lsc new albany oh prints

advertisement
Design Buildout Package for:
Revision History
The Exchange
at LC New Albany Park
rev
date
remark
-
2015-05-29
original issue
1
2015-01-22
revision 1
Amenities Building (Building 1)
5704 New Albany Road West
New Albany, Ohio 43054
NOTE: This drawing set is intended for use as a supplement to, and not a replacement of, the permitted architectural drawings for the
above-referenced building. If conflicting information exists between the permit drawings and this document set, construction project
manager and/or site superintendent is to stop work immediately and contact a member of the development team for clarification or
instruction. For questions regarding this set of construction drawing and/or architectural drawings, please contact:
Sheet Index
LC Development Department
phone
614-918-2000
email
architecture@lifestylecommunities.com
Underground and Slab Package
D1.01
Underground and Slab Plan - Area 1
D1.02
Underground and Slab Plan - Area 2
D1.11
Slab Details
Reflected Ceiling and Lighting Package
D2.01
Ceiling and Soffit Plan - Area 1
D2.02
Ceiling and Soffit Plan - Area 2
D2.03
Lighting Plan - Exterior and Amenity Area
D2.11
Ceiling Details
1
D2.20
Lighting Schedule
Key Plan
Low Voltage Electrical Package
D3.01
A/V and Data Plan - Area 1
D3.02
A/V and Data Plan - Area 2
D3.03
A/V and Data Plan - Amenity Area
D3.10
A/V and Data Plan - Schedule
Area 1
1
Casework Package
D4.00
Casework Key Plan
D4.11
Bar Plan
D4.12
Bar Elevations
D4.13
Bar Details
D4.14
Bar Island Plan, Elevations, and Exploded Perspective
D4.21
Server Station Plan, Elevations and Exploded Perspective
D4.22
Banquette Shelf Station Plan, Elevations and Exploded Perspective
D4.23
Bar Shelving Unit Station Plan, Elevations and Exploded Perspective
D4.24
Banquette Wall Plan and Elevations
D4.25
Bar Shelving Schedule and Details
D4.41
Leasing Desk Plan, Elevations, and Details
D4.42
Brand Wall and Coffee Bar Plans and Elevations
Area 2
Finish Packages
D5.01
D5.02
D5.12
D5.20
D5.30
Finish Plan - Area 1
Finish Plan - Area 2
Finish Details
Finish Schedule
Finish Legend
Furniture Package
D6.01
Furniture Plan - Area 1
D6.02
Furniture Plan - Area 2
D6.10
Furniture Schedule
Perspectives
D7.01
D7.02
D7.03
D7.11
D7.21
D7.22
Perspectives - Goat
Perspectives - Goat
Perspectives - Goat
Perspectives - Leasing
Perspectives - Fitness
Perspectives - Fitness
Electrical and Data
Symbol Legend:
SYMBOL
DESCRIPTION
STUB - ELECTRICAL
STUB - DATA
5'-6"
5'-6"
5'-6"
eq.
coordinate power req's
with bar equipment drawings
(6) duplex outlets
STUBS ARE TO BE LOCATED AT C/L OF
PARTITIONS (SHOWN AS DASHED) EXCEPT WHERE
NOTED OTHERWISE. REFER TO ARCHITECTURAL
PLANS FOR PARTITION LOCATIONS PRIOR TO
COMMENCING WORK.
SEE PLUMBING and
equipment PLANS FOR
FIXTURE LOCATIONS
coordinate power reqs
with bar equipment plan
(6) duplex outlets
(4) DUPLEX
OUTLETS (EA)
(8) data lines
coordinate power req's
with bar equipment drawings
(3) hardwired lamps
(4) duplex outlets
coordinate power req's
with bar equipment drawings
(3) hardwired lamps
(4) duplex outlets
sthgil ecnocs )2(
)nmuloc fo bew(
(2) sconce lights
(web of column)
6'-8"
6'-0"
6'-8"
(4) data lines
align with c/l
of column
6"
eq.
8'-4"
6"
eq.
(4) data lines
(4) data lines
(2) sconce
lights
(1) sconce
light
dump
sink
(2) sconce
lights
1'-3"
A1.11
7'-3"
B
(4) data lines
(4) duplex outlets
(2) duplex outlets
(2) hardwired lamps
SODA
FOUNTAIN;
see bar
equip. dwgs.
7'-6"
(6) data lines
(3) duplex outlets
(1) dedicated outlet
2'-6"
2'-6"
4"
2'-6"
2'-6"
6'-2"
1'-3"
(2) duplex outlets
Document Phase
Revision 1
eq.
The Exchange at LC New Albany Park
5'-10"
NOTE:
AT EACH STUB LOCATION, SEE NOTED
ELECTRICAL REQUIREMENTS ASSOCIATED
THEREWITH. ELECTRICAL CONTRACTOR IS
RESPONSIBLE FOR SIZING CONDUITS
ACCORDINGLY.
Amenities Building (Building 1)
HATCHED AREAS INDICATE
RECESSED FLOOR SLAB.
MAINTAIN MINIMUM 3" THICKNESS.
SEE ASSOCIATED DETAILS FOR
FURTHER INFORMATION
Document Date
22 Jan 2016
ROUGH PLUMBING
(SUPPLY AND DRAIN U.N.O.)
Design Buildout Package
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
A
SEE PLUMBING PLANS FOR
FIXTURE LOCATIONS
A
A1.11
(2) duplex outlets
(1) hardwired lamp
(4) data lines
(4) data lines
(2) duplex outlets
(1) hardwired lamp
8'-0"
(4) data lines
(2) sconce lights
(web of column)
(2) duplex outlets
(1) hardwired lamp
floor outlet
eq.
(4) data lines
A1.11
(2) duplex outlets
(1) hardwired lamp
(2) sconce lights
(web of column)
eq.
align with c/l
of column
ngila
Slab Plan
[Area 1]
scale: 1/4" = 1'-0"
D1.01
A
Slab Plan - Area 1
1/4" = 1'-0"
Electrical and Data
Symbol Legend:
SYMBOL
DESCRIPTION
STUB - ELECTRICAL
1
SEE PLUMBING PLANS FOR
FIXTURE LOCATIONS
Document Phase
Revision 1
STUBS ARE TO BE LOCATED AT C/L OF
PARTITIONS (SHOWN AS DASHED) EXCEPT WHERE
NOTED OTHERWISE. REFER TO ARCHITECTURAL
PLANS FOR PARTITION LOCATIONS PRIOR TO
COMMENCING WORK.
The Exchange at LC New Albany Park
NOTE:
AT EACH STUB LOCATION, SEE NOTED
ELECTRICAL REQUIREMENTS ASSOCIATED
THEREWITH. ELECTRICAL CONTRACTOR IS
RESPONSIBLE FOR SIZING CONDUITS
ACCORDINGLY.
Amenities Building (Building 1)
HATCHED AREAS INDICATE
RECESSED FLOOR SLAB.
MAINTAIN MINIMUM 3" THICKNESS.
SEE ASSOCIATED DETAILS FOR
FURTHER INFORMATION
Document Date
22 Jan 2016
ROUGH PLUMBING
(SUPPLY AND DRAIN U.N.O.)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
Design Buildout Package
STUB - DATA
A
A1.11
eq.
rev
date
remark
-
2015-07-27
original issue
1
2016-01-18
Revision 1
eq.
A
(1) quadplex outlet
(typ. of 3)
A1.11
4'-4"
(3) data lines
(typ. of 3)
(2) DUplex outletS
4'-11"
6'-6"
6'-6"
4'-10"
(3) data lines
8'-8"
(3) data lines
(2) dUplex outletS
1
Slab Plan
[Area 2]
scale: 1/4" = 1'-0"
D1.02
A
Slab Plan - Area 2
1/4" = 1'-0"
align
tile as specified
align
schluter t9/14eb
or similar
schluter t9/14eb
or similar
tile as specified
not to scale
schluter t9/25eb
or similar; omit
when flooring
transition is hidden
by casework
or partitions
align
flooring as
specified; leave
1/2" gap between
flooring and adj.
surfaces
fasten flooring
per manuf.'s
recommendations
3/4" exterior
grade plywood
subfloor; leave
1/2" gap between
all sheets and adj.
surfaces.
6 mil
vapor barrier
F
Not Used
not to scale
B
Slab Detail at Hardwood Floor Inset
not to scale
schluter t9/25eb
or similar
engineered
hardwood as
specified
align
Document Phase
Revision 1
A
Document Date
22 Jan 2016
not to scale
Slab Detail at Tile Floor Inset
Design Buildout Package
E
Slab Detail at Tile/Floor Mat Transition
thinset per
manufacturer's
recommendations
Amenities Building (Building 1)
thinset per
manufacturer's
recommendations
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
grout joint
The Exchange at LC New Albany Park
floor mat
as specified
rev
date
remark
-
2015-07-27
original issue
1
2016-01-18
Revision 1
schluter t9/14eb
or similar
Floor Mat as
specified
adhesive per
manufacturer's
recommendations
G
Slab Detail at Engineered Hardwood Inset
not to scale
C
Slab Detail at Recessed Floor Mat Inset
not to scale
schluter t9/25eb
or similar
engineered
hardwood as
specified
Slab Details
adhesive per
manufacturer's
recommendations
tile as specified
thinset per
manufacturer's
recommendations
D1.11
H
Slab Detail at Engineered Hardwood/Tile Transition
not to scale
D
Not Used
not to scale
Lighting Fixture Symbol Legend:
SYMBOL
DESCRIPTION
RECESSED CAN LIGHT
k
DECORATIVE CHANDELIER
3'-4"
DECORATIVE PENDANT
j
j
1
CENTER ON
COLUMNS
k
j
WALL-MOUNTED SCONCE
k
j
j
n
n
n
bb
o
o
o
o
u
1
u
t
t
o
t
1'-1 3/4"
t
t
5'-6"
n
n
12'-11"
n
ff
1
1
9"
u
t
t
u
t
t
9"
o
q
q
o
o
o
o
o
o
4'-0"
EQ. EQ.
p
t
2'-0"
align
1'-0"
n
n
ff
5'-6"
3'-0"
3'-0"
4'-8 7/8"
10'-6" CH
ff
p
2'
-0
"
o
o
2'-0"
o
1
1/4" = 1'-0"
edge of ceiling to
align with column
11'-8" CH
dd
3'-4"
Kitchen R.C. Plan
1
n
l
l
l
n
bb
eq. eq.
