Generating Facility Pre-Application Request Form Preamble and Instructions An Interconnection Customer who requests a Pre-Application Report must submit this Pre-Application Request by hand delivery, mail, e-mail, or fax to the Utility along with the non-refundable fee of $500. DISCLAIMER: Be aware that the Pre-Application Report is simply a snapshot in time and is nonbinding. System conditions can and do change frequently. Check here if payment is enclosed. Fee is required for application to be considered complete. Date: _____________________________ Interconnecting Customer Name (print): __ __________________ _______________________ Contact Person: ____________________ __________________ _______________________ Mailing Address: ________________________________________________________________ _____________________________________________________________________________ City: ____________________________ State: _________________ Zip Code: ___________________ Telephone (Daytime): ________________ ___ E-Mail Address: ________________________ Alternative Contact Information (e.g., system installation contractor or coordinating company) Name (print): _______________________ __________________ _______________________ Role: _____________________________ __________________ _______________________ Contact Person: ____________________ __________________ _______________________ Mailing Address: ________________________________________________________________ _____________________________________________________________________________ City: ____________________________ State: _________________ Zip Code: ___________________ Telephone (Daytime): ________________ _____ E-Mail Address: ______________________ Facility Information: 1) Proposed Facility Location Address (or cross-roads): __________ __________________ _______________________ City: ________________________________ State: ________ Zip Code: ______________________ Site Map provided (Google, MapQuest, etc.) Grid Coordinates - Latitude: __________________________ Longitude: ____________________ Pole or Tower number if available: _ __________________ _______________________ SC Generator Interconnection Request 1 2) Primary Energy Source Choose one: Renewable 1. Solar – Photovoltaic 2. Solar – thermal 3. Biomass – landfill gas 4. Biomass – manure digester gas 5. Biomass – directed biogas 6. Biomass – solid waste 7. Biomass – sewage digester gas 8. Biomass – wood 9. Biomass – other (specify below) 10. Hydro power – run of river 11. Hydro power - storage 12. Hydro power – tidal 13. Hydro power – wave 14. Wind 15. Geothermal 16. Other (specify below) Non-Renewable 17. Fossil Fuel - Diesel 18. Fossil Fuel - Natural Gas (not waste) 19. Fossil Fuel - Oil 20. Fossil Fuel – Coal 21. Fossil Fuel – Other (specify below) 22. Other (specify below) 3) Prime Mover Choose one: 1. 2. 3. 4. Photovoltaic (PV) Fuel Cell Reciprocating Engine Gas Turbine 5. Steam Turbine 6. Micro-turbine Other, including Combined Heat and Power (specify below) 4) Type of Generator Choose one: 1. 2. 3. Inverter-based Machine Rotating Machine Rotating Machine with Inverters 5) Size: ______________________ kW AC 6) Generator Configuration: Single-phase Three Phase SC Generator Interconnection Request 2 7) Interconnection Configuration New Generation Stand-alone Addition to existing commercial or industrial customer’s delivery Customer’s Electric Utility account number: _____________________________________ Customer’s Electric meter number: ____________________________________________ Is Customer’s kW load going to increase or decrease? No Yes, Details ____________________________________________________________ Proposed Point of Interconnection on Customer-side of Utility meter ________________________________ ____________________ __________________________ ***OR*** Addition to existing generation Stand-alone Addition to existing commercial or industrial customer’s delivery Customer’s Electric Utility account number: _____________________________________ Customer’s Electric meter number: ____________________________________________ Is Customer’s kW load going to increase or decrease? No Yes, Details _______________________________________________________ Type of Existing Generation: ______________________________________________ Size of Existing Generation: ____________ kWAC Proposed Point of Interconnection on Customer-side of Utility meter _____________________________________________________________________________ Additional Comments ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ SC Generator Interconnection Request 3