ARCHITECTURAL DOCUMENTS
This technical document contains the following:
• Job Submittals
• Architectural Specifications
taylordoor.com \ 800.248.3600 \ West Branch, Michigan
TAYLOR DOOR /PERMA-DOOR
INSULATED STEEL DOORS AND FRAMES
GENERAL NOTES
Materials shown on these drawings will not be released All frames shall be supplied with required wall and
for manufacture until formally approved by the architect,
floor anchors as illustrated on frame detail sheet.
recipt of approved hardware schedule, and all necessary
hardware templates.
All frames shall be tagged with shop marks as
The manufacturer is not responsible for code
compliance issues arising from the improper use or
application of materials.
All frames to be shipped 'knocked down' unless
shown otherwise.
Anchor bolts, expansion shields, and any metal
required. This will permit cross referencing of shop
fasteners to be furnished by others.
marks with architects marks.
All frames and doors shall be cleaned prior to
painting. All doors and frames to be field painted
unless otherwise noted.
Doors and frames and hardware to be installed by
Field welding, grinding, finishing, and field splicing
others. Installation of glass and glazing by others. Pre
by others.
hanging of units by others unless otherwise noted.
Doors and frames will be reinforced for surface
All standard type hardware will be located in
applied hardware as scheduled. Drilling and tapping
accordance with this manufacturer's standard
for surface mounted hardware and hardware
locations as shown on door and frame elevations.
installation by others.
All frames to be supplied with either mutes in the
case of non-kerfed frames or foam and or magnetic or
other weatherstrip as shown in this submittal.
It is the responsibilty of the General Contractor to Hardware items including exit devices deadbolts
coordinate the hardware locations if more than one and other items will also be located at
manufacturer is supplying doors and or frames.
manufacturer's standard hardware locations.
All frames must be absolutely plumb, square, and
level. Please see manufacturer's shop and installation
instructions.
RECORD OF SUBMITTALS
SUBMITTED
RETURNED
JOB NO.
PROJECT
LOCATION
ARCHITECT
1st
2nd
3rd
4th
REC'D APPV'D DWGS.
REC'D APPV'D HDWE.
DRAWN BY:
CONTRACTOR
FINISH HDWE. BY
DOOR HANDING CHART
SHEET NO.
OF
JOB NO.
PROJECT
DOOR
OPENING
LOCATION
SHEET NO.
REMARKS
HARDWARE SET
SURFACE BOLTS
CLOSER
PANIC
LOCK PREP
HINGE PREP
LITE/LOUVER
FRAME DATA
FACE TYPE
STEEL TYPE
GAUGE
DOOR MODEL
WALL ANCHOR
JAMB DEPTH
SECTION/ SHEET
HEIGHT
ELEVATION/
SHEET
WIDTH
GAUGE
FRAME CONSTR
SWING
TO
FROM
ARCH MARK
QUANTITY
ITEM
LOCATION
DOOR INFORMATION
OF
SECTION 08110
STEEL DOORS & FRAMES
PART 1 GENERAL
1.01
SUMMARY
A. Section Includes: Steel doors, frames, louvers, transoms, sidelights, and decorative glass.
B. Related Sections: Section(s) related to this section includes:
1. Masonry: Division 4 Masonry Sections.
2. Sealants: Division 7 Joint Sealer Section.
3. Glass and Glazing: Division 8 Glass and Glazing Section.
4. Hardware: Division 8 Hardware Section.
5. Drywall Construction: Division 9 Wall Board Assemblies Sections.
6. Painting: Division 9 Painting Sections.
1.02
REFERENCES
A.
General: Standards listed by reference, including revisions by issuing authority, form a
part of this specification section to the extent indicated. Standards listed are identified by
issuing authority, authority abbreviation, designation number, title or other designation
established by issuing authority. Standards subsequently referenced herein are referred to
by issuing authority abbreviation and standard designation.
B.
American Society for Testing and Materials (ASTM):
1.
ASTM A366 Standard Specification for Commercial Steel (CS) Sheet, Carbon
(0.15 Maximum Percent) Cold-Rolled.