TRACK LIGHTING
10'-0"
n
m
EQ.
w
2'-0"
6'-6"
n
10'-0"
Document Phase
Revision 1
EQ.
Document Date
22 Jan 2016
8'-0"
3'-0"
l
C
8'-0"
q
Design Buildout Package
8'-0"
cc
3'-0"
m
SUSPENDED LINEAR
FLUORESCENT INDIRECT
cc
10'-0"
RECESSED DIRECTIONIAL
SPOT LIGHT
2x4 LIGHT
cc
10'-0"
4'-4"
LINEAR COVE LIGHTING
cc
Amenities Building (Building 1)
q
D1.03
The Exchange at LC New Albany Park
l
6'-6"
GOOSE NECK SCONCE
B
9'-0"
eq. eq.
dd
CEILING FAN
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
o
w
r
eq.
eq. eq.
n
n
4'-4"
EQ.
x
B
x
n
w
7'-4"
9"
6'-0"
1
12'-11"
11'-8" CH
9"
ee
y
n
D1.03
n
w
n
s
10'-0"
EQ.
6'-0"
EQ. EQ.
EQ.
ee
1'-3"
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
j
SURFACE-MOUNTED
DIRECTIONAL SPOT LIGHT
eq.
k
k
j
1
k
CENTERED IN COLUMN
OPENING (TYP. OF 4)
3'-4"
1
3'-4"
RECESSED DIRECTIONAL
CAN LIGHT
x
10'-0"
x
10'-0"
EQ.
10'-0"
EQ.
EQ.
w
w
9'-1"
9'-1"
edge of ceiling to
align with column
B
Vestibule R.C. Plan
1/4" = 1'-0"
A
Reflected Ceiling Plan - Area 1
1/4" = 1'-0"
Reflected Ceiling
and Lighting Plan
[Area 1]
scale: 1/4" = 1'0"
D2.01
Lighting Fixture Symbol Legend:
DESCRIPTION
RECESSED CAN LIGHT
soffit framing as required
RECESSED DIRECTIONAL
CAN LIGHT
see
plan
DECORATIVE PENDANT
DECORATIVE CHANDELIER
track lighting;
see schedule
WALL-MOUNTED SCONCE
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
GOOSE NECK SCONCE
LINEAR COVE LIGHTING
Detail at Ceiling Recess
B
RECESSED DIRECTIONIAL
SPOT LIGHT
not to scale
2x4 LIGHT
SUSPENDED LINEAR
FLUORESCENT INDIRECT
TRACK LIGHTING
4'-6"
3'-0"
5'-0"
6'-0"
6'-0"
9'-0" CH
9'-0" CH
2'-9"
11'-0" CH
6'-0"
9'-0" CH
2'-6"
f
f
11'-0" CH
4'-6"
22'-0"
9'-0" CH
c
c
B
c
Document Phase
Revision 1
6"h x 6"w (finished dims)
gyp bd ceiling recess
Document Date
22 Jan 2016
The Exchange at LC New Albany Park
CEILING FAN
Design Buildout Package
Amenities Building (Building 1)
SURFACE-MOUNTED
DIRECTIONAL SPOT LIGHT
10'-6" CH
sim.
D1.02
5'-0"
e
h
eq.
align
eq.
c
6" (typ.)
B
align
9'-6" CH
D1.02
6'-0"
c
g
9'-6" CH
c
g
1
i
eq.
1'-5"
align
align
11'-0" CH
g
3'-6"
g
9'-6"
7'-0"
11'-4" CH
align
2015-07-27
original issue
1
2016-01-22
Revision 1
c
eq.
8'-0"
1'-5"
10'-6" CH
3'-6"
9'-6"
center in
tray (typ.)
-
6'-0"
i
g
remark
c
eq.
c
g
date
c
1'-6"
(typ.)
1
rev
11'-0" CH
gg
11'-6" CH
11'-0" CH
10'-6" CH
c
11'-6" CH
9'-6" CH
c
9'-6" CH
1
6"
(typ.)
h
6'-0"
6'-0"
6'-0"
e
6"
eq.
17'-0"
5'-0"
eq.
eq.
5'-0"
eq.
3'-6"
eq.
SYMBOL
floor joists
Reflected Ceiling
and Lighting Plan
[Area 2]
scale: 1/4" = 1'0"
A
Lighting Plan - Area 2
1/4" = 1'-0"
D2.02
Lighting Fixture Symbol Legend:
DESCRIPTION
Exterior Up/Down Sconce
see architecturals
Exterior Gooseneck Sconce
see architecturals
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
Architectural Directional Spot Light:
Kichler 15231AZT or sim.
Landscape Spot Light
Hinkley Lighting HK1536BZ-LED60 or sim.
Flood Light (Pole-Mounted)
TBD
Document Phase
Revision 1
Decorative String Light (Pole-Mounted)
Bulbrite 81002 or sim
Document Date
22 Jan 2016
Recessed Step Light
Progress Lighting P6803-31 or sim.
Design Buildout Package
Amenities Building (Building 1)
Bollard Light
YS Lighting FYZT3201 or sim.
The Exchange at LC New Albany Park
SYMBOL
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
Lighting Plan
[Exterior and
Amenity Area]
scale: n.t.s.
1
A
Lighting Plan - Amenity Area
not to scale
D2.03
WALL BRACKET
1'-4"
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
CABLE OR ROD
4'-7"
TURNBUCKLE
1" O.D. STEEL TUBe OR CONDUIT:
paint
not to scale
custom light fixture arm support
RH Globe Light Small 18
capiz shell pendant Small
installed per manufacturer's
instructions
D
Side View
G
1" = 1'-0"
Front View
1" = 1'-0"
1'-4"
E
Document Phase
Revision 1
B
Document Date
22 Jan 2016
not to scale
14'-3" a.f.f.
A
Capiz Shell Pendant
8"
Capiz Shell Pendant Top
radius : 8"
The Exchange at LC New Albany Park
8"
8'-0"
Design Buildout Package
Amenities Building (Building 1)
10'-0"
rev
date
remark
-
2015-07-27
original issue
Perspective
not to scale
4"
4"
Ceiling and
Lighting Details
scale:
C
Manufacturer's Installation Instructions
F
Wall Plate Detail
not to scale
H
Top View
1" = 1'-0"
D2.11
Lighting Schedule
cc
dd
bb
aa
MANUF.
DESCRIPTION
FINISH
PRODUCT #
DIM.
TYP. MNT. HT. (U.N.O.)
NOTES
A
B
C
D
(with D)
(with D)
(with D)
E
F
G
H
I
J
K
L
M
N
(with N)
O
P
Q
R
S
(with S)
T
U
V
W
X
Y
Z
AA
BB
CC
DD
EE
FF
GG
HH
II
JJ
Corelite
Zuo Modern
Nuvo Lighting
Millennium Lighting
Millennium Lighting
Millennium Lighting
Millennium Lighting
WAC Lighting
Hinkley Lighting
Rejuvenation
Progress Lighting
Neiman Marcus
Restoration Hardware
Hunter Fan Company
Restoration Hardware
Restoration Hardware
Hunter Fan Company
Hunter Fan Company
Affordable Quality Light.
Restoration Hardware
Restoration Hardware
Restoration Hardware
Restoration Hardware
Sundial Wire
Control Brand
Rejuvenation
Restoration Hardware
Restoration Hardware
Restoration Hardware
Restoration Hardware
Schoolhouse Electric
Sundial Wire
Restoration Hardware
Restoration Hardware
Restoration Hardware
Restoration Hardware
Restoration Hardware
West Elm
Restoration Hardware
Rejuvenation
Rejuvenation
Iridium Perf Suspended
Sleet Ceiling Lamp
Three Light Track Kit
R Series 1 Light Pendant
R Series Wire Guard
R Series Stem
R Series Steep Canopy
Multiple Spot Recessed
Winton 6 Light Vanity
Hood Cl. Globe Pendant
Cuddle Full-Sized
Monroe One-Light
Harbor Sconce
Sea Air Fan
Starboard Milk Glass
20th C. Library Dbl Sc.
Prestige Classic Orig.
Orig. Extension Dnrd
120V LED Solid Brass
20th C. Fct Fil. Metal
Grand Edison Caged
Edison Caged Inline Dbl
Industrial Pulley Dbl
3-Cond. Pulley Cord
The Tastrup Pendant
Ironside Sconce
Petite Candlestick
20th C. Lib. Single Sc.
20th C. Fct Fil. Cafe Sc.
20th C. Fct Fil. Rect.
Franklin Sconce
Brass, Keyless Socket
European Fct Caged
Capiz Shell Pendant
French Nautical Sconce
Library Sconce
Modern Picture Light
Industrial Textured Glass
Petite Candlestick Lamp
Avondale Buffet Lamp
Merchant Desk Lamp
White
White
Black
Satin Black
Satin Black
Satin Black
Satin Black
White
Chrome
ORB
White
Pol. Nickel
Bronze
White
Pol. Nickel
Pol. Nickel
Wlnt/Oak/Bl.
Black
Black
Aged Steel
Gunmetal
Gunmetal
Bronze
Walnut Brown
Brown Tint
Etched/Wire
Vintage Brass
Aged Steel
Aged Steel
Aged Steel
Antique Black
Red/Putty
Weather. Zinc
Matte Black
Distressed Al.
