IN EXISTING WINDOW FRAME WITH
GLAZING TO MATCH EXISTING.
9
REMOVE EXISING WINDOW IN ITS ENTIRETY AND PREPARE OPENING FOR NEW WINDOW. CONTRACTOR
IS RESPONSIBLE FOR ASBESTOS REMOVAL OF CAULKING AND GLAZING AT WINDOWS, SEE
UNIVERSITY'S ASBESTOS SPECIFICATIONS FOR ADDIITONAL INFORMATION
10
REMOVE EXISING WINDOW IN ITS ENTIRETY AND PREPARE OPENING FOR NEW WINDOW. CONTRACTOR
IS RESPONSIBLE FOR ASBESTOS REMOVAL OF CAULKING AND GLAZING AT WINDOWS, SEE
UNIVERSITY'S ASBESTOS SPECIFICATIONS FOR ADDIITONAL INFORMATION. CONTRACTOR TO
REMOVE PORTION OF WALL DIRECTLY BELOW WINDOW AND PREPARE OPENING FOR NEW DOOR.
ROWAN UNIVERSITY
2
9
LEGEND
9
EXISTING CONSTRUCTION TO REMAIN.
3
1
1
3
3
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
A402
3
TYP.
4
1
2
KEY PLAN
7
S
9
4
5
8
S
5
2
9
2
3
S
9
PARKING
LOT R
8
SPEAKER
5
2
2
CARRIAGE HOUSE
1. CONTRACTOR SHALL PROTECT EXISTING FURNITURE AND FINISHES IN OCCUPIED AREA DURING
CONSTRUCTION.
10
6
S
5
S
HOLLYBUSH
GENERAL NOTE
2
S
3
LAUREL
HALL
7
2
9
9
OAK
HALL
EXISTING CONSTRUCTION TO BE REMOVED.
2
5
L
RIA
MO LL
E
M HA
2
2
4
1
S
5
S
3
3
2
SPEAKER
8
1
S
9
S
5
4
2
2
A402
2
3
5
S
TYP.
6
4
2
S
3
3
2
5
9
9
3
2
12/23/2014
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
2
S
1
2
7
5
5
9
9
S
4
S
2
2
3
3
2
1
9
1
D101
1
2
9
2
9
Second Floor Demolition Plan
1/8" = 1'-0"
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
K
K
K
Project Title
200
L
L
M
M
M
M
BOLE HALL
RENOVATIONS
Drawing Title
M
M
L
L
SECOND FLOOR
DEMOLITION
PLAN &
WINDOW KEY
L
N
O
N
2
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
2
D101
Second Floor Window Key Plan
1/16" = 1'-0"
Checked By
Job No:
2014-064
Drawing No.
D101
DRAWING KEYNOTES
Width
Height
Thickness
100
101
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
200
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
2' - 6"
3' - 0"
3' - 0"
3' - 0"
2' - 11"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
6' - 8"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
HM
Type
Leaves
Glass
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
4
A
A
A
B
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
FIRE RATED
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
-
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
Buck
B
C
A
B
B
D
D
D
D
D
D
B
B
C
D
D
D
D
D
D
D
D
B
D
D
D
E
E
C
E
E
C
C
Hardware Set
No.
Saddle
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
A
B
B
A
C
07
THERMAL AND MOISTURE PROTECTION
072100.F1
SOUND BATT INSULATION
079200.B1
SEALANT
Fire Rating
A
A
A
A
A
C
08
OPENINGS
2
081113.B1
HOLLOW METAL DOOR
081113.C1
HOLLOW METAL DOOR FRAME
081416.C1
SOLID CORE DOOR
088000.E2
CLEAR TEMPERED FLOAT GLASS
60 MIN.
1
1
2
1
2
2
2
2
2
2
3
1
1
3
2
2
2
2
2
2
2
2
1
2
2
2
3
4
5
4
6
4
7
B
Remarks
ROWAN UNIVERSITY
09
FINISHES
092216.E1
3 5/8" METAL STUD FRAMING
092900.E1
5/8" GYPSUM WALLBOARD
10
SPECIALTIES
101400.B1
SIGNAGE
CONSTRUCTION NOTES
1
2
3
EXISTING WALL TO REMAIN
EXISTING BRICK TO REMAIN
CREATE DRYWALL RETURN TO MATCH EXISTING ADJACENT WALL FINISH
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
60 MIN.
60 MIN.
L
RIA
MO LL
E
M HA
2
2
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
60 MIN.
60 MIN.
079200.B1
081113.C1
079200.B1
GROUT MASONRY CORES SOLID BELOW THRESHOLD
079200.B1
2
092900.E1
A000
HM
Door Type
2
1/4" = 1'-0"
A000
2"
SEE SCHEDULE
2"
SEE SCHEDULE
2"
3' - 5 1/2" 2" 5"
5/8"
088000.E2
2"
072100.F1
092900.E1
079200.B1
5/8"
3
079200.B1
KEY PLAN
079200.B1
8"
088000.E2
SEE SCHEDULE
2"
3' - 5 1/2" 2" 5"
088000.E2
081113.C1
081113.C1
A
B
C
D
E
HM
HM
HM
HM
HM
PARKING
LOT R
5 7/8"
2"
081113.C1
SEE SCHEDULE
2"
3' - 5 1/2" 2" 5"
2
2"
2' - 0"
8"
Wood
SEE SCHEDULE
8"
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
B
081113.B1
2"
081113.C1
081113.C1
A
2"
SEE SCHEDULE
081416.C1
SEE SCHEDULE
CARRIAGE HOUSE
6"
2"
5 7/8"
2"
4"
2"
SEE SCHEDULE 9"
2"
2"
2"
2"
2"
2"
SEE SCHEDULE 1' - 6"
2"
2"
1
1 15/16"
SEE SCHEDULE
HOLLYBUSH
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
092216.E1
SEE SCHEDULE
LAUREL
HALL
081113.C1
1
081113.C1
OAK
HALL
1 15/16"
No.
Doors
Material
Door Schedule
Frames
Material
Type
Frame Types
3
1/4" = 1'-0"
A000
A
B
A
3 5/8" Mtl Stud/HM Frame
Existing Wall/HM Frame
Existing Wall/HM Frame
2
Buck Type
3" = 1'-0"
2
12/23/2014
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
2
1
5"
DEPTH OF FRAME
RESILIENT
FLOOR
1/4"
CARPET
1/4" 1/4"
EPOXY FLOOR
A
Marble Threshold
4
A000
CARPET TILE
31/32"
B
C
Resilient Floor to Carpet Transition
Exterior Aluminum Threshold
2
Saddle Types
12" = 1'-0"
Architecture
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
7"
FIN. FLR.
1/2"
ROWAN
UNIVERSITY
4 1/4"
EQ
1/2"
3/4"
1/2"
WOMEN
EQ
FIN. FLR.
FIN. FLR.
SIGN TYPE B
INTERIOR
INTERIOR
5/8" HIGH
LETTERS
(HELVETICA)
TYPE II
BRAILLE
EQ
Project Title
SIGN TYPE C
SIGN TYPE A
NJ C6793
NJ 07626
101400.B1
7"
EQ
TYPE II
BRAILLE
MOUNTING HEIGHT
1/2"
6"
REPLACEABLE
TEXT SLEEVE
TOILET
5/8" HIGH
LETTERS
(HELVETICA)
4'
6"
7 -1/8"
FRAME
1/2"
1"
7"
5/8" HIGH NUMBERS
(HELVETICA)
1/2"
1/2"
OCCUPANT
TEXT
TEXT
William P. Lammey AIA
Anthony R. Giorgio AIA
1/2"
6"
101400.B1
4"
TYPE II BRAILLE
MOUNTING HEIGHT
1"
2 1/2"
7"
MOUNTING HEIGHT
- 6"
74'5/8"
1"
5"
1" HIGH NUMBERS
(HELVETICA)
216
1/2"
1"
1/2"
1"
5"
4'
6"
7 -1/8"
1"
7"
101400.B1
1"
1 1/2"
1/2"
7"
1/2"
Planning
INTERIOR
BOLE HALL
RENOVATIONS
7"
1/2"
1/2"
101400.B1
Drawing Title
1/2"
6"
DOOR
SCHEDULE
AND DETAILS
EQ
4' - 6"
1/2"
1"
5/8" HIGH
LETTERS
(HELVETICA)
MEN
1/2"
MOUNTING HEIGHT
4'
6"
7 -1/8"
7"
4"
101400.B1
TYPE II
BRAILLE
EQ
FIN. FLR.
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
SIGN TYPE D
INTERIOR
SIGNAGE MOUNTING HEIGHT
SCALE 1/4"=1'-0"
Checked By
Job No:
5
A000
Sign Details
3" = 1'-0"
2014-064
Drawing No.
A000
2
B
12
A001
2"
EQ
2"
12
2"
088000.G2
12
A001
2"
2"
A001
C
D
13
A001
A001
E
2"
EQ
2"
EQ
2"
EQ
11
2"
3' - 8"
2"
3
A001
A001
F
4
A001
084113.A1
13
2"
EQ
2"
EQ
8
2"
A001
2"
11
2"
088000.G2
EQ
2"
EQ
2"
9' - 1"
2' - 11"
2"
3' - 5"
A001
12
A001
2"
J
A001
10
K
084113.A1
A001
12
A001
2"
9
2"
2"
2"
2' - 9 3/4" 2" 2' - 9 3/4"
2"
088000.G2
2"
2" 1' - 4"
2' - 11 1/2"
2" 1' - 4" 2"
2"
7
I
2"
A001
088000.G2
A001
3' - 3"
EQ
2"
EQ 2"
EQ
L
RIA
MO LL
E
M HA
2"
2"
3' - 2 1/2"
A001
10' - 8"
2"
A001
6' - 3 1/2"
2"
3' - 2 1/2"
6
5' - 0"
8' - 4"
2" 1' - 4"
A001
13
12
M
13
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
A001
L
A001
OAK
HALL
084113.A1
13
LE
BO LL
HA
A001
PARKING
LOT R
A001
EQ
2"
1' - 4"
8' - 4"
6
14
A001
A001
088000.G2
15
2" 1' - 4"
2" 1' - 4"
2"
A001
5' - 0"
2"
1' - 4"
2"
5' - 0"
6
N
084113.A1
A001
KEY PLAN
A001
O
7
084113.A1
A001
P
16
Window Elevations
A001
1/4" = 1'-0"
3
3
1
2
079200.B1
079200.B1
079200.B1
084113.A1
Window Head Detail Typ. Window Types A, B, F
5
3" = 1'-0"
A001
8
3" = 1'-0"
A001
Window Head Detail Typ. Window Types J
3" = 1'-0"
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
084113.A1
Window Head Detail - Typ.
Window Types C, D, E, G, K, L, M
A001
ADDENDUM #1
079200.B1
079200.B1
084113.A1
11
12/23/2014
8
079200.B1
079200.B1
084113.A1
Window Head Detail Typ. Window Types H, I, N, O
2
7
2
8
079200.B1
084113.A2
084113.A1
3
7
4
2
079200.B1
079200.B1
3
3
1
2
A001
3' - 2 1/2" 2"
2"
1' - 4"
2"
11
A001
2"
3' - 2 1/2" 2"
7
2
11
6' - 11"
1' - 4"
EQ
5
A001
2"
8' - 4"
2"
084113.A1
7
H
2"
2"
A001
EQ
2"
1' - 4"
2"
5' - 0"
2"
2" 1' - 4"
8' - 4"
A001
5
1
2"
3
4
5
6
7
8
9
1' - 4"
088000.G2
EQ
2' - 1 1/2"
2"
ROWAN UNIVERSITY
EXISTING LIMESTONE HEAD TO REMAIN
EXISTING FINISH TO REMAIN. PATCH FINISH WITH MATERIALS TO MATCH EXISTING ADJACENT FINISH,
PAINTED.
EXISTING STRUCTURE TO REMAIN
EXISTING GRANITE WALL PANEL TO REMAIN
EXISTING LIMESTONE JAMB TO REMAIN
EXISTING LIMESTONE SILL TO REMAIN
EXISTING BRICK TO REMAIN
EXISTING STEEL LINTEL TO REMAIN
EXISTING BRICK SILL TO REMAIN
2"
2"
5' - 5 1/2"
EQ
1' - 4"
2"
1' - 4"
EQ
2"
2"
2' - 1 1/2"
EQ
2"
2"
2"
EQ
5' - 5 1/2"
2"
6
6' - 11"
1
2
A001
3' - 1"
EQ
17' - 2"
2"
2"
2"
EQ
A001
20' - 7"
08
OPENINGS
084113.A1
ALUMINUM STOREFRONT WINDOW
084113.A2
HEAD TRIM CLIP
084113.A3
SILL TRIM CLIP
088000.G2
TINTED INSULATING GLASS
CONSTRUCTION NOTES
G
084113.A1
5
A001
2"
07
THERMAL AND MOISTURE PROTECTION
079200.B1
SEALANT
2"
12
A001
5
DRAWING KEYNOTES
A001
088000.G2
13
A001
13
084113.A1
EQ
1' - 4"
EQ
2"
1' - 4"
3' - 3"
2"
4
084113.A1
2"
A001
2"
EQ
2"
EQ
2"
2"
2"
A001
EQ
2' - 5"
EQ
088000.G2
2"
6' - 0"
2"
1' - 4"
A001
4
A001
2"
1' - 4" 2" 2' - 8" 2" 1' - 4"
3
2"
A
EQ
7' - 1"
11
2"
1' - 4"
2"
4' - 5 1/2"
7' - 9 1/2"
2"
1' - 4"
A001
A001
8' - 11 1/2"
2"
2"
2"
2"
EQ
5' - 9"
2"
2"
EQ
2"
1' - 4"
2"
4' - 5 1/2"
3
2"
7' - 9 1/2"
2"
2" 1' - 4"
088000.G2
EQ
4' - 6 1/2"
2"
2"
2"
A001
2" 1' - 4"
EQ
7' - 10 1/2"
2"
2"
EQ
2" 2' - 8" 2" 1' - 4"
2"
11
6' - 0"
EQ
11
2"
2"
10' - 5 1/2"
2"
EQ
2"
2"
A001
13' - 10 1/2"
4' - 1"
A001
2
20' - 7"
1' - 4"
2
14
3" = 1'-0"
A001
Window Head Detail Typ. Window Types P
3" = 1'-0"
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
3
3
5
3
5
5
2
079200.B1
079200.B1
2
079200.B1
079200.B1
3
A001
084113.A1
Window Jamb Detail Typ. Window Types A, B, F
6
3" = 1'-0"
A001
3" = 1'-0"
2
6
A001
3" = 1'-0"
084113.A1
084113.A3
079200.B1
9
Window Jamb Detail Typ. Window Types J
079200.B1
2
4
12
A001
15
3" = 1'-0"
A001
Window Jamb Detail Typ. Window Types P
3" = 1'-0"
084113.A1
079200.B1
079200.B1
2
4
084113.A1
Window Jamb Detail - Typ.