2.
ASTM A653 Standard Specification for Steel Sheet, Zinc-Coated (Galvanized)
or Zinc-Iron Alloy-Coated (Galvanized) by the Hot-Dip Process.
3.
ASTM A924 Standard Specification for General Requirements for Steel,
Metallic-Coated by the Hot-Dip Process.
4.
ASTM D610 Standard Test Method for Evaluating Degree of Rusting on
Painted Steel Surfaces.
5.
ASTM D714 Standard Test Method for Evaluating Degree of Blistering of
Paints.
6.
ASTM D1622 Standard Test Method for Apparent Density of Rigid Cellular
Plastics.
7.
ASTM D1654 Standard Test Method of Evaluation of Painted or Coated
Specimens Subjected to Corrosive Environments.
1.03
C.
American National Standards Institute (ANSI):
1.
ANSI/DHI A115.IG Installation Guide for Doors and Hardware.
2.
ANSI/SDI Standard A224.1 Test Procedure and Acceptance Criteria for Prime
Painted Steel Surfaces for Steel Door & Frames.
D.
National Fire Protection Association (NFPA):
1.
NFPA 80 Fire Doors and Windows.
2.
NFPA 252 Fire Tests of Door Assemblies.
E.
Window & Door Manufacturers Association (WDMA):
1.
N.A.F.S. 101/I.S.2/A440
F.
Warnock Hersey, Inc. (WHI):
1.
WHI Directory of Listed Products.
2.
WHI Directory of Positive Pressure Rated Door assemblies and components.
3.
SpecDirect web based listing of fire rated components & systems.
SYSTEM DESCRIPTION
A.
1.04
Performance Requirements: Provide metal doors and frames which have been
manufactured, fabricated and installed to maintain performance criteria stated by
manufacturer without defects, damage or failure.
SUBMITTALS
A.
B.
C.
General: Submit listed submittals in accordance with Conditions of the Contract and
Division 1 Submittal Procedures Section.
Product Data: Submit product data, including manufacturer’s product sheet, for specified
products.
Shop Drawings: Submit shop drawings showing layout, profiles and product components,
including anchorage, & accessories.
1.
2.
D.
Samples: Submit selection and verification samples for finishes, colors and textures.
Coordinate with Division 9 Painting Section for paint finishes.
E.
Quality Assurance Submittals: Submit the following:
1.
2.
3.
F.
Certificates: Product certificates signed by manufacturer certifying that materials
comply with specified performance characteristics and criteria and physical
requirements.
Manufacturer’s Instructions: Manufacturer’s installation instructions.
Manufacturer’s Field Reports: Manufacturer’s field reports specified herein.
Closeout Submittals: Submit the following:
1.
2.
1.05
Indicate door type, frame, steel, core, material thickness, reinforcements, anchorages,
exposed fasteners locations, openings (glazed, paneled or louvered) and hardware
arrangement.
Include schedule identifying each unit, with door marks or numbers referencing
numbering in schedules or drawings.
Operation and Maintenance Data: Operation and maintenance data for installed
products in accordance with Division 1 Closeout Submittals (Maintenance Data
and Operation Data) Section. Include methods for maintaining installed
products and precautions against cleaning materials and methods detrimental to
finishes and performance.
Warranty: Warranty documents specified herein.
QUALITY ASSURANCE
A.
Installer Qualifications: Installer should be experienced in performing work of this
section and should have specialized in the installation of work similar to that required for
this project.
1.
B.
Certificate: When requested, submit certificate indicating qualifications.
Regulatory Requirements: [Specify applicable requirements of regulatory agencies.]
1.
Labeled Door and Frame Construction: Where noted or required, provide
Warnock Hersey Inc. (WHI) labels (Intertek Services) with appropriate fire
resistance ratings for class of opening indicated. Construction details and
hardware applications authorized by testing or certification laboratories shall
take precedence over project details or specifications.
C.
Mock-Ups: Install at project site a job mock-up using acceptable products and
manufacturer approved installation methods. Obtain Owner’s and Architect’s acceptance
of finish color, texture, pattern and workmanship standards. Comply with Division 1
Quality (Mock-Up Requirements) Section.