Antique Brass
Antique Brass
Clear / Bronze
Vintage Brass
Pol. Nickel
Aged Brass
IP-WP-3T8
BCI2719466
TK346
MNLT1175
MNLT1208
MNLT1615
MNLT1207
MT-216-WT/WT
HD4839
A1445
BCI2238155
n/a
68050060 BRZ
23566
68080175 PNMK
68450204 PN
23855
26229
LEP20
68060468 ASTL
68450069 PEWT
68450188 PEWT
68070138 BRZ
W183RPWBXXMNS
VSR1292
A3160 with B2650
68450131 VBRS
68450206 ASTL
68450241 ASMK
68070543 ASTL
n/a
n/a
68070396 WZNC
68060923 SHEL
68030376 ALUM
68470007 ABRS
68450034 ABRS
n/a
68270276 VBRS
A5102
A2232
9" x 4'
16" x 37" x 37"
n/a
9.25" x 17" x 17"
4.5" x 17" x 17"
12"
n/a
6" x 10"
5" x 5" x 37,25"
42" x 14" x 14"
7.25" x 22" x 22"
6.75" x 8" x 34.25"
11" x 12.25" x 12.75"
52" x 52" x 10"
4.75" x 4.75" x 10"
7.5" x 29.25" x 10.5"
52" x 52" x 15"
48"
n/a
18" x 18" x 16'
4" x 3.5" x 18"
21.75" x 4.75" x 5"
12.5" x 32" x 60"
18-gauge; 100 ft. spool
12" x 5.25" x 5.25"
10.5" x 13" x 16.25"
9" x 9.25" x 10.25"
7.5" x 17.5" x 10.5"
8" x 9" x 12"
5" x 60" x 8'
5" x 5" x 4"
24"
17.24 x 17.25 x 8'
18" x 18" x 18"
5.5" x 5.5" x 9.75"
3.5" x 6" x 12"
18" x 1.5" x 12"
17" x 13" x 13"
9" x 9" x 24"
9" x 9" x 33"
13" x 9" x 27.5"
per instructions
field located
ceiling
use accessories
recessed
above mirrors 96"
120" a.f.f.
field located
ceiling
72" a.f.f.
per instructions
see detail
90" a.f.f.
use accessories
field located
96" a.f.f.
see detail, 114" a.f.f.
on header, install horizontally
66" a.f.f.
fixt. base 156" a.f.f.
fixt. base 114" a.f.f.
see trim detail
see perspective
see trim detail
fixt. base 108" a.f.f.
see detail
see detail
bottom of cage 79" a.f.f.
see D2.03
121" a.f.f.
see detail
72" a.f.f.
field located
see detail
installed on Leasing Desk
see detail
14" Opal Globe Shade w/ Wire
rewire with accessory item
can order by the foot
available through Alibaba
No Plug, Sm. Houndstooth
use black or brass canopy
part of custom fixture
install horizontally
5" x 1" x 6" backplate
plug-in fixture
plug-in fixture
plug-in fixture
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
[Note: Some fixtures on this schedule may not be used in this project; see lighting plans for locations. Finishes and specifications may vary from images shown on this sheet.]
z
y
x
w
v
u
t
s
r
Document Phase
Revision 1
ee
KEY
Document Date
22 Jan 2016
ff
gg
Design Buildout Package
hh
Amenities Building (Building 1)
ii
The Exchange at LC New Albany Park
jj
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
Note: Rewire to hang fixture
72" A.F.F.
q
p
o
n
m
l
k
j
Note: Include 48" downrod;
B.O. fan to be at 16'-5"
A.F.F.
Lighting Schedule
i
h
g
f
e
d
c
b
a
not to scale
1
D2.20
aLIGN EXTERIOR SPEAKERS
WITH LIGHTS AND FANS, INSTALL
CENTEreD ON COLS. WHERE
POSSIBLE AND B/T FAN AD
LIGHT WHEN LIGHT IS CENTERED
ON COL (TYP. OF 5)
Electrical and Data Symbol Legend:
SYMBOL
DESCRIPTION
12
HIDDEN DUAL CAT5e/6 10
ACCESS POINT
3
CATV DATA OUTLET
BB
WALL-MOUNTED TV
42"
B
6
SECURITY CAMERA
24"
ATM
$
POS
RCPT
POS
4
BB
POS
1
s
2
55"
55"
55"
55"
POS
55"
IN CASEWORK
C
L
IN CASEWORK
POS
12
1
POS
SUB
2
RCPT
65"
1
Coord location w/ Fryer
POINT OF SALE TERMINAL
12
ap
4
7
BB
c
REMOTE RECEIPT PRINTER
JUKEBOX
MOUNT VERTICALLY ON
SMALL 3/4" pLYWOOD
BRACKET PAINTED
BLACK, SET BACK FROM
EDGE OF KITCHEN TO
HIDE VISIBILITY
1
DUAL POWER OUTLET
25
MOUNTED ON STL BEAM
OUTLETS ON TOP OF
BEAM (TYP. OF 4)
BUMP BAR
BB
F
1
65"
Coord location w/ griddle
6
9
65"
8
c
MOUNTED ABOVE
ISLANDS (TYP. OF 6)
RCPT
STL BAR MOUNTED TVs
XLR AUDIO INPUT
XLR
8
9
LW
S
65"
LW
S
c
8
4
BRIVO CARD READER
c
LW
S
1
cOORD LOCATION W/
PIZZA PREP AREA
11
11
c
4
AUDIO VOLUME AND AUX INPUT
11
s
1
9
c
10
9
2
XLR
2
LW
S
WALL FAN
1
CHANGE MACHINE
POS
MOUNTED IN CASEWORK
SEE SHEET D4.21
55"
c
LW
S
MOUNTED IN CASEWORK
SEE SHEET D4.22
offset speaker
from center of bay
as shown to avoid
being directly
behind nearby
spiral duct.
POS
55"
8
General Notes:
Document Phase
Revision 1
VC
AUX
♫
7
2
SUBWOOFER
s
11
CEILING RECESSED SPEAKERS
SUB
s
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
1
Document Date
22 Jan 2016
s
8
1
Design Buildout Package
LARGE WALL SPEAKERS
1
s
C
L
WALL SPEAKERS
LW
S
24"
1
Amenities Building (Building 1)
W
S
ap
The Exchange at LC New Albany Park
ap
1
55"
- IT/AV ROOM LOCATED IN ROOM 207A ON
SECOND FLOOR
- LOW VOLTAGE SCHEDULE ON SHEET D3.10
1
s
MOUNTED IN CASEWORK
SEE SHEET d4.23
- COORDINATE GOAT
POS SYSTEM, BUMP
25
BARS, ETC WITH KITCH EQUIPMENT AND
GOAT STAFF
MOUNTED IN CASEWORK
SEE SHEET D4.23
10
42"
42"
MOUNTED IN CASEWORK
SEE SHEET d4.23
42"
42"
MOUNTED IN CASEWORK
SEE SHEET D4.23
10
42"
2
42"
2
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
ap
55"
MOUNTING HEIGHT/ LOCATION
1
s
1
7
MOUNT VERTICALLY ON
SMALL 3/4" pLYWOOD
BRACKET PAINTED
BLACK,
SET BACK FROM EDGE
OF ENTRY VESTIBULE TO
HIDE VISIBILITY
5
CEILING MOUNTED
12
SUB
12
4
2
ON WALL - 18" A.F.F.
3
ON WALL - 48" A.F.F.
55"
4
ON WALL - 60" A.F.F.
5
ON WALL - 72" A.F.F.
6
ON WALL - 84" A.F.F.
$
5
55"
25
♫
7
ON WALL - 96" A.F.F.
8
ATTACHED TO CEILING BEAM (~12' A.F.F.)
9
CENTER ALIGNED WITH ADJACENT LIGHT FIXTURE
10
ON TOP OF COL HIDDEN FROM VIEW (FUTURE USE)
11
IN EXTERIOR CEILING HIDDEN FROM VIEW (FUTURE USE)
12
ON TOP OF VESTIBULE
WALL MOUNT JUKEBOX
COORD DATA LOCATION
WITH JUKEBOX
8
LW
S
8
10
LW
S
8
10
LW
S
A/V Plan
[Area 1]
scale = 1/4" = 1'-0"
1
D3.01
A
A/V Plan - Area 1
1/4" = 1'-0"
Electrical and Data Symbol Legend:
General Notes:
SYMBOL
- IT/AV ROOM LOCATED IN ROOM 207A ON
SECOND FLOOR
DESCRIPTION
17
- LOW VOLTAGE SCHEDULE ON SHEET D3.10
HIDDEN DUAL CAT5e/6
1
LW
S
LARGE WALL SPEAKERS
s
SUB
SUBWOOFER
VC
AUX
AUDIO VOLUME AND AUX INPUT
B
1
2
BRIVO CARD READER
c
SECURITY CAMERA
24"
3
STL BAR MOUNTED TVs
XLR
XLR AUDIO INPUT
BB
BUMP BAR
ATM
POS
RCPT
B
POINT OF SALE TERMINAL
REMOTE RECEIPT PRINTER
3'-0"
$
♫
1
1
WALL-MOUNTED TV
42"
24"
6
CEILING RECESSED SPEAKERS
JUKEBOX
1
s
closet
DUAL POWER OUTLET
F
WALL FAN
2'-10"
1
OFFICE
gOAT OFFICE
OFFICE
4
42"
Center speaker in
corridor and b/t
light fixtures
eq.
MOUNTING HEIGHT/ LOCATION
eq.
s
CEILING MOUNTED
2
ON WALL - 18" A.F.F.
3
ON WALL - 48" A.F.F.
4
ON WALL - 60" A.F.F.
5
ON WALL - 72" A.F.F.
6
ON WALL - 84" A.F.F.
7
ON WALL - 96" A.F.F.
c
2'-10"
1
ap
7
1
s
3'-0"
1
Document Phase
Revision 1
WALL SPEAKERS
Document Date
22 Jan 2016
W
S
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
Amenities Building (Building 1)
ACCESS POINT
The Exchange at LC New Albany Park
ap
Design Buildout Package
CATV DATA OUTLET
1
VC
AUX
c
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
1
ATTACHED TO CEILING BEAM (~12' A.F.F.)
CENTER ALIGNED WITH ADJACENT LIGHT FIXTURE
10
ON TOP OF COL HIDDEN FROM VIEW (FUTURE USE)
11
IN EXTERIOR CEILING HIDDEN FROM VIEW (FUTURE USE)
12
ON TOP OF VESTIBULE
(4) Computers @
Leasing desk see
3.10 for more info
eq.
eq.
3'-0"
3'-0"
eq.
eq.
