SECTION 00 91 13 ADDENDA ADDENDUM NUMBER 2 – ISSUED

advertisement
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
SECTION 00 91 13
ADDENDA
ADDENDUM NUMBER 2 – ISSUED JULY 06, 2016
DATE: July 06, 2016
PROJECT TITLE: Marine Research Facility – Early Start Foundation Package
PROJECT NUMBER: 413
OWNER: Mississippi State Port Authority
ARCHITECT OF RECORD: Eley Guild Hardy Architects PA
TO: Prospective Bidders
This Addendum forms a part of the Contract Documents and modifies the June 1, 2016 Issued for
Bid documents with amendments and additions noted below.
Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may
disqualify the Bidder.
This Addendum consists of 1 page and 5 pages of attachments as follows:
SPECIFICATION CHANGES:
1. Section 00 41 43 Bid Form: Delete the Section 00 41 43 Bid Form in its entirety and
replace with the attached Section 00 41 43. Pay Item 26 05 01 was added to the Bid Form
(5 pages) to capture the electrical work.
END OF SPECIFICATION CHANGES FOR ADDENDUM NO. 2
END OF DOCUMENT
PGRP Project No.: 413
PGRP Project Title: Marine Research Facility – Early Start Foundation Package
Architect: Eley Guild Hardy Architects PA
Issued – July 06, 2016
Addenda No. 2
00 91 13 - 1
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
SECTION 00 41 43
BID FORM
ADDENDUM 2 – ISSUED JULY 06, 2016
(SINGLE-PRIME CONTRACT)
Proposal of ________________________________ (hereinafter called "Bidder"), doing business
as a __________________, (insert "a corporation," "a partnership," or "an individual” applicable; if
a corporation, indicate state of incorporation) to the Mississippi State Port Authority ("hereinafter
called "Port Authority" or "Authority), an agency existing under the laws of the State of Mississippi.
In compliance with your Advertisement for Bids, Bidder hereby proposes to perform all Work for the
Work of Improvement known as:
“Marine Research Facility – Early Start Foundation Package, Project No. 413”
and all appurtenant Work and materials required to complete the Work, in strict accordance with
the Contract Documents, within the time set forth therein, and at the prices stated below.
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid, each party thereto
certifies as to his/her own organizations, that this Bid has been arrived at independently, without
consultation, communication or agreement as to any matter relating to this Bid with any other
Bidder or with any competitor.
Bidder hereby agrees to commence Work of Improvement under this Contract within 5 consecutive
calendar days after the date of service of the Notice to Proceed and to fully complete the project
within 242 consecutive calendar days thereafter as provided in Sections 7 and 34 of the General
Conditions.
Bidder acknowledges receipt of the following Addenda: (if none, so state)
No.__________________
No.__________________
No.__________________
No.__________________
Date: __________________
Date: __________________
Date: __________________
Date: __________________
Attached to this Bid is a list of Subcontractors (Appendix A) as required by Section 27 of the
General Conditions and Advertisement for Bid.
Bidder agrees to perform all the Work described in the Contract Documents for the lump sum and
unit prices as set forth in the following Bid Schedule.
UNIT PRICES: For changing quantities of work from those indicated on the Drawings and
contained within these Specifications, upon written inspections from the Engineer and the
Mississippi State Port Authority and for determining payments on account of the contract, the
following unit prices shall prevail:
PGRP Project No.: 413
PGRP Project Title: Marine Research Facility – Early Start Foundation Package
Architect: Eley Guild Hardy Architects PA
Document Status: IFB – June 1, 2016 (Revised Addendum #2 – July 06, 2016)
Bid Form – Addendum 2
00 41 43 - 1
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
DESCRIPTION
Mobilization / Demobilization
Selective Site Demolition
Test pile and Reaction piles for
Compression Test ASTM
D1143 and Tension Test
ASTM D3689, piles for test
program 95’-0”, Thermal
Integrity Profile (TIP) Test
ASTM D7949-14 each test pile
UNITS
Lump Sum
Lump Sum
Each
QUANTITY
1
1
2
31 63 16.02
Production pile, 18” Auger-cast
Lineal Foot
15,010
31 63 16.03
Spoils removal
Cubic Yards
1,020
PAY ITEM
01 20 00.01
02 41 00
31 63 16.01
31 63 16.04
01 09 00-A
01 55 00-A
01 55 00-B
02 41 00-A
02 41 00-B
02 41 00-C
02 41 00-D
02 41 00-E
02 41 00-F
26 05 01
31 25 00-A
31 25 00-B
31 25 00-C
Thermal Integrity Profile (TIP)
Test ASTM D7949-14
CONSTRUCTION LAYOUT
MAINTENANCE OF TRAFFIC
MAINTENANCE STONE
REMOVAL OF PAVEMENTS
(ALL TYPES, ALL DEPTHS)
REMOVAL OF PIPE (8" AND
UNDER)
REMOVAL OF PIPE
(LARGER THAN 8")
REMOVAL OF FENCE
REMOVAL OF DRAINAGE
STRUCTURES
REMOVAL OF FIRE
HYDRANT & CAPPING LINE
MINOR ELECTRICAL
DEMOLITION Removal/storage of flood lights
and poles, relocation and
reconnection of panelboards,
controls, and existing site
lighting circuits shall be
measured and paid as a lump
sum. All work described in
other Sections of Division 26
shall be absorbed into this Pay
Item.