1.
2.
3.
D.
1.06
Preinstallation Meetings: Conduct preinstallation meeting to verify project requirements,
substrate conditions, manufacturer’s installation instructions and manufacturer’s warranty
requirements. Comply with Division 1 Project Management and Coordination (Project
Meetings) Section.
DELIVERY, STORAGE & HANDLING
A.
General: Comply with Division 1 Product Requirements Sections Ordering: Comply with
manufacturer’s ordering instructions and lead-time requirements to avoid construction
delays.
B.
Delivery: Deliver materials in manufacturer’s original, unopened, undamaged containers
with identification labels intact.
1.
C.
2.
Door Storage: Doors shall be protected at corners to prevent damage or marring
of finish. Doors shall be stored in an upright position under cover on building
site on wood sills or on floors in a manner that will prevent rust and damage.
Avoid creating a humidity chamber by using a plastic or canvas shelter and not
venting the area covered.
Frame Storage: Frames shall be stored in an upright position under cover on
building site on wood sills or floors in a manner that will prevent rust and
damage. Avoid creating a humidity chamber by using a plastic or canvas shelter
and not venting the area covered.
PROJECT CONDITIONS
A.
1.08
Handle and store products according to Taylor Building Products
recommendations published in technical materials. Leave product wrapped or
otherwise protected and under clean, dry storage conditions until required.
Storage and Protection: Store materials protected from exposure to harmful weather
conditions, at temperature and humidity conditions recommended by manufacturer.
1.
1.07
Mock-Up Size: [Specify mock-up size].
Maintenance: Maintain mock-up during construction for workmanship
comparison; remove and legally dispose of mock-up if it is no longer required.
Incorporation: Mock-up shall be incorporated into final construction upon
Owner’s approval.
Field Measurements: Verify actual measurements/openings by field measurements before
fabrication; show recorded measurements on shop drawings. Coordinate field
measurements and fabrication schedule with construction progress to avoid construction
delays.
WARRANTY
A.
Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
B.
Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard
warranty document executed by authorized company official. Manufacturer’s warranty is
in addition to, and not a limitation of, other rights Owner may have under Contract
Documents.
1.
Warranty Period: [Specify term.] years commencing on Date of Substantial
Completion.
PART 2 PRODUCTS
2.01
STEEL DOORS AND FRAMES
A.
Manufacturer: Taylor Building Products Inc.
1.
B.
Contact: 631 North First Street, West Branch, MI 48661; Telephone: (800) 2483600, (989) 345-5110; Fax: (989) 345-5116; E-mail: kbulow@taylordoor.com;
website: www.taylordoor.com.
Proprietary Product(s)/System(s): Taylor Metal Doors and Frames.
1.
Series Uni-Door (Taylor Brand)/Royal (Perma-Door Brand) 1 ¾” (45 mm) Full
Flush and Embossed Galvanealed Polyurethane Core Doors.
Series Durador (Taylor Brand)/Simplicity (Perma-Door Brand) 1 ¾” (45 mm)
Full Flush and Embossed Galvanealed Polyurethane Core Doors.
Series Regal (Taylor Brand)/Regency (Perma-Door Brand) 1 ¾” (45 mm) Full
Flush and Embossed Wood Grain Engraved Galvanealed Polyurethane Core
Doors.
Series Smooth Steel Sidelights 1_ (45 mm) Polyurethane Core Sash Panels
Series Stainable Steel Sidelights 1 _ (45 mm) Wood Grained Engraved
Polyurethane Sash Panels
Series Fitted Frame Adjustable Throat Steel Door Frames with Kerf for
Weatherstrip.
Series Secur-A-Storm High Wind Event Resistant Tested, Evaluated, &
Certified Systems
2.
3.
4.
5.
6.
7.
C.
Sizes:
1.
a.
b.
D.