7'-0"
s
s
1
1
55"
C
L
Tv Centered on bay
window
32"
5
32"
5
c
vESTIBULE
8'-8"
9
lEASING
Center speaker in
corridor and b/t
light fixtures
10'-0"
8
s
A/V Plan
[Area 2]
1
B
scale = 1/4" = 1'-0"
B
B
1
D3.02
A
A/V Plan - Area 2
1/4" = 1'-0"
Electrical and Data Symbol Legend:
SYMBOL
W S
DESCRIPTION
W S
1
CATV DATA OUTLET
HIDDEN DUAL CAT5e/6
ap
ACCESS POINT
10
W
S
WALL SPEAKERS
LW
S
LARGE WALL SPEAKERS
s
BRIVO CARD READER
c
W
SECURITY CAMERA
24"
W
S
S
STL BAR MOUNTED TVs
XLR
XLR AUDIO INPUT
BB
BUMP BAR
1
W
S
ATM
$
POS
RCPT
POINT OF SALE TERMINAL
REMOTE RECEIPT PRINTER
XLR
JUKEBOX
DUAL POWER OUTLET
F
WALL FAN
W
S
MOUNTING HEIGHT/ LOCATION
1
CEILING MOUNTED
2
ON WALL - 18" A.F.F.
3
ON WALL - 48" A.F.F.
4
ON WALL - 60" A.F.F.
5
ON WALL - 72" A.F.F.
6
ON WALL - 84" A.F.F.
7
ON WALL - 96" A.F.F.
8
ATTACHED TO CEILING BEAM (~12' A.F.F.)
9
CENTER ALIGNED WITH ADJACENT LIGHT FIXTURE
10
ON TOP OF COL HIDDEN FROM VIEW (FUTURE USE)
11
IN EXTERIOR CEILING HIDDEN FROM VIEW (FUTURE USE)
12
ON TOP OF VESTIBULE
W S
W S
W
S
Document Phase
Revision 1
B
Document Date
22 Jan 2016
WALL-MOUNTED TV
42"
Design Buildout Package
AUDIO VOLUME AND AUX INPUT
Amenities Building (Building 1)
VC
AUX
The Exchange at LC New Albany Park
SUBWOOFER
♫
W
S
CEILING RECESSED SPEAKERS
SUB
24"
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
See sheet 3.01 For Area 1 PLan
B
A/V Plan
[Amenity Area]
scale: n.t.s.
1
A
A/V Plan - Amenity Area
not to scale
D3.03
Brivo Maglock
Brivo Push-to-Exit Button
-
-
Brivo Motion Detector
Outdoor
Amenities
XLR
Brivo Remote Control Panel
DJ Input
USB modem cable
DirectTV main coax
Time Warner main line
Demark
Electrical Room
Data Closet
-
2
2
-
-
-
1
1
18/2 Wire for Power
18/4 Wire run between
buttton and strike/maglock
18/2 for power and 22/6
between button and motion
detector
c
##"
Other: Example, Sunbury Mills
22/2 shielded audio,
terminated as XLR
w
s
Entire Floor
Plan
4
-
ap
-
AV Rack
5
Network Rack
(5) 20amp power circuits
needed. Each outlet should
be dedicated circuit. Small
plywood 4 x 8, large plywood
8 x 8. Need at least 4 foot
clearance.
(2) 48-port Gigabit Cisco
Managed Network Switches
(1) 48-port Gigabit Cisco
Managed PoE Network
Switch
(3) - 48-port Patch Panels
(1) - Meraki MX 60 Router
(1) - ISP Modem
(1) - Tripp Lite 500VA 300W
UPS w/ network card add-in
s
s
(3) Just add power
Rackmount Transmitters
(8) DirectTV boxes (6 for
Goat, 2 for OM)
(1) DECA adapterfor DirectTV
network control
Digital Signage capable of
playing Rise Vision
(2) Pandora DMX Players (1
Goat, 1 Leasing/OM
(1) BSS London Architect
Audio Processor
(2) - QSC CMX 500V Audio
Amp
(4) QSC CMX 800V Audio
Amp
(10) "stick-on" adapters for
audio levels (mic level/line
level)
Audio Video /
IT Room
LW
S
Wireless Access Points
2
-
Duplex
Power
Outlets
0
Security Cameras
2
-
0
UC View/Digital Ads/Rise
2
-
0
Printer
Wall Speakers
indoor/outdoor
2
-
1
RCPT
Goat
♫
$
Recessed Ceiling Speakers
Outdoor Ceiling Speakers
4
2
Audio Zone
-
-
-
Dual Cat5e/6 Data Outlet
2
-
-
Hidden Dual Cat5e/6 Data
Outlet
Bar TVs
2
-
-
Wiring ran for future use
2
-
1
Each bar TV needs a JAP
Receiver. TV size indicated on
plans.
Aloha / Dinerware Terminal
(Point of Sale Terminal)
2
-
1
Placed on top of counter.
Requires data and power to
be placed 18" A.F.F.
Has local reciept printer
Aloha Receipt Printer
2
-
0
Goat Manager Computer
6
-
3
Goat Check-In Station
2
-
2
Jukebox
4
-
1
ATM
2
-
1
2
-
Musician/Stage Area
2
-
6
Outdoor Video Input
2
-
1
Bump Bar
2
-
1
4
-
2
BB
General Notes
Requires dedicated data and
power to be placed 18" A.F.F.
Devices: Goat Mgr
Computer, Dinerware Brain
Server, ATA phone adapter,
Monitor
22/2 shielded for audio input,
terminated as 3.5 mm female
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
Multiple power circuits
needed. Each outlet should
be dedicated circuit. 22/2
shielded audio, terminated as
XLR
CAT5e/6 jack placed in a
weatherproof cover
Coord locations w/ kitchen
equip and Goat staff
Subwoofer
Property Manager Desk
##"
(1) TV on the wall
(2) Data for Chromebox
(2) Data for TV
Located on second floor in
Rm 207
Each set of connected
speakers shown on planto be
wired as independant zone
1
XLR
Leasing
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
14/2 audio wire
Chromebox for Meetings
Golden Tee/Video Games
SUB
Wall Mounted TVs require
blocking. TV size indicated on
plans
indoor: 14/2 for both sizes
wall speakers
outdoor: 14/2 direct bury
rated for around the pool
patio
18/2 audio wire
##"
POS
Notes
Document Phase
Revision 1
-
Business Need / Item
Coaxial
Cables
Document Date
22 Jan 2016
-
Icon
Cat5e/Cat6
Cables
Design Buildout Package
Brivo Card Reader
Duplex
Notes
Power
Outlets
22/6 Shielded Wire
Amenities Building (Building 1)
B
Business Need / Item
Coaxial
Cables
The Exchange at LC New Albany Park
Icon
Cat5e/Cat6
Cables
Leasing Agent Computer
4
-
2
Maintenance Computer
2
-
2
Mail Room TV
2
-
1
Property Manager Desk
2
-
2
(2) data for computer and
(2) for phone
See plan for number of
computers per leasing desk.
(2) data for computer and
(2) for phone
Typically in Maintenance
Garage and not near Leasing
Requires 1 JAP receiver. Size
indicated on plans
Room 207 (not shown on plans)
- Includes Chromebox centered on north wall, see Chromebox entry on this sheet for info
- Data outlets spaced equally around east, south, and west walls 6'-0" O.C. and 18" A.F.F.
A/V Schedule
not to scale
1
D3.10
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
D4.04
D4.03
D4.02
Document Phase
Revision 1
D3.01
Document Date
22 Jan 2016
The Exchange at LC New Albany Park
D4.01
Design Buildout Package
Amenities Building (Building 1)
D2.01
rev
date
remark
-
2015-07-27
original issue
D6.02
D6.01
D6.02
Casework Key
Plan
not to scale
D4.00
A
Key Plan
not to scale
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
Document Date
22 Jan 2016
Document Phase
Revision 1
rev
Design Buildout Package
The Exchange at LC New Albany Park
D3.01
3'-6"
A
2'-6"
1
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
1'-0"
6'-4"
B
2'-3"
C
D2.01
D2.02
6'-0"
6'-0"
3'-10"
eq.
1'7"
"
/4
3
3'
1'-4 1/2"
3'-10"
1'-4"
1'-4 1/2"
5'-0"
1'-5"
4'-0" (typ. u.n.o.)
see elevations
for further
information
2'-0"
6'-0"
5'-4"
2'-6" sq.
2'-6" sq.
23'-9 1/4"
eq.
3'-10"
eq.
A
eq.
Bar Plan
scale: 1/2" = 1'-0"
D2.02
A
Enlarged Bar Plan
1/2" = 1'-0"
D4.11
7'-10"
8'-0"
7'-10"
hh
hh
hh
4'-0"
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
gpt-6
D2.03
2'-7 3/4"
1'-4 3/4"
1'-4 3/4"
4'-11"
A
4'-0"
7'-8"
3'-8 1/2"
4"
1'-4 3/4"
7'-8"
4"
7'-8"
4'-0"
Front Elevation
1/2" = 1'-0"
hh
D
E
D2.02
gpt-6
2'-10"
3'-6"
D2.02
omit paneling at
accessible bar location
C
Side Elevation
1/2" = 1'-0"
1'-4 3/4"
I
1'-4"
D2.03
B
Document Phase
Revision 1
D2.03
Document Date
22 Jan 2016
A
Design Buildout Package
gpt-6
Amenities Building (Building 1)
B
D2.03
3'-7 1/2"
C
The Exchange at LC New Albany Park
4'-0"
4'-0"
4'-0"
eq.
eq.
Side Elevation
1/2" = 1'-0"
rev
date
remark
-
2015-07-27
original issue
undercut 1/8" each side
2'-7 1/2" counter opening
H
D2.03
2'-6" framed opening
leave 1-1/2" framing
exposed for counter
bearing area
bolt latch; drill
hole in framing
as required
provide frp
corner trim
(ea side)
door to be
(2) 3/4" plywood
panels with frp
on back side
Bar Elevations
scale: 1/2" = 1'-0"
omit base and shoe
moulding at door panel
E
Elevation at Bar Pass-Thru (Back Side)
not to scale
D
Elevation at Bar Pass-Thru (Front Side)
not to scale
undercut door by 1/2"
D4.12
subway tile;
see finish schedule for
further information
3/4" PAINT-GRADE
PLYWOOD PANELS
PANEL MOULDING
(HL90571 or eq.)
3/4"X10-3/4" PAINT-GRADE
PLYWOOD BASE PANEL
2"Wx 1/4"H BRONZE STRAP
7-1/4" BASE
(HL272516 or eq.)
