ATTACHMENT 3 Generating Facility Pre-Application Report Form Preamble and Instructions An Interconnection Customer who requests a Pre-Application Report must submit this Pre-Application Report Request by hand delivery, mail, e-mail, or fax to the Utility along with the non-refundable fee of $300. DISCLAIMER: Be aware that this Pre-Application Report is simply a snapshot in time and is non- binding. System conditions can and do change frequently. Check here if payment is enclosed. Fee is required for application to be considered complete. Date: _________________ q Interconnecting Customer Name (print): Contact Person: Mailing Address: City: ________________________________ State: ______________ Zip Code: __________ Telephone (Daytime): E-Mail Address: Alternative Contact Information (e.g., system installation contractor or coordinating company) Name (print): Role: Contact Person: Mailing Address: City: ________________________________ State: ______________ Zip Code: __________ Telephone (Daytime): E-Mail Address: Facility Information: 1) Proposed Facility Location Address (or cross-roads): City: ________________________________ State: ________ Zip Code: __________ q Site Map provided (Google, MapQuest, etc.) NC Pre-Application Report Form 1 q Grid Coordinates - Latitude: ______________ Longitude: ______________ q Pole or Tower number if available: 2) Primary Energy Source Choose one: Renewable 1. Solar – Photovoltaic 2. Solar – thermal 3. Biomass – landfill gas 4. Biomass – manure digester gas 5. Biomass – directed biogas 6. Biomass – solid waste 7. Biomass – sewage digester gas 8. Biomass – wood 9. Biomass – other (specify below) 10. Hydro power – run of river 11. Hydro power - storage 12. Hydro power – tidal 13. Hydro power – wave 14. Wind 15. Geothermal 16. Other (specify below) Non-Renewable 17. Fossil Fuel - Diesel 18. Fossil Fuel - Natural Gas (not waste) 19. Fossil Fuel - Oil 20. Fossil Fuel – Coal 21. Fossil Fuel – Other (specify below) 22. Other (specify below) 3) Prime Mover Choose one: 1. 2. 3. 4. Photovoltaic (PV) Fuel Cell Reciprocating Engine Gas Turbine 5. 6. 7. 4) Type of Generator Choose one: 1. 2. 3. Inverter-based Machine Rotating Machine Rotating Machine with Inverters 5) Size: kW AC 6) Generator Configuration: q Single-phase q Three Phase NC Pre-Application Report Form 2 Steam Turbine Micro-turbine Other, including Combined Heat and Power (specify below) 7) Interconnection Configuration q New Generation q Stand-alone q Addition to existing commercial or industrial customer’s delivery Customer’s Electric Utility account number: ___________________ Customer’s Electric meter number: _________________________ Is Customer’s kW load going to increase or decrease? q No q Yes, Details ______________________________________ Proposed Point of Interconnection on Customer-side of Utility meter __________________________________________________________ ***OR*** q Addition to existing generation q Stand-alone q Addition to existing commercial or industrial customer’s delivery Customer’s Electric Utility account number: ___________________ Customer’s Electric meter number: _________________________ Is Customer’s kW load going to increase or decrease? q No q Yes, Details ______________________________________ Type of Existing Generation: ______________________________ Size of Existing Generation: ____________ kWAC Proposed Point of Interconnection on Customer-side of Utility meter __________________________________________________________ Additional Comments _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ NC Pre-Application Report Form 3