Width 2’ (610 mm), 2’ 4” (711 mm), 2’ 6” (762 mm), 2’ 8” (813 mm), 2’ 10” (864
mm), 3’ (914 mm), 3’ 4” (1016 mm), 3’ 6” (1067 mm).
Height 6’ 8” (2032 mm), 7’ (2134 mm), 8’ (2438 mm).
Fire Rating:
1.
E.
Standard Door Sizes: As indicated on drawings.
Provide doors and frames with WHI (Intertek Services) listing (classification marks)
where specified.
Sound Rating:
1.
Provide sound transmission class of standard units tested as follows:
a.
b.
c.
Series: All Taylor Doors 1 ¾” (45 mm) 22 Gauge Door with Storm Door: 35
STC.
Series: All Taylor Doors 1 ¾” (45 mm) 24 Gauge Door with Storm Door: 35
STC.
Series: All Taylor Doors 1 ¾” (45 mm) 22 Gauge Door: 24 STC.
d.
F.
Series: All Taylor Doors 1 ¾” (45 mm) 24 Gauge Door: 22 STC.
Finishes:
1.
2.
Exposed surfaces on doors and frames shall be cleaned & painted with a rust
inhibiting primer. Prime paint system shall be tested at a recognized independent
testing laboratory in accordance with ANSI/SDI Standard A250.10 and meet the
acceptance criteria outlined in that document (120 salt spray hours, 240 humidity
hours, etc.).
Colors: Finish doors with white primer paint, ready for field painting.
Specifier Note: Edit article below to suit requirements. If substitutions are permitted, edit text below. Add
text to refer to Division 1 Project Requirements (Product Substitutions Procedures) Section.
2.02
PRODUCT SUBSTITUIONS
A. Substitutions: No substitutions permitted.
2.03
MATERIALS
A.
Steel Materials:
1.
2.
Cold-rolled Steel: Comply with ASTM A366 cold-rolled carbon steel sheet.
Galvanized Steel: Comply with ASTM A924 general requirements for steel sheet
metallic coated by hot dip process (formerly ASTM A525).
B. Primer Materials: Comply with ANSI A250.10 test procedures and acceptance criteria for
prime painted steel surfaces for steel doors and frames.
C. Painted Finish Material: Comply with ANSI A250.3 test procedures and acceptance criteria
for factory applied finish for steel doors and frames.
D. Door Color Paint Material: Provide manufacturer’s standard finish and color.
2.04
DOORS
Specifier Notes:
(I.) Taylor Building Products INC doors provide superior insulation values, even in sub-zero temperature
ranges. The Apparent U-Value of Taylor opaque doors (Btu/ (ft2 _ h _ ˚F)) were as follows, 1 ¾” (45 mm)
24 gauge 0.18. Note that these ratings do not apply to panels but to operable door frame assemblies. Test
reports from Architectural Testing Laboratories Inc. per the NFRC 102-2001 are available to qualified
design professionals upon request.
(II.) Taylor Building Products INC Doors, meet the following specification requirements. Door panels are
manufactured of hot dipped material in the 0.6 oz. coating class conforming to ASTM Designations A924
and A653 (replaces A525 and A526, respectively) coating class A60. The material is treated in the mill to
ensure superior prime paint adhesion. In addition, the galvanized doors and frames receive a coat of rust
inhibiting white primer to ensure maximum adhesion of field applied finish paints.
(III.) Taylor Building Products INC Doors provide tested performance. Taylor Systems provide 90 minutes
of fire protection up to 8 foot high. The doors also meet the demands of a Grade 40 Security rating, as well
as the Hurricane Impact Code compliance areas with our Secur-A-Storm System. This tested performance
from doors without a single weld. There are no welds to provide blemishes or destruction of the rust
inhibiting galvanic coating. Unique engineered features include a composite lock block; which eliminates
typical wave in the lock area while enhancing structural performance, adjustable hinge plate to insure door
alignment for optimal performance (Durador & Royal), & slide on bottom sweeps for easy replacement &
maximum water & air infiltration resistance.
