Addendum No.1-Add to, modify, and clarify bid

advertisement
ADDENDA #01
To (Contractor):
Date of Issuance
November 4, 2015
From:
Paul J. Banta
Project Name:
Union County Human Services
CC:
Craig Fox
Project #:
830346
IFB# 2016-013
This document is an addendum, which modifies the requirements of the bid documents for the items
indicated. Bidders shall review the addendum and incorporate the modified requirements into their
proposals.
Information in this addendum supersedes information previously provided in the bidding requirements
with respect to the items indicated. Bidders shall coordinate addendum items with related work to
insure that the addendum results in a complete project, with the modified requirements completely and
fully integrated into the project.
GENERAL INFORMATION
A Pre-Bid conference was held on Tuesday, October 27, 2015. See attached minutes and sign in
sheet.
The addenda can be examined at the office of the Purchasing Division of Union County Administrative
Services, located at Union County Government Building, 500 North Main Street, Suite #709, Monroe,
NC 28112 , and at the following locations:
1.
Hispanic Contractors Associations of the Carolinas (HCAC) Plan Room – HCAC Digital Plan
Room 226 Westing House Blvd. Suite 303 Charlotte, NC 28273 Phone: 877- 227-1680
2.
Carolina AGC/ISQFT Plans Room Charlotte 1800-364-2059 / Main Headquarters; 6115 Park
South Dr., Suite 350 Charlotte, NC 28210
3.
Metrolina Minority Contractors Association (MMCA) Plan Room, Address: 2848 Queen City
Drive, Suite B, Charlotte, NC 28208, 704-332-5746, mmca@mmcaofcharlotte.org
Addendum for this project can be obtained from ABC Imaging, 9524 Hebron Commerce Drive,
Charlotte, NC. 28273, (P) 704.593.3380, (F) 704.593.3383.
CHANGES TO THE PROJECT MANUAL:
Replace the following specification sections in full with the revised documents attached. Specific
revisions are noted as follows:
Item No. PM-01 Specification
00 22 00 – Supplementary Instructions to Bidders
Page 4, 4.3 - Submission of Bids: Revise text as follows:
November 4, 2015
Re: 830346 IFB# 2016-013
4.3.5 The following forms must be returned with your bid proposal. Provide one (1) original
copy of the bid proposal.
Item No. PM-02 Specification
01 23 00 – Alternates
Revised Section 3.1 – Schedule of Alternates, Paragraph A.1 – Alternate No. A-01: Clinical Casework: Revise
text as follows:
1.
Alternate: Delete architectural wood casework in the WIC, Women’s Health, Adult Health,
Children’s and Dental Clinic (see room list below). Alternate clinical casework for these
spaces will be owner provided through a separate contract. Contractor is fully responsible
for management and coordination of this owner provided work including shop drawing
coordination, coordination of deliveries, review of application for payment, all quality
control requirements and closeout procedures.
ROOMS: B105, B106, B204, B205, B206, B207, B208, B210, B212, B213, B214,
B224, B226, C203, C209, C210, C216, C217, C221, C223, C225, B306, B307,
B308, B309, B310, B311, B312, B314, B315, B318, B323, B326, B327, B328,
B329, B330, B331, B332, B333, B334, B335, B336, B337, B338, B339, C308,
C309, C310, C311, C312, C313, C314, C315, C320, C322, C325, C326, C327, C328,
C329, C330, C334, C337, C338, C339, C340, C341, C342, C343, C344, C346
Item No. PM-03 Specification
07 81 00 – Applied Fireproofing
Revised Section 1.3 – Informational Submittals. Add the following paragraph:
B. Manufacturer’s Confirmation: Confirmation that UL Designs selected for the project are not load
restricted.
Revised Section 1.4 – Quality Assurance, item D.1 – Fire Resistance Ratings. Add the following paragraph:
a. UL design listings must state that the loading was determined by Allowable Stress Design Method or
Load and Resistance Factor Design Method. UL design listings requiring a load restriction factor are
not allowed.