1/2" DIA. BRONZE PRE-DRILLED
flat-head SCREWS at 4" o.c.;
use same spacing for each strap;
COUNTER-SiNK for flush surface;
see plan/elevations for locations
P.T.2x4 BOTTOM PLATE
2X4 FRAMING AT 12" O.C.
front of strap to form to
bartop edge; see f/d3.01
for further information
P.T.2x4 BOTTOM PLATE
E
not to scale
A
not to scale
1
Detail at Typ. Bar Base
not to scale
BAR TOP
(SEE E/d4.13 FOR
FURTHER INFORMATION)
3/8"
1 7/16"
double radius
demi-bullnosed edge (typ)
DOUBLE 2X4 TOP PLATE
3/4"X3-1/2" POPLAR
STOCK TOP RAIL
PANEL MOULDING
(HL90571 or eq.)
J
Detail at Bar Lamp
not to scale
F
Detail at Bar Edge
not to scale
B
Detail at Bar Counter
not to scale
Document Date
22 Jan 2016
I
Detail at Typ. Bar Top and Strap
Document Phase
Revision 1
4"X1-1/2" IRON CHANNEL C4x5.4
lEADING EDGE TO SIT PROUD OF SHOE
1/2" FURRING OR AS REQUIRED
bar top to have eased edge;
see f/d4.13 for further information
Detail at Tile Base
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
Design Buildout Package
2X4 FRAMING AT 12" O.C.
SHOE MOULD
(HL5-2050 or eq.)
Amenities Building (Building 1)
hardibacker cement
board or eq.
The Exchange at LC New Albany Park
modified thinset per
tile manufacturer's
recommendations
12" overhang (typ.)
PANEL MOULDING
(HL90571 or eq.)
3/4"X3-1/2" MDF OR
POPLAR STOCK SIDE RAIL
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
18"l min. Piano hinge on
column side of opening
9"X9" IRON BRACKET
4"X1-1/2" IRON CHANNEL
C4x5.4
1/2" FURRING
(COORDINATE WITH CHANNEL)
G
Detail at Bar Pass-Thru
not to scale
provide 1-1/2" min.
counter bearing
pAINT EDGES TO MATCH TRIM
C
Detail at Post and Bracket
not to scale
DRINK RAIL (GLASTENDER
DR-36R OR EQ.)
Bar Details
ROUTE BOTTOM OF BARTOP
FOR DRINK RAIL INSTALLATION
(COORDINATE WITH DRINK
RAIL SPECIFICATIONS)
not to scale
3/4" OSB BACKER
return frp to cover
framing member (ea side)
FRP PANEL - COLOR TBD
D4.13
FRP TRIM; REFER TO FRP
MANUFACTURER'S RECOMMENDATIONS
H
Detail at Bar Pass-Thru
not to scale
D
Detail at Bar Back
not to scale
D4.14
A
Enlarged Plan at Bar Island
1/2" = 1'-0"
restoration hardware
30" french library shelving;
item # 61460023 metl
3" overhang
(typ. all sides)
counter top; see finish package
for further information.
2'-6"
cover all exposed framing
with 3/4" paint-grade birch plywood.
miter all corners. see finish
package for stain/paint information
B
rev
date
remark
-
2015-07-27
original issue
3'-3" clear
bolt shelf to counter
Document Phase
Revision 1
B
Document Date
22 Jan 2016
eq. (center in
bar space)
D4.14
Design Buildout Package
C
Amenities Building (Building 1)
eq.
The Exchange at LC New Albany Park
eq. (center in
bar space)
eq.
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
4'-1" clear
6"
Front Elevation at Bar Island
1/2" = 1'-0"
2x4 top plate
and framing at 16" o.c.
cabinet doors to be full
overlay. style and species
to be approved by owner.
see finish package for
stain/paint information
3'-3" to u/s
of counter
Bar Island Plan,
Elevations, and
Exploded
Perspective
no toe kick
treated 2x4 bottom plate
cabinet to be
double-sided
2'-3"
D
Exploded Perspective at Bar Island
not to scale
C
Side Elevation at Bar Island
1/2" = 1'-0"
not to scale
D4.14
E
D4.21
8'-7"
eq.
note:
see box schedule on sheet
d4.25 for dimensions and
quantities of shelf boxes
1'-6 1/2"
to column c/l
2'-6"
eq.
D
3'-6"
D4.21
C
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
B
D4.21
1
4
1
A
Enlarged Plan at Server Station
1/2" = 1'-0"
provide wall tile;
see finish package
5
2
D4.25
3'-0"
4'-0"
7'-4"
1'-0"
2
E
provide frp (color: black)
on sides and back wall
eq.
3
6
C
3
Document Phase
Revision 1
8'-7"
Document Date
22 Jan 2016
7'-10 1/2"
Design Buildout Package
The Exchange at LC New Albany Park
2'-6"
DOTTED LINE INDICATES 3-1/2"
WOOD STUD SUPPORT WALL;
SEE DETAILS FOR FINISHED DIM'S
Amenities Building (Building 1)
D4.21
2'-6"
2'-6"
eq.
Elevation at Server Station
eq.
B
1/2" = 1'-0"
c
l
c
l
4'-0"
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
eq.
Elevation Plan at Server Station
1/2" = 1'-0"
C
D4.25
8'-1 1/2"; see f/3.01
light type 'aa'
see schedule
1
7'-8 1/2"; see f/4.01
1
soda
fountain;
see equip.
specs
provide
wall tile;
see finish
package
sink; see
plumbing
drawings
light type 'z'
see schedule
4'-1 3/4"
F
Exploded Perspective at Server Station Shelving Unit
not to scale
E
3'-0"
4'-1 3/4"
Elevation at Server Station
1/2" = 1'-0"
4'-0"
4'-0"
D
D4.25
1'-4"
D
2'-6"
2'-6"
Elevation at Server Station
1/2" = 1'-0"
1'-4"
Server Station
Plan, Elevations,
and Exploded
Perspective
not to scale
D4.21
1
4
1
B
D4.22
eq.
Document Phase
Revision 1
2
7'-4"
11"
5
eq.
1'-6"
2
8'-7"
Document Date
22 Jan 2016
7'-10 1/2"
Design Buildout Package
The Exchange at LC New Albany Park
note:
see box schedule on sheet
d4.25 for dimensions and
quantities of shelf boxes
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
DOTTED LINE INDICATES 3-1/2"
WOOD STUD SUPPORT WALL;
SEE DETAILS FOR FINISHED DIM'S
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
E
D4.21
3
6
3
A
Enlarged Plan at Banquette Shelf
1/2" = 1'-0"
C
7'-8 1/2"; see c/4.02
D4.25
light fixture 'aa'
see schedule
3'-0"
3'-10"
C
Exploded Perspective at Banquette Shelf
not to scale
B
Elevation at Banquette Shelf
1/2" = 1'-0"
provide wall
tile; see finish
package
4'-0"
1
3'-10"
Banquette Shelf
Plan, Elevations,
and Exploded
Perspective
not to scale
provide filler
strips (both sides)
D4.22
D4.23
MIRROR
7
1
DOTTED LINE INDICATES
cabinets underneath
shelving unit
7'-9"
B
D4.23
2
rev
date
remark
-
2015-07-27
original issue
7'-4"
8
Document Date
22 Jan 2016
B
Design Buildout Package
The Exchange at LC New Albany Park
5'-4 3/4"
Amenities Building (Building 1)
note:
see box schedule on sheet
d4.25 for dimensions and
quantities of shelf boxes
Document Phase
Revision 1
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
1'-0"
A
9
Enlarged Plan at Server Station
1/2" = 1'-0"
C
3
7'-8 1/2"; see c/4.03
D4.25
3'-0"
Bar Shelving Unit
Plan, Elevations,
and Exploded
Perspective
not to scale
3'-10 1/2"
C
Exploded Perspective at Bar Shelving Unit
not to scale
B
Elevation at Bar Shelf
1/2" = 1'-0"
3'-10 1/2"
D4.23
eq.
B
D4.04
2-0"
DOTTED LINE INDICATES 3-1/2"
WOOD STUD SUPPORT WALL;
SEE DETAILS FOR FINISHED DIM'S
10'-8"
5'-4"
v
Document Date
22 Jan 2016
4'-6" +/-
2'-0"
v
Design Buildout Package
Amenities Building (Building 1)
The Exchange at LC New Albany Park
5'-4"
10'-8"
v
Document Phase
Revision 1
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
1
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
eq.
v
rev
eq.
A
eq.
Enlarged Plan at Server Station
1/2" = 1'-0"
provide hl5-91131
or similar at all
outside corners
G
v
D4.05
end panel to be
poplar 3/4"x5-1/2"
flat stock
or plywood
v
v
1
1
4'-2"
1
F
D4.05
B
Elevation at Bar Shelf
1/2" = 1'-0"
v
Banquette Wall
Plan and
Elevations
not to scale
D4.24
Shelving Box Schedule
2
8
1'-4"
2'-5"
11-1/4"
P2 Light Fixture; See Electrical Plans
3
8
1'-4"
2'-8"
11-1/4"
P2 Light Fixture; See Electrical Plans
4
2
5'-1"
2'-3"
11-1/4"
5a
1
5'-1"
2'-5"
11-1/4"
10-3/4"h paint-grade plywood
base panel
P.T.2x4 BOTTOM PLATE
7-1/2" base (hl272516 or sim.)
shoe mould (hl5-2050 or sim.)
D
5b
1
5'-1"
2'-5"
11-1/4"
6
2
5'-1"
2'-8"
11-1/4"
7
4
4'-0"
2'-3"
11-1/4"
8
4
4'-0"
2'-5"
11-1/4"
9
4
4'-0"
2'-8"
11-1/4"
Typical Detail at Panel Wall Base
not to scale
(4) 4" Round Pan Boxes
(2) Shallow Electrical Duplex Boxes
(2) Shallow Data Boxes (4 Total Lines)
See A/D4.05
1
2
3
(2) Shallow Electrical Boxes
(2) Shallow Data Boxes (4 Total Lines)
See A/D4.05
eq.
(2) Shallow Electrical Boxes
(2) Shallow Data Boxes (4 Total Lines)
See A/D4.05
eq.
eq.
eq.
counter top;
1" overhang on all
exposed edges
eq.
eq.