Window Types C, D, E, G, K, L, M
079200.B1
079200.B1
079200.B1
079200.B1
084113.A1
084113.A1
084113.A3
079200.B1
8
079200.B1
079200.B1
084113.A1
Window Jamb Detail Typ. Window Types H, I, N, O
084113.A1
079200.B1
079200.B1
079200.B1
084113.A1
2
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
7
7
2
William P. Lammey AIA
Anthony R. Giorgio AIA
3
3
084113.A1
Project Title
BOLE HALL
RENOVATIONS
079200.B1
079200.B1
2
6
9
Drawing Title
WINDOW
DETAILS
3
3
3
3
3
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
4
A001
Window Sill Detail Typ. Window Types A, B, F
3" = 1'-0"
7
A001
Window Sill Detail Typ. Window Types H, I, N, O
3" = 1'-0"
10
A001
Window Sill Detail Typ. Window Types J
3" = 1'-0"
13
A001
Window Sill Detail - Typ.
Window Types C, D, E, G, K, L, M
3" = 1'-0"
16
A001
Window Sill Detail Typ. Window Types P
3" = 1'-0"
Checked By
Job No:
2014-064
2
Drawing No.
A001
Key
A
B
C
D
E
Floor
Base
Carpet
Carpet
Resilient Vinyl
Carpet
Epoxy Floor
Walls
Vinyl
Vinyl
Vinyl
Vinyl
Epoxy
WALL LEGEND
Finish Schedule
Wall Fin.
Existing/Gypsum Board
Gypsum Board
Gypsum Board
Existing/Gypsum Board
Existing/Gypsum Board
Ceiling
Paint
Paint
Paint
Paint
Ceramic Tile/Glass Tile
Remarks
ACT/Gypsum Board, Painted
ACT
ACT
Gypsum Board, Painted
ACT
DRAWING KEYNOTES
03
CONCRETE
033000.H5
CAST-IN-PLACE CONCRETE FILL
033000.O2
6 MIL VAPOR BARRIER
EXISTING WALL TO REMAIN. PATCH EXISTING PLASTER IN WORK AREAS.
3-5/8" METAL STUD WALL WITH 5/8" GYPSUM WALLBOARD ON EACH
SIDE AND 3 1/2" SOUND ATTENUATION BLANKET.
Accent Tile @ Wall
06
WOOD, PLASTICS, AND COMPOSITES
064023.A1
SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH
064023.A2
SOLID SURFACE COUNTERTOP
064023.D1
BUILT-IN MAIL BOXES
066500.A1
SOLID SURFACE WINDOW SILL
NEW 1-HR 3-5/8" METAL STUD WALL WITH 5/8" FIRE CODE GYPSUM
WALLBOARD ON EACH SIDE AND 3 1/2" SOUND ATTENUATION BLANKET.
WALL TO EXTEND TO THE UNDERSIDE OF FLOOR STRUCTURE
08
OPENINGS
083113.A2
ACCESS DOOR
083313.B1
OVERHEAD COILING SECURITY SHUTTER
10
SPECIALTIES
101100.C1
MARKER BOARD
104413.B1
FIRE EXTINGUISHER CABINET
260533.A1
033000.H5
1' - 2"
11
4"
3/4"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1"
1 1/2"
6"
22
PLUMBING
224000.A1
ACCESSIBLE SINK
5"
1 1/2"
132
1"
130
260533.A2
Men's Toilet Room
135 E 9'-0"
129
2
A101
033000.O2
Floor Patch Detail
Sill/Grille Hole Pattern
A101
1
2
3
4
5
6
7
8
9
066500.A1
3" = 1'-0"
1
SYSTEMS FURNITURE BY OWNER
FILE CABINET BY OWNER
PATCH VERTICAL SHAFT WALL. SEE DETAIL
PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING
PATCH CONCRETE FLOOR AT NEW ELECTRIC. SEE DETAIL 2/A101
NEW WINDOW SEE DRAWINGS D100, D101 AND A001 FOR ADDITIONAL INFORMATION
EXISTING CONCRETE SLAB
SEE DETAIL 3/A101 FOR HOLE PATTERN. LENGTH TO MATCH RADIATOR BELOW
PROVIDE NEW METAL STUDS AND 5/8" GYPSUM WALLBOARD TO ALIGN WALL
A300
128
5
A501
Janitor Closet
133 E 9'-0"
5
8
6
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
LE
BO LL
HA
PARKING
LOT R
2
12
A501
10
A501
OAK
HALL
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
CONSTRUCTION NOTES
3
3" = 1'-0"
L
RIA
MO LL
E
M HA
26
ELECTRICAL
260533.A1
FLOOR BOX
260533.A2
ELECTRIC CONDUIT
4"
1
A500
EQUIPMENT
113100.B1
REFRIGERATOR
12
FURNISHINGS
123530.B1
BASE CABINET
123530.B3
WALL CABINET
7
Women's Toilet
Room
132 E 9'-0"
ROWAN UNIVERSITY
5
A501
8
12
A501
A501
8
6
8
5
8
6
12
A501
8
A501
8
6
2
5
A300
A501
10
A501
8
6
1' - 11"
4
20' - 1"
20' - 6"
104
7' - 6 3/8"
13' - 1"
20' - 6"
4
Corridor
107 D VARIES
1' - 11"
4
8"
7' - 1"
4
1
4
5
SIM.
A501
5"
106
107
4
14
11' - 11"
12' - 4"
12' - 4"
10' - 5"
Office
105 B 8'-0"
12' - 4"
5' - 5"
5
Acc. Services
Assoc. Director
109 B 8'-0"
11' - 5"
3' - 8"
Payroll
SIM.
Director
104 B 8'-0"
Payroll Assist.
Supervisor
103 B 8'-0"
Acc. Services
Director
108 B 8'-0"
4
10' - 2"
SIM.
A501
8
35' - 9 1/2"
2
12/23/2014
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
6
8"
A501
12' - 4"
Mail/Copy
102 A 8'-0"
6
8" 1' - 8" 8"
105
1
13' - 10"
KEY PLAN
8
103
3
SIM.
8"
3' - 8"
5'-9"+/-
2' - 6"
1' - 11"
8"
4
2
4
10
A501
4"
8"
8'-1" +/-
7' - 1"
4 1/8"
8"
4"
4"
20' - 6"
4"
3' - 3"
1' - 1"
12' - 8"
14
113100.B1
A501
123530.B3
1
2' - 6"
2
A501
7A
1' - 8"
2' - 1"
5
1
Acc. Services
Director
113 B 8'-0"
Acc. Payable
Manager
114 B 8'-0"
1
8
5
SIM.
101100.C1
064023.A1
20' - 6"
224000.A1
123530.B1
123530.B3
114
Closet
116 B 8'-0"
11' - 2"
Media/P.R.
118 B 8'-0"
Media/P.R.
119 B 8'-0"
2' - 2 1/2"
11' - 5"
11' - 2"
Office
120 B 8'-0"
11' - 8"
Office
121 B 8'-0"
1' - 6 1/2"
William P. Lammey AIA
Anthony R. Giorgio AIA
12
A501
4
33' - 5" +/-
Office
122 B 8'-0"
1
2' - 1"
1' - 6 1/2"
1
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1' - 11"
113
11' - 6"
2' - 1"
5' - 4"
5
10' - 1"
4
2' - 6 1/2"
Lobby
100 A 9'-0"
2' - 6 1/2"
A501
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
5' - 5"
Corridor
106A B 8'-0"
2
Architecture
2' - 6 1/2"
104413.B1
112
6
108
2' - 1"
064023.A2
109
5' - 5"
3
110
2' - 1"
4' - 7"
2' - 1"
A501
123530.B1
3' - 7"
6' - 4"
100
064023.A1
111
101
A300
Conference
Room/Office
112 B 8'-0"
Copy
111 B 8'-0"
A501
083313.B1
14
12' - 4"
064023.D1
Break Room
110 C 8'-0"
7' - 7"
Open Office
131 A VARIES
A501
2' - 1"
16' - 8 1/2"
Payroll Open
SIM.
Office
101 A VARIES 083113.A2
3
9' - 8"
12' - 4"
13' - 10"
8' - 9"
1' - 11"
10
SIM.
A501
2
2' - 5"
2
8'-2"+/-
6' - 5"
Corridor
106 B 8'-0"
3' - 0"
1' - 8"
1' - 9"+/-
9
2' - 1"
12' - 4"
1' - 3 1/4"
1' - 9"
8 5/8"
127
4"
2
10' - 10"
A101
5
4
116
126
125
118
119
5
Corridor
124 B 8'-0"
123
124
122
121
SIM.
A501
Project Title
BOLE HALL
RENOVATIONS
20' - 6"
Corridor
123 B 8'-0"
117
5' - 5"
115
Reception
117 A 8'-0"
120
8
Media/P.R.
126 A VARIES
Media/P.R.
127 A VARIES
Office
128 A VARIES
Office
129 A VARIES
Budget Director
130 A VARIES
1' - 0"
2' - 1"
10' - 11"
10' - 6 3/4"
5
A501
A101
Partial Enlarged First Floor Plan
1/4" = 1'-0"
8
4
8
8
20' - 6"
12
A501
5
A501
SIM.
10' - 11"
4
6
1' - 11"
SIM.
SIM.
1' - 7"
10' - 11"
°
135
8
6
1
4
°
135
4
10' - 11"
6
A501
5
A501
12
A501
5
A501
SIM.
Drawing Title
PARTIAL
ENLARGED
FIRST FLOOR
PLAN
4
4
8
8
20' - 6"
SIM.
SIM.
13' - 1"
6
1' - 11"
6
4
1
4"
10'-7"+/-
1
10' - 4"
Media/P.R.
125 A VARIES
6
1' - 11"
6
A501
5
A501
20' - 6"
SIM.
SIM.
8
12
A501
5
A501
SIM.
1' - 11"
5
A501
SIM.
6
8
20' - 6"
12
A501
Date:
10/24/2014
Scale
1/4" = 1'-0"
8
5
A501
Drawn By:
SIM.
Checked By
Job No:
2014-064
Drawing No.
A101
DRAWING KEYNOTES
3
06
WOOD, PLASTICS, AND COMPOSITES
066500.A1
SOLID SURFACE WINDOW SILL
A300
07
THERMAL AND MOISTURE PROTECTION
072100.F1
SOUND BATT INSULATION
092216.A1
092216.E1
092216.E1
092216.E1
092216.E1
092216.E1
09
FINISHES
092216.A1
092216.E1
092900.E1
092900.O1
095123.B3
095400.B1
096513.C1
096519.B1
096813.B1
Parapet
15' - 6"
092216.E1
092900.E1
26
ELECTRICAL
265100.A1
LED PENDANT FIXTURE
2
15
A501
SIM.
TYP.
9
A501
9
TYP.
A501
9
TYP.
A501
9
TYP.
A501
9
TYP.
A501
Top of Roof Deck
13' - 7"
3
9
TYP.
A501
CONSTRUCTION NOTES
16
A501
092900.E1
092900.O1
1
092216.E1
265100.A1
095123.B3
092216.E1
Payroll
Director
104 B 8'-0"
092900.E1
072100.F1
Break Room
110 C 8'-0"
066500.A1
Media/P.R.
118 B 8'-0"
096813.B1
096519.B1
1
Media/P.R.
126 A VARIES
092900.E1
096513.C1
NEW ALUMINUM STOREFRONT WINDOWS. SEE DRAWINGS D100, D101 AND A001 FOR ADDITIONAL
INFORMATION
2
EXISTING ROOF DECK
PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING
L
RIA
MO LL
E
M HA
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
095123.B3
10' - 5"
Payroll Open
Office
101 A VARIES
2
3
265100.A1
Corridor
123 B 8'-0"
096813.B1
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
5
A501
2' - 1"
1
095123.B3
3' - 6"
11' - 4"
5
SIM.
A501
072100.F1
066500.A1
ROWAN UNIVERSITY
3 5/8" METAL COUNTOUR CEILING FRAMING
3 5/8" METAL STUD FRAMING
5/8" GYPSUM WALLBOARD
CEILING SUPPORT SYSTEM
2X4 ACOUSTICAL TILE
DECORATIVE COMPOSITE CEILING PANEL
RESILIENT COVE BASE
RESILIENT TILE FLOORING
TILE CARPET
First Floor
0' - 0"
LE
BO LL
HA
PARKING
LOT R
Building Section
1
A300
1/4" = 1'-0"
KEY PLAN
3
A300
9
A501
9
A501
2
15 SIM.
A501
4' - 9"
3
092900.E1
095123.B3
095400.B1
092900.E1
095400.B1
12/23/2014
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
15
A501
092216.E1
092216.E1
2
095400.B1
265100.A1
092216.A1
1
092216.A1
1
1
SIM.
5
A501
096813.B1
Open Office
131 A VARIES
096513.C1
096513.C1
096813.B1
2' - 1"
7' - 11"
10' - 0"
1
8' - 6"
066500.A1
Building Section
2
A300
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
1/4" = 1'-0"
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1
A300
2
A300
9
A501
7
A501
Parapet
15' - 6"
9
A501
9
A501
2
092216.E1
072100.F1
092216.E1
095400.B1
101
111
Lobby
100 A 9'-0"
110
092900.E1
109
092900.E1
108
Drawing Title
1
092900.E1
1
1
265100.A1
SIM.
Open Office
131 A VARIES
E
BUILDING
SECTIONS
11' - 4"
092900.E1
Corridor
106A B 8'-0"
BOLE HALL
RENOVATIONS
15
A501
092216.E1
092900.E1
Project Title
092216.A1
10' - 0"
092216.E1
SIM.
095123.B3
6' - 7"
095123.B3
3
095400.B1
265100.A1
072100.F1
Top of Roof Deck
13' - 7"
5
A501
096813.B1
096813.B1
096513.C1
2
096513.C1
096513.C1
096513.C1
066500.A1
2' - 1"
095123.B3
6' - 8"
11' - 4"
3
11' - 4"
092900.E1
265100.A1
First Floor
0' - 0"
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
3
A300
Partial Building Section
1/4" = 1'-0"
Job No:
2014-064
Drawing No.
A300
DRAWING LEGEND
2 x 4 ACOUSTIC CEILING TILE
1
2 x 2 ACOUSTIC CEILING TILE
1
ROWAN UNIVERSITY
1
GYPSUM WALLBOARD CEILING/SOFFIT
Payroll
Director
104 B 8'-0"
1
1
2 x 4 RECESSED LIGHT FIXTURE
1
1
Women's Toilet Rm.