Revised Section 2.1 – Concealed SFRM, paragraph B.1 – Material Composition. Replace with the following text:
1. Concealed Cementitious (wet mix) Fire-Resistive Material: Factory-mixed, dry formulation of inorganic
binders complying with indicated fire-resistance design and mixed with water at Project site to form a
slurry or mortar before conveyance and application.
Item No. PM-04 Specification
08 33 00 – Overhead Coiling Door
Revise Section 2.6 – Electric Door Operators, paragraph E – Remote Control Station. Delete sub-paragraph 2.
Revise Section 2.7 – Manufacturers, paragraph A – Basis of design. Delete the following text:
Auto set system, Model FSD M by McKeon Door Company
Revise Section 2.8 –Insulated Service Door Assembly, paragraph F. Revise text as follows:
2
November 4, 2015
Re: 830346 IFB# 2016-013
F. Curtain Jamb Guides: Galvanized steel with exposed finish matching curtain slats. At interior
overhead doors,
Revise Section 2.8 –Insulated Service Door Assembly, paragraph H. Delete paragraph.
Revise Section 2.8 –Insulated Service Door Assembly, paragraph J. Revise text as follows:
J. Factory applied baked-enamel or powder-coated (contractors discretion); color to match exterior metal
doors and frames.
Item No. PM-05 Specification
08 71 00 – Door Hardware
Hardware Set I-59 and I-62: changed Passage Lock to L9010 17A XL12-921
Door A116 moved from Hardware Set I-08 to I-09
Item No. PM-06 Specification
09 65 19 – Resilient Tile Flooring
Revise Section 2.1 - Manufacturers, paragraph A.2 Vinyl Composition Floor Tile as follows:
a.
Drawing Designation VT1:
1)
2)
3)
4)
Manufacturer: Armstrong.
Style: Imperial Texture.
Color: 51860 Soft Cool Gray
Size: 12 inches square
Item No. PM-07 Specification
10 14 00 – Signage
Add Section 1.2 – Performance Requirements: Add section and paragraph as follows:
A. Contractor shall determine sign sizes and appearance to comply with authorities having jurisdiction
and to receive a Certificate of Occupancy.
Revise Section 3.1 – Installation, paragraph C – Signage Schedule: Revise sub-paragraphs to read as follows:
1. Toilet Room Signage: Provide sign with room identifier and universal symbol, text and Braille.
2. Support Room Signage: For Closets, Mechanical, and Equipment Rooms provide sign with room
number, room identifier, in text and Braille.
3. Elevator: Provide sign with text indicating “Use Stairs in case of Fire” and universal graphic symbol.
4. Stair Signage: Provide sign with universal graphic, text and Braille.
Item No. PM-08 Specification
23 09 00 - Instrumentation and Control for HVAC
Revised Section 2.01 – Acceptable Manufacturers, paragraph A. MSS added as approved vendor.
Item No. PM-09 Specification
23 21 13 - Hydronic Piping
3
November 4, 2015
Re: 830346 IFB# 2016-013
Revised Section 1.1 – Summary, paragraph A. Add Condenser-water piping.
Revised Section 3.1 – Piping Applications, paragraph B. Revise text as follows:
2. Schedule 40 steel pipe; grooved, mechanical joint coupling and fittings; and grooved, mechanical
joints
Revised Section 3.1 – Piping Applications, paragraph B. Add text as follows:
3. Type L drawn-temper copper tubing, grooved, mechanical-joint, wrought-copper fittings, and soldered
joints
Revised Section 3.1 – Piping Applications. Insert new paragraph E after paragraph D.
E. Condenser-water piping, aboveground indoors, NPS 2 and larger, shall be the following:
1. Schedule 40 steel pipe, wrought-steel fittings and wrought-cast or forged-steel flanges and
flange fittings, and welded and flanged joints.
2. Schedule 40 steel pipe; grooved, mechanical joint coupling and fittings; and grooved,
mechanical joints.