A. Uni-Door & Royal Technical Specification: All Uni-Door (Taylor Door) & Royal (Perma-Door)
insulated steel entrance door systems shall be as manufactured by Taylor Building Products Inc., West
Branch, MI. The Distributor Supported Uni-Door & Royal Entrance Systems shall be comprised of the
door & weatherstripped frame assembly. The door shall have hinges, & machined to receive latching (&
deadbolt hardware when required):
1) Door shall be flushed or embossed, & nominally 1.75 inches thick. Steel face sheets shall be 24 or
22 gauge hot dipped G-40 galvanized tension leveled steel for superior flatness & enhanced
corrosion resistance.
2) All surfaces of the door exposed to view shall receive a factory prime finish for added protection.
Primed surface shall be suitable for maximum adhesion for finish paint.
3) Face sheet preparations shall be smooth or vertically grained.
4) Doors shall be foamed in place, stiffened & structurally reinforced with environmentally friendly
polyurethane at a density of 2.00 lbs. per cu.ft.
5) The door perimeter shall be continuously reinforced & strengthened with unitized all steel edge
construction.
6) Doors shall be prepped for 4x4 inch surface mounted residential weight hinges containing a nontemplate hole pattern. Template hole pattern is optional. Template 4 ½” x 4 ½” prep for
commercial weight hinges available. Doors up to 7’0” high shall be prepared for 3 hinges, &
doors 8’)” high shall be prepared for 4 hinges.
7) Heavy duty 12 gauge tapped plates provide for secure & adjustable anchoring of hinges. Unique
12 gauge hinge plate allows for adjustment of the door in & out & up & down insuring proper
alignment for maximum performance.
8) Latching & deadbolt hardware is supported by and reinforced with an advanced & patented
injection-molded composite lock block. Composite design provides superior screw holding
power, & allows for foam flow for flatter surface at lock area. Uniform density offers superior
structural windload performance.
9) Lock face preparations include but are not limited to 2 1/8” face bores at both 2 ¾” & 2-3/8”
backsets. Edge preps for cylindrical lock & deadbolt preps feature 2 ¼” x 1 (or 1-1/8”), or 4-5/32
x 1. Mortise, panic, closer & other hardware preps & reinforcements available.
10) Unique bottom sweep retainer/weatherstrip design shall be of dual durometer composite
construction for easy on & off slide-on installation & replacement & superior water & air
infiltration. Screw-on bottom sweep is optional.
B. Durador & Simplicity Technical Specifications: All Durador (Taylor Door) & Simplicity (Perma-Door)
insulated steel entrance door systems shall be as manufactured by Taylor Building Products Inc., West
Branch, MI. The Distributor Supported Durador & Simplicity Entrance Systems shall be comprised of the
door & weatherstripped frame assembly. The door shall have hinges, & machined to receive latching (&
deadbolt hardware when required)
1.
2.
3.
4.
5.
6.
Door shall be flushed or embossed, & nominally 1.75 inches thick. Steel face sheets shall be 24 or
22 gauge hot dipped G-40 galvanized tension leveled steel for superior flatness & enhanced
corrosion resistance.
All surfaces of the door exposed to view shall receive a factory prime finish for added protection.
Primed surface shall be suitable for maximum adhesion for finish paint.
Face sheet preparation shall be smooth or vertically grained.
Door shall be foamed in place, stiffened & structurally reinforced with environmentally friendly
polyurethane at a density of 2.0 lbs. per cu.ft.
The door perimeter shall be continuously reinforced & strengthened with unitized all steel edge
construction.
Doors shall be prepped for 4x4 inch surface mounted residential weight hinges containing a nontemplate hole pattern. Template hole pattern is optional. Doors up to 7’0” high shall be prepared
for 3 hinges, & doors 8’0” high shall be prepared for 4 hinges.
7.
Twenty gauge fixed hinge reinforcing plate is coined to a 12 gauge equivalent for secure
anchoring of hinges
8. Latching & deadbolt hardware is supported by and reinforced with an advanced & patented
injection-molded composite lock block. Composite design provides superior screw holding
power, & allows for foam flow for flatter surface area. Uniform density offers superior structural
windload performance.