132 E 9'-0"
Break Room
110 C 8'-0"
1
Office
105 B 8'-0"
Payroll Open
Office
101 A VARIES
Unisex Toilet Room
134 E 8'-0"
Janitor's Closet
133 E 9'-0"
1
A300
Acc. Services
Director
113 B 8'-0"
Copy
111 B 8'-0"
LED LINEAR PENDANT
Corridor
107 D VARIES
DRAWING KEYNOTES
08
OPENINGS
083113.A1
NEW ACCESS HATCH TO BE PLACED UNDER NEW VOLUME DAMPER
Acc. Services
Assoc. Director
109 B 8'-0"
09
FINISHES
095400.B1
DECORATIVE COMPOSITE CEILING PANEL
Acc. Payable
Manager
114 B 8'-0"
Open Office
131 A VARIES
A300
083113.A1
122413.B1
083113.A1
122413.B1
122413.B1
L
RIA
MO LL
E
M HA
12
FURNISHINGS
122413.B1
ROLLER WINDOW SHADE
2
083113.A1
122413.B1
Men's Toilet Rm.
135 E 9'-0"
Acc. Services
Director
108 B 8'-0"
Conference
Room/Office
112 B 8'-0"
Payroll Assist.
Supervisor
103 B 8'-0"
1
Corridor
106A B 8'-0"
Corridor
106 B 8'-0"
CONSTRUCTION NOTES
122413.B1
083113.A1
1
2
3
4
EXISTING LIGHT FIXTURE TO BE REPLACED - SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION
EXISTING LIGHT FIXTURE TO REMAIN - SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION
REMOVE AND REINSTALL EXISTING CEILING
CONTRACTOR SHALL PATCH THE VERTICAL SHAFT WITH 3-5/8 METAL STUDS AND TWO LAYERS OF 5/8"
TYPE 'X' GYPSUM BOARD AT OPENINGS. PROVIDE FIRE PENETRATION SEALANT AT ALL CONDUITS, EDGES
AND PENETRATIONS. CONTRACTOR SHALL PATCH WALL FROM OPENING TO UNDERSIDE OF DECK. SEE
DETAIL 2/A401.
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
PARKING
LOT R
122413.B1
3
3
1
083113.A1
4
095400.B1
Mail/Copy
102 A 8'-0"
KEY PLAN
3
122413.B1
2
1
095400.B1
083113.A1
3
3
A300
1
Lobby
100 A 9'-0"
083113.A1
095400.B1
Reception
117 A 8'-0"
Media/P.R.
118 B 8'-0"
Media/P.R.
126 A VARIES
Media/P.R.
125 A VARIES
2
3
2
2
12/23/2014
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
122413.B1
083113.A1
083113.A1
3
2
122413.B1
083113.A1
122413.B1
Media/P.R.
127 A VARIES
Corridor
123 B 8'-0"
1
A401
083113.A1
Office
128 A VARIES
Office
120 B 8'-0"
Media/P.R.
119 B 8'-0"
122413.B1
122413.B1
Office
129 A VARIES
Budget Director
130 A VARIES
Office
121 B 8'-0"
Office
122 B 8'-0"
083113.A1
122413.B1
Corridor
124 B 8'-0"
First Floor Reflected Ceiling Plan
Architecture
1/8" = 1'-0"
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
PATCH AREA
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
FIRST FLOOR
REFLECTED
CEILING PLAN
CONTRACTOR SHALL PATCH THE VERTICAL SHAFT WITH 3-5/8 METAL STUDS AND
TWO LAYERS OF 5/8" TYPE 'X' GYPSUM BOARD AT OPENINGS. PROVIDE FIRE
PENETRATION SEALANT AT ALL CONDUITS, EDGES AND PENETRATIONS.
CONTRACTOR SHALL PATCH WALL FROM OPENING TO UNDERSIDE OF DECK.
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2
A401
Pipe Chase Photo Detail
NO SCALE
2014-064
Drawing No.
A401
DRAWING LEGEND
2 x 4 ACOUSTIC CEILING TILE
ROWAN UNIVERSITY
2 x 2 ACOUSTIC CEILING TILE
2 x 4 RECESSED LIGHT FIXTURE
2 x 2 RECESSED LIGHT FIXTURE
DRAWING KEYNOTES
05
METALS
055000.A6
4" X 4" X 1/8" STEEL ANGLE. BEAR 4" ON EACH SIDE OF OPENING
06
WOOD, PLASTICS, AND COMPOSITES
061000.G9
2X6 PRESSURE TREATED WOOD BLOCKING
064023.H2
5/4X6 WOOD TRIM
07
THERMAL AND MOISTURE PROTECTION
078413.A1
FIRE STOPPING SEALANT
079200.B1
SEALANT
08
OPENINGS
084113.A1
2
09
FINISHES
092216.C1
092900.E1
095123.B3
095123.G1
2
L
RIA
MO LL
E
M HA
ALUMINUM STOREFRONT WINDOW
2
2 1/2" METAL STUD FRAMING @16" O.C.
5/8" GYPSUM WALLBOARD
2X4 ACOUSTICAL TILE
WALL ANGLE
OAK
HALL
LAUREL
HALL
1
2
3
1
200
1
3
2
A402
2
TYP.
2
1
1
3
4
5
6
1
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
CONSTRUCTION NOTES
1
HOLLYBUSH
PARKING
LOT R
EXISTING LIGHT FIXTURE TO BE REPLACED. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION
NEW ALUMINUM STOREFRONT WINDOWS. SEE DRAWINGS D100, D101 AND A001 FOR ADDITIONAL
INFORMATION
PATCH EXISTING PLASTER WALLS
EXISTING CONSTRUCTION TO REMAIN
EXISTING WALL TO REMAIN
FIRE DAMPER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
2
3
4
A402
KEY PLAN
1
2
1
1
4
A402
1
3
TYP.
2
1
A402
1
1
3
2
1
4
2
12/23/2014
ADDENDUM #1
A402
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
2
4
1
1
A402
4
1
A402
1
1
1
A402
2
Second Floor Reflected Ceiling Plan
1/8" = 1'-0"
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
5
078413.A1
055000.A6
078413.A1
061000.G9
5
078413.A1
078413.A1
092900.E1
Project Title
4
BOLE HALL
RENOVATIONS
092216.C1
064023.H2
6
079200.B1
079200.B1
095123.B3
095123.G1
084113.A1
078413.A1
Drawing Title
078413.A1
2
5
078413.A1
078413.A1
2
A402
Fire Damper Detail
1 1/2" = 1'-0"
NOTE: CONTRACTOR TO FILL IN OPENING LEFT BY DEMOLISHED
DUCTWORK. CONTRACTOR TO ASSUME 24" X 24" SIZE
PER OPENING. PROVIDE LINTELS & FIRE PENETRATION
SEALANT @ ALL NEW FIRE DAMPERS. SEE MECHANICAL
DRAWINGS FOR QUANTITY AND LOCATIONS AND MORE
INFORMATION
3
A402
Lintel Detail
1 1/2" = 1'-0"
NOTE: CONTRACTOR TO FILL IN OPENING LEFT BY DEMOLISHED
DUCTWORK. CONTRACTOR TO ASSUME 24" X 24" SIZE
PER OPENING. PROVIDE LINTELS & FIRE PENETRATION
SEALANT @ ALL NEW FIRE DAMPERS. SEE MECHANICAL
DRAWINGS FOR QUANTITY AND LOCATIONS AND MORE
INFORMATION
4
A402
Window Head Detail
3" = 1'-0"
SECOND
FLOOR
REFLECTED
CEILING PLAN
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
A402
4
A501
8
4
A501
095123.B3
A501
095123.B3
DRAWING KEYNOTES
PAYROLL
05
METALS
055000.A1
9
06
WOOD, PLASTICS, AND COMPOSITES
061000.B1
BLOCKING
061600.E11
3/4" PLYWOOD SHEATHING
064023.A1
SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH
064023.A2
SOLID SURFACE COUNTERTOP
064023.A8
VENEER PLYWOOD
064023.A9
4" HIGH WOOD BASE
064023.A10
VENEER PLYWOOD SUPPORT
064023.D1
BUILT-IN MAIL BOXES
064023.H12
1X4 WOOD TRIM
066500.A1
SOLID SURFACE WINDOW SILL
8"
095123.B3
224000.A1
1' - 8"
064023.A1
8' - 0"
092900.E1
5' - 11"
2442WC
9' - 0"
2442WC
064023.A1
123530.B3
3
1' - 6"
2142WC
123530.B3
3042WC
4' - 2"
3042WC
123530.B3
8' - 0"
092900.E1
3' - 6"
3624WC
3' - 6"
3624WC
123530.B1
21DB
096513.C1
096519.B1
24BC
24BC
123530.B1
30BC
3/4"
08
OPENINGS
083313.B1
OVERHEAD COILING SECURITY SHUTTER
064023.A8
3/4"
096513.C1
096813.B1
09
FINISHES
092216.A2
092216.E1
092900.D2
092900.E1
092900.J2
092900.O1
095123.B3
096513.C1
096519.B1
096813.B1
30BC
113100.B1
Breakroom
1
A501
096813.B1
3'-5 1/2".
1' - 1"
2
096513.C1
2' - 10"
092900.E1
3' - 0"
1
2' - 3" MIN.
2' - 10"
064023.A1
1 1/2"
2
1/2" = 1'-0"
A501
Copy Room
123530.B1
Payroll Counter
3
1/2" = 1'-0"
A501
ROWAN UNIVERSITY
07
THERMAL AND MOISTURE PROTECTION
072100.B3
R-13 BATT INSULATION
072100.F1
SOUND BATT INSULATION
079200.B1
SEALANT
064023.A2
3'-5 1/2".
CONCEALED HANGERS 2" X 1 1/2" ALUMINUM ANGLES
1/2" = 1'-0"
11
4
066500.A1
A501
1/4" ALUMINUM REVEAL
3 5/8" METAL STUD FRAMING
1/2" TYPE X GYPSUM WALLBOARD
5/8" GYPSUM WALLBOARD
J BEAD
CEILING SUPPORT SYSTEM
2X4 ACOUSTICAL TILE
RESILIENT COVE BASE
RESILIENT TILE FLOORING
TILE CARPET
L
RIA
MO LL
E
M HA
3/4" = 1'-0"
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
EQUIPMENT
113100.B1
REFRIGERATOR
12
FURNISHINGS
122413.B1
ROLLER WINDOW SHADE
123530.B1
BASE CABINET
123530.B3
WALL CABINET
Cabinet Section- Typical
OAK
HALL
LE
BO LL
HA
PARKING
LOT R
22
PLUMBING
224000.A1
ACCESSIBLE SINK
061000.B1
1'-1".
7
8
064023.H12
092216.E1
5' - 0"
7
092900.E1
4
26
ELECTRICAL
265100.A1
LED PENDANT FIXTURE
095123.B3
CONSTRUCTION NOTES
092900.E1
064023.D1
1
2
3
4
5
6
7
072100.B3
3".
EQ.
2' - 0"
061000.B1
072100.F1
066500.A1
092900.E1
8"
123530.B1
8
9
10
095123.B3
092216.E1
066500.A1
064023.A1
1' - 4"
5
EQ.
072100.F1
072100.F1
092900.D2
055000.A1
KEY PLAN
2
3' - 0"
5"
6
& 3' - 4" +/-
2'-2" +\-
092216.A2
PROVIDE WOOD VALANCE TO MATCH ADJACENT CABINETS
PROVIDE ADA COMPLIANT ANTI-SCALD PIPE INSULATION PROTECTION
WOOD PRIVACY SCREEN
EXISTING WALL
EXISTING CONCRETE SLAB
EXISTING RIGID INSULATION
NEW ALUMINUM STOREFRONT WINDOWS. SEE DRAWINGS D100, D101 AND A001 FOR ADDITIONAL
INFORMATION
EXISTING ROOF DECK
ENGRAVED WOOD VENEER PANEL
PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING
092216.E1
6°
2
5
A501
Window Sill Detail
6
A501
1 1/2" = 1'-0"
Window Mullion Detail
7
1 1/2" = 1'-0"
A501
1 hr Wall/Ceiling Detail
7A
3/4" = 1'-0"
A501
Copy Room Elevation
4' - 2"
ADDENDUM #1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
7
4
7
13
092216.E1
A501
4
7' - 0"
4
12/23/2014
1/2" = 1'-0"
066500.A1
7
2
3
8
11
064023.A2
11
A501
A501
SIM.
10
092216.E1
9"
1' - 0"
092900.E1
092216.E1
096513.C1
092216.A2
092216.A2
092216.A2
092900.E1
092900.E1
092216.E1
092216.E1
092900.E1
092900.E1
3 5/8"
096513.C1
5
8"
066500.A1
096813.B1
5/8".
8"
066500.A1
4 3/4".
6"
10
072100.F1
055000.A1
4
092900.E1
10
095123.B3
2' - 10"
055000.A1
3 5/8".
2'-0".
072100.F1
055000.A1
092216.A2
3 5/8".
2'-0".
10
10
092216.E1
8"
055000.A1
10
092900.E1
092216.A2
Architecture
4 3/4".
092900.E1
2' - 0"
092900.E1
4 3/4".
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
092216.A2
092216.E1
William P. Lammey AIA
Anthony R. Giorgio AIA
066500.A1
092900.E1
096813.B1
8
A501
Payroll Counter Section
9
A501
Typical Wall/Ceiling Detail
10
3/4" = 1'-0"
A501
Pipe Chase Plan Detail
11
1 1/2" = 1'-0"
A501
Pipe Chase Detail
12
1 1/2" = 1'-0"
A501
Planning
Column Pipe Chase Plan Detail
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1 1/2" = 1'-0"
1" = 1'-0"
092216.E1
8
8
092216.E1
4
4
Project Title
092900.E1
BOLE HALL
RENOVATIONS
092216.E1
066500.A1
095123.B3
2' - 4 1/2"
2' - 8 1/2"
061600.E11
072100.F1
072100.F1
092216.E1
7
135
°
092216.E1
4
092900.O1
072100.F1
A501
1 1/2" = 1'-0"
°
092216.E1
14
A501
Soffit Detail 1
3/4" = 1'-0"
2' - 9"
092900.J2
092216.E1
095123.B3
092900.E1
9'-0" A.F.F.
15
A501
Soffit Detail 2
3/4" = 1'-0"
092900.E1
092900.E1
095123.B3
16
A501
Soffit Detail 3
3/4" = 1'-0"
9'-0" A.F.F.
265100.A1
6'-8" A.F.F.
092900.E1
Column Pipe Chase Detail
INTERIOR
ELEVATIONS
AND MILLWORK
DETAILS
092900.J2
2' - 6"
13
Drawing Title
079200.B1
072100.F1
079200.B1
8'-0" A.F.F.