Revised Section 3.1 – Piping Applications, relabeled paragraph F. Revise text as follows:
F. Condenser-water Piping Installed Belowground and within Slabs: See Specification Section 23 21 14
– Underground Hydronic Piping.
Item No. PM-10 Specification
23 21 16 - Hydronic Piping Specialties
Revised Section 2.2 – Valves, paragraph C.1. PRO Hydronic Specialties added as approved manufacturer.
Revised Section 2.2 – Valves, paragraph D.1. American Wheatley added as approved manufacturer.
Revised Section 2.2 – Valves, paragraph E.1. American Wheatley added as approved manufacturer.
Revised Section 2.2 – Valves, paragraph F.1. PRO Hydronic Specialties added as approved manufacturer.
Item No. PM-11 Specification
23 25 16 - Water Treatment for Open-Loop Hydronic Systems
Revised Section 2.1 – Water Treatment, paragraph A.1. Pulse Pure, Griswold added as approved manufacturers.
Item No. PM-12 Specification
23 25 19 - Liquid-Solids Separation Systems
Revised Section 2.04 – Manufacturers. Puroflux added as approved manufacturers.
Item No. PM-13 Specification
23 52 16 - Condensing Boilers
Revised Section 2.1 – Water–Tube Condensing Boilers, paragraph A. Fulton added as approved manufacturer.
Item No. PM-14 Specification
23 73 13 – Modular Indoor Central Station Air-Handling Units
4
November 4, 2015
Re: 830346 IFB# 2016-013
Revised Section 2.01 – Acceptable Manufacturers, paragraph A. Racan/Carrier Custom added as approved
manufacturers.
Item No. PM-15 Specification
32 31 13 - Vinyl Coated Chain-Link Fence and Gate
Add specification section.
CHANGES TO THE DRAWINGS:
Replace the following drawing sheets in full with the revised documents attached. Specific revisions are
noted as follows:
Item No. DW-01 Drawings
A11-01A – Level 01 Floor Plan – Sector A
Door swing changed on Door #A116
Item No. DW-02 Drawings
A12-01A – Level 01 Reflected Ceiling Plan – Sector A
Added ceiling mounted exit sign outside of door existing from Stair A to the corridor.
Added wall mounted exit sign above door B111.
Item No. DW-03 Drawings
A12-03C – Level 03 Reflected Ceiling Plan – Sector C
Added exit sign at door C308.
Moved exit sign at door C301 from pull side to push side of door.
Adjusted exit sign directional arrows to reflect exit path.
Item No. DW-04 Drawings
A21-02 – Exterior Elevations - East
Identified the type of glazing in stair A as GL223 (safety glazing)
Item No. DW-05 Drawings
A21-04 – Exterior Elevations - West
Identified the type of glazing in stairs C and D as GL223 (safety glazing)
Item No. DW-06 Drawings
A30-12 – Wall Sections – Sectors A & E
Identified the fenestration in stair A as FE111
Item No. DW-07 Drawings
A41-02 – Stair A2 – Plans, Sections & Details
5
November 4, 2015
Re: 830346 IFB# 2016-013
Removed the railing in front of the glazing, and corrected the assembly tag at the window to FE111
Item No. DW-08 Drawings
A60-01 – Assembly Schedule
Corrected the glazing type identifiers in FE111 to coordinate with specification section 088000
Item No. DW-09 Drawings
A62-11 – Door Schedule – Levels 01 and 02
Added 1 hour rating to door ST-A102.
Added 1 hour rating to door ST-E101.
Item No. DW-10 Drawings
A62-12 – Door Schedule – Level 03
Added hardware group I-39 to door A324.
Added hardware group I-68 to door A342.
Added hardware group I-21 to door A343.
Item No. DW-11 Drawings
C-201 - Enlarged Site Plan North
An annotation referencing the “Fleet Parking Gate” was corrected to reference Sheet C-201.
Note “2.” under “SITE PLAN NOTES” was revised to provide additional information regarding the motorized gate
for fleet parking.