9. Lock face preparations include but are not limited to 2-1/8 face bores at both 2-3/4 & 2-3/8
backsets. Edge preps for cylindrical lock & deadbolt preps feature 2-1/4 x 1 (or 1-1/8), or 4-5/32 x
1. Mortise, panic, closer & other hardware preps & reinforcements available.
10. Unique bottom sweep retainer/weatherstrip design shall be of dual durometer composite
construction for easy on & off slide-on installation & replacement & superior water & air
infiltration. Screw-on bottom sweep is optional.
D. Smooth Steel Sidelight Technical Specifications: All Smooth Steel Sidelights (Taylor Door & PermaDoor) shall be as manufactured by Taylor Building Products INC., West Branch, MI. The Distributor
Supported Smooth Sidelight Entrance Systems shall be comprised of the door & weatherstripped sidelight
frame assembly. The door/sidelight assembly shall have hinges, & machined to receive latching (&
deadbolt hardware when required):
1) Sidelight shall be flushed or embossed, & nominally 1.75 inches thick. Steel face sheets shall be
24 gauge galvanized tension leveled steel for superior flatness & enhanced corrosion resistance.
2) Sidelights are available with & without cut-outs.
3) All surfaces of the sidelight exposed to view shall receive a factory prime finish for added
protection. Primed surface shall be suitable for maximum adhesion for finish paint.
4) Face sheet preparation shall be smooth.
5) Sidelights shall be filled with a polyurethane core.
6) The sidelight perimeter shall be continuously reinforced & strengthened with full surround
Medium Density Fiberboard stiles & rails.
E. Stainable Steel Sidelight Technical Data & Specifications: All Stainable Streel Sidelights (Taylor Door
& Perma-Door) shall be as manufactured by Taylor Building Products Inc., West Branch, MI. The
Distributor Supported Stainable Sidelight Entrance Systems shall be comprised of the door &
weatherstripped sidelight frame assembly. The door/sidelight assembly shall have hinges, & machined to
receive latching (& deadbolt hardware when required).
1) Sidelight shall be flushed or embossed, & nominally 1.75 inches thick. Steel face sheets shall be
22 gauge galvanized tension leveled steel for superior flatness & enhanced corrosion resistance.
2) Sidelights are available with & without cut-outs.
3) All surfaces of the sidelight exposed to view shall receive a factory prime finish for added
protection. Primed surface shall be suitable for maximum adhesion for stains or finish paint.
4) Face sheet preparation shall be either vertically grained or grained & architecturally correct to
represent stile & rail construction.
5) Sidelights shall be filled with a polyurethane core.
6) The sidelight perimeter shall be continuously reinforced & strengthened will full surround
Medium Density Fiberboard stiles & rails.
F. Hardware Preparation: Doors shall be mortised, reinforced, drilled and tapped to receive mortise
hardware. Drilling and tapping for surface applied hardware shall be done in the field. All locks require
flat faces.
G. Labeled Doors: Where noted, provide Warnock Hersey Inc. (Intertek Services) labels with appropriate
fire resistance ratings for the class of opening indicated. Construction details and hardware applications
authorized by labeling authorities shall take precedence over project details or specifications.
H. Hardware Locations: Unless otherwise specified, the location of locks, hinges, latches, push/pull plates
and bars, exit devices, handle sets, closer reinforcing, roller latches and arm pulls shall conform to the
recommendations of the Steel Door Institute & as detailed in the Taylor Building Products INC., Technical
Resource Guide.
I. Louvers: Provide installed insert type louvers with vision-proof inverted Y baffles. Louvers blades shall
be 18 gauge and frames shall be on 18 gauge welded steel construction.
J. Glazing: Provide doors with formed steel kits of screw-in type, to permit selection of secure side in
field. Glazing arrangements shall accommodate ¼” (6.4 mm) thick glass. Glass lite doors are furnished
with formed steel of the screw-in type. Muttin bars for multi-lite glazing are of the field applied type.
Glazing arrangements accommodate ¼” (6.4 mm) thick glass, supplied by others.