096813.B1
092900.E1
092900.E1
45
092900.E1
5
122413.B1
095123.B3
10
072100.F1
2' - 4 1/2"
3' - 4"
092900.E1
092216.E1
096513.C1
2' - 8 1/2"
°
45
& 3'-4" +/-
2'-2" +/-
092216.E1
°
135
2' - 4 1/2"
061000.B1
122413.B1
7
Date:
10/24/2014
Scale
1/4" = 1'-0"
265100.A1
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
A501
ZONE A
SD-1B
SD-1
RG-1
VAV
SD-2B
200 CFM
360 CFM
104B
210 CFM
G
RG-1
450 CFM
INSTALLATION KEYNOTES
SD-1C
SD-2A
8ø
VD
VD
8ø
250 CFM
100 CFM
1
SD-2A
8ø
10x10
SD-2A
100 CFM
2
VD
8x10
RG-1
10x12
6ø
10x10
EG-1
3
325 CFM
14ø
VD
65 CFM
RG-1
10ø
6ø
75 CFM
VD
4
5
6
8ø
75 CFM
REFER TO STRUCTURAL DRAWINGS FOR NEW ROOF OPENING SIZES AND
LOCATIONS. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL NEW ROOF
CURB. REFER TO DETAIL 3/S002. ROOFING TO BE PERFORMED BY G.C.
MAINTAIN FIRE RATING AT ALL WALL PENETRATIONS TO RENOVATED OFFICE
SUITE. COORDINATE WITH ARCHITECTURAL PLANS FOR WALL SECTIONS.
REFER TO DETAIL 11/M013 FOR FIRE DAMPER INSTALLATION.
FURNISH AND INSTALL NEW EQUIPMENT SUPPORT CURB FOR AHU. ROOFING
TO BE PERFORMED BY G.C.
CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 100 CFM.
CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 200 CFM.
CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 260 CFM.
ROWAN UNIVERSITY
SD-1C
8ø
245 CFM
8ø
18x14
VD
SD-2C
VAV
EG-1
VAV
104A
RG-1
225 CFM
104C
8ø
10ø
VD
160 CFM
2
M002
10x10
IAL
ORL
M
ME HAL
8ø
VD
ZONE D
175 CFM
18x14
10x12
SD-1D
12x12 EA UP
VAV
360 CFM
EG-1
102
ZONE C
50 CFM
EG-1
EG-1
VD
H
150 CFM
18x14
18x14
75 CFM
J
L
K
M
B
7
OAK
HALL
LAUREL
HALL
LE
BO LL
A
H
8ø
VD
VD
4
2
8ø
14x10
10ø
VD
ZONE D
ZONE C
6ø
18x14
5
VD
5ø
2
14x10
6ø
VD
VAV
4
H100
5
2
30x24
KEY PLAN
10ø
5
VAV
VD
100G
2
20x16
SD-1D
RG-1
360 CFM
400 CFM
24x24
ZONE F
PARKING
LOT R
20x16
10ø
VD
540 CFM
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
12ø
RG-1
HOLLYBUSH
14ø
2
M006
VAV
12x12
1
M007
3
L100
VD
ZONE F
2
T
VAV
4
ZONE D
125
3
VAV-125
2
1
VD
No.
12/23/14
12/3/14
ADDENDUM #1
ISSUED FOR BID
Date
Revision
VD
4
VD
VD
6
TYP. OF 3
1
ZONE D
ZONE F
G
ZONE D
1
M002
H
FIRST FLOOR PLAN
J
L
K
M
7
1/8" = 1'-0"
1-1/2" VENT PIPE
THROUGH ROOF,
REFER TO DETAIL
8/A102
1-1/2" GOOD NECK,
TERMINATE AT 24" ABOVE
ROOF DECK. PROVIDE S.S.
WIRE MESH SCREEN
ROWAN
UNIVERSITY
5
RELIEF AIR HOOD
AHU
34X34 RETURN AIR DN
1
1
Project Title
18x14 RA DUCT
BOD=10'-6"
6"Ø EA DUCT
BOD=10'-10"
6"Ø EA DUCT
BOD=9'-3"
1
S001
ROOF SUPPORT
18x14 SA DUCT
BOD=9'-2"
BOLE HALL
RENOVATIONS
3
3
CU
1
34X34 SUPPLY AIR DN
CEILING
1
SCREEN WALL
2
SERVICE CLEARANCE
TYPICAL
1/4" RS/ 1/2" RL DN
TO 1ST FLOOR,
REFER TO 1/M007
FOR CONTINUATION
OUTSIDE AIR
INTAKE HOOD
14
M013
Drawing Title
DUCT ROOF
SUPPORT TYPICAL
FIRST FLOOR
HVAC DUCT
INSTALLATIONS
PIPING VESTIBULE
CORRIDOR WALLS
1
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2
M002
Printed: 12/23/2014 11:16:12 AM
1ST FLOOR CORRIDOR
1/4" = 1'-0"
3
M002
FIRST FLOOR ROOFPLAN
1/8" = 1'-0"
2014-064
Drawing No.
M002
INSTALLATION KEYNOTES
1
H
SCREEN WALL
J
K
SCREEN WALL
L
MAINTAIN FIRE RATING AT ALL WALL PENETRATIONS TO RENOVATED OFFICE
SUITE. COORDINATE WITH ARCHITECTURAL PLANS FOR WALL SECTIONS.
REFER TO DETAIL 11/M013 FOR FIRE DAMPER INSTALLATION.
COORDINATE WITH G.C. FOR ACCESS DOORS AT ALL BALANCING DAMPER
LOCATIONS ABOVE HARD CEILINGS.
FURNISH AND INSTALL ADDITIONAL REINFORCING (10"W.G.)FOR 34"x34" DUCT
RISER AND MAIN DUCT BRANCHES ABOVE CORRIDOR TO MINIMIZE BREAKOUT
SOUND FROM AHU. FURNISH AND INSTALL 2" THICK (6LB/CF) RIGID BOARD
INSULATION FOR THESE SECTIONS OF DUCT.
FURNISH AND INSTALL STATIC PRESSURE SENSOR. REFER TO CONTROL
DRAWINGS M010 AND M011 FOR MORE INFORMATION.
CONNECT TO EXISTING LINEAR SLOT DIFFUSER PLENUM BOX. BALANCE
SYSTEM TO LISTED CFM'S
2
3
34X34 DUCT
THRU ROOF
4
AHU
40x40
1
36x36
5
ROOF
ROWAN UNIVERSITY
VAV
131B
20x28
16x16
16x20
20x30
26x30
IAL
ORL
M
ME HAL
16x18
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
26x32
B
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
1ST FLOOR
1
1ST FLOOR SECTION
1/4" = 1'-0"
M006
G
RG-1
H
75 CFM
J
LRG
LRG
215 CFM
215 CFM
L
LRG
LRG
315 CFM
K
315 CFM
7
LRG
LRG
275 CFM
275 CFM
VD
VD
REF.
155 CFM
6ø
RG-1
475 CFM
VAV
113
RG-1
VAV
110
115
VD
SD-2B
120 CFM
VD
VD
8ø
12ø
20x16
VAV
VD
VD
SD-3
SD-3
390 CFM
131A
390 CFM
RG-1
RG-1
75 CFM
75 CFM
34X34 UP
TO ROOF
32x26
32x20
3
LRG
315 CFM
8ø
22x12
8ø
22x12
Open Office
VAV
LRG
131
131B
350 CFM
30x20
18x16
SD-3
16x16
65 CFM
VD
70 CFM
VD
6ø
VD
VAV
65 CFM
Office
VAV
122
121
VD
RG-1
Project Title
65 CFM
10x10
118
10ø
20x18
120
RG-1
16x16
65 CFM
260 CFM
VD
8x8
RG-1
6ø
6ø
117
3
VD
VD
VD
Office
LSD-2
22x12
70 CFM
SD-2A
6ø
12x12
VD
Reception
700 CFM
SD-1
10ø
70 CFM
RG-1
121
VD
10ø
70 CFM
70 CFM
6ø
SD-1
VD
VD
6ø
SD-2A
SD-2A
ROWAN
UNIVERSITY
390 CFM
VD
Office
6ø
28x16
RG-2
119
118
6ø
6ø
Media/P.R.
VD
6ø
VD
Media/P.R.
VD
50 CFM
6ø
SD-2B
100
SD-3
390 CFM
6x8
Lobby
6ø
M006
12x12
VD
115 CFM
1
VD
5
3
6ø
30x26
VD
VAV
6ø
3
28x20
VD
114
80 CFM
10x8
RG-1
140 CFM
315 CFM
Acc. Payable
Manager
SD-2A
6ø
REFER TO M002
VD
VD
VD
VD
112
RG-1
34X34 UP
TO ROOF
390 CFM
108
80 CFM
Conference
Room/Office
VD
60 CFM
8ø
20x16
390 CFM
VAV
VD
SD-2A
130 CFM
VD
Break Room
6ø
111
SD-1A
117
6x8
6ø
Copy
Acc. Services
Director
112
1
12x12
12x12
6ø
Corridor
8ø
SD-1A
BOLE HALL
RENOVATIONS
5
VD
SD-1A
260 CFM
125
LSD-1
LSD-1
360 CFM
350 CFM
340 CFM
5
10ø
LSD-2
Media/P.R.
260 CFM
125
2
126
VD
Media/P.R.
Media/P.R.
126
127
SD-3
390 CFM
390 CFM
VD
VD
10ø
VD
VD
130
VD
LSD-1
VD
SD-2E
360 CFM
10ø
Office
128
12x12
Drawing Title
ENLARGED FIRST
FLOOR DUCT
INSTALLATIONS
VAV
350 CFM
VD
SD-3
16x16
LSD-1
12x12
VD
VAV
350 CFM
124
16x14
VD
LSD-1
VD
VD
VD
LRG
Corridor
100 CFM
10ø
LSD-2
SD-2B
20x14
VD
10ø
150 CFM
CONFERENCE
ROOM
VD
VD
10ø
5
140 CFM
Office
Budget Director
129
130
VD
10ø
24x14
16x12
16x12
RG-1
8ø
10ø
VD
355 CFM
2
FCU
1
1
LRG
LRG
LRG
LRG
LRG
LRG
LRG
LRG
325 CFM
320 CFM
310 CFM
315 CFM
320 CFM
325 CFM
350 CFM
350 CFM
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2
M006
Printed: 12/23/2014 11:16:16 AM
Revision
6ø
101
Date
22x12
80 CFM
106
Payroll Open
Office
2
65 CFM
SA
VD
5ø
280 CFM
ADDENDUM #1
ISSUED FOR BID
VAV
107
32x26
SD-3
VD
22x20
5ø
10ø
280 CFM
85 CFM
6ø
8ø
SD-2D
12/23/14
12/3/14
LRG
SD-3
SD-2A
6ø
VD
VD
2
109
VD
20x14
SD-2A
SD-2A
110
2
1
VD
80 CFM
SD-2A
VAV
VD
SD-2D
104
12x12
No.
VD
85 CFM
8ø
VD
24x14
8x8
20x24
VD
VD
108
Director
104
102
1
2
VD
105
12x14
VD
Acc. Services
Assoc. Director
Acc. Services
Director
VD
Office
VD
16x14
6ø
VD
75 CFM
VD
10x8
VAV
75 CFM
RG-1
VD
VD
VD
RG-1
VD
VD
10x12
280 CFM
SP
Mail/Copy
215 CFM
VD
6ø
101
4
1
300 CFM
28x14
VAV
50 CFM
SD-2C
SD-2D
10x10
1
LSD-1
VD
14x12
12x10
SD-2A
215 CFM
107
14x12
12x10
18x14
SD-2C
Corridor
VD
KEY PLAN
8ø
VD
1
PARKING
LOT R
DUCTWORK PLAN
1/4" = 1'-0"
2014-064
Drawing No.
M006
FINNED TUBE SCHEDULE
TAG
CAPACITY
(BTU/LF)
EWT
(°F)
LWT
(°F)
TUBE SIZE
FINS PER FT
FIN SIZE
FTR-1
1290
190
170
3/4"
40
4-1/4" X 3-5/8"
FTR-2
1520
190
170
3/4"
50
4-1/4" X 3-5/8"
ENCLOSURE
TYPE
BASIS OF
DESIGN
CUSTOM REFER TO
DETAILS
CUSTOM REFER TO
DETAILS
STERLING
INSTALLATION KEYNOTES
NOTES
STERLING
1
CORE DRILL, SLEEVE, AND FIRESTOP PIPE PENETRATIONS AT CHASE
WALL.
CORE DRILL, SLEEVE, AND WATERSTOP PENETRATION AT ROOF BELOW
PIPING VESTIBULE.
CONNECT TO EXISTING PIPING SERVING FINNED TUBE ELEMENT IN
CONFERENCE ROOM 125. EXISTING RETURN PIPING IN CONFERENCE
ROOM TO BELOW SLAB RETURN PIPING TO REMAIN.
CONNECT TO EXISTING CONVECTOR RISER SUPPLY PIPING AT POINT
ABOVE FIRST FLOOR SLAB TO SERVE TWO EXISTING AREAS TO REMAIN
ON BELOW SLAB DISTRIBUTION: STAIRWELL S2, AND OFFICE 100A
CORE DRILL, SLEEVE, AND WATERSTOP PENETRATION AT ROOF BELOW
PIPING VESTIBULE.
2
3
4
5
ZONE C
G
H
L
15
M013
J
K
TYPICAL
7
FTR-1
8'-0"
10.3
1/2" HWR
1/2" HWS
FTR-2
FTR-2
FTR-2
FTR-2
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
5/8" HWR
16
5/8" HWS
T
ZONE C
Corridor
M013
FTR-2
FTR-2
6'-0"
9.12
6'-0"
9.12
FTR-1
6'-0"
7.74
1/2" HWS
1/2" HWR
5/8" HWR
107
1-1/2" HWRHS
1-1/4" HWR
1-1/2" HWS
1-1/2" HWRHR
1-1/2" HWRHS
1-1/4" HWRHS
1" HWRHS
1-1/2" HWRHR
1-1/4" HWRHR
1" HWRHR
FTR-1
5/8" HWS
3'-0"
3.87
2" HWS DN
1-1/2" HWR DN
2-1/2" CHWS DN
T
1-1/2" VENT UP
THROUGH ROOF
ZONE C
VAV-101
T
T
VAV-107
VAV-104
T
VAV-108
8
M013
1" HWR
2-1/2" CHWR DN
1-1/2" HWRHR DN
1-1/2" HWRHS DN
1-1/2" HWR DN
1
VAV
Supervisor
104
TYP. FOR ALL
105
104
103
VAV
Office
Director
1" HWRHR
1/2" HWR
3/4" HWRHR
3/4" HWRHS
1/2" HWRHR
1" HWRHS
VAV
1/2" HWRHS
101
Acc. Services
Assoc. Director
Acc. Services
Director
3'-0"
3.87
TYP. FOR ALL
108
VAV
1/2" HWR
108
1/2" HWS
VAV-131A
1/2" HWR
T
3/4" HWRHR
Payroll Open
Office
101
1/2" HWRHR
5
1/2" HWRHS
REF.
