REQUEST FOR BIDS (RFB) FOR POLICE EXPLOSIVE MAGAZINE STORAGE RELOCATION CONTROL No. S09-060 ADDENDUM No. 1 ISSUE DATE: 4/17/09 DEADLINE: 4/24/09 AT 2:00 PM EDT This addendum is being issued to modify some sections of the RFB, as well as to answer questions submitted by the question deadline. I. MODIFICATIONS to RFB Attachment E Drawing Sheets: 1. Drawing Sheet S-1, SLAB PLAN, NOTES AND DETAILS: a. Add Expansion Joint at each column pier to Finished Floor Plan per the sketch attached to this Addendum. b. Change pier / slab relationship shown by Section 1 per the sketch attached to this Addendum. c. Add Expansion Joint note for Detail 3 per the sketch attached to this Addendum. d. Change pier / slab relationship shown by Section 4 per the sketch attached to this Addendum. e. Add a new Detail 5, Typical Expansion Joint per the sketch attached to this Addendum. 2. Drawing Sheet E-3, POWER PLAN: Correct the Proposed Pad Layout – Power Plan note for the Ground Test Station to read, “Refer to Detail 5 Sheet E-2”. 3. ADD: TO SECTION 4 - SPECIAL TERMS AND CONDITIONS: EQUALS - Bids submitted as alternates, as "equals," or on the basis of exceptions to specific conditions of purchases and/or required specifications, must be submitted with an attachment referencing the specific paragraph numbers and adequately defining the exception submitted. Specifications of the equal must be submitted to the Procurement Division upon request. If no exceptions are taken, the Airport Authority will expect and require complete compliance with the brands, specifications and conditions of purchase. The Airport Authority has the sole right to determine what constitutes an equal. THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID FORM IN THE RFB Addendum #1 Page 1 of 3 II. ANSWERS TO SUBMITTED QUESTIONS: 1. Does the interior require explosion proof installation for electrical? A. For this work explosion proof components are only required in enclosed structures. The existing components on the interior of the magazines are rated as explosion proof. The work to be performed to connect to the existing Magazine Load Centers on the magazine exterior shown by Detail 7 on Sheet E-2 does not require explosion proof components. 2. Is there a catalog number or a brand specification for the ground test station? A. ERICO’s Earth Rod Inspection Box PIT-03, or equal, is suitable for use as the Ground Test Station as an alternative to an eight inch ID steel pipe with matching cover as shown by Detail 5 on Sheet E-2. The test station should not be located in a position subject to heavy traffic. If a non-conductive enclosure/cover is used (such as the ERICO unit) a ground connection shown on the steel pipe wall is not necessary. 3. The Ground Test Station Detail on sheet E-2 shows it to be within a steel pipe, but does not note the pipe dimensions or type of cover. Please clarify. A. See the answer to question #2 above. 4. The Proposed Pad Layout shown on E-3 utilizes the same symbol for all ground rods, does this mean all locations or ground rods are Test Stations, or only the one noting the detail? A. The single Ground Test Station is located at the position as noted on Sheet E-3. 5. Is there a specific “Junction Box”, as it appears to be a fitting in the detail, or is it a type of box? A. The magazines are equipped with a single phase Load Center that is pre-wired to the existing devices in or on the magazine enclosure. The Contractor shall connect the power and ground feed to the Load Center of the individual magazines. The "junction box" as shown on Detail 7, Sheet E-2 could be a conduit fitting or could be eliminated if the actual conditions permit direct connections to the Magazine Load Center and all work is performed per NEC. 6. Is the contractor required to provide the wire from the Magazine Panelboard? A. The Contractor is to provide the raceways and wiring from the Magazine Panelboard (as shown on Detail 6, sheet E-2) to the individual Load Centers on the Magazines (as shown on Sheet E-3). THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID FORM IN THE RFB Addendum #1 Page 2 of 3 7. Is the contractor required to provide the connection from the junction box to the Magazine Load Center? A. The Contractor is to provide the raceways and wiring from the Magazine Panelboard (as shown on Detail 6, Sheet E-2) to the load center on the individual magazines. The "junction box" as shown on Detail 7, Sheet E-2 could be a conduit fitting or could be eliminated if the actual conditions permit direct connections to the Magazine Load Center and all work is performed per NEC. 8. Can Contractor personnel utilize restroom facilities at the Public Safety Training Center? A. No, Contractors will be required to provide a Porta John for their use on the jobsite. Attachments to this Addendum: 1. 2. 3. 4. 5. Sketch of Drawing Sheet S-1, Finished Floor Plan Sketch of Drawing Sheet S-1, Section 1 Slab on Grade (Looking North) Sketch of Drawing Sheet S-1, Detail 3 Slab Reinforcing And Hairpin Sketch of Drawing Sheet S-1, Section 4 Slab on Grade (Looking East) Sketch of Drawing Sheet S-1, new Detail 5 Typical Expansion Joint THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID FORM IN THE RFB Addendum #1 Page 3 of 3