K. Decorative Glass for Doors and Sidelights Sash & Transom Units/Assemblies may be framed in
injection molded composite materials where fire ratings are not required. High Wind Event Resistance
Design Pressure requirements can be satisfied using these systems. The protocols or tests protocols
certified by the National Accreditation Management Institute include but are not limited to TAS 201, TAS
202, TAS 203, ASTM E-330, ASTM E 1886, & ASTM E 1996. For further details for Secur-A-Storm
products see www.taylordoor.com.
L. Prepainted Doors: Doors shall be cleaned and painted. Doors shall receive a protective plastic wrap
adhered to the door faces, which shall protect paint finish during shipping and installation. Finish paint
shall be a durable forulation, made specifically for Taylor. Hard film shall provide good resistance to both
mar and abrasion tests. Weather and chemical resistance shall be a property of the finish.
2.05
MANUFACTURED FRAME UNITS
A. Fitted Frame: An adjustable two piece frame fabricated from 18 gauge steel. Base of frame
profile is rabbeted for doors 1 _ thick. Frame has 5/8 inch high stop kerfed to receive foam
weatherstrip. Frame features interlocking base & closure for one inch throat adjustability.
Frame is fire rated up to 90 minutes both positive & neutral pressure rated. Frame may be
cased out with steel wood or composite casting. Steel casing when scheduled to be fabricated
from 22 gauge steel.
B. Fixed throat frames, sidelights, transoms, borrowed lights, are available to the same specs as
listed below and subject to the fire rating requirements of Warnock Hersey (Intertek Services)
C. Hardware Preparation: Frames shall be mortised, reinforced, drilled and tapped to receive
specified mortise hardware and reinforced only for specified surface hardware. Drilling and
tapping for surface hardware shall be done in the field. Labeled Frames: When noted or
required, provide for frame, windows and/or transoms and sidelights Warnock Hersey Inc.
(WHI) labels for class of opening indicated. Construction details and hardware applications
authorized by labeling authorities shall take precedence over project details or specifications.
D. Galvanized: Provide frame members as ASTM A40 hot dipped galvanized materials in 0.4
oz. class conforming to ASTM A924 and A653. Treat materials in mill to ensure superior
prime paint adhesion.
E. Prime Painted Frames: Exposed surfaces shall be cleansed, treated with and given 1 baked-on
shop coat of EPA compliant primer.
F. Weather and chemical resistance shall be a property of finish.
2.06
RELATED MATERIALS
A. Related Materials: Refer to other sections listed under Related Sections for related materials.
2.07
SOURCE QUALITY
A. Source Quality: Obtain metal door and frame products from manufacturers inspected and
audited by third party inspection agencies such as Intertek Services and the National
Accreditation Management Institute.
PART 3 EXECUTION
3.01
MANUFACTURER’S INSTRUCTIONS
A. Compliance: Comply with manufacturer’s product data, including product technical bulletins,
product catalog installation instructions and product carton instructions for installation.
3.02
EXAMINATION
A. Site Verification of Conditions: Verify that substrate conditions, which have been previously
installed under other sections, are acceptable for product installation in accordance with
manufacturer’s instructions.
1.
3.03
Verify that door frame openings are installed plumb, ture and level before beginning
installation process. Select fasteners of adequate type, number and quality to perform the
intended functions.
PREPARATION
A. Surface Preparation: [Specify applicable product preparation requirements.].
1.
Preparation for Field Painting: Before application of finish coat of paint, surfaces must
be dry and free of dirt, oil and dust. Finish coat shall be applied over a film that is intact.
Scratches or bare edges shall be field primed with a rust inhibiting paint before top
coating. Comply with instructions on finish coat application provided by paint
manufacturer.
Specifer Note: Coordinate article below with manufacturer’s recommended installation details and
requirements.
3.04
INSTALLATION
Specifer Note: Refer to SDI publication, Installation Guide for Commercial Steel Doors and Frames and
DHI’s publication Installation Guide for detailed recommendations.
A. General:
1.
2.