1/2" HWRHS
1/2" HWRHR
VAV
1" HWRHS
1-1/2" HWR
3/4" HWRHR
115
Acc. Payable
Manager
Acc. Services
Director
VAV-110
3/4" HWRHR
T
VAV-115
2
M013
6'-0"
9.12
2
3/4" HWRHS
100
125
Closet
Media/P.R.
116
119
3/4" HWRHR
VAV-131B
3/4" HWRHR
T
FCU-1
3/4" HWS
3/4" HWR
2-1/2" CHWS/R UP TO RTU-1
Media/P.R.
3/4" HWRHS
1/2" HWRHR
118
1/2" HWRHS
Office
1/2" HWRHS
120
Office
T
Office
121
1/2" HWRHR
ZONE D
VAV
131B
131
FTR-2
CONNECT CONDENSATE TO SANITARY
PIPING IN CHASE VIA INDIRECT WASTE
RECEPTACLE. FURNISH AND INSTALL
TRAP SEAL PRIMER FOR INDIRECT WASTE
RECEPTACLE. REFER TO 4/P002.
Lobby
5/8" HWRHS
5/8" HWRHR
VAV
Open Office
T
2
M006
131A
T
3/4"
HWRHS
Revision
VAV
106
VAV-112
112
Date
6'-0"
9.12
114
Corridor
VAV
117
12/23/14 ADDENDUM #1
12/3/14 ISSUED FOR BID
No.
FTR-2
113
VAV
2
1
3/4" HWRHS
VAV
111
110
1/2" HWRHS
1/2" HWRHR
1" HWRHR
112
Copy
Break Room
1" HWRHS
Conference
Room/Office
110
1" HWRHR
1
KEY PLAN
109
107
3/4" HWRHS
FTR-1
5/8" HWR
2
3
122
1-1/2" HWR
1-1/4" HWS
1/2" HWRHS
Reception
VAV-118
117
VAV
VAV
1/2" HWRHR
126
118
T
VAV-121
T
1" HWR
VAV
121
FTR-2
VAV
5/8" HWRHS
1/4" RS/ 1/2" RL UP TO
ROOF. REFER TO ROOF
PLAN FOR CONTINUATION
Corridor
130
5/8" HWRHR
6'-0"
9.12
Corridor
124
123
T
3/4" CAPPED AND
VALVED FOR FUTURE
VAV-126
1/2" HWS
1/2" HWR
1-1/2" PUMPED
CONDENSATE, SLOPE
1/8" PER FOOT
FCU
1
EXISTING FTR
1/4" RS/ 1/2" RL
DN TO FCU-1
VAV-130 ZONE D
1-1/4" HWR
5/8" HWS
5/8" HWR
Media/P.R.
Media/P.R.
Media/P.R.
Office
Office
Budget Director
125
126
127
128
129
130
1-1/4" HWR
FTR-2
FTR-2
FTR-2
FTR-2
FTR-2
FTR-2
4'-0"
6.08
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
1/2" DN TO RETURN PIPING
BELOW SLAB
CALIBRATED BALANCING VALVE,
TYP. ALL RAD. 5
1" HWS
FTR-2
3
1-1/2" PUMPED
CONDENSATE UP
T
T
3/4" HWS
ROWAN
UNIVERSITY
5/8" HWS
5/8" HWR
ZONE D
T
FTR-2
6'-0"
9.12
FTR-2
FTR-2
6'-0"
9.12
6'-0"
9.12
Project Title
1
4
BOLE HALL
RENOVATIONS
ZONE D
1/2" DN TO FTR SUPPLY
PIPING BELOW SLAB
Drawing Title
1
2
M007
PIPING PLAN
1/4" = 1'-0"
ENLARGED FIRST
FLOOR PIPE
INSTALLATIONS
Date:
12/2/2014
Scale
1/4" = 1'-0"
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M007
Printed: 12/23/2014 11:16:19 AM
ROWAN UNIVERSITY
AIR HANDLING UNIT
SUPPLY FAN
RETURN FAN
FAN
TAG
LENGTH WEIGHT OA MAX/MIN
(IN)
(LBS)
(CFM)
AHU-1
390
9635
2,000/12,100
AHU-2
90
1855
400/400
MOTOR
CHILLED WATER COIL
FAN
PANEL FILTER
MOTOR
SENSIBLE TOTAL EAT-DB EAT-WB LAT-DB LAT-WB
FV
APD EWT LWT
WPD
FAN
ESP
TSP
ESP
TSP
(°F)
(°F)
(°F)
(FT/MIN) (INH2O) (°F) (°F) GPM (INH20) ROWS FPI TYPE
TYPE QTY. CLASS CFM RPM BHP (INH20) (INH20) ELEC. HP RPM CTRL TYPE QTY. CLASS CFM RPM BHP (INH2O) (INH2O) ELEC. HP RPM CTRL (BTU/HR) (BTU/HR) (°F)
30"
PLENUMDIRECT
DRIVE
16"
PLENUMDIRECT
DRIVE
1
2
12100 1339 12.34
1
2
3500
2665
3.86
1
4.58
1.1
4.68
208/60/3 15
1160
VFD
30"
PLENUM
-DIRECT
DRIVE
208/60/3 7.5 3500 NONE
-
LOCATION
DESCRIPTION
UH-1
2ND FLOOR
WALL MOUNTED
TAG
CHWP-1
HWP-1
HWP-2
HWP-3
SERVICE
MBH
GPM
180
872
3.08
0.85
1.01
208/60/3
5
1160
VFD
325,676
431,599
78
65
53
53
427
0.63
45
60
57.1
8.7
8
9
PLEATED (4)-12X24
(MERV 8) (8)-20X24
2
30
0.25
1
VARICEL II MH (4)-12X24
CARTRIDGE (8)-20X24
4
85
.047
1.5
SEE NOTE(S) 2,3,4
-
-
-
-
-
-
-
-
-
-
-
90,260
113,910
80
64
55
53
467
0.79
45
60
15.2
5.7
8
10 PLEATED (1)-24X12
(MERV 8) (2)-24X20
2
30
0.31
1
VARICEL II MH (1)-24X12
CARTRIDGE (2)-24X20
4
85
0.57
1.5
SEE NOTE(S) 1,3,5
IAL
ORL
M
ME HAL
VENTILATION SCHEDULE
AIR
EAT
LAT
VOLTAGE
PHASE
HZ
MODEL
65
95
120
1
60
HSB-HC
160
100
100H
100I
101
101G
102
102
103
104
104
104A
104B
104C
105
105
106
107
107
108
REMARKS
FLOW (GPM)
FT HD
HP
RPM
TYPE
HZ
MANUFACTURER
MODEL
COMMENTS
AHU 1 & 2
100
40
2
1750
BASE MOUNTED
208
3
60
BELL AND GOSSETT
SERIES 1510 2AD-ES
100 GPM INCLUDES ADDITIONAL 25 GPM FOR
FUTURE LOAD OF PRESIDENT'S SUITE.
FINNED TUBE
RADIATION
STANDBY
VAV REHEAT
62
35
0.5
1750
INLINE
208
3
60
BELL AND GOSSETT
SERIES E-901.5AB
62
30
35
35
0.5
1
1750
1750
INLINE
INLINE
208
208
3
3
60
60
BELL AND GOSSETT
BELL AND GOSSETT
SERIES E-901.5AB
SERIES E-901.5AB
109
110
111
112
113
HEAT EXCHANGER
SHELL
TUBE
TAG
LOCATION
SYSTEM
FLUID
LBS/HOUR
PSIG
FLUID
GPM
LWT
MAX PRESSURE
DROP (PSIG)
BASIS OF DESIGN
HX-1
BASEMENT MECHANICAL ROOM
HOT WATER
STEAM
936
5
WATER
92
180
0.5
BELL AND GOSSETT SU-84-2
REMARKS
114
117
118
119
120
121
122
124
125
125
126
127
128
129
130
131
200
201
202
203
204
205
205A
205B
206
207
208
209
H100
H102
H200
H201
L100
L101
L200
V100
W110
W200
W201
W202
W203
2
VAV BOX
TAG
MAX CFM
MIN CFM
(WINTER)
VAV-100G
VAV-101
VAV-102
VAV-104
VAV-104A
VAV-104B
VAV-104C
VAV-107
VAV-108
VAV-110
VAV-112
VAV-115
VAV-117
VAV-118
VAV-121
VAV-125
VAV-126
VAV-130
VAV-131A
VAV-131B
VAV-200
VAV-200B
VAV-201
VAV-203
VAV-205A
VAV-207
VAV-209
VAV-H100
VAV-L100
VAV-W202
600
1135
170
170
355
475
495
785
325
155
130
280
200
140
210
780
1050
1060
1560
1560
425
450
300
450
475
420
355
770
150
285
300
570
85
90
180
240
250
390
165
80
65
140
100
70
100
390
525
530
780
780
215
225
150
225
240
210
180
385
75
145
TAG
CFM
ESP
EF-1
EF-2
EF-3
RF-1
550
500
250
2550
0.4 in. wg.
0.5 in wg.
0.3 in. wg.
0.5 in. wg.
MIN CFM
(SUMMER) INLET SIZE MAX NC LEVEL
180
350
50
75
105
150
150
235
100
50
40
85
60
45
65
235
315
320
470
470
130
135
90
135
145
125
106
230
45
85
8
10
4
4
6
6
6
8
6
4
4
5
4
4
4
8
10
10
12
12
6
6
5
6
6
6
6
8
4
5
MOTOR
RPM
FAN RPM MOTOR HP
1148
1448
1564
1206
1/4
1/4
1/6
3/4
EAT (°F)
LAT(°F)
EWT(°F)
LWT(°F)
GPM
REHEAT MBH
BASIS OF DESIGN
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
55
55
55
55
55
55
55
55
55
55
84
86
93
87
92
88
87
83
94
94
97
86
91
94
89
86
86
86
86
86
84
83
84
83
83
84
84
83
97
84
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
160
160
160
158
160
160
160
157
159
160
160
158
159
159
160
160
160
160
160
160
156
156
155
156
156
156
156
156
160
155
1.1
2.1
0.4
0.5
.0.8
1.0
1.0
1.3
0.8
0.4
0.4
0.5
0.4
0.8
0.4
1.4
2.1
2.1
3.1
3.1
0.6
0.6
0.4
0.6
0.6
0.6
0.5
1.0
0.4
0.4
11.2
20.7
4.0
5.1
8.2
9.8
10.0
14.1
7.7
3.75
3.3
5.5
4.4
7.7
8.8
13.2
20.6
20.7
30.1
30.1
6.6
6.9
4.8
6.9
7.25
6.5
5.6
11.8
3.5
4.5
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
20
20
20
20
20
25
25
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
25
20
25
20
20
20
25
25
1725
1750
1725
1725
FANS
MOTOR
BHP
0.1
0.15
0.03
0.41
COMMENTS
10890
CFM
PUMP
VOLTAGE
PHASE
QTY.
2
ROOM
NUMBER
TAG
TYPE
CLEAN DIRTY
PD
BD
DEPTH EFF. (INH2O) (INH2O)
1
NOTES:
1.
VFD FOR AHU-2 FAN SHALL BE FURNISHED BY AHU MANUFACTURER AND FIELD INSTALLED/WIRED IN MECHANICAL ROOM BY E.C.(REFER TO ELECTRICAL DRAWINGS).
2.
VFD'S FOR AHU-1 SUPPLY AND RETURN FANS SHALL BE FACTORY INSTALLED BY THE AHU MANUFACTURER.
3.
REFER TO SPECIFICATIONS FOR ADDITIONAL UNIT REQUIREMENTS SUCH AS MARINE LIGHTS, MIXING BOXES, DAMPERS, AND BLENDERS.
4.
BASIS OF DESIGN DAIKIN MODEL OAH OR APPROVED EQUAL. (REFER TO SPEC SECTION 237413).
5.
BASIS OF DESIGN DAIKIN MODEL CAH OR APPROVED EQUAL. (REFER TO SPEC. SECTION 237313).
UNIT HEATER
WATER
EWT
LWT
QTY.
CLEAN DIRTY
PD
PD
DEPTH EFF. (INH2O) (INH2O)
REMARKS
ROOM NAME
LOBBY
KITCHEN
STORAGE
PAYROLL OPEN OFFICE
CONFERENCE ROOM
LOUNGE
MAIL/COPY
PAYROLL SUPERVISOR
OPEN OFFICE
DIRECTOR
FILE ROOM
OFFICE
OFFICE
WOMEN'S ROOM
FUTURE
CORRIDOR
MEN'S ROOM
CORRIDOR
ACC. SERVICES
DIRECTOR
ACC. SERVICES
ASSOCIATE DIRECTOR
BREAK ROOM
COPY
CONFERENCE ROOM
ACC. SERVICES
DIRECTOR
ACC. PAYABLE
MANAGER
RECEPTION
MEDIA/P.R.
MEDIA/P.R.
OFFICE
OFFICE
OFFICE
CORRIDOR
CONFERENCE ROOM
MEDIA/P.R.
MEDIA/P.R.
MEDIA/P.R.
OFFICE
OFFICE
BUDGET DIRECTOR
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
CORRIDOR
OFFICE
COPY ROOM
OFFICE
OFFICE
OFFICE/STORAGE
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
LOBBY
VESTIBULE
LOBBY
FOYER
OFFICE
WAITING AREA
CORRIDOR
CONFERENCE ROOM
CORRIDOR
UNCORRE
CTED OA
RATE
PRIMARY
AREA OA REQUIRED AIRFLOW
(VOU)
(VPZ)
RATE (RA)
PRIMARY OA INTAKE
OA
FLOW
FRACTION
RATE
(ZP)
(VOT)
TOTAL AREA
(SQ. FT.)