Note “4.” under “SITE PLAN NOTES” was added to provide additional information regarding the bike racks to be
provided.
Item No. DW-12 Drawings
C-500 - Enlarged Utility Plan
Annotation describing the irrigation meter on this sheet has been revised to show the correct size.
Item No. DW-13 Drawings
C-701 - Enlarged Planting Plan North
Hatch pattern has been added to identify the limits of irrigation.
Item No. DW-14 Drawings
C-702 - Enlarged Planting Plan South
Hatch pattern has been added to identify the limits of irrigation.
Item No. DW-15 Drawings
E00-01 - ELECTRICAL NOTES & LEGENDS
Edited the legend specific Typical wire mold poke thru devices and Typical floor box devices for clarity
6
November 4, 2015
Re: 830346 IFB# 2016-013
Item No. DW-16 Drawings
E11-01DEP - LEVEL 01 FLOOR PLAN – SECTOR D & E - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-17 Drawings
E11-02AP - LEVEL 02 FLOOR PLAN – SECTOR A - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-18 Drawings
E11-02BP - LEVEL 02 FLOOR PLAN – SECTOR B - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-19 Drawings
E11-02CP - LEVEL 02 FLOOR PLAN – SECTOR C - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-20 Drawings
E11-02DP - LEVEL 02 FLOOR PLAN – SECTOR D - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-21 Drawings
E11-02EP - LEVEL 02 FLOOR PLAN – SECTOR E - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-22 Drawings
E11-03AP - LEVEL 03 FLOOR PLAN – SECTOR A - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-23 Drawings
E11-03BP - LEVEL 03 FLOOR PLAN – SECTOR B - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-24 Drawings
E11-03CP - LEVEL 03 FLOOR PLAN – SECTOR C - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-25 Drawings
E11-03DP - LEVEL 03 FLOOR PLAN – SECTOR D - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-26 Drawings
E11-03EP - LEVEL 03 FLOOR PLAN – SECTOR E - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
7
November 4, 2015
Re: 830346 IFB# 2016-013
Item No. DW-27 Drawings
E11-04CP - LEVEL ROOF PLAN – SECTOR C - POWER
Edited the Keyed note 1 wire mold poke thru devices and Typical floor box devices for clarity.
Item No. DW-28 Drawings
E11-04DP - LEVEL ROOF PLAN – SECTOR D - POWER
Item No. DW-29 Drawings
E21-01 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-30 Drawings
E21-02 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-31 Drawings
E21-03 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-32 Drawings
E21-04 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-33 Drawings
E21-05 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-34 Drawings
E21-06 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-35 Drawings
E21-07 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-36 Drawings
E21-08 - Electrical Schedules
Updated Panelboards with Spares (20A) and Spaces (-) for all Panelboards.
Item No. DW-37 Drawings
E44-01 - Enlarged Plans
Revised some Views for symbol clarity.
8
November 4, 2015
Re: 830346 IFB# 2016-013
Item No. DW-38 Drawings
G00-01 – Index of Drawings and General Information
Added sheets C-403 and C-600 through C-629 to the sheet index.
Item No. DW-39 Drawings
G02-11—Level 01 Life Safety Plan
Added ceiling mounted exit sign outside of door existing from Stair A to the corridor.
Added wall mounted exit sign above door B111.
Item No. DW-40 Drawings
G02-12 – Level 02 Life Safety Plan
Updated Life Safety Legend – Exiting.
Item No. DW-41 Drawings
M30-03 - Mechanical Details
Approved alternate manufacturers listed for pressure independent control valves.
Item No. DW-42 Drawings
S11-01A – FOUNDATION PLAN – SECTOR A
Continuous footing tags and designations added.
Item No. DW-43 Drawings
S11-01BC – FOUNDATION PLAN – SECTORS B&C
Continuous footing tags and designations added.
Footing Elevations added where required.