4
t@g beadboard
(hl1738) or similar
(each side)
(2) 2x6 studs w/ (3)
wood screws t&b
cabinet mould
(hl907515) or similar
coordinate with
tv mounting
bracket manuf. specs
3/4"x3-1/2" poplar stock
top rail
shop-drill 1/8" dia pilot holes;
field-drill 1/4" finish holes
2x2 wood blocking
as required
6"
panel moulding (hl90571 or sim.)
washer
E
6"
5A
typ.
1/4" dia. carriage bolt;
field-trim end of bolt
after installation
washer
flange nut
eq.
Typical Detail at Panel Wall Cap
eq.
eq.
eq.
9"
double 2x4 top plate
5
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
not to scale
Document Phase
Revision 1
P2 Light Fixture; See Electrical Plans
Document Date
22 Jan 2016
11-1/4"
Design Buildout Package
2'-3"
Amenities Building (Building 1)
1'-4"
The Exchange at LC New Albany Park
8
2" (typ.)
1
2" (typ.)
2X4 FRAMING AT 12" O.C.
note:
see box schedule overall
dimensions of shelf boxes
NOTES
typ.
3/4"X3-1/2" poplar stock
vertical rail; see elevations
for spacing
WIDTH
HEIGHT DEPTH
(outside to outside)
eq.
3/4" paint-grade
plywood panels
QUANTITY
eq.
DESIG.
typical bolt detail
eq.
eq.
beadboard wainscotting
(HL1738 or sim.)
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
eq.
6
rev
2X4 FRAMING AT 12" O.C.
eq.
7-1/2" base (hl272516 or sim.)
P.T.2x4 BOTTOM PLATE
shoe mould (hl5-2050 or sim.)
5/8" gyp bd (ea side)
F
Typical Detail at Banquette Wall Base
double rabbet joint
(typ. at all corners)
B
not to scale
fixed shelf dado
7
fixed shelf double dado
(2) 2x6 studs w/ (3)
wood screws t&b
Typical Box Jointery Details
(2)
power
outlets
not to scale
(2) data
outlets
coordinate with
tv mounting
bracket manuf. specs
double 2x4 top plate
countertop;
1" overhang on all exposed edges
crown moulding (HL35253 or sim.);
compound miter
at corners (typ.)
eq.
3/4"X5-1/2" poplar stock rail
1
pancake box; center in trim;
see elevation for locations
finish nails as required;
putty, prime, and paint
for smooth finish
5/8" gyp bd (each side)
G
not to scale
Bar Shelving
Schedule and
Details
not to scale
9
beadboard wainscotting
(HL1738 or sim.)
Typical Detail at Banquette Wall Cap
eq.
eq.
eq.
8
wood blocking as required
C
Typical Crown Moulding Detail
not to scale
A
Shelf Box Elevations
3/4" = 1'-0"
D4.25
8"
(2) layers 3/4"
plywood
w/ plastic laminate;
see finish schedule
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
D4.42
2'-0"
transaction top material;
see finish schedule for
further information
eq.
2x4 framing as required
5'-0"
plastic laminate
"waterfall";
see finish schedule
eq.
center desk on
vestibule doors
C
3/4" plywood backsplash
with plastic laminate
8"
5 3/4"
plastic laminate
toe kick;
see finish schedule
2'-0"
6"
8'-0"
1 1/2"
D4.41
11"
3/4" plywood front panel
with plastic laminate
H
Section at "Waterfall" Counter
E
3" = 1'-0"
Detail at Transaction Top
6'-6"
5'-0"
6'-6"
not to scale
Document Phase
Revision 1
A
Document Date
22 Jan 2016
framing as
required
not to scale
The Exchange at LC New Albany Park
D
Detail at Typical Work Surface
3'-5"
1'-10 1/2"
(2) layers 3/4" plywood
Design Buildout Package
Amenities Building (Building 1)
plastic laminate; see
finish schedule for
further information
18'-0"
11"
3/4" plywood panel with
plastic laminate;
see finish schedule for
further information
B
D4.41
1 1/2"
wood top
1"
transaction top material
A
plastic laminate
panel; see finish
schedule
work surface material
Enlarged Plan at Leasing Desk
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
1/2" = 1'-0"
1 1/2"
E
I
knee wall
D4.41
D4.41
H
plastic laminate toe kick
D4.41
plastic laminate
panel; see finish
schedule
D4.41
6"
F
Detail at "Waterfall" Counter
2'-6"
G
3'-2"
2'-6 1/2"
framing as
required
not to scale
F
D4.41
2x4 framing
1
B
(2) strip LED Tape
cove lighting;
LED Wholesalers
2026NW or equal
1
(2) strip LED Tape
cove lighting;
LED Wholesalers
2026NW or equal
Front Elevation at Leasing Desk
1/2" = 1'-0"
(2) layers 3/4" plywood
with plastic laminate;
see finish schedule for
further information
front panel to overhang
cove ligthing to conceal
2x6 stud framing with 3/4"
plywood and plastic laminate
on all exposed sides
3/4" plywood toe kick base
with plastic laminate; see
finish schedule for further
information
not to scale
Section at Transaction Top
3" = 1'-0"
Note for LED Cove Lighting:
Note for LED Cove Lighting:
Mfr: LED Wholesalers
Model No.: 2026NW
Mfr: LED Wholesalers
Model No.: 2026NW
G
Detail at Base
not to scale
2'-4 1/2"
2x4 bottom plate
2'-6"
3'-2"
8"
6"
I
plastic laminate
toe kick; see
finish schedule
Leasing Desk
Plan, Elevations,
and Details
6 1/4"
C
Side Elevation at Leasing Desk
1/2" = 1'-0"
D4.41
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
C
D
D4.42
B
Enlarged Plan at Coffee Bar
1/2" = 1'-0"
Document Phase
Revision 1
1/2" = 1'-0"
Document Date
22 Jan 2016
Enlarged Plan at Brand Wall
Design Buildout Package
The Exchange at LC New Albany Park
A
Amenities Building (Building 1)
D4.42
rev
date
remark
-
2015-07-27
original issue
1
2016-01-22
Revision 1
ikea stained counterop; see finish
schedule for further information
ikea 'vinna' 6" stainless steel
handle (typ. of 8) . install
per manufacturer's
recommendations
3'-0"
ikea 'perfekt' rounded
deco strip, white. cut to
match opening; install with
wd blocking as req'd
ikea 'akurum" base cabinet
w/ shelf and 2 doors, white
frame, harlig white front
article #098.696.75
2'-6"
C
2'-6"
2'-6"
2'-6"
ikea 'perfekt' plinth, finish
white. provide 2x4 platform
with 1/2" osb or sim. material
to match plinth height. attach
plinth to platform with glue
(no nails or screws)
Front Elevation at Brand Wall
1/2" = 1'-0"
ikea stained countertop; see finish
package for schedule information
1
2'-9 3/8"
ikea 'vinna' 6" stainless steel
handle (typ. of 8) . install
per manufacturer's
recommendations
ikea 'akurum" base cabinet
w/ shelf and 2 doors, white
frame, harlig white front
article #098.696.75
3"
2'-6"
D
2'-6"
Front Elevation at Coffee Bar
1/2" = 1'-0"
2'-6"
ikea 'perfekt' plinth, finish
white. rip to 1-1/2"w.