POPULATI
ON(ZP)
PEOPLE
OA RATE
(RP)
130
45
80
860
270
195
77
130
315
150
130
165
500
160
150
500
80
280
140
1
1
1
6
8
1
1
1
2
1
1
1
5
5
5
5
5
5
5
5
5
5
5
5
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
16
10
12
102
70
21
12
16
36
18
16
19
50
100
100
1060
400
175
50
80
290
85
75
400
0.32
0.1
0.12
0.1
0.18
0.12
0.24
0.2
0.12
0.21
0.21
0.05
23
14
18
146
100
30
17
23
52
25
23
27
1
0
5
0
0.06
0.06
18
35
85
175
0.21
0.2
25
49
0
1
0
5
0.06
0.06
21
17
785
85
0.03
0.2
30
24
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
125
1
5
0.06
16
80
0.2
22
AHU-1
180
95
150
140
4
1
8
1
5
5
5
5
0.06
0.06
0.06
0.06
39
13
61
17
155
65
150
80
0.25
0.21
0.41
0.21
55
19
88
24
AHU-1
AHU-1
AHU-1
AHU-1
125
1
5
0.06
16
80
0.20
22
AHU-1
265
105
105
105
105
110
170
425
115
120
120
120
120
145
2280
155
250
135
165
90
155
205
115
125
155
75
120
435
65
205
75
415
215
225
165
85
145
100
156
120
3
1
1
1
1
1
0
22
1
1
1
1
1
1
19
1
2
1
1
1
1
2
1
1
1
1
1
0
0
0
0
0
3
3
0
1
0
0
8
0
5
5
5
5
5
5
0
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
0
0
5
5
5
0
0
0
0
0
5
5
0
5
5
5
5
5
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
39
14
14
14
14
15
13
169
15
15
15
15
15
17
290
18
31
16
19
13
18
28
9
9
18
12
15
33
5
15
6
31
35
36
12
13
11
8
62
9
145
65
65
65
65
65
40
520
360
350
340
345
355
360
3150
240
295
185
250
60
100
300
100
135
285
145
210
195
50
100
75
100
150
350
240
70
50
50
300
45
0.27
0.22
0.22
0.22
0.22
0.22
0.32
0.33
0.04
0.04
0.04
0.04
0.04
0.05
0.09
0.07
0.11
0.09
0.07
0.22
0.18
0.09
0.09
0.07
0.06
0.08
0.07
0.17
0.1
0.15
0.07
0.31
0.23
0.10
0.05
0.18
0.22
0.15
0.21
0.2
55
20
20
20
20
21
18
242
21
22
22
22
22
24
414
20
35
18
21
14
20
31
10
10
20
13
17
47
7
17
6
44
50
40
18
18
12
8
69
10
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-1
AHU-1
AHU-2
AHU-2
AHU-1
AHU-1
AHU-2
AHU-1
AHU-1
AHU-2
AHU-2
AHU-2
SYSTEM
NAME
B
ELEC.
MANUFACTURER
MODEL
GREENHECK
GREENHECK
GREENHECK
GREENHECK
CUE-99-A
SE1-12-432-A4
G-070-VG
QEI-15-1-5
LE
BO LL
A
H
NECK SIZE
EG-1
LRG
LSD-1
LSD-2
LSD-3
RG-1
RG-2
SD-1A
SD-1B
SD-1C
SD-1D
SD-2A
SD-2B
SD-2C
SD-2D
SD-3
SEE PLANS
SEE PLANS
12"ø
10"ø
6"ø
SEE PLANS
SEE PLANS
9"x9"-6"ø
18"x18"-6"ø
18"x18"-8"ø
18"x18"-12"ø
9"x9"-6"ø
18"x18"-6"ø
18"x18"-8"ø
18"x18"-10"ø
10"ø
24"x24"
60"
60"
60"
60"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
PARKING
LOT R
2
1
12/23/14
12/3/14
No.
ADDENDUM #1
ISSUED FOR BID
Date
Revision
COMMENTS
Project Title
DESCRIPTION
BASIS OF DESIGN
REMARKS
TAG
AREA SERVED
MAX CFM
NOMINAL
TONS
LOUVERED ALUMINUM EXHAUST GRILLE
LINEAR RETURN GRILLE
LINEAR SLOT DIFFUSER
LINEAR SLOT DIFFUSER
LINEAR SLOT DIFFUSER
LOUVERED RETURN GRILLE
LOUVERED RETURN GRILLE
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
PRICE 630
PRICE SDA100
PRICE AS230
PRICE AS220
PRICE AS210
PRICE 530
PRICE 530
PRICE SMX
PRICE SMX
PRICE SMX
PRICE SMX
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SCD
SEE NOTE 2
SEE NOTE(S) 1, 2
SEE NOTE(S) 1, 2
SEE NOTE(S) 1, 2
SEE NOTE(S) 1, 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
FCU-1
CONFERENCE ROOM
425
1.5
NOTES:
1.
PROVIDE INSULATED UNIVERSAL TYPE PLENUM.
2.
FURNISH AND INSTALL SQUARE TO ROUND TRANSITION PRIOR TO
FINAL CONNECTION TO DIFFUSER.
CARRIAGE HOUSE
ROWAN
UNIVERSITY
AIR DEVICES
TAG
HOLLYBUSH
KEY PLAN
BOLE HALL
RENOVATIONS
FAN COIL UNIT
NOMINAL
FACE SIZE
LAUREL
HALL
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
NOTES:
1.
POPULATION BASED ON DEFAULT OCCUPANCY DENSITIES LISTED IN TABLE 403.3
FOR THE 2009 IMC.
2.
UNCORRECTED AIRFLOW RATE INCLUDES A ZONE DISTRIBUTION EFFECTIVENESS
OF 0.8 FOR CEILING SUPPLY OF WARM AIR AND CEILING RETURN.
3.
CORRECTED OA BASED ON A SYSTEM VENTILATION EFFICIENCY OF 0.7 BASED ON
MAX ZONE PRIMARY OUTDOOR AIR FRACTION.
120/60/1
120/60/1
120/60/1
120/60/1
OAK
HALL
TOTAL HEAT
CAPACITY(MBH)
TOTAL COOLING
CAPACITY(MBH)
SENSIBLE
COOLING
CAPACITY(MBH)
ELECTRICAL
BASIS OF DESIGN
19
18
12
SERVED FROM CU-1
MITSUBISHI PKA-A18HA4
2
REMARKS
WALL
MOUNTED
TYPE.
Drawing Title
TAG
AREA SERVED
NOMINAL
TONS
CU-1
CONFERENCE ROOM
1.5
CONDENSING UNIT SCHEDULE
COOLING HEATING
CAPACITY CAPACITY(
(MBH)
MBH)
SEER
ELECTRICAL
18
19
15.3
208/3/60
SCHEDULES
MFS
MCA
BASIS OF DESIGN
20
13
MITSUBISHI PUZ-A18NHA4
REMARKS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M014
Printed: 12/23/2014 11:16:22 AM
G
ROWAN UNIVERSITY
3
P002
IAL
ORL
M
ME HAL
2
P002
H
J
L
K
B
7
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
2" SAN DN
1/2" HW &
1-1/2"CW DN
REF.
5
4
P002
KEY PLAN
5
P002
2" SAN
3
2
1
12/23/14
12/3/14
No.
1-1/2" CW UP TO SERVE
SECOND FLOOR. CONNECT
TO EXISTING AT POINT
BELOW SECOND FLOOR SLAB
ADDENDUM #1
ISSUED FOR BID
Date
Revision
1
1
P002
FIRST FLOOR PLAN
1/8" = 1'-0"
G
G
2" SAN DN,
2" V UP
2" SAN DN,
2" V UP"
4" SAN DN,
2" V UP
LAV
1/2" HW & CW UP TO
LAV FROM BASEMENT
LAV
LAV
LAV
WC
WC
3" V
3" V
1/2" HW & CW TO LAV
FROM BASEMENT
H
LAV
1-1/4" CW UP
FROM BASEMENT
FD
ROWAN
UNIVERSITY
H
LAV
FD
2" SAN DN,
2" V UP
FURNISH AND
INSTALL WALL
CLEANOUT
WC
3" V UP"
WC
WC
WC
WC
2" PUMP
VENT
MS
1-1/4" CW TO
WC TYP. OF 4
4" SAN,
3" V UP"
URI
LAV
P002
1/4" = 1'-0"
3" VTR
KS
KS
Drawing Title
WC
4" SAN DN
ENLARGED BATHROOM PLAN-SANITARY
FURNISH AND INSTALL DRAIN
PUMP BASIS OF DESIGN
LIBERTY PUMP 405 SERIES OR
APPROVED EQUAL
1/2" HW
1/2" CW
WC
2" SAN DN,
2" V UP
BOLE HALL
RENOVATIONS
URI
MS
LAV
4" VTR
2
WC
4" SAN DN
TYP. OF 4
Project Title
DEDICATED RECEPTACLE FOR
PUMP REFER TO ELECTRICAL
CONTRACT DRAWINGS
1/2" HW & CW
DN TO MS
FD
3
P002
1" CW TO URI
1/2" HW & CW
TO LAV
ENLARGED BATHROOM PLAN-DOMESTIC
1/4" = 1'-0"
1/2" HW &
CW DN
2" PUMPED
DISCHARGE
FD
1-1/2" INDIRECT WASTE
RECEPTACLE FROM PUMPED
CONDENSATE. PROVIDE
TRAP SEAL PRIMER.
4
P002
FROM DOMESTIC COLD WATER
TO TRAP FROM CONDENSATE
2
2
ENLARGED KITCHEN PLAN-SANITARY
1/4" = 1'-0"
5
TRAP PRIMER CONNECTED
P003
5
P002
FIRST FLOOR
PLUMBING
INSTALLATIONS
Date:
12/3/2014
ENLARGED KITCHEN PLAN-DOMESTIC
Scale
AS NOTED
1/4" = 1'-0"
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
P002
Printed: 12/23/2014 11:16:24 AM
PLUMBING FIXTURES
TAG
LAV
URI
WC
KS
MS
WATER HAMMER
ARRESTER
WATER HAMMER
ARRESTER
PIPING RUN IN
BATHROOM CHASE
1/2" CW
1/2" HW
FIXTURE
LAVATORY
URINAL
WATER CLOSET
KITCHEN SINK
MOP SINK
SOIL/
WASTE VENT
2"
3"
4"
2"
3"
1-1/2"
2"
2"
1-1/2
2"
CW
1/2"
3/4"
1"
1/2"
1/2"
HW
1/2"
1/2"
1/2"
MANUFACTURER
MODEL
AM. STANDARD
AM STANDARD
AM. STANDARD
JUST MANUFACTURERING COMPANY
AM. STANDARD
OVALYN 0495.300
WASHBROOK 6590.001 (1.0 GPF)
AFWALL MILLENIUM-ELONGATED (1.28 GPF)
SL-2225-A-GR (TYPE 316 STAINLESS STEEL)
AKRON SERVICE SINK MODEL 7695.008
FAUCET/VALVE
CHICAGO FAUCET MODEL 116.102.AB
ZURN ZEMS6003-IS
ZURN ZEMS6000AV-HET-IS
CHICAGO FAUCET MODEL 1102-E35ABCP
CHICAGO FAUCETS MODEL 305-VBRRCF
DESCRIPTION
HARD WIRED ELECTRONIC FAUCET.
HARD WIRED FLUSH VALVE
HARD WIRED FLUSH VALVE
1.5 GPM W/ AERATER, ADDITIONAL SPRAY
FURNISH AND INSTALL MOP HANGER FIAT MODEL 889-CC
ROWAN UNIVERSITY
2ND FLOOR/ROOF
1/2" HW
1-1/2" CW TO 2ND
FLOOR BATHROOM
1-1/2" CW
2" CW
2
1-1/2" CW
1/2" HW
LAV
1/2"
1
WC
1"
5
LAV
1/2"
1
LAV
1/2"
1
MS
1/2"
3
WC
1"
5
LAV
1/2"
3
URI
3/4"
4
WC
1"
5
WC
1"
5
WC
1"
5
KS
1/2"
1.5
1/2" CW TO TRAP
SEAL PRIMER
1ST FLOOR
1" CW
1/2" HW
IAL
ORL
M
ME HAL
1/2" CW
OAK
HALL
LAUREL
HALL
1/2" HW
(E)2" CW
(E)3/4" HW
(E)3/4" CW
(E)3/4" HW
BASEMENT
1
1-1/2" CONDENSATE
FROM FCU-1
2
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
1/8" = 1'-0"
P003
3" VTR
B
DOMESTIC WATER RISER DIAGRAM
HOLLYBUSH
PARKING
LOT R
4" VTR
2ND FLOOR/ROOF
KEY PLAN
PLUMBING FIXTURE
2" V
4" V
4" V
1/8"/FT
2" V
2" SAN
KS
1-1/2
3 DFU
LAV-1
1-1/2
1 DFU
SUMP
PIT
2" V
3" V
WC-1
4"
4 DFU
WC-1
4"
4 DFU
LAV-1
1-1/2
1 DFU
MS
2"
2 DFU
UR-1
2"
4 DFU
WC-1
4"
4 DFU
WC-1
4"
4 DFU
WC-1
4"
4 DFU
LAV-1
1-1/2
1 DFU
LAV-1
1-1/2
1 DFU
WCO
3 DFU'S
J.R. SMITH (2698) WATER
SAVER TRAP PRIMER
FD-1
4"
0 DFU
4" SAN
4" SAN
2" V
3" V
1/8"/FT
1/8"/FT
8 DFU'S
21 DFU'S
4" SAN
1/8"/FT
4" SAN
FD-1
4"
0 DFU
LAV SHIELD ADA COMPLIANT
"TOTAL ENCLOSURE"
WHERE REQUIRED
INSTALL FLOOR DRAIN IN
ACCORDANCE WITH
MANUFACTURER GUIDELINES
33 DFU'S
PIPE INSULATION
FIRESTOP SEALANT
ALL SIDES
2
1
1ST FLOOR
2 DFU'S
31 DFU'S
CMU WALL
12/23/14
12/3/14
No.
TYPE "K" COPPER FOR
TRAP PRIMER PIPING
ADDENDUM #1
ISSUED FOR BID
Date
Revision
1/8"/FT
FLOOR DRAIN W/ TRAP
PRIMER CONNECTION
10 DFU'S
CORE DRILL
AND SLEEVE
(E) 4" SAN
CO
MINERAL WOOL
WHERE CLEARANCE
IS GREATER THAN 1/4"
REFER TO ARCHITECTURAL
CONTRACT DRAWINGS FOR
FLOOR DETAIL
FURNISH AND INSTALL
RISER CLAMP BELOW
BASEMENT
2
P003
GARAGE BUILDING SANITARY RISER DIAGRAM
1/8" = 1'-0"
3
P003
4
FLOOR DRAIN TRAP SEAL PRIMER
NO SCALE
P003
PIPE PENETRATION DETAIL
NO SCALE
CW SUPPLY
1/2" PRIMER LINE
2
TRAP PRIMER
PRECISION PLUMBING
PRODUCTS
ROWAN
UNIVERSITY
DISTRIBUTION UNIT
PRECISION PLUMBING
PRODUCTS SERIES DV
(WHERE REQUIRED)
REFER TO PLMB PLANS
1/2" CW TO
FLOOR DRAINS
Project Title
NOTES:
1. FOR SINGLE FLOOR DRAIN TRAP PRIMER, USE PRECISION
PLUMBING PRODUCT MPB-500-115V.
BOLE HALL
RENOVATIONS
Drawing Title
5
P003
FLOOR DRAIN TRAP SEAL PRIMER
NO SCALE
RISER DIAGRAMS,
SCHEDULES, AND
DETAILS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
P003
Printed: 12/23/2014 11:16:26 AM
NOTES
2
1.
2.
3.
CONTRACTOR SHALL FURNISH AND INSTALL 208/120V, 600A, 3PH, 4W, DISTRIBUTION BOARD.