Item No. DW-44 Drawings
S11-01DE – FOUNDATION PLAN – SECTORS D&E
Continuous footing tags and designations added
Item No. DW-45 Drawings
S11-02A – LEVEL 2 FRAMING PLAN – SECTOR A
Top of pier elevations added.
Item No. DW-46 Drawings
S11-02B – LEVEL 2 FRAMING PLAN – SECTOR B
Top of pier elevations added.
Item No. DW-47 Drawings
S11-02C – LEVEL 2 FRAMING PLAN – SECTOR C
Continuous footing tags and designations added.
Top of pier elevations added.
9
November 4, 2015
Re: 830346 IFB# 2016-013
Item No. DW-48 Drawings
S11-02D – LEVEL 2 FRAMING PLAN – SECTOR D
Continuous footing tags and designations added.
Top of pier elevations added.
Item No. DW-49 Drawings
S30-01 – FOUNDAITON SECTIONS & DETAILS
Original detail 8/S30-01 removed. Sections 9, 10 & 11 renumbered.
Section 9, 10 & 11 dimensional information updated.
Item No. DW-50 Drawings
S30-02 – FOUNDATION SECTIONS & DETAILS
Schedule in section 1/S30-02 updated for required heights.
Item No. DW-51 Drawings
S30-03 – FOUNDAITON SECTIONS & DETAILS
Dimensions and reinforcing information added to details 1-5.
Item No. DW-52 Drawings
S50-03 – ELEVATED SLAB SECTIONS & DETAILS
Section 6/S50-03 “Top of Retaining Wall” section added.
Embed schedule 7/S50-03 added.
Item No. DW-53 Drawings
S60-01 – ROOF FRAMING SECTIONS & DETAILS
Sections 6, 7 & 8 revised to reflect beams.
Item No. DW-54 Drawings
S70-01 – BRACED FRAME ELEVATIONS & DETAILS
Member sizes and dimensional information added.
Item No. DW-55 Drawings
S70-03 – PLANS & SECTIONS – SECTOR-A-ELEVATOR
Foundation size and reinforcing information added
Wall reinforcing added.
Item No. DW-56 Drawings
S70-04 – PLANS & SECTIONS – SECTION-A-STAIRCASE
Foundation size and reinforcing information added.
10
November 4, 2015
Re: 830346 IFB# 2016-013
Item No. DW-57 Drawings
S70-05 – PLANS & SECTIONS – SECTION-DE-STAIRCASE
Foundation size and reinforcing information added.
Item No. DW-58 Drawings
S70-06 – PLANS & SECTIONS – SECTION-C-STAIRCASE
Foundation size and reinforcing information added.
Item No. DW-59 Drawings
S70-07 – PLANS & SECTIONS – SECTION-D-STAIRCASE
Foundation size and reinforcing information added
11
November 4, 2015
Re: 830346 IFB# 2016-013
Attachments:
2015-10-27_MM_UCHS Prebid Meeting Minutes.pdf
2015-10-27_IFB #2016-013 Pre-Bid Attendees.pdf
Specification Documents:
01 23 00 – Alternates
07 81 00 – Applied Fireproofing
08 33 00 – Overhead Coiling Door
08 71 00 – Door Hardware
09 65 19 – Resilient Tile Flooring
10 14 00 – Signage
23 09 00 - Instrumentation and Control for HVAC
23 21 13 - Hydronic Piping
23 21 16 - Hydronic Piping Specialties
23 25 16 - Water Treatment for Open-Loop Hydronic Systems
23 25 19 - Liquid-Solids Separation Systems
23 52 16 - Condensing Boilers
23 73 13 – Modular Indoor Central Station Air-Handling Units
32 31 13 – Vinyl Coated Chain Link Fence and Gate
Drawing Documents
A11-01
A12-01A
A12-03C
A21-02
A21-04
A30-12
A41-02
A60-01
A62-11
A62-12
C-201
C-500
C-701
C-702
E00-01
E11-01DEP
E11-02AP
E11-02BP
E11-02CP
E11-02DP
E11-02EP
E11-03AP
E11-03BP
E11-03CP
E11-03DP
E11-03EP
E11-04C
E11-04D
E21-01
E21-02
E21-03
E21-04
E21-05
E21-06
E21-07
E21-08
E44-01
G00-01
G02-11
G02-12
M30-03
S11-01A
S11-01BC
S11-01DE
S11-02A
S11-02B
S11-02C
S11-02D
S30-01
S30-02
S30-03
S50-03
S60-01
S70-01
S70-03
S70-04
S70-05
S70-06
S70-07
End of Addendum No. 01
12
Meeting Minutes
By:
Liz Richardson
Date: October 27, 2015
Meeting Date:
October 27, 2015
Project Name: Union County Human Services
Meeting Time:
2:00 pm
Project Number: 830346
Meeting Location:
Board of County Commissioners
Meeting Room, Monroe, NC
Attendees: See Enclosed Sign-In
1.