SILT FENCE
STRAW WATTLES
INLET PROTECTION
PGRP Project No.: 413
PGRP Project Title: Marine Research Facility – Early Start Foundation Package
Architect: Eley Guild Hardy Architects PA
Document Status: IFB – June 1, 2016 (Revised Addendum #2 – July 06, 2016)
Each
LS
LS
TON
15
1
1
120
SY
6500
LF
200
LF
LF
400
1000
EA
4
EA
LS
1
1
LF
LF
EA
800
100
5
UNIT COST
TOTAL
Bid Form – Addendum 2
00 41 43 - 2
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
31 25 00-D
31 25 00-E
31 25 00-D
32 10 00-A
32 10 00-B
32 31 00-A
32 31 00-B
32 31 00-C
32 31 00-D
33 30 00-A
33 30 00-B
33 30 00-C
33 30 00-D
33 30 00-E
33 41 00-A
33 41 00-B
33 49 00-A
33 49 00-B
CONSTRUCTION
ENTRANCE
FILTER SOCK
TEMPORARY STOMWATER
DRAIN
SELECT BEDDING
MATERIAL
SELECT FOUNDATION
MATERIAL
6' TALL TEMPORARY FENCE
4' WALK GATE
16' DOUBLE SWING GATE
8' TALL PERMANENT FENCE
WITH BASE PLATE
8" SEWER MAIN (0'-10'
DEEP)
INSTALL 8" CLEANOUT AND
CONNECT TO EXISTING
SEWER MANHOLE, 4' DIA.
(0'-10')
6" SEWER SERVICE
CONNECT NEW SEWER TO
EXISTING MANHOLE
15" RCP
24" RCP
CAST-IN-PLACE CONCRETE
DRAINAGE STRUCTURES
CASTINGS & GRATING
EA
LF
LS
1
450
1
CY
300
CY
LF
EA
EA
150
700
2
1
LF
140
LF
360
LS
1
EA
LF
3
10
EA
LF
LF
1
60
350
CY
LB
10
1000
BASE BID:
TOTAL AMOUNT OF BASE BID:
$
(IN FIGURES)
TOTAL AMOUNT OF BASE BID:
(IN WORDS)
Note: Bids shall include sales tax and all other applicable taxes and fees. All blanks shall be filled
in. Total amount of Bid shall be the sum of the Items. Contract Award will be made based upon the
pricing of this Bid Schedule and the contractor qualifications as set forth in the bid documents. In
case of discrepancy between the sum of the items and Total Amount of Bid, the sum of the items
shall be considered to be the Total Amount of Bid. Award will be made to only one Bidder based
upon the Base Bid as applicable from this Bid Form and determination of best value.
The undersigned, having read and understood the Bidding Documents and examined the Project site
and adjoining areas, and being familiar with the obstacles and conditions that will affect proposed
PGRP Project No.: 413
PGRP Project Title: Marine Research Facility – Early Start Foundation Package
Architect: Eley Guild Hardy Architects PA
Document Status: IFB – June 1, 2016 (Revised Addendum #2 – July 06, 2016)
Bid Form – Addendum 2
00 41 43 - 3
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
Work, hereby offers and agrees to furnish all labor, equipment and materials and to perform all the
Work required for “Marine Research Facility – Early Start Foundation Package” project at the
Mississippi State Port Authority at Gulfport, Port of Gulfport, Gulfport, Mississippi in accordance
with the Contract Documents and at the prices stated in the preceding Bid Schedule.
Respectfully submitted,
Legal Name of Bidder
Address
___________________________________
Signature of Authorized Person
City, State Zip
Name & Title of Authorized Person
Attest
________________________________________
Name & Title
(SEAL--if Bid is by a corporation)
Notes:
If Bid is by a corporation, corporate seal is affixed in space provided immediately above.
Signature is by an individual legally authorized to bind Bidder to a contract. If signature is by an
agent of Bidder, the current power-of-attorney verifying agent’s authority to bind Bidder is attached.
END OF DOCUMENT
PGRP Project No.: 413
PGRP Project Title: Marine Research Facility – Early Start Foundation Package
Architect: Eley Guild Hardy Architects PA
Document Status: IFB – June 1, 2016 (Revised Addendum #2 – July 06, 2016)
Bid Form – Addendum 2
00 41 43 - 4
MISSISSIPPI STATE PORT AUTHORITY - PORT OF GULFPORT RESTORATION PROGRAM
THIS PAGE INTENTIONALLY LEFT BLANK
PGRP Project No.: 413
PGRP Project Title: Marine Research Facility – Early Start Foundation Package
Architect: Eley Guild Hardy Architects PA
Document Status: IFB – June 1, 2016 (Revised Addendum #2 – July 06, 2016)
Bid Form – Addendum 2