REFER TO SINGLE LINE DIAGRAM.
CONTRACTOR SHALL RECONNECT ALL EXISTING CIRCUITS.
FURNISH AND INSTALL CABLE AND CONDUIT AND MAKE ALL FINAL CONNECTIONS FROM
DISCONNECT SWITCH TO SERVED EQUIPMENT.
ROWAN UNIVERSITY
PANEL LP-B-2
VOLTS: 208V/120V
PHASES: 3
WIRES: 4
ROOM:
FED FROM: MDP
MOUNTING Surface
NEMA RATING: Type 1
CKT
Circuit Description
Conduit
A (kVA)
Size
Trip Poles Wire Size
1.7
1,3,5
25 A
HWP-1/2/3
3
B (kVA)
20 A
20 A
20 A
1
1
1
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
3/4"
3/4"
3/4"
15 A
3
3#12 & 1 #12G
3/4"
1.7
0.5
0.2
20 A
3
0.9
1.6
0.0
25,27,29
20 A
SPARE
3
2.1
0.9
0.0
0.0
20 A
3
--
--
1.6
0.0
SPACE
SPACE
SPACE
----
----
----
----
3/4"
3/4"
3/4"
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
1
1
1
20 A ATC PANEL
20 A BASEMENT EF-2
20 A ROOF EF-3
3/4"
2#12 & 1#12G
2
20 A HEAT TRACE
3/4"
2#12 & 1#12G
1
20 A AHU-2 LIGHTING
--
--
3
20 A SPARE
0.0
--
0.0
0.0
7.5 kVA
64 A
LAUREL
HALL
8
10
12
14,16
0.0
0.0 0.0
5.8 kVA
48 A
20 A
20 A
20 A
----
18
20,22,24
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
EN
PARKING
E
E
L
GR
BO NNEX
LOT P
A
LL
HA
E
NC
BU
(E)PANEL A
LE
BO LL
A
H
20 A SPARE
1
-1
-1
-------TOTAL KVA: 21....
TOTAL 3PH AMPS: 59 A
0.0
8.2 kVA
70 A
3
--
-------
0.0
0.0
0.0
OAK
HALL
0.0
0.0
0.0
37
39
41
20 A CRU-1
0.0
0.0
SPARE
3
IAL
ORL
M
ME HAL
G
26,28,30
0.0
31,33,35
3#12&1#12G
0.0
--
--
3/4"
0.0
1"
3#10 & 1#10G
0.7
2.1
1.6
CONDENSING UNIT
1.2
0.7
0.9
CKT
0.2
0.5
0.5
19,21,23
Circuit Description
2,4,6
1.7
7
CONTROL PANEL
9
METER CKT
11
ROOF EF-1
13,15,17
CHWP-1
Conduit
Wire Size Poles Trip
Size
C (kVA)
0.2
3/4"
3#10 & 1#10G
AIC: 10KAIC
MAINS TYPE:
RATING: 125 A
MCB: 125 A
32
34
36
38
40
42
PARKING
LOT R
STORAGE/
(E)MAIN
SWITCH
(E)PANEL ITE
TELE/DATA
003
(E)METER
ELECTRICAL
ROOM
ELECTRICAL
001 PANEL MDP
(E)PANEL AC-B
002
Notes:
1. CKTS 1,3,5; WIRE SIZE AND QUANTITY TO FINAL EQUIPMENT CONNECTION SHALL BE 3#12 & 1#12G.
(E)FACP
(E)PANEL LP-B
UP
KEY PLAN
S3
004A
STAIR
FROM CAMPUS
DISTRIBUTION
STORAGE
004
H001
2
1
(E)PADMOUNT
TRANSFORMER
(E)65A
12/23/14
12/3/14
No.
(E)300kVA
4160-208/120V
ADDENDUM #1
ISSUED FOR BID
Date
Revision
MECHANICAL
ROOM
ELECTRICAL
007COORDINATE
CONNECTION WITH FINAL ATC
FURNISH AND INSTALL
CABLE. MATCH
EXISTING CABLE SIZE
AND PROVIDE ILSCO
SPLICE.
PANEL LOCATION
(E)MAIN SWITCH
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
CONTROL PANEL LOCATION
(E)600A
MAIN DISTRIBUTION PANEL, 208/120V, 600A 3PH, 4W, 22KAIC FULLY RATED, SERVICE RATED
EXISTING WIREWAY
J
J
UP
1
3
150A
3P
4
70A
3P
5
100A
3P
100A
3P
6
100A
3P
7
8
45A
3P
9
100A
3P
35A
3P
10
20A
3P
11
12
20A
3P
20A
3P
LP-B-2;8
LP-B-2;7
STORAGE
LP-B-2;13,15,17
005
CHWP
1
(E)PANEL
LP-1
(E)PANEL
LP-2
3#8 & 1#10G, 3/4"C
(E)
PANEL
AC-B
3#4 & 1#8G, 1-1/4"C
J
(E)PANEL
A
4#2 & 1#8G, 1-1/4"C
FURNISH AND
INSTALL CABLE
LENGTH AS NEEDED
(TYP. 6). MATCH
EXISTING CABLE
SIZE AND PROVIDE
ILSCO SPLICE.
2
4#2 & 1#8G, 1-1/4"C
FURNISH AND
INSTALL
WIREWAY
100A
3P
7
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
EQUIPMENT LOCATION
STAIR
(E)HOT WATER
HEATER
PANEL
LP-1-1
MDP ;6
PANEL
LP-B-2
60A
30A
60A
15A
100A
35A
COORDINATE ELECTRICAL
CONNECTION WITH EF-2
FINAL LOCATION
90A
006
J
J
PANEL LP-B-2
S1
UP
ROWAN
UNIVERSITY
LP-B-2;9
LP-B-2;10
DS-AHU-1-SF
DS-AHU-1-RF
3#12 & 1#12G,
3/4"C
3#10 & 1#10G,
3/4"C
40A
DS-AHU-2-SF
DS-AHU-2-RF
MECHANICAL
ROOM
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
METER LOCATION
CRU
3#2 & 1#8G,
1-1/4"C
(E)PANEL
LP-3
3#8 & 1#10G,
3/4"C
(E)PANEL
LP-B
UP
CH001
7.5
0.75
5
15
AHU-2
SUPPLY
FAN
AHU-2
RETURN
FAN
AHU-1
RETURN
FAN
AHU-1
SUPPLY
FAN
HWP
HWP
HWP
3
2
1
1
Project Title
(E)HOT WATER
HEAT DISCONNECT
LP-B-2;2,4,6
BOLE HALL
RENOVATIONS
LP-B-2;1,3,5
INSTALL VFD. CONTRACTOR
SHALL MAKE FINAL
CONNECTION TO VFD AND
FROM VFD TO MOTORS.
(TYPICAL FOR ALL FANS)
J
J
J
J
PROVIDE WIREWAY. COORDINATE
ELECTRICAL CONNECTION WITH FINAL
EQUIPMENT LOCATION (TYP. 3)
5
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
EQUIPMENT LOCATION
Drawing Title
2
E001
SINGLE LINE - INSTALLATIONS
12" = 1'-0"
1
E001
BASEMENT - POWER - INSTALLATIONS
1/4" = 1'-0"
BASEMENT POWER INSTALLATIONS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
E001
Printed: 12/23/2014 11:24:49 AM
INSTALLATION KEYNOTES
1
2
PANEL LP-1-1
ROOM:
FED FROM:
MOUNTING
NEMA RATING:
Mail/Copy 102
MDP
Surface
Type 1
VOLTS: 208V/120V
PHASES: 3
WIRES: 4
3
AIC: 10KAIC
MAINS TYPE:
RATING: 125 A
MCB: 125 A
4
5
6
7
CKT
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
43,45
CONTRACTOR SHALL
MAKE FINAL ELECTRICAL
CONNECTIONS TO ALL
HAND DRYERS.
S
H
LIGHTING
LIGHTING
EXIT SIGNS
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
CORR107/OFFICE131 RECEPT
RM101/105 RECEPT
RM108/109 RECEPT
RM 101&112 RECEPT
RM113/114 RECEPT
RM118/119 RECEPT
RM117/CORR123 RECEPT
RM127/128 RECEPT
RM129/130 RECEPT
BATHROOM LIGHTING
110 UNDERCOUNTER PUMP
MEN/WOMENS SINKS
TOILET
Trip Poles Wire Size
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Conduit
A (kVA)
Size
1.0
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#12G
2#10 & 1#10G
2#10 & 1#10G
2#8 & 1#8G
2#8 & 1#8G
2#10 & 1#10G
2#12 & 1#12G
2#10 & 1#10G
2#12 & 1#12G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
HAND DRYERS
20 A
2
2#12 & 1#12G
3/4"
WATER COOLER
COPIER
OPEN OFFICE
SPARE
20 A
20 A
20 A
20 A
1
1
1
1
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
--
3/4"
3/4"
3/4"
--
S
C (kVA)
0.9
1.1
0.1
0.5
0.7
1.0
0.9
1.5
0.7
0.9
0.5
0.7
0.3
0.4
0.5
0.7
1.4
0.2
0.7
0.7
0.7
0.2
0.7
0.7
0.7
0.7
0.7
0.9
0.7
0.7
0.7
1.0
1.0
0.7
0.5
1.2
0.3
2.5
1.5
1.6
0.5
0.7
1.6
0.2
0.7
0.2
0.2
0.0
0.0
0.4
1.0
15.6 kVA
137 A
LP-1-1;41
LP-1-1;40
B (kVA)
1.0
CONTRACTOR SHALL MAKE
FINAL ELECTRICAL
CONNECTIONS FOR ALL
PLUMBING DEVICES.
T
S
47
49
51
53
Circuit Description
0.5
15.0 kVA
132 A
9.5 kVA
79 A
Conduit
Wire Size Poles Trip
Size
1
2#10 & 1#10G
1
2#8 & 1#8G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#8 & 1#8G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#12 & 1#12G
1
2#10 & 1#10G
1
2#8 & 1#8G
1
2#12 &1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#12 & 1#12G
1
-TOTAL KVA: 40....
TOTAL 3PH AMPS: 111 A
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
--
Circuit Description
20 A
20 A
20 A
20 A
20 A
20 A
CKT
8
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
LIGHTING
LTG - OPEN OFFICE
NIGHT LIGHTING
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
RM100/101 RECEPT
RM100 RECEPT
PAYROLL/104 RECEPT
RM110 FRIDGE
RM110,111
CORR115/OFFICE122
RM120/121 RECEPT
RM125/126 RECEPT
OPEN OFFICE COLUMN...
NIGHT LIGHTING
110 COUNTERTOP
MEN/WOMENS TOILETS
BATHROOM FAUCET
FUTURE CONF. RM. POWER
RESTROOM RECEPTACLES
PAYROLL
SHREDDER
RM114
PAYROLL
SPARE
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
ROWAN UNIVERSITY
CONTRACTOR SHALL PROVIDE COMMUNICATIONS/DATA CONDUIT FROM DATA
DROP AND STUB 6" ABOVE CEILING. ROWAN SHALL REINSTALL WIRE AS
NEEDED (TYP. ALL DATA DROP LOCATIONS).
CONTRACTOR SHALL COORDINATE SIMPLEX RECEPTACLE UNDERCOUNTER
WITH FINAL EQUIPMENT LOCATION.
CONTRACTOR SHALL PROVIDE RECEPTACLE AND TELEDATA DROP
UNDERCOUNTER.
CONTRACTOR SHALL PROTECT EXISTING PANEL AND EXISTING CIRCUITS.
CONTRACTOR SHALL PROVIDE CEILING MOUNTED DUPLEX RECEPTACLE FOR
POWER AND DATA FOR FUTURE PROJECTOR.
CONTRACTOR SHALL MAKE ELECTRICAL CONNECTION TO FURNITURE.
COORDINATE WITH FINAL FURNITURE LOCATION. (TYP. ALL CUBICLE TYPE
FURNITURE)
CONTRACTOR SHALL MAKE ELECTRICAL CONNECTION TO DESK FURNITURE.
COORDINATE LOCATION WITH FINAL FURNITURE LOCATION AND ELECTRICAL
KNOCKOUT. (TYP. ALL PRIVATE OFFICE DESKS)
CONTRACTOR SHALL RUN CONDUIT DOWN COLUMNS TO FLOOR BOXES.
IAL
ORL
M
ME HAL
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
EN
PARKING
E
E
L
GR
BO NNEX
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
A
H
2
PARKING
LOT R
44
46
48
50
52
54
Notes:
KEY PLAN
T
H
T
T
S
LP-1-1;39
LP-1-1;44
T
T
LP-1-1;38
LP-1-1;43,45
2
G
L
H
J
M
2
1
K
7
LP-1-1;19
No.
ADDENDUM #1
ISSUED FOR BID
Date
Revision
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE RFB4-CI-1-NA WITH
CAT5/6 OUTLETS (TYP. 2)
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE EFBFF (TYP. 2)
F
12/23/14
12/3/14
LP-1-1;17
F
F
MDP ;5
LP-1-1;12
LP-1-1;20
PANEL LP-1-1
LP-1-1;11
F
J
J
J
J
LP-1-1;13
LP-1-1;21
LP-1-1;18
F
7
F
4
(E)LP-1
LP-1-1;46
F
LP-1-1;32
LP-1-1;32
LP-1-1;48
LP-1-1;22
LP-1-1;23
LP-1-1;47
LP-1-1;36
+
F
F
LP-1-1;49
F
LP-1-1;24
LP-1-1;50
1
5
LP-1-1;52
6
8
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE EFBFF (TYP. 2)
LP-1-1;25
5
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE RFB4-CI-1-NA WITH
CAT5/6 OUTLETS (TYP. 2)
P
+
LP-1-1;10
LP-1-1;16
LP-1-1;42
3
LP-1-1;37
J
J
J
J
LP-1-1;14
LP-1-1;9
2
F
ROWAN
UNIVERSITY
LP-1-1;26
LP-1-1;27
LP-1-1;28
F
SAWCUT CONCRETE
LP-1-1;32
8
J
3
J
LP-1-1;51
Project Title
LP-1-1;15
BOLE HALL
RENOVATIONS
F
LP-1-1;29
LP-1-1;8
LP-1-1;31
LP-1-1;7
LP-1-1;33
LP-1-1;30
J
J
J
J
F
Drawing Title
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE EFBFF (TYP. 3)
LP-1-1;32
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE RFB4-CI-1-NA WITH
CAT5/6 OUTLETS (TYP. 3)
FIRST FLOOR POWER INSTALLATIONS
LP-1-1;51
F
1
MARKERBOARD TYP.