Introductions
Introduce Architect, Engineers and Owner; welcome participants; circulate sign-in sheet, purpose of conference
is to go over bidding procedures and requirements and any other questions.
2.
Project Location: 2330 Concord Avenue, Monroe, North Carolina, 28110
3.
Form of Bids: Single prime, General Contractors must fill in all information required on the bid form.
4.
Brief Overview of Documents
5.
a)
Project Description: The work includes the new construction of 144,000 gross square feet of a social
services and public health departments and human services administration facility.
b)
Drawings: 1 bound volume
c)
Specification: Two Volumes
d)
Addendum: None to date. Addendum #1 and the Pre-Bid minutes will be issued following this meeting
e)
Alternates: Refer to specification section 01 23 00. Price all alternates. If there is any confusion about
the scope of the alternate, include the uncertain scope in the base bid.
Forms Required for Bids
a)
Bid Form – Specification contains the Bid Form, Unit Prices and MBE requirements.
b)
Bid Bond or Certified Check– 5% of Bid Amount is required with the bid. A bid will not be read or
considered without valid bid security.
c)
The Bid Bond must be submitted with the bid documents.
d)
Alternate pricing – Refer to Bid Form.
e)
Unit prices – Refer to Specification section 01 22 00.
f)
W/MBE Requirements and Forms.
The foregoing constitutes our understanding of matters discussed and conclusions reached. Other participants are requested to
review these items and advise the originator in writing of any errors or omissions.
i)
g)
W/MBE Goal: 10% Per GS 143-128.2
Owner reserves the right to waive formalities and reject any or all bids.
6.
Substitution Requests – Must be requested 10 days prior to bid date and must be on the form included in the
documents filled out completely with all necessary backup information. Substitution requests that are approved
will be listed in an addendum. Any product not specifically listed in the specifications or approved via addenda
is not allowed. After the bid, substitutions must show clear benefit to the owner or will not be considered.
7.
Contract Documents
9.
a)
The Form of Construction Contract is standard modified AIA Document A101 form and is included in the
project manual.
b)
General Conditions – AIA Document A201 is included in the project manual
c)
Instructions to bidders (AIA Document A701) and Supplementary Conditions bound in project manual
Performance and Payment Bond – Required of successful bidder at 100% of contract amount.
10. Bids Location and Date:
Sealed bids will be received by mail or hand delivery to Union County’s Procurement Division until 1:00PM on
November 19, 2015, at the Union County Government Building, Administrative Services Procurement Division,
500 North Main Street, Suite #709, Monroe, NC 28112. After such time, sealed bids, so marked, will be
received by hand delivery to Union County’s Procurement Division until 2:00PM on November 19, 2015, at the
Union County Government Center, 500 North Main Street, Room #115 (Board of Commissions Meeting Room),
Monroe, NC 28112, by which time all bids must be received and at which time the bids will be publically
opened and read
11. Construction Schedule
a)
Duration: 572 days
b)
Anticipated Start Date: Pre-mobilization Period: January 1, 2016
c)
Anticipated Completion Date: September 24, 2017
d)
Weather Days must be included in the schedule as non-working days and will be tracked cumulatively
throughout the project. A less than expected weather impact will not be cause for reducing the contract
time below that stated in the contract.
e)
The contract allows for 60 days from contract execution to complete all required paperwork and initial
submittals prior to mobilization. Notice to proceed will be issued upon completion of those requirements.