provide 1-1/2"h framed
platform recessed 3" on all
(3) sides. attach plinth to
platform with glue (no nails
or screws)
Brand Wall and
Coffee Bar Plans
and Elevations
not to scale
D4.42
gpt-6/gpt-7;
see bar details
gpt-6/gpt-7;
see bar details
A
D5.12
gpt-6/gpt-7;
see b/D7.01
typ. all
columns
BAR DINING
pt-12
109
STAGE
see d/d5.13
109B
MEN'S RR
110
Document Phase
Revision 1
18"x18" tile; straight lay
Document Date
22 Jan 2016
kitchen finishes
not included
in this package
Design Buildout Package
109A
The Exchange at LC New Albany Park
BAR
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
HC
STALL
110A
gpt-6
107
106
see e/d5.13
108
T.V. LOUNGE
ENTRY
LOUNGE
see e/d5.13
GAMES
111A
sim. c/d5.13
111
see c/d5.13
HC
STALL
WOMEN'S RR
sim. c/d5.13
gpt-6
VESTIBULE
106A
see d/d5.13
Finish Plan
[Area 1]
scale: 1/4" = 1'-0"
D5.01
A
Finish Plan - Area 1
1/4" = 1'-0"
PT-5
WOMEN'S POOL RR
A/V
CLOSET
102
116
115
mgt-2
5"h back
splash
above
counter
PT-5
STORAGE
PM OFFICE
117
GOAT OFFICE
114
mgt-2
5"h back
splash
above
counter
MEN'S POOL RR
CLOSET
103
PT-2
CLOSET
118
119
Document Phase
Revision 1
Document Date
22 Jan 2016
B
Not Used
The Exchange at LC New Albany Park
12"x24" tile in running bond
pattern parallel to vanity
Amenities Building (Building 1)
18"x18" tile; diagonal lay
Design Buildout Package
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
mt-2 & mt-5
see a/d7.11
CORRIDOR
100B
PT-5
A
D5.11
LEASING OFFICE
100
MAIL
113
VESTIBULE
120
Finish Plan
[Area 2]
scale: 1/4" = 1'-0"
A
Finish Plan - Area 2
1/4" = 1'-0"
D5.02
5"
D5.12
8"
steel column
Document Phase
Revision 1
Document Date
22 Jan 2016
B
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
1"
3/4"
(3) courses
half-bat brick
cornerstones
rev
date
remark
-
2015-07-27
original issue
3" = 1'-0"
(2-1/2) courses wide
3/4"
soldier coursing
Finish Details
(3) courses
half-bat brick
cornerstones
not to scale
8" +/(3 courses)
C
D5.12
C
(52 courses)
Detail at Brick Column Capital
11'-6 1/4" +/-
B
9'-4 3/8" (42 courses)
(5) soldiers
Detail at Brick Column Base
3" = 1'-0"
A
Detail at Brick Column
1" = 1'-0"
D5.12
3/4"
2 1/2"
varies
WCM 9883
8"
Plate Rail
WCM 1193
WCM 9858
6 1/4"
WCM 609
PANEL
MATERIAL
T-2
T-6
WCM 273
Picture
Mould
10"
T-1
WCM A33
similar to wcm 618; 7.25" high
WCM 591
4 3/4"
7 1/4"
WCM 206 CAP:
TRIM TO FIT
1x4 trim
8'-0"
WCM 474 CROWN
8"
T.O. TRIM
Document Date
22 Jan 2016
3/4"
WCM 623
Design Buildout Package
WCM 100
The Exchange at LC New Albany Park
WCM 31
Amenities Building (Building 1)
1/4"
Document Phase
Revision 1
1x8 trim
1in Astragal
T-3
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
WCM 206
T-4
T-5
VB-1
rev
date
remark
-
2015-07-27
original issue
10"
T-3
PT-8
scale: 6" = 1'-0"
3 1/2"
3 1/2"
A
Trim Profiles
1'-0"
PT-7
3" 2 1/2"
PT-13
mailboxES
WCM 273 Picture Mould:
(SOFT-SEATING AREA ONLY)
siding ripped flush
to g.w.b. ceiling; no stop
7'-6"
PWC-2
TOP OF CAP
4'-0"
2'-4"
T-2
TOP OF CAP
B.O. MAILBOX
WD-2
WCM A33
SUBSURFACE:
furring strips over
g.w.b. backer
Paint: pt-12
1x3
panel material
T-5
PT-7
Finish Details
panel materIal
WCM 206 CAP
caulk joint
WCM 609
B
1-1/2" = 1'-0"
align
GPT-10
T-1
not to scale
6" cut tile base
WCM 31
Mail Room Detail
Vinyl base
3/4" Hardwood flooring
C
T.V. Lounge Detail
1-1/2" = 1'-0"
T-6
GPT-4
D
Goat Restroom Detail
1-1/2" = 1'-0"
E
Goat Vestibule Detail
1-1/2" = 1'-0"
F
Window Casing Detail
scale: 1-1/2" = 1'-0"
D5.13
Room Finish Schedule:
1,091sf
537sf
178sf
178sf
380sf
94sf
40sf
70sf
151sf
6sf
6sf
49sf
175sf
21sf
997sf
224sf
340sf
30sf
539sf
245sf
-
VB-1
EHW-1
VB-1
CONC-1/RFM-1
GPT-5
GPT-1
GPT-5
GPT-1
VB-1/T-1 CONC-2
VB-1
MT-3/RFM-1
T-1
HWD-1
T-1
CONC-2
T-1
HWD-1/CONC-2
T-1
HWD-1/CONC-2
CONC-2
VB-1
CONC-2
GPT-4(6")GPT-4
GPT-8
GPT-4
GPT-4(6")GPT-4
GPT-8
GPT-4
T-1
GPT-2/RFM-1
VB-1
CONC-1
CONC-1
VB-1
CONC-1
VB-1
CPT-1
EHW-1
EHW-1
VB-1
MT-1/RFM-1
VB-1
CONC-1
CONC-1
VB-1
CONC-3
VB-1
EHW-2/MGT-1
VB-1
EHW-2
CONC-1
VB-1
CONC-1
VB-1
CONC-1/MGT-1/RFM-1
VB-1
CPT-1
Window/Door Trim
Ceiling
Notes
PT-1/PT-2/MT-2/MT-5
PT-4/PT-5
PT-5/MGT-2
PT-5 /MGT-2
WD-2/PT-12/PT-13
WD-2/PT-12
PT-13/PT-14/PWC-2
PT-12/PT-13
PT-12
PT-12/PT-13/GPT-6/GPT-7
PT-12/PT-13
PT-12
PT-14/GPT-6
PT-12
PT-14/GPT-6
Pt-12
PT-7/PT-8/PT-9/T-3
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-10
PT-4
PT-4
PT-4/MR-1/MP-1
PT-4/MGT-2
PT-4/MR-1
PT-4
PT-4
PT-4/MGT-2
PT-1
T-7 (all sides)
T-7
T-7
T-7
T-5 (casing)/T-6 (sills)
T-5 (casing)
T-5 (casing)/T-6 (sills)
T-5 (casing)/T-6 (sills)
T-5 (casing)/T-6 (sills)
T-5 (casing)/T-6 (sills)
PT-3
PT-3
PT-3
PT-3
PT-12
PT-12
PT-12
PT-12
PT-12
PT-12
PT-12
PT-12
PT-12
PT-12
PT-12
PT-9
PT-3
PT-3
PT-3
PT-3
PT-3
PT-3
PT-3
PT-3
PT-3
PT-3
PT-3
FABRIC-1; WD-1 (counters); PLAM-3, PLAM-5 (casework)
T-5 (door casing)
T-5 (door casing)
T-5 (door casing)
T-5 (door casing)
T-5 (casing)/T-6 (sills)/PT-9
T-7 (casing - all sides)
T-7 (casing)
SS-1 (sills)
SS-1 (sills)
SS-1 (sills)
SS-1 (sills)
T-7 (casing - all sides)
RP-1; PLAM-1
RP-1; PLAM-1
PT-14 (casework)
see D/D5.03
see D/D5.03 for additional detail
PT-14 on Exposed Steel
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
PT-14 on Exposed Steel/PT-14 (casework)/WD-3 (bar)
RP-2; see C/D5.03 & E/D7.01
RP-2; see C/D5.03 & E/D7.01
see A/D5.03 & G/D5.03
see D/D5.02; PLAM-4 (casework) / WD-4 (counters)
see D/D5.02; PLAM-4 (casework) / WD-4 (counters)
-
Document Phase
Revision 1
Leasing Office
Corridor
Women's Pool RR
Men's Pool RR
Entry Lounge
Vestibule (Goat)
T.V. Lounge
Games
Bar Dining
Bar
Stage
Janitor
Men's Goat RR
HC Stall
Women's Goat RR
HC Stall
Mail
Goat Office
A/V Closet
Storage
PM Office
Closet
Closet
Vestibule (Leasing)
Om Office
Laundry
Fitness
Breakout
Flex Studio
Closet
Sweat Studio
Om Lobby
Open Office
Walls
Document Date
22 Jan 2016
100
100B
102
103
106
106A
107
108
109
109A
109B
109C
110
110 A
111
111A
113
114
115
116
117
118
119
120
122
123
124
125
126
127
128
129
207
Floor
Design Buildout Package
Floor Area Base
Amenities Building (Building 1)
Room Name
The Exchange at LC New Albany Park
Room #
Plumbing Accessory Schedule:
Room #
100
100B
102
103
110
110A
111
111A
125
Room Name
Leasing Office
Corridor
Women's Pool RR
Men's Pool RR
Men's Goat RR
Stall
Women's Goat RR
Stall
Breakout
Lavatory
LAV-5
LAV-4
LAV-4
LAV-6
LAV-6
-
Faucet
FAUCET-3
FAUCET-1 qty 2
FAUCET-1 qty 2
FAUCET-2 qty 2
FAUCET-2 qty 2
-
Accessories
rev
date
remark
-
2015-07-27
original issue
WF-1 in addition to accessible/standard water fountain
WB-1, TPH-1 in each stall; HD-1, SD-1 at lavatory
TPH-1 in each stall; HD-1, SD-1 at lavatory
TPH-1 in each stall; HD-1, SD-2 at lavatory
TPH in stall
WB-1, TPH-1 in each stall; HD-1, SD-2 at lavatory
WB-1, TPH-1 in stall
TAP-1 see Casework Package
Finish Schedule
not to scale
D5.20
FINISH LEGEND:
GPT-6
GPT-7
GPT-8
GPT-10
Florida Tile
Product:
Series:
Size:
Color:
Grout:
Florida Tile
Product:
Size:
Color:
Grout:
Florida TIle
Product:
Size:
Color:
Grout:
Florida Tile
Product:
Series:
Size:
Color:
Grout:
Flooring Distributors
Product:
Grout:
Marble Tile
MT-1
Flooring Distributors
Product:
Flooring Distributors
Product:
Flooring Distributors
Product:
Grout:
Marble
Streamline
6" x 3"
Arctic
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 929 Charcoal
Streamline
6" x 3"
Gunmetal
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 929 Charcoal
High Definition Porcelain
Stellar
6x12 Cove Base
Helio
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 982 Summer Wheat
Daltile Keystones 1"x1" Hexagon in Arctic;
1"x1" Black Hexagon Accents upon install
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 941 Raven
Carrara Marble Italian White Bianco
Carrara Basketweave Mosaic Tile with
Nero Marquina Black Dots Polished
AccuColor Premium Sanded Grout
w/ Grout Boost
Color: 941 Raven
Carrara Marble Italian White Honed
Subway Tile 3"x6"x3/8"
AccuColor Premium Sanded Grout
w/ Grout Boost
Color: 949 Silverado
Carrara Marble Italian White Bianco
Ogee 1 Chairrail Molding Honed
AccuColor Premium Sanded Grout
w/ Grout Boost
Color: 949 Silverado
Product:
Edge Profile:
Carrara Marble Slab
Ogee over Half Bullnose
MARBLE-2
Product:
Edge Profile:
Carrara Marble Slab
Eased (1/8" max Radius)
BRICK-1
Sealed Concrete
CONC-1
CONC-2
CONC-3
Carpet
CPT-1
MARBLE-1
Brick
RFM-1
Notes:
Charleston Tumbled Brick
Modular
Color/Type to match Exterior Brick
Mortar Finish: Over-filled
See Detail
H&C
Product:
Notes:
H&C
Product:
Color:
Notes:
Shield-Crete
Product:
Notes:
Shaw Contract Group
Style:
Collection:
Color: 16504
Notes:
PT-3
PietraArt
Bliss
RSP 12"x12" Mosaic
Norwegian Ice
AccuColor Premium Sanded Grout
w/ Grout Boost
Color: 949 Silverado on floor, 910 Bright White
on walls
Classic Mat
See Plans
Smooth
Charcoal
Semi-Transparent Decorative Stain
TBD
Seal with Sealer per
manufacturer's recommendations
Epoxy Concrete Floor Coating
Apply per manufacturer's recommendations
Use Decorative Color Flakes:
Torginol ColorFlake Vinyl Color Chips
Color: Astroturf Blend B-313 1/4"
Seal with H&C Wet Look sealer or sim.