Set frame product plumb, square, aligned and without twist at correct elevation
Frame Installation: Install pressed steel frames. Installation shall be plumb, straight and
true, rigidly secured in place, and properly braced. Comply with ANSI/DHI A115-IG
installation guide.
B. Frame Installation Tolerances: Plumbness tolerance (measured through a line from
intersecting corner of vertical members and the head to the floor) + 0.063” (1.6 mm).
1.
2.
3.
Squareness tolerance (measured through a line 90 degrees from one jamb at upper corner
of product, to opposite jamb): + 0.063” (1.6 mm).
Alignment tolerance (measured on jambs, through a horizontal line parallel to plane of
wall): + 0.063” (1.6 mm).
Twist tolerance (measured at face corners of jambs, on parallel lines perpendicular to
plane of wall) + 0.063” (1.6 mm).
C. Installation:
1.
2.
3.
4.
5.
Secure anchorages and connections to adjacent construction.
Install hardware in accordance with manufactuers’ template and instructions.
Finish exposed field welds to present a smooth uniform surface. Touch up with a rust
inhibitive primer.
Touch up exposed surfaces scratched or marred during shipment, installation or handling
with a rust inhibitive primer.
Install glazing materials and door silencers.
Specifier Note: Coordinate paragraph below with manufacturer’s installation instructions to avoid
conflicts.
D. Installation Reference Standard(s): Install metal doors and frames in accordance with
requirements of applicable reference standards.
1.
2.
Comply with Door and Hardware Institute (DHI) installation standards.
Comply with NFPA80 installation standards.
E. Fire Rated Construction: [Specify applicable label construction for product installation.].
1.
F.
Regulatory Requirements: Install fire labeled steel door and frame product in accordance
with NFPA80, current edition, unless specified otherwise.
Related Products Installation: Refer to other sections listed under Related Sections for related
products installation.
Specifier Note: Finish coat recommendations: Taylor’s prime paint has been formulated to give the
product maximum protection. It is important that compatible materials be used in the final or finished coat
of paint. The painting contractor should test a small section of the door or frame if there is any doubt as to
the composition of the finish coat. Certain finish coat materials are not recommended. Consult
manufacturer.
Specifier Note: Repainting: Should it become necessary to add a field coat of finished paint to a factory
finished door or frame, first sand the door or frame for better adhesion and prime any bare metal. Due to
the many types of paint available today, it is recommended that the customer test a small area with the
coating before proceeding. Installation recommendations are available from the manufacturer.
3.05
FIELD QUALITY REQUIREMENTS
Specifier Note: Edit paragraph below. Establish number and duration of periodic site visits with Owner
and distributor, and specify below. Consult with distributor for services required. Coordinate paragraph
below with Division 1 Quality Assurance Section and Part 1 Quality Assurance Submittals herein. Delete
if distributor’s field service is not required.
A. Distributor’s Field Services: Upon Owner’s request, provide distributor’s field service
consisting of product use recommendations are periodic site visits for inspection of product
installation in accordance with manufacturer’s instructions.
1.
Site Visits: [Specify number and duration of periodic site visits.].
Specifer Note: Coordinate article below with Division 1 Execution Requirements (Starting, Adjusting,
Cleaning, and Protecting Installed Construction) Section.
3.06
ADJUSTING
A. Adjusting: Adjust hinge sets, locksets and other hardware. Lubricate using a suitable
lubricant compatible with door and frame coatings.
Specifier Note: Coordinate article below with Division 1 Execution Requirements (Cleaning) Section.
3.07
CLEANING
A. Cleaning: Remove temporary coverings and protection of adjacent work areas. Repair or
replace products that have been installed and are damaged. Clean installed products in
accordance with manufacturer’s instructions prior to Owner’s acceptance. Remove
construction debris from project site and legally dispose of debris.
3.08
PROTECTION
A. Protection: Protect installed product and finish surfaces from damage during construction.
3.09
SCHEDULES
Specifier Note: Retain paragraph below to suit project requirements. Reference a schedule or include a
schedule as an attachment that indicates where to locate products and equipment. Schedules: [Specfy
reference to applicable schedules.].
Download