See spec section 01 31 00 – Project Management Coordination, paragraph 1.4 for full requirements.
f)
Documents contain assumptions about sequencing. This is inherent to the design process. Bidders should
make themselves familiar with the requirements of the design before submitting a bid and thus agreeing to
the project duration.
Construction start: March 1, 2016
12. See Instructions to Bidders for withdrawing bids.
2
A bid may not be withdrawn after bids have been received and opened without forfeiture of the Bid Deposit
unless permitted by N.C.G.S. 143-129.1. Unless withdrawn pursuant to statute, no bid may be withdrawn after
the scheduled closing time for receipt of bids for a period of (120) one hundred twenty days.
12. Addendum
a)
All questions regarding the bid must be submitted in writing (preferably by email) no later than 4:00 pm,
November 9, 2015.
b)
The last addendum must be issued no later than November 13, 5 days prior to bid date.
c)
All addenda must be acknowledged on bid form.
14. Communications:
a)
The Instructions To Bidders requires bidders to notify the designer if they find any discrepancies or
omissions in the documents or if the meaning of any portion of the documents is unclear. Claims for
change in conditions for items that were apparent during the bidding will be rejected. Please note that bid
questions will not be directly answered. Any questions which can be clarified will result in an addendum
with revised drawings or specifications to clarify the appropriate scope.
b)
All questions shall be directed to the Architect. Do not ask questions directly to Architect’s consultants.
Clarifications will be included in Addendum. Bidders are not to rely on verbal responses; no verbal response
is official or binding until and unless it is reduced to writing.
c)
Ask questions early – The last day for asking questions is 10 days prior to bid date. No questions will be
entertained after 10 days prior to bid date.
d)
Electronic Distribution of Information:
For the duration of this project, it is the intent to distribute information only in electronic format where allowable.
Drawings, memoranda, letters or other documents issued in the normal course of the work will be issued in
electronic format (.pdf). Costs associated with printing and distribution of the project information is included in the
Contract amount.Printed documents will be provided and expected for documents that are required to be in paper
format by this contract or other legal requirement. Drawings that require revision will be issued as full-size sheet
replacements, and complete specification sections will be reissued.
15. Special Project Considerations/Characteristics
a)
Independent Scheduler. Section 01 31 00 requires the contractor to hire an independent scheduling
consultant to prepare, manage and report on the construction progress. We have not specifically listed any
consultants in the project manual, but you will be required to submit the qualifications for your preferred
consultant during the bidding for approval in the final addendum.
b)
Section 01 32 00 requires a variety of monthly reports related to schedule, which must be provided. The
schedule must be submitted as soon as possible following contract execution and the owner and designer
must be notified anytime that it changes. It is critical that the contractor effectively manage the schedule.
c)
The building enclosure for this project is designed to provide a continuous air/vapor/weather barrier that
includes the roof, walls, foundations, slab on grade and fenestrations. Contractor is required to coordinate
all materials and installations related to completion of this system as part of their work. Shop drawings for
3
all connections and details are required. Bidders are advised to carefully review the details to understand
the extent and sequencing of the system.
d)
Testing is required for the building enclosure mock up and certain elements of the in place installation
including roofs and fenestration. These tests are part of the contractor’s scope and must be performed in
accordance with the listed testing procedures by certified professionals.
e)
Exterior cladding consists of masonry and metal panels. The masonry is brick. Please note the type of
masonry veneer anchors indicated in the specifications also serve as the means of attachment for the
insulation. Metal panel scope includes the design and installation of the support framing.