Delivered
In Stock
Cursive Grey
Broadloom
EHW-2
Teragren
TPF-VGN-CRFTSMN or PF-FGN-MPL
Olde Wood Ltd
Face-planed Exterior Barn Siding; see detail
WD-3
Bartop
Thickness:
Stain/Finish:
Notes:
sample available for fabricator
2"
sample available for fabricator
Provide 1/8"T x 2"W Brass Strapping at
seems. See Details. Final spec to be provided
by fabricator/installer.
PWC-2
Paneling
MP-1
MR-1
Vinyl Base
VB-1
T-1
T-2
WD-2
Wall Covering
PT-13
3/4" x 3-1/4" Red Oak Unfinished Flooring
TBD
Cherry Butcher Block
1-1/2"
TBD on install
By Owner
Style
Thickness
Stain
T-3
T-4
T-5
Maple Butcher Block
1-3/4"
Sealed only
T-6
Kathy Kuo Home
Product:
Color:
British Industrial Storage Drawers
Charcoal
White County Mouldings
Product:
1" x 4" V-Groove Paneling
Paint/Stain:
PT-14
MetalsDepot.com
Product:
Notes:
Fitness Mirror
Johnsonite
Product:
Profile:
Color:
22 Gauge Galvanized 4' x 8' Steel Sheet
1" x 1" x 1/8" Galv. 10' Steel Angle on corners
Sheets and Angles will need to be cut in field
Sherwin Williams
Color:
#7673 Pewter Cast
Notes:
Eggshell Finish
Sherwin WIlliams
Color:
Color Match RH Flint (see below)
Notes:
Semi-Gloss Finish
Sherwin WIlliams
Color:
#7545 Pier
Notes:
Eggshell Finish
Sherwin Williams
Color:
#6127 Ivoire
Notes:
Eggshell Finish
Sherwin Williams
Color:
#6244 Naval
Notes:
Eggshell Finish
PT-12
Plastic Laminate
PLAM-1
WilsonArt
Type:
Color:
Notes:
107 Standard
4830 Satin Stainless
Linearity 18 Finish
PLAM-2
WilsonArt
Type:
Color:
Notes:
350 Vertical Grade
7909 Fusion Maple
Standard 60 Finish
PLAM-3
WilsonArt
Type:
Color:
Notes:
107 Standard
D354 Designer White
Linearity 18 Finish
PLAM-4
WilsonArt
Type:
Color:
Notes:
107 Standard
D354 Designer White
Standard 60 Finish
PLAM-5
WilsonArt
Type:
Color:
Notes:
107 Standard
4882 Oiled Soapstone
Standard 60 Finish
WIlsonArt
Color:
D354SL Designer White
Sherwin Williams
Color:
#7671 On The Rocks
Notes:
Eggshell Finish
PT-10
Trim
Lumber Liquidators
Style
Thickness
Stain:
Sherwin Williams
Color:
#7008 Alabaster
Notes:
Flat Finish
Sherwin Williams
Color
#6126 Navajo White
Notes:
Eggshell Finish; Semi-Gloss finish for Trim
STAIN-1
1
Sherwin Williams
Color:
Color Match RH Slate (see below)
Notes:
Eggshell Finish
PT-9
PT-14
WD-1
WD-4
PT-8
Stain
Rural Living 5" Hickory
Misty Grey
Solid Wood
PT-5
PT-7
Concrete Sealer Wet Look (Water-Based)
Apply per manufacturer's recommendations
Armstrong
Style:
Color:
R.L. Colston
Product:
Color:
PT-4
PT-6
EHW-1
PANEL-1
Triangle Brick
Product:
Size:
Mortar:
Waterhog
Product:
Size:
Backing:
Color:
PT-2
Engineered Hardwood
HWD-1
Grout:
MT-5
High Definition Porcelain
Tides
3" x 24" Bullnose Floor Trim
Sea Salt
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 908 Dove Gray
Recessed Floor Mat
Hardwood
Grout:
MT-2
High Definition Porcelain
Stellar
18"x18"
Helio
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 982 Summer Wheat
Florida Tile
Product:
Series:
Size:
Color:
Grout:
PietraArt
Bliss
5/8" Square 12"x12" Mosaic
Norwegian Ice
AccuColor Premium Sanded Grout
w/ Grout Boost
Color: 949 Silverado
Sherwin Williams
Color:
Color Match RH Sand Dollar (see below)
Notes:
Eggshell Finish
Solid Surface
SS-1
Curtains
FABRIC-1
Toilet Accessories
HD-1
Sherwin Williams
Color:
#6207 Thunderous
Notes:
Eggshell Finish
Hand Dryer
Manufacturer:
Model #:
Uline
H-1927W
SD-1
Sherwin Williams
Color:
#7554 Steamed Milk
Notes:
Eggshell Finish
Soap Dispenser
Manufacturer:
Model #:
Uline
H-3415GR
SD-2
Sherwin Williams
Color:
#7062 Rock Bottom
Notes:
Semi-Gloss Finish
Soap Dispenser
Manufacturer:
Model #:
Uline
H-3884
TPH-1
Toilet Paper Holder
Manufacturer:
Uline
Series:
H-2546
WB-1
Waste Basket
Manufacturer:
Model #:
Sherwin Williams
Product:
TBD
Color:
TBD
Uline
H-3454
Restroom Partitions
White County Mouldings
Style:
WCM-609 w/ WCM-31
Color:
PT-14 in Goat, PT-9 in Mailroom
Notes:
Base and Shoe Profile
White County Mouldings
Description:
Plate Rail
Style:
PLATE RAIL, WCM-9858, 1x6, 1" ASTRAGAL
Color:
PT-14
Notes:
See Detail
White County Mouldings
Style:
1x4, 1x8, WCM-9883
Color:
PT-9
Notes:
8" Crown Profile
White County Mouldings
Color:
PT-14
Notes:
6" Colonial Base
White County Mouldings
Style:
WCM-591
Color:
PT-14 in Goat, PT-9 in Mailroom
Notes:
Casing Profile
White County Mouldings
Style:
WCM-1193 w/ WCM-100 & WCM-623
Color:
PT-14 in Goat, PT-9 in Mailroom
Notes:
Stool w/ Apron
T-7
1x4 Flat Poplar Stock w/ Eased Edges
Color:
PT-1
Notes:
Casing (all sides - no sill)
T-8
White County Mouldings
Style:
WCM-206 CAP
Color:
PT-14
Notes:
Base Panel Mould
RP-1
RP-2
Hadrian
Product:
Series:
Color:
Note:
Powder Coated
Floor Mounted
621 Slate
Headrail Braced
Hadrian
Product:
Series:
Color:
Note:
Powder Coated
Floor Mounted
545 Charcoal
Headrail Braced
rev
date
remark
-
2015-07-27
original issue
1
2016-01-18
Revision 1
Plumbing Fixtures
FAUCET-1
American Standard
Product:
Metering Faucet
Series:
Serin Widespread 2064.451.002
FAUCET-2
Central Brass
Product:
Notes:
Laundry Faucet with 3.5" Centers
Offset Legs
FAUCET-3
Pfister
Product:
Model:
Marielle Faucet
F-072-M1SS
LAV-4
Signature Hardware
Product:
Angled Polished Carrara Marble Vessel
SKU:
232032
LAV-5
Signature Hardware
Product:
15" Executive Zero-Radius Rect Bar Sink
SKU:
338147
Notes:
Stainless Steel, 3.5" Drain not included
LAV-6
Signature Hardware
Product:
59" Stainless Steel Wall-Mount
Commercial Sink
SKU:
919297
WF-1
Elkay
Product:
Model:
TAP-1
Micromatic
Product:
Model:
Notes:
Floor to Ceiling; Even Panel Widths
Millwork Contoured Wall Base
4.5" Reveal
20 Charcoal
Covington Contract
Fabric Line:
Pristine
Color:
191 Pearl Grey
Width:
117"
Notes:
Curtain Track Included
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
Document Phase
Revision 1
GPT-5
Florida Tile
Product:
Series:
Size:
Color:
Grout:
High Definition Porcelain
Grandeur Natural
18"x18"
Elegant Amber
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 915 Light Smoke
MGT-2
PT-1
Document Date
22 Jan 2016
GPT-4
Florida Tile
Product:
Series:
Size:
Color:
Grout:
High Definition Porcelain
Tides
12"x24"
Sea Salt
AccuColor Premium Sanded Grout
w/ Grout Boost; Color: 908 Dove Gray
Paint
Design Buildout Package
GPT-2
Florida Tile
Product:
Series:
Size:
Color:
Grout:
Florida Tile
Product:
Series:
Size:
Color:
Grout:
Amenities Building (Building 1)
GPT-1
MGT-1
The Exchange at LC New Albany Park
Mosaic Glass Tile
Glazed Porcelain Tile
Elkay EZH20 Bottle Filing Station
LZWSRK EZH20 with Filter
Chrome Plated Standard Faucet
Stainless Steel Lever #4933
Use with Micromatic 12" Stainless Steel
Flushmount Drip Tray #DP-220D and
Oasis R5 Remote Chiller
Finish Legend
not to scale
D5.30
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Furniture Plan
[Area 1]
scale: 1/4" = 1'-0"
D6.01
A
Furniture Plan - Area 1
1/4" = 1'-0"
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Furniture Plan
[Area 2]
scale: 1/4" = 1'-0"
A
Furniture Plan
1/4" = 1'-0"
D6.02
Furniture Schedule:
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
Document Phase
Revision 1
Notes
Document Date
22 Jan 2016
Product #
Design Buildout Package
Manuf.
Amenities Building (Building 1)
Type
The Exchange at LC New Albany Park
Desig.
rev
date
remark
-
2015-07-27
original issue
Furniture Schedule
not to scale
D6.10
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Perspectives Goat
not to scale
D7.01
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Perspectives Goat
not to scale
D7.02
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Perspectives Goat
not to scale
D7.03
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Perspectives Leasing
not to scale
D7.11
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Perspectives Fitness
not to scale
D7.21
Document Phase
Revision 1
Document Date
22 Jan 2016
Design Buildout Package
The Exchange at LC New Albany Park
Amenities Building (Building 1)
Development Department
230 West Street / Suite 200
Columbus / Ohio / 43215
614.918.2000
rev
date
remark
-
2015-07-27
original issue
Perspectives Fitness
not to scale
D7.22
Download