OVER RETURN
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
1
E002
FIRST FLOOR - POWER - INSTALLATIONS
3/16" = 1'-0"
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
E002
Printed: 12/23/2014 11:24:52 AM
G
EF
1
DS-UH-1
J
UH
M
INSTALLATION KEYNOTES
ELECTRICAL EQUIPMENT SCHEDULE - NON-FUSED DISCONNECTS
NEMA
FRAME
NAME
VOLTAGE RATING PHASES WIRES RATING
DS-AHU-1-120V
DS-AHU-1-RF
DS-AHU-1-SF
DS-AHU-2-120V
DS-AHU-2-RF
DS-AHU-2-SF
DS-CU
DS-UH-1
2
3
1
LP-B-2;11
MDP
120 V
208 V
208 V
120 V
208 V
208 V
208 V
120 V
30
60
100
30
30
60
30
30
1
3
3
1
3
3
3
1
2
3
3
2
4
4
4
2
1
4X
4X
4X
1
1
1
4X
1
EXISTING POWER DEVICES LOCATED ON THE CEILING IN THIS SHADED AREA
SHALL BE REINSTALLED. ALL EXISTING ELECTRICAL CIRCUITS SHALL BE
REUSED.
EXHAUST FAN LOCATED ON ROOF ABOVE. CONTRACTOR SHALL PROVIDE 20A,
SINGLE POLE, NEMA 4X, MOTOR RATED DISCONNECT SWITCH AND MOUNT
DIRECTLY TO FAN.
REFER TO ROOF PENETRATION DETAIL.
PROVIDE CABLE AND CONDUIT TO HEAT TRACE CONTROLLER. UNISTRUT
MOUNT CONTROLLER TO AHU, COORDINATE LOCATION WITH MANUFACTURER
CLEARANCES. COORDINATE ELECTRICAL CONNECTION WITH MANUFACTURER
AND FINAL EQUIPMENT LOCATION. BASIS OF DESIGN: CHROMALOX MODEL SRL
CABLE WITH INTELLITRACE MODEL HTLS23041 CONTROL PANEL, 208V 1PH, 2
INDEPENDENT LOOP OF HEAT TRACE CONTROL, NEMA 4 ENCLOSURE WITH
ENCLOSURE HEATER AND ALARM, OR APPROVED EQUAL.
2
2
3
4
AHU
2
6 DS-AHU-2-120V
1
5
AHU-2 RETURN FAN.
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
EQUIPMENT LOCATION.
LP-B-2;18,8,10,12
3
MDP ;7
EF
M
LP-B-2;12
3
SELF-REGULATING HEAT TRACE CABLE, 208V 1PH, 5W PER LF. BASIS OF
DESIGN: SRL5-2C, 20LF PER LOOP (2 LOOPS). REFER TO MECHANICAL
DRAWINGS FOR PIPE SIZES AND LOCATION.
CONTRACTOR SHALL PROVIDE 120V POWER TO EACH SWITCH WITHIN THE
UNIT. COORDINATE WITH MANUFACTURER FOR SWITCH LOCATIONS AND
QUANTITY.
6
H
J
ROWAN UNIVERSITY
K
2
7
J
IAL
ORL
M
ME HAL
DS-AHU-2-RF
ELECTRIC HEAT TRACING NOTES
DS-AHU-2-SF
1.
2.
3.
4.
S
5.
6.
PROVIDE ELECTRIC HEAT TRACING AND ACCESSORIES. HEATING CABLES SHALL
BE SELF-REGULATING AND SHALL VARY THE OUTPUT IN RESPONSE TO
TEMPERATURE VARIATIONS ALONG THE LENGTH OF A TRACED PIPE.
THE CONTRACTOR SHALL TEST THE TRACING BEFORE PIPING IS INSULATED,
DURING THE INSTALLATION AND AFTER THE WORK IS COMPLETE.
FOLLOW HEAT TRACE MANUFACTURERS RECOMMENDATION ON SIZING AND
INSTALLATION REQUIREMENTS.
HEAT TRACING CIRCUITS SHALL BE EQUIPPED WITH GROUND FAULT EQUIPMENT
PROTECTION IN ACCORDANCE WITH NEC AND ANY APPLICABLE NATIONAL OR
LOCAL CODE REQUIREMENTS. MANUFACTURER SHALL BE CHROMALOX OR
APPROVED EQUAL.
NOTIFY OWNER/ENGINEER UPON INSTALLATION OF HEAT TRACE FOR INSPECTION
PRIOR TO THE INSTALLATION OF INSULATION.
TEMPERATURE SENSOR AND HEATING CABLE SHALL BE SEPARATED BY 90
DEGREES ON PIPE WALL.
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
EN
PARKING
E
E
L
GR
BO NNEX
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
A
H
PARKING
LOT R
S
SPEAKER
S
S
5
KEY PLAN
S
S
2
1
No.
AHU
S
J
S
ADDENDUM #1
ISSUED FOR BID
Date
Revision
J
1
S
12/23/14
12/3/14
S
3
MDP ;8
5
LP-3;16
3
4
S
SPEAKER
DS-AHU-1-120V
DS-AHU-1-SF
DS-AHU-1-RF
CU
6
LP-B-2;14,16
1
3
LP-B-2;19,21,23
S
2
DS-CU
S
S
ROWAN
UNIVERSITY
S
(E)PANEL LP-3
1
EXISTING PANEL LP-3
VOLTS: 208V/120V
PHASES: 3
WIRES: 4
ROOM:
FED FROM:
MOUNTING Recessed
NEMA RATING: Type 1
CKT
1
E003
SECOND FLOOR - POWER - INSTALLATIONS
1/4" = 1'-0"
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
Circuit Description
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
SPARE
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
Trip Poles Wire Size
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
----------------
Conduit
A (kVA)
Size
----------------
0.0
1. USE EXISTING SPARE BREAKERS FOR CIRCUITS 16 AND 24.
C (kVA)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Conduit
Wire Size Poles Trip
Size
-------3/4"
---3/4"
-------2#12 & 1#12G
---2#12 & 1#12G
1
1
1
1
1
1
1
1
1
1
1
1
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
PREFABRICATED ROOF CURB SUPPLIED
AND INSTALLED BY CONTRACTOR. THE
PATE COMPANY PART PC-1. SIZE TO
ACCOMMODATE SPACE AVAILABLE ON
ROOF AND ADJUST TO FIT. EXISTING
BOILER STACK IS DIRECTLY ADJACENT TO
STACK, SEAL WATER TIGHT WHERE POSSIBLE
Circuit Description
0.0
0.0
0.0 kVA
0A
--
0.0 0.0
0.1 kVA
1A
--
3
TOTAL KVA: 0.1...
TOTAL 3PH AMPS: 0 A
30 A
CKT
LAP SEALANT
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
RTU-1 RECEPT & LIGHTS
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
AHU-1 LTG
EXISTING LOAD
2
4
6
8
10
12
14
16
18
20
22
24
26,28,30
Project Title
CONDUIT
BOOT BY CONTRACTOR.
THE PATE COMPANY PART
B.
PREFABRICATED ROOF CURB
COVER SUPPLIED AND INSTALLED
BY CONTRACTOR. THE PATE
COMPANY PART PCC-C. SIZE
TO ACCOMMODATE VENT PIPES
AND CORRESPONDING ROOF
CURB.
EPDM FLASHING
0.0
0.0 kVA
0A
NOTES:
B (kVA)
kAIC:
MAINS TYPE:
RATING: 100 A
MCB:
EPDM ROOF MEMBRANE
8" ONTO EXISTING ROOF
MEMBRANE
PRESSURE TREATED WOOD
LAP SEALANT
EXISTING EPDM
ROOFING MEMBRANE
INSTALL NEW INSULATION,
MATCH EXISTING
1/4" GALV. STEEL PLATE
2
E003
Drawing Title
SECOND FLOOR POWER INSTALLATIONS
Date:
12/3/2014
PRESSURE TREATED WOOD
BLOCKING.
Scale
AS NOTED
EXISTING STEEL CHANNELS
Drawn By:
ROOF PENETRATION DETAIL
NO SCALE
BOLE HALL
RENOVATIONS
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
E003
Printed: 12/23/2014 11:24:53 AM
INSTALLATION KEYNOTES
1
CONTRACTOR SHALL MATCH EXISTING LIGHTING FIXTURES AND PROVIDE
NEW. PROVIDE 4000K COLOR TEMPERATURE FLUORESCENT 32W T8
LAMPS. EXISTING CIRCUITS SHALL BE REUSED. REINSTALL ANY EXISTING
POWER OR DATA DEVICES LOCATED IN CEILING REMOVED AND
PROTECTED DURING REMOVAL PHASE.
CONTRACTOR SHALL MATCH EXISTING 'L200 LOBBY' FIXTURES. PROVIDE
NEW AND REUSE EXISTING CIRCUITS. REINSTALL ANY EXISTING POWER
OR DATA DEVICES LOCATED IN CEILING REMOVED AND PROTECTED
DURING REMOVAL PHASE.
2
ROWAN UNIVERSITY
IAL
ORL
M
ME HAL
G
G
E
E
LP-3;24
7
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
EN
PARKING
E
E
L
GR
BO NNEX
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
A
H
PARKING
LOT R
S
S
SPEAKER
S
S
5
I
I
V
1
S
I
V
S
A
LP-1-1;35
A
KEY PLAN
A
LP-1-1;35
S
S
2
S
S
A
V
2
A
LP-1-1;35
1
1
V LP-1-1;35I
I
H
J
LP-1-1;5
F
DT
a
a
D
C
NL
LP-1-1;4
LP-1-1;2
D
LP-1-1;2
e
DT
e
D
e
LP-1-1;2
e
C
NL
M
3
LP-1-1;5
H
LP-1-1;4
PP
LP-1-1;5
F
L
K
D
LP-1-1;2
PP
PP
PP
PP
g
g
g
g
7
F
LP-1-1;5
DT G
W
LP-1-1;5
S
S
g
V
a
LP-1-1;1
V
NL
S
PP PP
V
A
A
A
A
A
A
A
A
A
A
A
g
a
A
A
A
A
g
A
C
A
a
LP-1-1;1
B
F
LP-1-1;5
PP
A
LP-1-1;5
F
NL
B
LP-1-1;2
V
LP-1-1;2
NL
V
LP-1-1;1 LP-1-1;5
F
b
dd
PP
PP
DT
A
b
LP-1-1;1
LP-1-1;5
C
A
A
F
DT
LP-1-1;3
d
G
A LP-1-1;5
A
A
A
LP-1-1;3
V
c
A
LP-1-1;3
NL
DT
W
g
C
g
V A
LP-1-1;3
B
V
PP
LP-1-1;1
F
NL
LP-1-1;5
V
LP-1-1;3
A
LP-1-1;3
V
f
V
A
LOBBY
V
g
LP-1-1;3
C
D
D
D
g
C
C
DT
DT
CW
W
C
NL
C
C
C
C
C
C
C
g
C
C
g
C
C
C
C
C
C
NL
g
NL
C
1/8" = 1'-0"
3
C
C
C
E004
SECOND FLOOR
g
LP-1-1;3
C
2
g
C
A
V
C
g
g
g
G
B
L200
g
C
A
LP-1-1;3
NL
V
1
C
C
g
f LP-1-1;5
DT
S
g
C
g
A
A
A
LP-1-1;3
V
C
5
C
C
NL
g
c
V
NL
(E)PANEL LP-3
NL
g
LP-1-1;3
DT
C
W
C
DT
LP-1-1;5
B
Revision
g
V
V
d
A
g
A
A
LP-1-1;2
F
A
B
LP-1-1;5
A
LP-1-1;2
V
DT
NL
A
NL
d
B
F PPc
NL
DT
LP-1-1;2
B
A
A
Date
S
g
g
DT
ADDENDUM #1
ISSUED FOR BID
g
g
D
DT
a
No.
C
g
g
LP-1-1;1
a
a
a
A
DT
A
(E)PANEL LP-1
V
12/23/14
12/3/14
g
d
NL
B
V
2
1
C
C
PANEL LP-1-1
SPEAKER
D
C
DT
L
o
a
d
Neutral
C
W
ROWAN
UNIVERSITY
Hot
1
2
1
E004
FIRST FLOOR
DECORA TYPE ODS10-IDW
OR APPROVED EQUAL
SET TO MANUAL ON MODE
1/8" = 1'-0"
3
E004
TYPE
A
B
C
D
E
F
G
H
I
DESCRIPTION
2' X 4' LED
2' X 4' LED
LINEAR DIRECT/INDIRECT
LINEAR DIRECT/INDIRECT
STEEL HOUSING HARSH ENVIRONMENT FLUORESCENT
FRONT FACE LED EXIT SIGN
FRONT/BACK LED EXIT SIGN
OUTDOOR EMERGENCY LIGHT
2' OVER MIRROR LED
MANUFACTURER
CORELITE
CORELITE
PRUDENTIAL LIGHTING
PRUDENTIAL LIGHTING
LITHONIA
DUALLITE
DUALLITE
DUALLITE
COOPER
LIGHTING FIXTURE SCHEDULE
LAMP
TYPE
MODEL
R3WL1L401UNV24
R3WL1L401BUNV24
WAVE2 04 WA YGW D3 SC UNV 144
WAVE2 04 WA YGW D3 SC UNV 144 EMH
DMS 2 32 120 WLF
LX U R W I
LX U R W I
PG Z-HTR
S22DW-1L40-SR-2-U-SI-S92HT-W
LED
LED
LED
LED
32W T8
LED
LED
LED
LED
LAMP
QUANTITY
VOLTAGE
VA
1
1
1
1
2
1
1
1
1
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
46 VA
46 VA
34 VA
34 VA
64 VA
4 VA
4 VA
15 VA
8 VA
MOUNTING
RECESSED
RECESSED
SUSPENDED
SUSPENDED
SURFACE
WALL
CEILING
WALL
WALL
WALL OCCUPANCY SENSOR SWITCH
CEILING MOUNT DT SENSOR: LEVITON OSC10-RMW
OR APPROVED EQUAL QUANTITY AS SHOWN PER
PLAN DRAWINGS
WALL MOUNT DT SENSOR: LEVITON OSW12-RMW
OR APPROVED EQUAL QUANTITY AS SHOWN PER
PLAN DRAWINGS
NO SCALE
Project Title
BOLE HALL
RENOVATIONS
COMMENTS
LOAD
BATTERY OPTION
Drawing Title
BATTERY OPTION
BLUE
Neutral
WHITE
Hot
BLACK
BLUE
YELLOW/ORANGE
LEVITON OPP20-RD4
OR APPROVED EQUAL
SET TO AUTO ON
(QUANTITY AS SHOWN PER
PLAN DRAWINGS)
WHITE/BLUE
LIGHTING PLAN REMOVALS AND
INSTALLATIONS
BLUE
RED
BLACK
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
4
E004
POWER PACK - AUTOMATIC ON WITH NO SWITCH
Checked By
NO SCALE
Job No:
MB
JWC
2014-064
Drawing No.
E004
Printed: 12/23/2014 11:24:53 AM
Download