f)
Coordination drawings are required for all work to be included in concealed spaces including shafts, above
ceilings, in masonry and concrete walls and below slabs as well as the ceilings themselves. The contractor
is required to manage this effort to verify the installation of all work and identify conflicts prior to
construction. Bidders are advised to include the necessary effort to perform this work in their bid. Please
note that the specifications require coordination drawings to be complete before steel shop drawings can be
approved. This effort will need to start immediately after contract execution.
g)
Temporary Heating and Cooling Requirements: If Owner authorizes use of permanent HVAC system for
temporary use during construction, Contractor acknowledges that this project uses forced air to provide
heating, cooling and fresh air. Contractor is responsible for any changes in sequencing or additional
equipment necessary to provide temporary heating and cooling beyond at any state of construction. Even
though the specifications state that the owner must approve use of temporary systems, it is our intent to
allow it. Authorization will be refused or revoked if the contractor does not take reasonable and adequate
care to protect the owner’s equipment during construction.
h)
Site visit- tour of existing conditions. Date to be determined
QUESTIONS
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
Is there any possibility of postponing the due date of bids due to several projects bidding at the same time?
Is there any possibility that the time bids are due can be shifted from 2pm until 3pm on November 19,
2015?
Must 2 copies of the bid be submitted?
Will the project be permitted through the Union County or the city of Monroe?
Is it required to list all subs on the bid application?
Is there a rough budget for the project?
Are development fees paid for by the owner or contractor?
Will more detail be provided on stair tower concrete reinforcing?
Does the scheduling consultant have to be independently contracted?
Is all casework included in contractor’s scope?
4
Project: IFB#2016-013, Human Services Building
Meeting: Pre-Bid Meeting
Date: October 27, 2015 at 2:00PM
Company Name
All Things Professional Cleaning, Inc.
Boswell Group, The
Connectivity Network Cabling
DPR Construction
DPR Construction
Edifice, Inc.
Edison Foard
Firestop Carolinas, Inc.
Focus Design Builders
Interstate Roofing Company, inc.
J.M. Thompson Company
Messer Construction Co.
Monteith Construction Corp.
Montrose Construction
Network Cabling Systems
Nova Engineering and Environmental
Radco Roofing
Schneider Corp, The
Security 101
Security Solutions & Management
Security Solutions & Management
Unit Paving, Inc.
Contact Name
Erica Hubbard
Lee A. Parks
Kelly Bright
Chris Franklin
Justin Stillman
Tim Taube
Mark Kolb
Nick Bergman
Jonathan Williams
Luke White
Barry Russell
Stephanie Kegley
Brian Stamp
Beau Rosser
Max Gebhart
Alexander Robinson
Bill Swatkoski
Thom Carpenter
Adrienne Hatch
Beth Berry
Pat Kane
Thomas Horton
Telephone
704-345-3976
704-289-8986
704-789-1030
919-337-9400
919-337-9400
980-722-0014
704-329-8000
704-662-7720
919-453-0200
704-430-8239
919-851-1611
704-221-7503
910-791-8101
704-237-4403
704-523-8606
980-321-4100 x1508
704-392-0850
704697-5900
704-561-3169
704-545-9933
704-545-9933
704-541-8079
Email
erica@allthingscleaning.com
plumbing@theboswellgroup.com
kelly@connectivitync.com
chrisfr@dpr.com
justinst@dpr.com
ttaube@edificeinc.com
mkolb@edisonfoard.com
nick@firestopcarolinas.com
jonathan@focusdesignbuilders.com
lw@interstateroofingco.com
barry.russell@jmthompsonco.com
skegley@messer.com
bstamp@monteithco.com
bids@buildmontrose.com
max@networkcablingsystems.com
arobinson@usnova.com
bswatkoski@radcoconstruction.com
contact@schneidercorp.com
adrienne@security101.com
beth.berry@secsolmgmt.com
pat.kane@secsolmgmt.com
thorton@unitpaving.com
Prime
x
X
x
x
x
x
x
x
x
Sub
x
x
x
x
x
x
x
x
x
x
x
Download